HomeMy WebLinkAbout2021 CIP 2021 2025 Capital Improvement Plan 1685 Crosstown Blvd NW, Andover, MN 55304 Phone: 763.755.5100 Fax: 763.755.8923 www.andovermn.gov CITY OF ANDOVER 2021 2025 Capital Improvement Plan Table of Contents Introduction 2021 2025 Capital Improvement Plan Message ........................................................................................................ 1 CIP Project Development & Process Authorization Schedule ..................................................................................... 4 Graph 2021 Expenditures By Department ................................................................................................................ 6 Graph 2021 CIP Expenditures By Year .................................................................................................................... 6 Five Year Summary of Expenditures By Department .................................................................................................. 7 Five Year Summary of Revenue By Source ................................................................................................................ 8 Five Year Summary of Projects By Department & Revenue Source ........................................................................... 9 Improvements Five Year Summary of Expenditures By Department Improvements ....................................................................... 15 Five Year Summary of Revenue By Source Improvements ..................................................................................... 16 Five Year Summary of Projects By Department & Revenue Source Improvements ................................................ 17 Improvement Projects By Department Community Center ................................................................................................................................................ 21 Emergency Management ...................................................................................................................................... 32 Engineering ........................................................................................................................................................... 33 Facility Management ............................................................................................................................................ 43 Parks & Recreation Operations .......................................................................................................................... 58 Parks & Recreation Projects .............................................................................................................................. 73 Sanitary Sewer ...................................................................................................................................................... 82 Storm Sewer .......................................................................................................................................................... 84 Streets - Roadways ................................................................................................................................................ 85 Water..................................................................................................................................................................... 106 Equipment Year Summary of Expenditures By Department Equipment .................................................................................... 111 Five Year Summary of Revenue By Source Equipment ........................................................................................... 112 Five Year Summary of Projects By Department & Revenue Source Equipment ..................................................... 113 Equipment By Department Central Equipment ................................................................................................................................................ 117 Community Center ................................................................................................................................................ 118 Emergency Management ...................................................................................................................................... 124 Engineering ........................................................................................................................................................... 125 Facility Management ............................................................................................................................................ 126 Finance .................................................................................................................................................................. 127 Fire Department .................................................................................................................................................... 128 Information Technology ....................................................................................................................................... 138 Parks & Recreation Operations .......................................................................................................................... 141 Sanitary Sewer ...................................................................................................................................................... 154 Storm Sewer .......................................................................................................................................................... 155 Streets -Equipment ................................................................................................................................................ 156 Water..................................................................................................................................................................... 166 Appendix Road & Bridge Fund Projected Fund Balance ............................................................................................................. 169 Park Improvement Fund Projected Fund Balance ........................................................................................................ 170 Trail Fund Projected Fund Balance .............................................................................................................................. 171 Capital Equipment Reserve Projected Fund Balance ................................................................................................... 172 Building Fund Projected Fund Balance ....................................................................................................................... 173 Water System Financial Projections ............................................................................................................................ 174 Sewer System Financial Projections ............................................................................................................................ 176 Storm Sewer System Financial Projections ................................................................................................................. 