Loading...
HomeMy WebLinkAboutWK - June 28, 20110 F NDOVE^ 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755 -5100 FAX (763) 755 -8923 • WWW.ANDOVERMN.GOV City Council Workshop Tuesday, June 28, 2011 Conference Rooms A & B 1. Call to Order— 6:00 p.m. 2. Joint Meeting with Open Space Advisory Commission 3. Update on Bunker Lake Blvd. NW Reconstruction/CSAH 7 to 38th Avenue /10 -27 — Engineering • Local Access Traffic Analysis • Joint Powers Agreement with Anoka County 4. Lower Rum River Management Organization Update - Engineering 5. 2012 -2016 CIP Development Discussion 6. Consider Resolution for Participation in the New Local Performance Measurement and Reporting Program - Finance 7. 2011 Budget Implementation Progress & May 2011 Investment Report 8. 2012 Budget Development Discussion (Presentation materials will be provided at the meeting) 9. Other Topics 10. Adjournment 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755 -5100 FAX (763) 755 -8923 • WWW.CI.ANDOVER.MN.US TO: CC: FROM: Mayor and Councilmembers Jim Dickinson, City Administrato. Courtney Bednarz, City Plann4 SUBJECT: Joint Meeting with Open Space Advisory Commission DATE: June 28, 2011 INTRODUCTION This item is intended to be an update on the activities of the Open Space Advisory Commission. DISCUSSION At their June 14'h meeting, the Commission recommended that the Council consider purchasing the 40 acre parcel immediately north of the open space purchased from the White Pine Wilderness Development. The Commission will be present at the meeting to discuss this recommendation with the Council. Additional information about the property is provided in the attachments. The Commission also recommended that the open space purchased from the White Pine Wilderness Development be named `Winslow's Woods' to honor Mr. Winslow Holasek. Staff has contacted the Holasek Family and they have expressed interest and appreciation for this consideration. The city policy for naming parks and other facilities is attached. The previous owner of the open space site, Mr. Larry Emmerich, was previously asked to suggest names for the site. He suggested that the name be different from the White Pine Wilderness development but did not have a specific preference. Additionally, suggestions from residents were solicited through newsletter articles. None were received. If the Council chooses to accept this recommendation, you may also want to consider scheduling a event at the site for the Holasek Family once a sign can be completed. ACTION REQUESTED The Council is asked to consider the recommendations of the Open Space Advisory Commission. Attachments Land Cover /Aerial Photograph Wetland and Floodplain Evaluation Criteria Scoring Concept Plan (showing potential fixture road) Area Map City Policy for Naming Parks, Park Facilities and Trails List of Properties RespeCedn itted, 0 n .j -` ' 1r - Oak Forest Dry Subtype Oak Forest- �. INesicSubtype "_. ..- Saturated Aspen Forest Oak Deciduous Saturated Soils`_.;, Oak Forest Woodland - Dry Subtype 6rushland Shrubland ,F Hayfield Aspen e # Forest Alder `Oak For -_� : Swamp v D ry S ubtype 5 •. ¢ fj PV f I gym] �_. III - V _� ':1: � al • i, � I� �� t L lwiL. k 14- 32 -24 -21 -0001 Wetland/Floodplain 18 Acres Upland 22 acres wetland floodplain -11-01 fib Property Search 1 ©❑ ® ® © Print Sketch Tools $ Zoom To Map Layers I Results d Planning I 1 161 ❑20201a1USA 19563 Floodways I 16, I® Fluoduags 16541 �NWI ® NNI is ❑Zoning 16480 ^16413 El Planning Grid m 19457 I [-Transportation 16466 Lsaal R Roads Z16425 16452fN"16417 i d Land Records Isa24 xu 16405 El Non Homestead i IS- 61"4 16395 D Parcels 18378•(7:,,, P 16387 OU les 16324 11 �°' N Parcels \C� 16381 19488 \ d Base Layers 16337 — 9x70 City Limits 16297 16289 16252 CC10931Y RK Parks LsanO 1 +d I- A: Lyls O Parks - --1484 iszzs r162ND LA/ �C —" i 1463 � 1213 / 1144 1094 16227 OWater 16231 ,fj4,5. 1223 1189 1153 �""��-- �p1 LA6' 1625 0 Hater 1 � Aerial Photos 1218 1190 1194 - � } tr:: lsi 1619 ea 116.179 !f i - ! ' L ❑Andover 16176 �" t 1179,rz1� L. 16157 1x87 16164 16167 y✓,.1° I6 LN - s 15!Ifl 1174' L6 91 1.:1.61414 f 13a1� 16132 •. �: 1:5622 I &TWIN Evaluation Criteria Scoring v 0 ,;, Evaluation Criteria X cv v L O c U Y/N Yes Prerequisite: The Area to be Protected is Sufficient in Size and Location to Preserve and Enhance Natural Resources The Area Presents an Opportunity to Protect Significant Natural Resources That Would 20 7 Otherwise be Negatively Affected by Development or Negligence Considerations include the development potential of property and lack of protection by regulations such as wetland and floodplain regulations or existing easements Lands Important as Native Wildlife Habitat and Corridors Scoring based on existence of habitat for 15 10 native animal species. Additional consideration given for the size of area (less than one acre, more than one acre or larger), width of the area (greater or less than 100 feet) and whether the area connects areas of native animalspecies habitat 10 10 Potential to be contiguous to additional conservation area 15 g Native Plant Communities (Identified in DNR Subsection Profile of Anoka Sand Plain) Consideration based on size and quality of the area . Additional scoring if threatened or endangered species of plants or animals are present DNR NHIS Data). 10 7 Buffer Adjacent to Upland Native Plant and Animal Communities Scoring based on effectiveness in protecting or connecting native plant communities 10 7 Buffer Adjacent to Lakes, Streams,Wetlands and Natural Watershed Systems Scoring based on width of area and its ability to protect these features. Additional scoring if the buffer area is adjacent to area within the DNR Public Waters Inventory or Coon Creek 15 15 The Area Provides Opportunities for Passive Recreation and Observation of the Natural Environment for the General Public Scoring based on public access and whether the area is visible to the general public 5 2 Other Notable Features (Historical, Educational, Archaeological, Aesthetic, Other) Scoring assigned as documented on a case by case basis 100 66 Totals a/va J�rr pe� w "Fb C p 'Fu-T-vt-E7 ac)A,-t;) EMMERICH PROPERTY lJoLn.o.liver A Ass Inc. o ANDOVER, MN FOR LARRY EMMERICH SKETCH PL AN r IT i Ganter - �i� f Kuik en Selmer ; , Selmer Ganter Sri Kbiken a; Putnam 1 _ r - 1 y 4Ny Aasness , A., OVA v City of Andover Policy for Naming and Renaming of Parks, Park Facilities and Trails I. Introduction The selection of a property name for a park, park facility and trail is a thoughtful process which requires careful analysis. The policy and procedure has been adopted by the City of Andover to provide the proper procedure and guidelines for any naming or renaming of said amenities. II. Procedure Original naming of a park, park facility and trail will be done as part of the platting process guided by the City of Andover's subdivision ordinance. Subsequent renaming will use the following procedure: 1. Staff, Council, Advisory Body or any Andover resident recognizes and requests the naming of a park, park facility or trail. 2. Staff will perform a background investigation of the request and then distribute the request to the City Council, upon review, send to the Parks & Recreation Commission for review. 3. The Park & Recreation Commission will discuss the merit of the name and make a recommendation to the City Council. 4. The recommendation will then be place on the next regular City Council meeting for consideration. III. Park, Park Facility and Trail Naming Criteria Listed below are some of the criteria that may be used to determine the appropriate naming or renaming of parks, park facilities and trails. 1. The name of the subdivision associated with the park, park facility or trail. 2. The name of the neighborhood in which the park, park facility or trail is located. 3. The street name adjacent to or closely identified with the park, park facility or trail. 4. The name of a local interest point, or local focal point near the park, park facility or trail. 5. The name of an event or historical occurrence associated with the park, park facility or trail. 6. The name of a person who donates a major part or all of the land for the park, park facility or trail. 7. The name of a person of significant stature within the community (with the permission of the honoree, immediate family or designated representative). He /she must adhere to at least one of the following credentials and complete a waiting period of at least six months from the conclusion of service or time of death: a. At least 10 years of local service to the community. b. Shown outstanding assistance or support of the local park system. c. Major financial donor to the park system. d. A historical figure or family. e. A local born or raised person of historic, statewide or national importance. IV. Final Determinations The City Council reserves all rights in the naming or renaming of all parks, park facilities and trails. c 0 :r d N d L Q S m N .F. N i r C 4) L m m J. i d c 3 O s 3 N d a) C O L CL w > ° m o > o o U) 0 a) o m ai m �' C a) — 0 c m m ° tA m = ai U 'C m "' —_ •� — a) U) C L m a) Q cn ~ y as (n a) U -0 U' 0 ° m U Li Li C co =' a) a) ° U O U °' a) U m a) c rn O w C N c C E 7 a) N m co C y0 .0 (0 N C N O s= N ^ L 0 7 C L °" (D >' a) m a) J0 a) "'' C 0 it a) co O N C Y C L 3 Y 1= O W L N ,> OL U W a�L) Y a) x a) •- a) a C Z O N ° V C L o fU 7 ° >. d V) O.. 'L O p O U C 0 U m m C U 3 m U m N Q U) c -0 �. c a) O O .� -O _ m j a) O d' •V O-C. N m m L C N •� a) c Y m C O N i � C C\I J_- p O O J Q s= 'C U N al a) C T � a) C O Q 0 L O C V a) — T N ° ` al O N C C 7 N N C U) O U -C U w O 4) 0 C Q L m U CO N m a) C E m � O_ O m-0 O V L m O 0 T N N Co al (D J m: N C � a) a) N C L U m ..-. C C N C m - 2 di !_ C 0 a) CO) a) � Q 4r -0 0 Y C L '� U W co U L' ai Cl) co U C m 2 _ .n = a) S a) C m _ 7 d C f s 70 N a,) Y — C i .�.. Y a) N i= a) a) � L L O) w U C C U O `�- (D m N L al a) m a) - C a) C m m D) U O_ E Y U ... a) C c m != M "a a) >O 'm' C -° a) N O l -0 m m "O O C m m O_ X "O -° a) L !OA "° >_ m U) m >. C m T N m m m N d to O U U U a) U U U !� ++ 'C C Lq �+ Q L y:. w w+ T a) U) a) CL U E L U L 4- N O C '" C N U Ca a) a) a U L 0) a) c E C fU a) C a) (O E L CL mX 00R) x o C.>- o ) 3N o 0 0 Co m x co a) n J0 m w z 0 IL n m O a) a (L CL m rn m 4uol ;eniasaJd ul lsaJalul } } } } } } } } } } } } } } } } asnoH 6ullslx�l } z z } } z z z z z z z } z cc o saJoy uleldpool j/ pUellaAA N CO O M T M O Un 0') N N 00 N a) a sJoy puel> W M N Oi O O N CN saJoy lelol 'T co 0 cr N ti M LO N M co co co CINJ O N N M � m CM N SIE ;Ol n LO CA M CO M O m fl- 'V• .- O O 00 Cfl 00 n Cfl CO `ct 1• d' co co M M M N N N CD to N co N N O N O O O O O O O O N LO co O u7 O 00 tt7 u7 to r LO O LO co O 00 u7 r r r r r r l— A O O M LO r LO 0 d0 O 0 M O 19T O "gr 0) O cc O O O O r- IT O M O N O O N r N O a� (D N if) 0 0 qct r 00 �- O UO O tO O O d• M CO N O CIS '(I) O O O O O M(Y) LO r- CC) O) LO 0 OT p (. 0 'L U c O M to LO O O O 1O O d. O O O M(Y) LO al al W Uv N f� O M O M N N N O O T 'N } } } } } } } } } z } } } } z } a) L a) N O U _U = a) m JaUMO -a) Q > C a) C CC m C/i L O C Y m N Y Y Y N J U- to Q U E � Y Y Y Y m Z E Q z CL) umi CU > L m i Z [b O Z N V U) N m > p n U U014830-1 Jo ssaJPPtl 04!S V U � as o ° E mm 0 0 v, 0 mm C >� m 3 c U �Q Z U a) O 2 E •X N 2 N O Un N a) O U° C ti Y Y N N N C N O d 0 N E UO c 4) U U V* CO a)) 0 m UU6 CO CMO O CD U) in co � c � � V NS al m0) r �U N MS CAU MCn # P1 al!S N cm M r Q m V eF M ti M W N r d L w rn O d d t V ac L a) O C 7 O V CN r L O CF O r m m L CL c M r N i r C O N_ C O_ yJ C6 W N d L Q. C d N d L d r+ C r•+ O C a) L m w+ Ri s w L d O 3 _d d Q IL a) a) r V > O L r+ L a) E p N p 0 (s U p Z y- a) co O a) p a) a) . a) U a) .O co -0 -0 Y C t6 co a) `� N a) E ° cc E co C6 C cc N 5 O W O O cc O = O cn ~ Q a m ca ° O S _U C �i ,°T, a) o � E -a a) w (D cts 0 a) .-. ca r— O U a) M ... L a) p M ca CD CU CL 0 cc r 0 O Y rn a3 Z (L6 a) C a) O r U O a) y °C m O N N 0 _� -0 S2 a) N Q N a) a) ai 0 C 0 (D O C c O C C p C6 = .0 L a) w C6 a) z O N co C a) co c w (n ++ U) 0 ai c T Q 'f+ "- (A N c — 0 .2 T n t o� E° � c`' �) 3° m ° ° •� Q O 2 a) ) O OL :Q a3 O ii) .� co z •� Q Q .Q. co O. 'C a) a) N a) O- Y� 0 C Q T � O) 3 L W N 'C -o m a) a) a) 'O O a) O O N ° f6 Q CO ° a) O a) a) O L N a. N Q a) i ca J vim) > cN > �-. !Z O N p "'' a C !Z C E C OL 3 rte-. .. N "O to .r N a) L O a) C -0 O- ' o- • � O O co O � N O � U � (n 0) Q �J O � >. a) � N -� � a) Q � X �+ a) a) Y fh O = •— C- 'j oC M U = w a) m O a) O_ "O y a) N c -a O Y C6 '7 o Q C a) to C ca 'O u) i a) p_ O N U a) E� U .r O a-. _ C a) C a) C OL .� Q a) co aj C O m N ° O "O f6 C D N C -a -p D '_' Q a) CU w0- p C6 M O O 'C W co 0 � m a) L a) r- co M ,U L L .0 a) � �+ i. > i p � 'O 'O � O X to O _a C O C U N a) a) m Y C a) ) C O a) "O O� O a) E w cu L ca cu C -O a) 3 C O a) C to O -C U w a) Co to C L to U to N 'C ca 3 t $ 'a ,moo N .. a) 0 o C E a) CO rn a) 2 a) .. N N N C 3 L (6 a) C C� 2 +o+ a) a) O 40- i� .�-. 3 O w 7 a w -p :'-' v) 0 L U C6 C C6 O O U U) w i C) a) N � 3 Q y- "'' U w wo.. � O a) IL = p a) p U O N C6 c ) J 7 = T U N .E c a) ,C= C2 N o c m C C C N� o i Z O C p L E i 0 L "O o ° Q Q Q h o x w "O O m m m C6 C 0 S O z O � O i— a O z m U � i— v 2 0 zlzl 0 O z ,C 7 I- 6UOIIenJ9s9Jd � z c� a• r• } �' z a• �• z z z �• } C'• z z z a ui �saJa }u� snOH 6ui;six3 z j. z z z > z z z z z z z >- z X >- N Z saJoy `c) r o0 N 0 o 0 It 1 0) uieldpoo13 M O r- O 0 0 0 m o o o cMo nj M O M 00 M O N N � 0) / pue1;aAA CD co co °: M m n T m LO M h m �; V r� N rn ti �? M co rn saJoy pueldn co C° O O N o Cfl M M O CL7 O V N T �; T 00 I� N (A T 0 saJoy le }o It CO M O co m 0_ O C4 - ci M 00 m O ca CA !) N N O r N�- •-- T Sle}oJ- 0) � IT N 0) C(O CNO 'O V' CM 000 00 � ti COO to O V � M M N N CO O M M O O O CO LO IT 19T M O O It O O O O O co N T CO T M LO CO T o O T O T O T O T O T O T O r O l� O T O T N T O O h O O T O O T O T N O M O T O T O T O T N co O O T M O 0 T r N w co CO O O O O OT O f` I, M I` O Cfl O O N O O TO U) OD M 0 M W O O M O 0 O M M e} Cfl OT Cn CO TO O I- CO TO OT I,- CO OT 00 O CO M O M I,- O CO) O CO N M O CO O O CO CO N O O N O M O 't M M O N N LO LO 0 O O O co LO O O O O O O O O O LO M O T T T T T N N N N �- N z Z w i z W W Y �° a) W a) r L Na) .r N N C N N O a) N O Y i a) .0 N J J a) JouMO C IZ C O 1 N C X_ a) rn N N w +� � rn a m C7 c ° U I— 3 o u m` ca LO U J C IL Q pjE U > 0 L Li ai U) (fl co ° _ L Z N O U U �! N O J U ) O O to i 7 00 0 0 a) Y Y cLa ? U m a) Y C Z N cu O m r rn = r m J N .. o a) co ca SR O N as J a i Q ,i( Q 1 L C L T a) a) w J I� Co .� NNO L O +� T O 00 O N ° U O O U a O 4-- ° O �C O O 'a U 7 p�j U r coo N U a) O U j j U 7 U p to c Q O (0 LO a) a) O a) 3 O O a) O� a) L a) U( (a) T T fn fn J U fn fn w w w U fn U 2 # pl GIM N N N M M M M I v M m co le It w O O N .Q .0 :3 9 _Q O O .r c w c 0 t "_. a) N N v N rn a) a) a) .r w— E •� 0 C t E E 3 p s >1 c _O � �' 0 a) E a) E c O. t U) -p N 0 N w v O O a) E E O O a _� O v N a) N fC = c c c a) O O 0 0) U Y ca Y c E E o v t s Ui 0) t C rn N c a) C O O LO t 'O C Y a) O a) "O 75 ca U E = O) � (a c a) c t � Q •O Y O c O C O M O .— p zz U) a) L a) � O O) c O p 0 c a) ao) c ° aoi Q i (te) ac) 3 E a) O .- a) O o-C p c a) L rn T a) O L • ° .... - E � O c c a) LP a) O = t w O � c o axi 03 — .,�.. C O a) Q Q -c U O C a) a) c - _O O L03 N Y m co a) a) E w a) U) t .Q "O C .0 a) O C L UO) O O O Y a) "' U) L6 C .2) O U) +. a) � c N O co 0 (/i N O O) ai E •w C c v a) .L a) _C w cc c (c6 >. •I= c L C c .Q "O U) O E w i fL6 '� a) CO () a) -C L a >, a) o c U) O w ca 2 a ° c O 0 m T 'C t - c 0 -O O U. C a) !L co n C (L6 j, O o Q '� E a t a a) a - � ° C ...; L ai U O o C o :C n '� CL � C ac) .: c N ate) c a) C C w 0 a) O O O Q Y CL j c N E E p °•' a) O E ... c N U) O O m O_ 3 w N .0 M U) O _O O -p O w N w c E 7 _O !1. U) CO U) w O p _O .w _ _ O O N E a) p > E N O O w E T E (a w C C O O T O N N a) a) C U C N O a) > O a) -r O •C O .O p_ a) O 'n c Q 'C O 0 a) N CO) O COL O 7U Lp O COQ E QU O E C a) :. Ui c = ai = O) N O_ O T O_ „ O' O O C O- �, U E O pU Q a) 0 0 OU 0_ () a a) Q L6 Q 9-0 ... -0 a) w O w U a) L C Z77 E T 0 E S U E w CL 0 O Z D- O. T T N a) a) Q 'O U) f6 Co N _O -a O c a) "O O O C — .O a) c O— y U) a) 0— 0 0 N Q a) � N = O O c p w� U 0 U) •w a3 w Fn U) N w N w C O a3 a) U) C C a) m y U L i c c C a) C S C C w e w -0 C� m E E 3 v c -Y -0 C a) Q a) E v -Q -a o o� c °� -a -o o U,_ c-a E- .E E ,c a c c o a) U a) a) E :E a) E a) a) " •- a) E a� a) U a) m a) a) Q) a) a) U N U a (ten w w N N "O U) U N L � U U N U U) O U) U) o E E U a) La m () a) E U m a) a) a) °) a) a) E a) m m a) a) U a) a) U a) E a) E Q- •C a) a) L T _O a) Y a) a) a) O U w Y c m O N a) O c N O a) a) "" a) a) a) N a) O N O Q. rn Q Q — N --0 '-' o U J c .. C .. C C) r. «� a) c c ++ c c p LE U c C c «� c .r a) c C a) c U c U C N } } } } } } } } } } } } } } } } } } } } } } Z Z Z } } } } } } } } } } } } } } } } } } } N M co (0 O) (fl d• M M LO N r- M O M O L6 N M LO � O W �t Il, � ((D 0) O N O O N 4 N V' O M N O O Ln NI—: I` M r OD r r r M M N V' M N O M (O co I` N M v co V N M O M (O (O M M M O M O N IT LO co I,: 00 LO O) M N d• O N <- d• N LO 4 N O) r O M M M � 00 LO (O Cl? m r M LO M .- N N r M (O M V• co I- N �- M M O (A 'd• (O (Or) O Op r co m d (6 It O LO N M N LO r. m � co M O O W (O co V O M m M LO M Vh M O M M N I` N LO N M r M N M O M N O O N O) O N O O O O O O O O O O O O O O O O O O I` LO O O r O O O M LO O O O O O O O O O O O O O ED O M O O O O N In CO C) N M M M N O O O O LO m co N O LO O O N .- O O N O O O O O O O O O Il- O Il- LO 00 CD co 0 M r O O co co O O O O O O O O OT LO LO LO co O O LO O LO LO LO O O O O O O O O O M LO O O O N O O L() O M (r) ti LO co N O O O O O N CN O CD N O i�- O Co O O O O O O O O O O O O O O } } } } } Z } Z Z } Z Z Z Z Z Z Z Z Z Z Z Z U) O N 0 co C O E2 34 U ' U) c O a) 0 w 0 X cc 0 .cu w U) ."-. p O d m J LiJ Z = Y m C7 Li Y (j O Z LL v Z a) Z Z p Z U CO Z Z 3 2 Z L T> Q Z C) O Y J Z a) ""' Y a) a) a) > U � U J m ,� N m A � J � � Q �i • c p L C a) O �N ` N 0 O) m / `' C (O 3 M LO Q I- U I LO H d H C I, o cu Y C� O r (4 r 'c Y f� ' { N r I� O LO O U O r L U O C7 N � N LO •� a) LO (fl W [- LO LO O N O0 M r t` N M Ln M LO M 00 O O LO � OD N � 0) r CD O O tt 00 Q .- M t7 U .- M M r ... r ti N (0 N OMO Z (7 M O t0 00 O) r N V' (O � O CA O r N M Co r r r r r r r N N N N N 7C4) N Y 0 F O j V E 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755 -5100 FAX (763) 755 -8923 • WWW.ANDOVERMN.GOV TO: Mayor and Council Members CC: Jim Dickinson, City 0 FROM: David D. Berkowitz, Director of Public Works /City Engineer SUBJECT: Update on Bunker Lake Blvd. NW Reconstruction /CSAH 7 to 38th Avenue /10 -27 - Engineering DATE: June 28, 2011 INTRODUCTION As the design for Bunker Lake Boulevard NW from 7th Avenue to 38th Avenue continues to move forward staff will provide information and updates to keep the City Council informed on the project status. DISCUSSION Staff will provide a verbal update on the design and noise wall status and discuss the Draft CSAH 7 at CSAH 116 Local Traffic Analysis and proposed Joint Powers Agreement (JPA) with Anoka County. Attached is the draft copy of the Traffic Analysis and a draft copy of the JPA. ACTION REQUIRED This is for information and discussion and no action is required at this time. Respectfully submitted, David D. Berkowitz ✓ ."