HomeMy WebLinkAboutEDA November 9, 1999 '\ -../ :J . \ .J CITY of ANDOVER 1685 CROSSTOWN BOULEVARD N.w. . ANDOVER, MINNESOTA 55304 . (612) 755-5100 Economic Development Authority Meeting - Tuesday, November 9, 1999 Call to Order - 6:00 PM 1. Discuss Architecture ofBuildings/116, LLC 2. Discuss WDE Park Development 3. Discuss Andover Station Development 4. Approve Change Order #4/97-2/Andover Commercial Park (Phase II) 5. Approve Final Payment/97-2/Andover Commercial Park (Phase II) 6. Approve Plans & Specs/Martin Street/99-17 7. Approve Plans & Specs/Jay Street Landscaping/98-11A 8. Approve Final Payment/Jay Street/98-11 9. Approve Change Order #1 and Compensating Change Order/Jay Street/98-11 10. Other Business Adjournment , , / "\ ) \ ) CITY OF ANDOVER REQUEST FOR ECONOMIC DEVELOPMENT AUTHORITY ACTION DATE November 9. 1999 AGENDA ITEM 1. Discuss Architecture and Design Restaurants/Banquet Hall/Office/ Warehouse Buildings 116, LLC ORIGINATING DEPARTMENT Community Development David L. Carlberg Community Development Director The Economic Development Authority (EDA) is requested to discuss the architecture and design ofthe restaurant buildings, banquet hall and office/warehouse buildings as being proposed by 116, LLC. Staff will present the latest elevations and site plans received from 116, LLC at the meeting. \ J CITY OF ANDOVER REQUEST FOR ECONOMIC DEVELOPMENT AUTHORITY ACTION DATE November 9. 1999 AGENDA ITEM 2. Discuss Park Development South of the WDE Site ORIGINATING DEPARTMENT Community Development David L. Carlberg Community Development Director The Economic Development Authority (EDA) is requested to discuss the latest design of the park complex located south of the WDE site. At the May 20, 1999 EDA meeting, the EDA agreed that only two baUfields should be developed. However, the Park and Recreation Commission has requested the EDA reconsider four ballfields instead of two. \ Staff will present the latest park development plans at the meeting. ) \ ) \ CITY OF ANDOVER REQUEST FOR ECONOMIC DEVELOPMENT AUTHORITY ACTION DATE November 9. 1999 AGENDA ITEM 3. Discuss Andover Station Development - Update ORIGINATING DEPARTMENT Community Development David L. Carlberg Community Development Director Staff will be giving an update on the status of the development of the Andover Station Project. The discussion will concentrate on design concepts and pricing ofthe land for the Ryan Companies portion of the project. , "' CITY OF ANDOVER REQUEST FOR EDA ACTION \ J DATE: November 9. 1999 AGENDA SECTION Discussion Item ORIGINATING DEPARTMENT ITEM NO. 4-. Approve Change Order #4/97-21 Andover Commercial Park (Phase II) Scott Erickson, ( Engineering The EDA is requested to approve Change Order #4 for Andover Commercial Park (Phase II) Site Grading, Project 97-2 with E & H Earth Movers. This change order accounts for a portion of the additional work previously discussed with the Council and EDA. The final contract cost is under the estimated project cost previously discussed and approved by the City Council. (See attached memo dated May 20, 1999) We are currently working on the back-up information for these items and will present them at \ the City Council meeting. / '\ I . , , j ECONOMIC DEVELOPMENT AUTHORITY IN AND FOR THE CITY OF ANDOVER COUNTY OF ANOKA STATE OF MINNESOTA RES. NO. MOTION by EDA member to adopt the following: A RESOLUTION APPROVING CHANGE ORDER #-A.. TO PROJECT NO. 97-2, ANDOVER COMMERCIAL PARK (PHASE 11). WHEREAS, the City of Andover has a contract for Project No. 97-2 with E & H Earth Movers. Inc. of Lake Elmo. MN NOW THEREFORE, BE IT RESOLVED by the EDA of Andover to hereby approve the change order to Project No. 97-2. Adopted by the Andover Economic Development Authority Board of Commissioners the 9th day of November, 1999. CITY OF ANDOVER ATTEST: J.E. McKelvey - President Michael Knight - Secretary " I I 9)",2. CITY OF ANDOVER REQUEST FOR EDA ACTION DATE: Mav 20. 