HomeMy WebLinkAboutRC April 19, 1994 .) ') " ) ~ CITY of ANDOVER Road Committee Meeting April 19, 1994 6:15 P.M. 1. Call to Order 2. 1994-1995 MSA Construction Project Discussion 3. BRA Fee Structure Discussion with Glen Cook 4. Rural Street Improvement Project Discussion 5. Pavement Management Program Discussion 6 _ 7. Adjournment c.c.. 171\L.C MI1~f7t(t:~, F/# Oll~.r P,cJ.;: FU.R!MArV" ~/Tl' APMWI57,crl,OF- FI?IlfJ J:: ~T'Nr E / rv.8/")~ W()f!.~:;' ~pt", Gt.-l"iV /,:?'o;:" - Be.A G \ ) CITY OF ANDOVER ROAD COMM'ITTEE ....::. AGENDA ITEM 2. 1994-1995 MSA Construction Project Discussion DATE l>pril 19, 19911 ORIGINATING DEPARTMENT Engineering ~ BY: Todd J. Haas The Road Committee is requested to review and recommend the options for 1994-1995 MSA possible construction. The Public Safety Committee has reviewed options presented by City staff and after a brief overview of staff's recommendation it was determined the following MSA priorities are as follows: 1. Tulip Street NW between 161st Avenue NW and 169th Lane NW 2. Crooked Lake Boulevard NW between 133rd Avenue NW and Bunker Lake Boulevard NW \ 3. Ward Lake Drive NW between 171st Avenue NW and 175th Avenue NW Others That Were Considered: - 149th Avenue NW between Round Lake Boulevard NW and Nightingale Street NW - 165th Avenue NW between Valley Drive NW and Tulip Street NW - 167th Avenue NW between Verdin Street NW and Hanson Boulevard NW ,.. Q \ ) (0") ,l'\. , . . CITY of ANDOVER 1685 CROSSTOWN BOULEVARD NW. . ANDOVER, MINNESOTA 55304. (612) 755-5100 .""'~--, " PUBLIC SAFETY COMMITTEE MEETING MINUTES MARCH 2, 1994 The Public safety Committee meeting was called to order by Chairperson Mike Knight on Wednesday, March 2, 1994 at 6:15 PM at Andover City Hall, 1685 Crosstown Boulevard NW, Andover, MN. Staff members present: Frank Stone, Public Works Superintendent Todd Haas, Assistant City Engineer Staff members absent: Dale Mashuga, Andover Fire Chief ) The City staff discussed the options for the 1994-1995 MSA possible construction and after a brief overview of staff's recommendation, it was determined that the first choice for the 1994-1995 MSA construction would be Tulip Street NW between 161st Avenue and 169th Lane. The second choice would be Crooked Lake Boulevard between 133rd Avenue and Bunker Lake Boulevard. The third choice would be Ward Lake Drive from 171st Avenue to 175th Avenue. The reason Tulip Street NW was the first choice is because of the problems that exist with drainage and the number of homes being constructed adjacent to Tulip Street NW. Crooked Lake Boulevard was recommended as the second choice for the following two reasons: 1) to try to provide adequate vertical curve at the location at the north end of Bunker Lake Boulevard and 2) because of some drainage problems that occur along the roadway during the spring thaw and the rainfall that is received during the summer. These recommendations by the Public Safety Committee will be presented to the Road Committee in the very near future. With no other items being discussed, motion by Perry, second by Knight to adjourn. Respectively submitted, /'P///~ Todd J. Haas Recording Secretary \ ) tC), \..Y ) CITY OF ANDOVER ROAD COMM'ITTEE 0_..':1 AGENOA ITEM 3. BRA Fee structure Discussion with Glen Cook DATE ORIGINATING OEPARTMENT Engineering April 19, 1994 / BY: Todd J. Haas The Road Committee is requested to discuss with Glen Cook of BRA the fee structure for feasibility reports. In addition, City staff has met with Glen Cook about a month ago to discuss the problems with projects that were not getting done on time. Glen has assured us that a full committment will be made to get the job done on time for future projects. The fee structure from 1993 is not recommended to change for 1994. If BRA personnel can do the job for this coming construction season, then Glen could discuss with the City Council the 1995 fee structure. / For your information, Tom Syfko did leave TKDA to become an employee of BRA. City staff has requested Glen allow Tom Syfko to work on future projects. ,.. .