HomeMy WebLinkAboutOrd. 582 2026 Fee Schedule CITY OF ANDOVER
COUNTY OF ANOKA
STATE OF MINNESOTA
ORD.NO. 582
AN ORDINANCE AMENDING CITY CODE 1-7-3 ESTABLISHING PERMIT FEES, SERVICE CHARGES, AND VARIOUS
OTHER FEES TO BE COLLECTED BY THE CITY OF ANDOVER.
THE CITY COUNCIL OF THE CITY OF ANDOVER HEREBY RESOLVES:
The following permit fees and service charges are hereby established for the year 2026 2425.
Administration:
Administrative Fee: (non-project related activity) 15%of total charges for overhead costs
Advertising:
Ice Arena
Wall Banner—4x8 $850.00 per year
Wall Banner—8x8 $1,350.00 per year
Dasher Board—3x8 $850.00 per year
In Ice Ad—Ice Arena $1,600.00 per year
In Ice Ad—Sports Complex $1,300.00 per year
Zamboni—full wrap $2,100.00 per year
Scoreboard—lighted $1,350.00 per year
Scoreboard—non-lighted $1,000.00 per year
Wall Sign-Lighted $1,250.00 per year
Field House
Wall Banner—4x8 $850.00 per year
Scoreboard—2x8 $500.00 per year
Parks
Fence Banner $240.00 per a two-year sign agreement
Approval/Recording of Deeds:
Abstract&Torrens Properties $100.00
Bad Check Fee: $30.00
Building Lease Damage Deposit: $500.00(If deposit is used for a repair,it must be made whole for the
duration of the lease.)
pery
Canvasser/Solicitor License: Investigation Fee$25.00 per individual—30 day license(Ord 352)
Cannabis Registration:
Initial Registration/Annual Fee $1,500.00
Annual Renewal Fee $1,000.00
Cannabis Business Violation Civil Penalty $2,000.00 per violation
Lower-Potency Hemp Annual Registration $125.00
City Code Amendment: $500.00
City Publications:
Budget $25.00
Financial Statements $25.00
Comp Plan $25.00
Compliance Order Appeal $50.00
Conduit Debt Administration Fee 0.25%of the principal amount of the issuance
Convenience Fee—In-Person 3.95%of the total charge if over$1,000.00
Convenience Fee—Online Permits 3.95%plus$2.00 (rounded up to the nearest dollar)
Copies: (per sheet)
Up to 8 ''/z"x 14" $0.35
Oversize $0.50
18"x24" $3.00
Page 1
24"x36" $4.00
Larger Sizes $7.00
Surveys $3.00
Surveys Requested by Owner $1.25
City Code-paper co $50.00
Dangerous Dog Annual Registration Fee $500.00
Dog Licensing:
Yearly License $6.00 per year
Commercial Kennel(more than 3 dogs) $380.00-includes mailing labels
Commercial Kennel Recording Fees
Abstract and Torrens $100.00
Private Kennel(more than 3 dogs) $200.00 Includes mailing labels
Annual Kennel Renewals $25.00
Facility Use Fees:
Pine Hills North Shelter $200.00 per 4-hour period
$40.00 per additional hour
$500.00 refundable damage deposit
Sunshine Park Gazebo Rental $30.00 per 4-hour period
Non-Profit/Service Organizations N/C weeknights after 4:30 p.m.Monday-Friday
Park Facilities-Youth Athletic Associations $500.00 refundable key/damage/maintenance deposit
Field Lights-Youth Athletic Associations $500.00 refundable key/damage/maintenance deposit
Field Lights-Private Rentals $500.00 refundable key/damage deposit
Garden Plot $50.00 per plot
Community Center
Ice Rental
Prime(Sept. I I-Mar. 31It) $265.00 per hour
Non-Prime $185.00 per hour
Turf Rental
Prime $135.00 per hour
Non-Prime $100.00 per hour
Field House Rental
Prime(Oct. 1ST-Apr. 301) $73.00 per hour
Non-Prime $63.00 per hour
Prime $600.00 daily
Non-Prime $525.00 daily
Track
Resident No Charge
Non-Resident-Drop-In $2.00
Non-Resident-3 Month $59.00
Non-Resident-6 Month $99.00
Non-Resident- 12 Month $179.00
Rental $67.50 per hour
Activity Packages-Ice,Turf,Field House
Drop-In Prime $7.00
Drop-In Tot Time $5.00
Prepaid Punch Card $60.00
Helmet Rental $2.00
Skate Rental $5.00
Skate Sharpening $8.00
Pickleball Paddle Rental $3.00
Page 2
Birthday Parties
Ice Skating w/Community Room $320.00
Turf Space w/Community Room $240.00
Field House w/Community Room $240.00
Field House w/Community Room-Tot Toys $290.00
Community/Conference Rooms
Local-Non-Profit No Charge
Local Business No Charge
Teen Room $40.00/hr
Resident $30.00/hr for11/2 room;$50.00/hr for full room
Non-Resident $40.00/hr for /2 room;$70.00/hr for full room
Food/Beverage $50.00
Simulator
Hourly Rental-Prime(Oct. 1st-Apr.301) $40.00
Hourly Rental-Non-Prime $30.00
False Alarm Fine:
Police $75.00 fee upon receipt of third false alarm notice at an address in one
calendar year. Each additional false alarm after the third is$75.00.
Fire $150.00 fee upon receipt of third false fire alarm notice at an address in one
calendar year. Each additional false fire alarm after the third is$150.00.
Garbage Hauler License: $200.00 per year+$30.00 per truck inspection
$60.00 re-inspections per truck
Horses:
Boarding& Stable Fee of Stray Horses by City Per contracted rate+administrative fee
Impoundment of Horses(city ordered) Per contracted rate+administrative fee
Transportation trailer rental Per contracted rate+administrative fee
Illegal Dumping: $100.00 plus the cost of disposal
Interest Charge on Past Due Escrows: 18%annually(if not paid within 30 days of bill date)
Liquor:
3.2%Malt Liquor
Off Sale $100.00 per year
On Sale $200.00 per year
Temporary On Sale $50.00-4 day maximum
2:00 a.m. Closing $50.00 per year
Intoxicating:
Sunday Liquor $200.00 per year
On Sale Liquor $5,500.00 per year
On Sale Wine $550.00 per year
Off Sale Liquor $250.00 per year
2 a.m.Closing $50.00 per year
Temporary On-Sale $50.00-4 day maximum
Brew Pub On-Sale $300.00
Brew Pub Off-Sale $300.00
Small Brewer Off-Sale $300.00
Liquor Compliance Violations
1st Violation $750.00
2°1 Violation $1,500.00
31 Violation $3,000.00
4'Violation Sus ension or revocation
Maps:
Full Size Color Maps 36"x36" $20.00
Custom GIS Maps Time and materials
Notary Fee: $3.00 per document
Ordinance Violations: City of Andover, 10'Judicial District Fines for Ordinance Violations-on file
with the City Clerk.
Page 3
Outdoor Food&Beverage Sales/Temp. $25.00 per day
Retail Food Establishment: $50.00 per week
$100.00 er year
Outdoor Party Permit Fee: $10.00
Barricades $50.00 refundable damage deposit
Outdoor Promotional Fee-Temporary: $100.00 per event
Parking Violations:
Street Obstructions: Golf Carts,Motorized $50.00,plus any court-imposed fees and/or surcharges
Vehicles, Snowmobiles,ATVs,Off-Highway
Motorcycles,Abandoned and Disabled Vehicles
Trailer Parking $50.00
Pawnbroker,Secondhand Goods Dealer,
Precious Metal License:
New $5,500.00 per year
Renewal $5,000.00 per year
Peddler License: $100.00+$25.00 Investigation Fee per individual—30 day license
Project Recovery Rate Factor:
Engineering Inspection Services 2.9 x hourly rate
City Staff Services 2.0 x hourly rate
(All projects directly related to staff time.
All public&private improvementprojects.)
