HomeMy WebLinkAbout2017 CIP�uj �Lu Q Z z 201 7— 2021 Capital improvement Flan i■ LQUCKS -" Ga '' CITY CAMPUS MASTER PLAN AN'30, Li , Vs 1685 Crosstownl5kJ NW, Andover, MN 55304 Fkonc:763.755.5100 Fax.763.755,89Z3 www.andoverinn.gov- MASTER PLAN This page left blank intentionally. CITY OF ANDOVER 2017 — 2021 Capital Improvement Plan Table of Contents Introduction 2017 — 2021 Capital Improvement Plan Message........................................................................................................ l CIP Project Development & Process Authorization Schedule.....................................................................................4 Graph — 2017 Expenditures By Department................................................................................................................6 Graph — 2017 CIP Expenditures By Year....................................................................................................................6 Five Year Summary of Expenditures By Department..................................................................................................7 Five Year Summary of Revenue By Source.................................................................................................................8 Five Year Summary of Projects By Department & Revenue Source...........................................................................9 Improvements Five Year Summary of Expenditures By Department — Improvements.......................................................................15 Five Year Summary of Revenue By Source — Improvements......................................................................................16 Five Year Summary of Projects By Department & Revenue Source — Improvements................................................17 Improvement Projects By Department CommunityCenter................................................................................................................................................21 EmergencyManagement.......................................................................................................................................35 Engineering...........................................................................................................................................................36 FacilityManagement.............................................................................................................................................47 Parks& Recreation — Operations..........................................................................................................................54 Parks& Recreation — Projects...............................................................................................................................61 SanitarySewer......................................................................................................................................................71 StormSewer..........................................................................................................................................................78 Streets/ Highways................................................................................................................................................79 Water.....................................................................................................................................................................102 Equipment Year Summary of Expenditures By Department — Equipment....................................................................................107 Five Year Summary of Revenue By Source — Equipment...........................................................................................108 Five Year Summary of Projects By Department & Revenue Source — Equipment ......................................................109 Equipment By Department Building................................................................................................................................................................113 CentralEquipment................................................................................................................................................114 CommunityCenter................................................................................................................................................115 EmergencyManagement.......................................................................................................................................125 Engineering...........................................................................................................................................................126 FacilityManagement.............................................................................................................................................127 Finance..................................................................................................................................................................129 FireDepartment....................................................................................................................................................130 InformationTechnology.......................................................................................................................................140 Parks& Recreation — Operations..........................................................................................................................141 Planning& Zoning................................................................................................................................................151 SanitarySewer......................................................................................................................................................152 StormSewer..........................................................................................................................................................154 StreetSigns...........................................................................................................................................................156 Streets/ Highways................................................................................................................................................157 Water.....................................................................................................................................................................166 Appendix Road & Bridge Fund Projected Fund Balance.............................................................................................................171 Park Improvement Fund Projected Fund Balance........................................................................................................172 Trail Fund Projected Fund Balance..............................................................................................................................173 Capital Equipment Reserve Projected Fund Balance...................................................................................................174 WaterSystem Financial Projections.............................................................................................................................176 SewerSystem Financial Projections............................................................................................................................178 Storm Sewer System Financial Projections..................................................................................................................180 This page left blank intentionally. 