Loading...
HomeMy WebLinkAbout2025-03-19• ,6', 1685 CROSSTOWN BOULEVARD N.W.. ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV Andover Planning and Zoning Commission Special Meeting Agenda March 19, 2025 Andover City Hall Council Chambers 7.00 p.m. 1. Call to Order 2. Pledge of Allegiance 3. Oath of Office — Commissioner Roger Grout 4. Approval of Minutes — February 25, 2025, Workshop 5. Approval of Minutes — February 25, 2025, Regular Meeting 6. Public Hearing: Consider a variance for Accessory Structure Construction Requirements — 3149162" d Ln NW; PID 16-32-24-23-0009 — Nick Morter, Minnesota Irrigation/Landscapes Unlimited Outdoors Inc. (Applicant). 7. Public Hearing: Consider Interim Use Permit (IUP) Request — Mining & Land Reclamation —16xxx Tulip St NW; PID# 08-32-24-34-0001 — Derrick Whiting (Applicant). 8. Public Hearing: Consider a Planned Unit Development (PUD) of a residential subdivision on the unaddressed property at 16xxx Ward Lake Drive NW; PID# 11-32-24-41-0003 - SW Wold Construction Inc. (Applicant). 9. Public Hearing: Consider City Code Amendment — City Code 12-2 adding definition of "Cannabis Retail Business" & City Code 12-11: Commercial/Industrial Permitted, Permitted Accessory, Conditional, Interim and Prohibited Uses — "Cannabis Retail Business" — City of Andover (Applicant) 10. Election of Vice Chairperson (effective next meeting) 11. Other Business 12. Adjournment AC I T Y O F NNDOVE^ 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV TO: Planning and Zoning Commissioners FROM: Peter Hellegers, City Planner SUBJECT: Swearing in Commissioner Roger Grout DATE: March 19, 2025 REQUEST Commissioner Roger Grout has been appointed to the Planning Commission by the City Council to fill the remainder of the term of former commissioner Karen Godfrey and will take an Oath of Office. The term for Commissioner Grout will end on January 1, 2027. C I T Y O F NDOVEA 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV TO: Planning and Zoning Commissioners FROM: Peter Hellegers, City Planner SUBJECT: Approval of Minutes DATE: March 19, 2025 REQUEST The Planning & Zoning Commission is requested to approve the following minutes: • February 25, 2025, workshop meeting minutes. • February 25, 2025, regular meeting minutes. 2 3 4 5 6 7 8 PLANNING AND ZONING COMMISSION MEETING — FEBRUARY 25, 2025 9 10 The Work Session Meeting of the Andover Planning and Zoning Commission was called 11 to order by Chairperson Godfrey on February 25, 2025, 6:00 p.m., at the Andover City 12 Hall, 1685 Crosstown Boulevard NW, Andover, Minnesota. 13 14 Commissioners present: Chairperson Karen Godfrey, Commissioners Scott Hudson, 15 Nick Loehlein, Chuck Naughton, Pat Shuman, Jr., and 16 Jonathan Weinhold. 17 18 Commissioners absent: Commissioner Ryan Winge 19 20 Also present: City Planner Peter Hellegers and Associate City Planner 21 Aidan Breen. 22 23 24 CALL TO ORDER 25 26 DISCUSSION— PLANNING & ZONING COMMISSION TRAINING 27 28 City Planner Hellegers reviewed the following topics for the Commissioner Training: 29 • Planning and Zoning Procedures 30 • Open Meeting Law and Remote Meeting Participation Policy 31 • Meeting Cadence 32 • Other Topics/Questions 33 34 Mr. Hellegers reviewed the Comprehensive Plan with the Commission. Commissioner 35 Loehlein asked how the Plan is updated. Mr. Hellegers explained the Met Council's role 36 in developing the Plan. The current plan is in effect until the new plan is approved by Met 37 Council and adopted by the City. Associate Planner Aidan Breen explained the standards 38 of zoning ordinances for a particular property. 39 40 Commissioner Hudson asked about Conditional Use Permits and Interim Use Permits. Mr. 41 Hellegers stated the Conditional Use Permit runs with the property and the Interim Use 42 Permit is a temporary use of property until a particular date, until the occurrence of a 43 particular event or until zoning regulations no longer permit it. Mr. Hellegers provided 44 examples of both types of permits. 45 Regular Andover Planning and Zoning Commission Meeting Minutes February 25, 2025 Page 2 1 Chair Godfrey asked about adjusted standards. She has not seen any approved other than 2 for lot width and lot depth. Mr. Hellegers explained. 3 4 Commissioner Loehlein asked about the Commission recommending denial. He asked 5 how facts can be considered while working in the parameters of the law. Mr. Hellegers 6 stated the Commission is asked to tie them best as they can and explained how variances 7 come into play. Lot standards, setbacks need to be considered. Mr. Breen stated included 8 in the packet is information on findings required and making recommendations based on 9 Findings of Fact. 10 11 Mr. Hellegers explained in detail the Open Meeting Law. The Typical Planning and 12 Zoning Meeting Cadence was also reviewed. 13 14 Commissioner Hudson asked about the Remote Meeting Policy. Mr. Hellegers stated the 15 attendees need to be in a public place where others can attend and hear everyone in 16 attendance. It is very challenging to hold a remote meeting. 17 18 ADJOURNMENT 19 20 Chair Godfrey adjourned the meeting at 6:35 p.m. 21 22 23 Respectfully Submitted, 24 25 26 Debbie Wolfe, Recording Secretary 27 Timesaver Off Site Secretarial, Inc. 1 2 3 4 5 6 7 8 PLANNING AND ZONING COMMISSION MEETING — FEBR UAR Y 25, 2025 9 to The Regular Bi-Monthly Meeting of the Andover Planning and Zoning Commission was 11 called to order by Chairperson Godfrey on February 25, 2025, 7:00 p.m., at the Andover 12 City Hall, 1685 Crosstown Boulevard NW, Andover, Minnesota. 13 14 Commissioners present: Chairperson Karen Godfrey, Commissioners Scott Hudson, 15 Nick Loehlein, Chuck Naughton, Pat Shuman, Jr., Jonathan 16 Weinhold and Ryan Winge. 17 18 Commissioners absent: None 19 20 Also present: City Planner Peter Hellegers and Associate City Planner Aidan Breen. 21 22 23 PLEDGE OF ALLEGIANCE 24 25 OATH OF OFFICE 26 27 Commissioners Scott Hudson and Chuck Naughton have been reappointed to the Planning 28 Commission by the City Council and were given the Oath of Office by Chair Godfrey. 29 The terms for Commissioners Hudson and Naughton will end on January 1, 2028. 30 31 Commissioner Jonathan Weinhold has been appointed to the Planning Commission by the 32 City Council to fill the remainder of the term of former Commissioner Jonathan Shafto 33 and was given the Oath of Office. The term for Commissioner Weinhold will end on 34 January 1, 2026. 35 36 APPROVAL OF MINUTES 37 38 January 28, 2025, Regular Meeting 39 40 Motion by Commissioner Loehlein, seconded by Hudson, to approve the minutes from the 41 January 28, 2025, Planning Commission Meeting as presented. Motion carried on a 4- 42 ayes, 3-Present (Winge, Shuman and Weinhold), 0-nay vote. 43 44 PUBLIC HEARING: Sketch Plan Review for a residential subdivision using a Planned 45 Unit Development (PUD) — Finnes Estates — 888 Crosstown Blvd (PID# 23-32-24-11- Regular Andover Planning and Zoning Commission Meeting Minutes — February 25, 2025 Page 2 1 0007) and 15540 Prairie Rd NW (PID#23-32-24-11-0002) — Brian Jansen, Boulder 2 Contracting (Applicant) 3 4 Associate Planner Aidan Breen reviewed the sketch plan for a single-family PUD 5 residential development titled Finnes Estates proposed by Brian Jansen of Boulder 6 Contracting. The applicant submitted a narrative for the proposed Sketch Plan which was 7 provided for Commission review. The purpose of the public hearing is to offer feedback to 8 the applicant and not to take any formal action. 9 to The City has received an application for a sketch plan showing a 32-lot single-family 11 urban residential development on a 14.24 acre site. The site is bordered by railroad tracks 12 on the west side, Crosstown Blvd on the north side, Prairie Road on the east side, and 13 Prairie Oaks, a single-family rural residential cul-de-sac at 150 Lane on the south side. 14 Neighborhoods to the west of the railroad tracks are fully developed and the 15 neighborhoods to the north, east, and south are zoned R-1 or R-3, but are located within 16 the MUSA and guided for future R-4 redevelopment. 17 18 Mr. Breen explained that for this concept to move forward, several actions would need to 19 occur including: 20 • Preliminary Plat. 21 • Conditional Use Permit/Planned Unit Development (CUP/PUD). 22 • Final Plat. 23 • Building Permits. 24 25 Mr. Breen reviewed Conformance with Local and Regional Plans and Ordinances, Site 26 Characteristics, Interagency Coordination, and Process. The Sketch Plan would be 27 forwarded to the City Council for their feedback. Based on the feedback received 28 throughout the sketch plan process, the developer would modify the layout and apply for a 29 Preliminary Plat, Rezoning, PUD, and Final Plat, to seek their desired outcome. 30 31 Mr. Breen noted the applicant Mr. Brian Jansen of Boulder Contracting, is present at the 32 meeting. 33 34 The Finnes Estates Site will be re -zoned to R-4 and a PUD is requested. In 2024, the 35 Comprehensive Plan sewer staging map was amended. This parcel is guided for 36 development in 2020-2025. 37 38 The Sketch Plan proposes 32 residential lots on 14.24 acres including 31 new ramblers 39 and two-story homes with basements. Access will be from Crosstown Blvd and Prairie Rd. 4o Trails are planned on Crosstown and Prairie. Turn lanes will be needed at both 41 intersections. A temporary cul-de-sac will be at the southwest end and a road stub will be 42 provided for property to the northeast. Ghost plats indicate it would be possible to develop 43 the adjacent properties indicated on the sketch plan. 44 Regular Andover Planning and Zoning Commission Meeting Minutes — February 25, 2025 Page 3 1 There are no floodplain or wetlands indicated on this site. The property is under the Coon 2 Creek Watershed District. Staff recommends preserving or planting trees on the southern 3 end, but this is not required. Grading may not allow tree preservation. City Code requires 4 4 trees on all lots with new construction. 6 The Park and Recreation Commission recommended cash -in -lieu of land to the City 7 Council. A trail easement will be provided on the south side of Crosstown Blvd. The trail 8 is already planned and is not part of this development. 10 Mr. Breen indicated Outlot A on the drawing. This is provided to allow ghost platted lots 11 125' lot depth. Staff recommends land sale or to be incorporated into platted lots. 12 13 The site will be rezoned to R-4 with a variety of lot sizes, some below R-4 minimum. This 14 site can be compared to Fields of Winslow Cove. A PUD is also requested. The purpose of 15 a PUD was explained to the Commission. 16 17 Mr. Breen reviewed the findings required to be considered when approving a PUD: 18 1. The proposed development is not in conflict with the goals of the Comprehensive 19 Plan for the City. 20 2. The proposed development is designed in such a manner as to form a desirable and 21 unified environment within its own boundaries. 22 3. The proposed development demonstrates how each modified or waived 23 requirement contributes to achieving the purpose of the PUD. 24 4. The PUD is of composition, and arrangement and its construction, marketing and 25 operation are feasible as a complete unit without dependence upon any subsequent 26 unit. 27 28 The Desirable Design Qualities were reviewed. 29 A. Achieves efficiency in the provision of streets and utilities and preserves area to 30 achieve elements of design qualities described in this chapter. 31 B. Provides convenient and safe access for vehicles and pedestrians and all types of 32 activity that are anticipated to be a part of the proposed development. 33 C. Provides a buffer between different uses, adjacent properties, roadways, between 34 backyards of back-to-back lots. 35 D. Preserves existing stands of trees and/or significant trees. 36 E. Provides considerable landscaping treatments that complement the overall design 37 and contribute toward an overall landscaping theme. 38 F. Preserves significant usable space on individual lots or through the provision of 39 open space within the development. 40 G. Provides an attractive streetscape through the use of undulating topography, 41 landscaping, decorative street lighting, decorative mailbox groupings, retaining 42 walls, boulders, fencing, area identification signs, etc. 43 H. The proposed structures within the development demonstrate quality architectural 44 design and the use of high -quality building materials for unique design and 45 detailing. Regular Andover Planning and Zoning Commission Meeting Minutes — February 25, 2025 Page 4 1 I. The lasting quality of the development will be ensured by design, maintenance and 2 use guidelines established through an owners' association. 4 The proposed PUD Standards were reviewed comparing the City Code Standards and the 5 Proposed Standards. 7 The sketch plan shown tonight incorporates all comments and feedback received to date. 8 9 The Planning Commission is asked to hold a public hearing, take public feedback on the 10 proposed Sketch Plan/Concept PUD, and informally advise the applicant through feedback 1 I on the proposed project. Also provided for Commission consideration were Location Map, 12 City Staff Comments with Applicant Responses, and Sketch Plan/PUD Concept Plan 13 Incorporating Staff Comments. 14 15 Commissioner Shuman asked what a building pad is. Mr. Breen stated a building pad is 16 required by Code that a certain amount of grading be done to accommodate the structure. 17 18 Commissioner Weinhold asked about the owner's association. Will there be a 19 homeowner's association that will maintain the development after the units are built. Mr. 20 Breen stated City Code requires that any public land or community space is being 21 maintained by a homeowner's association. Generally, it is decided by the homeowner's 22 association itself. 23 24 Commissioner Naughton asked about the roads and how snow removal will be handled. 25 Mr. Hellegers stated there would be a temporary cul-de-sac easement and it would be 26 treated as a standard cul-de-sac for snow removal. Examples of how other cul-de-sacs 27 were maintained were given by Mr. Hellegers. Commissioner Naughton asked what the 28 traffic control devices will be for the access roads. Mr. Breen stated he believes it would 29 be a stop sign at this point with turn lanes. A traffic study will be done regarding the turn 30 into the development off of Prairie Road. Commissioner Naughton asked if there are trees 31 removed will they be replanted. Mr. Breen stated the recommendation was for a buffer. 32 33 Chair Godfrey opened the public hearing at 7:30 p.m. 34 35 Mr. Jason Rud, 15644 Wake Street, Hain Lake, E.G. Rud & Sons, Inc. are the land 36 surveyors working with Boulder Contracting. They have been building homes for the past 37 30 years in the North Metro area. They have had the wetlands reviewed and prepared a 38 sketch plan. Initial comments have been reviewed and implemented in the revised sketch 39 plan. They are requesting some gentle adjustments in lot sizes. These will be custom 40 homes with one builder for the entire project. The owner's association would serve the 41 common elements. Yard maintenance will be done by the individual homeowners. They 42 will work to include means of safety for access to the development. 43 44 Commissioner Winge asked Mr. Rud to walk through the deviations in the PUD. Mr. Rud 45 stated a narrative has not been done at the sketch plan phase but will be prepared for the Regular Andover Planning and Zoning Commission Meeting Minutes — February 25, 2025 Page 5 1 PUD approval. Mr. Rud stated this is a land -locked parcel so engineering will require a 2 back-to-back drainage study. They will need to accommodate the requirements of the 3 engineer. Variances to some of the lot sizes will allow them to adhere to the drainage 4 requirements. Inter -connectivity to the trails will be provided along with screening. 5 Commissioner Winge asked if the development could be designed without the need for the 6 PUD. Mr. Rud stated the viability of the project would change if the R-4 standards were 7 completely followed. 8 9 Mr. David Branson, 15527 Prairie Road, stated he lives across the street from the 10 property. He asked where the road would go into the project on Prairie Road. 11 12 Mr. Brandon Riedel, 928 Crosstown Blvd., stated his driveway comes off Crosstown. He 13 stated Crosstown is a very busy road. If stop signs are put in there will be a large build-up 14 of traffic. He was told the speed limit on Crosstown could be increased due to the amount 15 of traffic. He sold the easement for a path that was supposed to be done and questioned 16 what is happening with the path. The drainage pond looks like a large area. His backyard 17 is very small and one of the lots and drainage pond will go up to his fire pit. There are 18 woods that he would like to see preserved. 19 20 Ms. Edith Tray, 838 Crosstown Blvd., asked about the wildlife and other things that are 21 there. To the west of her was wetland designated and also on the driveway to her pole 22 barn. She has lived there for 50 years and has a lot of questions. It is a wonderful thing for 23 the City but not for the existing residents. She came to Andover to live in the country. She 24 heard the builder is out of money. She does not want to have to get rid of her pole barn. 25 She also heard there would be a roundabout on Prairie Road. She is not in favor of this 26 development. 27 28 Mr. Bobby Miller, 15633 Prairie Road, stated he is indifferent to this development. Why 29 won't there be a park? He has 3 kids directly across the street. A park would be good for 30 the area. 31 32 Ms. Cindy Steeves, 773 157 h Avenue NW, stated the intersection is in need of more than 33 stop signs. She has asked the City to survey the corner. It is dangerous for children to 34 cross the Prairie and Crosstown intersection. The corner needs to be surveyed in detail. 