/ Attach: Draft CSAH 7 at CSAH 116 Local Traffic Analysis & Draft JPA To: Greg Lee, PE — City Engineer, City of Anoka David Berkowitz, PE — City Engineer, City of Andover From: Ross jentink, PE Dean Chamberlain, EIT Date: June 10, 2011 Re: DRAFT CSAH 7 at CSAH 116 Local Access Traffic Analysis WSB Project No. 02019 -000 The purpose of this Technical Memorandum is to document the existing and future traffic operations analysis of potential access for land surrounding the intersection of Anoka County State Aid Highway (CSAH) 7 (7th Avenue NW) and CSAH 116 (Bunker Lake Boulevard NW) in the Cities of Anoka and Andover in Anoka County. The cities have undeveloped land in the vicinity of the intersection of CSAH 7 and CSAH 116. Anoka County is in the process of evaluating roadway improvements for CSAH 116 including the intersection of CSAH 7 and CSAH 116. In conjunction with the county project, the Cities of Anoka and Andover are developing a local roadway network to provide access to the undeveloped land. Also, a roadway development plan is being developed for Anoka High School, the Anoka Area Ice Arena, and a proposed baseball field southwest of the intersection of CSAH 7 and CSAH 116. Background The project is located in the Cities of Anoka and Andover approximately 1.5 miles north of the interchange of United States Highway (US) 10 and CSAH 7. The existing land use in the area is primarily suburban residential. Additionally, Anoka High School and the Anoka Area Ice Arena are located southwest of the intersection of CSAH 7 and CSAH 116. The project area is shown in Figure 1. The two main highways in the project area are CSAH 7 and CSAH 116. CSAH 7 is a four -lane undivided roadway south of CSAH 116 and a two -lane undivided rural roadway north of CSAH 116. CSAH 7 is an A- minor arterial highway travelling north -south between Anoka, Andover, and Oak Grove. CSAH 7 has a 45 mph speed limit south of CSAH 116 and a 55 mph speed limit north of CSAH 116. CSAH 116 is an A- minor arterial highway providing an east -west connection between the Cities of Ramsey, Andover, and Ham Lake and functions as a reliever to US Highway 10. CSAH 116 varies between a two -lane undivided highway and a four -lane divided highway in the project area with a 50 mph speed limit. a- A WSB Infrastructure m Engineering m Planning m Construction 701 Xenia Avenue South &'Imchoes, hic. Suite 300 Minneapolis, MN 55416 Tel: 763 - 541 -4800 Fax: 763- 541 -1700 Technical Memorandum To: Greg Lee, PE — City Engineer, City of Anoka David Berkowitz, PE — City Engineer, City of Andover From: Ross jentink, PE Dean Chamberlain, EIT Date: June 10, 2011 Re: DRAFT CSAH 7 at CSAH 116 Local Access Traffic Analysis WSB Project No. 02019 -000 The purpose of this Technical Memorandum is to document the existing and future traffic operations analysis of potential access for land surrounding the intersection of Anoka County State Aid Highway (CSAH) 7 (7th Avenue NW) and CSAH 116 (Bunker Lake Boulevard NW) in the Cities of Anoka and Andover in Anoka County. The cities have undeveloped land in the vicinity of the intersection of CSAH 7 and CSAH 116. Anoka County is in the process of evaluating roadway improvements for CSAH 116 including the intersection of CSAH 7 and CSAH 116. In conjunction with the county project, the Cities of Anoka and Andover are developing a local roadway network to provide access to the undeveloped land. Also, a roadway development plan is being developed for Anoka High School, the Anoka Area Ice Arena, and a proposed baseball field southwest of the intersection of CSAH 7 and CSAH 116. Background The project is located in the Cities of Anoka and Andover approximately 1.5 miles north of the interchange of United States Highway (US) 10 and CSAH 7. The existing land use in the area is primarily suburban residential. Additionally, Anoka High School and the Anoka Area Ice Arena are located southwest of the intersection of CSAH 7 and CSAH 116. The project area is shown in Figure 1. The two main highways in the project area are CSAH 7 and CSAH 116. CSAH 7 is a four -lane undivided roadway south of CSAH 116 and a two -lane undivided rural roadway north of CSAH 116. CSAH 7 is an A- minor arterial highway travelling north -south between Anoka, Andover, and Oak Grove. CSAH 7 has a 45 mph speed limit south of CSAH 116 and a 55 mph speed limit north of CSAH 116. CSAH 116 is an A- minor arterial highway providing an east -west connection between the Cities of Ramsey, Andover, and Ham Lake and functions as a reliever to US Highway 10. CSAH 116 varies between a two -lane undivided highway and a four -lane divided highway in the project area with a 50 mph speed limit. a- t ; \." t tow r i i s. » AF c r4s, •. t �, `� ` � ' - 1 t: r`..+' -•"�k `L��. +tea �'f .`� � U f y �^1 m Z ] 6 i C i2Y3fix ,a a` A fil L $ on LU m m v v in U Q Q Q 0 0 N h J U 1 - °se 3- ♦i �„!� „z �. < ,+.rte �, `� ` � ' - 1 t: r`..+' -•"�k `L��. +tea �'f .`� � U f y �^1 m Z ] 6 i C i2Y3fix ,a a` A fil L $ on LU m m v v in U Q Q Q 0 0 N h J U 1 - °se 3- DRAFT CSAH 7 at CSAH 116 Local Access Traffic Analysis 00A June 10, 2D11 Page 3 F Cr Previous Studies Anoka County is completing an Environmental Assessment (EA) for the expansion of CSAH 116 to a four - lane divided roadway that will include intersection improvements at CSAH 7 and CSAH 116. The draft results of the Environmental Assessment show the need for additional turn lanes at the intersection of CSAH 7 and CSAH 116. Additionally, access revisions are required at the intersections of 415` Avenue and 40th Lane along CSAH 7. The County indicated the desire to limit access to right -in /right -out at these intersections to be consistent with the County's access spacing guidelines and to ensure safe intersection operations. In 2007, a study was completed for the City of Andover of proposed development of the northwest and southwest quadrants of the intersection of CSAH 7 and CSAH 116. The proposed development in this study included the addition of a bus garage on the northeast corner and residential development on the southeast corner. This study identified the need for roadway improvements at the intersection of CSAH 7 and CSAH 116. Also access was proposed about 1000 feet north of CSAH 116 on CSAH 7 for the bus garage. The study indicated that the proposed traffic would meet a peak hour signal warrant at the proposed access point 1000 feet north of the CSAH 116 and CSAH 7 intersection. Geographic Constraints Both cities desire a full access intersection on CSAH 7 north of CSAH 116 at approximately 43rd Avenue. The current proposed location is approximately 1200 feet north of the CSAH 116 and CSAH 7 intersection. The intersection location is constrained by a large natural gas main and a valve station located about 1300 feet north of CSAH 116 on the east side of CSAH 7. From information provided by the City of Andover, the natural gas valve station can not be relocated. The City of Andover desires a full access intersection on CSAH 116 at approximately 9th Avenue which is about 900 feet east of the CSAH 116 and CSAH 7 intersection. This intersection spacing is constrained by wetlands located east of the proposed intersection location on the north and south sides of CSAH 116. Additional constraints are the Rum River Nature Area and Wild and Scenic Boundary in the northwest quadrant of the intersection of CSAH 7 and CSAH 116. This nature area is located just north of the library in this quadrant and will constrain any loop road concept. Intersections Analyzed Traffic operations for this study were analyzed for the following intersections for the various alfernatives. Existing Intersections (Existing Traffic Control Type): CSAH 7 at CSAH 116 (Signal) • CSAH 7 at 4151 Avenue (Thru -Stop) • CSAH 7 at 40th Lane (Thru -Stop) • 'CSAH 7 at 38th Avenue N.W (Signal) + CSAH 116 at 6th Avenue (Thru -Stop) • CSAH 116iat.Blackfoot Street NW (Thru -Stop) K: \02019-0 \Traffc \Traffic Operations Reporc\ Draf t3-Traffic Operations Memo 6- g11.docs _y_ DRAFT CSAH 7 at CSAH 116 Local Access Traffic Analysis June 10, 2011 Page 4 '-V • CSAH 116 at 140th Avenue NW (Thru -Stop) ((( • CSAH 116 at 38th Avenue NW (Thru -Stop) Proposed Intersection Locations (new roadways): • CSAH 7 at 43`d Avenue • CSAH 116 at 41St Avenue • CSAH 116 at 9th Avenue Existing Traffic Counts Traffic counts for the intersections in the project area were taken in July 2010 and May 2011 by WSB and Associates. The traffic counts in July 2010 were taken for the Environmental Assessment study and did not cover all of the intersections analyzed for this study. Therefore additional counts were taken in May 2011 for the remaining intersections. The traffic volumes were balanced between intersections and used as the base for this study. The balanced existing traffic counts are provided in Figure 2. Trip Generation The Cities of Anoka and Andover provided the land use data that was used to estimate the development expected within their municipal boundaries in the project area. Previous traffic analysis was completed for the Anoka County Environmental Assessment. This analysis was also based on City provided data, but the data was used for a more global analysis using the County Regional Traffic Demand Model. More detail has been provided in terms of likely development locations of the different proposed land uses, the local roadway system that will serve the undeveloped areas and the amount of development expected. A map of the developable areas is provided in Figure 3. The development estimated for the vacant parcels located in the northwest corner of the intersection of CSAH 7 and CSAH 116 in the City of Anoka contains 120 residential units and 374,000 square feet of commercial properties including a mixture of restaurants, retail, and services. The expected land use for the vacant parcels in Anoka is shown in Tables A.1a and A.1b in Appendix A. The development estimated for the vacant parcels in the City of Andover to the northeast and southeast of the intersection of CSAH 7 and CSAH 116 is in line with City future land use plans. Estimates for development were calculated based on acres of developable land and floor area ratios. The- ty- C i i ctarr&A+ estimat4there will be 177 housing units and 65,000 square feet of commercial development in the northeast quadrant of the intersection and 70 housing units and 34,000 square feet of commercial development in the southeast quadrant. The land use assumptions for the vacant parcels in Andover are shown in Table A.2a and A.2b in Appendix A. Poe- loa ► S jh , �Sr b irevs Uw *%J avvk S RCrc U µ ' CaSf �i1sSS C*1 t - 1 S osnd- i�tt INKS; q> Z ot e �rc.S o �' Cow�Nne vc t csi Ova K: \02014000 \TmRlc \Tro flc Operatlons Report \Drag 1 -TraMC Operations Memo 6- S11.doa Sa �eas4 to4lvot.�J� C�° S� • BScd oh. 'E1kr- CvirrCh'4 Ft(xC (Ij k �4N 9+tc i r LL ai 0 u- JJJ t sot (996 g) Gov bn uj �� •( .ate° ' " � s _ r LLLlsctl -. •L «. - i� Y '— sat IL9L) J j s r t9 (ete): IL9)as q 1t to (Lat)Zat — ) rZj �w ,� • tep � � � � �t f t ; Va >f t' Pn (L9Z) 99t(95") �9 r Z91 IL9a L) Q. (g )a -i We ''1 f U 4- (9nc)6st � — V lettlsss = a no(s91 m (n)oz �� (91 )cot 4-- - J ll „a�:..�":..m"s..S�. :ate ".�:. EL�•. -s '�: tt r yt2 s Y I v fse l e a`i m m O v m c m V L L di O N Y 5 E O c p 0 L a m m m v to m K L t d L6 LLJ J u Q N d' L O Q) W m iy1 U Z Ni mY Q m \y Y y O z , J far I I 1 &C(Da) rt G- � Y 1. y' � :. �i } < ) �t j ir`k�. w �� 4.. ♦ tM.�w F* �. My. r— I � icx. � jt °. "F4X •���'�� � ci r � �J � � I���.1�1 ( � • i. � � � " ".py sue. ! � R3 'i 1r 1li 111111, it I 11 dll'v 1 r, 1 If nh�•- Iu aria' w� i r�- _ �-tis. } jf �, �,k+y R•,w � t .JiF ���.. txo . _ Ol (K ° , Its rou DRAFT CSAH 7 at CSAH 116 Local Access Traffic Analysis June 10, 2011 Page 7 L��4A F T Once the future land use for the undeveloped land in the project area was established, the trip generation of the proposed land use was estimated using trip generation rates from the 8th Edition of Trip Generation Manual published by the Institute of Transportation Engineers. Trip generation rates were determined for the AM and PM peak hours as well as for daily totals. Trip generation values were then adjusted for internal trips and pass -by /diverted trips as shown in Appendix A based on data in the ITE Trip Generation Manual. Additionally, the Anuka Area Ice Arena and a proposed baseball field in the southwest corner of the s CS n r •ll ff:c f... the H4 p 0. Trip t' for t0. _ _3 1-1 7 aitU CS iia riite'rr]et:t rvn win gcifcrd tc troui� of tifc rlvf Meek 11 r. n iN generation Hera trOir avf u1C$e facilities was projected based on facility operation information provided by the Anoka Area Hockey Association. The ice arena and baseball field facilities are expected to generate an additional 108 vehicles per weekday PM peak hour for a peak demand period as shown in Table 1. Table 1: Peak Hour Trip Generation Calculation for Ice Arena and Baseball Field Ice Arena Peak Hour Calculation: *Spectators per weekday: 720 Assumed people pervehicle: 2.5 Vehicles per weekday 288 Peak hour adjustment: 1.25 x average hour *Daily hours of operation: 5 Vehicles per average hour: 57.6 Vehicles per peak hour: 72 *Source: Anoka Area Hockey Association Baseball Field Peak Hour Calculation: Assumed children pergame: 30 Spectators per child: 3 People pergame: 90 Assumed people pervehicle: 2.5 Assumed games per peak hour: 1 Vehicles per peak hour: 36 The peak hour for both the ice arena and the baseball field is assumed to be the same for the purposes of the capacity analysis in the CSAH 7 /CSAH 116 project. This assumption was made to estimate a "worst- case" scenario for the recreational property usage. However, because of the nature of the recreational facilities, the baseball field will likely be used more frequently in the summer months, and the ice arena will likely be used more frequently in the winter months. K: \02O19- %Tra(FlC \Traffic Operations Report \Orak S- Traffc Operations Memo 5911.doa DRAFT CSAH 7 at CSAH 116 Local Access Traffic Analysis (� June , 2011 (/ C.�i� FTA FT Page 8 I Alternatives Improvements to the roadway network in the project area are assumed to be implemented in three separate phases: • Phase 1: Anoka Area Ice Arena access to CSAH 7 at 4151 Avenue. It is assumed this change in access will occur with Anoka County's improvements to the CSAH 116 and CSAH 7 intersection. • Phase 2: 41St Avenue extension from CSAH 7 to an intersection on CSAH 116 approximately 1,800 feet west of CSAH 7 providing full access for the Anoka Area Ice Arena and Anoka High School to CSAH 116. This improvement may occur with the development of the proposed base ball field. • Phase 3: Local roadway expansion in the northwest, northeast and southeast quadrants to provide access to future development. This roadway system will occur in conjunction with the future development of these areas. It is assumed that it will be fully developed by 2030. Within these phases, a number of alternatives are being evaluated to determine the best alternative for improving traffic operations in the area as identified on Figure 4. Phase 1 The first phase analyzed the access to and from the Anoka Area Ice Arena and CSAH 7. This access is planned to be modified with the reconstruction of the intersection of CSAH 7 and CSAH 116 project led by the County. The access to CSAH 7 from 41St Avenue will be closed to the west, and access will be provided via an extension of 40th Lane to connect to the road in front of the Anoka Area Ice Arena and provide access to the Anoka Area Ice Arena parking lot. Two alternatives were proposed for the intersection access at the CSAH 7 /40th Lane intersection: • Alternative 1A (Full access at CSAH 7 /40th Lane): 41St Avenue will only extend to the Anoka Area Ice Arena parking lot. No access to 6th Avenue will be allowed. • Alternative 10 (3/4 access at CSAH 7 %40th Lane): East -West through movements, east -west left turn movements and southbound left turn movements will be restricted on the 401h Lane approaches. The northbound left turn on CSAH 7 to westbound 40th Lane will be allowed. 41St Avenue will be extended to connect to 6th Avenue with a one -way connection for outbound traffic and provide access to eastbound CSAH 116 and northbound CSAH 7. Construction of this phase is necessary to provide access to the Anoka Area Ice Arena and a proposed baseball field located to the south of the 401th Lane extension. Phase 2 The second phase analyzed for the project area includes extending 416t Avenue from the Anoka Area Ice Arena and CSAH 7 to CSAH 116 to just west of the existing pedestrian bridge over CSAH 116. This phase will also include closing access to CSAH 116 from the south leg of 6th Avenue. All of the phase 2 alternatives assume that 41St Avenue will connect with CSAH 116 and provide access to Anoka High KA=19 \Trawc \Traffic Operations Report \Draft 1 -Traffic Operations Memo 6- 311.doa LUM6F17 t _ t w C -a) m .. oc I T Y • --+F• �K � � � [ �..1 to r.�, {{��" �^ i �.'! ' T ' N tq WL t i J' •. x c'{ ,' N C N _`! N m d. t -f q N •U O U P � O U �k 5r U ai W b x h S r s' 1w 9F�.,.:...3•"`'` • }r• a•. tY K K m fir/ s.. W m m e a 3 0 0 o E Q O i t f O = N r-4 M ¢ p 0 s =r W S h ti vOi m w Y^ m m fie" C L L N �a X• z ♦y _lb - DRAFT CSAH 7 at CSAH 116 Local Access Traffic Analysis DRAFT June 10, 2011 Page 10 School through a full- access intersection at CSAH 116. Three alternatives were analyzed for Phase 2 based on the access assumed at the intersection of CSAH 7 and 40th Lane: • Alternative 2A (Full access at CSAH 7 /40th Lane) • Alternative 2B (3/4 access at CSAH 7 /40th Lane): Through and left turn movements will be restricted on the 40th Lane approaches. The northbound left turn on CSAH 7 onto 40th Lane to the Anoka Area Ice Arena will be allowed. • Alternative 2C (Right -in /Right -out at CSAH 7 /40th Lane): In addition to the restrictions in Alternative 26, the median on CSAH 7 would be closed prohibiting left turns on northbound CSAH 7. Phase 3 The third phase of construction proposed for the project area involves building new local roads to provide access to CSAH 7 and CSAH 116 from the undeveloped land in the northwest, northeast, and southeast areas, as shown on Figure 1. The new roadways will provide access to the new developments at the following locations: • CSAH 116 and 41St Avenue (constructed in Phase 2) • 43rd Avenue NW at CSAH 7 • 9th Avenue at CSAH 116. The internal roadway system will include a partial loop system starting at the signalized intersection of CSAH 116 and 4161 Avenue (constructed in Phase 2) and will loop northeast and connect to CSAH 7 north of the CSAH 7 /CSAH 116 intersection at 43rd Avenue. 