Searches: Special Assessment $30.00 each
Therapeutic Massage Establishment**: All fees include investigation fee
Single Application Fee $200.00
Corporate Application Fee $300.00
Partnership Application Fee $300.00
Renewal Fee $150.00
**Residential Application Requires a Conditional
Use Permit
Therapeutic Massage Therapist: $175.00 annually
Tobacco License: Admin&Enforcement $250.00
Tobacco Compliance Violations
IIt Violation $250.00
211 Violation within 24 months $500.00
311 Violation within 24 months $1,000.00 in addition to license suspension for not less than 7 days
Individual selling to a minor $50.00
Transient Merchant License: $50.00+$25.00 Investigation Fee per individual-7 day license
Tree Trimmer License:
Commercial License Fee $75.00 per year
Vehicle Sales License: $150.00 per year
Page 4
BUILDING INSPECTION&PERMIT FEES
D.,..m:t Refund 700% „f Do«miValuation Ba Building Permit T:oo
Re inspeetion Fee
BUILD-NG PERMIT FEES;
T T„;F.w.Building!''...lo Table 1\T.� 1_A
e .,
Building Permit Fees $95.00 minimum er-Based on Valuation,whiebeveF-is greate-r-
if building 1 .,ti,.„ o eeds$1 nnn an ..„la r-ed to be
a�ancmr6-s-crxcsaccroxr-vicvwao�..�...,.. .,......,.t,.......,.�^y»......... ....
h 'tt .l 1 w F e of 650, f the building ;t fee mast lea
Current State > TnTvr-cnv-vaxxaxxxspcxiuxc xco:z.c
.,.Y„ Dl.,, Rev4ew
pa the building permit€ee. (7r.-.,....t........,. 71 AT7 A,.7.>..
l.f;,,..,.e-sota A..;1,1;.�., iE�zn-i.E�tt�t�6s .,
1?nnn 16n C' 1. c 1;.0 „ il,...„1,ns a er t e F;U..t s..h„,;tt„1 a 59%„1,n
iltural La ad U-see $ZS 99
ft
Siding,Basement Finish Per-mi $200.00
Door-Replaeement Permit-
Fix Single Family Dwelling e 1 cn nn
Two family Pwelling e200 nn
- Residential Garage eon nn
- Agfieu4tural Stmetur-es enn nn
- Multifamily Stfuetures! 1st Two Units e200 nn
£aeli A anal Knit ecn nn
(Does04-�-Q..--Imrgei SweSll har-ge must be paid peF MN Statutes 326B.148,in addition tR the Imlilding pefmit fee.
MECHANICAL PERMIT FEES:
Complete HA net inehide c,...D;,,,,.,1..ee-s permitted.. t.,l., see 1.,,1....1
Combination Permit
Existing Residential Qoc nn„ Fixt,,
Fixed Fe
Meehanieal Permits Nnc nn f Fixtur-e or- 1 50,;of job at. ..t:
,.h:,.hover-is gre.,te
PQt
U 17 Seater, U at D !'.....,..,...,..eial Ho ea Make a 77,E A;,.7T:t and ethe
meehanieabequipmeo
Commercial Meehaniea
10 of„o...„;t F o
Dl.,., D.,.,iew
z-ruxx�ccTxcn
Gas Piping Permit—No Qnnnn minimum er$1500„er-gas opening,...hieheyer-is gr-ea4e
StateSUFehaFgei State Sunhar-ge must be paid per-NO!Statutes 326B.148,in addition te the building pefmit fee.
Page 5
PLUMBING PERMIT FEES:
Q`1
New Single Family
Residential Plumbing Permit-
Residential Plumbing @On M Minimum or$1[ nn. fixture,,, iohoye.•is gr-ea4e
Perzi
Water Heater or Water
Fixed Fee Softener,New or $60.00
Gas Piping Permit No Qnn nnmum r$1 c nn pergas whieho„ef
Associated Mlith A Fixture
opening, .,greater
-
Associated
Landseape irrigation System
Mien
150.00 memor-$25 nn.+ fi.,t,..•e „h:ehe„e,-;
s gr-eate
Porm e1 nn sur-ehar-ge as requiredbyP,n Statutes Seetien 326B 148
Valuation Based do
Commereial Underground enn nn mumor- 1 50; ofjeh valuation, <.hiohe„ei!: e.ate.-(stMee
Utility\1 oFk De.-mivaluation 1%ofjob valuation)
Commereial Plumbing Water-distribution ,1 a waste andvent systems, noludi fig
Plan Re vieinter-eepte.� s . .to s eateh basins:
- 25 oF fewer drainage-fixture unit e i cn nn
- zg to 59 drainage fi*tare units $25n nn
- 71 to 150 dr-ainzgBZfixtufe units $350_00
151 to 24drainage fxtwe units $500 nn
250 or more d- ., fixture units $3.00 per-drainage 4:.,t,. e a ni
to a maximum •$4 nnn nn
intereepter,separator-,or-ca4eh basin=$79-AA
Buillding sewer sern-'iee-only P50.000
vu'lr ing�Yater ser ive e"1.,. e l 5n nn
Building water distribution system only,no drainage syste
Stofm dr-anage S3Fetern a. ... F e oP Q=So.on
o,o
in
Planlumbe L',,,.� $50.n� p to a maximum o€�A0.99,and
f70 nn pintereepte.• separator-, eteh basin
z to 25 sites $?nn nn
$35n nn
26 to 50 e saes
51 te 125sites $nnn nn
mere an 123 sites $500 nnn
D F 1 F „h;eh the e t.,has issued t ester F
x�cv�zvw-�r�nrsnri xusio:ia'va cvv'o of iiiory rcq�cio.,...,....
,i,i't' 1 F ..t; $1 nn to .,t of theoriginalfeeF
„h:ohe .,te
f.
Revision tO Previously
Reviewed or ineomplete Proposer-requested r-evision with., ase in pr-ojeet soope,$50 o Wn
Plans a ent oforiginal fee,,„hiehe .,e greater-.
D requested r-evisionwith., project s e $50 plus the
diff-er-enee bem,een the original pr-o-jeet fee and the revised pwjeot fee.
in addition to the buildiRg
pefmit fee-.
Page 6
14OA4EOSALNF-,:-R-S- AND ELECTRICAL C 0--NT-R--A-C-T-ORS: Complete an eleeti-ioal peEmit fofm m,ailable from the Building
Depai4ment. The f�e is the total of the listed fees or-the total RumbeF of inspeetien tfips�i$50.00,w-hiehever-is gFeaten
Residential Panel Replacement: $120.00
C $50.00
500 Amp nn
6g000 p�-`�-af`x.P� �'.� 00
.00
4-,000 Amp $172.00
Add$1 nn r r eaeh.,aa;t;,.«..1 1 nn.,
1 n1 1 200 Amp $20.00
201 300 Amp $26.00
401 500 Amp $9:00
-5,04 -608 Amp $44.00
Onei«s«o,.t; « n«l.,
Rough in and Final inspe6t $100,00tlus State Surcharge
Maximum Permit Feel
For-Single Family dwelling ell;« $200 nn 1 Qt t Surcharge (N F 7 1, a 1 final, o^ti,.«\
Sri vv-:oo�.ro taco-��m-vrxargo�a�crnxaxxx vx s xvabxx uxS�xa .c�a. ux�r....�.....�
R.e maximum if ser..;..o; over Inn amps)
Reinspeetivir-rr'c� $50.00 eaoh
enn nn t (This.l + t feeders r h panels)
l>7�cz�xxxs-c[vc�iivc-ov�vi-�viviv�crizzc xooaci..�.....»..�t.;......,�
Swimming Pools 1 Hot Tubs� e 1 nn nn 1 t t$1 n nn > (Tl s; ..h,.las 2: ee fi.«�
y-xvcrvv-Pzusvirocciz�-as yxv-vo-cavn�rxxx ...�t..............)
Additions,Remodels oF Basement Finish Q'1 nn nn/This inoludes.«t.. 10.. „ts and 7 o..ti..«s)
Residential A n....SSOFY CtFUCt,,Fesi The gr-eat F$tin nn F panof plus$1 n nn per- „t or-$1 nn nn for 2;« eeti„«s
77.,.,..1.E Rate for Carnivals /Festivals. c.()Q
Solar- V----J
5z", $165 00
i0 1 0 $245.00
20.1 -30 $330.00
30.1 40 k-m $410.00
40.1 kw $410.00 plus etc.nn For eaeh.dditiona
io"
enn nn eaoh (fer-a fufnaee,air l;t; «or w tl, « FiFel-I ce o.. ele f r
> o
water heater-.eat„«i..\
Refunds mustbe requestedtin,. No refunds unless it's more than the
minitnufn Fee. A 700/ 1.,,«.11;«g fee ..;11 be ehar-ged to all rof,.,ao
State Surcharge. State St*shar-go must be paid per-MW St-asusedis-3-26B.148,in addition te the eleratrioal pefmi4
THE PERMIT FEE 1S DOUBLED lF THE WORK STARTS BEFORE A PERMIT 1S!SSUEW.