35 Many houses are being constructed with many variances. If they don't meet the Code they 36 should reduce the number of houses. No exceptions should be made. Her concern is the 37 City is making too many exceptions for this to go in and the safety of the intersection. 38 39 Mr. Sam Warneke, 978 1541h Lane, stated he is south of the proposed project. He has been 40 living here for 20 years. The charm in Andover is the wildlife and woods. He does not like 41 the fact that development is occurring. He does not plan on moving and was hoping to buy 42 some parcels around him for his children. 43 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 Regular Andover Planning and Zoning Commission Meeting Minutes — February 25, 2025 Page 6 Ms. Edith Tray, 838 Crosstown Blvd., stated she does not want to have City water. She has a well and she will keep using that. Drainage needs to be addressed. The City water has chemicals. Mr. Brandon Riedel, 928 Crosstown Blvd., wanted to show his property on the map. The pond would be in his backyard. He has been assessed for Crosstown Boulevard utility improvements. He asked what assessments will be done with newer, expensive homes going in. Only seven properties on Crosstown Blvd were assessed. Chair Godfrey closed the public hearing at 8:05 p.m. Mr. Breen referred to the questions about traffic controls and stop signs, he did not mean to say that additional controls would be put on Crosstown and Prairie. There are planned improvements for the Prairie and Crosstown intersection which are still being discussed with the City Engineers. The City is aware there is a high volume of traffic. Any existing structures on individual properties will not require any changes. That would only come into play if a homeowner chooses to make changes to their properties. All would be grandfathered in. Mr. Hellegers will ask the City Engineer to speak with Mr. Riedel about the path. Mr. Breen stated there would be no changes to utilities for existing properties. Chair Godfrey asked who residents can contact with specific questions and Mr. Breen stated business cards will be put out for residents. Commissioner Loehlein asked Mr. Breen to review park in lieu of land dedication, which he described. There are two small parks in Winslow Cove. They are part of the development but are still under construction. Commissioner Weinhold noted many of the questions and comments by residents were related to traffic. He asked Mr. Breen to address the residents' questions. Mr. Breen suggested residents contact Mr. Hellegers, City Engineering, or himself. Commissioner Loehlein thanked the residents who came to the meeting. He reminded all that landowners have the right to develop their property. He is looking forward to the applicant's narrative for the PUD as the rationale for the PUD mentioned tonight seemed a bit flimsy. Chair Godfrey thanked the residents for their comments. ELECTION OF CHAIRPERSON & VICE CHAIRPERSON The Commission is requested to nominate and appoint a Chairperson and Vice Chairperson to be effective at the next Planning and Zoning Commission Meeting. Commissioner Godfrey is the current Chairperson and Commissioner Loehlein is the current Vice Chairperson. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Regular Andover Planning and Zoning Commission Meeting Minutes — February 25, 2025 Page 7 Motion by Commissioner Hudson, seconded by Commissioner Weinhold to nominate Commissioner Loehlein as Chairperson and Commissioner Godfrey as the Vice Chairperson for 2025. Motion carried on a 7-ayes, 0-nays vote. OTHER BUSINESS Mr. Hellegers stated the Home Show will be March 8 starting at 8:00 a.m. The Met Council is looking at increasing the density to 3.5 for Andover. Staff will be looking at this during the next Comprehensive Plan cycle. The next meeting will be March 11, 2025. ADJOURNMENT Chair Godfrey adjourned the meeting at 8:30 p.m. Respectfully Submitted, Debbie Wolfe, Recording Secretary Timesaver Off Site Secretarial, Inc. LC I T Y 0 F NNDOVE^ 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV TO: Planning & Zoning Commissioners CC: Joe Janish, Community Development Director FROM: Aidan Breen, Associate Planner SUBJECT: Public Hearing: Consider a variance for Accessory Structure Construction Requirements — 3149 162nd Ln NW; PID 16-32-24-23-0009 — Nick Morter, Minnesota Irrigation/Landscapes Unlimited Outdoors Inc. (Applicant). DATE: March 19, 2025 BACKGROUND A variance is a way that cities may allow for an exception to part of an ordinance for a specific property. Minnesota State Statute and City Code provide specific review criteria the City must consider when reviewing a variance request, these criteria are included later in this report. If a variance is approved, it becomes a property right which runs with the land. DISCUSSION The applicant is requesting variances to build a 1,960 square foot accessory structure with corrugated steel siding, commonly known as a pole barn, for storage of materials, equipment, and vehicles. The accessory structure would be built north of the principal structure. To build this structure applicants are requesting a variance from two sections of Andover City Code: 1) Accessory Structure Construction Requirements established by City Code 12-6-4-C: Construction Requirements. According to this section of code, accessory structures located on any lot of less than 2.5 acres must be architecturally compatible with the principal structure, use, and neighborhood. City Code states that architectural compatibility shall be accomplished by integrating some or all of the following features of the principal structure into the accessory structure: • Roof pitch, soffits, gables, dormers • Placement of windows and doors • Exterior finish colors and textures • Decorative exterior finishes, siding, wainscot, and veneers • Decorative lighting • Landscaping A steel structure would incorporate the roof pitch, exterior colors, and landscaping from the principal structure. The exterior finishes (steel walls) would vary from the existing structure, which is made of reinforced concrete block. 2) Construction standards established by City Code 9-7-3-A: Materials of Construction. This section of code requires that all buildings in a non -residentially zoned district shall be built of masonry construction, its equivalent or better. Upon approval of the Andover Review Committee, wood frame construction may be considered equivalent to masonry. Walls of such buildings facing on streets must be finished with face brick, stone, glass, wood, or their aesthetic equivalent. Any building wall facing a residentially zoned district shall not be finished with exposed plain -faced poured concrete or concrete block. A steel structure would not meet the masonry or equivalent standard set in City Code 9-7-3-A. Review Criteria City Code 12-15-9 establishes review criteria for considering variance requests and states that variances shall only be permitted when they are in harmony with the general purposes and intent of the official control and when the variances are consistent with the comprehensive plan. Variances may be granted when the applicant for the variances establishes that there are practical difficulties in complying with the official control. "Practical difficulties" as used in connection with the granting of a variance, means: l . The property owner proposes to use the property in a reasonable manner not permitted by an official control. 2. The plight of the landowner is due to circumstances unique to their property not created by the landowner. 3. The variance, if granted, will not alter the essential character of the locality. 4. Economic considerations alone do not constitute practical difficulties. The City Council may also impose reasonable conditions on the granting of a variance request. A condition must be directly related to and must bear a rough proportionality to the impact created by the variance. As practical difficulties must be established by the applicants, a letter submitted by the applicants is attached for review as well as other materials submitted by the applicant in support of their request. Below are the applicant's responses to the Variance criteria from an email provided on January 31, 2025: 1. The property owner proposes to use the property in a reasonable manner not permitted by an official control. Not sure if this applies to our situation, the use of the property would not change. I would be happy to discuss any questions with City Council. 2. The plight of the landowner is due to circumstances unique to their property not created by the landowner. This is what we are addressing in our variance application. We are in a unique situation being along Round Lake Blvd where the visibility of the property requires additional requirements and cost to build a storage building. 3. The variance, if granted, will not alter the essential character of the locality. This is subjective, but 1 would be happy to discuss with the City Council. 4. Economic considerations alone do not constitute practical difficulties. Understood. ACTION REQUESTED The Planning & Zoning Commission is requested to hold a public hearing on the variance requests, compare the variance requests to the review criteria of City Code 12-15-9, and make a recommendation based on findings of fact to the City Council. Respectfull submitted, A an Bre Associate City Planner Attachments Draft Resolution of Approval Draft Resolution of Denial Applicant's Materials Photos of Principal Structure at 3149 162nd Ln NW (dated June 2024) CC: Nick Morter, MN Irrigation/Landscapes Unlimited — Applicant (Email) CITY OF ANDOVER COUNTY OF ANOKA STATE OF MINNESOTA RES. NO. XXXX A RESOLUTION APPROVING VARIANCES FOR THE PROPERTY LOCATED AT 3149 162ND LANE NW; PID# 16-32-24-23-0009 LEGALLY DESCRIBED AS FOLLOWS: LOT 1 BLOCK l HUGHS INDUSTRIAL PARK, SUBJ TO EASE OF REC WHEREAS, Landscapes Unlimited Outdoors, Inc. are the owners of a parcel of land located at 3149 162nd Lane NW, Andover, Minnesota with Parcel ID Number 16-32-24-23-0009; and, WHEREAS, Landscapes Unlimited Outdoors, Inc. have applied to the City for variances to the accessory structure construction and construction material requirements on the subject property; and, WHEREAS, the proposal would vary from City Code 12-6-4-C: Construction Requirements in that it would permit the construction of an accessory structure that is not architecturally compatible with the principal structure; and, WHEREAS, the proposal would vary from City Code 9-7-3-A: Materials of Construction in that it would permit the construction of a building not of masonry or equivalent construction; and, WHEREAS, the Andover Review Committee has reviewed the variance requests and did not recommend the proposed construction materials for use at this property; and, WHEREAS, pursuant to published and mailed notice thereof, the Planning and Zoning Commission held a public hearing on March 19, 2025; and, WHEREAS, the Planning and Zoning Commission recommends to the City Council approval of the variance request; and, WHEREAS, the City Council completed a review of the variance request along with the recommendation of the Planning and Zoning Commission; and, WHEREAS, the City Council agrees with the recommendation of the Planning and Zoning Commission and approves the variance request to permit the construction of an accessory structure that is not architecturally compatible with the principal structure and is not constructed of masonry or its equivalent; and, WHEREAS, based on the criteria for granting variances under City Code 12-15-9, the City Council finds the following findings of fact to support the approval of the variance requests: 1. 2. 3. 4. NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Andover hereby approves the variance request with the following conditions: 1. All necessary permits shall be obtained from any agency having an interest in improvements constructed on the property. 2. An approved Commercial Site Plan shall be required for all proposed improvements to the property. 3. Pursuant to City Code 12-15-9-E-6, if the City Council determines that no significant progress has been made within the first twelve (12) months after the approval of the variance, the variance will be null and void. Adopted by the City Council of the City of Andover this 1st day of April 2025. CITY OF ANDOVER CITY OF ANDOVER Michelle Hartner, City Clerk Jamie Barthel, Mayor CITY OF ANDOVER COUNTY OF ANOKA STATE OF MINNESOTA RES. NO. XXXX A RESOLUTION DENYING VARIANCES FOR THE PROPERTY LOCATED AT 3149 162ND LANE NW; PID# 16-32-24-23-0009 LEGALLY DESCRIBED AS FOLLOWS: LOT 1 BLOCK 1 HUGHS INDUSTRIAL PARK, SUBJ TO EASE OF REC WHEREAS, Landscapes Unlimited Outdoors, Inc. are the owners of a parcel of land located at 3149 162nd Lane NW, Andover, Minnesota with Parcel ID Number 16-32-24-23-0009; and, WHEREAS, Landscapes Unlimited Outdoors, Inc. have applied to the City for variances to the accessory structure construction and construction material requirements on the subject property; and, WHEREAS, the proposal would vary from City Code 12-6-4-C: Construction Requirements in that it would permit the construction of an accessory structure that is not architecturally compatible with the principal structure; and, WHEREAS, the proposal would vary from City Code 9-7-3-A: Materials of Construction in that it would permit the construction of a building not of masonry or equivalent construction; and, WHEREAS, the Andover Review Committee has reviewed the variance request and did not recommend the proposed construction materials for use at this property; and, WHEREAS, pursuant to published and mailed notice thereof, the Planning and Zoning Commission held a public hearing on March 19, 2025; and WHEREAS, the Planning and Zoning Commission recommends to the City Council denial of the variance request; and, WHEREAS, the City Council completed a review of the variance request along with the recommendation of the Planning and Zoning Commission; and, WHEREAS, the City Council agrees with the recommendation of the Planning and Zoning Commission and denies the variance request to permit the construction of an accessory structure that is not architecturally compatible with the principal structure; and, WHEREAS, based on the criteria for granting a variance under City Code 12-15-9, the City Council finds the following findings of fact to support the denial of the variance requests: 1. 2. 3. 4. NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Andover hereby denies the variance requests to permit the construction of an accessory structure that is not architecturally compatible with the principal structure and is not constructed of masonry or its equivalent. Adopted by the City Council of the City of Andover this 1st day of April 2025. CITY OF ANDOVER CITY OF ANDOVER Michelle Hartner, City Clerk Jamie Barthel, Mayor Nick Morter 3149 162ND LN NW Andover, MN 55304 nmorter@mnirrigation.com 612-505-3181 1-22-2025 Planning and Zoning Department City of Andover 1685 Crosstown Boulevard N.W. Andover, MN 55304 Subject: Request for Variance to Allow Steel Storage Building Dear Members of the Planning and Zoning Commission. 1 am writing to formally request a variance Born the City of Andover's zoning code to allow the construction of a steel storage building at 3149 162"d LN NW. This request pertains specifically to the requirement that structures be constructed using materials consistent with the City's aesthetic guidelines for structures visible from the county road. The proposed storage building would be made of steel, a material that, according to current zoning guidelines, is not permitted for visible structures from Round lake Blvd. However, we are committed to ensuring the building does not detract from the visual appeal or character of the surrounding neighborhood. To address this concern, we propose to screen the steel building from view with a row of evergreen trees along Round Lake Blvd. These trees will provide year-round coverage, ensuring that the building is screened from public view and blends in «•ith the area. The color of the storage building will match the existing office building on site. The steel storage building is needed to storage equipment, materials and vehicles inside and it will significantly improve the functionality and upkeep of our property. The design and location of the building have been carefully planned to minimize an,, potential negative impact on the neighborhood's aesthetic or the environment. The evergreen trees will not only offer a visual barrier but will also contribute to the overall greenery of the area. We understand the importance of maintaininl- the aesthetic integrity of the City of Andover and have taken all steps necessary to ensure that our proposal will meet the spirit of these guidelines while addressing our needs for storage space. The existing code requirements are prohibitive to a cost-effective storage building and we respectfully request that you grant this variance, allowing for the construction of the steel storage building as described, am happy to provide any additional information or attend a meeting to diSCUSS this request further. Thank you for your consideration of this %ariance request. I look forward to Your positive response. Sincerely, Nick Morter l Minnesota Irrigation C; < 0 k < 162Nr) t.A,,r \ORT14WFS I fOR-- A— MAY C—NO! SURVEY LEGEND 7 -7 rd t , SATHRE mm. B ERGOUIST CERTIFICATE OF SURVEY INC. ANDOVER, PREPARED FDR: MINNESOTA LANDSCAPE UNLIMITED 0 BISON STEEL BUILDINGS J08 RuveER. B94839 PROJECT w,►E- LANSCAPES UNLIMITED, INC. PROJECT Locnnom3149 162ND LN NW, PROJECT LocAnmANDOVER, MN 55304 PROJECT omwm- ANOKA PROFESSIONAL ENGINEER 1 hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Print Name: RICHARD T. SMITH 03/27/24 License # 41518 DRAWING INDEX MIR SHM 1 D1rDMD WFD COYMNEET: 2 ANCHOR DOLT FiAR: s ANCHOR DOLT RTALS ANCHOR DOLT WJ47 MS D ROD FRAME EIEVATCK0 D MMUL FRAMING & DREETM2 7.0 EIDRALL FRAMIO ! DRM'IMR 6.10 ROOT FRAMIO & MrW PLA* 11 DETAL ORAWDOc 14 17. K 15 A - 2XW4GD Qr ut z 1/4 ■ Faros (1 or 2) (2) Two Sida PS-26R 19 2B CA. PaR. KDXO BIIO�YI 1T { •-�• - I- 1t•-iI Ir arArt 31• IT-- 1•-2112• 1 1 + - RIGID FRAME ELEVATION: FRAME LINES 2 3 r>, z R 3 0 Z J i m EdA� J o Z N LU W Icn p Z ca COIifD m O o� z z T 2a f0 Z O f= Q W I W W Q rL' LL PROFESSIONAL ENGINEER i tweby certify that this plan, specification, I fall was prepared by me or under my dire supervision and that I am a duty Licensed Professional Engineer under the laws of the State of Minnesota. Print Name: RICHARD T. SMITH SIM re: 03/27/24 License # 41518 MM AM AiP= BY TIE KTAL 91 %M T[ ORAIMCS AND TIE WIX 1510 Wom T1LY WI ARE 111E RM OF WE METAL PUI DW SUFFICE PIEC61nIEn PIIO/LSSWAL ENi11EF7! IMSE . AND SNNIAWK APPEARS ON IHM mm IS ENPLDITD W TIE WIX wt=C 41ER NO DOES NOT SMW AS OR IMIf TE VII PRQEICT DIDSIEEn OF W Me SHALL NOT PE Ommum AS FRATABLE ME LINE 1 011) OUM PART LENGTH DETAL :n y b SI F A - D C 2 4 FL-15 3 2 FL-601B 9'-5- 7 3/4• TD38 TD85 ! t a' 4 1 FL-600L 5 5/B' TD12 5 1 FL-17 1'-j' ,eft' 6 1 FL-600R S 5/8• 112 12 ER-T C Bt,2 T2 7 2 FL-55 12'-2• TD51 E a 2 FL-48 1Y-2• TD51 9 1 FL-55 12•-7• TD52 16 1 FL-52 12'-4• TD52 I I 12 1 FL-52 3r 8' TTDD52 I \ I V) a " \ Z 3 co DO � MM •jl \� In pl-2 J FRRAMEEMMEE L TABLEER I m o \ MAN MARK 1 EC-1 PART 8TtW5 LENGTH ui % 3 I Z 12-715AjI6• vi I \ 1 EC -2 8E?