HomeMy WebLinkAbout2026-10-13
1685 CROSSTOWN BOULEVARD N.W. ANDOVER, MINNESOTA 55304 (763) 755-5100
FAX (763) 755-8923 WWW.ANDOVERMN.GOV
Andover 2050 Comprehensive Plan Steering Committee
MeetingAgenda
October 13, 2026
Andover City Hall
Council Chambers
7:00p.m.
1.Discuss current Comprehensive Plan
2.Discuss MetropolitanCouncilIMAGINE 2050
a.System Statement for Andover
3.Other Business
a.Future Meeting Date Discussion
4.Adjournment
STAFF REPORT
Agenda Item #1
TO: 2050 Comprehensive Plan Steering Committee
FROM : Peter Hellegers, City Planner
SUBJECT: Current Comprehensive Plan
DATE: October 13, 2026
INTRODUCTION
Staff will discuss the City’s current Comprehensive Plan and the process for how the plans were
updated.
BACKGROUND
What is a Comprehensive Plan?
A Comprehensive Plan is a “road map” for the community. This document establishes the vision
and goals for the future of the community and City Code is required to be consistent with the
Comprehensive Plan. As the City of Andover is part of the seven-county metropolitan area, our
Comprehensive Plan is also required to be consistent with Metropolitan Council (Met Council)
Policy Statements and guidance from the Met Council. This plan provides the foundation for all
land use regulations in the city.
Overall the information within a Comprehensive Plan follows three basic questions:
a. What is the state of the community today?
b. What should the community be like in the future?
c. How will the community get there?
Why does the City of Andover need to update the Comprehensive Plan now?
Minnesota Statute 473.858 requires cities within the 7-county Twin Cities metropolitan region to
review and amend its comprehensive plan at least once every 10 years and submit the plan to
Metropolitan Council for review.
The receipt of the metropolitan system statement triggers the process requiring cities in the
metropolitan region to update their decennial comprehensive plans and must submit them to the
Metropolitan Council within 3 years following the receipt of the system statement.
Additionally, cities are required to bring their zoning ordinances in compliance with the
comprehensive plan, and they cannot adopt fiscal devices or official controls which are in
conflict with the comprehensive plan.
Current Comprehensive Plan (2018 Comprehensive Plan Update / 2040 Plan)
The City’s current Comprehensive Plan is also referred to as the 2018 Comprehensive Plan
Update. The plan has a 20-year planning horizon which stretches out from adoption of the plan
1
to the end of the planning window in the year 2040. The current comprehensive plan remains in
effect until the adoption of the update.
Plans used in support of the City’s Comprehensive Plan included:
Transportation Plan –approved 8/17/2018
Comprehensive Wastewater Plan
Comprehensive Water System Plan –approved 9/18/18
Surface Water Management Plan –approved October 16, 2018
Local Water Supply Plan (WSP) – approved 06/19/18 and updated 05/13/20
Parks and Open Space Plan –Approved January 16, 2018
During the previous decennial update, the City of Andover conducted public hearings, adopted
the plan in the spring of 2019,and submitted the plan to Met Council in June of 2019. Met
Council required changes to the plan regarding overall density, density at levels to reach
affordability, net vs. gross density and also revised the forecast for population, housing, and
employment. The City Council approved the Comp Plan in September of 2020 and submitted it
to Met Council for review. The Comprehensive Plan Update was officially adopted December
15, 2020.
Comprehensive Plan Amendments
The Comprehensive Plan also includes the eight Comprehensive Plan Amendments that have
been adopted by the City since the update of the Comprehensive Plan in 2020, including the
following text amendments and map amendments:
2021: Text amendment for density transfer for certain properties in URL – multiple sites
2021: Map change: 1.9 acres from RRto TR / add to MUSA – Fields of Winslow Cove
2021:Map change: URM to URMLand Public to URHL –Andover Village
2022: Text amendment for mixed-use buildings within URHL; change map fromGB and
URML to URHL – J. A. Wedum
2023: Map change: from URHL to URH and 1.5 acres to NC – J. A. Wedum
2024: Sewer staging map: change staging map for area adjacent to crosstown sewer pipe
extension from to the 2020-2025 phase – No proposed development
2025: Sewer staging map: change staging map from 2031-2035/2036-2040 to 2020-2025
–Meadow Creek Church/Legacy Christian Academy
2026: Master Planned Area (MPA) –Fields of Andover
DIRECTION REQUESTED
Informational.
2
STAFF REPORT
Agenda Item #2
TO: 2050 Comprehensive Plan Steering Committee
FROM : Joe Janish, Community Development Director
SUBJECT: Met Council 2025 System Statement Discussion
DATE: September 22, 2026
INTRODUCTION
The Metropolitan (Met) Council adopted Imagine 2050 in February 2025, updating regional
system and policy plans, including the 2050 Transportation Policy Plan, the 2050 Regional Parks
and Trails Policy Plan, the 2050 Water Policy Plan, the 2050 Housing Policy Plan, and the 2050
Land Use Policy. Based upon the Met Council policy, system statements had been issued to all
metropolitan communities as required by state statute. City Council review Andover’s 2025
System Statement.
The receipt of the system statement triggered a community’s obligation to review, and as
necessary, amend our comprehensive plan to conform to the Met Councils regional system plans.
Updated local comprehensive plans are due by December 2028. Met Council will review our
plan for conformance to metropolitan system plans, consistency with Met Council policies, and
compatibility with adjacent and affected governmental units. Updated local comprehensive plans
are due for review by December 31, 2025.
BACKGROUND
Attached is the 2025 System Statement for the City of Andover. The system statement includes
information specific to the City of Andover, including the community designation; forecasted
population, households, employment through 2050; affordable housing need allocation;
transportation; water resources, climate adaptation, and regional parks and trails. After the
System Statement was released, Met Council informed city staff that population estimates and
building permit activity exceeded expectations. Given this information and the proposed Fields
of Andover development, the City of Andover should plan for a higher forecast, identified as the
Revised Forecast.
Staff has provided a comparison between the new requirements (Imagine 2050) and the last set
of requirements (Thrive 2040), and also calling out the Revised Forecast, when appropriate.
1
FORECASTS
Revised Forecast for the City of Andover
Imagine 2050 (NEW MET COUNCIL POLICY)
Thrive 2040 (OLD MET COUNCIL POLICY).
Comparison between the threeindicatesthat Met Council has slightly decreased population and
households and slightly increased employment from Thrive 2040/Revised Forecastto Imagine
2050 projections. This indicates the Met Council is expecting less housing growth to occur
within ourcommunity.
HOUSING POLICY
Imagine 2050
Thrive 2040
2
It is possible that the Affordable Housing Need allocation may be updated if the Fields of
Andover AUAR continues to actual development.
In general, the City has the following options to meet the housing policy needs:
1. Guide sufficient land at minimum residential densities of 10 units/acre to support
your city or townships' total allocation of future affordable housing need for 2031-
2040.
2. Guide sufficient land at minimum residential densities of:
12 units/acre to support your city or townships' 2031-2040 allocation of future
affordable housing need at 30% AMI or less.
8 units/acre to support your city or townships' allocation of future affordable
housing need at 31-60% AMI. This combines your city or townships'
allocation of 31-50% AMI and 51-60% AMI.
A city or township that chooses Option 2 and has demonstrated history of
creating 51-60% AMI affordable units at densities lower than 8 units/acre,
may guide land at lower minimum densities (as low as 4-8 units/acre) to meet
only the 51-60% AMI allocation of future affordable housing need.
CLIMATE POLICY– NEW
This is a new section to local comprehensive plans and is required by state law. The
Metropolitan Land Planning Act was amended in 2023. Met Council will assist usin addressing
climate mitigation and adaptation elements by providing us with greenhouse gas inventories and
technical assistance for identifying appropriate strategies.
COMMUNITY DESIGNATION
Imagine 2050
3
Thrive 2040
4
From Thrive 2040 to Imagine2050,the Met Council modified Community Designations with the
elimination of Emerging Suburban Edge. Met Council also modified the overall density for
Suburban Edge to 3.5 units per acre overall. Met Council will no longer permit the expansion of
Rural Residential areas (1 unit per 2.5 acres) in communities.This means a reduction of the
current MUSA would place a property in Diversified Rural (1 unit per 10 acres).