COMMERCT-A-1 PERMIT: Complete an eleotrioal pormit fefm available from the Building DepaAment. The fee
is the total of the listed fees or the total number-of inspeetien 4ips x$50.00,w-hiehever-is gFea4en
Page 7
1C....!'..1....1 a t:..R.
n,.t..,.tie c1 t,.$1 nnn
,
ecn nn for-the first e 1,000,.1„s$3 n c F. oaeh additional e 100or-freetion
Valuation$1,0014o-$2-,000 thereof-,to and inoluding$2,000
$82 nn for—the first ee nnn,.t„s$14 oc for-o.,,.t,additional$1 nnn f:- otien
ennz cc f the first enc nnn t c 1 n 7n fo t additional Q 1 nnn er f µ����
y�zvrcnvzrrvs yzT,vwpras�rxvrvzvrcuvn-aaaxcxvxx�ux.v.,...... ... .,..
$69-1r nc fviZ the-first y'n,nnn piav$7.nT fe reaex'additional 41,000 or.raot.,„..
c 1 n63 cc f t1 first$1 nn nnn plus$6 nn fe o..,.t. additional$1 nnnor-fraction
e3 n63 cc fer-the first Cofer-ea.t,additional$t nnn rf-a...:..
$6 n 1 z cc f the f t Q 1,000,000�1„s cn nn for o..,.t additional$t nnn
.mac:p- .rY��vzvrcuvn-c[aaxcxvxxux�v.,...... ...
Vie€
Reinspection Fee— ecn nn o.,,.t,
n
Refunds must bvTvcjacvcoa in rwriting.-Nvzvruixc[Taincso it's xxxoiv than
0
,;handling fee will be ehar-ged to all r-efunds.
State Sumharge midst be paid per-AOr Statutes 326B 1 44 addition to tl,o
o , ,
State Sur-eharge� ekeetrioal-pefmit fee.
THE PERMIT FEE 1S DOUBLED lF THE WORK STARTS BEFORE A PERMIT 1S !SSUEDZ
ON SITE SEWAGE TREATMENT SYSTEM PERMIT FEES:
Now—szt Cn�zr4om
c.,. System
AAA-:99
New or Replaee pumping $20.00
CONTRACTOR LICENSE FEES:
- 3riY $75.00-
na, etc nn
5subseq. $150:00-
1 st&2.Ixa $7c nn b
_ T �z 37
z r,a �n�o
Ti o...om,inspent;n.x Finn
Ott. Wvn.vv
Page 8
BUILDING DEPARTMENT ESCROSAIS--
As-Built Sur-vey
Grading&Evossion—Control
$4 A98 9A
Topsoil,Seed&Mulch 14 et.wino(n..,.a ot) en c�-�per--sq—. ft
Residential
TeMPOFSFY Site Stabilization 8
(in addition to sod eser-em)
R*takvhM-W-aH c c c nn« ft
8
- Driveway Apr-on(D.....1 lot)
- steps `V"00.00 PeF r-iser
- $idewall en nn per-sq.ft
to en nn«o Ft
qPFees S1,399:99-eaeh
- Swimming Pool Fene
8
-mined by Evaluation
Deter
Single Family Rental Housmig
(gal
Two Year Rental 7; e&laspeetion Tine $7G n
Multifamily Rental Housing Two Year Rental T; e R_Tnspeetion Fee_
License.,/A units or less)
Two Year Rental 7; e P_T«..«.etion Fee $7'7 nn per-lieensed.ni
Ct.- ..t..ire ,itl. t;.- Stems
Multifamily Rental Ho
'T ear-Rental T R_7« Ti eti n
of mere units)Single Family-& .. its
De inspeetion Fee D...-Vand Complaint $7C nnper-r-e eotio
Single Family&MultifamilyT: ease Reinstatement After-D......e tion
f
Reinstatement Fee Suspension,Denial or-Non Renewal by the Ci $1,000.00 per-dwelling uni
Couffeil
Page 9
BUILDING INSPECTION AND PERMIT FEES
The administration and issuance of permits,along with the collection of fees and services administered by the City of Andover Designated
Building Official shall be conducted in accordance with the Andover City Code,Minnesota Statutes and Administrative Rules,as provided
in this Ordinance.Fees based on valuation,shall include the total value of all construction work,including materials and labor,for which
the permit is being issued.Valuation shall be determined by the Designated Building Official.
Subd. 1. Fee Multiplier Table (FMT). For other than as specifically identified within this fee schedule,fees shall be calculated from
the following permit fee table and Subd,7 of this fee schedule:
Valuation Permit Fee
$1 to$4,000 $125.00(minimum fee)
$4,001 to$25,000 $125.00 for the first$4,000 plus$16.55 for each additional$1,000 or fraction thereof,to and
including$25,000
$25,001 to$50,000 $464.15 for the first$25,000 plus$12 for each additional$1,000 or fraction thereof,to and
including$50,000
$50,001 to$100,000 $764.15 for the first$50,000 plus$8.45 for each additional$1,000 or fraction thereof,to and
including$100,000
$100,001 to$500,000 $1,186.65 for the first$100,000 plus$6.75 for each additional$1,000 or fraction thereof,to and
including$500,000
$501,000 to$1,000,000 $3,886.65 for the first$500,000 plus$5.50 for each additional$1,000 or fraction thereof,to and
including$1,000,000;and
$1,000,001 and up $6,636.65 for the first$1,000,000 plus$4.50 for each additional$1,000 or fraction thereof
Subd. 2. Building and Mechanical Permit Fees. Building and mechanical permit fees shall be calculated from the FMT in Subd. 1.
(Fees for commercial and multifamily building and mechanical plan review are separate and must be charged according to Subd. 7 of
this fee schedule)
Subd.3.Plumbing Permit and Plan Review Fees for Commercial and Multifamily Structures Including Commercial Underground
Utility Work. Commercial and multifamily plumbing permits and plan review fees shall be calculated from the following fee tables.
(Fees for plumbing plan review are separate and must be charged according to this fee schedule; however,plumbing plan review fees
may be waived for minor work of seven (7)fixtures or less)
Valuation/Project Details Plumbing Permit Fee
$0 to$1,500 $135.00(minimum fee)
$1,501 to$2,500 $135.00 for the first$1,500,plus$43 for each additional$500 or fraction thereof,to and including
$2,500;
$2,501 to$5,000 $221.00 for the first$2,500,plus$28 for each additional$500 or fraction thereof,to and including
$5,000;
$5,001 to$25,000 $361.00 for the first$5,000,plus$53 for each additional$1,000 or fraction thereof,to and
including$25,000;
$25,001 to$50,000 $1,421 for the first$25,000,plus$51 for each additional$1,000 or fraction thereof,to and
including$50,000;
$50,001 to$500,000 $2,696 for the first$50,000,plus$47 for each additional$10,000 or fraction thereof,to and
including$500,000;
$500,001 to$3,000,000 $4,811 for the first$500,000,plus$61 for each additional$50,000 or fraction thereof,to and
including$3,000,000;or
$3,000,001 and over $7,861 for the first$3,000,000,plus$51 for each additional$100,000 or fraction thereof,
Manufactured home park or $25 for each site,minimum charge of$135
campground
Single fixture permit $210.00
Page 10
Valuation/Project Details Plumbing Plan Review Fee
$0 to$1,500 $135.00(minimum fee)
$1,501 to$2,500 $135.00 for the first$1,500,plus$28 for each additional$500 or fraction thereof,to and including
$2,500;
$2,501 to$5,000 $191.00 for the first$2,500,plus$25 for each additional$500 or fraction thereof,to and including
$5,000;
$5,001 to$25,000 $316.00 for the first$5,000,plus$33 for each additional$1,000 or fraction thereof,to and
including$25,000;
$25,001 to$50,000 $976 for the first$25,000,plus$31 for each additional$1,000 or fraction thereof,to and including
$50,000;
$50,001 to$500,000 $1,751 for the first$50,000,plus$23 for each additional$10,000 or fraction thereof,to and
including$500,000;
$500,001 to$3,000,000 $2,786 for the first$500,000,plus$41 for each additional$100,000 or fraction thereof,to and
including$3,000,000;and
$3,000,001 and over $3,811 for the first$3,000,000,plus$33 for each additional$100,000 or fraction thereof,
One to 25 sites: $300
Manufactured home park or 26 to 50 sites: $350
campground(plumbing only) 51 to 125 sites: $400
More than 125 sites: $500
Subd. 4. Plumbing Permit Fees for Structures Regulated Under the Minnesota Residential Code. The following table establishes
plumbing permit fees for single-family,two-family,townhouses and residential accessory structures:
Type of Plumbing Permit Permit Fee-Per Dwelling Unit
New construction $175.00
Addition,alteration,remodel,or replacement $95.00
Included with building permit provided inspections are
Basement finish—Owner-occupied,non-rental(owner performed work) performed together(e.g.framing,rough-in plumbing and
mechanical
Waterheater,conditioning system,irrigation,backflow prevention or $70.00
minor work
Gas piping-Not associated with a fixture $95.00
Sewer and/or water connection $95.00 each or$150.00,if installed and inspected
simultaneously
Subd.5.Mechanical Permit Fees for Structures Regulated Under the Minnesota Residential Code.The following table establishes
mechanical permit fees for single-family,two-family,townhouses and residential accessory structures:
Type of Mechanical Permit Permit Fee-Per Dwelling Unit
New construction(HVAC,mechanical ventilation system,and gas lines) $175.00
Addition,alteration,remodel,or replacement $95.00
Included with building permit provided inspections are
Basement finish—Owner-occupied,non-rental(owner performed work) performed together(e.g. framing,rough-in plumbing and
mechanical
Furnace,fireplace,air conditioner,garage heater,gas lines, $95.00
miscellaneous appliance,or other minor work
Furnace and A/C Combination if installed and inspected simultaneously $150.00
Subd.6 Fire Prevention and Life Safety Permits.The following table establishes permit and plan review fees for administration of fire
prevention and life safety permits as regulated by the Minnesota State Building Code(MSBC)and Minnesota State Fire Code(MSFC).