<iC14 F- $p 13 -6 7/16' V] F- @L I 1 EC-3 1 EC-4 BtW4 BR25C16 , , 13-6 7/16' o 'A W 12'-7 15 r Z o W m o N I 2 W 1 - N 7 1/2' 1n m z &6 48 S---------- FC-1 — — — — — — — — --- ---- 6C-2 EC--3 --- 3'-4• — EC-4 1 DH-1 G-1 8E25C16 11'-t1 1/2' F.LF.O. 4 aX25Z16 10'-1 15 6• Z ENDWALL FRAMING: FRAME LINE i NO% FS.F.O.. FiE1D IOGIm FRAME OPE1�16 1 CB-1 1 CB-2 CB0250 C00250 16'-9 3. is'-6 1 Y u� Q CONVECTION PLATES W FRAME LINE 1 .41 O 1 OUAN a m Q d1' T T T '•� e CL 100 3 33 CL-5 Z n-ANGE BRACE TABLE FRAME LINE 1 OUAN NARK I I I I 1 hereby certify that this plan, specification, or I I report was prepared by me or under my direct I I = supervision and that 1 am a duly Licensed o Professional Engineer under the laws of the State of Minnesota. Print Name: RICHARD T. SMITH I I I I I I 03/27/24 License # _41518 Daj I I I I I I WAL PMAW OWY TO THE NATIONALS — — — — — — — — — — — AM $iPMED BY TIE METAL BUEDIN6 SUPPU . TIE DRAB AMID THE METAL 1 BURDNP IBBCN TIET RFPRESIR ARE THE PRODUCT a TIE METAL BtRDNO SUPPLER. THE REWSWED PROnnMI NAL DO N ER WOOS t ENDWALL SHEETING & TRIM: FRAME LINE 1 SEAL AND SIG MATURE APPEARS ON THESE PAIFLS: 2E CA f9R - LIMIT STORE tEiAN*QS R oFIOTm BY THE METAL WU NG SiMM AND DOES NOT SERK AS OR REPRESENT THE OXIRA1L PROJECT ENONEEA OP RECORD AND SNML NOT K CONSTRUED AS BOLT TABLE FRAME LINE 1 LOCATION QUAN TYPE OIA LENCIH ER-1/ER-2 4 A325 5/8' 1 1/2' COLt�MS 2 A325 5 6' 1 1 2' Q,' gtO) I I TI FR-4 \/IV I L / L ElAt tv I 3 — — — — — — — — — — — — — — — — — — — — — — — — E w-+ ENDWALL FRAMING: FRAME LINE 4 1'- �,. Q Q 4 4 S ,� ,2 IB►E LINE R1Ah 4 4 2 BOLT TABLE FRAME LIE 4 LOCATION I OUAN I T1PE DIA LENGIH 4 A3Z5 5/� 11/Y COLUWR-4 tAu►V15 2 A7?5 S 11 2' 1 4 MARK 0 Z F- w LJ V) _Z a L� J J - - -FT w 1 P20FMIONAL ENGINEER I I 1 1 hereby certify that this plan, spec -Won, c report was prepared by me or under my direr supervision and that I am a duly Licensed o q o Professional Engineer under the laws of the q State of Minnesota. Print Name: RICHARD T. SMITH_ St re: _ _L127124 License # 415t8 I I IM SEAL PERTANS MY TO THE MAIDUA S DESRRIED AND SUPPUW eY 4E IETAL 9IADOD SUPPER. TW oRA11006 AM THE METAL 1 BURDW MUM TEY REPRESENT ARE THE DUCT PROOF THE FETAL SU MO 9.MX . Rg REMS'O R PROFETSIOMAL OMMA ER OWSE ENDWALL SHEETING & TRIM: FRAME LINE 4 SEX AM 9WATLW APPEARS ON TMESE DRAMMPS 6 EiPLO= BY Rg WML BULOPD PANUS' X GA PBR - LWT SWSUPPLIERID ES R ADONOT SERVE AS OR REPRESENT THE D\ERALL PRO EDT ENCREIIL OF RECORD AND WALL ROT BE CON57PoAA AS SLOL r t i 5 \ j \♦ / EA-1 1 Rn-2 \ / M-2 _ ER-4 /X\ - \ / i ♦ / - - W-2 Rn-2 ♦ X / - ♦\ WI-2 ER-3 - / _ _ _ ROOF FRAMING PLAN r-1 L(T TABLE PINT 2 J V o' b 1 I 19) 5 A 1^ 3 ROOF SHEETING PAWM 29 CA POR KOKO MM V) Qi O � O z J „T M Q m l mn8Z J c z a Q LIJJ - 3 I W J F- K VI W V) O Z°iwWm Z O w Z W W n 3 a _ V) � O Z O 00 Q M L� L� O O PROFESSIONAL ENGINEER 1 hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Pdnt Name: RICHARD T. SMITH Signature: D.112_L127124_j License # 41518 THIS SEAT. PERTAINS ONLY TO THE WTETRAL4 CESRNED AM SWMED WY THE METAL BUKDRA SLPPLI13L THE DRAMRICS AND THE METAL MAANG WEN THEY RANT ARE THE PRODUCT OF THE METAL &1LDINC SUPPLER. THE RFG STETTED PRORSSIDNAL EMMMETA WIOSE SEAL AND SIONARSE APPEARS 01 THESE DRAW" 15 EMPLOYED BY THE METAL RTADNC SUPPU R AND DOES NOT SERVE AS OR RET+RESEIT THE OVERALL PRGECT QICMV OF IrECOrO AND SHALL NOT BE CONSTRUED AS Photos of principal structure at 3149 162nd Ln NW Photos dated June 2024 1685 CROSSTOWN BOULEVARD N.W. 9 ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN GOV TO: Planning & Zoning Commission CC: Joe Janish, Community Development Director-77 FROM: Aidan Breen, Associate City Planner SUBJECT: Public Hearinv Consider Interim Use Permit (IUP) Request — Mining & Land Reclamation — 16xxx Tulip St NW; PID# 08-32-24-34-0001 — Derrick Whiting (Applicant). DATE: March 19, 2025 INTRODUCTION The applicants are looking to grade the unaddressed property at 16xxx Tulip St NW for two building pads in order to split the lot into two (2) parcels. As the applicant proposes to move more than 400 cubic yards of fill, they are required to submit an Interim Use Permit application for land reclamation/mining. DISCUSSION: The applicant is proposing to split their 40-acre parcel into two 20-acre parcels. As both resultant lots are over 5 acres, the lot split will be reviewed and approved administratively. A lot split applica requires the applicant to prove that the new lots each meet buildability criteria for residential homes. To do so, the applicant will grade the property to create two (2) building pads for future construction. Since the land reclamation utilizing more than 400 cubic yards, an IUP is required pursuant to City Code 12-13-1 and 12-15-8. A copy of the grading plan for is included for your review. Staff have reviewed the grading plan and have no outstanding comments. The applicant expects that the grading work will take place over the span of a few weeks to a month and has requested a duration of one (1) year for the IUP. Staff are proposing a two (2) year permit with a completion date of April 1, 2027 to account for any unexpected delays. 5-years is the longest amount of time an IUP can be granted under City Code 12-14-12-E. If at that time, the applicant has not completed the work identified with the grading plan the applicant will need to obtain the IUP again. Flood Plain Impacts As part of this driveway project, the applicant is proposing to fill 675.32 cubic yards of the flood plain. For every amount of wetland that is filled, the applicant is required to "create floodplain" at a 1 to 1 ratio. The applicant is proposing to construct a pond next to each building pad and to create additional floodplain from excavating the fill material at the northwest portion of the property. These proposed changes will provide more flood plain mitigation than is required, providing 2,039.85 cubic yards of flood storage. The applicant will be required to apply for a Letter of Map Revision (LOMR) from FEMA that approves the new floodplain boundaries. This LOMR will be required before building permits can be issued for the new parcels. Wetland Impacts The grading work on the property will not disturb any delineated wetlands. The Lower Rum River Watershed Management Organization has conditionally approved the grading plan and confirmed there will be no wetland impacts. Type of Fill Permitted The applicant will be utilizing fill appropriate for building pads that will be taken from the northwest corner and proposed ponds on the site. No off -site fill will be used. Haul Route The applicant has proposed two possible haul routes to be used on the site, and they will use whichever is most feasible at the time of construction. All material hauling will take place on site; no off -site fill material will be needed. Grading equipment will be stored on site during grading work, only entering or leaving the site at the beginning or end of the day if necessary. The applicant will be required to utilize a rock construction entrance. The applicant's proposed hours of operation are 7:30am to 8:OOpm Monday through Friday and 8:30am through 5:OOpm Saturday through Sunday "not to be everyday necessarily, but when work is required to be completed." Erosion Control Silt fencing will be required around the area until vegetation has occurred to control any erosion. Any fill stockpiles will be maintained with a 3:1 slope ratio. The applicant will be required to ensure proper vegetation across disturbed areas within 7 days of inactivity. Coordination with other Agencies The applicant is responsible to obtain all appropriate and necessary permits (such as but not limited to the Coon Creek Watershed District, etc.) The applicant has already been working with the City Engineering Department and Lower Rum River Watershed Management Organization, who have conditionally approved their permit. Interim Use Permit Standards The Planning and Zoning Commission shall recommend an interim use permit and the Council shall issue such interim use permit only if it finds that such use at the proposed location: Will not create an excess burden on parks, streets, and other public facilities; The proposed project will not create an excess burden on parks or other public facilities. No additional traffic is expected during grading, as all the fill will be excavated and used on -site. Will not be injurious to the surrounding neighborhood or otherwise harm the public health, safety, and general welfare; The applicant shall establish vegetation and ensure proper erosion control to the satisfaction of the City Engineer. The applicant is required to observe all noise and nuisance regulations during their operation hours of 7: OOam to 8:00pm Monday through Friday and 8: 30am to 5: OOpm Saturday through Sunday. Will not have a negative effect on the values of property and scenic views; The property is zoned rural residential (R-1), and development has been expected for this property at some point in the future. The grading work is planned to occur over several weeks to a month in Spring 2025 and will support the construction of two homes on 20-acre parcels. These two new lots would meet all zoning criteria, and development has been expected at this site. Will not impose additional unreasonable costs on the public; The applicant is required to obtain all necessary permits. Any material that falls outside of the property line or right-of-way is the responsibility of the applicant to remove. If the driveway is not complete prior to the expiration date of the IUP, the applicant will need to seek a new IUP to complete their driveway at their own cost. Any fill material on the roadway is the applicant's responsibility to clean. Will be subjected to, by agreement with the owner, any conditions that the City Council has deemed appropriate for the permission of the use, including a condition that the owner may be required to provide appropriate financial surety to cover the cost of removing the interim use and any interim structures upon the expiration of the interim use period. ACTION REQUESTED The Planning and Zoning Commission is asked to hold a public hearing and make a recommendation to the City Council regarding the interim use permit request. Respectfully submitte Afdan Breen Associate City Planner Attachments: Draft Resolution of Approval Draft Resolution of Denial Site Location Map Staff Comments for Review #2, dated February 24, 2025 Proposed Haul Routes A & B Proposed Grading Plan CC: Derrick Whiting - email CITY OF ANDOVER COUNTY OF ANOKA STATE OF MINNESOTA RES. NO. R A RESOLUTION GRANTING AN INTERIM USE PERMIT FOR MINING AND LAND RECLAMATION AT PID 13-32-24-11-0004, LEGALLY DESCRIBED AS: The Southeast Quarter of the Southwest Quarter of Section 8, Township 32, Range 24, and all that part of the South Half of the Southeast Quarter of said Section 8, Township 32, Range 24 aforesaid, described as follows, to -wit. Commencing at the intersection of the section line between Sections 8 and 17 in the center of the highway leading to N. Small's and thence running Northwest in the center of said highway about 80 rods to the quarter section line of said Section 8; thence South on said quarter section line to Section 17; thence East on said section line between said Section 8 and 17 about 6 rods to the place of beginning. Except those parcels conveyed to the City of Andover in Quit Claim Deed dated 8/17/2006, filed 9/8/2006, as Document No. 1987378.004. WHEREAS, the applicant requested an interim use permit for the mining and land reclamation to construct two building pads; and, WHEREAS, the Planning and Zoning Commission held a public hearing on March 19, 2025; and, WHEREAS, the Planning and Zoning Commission finds the request would not have a detrimental effect upon the health, safety, and general welfare of the City of Andover; and WHEREAS, the Planning and Zoning Commission recommends to the City Council approval of the interim use permit. NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Andover hereby approves the interim use permit to allow for the mining and land reclamation to construct a driveway and pond on the property with the following conditions: 1. Applicant shall obtain all appropriate permits needed for the project prior to the start of work. 2. Soil shall not be placed within wetland, floodplain or right-of-way areas without first obtaining any required approvals and completing any required mitigation. 3. Silt fencing and any other erosion control measures as deemed necessary by the City Engineer shall be installed and maintained. 4. All material shall be utilized in compliance with the City requirements. 5. Applicant shall meet comments from Engineers Memo dated February 24, 2025. 6. Hours of operation shall be restricted to the normal construction hours as regulated by City Code 5-6-3. 7. The applicant shall be responsible for the cleaning of material (soil, sand, etc.) from the public roadways as needed (may be required multiple times a day), with a minimum of daily cleaning. 8. All appropriate permits shall be obtained, including but not limited to obtaining an approved grading plan from the City Engineering Department. 9. Any future mining or land reclamation with fill in excess of 400 cubic yards shall require a new IUP. 10. Applicant shall protect possible septic locations and not disturb them. 11. Permit shall expire on April 1, 2027. Adopted by the City Council of the City of Andover on this I" Day of April 2025. .&we]W:1►L1Z01LT1�1.3 ATTEST: Michelle Hartner, City Clerk Jamie Barthel, Mayor CITY OF ANDOVER COUNTY OF ANOKA STATE OF MINNESOTA RES. NO. R A RESOLUTION DENYING AN INTERIM USE PERMIT FOR MINING AND LAND RECLAMATION AT PID 13-32-24-11-0004, LEGALLY DESCRIBED AS: The Southeast Quarter of the Southwest Quarter of Section 8, Township 32, Range 24, and all that part of the South Half of the Southeast Quarter of said Section 8, Township 32, Range 24 aforesaid, described as follows, to -wit. Commencing at the intersection of the section line between Sections 8 and 17 in the center of the highway leading to N. Small's and thence running Northwest in the center of said highway about 80 rods to the quarter section line of said Section 8; thence South on said quarter section line to Section 17; thence East on said section line between said Section 8 and 17 about 6 rods to the place of beginning. Except those parcels conveyed to the City of Andover in Quit Claim Deed dated 8/17/2006, filed 9/8/2006, as Document No. 1987378.004. WHEREAS, the applicant requested an interim use permit for the mining and land reclamation to construct two building pads; and, WHEREAS, the Planning and Zoning Commission held a public hearing on March 19, 2025; and, WHEREAS, the Planning and Zoning Commission recommends to the City Council denial of the interim use permit. NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Andover hereby denies the interim use permit to allow for the mining and land reclamation to construct a driveway and pond on the property with the following conditions: NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Andover hereby agrees with the Planning and Zoning Commission and denies the interim use permit to allow for the construction of a driveway and pond on property for the following reasons: 1. 2. 3. Adopted by the City Council of the City of Andover on this 1" day of April 2025. CITY OF ANDOVER ATTEST: Michelle Harter, City Clerk Jamie Barthel, Mayor gal AM I wAt S P'll LEO 1685 CROSSTOWN BOULEVARD N W. 9 ANDOVER, MINNESOTA 553C4 . (783) 7 55-5100 FAX (763) 755-8923 • WjVjV ANDOVERNN GOV MEMORI DL M TO: Derrick Aliting FR0:11: -aidan Breen, Associate Planner DATE: Februan- 24, 2025 REFERENCE: Rei-iew 92 — Land Reclamation nT: ILA' for the property at 16%-mx Tulip St (PID: OS-32-24-34-0001) The following comments are regarding Revie«v #2 of the Interim Use Permit (IL-P) application: Engineering Department Comments 1. (ReVie-w =1) \eed to .Maui the nece ssw, permit-. from the LRR`,t \ 10, MPCA (NPDES Permit) and am• other aaenc•,- interested in the site. Vetland delineations were previoush- approved b%• the LRR`,V 10 with pernut =2022-20. Convnent acimossiedg ed and kept for tracking ptrposes. Pro►ide copies of pernt is to City prior to static.