1685 CROSSTOWN BOULEVARD N.W.. ANDOVER, MINNESOTA 55304 . (763) 755-5100 FAX (763) 755-8923 . WWW.CI.ANDOVER.MN.US TO: Mayor and Council Members FROM: Jim Dickinson, City Administrator / Finance Director SUBJECT: 2017 — 2021 Capital Improvement Plan DATE: October 18, 2016 INTRODUCTION On behalf of the City's Management Team, I am pleased to present the City of Andover's Capital Improvement Plan for years 2017 through 2021. The City's management team and their respective staff worked diligently to produce a document that was both practical, substantive in addressing needed capital improvements and insightful regarding the underlying factors associated with the City's rapidly changing suburban landscape. CAPITAL IMPROVEMENT PLAN GOALS ACKNOWLEDGE AND COMMUNICATE PUBLIC INFRASTRUCTURE PRIORITIES AND DYNAMICS ENSURE APPROPRIATE RESPONSES TO CHANGING INFRASTRUCTURE NEEDS AND DEMANDS DEVELOP A FINANCIAL ASSESSMENT OF CAPITAL RESOURCES AVAILABLE TO MEET FUTURE CAPITAL PROJECT PLANNING NEEDS INSTITUTE A STRATEGIC VISION PREDICATED ON MAINTAINING A HIGH QUALITY SERVICE INFRASTRUCTURE CAPABLE OF MEETING THE NEEDS OF OUR CITIZENS FOR TODAY AND TOMORROW The purpose of the City's Capital Improvement Plan (CIP) is to identify, prioritize and address community needs through careful long-term capital planning and balanced public investment in supporting physical infrastructure. To ensure that this commitment is both meaningful and achievable, appropriate capital improvement factors were given significant consideration in developing a CIP that addresses community priorities over the next five (5) years. The CIP will also provide a planning foundation for future needs assessments to ensure the City is appropriately responding to the critical infrastructure needs necessary for sustainable future growth. The CIP represents a beginning in terms of producing a comprehensive planning response to address changing capital needs by developing a project schedule that will lead to timely and cost-effective project completions. DISCUSSION The 2017 - 2021 CIP has been prepared as a strategic planning tool to assist the City Council in identifying proposed capital improvement projects over the next five years. With the inclusion of preliminary financing sources, appropriate background information citing needs and projected cost estimates, this document will provide Council with the needed information to begin the process for planning improvements that meet the City's physical infrastructure needs. Consequently, the CIP serves as a flexible guide plan to properly identify the critical components of the City's infrastructure, yet maintain flexibility in determining project timeframes, project scope and possible funding sources. The 2017 - 2021 CIP continues the emphasis of judiciously managing the City's limited resources by prudently planning for known and/or anticipated future capital expenditures. A critical step in the plan adoption process is the collaborative nature of plan review that involves the leadership of the City Council, the input of appointed Commissions and staff, and most importantly, affected residents of the community. Consequently, the strategic value of this plan lies in the acknowledgement of future needs by the governing body and the effective communication of those needs to the general public during project development stages. Likewise, the availability and preliminary designation of fiscal resources to serve both current and future needs is critical to the achievement of plan outcomes that meet with Council approval. Following the approval of the plan, feasibility studies are performed, affected constituencies are notified to formally disseminate and receive public feedback on proposed project plans. This process culminates with the City Council considering all relevant information and making a final decision on whether to proceed with the proposed capital improvement. The public process that supports the advancement of these projects from inception to completion is engendered in the CIP project development and authorization schedule. Formalizing the steps in the CIP project advancement process serves a number of purposes and ensures that the Council and public are kept well informed regarding project purposes and desired outcomes, estimated project costs, funding sources, progress and final status. It should be emphasized that projects will require approval in various stages of project development by the City Council in accordance with approved policies. The objectives of the 2017 - 2021 Capital Improvement Plan are to present a comprehensive capital improvement program that communicates efforts: ➢ to ensure that community priorities are reflected in the capital investment plans of each City department; ➢ to provide a consolidated financial picture of anticipated expenditures and outline recommended funding strategies to underwrite anticipated capital improvements; ➢ to document and communicate capital improvement processes for City projects that will ensure consistency, a full appreciation of both the costs and benefits of proposed capital investments, and raises the level of public understanding regarding the City's public improvement processes; ➢ to provide information on the fiscal impacts of capital investment plans on total City finances; and ➢ to effectively plan for public improvements that support community needs in the areas of private development infrastructure, transportation, public safety, parks and recreation, utilities, and commercial/industrial growth through fiscally responsible economic development initiatives. Accordingly, this document attempts to recognize known or perceived capital improvement needs, but as with any plan recognizes that social, economic and political considerations will by necessity determine final project outcomes. The major categories of expenditures that are identified within the CIP include, but are not limited to: 1. New Public Facilities Planning 2. Street Construction, Maintenance and Reconstruction 3. Utility Construction, Maintenance and Reconstruction 4. Construction, Maintenance and Upgrade of Parks, Playgrounds and Trails 5. Capital Improvements to Existing Facilities 6. Private development infrastructure 7. Capital equipment and vehicle planning needs (Equipment purchases to be determined through normal budgetary process) The City Council, consequently, accepts this document with the provision that capital improvement planning is subject to the dynamics of community growth, political leadership and acknowledges that other unanticipated needs may take precedence over planned projects. RECOMMENDATION The 2017 - 2021 Capital Improvement Plan is the product of collaborative planning efforts by City staff, Park and Recreation Commission, Community Center Advisory Commission and the City Council. Projects have been introduced based on 1) anticipated future growth trends articulated in the City's current Comprehensive Plan, 2) the natural cycle of deterioration and decay evident in all physically constructed and engineered improvements in the more established areas of the community and 3) capital deficiencies or infrastructure