43rd Avenue will then run southeast and connect to CSAH 116 at a new intersection with an extended 9th Avenue. Some assumptions were made regarding the intersection configuration of the minor intersections in the project area for the capacity analysis. The intersection of CSAH 7 and 40th Lane is assumed to be a access intersection with the northbound left turn allowed. The access to CSAH 116 from 6th Avenue to the north is assumed to close, and traffic currently utilizing the CSAH 116/6th Avenue intersection will move to the new CSAH 116/41st Avenue intersection. All other intersections in the project area are assumed to be right -in /right -out unless specified in the alternative description. It is assumed in the analysis that the undeveloped parcel in the southeast quadrant of CSAH 116 and CSAH 7 will have access to 9th Avenue to the south of CSAH 116. This will provide alternative access to the undeveloped parcel via 9th Avenue using 41st Avenue and 38t Avenue. A number of alternatives involving intersection configurations for the proposed intersection locations were identified by the Cities and analyzed for this phase: • Alternative 3A: Full access at CSAH 7/43rd Avenue intersection and right -in /right -out access at CSAH 116/9th Avenue intersection. K: \020190]0 \Tr. flc \T.W.0 OP.Wl.n, Report \Draft 3 -TraMC 0,ewl.ns Mema 6- 311.doa A it �RA JF T DRAFT CSAH 7 at CSAH 116 Local Access Traffic Analysis June 10, 2011 Page 11 • Alternative 313: Right -in /right -out access at CSAH 7/43`d Avenue intersection and right -in /right- out access at CSAH 116/9th Avenue intersection. • Alternative 3C: Right -in /right -out access at CSAH 7/43`d Avenue intersection and full access at CSAH 116/9th Avenue intersection. • Alternative 3D: Full access at CSAH 7/43`d Avenue intersection and % access at CSAH 116/9th Avenue intersection (westbound left turns allowed) • Alternative 3E: Full access at CSAH 7/43rd Avenue intersection and right -in /right -out access at CSAH 116/9th Avenue intersection. In this alternative, 41" Avenue will be extended east to the CSAH 116 /Blackfoot Street intersection with full access at the intersection. • Alternative 3F: Full access at CSAH 7/43`d Avenue and CSAH 116/9th Avenue intersections. Traffic Forecasts Traffic volumes were estimated for the new access alternatives based on existing counts and the forecasted peak hour trip generation estimates. The assumptions behind these forecasts are discussed below. Phase 1 Alternative 1A assumes the turning movements at the intersection will be similar to today, except that traffic from the ice arena and the proposed ball field will move to 40th Avenue. Alternative 1B assumes traffic is similar to alternative 1A, except traffic to northbound CSAH 7 and westbound CSAH 116 will use 6th Avenue to exit the Ice Arena parking lot. Phase 2 For Alternative 2A, it is assumed that most of the trips from Anoka High School destined for northbound CSAH 7 that previously used 6th Avenue will instead use the CSAH 7 /40th Lane intersection. When the westbound (outbound) left turn movement is prohibited in Alternative 2B, Anoka High School traffic destined for northbound CSAH 7 will use the CSAH 116/416t Avenue intersection west of the school and proceed on CSAH 116 to CSAH 7. Anoka High School traffic turning left on northbound CSAH 7 at the 40th Lane intersection will use the 38th Avenue intersection when the northbound left turn is prohibited in Alternative 2C. Traffic destined to the Anoka Area Ice Arena will use the CSAH 116 /41St Avenue intersection to access the Ice Arena when the northbound left turn is restricted at the CSAH 7 /40th Lane intersection. Phase 3 Traffic volumes for the Phase 3 alternatives were forecasted for each development zone based on the land use provided by the Cities and resulting trip generation. The trip distribution was calculated using the Anoka County Travel Demand Model and existing traffic flow patterns. The approach direction distributions are shown in Figure 5. Traffic destined to and from the project area was then assigned to roadways in the project area according to the ease of travel to reach the intended destinations based on the access provided in each alternative. The traffic forecasts for Alternative 3A correspond the closest to the 2030 traffic forecasts for the EA, although none of the alternatives is an exact match for the EA since this study has more detail relative to access to adjacent parcels. Traffic assignments were adjusted X. \03014000 \Traffic \Traffic Operations Report \Draft 1 -Traffic Operations Memo 6 9 -11.d= 00AAFT J A 0° 4 car . °> o t 'lN -� • - -w X9.3 •,R1.� - z .e I.l_ L .' I.. lu 30%(25 is i 3T �t Sy' >xn •' ` .Ir 7. per-. .�. ,:.. `� •�t � �, a � ,x.. 0 �' i � It � '� �,; • , � � may« .. T i--� U - r ' u 4 bD t " C u ti ' 3 o 0 t D L°n v ° y° o_c_._. CL s W U Q vii U c3`v f e L i .. - N O 0 u � rl Ln a at )3 DRAFT CSAH 7 at CSAH 116 Local Access Traffic Analysis 1 ! /' A F , June 10, 2011 Page 13 between alternatives to reflect the change in access to CSAH 7 and CSAH 116. The impact on routing is discussed in more detail in the traffic operations analysis section of this study. The projected turning movements are provided in Appendix B. Access Spacing Analysis of intersection spacing was performed in accordance with the Anoka County Highway Department's Access Spacing Guidelines located at the department's website. The County's Access Spacing Guidelines recommend'' /: mile spacing between signalized full access intersections on "A" minor arterials in rural areas with speeds of 50 to 55 miles per hour and '' /< mile spacing between conditional secondary access. For an "A" minor arterial in an urbanizing area with speeds of 40 to 45 miles per hour the County's Access Spacing guidelines recommend % mile spacing between signalized full access intersections and 1/8 mile spacing between conditional secondary access. Both CSAH 7 and CSAH 116 are classified as "A" minor arterials. The posted speed on CSAH 7 south of CSAH 116 is 45 miles per hour and north of CSAH 116 is 55 miles per hour. CSAH 116 through the study area is posted at 50 miles per hour. Currently much of the land in this area is undeveloped. However, with the proposed land use and development the area could be considered an urbanizing area. As a result, the exact classification of these routes relative to the County's Access spacing guidelines is not definitive. The purpose and need section for the CSAH 116 improvements indicates that the appropriate criteria for CSAH 116 is the mile spacing between signalized intersections and '' /< mile spacing between secondary access. It did not address CSAH 7. CSAH 7 does appear to be in a transition area. The distances between the intersections analyzed in this study are as follows: • The distance on CSAH 7 between 43rd Avenue and CSAH 116 is 1200 feet, 120 feet less than X mile spacing and 1440 feet less than the % mile spacing. The intersection location is limited by a high pressure natural gas line and valve station located 100 feet north of the proposed intersection location. The gas line cannot be relocated. If a signal were provided at this location greater spacing between full access intersections could be provided north of 43`d to achieve the %z mile intersection spacing. • The distance on CSAH 7 between CSAH 116 and 4155 Avenue is 450 feet and between 41" Avenue and 40th Lane is 350 feet. They are both less than the 1/8 mile (660 feet) required for secondary access intersections. Anoka County is proposing closing the 41St Avenue access to the west and relocating it to 40th Lane. This would increase the spacing with CSAH 116 to 800 feet and would meet spacing requirements for a "Conditional Secondary" intersection on an "A" minor arterial with speeds of 40 to 45 miles per hour. • The proposed intersection location at CSAH 116/9th Avenue is 900 feet east of the signalized intersection of CSAH 7 and CSAH 116. This does not meet the recommended distance for a full access intersection, though it would meet the spacing for a "Conditional Secondary" access on an "A" minor arterial with speeds of 40 -45 miles per hour in an urbanizing area. �urrently though the posted speed of 50 miles per hour would indicate spacing of 5/o mile for a conditional secondary access, it is recommended the location be further evaluated. K: \03019-000 \Traffic \Traffic Operations Repm1\Oraff 3 -Traffic Operations Memo 6 411.doa 14 DRAFT CSAH 7 at CSAH 116 Local Access Traffic Analysis June 10, 2011 Page 14 Wetlands exist both north and south of CSAH 116 further east of the proposed intersection location. These wetlands have been identified as project constraints by the City of Andover. If access is desired, the location should be pushed as far east as possible. Further evaluation of the wetland limits is needed to determine viable locations. Signal Warrant Analysis Standards for determining if a signal is warranted are published in the 2005 edition of the Minnesota Manual on Uniform Traffic Control Devices ( MUTCD). Traffic volumes used in the warrant analysis can be found in Figure 2 and Figure A.1. Part 4 of the MUTCD contains information pertaining to highway traffic signals, including a series of traffic signal warrants that define the minimum conditions under which installing a traffic signal might be justified. Traffic signal warrants have been developed as national guidelines to promote continuity of traffic control devises and to ensure that traffic signals are being installed at intersections that would benefit from their use. Traffic signal warrants are usually calculated for existing traffic counts based on hourly approach volumes. In an effort to determine if warrants will be met for the proposed intersections with traffic generated by the 2030 full build out of the undeveloped land, a general time of day distribution of traffic was used to estimate whether the hourly criteria are met or not. The criteria was developed using average hourly traffic distribution data published by the Metropolitan Council for the Twin Cities and the hourly signal warrant criteria published in the MUTCD for the various signal warrants. With this general approach, signal warrants could be evaluated based on the extrapolation of hourly volume warrant criteria to daily traffic volumes. The following traffic signal warrant criteria was developed for a 4 -lane roadway: Warrant 1 -Eight -Hour Vehicle Volume • Condition 1A, Minimum Vehicle Volume —The major roadway volumes are greater than 12,000 vehicles per day (vpd) and the minor street volume is greater than 5,000 vpd • Condition 113, Interruption of Continuous Flow - The major roadway volumes are greater than 18,000 vpd and the minor street volume is greater than 3,000 vpd. Warrant 2- Four -Hour Vehicle Volume The four -hour warrant is based on the relationship between the major roadway volume and the higher volume of the minor street approach. This relationship, though not linear, is inversely proportional. If the major street volumes grow the minor street volume can be smaller and the warrant will still be met. This criteria may be met if the major volumes is 8,000 vpd and the minor street volume is 8,000 vpd, the criteria is also met if the major volumes is 14,000 vpd and the minor street volume is 3,000 vpd. This volume range is graphed to determine if the warrant is met. K:\O3OI9 Wraftic \Traffic Operations Report\Oraft 1 -Trafflc Operatlons Memo 6- 411.doa tV DRAFT CSAH 7 at CSAH 116 Local Access Traffic Analysis June 10, 2011 Page 15 CAF Traffic signals have been considered for the following three new intersection locations in the alternatives analyzed. • CSAH 116 at 41st Avenue NW (1800 feet west of CSAH 7) • CSAH 7 at 43`d Avenue NW (1200 feet north of CSAH 116) • CSAH 116 at 9`1' Avenue NW (900 feet east of CSAH 7) The proposed intersection of CSAH 116 at 4ist Avenue NW was analyzed using the traffic volumes forecast for Phase 2, including just a south ieg with access to the high school. No signal warrants were met for the opening year. The forecast daily traffic volume for the year 2030 is 29,000 vpd for CSAH 116 and is about 6,000 vpd for 41St Avenue NW (north leg). After development occurs to the north, the forecast traffic volumes indicate the intersection will meet the 8 -hour and 4 -hour warrants. The proposed intersection of CSAH 7 at 43`d Avenue NW was analyzed using the full build 2030 traffic volumes forecast for Phase 3, including full access to both the east and west sides of CSAH 7. The forecast daily traffic volume for the year 2030 is 25,000 vpd for CSAH 7 and is about 12,000 vpd for 43`d Avenue NW (west leg). With the forecast traffic volumes, the intersection will meet the 8 -hour and 4- hour warrants. The proposed intersection of CSAH 116 at 9th Avenue NW was analyzed using the full build 2030 traffic volumes forecast for Phase 3, including full access to both the north and south sides of CSAH 7. The forecast daily traffic volume for the year 2030 for CSAH 116 is 25,000 vpd and for 9th Avenue (north leg) is about 3,500 vpd. With the forecast traffic volumes, the 4 -hour and 8 -hour warrants will be met. It should be noted that the forecast traffic volumes at CSAH 116 and 9th Avenue are near the minimum levels to warrant a traffic signal and depending on development and neighborhood access volumes could easily change such that warrants are not met. Traffic Operations Analysis The key intersections identified were evaluated during the AM and PM peak hours using Synch ro /SimTraffic micro - simulation software. The results are derived from established methodologies documented in the Highway Capacity Manual (HCM) 2000. The software was used to evaluate the characteristics of the roadway network including lane geometrics, turning - movement volumes, traffic control, and signal - timing. In addition, the signal - timing parameters for future year conditions were optimized using Synchro. This information was then transferred to SimTraffic, the traffic simulation model, to estimate average peak - hour vehicle delays. One of the primary measures of effectiveness used to evaluate intersection traffic operations, as defined in the HCM, is Level of Service (LOS) — a qualitative letter grade, A — F, based on seconds of delay per vehicle due to a traffic control device at an intersection. By definition, LOS A conditions represent high - quality operations (i.e., motorists experience very little delay or interference) and LOS F conditions K: \010140]0 \Traffic \Traff1c Operations Report \Draft 1- Traffic Operations Memo 6311.dom 1(a DRAFT CSAH 7 at CSAH 116 Local Access Traffic Analysis URA June 10, 2011 F73 Page 16 represent very poor operations (i.e., extreme delay or severe congestion). Figure 4 depicts a graphical interpretation of delay times that define level of service. The delay thresholds are lower for unsignalized intersections than signalized intersections due to the public's perception of acceptable delays for different traffic controls as indicated in the HCM. The LOS D/E boundary is an indicator of acceptable traffic operations and was used for this analysis. _ 4 so V oLOS u E __.. ^ u ai 55 d ° 50 m u O 2 LOS E 35 � A 35 LOS p N o 1 25 20 0 o LOS m LOS B z 15 0 10 10 LOS U LOSA LOS P Z Vnugnafeed lnter_emion Sgnoli :ed lntaweaion 54s_Ka E fu lsat R Figure 6: Level of Service Thresholds for Signalized and Unsignalized Intersections Results of the capacity analysis are summarized in the following sections. Detailed capacity analysis results for each alternative can be found in Appendix C. Neighborhood traffic impacts were also evaluated in relation to the 9th Avenue connection to CSAH 116 and 41Rt Avenue NW in Andover. Anoka residents have shown concern that if this connection is made, traffic from the planned development will cut through their development. Estimated daily traffic from the development was assigned to the roadways and compared to the existing traffic counts to estimate traffic impacts on 9th Avenue, 41't Avenue NW and 38th Avenue NW. The results of the analysis for each alternative in each Phase is discussed in the following section. X,XM014 \Traffic \Traffic Operations Report\Drak 1- Traffic Operations Memo&911.doa 1'1 DRAFT CSAH 7 at CSAH 116 Local Access Traffic Analysis June 10, 2011 Page 17 Phase 1 Alternative 1A (Full access at CSAH 7/401h Lane) The traffic modeling estimates that the intersections in the project area operate at acceptable Level of Service (LOS) values for both peak hours as shown in Table 3 for Alternative 1A. The access modifications for the Anoka Area Ice Arena at CSAH 7 and 40th Lane operate without significant delay. The maximum queues for the northbound left turn from CSAH 7 to 40th Lane and the Anoka Area Ice Arena are 15 and 29 feet for the AM and PM peak hours, respectively, which will not block the through traffic on CSAH 7. The delay for the left turn movement from the ice Arena to northbound CSAH 7 was 16:7 seconds. Table 3: Selected Intersection Operations for Alternative 1A (Full Access at CSAH 7 /40th Lane) CSAH 7 at CSAH 116 - Traffic Signal 15 / 27 B / C CSAH 7 at 40th Lane Thru -Stop 1 / 3 A / A CSAH 7 at 38th Avenue Traffic Signal 15 / 11 B / B CSAH 116 at 6th Avenue Thru -Stop 4 / 4 A / A Alternative 1B (3/4 access at CSAH 7/40th Lane) The intersections in the project area also operate at acceptable LOS values in Alternative 1B as shown in Table 2. The intersection delays and queues shown by the capacity analysis are very similar to Alternative A1. Vehicle queues will not fill the turn bay and block through traffic. Table 2: Selected Intersection Operations for Alternative 1B (3/4 Access at CSAH 7 /400 Lane) K:\ 02014000 \Traffic \Traffic Operatons Report\Draft 1- Traffic Operations Memo 6- 211.EOa I's DRAFT CSAH 7 at CSAH 116 Local Access Traffic Analysis June 10, 2011 00AFT Page 18 Phase 2 Alternative 2A (Full access at CSAH 7/40th Lane) The intersections in the project area are estimated to operate at acceptable LOS values for both peak hours. The longest queue at the signalized intersection at CSAH 116 and 41St Avenue is estimated at 160 feet for the westbound through movement in the Pry peals hour. The maximum northbound left turn queue at the CSAH 7 /401h Lane intersection is estimated to be approximately 100 feet which will not block the through traffic. The highest delay is 16 seconds for the eastbound left turn in the AM peak hour which is an LOS C and in the acceptable ranee for unsignalized intersections. The only movement with an unacceptable LOS is the northbound left turn at the CSAH 7/38 1h Avenue intersection during the AM peak hour. The capacity analysis results are summarized below in Table 3. Table 3: Selected Intersection Operations for Alternative 2A (Full Access at CSAH 7 /40th Lane) Alternative 2B (3/4 access at CSAH 7/40th Lane) The capacity analysis results, which are summarized in Table 4, show that traffic operations for this alternative are similar to those in Alternative 2A. The longest maximum queue at the CSAH 116/415t Avenue intersection is 190 feet for the westbound through movement in the PM peak. The maximum northbound left turn queue at the CSAH 7 /40th Lane intersection is estimated to be approximately 85 feet. Again, the only movement with an unacceptable LOS is the northbound left turn at the CSAH 7/38th Avenue intersection in the AM peak hour. Table 4: Intersection Operations for Alternative 2B (3/4 access at CSAH 7 /401h Lane) Alternative 2C (Right -in /Right -out at CSAH 7/40th Lane) The capacity analysis shows that Alternative 2C performs similar to Alternatives 2A and 2B. The longest queue at the intersection of CSAH 116 and 41St Avenue is estimated at 160 feet for the westbound through movement in the PM peak hour. The capacity analysis for Alternative 2C is summarized in Table S. N:: \03019 k`trafFlc \Traffic Operations Report\Draft3 Traffic Operations Memo 6 911.tlau )4 DRAFT CSAH 7 at CSAH 116 Local Access Traffic Analysis June 10, 2011 Page 19 Table 5: Intersection Operations for Alternative 2C (Right -in /Right -Out at CSAH 7 /401h Lane) Phase 3 Capacity analysis results for the Phase 3 alternatives are provided in this section. The capacity analysis was performed using Synchro and SimTraffic software for the proposed intersection configurations for each alternative. Alternative 3A (Full access at CSAH 7/43rd Avenue intersection and Right -in /Right -out at CSAH 116/91h Avenue intersection) This alternative corresponds the most closely to the 2030 traffic volume forecasts for the EA analysis. This alternative will provide acceptable LOS in both the AM and PM peak hours for the forecast 2030 traffic. The estimated maximum queue lengths with this alternative can all be accommodated with the proposed design and traffic queues are not expected to impact the traffic operations at adjacent intersections. The results of the capacity analysis are summarized in Table 6. Table 6: Intersection Operations for Alternative 3A (Full Access at CSAH 7/43rd Avenue Intersection and Right -In /Right -Out at CSAH 116/9th Avenue Intersection) Intersection CSAH 7 at 43rd Avenue Traffic Control Traffic Signal Intersection 17 (s) / Delay 18 Intersection (AM/PM) B / LOS B CSAH 7 at CSAH 116 Traffic Signal 23 / 49 C / 0 CSAH 7 at 40th Lane Thru -Stop 2 / 4 A / A CSAH 116 at 41st Avenue Traffic Signal 17 / 33 B / C CSAH 116 at 9th Avenue Thru -Stop 3 / 5 A / A CSAH 116 at Blackfoot Street Thru -Stop 1 / 1 A / A Alternative 3B (Right -in /Right -out at CSAH 7/43rd Avenue and CSAH 116/9th Avenue intersections) This alternative has the most restrictive access of any of the Phase 3 alternatives, allowing only right - in /right -out movements