TRANSPORTATION POLICY
Regional Highway System
o There are no principal arterials located within Andover.
Regional Transit System
o Only Transit Link dial-a-ride service and ridesharing services.
Regional Aviation
o Suggest consultation with Blaine Airport to verify we are consistent with the
airport plans,as the Southeastcorner of Andover is within 6-mileAirport
Influence Area(page 21 of 2025 System Statement includes a map).
Regional Bicycle System
o Met Council has included the alignment of Bunker Lake Blvd as a Tier 2
alignment, and a section through Bunker Hills Regional Park as a Tier 2
alignment (page 19 of the System Statement includes a map).
o The City is asked to provide connectionsto the Tier 2 trail network.
5
Regional Freight System
o Local communities are encouraged to create curb management policies, consider
delivery needs in complete streets planning, and identify microhubs for last-mile
parcel distribution.
Other Transportation Policy Plan Considerations
o Pedestrian Planning –Met Council encourages communities to address pedestrian
needs. Suggestion to include a pedestrian, active transportation, or multimodal
plan as an addendum or in addition to the comprehensive plan.
o Travel Demand Management– Encouragement by Met Council to identify Anoka
County TMO and describe any policies, ordinances, practices or programs in
place which aid in regional TDM work in our 2050 Comprehensive Plan.
o Greenhouse Gas (GHG) Emissions – This is a State Law. We must include plans
or strategies to limit GHG emissions on the surface transportation system in our
2050 Comprehensive Plan.
WATER POLICY PLAN
Regional Sewer Service
o Andover’s plan will identify sewer service needs. This will be based on the Met
Council Policy within Imagine 2050. Housing density, affordable housing needs,
and sewer staging.
o The City of Andover will also need to include locations of private septic systems
(lot location) and provide information related to our private septic requirements.
Surface Water Management
o The local water plan will need to meet the requirements identified by state statute
and Minnesota Rules. In general the plans need to include a summary of the
priorities and problems in the community; structural, nonstructural and
programmatic action to take to address the priorities and problems; and clearly
identified funding mechanisms to fix the problems.
Water Supply
o Water supply information is required for local comprehensive plan updates to
meet statutory requirements and for consistency with regional policy.
o Identify locations of water sources and amount of water currently used and
planned to be used.
o Creating a program for how to implement local rules and regulations about water
supply, including when and how these rules will be developed, adopted, and
administered.
o We will need to include a local water supply plan approved by the Minnesota
Department of Natural Resources as an appendix to the comprehensive plan.
REGIONAL PARKS AND TRAILS SYSTEM
Bunker Hills Regional Park
o Acknowledgement of park boundary.
Central Anoka Regional Trail
o Acknowledgment of trail alignment.
Rum River Regional Trail
o Acknowledgment of trail alignment.
BUDGET IMPACT
6
Costs will be incurred as part of the formulation of the Comprehensive Plan.
DIRECTION REQUESTED
Informational.
Attachment(s): 2025 Met Council System Statement
7
DJUZ!PG
BOEPWFS
3136
TZTUFN!
TUBUFNFOU
2025 SYSTEMS STATEMENT
CITY OF ANDOVER
Regional Development Plan Adoption
On February 12, 2025, the Met Council adopted Imagine 2050 as a comprehensive
development guide for the Twin Cities metro region. Imagine 2050 includes regional systems
plans, including the 2050 Transportation Policy Plan, the 2050 Water Policy Plan, the 2050
Regional Parks and Trails Policy Plan, and the 2050 Housing Policy Plan. The development
guide also outlines land use policies and community designations important for local
comprehensive planning updates.
The Metropolitan Council is now issuing systems statements pursuant to State statute.
Systems Statements
Metropolitan systems plans are long-range comprehensive plans for the regional systems –
transit, highways, and airports; wastewater services; and parks and open space – along with
the capital budgets for those systems. Systems statements explain the implications of
metropolitan system plans for each community in the region. They are intended to help
communities prepare or update their comprehensive plan, as required by the Metropolitan
Land Planning Act:
Within nine months after receiving a system statement for an amendment to a
metropolitan system plan, and within three years after receiving a system statement
issued in conjunction with the decennial review required under section 473.864,
subdivision 2, each affected local governmental unit shall review its comprehensive plan
to determine if an amendment is necessary to ensure continued conformity with
metropolitan system plans. If an amendment is necessary, the governmental unit shall
prepare the amendment and submit it to the council for review.
The system statement includes information specific to a community, including:
• community designation or designation(s)
• forecasted population, households, and employment through the year 2050
• guidance on appropriate densities to ensure that regional services and costly
regional infrastructure can be provided as efficiently as possible
• affordable housing need allocation.
In the following sections, this systems statement contains an overview of key changes and
updates to the policies and plans from the previous 2040 regional development guide and
specific system changes that affect your community:
• Transportation, including metropolitan highways, aviation, and transit
• Water Resources, including wastewater, surface water, and water supply planning
2025 SYSTEM STATEMENTINTRODUCTION1
•Regional parks and trails
Regional Development Guide
The development guide adopted in February 2025 reflects the vision and plans adopted by
communities for a prosperous, equitable, and resilient region with abundant opportunities for
all to live, work, play, and thrive.
Regional values are shared core beliefs or principles that guide the work of developing and
implementing Imagine 2050. The values build on those identified in Thrive MSP 2040 and
incorporate what we’ve learned over the last ten years as well as the common values
expressed by local governments and partners across the region. These values guide the Met
Council in building partnerships and developing policies and programs to support Imagine
2050.
The Met Council has endorsed the following goals for our region to achieve through our
policies, practices, programs, and partnerships:
•Our region is equitable and inclusive.
•Our communities are healthy and safe.
•Our region is dynamic and resilient.
•We lead on addressing climate change.
•We protect and restore natural systems.
Dispute Process
If your community disagrees with elements of this systems statement or has any questions
about the process, please contact your Sector Representative, Patrick Boylan, at 651-602-
1438 to review and discuss potential issues or concerns. The Council and local government
units and districts have usually resolved issues relating to the system statement through
discussion.
Request for Hearing
If a local governmental unit and the Met Council are unable to resolve disagreements over the
content of a system statement, the unit or district may, by resolution, request that a hearing be
conducted by the Met Council’s Land Use Advisory Committee or by the State Office of
Administrative Hearings to consider amendments to the system statement. According to
Minnesota Statutes section 473.857, the request shall be made by the local governmental unit
or school district within 60 days after receiving the system statement. If the Met Council does
not receive a hearing request within 60 days, the statement becomes final.
Next Steps in the Regional Planning Cycle
Receipt of this system statement and the metropolitan system plans triggers a community’s
obligation to review and amend its comprehensive plan by December 2028. Local
comprehensive plans and amendments will be reviewed by the Met Council for conformance to
2025 SYSTEM STATEMENTINTRODUCTION2
metropolitan system plans, consistency with Met Council policies, and compatibility with
adjacent and affected governmental units. Updated local comprehensive plans are due to the
Met Council for review by Dec. 31, 2028.
Forecasts
The Met Council uses the forecasts developed as part of Imagine 2050 to plan for regional
systems. Communities should base their planning work on these forecasts. Given the nature of
long-range forecasts and the planning timeline undertaken by most communities, the Met
Council will maintain on-going dialogue with communities to consider any changes in growth
that may have an impact on regional systems.
Imagine Forecasts for the City of Andover
2020 (actual) 2030 2040 2050
Population32,60133,70035,40038,100
Households 10,782 11,500 12,300 13,300
Employment 5,6096,800 7,300 7,400
Housing Policy
The purpose of the Housing Policy Plan, adopted by the Metropolitan Council in February
2025, is to provide leadership and guidance on regional housing needs and challenges and to
support Imagine 2050. The Housing Policy Plan provides an integrated policy framework that
unifies our existing roles in housing and identifies opportunities to expand our role in
supporting safe, affordable and dignified housing in the region.
Consistent with state statute (Minn. Stat. 473.859, subd. 2(c) and subd. 4), cities and
townships must include a housing element and implementation program in their local
comprehensive plans that address existing and projected housing needs.