(Plan review fees may be waived for ordinary repairs and minor work on existing systems such as moving or replacing six(6)sprinkler
heads or less)
Page 11
Description Permit Fee(FMT=Fee Multiplier Table)
Fire Suppression System Per the FMT in Subd. 1 and Plan Review Fee in Subd.7
(Includes Central Station Monitoring System)
Fire Alarm System Per the FMT in Subd. 1 and Plan Review Fee in Subd.7
Type I Commercial Kitchen Hood Fire Suppression System Per the FMT in Subd. I and Plan Review Fee in Subd.7
Aboveground and Install or Removal of Underground Storage
Tank Permit Used to Contain All Types of Hazardous,
Combustible or Flammable Material (Gas,Liquid or Solid)
Exceptions: 1. Aboveground tanks excluded under MN Pollution Control Per the FMT in Subd. I and Plan Review Fee in Subd.7
Agency Chapter 7151 Part 7151.1300;and
2. Underground tanks excluded under MN Pollution Control
Agency Chapter 7150
Subd.7. Plan Review Fees. When submittal documents are required to be submitted by Minnesota State Building Code,Chapter 1300,
a plan review fee shall be required. (Exceptions from plan review fees for minor work maybe determined by the Designated Building
Official.)
(a) Building and Mechanical Plan Review Fees. Plan review fees for building and mechanical work shall be:
(1) 65%of the permit fee as calculated from the FMT in Subd. 1.
(2) Plan review fees for similar plans are set forth in Minnesota Rules 1300.0160.
(3) Minimum plan review fee for residential work is$81.25.
(4) Where a plan review fee is to be charged for commercial and multifamily work,the minimum fee is$150.00.
(b) Plan Revisions.Applicant-submitted changes:
(1) Residential Projects.
(i) Review of plans for which the Designated Building Official or their designee has issued two (2) or more requests for
additional information: $95 per hour with a minimum of one-half(1/2)hour.
(ii) Additional plan review required for changes, additions, or revisions to previously approved plans: $95 per hour with a
minimum of one-half(1/2)hour.
(2) Commercial and Multifamily Projects.
(i) Review of plans for which the Designated Building Official or their designee has issued two (2) or more requests for
additional information: $125 per hour with a minimum of one-half(1/2)hour.
(ii) Additional plan review required for changes, additions, or revisions to previously approved plans: $125 per hour with a
minimum of one-half(1/2)hour.
(c) Abandoned Permit Applications.When an application requiring plan review is submitted,and the applicant either:
(1) Elects not to proceed following completion of the review,or
(2) The application is deemed abandoned by the Designated Building Official pursuant to Minnesota Rules 1300.0120,Subpart 9;
The applicant will be assessed one hundred percent(100%)of the plan review fee,for plan review and processing services,whether
or not a permit is issued.
Subd.8.Industrialized Modular or Prefabricated Buildings,Plan Review and Inspection Fees.
(a) Inspections and Audit Fees.Inspection fees for industrialized modular or prefabricated buildings will be assessed at$125 per hour.
(b) Plan Review Fees. The following fees are for plan review and inspections of industrialized or modular buildings as defined in
Minnesota Statutes§326B.103,subdivision 8a,and prefabricated buildings as defined in Minnesota Statutes§326B.103,subdivision
I Oa.
(1) Fees for the review of quality-control manuals,systems manuals,and related documents submitted are$125 per hour.
(2) Fees for the review of building plans,specifications,installation instructions,and related documents submitted include sixty five
(65)percent of the fee,minimum plan review fee of$150.00.Plan review is determined by Designated Building Official or their
designee.
Page 12
Subd.9.Other Permits and Fees.The following table identifies costs for permits or fees associated with administration of the Minnesota
State Building Code and the City of Andover codes. The minimum fee for the following permits is $125. Plan review is charged
according to Subd. 7 of this fee schedule,unless otherwise identired.
Description Permit Fee(FMT=Fee Multiplier Table)
Basement fmish building permit $225.00
Change of use/occupancy Refer to the FMT in Subd. 1
Minimum fee: $500
If the actual cost to the City of Andover for service provided
Consultants,cost for service by a contracted consultant is greater than indicated by this
fee schedule,the greater rate shall be paid.
Demolition building permit,residential,commercial and multifamily $300,includes two(2)site inspections and administrative
plan review
Inspection,no fee specifically indicated $95 per hour,one(1)hour minimum
Inspection,outside normal business hours $150 per hour,two(2)hour minimum
Inspection,reinspection $95 per hour,one(1)hour minimum
Investigation In addition to,but not to exceed,the permit fee.
Manufactured home set-up building permit $375,includes mechanical and plumbing inspections and
plan review
Mechanical temporary heating equipment,commercial and $210.00
multifamily
$250 if the structure being moved is within the City of
Moved-in structure building permit,residential Andover;or
$250 plus$95/hour plus mileage at the current IRS standard
rate if the structure is located outside the City of Andover
Refer to the FMT in Subd. 1 and determined based on the
Permit record reopen remaining work to be completed.
Minimum fee: $50.00
Roof building permit,one and two-family residential $110.00
Siding building permit,one and two-family residential $110.00
Window same size replacement building permit,one and two-family $110.00 per dwelling unit
residential
Subd. 10.State Surcharge.In accordance with Minnesota Statutes§ 326B.148,a state surcharge shall be charged on all permits,as
applicable.
Subd. 11.Refunds.The Designated Building Official may authorize refunds of up to eighty percent(80%)of the issued permit fee when
no work has commenced and no inspections have been performed.
(a) Requests must be submitted in writing by the permit applicant within one hundred eighty(180)days of permit issuance.
(b) Within(10)business days of receipt,the Designated Building Official or their designee shall review the request and determine the
amount to be refunded or provide written justification if the request is denied.
(c) Fees retained shall cover expenses incurred for services rendered by the city and/or its consultant(s).
(d) Refunds shall only be issued to the original payee.
(e) No refunds shall be granted for the following:
(1) Plan review fees;
(2) Re-inspection fees;
(3) State surcharge fees;
(4) Fraudulent applications;
(5) Expired,revoked,suspended,or invalid permits;
Subd.12.Work Without a Permit.If work requiring a permit under state law,rule,or the City of Andover code has commenced without
first obtaining a permit,an investigation shall be conducted before a permit may be issued. Investigation fees are identified in Subd.
9 of this fee schedule.This fee is in addition to the permit fee and is due whether or not a permit is ultimately issued.
Page 13
Subd. 13. Abandonment, Expiration, Revocation/Suspension, or Validity. The validity, expiration, suspension, and revocation of
permits shall be governed by Minnesota Rules 1300.0120 and the following:
(a) An application for a permit for any proposed work shall be considered abandoned one hundred eighty (180) days after the date of
filing,except in the following cases:
(1) The application has been actively pursued in good faith by the applicant, as determined by the Designated Building Official or
their designee;and
(2) A written request for an extension, not to exceed one hundred eighty (180) days, has been submitted with justifiable cause
demonstrated,and the extension has been approved by the Designated Building Official or their designee.