at the CSAH 7/43rd Avenue and CSAH 116 /9th Avenue intersections. The restriction of right -in, right -out access at the CSAH 7 and 43rd Avenue intersection results in two major changes in the traffic flows compared to Alternative 3A which has full access at CSAH 7 and 43rd Avenue. First, the left turn movement from the northwest quadrant to go north on CSAH 7 is forced to go through the intersection of CSAH 7 and CSAH 116 either as a U -turn or by utilizing access to CSAH 116 and then making a left at CSAH 7 and CSAH 116. Our forecast for this movement is 227 vehicles in the K: \02019000 \Tra,fic \Traffic Operations Report \Draft 1- Traffic Operations Memo 669- 11.dou DRAFT CSAH 7 at CSAH 116 Local Access Traffic Analysis June 10, 2011 Page 20 PM peak hour. Second, the left turn from northbound CSAH 7 into the northwest quadrant would not be possible under this alternative, which will increase the westbound CSAH 116 through movement and the northbound CSAH 7 left turn volume at CSAH 116. Both of these movements are critical movements at the CSAH 7 and CSAH 116 intersection. The total left turn volume that is affected is 571 vehicles in the PM peak hour. As a result of this change in traffic routing at the CSAH 7 and CSAH 116 intersection, the intersection goes from a LOS D to a LOS F in the PM peak hour. As a result of the change in LOS there is a significant increase in traffic queues that impact the operations at the adjacent intersections. Many turning movements on the side streets operate at unacceptable LOS levels due to the lengthy queues from the CSAH 7 /CSAH 116 intersection. Intersection operations for this alternative are summarized in Table 7. Table 7: Intersection Operations for Alternative 3B (Right -In /Right -Out at CSAH 7/43 rd Avenue and CSAH 116 /9th Avenue Intersections) CSAH 7 at 43rd Avenue Thru -Stop 2 / 73 A / D CSAH 7 at CSAH 116 Traffic Signal 31 / 149 C / CSAH 7 at 40th Lane Thru -Stop 3 / 272 A / CSAH 116 at 41st Avenue Traffic Signal 13 / 35 B / D CSAH 116 at 9th Avenue Thru -Stop 3 / 206 A / CSAH 116 at Blackfoot Street Thru -Stop 1 / 37 A Alternative 3C (Right -in /Right -out at CSAH 7/43rd Avenue intersection and full access at CSAH 116/9th Avenue intersection) As shown in Table 8, traffic operations in Alternative 3C are similar to Alternative 3B. The full access at the 9th Avenue and CSAH 116 intersection provides some minor reductions in traffic at CSAH 7 and CSAH 116, but not enough to improve the intersection LOS. The full access at 9th Avenue will not affect the left turn to northbound CSAH 7 from the northwest quadrant or the left turn into the northwest quadrant from CSAH 7. The PM peak hour westbound queue on CSAH 116 from the CSAH 7 /CSAH 116 intersection extends approximately 1475 feet beyond the CSAH 116/9th Avenue intersection, and the PM peak hour northbound maximum queue on CSAH 7 at the CSAH 7 /CSAH 116 intersection extends to approximately the CSAH 7/38th Avenue intersection. Again, many side street turning movements operate at unacceptable LOS levels due to lengthy queues. K. \02019 -000 \TrdfficWraf c Operations Report \Draft S- Traffic Operatlons Memo &S-11. do= "�I DRAFT CSAH 7 at CSAH 116 Local Access Traffic Analysis June 10, 2011 Page 21 Table 8: Intersection Operations for Alternative 3C (Right -In /Right -Out at CSAH 7/43— Avenue Intersection and Full Access at CSAH Intersection Delay Intersection Traffic Control is JAMIPM) CSAH 7 at 43rd Avenue Thru -Stop 3 / 64 _ '_E CSAH 7 at CSAH 116 Traffic Signal 30 / 129 / B CSAH 7 at 40th Lane Thru -Stop 3 / 132 C / CSAH 116 at 41st Avenue Traffic Signal 15 / - 32 5A/ C CSAH 116 at 9th Avenue Thru -Stop 4 / 188 / 32 CSAH 116 at Blackfoot Street Thru -Stop 1 / 13 3 B ,U9AFr 16 /9th Avenue Intersection) Alternative 3D (Full access at CSAH 7/43rd Avenue intersection and 3/4 access at CSAH 116/9th Avenue intersection) Traffic operations for Alternative 3D are similar to those in Alternative 3A. The major benefit of this alternative is the full access on CSAH 7 at 43rd Avenue. The % access on CSAH 116 at 9th Avenue provides limited benefits to the traffic operations on CSAH 116 and CSAH 7. The PM peak hour maximum queue for westbound CSAH 116 extends approximately 640 feet beyond the CSAH 7 /CSAH 116 intersection, and the PM peak hour maximum queue extends approximately 120 feet beyond the CSAH 7/41't Avenue intersection. The traffic operations are summarized in Table 9 for Alternative 3D. Table 9: Intersection Operations for Alternative 3D (Full Access at CSAH 7/43rd Avenue Intersection and 3/4 Access at CSAH 116/9th Avenue Intersection) Intersection CSAH 7 at 43rd Avenue Traffic Control Traffic Signal Intersection 17 (s) / Delay 18 (AM/PM) B / B CSAH 7 at CSAH 116 Traffic Signal 24 / 49 C / D CSAH 7 at 40th Lane Thru -Stop 3 / S A / A CSAH 116 at 41st Avenue Traffic Signal 17 / 32 B / C CSAH 116 at 9th Avenue Thru -Stop 3 / 5 A / A CSAH 116 at Blackfoot Street Thru -Stop 1 / 1 1 A / A Y I Alternative 3E (Full access at CSAH 7/43rd Avenue intersection and Right -in /Right -out at CSAH 116/9th Avenue intersection with 41St Avenue extension to CSAH 116 /Blackfoot Avenue intersection) Traffic turning movements for Alternative 3E are very similar to those forecast for Alternative 3A. It would have about the same forecast LOS as Alternative 3A. The primary benefit of the 41" Avenue extension to CSAH 116 and Blackfoot Avenue would be to reduce the traffic that would potentially go through the residential neighborhood in the southwest quadrant of CSAH 7 and CSAH 116. Alternative 3E also provides shorter delays and queues than Alternative 3A. The PM maximum queue for westbound CSAH 116 at the CSAH 7 /CSAH 116 intersection is 700 feet, and the northbound queue for the PM peak hour on CSAH 7 at the CSAH 7 /CSAH 116 intersection extends to 340 feet past the CSAH 7 /40th Lane intersection. Table 10 summarizes the traffic operations for Alternative 3E. K:: \Oi019 N0 \TrafFlC \Traffic Operations Report\Orak I - Traftic Operations Memo 6- 9- 11.doa V I DRAFT CSAH 7 at CSAH 116 Local Access Traffic Analysis June 10, 2011 Page 22 IX M [ri j Table 10: Intersection Operations for Alternative 3E (Full Access at CSAH 7/43rd Avenue Intersection, Right -In /Right -Out at CSAH 116 /9th Avenue Intersection, and 4151 Avenue Extension to CSAH 116 /Blackfoot Avenue Intersection) Intersection CSAH 7 at 43rd Avenue Traffic Control Traffic Signal Intersection 17 I / Delay 19 (AM/PM) B / B CSAH 7 at CSAH 116 Traffic Signal 23 / 53 C / D CSAH 7 at 40th Lane Thru -Stop 2 / 13 A / B CSAH 116 at 41st Avenue Traffic Signal 17 / 32 C / C CSAH 116 at 9th Avenue Thru -Stop 3 / 5 A - / A CSAH 116 at Blackfoot Street Thru -Stop 1 / 2 1 A / A Alternative 3F (Full access at CSAH 7/43rd Avenue and CSAH 116/9th Avenue intersections) Alternative 3F provides the least restrictions on turning movements of all of the Phase 3 alternatives and also generally provides the shortest queues on CSAH 7 and CSAH 116 of any of the alternatives. The PM peak hour maximum queue on westbound CSAH 116 at the CSAH 7 /CSAH 116 intersection extends approximately 580 feet past the CSAH 7 /CSAH 116 intersection, and the northbound CSAH 7 maximum queue in the PM peak hour extends 30 feet past the CSAH 7/419t Avenue. Table 11 summarize the operations for Alternative 3F. Table 11: Intersection Operations for Alternative 3F (Full Access at CSAH 7/43rd Avenue and CSAH 116/9th Avenue Intersections) CSAH 7 at 43rd Avenue Traffic Signal 17 / CSAH7at CSAHii6 Traffic Signal 22 / CSAH 7 at 40th Lane Thru -Stop 2 / CSAH 116 at 41st Avenue Traffic Signal 17 / CSAH 116 at 9th Avenue Thru -Stop 4 / CSAH 116 at Blackfoot Street Thru -Stop 1 / 18 B / B 41 C / D 3 A / A 32 B / 51 A 1 43 K:\ieffil ]0 \Tn(fc \TmMe Opera tic m; Report\0 raft 1- Traftfc Operations Memo 6- 9- 11.doa DRAFT CSAH 7 at CSAH 116 Local Access Traffic Analysis June 10, 2011 Page 23 i�A F T Neighborhood Traffic Impacts Neighborhood traffic impacts were also evaluated in relation to the 9th Avenue connection to CSAH 116 and 41St Avenue on the Anoka /Andover border to serve the development on the southeast corner of CSAH 7 and CSAH 116. Anoka residents are concerned that if the 9th Avenue connection is made, traffic from the planned development will cut through their neighborhood. Traffic counts were taken along 9th Avenue at two locations, one just north of 40th Lane and one just north of 38th Avenue. The traffic counts show the volume on 9th Avenue north of 40th Lane is 230 vehicles pe ay, and the count on 9th Avenue just north of 38th... h AenUe is 1400 vehicles per day. The daily traffic volume on 41St Avenue east of CSAH 7 was estimated at 180 vehicles per day based on peak hour traffic counts. Daily traffic volumes are shown on Figure 7. Four access scenarios were evaluated for the intersection of CSAH 116 and 9th Avenue, and development traffic was routed based on the easiest route available. The access scenarios include: 1. Full access at CSAH 116 and 9th Avenue, with the 9th Avenue connection to 41St Avenue. 2. % access (no outbound left turning or through vehicles) at CSAH 116 and 9th Avenue with a 9th Avenue connection to 415t Avenue. 3. 'Right in /right out access at CSAH 116`and 9th Avenue with a 9th Avenue connection to 415t Avenue. 4. Extension of 41ST Avenue east to CSAH 116 providing full access to CSAH 116 at Blackfoot Street and right -in /right -out access at CSAH 116 and 9th Avenue. This scenario assumes the 41St Avenue extension and the 9th Avenue development would not be connected to the neighborhood. If full access is allowed at CSAH 116 and 9th Avenue, all development traffic would have access to CSAH 116. Development traffic using 91h Avenue or 41St Avenue would be minimal. If the 9th Avenue connection is made and full access is allowed, the connection may draw traffic originating in the neighborhood. The volume would likely grow on 9th Avenue near 40th Lane and decrease near 38th Avenue. Assuming % access is provided at CSAH 116 and 9th Avenue, only the northbound left and through movements would not have access to CSAH 116 limiting access to CSAH 7 and westbound CSAH 116. Development related traffic destined to CSAH 7 north of CSAH 116 or CSAH 116 west of CSAH 7, estimated at 640 trips per day, would likely use 41St Avenue, The daily traffic volume on 41St Avenue is estimated at 820 vehicles per day under this scenario. Development traffic destined to CSAH 7 south of 38th Avenue w luo d likely use 9th Avenue south to 38th Avenue to get to CSAH 7. The traffic volume on 9th Avenue is estimated to increase 410 trips increasing the daily volume to 640 vehicles per day north of 40t" Lane and 1,810 vehicles per day on north of 38th Avenue. Estimated daily traffic volumes are shown on Figure 7. With right -in /right -out access at CSAH 116 and 9th Avenue, development traffic would have the same limitations as the % access plus traffic would not be able to make the left into the development when Zv�P,,c -Eo fiv�oka yc�` /�oTm K: \DE0190 \Traffic \TraRC Operations Deport\Draft 3 - Traffic operatlonz Memo 6 9- I1.EOa q i (r{�rda, eP cfo'1`� -no f040 40" /y00 ta, r6r0 ��y _ DRAFT CSAH 7 at CSAH 116 Local Access Traffic Analysis June 10, 2011 Page 24 ��AFT coming from the east on CSAH 116. Traffic would then use 38th Avenue and 9th Avenue to enter the development. This would add 730 additional daily vehicle trips to 9th Avenue for a total increase of 1,140 trips per day increasing the volume on 9th Avenue to 1,370 vehicles per day north of 40th Lane and 2,540 vehicles per day north of 38th Avenue. The volume on 41" Avenue will be the same as the access scenario, estimated at 820 vehicles per day. Estimated daily traffic volumes are shown on Figure 7. The scenario that includes the extension of 41St Avenue east to CSAH 116 would provide full access to the development at CSAH 116 at Blackfoot Street and right -in /right -out access at CSAH 116 and 9th Avenue. This scenario assumes the 41St Avenue extension and the 9th Avenue development would not be connected to the neighborhood and therefore there would be no increase in traffic on 9th Avenue south of 41ST Avenue or on 415t Avenue west of 9th Avenue. A possible configuration to separate the neighborhood traffic from the development may include a new configuration for the intersection of 41St Avenue and 9th Avenue. The development may be separated from access to the neighborhood by connecting the west leg of 41St Avenue to the south leg of 9th Avenue and connecting the proposed north leg to the east leg of 41St separating the two roads by a boulevard. Other configurations maybe identified with further study. 'Twls k eovt "-sn a Y Ad.ra.'A)%n U"* . U \Ae.(P. K: \Ui0190 \ Traffic \TtaffidCperaflons Report \Oraftl -Tr3Ml OP.�mtloni Memo6- MI.ded a •- i.. 1 LA � F : Z } g 1 — fR _ • ( —a -- I l! ` / r _ T f- i r r � W6.y Or ^'a �•ti �►�+� at n� *f _ �1qq� a -`�� ,, �[s. �sr rsj ' �8r r r .f it X iT - h ° t /1 vi 6t e 1 a + .. .. CU CL ff u rn ^ab O A TM vA 3 i O o U _ Q m m w m '3 O '3 0 bp O` vI 0 3 5 O O E N o n ° x m 3 0 3 o 3 0 W w U a w I— > I—> �w CD CD CD Y l''11 c ^1 LLL S ° �G DRAFT CSAH 7 at CSAH 116 Local Access Traffic Analysis MTAF� June 10, 2011 Page 26 Corridor Travel Time Another consideration in evaluating the future access to CSAH 7 and CSAH 116 is the impact that the change in access would have on travel times through the corridor. The introduction of an additional signal may reduce delays for the side streets and potentially improve the operation of the CSAH 7 and CSAH 116 intersection, but it will also add delay for through traffic at the new signalized intersection. The overall travel times through the study area on both CSAH 7 and CSAH 116 were evaluated for the various alternatives in Phase 3 to determine the overall impact on through traffic on both CSAH 7 and CSAH 116. For the CSAH 7 corridor the corridor travel times were measured from % mile north of the proposed intersection at 43'd Avenue to % mile south of the intersection at 38`1' Avenue. For CSAH 116 the corridor travel times were measured from % mile east of 38th to a X mile west of 41St Avenue. The results are shown in Table 14. The alternatives that have full access at 43`d Avenue have the best overall corridor travel times on both CSAH 7 and CSAH 116. This is primarily because the traffic operations and delay at the intersection of CSAH 7 and CSAH 116 fail without a full intersection at 43`d Avenue. Table 14: Corridor Travel Time by Alternative Conclusions Traffic operations, access spacing, signal warrants, and neighborhood impacts were analyzed for the local intersections adjacent to the CSAH 7 intersection with CSAH 116. Anoka County is currently developing plans for the reconstruction of CSAH 116 including its intersection with CSAH 7. With this reconstruction, the Cities of Anoka and Andover have identified potential roadway access that they desire to maintain the economic viability of the land adjacent to the intersection of CSAH 7 and CSAH 116. Phase 1 Phase 1 analyzed the potential access for the Anoka Area Ice Arena. The access is currently positioned along CSAH 7 at 41St Avenue. This intersection is 350 feet south of CSAH 116. The access does not meet Anoka County's Access Spacing Guidelines for a secondary access and has been identified by the County to be closed with the reconstruction of CSAH 7 and CSAH 116. With this closure the City of Anoka has proposed relocating the access south 450 feet to line up with 40th Lane. Two potential access alternatives were identified to provide access to the Anoka Area Ice Arena at 40th Lane, • Alternative 1A: full access to CSAH 7, similar to today. K: \03014000 \Traffic \Traffic Operations Rep ert\Oraft 1- Traffic Operations Memo 5- 4lI.dou V I DRAFT CSAH 7 at CSAH 116 Local Access Traffic Analysis June 10, 2011 Page 28 j�AFI" With a full access at 40th Avenue and CSAH 7, traffic to northbound CSAH 7 could make the left out at 40th Avenue. With existing traffic volumes the delay for this movement is 16.1 seconds in the PM peak hour. However, in the future the delays would increase significantly. With a % access, the traffic to northbound CSAH 7 would have to use the 41St and CSAH 116 intersection. Although this is farther for traffic to go it would be much safer when traffic volumes increase. With a right -in and right -out access at 40th Avenue and CSAH 7, the northbound CSAH 7 traffic to the Ice Arena would have to make a left at CSAH 7 and CSAH 116 and then use the intersection at 41St Avenue and CSAH 116. This would add to a high left -turn volume at CSAH 7 and CSAH 116. The northbound left turn from CSAH 7 at 40th Avenue could be accommodated at an acceptable level of service. Phase 3 Phase 3 of construction proposed for the project area involves building new local roads to provide access to CSAH 7 and CSAH 116 from the undeveloped land in the northwest, northeast, and southeast areas. The new roadways will provide access to the new developments at the following locations: • CSAH 116 and 41St Avenue (constructed in Phase 2), signalized by 2030, • 43rd Avenue NW at CSAH 7, • 9th Avenue at CSAH 116. It is assumed that a full access intersection will be provided at CSAH 116 and 41St Avenue under all alternatives. The analysis shows that a full access at 43rd Avenue and CSAH 7 is important to maintain an acceptable level of service at the CSAH 7 and CSAH 116 intersection. Without the full access at CSAH 7 and 43`d Avenue, the intersection of CSAH 7 and CSAH 116 is forecast to fail and create queues and back -ups that affect the adjacent intersections. It also results in a significant increase in the overall corridor travel times. It is expected that the intersection of 43`d Avenue and CSAH 7 will meet signal warrants with the future development in the northwest quadrant. This intersection does not meet the County's Access Spacing Guidelines and, if provided, would require greater spacing at other future intersections to the north to achieve the % mile spacing in the County's guidelines. The analysis shows that a full access intersection at 9th Avenue and CSAH 116 provides limited benefits to the overall traffic operations in the corridor. Without a traffic signal at this location the left turn movements from the side streets would operate at level of service "I'". The analysis indicates that with full development the traffic volumes at this intersection may potentially meet signal warrants but it will depend on actual access and traffic characteristics. 01n b,_4- - 5,&rp°`k 4r -�kc. 3/q o II ( q- 9''' A04- N: \Odo1 \Tral& \Traffic Operatlans Report\Draft 3- Traffic Operatlom Memo 6- 9- 11.doa ' DRAFT CSAH 7 at CSAH 116 Local Access Traffic Analysis June 10, 2011 Page 27 • Alternative 16: 3/4 access restricting lefts out of the ice arena. With the 3/4 access alternative there would be a one -way outbound connection to 6th Avenue just west of CSAH 7 to provide access to CSAH 116. 