The Met Council has determined the regional need for low-income housing for the decade of
2031-2040 (see Appendix B in the Housing Policy Plan).
Based on regional forecasts, the regional need for future affordable housing units is 39,700.
Andover’s share of the region’s future need for low-income housing is 345 new units of
affordable housing. Of these new units, the need is for 182 affordable to households earning at
or below 30% of AMI, 133 affordable to households earning 31% to 50% of AMI, and 30
affordable to households earning 51% to 60% of AMI.
Affordable Housing Need Allocation for the City of Andover
Units
At or below 30% AMI
182
31 to 50% AMI133
51 to 0% AMI 30
Total Units345
2025 SYSTEM STATEMENTINTRODUCTION3
Future Affordable Housing Need allocations may be updated throughout the decade if local
projected sewered growth changes.
A
ndover should consult the complete Housing Policy Plan when preparing its local
comprehensive plan. In addition,Andovershould consult Imagine 2050 and the Local Planning
Handbook for specific requirements necessary for the housing element and housing
implementation programs of local comprehensive plans.
Climate Policy
In 2023, the State legislature amended the Metropolitan Land Planning Act (Minn Stat. §
473.859, subd. 2 and 7) to include new requirements that comprehensive plans address
climate mitigation and adaptation. In climate policy, mitigation strategies focus on minimizing
contributions to climate change through efficiency measures and reducing greenhouse gas
emissions. Adaptation strategies focus on how to change policies and practices to adjust to
ongoing and future impacts of climate change.
The Met Council will assist communities in addressing climate mitigation and adaptation
elements by providing communities with greenhouse gas inventories and technical assistance
for identifying appropriate strategies.
Community Designation
Community designations group jurisdictions with similar characteristics for the application of
regional policies. The Council uses community designations to guide regional growth and
development; establish land use expectations including overall development densities and
patterns; and outline the respective roles of the Council and individual communities, along with
strategies for planning for forecasted growth. If there are discrepancies between the Imagine
2050 Community Designations Map and the Community Designation map contained within this
systems statement, communities should follow the specific guidance contained in this
document. Imagine identifies the City of Andover with the community designations of
Diversified Rural, Rural Residential, and Suburban Edge on the Community Designation map.
Diversified Rural cities and townships include some prime agricultural land and farms, as well
as large-lot residential development and clustered housing. Most of these areas were
developed just prior to 2000 with lower residential densities. This pattern of development is
most conducive for future expansion of urban infrastructure, as some of these areas are within
the Met Council’s Long Term Service Area. Considering the long-term plans for orderly growth
of these areas, urbanized levels of residential development is discouraged to avoid premature
demand for wastewater expansion, as are subdivisions that would preclude future urbanized
development. Diversified Rural cities and townships may have more than one community
designation based on forecasted growth and current or planned development patterns.
Rural Residential communities are areas with larger lot developments which preclude the
provision of urban infrastructure, such as regional wastewater service. Rural Residential areas
represent historic development patterns of average lots sizes of 1-2.5 units per acre that were
mostly built in the 1980s and 1990s. The growth pattern in Rural Residential areas is not
2025 SYSTEM STATEMENTINTRODUCTION4
aligned with the Met Council’s mission of orderly and economical growth, therefore, the Met
Council discourages any expansion of this community designation. These cities and townships
generally plan to accommodate minimal growth while preserving natural areas as some areas
may have environmental limitations to development. Rural Residential cities and townships
often have more than one community designation representing the historic development
patterns which exist alongside newer planned development areas which may be anticipating
regional sewer service or are part of orderly annexation areas in nearby cities.
Suburban Edge municipalities are on the edge of the Metropolitan Urban Service Area (MUSA)
and primarily developed after the 1990s. While denser downtown or core areas are often
present, the predominate development pattern is low or medium density residential
subdivisions characterized by cul-de-sacs and limited access to major thoroughfares for traffic
movement. These areas also feature extensive undeveloped land planned for low to medium
residential densities along with some areas guided for industrial and commercial uses, often
near highway intersections. The planning challenge in Suburban Edge areas is to improve
street connectivity and integrate sustainable development practices, ensuring that growth and
conservation effectively coexist. Suburban Edge cities may have more than one community
designation based on forecasted growth and current or planned development patterns. This
happens generally when areas in a municipality either have an historic development pattern
more appropriate for a different designation or portions of the municipality are not currently
planned for future development and are still considered rural or agricultural in nature.
Specific strategies for Andover can be found on your Community Page in the Local Planning
Handbook.
2025 SYSTEM STATEMENTINTRODUCTION5
2025 SYSTEM STATEMENTINTRODUCTION6
2025 TRANSPORTATION SYSTEM STATEMENT
CITY OF ANDOVER
Transportation Policy Plan Overview
The 2050 Transportation Policy Plan (TPP) is the metropolitan system plan for transportation,
including highways, transit, bicycle, pedestrian, freight, aviation, and travel demand
management, to which local comprehensive plans must conform. The TPP also includes
regional transportation objectives, supporting policies and actions, and regional performance
measures. The full TPP can be found at the following url:
https://imagine2050.metrocouncil.org/chapters/transportation
This system statement summarizes the regional systems and any significant changes to them,
other important regional transportation considerations, and changes made to the 2050 TPP
since the 2040 TPP was adopted in 2015. Additionally, this system statement highlights those
elements of the system plan that apply to your community. The TPP incorporates policy
direction and new 2050 socioeconomic forecasts adopted by the Metropolitan Council in
Imagine 2050 and extends the planning horizon from 2040 to 2050.
Federal and State Requirements
The TPP is a document that meets both state requirements outlined in statute for a
metropolitan system plan, and federal requirements as a fiscally constrained long-range
investment plan for surface transportation. As the region has recently received a significant
number of new and increased sources of transportation revenue, the 2050 TPP no longer
includes an increased revenue scenario, but it does include additional opportunities for
investment. The plan also continues to assume competitive transportation funding (e.g., state
and federal discretionary programs like INFRA and Corridors of Commerce) will be sought and
amended into the plan as awarded.
Under the Metropolitan Land Planning Act, local comprehensive plans are expected to conform
to the projects currently identified as funded in the fiscally constrained plan, which is the official
metropolitan system plan. The additional opportunities for investment may be identified
separately in local plans as unfunded proposals but are not required to be included.
Federal requirements also call for metropolitan transportation plans to be performance based,
so the TPPincludes objectives, policies, and actions for the regional transportation system.
These objectives, policies, and actions guide the Council and regional partners in their
planning and investment in the surface transportation system.
In addition to reviewing this system statement, consult the TPP to ensure that your
community’s local comprehensive plan and plan amendments conform to the metropolitan
transportation system plan. Communities should also review the Imagine 2050 Land Use
Policy for land use considerations near certain transportation infrastructure. The format of this
plan is different than past TPPs. The plan is no longer separated by chapter, rather each
modal plan is distinguished from each other as individual investment or system plans. If the
Council has a role in the funding of a regional system, the plan is identified as an investment
2025 SYSTEM STATEMENTTRANSPORTATION7
plan, if not, thenit is identified as a system plan.There is no appendix in the 2050 TPP,
supporting documentation is combined directly with the specific investment or system plan and
identifiedas support documentation.
2050 TransportationPolicy Plan Regional Systems
Adopted by the Metropolitan Council in February 2025, the TPP identifies the regional
transportation systems, regional transportation objectives and policies, and other regional
transportation issues communities should consider when producing their own comprehensive
plans. This section will cover descriptions of each system and key changes made to these
systems in the TPP.
Regional Transportation Policies and Actions
In addition to identifying regional systems and investment needs, the TPP includes a set of
policies and related actions to guide investments, planning and priorities for the regional
transportation system. The policies and actions cover many topics including safety, highway
planning priorities, complete streets, non-motorized transportation, equity, climate and natural
systems. Communities are encouraged to incorporate regional policies in their local plans.
Regional Highway System
The Metropolitan Highway System is made up of principal arterials, shown in Figure 1 of the
Highway Investment Plan and included with this system statement. This system is federally
known as the National Highway System. The Metropolitan Highway System is a vital element
of the regional transportation system; while minor arterials are lower order roadways that
provide connectivity to and relieve congestion inthe principal arterial system. Principal and
minor arterials combined represent the Regional Highway System.