1999 AGENDA SECTION Discussion Item ITEM NO. 5. Status of Andover Commercial Park (Phase II) Site Grading/97-2 ORIGINATING DEPARTMENT Scott EriCkson.d t Engineering Over the last few months we have meet a number of times with our Andover Station grading. contractor, E&H Earthmovers, regarding the amount of work and costs associated with the project. There are essentially two areas where the contractor has indicated that his costs have exceeded the scope of the contract. The two areas being discussed are as follows: 1. Ability to Separate Debris: A much larger amount of debris was encountered and removed then was originally anticipated in the original contract. Under the contract the contractor was to separate the various types of debris he encountered. This would result in , separate piles of tires, wood, metal, concrete, bituminous, brick, et. The contractor had the ) material excavated and removed to a landfill without separating the materials. He had indicated that the separation process would have been to difficult with the way the material was intermixed and had initially indicated that he would want to be paid for this work under a Miscellaneous Debris item in the contract. This item was bid at $40 per cubic yard and was not intended to be used for this amount or volume of work. Essentially it would result in 2-3 times the actual cost of the work performed. I did find it reasonable to recommend payment of the contract for the actual cost to dispose of the material with appropriate overhead and profit added. This resulted in change order #2 which is presented to the EDA tonight. 2. Ability to Screen excess Sand from Excavated Material: The contractor has indicated that the costs associated with screening the excavated debris material was much more expensive then he had indicated and that the contract was not clear in this requirement. I have discussed this process and the contract with a independent engineer and contractor and have come to the conclusion that this item could be effectively argued from both our side and the side of the contractor. Without going into lengthy detail if this issue were mediated or litigated it would be difficult to theorize the out come: With this thought and a lot of discussion we have evaluated the concept of determining what the actual cost has been to perform the clean up work for this project. We have received all of the contractors daily records of equipment and person hour breakdowns for the project along with a '. complete list of his expense receipts for the project. We have applied standard equipment ) rates and hourly charges to his records and have provided a reasonable determination of what the work performed actually costs. If we adopt the Philosophy that we would pay for the actual cost of the work performed the estimated project cost is as follows: Amount of Work Completed per Invoices and Time Records of Equipment and Employees: ,(Does not include Overhead and Profit) $869,821.40 Overhead & Profit (Use 7.5% instead of the typical 15%) $65,236 Estimated Amount of Work Remaining: ESTIMATED TOTAL PROJECT COST: The estimated project cost to complete the project using contract provisions is: $1,100,000 The estimated amount the contractor has indicated as $1,300,000 his project expense Budgeted amount for the Andover Station grading is: $1.184,139 ~J ~(., (, t p '. CITY OF ANDOVER REQUEST FOR EDA ACTION . " , / DATE: November 9. 