6th Avenue is also right -in /right -out at CSAH 116, so with Alternative 16 no direct access would be provided to westbound CSAH 116 and a u -turn would be required to go west. The intersection location at CSAH 7 and 40 Lane is 800 feet south of CSAH 116 and would meet the Anoka County Access Spacing Guidelines for a secondary access to an "A" minor arterial with speeds of 40 to 45 unfles per hour but dues not meet the guidelines fur a full access. Tile key difference between the two alternatives is how the movement from the ice arena to northbound CSAH 7 and westbound CSAH 116 is handled. With a % access at 40th Avenue and CSAH 7 traffic destined to northbound CSAH 7 and westbound CSAH 116 would make a right -turn onto CSAH 116 at 6th Avenue and then a left or u- turn at CSAH 7. With a full access at 40th Avenue this traffic would turn onto CSAH 7. Based on the analysis the delay for this left -turn onto CSAH 7 would be 16.7 seconds which is an acceptable level of service "C ". Phase 2 Phase 2 includes extending 41St Avenue from the Anoka Area Ice Arena and CSAH 7 to CSAH 116 to just west of the existing pedestrian bridge over CSAH 116. This phase also included closing access to CSAH 116 from the south leg of 6th Avenue and the reconstruction of the intersection of CSAH 7 and CSAH 116. All of the Phase 2 alternatives assume that 41" Avenue will connect with CSAH 116 and provide access to Anoka High School through a full- access intersection at CSAH 116. The Anoka High School currently uses 38th Avenue and CSAH 7 to go westbound on CSAH 116. An alternate route to westbound CSAH 116 commonly used (as observed when collecting traffic data) is vehicles use the right -out access from 6th Avenue to CSAH 116 and proceed east on CSAH 116 and make a u -turn at CSAH 7 or further east just past CSAH 7 and make a u -turn mid - block. Also, some vehicles were observed making a left turn from the right -out on 6th Avenue to go west on CSAH 116, which is an illegal traffic movement. The access at CSAH 7 and the proposed 40th Lane location was evaluated with the 41st Avenue and CSAH 116 intersection assuming full access, %access, and right -in /right -out access and existing traffic volumes. The 41St Avenue extension to CSAH 116 would provide more direct access for the Anoka High School and the Anoka Area Ice Arena to westbound CSAH 116. It also provides an alternative for the Ice Arena traffic to westbound CSAH 116. The intersection would remove the need to make u -turns at the intersection of CSAH 7 improving the operations at this intersection in the future. The intersection location is 1,800 feet west of CSAH 7 which is less than the 1/2 miles spacing required by the Anoka County Access Spacing Guidelines for a full access intersection on an "A" minor arterial with speeds of 50 or 55 miles per hour but greater than the 1/4 mile spacing required on a roadway in an urbanizing area. The intersection operates at a LOS of A with estimated existing volumes and signal control. The intersection does not meet signal warrants with existing traffic volumes. Traffic volumes at this intersection will meet traffic signal warrants with the future access to the north of CSAH 116. When the 41St Avenue extension is constructed, signal warrants may want to be reevaluated due to the high school traffic and anticipated large peak traffic flows that come from sporting events. K: \03019-0 \Traffic \Tmfflc Operatlons Report \Draft I- TrafficOperations Mema 6- g11.doa ^ A :Ek', G J; • COS-E-5 •I Anoka County Contract No. 2011 -0516 • �Xlnib�-� �U . JOINT POWERS AGREEMENT FOR THE RECONSTRUCTION OF COUNTY STATE AID HIGHWAY 116 (BUNKER LAKE BOULEVARD) BETWEEN CSAH 7 (SEVENTH AVE) AND 38TH AVENUE NW IN THE CITIES OF ANOKA, MN AND ANDOVER, MN (SP 02- 716 -12) THIS AGREEMENT is made and entered into this _ day of , 2011 by and between the County of Anoka, a political subdivision of the State of Minnesota, 2100 Third Avenue, Anoka, Minnesota 55303, hereinafter referred to as "County ", and the City of Andover, 1685 Crosstown Boulevard, Andover, MN 55304, hereinafter referred to as "City ". WITNESSETH WHEREAS, the parties to this agreement agree it is in the best interest of the traveling public to reconstruct County State Aid Highway 116 (Bunker Lake Boulevard) from CSAH 7 (Seventh Ave) to 38th Avenue NW and, WHEREAS, said parties mutually agree that County State Aid Highway 116 between CSAH 7 and 38th Avenue NW is in need of reconstruction; and, WHEREAS, the County has prepared preliminary design plans for the reconstruction of County State Aid Highway 116 between CSAH 7 and 38th Avenue NW in accordance with Anoka County and the Minnesota Department of Transportation standards to a staff approved layout condition; and, WHEREAS, Anoka County has jurisdiction over County State Aid Highway 116 between CSAH and 38th Avenue NW and, WHEREAS, the parties agree that it is in their best interest that the cost of said project be shared;. and, • ... WHEREAS, Minn. Stat. § 471.59 authorizes political subdivisions of the state to enter irito joint powers agreements for the joint exercise of powers common to each. NOW, THEREFORE, IT IS MUTUALLY STIPULATED AND AGREED: I. PURPOSE AND UNDERSTANDING The parties have joined together for the purpose of reconstructing the roadway, drainage, trail, and traffic control systems on a portion of CSAH 116 (Bunker Lake Boulevard) between CSAH 7 and 38th Avenue NW, and the extension of the trail construction to CSAH 9 (Round Lake Boulevard); as described in the plans and specifications numbered Anoka County Project S.P. 02- 716 -12 (hereinafter referred to as "Project") on file in the office of the Anoka County Highway Department. As part of the approval of the Project, the City and County have reached an agreement with regards to other matters which are described below: 92 DRAA F T i The parties to this Joint Powers Agreement (JPA) agree in principle that construction of County State Aid Project No. 02- 716 -12 between CSAH 7 and 38th Avenue NW is in -the bestJaterest:of the traveling public and that the Preliminary Layout as shown in Exhibit "A" defines the preliminary design of the Project. It is agreed that the Exhibit "A" Layout dated April 20, 2011 has been reviewed and accepted by the parties and is suitable for preparation of final construction documents. Any significant changes made hereafter to the design as presented in the Exhibit "A" Layout will require approval by the parties as an amendment to this JPA. These same changes will require a change in the cost share to include any additional design engineering costs that may occur. IMPROVEMENTS: It is agreed by the parties that in 2012, CSAH 116 will be reconstructed to a four -lane section with concrete mediatiolie extent shown in "Exhibit A ". Improvements include, but are not limited to: traffic signal reconstruction at CSAH 7, new traffic signal at 38th Avenue NW, right- and left -turn lanes, through lanes, shoulders, concrete curb and gutter, storm sewer with associated ponding, bituminous trail and potential noise walls based upon the findings of the noise study. INTERSECTIONS: As agreed by the parties, improvements to the following intersections have been incorporated in the Exhibit "A" Layout design: CSAH 116 / CSAH 7: Full Access Intersection with Traffic Signal CSAH 116 / Blackfoot St NW: Full Access CSAH 116 / 140th Ave NW: Right In / Right Out CSAH 116 / 38th Ave NW: Full Access Intersection with Traffic Signal CSAH 7 / Future city street connection north of CSAH 116: [The City has requested a full access intersection at this future city street connectic location is outside the limits of the center concrete median for this nroiect, and not -.ct. Per County access spacing guidelines, there are three full accesses allowed 16 and CSAH 20. Three full access locations along CSAH 7 between CSAH 11 0 will be allowed, with the first full access location to be located in the vicinity i for the CenterPoint Enerev/Northem Natural Gas Co. site. The remainirie two This was approved at the January 25, 2011 City Council Workshop.] �ted by between The City is currently working with City of Anoka staff on a traffic study for this area to determine what future local roadway network and intersection control will be necessary to facilitate development and accommodate existing and future traffic in the area. If this study determines that an alternative design provides benefit to the County roadway system, these changes may be incorporated into the design, pending County approval of the study. 3► RIGHT OF WAY: The parties agree that the County will acquire all necessary right -of -way and easements for the Project. Acquisition of any additional right -of -way and/or easements needed for improvements to the City street intersections beyond what is defined in the Exhibit "A" Layout will be the responsibility of the City. It is agreed by the parties that all necessary right of way and easements will be in legal possession of the County prior to acceptance of bids for the project. Any City owned property or easements required for the construction will be conveyed to the County at no cost. TRAFFIC SIGNALS: CSAH 116 and CSAH 7 Intersection: The parties agree that the existing traffic control signal system at the CSAH 116 and CSAH 7 intersection will be reconstructed with this project pending state and federal approval. The parties agree that the cost of the reconstruction of this signal pending the availability of Federal funding shall be standard County cost share; with 100% of the EVP reconstruction costs (50% City of Andover, 50% City of Anoka); and 25% of the traffic signal cost to the City of Andover, 25% of the traffic signal cost to the City of Anoka, and 50% of the traffic signal cost to the County. CSAH 116 and 38th Ave NW Intersection: The traffic analysis has determined that a traffic signal is warranted at the CSAH 116 and 38th Avenue NW intersection. The parties agree that a traffic control signal system will be constructed at this intersection with this project pending state and federal approval. The parties agree that the cost of this new traffic signal pending the availability of Federal funding shall be standard County cost share, with 100% of the EVP reconstruction costs (50% City of Andover, 50% City of Anoka); and 33.3% of the traffic signal cost to the City of Andover, 33.3% of the traffic signal cost to the City of Anoka, and 33.3% of the traffic signal cost to the County. DRAINAGE: The City shall pay for a percentage of the cost of the storm sewer system, including the detention basins ' "and thei r outlet stt•uctihe%, The:City portion of the-cost. is based on contributing flow through the storm ••sewer" .ystdm.to the.detention basin.determined by the_pzQduct of contributing area and runoff coefficient. ENVIRONMENTAL ISSUES: A noise analysis has been performed as part of the Environmental Assessment process. It was concluded that noise walls would be feasible at one location in the City of Andover. The County will meet individually with these property owners to review their options concerning noise walls on their property. The parties agree that the costs of these improvements, pending the availability of Federal funding, shall .bp standard county,cost share. The'county pays 100% of the local share for the noise walls. The city pays for any costs above the base cost of the noise wall. 3 BITUMINOUS TRAIL: r CSAH 116 (Bunker Lake Boulevard) Trail: The parties agree that the construction of the bituminous trail along the north side of CSAH 116 is eligible for Federal funds and that the City will contribute all matching funds [except for the replacement of the existing trail west of CSAH 7, which is paid for by the County]. This trail location has been agreed to by the City. If this location changes in the future, the additional costs associated with this change will be the responsibility of the City. This trail is part of the County Regional Trail System and is eligible for potential funding through the Metropolitan Council's Regional Parks Capital Improvement Program after the project has been constructed and a request has been received from the City. If the Anoka County Parks and Recreation Department receives a letter of request from the City, the Anoka County Parks and Recreation Department will seek reimbursement for one -half of the City's share for trail construction along CSAH 116. If funds are secured, the Anoka County Parks and Recreation Department will reimburse the City with the additional funds received. The parties understand that the cost for the trail includes: bituminous surfacing, aggregate base, excavation (including muck excavation), borrow material (granular and topsoil), and turf establishment. The parties agree that the County will pay for the design of the trail, wetland mitigation required by impacts caused by the trail, the additional right of way and easements required to construct the trail at the proper location, and any removal items, with the exception of soils, required to construct the trail. CSAH 116 (Bunker Lake Boulevard) Trail from 38th Ave NW to CSAH 9 (Round Lake Blvd): The City has requested a trail connection between the east end of the project and 300 ft east of Underclift Street be included in the project. It has been agreed that the County will include the environmental analysis required for this trail connection in the Environmental Assessment document for the roadway project, with the City reimbursing the County for this work. The County will prepare preliminary and final construction plans for this trail connection, with the City reimbursing the County for this work. The County will purchase the required right of way, with the City reimbursing the County for this work. The City shall be responsible for all construction costs for this trail connection, including the costs of the roadway shoulder, curb and gutter, storm sewer, and ponding. The City shall also be responsible for all floodplain mitigation, wetland mitigation, and all other associated costs related to the construction of this trail. This trail is part'of the County Regional Trail System and shall follow the same process for reimbursement as discussed above. Awca. C«,n.iy T>*A -S W :I l cyrl y ( ' CSAH 7 Seventh Avenue Trail: — fs�oi��Nh..Kce�«.w� d..•� (Seventh +Ae, t/Ytc�i�� ice- Ca.r►e_i -i� k wai n� The parties agree that the construction of the bituminous trail along the east side of CSAH 7 is eligible for federal funds and that the City will contribute all matching funds [except for the replacement of the existing trail south of CSAH 7, which is paid for by the County]. This trail location has been agreed to by the City. If this location changes in the future, the additional costs associated with this change will be the responsibility of the City. The trail segment north of CSAH 116 is part of the County Regional Trail System and shall follow the same process for reimbursement as discussed above. -VAC C: 1� w:1 LA,P COS* to c,m stru-t-+ ;1 a� d b'e- �c�c •►tib„w w (ne �n -� PNc- jp -s CL. 4PLw9L5 Art rr at awavAlc.A 'tt%C- Cl w: ( l da wlihe. T 40-t � -1-Zw%G_ %i ''O%c- OVbJ GG-'t 1/Y 'itt, "W W kPJ 33 DI GAT TRAFFIC CONTROL: The parties understand and agree that CSAH 116 will be closed to thru traffic during construction, but access for local traffic will be maintained during construction. The parties agree and understand the cost share for traffic control for the city shall be a prorated share based on the city project cost divided by the total project cost. DRIVEWA`fS: The parties agree that all driveways affected (excluding those identified for removal) by the Project will be reconstructed in kind with the cost of any upgrades requested by the City, including concrete aprons, to be the sole responsibility of the City. LANDS CAPING /STREETSCAPING: The parties agree that if the City wishes to include landscaping or streetscape features in the project, they shall be designed in accordance with Anoka County Highway Department Landscape / Streetscape Guidelines. The City shall supply the signed plan sheets and specifications for the proposed landscape /streetscape. The total cost of the design as well as the construction cost above standard median cost will be at the expense of the requesting City or split between the requesting Cities. All construction documents must be submitted to the County by September 1, 2011. Future maintenance of any landscaping/streetscaping will be the sole responsibility of the city. UTILITIES: The parties agree that the Exhibit "A" Layout does not include specific proposed utility locations, as those will be determined during later stages of the design process. The City will be responsible for the deSigi. of ai.y Saiutaiy Sealer and water ma:r. Am "Frove...enta and/or relocations due to road reconstruction, which will be incorporated into the project bid documents. The cost of the design of these features shall be the responsibility of the City. The cost of construction of these features, other than those relocations solely due to roadway reconstruction, shall be the responsibility of the City. The cost of construction of these features solely due to road reconstruction shall be the responsibility of the County. The City's design of the sanitary sewer and water main utilities are to include signed plans, specifications, and estimated quantities and cost. All construction documents must be submitted to the County by September 1, 2011. The City shall provide all City utility easement documents to the County upon signature of this agreement. PERMITS: The parties agree that the County will secure all necessary permits for this Project. The City agrees to coordinate with the County in securing the permits required by the Lower Rum River WMO, city permits, as well as any other permits that may be required. The County also requests that the City S9 BMzl Fr inform the County of any ordinances or city regulations that affect construction at the time of the signing of this JPA. (e.g. setbacks, tree clearing ordinances, or any other city ordinances.) II. METHOD The County shall cause the construction of Anoka County Project SP 02- 716 -12, in conformance with proposed engineering plans and specifications. III. COSTS The contract costs of the work, or if the work is not contracted, the cost of all labor, materials, normal engineering costs and equipment rental required to complete the work, shall constitute the "actual construction costs" and shall be so referred to herein. "Estimated construction costs" are good faith projections of the costs, which will be incurred for this project. Actual costs will vary and those will be the costs for which the relevant parties will be responsible. The estimated construction cost of the total project is $XXXXXXX. Federal funds available for the Project are capped at $4,204,000. The federal funds shall be split based on the ratio of eligible cost incurred by each party to the total eligib cost. Eligible costs are the costs of items that can participate in federal funding as shown Exhibit B. % The total estimated construction cost to the City is $XXXXXXX (prior to application of federal funds available). After federal funding percentage is applied, the cost to the City for their share of the construction items of the Project is $XXXXXX ($XXXXX minus $XXXXXX, the federal funds available to the City). The City participation in construction engineering will be at a rate of eight percent (8 %) of their designated construction share of $XXXXXX. The estimated cost to the City for construction engineering is $XXXXXXX. In summary, the total City share of this project is $X (includes construction and construction engineering costs). The total cost to the city after federal funds have been applied including construction engineering is * $XXXXXXX ( see summary below). *( $XXXXX — $XXXXXXX + $XXXXXX = $XXXXXX note: construction engineering costs are not federally eligible) Upon award of the contract, the City shall pay to the County, upon written demand by the County, ninety five percent (95 %) of its portion of the cost of the project estimated at $XXXXXX Prior to billing, this estimate will be updated by the County to reflect the actual bid prices as awarded. An updated cost estimate shall be provided to the City at the time of billing. The City's share of the cost of the project shall include only construction and construction engineering expense and does not include engineering design and administrative expenses incurred by the County. Upon final completion of the project, the City's share of the construction cost will be based upon actual construction costs. If necessary, adjustments to the initial ninety five percent (95 %) charged will be made in the form of credit or additional charges to the City's