HomeMy WebLinkAboutOrd. 576 Amendment 1-7-3CITY OF ANDOVER
COUNTY OF ANOKA
STATE OF MINNESOTA
ORD. NO. 576
AN ORDINANCE AMENDING CITY CODE 1-7-3 ESTABLISHING PERMIT FEES, SERVICE CHARGES, AND VARIOUS OTHER
FEES TO BE COLLECTED BY THE CITY OF ANDOVER.
THE CITY COUNCIL OF THE CITY OF ANDOVER HEREBY RESOLVES:
BUILDING INSPECTION & PERMIT FEES BUILDING
Permit Refund 20% of Permit Fee
Re -Inspection Fee 195n nn
BUILDING PERMIT FEES:
1997 Uniform Building Permit Fee Schedule as Extracted from the 1997
Valuation Based
Building Permit Fees
Building Permit
Uniform Building Code, Table No. 1-A
(Fees are to be based
$95.00 minimum or Based on Valuation, whichever is greater
on Building Valuation
as deteml fined by
current State of
Minnesota Building
Valuation Data and
Building Official)
Plan Review
If building valuation exceeds $1,000 and a plan is required to be
submitted, a plan review fee of 65% of the building permit fee must be
aid in addition to the building
g permit fee. (Except as per MY Rules
1300.0160, Subp. 5for similar plans after the first submittal, a 25%plan
review fee may be paid)
Agricultural Land Use
Permit
25.00
$
Basement Finish Permit
$200.00
House Moving Permit
$200.00
Roofing, Siding, Window or
Door Replacement Permit
$100.00
Demolition Permit
Single Family Dwelling $150.00
Fixed Fee
Building Permits
Two-family Dwelling $200.00
Residential Garage $90.00
Agricultural Structures $90.00
Multifamily Structures: Ist Two Units $200.00
Each Additional Unit $50.00
Commercial/Industrial $300.00
State Surcharge: State Surcharge must be paid per MN Statutes 32613.148, in addition to the building permit fee.
MECHANICAL PERMIT FEES:
New Residential
Complete HVAC
Combination Permit
$175.00
(Does not include Gas Fireplaces - permitted separately, see below)
Existing Residential
$95.00 per Fixture
Fixed Fee
Repair/Replacement
Mechanical Permit
(Fixture" includes: Heating/Air Conditioning Combination, Air to Air Exchanger, Gas
Fireplace, Geo-Thermal Heating/Cooling, Boiler, In -Floor Heating &Boiler, Exhaust Fan,
Direct Fired Heater, Unit Heater Heat Pumo and other mechanical eauipmend
Page 5
Mechanical Permits $95.00 per Fixture or 1.5% of job valuation,
whichever is greater
Commercial Mechanical ("Fixture" includes: Furnace, Air Conditioning, Airto Air Exchanger, Gas Fireplace, Geo-
Permit Thermal Healing l Cooling, Boiler, In -Floor Heating & Boiler, Exhaust Fan, Direct Fired
Heater, Unit Heater, Heat Pump. Commercial Hood. Make -Up Air Unit, and other
mechanical eautomenq
Commercial Mechanical Plan Review •'-• IO%of permit fee ^-�-•-'- -"•_"-- •--•-e-•'^ Q'^ ^^^
Gas Piping Permit- Not
Associated With A Fixture $90.00 minimum or $15.00 per gas opening, whichever is greater
State Surcharge: State Surcharge must be paid per MN Statutes 32613.148, in addition to the building permit fee.
Adopted by the City Council of the City of Andover this 6" day of May, 2025.
Attest:
%ice1leHartner—City Clerk
Page 5
CITY OF ANDOVER
COUNTY OF ANOKA
STATE OF MINNESOTA
ORD. NO. 576 SUMMARY
AN ORDINANCE ESTABLISHING PERMIT FEES, SERVICE CHARGES AND VARIOUS
OTHER FEES TO BE COLLECTED BY THE CITY OF ANDOVER.
The City Council of the City of Andover ordains:
Section 1. Pursuant to Minnesota Law, the Andover City Code and upon a review by city staff, a
fee schedule for city services, permit fees and various other fees is hereby adopted.
2025 Fee Schedule Changes
a) The city code of the City of Andover establishes that certain fees be set from time
to time by the City Council.
b) City staff has reviewed the current Fee Schedule for the City of Andover and is
hereby recommending that the 2025 Fee Schedule changes, which are available for
inspection in the office of the City Clerk, be adopted.
c) Upon consideration and review by the City Council, the 2025 Fee Schedule changes
is hereby adopted and becomes effective May 7 h, 2025.
Section 2. This ordinance shall be in full force and effect May 7', 2025.
Adopted by the City Council of the City of Andover this 6a' day of May, 2025.
CITY OF ANDOVER
Attest:
icl elle Harmer —City Clerk