178 1685 CROSSTOWN BOULEVARD N.W. ANDOVER, MINNESOTA 55304 (763) 755-5100 FAX (763) 755-8923 WWW.CI.ANDOVER.MN.US TO:Mayor and Council Members FROM:Jim Dickinson, City Administrator SUBJECT:20212025Capital Improvement Plan DATE:October20,2020 INTRODUCTION Improvement Plan for years 2021through 2025 worked diligently to produce a document that was both practical, substantive in addressing needed capital y changing suburban landscape. CAPITAL IMPROVEMENT PLAN GOALS A CKNOWLEDGE AND C OMMUNICATE PUBLIC I NFRASTRUCTURE PRIORITIES AND DYNAMICS E NSURE A PPROPRIATE R ESPONSES TO CHANGING INFRASTRUCTURE NEEDS AND DEMANDS D EVELOP A F INANCIAL A SSESSMENT OF C APITAL R ESOURCES AVAILABLE TO MEET FUTURE CAPITAL PROJECT PLANNING NEEDS I NSTITUTE A S TRATEGIC V ISION PREDICATED ON MAINTAINING A HIGH QUALITY SERVICE INFRASTRUCTURE CAPABLE OF MEETING THE NEEDS OF OUR CITIZENS FOR TODAY AND TOMORROW needs through careful long-term capital planning and balanced public investment in supporting physical infrastructure. To ensure that this commitment is both meaningful and achievable, appropriate capital improvement factors were given significant consideration in developing a CIP that addresses community priorities over the next five (5) years. The CIP will also provide a planning foundation for future needs assessments to ensure the City is appropriately responding to the critical infrastructure needs necessary for sustainable future growth. The CIP represents a beginning in terms of producing a comprehensive planning response to address changing capital needs by developing a project schedule that will lead to timely and cost-effective project completions. 1 DISCUSSION The 2021-2025CIP has been prepared as a strategic planning tool to assist the City Council in identifying proposed capital improvement projects over the next five years. With the inclusion of preliminary financing sources, appropriate background information citing needs and projected cost estimates, this document will provide Council with the needed information to begin the process for planning improvements that meet the identify the critical components of the City's infrastructure, yet maintain flexibility in determining project timeframes, project scope and possible funding sources. The 2021-2025CIP continues the emphasis of future capital expenditures. A critical step in the plan adoption process is the collaborative nature of plan review that involves the leadership of the City Council, the input of appointed Commissions and staff, and most importantly, affected residents of the community. Consequently, the strategic value of this plan lies in the acknowledgement of future needs by the governing body and the effective communication of those needs to the general public during project development stages. Likewise, the availability and preliminary designation of fiscal resources to serve both current and future needs is critical to the achievement of plan outcomes that meet with Council approval. Following the approval of the plan, feasibility studies are performed, affected constituenciesare notified to formally disseminate and receive public feedback on proposed project plans. This process culminates with the City Council considering all relevant information and making a final decision on whether to proceed with the proposed capital improvement. The public process that supports the advancement of these projects from inception to completion is engendered in the CIP project development and authorization schedule. Formalizing the steps in the CIP project advancement process serves a number of purposes and ensures that the Council and public are kept well informed regarding project purposes and desired outcomes, estimated project costs, funding sources, progress and final status. It should be emphasized that projects will require approval in various stages of project development by the City Council in accordance with approved policies. The objectives of the 2021-2025Capital Improvement Plan are to present a comprehensive capital improvement program that communicates efforts: to ensure that community priorities are reflected in the capital investment plans of each City department; to provide a consolidated financial picture of anticipated expenditures and outline recommended funding strategies to underwrite anticipated capital improvements; to document and communicate capital improvement processes for City projects that will ensure consistency, a full appreciation of both the costs and benefits of proposed capital investments, and raises the level of public understanding public improvement processes; to provide information on the fiscal impacts of capital investment plans on total City finances; and to effectively plan for public improvements that support community needs in the areas of private development infrastructure, transportation, public safety, parks and recreation, utilities, and commercial/industrial growth through fiscally responsible economic development initiatives. Accordingly, this document attempts to recognize known or perceived capital improvement needs, but as with any plan recognizes that social, economic and political considerations will by necessity determine final project outcomes. The major categories of expenditures that are identified within the CIP include, but are not limited to: 2 1.New Public Facilities Planning 2.Street Construction, Maintenance and Reconstruction 3.Utility Construction, Maintenance and Reconstruction 4.Construction, Maintenance and Upgrade of Parks, Playgrounds and Trails 5.Capital Improvements to Existing Facilities 6.Private development infrastructure 7.Capital equipment and vehicle planning needs (Equipment purchases to be determined through normal budgetary process) The City Council, consequently, accepts this document with the provision that capital improvement planning is subject to the dynamics of community growth, political leadership and acknowledges that other unanticipated needs may take precedence over plannedprojects. RECOMMENDATION The 2021-2025Capital Improvement Plan is the product of collaborative planning efforts by City staff, Park and Recreation Commission, Community Center Advisory Commissionand the City Council. Projects have been introduced based on 1) anticipated future growth trends current Comprehensive Plan, 2) the natural cycle of deterioration and decay evident in all physically constructed and engineered improvements in the more established areas of the community and 3) capital deficiencies or infrastructure issues brought to the City's attention through a variety of sources. Capital expenditures identified within the CIP are the best estimates available, and once the CIP is adopted, will be reviewed and confirmed through individual feasibility reports where appropriate. I am appreciative of the commitment, good judgment and expertise that each department has contributed to the capital improvement planning process. Respectfully submitted, Jim Dickinson City Administrator 3 CIP PROJECT DEVELOPMENT AND PROCESS AUTHORIZATION SCHEDULE The following process is a Council/staff guideline for authorizing public improvement projects. As this process is controlled by State Statute and other influencing environmental factors, it is subject to change and should be viewed as a guide to assist the Council and public in understanding the public improvement process used by City staff. A separate Council meeting would facilitate each step in the process, and accomplishment of respective activities.As a result, the process time frame is a significant and complete approved Council ordered projects within budget and on time. 1.Council Approval of Annual CIP Projects by City Resolution will