1999 AGENDA SECTION Discussion Item - ITEM No.5. Approve Final Payment/97-2/ Andover Commercial Park (Phase II) ORIGINATING DEPARTMENT Scott ~rick~on, d\ Englneenng The EDA is requested to approve the resolution accepting work and directing final payment for Project 97-2, Andover Commercial Park (Phase II). The final contract cost is under the estimated project cost previously discussed and authorized by the EDA. We are currently working on the back-up information for these items and will present them at the City Council meeting. / \ , _ J \ , I '\ J ECONOMIC DEVELOPMENT AUTHORITY IN AND FOR THE CITY OF ANDOVER COUNTY OF ANOKA STATE OF MINNESOTA RES. NO. MOTION by EDA member to adopt the following: A RESOLUTION ACCEPTING WORK AND DIRECTING FINAL PAYMENT TO E & H EARTH MOVERS. INC. FOR PROJECT NO. 97-2 FOR THE IMPROVEMENT OF ANDOVER COMMERCIAL PARK (PHASE II) . WHEREAS, pursuant to a written contract signed with the City of Andover on Julv 21. 1998, E & H Earth Movers. Inc. of Lake Elmo. MN ,has satisfactorily completed the construction in accordance with such contract. '\ ./ NOW THEREFORE, BE IT RESOLVED by the EDA of Andover, Minnesota that the work completed is hereby accepted and approved; and BE IT FURTHER RESOLVED that the City Clerk and Mayor are hereby directed to issue a proper order for the final payment, reimbursing the contractor's receipt in full. Adopted by the Andover Economic Development Authority Board of Commissioners the 9th day of November, 1999. CITY OF ANDOVER ATTEST: J.E. McKelvey - President Michael Knight - Secretary , .I CITY OF ANDOVER REQUEST FOR EDA ACTION "- / DATE: November 9.1999 AGENDA SECTION Discussion Item ORIGINATING DEPARTMENT (;,. ITEM NO. Approve Plans & Specs/99-17/Martin Street Scott Erickson -\l Engineering \Jl The EDA is requested to approve the resolution approving plans and specifications and ordering advertisement for bids for Project 99-17, Andover Station/Martin Street. The plans and specs are available in the Engineering Office for your review. Please note that this project will be bid in January, 2000 to attempt to receive favorable bids. Also, the street lighting for Jay Street NW will be included with the lighting portion of this contract in order to provide economies and hopefully improve the bids we receive. "\ I / \ / , I .I ECONOMIC DEVELOPMENT AUTHORITY IN AND FOR THE CITY OF ANDOVER COUNTY OF ANOKA STATE OF MINNESOTA RES. NO. MOTION by EDA member to adopt the following: A RESOLUTION APPROVING FINAL PLANS AND SPECIFICATIONS AND ORDERING ADVERTISEMENT FOR BIDS FOR PROJECT NO. 99-17 ,FOR ANDOVER STATIONIMARTIN STREET. WHEREAS, pursuant to Resolution No. 005-99, adopted by the City Council on the 30th day of March ,19 99, TKDA has prepared final plans and specifications for Project 99-17 for Andover Station/Martin Street. WHEREAS, such final plans and specifications were presented to the EDA for their review on the -.JillL day of November ,19~. .I NOW, THEREFORE, BE IT RESOLVED by the EDA of the City of Andover to hereby approve the Final Plans and Specifications. BE IT FURTHER RESOLVED by the EDA of the City of Andover to hereby direct the City Clerk to seek public bids as required by law, with such bids to be opened at 10:00 a.m. January ,2000 at the Andover City Hall. Adopted by the Andover Economic Development Authority Board of Commissioners the 9th day of November, 1999. CITY OF ANDOVER ATTEST: J.E. McKelvey - President Michael Knight - Secretary \ J CITY OF ANDOVER REQUEST FOR EDA ACTION , \ I DATE: November 9. 1999 AGENDA SECTION Discussion Item ORIGINATING DEPARTMENT Scott ~ricks.on, {'...\f Engineering \j\ ITEM No.7. Approve Plans & Specs/98-11A1Jay Street Landscaping The EDA is requested to approve the resolution approving plans and specifications and ordering advertisement for bids for Project 98-11A, Jay Street Landscaping. Please note that we had previously bid this project and subsequently rejected bids due to the high bids received and lack of bidders for the project. We will bid this project in January, 2000, and hopefully receive favorable bids for the project. " The street lights previously included with the landscaping project will be bid with Martin Street in order to improve our bids for these projects. ~/ The plans and specs are available in the Engineering Office for your review. '\ ) , , / ECONOMIC DEVELOPMENT AUTHORITY IN AND FOR THE CITY OF ANDOVER COUNTY OF ANOKA STATE OF MINNESOTA RES. NO. MOTION by EDA member to adopt the following: A RESOLUTION APPROVING FINAL PLANS AND SPECIFICATIONS AND ORDERING ADVERTISEMENT FOR BIDS FOR PROJECT NO. 98-11A ,FOR JAY STREET LANDSCAPING. WHEREAS, pursuant to Resolution No. 005-99, adopted by the EDA on the 16th day of February, 19 99, TKDA has prepared final plans and specifications for Project 98-11A for Jav Street LandscapinQ. WHEREAS, such final plans and specifications were presented to the EDA for their review on the ~ day of November , 19~. , / NOW, THEREFORE, BE IT RESOLVED by the EDA of the City of Andover to hereby approve the Final Plans and Specifications. BE IT FURTHER RESOLVED by the EDA of the City of Andover to hereby direct the City Clerk to seek public bids as required by law, with such bids to be opened at 10:30 a.m. January 16 , 2000 at the Andover City Hall. Adopted by the Andover Economic Development Authority Board of Commissioners the 9th day of November, 1999. CITY OF ANDOVER ATTEST: J.E. McKelvey - President Michael Knight - Secretary " J CITY OF ANDOVER REQUEST FOR EDA ACTION , ) J DATE: November 9.1999 AGENDA SECTION Discussion Item ITEM NO. 0: Approve Final PaymenU98-11/ Jay Street ORIGINATING DEPARTMENT Scott Erickson, ~~ Engineering lJ The EDA is requested to approve the resolution accepting work and directing final payment for Project 98-11, Jay Street Reconstruction. " ;' , \ J , ) ; ECONOMIC DEVELOPMENT AUTHORITY IN AND FOR THE CITY OF ANDOVER COUNTY OF ANOKA STATE OF MINNESOTA RES. NO. MOTION by EDA member to adopt the following: A RESOLUTION ACCEPTING WORK AND DIRECTING FINAL PAYMENT TO FOREST LAKE CONTRACTING FOR PROJECT NO. 98-11 FOR THE IMPROVEMENT OF JAY STREET CONSTRUCTION. WHEREAS, pursuant to a written contract signed with the City of Andover on September 15. 1998, Forest Lake Contractina of Forest Lake. MN ,has satisfactorily completed the construction in accordance with such contract. I , NOW THEREFORE, BE IT RESOLVED by the EDA of Andover, Minnesota that the work completed is hereby accepted and approved; and , '. BE IT FURTHER RESOLVED that the City Clerk and Mayor are hereby directed to issue a proper order for the final payment, reimbursing the contractor's receipt in full. Adopted by the Andover Economic Development Authority Board of Commissioners the 9th day of November, 1999. CITY OF ANDOVER ATTEST: J.E. McKelvey - President Michael Knight - Secretary . " / NOV-05-1999 1Z'Z0 651 Z9Z 0083 P.0Z/09 TKDA TOLTZ. KING, DUVALL. ANDERSON AND ASSOCIATES. INCORPORATED ENGINEERS. ARCHITECTS. PLANNERS ISOO PIPER JAFfP.AY PLAZA 444 CEDAR STREET SAINT PAUL. MINNESOTA ~5'01.2140 PHONE,6S1I292.4400 FAJt65l/"2-0083 , I .' .Comm. No. 11608 Cert. No. 4 Final St. Paul, MN. November 4 . 19--.22.... To City of Andover. Minnesota Owner This Cenifies that Forest Lake Contract;ne: , Contractor For Jay Street Reconstruction Is entitled to Thirty One Thousand Seven Hundred Eie:hty Eil!ht and - - - - . 65/100 ...... ($ 31 788.65 ) being 4th Final estimate for partial payment on contract with you dated SePtember 15 .19~ Received payment in full of above Certificate. CONTRACTOR , 19 TOL TZ, KING. DUVALL, ANDERSON AND ASSOClA TES, lNC. EN~ERS ~ ~. Thomas D. Prew. P.E. November 4,1999 RECAPITULATION OF ACCOUNT , CONTRACT PLUS EXTRAS PAYMENTS CREDITS Contract price plus extr~s 357.640.50 All previous payments $ 331.952.28 All previous credits Extra No. .. .. Change Order No. I 5.373.28 .. .. Compens:ninl! Change Order No.2 727.15 .. .. .. .. Credit No, .. .. .. .. .. .. .. .. AMOUNT OF THIS CERTIFICATE 31,788.65 T olals 363.740.93 363.740.93 Credit Balance There will remain unpaid on contract after payment of this Certificllte 0.00 363.740.93 363.740.93 " , An Equal Opporrunlty Employer NOV 05 '99 12:30 651 292 0083 PAGE. 02 , / NDV-05-1999 12:20 651 292 0083 P.03/09 , I TOLTZ, KING, DUVALL, ANDERSON AND ASSOCIATES, INCORPORATED Engineers-Architects-Planners Saint Paul, Minnesota 55101 PI!:RJ:OD:ICAL ESTIMATE FOR PART:IAL PAYMENTS Estimate No. 4 Final Period Ending November 4, 19 99 Page 1 projecc Jay Street Reconstruction Location City of Andover, Minnesota Contractor Forest Lake Contractinq of 1 Comm. No. 11608 Original Contract Amount $ 357,640.50 Amount Due This Estimate $ 31,788.65 Contractor ~ d--:;P~ Date Date //'~-79 NDV 05 '99 12:30 651 292 0083 PAGE. 03 NDV-05-1'3'3'3 12:20 651 2'32 0083 P.04/0'3 ESTIMATE NO.4 (Final) JAY STREET RECONSTRUCTION CITY PROJECT 98-11 .' - 'P 198-118-01 '. ..y OF ANDOVER, MINNESOTA COMMISSION NO. 11608 ., REVISED AS PER MNDOT ITEM SPEC CONTRACT QUANTITY UNIT AMOUNT NO. NO. ITEM UNIT QUANTITY TO DATE PRICE TO DATE 1 2021.501 MOBILIZATION LS 1.00 1.00 $ 16,000.00 $ 16,000.00 2 2104.501" REMOVE CONCRETE CURB & GUTTER M 45.00 45.00 S 8.00 $ 360.00 3 2104.523" SALVE CB CASTING INST MH CASTING EA 1.00 1.00 S 400.00 $ 400.00 4 2104.523 SALVE HYDRANT & REINST HYDRANT EA 2.00 2.00 $ 1.000.00 $ 2,000.00 5 2104.604 RECLAIM BITUMINOUS PAVEMENT (P) M2 5,330.00 5,643.93 $ 1.50 $ 6,765.90 6 2105.501 COMMON EXCAVATION (P) M' 2,445.00 3,656.30 S 4.00 $ 14,625.20 7 2105.521 GRAN BORROW FROM STOCKPILE (LV) M3 500.00 1.257.00 $ 7.00 $ 8,799.00 8 2105.525 TOPSOIL BORROW FROM STOCKPILE (LV) M3 1,180.00 751.60 $ 7.50 $ 5,637.00 9 2123.501 COMMON LABORERS HR 40.00 47.50 $ 31.00 $ 1.472.50 10 2130.501 WATER FOR DUST CONTROL MS 100.00 22.70 S 4.00 S 90.80 11 2211.501 AGGREGATE BASE CLASS V T 3.825.00 2,977.60 $ 7.00 $ 20,843.20 12 2350.603 SAWED/SEALED JOINT M 620.00 590.00 $ 5.50 $ 3,245.00 13 2350.604 TYPE LV 4 WEARING COURSE 50 MM ~ 200.00 536.60 S 10.00 $ 5,366.00 14 2350.609 TYPE LV 4 WEARING COURSE T 600.00 720.00 $ 31.00 $ 22.320.00 15 2350,609 TYPE LV 3 NON.WEARING COURSE T 800.00 961.80 S 31.00 $ 29,815.80 16 2357.502 BITUMINOUS MATERIAL FOR TACK COAT L 1,775.00 651.70 $ 0.50 $ 425.65 17 2501.567 675 MM GS SAFETY APRON AND GRATE" EA 1.00 1.00 $ 900.00 $ 900.00 18 2503.511 150 MM PVC SDR 35 SAN SEW PL DEPTH M 56.00 56.00 S 50.00 $ 2,800.00 , '} 226.00 222.50 S 32.00 $ 7,120.00 2503.511 200 MM PVC SDR 35 SAN SEW PL DEPTH M , , -LO 2503.511 200 MM DIP CL 50 SAN SewER PL DEPTH M 6.00 6.00 $ 60.00 $ 360.00 21 2503.541 300 MM RC PIPE SEW DESIGN 3006 CL V M 67.00 87.40 $ 85.00 $ 7,429.00 22 2503.541 375 MM RC PIPE SEW DESIGN 3006 CL V" M 136.00 140.39 $ 60.00 $ 8,423.40 23 2503.541 525 MM RC PIPE SEW DESIGN 3006 CL III M 63.00 63.40 $ 70.00 $ 4,436.00 24 2503.541 600 MM RC PIPE SEW DESIGN 3006 CL III M 32.00 32.60 $ 80.00 $ 2,608.00 25 2503.541 675 MM RC PIPE SEW DESIGN 3006 CL III .. M 15.00 16.00 $ 100.00 $ 1,600.00 26 2503.511" 375 MM CS PIPE SEWER INCL BENDS" M 20.00 21.80 $ 75.00 $ 1,635.00 27 2503.511" 675 MM CS PIPE SEWER .. M 49.00 56.40 $ 80.00 $ 4,512.00 28 2503.603" 375 MM CS SLD DRAIN WI300 MM RISERS" M 42.00 42.00 $ 200.00 $ 6,400.00 29 2504.602 150 MM GATE VALVE WITH BOX EA 1.00 1.00 $ 500.00 $ 500.00 30 2504.602 200 MM GATE VALVE WITH BOX EA 8.00 8.00 $ 650,00 $ 5,200.00 31 2504.602 250 MM GATE VALVE WITH BOX EA 1.00 1.00 $ 1,000.00 $ 1,000.00 32 2504.602 150 MM HYDRANT 2.6 M BURY EA 1.00 1.00 $ 1,700.00 $ 1,700.00 33 2504.602 1.5 M DIA WATER SERVICE MANHOLE EA 7.00 7.00 $ 2.000.00 $ 14,000.00 34 2504.602 50 MM CORPORATION STOP W/ SADDLE EA 7.00 7.00 $ 300.00 $ 2,100.00 35 2504.602 50 MM CURB STOP AND BOX EA 7.00 7.00 $ 150.00 $ 1,050.00 36 2504.602 CONNECT TO EXIST. WATERMAIN EA 3.00 3.00 $ 200.00 $ 600.00 37 2504.603 50 MM TYPE K COPPER SERVICE PIPE M 88.00 87.50 $ 40.00 $ 3,500.00 38 2504.603 150 MM DIP CL 52 WM PL DEPTH W/ FTGS M 25.00 19.70 $ 55.00 $ 1,083.50 39 2504.603 200 MM DIP CL 52 WM PL DEPTH WI FITGS M 113.00 113.00 $ 