HomeMy WebLinkAboutSeptember 22, 2026
PLANNING AND ZONING COMMISSION REGULAR MEETING – SEPTEMBER
22, 2026
The Regular Meeting of the Andover Planning and Zoning Commission was called to
order by Chairperson Loehlein on September 22, 2026, at 7:00 p.m., at the Andover City
Hall, 1685 Crosstown Boulevard NW, Andover, Minnesota.
Commissioners present: Chairperson Nick Loehlein, Commissioners Roger Grout,
Chuck Naughton, Jonathan Weinhold, Nicole Wicklund, and
Ryan Winge.
Commissioners absent: Scott Hudson.
Also present: City Planner Peter Hellegers and Associate City Planner
Aidan Breen.
CALL TO ORDER
PLEDGE OF ALLEGIANCE
APPROVAL OF MINUTES
Motion. The Chair assumed a motion to approve the August 25, 2026, Regular Meeting
Minutes as presented. The Motion passed by unanimous consent.
th
PUBLIC HEARING – Variance for Accessory Structure Height – 15349 7 Avenue
NW – PID #19-32-24-13-0012. (Applicant: Todd Kubes)
City Planner Peter Hellegers reviewed a request from Mr. Todd Kubes for a 3.5-foot
variance to allow a proposed accessory structure at 15349 7th Avenue NW to exceed the
height of the principal structure. The approximately five-acre property is located in the R-
1 Single Family Rural Residential Zoning District. The proposed accessory structure
would have a maximum height of approximately 21 feet.
Chair Loehlein opened the public hearing at 7:08 p.m.
Mr. Todd Kubes, 15349 7th Avenue NW, explained that he had lived on the
approximately five-acre property for seven years and wanted to construct a detached
garage to accommodate several personal vehicles. He described himself as a car enthusiast
Regular Andover Planning and Zoning Commission Meeting
Minutes – September 22, 2026
Page 2
and noted that he had previously operated an automobile business in Coon Rapids but was
now somewhat retired. He would use the proposed garage strictly for his personal vehicles
and related activities.
Mr. Kubes explained that one reason for constructing the garage was to have space to
store and work on a vehicle belonging to his father. He hoped the garage would give them
an opportunity to spend time together working on cars. He also wanted sufficient interior
height to install an automotive lift so he could perform routine maintenance, including oil
changes and work underneath vehicles.
Mr. Kubes noted that accessory structures are common on the surrounding developed
properties, including some buildings containing loft areas. He was not seeking a loft or
similar additional living space. His existing accessory building has approximately 10-foot
walls and is already full. The additional height was needed to make the new garage
functional for the proposed automotive lift.
Commissioner Grout asked Mr. Kubes to address the variance criterion regarding
economic considerations and whether the requested height was intended to reduce
construction costs. Mr. Kubes explained that the proposed design would cost more
because he intended to coordinate the garage's appearance with the residence. The siding,
windows, doors, roofing, and other exterior elements would be selected to complement the
house. He emphasized that he was not requesting a variance to build a cheaper structure.
The proposed garage would be approximately 100 to 150 feet from the house and oriented
at approximately a 90-degree angle. He wanted the two buildings to appear compatible
when viewed from the driveway.
No additional members of the public spoke regarding the request.
Chair Loehlein closed the public hearing at 7:14 p.m.
Commissioner Weinhold asked whether the residence's earth-sheltered design was
essentially the reason a height variance was required. Mr. Hellegers agreed that it was a
significant factor. A more conventional split-level, two-story or similarly designed
residence in the R-1 District would generally provide sufficient principal-building height
to accommodate the proposed accessory structure. Because most of the applicant's
residence is within the hill, the measurable height is limited to approximately 17 feet on
the exposed side. That unusual configuration caused the proposed garage to exceed the
principal structure's height.
Chair Loehlein asked whether staff knew approximately how many earth-sheltered homes
existed in Andover, noting the importance of considering whether approval could create
implications for future variance requests. Mr. Hellegers explained that staff had not
previously been aware of earth-sheltered residences within the City but learned through
review of the application that at least two existed. Staff did not believe this was common
Regular Andover Planning and Zoning Commission Meeting
Minutes – September 22, 2026
Page 3
and had not previously encountered an accessory-building height request resulting from an
earth-sheltered residence.