authorize the following outcomes: a)Staff and/or Consultant preparation of project feasibility studies b)Staff preparation of detailed financial review of project funding sources c)Neighborhood Meeting may be held prior to Feasibility Study subject to need and type of project. TIME FRAME: October-November of each preceding year. 2.Presentation of Feasibility Study a)Feasibility Study Components: 1)Review of Project Engineering and Construction Estimates 2)Total Project Costs (All related project costs, i.e. land, soft costs) 3)Project Financial Plan/Fiscal Implications (Engineering/Finance) 4)Authorization to develop a Preliminary Assessment Roll, if any, for the Public Hearing. (Engineering) d Setting Date for 1)Notices mailed to affected Residents per statute requirements no less than 10 days before Public Hearing. (Engineering) 2)Public Hearing Notice is published. Two publications one week apart, with the second publication no less than three days before the hearing. (Engineering/City Clerk) TIME FRAME: February-March-April-May of current year. 3.Neighborhood Meeting City staffwill hold neighborhood project meetings, when appropriate, to review and present Project Feasibility Studies, answer questions and meet with affected property owners. These meetings will include a question and answer component designed specifically to bring awareness to the property owner, public improvements in the affected area. TIME FRAME: Following the presentation of the Feasibility Study to Council, but prior to the holding of a Public Hearing by Council. 4.Council holds a Public Hearing when appropriate for following purposes: a)Presentation of Project (Engineering Department) b)Presentation of Preliminary Special Assessment Rolls and Financing Implications (Engineering/Finance Department) c)Council to hear Affected Resident Input d) 4 Council may ORDER THE IMPROVEMENT after the public hearing is closed or at a subsequent Council Meeting within 6 monthsof the public hearing date. (Statutory Requirement -Council Resolution ordering project must be approved on 4/5 Council vote if it is Council initiated project with assessments). If Council decides to reject the project as presented, a Council vote should be taken to officially determine the final status of the project. TIME FRAME: April-May-June of current year 5.Plans and Specifications are presented to Council for approval. (Engineering Department) a)A Council Resolution is drafted authorizing the following: 1)Accepting and Approving Project Plans and Specifications 2)Authorizing the Advertisement for Project Bids. Bids are developed and invitation to Bid is processed. Bid opening date is no less than 3 weeks after publication. (Engineering) 3)Authorize staff to pursue an appropriate funding mechanism to underwrite project costs TIME FRAME: May-June of each year 6.Council Acceptance of Project Bids and Awarding of Contracts would authorize the following outcomes: a)A Counci b)Initiation of Project Construction and work (Engineering) TIME FRAME: April-May-June-July of current year. 7.Project Completion a)Council Acceptance of Project b)Final Presentation and Review of Project Costs versus Project Budget by Finance Department. c) d at this same meeting. (Engineering/Finance) TIME FRAME: Upon completion of project. 8.If Special Assessments would finance a portion of the projects costs, Council Holds a Special Assessment Hearing to review the following: a)Affected Property owners would be officially notified per statute no less than two weeks prior to Special Assessment Hearing. (Clerk/Engineering) b)Public Notice is published no less than two weeks prior to Special Hearing per statute (Clerk/Engineering) c)Staff prepares a proposed roll and Council Approves Final Assessment Roll (Engineering/Finance) d)Council consideration of Assessment Appeals and Requested Deferrals filed prior to hearing or during the hearing. e)Meets M.S. Chapter 429 statutory requirements at this meeting. TIME FRAME: October/November of current year depending on finalization of project and status of completion. 5 6 Capital Plan Central Equipment45,00045,000 Community Center33,000145,0001,372,00050,000423,000 2,023,000 Emergency Management60,00050,00025,000 135,000 Engineering896,0002,229,000262,0001,210,000538,000 5,135,000 Facility Management466,000295,000370,000215,000160,000 1,506,000 Finance15,00015,00030,000 Fire12,00093,000140,000825,000770,0001,840,000 Information Technology7,00045,00030,00082,000 Park & Rec - Operations195,000465,000135,000385,000480,000 1,660,000 Park & Rec - Projects255,000415,00015,00015,000575,000 1,275,000 Sanitary Sewer85,0003,500,000 3,585,000 Storm Sewer65,00068,00070,000320,00073,000596,000 Streets - Equipment70,000270,00060,000595,000560,0001,555,000 Streets - Roadways2,956,0006,374,0002,652,0009,630,0004,128,00025,740,000 Water1,555,0002,435,000355,000300,000360,0005,005,000 6,585,00013,014,0005,486,00017,045,0008,082,00050,212,000 7 Capital Plan Assessments600,0001,307,500448,0002,183,500680,0005,219,000 Capital Equipment Reserve217,000538,000255,000185,000370,000 1,565,000 Comm Ctr Operations33,000145,0001,372,00050,000423,0002,023,000 Construction Seal Coat Fund10,00010,00010,00010,00010,000 50,000 County Reimbursement1,500,0001,500,000 Donations100,000460,000560,000 Equipment Bond620,0001,435,0001,380,000 3,435,000 Facility Maintenance Reserve467,000295,000370,000215,000160,0001,507,000 General Fund141,000585,000135,000235,000255,000 1,351,000 Grant1,900,0001,900,000 Municipal State Aid Funds1,412,500512,0002,416,5001,000,0005,341,000 Park Dedication Funds255,000135,00015,00015,000465,000 885,000 Road & Bridge Funds2,962,0003,733,0001,754,0003,125,0002,696,00014,270,000 Sanitary Sewer Fund42,500 42,500 Sewer Revenue Bonds2,250,0002,250,000 Sewer Trunk Fund125,000125,000130,000135,000140,000 655,000 Storm Sewer Fund65,000110,50070,000320,00073,000638,500 Trail Funds1,020,000705,0001,725,000 Water Fund1,340,000100,000155,000100,000160,000 1,855,000 Water Trunk Fund270,0002,375,000260,000265,000270,0003,440,000 6,585,00013,014,0005,486,00017,045,0008,082,00050,212,000 8 Capital Plan Replacement - Service Truck #371222-48800-0145,000 45,000 Capital Equipment Reserve45,00045,000 45,00045,000 Remodel Old Proshop and Info Desk Area121-44000-0215,00015,000 Comm Ctr Operations15,00015,000 Replacement - Lobby Furniture121-44000-0510,00010,000 Comm Ctr Operations10,00010,000 Refinish wooden benches121-44300-018,000 8,000 Comm Ctr Operations8,0008,000 Replacement - Walk Behind Floor Scrubber122-44000-0115,00015,000 Comm Ctr Operations15,00015,000 Exterior Caulking122-44000-0450,00050,000 Comm Ctr Operations50,00050,000 Replacement - Water Heater122-44000-0570,000 70,000 Comm Ctr Operations70,00070,000 Replacement - Electric Edger122-44300-0210,00010,000 Comm Ctr Operations10,00010,000 Carpet - Office/Fieldhouse Foyer123-44000-0115,000 15,000 Comm Ctr Operations15,00015,000 Replacement - Roof123-44000-021,300,000 1,300,000 Comm Ctr Operations1,300,0001,300,000 Replacement - Kaivac Cleaning System123-44000-036,0006,000 Comm Ctr Operations6,0006,000 Concrete Floor Sealant123-44000-0636,000 36,000 Comm Ctr Operations36,00036,000 Replacement - Zamboni Battery Pack123-44300-0115,000 15,000 Comm Ctr Operations15,00015,000 Repaint Field House Ceiling124-44200-0150,00050,000 Comm Ctr Operations50,00050,000 Replacement - ACC East Parking Lot125-44000-01200,000 200,000 Comm Ctr Operations200,000200,000 Replacement - Carpeting Entryway125-44000-028,000 8,000 Comm