(b) Every permit issued shall expire unless the authorized work is commenced within one hundred eighty (180) days of issuance. The
Designated Building Official or their designee may grant written extensions of time,not to exceed one hundred eighty(180)days,if
the applicant demonstrates justifiable cause.
(c) The Designated Building Official or their designee may suspend or revoke a permit if it was issued in error,if the application contained
incorrect,inaccurate,or incomplete information,or if there is a violation of any state law,rule,or ordinance.
(d) The issuance of a permit, or the approval of plans, specifications, or computations, shall not be construed as authorization for any
violation of this code or any other ordinance of the City of Andover.Any permit purporting to authorize work in violation of the code
or other ordinances shall be invalid.A permit also becomes invalid if the authorized work is suspended or abandoned for more than
one hundred eighty(180)days,commencing on the first day the work was suspended or abandoned.
Subd.14.Subsurface Sewage Treatment System(SSTS)Fees.The following table identifies costs associated with SSTS administration
and permits.
Description Permit Fee
SSTS:Type I,II,or III(new or replacement) $275.00(includes soil verification)
SSTS: Replace existing tank or drain field $225.00
SSTS:Type IV or V(new or replacement for performance or
$375.00+Actual Cost
engineered systems)
Soil Site Review(for development) $250.00+$50.00 per lot
Operating Permit $200.00 annually
Pumping Permit $20.00
SSTS Reinspection $95.00 per hour, 1 hour minimum
Subd. 15. Mechanical Contractor License Fee. The following table identifies costs associated with administration of the City of
Andover's contractor licensing program.
Description License Fee
Mechanical Contractor License $50.00
Subd. 16. Site Development Fees.
Description Fee
1st&2nd No Charge
Grading Inspection Fees: (engineering) 3rd $75.00
4th $125.00
5th&subse . $150.00
1st&2nd $75.00 each
Escrow Inspection Fee 3rd $100.00
4th $150.00
5th&subse . $200.00
Page 14
Subd. 17.Building Department Escrows.
Property Type Description Fee
As-Built Survey $2,000.00
Grading&Erosion Control $4,000.00
Topsoil, Seed&Mulch 18 ft.wide(Rural lot) $0.50 per sq.ft.
Front Yard Sod or Seed(Urban Lot) $3,500.00
Temporary Site Stabilization(in addition to sod escrow) $750.00
Retaining Wall $55.00 per sq.ft.
Residential Driveway(Urban lot) $7,000.00
Driveway Apron(Rural lot) $1,500.00
Steps $100.00 per riser
Sidewalk $4.00 per sq.ft.
Garage Floor $4.00 per sq.ft.
Trees $1,500.00 each
Swimming Pool Fence $2,500.00
Commercial Determined by Evaluation
Subd. 18.Rental Licensing.The following table identifies costs associated with administration of the City of Andover's rental licensing
program.
Type of Dwelling Description License Fee
Single-Family Rental Housing(SEE ORDINANCE) Two-Year Rental License&Inspection Fee $75.00 per unit
Two-Year Rental License&Inspection Fee- $100.00 per licensed unit
Multifamily Rental Housing License(4 units or Structure without fire suppression systems (except owner occupied)
less) Two-Year Rental License&Inspection Fee- $77.00 per licensed unit
Structure with fire suppression systems (except owner occupied)
Multifamily Rental Housing License/Apartment Two-Year Rental License&Inspection Fee $600.00 plus$15.00 per
Complex(5 or more units) number of units
Single Family&Multifamily Re-inspection-Fee Per Valid Compliant $75.00 per re-inspection
Single Family&Multifamily Reinstatement Fee License Reinstatement (After Council Denial, $1,000.00 per dwelling unit
Non-Renewal,Revocation or Suspension)
Subd. 19. Electrical Permits.
(a) Residential Electrical Permit Fees. The following tables establish permit fees for all single and multifamily residential dwelling
types and residential accessory structures. Fees include required inspections unless otherwise noted. The greater of the listed fee or
the total number of inspection trips multiplied by$60.00 shall apply.
(1) Residential Electrical Permit Expiration,Refunds,and Enforcement. The following policies apply to residential electrical
permits:
(i) Minimum fee permits expire in 6 months.
(ii) Permits exceeding the minimum fee and up to$1,000 expire in 12 months.
(iii) Permit fees are doubled if work begins before the permit is issued.
(iv) Refunds: - Must be requested in writing.
No refunds issued if the total fee equals the minimum fee.
Refunds are reduced by a 20%administrative handling fee.
Page 15
Residential Service,Panels,Circuits&Feeders
Description Permit Fee
New service or power supply:0 to 300 amps $75.00
New service or power supply:400 amps $100.00
Additional service capacity Add$25.00 per additional 100 amps
Circuits/Feeders:0-100 amp $12.00 each
Circuits/Feeders: 101-200 amp $20.00 each
Additional circuit capacity Add$10.00 per additional 100 amps
Residential panel replacement $125.00
Subpanel replacement $75.00
Other Residential Electrical Work
(Includes accessory structures, remodels, basement finishes, and pools)
Description Permit Fee
Swimming pools and hot tubs(includes 2 inspections) $120.00 plus$12.00 per circuit.
Basement finishes,additions,remodels $120.00(includes up to 10 circuits and 2 inspections)
Accessory structures(panel+circuits) Greater of$75.00 for panel plus$12.00 per circuit,or$120.00 for 2
inspections
Residing jobs $60.00
Dwelling Fees(New One-and Two-Family and Townhome Construction)
Dwelling electrical permit fees apply only to new single-family dwellings or townhomes with services not over 200 amps and up to 25
circuits. Maximum fee is$225.00 plus$1.00 State Surcharge. Maximum of 2 rough-in's and 1 final inspection. (Failed inspections are
an additional$50.00 each..)
Apartment Buildings
Description Permit Fee
Electrical permit-per dwelling unit in an apartment or $110.00 per unit
condominium complex(includes up to 15 circuits per unit)
Lighting,Low Voltage,Transformers&Generators
Description Permit Fee
Street and parking lot lights $10.00 per standard
Retrofit lighting $1.00 per fixture
Low voltage fire alarm/HVAC control wiring $60.00
Transformers and generators up to 10 kVA $5.00
11 to 74 kVA $55.00
75 to 299 kVA $70.00
Over 299 kVA $175.00
Page 16
Solar and Energy Storage Systems
System Size Permit Fee
0-5 kW $100.00
5.1-10 kW $165.00
10.1-20 kW $245.00
20.1-30 kW $330.00
30.1-40 kW $410.00
Over 40.1 kW $410.00+$25 per additional 10 kW
Electronic-Only Inspections
Description Permit Fee
For these items only,furnace,air conditioner,bath fan, $40.00
fireplace,or receptacle for water heater vent
Reinspection&Minimum Fees
Description Fee
Reinspection fee $60.00
Minimum electrical fee(one inspection) $60.00 plus state surcharge
Minimum rough-in and final inspection $120.00 plus state surcharge
(b) Commercial Electrical Permit Fees. Commercial electrical permit fees are based on project valuation.The greater of the
calculated fee or$60.00 per inspection trip shall apply. Solar fees for commercial projects follow the residential solar fee schedule.
(1) Commercial Electrical Permit Expiration. The following policies apply to commercial electrical permits:
(i) Minimum fee commercial electrical permits expire in 6 months.
(ii) Commercial electrical permits exceeding the minimum fee and up to$1,000 expire in 12 months from the
filing date.
Valuation Commercial Electrical Permit Fees
$1 to$1,000 $60.00 per trip
$1,001 to$2,000 $60.00 for first$1,000 plus$3.25 per additional$100 or fraction thereof
$2,001 to$25,000 $82.00 for first$2,000 plus$14.85 per additional$1,000 or fraction thereof
$25,001 to$50,000 $423.55 for first$25,000 plus$10.70 per additional$1,000 or fraction
thereof
$50,001 to$100,000 $691.05 for first$50,000 plus$7.45 per additional$1,000 or fraction thereof
$100,001 to$500,000 $1,063.65 for first$100,000 plus$5.70 per additional$1,000 or fraction
thereof
$500,001 to$1,000,000 $3,463.55 for first$500,000 plus$5.10 per additional$1,000 or fi-action
thereof
$1,000,001 and up $6,013.55 for first$1,000,000 plus$4.00 per additional$1,000 or fraction
thereof
Commercial Reinspection and Investigative Fees
Description Fee
Reinspection fee $60.00
Investigative fee(work without a permit) Fee is doubled
Page 17
Commercial Refunds,Surcharge,and Administrative Fees
Description Fee
Refunds for commercial electrical permits Only for permits over$120.00
State surcharge 0.0005 x project valuation
Dishonored check fee $35.00
SOBER HOUSE LICENSE FEES:
Sober House License One-Year License&Inspection Fee $100.00 per unit
Sober House License Re-inspection—Fee Per Valid Complaint $75.00 per re-inspection
Sober House License License Reinstatement After Revocation,
Reinstatement Fee Suspension,Denial or Non-Renewal by the City $1,000.00 per dwelling unit
Council
Page 18
En ineerin
Curb Cut Permit&Secondary Driveway: $100.00 permit and$1,000.00 refundable deposit. Note: Deposit will be
refunded once requirements are inspected and approved.