issues brought to the City's attention through a variety of sources. Capital expenditures identified within the CIP are the best estimates available, and once the CIP is adopted, will be reviewed and confirmed through individual feasibility reports where appropriate. I am appreciative of the commitment, good judgment and expertise that each department has contributed to the capital improvement planning process. Respectfully submitted, 4 Jim Dickinson City Administrator CIP PROJECT DEVELOPMENT AND PROCESS AUTHORIZATION SCHEDULE The following process is a Council/staff guideline for authorizing public improvement projects. As this process is controlled by State Statute and other influencing environmental factors, it is subject to change and should be viewed as a guide to assist the Council and public in understanding the public improvement process used by City staff. A separate Council meeting would facilitate each step in the process, and accomplishment of respective activities. As a result, the process time frame is a significant factor affecting City staffs ability to properly manage and complete approved Council ordered projects within budget and on time. 1. Council Approval of Annual CIP Projects by City Resolution will authorize the following outcomes: a) Staff and/or Consultant preparation of project feasibility studies b) Staff preparation of detailed financial review of project funding sources c) Neighborhood Meeting may be held prior to Feasibility Study subject to need and type of project. TIME FRAME: October -November of each preceding year. 2. Presentation of Feasibility Study a) Feasibility Study Components: 1) Review of Project Engineering and Construction Estimates 2) Total Project Costs (All related project costs, i.e. land, soft costs) 3) Project Financial Plan/Fiscal Implications (Engineering/Finance) 4) Authorization to develop a Preliminary Assessment Roll, if any, for the Public Hearing. (Engineering) If Council accepts Feasibility Study, A Resolution "Accepting Feasibility Study and Setting Date for Public Hearing on the Project" when appropriate (Engineering Department) would initiate the following: 1) Notices mailed to affected Residents per statute requirements no less than 10 days before Public Hearing. (Engineering) 2) Public Hearing Notice is published. Two publications one week apart, with the second publication no less than three days before the hearing. (Engineering/City Clerk) TIME FRAME: February -March -April -May of current year. 3. Neighborhood Meeting — City staff will hold neighborhood project meetings, when appropriate, to review and present Project Feasibility Studies, answer questions and meet with affected property owners. These meetings will include a question and answer component designed specifically to bring awareness to the property owner, obtain citizen input and produce an understanding of the purposes behind the City's attempts to construct public improvements in the affected area. TIME FRAME: Following the presentation of the Feasibility Study to Council, but prior to the holding of a Public Hearing by Council. 4. Council holds a Public Hearing when appropriate for following purposes: a) Presentation of Project (Engineering Department) b) Presentation of Preliminary Special Assessment Rolls and Financing Implications (Engineering/Finance Department) c) Council to hear Affected Resident Input d) Council determines whether to "order" the public improvement • A Council Resolution is drafted "Ordering the Project and Authorizing Preparation of Plans and Specifications" (Engineering Department). Council may ORDER THE IMPROVEMENT after the public hearing is closed or at a subsequent Council Meeting within 6 months of the public hearing date. (Statutory Requirement - Council Resolution ordering project must be approved on 4/5 Council vote if it is Council initiated project with assessments). • If Council decides to reject the project as presented, a Council vote should be taken to officially determine the final status of the project. TIME FRAME: April -May -June of current year 5. Plans and Specifications are presented to Council for approval. (Engineering Department) a) A Council Resolution is drafted authorizing the following: 1) Accepting and Approving Project Plans and Specifications 2) Authorizing the Advertisement for Project Bids. Bids are developed and invitation to Bid is processed. Bid opening date is no less than 3 weeks after publication. (Engineering) 3) Authorize staff to pursue an appropriate funding mechanism to underwrite project costs TIME FRAME: May -June of each year 6. Council Acceptance of Project Bids and Awarding of Contracts would authorize the following outcomes: a) A Council Resolution is drafted "Accepting Project Bids and Awarding Contracts" (Engineering) b) Initiation of Project Construction and work (Engineering) TIME FRAME: April -May -June -July of current year. 7. Project Completion a) Council Acceptance of Project b) Final Presentation and Review of Project Costs versus Project Budget by Finance Department. c) If Special Assessments are financing a portion of the Project, A Council Resolution "Setting the Special Assessment Hearing for Project 4" is adopted at this same meeting. (Engineering/Finance) TIME FRAME: Upon completion of project. 8. If Special Assessments would finance a portion of the projects costs, Council Holds a Special Assessment Hearing to review the following: a) Affected Property owners would be officially notified per statute no less than two weeks prior to Special Assessment Hearing. (Clerk/Engineering) b) Public Notice is published no less than two weeks prior to Special Hearing per statute (Clerk/Engineering) c) Staff prepares a proposed roll and Council Approves Final Assessment Roll (Engineering/Finance) d) Council consideration of Assessment Appeals and Requested Deferrals filed prior to hearing or during the hearing. e) Meets M.S. Chapter 429 statutory requirements • A Council Resolution is drafted "Adopting Final Special Assessment Roll"(Engineering), and is adopted at this meeting. TIME FRAME: October/November of current year depending on finalization of project and status of completion. 61 CITY OF ANDOVER 2017 CIP Expenditures By Department Parks - Proj. Parks - Oper. Water Fire 8.83% 4.05% 1.18% 1.47% Emergency Mgmt Planning & Zoning 1.25% 0.44% Engineering 12.82% Street Signs 0.15% Sanitary Sewer 9.05% Streets/Highways Comm Ctr 54.20% 1.19% Storm Sewer Facility Mgmt. 0.81% 4.56% 2021 2020 2019 2018 2017 2016 Adopted CITY OF ANDOVER 2017 CIP Expenditures By Year $- $5,000,000 $10,000,000 $15,000,000 $20,000,000 $25,000,000 $30,000,000 6 City of Andover, MN Capital Plan 2017 thru 2021 DEPARTMENT SUMMARY Department 2017 2018 2019 2020 2021 Total Building 35,000 35,000 Central Equipment 40,000 40,000 Community Center 81,000 248,000 7,879,000 589,000 268,000 9,065,000 Emergency Management 85,000 63,000 52,500 45,000 245,500 Engineering 871,000 569,500 607,000 1,088,000 809,000 3,944,500 Facility Management 310,000 580,000 9,025,000 115,000 40,000 10,070,000 Finance 150,000 150,000 Fire 100,000 190,000 510,000 635,000 55,000 1,490,000 Information Technology 12,000 12,000 Park & Rec - Operations 275,000 300,000 241,000 102,000 75,000 993,000 Park & Rec - Projects 599,800 35,000 35,000 457,500 15,000 1,142,300 Planning & Zoning 30,000 30,000 Sanitary Sewer 615,000 1,250,000 1,865,000 Storm Sewer 55,000 280,000 260,000 62,000 65,000 