Ctr Operations8,0008,000 Repaint Ice Arena ceiling125-44300-01200,000200,000 Comm Ctr Operations200,000200,000 Replacement - Zamboni Battery Pack - Machine #2125-44300-0315,000 15,000 Comm Ctr Operations15,00015,000 33,000145,0001,372,00050,000423,0002,023,000 9 Emergency Operations Center Improvement121-42400-0110,00010,000 Capital Equipment Reserve10,00010,000 Replacement - Emergency Sirens121-42400-0250,00050,00025,000 125,000 Capital Equipment Reserve50,00050,00025,000125,000 135,000 60,00050,00025,000 New Development Projects121-41600-01180,000185,000190,000200,000210,000 965,000 Sewer Trunk Fund125,000125,000130,000135,000140,000655,000 Water Trunk Fund55,00060,00060,00065,00070,000310,000 Pedestrian Trail Maintenance121-41600-0266,00069,00072,00075,00078,000360,000 Road & Bridge Funds66,00069,00072,00075,00078,000360,000 Pedestrian/Park Trail Reconstruction121-41600-03550,000450,000230,000250,000 1,480,000 General Fund450,00050,00070,000570,000 Road & Bridge Funds550,000180,000180,000910,000 New Pedestrian Trail and Sidewalk Segments122-41600-01800,000705,0001,505,000 Trail Funds800,000705,0001,505,000 Railroad Underpass Trail122-41600-02100,000680,000 780,000 Donations100,000460,000560,000 Trail Funds220,000220,000 Replacement - Pick Up Truck #6222-41600-0345,00045,000 Capital Equipment Reserve45,00045,000 5,135,000 896,0002,229,000262,0001,210,000538,000 Annual Parking Lot Maintenance/Replacement121-41900-0140,000250,000170,00050,00060,000 570,000 Facility Maintenance Reserve40,000250,000170,00050,00060,000570,000 Replacement - Tube Heaters PW121-41900-0280,000 80,000 Facility Maintenance Reserve80,00080,000 Replacement - Air Handling Unit/Condenser FS #1121-41900-036,0006,000 General Fund6,0006,000 Replacement - Refinish PW Exterior Panels121-41900-04250,000250,000 Facility Maintenance Reserve250,000250,000 New - 1/2 ton Pick Up Truck 4x4121-41900-0545,000 45,000 Facility Maintenance Reserve45,00045,000 New - Diesel Exhaust Capturing System FS #1121-41900-0645,00045,000 Facility Maintenance Reserve45,00045,000 Replacement - Roof Top Package Unit PW222-41900-0145,000 45,000 Facility Maintenance Reserve45,00045,000 Replacement - Emergency Generator FS #1123-41900-0150,000 50,000 Facility Maintenance Reserve50,00050,000 Replacement - Make Up Air Unit /Exhaust Fan PW123-41900-04125,000125,000 Facility Maintenance Reserve125,000125,000 Replacement - Tube Heaters FS #1123-41900-0525,000 25,000 Facility Maintenance Reserve25,00025,000 Replacement - Carpet / Tile124-41900-0130,000 30,000 Facility Maintenance Reserve30,00030,000 Replacement - Emergency Generator FS #2124-41900-0235,00035,000 Facility Maintenance Reserve35,00035,000 Replacement - Fire Sprinkler System FS #1124-41900-0350,000 50,000 Facility Maintenance Reserve50,00050,000 Replacement - Fire Sprinkler System PW124-41900-0450,000 50,000 Facility Maintenance Reserve50,00050,000 10 Replacement - Emergency Generator FS #3125-41900-0150,00050,000 Facility Maintenance Reserve50,00050,000 Replacement - Fire Sprinkler System CH125-41900-0350,000 50,000 Facility Maintenance Reserve50,00050,000 1,506,000 466,000295,000370,000215,000160,000 Financial / Payroll System Upgrade121-41400-0115,00015,000 30,000 Capital Equipment Reserve15,00015,00030,000 30,000 15,00015,000 New - Extrication Combination Tool121-42200-0112,000 12,000 Capital Equipment Reserve12,00012,000 New - First Response Vehicle122-42200-0170,00070,000 Equipment Bond70,00070,000 New - Digital Fire Extinguisher Training System122-42200-0312,00012,000 Capital Equipment Reserve12,00012,000 Replacement - Washer Extractor St. 2122-42200-0411,000 11,000 Capital Equipment Reserve11,00011,000 New - First Response Vehicle123-42200-0175,00075,000 Capital Equipment Reserve75,00075,000 Replacement - UT-10 #4810123-42200-0265,000 65,000 Capital Equipment Reserve65,00065,000 Replacement - Rescue 31 #481824-42200-011125,000 125,000 Capital Equipment Reserve125,000125,000 Replacement - Engine 31 #480024-42200-031700,000700,000 Equipment Bond700,000700,000 Replacement - Engine 11 #4821125-42200-02725,000 725,000 Equipment Bond725,000725,000 Replacement - Grass Utility Vehicle (UTV) #4813125-42200-0345,000 45,000 Capital Equipment Reserve45,00045,000 12,00093,000140,000825,000770,0001,840,000 Camera Security Software Upgrade121-41420-017,0007,000 Facility Maintenance Reserve7,0007,000 Laserfiche Upgrade222-41420-0145,00045,000 Capital Equipment Reserve45,00045,000 Replacement - Data SAN (Storage Area Network)223-41420-0130,000 30,000 Capital Equipment Reserve30,00030,000 82,000 7,00045,00030,000 Replace/Repair Play Structures - Various Parks121-45000-01100,000100,000100,000150,000150,000 600,000 General Fund100,000100,000100,000150,000150,000600,000 Replace/Repair Major Park Projects - Various Parks121-45000-0235,00035,00035,00035,00035,000175,000 General Fund35,00035,00035,00035,00035,000175,000 Replacement - Cushman Field Dresser #547121-45000-0330,000 30,000 Capital Equipment Reserve30,00030,000 Replacement - Trailer #T-555121-45000-0420,000 20,000 11 Capital Equipment Reserve20,00020,000 New - Turbine Tow-Behind Blower121-45000-0510,00010,000 Capital Equipment Reserve10,00010,000 Replacement - Large Capacity Mower #585122-45000-01130,000 130,000 Equipment Bond130,000130,000 Replacement - Tractor #515122-45000-0250,000 50,000 Capital Equipment Reserve50,00050,000 New - Trail Machine122-45000-03150,000150,000 Equipment Bond150,000150,000 Replacement - Toro Groundsmaster #561124-45000-0160,000 60,000 Capital Equipment Reserve60,00060,000 Replacement - One Ton Truck w/ Plow #569124-45000-0280,000 80,000 Equipment Bond80,00080,000 Replacement - One Ton Irrigation Truck124-45000-0360,00060,000 Equipment Bond60,00060,000 Replacement - Toro Groundsmaster #564125-45000-0180,000 80,000 Equipment Bond80,00080,000 Replacement - Toro Workman #565125-45000-0250,00050,000 Equipment Bond50,00050,000 Replacement - Toro Groundsmaster #550125-45000-0380,00080,000 Equipment Bond80,00080,000 Replacement - One Ton Truck w/ Plow #577125-45000-0485,000 85,000 Equipment Bond85,00085,000 195,000465,000135,000385,000480,0001,660,000 Annual Miscellaneous Park Projects121-45001-0115,00015,00015,00015,00015,000 75,000 Park Dedication Funds15,00015,00015,00015,00015,00075,000 Prairie Knoll North Parking Lot Impr121-45001-02230,000230,000 Park Dedication Funds230,000230,000 Pickleball Study121-45001-0310,000 10,000 Park Dedication Funds10,00010,000 Pine Hills North - Phase II122-45001-01400,000 400,000 Capital Equipment Reserve280,000280,000 Park Dedication Funds120,000120,000 Dalske Preserve Boardwalk125-45001-01110,000110,000 Capital Equipment Reserve110,000110,000 New Pickleball Facility125-45001-02450,000 450,000 Park Dedication Funds450,000450,000 255,000415,00015,00015,000575,0001,275,000 Replacement - One Ton Truck w/ Plow #78122-48200-0185,000 85,000 Sanitary Sewer Fund42,50042,500 Storm Sewer Fund42,50042,500 Rural Reserve Trunk Sanitary Sewer124-48200-013,500,000 3,500,000 Assessments1,250,0001,250,000 Sewer Revenue Bonds2,250,0002,250,000 85,0003,500,0003,585,000 Storm Sewer Improvements121-48300-0165,00068,00070,00070,00073,000346,000 12 Storm Sewer Fund65,00068,00070,00070,00073,000346,000 Replacement - Elgin Street Sweeper #16924-48300-011250,000250,000 Storm Sewer Fund250,000250,000 596,000 65,00068,00070,000320,00073,000 New - 3/4 Ton Truck w/ Snow removal equipment121-43100-0170,00070,000 Capital Equipment Reserve70,00070,000 New - Dump Truck w/ Snow removal equipment122-43100-01250,000 