- grading. 2. (Re-.-ie�x =1) Pncr to issuance of a building permit for the structures a LO�L-k will need to be approved by FE-'\La reflecting the floodplaun boundar: changes with this prcject Comment aclanossiedged and kept. for trading purposes I would reconut:end subnutring a CIO-IL4 (conditional lever of rtW amendnienu) to FEIL4 as soon as possible based upon the proposed gradi)W. To finalize a LO-IN diet- m21 require a final grading as -built, but doing a CLO.1L4 mat get tour processed stated sooner as FE.1L4 has a leng-tkt• response time_ 3. -U Sheet: Remove ' •Prelinuinan� � from the plan sheet simiature block Note: It is a requirement that the applicant respond to each of these items in writing when re- submitting the revised IUP submittal to the City. If you have any questions; feel free to contact Jason Law, .Assistant City Engineer at (763) ,67 130 or David Berkowitz, Director of Public Works Cit<• Engineer at (763) ,67-:133. Planning Department Comments 1. No further comments. Note: It is a requirement that the applicant respond to each of these items in writing when re submitting the revised ILP submittal to the City. If you ha:e any questions; feel free to contact -Aidan Breen, .associate Planner at : 6.) 6 . --1 42.1 Proposed Haul Routes �ctE v FlUkKA I GREEN = HAUL ROUTE A PURPLE = HAUL ROUTE B �'n s �WEa�iM-n�i''� . .w. .F.• NFF ...I e 1 1 V 11 1 1 1 �1 �Pj`�C � .n.. Hn• .•M• M• • .rH r .r• .M. .rH .r. .aiH .nt• � sI19 1, 1� Y� .r• 1 I 1 M ( I ,nAM AAP u+R.'n ax-+tl lrHn—•f I7IE SKET).Rt.�(PCHrpYF.MO OR•ARIRIHf) x .s. 1 r�. PARCEL 8 M. BS6 • BSA Know what's below. Call before you dig. 1 I M�P)L 1 •.wMHI � 4 1 ( 1 1 •'}� 1 R-1 BUILDING SETBACKS: FRONT = 40 FEET SIDE = 10 FEET REAR = 50 FEET SITE SEQUENCING • MICA TO ANY GRADING OPERATIONS, THE CONTRACTOR SHALL INSTAL ROCK CONSTRUCTION ENTRANCE (LOCATIONS TO BE DETERMINED COORDINATE WITH OWNER) AND PERIMETER SILT FENCE AS SHOWN ON PLAN. (CONTACT CITY TO INSPECT EROSION CONTROL MEASURES MIOR TO GRADING OPERATIONS. IF NECESSARY I ADDITIONAL SILT FENCE MAY BE NECESSARY IF LOCAL CONDSTICNS REQUIRE. • THE CONTRACTOR. SHALL PROVIDE ALL SCD, SEED. MULCH AND FERTILIZER WHICH SMALL CONFORM WITH THE FOU.0 W:NG MNDOT SPECIFICATIONS AS MODIFIED BELOW. ITEM MNDOT SPECIFICATIOIUNOTES SOD _ 3178 -.._. SEED •• 3076 • FOR TJRF ESTA9LJSHMENT - -- CON MERCI4 TURF MNOOT MIX 25•131 (220 LNSVACRE) RESIDENTIAL TURF MND'UT MIX 2S-111 (120 LSWAC*E) MNDOT MIT1-1 212 (COD UNWACRE) TEMPORARY FALL COVER SIRIWSUMMER MN DOT MIi 21-111 (TOLD LWWACRE) SOIL BUILDING COVER MILADY MIX 21.113 (110 UWACI E) 1 2 YEARS COVER MNOT MIA Z2-111 (30.5 UWACRE) 2-5 YEARS COVER MNOOT MIX 22-1 L2 (N LBSIACRE) MULCH 3882 (TER 1 - DISC ANCHOM) VERMEER 1665 (CATEGARY Z) WOOD FIBER BLANKET • NOW A MINIMUM OF ONCE PER 2 WEEKS • • SEEDED AREAS SHALL BE EITHER MULCHED OR COVERED BY FIBROUS BLANKETS TO PRCTECr SEEDS AND LIMIT EROSION. • ALL EXPOSED SOILS MUST HAVE TEMPORARY EROSION CONTROL PROTECTION DR PERMANENT COVER WITHIN SEVEN (7) OIAVS • THECONTRACTOR SHALL PAY SPECIAL ATTENTION TO ALL ADJACENT PROPERTY LINES AND MARE SURE THE EROSION CONTROL PRACTICES NPLACE IN THOSE AREAS PREVENT MIGRATION OF SEDNENT ONTO ADJACENT PROPERTIES. • THE CONTRACTOR SMALL K04VTAIN SILT FENCE INCLJD:NG THE REMOVAL OF ACCUMULATED SEDOIENT, THROUGH COMPLETION OF BUILDING CONSTRUCTION. SILT FENCE TO BE REMOVED ONLY AFTER COMPLETION OF BUILDING CONSTRUCTION AND UPON ESTABLISHMENT OF VEGETATION. • THE CONTRACTOR SHALL PROVIDE WOOD FIBER BLANKET FOR ALL AREAS OF CONCENTRATED FLAW AND FOR ALL SLOPES 3:1 OR GREATER ADDITIONAL GRADING NOt'S • PROTECT ALL STORM WATER MANAGEMENT FACILITIES FROM CONSTRUCTION RUN-OFF C'DMTRACTOR TO INSTALL AND CONSTRUCT SAID I CONTRACTOR SHALL REMOVE ALL EROSION CONTROL MEASURES DOKE RITE IS FACILITIES ONCE SITE HASBEEN STABILIZED. PERMANENTLY STABILIZED • -F AAV SLOPES APPEAR TO BE rAILNG. THE CONTRACTOR SHALL 'ROMX ADDITIONAL SILT FENCE, BIOROLLS AND EROSION RA 2 CON TCTOR SHALL REMOVE INLET PROTECTION DEVICES IN TULIP STREET PRIORI TO CON ROL BIANA=T AS NEEDED WINTER FREEZE WINTER FREEZE AND A ING1 W SMOG B SITE STAPIIIATON D NOT AORV'FD, 011 AT E THE CITY ENGINEER. • THE CONTRACTOR SMALL FINAL GRADE SW ALE AREAS (UPON STABILIZATION OF UPSTREAM AREAS. • THE CONTRACTOR SHALL SOC ALL DISTURBED DRAINAGE AREAS, INCLUDING SWALES B OVERFLOWS. / • UPON GRADING CDMIPLMON THE CONTRACTOR SHALL PROVIDE NATIVE TOPSOL WITH SOO OR SEED. AND MULCH ANCHORED WITH A STRAIGHT SET DISC WITHIN 46 HOURS OF FINAL GILDING. / • EXCESS SOIL SWIAD RE TREATED LIKE OTHER EXPOSED SOIL AND STABILIZED WITHIN 72 MIRES. NO 501E STOCKPILES ARE TO NAVE / SILT FENCE PLACED ON DOWNSTREAM SIDES. / O IF A STREET. ALLEY. SIDEWALK OR OTHER PJBLC PLACE SHOULD BECOME SOILED OR LITTERED, THE CONTRACTOR SHALL CAUSE SUCH SOILING OR UTTERING TO FM CLEANED LIP BY SWEEPING NOT LATER THAN THE END OF THE WORKING DAY IN WHICH SUCH SOILING OR / LITTERING SMALL HAVE OCCWRIO OR RFFN ORSERVED ADDITIOIML LRRWMO NOTES. 1. EROSION CONTROL MEASURES MUST BE INSTALLED AT THE 1 INITIAL STAGE OF SITE GRADING OPERATIONS. 2. UPON CCMPLETION OF CONSTRUCTION AND RESTORATION OF DISTURBED AREAS, THE PERMIT APPLICANT IS RESPONSIBLE FOR THE REMOVAL OF ALL EROSION CONTROL MEASURES INSTALLED THROUGHOUT THE CONSTRUCTION SITE 3. TO MINIMIZE THE POTENTIAL OF MATERIAL FROM LEAVING THE I SITE AND BEING TRACKED ONTO THE ROADWAY. THE ROCK I FILTER CONSTRUCTION ENTRANCE BEING A MINENUM OF TWO FEET IN HEIGHT AND HAVING SIDE SLOPES OF 4.1 MUST BE I CONSTRUCTED AT THE ENTRYWAY ONTO THE SITE THE ROCK CONSTRUCTION ENTRANCE WILL PROVIDE AN EROSION CONTROL FACILITY AND ENABLE CONSTRUCTION TRAFFIC TO • ENTER THE SITE =S •a ' 1 •--' 4 STREET SWEEPING MUST BE UND_RTAKEN AND COMPLETED ON •HUT : ; I AN AS NEEDED BASS •"' 4 1 5 COMPLIANCE KITH THE STORM WATER MANAGEMENT _ .H+ �' •n'• 1 m I REQUIREMENTS OF THE LOWER RUM RIVER WATERSHED •�' M 1 MANAGEMENT ORGANIZATIOV IS TO BE ADMINISTERED FOR THIS PROJECT BY THE CITY OF ANDOVER. • 'F I 1 6 THE STORM WATER MANAGEMENT PLAN HAS ASSUMED AN IMPERVIOUSNESS OF 4% FOR THE 11.9-ACRE DEVELOPMENT M • 1 HWA �I m M AREA SITE DEVELOPMENT THAT EXCEEDS AN IMPERVIOUS T•� AREA OF 4% MUST PROVIDE AN UPDATED STORM WATER rH l + I MANAGEMENT PLAN SHOWING THE LRRWMO CRITERIA IS MET. Mi4 N 1 T IN ALL CASES WHERE THE DOING BY THE PERMITTEE OF • ANYTHING AUTHORIZED BY THIS PERMIT SHALL INVOLVE THE r+ I H I TAKING. USING, OR DAMAGING OF ANY PROPERTY. RIGHTS OR Hw, now iT INTERESTS OF ANY OTHER PERSON OR PERSONS, OR OF ANY r PUBLICLY OWNED LANDS OR IMPROVEMENTS OR INTERESTS. •r• I 1 THE PERMITTEE: BEFORE PROCEEDING: SHALL OBTAIN THE - WRITTEN CONSENT OF ALL PERSONS, AGENCIES. OR AUTHORITIES CONCERNED. AND SHALL ACQUIRE ALL •r• 'RAIL 1 I • i NECESSARY PROPERTY RIGHTS AND INTEREST t '7 / 1 OTHER POLLUTION CONTROL MEASURES :ONSIR:i TIONWASTEMATERIAL5 ALL WASTE MATERI454ENERA TED AS A RESULT O SITE CONSTRUCTION SHALL 6E COLLECTED AND REMOVED ACCORDING TO ALL LOCAL AND/OR STATE WASTE MANAGEMENT REGULATIONS BY A LICENSED SOLID WASTE MANAGEMENT COMPANY. THE CONTIU TOR WILL ENSURE THAT ALL SITE PERSONNEL ARE INSTRUCTED IN THESE PRACTICES. HAZARDOUS WASTES - ALL HAZARDOUS WASTE MATERIALS SHALL BE STORED PROPERLY TO PREVENT SPILLS AND VANDALISM. WHEN NECESSARY, HAZARDOUS WASTES WILL BE DISPOSED OF IN THE MANNER SPECIFIED BY LOCAL ANWOR STATE REGULATION OR BY THE MANUFACTURER, SANITARY WASTE -ALL SANITARY WASTE WILL BE COLLECTED FROM THE PORTABLE UNITS BY A LOCAL LICENSED WATER MANAGEMENT COMPANY, AS REQUIRED BY LOCAL REGULATION. OFFSITE VEHICLE 1RACK:NG - A ROC< CONSTRUCTION ENTRANCE HAS BEEN PROVIDED TO HELP REDUCE VEHICLE TRACKING OF SED:M_NTS. IF A STREET, ALLEY, SICEWAL< DR OTHER PUBI IC PLA3 SHOULD BECOME SOILED OR LITTERED, THE CONTRACTOR SHALL CAUSE SUCH SOILING OR LITTERING TO BE CLEAVED UP BY SWEEP:MG NOT LATER THAN THE END OF THE WORKING DAY A WHICH SUCH SOILNG OR LITTERING SHALL HAVE OCCURRED OR BEEN OBSERVED. DIAIP TRUCKS MAULING LOOSE MATERIALS (SAND. TOPSOIL. ETC_ i 'O AND/OR FROM THE SITE SMALL BE COVERED WITH A TARPAULIN. VEHICLE CLEANING - NO ENGINE DCGREASING IS ALLOWED ON -SLIT. EXTERNAL WASHING OF VEHICLES TO BE CONFINED TO A DEFINED AREA (*BONE YARD*) ON SITE CONTRACTOR TO PROVIDE DESIGNATED TRUCK WASHOUT AREA WITH APPROPRIATE SIGNAGE. WASHOUT AREA IS TO BE A MINIMUM OF i0FROM DITCHES, "IS, OROTHER STORNWATER FEATURES. ALL LIQUID AND SOUD WASTE GENERATED BY W ASHOIIT OPERATIONS MUST BE CONTAINED IN A LEAK -PROOF CONTAINMENT FACILITY OR IMPERMEABLE LINER ( E.G. COMPACTED CLAY LIVER, IMPERMEABLE GEO-MEMBRANEI AND DISPOSED OF PROPERLY. SPILL MEVENTION AND CONTROL - ALL VEHICLES WILL BE CHECKED FOR LIKING OIL AND FLUIDS. VEHICLES LEAKING FLUIDS WILL NOT RE ALLOWED ON -SITE SPILL +ITS WILL 6E STORED ON -SITE AND ALL SPILLS WILL BE CLEANED LOP IMMEDIATELY DISCOVERY SPENT ABSORBENT MATERIALS AND RAGS WILL BE MANED Off -SIT: IMMEDIATELY AFTER THE SPILL IS CLEANED UP AND PROPERTY DISPOSED OF. SPILL PREVENTION AND CONTROL MEASURES SHALL BE IMPLEMENTED ONCE CONSTRUCTION BEGINS SOIL STOCKPILES INSTALL SILT FENCE OR OTHER EFFECTIVE SED:ME'lt CONTROLS AROUND ALL TEMPORARY SOIL STOCKPILES. LOCATE SOIL OR DIRT STOCKPILES SUCH THAT DOWNSLDR DRAINAGE LENGTH IS ND LESS THAN 6 M ITS FEET) FROM THE TOE OF THE PILE TO A SURFACE WATER, RIMMING STORMWATER CONVEYANCES SUCH AS CURB AND GUTTER SYSTEMS, OR CONDUITS MD DITCHES UNLESS THERE IS A BYPASS IN PLACE FOR T-E STORMWATER. IF REMAINING FOR MORE THAN 7 DAYS, STABLRE THE STOCKPILES BY MIACHING. VEGETATIVE COVER, TARPS, OR OTHER MEANS WRING STREET REPAIR. COVER CONSTRUCTION SOIL OR DIRT STOCKPILES LOCATED CLOSER THAN 6 M (25 FEET) TO ROADWAY OR DRAINAGE CHANNEL WITH TARPS, AND PROTECT STORM SEWER INLETS WITH SILT SOCKS OR STAKED SILT FENCE. PROVIDE WIMCO (OR APPROVED EQLWL) FOR INLET PROTECTION A- ALL DDSTING STORM SEWER INLETS THAT WILL RECEIVE RUN-OFF DURING CONSTRUCTION. INLET PROTECTION TO REMAIN IN -PLACE UNTIL AT LEAST 705V O SITE VEGETATION HAS BEEN ESTABLISHED. CONTRACTOR TO PROVIDE DESIGNATED CONCRETE TRICK WASHOUT AREA WITH APPROPRIATE SIGMAGE. KEEP WASHOUT AREAS AS FAR AS PRACTICAL MOM STORM DRAINS, DITCHES AND PONDS DO NOT ALLOW RUN-OFF FROM THIS AREA OV CONSTRUCTING A TEMPORART PIT Oft BEAMED AREA LARGE ENOUGH FOR UQUID AND SOLID WASTE. AFTER WASTE CONCRETE IS SET, BREAK UP AND DISPOSE OF PROPERLY. THE CONTRACTOR MUST DISCHARGE TURBID OR SEDIMENT -LADEN WATERS RELATED TO DEWATERING [E.G_ PLUMPED DISCHARGES. TRENC /O(TCH CUTS FOR ORA:FAGE) TO A TEMPORARY OR PERMANENT SEDIMENTATION BASIN ON THE PROTECT SITE UNLESS INFEASIBLE. THE CONTRACTOR MAY CISCNAROE FROM THE TEMPORARY 07 PERMANENT SEDIMENTATION BASINS TO SURFACE WATERS IF THE OSIN WATER HAS BEEN VISUALLY CHECKED TO ENSURE ADEQUATE TREATMENT HAS BEEN OBTAINED IN THE BASIN AND THAT PRAISANCE CONDITIONS (SEE MINN. R. 70S0.0210. SUlP. 2) WILL NOT RESULT MOM THE DISCHARGE. IF THE WATER CANNOT BE OfIOMANIED TO A SEDIMENTATION BASIN PRIOR TO ENTERING THE SURFACE WATER, IT MCAT BE TREATED WITH THE APPROPRIATE BMPS, SUCH THAT THE DISCHARGE DOES 40T ADVERSELY AFFECT THE RECEIVING WATER 09 DOWNSTREAM PROPERTIES. DRAWNSY DESONBY. M.QA. OMA CHCIm BY PRO, NO ORIGIIML DATE SEPTEMBER 3 2024 O a COIL N O K PREPARED FOR )ERRICK WHITING 110 S Tr PI 4V,N NG GH� PLOWS ENGINEERING, INC. GIHG LAKZ DR`:c SUITE 116 LINO LANES. INN 55014 PHONE (651)3614210 O�B•iOKB ■BIB I D 49 Rn GRADING, DRAINAGE, AND EROSION CONTROL PLAN CINI WHITING-YELTON RESIDENTIAL LOT SPLIT acts, 1-1 MIMING UTUO s: FRONT = 40 FEET SIDE = 10 FEET REAR = 50 FEET DRAWN By DUGN BY: r1 MvOeA, AMA ORCANAL DATE' SEPTEMBER 3.2024 I s i Z E ;2g2 s ��m a y N gf�JEas� Q PUBLICLY OWNED LANDS OR IMPROVEMENTS OR INTERESTS. THE PERMITTEE. BEFORE PROCEEDING. SHALL OBTAIN THE . "" • ^, \ . W . WRIT EN CONSENT OF ALL PERSONS, AGENCIES. OR a ( AUTHORITIES CONCERNED. AAD SHALL ACQUIRE ALL PROP. / ,( I NECESSARY PROPERTY RIGHTS AND INTEREST. Z F WELL Y \� /s 1I I Q yoyO 4 r. W ZZ, 1 Er O z i I" DATA PROYIOEO top a 0 Z V KXlUW1G W i an (SEE DETAIL ONE BAFFLE C3) WEIR/ •—• W / I W g _ INSTALL SEED WITH Y/ O STABILIZATION BLANKET (CURLEX I OR APPROVED EQUAL) i 4D W/ 6 C.Y. OF CL 11 RIM" W/ / ^ . FABRIC • / ...r I ` PREPARED FOR F 1 DERRICK WHITING PROPOSED LOW FLOOR ELEVATION SHOULD BE 2.0 �, FEET AT A MINIMUM ABOVE THE ADJACENT CITY ` POND HWL, FLOODPLAIN, AND BMP HWL. I' i 1+ SITE I nEE--� r ENGINE— Qn, PLOWSsf"ai I a , I 1 I SEPTIC SYSTEM & CONNECTION TO WELL DESIGN ENGINEERING, INC. ( BY OTHERS. SEE DESIGNER'S DESIGN AND NOTES ; - ✓/ 4r/� s I FOR ADDITIONAL DETAILS. mmlow'm mmmmmmm�m ;ATCHLIIrIE SF`EET`C1.3 ~ pm � I — I NORTH I I I u w I I 1I I Know what's below, li Call before you dig. GRADING, DRAINAGE, AND EROSION CONTROL PLAN (NORTHERN LOT) C1�2 WHITING—YELTON RESIDENTIAL LOT SPLIT 12 i LC 1 I 9 O stint ut• + ..., I I � I 3 ' 10.0 uus nr .,vu ( or MiN. 1 asTauAKEYCTw., I LC — �,l t \ EX. \ �\ I � LOOK I DR IN I I I fY POND \ I 'EX P) i I fR 866.48 I I — ...Q OO I MS.� I N J 5 E. I I E+ Q014. l%1 EK. Q 4N.Si K, 1 ecs ss fa Q \ I 1 I 0 EMIT= ADDITIONAL LRRWMO NOTES. 1. EROSION CONTROL MEASURES MUST BE INSTALLED AT THE INITIAL STAGE OF SITE GRADING OPERATIONS 2 UPON COMPLETION OF CONSTRUCTION AND RESTORATION OF DISTURBED AREAS. THE PERMIT APPLICANT IS RESPONSIBLE FOR THE REMOVAL OF AL- EROSION CONTROL MEASURES INSTALLED THROUGHOUT THE CONSTRUCTION SITE 3 TO MINIMIZE THE POTENTIAL OF MATERIAL FROM LEAVING THE SITE AND BEING TRACKED ONTO THE ROADWAY, THE ROCK FILTER CONSTRUCTION ENTRANCE BEING A MINIMUM OF TWO FEET IN HEIGHT AND HAVING SIDE SLOPES OF 4 1 MUST BE CONSTRUCTED AT THE ENTRYWAY ONTO THE SITE. THE ROCK CONSTRUCTION ENTRANCE WILL PROVIDE AN EROSION CONTROL FACILITY AND ENABLE CONSTRUCTION TRAFFIC TO ENTER THE SITE 4. STREET SWEEPING MUST BE UNDERTAKEN AND COMPLETED ON AN AS NEEDED BASIS 5. COMPLIANCE WITH THE STORM WATER MANAGEMENT REQUIREMENTS OF THE LOWER RUM RIVER WATERSHED MANAGEMENT ORGANIZATION IS TO BE ADMINISTERED FOR THIS PROJECT BY THE CITY OF ANDOVER. 6. THE STORM WATER MANAGEMENT PUN HAS ASSUMED AN IMPERVIOUSNESS OF 4% FOR -HE 11 2,ACRE DEVELOPMENT AREA SITE DEVELOPMENT THAT EXCEEDS AN IMPERVIOUS AREA OF 4% MUST PROVIDE AN UPDATED STORM WATER MANAGEMENT PLAN SHOWING THE LRRWMO CRITERIA IS MET 7 IN ALL CASES WHERE THE DOING BY THE PERMITTEE OF ANYTHING AUTHORIZED BY THIS PERMIT SHALL INVOLVE THE TAKING, USING. OR DAMAGING OF ANY PROPERTY, RIGHTS OR INTERESTS OF ANY OTHER PERSON OR PERSONS OR OF ANY MATCHLINE SHEET C1.2' ) I I r r ) I r 1 ) I .a.• 1 1 I I 1 w. ) I 1 1 I ' 1TILITI' EASEMENT (TYP) I 1 IONS AND DIMENSIONS) jA3 Sl3K MM I 4 FONr1Yc oA.eF+r:,tmlo,r t.alorio.o[c d fttrlA 10 4fT .M"Y: I ✓ BAFFLE WEIR (SEE DETAIL ON SHEET C3)•,• , e•� INSTALL SEED WITH }' STABIUZA71ON BLANKET (CURLEX I OR APPROVED EQUAL) 6 C.Y. OF Q II RIPRAP IC FABRIC APPROTIIMTE EDGE «. i .w • N « , OF W ETIMO A ♦ _ -- - -- (TYFE 7 Pow) IER DATA i71011M \ » ITT 10 Ft tww l000nA[e I[w w.o 3:1 W 1tp6 IRON Ntl Tr At,RYT R•1 BUILDING SETBACKS: FRONT = 40 FEET SIDE = 10 FEET REAR = 50 FEET ADDITIONAL LRRWMO NOTES 1 EROSION CONTROL MEASURES MUST BE INSTALLED AT THE INITIAL STAGE OF SITE GRADING OPERATIONS 2 UPON COMPLETION OF CONSTRUCTION AND RESTORATION OF DISTURBED AREAS, THE PERMIT APPLICANT IS RESPONSIBLE FOR THE REMOVAL OF ALL EROSION CONTROL MEASURES INSTALLED THROUGHOUT THE CONSTRUCTION SITE. 3 TO MINIMIZE THE POTENTIAL OF MATERIAL FROM LEAVING THE SITE AND BEING TRACKED ONTO THE ROADWAY, THE ROCK FILTER CONSTRUCTION ENTRANCE BEING A MINIMUM OF TWO FEET IN HEIGHT AND HAVING SIDE SLOPES OF 4:1 MUST BE CONSTRUCTED AT THE ENTRYWAY ONTO THE SITE. THE ROCK CONSTRUCTION ENTRANCE WILL PROVIDE AN EROSION CONTROL FACILITY AND ENABLE CONSTRUCTION TRAFFIC TO ENTER THE SITE 4. STREET SWEEPING MUST BE UNDERTAKEN AND COMPLETED ON AN AS NEEDED BASIS. 5 COMPLIAME WITH THE STORM WATER MANAGEMENT REQUIREMENTS OF THE LOWER RUM RIVER WATERSHED MANAGEMENT ORGANIZATION IS TO BE ADMINISTERED FOR THIS PROJECT BY THE CITY OF ANDOVER. 6 THE STORM WATER MANAGEMENT PLAN HAS ASSUMED AN '-IMWNSY DESGNITY. MCA, QMA CIVAD BY PRO NO ORIGINAL DATE SEPTEMBER 3. 2024 z Y� • CT f f IMPERVIOUSNESS OF 4% FOR THE 11 9-ACRE DEVELOPMENT w g $ AREA SITE DEVELOPMENT THAT EXCEEDS AN IMPERVIOUS AREA OF NUST b y / 4% PROVIDE AN UPDATED STORM WATER MANAGEMENT PLAN SHOWING THE CRITERIA c .•8T ,e LRRWMO IS MET y jp, R 1 7 IN ALL CASES WHERE THE DOING BY THE PERMITTEE OF a` a w 1. li ANYTHING AUTHORIZED BY THIS PERMIT SHALL INVOLVE THE e 'r= 9 O o F N TAKING. USING, OR DAMAGING OF ANY PROPERTY. RIGHTS OR . "• , 3 O ` INTERESTS OF ANY OTHER PERSON OR PERSONS, OR OF ANY ll PUBLICLY OWNED LANDS OR IMPROVEMENTS OR INTERESTS, a p THE PERMITTEE; BEFORE PROCEEDING: SHALL OBTAIN THE - "S"s �~ I 1 + WRITTEN CONSENT OF ALL PERSONS. AGENCIES. OR Kt 11 AUTHORITIES CONCERNED. AND SHALL ACQUIRE ALL w � NECESSARY PROPERTY RIGHTS MID INTEREST ZZ ti ' ~_ v00O 400 = ~ wa ca H roi r, a3rs:xr*T. 6O I 18 U } .. LC = W C Q ii N 8 3 v' cr 4 T a NK7 nP 1 9Z z I I [3F I cs PREPARED FOR _ unwci I DERRICK WHITING - 40.0 IT•F.1 I ROP. • toga ate I c oeo PROPOSED LOW FLOOR ELEVATION SHOULD BE 2.0 IV --�-- — 1 s o° o 1 I FEET AT A MINIMUM ABOVE THE ADJACENT CITY 0 7S1 B -- o oeo 00o POND HWL, FLOODPLAIN, AND BMP HWL. pY n srtE PIaVI vr: SEPTIC SYSTEM & CONNECTION TO WELL DESIGN ��0� I 11 I BY OTHERS. SEE DESIGNER'S DESIGN AND NOTES = FOR ADDITIONAL DETAILS. ENGINEERING, INC. a = 11 I I N - NORTH 1o 1 I w .T I is 30 Fa N I Know what's below. Cal) before you dig. I W, 4 MFEET GRADING, DRAINAGE, AND EROSION CONTROL PLAN (SOUTHERN LOT) Clm3_ WHITING-YELTON RESIDENTIAL LOT SPLIT I I I V I I I I I .o I I I w FLOODPLAIN NWL = 859.50 FLOODPLAIN HWL = 864.00 FLOODPLAIN FILL = 367.65 C.Y FLOODPLAIN CUT = 495.03 C.Y TOTAL = 127.37 YD3 (NET CUT) Dmm ey MS GN By MQA. QMA MCM By PRO. NO AREA TO BE REMOVED FROM FLOODPLAIN = Z z _ z z 96 0—_ O Vf C H W cm_ — R = O p ?r 3 W K PRFPARFTI FOR- S.TE PLANN',NC S ENGINEERM PLOWE G ry L.K"c DR':- SUITE 116 NORTH I 1s �a Know what's below. Call before you dig. I NLN• WFEEI FLOODPLAIN FILL EXHIBIT (NORTHERN LOT) C2m1 WHITING-YELTON RESIDENTIAL LOT SPLIT m m mm� !m m ■ MLITY EASEMENT (TYP)' IONS AND DIMENSIONS) FLOODPLAIN NWL = 859.50 FLOODPLAIN HWL = 864.00 FLOODPLAIN FILL = 306.56 C.Y FLOODPLAIN CUT = 574.13 CA TOTAL =I 267.57 YD3 (NET CUT) l DRAVIF7 By I DES CN BY. ^ M.OA. OMA OR,OINAI DATE SEPTEMBER 3.2024 AREA TO BE REMOVED FROM FLOODPLAIN i z .... `\) w I.cr.n. la TET •Y••T'. I __--- ✓✓✓ eb, b 3 0 + +.