Loading...
HomeMy WebLinkAboutPS March 2, 1994 \ \ / ,.0.'<"." ...--.....,L .-,-C '-(]'~'. " \ M :,; .... ,,~,I CITY of ANDOVER 1685 CROSSTOWN BOULEVARD NW. . ANDOVER, MINNESOTA 55304 . (612) 755-5100 PUBLIC SAFETY COMMITTEE MEETING MINUTES MARCH 2, 1994 The Public Safety Committee meeting was called to order by Chairperson Mike Knight on Wednesday, March 2, 1994 at 6:15 PM at Andover City Hall, 1685 Crosstown Boulevard NW, Andover, MN. Staff members present: Frank Stone, Public works Superintendent Todd Haas, Assistant City Engineer Staff members absent: Dale Mashuga, Andover Fire Chief . ) The City staff discussed the options for the 1994-1995 MSA possible construction and after a brief overview of staff's recommendation, it was determined that the first choice for the 1994-1995 MSA construction would be Tulip Street NW between 161st Avenue and 169th Lane. The second choice would be Crooked Lake Boulevard between 133rd Avenue and Bunker Lake Boulevard. The third choice would be Ward Lake Drive from 171st Avenue to 175th Avenue. The reason Tulip Street NW was the first choice is because of the problems that exist with drainage and the number of homes being constructed adjacent to Tulip Street NW. Crooked Lake Boulevard was recommended as the second choice for the following two reasons: 1) to try to provide adequate vertical curve at the location at the north end of Bunker Lake Boulevard and 2) because of some drainage problems that occur along the roadway during the spring thaw and the rainfall that is received during the summer. These recommendations by the Public Safety Committee will be presented to the Road Committee in the very near future. With no other items being discussed, motion by Perry, second by Knight to adjourn. Respectively submitted, /~4~.tM-/ Todd J. Haas Recording Secretary \ j '\ ) ~ 1685 CROSSTOWN BOULEVARD NW. . ANDOVER, MINNESOTA 55304. (612) 755-5100 CITY of ANDOVER MEMORANDUM Public safety Committee (Mike Knight & Marj Perry) TO: COPIES TO: FROM: DATE: REFERENCE: 1994-1995 MSA street Construction Dale Frank stone, Public Works Supt. A meeting has been scheduled for wednesday, March 2, 1994 at 6:15 PM to discuss possibilities of 1994-1995 MSA street Construction. Bring the map that was given to you in your January 12, 1994 memo. '\ ) '\ ) CA CITY of ANDOVER 1685 CROSSTOWN BOULEVARD NW. . ANDOVER. MINNESOTA 55304. (612) 755-5100 MEMORANDUM TO: COPIES TO: FROM: DATE: Public Safety Committee (Mike Knight & Marj Perry) Dale Mashuga, Fire Chief and Frank stone, Public works Supt. and uaryl ~Ulander, Act~ng c~ty Adm~n~strator Todd J. Haas, Assistant Clty Enginee~ January 12, 1994 REFERENCE: 1994-95 MSA Street Construction A meeting has been scheduled at 6:30 PM Tuesday, January 18, 1994 to discuss possibilities of 1994-95 MSA Street Construction. Attached is a map of possibilities for construction. } / ,