Encroachment Agreement Fee: $250.00
Fence(Plan Check): $100.00
Flood Zone Search/Map: $25.00
Illicit Discharge: Grass Clipping Cleanup $100.00
Temporary Site Stabilization(Erosion Control) $1,000.00 per acre
for Developments or Home Building Sites and
Existing Lots
Retaining Wall(Plan Check): $100.00
Rights-of-Way Permit Fee Structure:
Annual Registration Fee $55.00$50.00
Excavation Permit Fee $210.00$200.00
Per Add'l Excavation(paved area) $35.00$30.00
Per Add'1 Excavation(unpaved area) $20.00$15.00
Trench Fee
Underground Utility/Telecom Installation $45.00$40.00 per 100 L.F.
Directional Boring or Tunneling(in addition to
excavation permit fee)
Underground Utility/Telecom Installation Open $60.00$55.00 per 100 L.F.
Trenching(in addition to excavation permit fee)
Overhead Utility/Telecom Installation(in addition $10.00$5:00 per 100 L.F.
to excavation permit fee)
Obstruction Permit Fee $55.00$50.00
Permit Extension Fee $60.00$55.00
Annual Mapping Fee $15.00$10.00 per Permit($0.00 if in the City format)
Delay Penalty(up to 3 days late) $65.00$60.00
(each day late over 3 days) Plus$10.00 per Day
Individual Service Work in the Right-of-Way $260.00$250.00 annual fee or$15.00$10.00 per service
Work within the ROW without a permit Double the permit fee
Per Lot Fee(Can be used as an alternative for new
developments)
Urban Rural
Connexus Energy $32.00$31.00 per lot $36.00$35-00 per lot
CenterPoint Energy $40.00$39.00 per lot $62.00$60-00 per lot
CenturyLink $25.00$24.00 per lot $41.00$40.00 per lot
Comcast $35.00$34,00 per lot $49.00$47-40 per lot
Special Assessment Costs(Estimated): See Development Contract Escrows
Street Opening Permit(Sewer&Water): $350.00-Permit&Engineering Inspection
Trail Fee(Bikeway/Pathway):
Residential $1,113.00$1,076.00 per unit
Internal Trails(New Plats) Developer's Responsibility
Commercial/Industrial Developer's Responsibility
Collected pursuant to development contract or
Council resolution
Vacation of Easement $350.00-Includes mailing labels
Recording Fee:
Abstract and Torrens $100.00
Page 19
CITY INSTALLED IMPROVEMENTS
Part A of Development Contract
1. Developer's Improvements Costs
• Erosion Control..............................................................................................................................$3,000.00
• Tree Protection...............................................................................................................................$2,000.00
• Street Sweeping..............................................................................................................................$1,000.00
• Iron Monuments.................................................................................................................. $150.00 per Lot
• Grading,Clearing&Grubbing Certification,As-Builts..............................Value of Work Not Completed
• Tree Removal................................................................................................................................ $2,000.00
• Installation of Street Lights......................................................................... Value of Work Not Completed
• Grading Certification&As-Builts.................................................................................................$4,000.00
• Landscaping Improvements(if required) ....................................................Value of Work Not Completed
• Sodding of Boulevard(if required in common areas) .................................Value of Work Not Completed
• The estimated engineering, legal, and administrative fees are 15% of the total estimated cost for the developer's
improvements.
• The total Developer's Improvement costs(including engineering,legal, and administrative)are then multiplied by 150%to
establish the Developer's Security for the project.
Part B of Development Contract
1. Developer's Improvements Costs
• Streets&Utilities(Based on Developer's estimated construction cost)..............................Value of Work
• Trails/Sidewalks...........................................................................................Value of Work
• The estimated engineering, legal, and administrative fees are 15% of the total estimated cost for the developer's
improvements.
• The total Developer's Improvement costs(including engineering,legal,and administrative)are then multiplied by 105%to
establish the Developer's Security for the project.
2. Project Security Requirements Prior to Final Street&Utility Plans&Specifications are as follows:
a. Developer to escrow 6%of estimated construction cost to complete street and utility construction plan,if plans are requested
prior to the execution of the development contract. This will be returned to the developer when the development contract is
executed. This only applies to urban developments.
Special Assessment Costs(estimated)
1. Estimated Construction Costs(costs vary according to project requirements):
✓ Lateral Sanitary Sewer ✓ Storm Sewer
✓ Trunk Sanitary Sewer ✓ Streets
✓ Lateral Water Main ✓ Sidewalks
✓ Trunk Water Main ✓ Other
All project cost estimates are identified within the project feasibility report. The construction cost estimates are based on current
industry construction cost standards. The final construction costs are based on competitive bids and final construction quantities.
Development of Street&Utility Feasibility Report..........................................................$8,000.00
2. Estimated Project Expenses:
✓ Engineering-The estimate is based upon project size,scope and complexity. The amount assessed is based upon billable
hourly rates times project recovery rate factor.
✓ Aerial Mapping- 1%of Street. The estimate is based upon 1%of the value of the street construction. The final value is
based upon 1%of the final street costs.
✓ Administration-3%. The estimate is based upon 3%of the estimated construction cost. The final value is based upon 3%
of the final construction cost.
✓ Assessing- 1%. The estimate is based upon 1%of the estimated construction cost. The final value is based upon 1%of the
final construction cost.
✓ Legal-Legal costs will be actual billing.
✓ Easement-Estimates are project-specific.
Page 20
✓ Advertising—Project specific.
✓ City Costs-Includes inspection and city related project costs.
✓ Street Signs-The cost is based upon the size of the project.See Signs under the Public Works section for cost determination.
✓ Construction Interest—Rate is determined at time of project estimate.
✓ Bonding-0.5%of total project cost.
✓ Drainage Plan-0.3%of street&storm sewer costs.
✓ County Road Improvement Fee(if applicable)—Project-specific,determined at Preliminary or Final Plat
3. Crack Seal&Pavement Seal: $2.00 x sq.yd.of paved street surface.
DEVELOPER INSTALLED IMPROVEMENTS
Part A of Development Contract
1. Developer's Improvements Costs
• Erosion Control..............................................................................................................................$3,000.00
• Tree Protection...............................................................................................................................$2,000.00
• Street Sweeping..............................................................................................................................$1,000.00
• Iron Monuments.................................................................................................................. $150.00 per Lot
• Grading,Clearing&Grubbing Certification,As-Builts..............................Value of Work Not Completed
• Tree Removal................................................................................................................................ $2,000.00
• Installation of Street Lights......................................................................... Value of Work Not Completed
• Grading Certification&As-Builts.................................................................................................$4,000.00
• Landscaping Improvements(if required) ....................................................Value of Work Not Completed
• Sodding of Boulevard(if required in common areas) .................................Value of Work Not Completed
• The estimated engineering, legal, and administrative fees are 15% of the total estimated cost for the developer's
improvements.
• The total Developer's Improvement costs(including engineering, legal,and administrative)are then multiplied by 150%to
establish the Developer's Security for the project.
Part B of Development Contract
1. Developer's Improvements Costs
• Streets&Utilities(Based on Developer's estimated construction cost)...................Value of Work
• Trails/Sidewalks................................................................................Value of Work
• The estimated engineering, legal, and administrative fees are 15% of the total estimated cost for the developer's
improvements.
• The total Developer's Improvement costs(including engineering, legal,and administrative)are then multiplied by 105%to
establish the Developer's Security for the project.
Proiect Expenses
1. Project Expenses—collection of expenses will be outlined in the development contract agreed to before street and utility construction
can begin:
✓ Aerial Mapping- 1%of Street. The estimate is based upon 1%of the value of the street construction. The final value is
based upon 1%of the final street costs.