80.00 $ 9,040.00 40 2504.603 250 MM DIP CL 52 WM PL DEPTH W/ FTGS M 206.00 206.00 $ 80.00 $ 16.480.00 41 2506.502 CONSTRUCT CATCH BASIN DESIGN 401 EA 4.00 4.00 $ 1,400.00 $ 5,600.00 42 2506.502 CONSTRUCT CATCH BASIN DESIGN 405 EA 7.00 7.00 S 1.400.00 S 9,800.00 43 2506.502 STORM SEW MANHOLE DES407 1.5 M DIA EA 1.00 1.00 $ 1,800.00 $ 1.800.00 .014 2506.602 150 MM SANITARY SEWER SERVICE RISER EA 3.00 3.00 $ 60.00 $ 180.00 , /' 2506.602 SANI SEW MANHOLE DESIGN 301 PL DEPTH EA 2.00 2.00 $ 2,000.00 $ 4,000.00 46 2506.602 CONST 200 MM OUTSIDE DROP ON EX. MH EA 1.00 1.00 $ 8,000.00 $ 8,000.00 1 11608 NOV 05 '99 12:31 651 292 0083 PAGE. 04 NOV-05-1999 12:21 651 292 0083 P.05/09 ITEM SPEC CONTRACT QUANTITY UNIT AMOUNT NO. NO. ITEM UNIT QUANTITY TO DATE PRICE TO DATE 47 2506.602 150 MM X 200 MM PVC WYE BRANCH EA 2.00 3.00 $ 20.00 $ 60.00 '18 2511.501 RANDOM RIPRAP CL III M' 8.00 $ BO.OO $ -49 2531.501 CONCRETE CURB & GUTTER DES B624 M 700.00 703.00 $ 25.00 $ 17,575.00 50 2531.501 CONCRETE CURB & GUTTER DESIGN B612 M 675,00 697.00 $ 21.00 $ 14,637.00 51 2531.507 200 MM CONCRETE DRIVEWAY PAVEMENT ~ 330.00 330.30 $ 40.00 $ 13,212.00 52 2545.521 100 MM RIGID STEEL CONDUIT (RSC) M 193.00 204.50 $ 60.00 $ 12,270.00 53 2545.523 50 MM NON.METALLIC CONDUIT (NMC) M 732.00 717.50 $ 18.00 $ 12,915.00 54 2545.551 JUNCTION BOX EA 6.00 6.00 $ 600.00 $ 3,600.00 55 2563.610" FLAG PERSON HR 40.00 $ 31.00 $ 56 2564.604 STREET SIGNS INCLUDING POSTS M2 10.87 13.80 $ 250.00 $ 3,450.00 57 2564.603" PVMT MARK100 MM SOLID WHITE PAINT M 295.00 724.00 $ 1.50 $ 1,086.00 58 2564.6030. PVMT MARK 100 MM SOLID YELLOW PAINT M 650.00 659.00 $ 1.50 $ 988.50 59 2564.603" PVMT MARK 100 MM SKIP WHITE PAINT M 470.00 624.00 $ 1.50 $ 936.00 60 2564.603" PVMT MARK 300 MM WHITE STOP BAR PAINT M 26.00 22.60 $ 5.0Q $ 113.00 61 2564,602 PVMT MESSAGE LT ARROW PAINT EA 8.00 9.00 $ 60.00 $ 540.00 62 2564.602 PVMT MESSAGE RT ARROW PAINT EA 7.00 7.00 $ 60.00 $ 420.00 63 2564.602 PVMT MESSAGE THRU ARROW PAINT EA 4.00 4.00 $ 60.00 $ 240.00 64 2573.501 BALE CHECK AT CATCH BASIN EA 12.00 6.00 $ 50.00 $ 300,00 65 2575.505 SODDING TYPE 1 M2 3,000.00 $ 2.50 $ TOTAL PROJECT $ 358,367.65 " / . \ I 2 11608 NOV 05 '99 12:31 651 292 0083 PAGE. 05 CITY OF ANDOVER REQUEST FOR EDA ACTION '\ , J DATE: November 9. 1999 AGENDA SECTION Discussion Item ITEM NO. c;- Approve Change Order #1 and Compensating Change Order/98-11/Jay Street ORIGINATING DEPARTMENT Scott Eri.ckso~,f\~~ EngmeennV The EDA is requested to approve Change Order #1 and Compensating Change Order for Jay Street Reconstruction, Project 98-11 with Forest Lake Contracting. , .I .I ) ... / ... / ECONOMIC DEVELOPMENT AUTHORITY IN AND FOR THE CITY OF ANDOVER COUNTY OF ANOKA STATE OF MINNESOTA RES. NO. MOTION by EDA member to adopt the following: A RESOLUTION APPROVING CHANGE ORDER #-1.. and COMPENSATING CHANGE ORDER TO PROJECT NO. 98-11, JAY STREET RECONSTRUCTION. WHEREAS, the City of Andover has a contract for Project No. 98-11 with_ Forest Lake Contractina of Forest Lake. MN NOW THEREFORE, BE IT RESOLVED by the EDA of Andover to hereby approve the change order to Project No. 98-11. Adopted by the Andover Economic Development Authority Board of Commissioners the 9th day of November, 1999. CITY OF ANDOVER ATTEST: J.E. McKelvey - President Michael Knight - Secretary NOV-05-1999 12:21 651 292 0083 P.06/09 CHANGE ORDER , ) TOLTZ, KING, DUVALL, ANDERSON AND ASSOCIATES. INCORPORATED Engineers-Architects-Planners Saint Paul, MN November 4 19 99 Comm. No. 11608 Change Order No. 1 To Forest Lake Contracting for Jay Street Reconstuction for City of Andover, Minnesota You are hereby directed to make the following change to your contract dated september 15 . 