722,000 Street Signs 10,000 10,000 Streets / Highways 3,683,000 2,857,000 3,673,000 2,986,000 4,636,000 17,835,000 Water 80,000 798,000 1,660,000 50,000 50,000 2,638,000 TOTAL 6,794,800 7,222,500 24,127,500 6,129,500 6,013,000 50,287,300 7 City of Andover, MN Capital Plan 2017 thru 2021 FUNDING SOURCE SUMMARY Source 2017 2018 2019 2020 2021 Total Assessments 657,000 880,500 1,140,000 388,000 332,000 3,397,500 Capital Equipment Reserve 885,000 205,000 277,500 438,000 75,000 1,880,500 Comm Ctr Operations 66,000 48,000 79,000 49,000 268,000 510,000 Construction Seal Coat Fund 17,000 8,000 10,000 10,000 10,000 55,000 Donations 100,000 100,000 Equipment Bond 688,500 1,111,000 1,082,000 220,000 3,101,500 G.O. Bond 650,000 16,750,000 537,000 17,937,000 General Fund 95,000 95,000 95,000 95,000 95,000 475,000 Grant 265,000 1,600,000 1,865,000 Municipal State Aid Funds 1,057,000 1,029,500 1,546,000 335,000 750,000 4,717,500 Park Dedication Funds 499,800 35,000 35,000 177,500 15,000 762,300 Road & Bridge Funds 2,048,000 1,590,000 1,644,000 1,996,000 1,953,000 9,231,000 Sanitary Sewer Fund 245,000 116,000 361,000 Sewer Trunk Fund 397,000 1,267,000 120,000 125,000 125,000 2,034,000 Storm Sewer Fund 55,000 76,000 60,000 62,000 65,000 318,000 Trail Funds 565,000 225,000 710,000 400,000 1,900,000 Water Fund 65,000 126,000 950,000 75,000 50,000 1,266,000 Water Trunk Fund 43,000 183,000 45,000 50,000 55,000 376,000 GRAND TOTAL 6,794,800 7,222,500 24,127,500 6,129,500 6,013,000 50,287,300 8 City of Andover, MN Capital Plan 2017 thru 2021 PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project# Priority 2017 2018 2019 2020 2021 Total (Building Replacement - Small Extended Cab Pick Up #8 19-42300-01 1 35,000 35,000 Equipment Bond 35,000 35,000 Building Total 35,000 35,000 Central Equipment Replacement - Service Truck #371 18-48800-01 Equipment Bond Central Equipment Total 40,000 Community Center Exterior Painting 17-44000-01 Comm Ctr Operations ACC/YMCA Expansion 17-44000-02 Capital Equipment Reserve G.O. Bond Replacement - Carpeting 18-44000-01 Comm Ctr Operations 6,725,000 Replacement - Skate Sharpener 18-44200-01 Comm Ctr Operations Replacement - Pickleball Inserts/Net System 18-44400-01 Comm Ctr Operations New- Inflatables 18-44400-02 Comm Ctr Operations 6,925,000 Replacement - All Community Center Doors 19-44000-02 G.O. Bond 123000 Refacing Rink Boards 19-44300-01 Comm Ctr Operations Repaint Ice Arena ceiling 19-44300-02 Comm Ctr Operations 10,000 Replacement - Ice Arena Refrigeration Replacement 19-44300-02 G.O. Bond Replacement - Heat Exchangers - Munters Unit 19-44300-04 Comm Ctr Operations 10,000 Replacement - Zamboni Battery Pack 19 -44300 -OE Comm Ctr Operations Replacement - Scissor Lift 20-44000-01 Equipment Bond Replacement - Lobby Furniture 20-44000-02 Comm Ctr Operations 10,000 Replacement - Roof 20-44000-02 G.O. Bond 2 40,000 40,000 40.000 40,000 40,000 40,000 1 6,000 6,000 6,000 6,000 2 75,000 200,000 6,725,000 7,000,000 75,000 75,000 200,000 6,725,000 6,925,000 1 18,000 123000 30,000 18,000 12,000 30,000 1 10,000 10,000 10,000 10,000 1 10,000 10,000 10,000 10,000 1 10,000 10,000 10,000 10,000 1 75,000 75,000 75,000 75,000 1 25,000 25,000 25,000 25,000 1 25,000 25,000 25,000 25,000 1 1,000,000 1,000,000 1,000,000 1,000,000 1 15,000 15,000 15,000 15,000 1 14,000 14,000 14,000 14,000 1 15,000 15,000 15,000 15,000 1 15,000 15,000 15,000 15,000 1 500,000 500,000 500,000 500,000 9 Department Project# Priority 2017 Replacement - Kaivac Cleaning System 20-44000-05 1 Comm Ctr Operations 10,000 Replacement - Camera/Security System 20-44000-06 1 G.O. Bond Capital Equipment Reserve Replacement - Zamboni Room Water Heater 20-44300-02 1 G.O. Bond Capital Equipment Reserve Replacement - Floor Scrubber 21-44000-01 1 Comm Ctr Operations 25,000 Repaint Field House Ceiling 21-44200-01 1 Comm Ctr Operations 17-41600-01 Replacement - Munters Desiccant Wheel 21-44300-01 1 Comm Ctr Operations 25,000 Replacement - Electric Edger 21-44300-02 1 Comm Ctr Operations 25,000 Replacement - Evaporative Condenser 21-44300-03 1 Comm Ctr Operations 710,000 Replacement- Field House Floor 21-44400-02 1 Comm Ctr Operations 248,000 Community Center Total 10,000 9,065,000 10,000 Emergency Management Emergency Operations Center Improvement 17-42400-01 Capital Equipment Reserve 40,000 Replacement - Emergency Sirens 17-42400-02 Capital Equipment Reserve 25,000 Emergency Management Total 45,000 25,000 453000 Engineering New Development Projects 17-41600-01 Sewer Trunk Fund 15,000 Water Trunk Fund 25,000 Pedestrian Trail Maintenance 17-41600-02 Road & Bridge Funds 25,000 New Pedestrian Trail and Sidewalk Segments 17-41600-03 Grant 710,000 Trail Funds 10,000 Pedestrian Trail Reconstruction 17-41600-04 Road & Bridge Funds Pedestrian Curb Ramp Replacements 17-41600-05 Road & Bridge Funds 60,000 LED Crosswalk Warning System 17-41600-06 Road & Bridge Funds 60,000 Replacement - Data Collector/Total Station 18-41600-01 Equipment Bond 120,000 Engineering Total Facility Management Annual Parking Lot Maintenance 17-41900-01 Capital Equipment Reserve Comm Ctr Operations Replacement - Carpet / Tile 17-41900-02 Capital Equipment Reserve 2018 2019 2020 2021 Total 10,000 248,000 10,000 10,000 9,065,000 10,000 12,000 7,500 12,000 12,000 40,000 12,000 25,000 43,000 25,000 25,000 45,000 25,000 453000 15,000 15,000 45,000 15,000 15,000 180,000 25,000 25,000 52,500 25,000 25,000 1 565,000 10,000 10,000 710,000 10,000 10,000 8,000 8,000 8,000 8,000 565,000 60,000 60,000 710,000 60,000 60,000 1 60,000 150,000 150,000 120,000 150,000 150,000 81,000 248,000 7,879,000 589,000 268,000 9,065,000 1 40,000 18,000 7,500 120,000 65,500 40,000 18,000 7,500 43,000 65,500 1 45,000 45,000 45,000 453000 180,000 45,000 45,000 45,000 45,000 180,000 85,000 63,000 52,500 45,000 245,500 1 160,000 160,000 165,000 175,000 180,000 840,000 117,000 117,000 120,000 125,000 125,000 604,000 43,000 43,000 45,000 50,000 55,000 236,000 1 50,000 55,000 60,000 65,000 70,000 300,000 50,000 55,000 60,000 65,000 70,000 300,000 1 565,000 225,000 265,000 710,000 400,000 2,165,000 265,000 265,000 565,000 225,000 710,000 400,000 1,900,000 1 60,000 80,000 100,000 120,000 140,000 500,000 60,000 80,000 100,000 120,000 140,000 500,000 1 15,000 16,000 17,000 18,000 19,000 85,000 15,000 16,000 17,000 18,000 19,000 85,000 1 21,000 21,000 21,000 21,000 1 33,500 33,500 33,500 33,500 871,000 569,500 607,000 1,088,000 809,000 3,944,500 1 90,000 1303000 30,000 30,000 30,000 310,000 30,000 130,000 30,000 30,000 30,000 250,000 60,000 60,000 2 10,000 10,000 10,000 30,000 10,000 10,000 10,000 30,000 10 Department Project# Priority 2017 2018 2019 Replacement - Security Management System 17-41900-03 1 100,000 Capital Equipment Reserve 50,000 100,000 Public Works Relocation / Expansion 17-41900-04 1 50,000 450,000 8,500,000 Capital Equipment Reserve 20-41900-01 50,000 G.O. Bond Comm Ctr Operations 450,000 8,500,000 HD Upgrade - City Hall Council Chambers 17-41900-05 1 60,000 Capital Equipment Reserve (Finance 60,000 Building A - Seal Floor 19-41900-01 Capital Equipment Reserve 100,000 Pedestrian Tunnel Under Crosstown Blvd. 19-41900-05 G.O. Bond 50,000 Memorial - Veterans Memorial 19-41900-06 Capital Equipment Reserve 60,000 Surface Seal all Brick Structures 20-41900-01 Capital Equipment Reserve 25,000 Comm Ctr Operations 25,000 Water Fund 450,000 Facility Management Total 450,000 (Finance 10,000 Financial / Payroll System Upgrade / Replacement 