✓ Administration-2%. The estimate is based upon 2%of the estimated construction cost. The final value is based upon
2%of the final construction cost.
✓ Crack Seal&Pavement Seal-$2.00 x sq.yd. of paved street surface.
✓ *Water Area Charge—Refer to Water Fees,Page 20
✓ *Water Connection Fee-Refer to Water Fees,Page 20
✓ *Sanitary Sewer Area Charge—Refer to Sanitary Sewer Fees,Page 19
✓ *Sanitary Sewer Connection Fee-Refer to Sanitary Sewer Fees,Page 19
✓ *Sanitary Sewer Lift Station Connection Fee(if applicable)—Refer to Sanitary Sewer Fees,Page 19
✓ *Sanitary Sewer 2"d Lift Station Connection Fee(if applicable)—Refer to Sanitary Sewer Fees,Page 19
✓ *Sanitary Sewer&Water Main Railroad Crossing Fee—Refer to Sanitary Sewer Fees,Page 19
✓ County Road Improvement Fee(if applicable)—Project specific,determined at Preliminary or Final Plat
Page 21
2. Project Security Requirements Prior to Final Street&Utility Plans&Specifications are as follows:
a. Developer to escrow 6%of estimated construction cost to complete street and utility construction plan,if plans are requested
prior to the execution of the development contract. This will be returned to the developer when the development contract is
executed. This only applies to urban developments.
3. City Costs including engineering(design),inspection and City related project costs. The amount of expenses shall be invoiced to the
developer as work is completed.
Page 22
Fire
Accident Response Fees**:
Each Fire Engine/Pumper/Tender $300.00 per hour
Each Utility Vehicle or Pickup $150.00 per hour
Ladder/Aerial Truck $545.00 per hour
6 wheelT $75 nn Per1,ouf
Each Firefighter $25.00$20.00 each,per hour
Chief(s)response $150.00 Q,�per hour
Fire Marshal response $150.00$110.00 per hour
**Fees would be charged to the insurance companies of the parties involved. Fire officer would collect information needed to
charge on the scene. The resident,should the insurance company not pay,will not be responsible for the charges.
Copies of Fire Reports: $25.00
Building and Fire Re-inspection Fees: $125.00$400:80 per hour
Burning Permits: $40.00�38 A0
Fire&Pyrotechnics Special Effects: $350.00$300.00
Gas Pipeline Response Fees**:
Each Fire Engine/Pumper/Tender $300.00 per hour
Each Utility Vehicle or Pickup, $150.00 per hour
Ladder/Aerial Truck $545.00 per hour
Each Firefighter $25.00$29:00 each,per hour
Chief(s)response $150.00$135.00 per hour
Fire Marshal response $150.00$110.00 per hour
**This fee would be charged to contractors or sub-contractors who hit properly marked gas lines. Charges would not apply to
residents who hit a gas line.
Home Occupation Inspections: $125.00$440-.00 per hour
Inspection Fees:
n beye,...ound Storage Tanks ne,mit F e 1 25 f t tel« eet,.el„e(minimum$1 nn nn)roxrrrr
PlanReviewFee 650/ of«eFmit foe(mia,,,,,,,, $l nn 00
Gemmer-eial Heed Extinguishing Systems Pe,mit Fee 1 25 of total« eet value i,, ini ff, m$1 nn nm
(planr-eview, ,mit inspeefien, „a:fie tied Pl. Review Fee 650/ of pen n t foe(minimum$1 nn 00)
Day Care Licensing Inspections $50.00$100.00 per inspection(includes 1 re-inspection)
Fire Alarm Systems(plan r-evi PeFmitFee 1.25-1,;of total prejeet value(miaiffmm$100.00)-.
insperation,modification) U-1rn cirnovivvFvo 65v'vf�cxxat fee(aaxaxar$-xnn-nv�r
Uvxzxrr i 25- f total« eet valuein..,(mu $1 nn nm
r-
.•mit inspeefien, .difi.etion) Ale«Rev ew Fee 65,0 „fpermit foe(minimum$100 nm
Fire Sprinkler-Systems/«l.,«.- Permit Fee 1 25 of ttotal« eot value/.«:«:n,,.« $1 nn nm
pefmit,inspeetion, D1 D F 65%rvf'rvrnrt iowe(c aaic: $x n n.n m).Underground Storage tanks(planY-eview, Aefmit Fee i 250 of ttotal« e..t,.el„e(minimum$1 nn nn)
0 of pefmit fee(mini— _100.00,
Other Inspections as Requested: $125.00 S400-00 per hour
Special Investigation as Requested: $125.00$1-00.00 per hour
Page 23
Parks
Ball Field Usage:
Non-Youth Athletic Associations $75.00 per team,per season
$10.00 additional,per player,non-resident fee
Youth Athletic Associations $0.00 per team,per person
$0.00 additional,per player,non-resident fee
Note: Includes the use of fields for both lighted and non-lighted
Field without Lights(Private Use) $20.00 per hour or
$100.00 per day
Field with Lights(Private Use) $25.00 per hour or
$125.00 per day
Tournaments
Non-Youth Athletic Associations $275.00 tournament fee for the park plus
$200.00 field usage fee per field plus$500.00 damage deposit.
Note: 50%of the tournament fee will be assessed for applications made less
than 8 weeks prior to the tournament date.
Youth Athletic Associations $275.00 tournament fee for the park plus
$100.00 field usage fee per field for youth organizations not affiliated with
Andover Youth plus$500.00 damage deposit.
Note: 50%of the tournament fee will be assessed for applications made less
than 8 weeks prior to the tournament date.
Hockey Rink Usage:
Non-Youth Athletic Associations $75.00 per team,per season
$10.00 additional,per player,non-resident fee
Youth Athletic Associations $0.00 per team,per person
$0.00 additional,per player,non-resident fee
Note: Includes the use of rinks for both lighted and non-lighted
Rink without Lights(Private Use) $20.00 per hour or
$100.00 per day
Rink with Lights(Private Use) $25.00 per hour or
$125.00 per day
Tournaments
Non-Youth Athletic Associations $200.00 tournament fee for the rink or rinks plus
$100.00 rink usage fee per rink plus$500.00 damage deposit.
Youth Athletic Associations $200.00 tournament fee for the rink or rinks plus
$100.00 rink usage fee per rink for youth organizations not affiliated with
Andover youth plus$500.00 damage deposit.
Park Dedication Fees:
Single Family Residences $5,435.00$5,'�o per unit
Town Home and Twin Home $5,435.00 a 5,''�o per unit
Apartment(Multi-Family) $5,435.00$5,256.00 per unit
Lot Splits $5,435.00$5,256.00 per unit
Commercial/Industrial $16,302.00$15,766.00 per acre or 10%of market value of land,whichever is
less(per Ord. 10 Sec.9.07.5)
Collected pursuant to development contract or
Council resolution
Scoreboard Controller&Battery Pack Rentals: $1,300.00 refundable deposit
Page 24
Planning
Adult Use Business License: $8,000.00 per year
see ordinance
Commercial Site Plan Review:
Escrow for services&agree to reimburse city for $1,500.00 for small projects less than 5,000 sq. ft.
services provided. $2,000.00 for projects between 5,000 and 10,000 sq. ft.