Key Changes from the 2040 TPP
A major shift from previous TPPs is that potential new revenues are no longer
considered a means to resolve unmet needs on the system. The 2050 TPP does not
have a current and increased revenue scenario as a result. Instead, the 2050 TPP
identifies funded projects in the fiscally constrained plan and additional opportunities
beyond what is funded. Multiple studies completed since the 2040 TPP identified
additional opportunities for investment, these are shown in figures 8 and 10.
The 2050 TPP identifies highway investments in five major categories:
o Safety: Figure 7 in the Highway Investment Plan shows regionally significant
safety investments.
o Spot mobility: Figure 8 in the Highway Investment Plan shows funded regionally
significant spot mobility projects alongside identified additional opportunities for
investment.
o Interchanges: Figure 9 in the Highway Investment Plan shows funded and
planned regionally significant interchange investments.
o Managed lanes: Figure 10 in the Highway Investment Plan shows the existing,
under construction and planned E-ZPass system. It also includes managed lane
corridors which are identified additional opportunities for investment.
2025 SYSTEM STATEMENTTRANSPORTATION8
o Targeted regional capacity: Figure 11 in the Highway Investment Plan shows
funded and planned regionally significant highway capacity investments. It also
includes potential future capacity enhancements identified in studies.
Modifications were made to the 2050TPPthat removed appendix naming found in
previous plans and reworks previous chapters. Support documents for the Highway
Investment Plan are now: Functional Classification, Preliminary Interchange Approval
Process, and Congestion Management Process. The project list appendix item is now a
separate section of the TPP, titled Long Range Highway and Transit Capital Project
List. This updated list identifies projects from 2025 to 2050.
Regional Transit System
The regional transit system iscomprised of the region’s transitways, regular route bus
services, demand response services, transit centers and park and rides, and transit
advantages. This system is operated by six different service providers in the region. The
COVID-19 pandemic upended transit, and some services vary dramatically from pre-pandemic
levels. Many routes were suspended in the region and are still in the process of restructuring.
Key Changes from the 2040 TPP
A major shift from previous TPPs is from new revenues raised to fill budget gaps in the
system. A new source of revenue for transit was created in 2023 to fund operations and
maintenance for the region. Similar to highways, the Transit Investment Plan no longer
contains a current and increased revenue scenario. The projects shown in the 2050
TPP are those in the fiscally constrained plan. Additional opportunities for investment
are also identified in the plan and these may be incorporated into local comprehensive
plans.
Several transitways have been implemented and opened and additional transitways
have been identified in the region. Multiple arterial bus rapid transit (BRT) routes have
been completed and put into operation, while more alignments have been identified in
studies for future implementation. The Transit Investment Plan identifies investments
planned to be implemented in the 2050 TPP:
o Two light rail extensions (Green Line Extension, Blue Line Extension)
o Two dedicated BRT routes (Gold Line, Purple Line)
o Five arterial BRT routes (B Line, E Line, F Line, G Line, H Line)
Modifications were made to the 2050 TPP that removed appendix naming found in
previous plans and reworks previous chapters. Support documents for the Transit
Investment Plan are now: Transit Design and Performance Guidelines.
Regional Aviation System
The regional aviation system iscomposed of Minneapolis-St Paul International Airport, eight
publicly owned regional airports, and two privately owned seaplane bases. These regional
airports are owned and operated by the Metropolitan Airports Commission (MAC) and local
communities.
2025 SYSTEM STATEMENTTRANSPORTATION9
Key Changes from the 2040 TPP
The MAC completed an update to the Long-Term Comprehensive Plan (LTCP) for the
Minneapolis-St Paul International Airport in 2024. This update moves the planning
horizon to 2040 with new operation forecasts, anticipated noise impacts and capital
project needs.
The Aviation System Plan now identifies all facilities where aviation activity may take
place in the region beyond regional airports. These facilities may be incorporated into
and considered in local planning.Aviation appendix items of the TPP are now included
as a single support document titled Aviation Supporting Information.
Regional Bicycle System
The regional bicycle system is identified through the Regional Bicycle Transportation Network
(RBTN). The RBTN is made up of alignments and corridors. Corridors are shown where more
specific alignments within those corridors have not yet been designated. The process used to
develop the RBTN, the general principles and analysis factors used in its development, and
studies done to analyze and update the network can be found in the Bicycle Investment Plan.
The RBTN was established in the 2040 TPP with the intent of achieving the following goals:
Establish an integrated and seamless network of on-street bikeways and off-road trails.
Provide the vision for a “backbone” arterial network to serve daily bicycle trips by
connecting regional destinations and local bicycle networks.
Encourage cities, counties, park agencies, and the state to plan and implement future
bikeways in support of the network vision.
The RBTN also incorporates regional bicycle barriers which are established in the TPP as the
region’s most significant physical barriers to everyday bicycle travel and include freeways and
expressways, railroad corridors, and secondary rivers and streams. They were developed and
analyzed through the Regional Bicycle Barrier Study, the map which displays these barriers
can be found here: Regional Bicycle Barriers Map.
Key Changes from 2040 TPP
The RBTN has been refined and expanded since it was first implemented in the 2040
TPP. Requests from local governments to add and revise RBTN corridors and
alignments prompted the Regional Bicycle Guidelines and Measures Studywhich
developed specific measures used in reviewing update requests submitted by local
agencies.
The RBTN undergoes a formal update of alignments and corridors about every 2 years.
The next formal update will take place in 2025 prior to the 2026 Regional Solicitation.
Regional Freight System
The regional freight system is composed of interconnecting transportation modes, some of
which are unique to freight and some which overlap with passenger travel modes. There are
five distinct modes of freight transportation: highway trucks, railroads, river barges, air freight,
and pipelines. Combined with intermodal or warehouse/distribution terminals and supporting
2025 SYSTEM STATEMENTTRANSPORTATION10
infrastructure these modes of transportationcomprise theregional freight system, known as
theMetropolitan Freight System.
Key Changes from 2040 TPP
E-commerce has become an increasingly important segment of freight movements and
deliveries of goods to homes. The Urban Freight Distribution Study focused on e-
commerce trends and impacts or opportunities of last-mile parcel deliveries in regional
communities. The study notesthat as urban deliveries become more common local
communities are encouraged to create curb management policies, consider delivery
needs in their complete streets planning and identify microhubs for last mile parcel
distribution in addition to other recommendations.
Pedestrian System
The Council coordinates with local partners on pedestrian issues and trends, and aids in
funding for pedestrian needs in a variety of ways.
Key Changes from 2040 TPP
In previous TPPs pedestrian and bicycle travel were combined into one chapter and
discussed together. The pedestrian system is now discussed and considered as an
independent investment section of the 2050 TPP.
To address rising pedestrian danger on our streets, the Council undertook a study to
create the Pedestrian Safety Action Plan,which was released in 2022. This plan
includes analysis of crash trends in the region, recommendations of actions to take to
increase pedestrian safety, and a weighted crash score on every road in the region to
aid in future safety planning and project prioritization. Communities are encouraged to
incorporate the plan’s findings into the pedestrian elements of their comprehensive
plans.
Travel Demand Management
Travel demand management(TDM)isthe application of strategies, programsand policies to
increase the efficiency of transportation systems by reducing travel demand, or redistributing
this demand in space or in time. These initiatives are intended to inspire new travel habits to
support infrastructure investments and a more efficient use of the transportation systemby
reducing the demand for personalvehicle trips.
Key Changes from 2040 TPP
TDM has its own dedicated investment plan and discussion in the 2050 TPP, which is
completely new to the plan. This section describes key partners in TDM in the region
and identifies roles and responsibilities for these partners. As a result of this new
investment plan, local communities are being asked to discuss how they include travel
demand management strategies in their local plans, since some of them have
relationships to land use controls and ordinances.
The Council conducted the Regional Travel Demand Management Study that concluded
with the Regional Travel Demand Management Action Plan in 2023. The Action Plan
outlines a structure for a regional TDM program to implement and operationalize
2025 SYSTEM STATEMENTTRANSPORTATION11
strategies, programs and incentives that achieve reductions in single-occupant vehicle
trips, vehicle-miles traveled, and greenhouse gas emissions through travel behavior
change. The Action Planis summarized in the 2050TPPTravel Demand Management
Investment Plan.