Commissioner Wicklund asked whether staff had received any written comments
regarding the variance. Mr. Hellegers confirmed that no comments had been submitted.
Commissioner Winge reviewed the variance criteria and found the request reasonable. He
noted that the property owner sought to use the property in a reasonable manner, that
circumstances unique to the property existed, that the proposed variance would not alter
the essential character of the locality, and that the request was not based solely on
economic considerations. He believed the requested accessory building was reasonable for
the property.
Motion by Commissioner Winge, seconded by Commissioner Wicklund, to recommend
the City Council approve the variance request allowing the proposed accessory structure
to exceed the height of the principal structure by approximately 3.5 feet, with a maximum
height of approximately 21 feet.
Chair Loehlein agreed with the result but emphasized the importance of connecting the
practical difficulty to the earth-sheltered home. City Code establishes accessory-building
height limitations for a reason, and approval should not imply that any property owner
could obtain additional accessory-building height merely by requesting it. He viewed the
unusual design and measurable height of the earth-sheltered residence as the
distinguishing circumstance supporting the variance.
Commissioner Naughton agreed. He believed it was important for the record to establish
that the request involved a unique circumstance associated with the earth-sheltered
residence rather than creating an expectation that accessory-building height variances
would routinely be granted. The proposed approval resolution similarly identified the
earth-sheltered residence and its unusual method of measuring building height as the
circumstances creating the practical difficulty.
The motion carried unanimously.
Chair Loehlein noted that the request was tentatively scheduled for City Council
consideration on October 6, 2026. He reminded the applicant and the public that the
Planning and Zoning Commission was a recommending body and that the City Council
would take final action.
PUBLIC HEARING – Consider an Interim Use Permit – Mining and Land
th
Reclamation – Unaddressed Property at the NE Quadrant of Prairie Road and 146
Lane – PID #25-32-24-21-0004. (Applicant: Mark Smith)
Associate City Planner Breen reviewed a request from Mr. Mark Smith for an Interim Use
Permit (IUP) for mining and land reclamation on an approximately 35-acre unaddressed
Regular Andover Planning and Zoning Commission Meeting
Minutes – September 22, 2026
Page 4
parcel at the northeast quadrant of Prairie Road and 146th Lane NW. The applicant
proposed accumulating approximately 70,000 cubic yards of soil primarily on the eastern
portion of the property for possible future residential development. The requested IUP
would remain in effect for five years, with the option to seek an extension in the future.
Commissioner Wicklund sought clarification regarding language requiring the applicant to
obtain appropriate permits. Mr. Breen explained that City Engineering was familiar with
many outside-agency requirements, but the individual agencies ultimately determine
whether their permits apply. The applicant would be responsible for determining and
obtaining all permits required for the work.
Chair Loehlein asked how the applicant would know which permits were needed. Mr.
Breen explained that staff would help determine the permits required.
Commissioner Wicklund asked whether the City had a system in place to notify different
departments of the application. Mr. Breen explained that the City Engineering Department
does coordinate these types of projects with other agencies.
Commissioner Weinhold asked for clarity on what defines clean, compatible soil and, if
the City is conditioning the silt fencing to be installed, how long the City is giving the
applicant to keep the fencing up. Mr. Breen believed that the report meant to state “clean,
compactible soil”. He explained that City Code permits a maximum of five years for the
silt fence. The applicant anticipated obtaining material intermittently as suitable fill
became available rather than purchasing and hauling the entire 70,000 cubic yards at one
time. Staff understood that the activity would therefore occur intermittently throughout the
permit period.
Commissioner Naughton questioned the history of the previous IUP, the amount of
material already delivered, the site condition, erosion controls, and whether the silt fence
identified in the applicant's materials had been installed. Mr. Breen explained that the
application materials showed a proposed silt-fence location and indicated that fencing was
installed, but City staff had not personally verified its installation. Photographs
subsequently submitted by members of the public did not appear to show silt fencing.
Chair Loehlein opened the public hearing at 7:57 p.m.