250,000 Equipment Bond250,000250,000 Replacement - Asphalt Roller #114122-43100-0220,000 20,000 Equipment Bond20,00020,000 Replacement - Bobcat S185 #120123-43100-0160,00060,000 Capital Equipment Reserve60,00060,000 New - Dump truck w/ Snow removal equipment24-43100-011255,000 255,000 Equipment Bond255,000255,000 Replacement - Dump Truck w/ Snow removal #19824-43100-021255,000255,000 Equipment Bond255,000255,000 Replacement - One Ton Truck w/ Plow #134124-43100-0385,00085,000 Equipment Bond85,00085,000 Replacement - Dump Truck w/ Snow removal #200125-43100-01260,000 260,000 Equipment Bond260,000260,000 Replacement - Aerial bucket truck #00-139125-43100-02200,000200,000 Capital Equipment Reserve200,000200,000 Replacement - Backhoe Loader #80125-43100-03100,000100,000 Equipment Bond100,000100,000 70,000270,00060,000595,000560,0001,555,000 Annual Street Crack Seal Project121-49300-02180,000190,000200,000210,000220,000 1,000,000 Construction Seal Coat Fund10,00010,00010,00010,00010,00050,000 Road & Bridge Funds170,000180,000190,000200,000210,000950,000 Annual Pavement Markings121-49300-0358,00060,00062,00064,00066,000310,000 Road & Bridge Funds58,00060,00062,00064,00066,000310,000 Curb, Sidewalk and Pedestrian Ramp Replacement121-49300-04100,000105,000110,000115,000120,000 550,000 Road & Bridge Funds100,000105,000110,000115,000120,000550,000 Municipal State Aid Routes / New & Reconstruct121-49300-051,600,000530,000670,0001,000,0003,800,000 Assessments187,50018,000103,500309,000 Municipal State Aid Funds1,412,500512,000566,5001,000,0003,491,000 Annual Street Reconstruction121-49300-063,400,000730,0002,300,0001,700,000 8,130,000 Assessments850,000180,000580,000430,0002,040,000 Road & Bridge Funds2,550,000550,0001,720,0001,270,0006,090,000 Intersection Upgrades121-49300-075,250,0005,250,000 County Reimbursement1,500,0001,500,000 Grant1,900,0001,900,000 Municipal State Aid Funds1,850,0001,850,000 Gravel Road Improvements121-49300-0818,00019,00020,00021,00022,000100,000 Road & Bridge Funds18,00019,00020,00021,00022,000100,000 Street Mill & Overlays121-49300-092,400,0001,000,0001,000,0001,000,0001,000,000 6,400,000 Assessments600,000250,000250,000250,000250,0001,600,000 Road & Bridge Funds1,800,000750,000750,000750,000750,0004,800,000 Pedestrian Crossing221-49300-10200,000200,000 Road & Bridge Funds200,000200,000 13 2,956,0006,374,0002,652,0009,630,0004,128,00025,740,000 Recondition & Paint Water Tower #2121-48100-0115,0001,655,000 1,670,000 Water Trunk Fund15,0001,655,0001,670,000 Rehabilitation of Wells121-48100-0230,00055,00060,000145,000 Water Fund30,00055,00060,000145,000 Water Meter Reading System AMI/AMR121-48100-041,210,000 1,210,000 Water Fund1,210,0001,210,000 Residential Meter Replacement121-48100-05100,000100,000100,000100,000100,000 500,000 Water Fund100,000100,000100,000100,000100,000500,000 Water Main Gate Valve Rehabilitation121-48100-06200,000200,000200,000200,000200,0001,000,000 Water Trunk Fund200,000200,000200,000200,000200,0001,000,000 Water Main Improvements122-48100-01480,000 480,000 Assessments20,00020,000 Water Trunk Fund460,000460,000 1,555,0002,435,000355,000300,000360,0005,005,000 6,585,00013,014,0005,486,00017,045,0008,082,00050,212,000 14 Capital Plan Community Center33,00050,0001,351,00050,000408,0001,892,000 Emergency Management10,000 10,000 Engineering896,0002,184,000262,0001,210,000538,000 5,090,000 Facility Management421,000295,000370,000215,000160,000 1,461,000 Park & Rec - Operations135,000135,000135,000185,000185,000 775,000 Park & Rec - Projects255,000415,00015,00015,000575,0001,275,000 Sanitary Sewer3,500,0003,500,000 Storm Sewer65,00068,00070,00070,00073,000346,000 Streets - Roadways2,956,0006,374,0002,652,0009,630,0004,128,000 25,740,000 Water245,0002,335,000255,000200,000260,000 3,295,000 5,016,00011,856,0005,110,00015,075,0006,327,00043,384,000 15 Capital Plan Assessments600,0001,307,500448,0002,183,500680,0005,219,000 Capital Equipment Reserve10,000280,000110,000 400,000 Comm Ctr Operations33,00050,0001,351,00050,000408,0001,892,000 Construction Seal Coat Fund10,00010,00010,00010,00010,000 50,000 County Reimbursement1,500,0001,500,000 Donations100,000460,000560,000 Facility Maintenance Reserve415,000295,000370,000215,000160,000 1,455,000 General Fund141,000585,000135,000235,000255,0001,351,000 Grant1,900,000 1,900,000 Municipal State Aid Funds1,412,500512,0002,416,5001,000,0005,341,000 Park Dedication Funds255,000135,00015,00015,000465,000885,000 Road & Bridge Funds2,962,0003,733,0001,754,0003,125,0002,696,000 14,270,000 Sewer Revenue Bonds2,250,0002,250,000 Sewer Trunk Fund125,000125,000130,000135,000140,000 655,000 Storm Sewer Fund65,00068,00070,00070,00073,000346,000 Trail Funds1,020,000705,000 1,725,000 Water Fund30,00055,00060,000145,000 Water Trunk Fund270,0002,375,000260,000265,000270,0003,440,000 5,016,00011,856,0005,110,00015,075,0006,327,00043,384,000 16 Capital Plan Remodel Old Proshop and Info Desk Area121-44000-0215,000 15,000 Comm Ctr Operations15,00015,000 Replacement - Lobby Furniture121-44000-0510,00010,000 Comm Ctr Operations10,00010,000 Refinish wooden benches121-44300-018,0008,000 Comm Ctr Operations8,0008,000 Exterior Caulking122-44000-0450,000 50,000 Comm Ctr Operations50,00050,000 Carpet - Office/Fieldhouse Foyer123-44000-0115,00015,000 Comm Ctr Operations15,00015,000 Replacement - Roof123-44000-021,300,000 1,300,000 Comm Ctr Operations1,300,0001,300,000 Concrete Floor Sealant123-44000-0636,00036,000 Comm Ctr Operations36,00036,000 Repaint Field House Ceiling124-44200-0150,00050,000 Comm Ctr Operations50,00050,000 Replacement - ACC East Parking Lot125-44000-01200,000 200,000 Comm Ctr Operations200,000200,000 Replacement - Carpeting Entryway125-44000-028,000 8,000 Comm Ctr Operations8,0008,000 Repaint Ice Arena ceiling125-44300-01200,000200,000 Comm Ctr Operations200,000200,000 1,892,000 33,00050,0001,351,00050,000408,000 Emergency Operations Center Improvement121-42400-0110,000 10,000 Capital Equipment Reserve10,00010,000 10,000 10,000 New Development Projects121-41600-01180,000185,000190,000200,000210,000 965,000 Sewer Trunk Fund125,000125,000130,000135,000140,000655,000 Water Trunk Fund55,00060,00060,00065,00070,000310,000 Pedestrian Trail Maintenance121-41600-0266,00069,00072,00075,00078,000360,000 Road & Bridge Funds66,00069,00072,00075,00078,000360,000 Pedestrian/Park Trail Reconstruction121-41600-03550,000450,000230,000250,000 1,480,000 General Fund450,00050,00070,000570,000 Road & Bridge Funds550,000180,000180,000910,000 New Pedestrian Trail and Sidewalk Segments122-41600-01800,000705,0001,505,000 Trail Funds800,000705,0001,505,000 Railroad Underpass Trail122-41600-02100,000680,000 780,000 Donations100,000460,000560,000 17 Trail Funds220,000220,000 896,0002,184,000262,0001,210,000538,0005,090,000 Annual Parking Lot Maintenance/Replacement121-41900-0140,000250,000170,00050,00060,000 570,000 Facility Maintenance Reserve40,000250,000170,00050,00060,000570,000 Replacement - Tube Heaters PW121-41900-0280,00080,000 Facility Maintenance Reserve80,00080,000 Replacement - Air Handling Unit/Condenser FS #1121-41900-036,000 6,000 General Fund6,0006,000 Replacement - Refinish PW Exterior Panels121-41900-04250,000 250,000 Facility Maintenance Reserve250,000250,000 New - Diesel Exhaust Capturing System FS #1121-41900-0645,00045,000 Facility Maintenance Reserve45,00045,000 Replacement - Roof Top Package Unit PW222-41900-0145,000 45,000 Facility Maintenance Reserve45,00045,000 Replacement - Emergency Generator FS #1123-41900-0150,00050,000 