System Plan Considerations Affecting Your Community
Your community should consult the complete TPP in preparing its local comprehensive plan. In
addition, your communityshould consult Imagine 2050 and the current version of the
Metropolitan Council’s Local Planning Handbook (LPH) for specific information needed in its
comprehensive plan. Specific system plan considerations affecting your community are
detailed below.
Regional HighwaySystem
There are no principal arterials located within your community.
The 2050 TPPincludes the following regional highway mobility improvements in your
community as shown in the Highway Investment Plan Figures 8, 9, 10, 11:
Funded or Planned Targeted Regional Capacity
o Anoka CSAH 7 (7th Ave) from Anoka CR 116 (Bunker Lake Boulevard) to Anoka
CR 20 (157th Ave)
The TPP includes programmed safety investments in your community, these investments can
be seen on this system statement and in Figure 7 of the TPP. Communities should incorporate
these investments in your local plans and consider local planning to support these investments
on your local system.
Regional Transit System
Your community is located within the following Transit Market Areas:TMA 3, TMA 4, and TMA
5.
TMA 3: Primarily lower density Urban Edge and Suburban communities. It is
characterized by lower density and less transit-supportive street networks and land use
but with some pockets of denser development. Transit service in this market area
includes suburban local routes, express and commuter service, and non-regular route
transit services, usually dial-a-ride, providing basic transportation access.
TMA 4: Primarily Suburban Edge communities along with portions of Suburban
communities. It is characterized by low population and job densities that do not support
frequent local transit service and a spread out, often circuitous, street network that
hinders efficient routing. Transit service in Market Area 4 is mainly peak-period express
and commuter service at park-and- rides which can effectively gather the lower density
transit demand into one spot. There are some suburban local routes, including suburb-
to-suburb connectors, although service istypically very infrequent. Non-regular route
transit, usually dial-a-ride, is generally available.
TMA 5: Primarily Generally Rural communities including rural centers but also some
suburban edge communities as well as freestanding town centers characterized by very
2025 SYSTEM STATEMENTTRANSPORTATION12
low-density development or undeveloped land not well suited for regular-route transit
service outside of limited peak-period express and commuter service.
Your communityis not located within the Transit Capital Levy District as shown in Figure 2 of
the Transit Investment Plan. Regardless of the Transit Market Area or transitway corridor
planning, the only transit services provided in this type of community are Transit Link dial-a-
ride service and various ridesharing services.
Regional Aviation System
All communities must include an aviation element in the transportation sections of their
comprehensive plans. The degree of aviation planning and development considerations that
need to be included in the comprehensive plan varies by community. Even those communities
not impacted directly by an airport have a responsibility to include airspace protection in their
comprehensive plan. The protection element should include potential hazards to air navigation
including electronic interference. Local comprehensive plans can also begin to consider other
aviation uses which do not take place at airports, like drones.
Communities influenced by this airport should review the LTCP to ensure that the updated
comprehensive plan developed by the community remains consistent with the airport plans.
Consult the LPH for specific comprehensive planning requirements and considerations such as
airport zoning, noise and other environmental mitigation, airport development and economic
impacts, ground access needs, infrastructure requirements, and general land use compatibility.
Local communities should also consider other facilities which may generate aviation activity,
such as heliports or private air facilities. To see all aviation facilities in the region including
those that are not defined as a part of the regional aviation system, refer to Figure 6 of the
Aviation System Plan.
Regional Bicycle Planning
The RBTN is depicted on Figure 2 of the Bicycle Investment Plan. The network consists of Tier
1 and Tier 2 corridors and alignments. These are not intended to be the only bicycle facilities in
the region, and local units should also include local network plans in their communities.
In your communitythere are 2 RBTN alignments. Your communityshould incorporate the
RBTN map within your local bicycle plan maps and use your comprehensive planning process
to identify suitable alignments within and along the RBTN corridors for future incorporation into
the TPP. In addition, agencies should plan their local on and off-road bikeway networks to
connect to the designated Tier 1 and Tier 2 alignments, as well as any new network
alignments within RBTN corridors to be proposed in local comprehensive plans. Bikeway
projects that complete segments of, or connect to, the RBTN are given priority for federal
transportation funds through the Transportation Advisory Board’s biannual regional solicitation.
In your communitythere are one or more identified bicycle barrier crossings. To determine
which regional bicycle barriers and prioritized barrier crossing improvement locations occur
within your community, please review the Regional Bicycle Barriers Online Map. The tiered
crossing improvement locations are used as one alternative criterion in the Regional
Solicitation to distribute federal transportation funds. Communities are encouraged to analyze
and address the need for new bicycle barrier crossings or improved bicycle facilities at existing
barrier crossings.
2025 SYSTEM STATEMENTTRANSPORTATION13
Regional Freight Planning
The Council encourages all local governments to plan for freight movement in their
communities. Trucks are the major mode of freight movement in the region and across the
nation to distribute consumer goods as well as move manufactured goods and commodities,
and they operate in every community.
The Metropolitan Freight System and the National Highway Freight Network are shown in
Figures 1 and 5 of the Freight Investment Plan, respectively. The following regional freight
facilities are in your community: an active freight railroad.These networks and facilities should
be incorporated into your local comprehensive plan. The local plan should also plan for
compatible adjacent land uses, consider last-mile freight delivery needs and curb management
strategies for local deliveries, if applicable. Refer to the Urban Freight Distribution Study for
specific guidance on how to consider e-commerce and local deliveries on the local
transportation system.
Other Transportation Policy Plan Considerations
Pedestrian Planning
The Council encourages local governments to address pedestrian needs for transportation in
their local comprehensive plans. The necessary planning for pedestrians can be done within
your community’s comprehensive plan. An adopted pedestrian, active transportation, or
multimodal plan can be included as an addendum to or in addition to the comprehensive plan.
This planning should also include ensuring your local community has a current ADA self-
evaluation that covers the public rights-of-way for transportation. Agencies with 50 or more
employees must also have an adopted ADA transition plan, not just a self-evaluation.
Travel Demand Management
The Council encourages local governments to address travel demand management needs for
areas which experience traffic congestion. Your community is served by Anoka County TMO.
Local governments should identify the transportation management organization which serves
their community and describe any policies, ordinances, practices or programs in place which
would aid in regional TDM work in their local comprehensive plans.
Greenhouse Gas Emissions
State law directs the Minnesota Department of Transportation to establish targets to meet
greenhouse gas (GHG) emissions reduction for the seven-county metro to reach net-zero
emissions in the transportation sector by 2050. Your community must include plans or
strategies to limit GHG emissions on the surface transportation system in your comprehensive
plan to meet the designated regional targets.
2025 SYSTEM STATEMENTTRANSPORTATION14
2025 SYSTEM STATEMENTTRANSPORTATION15
2025 SYSTEM STATEMENTTRANSPORTATION16
2025 SYSTEM STATEMENTTRANSPORTATION17
2025 SYSTEM STATEMENTTRANSPORTATION18
2025 SYSTEM STATEMENTTRANSPORTATION19
2025 SYSTEM STATEMENTTRANSPORTATION20
2025 SYSTEM STATEMENTTRANSPORTATION21
2025 WATER RESOURCES SYSTEM STATEMENT
CITY OF ANDOVER
Water PolicyPlan Overview
The 2050 Water Policy Plan includes policies and strategies to achieve four objectives that
support our regional goals:
CLIMATE:The region’s waters and water services are protected from and made
resilient to the ongoing and future effects of climate change.
INVESTMENTS: Water protection, planning, management, and infrastructure
investments are optimized to ensure public and ecosystem health are fully protected
now and for future generations.
HEALTH: Natural waters, source waters, water services, and infrastructure are
managed, restored, and enhanced to protect public and ecosystem health that ensures
a high quality of life in the region.
EQUITY:The benefits of clean and abundant water and water services are defined by
local needs and environmental context, accessible, and justly shared by all residents
and communities.
These objectives help to protect our region’s groundwater and surface water, ensure the
sustainability of water sources and utility service providers, support public and ecosystem
health, and promote a thriving economy, sound development decisions, and a high quality of
life for all who call this region home.