19-41400-01 Capital Equipment Reserve 85,000 Finance Total 48,000 12,000 12,000 Fire Replacement - Turnout Gear 17-42200-01 General Fund Replacement - Extrication (Rescue) Equipment 17-42200-02 Capital Equipment Reserve Replacement - Grass #31 18-42200-01 Equipment Bond Replacement - Grass #21 18-42200-02 Equipment Bond Replacement - Tanker #11 19-42200-01 Equipment Bond Replacement - Grass Utility Vehicle (UTV) #4813 19-42200-03 Equipment Bond 400,000 Replacement -1999 GMC Sonoma Truck (U-10) #4810 19-42200-05 Equipment Bond Replacement - SCBA Compressors 20-42200-01 Equipment Bond Replacement - 800 MHz radios 20-42200-02 Capital Equipment Reserve 45,000 Replacement - Engine 21 #4884 20-42200-03 Equipment Bond 1 25,000 25,000 1 450,000 450,000 1 10,000 10,000 1 2020 2021 Total 310,000 580,000 9,025,000 115,000 40,000 10,070,000 1 150,000 150.000 150,000 150,000 150,000 150,000 1 1 1 1 1 1 2 1 1 1 Fire Total Information Technology Smartboard Addition 18-41420-01 1 Capital Equipment Reserve 20,000 100,000 203000 100,000 20,000 9,000,000 20,000 50,000 20,000 8,950,000 20,000 60,000 80,000 60,000 25,000 25,000 80,000 450,000 450,000 10,000 10,000 85,000 85,000 48,000 48,000 12,000 12,000 25,000 25,000 310,000 580,000 9,025,000 115,000 40,000 10,070,000 1 150,000 150.000 150,000 150,000 150,000 150,000 1 1 1 1 1 1 2 1 1 1 Fire Total Information Technology Smartboard Addition 18-41420-01 1 Capital Equipment Reserve 20,000 20,000 203000 203000 20,000 100,000 20,000 20,000 20,000 20,000 20,000 100,000 80,000 80,000 80,000 80,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 400,000 400,000 400,000 400,000 45,000 45,000 45,000 45,000 45,000 45,000 45,000 45,000 130,000 130,000 130,000 130,000 35,000 35,000 70,000 35,000 35,000 70,000 450,000 450,000 450,000 450,000 100,000 190,000 510,000 635,000 55,000 1,490,000 is 12,000 12,000 12,000 12,000 Department Project# Priority 2017 2018 2019 2020 2021 Total Information Technology Total 12,000 15,000 15,000 15,000 Park & Rec - Operations Replace/Repair Play Structures - Various Parks 17-45000-01 General Fund 50,000 Replace/Repair Major Park Projects - Various Parks 17-45000-02 General Fund 50,000 Replacement - One Ton Crew Cab Pickup #502 17-45000-03 Capital Equipment Reserve 50,000 New - Trail Machine 17-45000-04 Capital Equipment Reserve 25,000 Replacement - One Ton Truck w/ Plow #599 18-45000-01 Equipment Bond 25,000 New - Wood Chipper Tow -Behind 18-45000-02 Equipment Bond 25,000 Replacement - Bobcat Track Loader #610 18-45000-03 Equipment Bond Replacement - Small Extended Cab Truck #76 18-45000-04 Equipment Bond 50,000 New -'Y Snow Plow for #09-589 18-45000-05 Equipment Bond 1 20,000 Replacement - Water Tanker #161 19-45000-01 Equipment Bond 60,000 Replacement - Trailer #T555 19-45000-02 Equipment Bond 150,000 Replacement -Cushman Field Dresser#547 20-45000-01 Equipment Bond Park & Rec - Operations Total 1 80,000 Park & Rec - Projects Annual Miscellaneous Park Projects 17-45001-01 Park Dedication Funds 80,000 Fox Meadows Park - Renovation 17-45001-02 Park Dedication Funds 80,000 Pine Hills North - Phase II 17-45001-03 Capital Equipment Reserve 42,500 Donations 20,000 Park Dedication Funds 20,000 Irrigation Projects - Small Parks 17-45001-04 Park Dedication Funds 20,000 Nordeen's Park Basketball Court 17-45001-05 Park Dedication Funds Wild Iris Park Irrigation and Water Service 19-45001-02 Park Dedication Funds 55,000 Park & Rec - Projects Total 55,000 Planning & Zoning Replacement - Planning Vehicle #7 17-41500-01 Capital Equipment Reserve Planning & Zoning Total 1 15,000 12,000 15,000 15,000 15,000 75,000 12,000 1 50,000 50,000 50,000 50,000 50,000 250,000 50,000 50,000 50,000 50,000 50,000 250,000 1 25,000 25,000 25,000 25,000 25,000 125,000 25,000 25,000 25,000 25,000 25,000 125,000 1 50,000 100,000 50,000 50,000 120,000 120,000 1 20,000 50,000 1 150,000 60,000 20,000 20,000 150,000 150,000 60,000 1 7,500 150,000 1 80,000 80,000 1 80,000 42,500 42,500 80,000 1 20,000 42,500 42,500 599,800 20,000 35,000 20,000 1,142,300 1 30,000 20,000 1 55,000 30,000 55,000 30,000 55,000 55,000 1 55,000 55,000 55,000 55,000 1 15,000 15,000 15,000 15,000 1 150,000 150,000 150,000 150,000 1 16,000 16,000 16,000 16,000 1 27,000 27,000 27,000 27,000 275,000 300,000 241,000 102,000 75,000 993,000 1 15,000 15,000 15,000 15,000 15,000 75,000 15,000 15,000 15,000 15,000 15,000 75,000 1 457,300 457,300 457,300 457,300 1 100,000 400,000 500,000 280,000 280,000 100,000 100,000 120,000 120,000 1 20,000 20,000 20,000 60,000 20,000 20,000 20,000 60,000 1 7,500 7,500 7,500 7,500 1 42,500 42,500 42,500 42,500 599,800 35,000 35,000 457,500 15,000 1,142,300 1 30,000 30,000 30,000 30,000 30,000 30,000 IN Department Project# Priority 2017 2018 2019 2020 2021 Total Sanitary Sewer Sanitary Sewer Extensions 17-48200-01 1 105,000 500,000 605,000 Assessments 105,000 105,000 Sewer Trunk Fund 500,000 500,000 Replacement - Jet/Vac Truck #99 17-48200-02 1 460,000 460,000 Sanitary Sewer Fund 230,000 230,000 Sewer Trunk Fund 230,000 230,000 Lift Station #4 Upgrade 17-48200-03 1 50,000 50,000 Sewer Trunk Fund 50,000 50,000 Yellow Pine Lift Station 18-48200-01 1 650,000 650,000 Sewer Trunk Fund 650,000 650,000 Replacement - One Ton Util ity Truck #69 18-48200-02 1 100,000 100,000 Sanitary Sewer Fund 100,000 100,000 Sanitary Sewer Total 615,000 1,250,000 1,865,000 Storm Sewer Storm Sewer Improvements 17-48300-01 1 55,000 60,000 60,000 62,000 65,000 302,000 Storm Sewer Fund 55,000 60,000 60,000 62,000 65,000 302,000 Replacement - Tymco Street Sweeper #172 18-48300-01 1 220,000 220,000 Equipment Bond 220,000 220,000 Replacement - Elgin Street Sweeper #169 19-48300-01 1 200,000 200,000 Equipment Bond 200,000 200,000 Storm Sewer Total 55,000 280,000 260,000 62,000 65,000 722,000 Street Signs Sign Design Software and Plotter 17-43300-01 2 10,000 10,000 Capital Equipment Reserve 10,000 10,000 Street Signs Total 10,000 10,000 Streets / Highways Annual Street Seal Coat Project 17-43100-01 1 725,000 250,000 260,000 275,000 285,000 1,795,000 Road & Bridge Funds 725,000 250,000 260,000 275,000 285,000 1,795,000 Annual Street Crack Seal Project 17-43100-02 1 160,000 170,000 245,000 290,000 375,000 1,240,000 Construction Seal Coat Fund 17,000 8,000 10,000 10,000 10,000 55,000 Road & Bridge Funds 143,000 162,000 235,000 280,000 365,000 1,185,000 Annual Pavement Markings 17-43100-03 1 42,000 44,000 46,000 48,000 50,000 230,000 Road & Bridge Funds 42,000 44,000 46,000 48,000 50,000 230,000 Annual Curb Replacement 17-43100-04 1 50,000 52,000 54,000 56,000 58,000 270,000 Road & Bridge Funds 50,000 52,000 54,000 56,000 58,000 270,000 Municipal State Aid Routes / New & Reconstruct 17-43100-05 1 1,300,000 820,000 1,690,000 350,000 290,000 4,450,000 Assessments 243,000 75,500 144,000 15,000 15,000 492,500 Municipal State Aid Funds 1,057,000 744,500 1,546,000 335,000 275,000 3,957,500 Annual Street Reconstruction 17-43100-06 1 1,236,000 821,000 1,143,000 1,092,000 1,268,000 5,560,000 Assessments 309,000 205,000 286,000 273,000 317,000 1,390,000 Road & Bridge Funds 927,000 616,000 857,000 819,000 951,000 4,170,000 Intersection Upgrades 17-43100-07 1 285,000 2,075,000 2,360,000 Grant 1,600,000 1,600,000 Municipal State Aid Funds 285,000 475,000 760,000 Gravel Road Improvements 17-43100-08 1 15,000 15,000 15,000 15,000 15,000 75,000 Road & Bridge Funds 15,000 15,000 15,000 15,000 15,000 75,000 Replacement - One Ton Truck w/ Plow #134 17-43100-11 1 80,000 80,000 