19 98. The change and the work affected thereby is subject to all contract stipulations and covenants. This Change Order will (increase) (aee~ease) (Rst ehaR~e) the contract sum by Five Thousand Three Hundred Seventy Three and 28/100($ 5,373.28). CHANGE ORDER No. 1 Adjust Existing Gate valve Adjust Existing Manhole Sod Preparation Replace Damaged Curb Prepare Project for Winter 3 EA @ $150.99 2 EA @ $250.00 $ 450.00 = $ 500.00 = $1,050.00 "$ 375.75 $2,997.53 NET CHI\NGE " $ 5,373.28 ... / Amount of Original Contract Additions approved to date (Nos. Deductions approved to date (Nos. Contract amount to date Amount of this Change Order (Add) Revised Contract Amount $ $ S $ S $ 357,640.50 0.00 0.00 357,640.50 5,373.28 363.013.78 Approved City of Andover. MN Owner TOLTZ. KING, DUVALL. ANDERSON AND ASSOCIATES. INCORPORATED By --- By ~~ Thomas D. Prew. P.E. Approved Forest Lake Contracting Contractor Whi te - Owner pink - Contractor Blue - TKDA By NOV 05 '99 12:31 651 292 0083 PAGE. 06 NOV-05-1999 12:21 651 292 0083 P.07/09 CH.llliGE ORDER ) TOLTZ, KING. DUVALL, ANDERSON AND ASSOCIATES, INCORPORATED Engineers-Architects-P1anners Saint Paul. MN November 4 19..1i... Corom. No. 11608 (Compensating) Change Order No. 2 To Forese Lake Contracting for Jay- Sereet Reconstruction for City of Andover, Minnesota You are hereby directed to make the following change to your contract dated September 15 , 1998. The change and the work affeceed ehereby is subject to all contract stipulaeions and covenanes. This Change Order will (increase) (aee~ease) (net ehan~e) the contract sum by Seven Hundred Twenty Seven and 15/100 ($ 727.15 ). COMPENSATING CHANGE ORDER This change order shows the aceual quaneities installed at the unit price bid amounts (See attached itemization) : NET CHANGE = 727.15 " Amount of Original Contract Additions approved to date (Nos. Change Order No.1) Deductions approved to date (Nos. Contract amount to date Amount of this Change Order (Add) Revised Contract Amoune $ $ $ $ $ $ 357.640.50 5,373.28 0.00 363,013.78 727.15 363,740.93 , / Approved City of Andover, MN TOLTZ, KING, DUVALL. ANDERSON Owner AND ASSOCIATES, INCORPORATED r: Tb~fi~ By Approved Forest Lake Contracting Contractor ~1hi te - Owner pink - Contractor Blue - TKDA By / NOV 05 '99 12:32 651 292 0083 PAGE. 07 NOV-05-1999 12:22 651 292 0083 P.08/09 COMPENSATING CHANGE ORDER NO.2 JAY STREET RECONSTRUCTION CITY PROJECT 98.11 ....p 198-118-01 J OF ANDOVER, MINNESOTA COMMISSION NO. 11608 ., REVISED AS PER MNDOT ITEM SPEC CONTRACT QUANTITY UNIT NET NO. NO. ITEM UNIT QUANTITY TO DATE DIFFERENCE PRICE CHANGE 1 2021.501 MOBILIZATION LS 1.00 1.00 0.00 $ 16.000.00 $ 2 2104.501" REMOVE CONCRETE CURB & GUTTER M 45.00 45.00 0.00 $ 8.00 $ 3 2104.523" SALVE CB CASTING INST MH CASTING EA 1.00 1.00 0.00 $ 400.00 $ 4 2104.523 SALVE HYDRANT & REINST HYDRANT EA 2.00 2.00 0.00 $ 1,000.00 $ 5 2104.604 RECLAIM BITUMINOUS PAVEMENT (P) ~ 5,330.00 5,643.94 513.94 $ 1.50 $ 770.90 6 2105.501 COMMON EXCAVATION (P) M' 2.445.00 3,656.30 1211.30 $ 4.00 $ 4.845.20 7 2105.521 GRAN BORROW FROM STOCKPILE (LV) M' 500.00 1.257.00 757.00 $ 7.00 $ 5.299.00 8 2105.525 TOPSOIL BORROW FROM STOCKPILE (LV) M" 1.180.00 751.60 (428.40) $ 7.50 $ (3.213.00) 9 2123.501 COMMON LABORERS HR 40.00 47.50 7.50 $ 31.00 $ 232.50 10 2130.501 WATER FOR OUST CONTROL MJ 100.00 22.70 (77.30) $ 4.00 $ (309.20) 11 2211.501 AGGREGATE BASE CLASS V T 3,825.00 2,977.60 (847.40) $ 7.00 $ (5.931.80) 12 2350.603 SAWED/SEALED JOINT M 620.00 590.00 (30.00) $ 5.50 $ (165.00) 13 2350.604 TYPE LV 4 WEARING COURSE SO MM M2 200.00 536.60 336.60 $ 10.00 $ 3.366.00 14 2350.609 TYPE LV 4 WEARING COURSE T 800.00 720.00 (80.00) $ 31.00 $ (2,480.00) 15 2350.609 TYPE LV 3 NON-WEARING COURSE T 600.00 961.60 161.80 $ 31.00 $ 5m 5.80 16 2357.502 BITUMINOUS MATERIAL FOR TACK COAT L 1.775.00 651.70 (923.30) $ 0.50 $ (461.65) 17 2501.567 675 MM GS SAFETY APRON AND GRATE" EA 1.00 1.00 0.00 $ 900.00 $ 16 2503.511 150 MM PVC SDR 35 SAN SEW PL DEPTH M 56.00 56.00 0.00 $ 50.00 $ 19 2503.511 200 MM PVC SDR 35 SAN SEW PL DEPTH M 