� N•el,•0E ro O C AREA l0 '• Y BAFFLE WEIR ��:;••.'•? o;i*ae�ncE;TM: .^.• '^ 1 � 11 � E ., / (SEE DETAIL ON SHEET 0) �1 INSTALL SEED WITH + + + + + a 135 3WITH 1 l _ I o STABILIZATION BLANKET / I I (CURLER 1 OR APPROVED EQUAL) . + i' • + + W/ 6 GY- OF CL Il RIPRAFABRIC RICIC l .�•. I - - a.., + : + + . + + CD \ OF WETLAND A 40 0 1 W - 1"4 OF NFRAND A ' (Tv1E 2 o'HE60) j o a•rx •7 10 = Z rtebDAtIIy KXXH�li ic0®..: + . r�i r+,cb / } P 1 cc LC + + I ISO �n.a c 1 EL W e om rN Q it .«- � rwr run f.7, - - .r.., - - •- - . + + WT E56.1p 1 O I LN I ✓/// MOOMYn,vn fY•0 r + 1 + �I PREPARED FOR . E, 1 I DERRICK WHITING .... .r 9 I I ( I . I I I 1 I f 1 I I ( 1 ( 1 I I no. u7 4 LC • I •• I } I r 1 1 vw 1 166V 1_D'1`E NW F• Rp SE.r':.•E. I a I 1 SRr ' _s.cacv I z 1 �.. Ta,.nc A.fA 7v it f7wn•cE efTHOJT :St�oO/C Eu PROP. • Y - ' - - - - - - - — ^+ WELL + 1 +.. p: l ' 7 +- .. 3 — + nnaaN•u. / nHr•T,On / .r. ea.m .r. 1 1 1 1 / cnnsrn¢T,on fM.l N : rrr a cuae I 1 000 000 ee s 1 I O a B I PLOWE ENGINEERING, INC. I 6776 LAKE DR VE SEAT[ 110 I _ LMO UUQA W 560I4 I I P11pE p61)161I x FAX (B61) 361.1 CA F 1A I I E7 I lip 0 10 30 CA a I Know what's below. I Call before you dig, 1 FLOODPLAIN FILL EXHIBIT (SOUTHERN LOT) C2.2-, WHITING-YELTON RESIDENTIAL LOT SPLIT B16 87a 872 \ \ 1 i i i / i i i i i / / / / / / / PA A �3. FLOODPLAIN NWL = 859.50 FLOODPLAIN HWL = 864.00 FLOODPLAIN CUT = 127.37 C.Y (NORTH LOT) FLOODPLAIN CUT = 267.57 C.Y (SOUTH LOT) FLOODPLAIN BALANCE = 1394.94 C.Y (CUT) DRAWN BY: DESIGN BY: M.Q.A. Q.M.A. CHCKD BY: PROD. NO. M.O.A 24-2166 ORIGINAL DATE: 0 a U w O ADDITIONAL FLOODPLAIN REPLACEMENT IN NORTHWEST: 0 NW REPLACMENT FILL = 1.11 C.Y (FROM 859.50 TO 864.00) NW REPLACEMENT CUT = 1,646.02 (FROM 859.50 TO 864.00) EAt S REPLACEMENT BALANCE = 1,644.91 YD3 (CUT) o �L WZ 3o TOTAL BALANCE = 2039.85 YD3 (NET CUT) or ,5 2 E i m E o _ W F D Q )ERRICK WHITING I � I IIFI w w .. I / / PARCEL A SITE PLANNING & ENGINEERING PLOWS'I APPROXIMATE ENGINEERING, INC. / FLOODWAY 6]]6 LAKE DRIVE SUITE 110 LINO LAKES, MN 55014 PHONE: (651) 361b FAX (651) 361-8701 % NORTH 0 15 30 I / I Know what's below. Call before you dig. ""C"- 30FEE' ' `FLOODPLAIN REPLACEMENT EXHIBIT WHITING—YELTON RESIDENTIAL LOT SPLIT C23, C I T Y O F NNDOVE^ 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV TO: Planning and Zoning Commissioners FROM: Joe Janish, Community Development Director SUBJECT: Public Hearing: Consider a Planned Unit Development (PUD) of a residential subdivision on the unaddressed property at 16xxx Ward Lake Drive NW; PID# 11-32-24-41-0003 - SW Wold Construction Inc. (Applicant). DATE: March 19, 2025 INTRODUCTION The Planning and Zoning Commission is asked to review a Conditional Use Permit (CUP)/Planned Unit Development (PUD) for Hartmans Meadows The proposal contains 12 rural residential lots. The PUD narrative submitted by the developer is attached for your review. The applicant previously requested a PUD for a development with 15 lots. The Andover City Council denied that proposal. The applicant is now proposing a 12-lot subdivision with each lot being a minimum of 2.5 acres in size or larger. Purpose of PUD? The purpose of a PUD is to encourage more efficient allocation of density and intensity of land use where such arrangement is desirable and feasible by providing the means for greater creativity and flexibility in environmental design than provided under the strict application of this code. It must be demonstrated to the satisfaction of the City Council that a higher quality development will result than could otherwise be achieved through strict application of this code. DISCUSSION According to City Code 13-3 Planned Unit Development, the purpose of a PUD is to encourage more efficient allocation of density and intensity of land use where such arrangement is desirable and feasible by providing the means of greater creativity and flexibility in environmental design than provided under strict application of the standards set in code. Attached for your review is City Code 13-3. City Code 13-3-9 regulates the findings that are required for a PUD to be approved and 13-3-11 identifies desirable PUD design standards that are sought in any PUD proposal. As part of the attached PUD Narrative, the applicant addresses the design qualities they believe the city seeks when granting for a PUD proposal as identified in City Code 13-3-11. City Code 13-3-9 states the following required findings to consider when approving a PUD: 1. The proposed development is not in conflict with the goals of the Comprehensive Plan for the City. Overarching Goals, Objectives and Policies Goal 1: Maintain and enhance the quality of life in Andover Land Use Goals, Objectives and Policies Goal 4: Allow residential growth while maintaining the quality of natural resources and amenities. Goal: Reduce maintenance and energy costs for public facilities and infrastructure. Housing Goals, Objectives and Policies Goal: Provide a variety of housing types to accommodate the life cycle needs of all residents. Transportation Goals, Objectives and Policies Goal: Minimize impacts of the transportation system on the natural environment. 2. The proposed development is designed in such a manner as to form a desirable and unified environment within its own boundaries. The low -impact qualities of this development will lead to a desirable and unified environment. The applicant is proposing lot sizes of 2.5+ acres The density of 12 lots over 35.24 acres is .34 units per acre. The street and lot layouts are specifically designed to preserve as many trees as possible, other than the required Sycamore Street connection area. A conservation easement will be provided over the southern portion of the property with the exception of the roadway connection. The 50 foot right of way (ROW) provides larger lots to the future property owners, and will allow for homes to be slightly closer to the roadways, reducing the need for additional ground disturbances. Due to the narrower ROW an additional 10 foot drainage and utility easement will be provided to handle the ditch system. This additional easement area will provide a total of 20 feet vs the standard 10 foot drainage and utility easement. An HOA will maintain the monument sign at the entrance of Ward Lake Drive NW. The HOA will also be responsible for design considerations prior to construction of each new home. Minimum houses sizes will be 1, 600 square feet for ramblers and 2, 000 square feet for two -stories, with a minimum garage size of 720 square feet. Roof pitches will be 7:12 or greater. Exteriors will be finished with maintenance free siding and minimum of 150 square feet of stone or rock on the front fagade. High -end design elements will be utilized throughout the development and construction of homes. 3. The proposed development demonstrates how each modified or waived requirement contributes to achieving the purpose of PUD. The proposal is requesting flexibility to use a rural residential road section with 18 " ribbon curb, to create a Low Impact Development (LID), and to exceed the block length of 1,320 feet. The requested flexibilities contribute to achieving the purpose of a PUD, specifically: 2 • The use of ditches will reduce the number of trees removed because the amount of traditional ponding and pipe will not be needed to achieve stormwater requirements. • The vacation of 167`h Ave NW will preserve trees as the connection will no longer be constructed to Ward Lake Drive. Originally 167`h Ave NW was expected to cross the railroad tracks providing additional access to the west, however City Council did not require the railroad crossing with the development of Country Oaks North. 4. The PUD is of composition, and arrangement that its construction, marketing, and operation are feasible as a complete unit without dependence upon any subsequent unit. The development will incorporate high -end design elements. This project follows the Comprehensive Plan. Andover has a finite amount of land that remains to be developed and a LID style of development allows for us to be good stewards of the land. A LID will provide conservation of nature and sustainable development with the overall design to manage and protect the land in ways that benefit the environment and future generations. Street Improvements As part of the PUD request, the applicant is asking for flexibility with street construction standards. The applicant is requesting to construct a rural residential roadway with 18 inch ribbon curb. The ribbon curb has been used in developments such as Petersen Farms additions, and Preserve at Oak View. 3 Figure /- Aerial photo Rural Street: The 18 inches of concrete ribbon curbing on each side of the street will maximize the protection of the edge of paved surface from the wear and tear of vehicle parking and snow removal. Since storm water will be treated within the ditch area, the ribbon curb will allow the flow of water into the ditches yet support the edging of the paved area. The Petersen Farms development and Preserve at Oak View have created similar roadways. The ROW will be 50 feet within the development along the new roadway(s) and an additional 10-foot drainage and utility easement will be provided along the roadways constructed. This is yet again similar to the Petersen Farms development and Preserve at Oak View. 4 VARIES 30-33' VARIES 30-33' 8' 16.5' min.l 16.5' min. 6' 14.0' min. 14-0' mfn. •--3% 3%--. 4. LLL5- (MIN. THICKNESS) SPEC. 2360 SPW'EA240C WEAR COURSE TACK (WIN. THICKNESS) SPEC. 2360 SPWEB240C BASE COJRSE 18" CONC, RIBBON CURB 5" (MIN, THICKNESS) SPEC 2211 CL,5 AGGREGATE BASE (SEE DETAIL 502) L APPROVED SUBGRADE TYPICAL RURAL STREET SECTION W/RIBBON CURB <NEW DEVELOPMENTS WITH PUD APPROVAL) 4'ti 4" TOPSOIL Lot Standards Lot standards in the R1 — Single Family Rural district require 2.5 acre lots with a 300 foot lot width at the front yard setback. The PUD proposes lot sizes meeting minimum R1 lot standards, as shown they ranging from 2.50 — 2.81 acres and provide widths exceeding the minimum standard of 300 feet. CITY CODE REQUIREMENTS PUD PROPOSAL Lot size/Gross Density 2.5 acres/0.4 units per acre 2.50+/.36 units per acre Lot Width 300 feet 300+ feet Lot Depth 150 feet 150+ feet 2.5 acres / 35.24 acres 14 12 proposed Each lot will exceed the minimum requirement of 8,600 square feet of buildable area. The standard R-1 requirement allows for 3,600 square feet for a home location and 5,000 square foot locations for septic systems. Utilities Each of the lots will be served by individual septic systems and wells. DISCUSSION This section will review some of the site characteristics and processes for the proposed development shown on the sketch plan. For this project to move forward, additional actions would need to occur including: • Preliminary Plat (Public Hearing). • Final Plat (City Council Action). • Building permits (Administrative). 5 GENERAL Conformance with Local and Regional Plans and Ordinances 1. The entire 35.24-acre site (11-32-24-41-0003) is located outside of the Metropolitan Urban Service Area (MUSA) boundary. 2. The property is guided in the 2018 Comprehensive Plan as Rural Residential, a designation that calls for densities of 0.0 to 0.4 units per acre. The proposed 12-lot development would have a density of 0.36 units per acre. 3. The proposed development includes deviations from City Codes that are proposed to be addressed through the PUD process. h rgure z - Zoning alld run maps SITE CHARACTERISTICS Access The proposed PUD plan shows two access points; one at the south end of the development on Sycamore Street, and the other at the northeastern portion of the development accessing Ward Lake Drive. The proposed access points are identified as red circles on the following map. Two homes would have access to Ward Lake Drive NW by new driveways and are shown as orange circles. Future development to the north (not proposed) would provide another possible connection point which is also shown as a red circle (dashed lines). on Figure 3 - Access Block Length With the proposed vacation of 167t' Avenue NW the block length will be longer than 1,320 feet. Originally the intent was for 167t' Avenue NW to cross the rail tracks to the west. However, as part of Country Oaks North development process it was determined that this access would not occur. While the vacation of the ROW would occur as part of the Final Plat process, the vacation would extend the block length. Extending 167th Avenue NW to Ward Lake Drive would require the removal of many trees in the area. Zoning and Lot Size The subject property is zoned R-1 Single Family Rural and there is not a request to change the zoning of the property. City Code requirements for the R-1 zoning district include a minimum lot size of 2.5 acres and minimum lot width of 300 feet measured at the front yard setback fine. The applicant is proposing to meet the standards of the R-1 zoning district. Utilities Each of the lots will be served by private well and septic systems. The sketch shows septic drain field locations for each lot (green rectangles). The City Code requires two drain field locations with a combined area totaling 5,000 square feet per lot. 7 Figure 4 - Utilities/Septic Tree Preservation Plan There are a significant number of trees at the southeasterly portion of the site that the developer is proposing to preserve as a wooded buffer (see approximate area in red on the map below). The trees will provide a buffer between the development and the existing residence to the south. As part of the PUD process, the applicant is required to submit a tree protection plan showing trees to be preserved. This will be required during the preliminary plat process. Wetlands/Floo dplains The 2013 National Wetlands Inventory (NWI 2013) does not indicate wetlands on the property. A Wetland Delineator also has indicated wetlands are not onsite. INTERAGENCY COORDINATION Coordination with other Agencies The developer and/or owner are responsible to obtain all necessary permits (Minnesota Department of Natural Resources, U.S. Army Corp of Engineers, Lower Rum River Watershed Management Organization, Minnesota Pollution Control Agency, and any other agency that may have an interest in the site). Initial contact shall be made with the City Engineering Department regarding this item. Lower Rum River Watershed Management Organization (LRRWMO) If the PUD is approved the applicant will prepare a grading plan, hydrology calculations and a soils report that will be reviewed by the City, an engineering consultant and the LRRWMO. The LRRWMO will need to review the preliminary plat and the applicant will need to address any items. PROCESS Andover Review Committee The Andover Review Committee (ARC) conducted a review of the PUD and has submitted these comments to the applicant. These comments have been attached for review by the Planning and Zoning Commissioners. Public Notice In accordance with the City Code, public hearing notice is published in the Anoka County Union Herald and mailed notice was provided to properties within 700 feet of the site located outside of the MUSA boundary, using GIS data provided by Anoka County. In addition, signs have been posted on Ward Lake Drive and at the north end of Sycamore Street to alert passersby of the proposed public hearing. The City's practice is more generous than Statute which only requires the published notice and mailed notice to properties within 350 feet. Park and Trail Dedication — (Park and Recreation Commission) The Park and Recreation Commission reviewed the request when more lots were proposed on July 18, 2024, and on November 7, 2024 and suggested cash in lieu of parkland dedication. The current Master Park Plan does not identify parkland in this area. PUD The applicant is requesting a Planned Unit Development (PUD) as part of this development. The applicant is requesting flexibility in the bulk area standards including size, dimension, and density. The following table depicts the proposed conceptual PUD standards: 9 Proposed PUD Standards: Proposed Conceptual i Standards City Code No. Item Standards: (R-1: Single PROPOSED Notes Family Rural) 1)* Lot Width (min) 300' min 300' Lot Width — on cul-de-sac 160' min Only a temporary cul de sac is 2) (lacking municipal sanitary sewer (max 2 lots of this N/A proposed at the north end of the max 2 lots reduced width on the CDS) development this does not apply 3) Lot Depth (min.) 150' min 290' + 4) Lot Area (min.) 2.5 Acres 2.5 Acres+ 5)* *Block Length (max) 1,320' max. Exceeds Exceeds due to proposed vacation of 167th. 6) Cul-de-Sac Length (max) 500' 350' Approx. Temporary cul de sac for future development to the north. 7) Front Yard Setback (Shoreland) 40' 40' 8) Side Yard Setback — 40' N/A Shoreland requires a greater Adjacent to Local Street (min.) setback. 