$2,500.00 for projects 10,000 sq. ft. and greater
Billable Staff Time x Project Recovery Rate Factor 2.0
Comprehensive Plan Amendment: $500.00-Includes mailing labels
Public Notification Sign $30.00
$1,000.00 Comprehensive Plan Escrow
Conditional Use Permit:
Commercial $1,000.00 escrow-to facilitate ARC review
Residential $400.00-Includes mailing labels
Amended Conditional Use Permit $400.00-Includes mailing labels$1,000.00 escrow if commercial
Public Notification Sign $30.00
Recording Fee $100.00
Interim Use Permit: $400.00-Includes mailing labels
Amended Interim Use Permit $400.00-Includes mailing labels
Recording Fee $100.00
Public Notification Sign $30.00
Land Reclamation or Mining $1,000.00 escrow
Lot Split Fee:
Lot Split $400.00-Includes mailing labels
Lot Split Escrow Deposit $400.00 to cover additional costs
Lot Line Adjustment Fee: $400.00
Planned Unit Development Fee: $400.00-Includes mailing labels
PUD Review Fee $1,000 escrow for services&agree to reimburse city for all services
provided.Billable Staff time x Project Recovery Rate Factor(2.0)
Amended PUD Review Fee $400.00-Includes mailing labels
$1,000 escrow for services&agree to reimburse city for all services
provided.Billable Staff time x Project Recovery Rate Factor(2.0)
Public Notification Sin $30.00
Plat Fees:
Sketch Plan Fee $1,000 escrow for services&agree to reimburse city for all services
provided.Billable Staff time x Project Recovery Rate Factor(2.0)
Preliminary Plat Filing Fee $400.00
Final Plat Fee $400.00
Multi-Phased Final Plat Escrow Deposit
Urban Lot $200.00 per lot
Rural Lot $200.00 per lot
Plat Escrow Deposit
Urban Lot $400.00 per lot
Rural Lot $750.00 per lot
Commercial $1,000.00 per lot
Public Notification Sin $30.00
Re-zoning: $400.00-Includes mailing labels
Public Notification Sign $30.00
Sign Permit: $2.00 per square foot/side
$4.00 per square foot per side erected without permit if approved
Towers&Antennas:
Application Fee Conditional Use $3,000.00 escrow-Includes mailing labels
Application Fee Conditional Use-Water Tower $8,500.00 escrow-Includes mailing labels
Small Cell Facilities $1,500.00 permit application fee
Lease Rates Negotiated
Public Notification Sin $30.00
Page 25
Variances:
Zoning Ordinance Variance Requests $400.00
Public Notification Sign $30.00
Recording Fee $100.00
Zoning Letter: $75.00
Zoning Ordinance Amendment: $500.00
Page 26
Public Works
Service Charges:
Equipment Fee $150.00 per hour(minimum charge'/2 hour)
Labor Billable hourly rate times project recovery rate factor
Non-Emergency After Hours Call In $125.00 minimum
Signs:
Materials Cost plus administrative fee
Labor Billable hourly rate times project recovery rate factor
Sanitary Sewer
Laterals: $67.10$64.85 per front foot
Lateral Charge:
1484 to 1452 148'h Lane NW $129.86 per front foot plus cost index percentage(Engineers News Record)
dated back to November 2023. Constructed with City Project#23-02.
Plumbing: Homeowner contracts for
Sanitary Sewer Rates:
Sewer Area Charge $2,041.00$1,944.00 per acre
Sewer Connection Fee $550.00$524.00 per unit
Commercial Connection Fee Rate= 1 connection fee for each SAC unit
Sanitary Sewer Extra Depth Lateral Fee:
South Coon Creek Drive Sewer Connection $59,138.00 plus cost index percentage(Engineers News Record)dated back
to December 2012. Constructed with City Project#11-10.
Sanitary Sewer Lift Station Connection Fee:
Fox Hollow Lift Station $344.00$333.00 per unit
Shadowbrook Lift Station $1,496.00$1,447.00 per unit
Chesterton Commons Lift Station(Lift Station#4) $849.00$82 1.00 per unit
Constance Corners Lift Station(Lift Station#6) $1,481.00$1,^ter�00 per unit
Sanitary Sewer&Water Main Railroad
Crossing Fee 161"Avenue: $320.00$301:50 per unit
Service Connection/Inspection Fee: $90.00
Sewer Availability Charge-Met Council Fee: $2,485.00
Sewer Contracting:
Equipment Fee $150.00 per hour
Labor Fee Billable hourly rate times project recovery rate factor
Sewer Usage Rates: Monthl Quarterly
Sewer Usage Rate $25.40$24.20 $74.45$70.90
Senior Citizen Reduced Rate* $12.70$12.10 $37.25$35.45
Disabled Persons Reduced Rate* $12.70$12.10 $37.25$335.45
Penalty/Late Payment 18%annually
*must meet income eligibility
Storm Water
Storm Water Utility Fee: Monthl Quarterl
Zoning Category:
Single Family Urban(per unit) $5.30$5-00 $14.20$13.50
Single Family Rural,Estates, Suburban $5.30$5-00 $14.20 Q,�0
&Farmstead(per unit)
Manufactured Housing N/A N/A
Multiple Dwelling(per acre) $11.25$10.70 $32.00$30.50
Business,Comm.Industrial&Public(per acre) N/A $61.75$58.80
Developed Parks(per unit) N/A $14.20$13.50
Elementary&Middle Schools(per acre) N/A $29.10$27.70
High Schools(per acre) N/A $29.10$27.70
Religious Institutions(per acre) N/A $29.10$27.70
Undeveloped Open Space N/A N/A
Penalty/Late Payment 18%annually
Page 27
Water
Hydrant Meter Deposit&Rental Rates: Deposit Rental Rate
3/4"hydrant meter setup $250.00 $4.00 per day for the first 7 days
$2.00 per day thereafter for full rental period
3"hydrant meter setup $2,500.00 $5.00 per day for the first 30 days
$3.00 per day thereafter for full rental period
Hydrant Use: Deposit as stated aboveplus standard water rates
Laterals: $67.10$6485 per front foot
Lateral Charge:
1516 to 1452 1481h Lane NW $154.08 per front foot plus cost index percentage(Engineers News Record)
dated back to November 2023. Constructed with City Project#23-02.
Manual Meter Reading: $50.00 per read
Service Charges:
Labor Billable hourly rate times project recovery rate factor
Testing 0 to 6"Meters Cost plus administrative fee
Violation Penalties:
May 1"through AuEust 31'
1st Penalty Warning
2"Penalty $100.00
3'Penalty $200.00
41 Penalty $200.00&Turned over to the City Attorney for criminal prosecution.
Unit Connection Charges:
Residential $6,580.00$6,363 00 per unit
Non-residential and Institutional(Land owned $19,737.00$19,088 00 per acre
or operated by municipal, school district,county,
state or other governmental agencies)
Water Area Charges:
Residential and Commercial $6,027.00$5 824 00 per acre
Water Meter Charges:
3/4"Meter $227.78$221.63
#2 Horn(for 3/4"meter) $193.54$184.36
3/4"Meter with#2 Horn/Radio $665.11 $642.38
Special Sizes Cost plus administrative fee
Water Permit Fees:
Service/Connection/Inspection Fee $95.00
Tapping Main $30.00
Disconnection/Reconnection for Non-Repairs $50.00
HVAC $15.00
Re-Inspection all $50.00 per hour
Water Usage Rates:
Monthly Rate Structure $7.20$-7-.00 Base Rate
$2.85$2-.80 per 1,000 for 1st 6,000 Gallons
$3.15$3.85 per 1,000 for 6,001 - 16,000
$3.65$34.55 per 1,000 for 16,001 -33,000
$4.65$ ..55 per 1,000 for 33,001 and above
Monthly Minimum $10.60$10.35
Penalty/Late Payment 18%Annually
Quarterly Rate Structure $16.35 $15.95 Base Rate
$2.85$2-.80 per 1,000 for V 18,000 Gallons
$3.15$3-.05 per 1,000 for 18,001 -48,000
$3.65$3-.55 per 1,000 for 48,001 -99,000
$4.65$4:55 per 1,000 for 99,001 and above
Quarterly Minimum $20.25$19.75
Penalty/Late Payment 18%Annually
Page 28
Street Lighting
Charges: Monthl Quarterl
Urban Residential Areas $2.15 $6.45
Rural Residential Areas $3.65 $10.95
Commercial Property $2.15 $6.45
Adopted by the City Council of the City of Andover this 16th 47'day of December 2025 2024.
CITY OF ANDOVER
Attest:
Jami arthel-Mayor
S. I Bulddla Maya
is lle artner—City Clerk
Page 29
CITY OF ANDOVER
COUNTY OF ANOKA
STATE OF MINNESOTA
ORD.NO. 582 SUMMARY
AN ORDINANCE ESTABLISHING PERMIT FEES, SERVICE CHARGES AND VARIOUS
OTHER FEES TO BE COLLECTED BY THE CITY OF ANDOVER.
The City Council of the City of Andover ordains:
Section 1. Pursuant to Minnesota Law, the Andover City Code and upon a review by city staff, a
fee schedule for city services,permit fees and various other fees is hereby adopted.
2026 Fee Schedule
a) The city code of the City of Andover establishes that certain fees be set from time
to time by the City Council.
b) City staff has reviewed the current Fee Schedule for the City of Andover and is
hereby recommending that the 2026 Fee Schedule,which is available for inspection
in the office of the City Clerk, be adopted.
c) Upon consideration and review by the City Council, the 2026 Fee Schedule is
hereby adopted and becomes effective January 1, 2026.
Section 2. This ordinance shall be in full force and effect January 1, 2026.
Adopted by the City Council of the City of Andover this 16th day of December, 2025.
CITY OF ANDOVER
Attest:
/licBarthel —Mayor
c p
is elle Hartner —City Clerk