Capital Equipment Reserve 80,000 80,000 13 Department Project# Priority 2017 2018 2019 2020 2021 Total New -One Ton Truck w/ Regular Box w/ Lift & Plow 17-43100-12 1 55,000 Capital Equipment Reserve 55,000 New - Bobcat paver 17-43100-13 1 20,000 Capital Equipment Reserve 20,000 Street Overlays 18-43100-01 1 Assessments 2,857,000 Road & Bridge Funds 2,986,000 New - Dump Truck w/ snow removal 19-43100-01 Equipment Bond 50,000 Replacement - Dump Truck w/ Snow removal #198 20-43100-01 Equipment Bond 250,000 Replacement - Bobcat S185 #120 20-43100-02 Equipment Bond 50,000 Replacement - One Ton Truck w/ Plow #133 20-43100-03 Equipment Bond Replacement - Backhoe Loader #80 20-43100-04 Equipment Bond 30,000 Replacement - Dump Truck w/ Snow removal #200 21-43100-01 Equipment Bond Streets / Highways Total 15,000 Water Rehabilitation of Wells 17-48100-01 Water Fund 15,000 Replacement - Dodge Dakota #95 17-48100-02 Sanitary Sewer Fund Water Fund 60,000 Replacement - 3/4 Ton Utility Truck #66 18-48100-02 Water Fund Replacement - Side by Side UTV #70 18-48100-03 Sanitary Sewer Fund 48,000 Storm Sewer Fund Water Fund 48,000 Water Main Improvements 18-48100-04 Assessments Water Trunk Fund 16,000 Water Meter Reading System AMI/AMR 19-48100-01 Water Fund Water Total 16,000 GRAND TOTAL 16,000 400,000 100,000 300,000 1 220,000 220,000 1 1 1 2 1 400,000 100,000 300,000 220,000 220,000 50,000 50,000 80,000 80,000 110,000 110,000 220,000 220,000 55,000 55,000 20,000 20,000 800,000 200,000 600,000 220,000 220,000 220,000 220,000 50,000 50,000 80,000 80,000 110,000 110,000 220,000 220,000 3,683,000 2,857,000 3,673,000 2,986,000 4,636,000 17,835,000 1 50,000 50,000 50,000 50,000 50,000 250,000 50,000 50,000 50,000 50,000 50,000 250,000 1 30,000 30,000 15,000 15,000 15,000 15,000 1 60,000 60,000 60,000 60,000 1 48,000 48,000 16,000 16,000 16,000 16,000 16,000 16,000 1 640,000 710,000 1,350,000 500,000 710,000 1,210,000 140,000 140,000 2 900,000 900,000 900,000 900,000 80,000 798,000 1,660,000 50,000 50,000 2,638,000 6,794,800 7,222,500 24,127,500 6,129,500 6,013,000 50,287,300 14 Department City of Andover, MN Capital Plan 2017 thru 2021 DEPARTMENT SUMMARY 2017 2018 2019 2020 2021 Total Community Center 81,000 218,000 7,865,000 552,000 185,000 8,901,000 Emergency Management 40,000 18,000 7,500 65,500 Engineering 871,000 536,000 607,000 1,088,000 809,000 3,911,000 Facility Management 150,000 580,000 9,025,000 115,000 40,000 9,910,000 Park & Rec - Operations 75,000 75,000 75,000 75,000 75,000 375,000 Park & Rec - Projects 599,800 35,000 35,000 457,500 15,000 1,142,300 Sanitary Sewer 155,000 1,150,000 1,305,000 Storm Sewer 55,000 60,000 60,000 62,000 65,000 302,000 Streets / Highways 3,528,000 2,857,000 3,453,000 2,526,000 4,416,000 16,780,000 Water 50,000 690,000 760,000 50,000 50,000 1,600,000 TOTAL 5,604,800 6,219,000 21,887,500 4,925,500 5,655,000 44,291,800 15 City of Andover, MN Capital Plan 2017 thru 2021 FUNDING SOURCE SUMMARY Source 2017 2018 2019 2020 2021 Total Assessments 657,000 880,500 1,140,000 388,000 332,000 3,397,500 Capital Equipment Reserve 205,000 148,000 82,500 358,000 40,000 833,500 Comm Ctr Operations 66,000 18,000 65,000 39,000 185,000 373,000 Construction Seal Coat Fund 17,000 8,000 10,000 10,000 10,000 55,000 Donations 100,000 100,000 G.O. Bond 650,000 16,750,000 525,000 17,925,000 General Fund 75,000 75,000 75,000 75,000 75,000 375,000 Grant 265,000 1,600,000 1,865,000 Municipal State Aid Funds 1,057,000 1,029,500 1,546,000 335,000 750,000 4,717,500 Park Dedication Funds 499,800 35,000 35,000 177,500 15,000 762,300 Road & Bridge Funds 2,048,000 1,590,000 1,644,000 1,996,000 1,953,000 9,231,000 Sewer Trunk Fund 167,000 1,267,000 120,000 125,000 125,000 1,804,000 Storm Sewer Fund 55,000 60,000 60,000 62,000 65,000 302,000 Trail Funds 565,000 225,000 710,000 400,000 1,900,000 Water Fund 50,000 50,000 50,000 75,000 50,000 275,000 Water Trunk Fund 43,000 183,000 45,000 50,000 55,000 376,000 GRAND TOTAL 5,604,800 6,219,000 21,887,500 4,925,500 5,655,000 44,291,800 IV., City of Andover, MN Capital Plan 2017 thru 2021 PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project# Priority 2017 2018 2019 2020 2021 Total Community Center Exterior Painting 17-44000-01 1 6,000 7,865,000 552,000 185,000 8,901,000 6,000 Comm Ctr Operations 6,000 Emergency Operations Center Improvement 17-42400-01 6,000 ACC/YMCA Expansion 17-44000-02 2 75,000 200,000 6,725,000 Capital Equipment Reserve 40,000 7,000,000 Capital Equipment Reserve 75,000 65,500 Emergency Management Total 40,000 18,000 75,000 G.O. Bond 65,500 200,000 6,725,000 6,925,000 Replacement - Carpeting 18-44000-01 1 18,000 160,000 12,000 1753000 30,000 Comm Ctr Operations Sewer Trunk Fund 117,000 18,000 120,000 12,000 125,000 30,000 Replacement - All Community Center Doors 19-44000-02 1 45,000 75,000 55,000 236,000 75,000 G.O. Bond 55,000 60,000 65,000 75,000 300,000 Road & Bridge Funds 75,000 Refacing Rink Boards 19-44300-01 1 70,000 25,000 25,000 Comm Ctr Operations 25,000 25,000 Repaint Ice Arena ceiling 19-44300-02 1 25,000 25,000 Comm Ctr Operations 25,000 25,000 Replacement - Ice Arena Refrigeration Replacement 19-44300-03 1 1,000,000 1,000,000 G.O. Bond 1,000,000 1,000,000 Replacement - Heat Exchangers - Munters Unit 19-44300-04 1 15,000 15,000 Comm Ctr Operations 15,000 15,000 Replacement - Lobby Furniture 20-44000-02 1 15,000 15,000 Comm Ctr Operations 15,000 15,000 Replacement - Roof 20-44000-03 1 500,000 500,000 G.O. Bond 500,000 500,000 Replacement - Zamboni Room Water Heater 20-44300-02 1 25,000 25.000 G.O. Bond 25,000 25,000 Repaint Field House Ceiling 21-44200-01 1 25,000 25,000 Comm Ctr Operations 25,000 25,000 Replacement - Munters Desiccant Wheel 21-44300-01 1 10,000 10,000 Comm Ctr Operations 10,000 10,000 Replacement- Field House Floor 21-44400-02 1 150,000 150,000 Comm Ctr Operations 150,000 150,000 Community Center Total 81,000 218,000 7,865,000 552,000 185,000 8,901,000 (Emergency Management Emergency Operations Center Improvement 17-42400-01 1 40,000 18,000 73500 65,500 Capital Equipment Reserve 40,000 18,000 7,500 65,500 Emergency Management Total 40,000 18,000 7,500 65,500 Engineering New Development Projects 17-41600-01 1 160,000 160,000 165,000 1753000 180,000 840,000 Sewer Trunk Fund 117,000 117,000 120,000 125,000 125,000 604,000 Water Trunk Fund 43,000 43,000 45,000 50,000 55,000 236,000 Pedestrian Trail Maintenance 17-41600-02 1 50,000 55,000 60,000 65,000 70,000 300,000 Road & Bridge Funds 50,000 55,000 60,000 65,000 70,000 300,000 17 Department Project# Priority 2017 2018 2019 2020 2021 Total New Pedestrian Trail and Sidewalk Segments 17-41600-03 1 565,000 225,000 265,000 710,000 400,000 2,165,000 Grant 265,000 265,000 Trail Funds 565,000 225,000 710,000 400,000 1,900,000 Pedestrian Trail Reconstruction 17-41600-04 1 60,000 80,000 100,000 120,000 140,000 500,000 Road & Bridge Funds 60,000 80,000 100,000 120,000 140,000 500,000 Pedestrian Curb Ramp Replacements 17-41600-05 1 15,000 16,000 17,000 18,000 19,000 85,000 Road & Bridge Funds 15,000 16,000 17,000 18,000 19,000 85,000 LED Crosswalk Warning System 17-41600-06 1 21,000 21,000 Road & Bridge Funds 21,000 21,000 Engineering Total 871,000 536,000 607,000 1,088,000 809,000 3,911,000 Facility Management Annual Parking Lot Maintenance 17-41900-01 1 90,000 130,000 30,000 30,000 30,000 310,000 Capital Equipment Reserve 30,000 130,000 30,000 30,000 30,000 250,000 Comm Ctr Operations 60,000 60,000 Replacement - Carpet / Tile 17-41900-02 2 10,000 10,000 10,000 30,000 Capital Equipment Reserve 10,000 10,000 10,000 30,000 Public Works Relocation / Expansion 17-41900-04 1 50,000 450,000 8,500,000 9,000,000 Capital Equipment Reserve 50,000 50,000 G.O. Bond 450,000 8,500,000 8,950,000 Building A- Seal Floor 19-41900-01 1 25,000 25,000 Capital Equipment Reserve 25,000 25,000 Pedestrian Tunnel Under Crosstown Blvd. 19-41900-05 1 450,000 450,000 G.O. Bond 450,000 450,000 Memorial - Veterans Memorial 19-41900-06 1 10,000 10,000 Capital Equipment Reserve 10,000 10,000 Surface Seal all Brick Structures 20-41900-01 1 85,000 85,000 Capital Equipment Reserve 48,000 48,000 Comm Ctr Operations 12,000 12,000 Water Fund 25,000 25,000 Facility Management Total 150,000 580,000 9,025,000 115,000 40,000 9,910,000 Park & Rec - Operations Replace/Repair Play Structures - Various Parks 17-45000-01 1 50,000 50,000 50,000 50,000 50,000 250,000 General Fund 50,000 50,000 50,000 50,000 50,000 250,000 Replace/Repair Major Park Projects - Various Parks 17-45000-02 1 25,000 25,000 25,000 25,000 25,000 125,000 General Fund 25,000 25,000 25,000 25,000 25,000 125,000 Park & Rec - Operations Total 75,000 75,000 75,000 75,000 75,000 375,000 Park & Rec - Projects Annual Miscellaneous Park Projects 17-45001-01 1 15,000 15,000 15,000 15,000 15,000 75,000 Park Dedication Funds 15,000 15,000 15,000 15,000 15,000 75,000 Fox Meadows Park - Renovation 17-45001-02 1 457,300 457,300 Park Dedication Funds 457,300 457,300 Pine Hills North - Phase II 17-45001-03 1 100,000 400,000 500,000 Capital Equipment Reserve 280,000 280,000 Donations 100,000 100,000 Park Dedication Funds 120,000 120,000 Irrigation Projects - Small Parks 17-45001-04 1 20,000 20,000 20,000 60,000 Park Dedication Funds 20,000 20,000 20,000 60,000 Nordeen's Park Basketball Court 17-45001-05 1 7,500 7,500 Park Dedication Funds 7,500 7,500 18 Department Project# Priority 2017 Wild Iris Park Irrigation and Water Service 19-45001-02 1 Park Dedication Funds Park & Rec - Projects Total Sanitary Sewer Sanitary Sewer Extensions 17-48200-01 Assessments Sewer Trunk Fund Lift Station #4 Upgrade 17-48200-02 Sewer Trunk Fund Yellow Pine Lift Station 18-48200-01 Sewer Trunk Fund Sanitary Sewer Total Storm Sewer Storm Sewer Improvements 17-48300-01 Storm Sewer Fund Storm Sewer Total 35,000 Streets / Highways 457,500 Annual Street Seal Coat Project 17-43100-01 Road & Bridge Funds 5003000 Annual Street Crack Seal Project 17-43100-02 Construction Seal Coat Fund 605,000 Road & Bridge Funds 170,000 Annual Pavement Markings 17-43100-03 Road & Bridge Funds 105,000 Annual Curb Replacement 17-43100-04 Road & Bridge Funds 10,000 Municipal State Aid Routes / New & Reconstruct 17-43100-05 Assessments 162,000 Municipal State Aid Funds 280,000 Annual Street Reconstruction 17-43100-06 Assessments 44,000 Road & Bridge Funds 48,000 Intersection Upgrades 17-43100-07 Grant 650,000 Municipal State Aid Funds 48,000 Gravel Road Improvements 17-43100-08 Road & Bridge Funds 650,000 Street Overlays 18-43100-01 Assessments 650,000 Road & Bridge Funds 1,150,000 Streets / Highways Total 56,000 58,000 1,305,000 Water Rehabilitation of Wells 17-48100-01 Water Fund 65,000 Water Main Improvements 18-48100-04 Assessments 60,000 Water Trunk Fund 65,000 2018 2019 2020 2021 Total 42,500 42.500 42,500 42,500 599,800 35,000 35,000 457,500 15,000 1,142,300 1 105,000 5003000 260,000 275,000 285,000 605,000 105,000 170,000 245,000 290,000 375,000 105,000 17,000 500,000 10,000 10,000 10,000 500,000 1 50,000 162,000 235,000 280,000 365,000 50,000 50,000 44,000 46,000 48,000 50,000 50,000 1 650,000 46,000 48,000 50,000 650,000 1 50,000 650,000 54,000 56,000 58,000 650,000 155,000 1,150,000 54,000 56,000 58,000 1,305,000 1 55,000 60,000 60,000 62,000 65,000 302,000 55,000 60,000 60,000 62,000 65,000 302,000 55,000 60,000 60,000 62,000 65,000 302,000 1 725,000 250,000 260,000 275,000 285,000 1,795,000 725,000 250,000 260,000 275,000 285,000 1,795,000 1 160,000 170,000 245,000 290,000 375,000 1,240,000 17,000 8,000 10,000 10,000 10,000 55,000 143,000 162,000 235,000 280,000 365,000 1,185,000 1 42,000 44,000 46,000 48,000 50,000 230,000 42,000 44,000 46,000 48,000 50,000 230,000 1 50,000 52,000 54,000 56,000 58,000 270,000 50,000 52,000 54,000 56,000 58,000 270,000 1 1,300,000 820,000 1,690,000 350,000 290,000 4,450,000 243,000 75,500 144,000 15,000 15,000 492,500 1,057,000 744,500 1,546,000 335,000 275,000 3,957,500 1 1,236,000 821,000 1,143,000 1,092,000 1,2683000 5,560,000 309,000 205,000 286,000 273,000 317,000 1,390,000 927,000 616,000 857,000 819,000 951,000 4,170,000 1 285,000 2,075,000 2,360,000 1,600,000 1,600,000 285,000 475,000 760,000 1 15,000 15,000 15,000 15,000 15,000 75,000 15,000 15,000 15,000 15,000 15,000 75,000 1 400,000 400,000 800,000 100,000 100,000 200,000 300,000 300,000 600,000 3,528,000 2,857,000 3,453,000 2,526,000 4,416,000 16,780,000 1 50,000 50,000 50,000 50,000 50,000 250,000 50,000 50,000 50,000 50,000 50,000 250,000 1 640,000 710,000 1,350,000 500,000 710,000 1,210,000 140,000 140,000 Department Water Total GRAND TOTAL Project# Priority 2017 50,000 2018 2019 2020 2021 Total 690,000 760,000 50,000 50,000 1,600,000 5,604,800 6,219,000 21,887,500 4,925,500 5,655,000 44,291,800 M Capital Flan 2017 th i+ 2021 Justification After 12 years, the paint has begun to chip and flake away. A new paint job will insure a quality look as our customers make their way into the Expenditures 2017 2018 2019 2020 2021 Total Facility Maintenance 6,000 6,000 Tom 6,000 6,000 Funding Sources 2017 2018 2019 2020 2021 Total Comm Ctr Operations 6,000 6,000 Total 6,000 Budget Impact/Other ,ess time spent in the entrance areas. QI 6,000 Capital Flan City ®f Andover, MN Project # 17-44000-02 Project Name ACCNMCA Expansion Type Improvement Useful Life 30 Years + Category Equipment Description 2017 thru 2021 Department Community Center Contact Comm Ctr Manager Priority 2 - Medium Expansion of the Community Center which may include a youth center, additional meeting rooms, office space, library services space, practice ice rink, storage, hockey training and multi-purpose space. The YMCA may look into additional studio space as well as "flex space" and offices. 2017 and 2018 includes a study to determine what type of space is needed, a preliminary design, a high-level cost estimation and other necessary information needed to make a decision on whether to move forward with construction. Justification After 12 years in operation, the city is exploring an expansion to the Community Center to accommodate additional users and address some of the issues that staff currently face. Expenditures 2017 2018 2019 2020 2021 Total Planning/Design Construction 75,000 200,000 6,725,000 275,000 6,725,000 Total Funding Sources 75,000 2017 200,000 2018 6,725,000 2019 2020 7,000,000 2021 Total Capital Equipment Reserve G.O. Bond 75,000 200,000 6,725,000 75,000 6,925,000 Total 75,000 200,000 6,725,000 7,000,000 Budget Impact/Other Wditional $7,000,000 in debt service; additional lease revenue from YMCA. 10% Capital Flan 2017 thrz, 2021 Justification After time, the carpet begins to wear and needs replacement. Expenditures 2017 2018 2019 2020 2021 Total Facility Maintenance 18,000 12,000 30,000 Total 18,000 12,000 30,000 Funding Sources 2017 2018 2019 2020 2021 Total Comm Ctr Operations 18,000 12,000 30,000 Total 18,000 Budget Impactl0ther )verall cost of new carpet will insure a quality experience for our customers for another 5 years. 