9) Side Yard Principal Structure 10' 10, from Interior Lot Line Side Yard Principal Structure 10) for Garage over 20 feet wide N/A N/A from Interior Lot Line 11) Side Yard Setback - Interior 10' 10, (min.) 12) Rear Yard Setback 50' 50' 13) Setback — County Road 50' N/A 14) Max Structure Height 35' 35' 15) Max Lot Coverage (structure) 20% 20% 16) Impervious Coverage 25% N/A Property is not within the Shoreland Shoreland District *Right of Way (local rural city Additional 10 foot of drainage and 17)* street) 60 50 utility easement will be provided on each side of roadway 18) Driveway Access (from an 60' 60' intersection) *Red text indicates deviation from City Code PUD Review The following City Code standards for PUD Review that the proposed development would need to address at the Preliminary Plat / PUD review stage. 10 Applicable Ordinances City Code 13-3-9 regulates the findings that are required for a PUD to be approved: 1. The proposed development is not in conflict with the goals of the Comprehensive Plan for the City. 2. The proposed development is designed in such a manner as to form a desirable and unified environment within its own boundaries. 3. The proposed development demonstrates how each modified or waived requirement contributes to achieving the purpose of PUD. City Code 13-3-11 identifies Desirable PUD Design Qualities that are sought in any PUD proposal as listed below. A. Achieves efficiency in the provision of streets and utilities and preserves area to achieve the elements of design qualities described in this Chapter. The development is proposed to be a low impact development with use of ribbon curb and ditching. A 50 foot ROW is proposed with an additional 10 foot drainage and utility easement to accommodate the low impact development. Each lot will have a 20 foot drainage and utility easement along the proposed roadways vs the standard 10 feet. B. Provides convenient and safe access for vehicles and pedestrians and all types of activity that are anticipated to be a part of the proposed development. The access to Ward Lake Drive will be designed to meet city requirements. The extension of Sycamore Street NW will provide a secondary access to Deerwood Estates. C. Provides a buffer between different uses, adjacent properties, roadways, between backyards of back-to-back lots. The applicant is proposing to add additional tree buffer from the railroad tracks. The applicant is proposing to meet or exceed minimum standards within the R-1 zoning district related to lot dimensions. D. Preserves existing stands of trees and/or significant trees. The applicant is proposing to preserve a 50 foot conservation easement along the southern edge of the property in order to preserve trees. E. Provides considerable landscaping treatments that complement the overall design and contribute toward an overall landscaping theme. The applicant is proposing to add additional trees. The proposed tree variates proposed are acceptable to the City of Andover. F. Preserves significant usable space on individual lots or through the provision of open space within the development. 11 The applicant is proposing to meet the R-I standards. The property does not have wetlands according to the Nation Wetland Inventory and the Wetland specialist that reviewed the property. G. Provides an attractive streetscape through the use of undulating topography, landscaping, decorative street lighting, decorative mailbox groupings, retaining walls, boulders, fencing, area identification signs, etc. The applicant is proposing several trees in the front yards of the properties. The road will be designed in a manner to take advantage of the existing topography. The road will be designed in a manner to include ditches to address Stormwater including the use of 18 inch ribbon curb. H. The proposed structures within the development demonstrate quality architectural design and the use of high -quality building materials for unique design and detailing. The HOA will be responsible for approving design considerations prior to construction of each new home. Minimum houses sizes will be 1, 600 square feet for ramblers and 2, 000 square feet for two -stores, with a minimum garage size of 720 square feet. Roofpitches will be 7:12 or greater. Exteriors will be finished with maintenance free siding and minimum of 150 square feet of stone or rock on the front. I. The lasing quality of the development will be ensured by design, maintenance and use guidelines established through an owners' association. Exteriors of homes will be finished with maintenance free siding and minimum of 150 square feet of stone or rock on the front. Homeowners Association will review designs of new homes. HOA will be responsible for development sign. NEXT STEPS The CUP/PUD request would be reviewed by City Council based on the decision of the Planning and Zoning Commission. If City Council approves the CUP/PUD Plan the applicant is expected to continue with applications for Preliminary Plat, and Final Plat. ACTION REQUESTED The Planning Commission is asked to hold a public hearing, take public feedback on the proposed CUP for a PUD, and provide a recommendation to the City Council. Attachments 1) Draft Resolution of Approval 2) Draft Resolution of Denial 3) Location Map 4) Comprehensive Plan Goals 5) Applicants responses to City Comments dated March 10, 2025 6) Public Comments Received — (None at time of write up) 7) PUD Narrative 8) PUD Plan 12 Respectfully submifte , JoeWanish Community Development Director CC: Scott Wold, SW Wold Construction Inc., (email) Craig Wensmann, Bogert -Pederson and Associates (email) 13 CITY OF ANDOVER COUNTY OF ANOKA STATE OF MINNESOTA RES. NO. R A RESOLUTION APPROVING THE CONDITIONAL USE PERMIT / PLANNED UNIT DEVELOPMENT REQUESTED BY SW WOLD CONSTRUCTION, INC, AS SHOWN AS HARTMANS MEADOWS PLAN DATED 2/4/2025, LEGALLY DESCRIBED AS: THAT PRT OF NE'/OF SE'/a OF SEC 11 TWP 32 RGE 24 LYG ELY OF W R/W LINE OF BN R/R, EX RD SUBJ TO EASE OF REC WHEREAS, SW WOLD CONSTRUCTION, INC has requested a Conditional Use Permit for a Planned Unit Development (PUD) for HARTMANS MEADOWS, and; WHEREAS, the Planning and Zoning Commission has reviewed the request and has determined that said request does meet the criteria of City Code and would not have a detrimental effect upon the health, safety, general welfare, values of property and scenic views in the surrounding area, and; WHEREAS, the Planning and Zoning Commission has reviewed the request and has determined that said request does meet the criteria of City Code and 13-3-9; as the proposed PUD is not in conflict with the goals of the Comprehensive Plan for the City; and; WHEREAS, the Planning and Zoning Commission recommends to the City Council the approval of the Conditional Use Permit / Planned Unit Development request, and; WHEREAS, the City Council of Andover has reviewed the request and has determined that said request does meet the criteria of City Code and 13-3-9 because: 1. The proposed development is not in conflict with the goals of the Comprehensive Plan for the City. The proposed development is not in conflict with the goals of the comprehensive plan of the city because the plan calls for the development of this property as rural and the applicant is proposing a rural development. Land Use Goals, Objectives and Policies Goal 4: Allow residential growth while maintaining the quality of natural resources and amenities. Objective: Create opportunities for the city to preserve open space, nature preserves and natural amenities through review of development proposals and implementation fo the Parks and Open Space Plan Policies: Allow rural development outside of the MUSA Boundary consistent with the Rural Residential Land Use Designation. 14 Policies: Require existing conditions information to be provided during the development review process to allow evaluation of opportunities to preserve and protect natural features and open space. Goal 5: Encourage appropriate economic growth and redevelopment Objective: Develop a diversified tax base through balanced development of commercial, light industrial, and residential properties Goal: Reduce maintenance and energy costs for public facilities and infrastructure Housing Goals, Objectives and Policies Goal: Provide a variety of housing types to accommodate the life cycle needs of all residents Goal: Remain responsive to housing market demands through implementation of the Land Use Plan Objective: Utilize local controls to provide opportunities for a variety of housing types, including affordable housing Goal: Minimize impacts of the transportation system on the natural environment Objective: Ensure environmentally sensitive implementation of the transportation system through the planning, design and construction of improvements Goal 2: Promote, protect, preserve and enhance the City's natural resources and open space for the enjoyment of residents, protection oj'water and air quality and the preservation of wildlife habitat Objective: Consider development of passive, nature related recreation or conservancy areas on site found to be suitable for these purposes Policies: Work collaboratively with property owners in the preservation of open space Policies: Recognize preservation of nature preserves and open space as a benefit in Planned Unit Developments 2. The proposed development is designed in such a manner as to form a desirable and unified environment within its own boundaries. The low -impact qualities of this development will lead to a desirable and unified environment. The applicant is proposing lot sizes of 2.5+ acres The density of 12 lots over 35.24 acres is .34 units per acre. The street and lot layouts are specifically designed to preserve as many trees as possible, other than the required Sycamore Street connection area. A conservation easement will be provided over the southern portion of the property with the exception of the roadway connection. The 50-foot right of way 15 (ROW) provides larger lots to the, future property owners, and will allow for homes to be slightly closer to the roadways, reducing the need for additional ground disturbances. Due to the narrower ROW an additional 10 foot drainage and utility easement will be provided to handle the ditch system. This additional easement area will provide a total of 20 feet vs the standard 10 foot drainage and utility easement. An HOA will maintain the monument sign at the entrance of Ward Lake Drive NW. The HOA will also be responsible for design considerations prior to construction of each new home. Minimum houses sizes will be 1, 600 square feet for ramblers and 2, 000 square feet for two -stories, with a minimum garage size of 720 square feet. Roof pitches will be 7:12 or greater. Exteriors will be finished with maintenance free siding and minimum of 150 square feet of stone or rock on the front facade. High -end design elements will be utilized throughout the development and construction of homes. 3. The proposed development demonstrates how each modified or waived requirement contributes to achieving the purpose of PUD. The proposal is requesting flexibility to use a rural residential road section with 18 " ribbon curb, to create a Low Impact Development (LID), and to exceed the block length of 1, 320 feet. The requested flexibilities contribute to achieving the purpose of a PUD, specifically. - The use of ditches will reduce the number of trees removed because the amount of traditional ponding and pipe will not be needed to achieve stormwater requirements. The vacation of 1671h Ave NW will preserve trees as the connection will no longer be constructed to Ward Lake Drive. Originally, 167h Ave NW was expected to cross the railroad tracks providing additional access to the west; however, City Council did not require the railroad crossing with the development of Country Oaks North. 4. The PUD is of composition, and arrangement that its construction, marketing, and operation are feasible as a complete unit without dependence upon any subsequent unit. The development will incorporate high -end design elements. This project follows the Comprehensive Plan. Andover has a finite amount of land that remains to be developed and a LID style of development allows for us to be good stewards of the land. A LID will provide conservation of nature and sustainable development with the overall design to manage and protect the land in ways that benefit the environment and_future generations. NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Andover does hereby approve the Conditional Use Permit/ Planned Unit Development for Hartmans Meadows at the above legally described property with the following conditions: 1. Applicant shall obtain approval of Preliminary Plat, which shall be consistent with PUD. 2. Applicant shall be able to provide a 50 foot right of way with an additional 10 foot drainage and utility easement along each side of the roadways that applicant will construct. This will mean that 16 a minimum of a 20-foot drainage and utility easement will be provided for along property lines that abut the roadways that the applicant will construct. 3. Upon approval action by Andover City Council of the Hartmans Meadows Preliminary Plat, it shall be incorporated into the PUD. 4. The following deviations shall be permitted from the R-1 zoning district and subdivision regulations with the PUD: a. Applicant shall be permitted to exceed the maximum block length of 1320 feet if consistent with PUD. 5. The applicant shall construct homes that meet the requirements established by the Andover City Code and with varying architectural styles and as outlined by the applicant within the PUD. 6. The applicant shall establish a Homeowners Association to handle common elements of the development. 7. Applicant shall lead the vacation of excess ROW to the south of proposed project as offered by applicant. 8. If applicant does not receive preliminary plat approval within 1 year of the date of this resolution the CUP/PUD shall become null and void, unless an extension is requested and approved by Andover City Council prior to expiration date. Adopted by the City Council of the City of Andover on this day of , 2025. CITY OF ANDOVER ATTEST: Michelle Hartner, City Clerk Jamie Barthel, Mayor 17 CITY OF ANDOVER COUNTY OF ANOKA STATE OF MINNESOTA RES. NO. R A RESOLUTION Denying THE CONDITIONAL USE PERMIT / PLANNED UNIT DEVELOPMENT REQUESTED BY SW WOLD CONSTRUCTION, INC, AS SHOWN AS HARTMANS MEADOWS PLAN DATED 2/4/2025, LEGALLY DESCRIBED AS: THAT PRT OF NE '/ OF SE '/ OF SEC 11 TWP 32 RGE 24 LYG ELY OF W R/W LINE OF BN R/R, EX RD SUBJ TO EASE OF REC WHEREAS, SW WOLD CONSTRUCTION, INC has requested a Conditional Use Permit for a Planned Unit Development (PUD) for HARTMANS MEADOWS, and; WHEREAS, the Planning and Zoning Commission has reviewed the request and has determined that said request does not meet the criteria of City Code and would have a detrimental effect upon the health, safety, general welfare, values of property and scenic views in the surrounding area, and; WHEREAS, the Planning and Zoning Commission has reviewed the request and has determined that said request does not meet the criteria of City Code and 13-3-9; as the proposed PUD is/is not in conflict with the goals of the Comprehensive Plan for the City; the proposed development is/is not designed in such a manner as to form a desirable and unified environment within its own boundaries; and the proposed development does/does not demonstrate how each modified or waived requirement contributes to achieving the purpose of a PUD; the PUD is/is not of composition, and arrangement that its construction, marketing, and operation are feasible as a complete unit without dependence upon any subsequent unit, and; WHEREAS, the Planning and Zoning Commission recommends to the City Council the denial of the Conditional Use Permit request, and; NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Andover does hereby deny the Conditional Use Permit on the above legally described property for a Planned Unit Development for Hartmans Meadows due to the following findings: 1. 