share. Also, the remaining five percent (5 %) of the City's portion of the construction costs shall be paid. $50 IV. TERM j9AFT This Agreement shall continue until terminated as provided hereinafter. V. DISBURSEMENT OF FUNDS All funds disbursed by the County or City pursuant to this Agreement shall be disbursed by each entity pursuant to the method provided by law. VI. CONTRACTS AND PURCHASES All contracts let and purchases made pursuant to this Agreement shall be made by the County in. conformance to the State laws. VII. STRICT ACCOUNTABILITY A strict accounting shall be made of all funds and report of all receipts and shall be made upon request by either party. Prior to city payment to the County, Anoka County shall provide the City a copy of all cost participation documents submitted to MnDOT State Aid to assist the city in their application for MSA funding. VIII. TERMINATION This Agreement may be terminated by either party at any time, with or without cause, upon not less than thirty (3 0) days written notice delivered by mail or in person to the other party. If notice is delivered by mail, it shall be deemed to be received two days after mailing. Such termination shall not be effective with respect to any solicitation of bids or any purchases of services or goods which occurred prior to such notice of termination. The City shall pay its pro rata share of costs which the County incurred prior to such notice of termination. IX. SIGNALIZATION POWER The City shall at their sole expense, install and cause the installation of an adequate electrical power source to the service cabinet for the CSAH 116 /CSAH 7 traffic control signal system and the CSAH 116/38' Avenue NW traffic control signal system including any necessary extension of power lines. The City shall be the lead agency in this matter. Upon completion of said traffic control signal installation, the ongoing cost of the electrical power to the signal shall be the sole cost and expense of the City. The City shall enter into a separate agreement with the City of Anoka regarding cost sharing of the ongoing electrical power costs for the completed traffic control signals as applicable. X. MAINTENANCE A. Maintenance of the completed watermain, sanitary sewer, storm sewer (except catch basins and catch basin leads), detention basins (including ponds and their outlet structures and grit chambers /collectors) shall be the sole obligation of the City. B. Maintenance of the bituminous trails shall be the responsibility of the City and Anoka County Parks and Recreation Department. The City shall be responsible for general routine maintenance such as, sweeping, clearing, plowing, trash removal and other incidental items. The County Parks and Recreation Department shall be responsible for long -term maintenance, 7 36 004"/' such as bituminous overlays, crack sealing and replacement. Trail signage will be provided by and maintained by the County Parks and Recreation Department. C. Maintenance of crosswalk pavement markings shall be the responsibility of the City and the County. The County will be responsible for the maintenance of the crosswalk pavement marking for the crossings at the signalized intersections. The City will be responsible for all crosswalk pavement markings for any trail/sidewalk crossings at all city streets. D. Maintenance of streetlights and cost of electrical power to the streetlights shall be the sole obligation of the City. E. Maintenance of the completed traffic control signal and signal equipment at the CSAH 116 /CSAH 7 intersection and the CSAH 116/38th Avenue NW intersection shall be the sole obligation of the County. F. The County shall maintain the said traffic signal controllers., traffic signal and pedestrian indications, loop detectors and associated wiring of the said traffic control signals at the sole obligation of the County. G. Painting of the traffic signal shall be the sole obligation of the County. Any variation of painting color standards will be billed to the City. H. Timing of the completed traffic control signal shall be determined by the County. I. Only the County shall have access to the controller cabinets. J. The traffic control signals shall be the property of the County. K. The City shall be responsible for maintenance of the luminaries, luminaire relamping, and luminaire painting. L. All maintenance of the EVP Systems at the CSAH 116 /CSAH 7 intersection and the CSAH 116/38th Ave NW intersection shall be completed by the County. The City shall be billed by the County on a quarterly basis for all incurred costs. The City shall enter into a separate agreement with the City of Anoka regarding cost sharing of the ongoing EVP maintenance costs for the completed traffic control signal as applicable. M. EVP Emitter Units may be installed on and used only by Emergency Vehicles responding to an emergency as defined in Minnesota Statutes §169.01, Subdivision 5, and §169.03. The City shall provide a list to the County Engineer, or the County's duly appointed representative, of all such vehicles with emitter units on an annual basis. N. Malfunctions of the EVP Systems shall be immediately reported to the County. O. All timing of said EVP Systems shall be determined by the County. P. In the event said EVP Systems or components are, in the opinion of the County, being misused, or the conditions set forth are violated, and such misuse or violation continues after receipt by the City, written notice thereof from the County, the County shall remove the EVP Systems. 8 $7 Upon removal of the EVP Systems pursuant to this paragraph, the field wiring, cabinet wiring, detector receiver, infrared detector heads and indicator lamps and all other components shall become the property of the County. Q. Anoka County shall be responsible for all maintenance of County installed noise walls. Xi. 1-40TICE For purposes of delivery of any notices herein., the notice shall be effective if delivered to the County Administrator of Anoka County, 2100 Third. Avenue, Anoka, Minnesota 55303, on behalf of the County, and to the City Administrator of Andover, 1685 Crosstown Boulevard, Andover, MN 55304, on behalf of the City. XII. INDEMNIFICATION The City and County mutually agree to indemnify and hold harmless each other from any claims, losses, costs, expenses or damages resulting from the acts or omissions of the respective officers, agents, or employees relating to activities conducted by either party under this Agreement. 9 38 XIII. ENTIRE AGREEMENT REQUIREMENT OF A WRITING . DRAFT It is understood and agreed that the entire agreement of the parties is contained herein and that this Agreement supersedes all oral agreements and all negotiations between the parties relating to the subject matter thereon as well as any previous agreement presently in effect between the pa«ies to the subject matter thereof. Any alterations, variations, or modifications of the provisions of this Agreement shall be valid only when they have been reduced to writing and duly signed by the parties. IN WITNESS WHEREOF, the parties to this Agreement have hereunto set their hands on the dates written below. COUNTY DE ANO A By:_ Dated: Rhonda Sivarajah, Chair Board of Commissioners ATTEST 2 Jerry Soma County Administrator Dated: RECOMMENDED FOR APPROVAL IN Douglas W. Fischer, P.E. County Engineer Dated: APPROVED AS TO FORM CITY OF ANDOVER LOM I: Dated: : Dated: By: By: Dan Klint Assistant County Attorney 10 Mike Gamache Mayor Jim Dickinson City Administrator David D. Berkowitz, P.E. Director of Public Works /City Engineer City Attorney $1 EXHIBIT "C" COST - SHARING AGREEMENT FOR PROJECTS CONSTRUCTED IN ANOKA COUNTY USING COUNTY STATE AID FUNDS OR LOCAL TAX LEVY DOLLARS ITEMS COUNTY SHARE CITY SHARE Concrete Curb & Gutter 50% 50% Concrete Curb & Gutter for Median Construction 100% 0% Concrete Median 100% 0 *' Concrete Sidewalk 0% 100% Concrete Sidewalk Replacement 100% 0% Bikeways 0% 100% Bikeway Replacement 100 %, 0% Unless existing trail not placed at edge of RNV Construction or Adjustment of Local Utilities 0% 100% Grading, Base and Bituminous 100% 0% Storm Sewer based on state aid letter *2 based on state aid letter *2 Driveway Upgrades 100 %, in -kind 100 %, of up- grades Traffic Signals, new & replacements (communities larger than 5,000) / the cost of its the cost of its legs of w! State Aid approved SJR legs of the intersection the intersection plus Y: the cost of the County legs of the intersection Traffic Signals, new & replacements (communities less than 5,000) 100% 0% w/ State Aid approved SJR Traffic Signal, w/o State Aid approved SJR 0% 100% EVP 0% 100% Engineering Services *3 *3 Right -of -Way 100% 4 0% Street Lights 0% 100% Noise Walls 100 %, if not previously notified 5 100 %, if previously notified *5 *1 The County pays for 100% of Standard Median Design such as plain concrete. If a local unit of government requests decorative median such as brick, stamped concrete, or landscaping, the local unit will pay the additional cost above the cost of standard median. *2 In the event no State Aid is being used, or in the event the state aid letter does not determine cost split percentages, drainage cost shares will be computed by the proportion of contributing flow outside the County right of way to the total contributing flow. *3 Engineering shall be paid by the Lead Agency except that any participating agency will pay construction engineering in the amount of 8% of the construction costs paid by that agency. *4 In the event that the Township or City requests purchase of right -of -way in excess of those right -of -ways required by County construction, the Township or City participates to the extent an agreement can be reached in these properties. For instance, a Township or City may request a sidewalk be constructed alongside a County roadway which would require additional right -of -way, in which case the Township or City may pay for that portion of the right -of -way. Acquisition of right -of -way for new alignments shall be the responsibility of the Township or City in which the alignment is located. This provision may be waived by agreement with the County Board if the roadway replaces an existing alignment and the local unit of government takes jurisdiction of that existing alignment. In addition, any costs, including right -of -way costs, incurred by the County because a Township or City did not acquire sufficient right -of -way during the platting process or redevelopment process as requested by the County shall be paid by the Township or City. *5 Notification includes any letter to the agency indicating that noise will potentially be an issue in the future, likely received during the Plat Review Process. Maintenance shall be the responsibility of the agency paying for the initial installation. When the County is the responsible agency, it shall pay 100% of Standard Noise Wall Cost. If a local agency requests decorative noise walls, the requesting agency will pay the additional cost above the cost of standard noise wall. 11 Y O F OVE: 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755 -5100 FAX (763) 755 -8923 • WWW.AN DOVE RMN.GOV TO: Mayor and Council Members CC: Jim Dickinson, City AdministratViorkslCity David D. Berkowitz, Director of FROM: Todd J. Haas, Lower Rum River WMO SUBJECT: Update LRRWMO — Engineering DATE: June 28, 2011 INTRODUCTION This item is in regards to updating the City Council as to the status of the Lower Rum River Watershed Management Organization ( LRRWMO) and the Wetland Management Standards that are currently being drafted by the TAC. DISCUSSION As mentioned at the last Council workshop in May, a Technical Advisory Committee (TAC) has been created to address two items which are or will be included in the plan. The storm water standards have been completed and have already been approved by the LRRWMO board. The second item currently being discussed by TAC is the wetland management standards. The standards are set to protect wetlands (besides storm water treatment ponds) where there is direct runoff from adjacent properties (roofs, backyards, chemicals that are used to fertilize yards).The standard also will provide the wildlife habitat which is a goal of the LRRWMO as identified in the 3rd Generation Plan. At this point TAC is looking at backyard infiltration basins (swales to capture the water which will infiltrate eventually back into the wetland as treated water) and buffers (or also known as maintenance strips). TAC is in agreement that either one or a combination of both would work in the treatment of the runoff based on scientific data and studies that was provided by the Anoka Conservation District. If one of the goals of the LRRWMO is to provide habitat, then buffers may provide the best option. TAC is not saying that a buffer strip (for example placing a 16.5 foot wide buffer strip around the perimeter of the wetland) be placed around the wetland but to use judgment when establishing the width of the buffer strip based on slope and condition of the property. The steeper the slope that exists, the larger the buffer strip needs to be. There is no state mandate requiring buffers but research has shown that it is one of the best management practices to protect wetlands. The Board of Water and Soil Resources (BWSR), as mentioned at the last workshop, is the agency that ultimately will be reviewing and approving the entire plan including the wetland protection section. If the goals that have been stated in the plan are not addressed on how the LRWMO will accomplish these goals (for example buffers and/or infiltration swales), the plan will or may not be approved by BWSR. Note: TAC is in agreement that education on protecting wetlands is extremely important and will be one component. The opinion by BWSR feels that this is not enough in the physical protection of wetlands. 04 9ALWA Mayor and Council Members June 28, 2011 Page 2 of 2 Here are a few other things that are going on with the LRRWMO. A water quality representative of the National Park Service gave a short presentation to the LRRWMO at their last meeting in June and what is happening along the Mississippi River. They also gave some ideas about partnering with the adjacent communities on grants and other opportunities. For those not familiar with segment of the Mississippi River, the National Park Service is responsible for providing recreational opportunities for 72 mile stretch of the river from Dayton/Ramsey down to Hastings. ACTION REQUIRED This is for information and no action is needed at this time. Respectfully submitted, Tod)rIaas Cc: Bruce Perry, LRRWMO Andover Alternate I T Y O F [DOVE 1685 CROSSTOWN BOULEVARD N.W.. ANDOVER, MINNESOTA 55304 • (763) 755 -5100 FAX (763) 755 -8923 . WWW.CI.ANDOVER.MN.US TO: FROM: SUBJECT: DATE: Mayor and Councilmembers Jim Dickinson, City Administrator 2012 -2016 CIP Discussion June 28, 2010 0 INTRODUCTION In late March, Administration/Finance distributed baseline worksheets to Department Heads as a 2012- 2016 CEP kick -off. Subsequent discussion has centered on the need of other committees (Vehicle Purchasing & Facility Management Committees) and commissions (Parks and Recreation & Community Center Advisory) to start their work. DISCUSSION Throughout the summer a significant amount of time will be spend on evaluating water /sewer infrastructure, transportation improvements, building maintenance, equipment and park and recreation needs. Each of these items will be supported by a detailed analysis of funding sources (based on various assumptions and estimates) that will be presented to the Council for review at future workshops. At this time the Staff would like to update the Council on the 2011 CIP projects progress (report attached) and the G°draft" 2012 -2016 CIP Projects (attached) throu¢h staff/committee /commission Proeress to date. Also staff will seek Council input on a Park & Recreation Commission initiative to pursue analysis on artificial turf ACTION REQUESTED The Council is requested to receive a brief presentation, discuss current sanitary sewer rate theory and pWvaide direction to staff. submitted, Community Center Replacement - Zamboni Battery Pack Engineering New Development Projects Pedestrian Trail Maintenance Facility Management Annual Parking Lot Maintenance Building A -Seal Floor Andover Station North Parking Lot /Access Road Information Technology VMWare Virtual Server / SAN Project Park & Recreation - Operations Replace /Repair Play Structures - Various Parks Replacement - Large Capacity Lawnmower Park & Recreation - Projects. Annual Miscellaneous Projects Skate Board Park Hawkridge Park Improvements Public Works Campus Warming House . Storm Sewer Storm Sewer Improvements Streets / Highways Annual Street Seal Coat Project Annual Street Reconstruction Annual Pavement Markings Annual Curb Replacement Bridge Scour Repairs Municipal State Aid Routes / New & Reconstruct Intersection Upgrades Replacement - Dump Truck w/ Snow Removal Water Rehabilitation of Wells Water Main Improvements s Water Tower #1 Rehabilitation Grand Total CITY OF ANDOVER 2011 Capital Improvement Plan Projects By Department - Use of Funds Budget Actual / Est. $ 7,000 $ 9,666 Purchased 80,000 - No new developments 55,000 55,000 Kelsey Round Lake Park - summer 135,000 55,000 104,000 90,000 Bids received 8,000 8,000 summer /fall project 400,000 400,000 Design phase, bid this summer 512,000 498,000 50,000 42,319 Completed 45,000 45,000 Structures ordered 112,000 70,898 Purchased 157,000 115,898 15,000 15,000 Bid, start this summer 70,000 58,000 Completed 24,000 20,000 Trail paved in August 35,000 35,000 Completed 144,000 128,000 Postponed until 2012 - S Coon Creek Dr 25,000 25,000 Culvert replacement on 167th this summer 410,000 410,000 Bid, start this summer 708,000 625,000 Bid, start this May 23,000 26,000 Bid, start this summer 41,000 - No curb work this year 60,000 - Postponed until 2012 - S Coon Creek Dr 376,000 376,000 Currently out for bids 130,000 - Postponed by City Council 200,000 188,336 Purchased 1,948,000 1,625,336 55,000 55,000 Well #7 - 75% complete, Well #6 this fall 305,000 - Not to be constructed 650,000 500,000 Project underway; added fence 1,010,000 555,000 $ 3,988,000 $ 3,054,218 -a- City of Andover, MN Capital Plan 2012 ffim 2016 FUNDING SOURCE SUMMARY Source 2012 2013 2014 2015 2016 Total Assessments 944,000 240,000 201,000 1,174,000 1,215,000 3,774,000 Building Fund 1,500,000 1,500,000 Capital Equipment Reserve 300,000 300,000 Capital Projects Levy 157,500 115,000 97,000 118,000 100,000 587,500 Comm Ctr Operations 32,000 18,000 12,000 100,000 162,000 Construction Seal Coat Fund 4,000 1,000 11,000 23,000 39,000 Equipment Bond 348,100 830,000 1,618,000 142,000 50,000 2,988,100 G.O. Bond 5,235,000 5,235,000 Municipal State Aid Funds 2,562,000 1,561,000 498,000 4,621,000 Park Dedication Funds 15,000 115,000 15,000 115,000 15,000 275,000 Road & Bridge Funds 1,151,000 1,195,000 1,319,000 1,713,000 1,702,000 7,080,000 Sanitary Sewer Fund 25,900 97,500 178,500 301,900 Sewer Revenue Bonds 2,000,000 250,000 2,250,000 Sewer Trunk Fund 67,000 22,000 268,500 1,260,000 110,000 1,727,500 State Grant 110,000 110,000 Storm Sewer Fund 30,000 67,500 40,000 45,000 50,000 232,500 Water Fund 109,100 115,000 70,000 970,000 1,264,100 Water Trunk Fund 804,000 88,000 25,000 30,000 40,000 987,000 GRAND TOTAL 6,549,600 6,074,000 4,331,000 12,825,000 3,655,000 33,434,600 City of Andover, MN Capital Plan 2012 tir„ 2016 PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project# Priority 2012 2013 2014 2015 2016 Total Central Equipment Replacement- Hotsy Pressure Washer 1448800 -01 3 7,000 Equipment Bond 7,000 7,000 7,000 Replacement - Service Truck 14-48800 -02 2 40,000 Equipment Bond 40,000 40,000 40,000 Replacement - Floor Sweeper 1548800 -01 3 35,000 35,000 Equipment Bond 35,000 35,000 Central Equipment Total 47,000 35,000 