Mr. Mark Smith, 2120 Otter Lake Drive, Lino Lakes, explained that he had owned the
property for some time and previously held an IUP for the site. He had not realized the
previous permit had expired and would otherwise have attempted to extend it.
Mr. Smith explained that City engineers had contacted him regarding sewer and water
improvements approaching the property. He therefore began preparing the parcel for
future development. A wetland delineation had been performed, and a Technical
Evaluation Panel involving wetland-review agencies was expected to inspect the
delineation flags later that week. He explained that silt fencing installation was delayed
Regular Andover Planning and Zoning Commission Meeting
Minutes – September 22, 2026
Page 5
because he was advised to wait until the wetland boundaries were verified so the fencing
would not have to be relocated.
Mr. Smith described previous plans to obtain excess fill from other development projects.
One project was expected to generate approximately 30,000 cubic yards of material that
could be transported to the subject property, but site conditions changed, and the material
was needed elsewhere. He explained that suitable fill can be difficult and expensive to
obtain and that opportunities to acquire material sometimes arise unexpectedly and require
a quick decision. He estimated that portions of the subject property would need to be
raised approximately five to seven feet for future development. He maintained that
accumulating material over time would make future development more economically
practical than purchasing all necessary fill at market prices. He anticipated future
residential development once sewer and water became available.
Mr. Smith discussed his approximately 40 years of development experience and projects
he had completed in Andover and other communities. He maintained that the material had
value and would ultimately benefit the property regardless of whether he personally
completed the future development. Because the property is within the MUSA and
municipal utilities are anticipated, he believed he or a future owner would eventually
develop it. He also maintained that he monitored fill material because unsuitable material
would create problems when building on the site. He described other projects where fill
was compacted and stabilized as work progressed and indicated that he intended to follow
similar procedures at the subject property.
Mr. Breen then summarized written comments received from adjacent property owners,
the Hoernemann family. The comments strongly opposed the IUP and alleged that
material recently delivered to the site included roadway-demolition debris, asphalt,
concrete, and utility materials rather than clean soil. The submitted materials included
photographs of the site and equipment and questioned whether the site was being used for
activities beyond the proposed land reclamation. The comments also raised concerns
regarding the absence of visible silt fencing, proximity to wetlands, erosion and runoff,
compliance with the previous IUP, the nature of the material already delivered, and the
lack of a defined future development proposal.
Chair Loehlein emphasized that the Commission had reviewed the detailed written
comments. He clarified, however, that several requested enforcement actions contained in
the correspondence were outside the Planning and Zoning Commission's authority. That
evening, the Commission's responsibility was to recommend the IUP to the City Council.
City staff handled code-enforcement matters administratively.
Ms. Jean Carlstrom, 14941 Butternut Street NW, explained that she had lived in the area
for approximately 36 years and had witnessed extensive changes as Andover developed.
She was particularly concerned about preserving the remaining natural areas and wetlands.
She regularly traveled past the subject property and opposed activities that could disturb
the wetlands or the site's natural condition.
Regular Andover Planning and Zoning Commission Meeting
Minutes – September 22, 2026
Page 6
Mr. Allan Newcomb, 280 146th Lane NW, explained that a drainage ditch from the
subject property crossed his property. He wanted to understand what was occurring at the
site and asked the City to ensure that runoff remained safe, and that hazardous or
inappropriate material did not enter the drainage system.
Mr. Smith returned to the podium for additional questions.
Commissioner Winge asked whether soil borings had been performed to determine
whether the property was physically and financially feasible for residential development.
Mr. Smith responded that soil studies were completed, including information obtained
from a previous owner. He noted that some information indicated sand beneath areas that
mapping identified differently. He also explained that City staff and engineers estimated
that approximately 13 to 14 acres could potentially be built on. He reiterated that the
wetland delineation was underway and that the Technical Evaluation Panel was scheduled
to inspect the site. Once the wetland boundary was confirmed, the silt fencing could be
placed appropriately.