2. Adopted by the City Council of the City of Andover on this day of , 2025. CITY OF ANDOVER ATTEST: Michelle Hartner, City Clerk Jamie Barthel, Mayor A' ti1)7 6N • A Site location — 16xxx Ward lake Dr. NW (Parcel ID: 11-32-24-41-OW3) IJAVE - v Dote CrEMRC October 29. u Ac i r r o c DOVE 2018 Comprehensive Plan Update 1-3 Goals, Objectives and Policies The following pages describe the goals of the community and the strategies that are employed to achieve them. The goals, objectives and policies are structured according to the topic that they address. However, it is important to remember that these statements are interrelated. As a result, the cause and effect for each topic must be considered when decisions concerning the Comprehensive Plan are made. For the purposes of this plan these terms are defined as follows: Goal: A statement that expresses a desired outcome or state of affairs. Objective: A statement that provides direction on how the goal will be achieved Policy: A specific action that will be taken or a general rule that will be applied to a specific situation Overarching Goals, Objectives and Policies Goal 1: Maintain and enhance the quality of life in Andover Objective: Efficiently provide basic services to improve all aspects of the city that contribute to quality of life including land use, public safety, transportation, recreation, health, education, and resource preservation Policy: Prepare, implement, periodically evaluate and update local controls such as: • Comprehensive Plan • City Code • Capital Improvement Plan • Water Resource Management Plan • Stormwater Pollution Prevention Program • Parks and Open Space Plan Objective: Preserve the rural character of the community Policies: • Preserve the Rural Residential Planning Area Designation Identified by the Metropolitan Council 2040 Regional Development Framework • Plan the efficient expansion of municipal sewer and water through implementation of the Land Use Plan • Preserve natural areas through implementation of the Parks and Open Space Plan A-MiMA- 2018 Comprehensive Plan Update 1-4 Goal 2: Maintain a high degree of community planning and involvement Objective: Ensure an open and accessible local government that is responsive to the needs of residents Policies: • Provide access to information in a variety of forms including the newsletter, official newspaper, web site and televised meetings • Maintain healthy relationships with residents, businesses, community groups, school districts, and government agencies to ensure all points of view are represented • Promote participation in citizen advisory committees • Consider all available information and the potential impacts on all aspects of the community when making land use decisions • Maintain a mix of land uses, including schools, professional and medical office, retail, community and park facilities to provide a vital node of activity in the vicinity of City Hall, as well as along major corridors • Encourage resident involvement through the public hearing process and utilize a variety of public hearing notification methods including direct mailing, publication in the official newspaper and signs placed on subject properties Goal 3: Maintain the Comprehensive Plan as a relevant official document Objective: Consider Comprehensive Plan amendments that better achieve the goals, objectives and policies of the Comprehensive Plan Policies: • Adhere to the goals, objectives and policies of this Comprehensive Plan to prevent incremental decision making that adversely affects the intent of the plan • Review Comprehensive Plan text amendments with the following criteria: o A public need for the proposed amendment can be identified o The proposed amendment is the best way to satisfy that need o The amendment is consistent with the goals, objectives and policies of the Comprehensive Plan 9W.bvEi 2018 Comprehensive Plan Update 1-5 o The amendment is in the best interest of the City of Andover as determined by the City Council • Review Comprehensive Plan amendments concerning a proposed land use change with the following criteria: o Conditions have changed since the present land use designation was established such to warrant the proposed amendment or the present land use designation is in error o The proposed land use is compatible with surrounding land uses and with the goals, objectives and policies of the Comprehensive Plan o There is capacity of public systems, facilities and services to serve the proposed land use and capacity of these systems to serve other planned land uses is not adversely affected o Agreement can be reached for the applicant of the proposed land use to pay for any increased capacity of public systems, facilities and services required to serve the proposed land use o Potential impacts by the proposed land use on natural resources including vegetation, wetlands, floodplain and other natural features can be avoided or sufficiently mitigated as determined by the City Council o To ensure a transition or buffer between urban and rural residential zoning districts Land Use Goals, Objectives and Policies Goal 4: Allow residential growth while maintaining the quality of natural resources and amenities Objective: Clearly define areas for urban and rural residential development Objective: Promote orderly growth to ensure efficient utilization and delivery of community services Objective: Prevent extension of infrastructure that is inconsistent with the Comprehensive Plan Objective: Work cooperatively with resource protection agencies and organizations to minimize the impact of development on natural resources and amenities Objective: Create opportunities for the city to preserve open space, nature preserves and natural amenities through review of development proposals and implementation of the Parks and Open Space Plan AWLOW 2018 Comprehensive Plan Update Policies: • Maintain a Municipal Urban Service Area (MUSA) Boundary to define the boundary between the Developing Community and Rural Residential planning area designations of the 2040 Regional Development Framework • Stage urban development within the MUSA Boundary to ensure orderly growth and cost-efficient expansion of infrastructure • Review and update the staging plan periodically to address changes in times and conditions • Prohibit platting of property without municipal sewer and water within the MUSA Boundary; except for properties that cannot be feasibly developed at an urban capacity. • Restrict lot splits without municipal sewer and water within the MUSA Boundary • Encourage infill development within the MUSA Boundary with appropriate transitions to existing neighborhoods • Allow rural development outside of the MUSA Boundary consistent with the Rural Residential Land Use Designation • Require existing conditions information to be provided during the development review process to allow evaluation of opportunities to preserve and protect natural features and open space • Engage local watershed management organizations and other appropriate agencies and organizations in the review of development proposals Goal 5: Encourage appropriate economic growth and redevelopment Objective: Develop a diversified tax base through balanced development of commercial, light industrial, and residential properties Objective: Create cohesive vibrant retail hubs to serve the community by aggregating commercial land uses along Bunker Lake Boulevard Objective: Select strategic locations for neighborhood and community commercial sites and establish design performance standards for such uses that promote quality site design and compatible land use arrangements Objective: Prevent the intensification of neighborhood commercial areas that may negatively affect surrounding residential properties Axo*^2018 Comprehensive Plan Update 1-7 Policies: • Maintain the existing commercial nodes along Hanson Boulevard, Bunker Lake Boulevard, Round Lake Boulevard, Crosstown Drive and 7t" Avenue as cohesive, interrelated nodes of commercial activity • Prevent fragmented, uncoordinated and linear commercial development away from these locations • Provide limited opportunities for commercial development in other areas of the city only when demand is demonstrated with a professionally prepared market study • Ensure that new development and redevelopment has a positive impact on the community by providing appropriate transitions and demonstrating compliance with the City Code • Promote redevelopment of existing industrial zones to accommodate industrial development, enhance community appearance and tax base • Allow limited industrial development within Andover Station North when the use, site design, and building architecture are compatible with the existing and planned uses within this commercial center • Encourage continued investment in the Andover North regional shopping area Goal: Protect and develop access for alternative energy systems Objective: Preserve reasonable access to all parcels so that alternative forms of energy can be used to supplement or replace conventional forms of energy Policies: • Encourage and support educational programs and research that focuses on alternative or renewable energy systems such as offered by Metro Cities, University of Minnesota Extension Services, Minnesota Office of Environmental Assistance, Anoka County and other organizations • Encourage the possible use of solar energy in future housing developments • Encourage future site and building plans to design for efficient use of solar energy including such elements as the location of windows, shade trees, and driveways Goal: Reduce maintenance and energy costs for public facilities and infrastructure AN6OVE 2018 Comprehensive Plan Update 1-8 Objective: Where feasible, use low energy design elements for future public facilities and infrastructure development Policy: • Explore alternative energy sources when replacing systems in public facilities Housing Goals, Objectives and Policies Goal: Provide a variety of housing types to accommodate the life cycle needs of all residents Goal: Remain responsive to housing market demands through implementation of the Land Use Plan Objective: Utilize the existing housing stock to provide a portion of the affordable housing demand projected by the Metropolitan Council Objective: Utilize local controls to provide opportunities for a variety of housing types, including affordable housing Objective: Continue to work with agencies that provide affordable housing and housing for residents with special needs Policies: • Work with property owners to identify sources of funding for home improvements to prevent deterioration of the city's older homes • Support Anoka County's efforts to implement the Five -Year Consolidated Plan • Utilize the planned unit development review process for medium and high -density residential projects to encourage more efficient allocation of density and intensity of land use and get higher quality development while providing amenities not otherwise achievable with existing zoning classes. • Support public service agency applications for the Community Development Block Grant Program AKD6�W 2018 Comprehensive Plan Update 1-9 Transportation Goals, Objectives and Policies Goal: Provide a safe and efficient transportation system that is cost effective and serves the existing and future access and mobility needs of the City Objective: Ensure adequate internal and external transportation access and links for efficient movement of people and goods Objective: Provide a transportation system that enhances quality economic development within the City Objective: Provide a transportation system that meets the varied needs of Andover residents Objective: Consider the mobility needs of all persons in the planning and development of the transportation system Objective: Continue to support Anoka County Transportation Department applications for safety improvements of roadways Policies: • Provide for early and continuing citizen involvement in transportation planning and implementation of projects • Provide a roadway system within a functional hierarchy that accommodates existing and future travel demands by providing the necessary design features to satisfy the roadway's intended use • Provide sufficient roadway capacity through the construction of transportation system improvements that accommodate existing and future demand • Require construction of transportation system improvements in conjunction with new developments when the need is created by the new development • Require payment for future transportation improvements as a part of development approval proportionate to the demand created by new developments • Ensure that all components of the transportation system are maintained and developed to the highest standards to insure against detrimental impact upon community growth • Utilize the Capital Improvement Plan to schedule projects that increase public safety by minimizing hazards and correcting poorly designed intersections and access points Acto DOVE1 2018 Comprehensive Plan Update 1 - 10 Goal: Provide a coordinated transportation system that is compatible with adjacent municipality, Anoka County, Metropolitan Council and State of Minnesota transportation plans Objective: Coordinate transportation planning and transportation system improvements with other government agencies to increase efficiencies Objective: Increase opportunities for funding of local transportation system improvements from federal, state and county funding sources Policies: • Coordinate grant applications and other funding requests, when appropriate, with neighboring municipalities, as well as state, regional and county agencies • Coordinate participation of Anoka County and adjacent cities, where appropriate, in the provision of Transportation Plan elements Goal: Provide multi -modal transportation options whenever and wherever feasible and advantageous Objective: Periodically evaluate potential ridership and feasibility of joining the Metropolitan Transit Taxing District to provide additional transit options for Andover residents Policies: • Identify locations for park and ride facilities and preserve the ability to implement these facilities in the future • Promote ridesharing and increased vehicle occupancies throughout the City Goal: Minimize impacts of the transportation system on the natural environment Objective: Ensure environmentally sensitive implementation of the transportation system through the planning, design and construction of improvements Objective: Consider the impacts of improvements to the existing transportation system on land use, environmental, social, historic, and cultural resources 9AN-6bWA2018 Comprehensive Plan Update 1 - 11 Policies: • Adhere to best management practices and all components of the Implementation Plan during the planning, construction and maintenance of the transportation system • Separate non -motorized traffic from arterial and collector roadways • Encourage joint parking facilities to conserve land Goal: Enhance accessibility by providing an interconnected multi- use trail system Objective: Provide an accessible trail system that links residential neighborhoods, commercial developments, and park areas Objective: Utilize multiple funding sources to complete the regional and local trail systems Objective: Coordinate trail construction with street improvement projects, new development, expansion and redevelopment projects Policies: • Maintain a map of existing and future local and regional trails and coordinate trail planning, construction and maintenance in the Capital Improvement Plan • Fund regional trail system improvements adjacent to residential properties with trail fees collected from new residential developments • Require regional trail construction adjacent to commercial and industrial properties, where shown on the trails plan, in conjunction with development, expansion and redevelopment projects • Require local trail construction adjacent to residential, commercial and industrial properties, where shown on the trails plan, in conjunction with development, expansion and redevelopment projects • Develop trails in accordance with the American Association of State Highway Transportation Officials (AASHTO) standards • Coordinate trail and sidewalk improvements, where appropriate, with Anoka County and neighboring cities Aw OVE 2018 Comprehensive Plan Update 1 - 12 Water Resources Goals, Objectives and Policies These goals, objectives and policies are included within the City of Andover Water Resource Management Plan and Water Supply Plan. These are separate documents that have been adopted as a component of the Comprehensive Plan. Parks and Open Space Goals, Objectives and Policies Goal 1: Provide parks and facilities that meet present park needs and plan for the future needs of the city Objectives: a. Maintain and upgrade current park facilities b. Evaluate existing conditions and future growth projections to determine the types of parks and facilities needed to complete the park system C. Provide more passive recreation opportunities d. Provide for a balance among active and passive recreation areas and activities e. Provide recreation facilities for all age groups and abilities within the city f. Design and maintain recreation areas with appropriate lighting, landscaping, parking, and shelter design g. Consider the Site Selection Criteria established in the Parks and Open Space Plan and the standards of the National Recreation and Park Association in the planning and design of the park system Policies: • Implement a maintenance schedule for the grounds and facilities within the current park system • Aggregate resources from local, state and federal sources to complete planned improvements as scheduled in the Capital Improvement Plan • Maintain and Update the Park Study as a guide for the number, size, type and location of parks and facilities needed to complete the park system to serve the needs of residents c AN- 6 OVE 2018 Comprehensive Plan Update 1-13 • Accept only lands suitable for park and recreation purposes as fulfillment of the parkland dedication requirements. • Utilize the Capital Improvement Plan to schedule replacement of existing park facilities and installation of new facilities • Utilize the Park and Recreation Commission to advise the Council on matters relating to parks, recreation and park facilities • Provide regulations and policies for park use and park dedication • Consider the adopted Guidelines for Field Usage by Youth Athletic Associations • Work cooperatively with other organizations and government agencies to enhance local and regional park systems Goal 2: Promote, protect, preserve and enhance the City's natural resources and open space for the enjoyment of residents, protection of water and air quality and the preservation of wildlife habitat Objective: Consider development of passive, nature -related recreation or conservancy areas on sites found to be suitable for these purposes Objective: Identify appropriate areas for preservation through analysis of natural features, the Site Selection Criteria established in the Parks and Open Space Plan and the Land Use Plan Objective: Plan for and provide connections with the park and trail systems in a manner that both preserves and allows public enjoyment of natural areas Objective: Seek to provide buffer areas adjacent to significant natural resources and parks Policies: • Work collaboratively with property owners in the preservation of open space • Permanently protect open space with conservation easements, even when fee title acquisition and other methods are used • Prepare, implement and monitor the effectiveness of conservation plans that address the specific characteristics of the various types of natural areas • Utilize the Open Space Advisory Commission to advise the Council on matters concerning preservation of open space AKD�MA 2018 Comprehensive Plan Update 1 - 14 • Prevent incompatible land uses from locating adjacent to parks and open space areas through implementation of the Land Use Plan and zoning regulations • Work cooperatively with other organizations and government agencies to acquire and enhance open space areas within the city • Recognize preservation of nature preserves and open space as a benefit in Planned Unit Developments Response to January 19, 2025 & February 20, 2025 Memorandum TO: Peter Hellegers, City Planner FROM: Michael Mordal-Huebsch, Bogart, Pederson & Associates DATE: March 10, 2025 RE: Review #1 — The Meadows East PUD: PUD for 15-lot rural residential development at 16xxx Ward Lake Dr NW (PID: 11-32- 24-41-0003) Thank You for reviewing the Sketch Plan of the property on 16xxx Ward Lake Drive and surrounding lots to the north. BPA has reviewed the comments and we offer the following response to comments and recommendations that have been made in the review. Comments on the plan have been tabulated and responded to below. Engineering Department The following comments are regarding Review #1 to Joe Janish: 1. The developer is responsible to obtain the necessary permits from the LRRWMO, DNR, MPCA or any other agency that is interested in the site. a. BPA Response: Comment noted. 