Loading...
HomeMy WebLinkAboutOrd. 412 - Amendment 1-7-3 Electrical Fees CITY OF ANDOVER COUNTY OF ANOKA STATE OF MINNESOTA ORDINANCE NO. 412 AN ORDINANCE AMENDING CITY CODE TITLE 1-7-3 ESATABLlSHING PERMIT FEES, SERVICE CHARGES, AND VARIOUS OTHER FEES TO BE COLLECTED BY THE CITY OF ANDOVER, THE CITY COUNCIL OF THE CITY OF ANDOVER DOES HEREBY ORDAIN AS FOLLOWS: City code 1-7-3 is hereby amended as follows: Administration RESIDENTIAL ELECTRICAL PERMIT FEE SCHEDULE ** Add $5.00 per permit for State Surcharge ** Electric installed in new commercial and/or residential dwellings is paid for by the electrical contractorlinstaller at the time the building permit is issued, Separate permits for electric will be required on jobs where there is no related building permit. 1, Minimum fee (does not include state surcharge $45,00 2, Single family dwelling and multi-family dwelling with individual service 148,50 3, Multi-family dwelling with common service, each unit 77.00 4, Swimming pool, spa, fountain 84,00 5, Finish basement, rough in and final inspection 77.00 6. Amperes service, generators and other power supplies and feeders to separate structures 0-400 amperes 45.00 401-8001mperes 66.00 more than 800 amperes 110,00 7, 0-200 ampere circuits 6,60 8, More than 200 ampere circuits 16,50 9, Street, parking and outdoor lighting standard 5,50 10. Traffic signal 5,50 11, 0-10 KV A transformers for light, heat and power 16,50 12. More than 10 KVA transformers for light, heat, power 33,00 13. Transformers for electronic power supplies, signs and outline lighting 5.50 14. Alarm communication, remote controi and signal circuits less than 50 volts, each 0,83 15, Electrical re-inspection 45.00 16, Fee for electrical work started without a permit double the permit fee 17. Residential Service Change Fuses to breakers 75,00 COMMERCIAL ELECTRICAL PERMIT FEE SCHEDULE ** Add $5.00 per permit for State Surcharge ** Electric installed in new commercial or leasehold projects is paid for by the electrical contractor/installer at the time the building permit is issued, Services Circuits & Feeders Reference Fee Reference Fee o - 400 amp $ 45.00 ea 0-200amp $ 6,60 ea 401 - 800 amp $ 66.00 ea More than 200 amp $16,50 ea More than 800 amp $110,00 ea Additional charoes: Street, parking and outdoor lighting standards (each standard) $ 5.50 ea Traffic signals $ 5,50 ea Transformers for light, heat and power (0 -10 KVA) $16,50 ea Transformers for light, heat and power (more than 10 KVA) $33.00 ea Transformers for electronic power supplies, signs and outline lighting $ 5,50 ea Minimum commercial electrical fee (does not include state surcharge): $77.00 Electrical reinspection fee (does not include state surcharge): $45,00 Adopted by the City Council of the City of Andover on this 6th day of July, 2011, CITY OF ANDOVER ATTEST: CITY OF ANDOVER COUNTYOFANOKA STATE OF MINNESOTA ORDINANCE NO. 412 SUMMARY AN ORDINANCE AMENDMENT TO CITY CODE 1-7-3 PERMIT FEES STATUTORY AUTHORIZATION AND POLICY Statutory Authorization This ordinance amendment is adopted pursuant to the authorization and policies contained in Minnesota Statute 412. Policy The purpose ofthese regulations is to protect the public health, safety and welfare and to establish fees for the administration and enforcement of electrical codes. GENERAL PROVISIONS AND DEFINITIONS Jurisdiction The provisions of this ordinance shall apply to the City of Andover. Enforcement The City Administrator or his/her designee shall have the authority to enforce the provisions of this ordinance. Interpretation Interpretation of the provisions of this ordinance shall be held to be the minimum requirements and shall be liberally construed in the favor of the governing body. A printed copy of this ordinance is available for inspection by any person during regular hours of the City Clerk. Adopted by the City Council ofthe City of Andover on this 19th day of July, 2011. ATTEST: CITY OF ANDOVER , 1