226.00 222.50 (3.50) $ 32.00 $ (112.00) "0 2503.511 200 MM DIP CL 50 SAN SEWER PL DEPTH M 6.00 6.00 0.00 $ 60.00 $ , 2503.541 300 MM RC PIPE SEW DESIGN 3006 CL V M 67.00 87,40 0.40 $ 85.00 $ 34.00 . , 22 2503.541 375 MM RC PIPE SEW DESIGN 3006 CL V" M 136.00 140.39 4.39 $ 60.00 $ 263.40 23 2503.541 525 MM RC PIPE SEW DESIGN 3006 CL III M 63.00 63.40 0.40 $ 70.00 $ 28.00 24 2503.541 600 MM RC PIPE SEW DESIGN 3006 CL III M 32.00 32.60 0.60 $ 80.00 $ 48.00 25 2503.541 675 MM RC PIPE SEW DESIGN 3006 CL III .. M 15.00 16.00 1.00 $ 100.00 $ 100.00 26 2503,511" 375 MM CS PIPE SEWER INCL BENDS" M 20.00 21.60 1.80 $ 75.00 $ 135.00 27 2503.511" 675 MM CS PIPE SEWER" M 49.00 56.40 7.40 $ 80.00 $ 592.00 28 2503.603" 375 MM CS SLD DRAIN W1300 MM RISERS" M 42.00 42.00 0.00 $ 200.00 $ 29 2504.602 150 MM GATE V/liLVE WITH BOX EA 1.00 1.00 0.00 S 500.00 $ 30 2504.602 200 MM GATE VALVE WITH BOX EA 8.00 B.OO 0,00 $ 650.00 $ 31 2504.602 2S0 MM GATE VALVE WITH BOX EA 1.00 1.00 0.00 $ 1.000.00 $ 32 2504.802 150 MM HYDRANT 2.6 M BURY EA 1.00 1.00 0.00 $ 1,700.00 $ 33 2504.602 1.5 M DIA WATER SERVICE MANHOLE EA 7.00 7.00 0.00 $ 2,000.00 $ 34 2504.602 50 MM CORPORATION STOP WI SADDLE EA 7.00 7.00 0.00 $ 300.00 $ 35 2504.602 50 MM CURB STOP AND BOX EA 7.00 7.00 0.00 $ 150.00 $ 36 2504.602 CONNECT TO EXIST. WATERMAlN EA 3.00 3.00 0.00 $ 200.00 $ 37 2504.603 SO MM TYPE K COPPER SERVICE PIPE M 88.00 67.50 (0.50) $ 40.00 $ (20.00) 38 2504.603 150 MM DIP CL 52 WM PL DEPTH WI FTGS M 25.00 19.70 (5.30) $ 55.00 $ (291.50) 39 2504.603 200 MM DIP CL 52 WM PL DEPTH W/ FITGS M 1t3.00 113.00 0.00 $ 80.00 $ 40 2504.603 250 MM DIP CL S2 WM PL DEPTH W/ FTGS M 206.00 206.00 0.00 $ 80.00 $ 41 2506.502 CONSTRUCT CATCH BASIN DESIGN 401 EA 4.00 4.00 0.00 $ 1.400.00 $ 42 2506.502 CONSTRUCT CATCH BASIN DESIGN 405 EA 7.00 7.00 0.00 $ 1.400.00 $ 43 2506.502 STORM SEW MANHOLE DES407 1.5 M DIA EA 1.00 1.00 0.00 $ 1,800.00 $ 44 2506.602 150 MM SANITARY SEWER SERVICE RISER EA 3.00 3.00 0.00 S 60.00 $ 45 2506.602 SANI sew MANHOLE DESIGN 301 PL DEPTH EA 2.00 2.00 0.00 $ 2.000.00 S 46 2506.602 CONST 200 MM OUTSIDE DROP ON EX. MH EA 1.00 1.00 0.00 $ 8.000.00 $ / 11608 NOU 05 '99 12:32 651 292 0083 PAGE. 08 NDV-05-1999 12:22 651 292 0083 P.09/09 ITEM ~PEC CONTRACT QUANTllY UNIT NET NO. NO. ITEM UNIT QUANTllY TO DATE DIFFERENCE PRICE CHANGE 47 2505.502 150 MM X 200 MM PVC WYE BRANCH EA 2.00 3.00 1.00 $ 20.00 $ 20.00 -48 251 1.501 RANDOM RIPRAP CL III M" 8.00 (8.00) $ 80.00 $ (640.00) ,9 2531.501 CONCRETE CURB & GUTTER DES B524 M 700.00 703.00 3.00 $ 25.00 $ 75.00 50 2531.501 CONCRETE CURB & GUTTER DESIGN B512 M 675.00 597.00 22.00 $ 21.00 $ 462.00 51 2531.507 200 MM CONCRETE DRIVEWAY PAVEMENT M2 330.00 330.30 0.30 $ 40.00 $ 12.00 52 2545.521 100 MM RIGID STEEL CONDUIT (RSC) M 193.00 204.50 11.50 $ 50.00 $ 690.00 S3 2545.523 50 MM NON-METAlLIC CONDUIT (NMC) M 732.00 717.50 (14.50) $ 18.00 $ (261.00) 54 2545.551 JUNCTION BOX EA 6.00 6.00 0.00 $ 600.00 $ 55 2563.610.' FLAG PERSON HR 40.00 (40.00) $ 31.00 $ l1,240.00) 56 2564.604 STREET SIGNS INCLUDING POSTS M2 10,87 13.BO 2.93 $ 250.00 $ 732.50 57 2564.603". PVMT MARK100 MM SOLlD WHITE PAINT M 295.00 724.00 429.00 $ 1.50 $ 643.50 58 2564.603.. PVMT MARK 100 MM SOUD YELLOW PAINT M 650.00 659.00 9.00 $ 1.50 $ 13.50 5Q 2564.503" PVMT MARK 100 MM SKIP WHITE PAINT M 470.00 624.00 154.00 $ 1.50 $ 231.00 60 2564.603" PVMT MARK 300 MM WHITE STOP BAR PAINT M 26.00 22.60 (3.40) $ 5.00 $ (17.00) 61 2564.602 PVMT MESSAGE LT ARROW PAINT EA 8.00 9.00 1.00 $ 60.00 $ 60.00 62 2564.502 PVMT MESSAGE RT ARROW PAINT EA 7.00 7.00 0.00 $ 50.00 $ 63 2564.602 PVMT MESSAGE THRU ARROW PAINT EA 4.00 4.00 0.00 $ 60.00 $ 64 2573.501 BALE CHECK AT CATCH BASIN EA 12.00 6.00 (6.00) $ 50.00 $ (300.00) 65 2575.505 SODDING lYPE 1 M' 3.000.00 (3000.00) $ 2,50 $ (7.500.00) TOTAL PROJECT $727.15 .' "\ ) / 2 11608 NOV 05 '99 12:32 651 292 0083 TOTAL P.09 PAGE. 09