2. Stormwater design shall meet requirements of the City's Stormwater Management Plan and LRRWMO requirements. a. BPA Response: Comment noted. We are planning on multiple infiltration basins throughout the site, final locations may change depending on grading. 3. Concrete ribbon curb would be required along the roadway edges consistent with City Standard Detail 518B for new rural residential roadways. a. BPA Response: Comment noted. The 18" Concrete ribbon curb will be used. 4. Developer would be responsible for removing existing temporary cul de sac on Sycamore Street and restoring adjacent properties front yards and driveways to existing or better condition. a. BPA Response: Comment noted. This is called out and more information will be included with the removal plan. 5. An 80' diameter temporary cul de sac would be required on the stub street on the north end of the plat. a. BPA Response: The temporary cul-de-sac will have an 80' diameter. 6. Refer to Engineering Design Standards and Engineering Plan Review checklist for miscellaneous required items if plans evolve beyond sketch plan. a. BPA Response: Comment noted. 7. Engineering would support the proposed vacation of the existing right of way along the south plat boundary in the east/west direction. a. BPA Response: This is currently planned to be vacated to the existing lots to the south. 8. During the preliminary plat review the Park & Recreation Commission will need to review and determine if land should be dedicated for a park or if a cash dedication will be recommended in lieu of land. Bogart, Pederson & Assoc Phone: 763/262-8822 13076 First Street Fax:763-262-8844 Becker, MN 55308 Toll free: 888/210-8301 www.bogao-pederson.com a. BPA Response: Comment noted. The developer is pursuing a cash dedication. 9. When beginning the platting process, the plat, grading plan and all other plans must utilize the Anoka County coordinate system and datum so the information can be transferred to the City's GIS mapping. a. BPA Response: Comment noted, this datum will be utilized. 10. Additional comments pending further review. a. BPA Response: Comment noted. Planning Department The following comments are regarding Review #1 to Scott Wold: Fire Department 1. Fire access shall be maintained throughout the construction period. a. BPA Response: Comment noted. Planning Department Planning Department comments from Review #1 are asfollows: 2. Gross Site Area is different from what has been provided in the past. In the past a number of 33.7 acres was provided. a. BPA Response: The gross site area is now identified to be 35.24 acres. The exact area will be determined with the preliminary plat. 3. All lots shall have 4 trees in the front yard, unless Natural Resource Technician agrees to less due to preservation of existing trees. If tree(s) are preserved in the front, it may satisfy the front yard requirements. However, builder may still have to plant 4 trees elsewhere; at the discretion of the Natural Resource Technician. a. BPA Response: A full landscape plan shall be developed and follow this requirement. 4. Layout indicates 60 foot ROW; however, narrative describes 50 foot ROW. a. BPA Response: A 50' ROW is now shown and proposed. An additional 10 feet of drainage and utility easement will be provided to provide a total of 20 foot drainage and utility easements along the new roadways. 5. Septic soil boring logs will be required at time of final plat. a. BPA Response: Comment noted. We are planning to have borings located on infiltration basins, points in the road, and septic locations. 6. Entrance monument sign appears to be within ROW. This will require a 10-foot setback from property lines/ROW and will need to be evaluated related to sight triangles. a. BPA Response: This will be pushed north to be 10' off of the right of way with proper easements. When full size of sign is designed, final location will be set. 7. Preliminary and Final Plat process will also be required. a. BPA Response: Comment noted. 8. As plans continue forward, they will need to be submitted to the Lower Rum River Water Management Organization (LRRWMO). a. BPA Response: Comment noted. 9. Additional comments pending further review a. BPA Response: Comment noted. Bogart, Pederson & Assoc Phone: 763/262-8822 13076 First Street Fax:763-262-8844 Becker, MN 55308 Toll free: 888/210-8301 www.bogaa-pederson.com If you have any questions I can be reached at (763) 262-8822. Thank you for providing review comments for this project. Sincerely, Bogart, Pederson & Associates, Inc. Michael Mordal-Huebsch, P.E. Bogart, Pederson & Assoc Phone: 763/262-8822 13076 First Street Fax:763-262-8844 Becker, MN 55308 Toll free: 888/210-8301 www. bogart-Pederson. com Bogart, Pederson & Associates, Inc. CIVIL ENGINEERING 7,rQt�iti4�tQi�Ct�led •ati�Ie So%[aKd LAND SURVEYING ENVIRONMENTAL SERVICES February 3, 2025 City of Andover 1685 Crosstown Boulevard N.W. Andover, Minnesota 55304 RE: PUD Narrative for HARTMANS MEADOWS Development. Requested by SW Wold. SW Wold is proposing a Low Impact Residential Development in the City of Andover. The project is located along Ward Lake Dr NW and 167th Ave NW. The Parcel is approximately 35.2 acres in size and is currently zoned R-1, Single Family Rural Residential. The property requires flexibility from the zoning standards to allow for a Low Impact Development (LID) to be developed. The Low Impact Design will allow for onsite trees and other natural features to be preserved, while enhancing the remaining areas with additional plantings and improvements. This design will incorporate natural and engineered stormwater treatment methods to treat and control stormwater onsite. This development will deviate from the R-1 zoning standards with a rural residential road section having a 50-foot wide right of way, larger 20-foot wide easements versus 10-foot, and ribbon curb, similar to other developments within the City of Andover. These design elements enhance stormwater management and reduce runoff by minimizing impervious coverage for future roads and driveways. The flexibilities will create a more efficient design to allow for the preservation of natural features of the property and ensure economic viability & general welfare of the City. The Purpose of Each District for R-1 Single Family Rural Residential: • This district is intended to provide a residential atmosphere for those persons desiring to retain a large parcel of land. Such large lots are logical in areas where development into smaller lots would be difficult, or where public utilities will not be available in the foreseeable future. Furthermore, larger houses are more costly and require larger lots. Thus, to provide an area to accommodate those persons with the financial means to erect a large house, it is necessary to have an area of large lots. • Land which is wooded, or which has a changing topography, and low land which tends to be poor agriculturally is also the most expensive to develop for residential sites and, after development, the sites tend to be expensive to maintain. Such areas are the most interesting and most susceptible to large lot development. The district also is intended to preserve productive land for agricultural use. (Amended Ord. 314, 10-4- 05) • Maximum impervious surface area and stormwater management standards - o The total area of all structures shall not exceed 20% of each lot as identified in City Code. o Development will minimize the extent of disturbed areas, runoff velocities, erosion potential, and reduce/delay runoff volumes, and stabilize and protect disturbed areas. SO - foot wide rights of way will allow for a reduction of Page I 1 The proposed HARTMANS MEADOWS Low Impact Development requests the following of the PUD to allow greater flexibility of design by incorporating design modifications and/or alternative uses into a conventional zoning district's requirement: • Use of rural residential road section with ribbon curb. • 50-foot wide right of way corridor with 20-foot-wide drainage easements. • Exceed maximum block length of 1,320 feet. The intent is to meet all R-1 front, side and rear setbacks and lot size/dimensional standards. Preliminary soil borings show that standard septic systems can be installed with adequate separation to wells for each lot. The City of Andover has a maximum block length of 1,320 feet. Working with the site and existing roadways and access to Ward Lake Drive NW, the proposed access to Ward Lake Drive through this development is preferred. The railroad tracks to the west create issues with trying to address the length as the Railroad limits crossings. The proposed roadway will add a second access to the existing development (Deerwood Estates) to the south. The developer is looking to take the lead to vacate the 167th Ave NW right of way (East/West of existing Sycamore St NW). This vacation of right of way will provide additional land to 16668 Sycamore St NW and 16683 Sycamore St NW. The street and lot layouts were specifically designed to preserve as many trees as possible by leaving the native forested areas, other than the required Sycamore Street connection area. The developer proposes extensive plantings to extend throughout remaining portions of the development, and also proposes a conservation easement over a buffer strip along the south side of the property to preserve the existing trees (see proposed PUD map). The development will have a Homeowners Association (HOA) that will be proposed as part of the Preliminary Plat. This HOA will be responsible for maintenance of the monument sign at the entrance onto Ward Lake Drive NW and for approving design considerations prior to construction of each new home. Minimum houses sizes will be 1,600 square feet for ramblers and 2,000 square feet for two - stories, with a minimum garage size of 720 square feet. Roof pitches will be 7:12 or greater. Exteriors will be finished with maintenance free siding and minimum of 150 square feet of stone or rock on the front fagade. High -end design elements will be utilized throughout the development and construction of homes. The Low Impact Development will provide conservation of nature and sustainable development with the overall design to manage and protect the land in ways that benefit the environment and future generations. Page 12 Z3 4z .°� RTMANS 0 I An ov ,. MN I I Parcel I : 11-3 MW 2.74 2 AA((EEppccGG 2.`,9 ACRES .j, it „�. •� a� � � 2.54 ACRES t i r t 2.56 ACRES 4 3] J -�-. 4 El-k Hd1 Cpn:ce yam_ Septic FiekJs 3� t +tee 0 2 2.59 ACRES 2.54 ACRES S 25, .51 ACRES Quaking Aspen- Wn:telRed P,n355 y 2.5S ACRES . \ + silo - r ..�.n: �-r 167TH AVE NW MiL I/ I III a CONCEPT DATA Gross Site Area: Ri 35.24 Ac s t<. Proposed Zoning. P.U.D. Proposed Single Family Lots. 12 Units A PROPOSED ZONING STANDARDS Single Family House Lot - - - Standard Lot Size Width: 300' Area. 2.5 Ac Setbacks Front Setback 40' Side Setback: 10, Rear Setback: 50, Front Easement. 20' Proposed Tree Types mixed into lots, 40 trees total (Exact Locations to be finalized with evil design) • Red Maple • Paper Birch Bur 0 k • American Elm • Big Tooth Aspen • Servicebeny • Black Spruce • Quaking Aspen • White Pine • Red Pine o' ao• � SCALE 1'.pp BOGART PEDERSON 763-262-8822 C I T Y O F NDOVE 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV TO: Planning & Zoning Commissioners FROM: Joe Janish, Community Development Director SUBJECT: Public Hearing: Consider City Code Amendment — City Code 12-2 adding definition of "Cannabis Retail Business" & City Code 12-11: Commercial/Industrial Permitted, Permitted Accessory, Conditional, Interim and Prohibited Uses — "Cannabis Retail Business" — City of Andover (Applicant) DATE: March 19, 2025 DISCUSSION The 2023 MN State Legislature adopted State Statute 342 legalizing Cannabis in Minnesota as of August 2023 and amended in 2024. The legislation creates the framework for adult -use cannabis in Minnesota and established a new Office of Cannabis Management (OCM), which will regulate cannabis and issue licenses and develop regulations outlining how and when businesses can participate in the industry. Under State Statute 342 local governments play a critical role in the licensing process, serving as a near final approval for a cannabis business nearing award of a State license from the OCM. Once the Applicant is vetted by the OCM and is selected to proceed in the verification process. The Applicant is then required to receive the City's certification of zoning compliance and approved of local registration before operations may commence. City Council will review language for local registration at the same time they review tonight's proposed amendment. City Council provided feedback to the registration process and zoning amendment at a January 28, 2025 Workshop. The proposed amendments tonight follow that direction. In order to allow for sales which State Statute 342 requires we will need to define Cannabis Retail Business in City Code 12-2, and identify locations within City Code 12-11 Commercial/Industrial Permitted, Permitted Accessory, Conditional, Interim and Prohibited Uses. The proposed "use" locations follow our current cannabinoid locations and will be allowed in Neighborhood Business (NB), Shopping Center (SC), General Business (GB), Industrial (I) provided they meet the registration requirements. The registration process establishes a buffer of 500 feet from commercial daycares and 1,000 feet from city parks, staff has included the Cannabis Buffer Map as part of this agenda item. Although registration is not part of this discussion or zoning amendment, here are a few highlights of the registration approval: • Limits of privately held cannabis retail businesses licensed in the City based on population • Required Registration Fees • Outlines City registration process, business relocation, and renewal process • Retail Business Hours of Operations • Retail Business Building Conditions • Retail Business Compliance Checks • Registration, Suspension, and Cancellation • Civil Penalties ACTION REQUESTED The Planning and Zoning Commission is requested to hold a public hearing and make a recommendation to the Andover City Council. Resp ctfu s m' ed, Jo Janish Community Development Director Attachments Draft Ordinance Changes Draft Cannabis Buffer Map CITY OF ANDOVER COUNTY OF ANOKA STATE OF MINNESOTA ORDINANCE NO. XX THE CITY COUNICL OF THE CITY OF ANDOVER HEREBY ORDAIN AS FOLLOWS: CITY CODE TITLE 12: ZONING REGULATION CHAPTER: 2 RULES AND DEFINITIONS SECTION 12-2-2 DEFINITIONS Cannabis Retail Business: A business licensed by the Office of Cannabis Management (OCM) and registered with the City to sell Adult -use cannabis products directly to customers including Medical Cannabinoid Products. Cannabis Retail Business does not include any other cannabis State license types including those who may have a combination license, which includes a retail component. CITY CODE CHAPTER 11: COMMERCIAL/INDUSTRIAL PERMITTED, PERMITTED ACCESSORY, CONDITIONAL, INTERIM AND PROHIBITED USES COMMERCIAL/INDUSTRIAL PERMITTED, PERMITTED ACCESSORY, CONDITIONAL, INTERIM AND PROHIBITED USES P — Permitted Use NB — Neighborhood Business PA — Permitted Accessory Use SC — Shopping Center C — Conditional Use' GB — General Business I — Interim Use I - Industrial PLJD — Planned Unit Development X — Prohibited Use RETAIL TRADE AND SERVICES I NB SC GB I Cannabis Retail Business in Compliance with City Code 3-11 1 P P P P All other Titles, Chapters, and Sections of the City Code shall remain as written and adopted by the Andover City Council. Adopted by the City Council of the City of Andover on this 1st day of April 2025. ATTEST: CITY OF ANDOVER: Michelle Hartner, City Clerk Jamie Barthel, Mayor C I T Y O F NDOVE^ 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV TO: Planning and Zoning Commissioners FROM: Peter Hellegers, City Planner SUBJECT: Appointment of Vice Chairperson DATE: March 19, 2025 DISCUSSION The Commission is requested to nominate and appoint a Vice Chairperson. At their February 25 h meeting the Commission appointed Commissioner Loehlein to be the Chairperson and former Commissioner Godfrey to the Vice Chairperson. Former Commissioner Godfrey was appointed to fill the vacant seat on the City Council and then vacated the seat on the Planning and Zoning Commission and the Vice Chairperson role.