- n G "- J CITY OF ANDOVER ROAD COMM'ITTEE AGENDA ITEM 4. Rural Street Improvement Project Discussion DATE April 19. 1994 ORIGINATING DEPARTMENT Engineering ~ BY: Todd J. Haas The Road Committee is requested to discuss the Rural Street Improvement Projects. This is an information item for the Road Committee. We want to remind the Committee the construction costs are continually on the rise. In fact, the Engineering New Records (ENR) construction index has very rarely shown a decrease in cost. We hope the 2 1/2 bituminous thickness will give a longer life as along as the proper maintenance is allowed (cracksealing, sealcoating, etc.). Q '\ .i CITY OF ANDOVER ROAD COMM'ITTEE DATE lI.rr; 1 1 Q . lQQ4 ".";. AGENDA ITEM 5. Pavement Management Program Discussion ORIGINATING DEPARTMENT Engineering /" Todd J. Haas BY: This item is for discussion purposes only. Currently the City does not have a program for replacing streets that cannot be maintained any further (cracking, sealcoating, etc.). A couple of cities for example do have programs for replacing streets. - Roseville assesses 25% to property owners and the remaining 75% comes from the general fund. - Shoreview budgets $200,000 a year for this from the general fund. - Blaine's policy is to assess. c. 6 CITY of ANDOVER 1685 CROSSTOWN BOULEVARD NW. . ANDOVER, MINNESOTA 55304. (612) 755-5100 ROAD COMMITTEE MEETING - APRIL 19, 1994 MINUTES The Road Committee Meeting was called to order by Chairperson Don Jacobson on April 19, 1994 at 6:15 PM, at the Andover City Hall, 1685 Crosstown Boulevard N.W., Andover, Minnesota. Members present: Also present: Mike Knight Fire Chief Dale Mashuga, Public works Superintendent Frank Stone, Dick Fursman, City Administrator, BRA Consulting Engineer Glen Cook Item *2 - 1994-1995 MSA Construction Project Discussion The Road Committee had reviewed the recommendation by the Public Safety Committee to determine the following MSA priorities. The priorities are as follows: 1. Tulip Street NW between 161st Avenue NW and 169th Lane NW. 2. Crooked Lake Blvd. NW between 133rd Avenue NW and Bunker Lake Blvd. NW. 3. ward Lake Drive NW between 171st Avenue NW and 175th Avenue NW. There were others that were considered by the Road Committee with some concern by the Fire Department to see 165th Avenue NW between valley Drive NW and Tulip Street NW constructed. Based on the recommendation by the Public Safety Committee the Road Committee has recommended the options as presented to go to the City Council for their review and approval. Item *3 - BRA Fee Structure Discussion with Glen Cook The Road Committee reviewed this with Glen Cook because of problems with projects that were not getting done on time. Glen assured us that full time commitment will be made to get the job done on time for future projects. The Road Committee had recommended that the 1994 fee structure will not change from the 1993 fee structure. Item *4 - Rural Street Improvement Project Discussion This was an informational item for the Road Committee. This was to remind the Committee that construction costs are continually going on the rise. Information was provided to the Road Committee regarding the construction index which has very rarely shown a decrease in cost. Item #5 - Pavement Management program Discussion This item was brought to the Committee to let them know that the city currently does not have a program as far as replacing streets that can not be maintained any further. A few examples were given as to other communities that have a program as far as replacing streets. Those were presented to the Road Committee for information. This pavement management program will be discussed at a further date. Adjourned at 6:50 PM. Respectfully submitted, -;?~/ /n~ Todd J. Haas Recording Secretary "