Facility Maintenance Reserve50,00050,000 Replacement - Make Up Air Unit /Exhaust Fan PW123-41900-04125,000125,000 Facility Maintenance Reserve125,000125,000 Replacement - Tube Heaters FS #1123-41900-0525,000 25,000 Facility Maintenance Reserve25,00025,000 Replacement - Carpet / Tile124-41900-0130,00030,000 Facility Maintenance Reserve30,00030,000 Replacement - Emergency Generator FS #2124-41900-0235,00035,000 Facility Maintenance Reserve35,00035,000 Replacement - Fire Sprinkler System FS #1124-41900-0350,000 50,000 Facility Maintenance Reserve50,00050,000 Replacement - Fire Sprinkler System PW124-41900-0450,00050,000 Facility Maintenance Reserve50,00050,000 Replacement - Emergency Generator FS #3125-41900-0150,000 50,000 Facility Maintenance Reserve50,00050,000 Replacement - Fire Sprinkler System CH125-41900-0350,000 50,000 Facility Maintenance Reserve50,00050,000 421,000295,000370,000215,000160,0001,461,000 Replace/Repair Play Structures - Various Parks121-45000-01100,000100,000100,000150,000150,000 600,000 General Fund100,000100,000100,000150,000150,000600,000 Replace/Repair Major Park Projects - Various Parks121-45000-0235,00035,00035,00035,00035,000175,000 General Fund35,00035,00035,00035,00035,000175,000 775,000 135,000135,000135,000185,000185,000 Annual Miscellaneous Park Projects121-45001-0115,00015,00015,00015,00015,00075,000 Park Dedication Funds15,00015,00015,00015,00015,00075,000 Prairie Knoll North Parking Lot Impr121-45001-02230,000 230,000 Park Dedication Funds230,000230,000 Pickleball Study121-45001-0310,00010,000 Park Dedication Funds10,00010,000 Pine Hills North - Phase II122-45001-01400,000 400,000 Capital Equipment Reserve280,000280,000 18 Park Dedication Funds120,000120,000 Dalske Preserve Boardwalk125-45001-01110,000110,000 Capital Equipment Reserve110,000110,000 New Pickleball Facility125-45001-02450,000 450,000 Park Dedication Funds450,000450,000 1,275,000 255,000415,00015,00015,000575,000 Rural Reserve Trunk Sanitary Sewer124-48200-013,500,000 3,500,000 Assessments1,250,0001,250,000 Sewer Revenue Bonds2,250,0002,250,000 3,500,0003,500,000 Storm Sewer Improvements121-48300-0165,00068,00070,00070,00073,000 346,000 Storm Sewer Fund65,00068,00070,00070,00073,000346,000 65,00068,00070,00070,00073,000346,000 Annual Street Crack Seal Project121-49300-02180,000190,000200,000210,000220,0001,000,000 Construction Seal Coat Fund10,00010,00010,00010,00010,00050,000 Road & Bridge Funds170,000180,000190,000200,000210,000950,000 Annual Pavement Markings121-49300-0358,00060,00062,00064,00066,000 310,000 Road & Bridge Funds58,00060,00062,00064,00066,000310,000 Curb, Sidewalk and Pedestrian Ramp Replacement121-49300-04100,000105,000110,000115,000120,000550,000 Road & Bridge Funds100,000105,000110,000115,000120,000550,000 Municipal State Aid Routes / New & Reconstruct121-49300-051,600,000530,000670,0001,000,000 3,800,000 Assessments187,50018,000103,500309,000 Municipal State Aid Funds1,412,500512,000566,5001,000,0003,491,000 Annual Street Reconstruction121-49300-063,400,000730,0002,300,0001,700,0008,130,000 Assessments850,000180,000580,000430,0002,040,000 Road & Bridge Funds2,550,000550,0001,720,0001,270,0006,090,000 Intersection Upgrades121-49300-075,250,000 5,250,000 County Reimbursement1,500,0001,500,000 Grant1,900,0001,900,000 Municipal State Aid Funds1,850,0001,850,000 Gravel Road Improvements121-49300-0818,00019,00020,00021,00022,000 100,000 Road & Bridge Funds18,00019,00020,00021,00022,000100,000 Street Mill & Overlays121-49300-092,400,0001,000,0001,000,0001,000,0001,000,0006,400,000 Assessments600,000250,000250,000250,000250,0001,600,000 Road & Bridge Funds1,800,000750,000750,000750,000750,0004,800,000 Pedestrian Crossing221-49300-10200,000 200,000 Road & Bridge Funds200,000200,000 2,956,0006,374,0002,652,0009,630,0004,128,00025,740,000 Recondition & Paint Water Tower #2121-48100-0115,0001,655,0001,670,000 Water Trunk Fund15,0001,655,0001,670,000 Rehabilitation of Wells121-48100-0230,00055,00060,000145,000 Water Fund30,00055,00060,000145,000 Water Main Gate Valve Rehabilitation121-48100-06200,000200,000200,000200,000200,000 1,000,000 Water Trunk Fund200,000200,000200,000200,000200,0001,000,000 19 Water Main Improvements122-48100-01480,000480,000 Assessments20,00020,000 Water Trunk Fund460,000460,000 3,295,000 245,0002,335,000255,000200,000260,000 5,016,00011,856,0005,110,00015,075,0006,327,00043,384,000 20 thru 15,00015,000 15,00015,000 15,00015,000 15,00015,000 21 thru 10,00010,000 10,00010,000 10,00010,000 10,00010,000 22 thru 8,0008,000 8,0008,000 8,0008,000 8,0008,000 23 thru 50,00050,000 50,00050,000 50,00050,000 50,00050,000 24 thru 15,00015,000 15,00015,000 15,00015,000 15,00015,000 25 thru 1,300,0001,300,000 1,300,0001,300,000 1,300,0001,300,000 1,300,0001,300,000 26 thru 36,00036,000 36,00036,000 36,00036,000 36,00036,000 27 thru 50,00050,000 50,00050,000 50,00050,000 50,00050,000 28 thru 200,000200,000 200,000200,000 200,000200,000 200,000200,000 29 thru 8,0008,000 8,0008,000 8,0008,000 8,0008,000 30 thru 200,000200,000 200,000200,000 200,000200,000 200,000200,000 31 thru 10,00010,000 10,00010,000 10,00010,000 10,00010,000 32 thru 180,000185,000190,000200,000210,000965,000 180,000185,000190,000200,000210,000965,000 125,000125,000130,000135,000140,000655,000 55,00060,00060,00065,00070,000310,000 180,000185,000190,000200,000210,000965,000 33 thru 66,00069,00072,00075,00078,000360,000 66,00069,00072,00075,00078,000360,000 66,00069,00072,00075,00078,000360,000 66,00069,00072,00075,00078,000360,000 34 thru 550,000450,000230,000250,0001,480,000 550,000450,000230,000250,0001,480,000 450,00050,00070,000570,000 550,000180,000180,000910,000 550,000450,000230,000250,0001,480,000 35 Capital Improvement Plan 36 Capital Improvement Plan 37 thru 800,000705,0001,505,000 800,000705,0001,505,000 800,000705,0001,505,000 800,000705,0001,505,000 38 Capital Improvement Plan 39 Capital Improvement Plan 40 thru 100,000100,000 680,000680,000 100,000680,000780,000 100,000460,000560,000 220,000220,000 100,000680,000780,000 41 Capital Improvement Plan 42 thru 40,000250,000170,00050,00060,000570,000 40,000250,000170,00050,00060,000570,000 40,000250,000170,00050,00060,000570,000 40,000250,000170,00050,00060,000570,000 43 thru 80,00080,000 80,00080,000 80,00080,000 80,00080,000 44 thru 6,0006,000 6,0006,000 6,0006,000 6,0006,000 45 thru 250,000250,000 250,000250,000 250,000250,000 250,000250,000 46 thru 45,00045,000 45,00045,000 45,00045,000 45,00045,000 47 thru 45,00045,000 45,00045,000 45,00045,000 45,00045,000 48 thru 50,00050,000 50,00050,000 50,00050,000 50,00050,000 49 thru 125,000125,000 125,000125,000 125,000125,000 125,000125,000 50 thru 25,00025,000 25,00025,000 25,00025,000 25,00025,000 51 thru 30,00030,000 30,00030,000 30,00030,000 30,00030,000 52 thru 35,00035,000 35,00035,000 35,00035,000 35,00035,000 53 thru 50,00050,000 50,00050,000 50,00050,000 50,00050,000 54 thru 50,00050,000 50,00050,000 50,00050,000 50,00050,000 55 thru 50,00050,000 50,00050,000 50,00050,000 50,00050,000 56 thru 50,00050,000 50,00050,000 50,00050,000 50,00050,000 57 thru 100,000100,000100,000150,000150,000600,000 100,000100,000100,000150,000150,000600,000 100,000100,000100,000150,000150,000600,000 100,000100,000100,000150,000150,000600,000 58 Capital Improvement Plan 59 Capital Improvement Plan 60 Capital Improvement Plan 61 Capital Improvement Plan 62 Capital Improvement Plan 63 Capital Improvement Plan 64 Capital Improvement Plan 65 Capital Improvement Plan 66 Capital Improvement Plan 67 Capital