82,000 Community Center Carpet/Floodng 13- 44000 -01 1 10,000 Comm Ctr Operations 10,000 10,000 Replacement- Ice Edger 13-44300 -02 1 8,000 10,000 Comm Ctr Operations 8,000 8,000 Replacement - Rink Boards 15 -04300 -01 2 8,000 Comm Ctr Operations 12,000 12,000 12,000 12,000 Community Center Total 18,000 12,000 30,000 Elections Replacement - Voting Equipment 13- 41310 -01 1 110,000 State Grant 110, 000 110,000 110,000 Elections Total 110,000 110,000 Engineering New Development Projects 12- 41600 -01 1 85,000 110,000 115,000 140,000 150,000 600,000 Sewer Trunk Fund Water Trunk Fund 67,000 22,000 90,000 110,000 110,000 399,000 18,000 88,000 25,000 30,000 40,000 201,000 Pedestrian Trail Maintenance 12 -01600 -02 1 58,000 56,000 68,000 76,000 68,000 326,000 Road B Bridge Funds 58,000 56,000 68,000 76,000 68,000 326,000 Bunker Lake Boulevard Trail 1241600 -03 1 55,000 Municipal State Aid Funds 55,000 55,000 55,000 Engineering Total 198,000 166,000 183,000 216,000 218,000 981,000 Facility Management Surface Seal all Brick Structures 12 -41900 -01 1 75,000 Capital Projects Levy 22,500 0, 00 75 5,000 Comm Ctr Operations 32,000 Water Fund 20,500 32,000 20,500 Department Project# Priority 2012 2013 2014 2015 2016 Total Roof Replacements 12- 41900 -03 1 300,000 Replacement- Rescue #11 12 -02200 -02 2 55,000 Capital Equipment Reserve 13,000 300,000 Replacement - Hydraulic Rescue Cutters 1242200 -03 1 300,000 Equipment Bond 1,200,000 13,000 New - Thermal Imaging Camera 12 -02200 -04 1 300,000 Annual Parking Lot Maintenance 12 -01900 -04 1 25,000 26,000 27,000 28,000 130,000 236,000 Capital Projects Levy 45,000 340,000 25,000 26,000 27,000 28,000 30,000 134000 Comm Ctr Operations 40,000 40,000 Replacement- Grass #21 14 -02200 -02 2 32,000 Equipment Bond 32,000 31000 Replacement - Tan ker #11 1442200 -03 100,000 100,000 Land Purchase 13 -01900 -01 1 20,000 1,500,000 14 -02200 -04 2 1,500,000 Building Fund 1,500,000 15 -02200 -01 2 11500,000 Building A - Seal Floor 13 -01900 -02 1 9,000 10,000 2 19,000 Capital Projects Levy 9,000 10,000 1 19,000 Carpet /Tile Replacement 1341900 -03 2 10,000 10,000 20,000 Capital Projects Levy 10,000 10,000 20,000 Addition to Storage Building & Vehicle Maint. Shop 15 -01900 -01 1 G.O. Bond 3,000,000 3,000,000 3,000,000 3,000,000 Recycling Building & Fence 15 -01900 -02 1 300,000 G.O. Bond 300,000 300,000 300,000 Attached Storage Building 15- 41900 -03 1 300,000 G.O. Bond 300,000 300,000 300,000 Relocate Fuel Station w/ Canopy 15- 41900 -04 2 300,000 G.O. Bond 300,000 300,000 300,000 Fire St. #2 Addition with additional land purchase 15 -01900 -05 2 885,000 G.O. Bond 885,000 885,000 885 000 Pedestrian Tunnel Under Crosstown Blvd. 1541900 -06 1 G.O. Bond 450,000 450,000 450,000 450,000 Facility Management Total 400,000 1,545,000 27,000 5,283,000 130,000 7,385,000 Fire 45,000 Replacement - Fire Chiefs Vehicle 12 -02200 -01 2 45,000 Equipment Bond 45,000 Replacement- Rescue #11 12 -02200 -02 2 55,000 Equipment Bond 13,000 55,000 Replacement - Hydraulic Rescue Cutters 1242200 -03 1 13,000 Equipment Bond 1,200,000 13,000 New - Thermal Imaging Camera 12 -02200 -04 1 20,000 Equipment Bond 45,000 20,000 Replacement - Ladder Truck #11 13 -02200 -01 1 45,000 Equipment Bond 45,000 340,000 Replacement - Grass #31 14 -02200 -01 2 340,000 Equipment Bond 40,000 40,000 Replacement- Grass #21 14 -02200 -02 2 32,000 Equipment Bond 32,000 31000 Replacement - Tan ker #11 1442200 -03 2 Equipment Bond 31000 20,000 Replacement- Fire Marshall Vehicle 14 -02200 -04 2 20,000 Equipment Bond Replacement- Utility #4 15 -02200 -01 2 Equipment Bond Replacement - Utility #5 15 -02200 -02 2 Equipment Bond New - Water /Ice rescue boat 15 -02200 -03 1 Equipment Bond S 45,000 45,000 55,000 55,000 13,000 13,000 20,000 20,000 600,000 600,000 1,200,000 600,000 600,000 1,200,000 45,000 45,000 45,000 45,000 45,000 45,000 45,000 45,000 340,000 340,000 340,000 340,000 40,000 40,000 40,000 40,000 32,000 32,000 32,000 31000 32,000 32,000 32,000 31000 20,000 20,000 20,000 20,000 Department Project# Priority 2012 2013 2014 2015 2016 Total Fire Total 133,000 600,000 1,070,000 84,000 1,887,000 Information Technology Spdngbrook Version 7 1241420 -01 1 40,000 40,000 Capital Projects Levy 40,000 40,000 Information Technology Total 40,000 40,000 Park & Rec - Operations Replace /Repair Play Structures - Various Parks 12- 45000 -01 1 45,000 45,000 45,000 45,000 45,000 225,000 Capital Projects Levy 45 ,000 45,000 45,000 45,000 45,000 225,000 Replace /Repair Major Park Projects - Various Parks 12- 45000 -02 1 25,000 25,000 25,000 25,000 25,000 125,000 Capital Projects Levy 25,000 25,000 25,000 25,000 25,000 115,000 New - Cab and Snow Blower Attachment 12 -05000 -03 1 9,000 9,000 Equipment Bond 4,500 4,500 Sanftary Sewer Fund 4500 4,500 New - Trail Plow Attachment 12- 45000 -04 1 5,600 5,600 Equipment Bond 5,600 5,600 Replacement -10 Ft Wide Trail Mower #583 1245000 -05 1 65,000 65,000 Equipment Bond 65,000 65,000 Replacement -One Ton Truck w/ Plow #599 1345000 -01 2 65,000 65,000 Equipment Bond 65,000 65,000 Replacement - Trailer #T -554 1345000 -02 2 10,000 10,000 Equipment Bond 10,000 10,000 Replacement- One Ton Truck wl Plow #503 14 -45000 -01 2 65,000 65,000 Equipment Bond 65,000 65,000 Replacement - Bobcat #610 1445000 -02 2 36,000 36,000 Equipment Bond 36,000 36,000 Replacement - Toro Groundsmaster #559 15- 45000 -01 1 23,000 23,000 Equipment Bond 23,000 23,000 Replacement- One Ton Crew Cab Pickup #502 16 -05000 -01 1 50,000 50,000 Equipment Bond 50,000 50,000 Park & Rec - Operations Total 149,600 145,000 171,000 93,000 120,000 678,600 Park & Rec - Projects Annual Miscellaneous Park Projects 1245001 -01 1 15,000 15,000 15,000 15,000 15,000 75,000 Park Dedication Funds 15,000 15,000 15,000 15,000 15,000 75,000 Irrigation Improvements 1345001 -01 2 100,000 100,000 200,000 Park Dedication Funds 100,000 100,000 200,000 Park & Rec - Projects Total 15,000 115,000 15,000 115,000 15,000 275,000 Sanitary Sewer Sanitary Sewer Extensions 12 -08200 -01 1 270,000 500,000 770,000 Assessments 270,600 270,000 Sewer Trunk Fund 500,000 500,000 Radio System Upgrade 12 -08200 -02 1 21,400 21,400 Sanitary Sewer Fund 21,400 21,400 Replacement - 314 Ton Truck w/ Plow #90 13 -08200 -01 1 65,000 65,000 Sanitary Sewer Fund 65,000 65,000 Replacement- One Ton Truck w/ Plow #94 13 -08200 -02 2 65,000 65,000 C - Department Project# Priority 2012 2013 2014 2015 2016 Total Sangary Sewer Fund Construction Seal Coat Fund 34,000 Road & Bridge Funds 32500 Annual Street Reconstruclion 12 43100 -03 Assessments 32,500 Storm Sewer Fund 103,000 Annual Pavement Markings 12 43100 -04 32,500 776,000 Annual Curb Replacement 12- 43100 -05 32500 Replacement - Jet/Vac Truck #99 14 -08200 -02 1 Assessments 103,000 357,000 166,000 Intersection Upgrades 357,000 Sanitary Sewer Fund 700,000 New - Front -End Loader 12 43100 -08 Equipment Bond 178,500 Replacement - Ditch mowing tractor and mowers 1343100 -01 178,500 Sewer Trunk Fund Replacement - One Ton Truck w/ Plow #132 13 -03100 -02 Equipment Bond 525,000 178,500 14 -03100 -01 Equipment Bond 178,500 Yellow Pine Lift Station 15 -08200 -01 1 29,000 Streets / Highways Total 138,000 650,000 26,000 650,000 Sewer Trunk Fund 31,000 138,000 1 42,000 43,000 44,000 650,000 46,000 650,000 Rural Reserve Trunk Sanitary Sewer 15 -08200 -02 1 45,000 46,000 220,000 2,250,000 1,250,000 3,500,000 Assessments 4,261,000 220,000 65,000 250,000 1,000,000 1,250,000 Sewer Revenue Bonds 1,561,000 433,000 3,976,000 2000,000 250,000 2,250,000 Sanitary Sewer Total 590,000 291,400 130,000 357,000 3,400,000 1,250,000 5,428,400 1 140,000 140,000 140,000 Storm Sewer Storm Sewer Improvements 12 -08300 -01 1 30,000 35,000 40,000 45,000 50,000 200,000 Storm Sewer Fund 30,000 35,000 40,000 45,000 50,000 200,000 Replacement- Elgin Street Sweeper #169 14 -08300 -01 1 65,000 150,000 65,000 150,000 Equipment Bond 150,000 150,000 150,000 150,000 150,000 Storm Sewer Total 150,000 2 30,000 35,000 190,000 45,000 50,000 350,000 Streets / Highways 442,000 Annual Street Seal Coat Project 12 -03100 -01 Construction Seal Coat Fund 2,689,000 Road & Bridge Funds Annual Street Crack Seal Project 12 -03100 -02 Construction Seal Coat Fund 34,000 Road & Bridge Funds 442000 Annual Street Reconstruclion 12 43100 -03 Assessments 2655,000 Road & Bridge Funds 103,000 Annual Pavement Markings 12 43100 -04 Road & Bridge Funds 776,000 Annual Curb Replacement 12- 43100 -05 Road & Bridge Funds 1,000 Municipal State Aid Routes / New & Reconstruct 12 -03100 -06 Assessments 103,000 Municipal State Aid Funds 166,000 Intersection Upgrades 12 -03100 -07 Municipal State Aid Funds 700,000 New - Front -End Loader 12 43100 -08 Equipment Bond 3,963,000 Replacement - Ditch mowing tractor and mowers 1343100 -01 Equipment Bond 214,000 Replacement - One Ton Truck w/ Plow #132 13 -03100 -02 Equipment Bond 525,000 Replacement - Dump Truck w/ Snow Removal 4198 14 -03100 -01 Equipment Bond 2970,000 Replacement - Water Tanker #163 14- 43100 -02 Equipment Bond 29,000 Streets / Highways Total 138,000 25,000 26,000 Water 1 355,000 442,000 387,000 765,000 740,000 2,689,000 4000 10,000 20,000 34,000 351,000 442000 387,000 755,000 720,000 2655,000 1 110,000 103,000 191,000 167,000 205,000 776,000 1,000 1,000 3,000 5,000 110,000 103,000 190,000 166,000 202000 771,000 1 753,000 700,000 804,000 856,000 850,000 3,963,000 188,000 175,000 201,000. 214,000 215000 993,000 565,000 525,000 603,000 642000 635,000 2970,000 1 25,000 26,000 27,000 29,000 31,000 138,000 25,000 26,000 27,000 29,000 31,000 138,000 1 42,000 43,000 44,000 45,000 46,000 220,000 42,000 43,000 4000 45,000 46,000 220,000 1 2,202,000 1,626,000 433,000 4,261,000 220,000 65,000 285,000 1,982000 1,561,000 433,000 3,976,000 1 525,000 65,000 590,000 525,000 65,000 590,000 1 140,000 140,000 140,000 140,000 1 90,000 90,000 90,000 90,000 1 65,000 65,000 65,000 65,000 1 150,000 150,000 150,000 150,000 2 100,000 100,000 100,000 100,000 4,152,000 3,095,000 2,201,000 1,862,000 1,872,000 13,182,000 Department Project# Priority 2012 2013 2014 2015 2016 Total Rehabilitation of Wells 12 48100 -01 1 60,000 65,000 70,000 70,000 265,000 Water Fund 60,000 65,000 70,000 70,000 265,000 Water Main Improvements 12 -08100 -02 1 1,052,000 710,000 1,762,000 Assessments 266,000 710,000 974000 Water Trunk Fund 786,000 786,000 Radio System Upgrade 12 -08100 -03 1 28,600 28,600 Water Fund 28,600 28,600 WTP Generator Upgrade 13 48100 -01 1 50,000 50,000 Water Fund 50,000 50,000 Water Meter Reading System AMIIAMR 1548100 -01 2 900,000 900,000 Water Fund 900,000 900,000 Water Total 1,140,600 115,000 70,000 1,680,000 3,005,600 GRAND TOTAL 6,549,600 6,074,000 4,331,000 12,825,000 3,655,000 33,434,600 , Q ,. r; 1685 CROSSTOWN BOULEVARD N.W.. ANDOVER, MINNESOTA 55304 • (763) 755 -5100 FAX (763) 755 -8923 • WWW.CI.ANDOVER.MN.US TO: CC: FROM: SUBJECT: DATE: Mayor and Councilmembers Jim Dickinson, City Administrator / Finance Dire Lee Brezinka, Assistant Finance Director Consider Resolution for Participation in the new Local Performance Measurement and Reporting Program June 28, 2011 INTRODUCTION The Council on Local Results and Innovation was created by the Legislature in 2010. In February 2011, the Council released a standard set of ten performance measures for cities and counties that will aid residents, taxpayers, and state and local elected officials in determining the efficacy of counties and cities in providing services, and measure residents' opinions of those services. Cities and Counties that choose to participate in this voluntary program may be a reimbursement in LGA and exemption from levy limits. DISCUSSION Information on this program is attached including a letter from the State Auditor's office, an excerpt from the State Statute and a copy of the legislative report which outlines the performance measures to be reported by participating counties and cities. Most of the statistical performance measures are currently available, but several of the performance measures are community survey questions and have the potential of additional expenditures for the City. In order to participate in the program, Council must officially adopt the ten performance measures and submit a resolution to the State Auditor's office by July 1, 2011. BUDGET IMPACT The adoption of this program will allow the City to collect $0.14 per capita in LGA to help offset any expenditures associated with a community survey, in addition to being exempt from levy limits for taxes payable in 2012. ACTION REQUESTED The Andover City Council is requested to adopt the attached resolution adopting the ten performance measures recommended by the Council of Local Results and Innovation. Respectfully submitted, ,z C Lee Brezi ka� Attachments: State Auditor Information Resolution •J1LCLt �f%�•''i STATE OF MINNESOTA OFFICE OF THE STATE AUDITOR 's •. ` - ='s >' SUITE 500 525 PARK STREET (651) 296 -2551 (Voice) REBECCA OTTO SAINT PAUL, MN 55103 -2139 (651) 296 -4755 (Fax) state.auditorestate.mn.us (E -mail) STATE AUDITOR 1 -800- 627 -3529 (Relay service) June 1, 2011 Dear City Clerk/Finance Officer /County Auditor: In 2010, the Legislature created the Council on Local Results and Innovation. In February 2011, the Council released a standard set of ten performance measures for counties and ten performance measures for cities that will aid residents, taxpayers, and state and local elected officials in determining the efficacy of counties and cities in providing services, and measure residents' opinions of those services. By February of 2012, the Council must create comprehensive performance measurement systems for cities and counties to implement in 2012. Cities and counties that choose to participate in the new standards measure program may be eligible for a reimbursement in LGA, and exemption from levy limits. Participation in the standard measures program by a city or a county is voluntary. Counties and cities that choose to participate in the standard measures program must officially adopt the corresponding 10 performance benchmarks developed by the Council, and implement them in 2011. They will be required to communicate the results of the measures to their residents the following calendar year. A county or city that elects to participate in the standard measures program for 2011 is eligible for a reimbursement of $0.14 per capita in local government aid, not to exceed $25,000 and is also exempt from levy limits under sections 275.70 to 275.74 for taxes payable in 2012, if levy limits are in effect. In order to receive the per capita reimbursement in 2011, and levy limit exemption for calendar year 2012, counties and cities must: ✓ File a report with the Office of the State Auditor by July 1, 2011. This report will consist of a declaration approved by the city council or county board stating that the city /county has adopted the corresponding 10 performance measures developed by the Council. Annual reporting will be required by the cities and counties that participate in the program. By July 1, 2012, cities and counties will be required to report to the OSA that they have adopted both the performance benchmarks, and the performance measure system released by the Council in February of 2012. A declaration will be required that the city /county has reported or will report the results for calendar 2011 of the 10 adopted measures to its residents before the end of calendar year 2012. To meet the reporting requirements for 2011, a copy of the declaration in a PDF format can be attached to an email and sent to gid @osa.state.mn.us. Beginning next year, the Office of the State Auditor will be using the State Auditor's Form Entry System (SAFES) for the local performance measurement and improvement program reporting. An Equal Opportunity Employer To view the 10 performance measures for voluntary adoption for both cities and counties, please go to the Office of the State Auditor's website at www. auditor. state.mn. us, and then in the middle of the home page under Meetings, click on Council on Local Results and Innovation, and then on Measurements. Please submit your declaration by July 1, 2011. There will be no extensions for the reporting deadline. If you have any questions, please contact me at (651) 297 -3682 or email me at Dave.Kazeck@osa.state.nin.us. Sincerely, C "- 4-- David R. Kazeck; Supervisor Government Information Division Encl: Legislation for new program An Equal Opportunity Employer 6.91 LOCAL PERFORMANCE MEASUREMENT AND REPORTING. Subdivision 1.Reports of local performance measures. (a) A county or city that elects to participate in the standard measures program must report its results to its citizens annually through publication, direct mailing, posting on the jurisdiction's Web site, or through a public hearing at which the budget and levy will be discussed and public input allowed. (b) Each year, jurisdictions participating in the local performance measurement and improvement program must file a report with the state auditor by July 1, in a form prescribed by the auditor. All reports must include a declaration that the jurisdiction has complied with, or will have complied with by the end of the year, the requirement in paragraph (a). For jurisdictions participating in the standard measures program, the report shall consist of the jurisdiction's results for the standard set of performance measures under section 6.90. subdivision 2, paragraph (a). In 2012, jurisdictions participating in the comprehensive performance measurement program must submit a resolution approved by its local governing body indicating that it either has implemented or is in the process of implementing a local performance measurement system that meets the minimum standards specified by the council under section 6.90, subdivision 2, paragraph (b). In 2013 and thereafter, jurisdictions participating in the comprehensive performance measurement program must submit a statement approved by its local governing body affirming that it has implemented a local performance measurement system that meets the minimum standards specified by the council under section 6.90, subdivision 21 paragraph (b). Subd. 2.I3enefits of participation. (a) A county or city that elects to participate in the standard measures program for 2011 is: (1) eligible for per capita reimbursement of $0.14 per capita, but not to exceed $25,000 for any government entity; and (2) exempt from levy limits under sections 275.70 to 275.74 for taxes payable in 2012, if levy limits are in effect. (b) Any county or city that elects to participate in the standard measures program for 2012 is eligible for per capita reimbursement of $0.14 per capita, but not to exceed $25,000 for any government entity. Any jurisdiction participating in the comprehensive performance measurement program is exempt from levy limits under sections 275.70 to 275.74 for taxes payable in 2013 if levy limits are in effect. (c) Any county or city that elects to participate in the standard measures program for 2013 or any year thereafter is eligible for per capita reimbursement of $0.14 per capita, but not to exceed $25,000 for any government entity. Any jurisdiction participating in the comprehensive performance measurement program for 2013 or any year thereafter is exempt from levy limits under sections 275.70 to 275.74 for taxes payable in the following year, if levy limits are in effect. Subd. 3.Certification of participation. (a) The state auditor shall certify to the commissioner of revenue by August 1 of each year the counties and cities that are participating in the standard measures program and the comprehensive performance measurement program. (b) The commissioner of revenue shall make per capita aid payments under this section on the second payment date specified in section 477A.0151 in the same year that the measurements were reported. (c) The commissioner of revenue shall notify each county and city that is