Commissioner Winge questioned the lack of erosion controls already in place and noted
that silt fencing could be installed and later moved if necessary. He also raised concerns
regarding the applicant's proposed stabilization schedule compared with applicable
environmental requirements. Mr. Smith acknowledged the concern and indicated that the
site would be stabilized before City Council consideration. He explained that he had
delayed fencing because he expected the wetland delineation process to move more
quickly and did not want to install fencing only to relocate it shortly thereafter.
Commissioner Winge emphasized that his questions were intended to determine whether
sufficient assurances existed that he would follow the permit commitments. Mr. Smith
responded that he had developed numerous lots in Andover and believed his prior projects
demonstrated that he followed through on development requirements. He acknowledged
that the present situation had not proceeded as intended and expressed frustration that the
wetland and planning processes had taken longer than anticipated.
Chair Loehlein questioned how the previous IUP had been allowed to expire given Mr.
Smith's extensive development experience and familiarity with City processes. Mr. Smith
reiterated that he had not realized the permit had expired and that opportunities to acquire
needed material can arise quickly.
The Commission and applicant continued discussing the distinction between the existing
material already placed on the property and the prospective request for permission to bring
additional material to the site. Concerns included the lack of a detailed future development
plan, the quantity and character of fill, wetland protection, erosion controls, the duration of
the requested IUP, possible effects on neighboring property, haul routes and public streets,
and the ultimate disposition of as much as 70,000 cubic yards of material if development
did not occur.
Regular Andover Planning and Zoning Commission Meeting
Minutes – September 22, 2026
Page 7
Mr. Breen explained that the property previously had an IUP allowing a substantial
amount of fill from 2019 through 2024. He noted that land-reclamation permits can
involve varying levels of grading detail depending on the circumstances. In this instance,
staff believed the general stockpile plan, proposed depth, and required erosion-control
measures could provide a basis for review. The anticipated process could also involve
placing and compacting fill incrementally over time.
The Commission discussed whether to require a financial surety to guarantee removal or
correction of the stockpile if the project did not proceed. Mr. Breen explained that
requiring financial security sufficient to remove tens of thousands of cubic yards could be
prohibitively expensive. The City had generally relied on permit conditions, inspections
and enforcement rather than requiring a bond covering the entire potential removal cost
for a stockpile of this magnitude.
Mr. Smith maintained that removal of the fill was unlikely because suitable fill added
value to a property that would eventually require substantial grading for development. He
believed any future developer would benefit from having the material available.
Chair Loehlein closed the public hearing at 8:47 p.m.
Commissioner Grout discussed what an "interim" use means in the context of the request.
The property had already been subject to a five-year IUP from approximately 2019
through 2024, and the Commission was now being asked to recommend another five-year
permit that potentially could be extended again. He questioned whether an activity
potentially spanning approximately 10 to 15 years remained consistent with the concept of
an interim use.
Commissioner Grout also distinguished between two separate issues before the City: the
applicant's request for prospective permission to stockpile material and concerns regarding
activity that had already occurred. He understood that enforcement regarding previous
activity was primarily a staff responsibility rather than a Planning and Zoning
Commission function. He did not want concerns about past enforcement to obscure the
Commission's responsibility to evaluate the pending IUP according to the applicable
criteria. Mr. Breen agreed. He explained that the matter initially came to staff's attention
through a code-enforcement complaint. The City's general approach to code enforcement
is to obtain compliance and remedy violations rather than immediately pursue punitive
action. The Commission's role was to evaluate the IUP application. Staff would separately
determine how existing site conditions and previously delivered material should be
addressed through the code-enforcement process.
Commissioner Weinhold expressed significant concern regarding photographs submitted
as Exhibits B1 and B2. He noted the site's proximity to Prairie Knoll Park, where families
play football, soccer, sled, and other recreational activities. He was particularly troubled
by the appearance of the fill and its relationship to nearby wetlands. Although he
Regular Andover Planning and Zoning Commission Meeting
Minutes – September 22, 2026
Page 8
understood Mr. Smith's explanation regarding delays and staffing issues, he believed the
existing conditions required prompt attention and questioned what conditions could
adequately ensure the situation was corrected.
Commissioner Winge agreed that the property's history was relevant when considering
whether commitments associated with a new permit would be fulfilled. Although the
Commission was not concerned with past activity, he believed past performance could
inform expectations about future compliance.