Improvement Plan 68 Capital Improvement Plan 69 Capital Improvement Plan 70 Capital Improvement Plan 71 thru 35,00035,00035,00035,00035,000175,000 35,00035,00035,00035,00035,000175,000 35,00035,00035,00035,00035,000175,000 35,00035,00035,00035,00035,000175,000 72 thru 15,00015,00015,00015,00015,00075,000 15,00015,00015,00015,00015,00075,000 15,00015,00015,00015,00015,00075,000 15,00015,00015,00015,00015,00075,000 73 thru 230,000230,000 230,000230,000 230,000230,000 230,000230,000 74 Capital Improvement Plan 75 thru 10,00010,000 10,00010,000 10,00010,000 10,00010,000 76 thru 400,000400,000 400,000400,000 280,000280,000 120,000120,000 400,000400,000 77 Capital Improvement Plan 78 thru 110,000110,000 110,000110,000 110,000110,000 110,000110,000 79 Capital Improvement Plan 80 thru 450,000450,000 450,000450,000 450,000450,000 450,000450,000 81 thru 3,500,0003,500,000 3,500,0003,500,000 1,250,0001,250,000 2,250,0002,250,000 3,500,0003,500,000 82 Capital Improvement Plan 83 thru 65,00068,00070,00070,00073,000346,000 65,00068,00070,00070,00073,000346,000 65,00068,00070,00070,00073,000346,000 65,00068,00070,00070,00073,000346,000 84 thru 180,000190,000200,000210,000220,0001,000,000 180,000190,000200,000210,000220,0001,000,000 10,00010,00010,00010,00010,00050,000 170,000180,000190,000200,000210,000950,000 180,000190,000200,000210,000220,0001,000,000 85 thru 58,00060,00062,00064,00066,000310,000 58,00060,00062,00064,00066,000310,000 58,00060,00062,00064,00066,000310,000 58,00060,00062,00064,00066,000310,000 86 thru 100,000105,000110,000115,000120,000550,000 100,000105,000110,000115,000120,000550,000 100,000105,000110,000115,000120,000550,000 100,000105,000110,000115,000120,000550,000 87 thru 1,600,000530,000670,0001,000,0003,800,000 1,600,000530,000670,0001,000,0003,800,000 187,50018,000103,500309,000 1,412,500512,000566,5001,000,0003,491,000 1,600,000530,000670,0001,000,0003,800,000 88 Capital Improvement Plan 89 Capital Improvement Plan 90 Capital Improvement Plan 91 Capital Improvement Plan 92 thru 3,400,000730,0002,300,0001,700,0008,130,000 3,400,000730,0002,300,0001,700,0008,130,000 850,000180,000580,000430,0002,040,000 2,550,000550,0001,720,0001,270,0006,090,000 3,400,000730,0002,300,0001,700,0008,130,000 93 Capital Improvement Plan 94 Capital Improvement Plan 95 Capital Improvement Plan 96 Capital Improvement Plan 97 Capital Improvement Plan 98 thru 5,250,0005,250,000 5,250,0005,250,000 1,500,0001,500,000 1,900,0001,900,000 1,850,0001,850,000 5,250,0005,250,000 99 Capital Improvement Plan 100 thru 18,00019,00020,00021,00022,000100,000 18,00019,00020,00021,00022,000100,000 18,00019,00020,00021,00022,000100,000 18,00019,00020,00021,00022,000100,000 101 thru 2,400,0001,000,0001,000,0001,000,0001,000,0006,400,000 2,400,0001,000,0001,000,0001,000,0001,000,0006,400,000 600,000250,000250,000250,000250,0001,600,000 1,800,000750,000750,000750,000750,0004,800,000 2,400,0001,000,0001,000,0001,000,0001,000,0006,400,000 102 Capital Improvement Plan 103 Capital Improvement Plan 104 thru 200,000200,000 200,000200,000 200,000200,000 200,000200,000 105 thru 15,00015,000 1,655,0001,655,000 15,0001,655,0001,670,000 15,0001,655,0001,670,000 15,0001,655,0001,670,000 106 thru 30,00055,00060,000145,000 30,00055,00060,000145,000 30,00055,00060,000145,000 30,00055,00060,000145,000 107 thru 200,000200,000200,000200,000200,0001,000,000 200,000200,000200,000200,000200,0001,000,000 200,000200,000200,000200,000200,0001,000,000 200,000200,000200,000200,000200,0001,000,000 108 thru 480,000480,000 480,000480,000 20,00020,000 460,000460,000 480,000480,000 109 Capital Improvement Plan 110 Capital Plan Central Equipment45,00045,000 Community Center95,00021,00015,000 131,000 Emergency Management50,00050,00025,000 125,000 Engineering45,000 45,000 Facility Management45,000 45,000 Finance15,00015,00030,000 Fire12,00093,000140,000825,000770,0001,840,000 Information Technology7,00045,00030,00082,000 Park & Rec - Operations60,000330,000200,000295,000 885,000 Sanitary Sewer85,000 85,000 Storm Sewer250,000 250,000 Streets - Equipment70,000270,00060,000595,000560,0001,555,000 Water1,310,000100,000100,000100,000100,0001,710,000 1,569,0001,158,000376,0001,970,0001,755,000 6,828,000 111 Capital Plan Capital Equipment Reserve207,000258,000255,000185,000260,0001,165,000 Comm Ctr Operations95,00021,00015,000 131,000 Equipment Bond620,0001,435,0001,380,0003,435,000 Facility Maintenance Reserve52,000 52,000 Sanitary Sewer Fund42,50042,500 Storm Sewer Fund42,500250,000292,500 Water Fund1,310,000100,000100,000100,000100,000 1,710,000 1,569,0001,158,000376,0001,970,0001,755,000 6,828,000 112 Capital Plan Replacement - Service Truck #371222-48800-0145,000 45,000 Capital Equipment Reserve45,00045,000 45,00045,000 Replacement - Walk Behind Floor Scrubber122-44000-0115,00015,000 Comm Ctr Operations15,00015,000 Replacement - Water Heater122-44000-0570,00070,000 Comm Ctr Operations70,00070,000 Replacement - Electric Edger122-44300-0210,000 10,000 Comm Ctr Operations10,00010,000 Replacement - Kaivac Cleaning System123-44000-036,0006,000 Comm Ctr Operations6,0006,000 Replacement - Zamboni Battery Pack123-44300-0115,00015,000 Comm Ctr Operations15,00015,000 Replacement - Zamboni Battery Pack - Machine #2125-44300-0315,000 15,000 Comm Ctr Operations15,00015,000 95,00021,00015,000131,000 Replacement - Emergency Sirens121-42400-0250,00050,00025,000 125,000 Capital Equipment Reserve50,00050,00025,000125,000 50,00050,00025,000125,000 Replacement - Pick Up Truck #6222-41600-0345,00045,000 Capital Equipment Reserve45,00045,000 45,00045,000 New - 1/2 ton Pick Up Truck 4x4121-41900-0545,00045,000 Facility Maintenance Reserve45,00045,000 45,00045,000 Financial / Payroll System Upgrade121-41400-0115,00015,00030,000 Capital Equipment Reserve15,00015,00030,000 30,000 15,00015,000 113 New - Extrication Combination Tool121-42200-0112,00012,000 Capital Equipment Reserve12,00012,000 New - First Response Vehicle122-42200-0170,000 70,000 Equipment Bond70,00070,000 New - Digital Fire Extinguisher Training System122-42200-0312,00012,000 Capital Equipment Reserve12,00012,000 Replacement - Washer Extractor St. 2122-42200-0411,00011,000 Capital Equipment Reserve11,00011,000 New - First Response Vehicle123-42200-0175,000 75,000 Capital Equipment Reserve75,00075,000 Replacement - UT-10 #4810123-42200-0265,000 65,000 Capital Equipment Reserve65,00065,000 Replacement - Rescue 31 #481824-42200-011125,000125,000 Capital Equipment Reserve125,000125,000 Replacement - Engine 31 #480024-42200-031700,000 700,000 Equipment Bond700,000700,000 Replacement - Engine 11 #4821125-42200-02725,000725,000 Equipment Bond725,000725,000 Replacement - Grass Utility Vehicle (UTV) #4813125-42200-0345,00045,000 Capital Equipment Reserve45,00045,000 1,840,000 12,00093,000140,000825,000770,000 Camera Security Software Upgrade121-41420-017,0007,000 Facility Maintenance Reserve7,0007,000 Laserfiche Upgrade222-41420-0145,000 45,000 Capital Equipment Reserve45,00045,000 Replacement - Data SAN (Storage Area Network)223-41420-0130,00030,000 Capital Equipment Reserve30,00030,000 82,000 7,00045,00030,000 Replacement - Cushman Field Dresser #547121-45000-0330,00030,000 Capital Equipment Reserve30,00030,000 Replacement - Trailer #T-555121-45000-0420,000 20,000 Capital Equipment Reserve20,00020,000 New - Turbine Tow-Behind Blower121-45000-0510,000 10,000 Capital Equipment Reserve10,00010,000 Replacement - Large Capacity Mower #585122-45000-01130,000130,000 Equipment Bond130,000130,000 Replacement - Tractor #515122-45000-0250,000 50,000 Capital Equipment Reserve50,00050,000 New - Trail Machine122-45000-03150,000150,000 Equipment Bond150,000150,000 Replacement - Toro Groundsmaster #561124-45000-0160,000 60,000 Capital Equipment Reserve60,00060,000 Replacement - One Ton Truck w/ Plow #569124-45000-0280,000 80,000 Equipment Bond80,00080,000 Replacement - One Ton Irrigation Truck124-45000-0360,00060,000 Equipment Bond60,00060,000 Replacement - Toro Groundsmaster #564125-45000-0180,00080,000 114 Equipment Bond80,00080,000 Replacement - Toro Workman #565125-45000-0250,00050,000 Equipment Bond50,00050,000 Replacement - Toro Groundsmaster #550125-45000-0380,000 80,000 Equipment Bond80,00080,000 Replacement - One Ton Truck w/ Plow #577125-45000-0485,000 85,000 Equipment Bond85,00085,000 60,000330,000200,000295,000885,000 Replacement - One Ton Truck w/ Plow #78122-48200-0185,000 85,000 Sanitary Sewer Fund42,50042,500 Storm Sewer Fund42,50042,500 85,000 85,000 Replacement - Elgin Street Sweeper #16924-48300-011250,000250,000 Storm Sewer Fund250,000250,000 250,000250,000 New - 3/4 Ton Truck w/ Snow removal equipment121-43100-0170,000 70,000 Capital Equipment Reserve70,00070,000 New - Dump Truck w/ Snow removal equipment122-43100-01250,000 250,000 Equipment Bond250,000250,000 Replacement - Asphalt Roller #114122-43100-0220,00020,000 Equipment Bond20,00020,000 Replacement - Bobcat S185 #120123-43100-0160,000 60,000 Capital Equipment Reserve60,00060,000 New - Dump truck w/ Snow removal equipment24-43100-011255,000 255,000 Equipment Bond255,000255,000 Replacement - Dump Truck w/ Snow removal #19824-43100-021255,000255,000 Equipment Bond255,000255,000 Replacement - One Ton Truck w/ Plow #134124-43100-0385,000 85,000 Equipment Bond85,00085,000 Replacement - Dump Truck w/ Snow removal #200125-43100-01260,000260,000 Equipment Bond260,000260,000 Replacement - Aerial bucket truck #00-139125-43100-02200,000200,000 Capital Equipment Reserve200,000200,000 Replacement - Backhoe Loader #80125-43100-03100,000 100,000 Equipment Bond100,000100,000 1,555,000 70,000270,00060,000595,000560,000 Water Meter Reading System AMI/AMR121-48100-041,210,000 1,210,000 Water Fund1,210,0001,210,000 Residential Meter Replacement121-48100-05100,000100,000100,000100,000100,000500,000 Water Fund100,000100,000100,000100,000100,000500,000 1,310,000100,000100,000100,000100,0001,710,000 115 1,569,0001,158,000376,0001,970,0001,755,0006,828,000 116 thru 45,00045,000 45,00045,000 45,00045,000 45,00045,000 117 thru 15,00015,000 15,00015,000 15,00015,000 15,00015,000 118 thru 70,00070,000 70,00070,000 70,00070,000 70,00070,000 119 thru 10,00010,000 10,00010,000 10,00010,000 10,00010,000 120 thru 6,0006,000 6,0006,000 6,0006,000 6,0006,000 121 thru 15,00015,000 15,00015,000 15,00015,000 15,00015,000 122 thru 15,00015,000 15,00015,000 15,00015,000 15,00015,000 123 thru 50,00050,00025,000125,000 50,00050,00025,000125,000 50,00050,00025,000125,000 50,00050,00025,000125,000 124 thru 45,00045,000 45,00045,000 45,00045,000 45,00045,000 125 thru 45,00045,000 45,00045,000 45,00045,000 45,00045,000 126 thru 15,00015,00030,000 15,00015,00030,000 15,00015,00030,000 15,00015,00030,000 127 thru 12,00012,000 12,00012,000 12,00012,000 12,00012,000 128 thru 70,00070,000 70,00070,000 70,00070,000 70,00070,000 129 thru 12,00012,000 12,00012,000 12,00012,000 12,00012,000 130 thru 11,00011,000 11,00011,000 11,00011,000 11,00011,000 131 thru 75,00075,000 75,00075,000 75,00075,000 75,00075,000 132 thru 65,00065,000 65,00065,000 65,00065,000 65,00065,000 133 thru 125,000125,000 125,000125,000 125,000125,000 125,000125,000 134 thru 700,000700,000 700,000700,000 700,000700,000 700,000700,000 135 thru 725,000725,000 725,000725,000 725,000725,000 725,000725,000 136 thru 45,00045,000 45,00045,000 45,00045,000 45,00045,000 137 thru 7,0007,000 7,0007,000 7,0007,000 7,0007,000 138 thru 45,00045,000 45,00045,000 45,00045,000 45,00045,000 139 thru 30,00030,000 30,00030,000 30,00030,000 30,00030,000 140 thru 30,00030,000 30,00030,000 30,00030,000 30,00030,000 141 thru 20,00020,000 20,00020,000 20,00020,000 20,00020,000 142 thru 10,00010,000 10,00010,000 10,00010,000 10,00010,000 143 thru 130,000130,000 130,000130,000 130,000130,000 130,000130,000 144 thru 50,00050,000 50,00050,000 50,00050,000 50,00050,000 145 thru 150,000150,000 150,000150,000 150,000150,000 150,000150,000 150,000150,000 150,000150,000 146 thru 60,00060,000 60,00060,000 60,00060,000 60,00060,000 147 thru 80,00080,000 80,00080,000 80,00080,000 80,00080,000 148 thru 60,00060,000 60,00060,000 60,00060,000 60,00060,000 149 thru 80,00080,000 80,00080,000 80,00080,000 80,00080,000 150 thru 50,00050,000 50,00050,000 50,00050,000 50,00050,000 151 thru 80,00080,000 80,00080,000 80,00080,000 80,00080,000 152 thru 85,00085,000 85,00085,000 85,00085,000 85,00085,000 153 thru 85,00085,000 85,00085,000 42,50042,500 42,50042,500 85,00085,000 154 thru 250,000250,000 250,000250,000 250,000250,000 250,000250,000 155 thru 70,00070,000 70,00070,000 70,00070,000 70,00070,000 156 thru 250,000250,000 250,000250,000 250,000250,000 250,000250,000 157 thru 20,00020,000 20,00020,000 20,00020,000 20,00020,000 158 thru 60,00060,000 60,00060,000 60,00060,000 60,00060,000 159 thru 255,000255,000 255,000255,000 255,000255,000 255,000255,000 160 thru 255,000255,000 255,000255,000 255,000255,000 255,000255,000 161 thru 85,00085,000 85,00085,000 85,00085,000 85,00085,000 162 thru 260,000260,000 260,000260,000 260,000260,000 260,000260,000 163 thru 200,000200,000 200,000200,000 200,000200,000 200,000200,000 164 thru 100,000100,000 100,000100,000 100,000100,000 100,000100,000 165 thru 1,210,0001,210,000 1,210,0001,210,000 1,210,0001,210,000 1,210,0001,210,000 166 thru 100,000100,000100,000100,000100,000500,000 100,000100,000100,000100,000100,000500,000 100,000100,000100,000100,000100,000500,000 100,000100,000100,000100,000100,000500,000 167 This page left blank intentionally. 168 169 CITY OF ANDOVER Park Improvement Fund Projected Fund Balance Estimate 202020212022202320242025TOTALS Projected Sources of Revenue Park Dedication Fee - Residential Units4025252525 Park Dedication Fee - Residential ($3,475/unit)$ 282,748$ 139,000$ 86,875$ 86,875$ 86,875$ 86,875$ 769,248 less: Contribution to Comm Ctr Expan (50%)(175,146)(202,604)(69,500)(43,438)(43,438)(43,438)(577,564) Donation / Contribution - Kelsey Round Lake Park76,000-----76,000 Capital Projects Levy - Park Improvements15,00015,00015,00015,00015,00015,00090,000 Total Revenues Available198,602(48,604)32,37558,43758,43758,437357,684 Projected Commitments Irrigation Project - Small30,16230,162 Sophies Park - Trail & Water Service18,80318,803 Kelsey Round Lake Park - Trail Expansion175,000175,000 Andover Station North east field lighting180,000180,000 Prairie Knoll Park - Pave north parking lot6,767230,000236,767 Pickleball Study10,00010,000 Pine Hills North - Phase II parking lot120,000120,000 New Pickleball Facility450,000450,000 Annual Miscellaneous Projects15,00015,00015,00015,00015,00015,00090,000 Total Commitments425,732255,000135,00015,00015,000465,0001,310,732 Revenues Over (Under) Expenditures(227,130)(303,604)(102,625)43,43743,437(406,563) Fund Balance as of December 31, 2019710,443 Fund Balance Brought Forward483,313179,70977,084120,521163,958 Ending Fund Balance **$ 483,313$ 179,709$ 77,084$ 120,521$ 163,958$ (242,605) **Target - $50,000 to create a contingency for any project overages. Dedicated Funds Available for: Rose Park - tower rental fee$ 37,254 170 171 172 173 174 175 176 177 178