entitled to exemption from levy limits by August 10 of each levy year. An Equal Opportunity Employer The Council on Local Results and Innovation 2011 Legislative Report February 14, 2011 February 14, 2011 To the Property and Local Sales Tax Division of the House of Representatives, Taxes Committee and the Taxes Division on Property Taxes of the Senate Tax Committee, Per the requirements of 2010 Minnesota Laws Chapter 389, Article 2, Sections 1 and 2, the Council on Local Results and Innovation is submitting its recommended "... standard set of approximately ten performance measures for counties and ten performance measures for cities that will aid residents, taxpayers, and state and local elected officials in determining the efficacy of counties and cities in providing services, and measure residents' opinion of those services." The recommended model performance measures are attached. Local government and public feedback was solicited on the proposed benchmarks. The members of the Council include: • Patricia Coldwell, Association of Minnesota Counties • John Gunyou, City of Minnetonka • Mark Hintermeyer, City of Moorhead • Jay Kiedrowski, Humphrey School, University of Minnesota • Katie Nerem, Blue Earth County • Rebecca Otto, Minnesota State Auditor • Jay Stroebel, City of Minneapolis • Matt Stemwedel, City of Woodbury • Wendy Underwood, City of St. Paul • Tim Walsh, Scott County • Ben Woessner, City of Pelican Rapids The Council received no funding to conduct their work. Meeting minutes were taken by volunteers, and the Office of the State Auditor posted all meeting materials and meeting dates on the Office of the State Auditor website. All meetings were open to the public. The Council sees value in having all counties and cities in Minnesota develop performance measures that they use to manage their jurisdictions and having results of those performance measures shared with citizens and property tax payers. Our recommended performance measures should be considered examples to assist counties and cities in developing their own performance measures. The Council was concerned about the misuse of these performance measures by the legislature or others in the appropriation of funds or for comparisons among counties and cities. The general performance measures recommended are simply inadequate for those purposes. The Council on Local Results and Innovation is proceeding to meet the additional requirements of the statute, which is to "develop recommended minimum standards for comprehensive performance measurement systems by February 15, 2012." We interpret "performance measurement system" to mean more broadly a performance management system that uses performance measures to manage counties and cities. Representatives of the Council would welcome the opportunity to discuss the Council's work, our recommended model performance measures, and our concerns about the use of these measures. Sincerely, Jay Kiedrowski, Chair Minnesota Council on Local Results and Innovation Cc: House Speaker, House Minority Leader, Senate Majority Leader, and Senate Minority Leader Attached: Model Performance Measures for Counties, Model Performance Measures for Cities Model Performance Measures for Counties The following are the recommended model measures of performance outcomes for counties, with alternatives provided in some cases. Key output measures are also suggested for consideration by local county officials. Public Safety Part I and II crime rates (Submit data as reported by the Minnesota Bureau of Criminal Apprehension. Part I crimes include murder, rape, aggravated assault, burglary, larceny, motor vehicle theft, and arson. Part II crimes include other assaults, forgery /counterfeiting, embezzlement, stolen property, vandalism, weapons, prostitution, other sex offenses, narcotics, gambling, family /children crime, D. U.I., liquor laws, disorderly conduct, and other offenses.) XV Citizen's rating of safety in their county. (Citizen Survey: very safe, somewhat safe, neither safe nor unsafe, somewhat safe, very unsafe) Output Measure: Deputy Response Time (Time it takes on top priority calls from dispatch to the first officer on scene.) Probation /Corrections: 2. Percent of adult offenders with a new felony conviction within 3 years of discharge Public Works: 3. Hours to plow complete system during a snow event 4. Average county pavement condition rating I Citizen's rating of the road conditions in their county. (Citizen Survey: good condition, mostly good condition, many bad spots) (Under legislation passed in 2009 (Minn. Stat. § 402A.15), counties are engaged with the Department of Human Services and community organizations in a three -year process to develop comprehensive performance measures across all areas of human services, for which all counties will be held accountable. The following measures here are intended to serve as `place - holders', not to replace the more comprehensive measures scheduled to be completed by December 2012.) Public Health: 5. Life Expectancy generally and by sex and race M Behavioral Risk Factor Surveillance system rating (Citizen Survey: excellent, very good, good, fair, or poor) Social Services: 6. Workforce participation rate among MFIP and DWP recipients 7. Percentage of children where there is a recurrence of maltreatment within 12 months following an intervention Taxation: 8. Level of assessment ratio (If the median ratio falls between 90% and 105%, the level of assessment is determined to be acceptable) Elections: 9. Accuracy of post - election audit (Percentage of ballots counted accurately) Veterans' Services: Parks: Output Measure: Percent of veterans surveyed who said their questions were answered when seeking benefit information from their County Veterans' Office 10. Citizens' rating of the quality of county parks, recreational programs, and/or facilities. (Citizen survey: excellent, good, fair, poor) Library 11. Number of annual visits per 1,000 residents Model Performance Measures for Cities The following are the recommended model measures of performance outcomes for cities, with alternatives provided in some cases. Key output measures are also suggested for consideration by local city officials. General: 1. Rating of the overall quality of services provided by your city (Citizen Survey: excellent, good, fair, poor) 2. Percent change in the taxable property market value 3. Citizens' rating of the overall appearance of the city (Citizen Survey: excellent, good, fair, poor) Police Services: 4. Part I and II crime rates (Submit data as reported by the Minnesota Bureau of Criminal Apprehension. Part I crimes include murder, rape, aggravated assault, burglary, larceny, motor vehicle theft, and arson. Part II crimes include other assaults, forgery /counterfeiting, embezzlement, stolen property, vandalism, weapons, prostitution, other sex offenses, narcotics, gambling, family /children crime, D. U.I., liquor laws, disorderly conduct, and other offenses.) M Citizens' rating of safety in their community (Citizen Survey: very safe, somewhat safe, neither safe nor unsafe, somewhat unsafe, very unsafe) Output Measure: Police response time (Time it takes on top priority calls from dispatch to the first officer on scene) Fire Services: 5. Insurance industry rating of fire services (The Insurance Service Office (ISO) issues ratings to Fire Departments throughout the country for the effectiveness of their fire protection services and equipment to protect their community. The ISO rating is a numerical grading system and is one of the primary elements used by the insurance industry to develop premium rates for residential and commercial businesses. ISO analyzes data using a Fire Suppression Rating Schedule (FSRS) and then assigns a Public Protection Classification from 1 to 10. Class 1 generally represents superior property fire protection and Class 10 indicates that the area's fire suppression program does not meet ISO's minimum criteria.) 1t Streets: Water: Citizens' rating of the quality of fire protection services (Citizen Survey: excellent, good, fair, poor) Output Measure: Fire response time (Time it takes from dispatch to apparatus on scene for calls that are dispatched as a possible fire). Emergency Medical Services (EMS) response time (if applicable) (Time it takes from dispatch to arrival of EMS) 6. Average city street pavement condition rating (Provide average rating and the rating system program /type. Example: 70 rating on the Pavement Condition Index (PCI)) K' Citizens' rating of the road condition in their city (Citizen Survey: good condition, mostly good condition, many bad spots) 7. Citizens' rating the quality of snowplowing on city streets (Citizen Survey: excellent, good, fair, poor) 8. Citizens' rating of the dependability and quality of city water supply (centrally - provided system) (Citizen Survey: excellent, good, fair, poor) Output Measure: Operating cost per 1,000,000 gallons of water pumped/produced (centrally- provided system) (Actual operating expense for water utility / (total gallons pumped11, 000, 000)) Sanitary Sewer: 9. Citizens' rating of the dependability and quality of city sanitary sewer service (centrally provided system) (Citizen Survey: excellent, good, fair, poor) Output Measure: Number of sewer blockages on city system per 100 connections (centrally provided system) (Number of sewer blockages on city system reported by sewer utility / (population 1100)) Parks and Recreation: 10. Citizens' rating of the quality of city recreational programs and facilities (parks, trails, park buildings) (Citizen Survey: excellent, good, fair, poor) CITY OF ANDOVER COUNTY OF ANOKA STATE OF MINNESOTA RES. NO. MOTION by Councilmember A RESOLUTION ADOPTING PERFORMANCE. to adopt the following: WHEREAS, the Minnesota Legislature created a Council on Local Results and Innovation that released a set of ten performance measures for cities; and WHEREAS, cities that chose to participate in the program may be eligible for a reimbursement in LGA and an exemption from levy limits; and WHEREAS, participating in the program furthers the City of Andover's goals of improving service delivery and enhancing communication with residents; and WHEREAS, in order to be eligible for reimbursement and exemption from levy limits, the City Council must officially adopt the ten performance measures and submit a declaration to the Office of the State Auditor by July 1, 2011. NOW, THEREFORE BE IT RESOLVED by the City Council that they hereby adopt the ten performance measures developed by the Council on Local Results and Innovation. MOTION seconded by Councilmember and adopted by the City Council at a regular meeting this 28th day of June 2011, with Councilmembers voting in favor of the resolution, and Councilmembers voting against, whereupon said resolution was declared passed. CITY OF ANDOVER ATTEST: Michael R. Gamache - Mayor Michelle Hartner - Deputy City Clerk NDOVE: 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755 -5100 FAX (763) 755 -8923 • WWW.CI.ANDOVER.MN.US TO: FROM: SUBJECT: DATE: Mayor and Councilmembers Jim Dickinson, City Administrator 2011 Budget Implementation Progress & May 2011 Investment Report June 28, 2011 (D INTRODUCTION The overall City of Andover 2011 Budget contains total revenues of $28,910,245 and total expenditures of $30,785,805. The $1,875,560 of expenditures over revenues is largely due to prepaying debt in order to save on interest expenditures. The 2011Budget includes a total property tax levy of $10,856,299: $7,500,802 (69.09 %) operational levy, $1,929,112 (17.77 %) debt service levy, and $1,426,385 (13.14 %). capital/watershed levy. This reflects a zero percent gross levy increase as compared to the 2010 budget. DISCUSSION The following represents City Administration directives and departmental expectations for 2011 1. Expenditure budgets while approved, expenses are to meet with the spirit that needs are fulfilled first, expansions of service and special requests are to be reviewed with City Administration before proceeding. 2. Departments are committed to search for the best possible prices when purchasing goods and services. 3. Departments are committed to continually searching out new efficiencies and to challenge the status quo of how the City provides services. We don't do things (or provide a service) just because we have always done it that way! 4. Departments are committed to searching out collaborative opportunities with our neighborin g government agencies to facilitate efficient and cost - effective utilization of governmental assets and personnel. 5. Department are committed to developing effective consistent and ongoing communications with City residents, businesses and other stakeholders. The following attachments are provided to assist discussion in reviewing 2011 progress, other documents may be distributed at the meeting: 1. General Fund Expenditure Budget Summary -Budget Year 2011 through May 2011 2. Investment Maturities Summary —May 2011 (Investments managed by City Treasurer) ACTION REQUESTED The Council is requested to receive a presentation and provide direction to staff. r Dic tfully submitted, mson Attachments REVENUES General Property Tax Licenses and Permits CITY OF ANDOVER General Fund Budget Summary Totals Budget Year 2011 2010 1 2011 Budget May YTD % of Bud Final Budget May YTD % of Bud $ 7,308,495 $ 237,055 0% $ 7,191,602 $ 7,217,219 $ 50% 329,901 250,080 0% Intergovernmental 567,498 190,557 34% 570,097 558,215 174,055 31% Charges for Services 543,500 228,824 42% 755,184 580,200 230,422 40% Fines 100,750 42,232 42% 104,780 105,750 34289 32% • Investment Income 65,000 5,408 8% 70,368 65,000 6,023 9% Miscellaneous 83,400 86,295 103% 136,684 84,900 91,779 108% Transfers In 196,930 196,930 100% 196,930 196,930 196,930 100% Total Revenues S ` 9,102,628 $ 869,205 10% $ 9,355,546 S 9,058;294 S 830,723 9 Animal Control 9,970 1,891 19% 6,952 9,970 2,720 27% Total Public Safety 4,041,792 1,166,722 29% 3,920,073 4,082,713 1,191,964 29%, PUBLIC WORKS Streets and Highways Snow and lee Removal 556,452 489,381 2010 35% 51% 518,989 537,948 578,050 489,315 2011 37% ^ 57% EXPENDITURES Budget May YTD % of Bud Final Budget May YTD % of Bud GENERAL GOVERNMENT 36,000 6,388 18% 25,830 36,000 6,589 18% Mayor and Council $ 104,251 $ 49,486 47% $ 100,710 $ 106,956 $ 49,712 46% Administration 132,967 48,958 37% 131,218 138,157 55,309 40% Newsletter 23,000 7,014 30% 17,094 27,500 12,577 46% Human Resources 60,744 6,161 10% 54,968 36,221 5,541 15% Attorney 178,500 57,411 32% 172,775 178,300 57,307 32% City Clerk 96,828 38,815 40% 95,166 103,333 43,381 42% Elections 49,126 2,231 5% 37,927 6,750 2,665 39% Finance 202,011 89,104 44% 194,865 212,967 101,893 48% Assessing 152,500 - 0% 144,760 152,500 51 0% Information Services 150,812 47,938 32% 136,931 154,871 52,844 34% Planning & Zoning 328,449 123,565 38% 327,566 355,258 131,536 37% Engineering 390,087 146,702 38% 389,037 414,408 171,257 41% Facility Management 571,716 178,909 31% 421,850 553,739 177,640 32% Total General Gov 2,440,991 796,294 33% 2,224,867 2,440,960 861,713 35% PUBLIC SAFETY Police Protection 2,599,246 649,811 25% 2,599,246 2,615,407 653,852 25% Fire Protection 1,070,385 384,142 36% 967,716 1,077,084 381,613 35% Animal Control 9,970 1,891 19% 6,952 9,970 2,720 27% Total Public Safety 4,041,792 1,166,722 29% 3,920,073 4,082,713 1,191,964 29%, PUBLIC WORKS Streets and Highways Snow and lee Removal 556,452 489,381 193,618 248,532 35% 51% 518,989 537,948 578,050 489,315 216,503 280,211 37% ^ 57% Street Signs 195,562 70,370 360/. 166,244 196,712 69,331 35% Traffic Signals 36,000 6,388 18% 25,830 36,000 6,589 18% Street Lighting 36,400 10,640 29% 30,885 36,400 10,717 29% Street Lights - Billed 200,000 61,021 31% 186,320 206,000 61,708 30% Park & Recreation 872,633 261,385 30% 827,910 916,832 301,559 33% Recycling 118,838 38,283 32% 109,034 122,273 45,505 37% Total Public Works 2,505,266 890,237 36% 2,403,160 2,581,582 992,123 38 %- OTHER Total Other 18,641 18,641 11% 24,953 45,000 17,350 39% 11% 24,953 77 45,000 17,350 39%, Total Expenditures S 9,158,128 $.. 2,871,894 31% S 8,573,053 S 9,150,255 S .3,063,150 33% NET INCREASE (DECREASE) $. (55,500) S (2,002,689) S 782,493 $ (91,961). $ (2,232,427) .~i O N i r d N d > C H f c C ti U .y C U Q 00 It 0\ N N w F O CA 00 M 0 n N o N Y F V p Q ti (_A N G •Q I 69 w 4! > 0 �y b a 0 b 69 p ❑ 5 U O N O n .N. U °° 9 ¢ a y ° ❑ c •w- v o o v� vi ,c°. 39 U U .a 'a Q F � N ss 69 N vMi It a�OO W 0000 '• h W h W V1 M 01 N 00 l0 O m ON N b .-. N M -•� r 59 as It N �o O pp �y vNi O O 7 r- 0000 OM It 7 O � O y N --� N �O a 6t &s d' N .. O [- h It l- N a 00 V1 .�. � O O O cl N �O M oD 00 00 ~ N O F. O� 00 N O vi 00 O l-- l- O O, .� 01 7 N 0 W C N ss vs cs 0 N Y F V p Q ti (_A •Q VI w 4! > 0 �y b a 0 b a'"i ro p ❑ 5 U U °° 9 ¢ a y ° ❑ c •w- v o o v� vi ,c°. 39 U U .a 'a Q F G 149th Avenue NW Water Issue June 28, 2011 Gordon Pietsch Personal Historical Observations • Spring 1999 — Snow melt results in wetland easement filling within a day. 24 hours later, water disappears • Sept 2005 — Andover storm — wetland easement fills that night. Within 4 -5 days water is completely gone • March 2011— City begins pumping water into Storm Water Management System — Surface water recedes, however, sink holes found in wetland remain filled (water table is near surface) • Without the city's pumping effort of the easement, a pond would have would continued to exist • June 2011— Portions of the wetland bottom drops about a foot heading north from the culvert • It appears that several trees will die in the wetland 6/28/2011 1 Storm Water Management System (SWMS) • What is consider in developing a SWMS? • Can the city provide a map that defines the footprint of this SWMS? • What design specification were used to determine the amount of rainfall range (short term and long term periods)? — Was the wetland easement considered as a contingency? — Was soil structure of the wetland part of the analysis? Easement Notification • How is the public educated on whether an easement exists within their property? • Did everyone understand the purpose of the easement? • What does an utility easement entail? — Gas, electric, drinking water, sewer, cable? — Other? • Will we have available to us the original and current survey maps? • Will the city outline with flags, the perimeter of the easement? 6/28/2011 2 It r r Precipitation History • Several have suggested that since last fall, precipitation is above average — Does documentation exist to confirm this? — What data source could be used to confirm this? Well Pumping Study • Was an impact study completed to determine how much water the Storm Water Management System could handle? — Did it assume the availability of the wetland easement? — Did it consider the past precipitation history? — Did it allow for potential rainfall in the future? 6/28/2011 3 Well Pumping • How did the city notify residences that the easements were going to be used? If so, when did residences get notified? • If the city had not been contacted, how long would the city well pumping have continued? — Until the city well was cleaned? — Until the water went beyond the easements? — Was city staff monitoring the water levels? • How much water was pumped from the city well into the Storm Water Management System? When did it start? How much water was pumped each day into: — Ponds land 2? — Other ponds? • What was well #7 capability (gal /minute) prior to pumping? • What was the capacity goal following the pumping? • What is the current capacity? Future • Continued pumping of the well is required to get the well to full capacity — Where does the city intend to pump the water to? — When will the well pumping begin again? 6/28/2011 4 n f 1,000,000 Gallons 231 cubic inches 231,000,000 cubic inches of well water 1" depth 5 " depth 10" depth 20" depth • e • • i s 6/28/2011 5