The Water Policy Plan strives to generate innovative actions, including water reuse, resource
recovery, and nature-based approaches, that have multiple benefits at both the local and
regional scales. Additionally, the plan includes policies and strategies to address the impacts
of climate change, equitable access to water benefits, and water sector workforce concerns.
The region has a strong history of water planning and management, and the 2050 Water
Policy Plan continues this tradition. It progresses our organization and the region to ensure
clean and abundant water for current and future generations.
Key Concepts
Adopted by the Metropolitan Council in February 2025, the 2050 Water Policy Plan - including
the regional water policies, Wastewater System Plan, and the Metro Area Water Supply Plan -
outline the conditions for regional wastewater service, surface water management, and water
supply planning. Local comprehensive plans shall conform to these conditions. The Policy Plan
incorporates the following changes:
2025 SYSTEM STATMENTWATER RESOURCES22
Integrated Planning (next steps)
The Water Policy Plan is a guide for managing wastewater, water supply, surface waters, and
groundwater. It takes an integrated approach to water planning and management from local to
federal and Tribal levels, which helps to ensure a clean and plentiful water future. Water
planning organizations need to work together to address issues that transcend political
boundaries to achieve holistic water management.
Subregional Approach to Planning
The Met Council is committed to continuing and broadening the subregional approach to
integrated water planning. Subregional groups will be expanded to include stakeholders from
Tribal Nations, state agencies, county planning staff, municipal public works and planning staff,
watershed organizations, non-governmental organizations, and others who want to participate
in discussions about localized, integrated water concerns.
Water Equity
The Water Policy Plan prioritizes equitable access to clean water and water services,
especially for historically marginalized communities. Reaching these outcomes requires
initiatives such as prioritizing investments in overburdened communities, addressing historical
harms, creating accessible information and communications, and including diverse
perspectives of community members in water planning and management decisions.
Climate and Natural Systems
The Water Policy Plan includes climate and natural systems objectives, policies, and
actions, which guide the Met Council and communities to employ approaches that lead
to sustainable water and water services. This includes building water resiliency, limiting
risks, and benefiting a growing and a thriving economy through convening partners, new
tools and technologies, water conservation and protection efforts, and water planning
and technical assistance.
Considerations Affecting Your Community
Regional Sewer Service
The treatment of wastewater is foundational to ensure public health and protect the region’s
natural environments. Reclamation of water and byproducts from the wastewater treatment
process can help our region meet sustainability and climate goals. To operate and steward the
regional wastewater system, it is essential for the Met Council to understand local conditions,
identify current and future needs, and take innovative approaches to address the region’s
water sustainability challenges.
Local governments are required to submit both a wastewater plan element to their
comprehensive plan and a comprehensive sewer plan describing service needs from the Met
Council (Minnesota Statutes 473.513). A complete list of requirements for the comprehensive
sewer plan, depending on wastewater service methods in your community, can be found in the
Water Resources section of the Local Planning Handbook.
2025 SYSTEM STATMENTWATER RESOURCES23
Forecasts
The forecasts of population, households, employment, and wastewater flows for Andover can
be found on your Community Page in the Local Planning Handbook. These forecasts are for
sewered development. The sewered forecasts were estimated using Met Council’s census
block forecast data, individual and communal sewage treatment system data, Sewer
Availability Charge (SAC) data, annual city reports, current trends, existing and future local
wastewater service areas and other municipal information. The wastewater flows are based on
historical wastewater flow data, future wastewater generation rates, and the sewered
population and employment forecast data.
The Met Council will use these growth and wastewater flow forecasts to plan future regional
wastewater conveyance and treatment system improvements needed to serve your
community.
Andover, through its comprehensive planning process, must decide the location and staging of
development, and then plan and design its local wastewater collection system to serve this
development.
Wastewater Service
Metropolitan Council Environmental Services (Environmental Services) designs, constructs,
and operates the regional wastewater system (Metropolitan Disposal System): a publicly
owned system of regional sanitary sewers and water resource recovery facilities(wastewater
treatment plants), for the conveyance, treatment and disposal of domestic waste, industrial
waste and other waste from residential, commercial, institutional, and industrial users in the
metropolitan area. The regional wastewater system currently serves 111 communities and
through its work it protects public health, protects the environment, and fosters the economic
growth of the seven-county Twin Cities Metropolitan Area.
A Regional Sanitary Sewer System map is provided to assist in the completion of your
community’s comprehensive sewer plan. The map shows Environmental Services’ wastewater
infrastructure located within your community’s boundaries, if your community is provided
regional wastewater service.
A complete list of items required for inclusion in your community’s comprehensive sewer plan,
depending on wastewater service methods in your community, can be found in the Local
Planning Handbook. A comprehensive plan will be found incomplete for review if all submittal
requirements are not met.
If your community has multiple methods of wastewater service (including regional service, local
(municipal) wastewater treatment system, private communal systems, and/or subsurface
sewage treatment systems), review the information in each corresponding section and refer to
the Local Planning Handbook for a complete list of requirements that must be included in the
comprehensive sewer plan for these systems. We strongly encourage you to include this
information in a water chapter of your comprehensive plan.
2025 SYSTEM STATMENTWATER RESOURCES24
Areas Served by the Regional System
Current wastewater treatment services are provided to the City by Environmental Services.
Wastewater generated within the City is conveyed by Met Council Interceptor 7035 to and
treated at the Metropolitan Water Resource Recovery Facility in St. Paul.
Regional Inflow and Infiltration Program
The Met Council is continuing implementation of its inflow and infiltration (I/I) reduction
program and will continue to establish I/I goals for all communities discharging wastewater to
the regional wastewater system. Communities that have excessive I/I in their sanitary sewer
systems will be required to eliminate the excessive I/I. Those communities will be required to
submit a work plan that details work activities to identify and eliminate I/I sources from both
municipal and private sources. The Met Council will not design future regional sanitary sewer
improvements or water resource recovery facilities to handle peak hourly flows in excess of the
allowable rate for your community. Increases in service may be limited in communities that do
not demonstrate progress in reducing excess I/I.
Two grant programs are currently available for communities with excessive I/I in their sanitary
sewer systems: The Municipal Inflow and Infiltration Grant Program and the Private Property
Inflow and Infiltration Grant Program. It is recommended that communities review these
programs and determine if participation fits into their I/I work plan. The Municipal Inflow and
Infiltration Grant Program is based on annual legislative action and funding amount and
availability may vary year to year.
Areas Served by Local Wastewater Treatment System
The requirements of this element do not apply because Andover does not have a local
wastewater treatment system.
Areas Served by Private Communal Treatment Systems and/or Subsurface
Sewage Treatment Systems
The Met Council’s position is that private communal wastewater treatment systems should only
be permitted in areas not programmed for regional sewer service in the foreseeable future and
they are provided for in a community’s comprehensive plan. The community is responsible for
permitting all private communal or cluster wastewater treatment systems consistent with
current Minnesota Pollution Control Agency standards (Minnesota Rules Chapter 7080-7083).
The Met Council will not provide financial support to assist communities if these systems fail.
Communities with individual subsurface sewage treatment systems (SSTS), commonly known
as septic systems, must adopt a management program consistent with current Minnesota
Pollution Control Agency regulations (Minnesota Rules Chapter 7080-7083). A description of
the management plan and current SSTS ordinance must be included in the community’s
comprehensive sewer plan.
2025 SYSTEM STATMENTWATER RESOURCES25
Surface Water Management
The metro region consists of hundreds of miles of rivers, streams, thousands of acres of
wetlands, and nearly a thousand lakes. These surface waters define our region. They are
where we play, exercise, find peace, and celebrate with friends and family. They support the
region’s ecosystems and biodiversity. They provide drinking water for the region’s residents
and energy for industry. They are critical transportation corridors and places to recreate,
fueling local economies. Yet these waters are threatened by complex issues like ongoing
pollution stress, climate change, and unsustainable development pressures. Comprehensive
community planning includes surface water planning to ensure the region’s residents,
businesses, and ecosystems can benefit from clean and abundant water.
In 1995, Minnesota Statutes Section 473.859, subd. 2 was amended to make the local water
plan (often referred to as local surface water management plans) required by Section 103B.