Commissioner Winge also expressed concern that no sufficiently defined future
development plan had been presented. Without greater assurance that residential
development would proceed within five, ten, or even 15 years, he was concerned the
property could function primarily as a long-term stockpile for material generated
elsewhere.
Commissioner Winge reviewed the IUP approval criteria individually. He questioned
whether approximately 5,000 truckloads associated with 70,000 cubic yards of material
could create an excessive burden on public streets. He also questioned the potential
environmental effects and whether the proposed operation could injure the surrounding
neighborhood or public health, safety, and welfare. A large stockpile could affect scenic
views, and significant truck traffic could potentially affect public infrastructure. Mr. Breen
clarified that the proposed haul route utilized the existing driveway from 146th Lane and
did not show trucks traveling through mapped wetland areas.
Commissioner Winge noted that the maps initially raised concerns about the relationship
between the driveway and wetlands, and staff reviewed the location on the exhibits. Mr.
Breen further clarified that City Code did not require a stockpile IUP to be tied to an
approved future development plan. The City had considered other stockpile applications
for purposes unrelated to immediate development. While Commissioners could consider
the information provided in evaluating the applicable IUP criteria, the applicant was not
legally required to present a ready-to-construct subdivision plan simply to request the
stockpile permit.
Motion by Commissioner Winge, seconded, to recommend the City Council deny the
Interim Use Permit for mining and land reclamation on the unaddressed property at the
northeast quadrant of Prairie Road and 146th Lane NW, PID #25-32-24-21-0004.
Commissioner Naughton discussed the difficulties inherent in evaluating development-
related impacts. Development inevitably burdens roads, land, and natural resources, and
the City must allow reasonable room for those impacts. However, he remained concerned
that the current application did not provide sufficient safeguards or certainty. The
photographs and information regarding runoff and site conditions were troubling. He
specifically questioned whether the Commission could make the finding contained in the
proposed approval resolution that the request would not have a detrimental effect on the
health, safety, and general welfare of Andover. Based on the information presented, he
Regular Andover Planning and Zoning Commission Meeting
Minutes – September 22, 2026
Page 9
was not comfortable making that finding. Although he believed the property was likely to
develop eventually and recognized that fill would probably be required, he concluded that
the IUP should not be recommended at that time.
Commissioner Grout similarly indicated that he could support the general concept of
developing the parcel and could envision an IUP supporting that development. He was
concerned that the present request appeared premature. Because the applicant indicated
that the immediate opportunity for incoming material had passed, he preferred that the
applicant return after additional safeguards were established, the intended use of the
property was clearer, and the Commission had more complete information upon which to
evaluate a new IUP request.
Commissioner Winge suggested that a surety could address the Commission's concerns.
He indicated that if an applicant came forward with a more developed plan, acknowledged
the earlier permit's expiration, and provided stronger assurances for environmental
protection and site restoration, he might view the request differently. A surety could
potentially provide the City with resources to address erosion control or other site
problems if the property owner failed to do so. Mr. Breen reiterated that a surety large
enough to guarantee complete removal of approximately 70,000 cubic yards would likely
be prohibitively expensive. He also reminded the Commission that the property is within
the MUSA and guided for Transitional Residential development, demonstrating the City's
expectation that the property could eventually develop. However, neither the
Comprehensive Plan nor the IUP regulations established a specific timetable for that
development.
Following discussion, Chair Loehlein restated that the motion before the Commission was
to recommend denial of the IUP. He clarified that an affirmative vote would recommend
denial to the City Council.
The motion carried unanimously.
Chair Loehlein noted that the City Council was tentatively scheduled to consider the
request on October 6, 2026.
OTHER BUSINESS
None.
ADJOURNMENT
Chair Loehlein assumed a motion to adjourn the meeting at 9:09 p.m. Motion carries by
unanimous consent.
Respectfully Submitted,
Regular Andover Planning and Zoning Commission Meeting
Minutes – September 22, 2026
Page 10
Sue Osbeck, Recording Secretary
TimeSaver Off Site Secretarial, Inc.