235 a part of the land use plan of the local comprehensive plan. Minnesota Rules Chapter
8410, updated in July of 2015, includes the requirements for local water management plans.
All communities in the metro region must update their local water plan between Jan. 1, 2027
and Dec. 31, 2028. This means that Andover must update its local water plan as part of the
comprehensive plan update. The community’s updated local water plan should be submitted
to the Met Council for its review concurrent with the review by the local watershed
management organizations.
The Surface Water Features map shows the watershed management organizations, Coon
Creek WD and Lower Rum River WMO, that have jurisdiction in Andover.
Failure to have an updated local water plan approved by your watershed management
organizations will result in the comprehensive plan being incomplete for review. Local water
plans shall be submitted to the Met Council for review in the timeframe described above,
comments are sent from the Met Council to the appropriate watersheds for inclusion in their
review and approval of the plan, and finally the plan is approved by the appropriate
watersheds.
Local water plans must meet the requirements for local water plans in Minnesota Statutes,
section 103B.235 and Minnesota Rules Chapter 8410. In general, local water plans need to
include a summary of the priorities and problems in the community; structural, nonstructural
and programmatic actions to take to address the priorities and problems; and clearly identified
funding mechanisms to fix the problems.
More detailed guidance for the local water plans can be found in Appendix A of the 2050 Water
Policy Planand in the Met Council’s current Local Planning Handbook.
Priority Waters List
The Met Council updated its Priority Waters List (formerly Priority Lakes List) in July 2022. This
new version includes rivers, lakes, and streams. With more than 950 lakes and hundreds of
miles of rivers and streams in the region, waterbodies needed to be prioritized to adequately
dedicate staff and financial resources. The Met Council uses the Priority Waters List to focus
its limited resources. The list is also used in the environmental review process. The Surface
Water Features map and Priority Waters List table show the priority waters for Andover.
2025 SYSTEM STATMENTWATER RESOURCES26
When using this Priority Waters List, for projects near a specific waterbody, we recommend
you connect with local residents to understand how they value and interact with the waterbody.
The Twin Cities region is home to many diverse communities with different cultural and
personal relationships to water, so it’s important to incorporate those perspectives in addition
to the Priority Waters List when working on local-scale projects. Communities should identify
the Priority Waters and the projects and/or programs that will protect or restore these waters.
The Water Contamination and Impaired Waters map includes any water bodies that are on the
Minnesota Pollution Control Agency’s 303d Impaired Waters List.
Table of Priority Waters for the City of Andover
Waterbody Type Name DNR Lake ID DNR Kittle Number
Lake Crooked 02008400 ---
Lake Round 02008900 ---
River/stream Cedar Creek --- M-063-003
River/stream Coon Creek--- M-061
River/stream Rum River--- M-063
River/stream Trott Brook --- M-063-001.5
Water Supply
Water supply is not a regional system. However, water supply information is required for local
comprehensive plan updates to meet statutory requirements and for consistency with regional
policy.
To ensure that there is a safe and plentiful supply of water–for a wide range of residential,
commercial, institutional, industrial, recreational, and other purposes–it is important to make
sure local water supply sources, infrastructure, and planned investments are aligned with
planned land use changes.
The Met Council recognizes the local responsibility and authority for water supply planning.
However, a regional perspective is also valuable, because the effects of local water supply
decisions do not stop at community boundaries. The Met Council provides regional planning,
guidance, and resources to support communities and help safeguard our shared water
resources.
Water supply plan-related requirements generally include:
Clearly identifying the locations of water sources and amount of water that is currently
used and is planned to be used for things like agriculture, homes, businesses,
industries, and other public and private purposes. This includes areas that affect those
water sources, such as source water protection areas.
Creating a program for how to implement local rules and regulations about water
supply, including when and how these rules will be developed, adopted, and
administered.
Communities served by a municipal community public water supply system must fulfill part of
these requirements by attaching a local water supply plan approved by the Minnesota
Department of Natural Resources as an appendix to the comprehensive plan.
2025 SYSTEM STATMENTWATER RESOURCES27
The Water Supply Considerations map illustrates some key content for your community,
including Drinking Water Supply Management Areas, Special Well and Boring Construction
Areas, and Priority Waters qualifying as drinking water sources.
We strongly encourage you to include any required information that isn’t in the local water
supply plan—such as source water protection and privately-owned wells—in a water chapter of
your comprehensive plan.
A customized checklist of minimum requirements for your community is included in the Local
Planning Handbook, along with resources to help you meet and go beyond minimum
requirements.
Source Water ProtectionAreas
Your comprehensive plan should consider water use (including water supply sources) as part
of land use planning, to promote land use practices and development decisions that protect
public health for your community and the region. Include information aboutthe location of both
groundwater and surface water source water protection areas and their vulnerability for all
community public drinking water source(s) within your community’s borders and associated
contaminant threats. Also include a commitment to collaborate with neighbors on source water
protection, when applicable.
Privately-Owned Wells and Nonmunicipal Public Water Supply Systems
Your comprehensive plan should include information about the current and planned use and
management strategies for privately-owned wells and nonmunicipal public water supply
systems, because people, institutions, and businesses in your community use those sources
for a wide range of agricultural, residential, commercial, industrial and/or other nonmunicipal
purposes.
If a new municipal community public water supply system is planned by 2050, a water chapter
of the updated comprehensive plan should include details about the planned system.
Municipal Community Public Water Supply Systems
Water Supply System Information
Because people, institutions, and businesses in your community get water through a municipal
community public water supply system, you must include information about that system and an
implementation program in your comprehensive plans, to demonstrate the availability of clean,
safe drinking water to meet projected water demand consistent with the Met Council’s
forecasts.
The Minnesota Department of Natural Resources (DNR)-approved local water supply plan for
the municipal public water supplier providing service to your community must be attached as
an appendix to the comprehensive plan. To ensure that the DNR-approved local water supply
plan is consistent with regional policies and is compatible with adjacent and affected
governmental units, you should provide the Met Council and adjacent and affected jurisdictions
with the opportunity to review and comment on your draft local water supply plan update.
2025 SYSTEM STATMENTWATER RESOURCES28
Failure to include an updated local water supply plan approved by the DNR will result in the
comprehensive plan being incomplete for review until the required plan is submitted to the Met
Council.
2025 SYSTEM STATMENTWATER RESOURCES29
2025 SYSTEM STATMENTWATER RESOURCES30
2025 SYSTEM STATEMENTWATER RESOURCES31
2025 SYSTEM STATMENTWATER RESOURCES32
2025 SYSTEM STATMENTWATER RESOURCES33
REGIONAL PARKS AND TRAILS SYSTEM
STATEMENT
CITY OF ANDOVER
Overview of the Regional Parks and Trails System
The Regional Parks and Trails System includes 66 regional parks, park reserves, and special features,
plus more than 487 miles of regional trails that showcase the unique landscapes of the region and
provide year-round recreation. The Regional Parks and Trails System is well-loved by our region’s
residents and attracted over 69 million visits in 2023.
The organizational structure of the Regional Parks and Trails System is unique, built upon a strong
partnership between the Met Council and the ten regional park implementing agencies that own and
operate Regional Parks and Trails System units. The regional park implementing agencies are:
Anoka County Ramsey County
City of Bloomington City of Saint Paul
Carver CountyScott County
Dakota County Three Rivers Park District
Minneapolis Park and Recreation Board Washington County
The 2050 Regional Parks and Trails Policy Plan advances the Imagine 2050 regional goals and core
values including Equity, Leadership, Accountability, and Stewardship by striving to:
Foster equity and belonging: Connect people with nature, community, and cultural
landscapes to better support their physical, mental, and emotional well-being
Take care of what we have: Reinvest in existing regional parks and trails to maintain and
enhance visitor experiences
Protect and restore: Protect and restore natural systems to safeguard the well-being of all
living things
Adapt and mitigate: Increase the region’s resilience to climate change through land
stewardship practices that mitigate greenhouse gases and adapt to future climates
Meet future needs: Meet the growing demand for regional parks and trails through strategic
and timely land acquisition and development.
Key Concepts in the 2050 Regional Parks and Trails Policy Plan
The 2050 Regional Parks and Trails Policy Plan includes the following policies, each with specific
associated strategies:
System Plan policy: Maintain a robust and current set of data, maps, plans, processes, and
applications to support regional parks and trails planning.
2025 SYSTEM STATEMENTREGIONAL PARKS AND TRAILS34
Natural Systems policy: Identify lands with high-quality natural features and/or with high
restoration potential that are desirable for Regional Parks and Trails System activities and put
these lands in a protected status so they will be available for recreational uses and preservation
purposes in perpetuity.
Climate Resilience policy: Adapt and enhance the Regional Parks and Trails System to
promote resilience to climate change, including the mitigation of greenhouse gas emissions.
Planning policy: Promote long-range planning and help provide integrated resource planning
across jurisdictions in order to create a seamless system that connects everyone to the
outdoors.
System Protection policy: Protect public investments in acquisition and development by
assuring that every component in the system is able to fully carry out its designated role.
Recreation, Facilities, and Programming policy: Foster a sense of belonging by providing a
wide spectrum of leisure and play opportunities while connecting people, places, and the natural
world.
Finance policy: The Met Council administers, provides financial oversight, and collaborates
with a range of partners to fund the ten regional park implementing agencies in support of the
Regional Parks and Trails System.
The 2050 Regional Parks and Trails Policy Plan is the metropolitan system plan for regional recreation
open space with which local comprehensive plans must conform. This system statement highlights the
elements of the system plan which apply specifically to your community. Find the complete text of the
2050 Regional Parks and Trails Policy Plan at the following url:
https://imagine2050.metrocouncil.org/chapters/regional-parks-and-trails.
Key Changes in the 2050 Regional Parks and Trails Policy Plan
Adopted by the Met Council in February 2025, the 2050 Regional Parks and Trails Policy Plan
incorporates the following changes:
Unit name changes
o Anoka County
“Northwest Search Area” changed to “Sugar Hills Search Area”
o Dakota County
“Lebanon Hills-Big Rivers Greenway Trail Search Corridor” changed to “Lebanon
Hills-Minnesota River Greenway Trail Search Corridor”
“Lebanon Hills-Mendota Greenway Regional Trail, Highway 62 segment”
changed to “Lebanon Hills Greenway Regional Trail”
o Scott County
“Scott West Regional Trail” changed to “Big Woods Regional Trail”
“Minnesota River Bluffs Extension and Scott County Connection Regional Trail”
changed to “Merriam Junction Regional Trail”
“Louisville Trail Search Corridor” changed to “Merriam Junction Regional Trail”
Portion of “Southern Scott Trail Search Corridor” changed to “Shallow Waters
Regional Trail”
2025 SYSTEM STATEMENTREGIONAL PARKS AND TRAILS35
Trail refinements
o Three Rivers Park District’s Dakota Rail Regional Trail Search Corridor Extension
moving the trail terminus from Highway 494 to Minnetonka City Hall
o Three Rivers Park District is transferring a portion of the Lake Minnetonka Regional Trail
to Carver County
Future 2028/2029 system additions process candidates
o Ramsey County’s Rice Creek North Regional Trail Boundary Adjustment adding 2,407
acres to the current 792 acres at the former Twin Cities Army Ammunition Plant
o Three Rivers Park District’s 5.5-mile West Minnehaha Creek Trail Corridor Study Area
o Dakota County’s 58-acre Thompson County Park Study Area in West St. Paul serving
the outdoor recreational needs of the more than 50,000 residents who live in the
northern portion of Dakota County
The 2050 Regional Parks and Trails System Plan Map is depicted in Figure 1. Andover should consult
the complete 2050 Regional Parks and Trails Policy Plan in preparing its local comprehensive plan. In
addition, Andover should consult Imagine 2050 and the current version of the Met Council’s Local
Planning Handbook for specific comprehensive plan requirements.
2050 Regional Parks and Trails System Units
The Regional Parks and Trails System comprises four main types of units: regional parks, park
reserves, special features and regional trails.
Regional parks contain a diversity of natural features, either naturally occurring or restored,
and are typically 200-500 acres in size. Regional parks accommodate a variety of outdoor
recreation activities. In 2024, a total of 46 regional parks are open to the public.
Park reserves, like regional parks, provide for a diversity of outdoor recreation activities. One
major distinguishing feature is that the minimum size for a park reserve is 1,000 acres.
Additionally, regional park implementing agencies are required to manage at least 80% of the
park reserve as natural lands that protect the ecological functions of the native landscape. As of
2024, a total of 12 park reserves were open to the public.
Special features provide opportunities not generally found in the regional parks, park reserves,
or trail corridors. Special features often require a unique managing or programming effort. As of
2024, there are eight special features open to the public.
Regional trails: The Met Council has defined two major types of trails to serve the region:
destination or greenway trails and linking trails. Destination or greenway trails typically follow
along corridors with high-quality natural features that make the trail itself a destination. Linking
trails are predominately intended to provide connections between various Regional Parks and
Trails System units. As of 2024, 56 regional trails totaling approximately 487 miles were open
for public use.
2050 Regional Parks and Trails System Components
The 2050 Regional Parks and Trails Policy Plan identifies five components which together comprise the
vision for the Regional Parks and Trails System in 2050, as described below.
2025 SYSTEM STATEMENTREGIONAL PARKS AND TRAILS36
Existing Regional Parks and Trails System facilities are open for public use and include land
that is owned by regional park implementing agencies. They may include inholding parcels
within the boundaries of these parks and trail corridors that have not yet been acquired. Existing
regional trails may include planned segments that will be developed in the future.
Planned Regional Parks and Trails System facilities (not yet open to the public) have a
Council-approved long-range plan and may be in stages of acquisition and development but are
not yet open for public use.
Regional Parks and Trails System boundary adjustments include general areas identified as
potential additions to existing Regional Parks and Trails System facilities to add recreational
opportunities or protect natural resources. Specific adjustments to park or trail corridor
boundaries have not yet been planned.
Regional Park and Special Feature search areas include general areas for future regional
parks and special features to meet the recreational needs of the region by 2050 where the
regional park boundary has not yet been planned.
Regional trail search corridors include proposed regional trails to provide connections
between Regional Parks and Trails System facilities where the trail alignment has not yet been
planned.
System Plan Considerations Affecting Your Community
The following Regional Parks and Trails System Components within Andover are identified in the 2050
Regional Parks and Trails Policy Plan:
Regional Parks, Park Reserves, and Special Features
Bunker Hills Regional Park: This is an existing regional park with an established boundary.
Bunker Hills Regional Park, at nearly 1,600 acres, is home to one of only a few remaining oak
savannas in Minnesota and over 10 miles of paved and natural surface trails. The regional park
boundary as shown in Figure 2 should be acknowledged in the comprehensive plan.
Regional Trails
Central Anoka Regional Trail: This is a regional trail that includes segments that are open to
the public as well as planned segments that will be developed in the future. The trail segment
that runs through Andover is open to the public. The regional trail travels through Ramsey,
Anoka, Andover, Ham Lake, Blaine, Lino Lakes, and Centerville as it connects Mississippi West
Regional Park, Rum River Regional Trail, Bunker Hills Regional Park, East Anoka County
Regional Trail and Rice Creek Chain of Lakes Park Reserve. The regional trail alignment as
shown in Figure 2 should be acknowledged in the comprehensive plan.
Rum River Regional Trail: This is a regional trail that includes segments that are open to the
public as well as planned segments that will be developed in the future. The regional trail travels
through Anoka, Andover, Oak Grove and St. Francis as it connects Mississippi River Regional
Trail, Central Anoka Regional Trail, Rum River Central Regional Park, North Anoka County
Regional Trail Search Corridor, Sugar Hills Regional Trail and Lake George Regional Park. The
regional trail alignment as shown in Figure 2 should be acknowledged in the comprehensive
plan.
2025 SYSTEM STATEMENTREGIONAL PARKS AND TRAILS37
Please contact Anoka County for more information regarding Regional Parks and Trails System
Components in Andover.
2025 SYSTEM STATEMENTREGIONAL PARKS AND TRAILS38
2025 SYSTEM STATEMENTREGIONAL PARKS AND TRAILS39
2025 SYSTEM STATEMENTREGIONAL PARKS AND TRAILS40