23 12,000 30,000 Capital Flan 2017 111 i+ 2021 Justification After 12+ years, all the doors are showing wear and tear and in need of replacement. Expenditures 2017 2018 2019 2020 2021 Total Equipment 75,000 75,000 Tom Funding Sources 2017 75,000 2018 2019 2020 2021 75,000 Total G.O. Bond 75,000 75,000 Total 75,000 75,000 Budget Impact/Other 24 Capital Flan City ®f Andover, MN Project # 19-44300-01 Project Name Refacing Rink Boards Type Improvement Useful Life 15-20 Years Category Improvements 2017 thru 2021 Department Community Center Contact Comm Ctr Manager Priority 1 -High Description 3eplace the white poly and yellow kick plates on the rink boards along with new netting above the glass on the ends. Justification Fo ensure a safe and proper playing area, the rink boards, kick plates and nets need to be replaced after 15 years of wear and tear. It also gives us Ln opportunity to inspect all of the frames and fix alignment issues from the expansion and contraction of the sand floor. Expenditures 2017 2018 2019 2020 2021 Total Facility Maintenance 25,000 25,000 Total 25,000 25,000 Funding Sources 2017 2018 2019 2020 2021 Total Comm Ctr Operations 25,000 25,000 Total 25,000 Budget Impact/Other Fhere will be less maintenance initially; but as they age, the maintenance will increase as well. W 25,000 Capital Flan 2017 111 i+ 2021 After 15 years, the ice arena ceiling is showing signs of flaking and pealing. Painting the ceiling will provide a clean, restored look to the space. Expenditures 2017 2018 2019 2020 2021 Total Facility Maintenance 25,000 25,000 Tom 25,000 25,000 Funding Sources 2017 2018 2019 2020 2021 Total Comm Ctr Operations 25,000 25,000 Total Budget Impact/Other 25,000 25,000 Capital Flan City of Andover, MN 2017 th it 2021 Project # 19-44300-03 Project Name Replacement -Ice Arena Refrigeration Replacement Type Improvement Useful Life 15 Years Category Improvements Description Department Community Center Contact Comm Ctr Manager Priority 1 -High Tied to Building Expansion - As R22 is phased out we will need to look at a new compressor system for the rink floor Justification f a second sheet were built, we would have the options to tie the two systems together with the best option at the time. Either way, as R-22 is )hased out, we will need to look at a new compressor system to handle the refrigerant we decide to go with. Expenditures 2017 2018 2019 2020 2021 Total Equipment 1,000,000 1,000,000 Total 1,000,000 1,000,000 Funding Sources 2017 2018 2019 2020 2021 Total G.O. Bond 1,000,000 1,000,000 Total 1,000,000 1,000,000 Budget Impact/®ther 'ost will get us a new system that will be in compliance with new laws and regulations when it comes to R-22 freon, which is being phased out. few efficiencies and less maintenance on a new system will help offset the costs. 27 Capital Flan City ®f Andover, MN Project # 19-44300-04 Project Name Replacement -Heat Exchangers - Munters Unit Type Improvement Useful Life 15 Years Category Improvements 2017 thi it 2021 Department Community Center Contact Comm Ctr Manager Priority 1 -High Description Zeplacement of the heat exchangers in the Munters unit that heats the ice arena. Justification Wer 12 years, the heat exchangers that provide the heating to the ice arena will need to be replaced. Expenditures 2017 2018 2019 2020 2021 Total Equipment 15,000 15,000 Total 15,000 15,000 Funding Sources 2017 2018 2019 2020 2021 Total Comm Ctr Operations 15,000 15,000 Total 15,000 Budget Impact/®ther )verall cost of the heat exchangers will be offset by better technologies and efficiencies with less maintenance costs upfront. 28 15,000 Capital Flan City of Andover, MN Project # 20-44000-02 Project Name Replacement -Lobby Furniture 2017 1l11,1r 2021 Justification After 15 years, the lobby furniture is in need of replacement. Expenditures 2017 2018 2019 2020 2021 Total Office Equipment/Furniture 15,000 15,000 Total 15,000 15,000 Funding Sources 2017 2018 2019 2020 2021 Total Comm Ctr Operations 15,000 15,000 Total Budget Impact/Other 29 15,000 15,000 Capital Flan City ®f Andover, MN Project # 20-44000-03 Project Name Replacement -Roof Type Improvement Useful Life 20 Years Category Improvements Description { ull roof replacement (rubber membrane). 2017 tlii it 2021 Department Community Center Contact Comm Ctr Manager Priority 1 -High Justification Wer 15+ years, the rubber roof membrane will need to be replaced. Expenditures 2017 2018 2019 2020 2021 Total Facility Maintenance 500,000 500,000 Total 500,000 500,000 Funding Sources 2017 2018 2019 2020 2021 Total G.O. Bond 500,000 500,000 Total Budget Impact/Other 30 500,000 500,000 Capital Flan City ®f Andover, MN Project # 20-44300-02 Project Name Replacement - Zamboni Room Water Heater Type Improvement Useful Life 15 Years Category Improvements 2017 th it 2021 Department Community Center Contact Comm Ctr Manager Priority 1 -High Description Zeplace the water heater that provides hot water to the Zamboni room. Justification Wer 12+ years, the water heater within the Zamboni room will need to be replaced. Expenditures 2017 2018 2019 2020 2021 Total Equipment 25,000 25,000 Total 25,000 25,000 Funding Sources 2017 2018 2019 2020 2021 Total G.O. Bond 25,000 25,000 Total 25,000 Budget Inipact/®ther )verall cost of the new hot water heater will keep maintenance costs down and provide better efficincies. 0I 25,000 3 � 7 Expenditures 2017 2018 2019 2020 2021 Total Equipment 25,000 25,000 Total 25,000 25,000 Funding Sources 2017 2018 2019 2020 2021 Total G.O. Bond 25,000 25,000 Total 25,000 Budget Inipact/®ther )verall cost of the new hot water heater will keep maintenance costs down and provide better efficincies. 0I 25,000 Capital Flan City ®f Andover, MN ect # 21-44200-01 iectName Repaint Field House Ceiling Type Improvement Useful Life 15 Years Category Improvements Description 3epainting the field house ceiling. 2017 thn, 2021 Department Community Center Contact Comm Ctr Manager Priority 1 -High Justification Wer 15 years, the field house arena ceiling is showing signs of flaking and pealing. Painting the ceiling will provide a clean, restore look to the Expenditures 2017 2018 2019 2020 2021 Total Facility Maintenance 25,000 25,000 Total 25,000 25,000 Funding Sources 2017 2018 2019 2020 2021 Total Comm Ctr Operations 25,000 25,000 Total Budget Impact/Other 00 25,000 25,000 Capital Flan City of Andover, MN Project # 21-44300-01 Project Name Replacement - Munters Desiccant Wheel Type Improvement Useful Life 15 Years Category Improvements 2017 thi it 2021 Department Community Center Contact Comm Ctr Manager Priority 1 -High Description Zeplace the desiccant wheel in the Munters unit that provides the dehumidification to the ice arena. The wheel is the part of the system that draws he moisture out. Justification After 15+ years, the desiccant wheel that provides the dehumidification to the ice arena will need to be replaced. Expenditures 2017 2018 2019 2020 2021 Total Equipment 10,000 10,000 Total 10,000 10,000 Funding Sources 2017 2018 2019 2020 2021 Total Comm Ctr Operations 10;000 10,000 Total 10,000 10,000 Budget Impact/Dt®ther 33 Capital Plan 2017 thn, 2021 Justification Over the last 15+ years, the floor has hosted many different types of events. The overall finish of the floor is wearing off along with the cracking and chipping that warrants a replacement. Expenditures 2017 2018 2019 2020 2021 Total Facility Maintenance 150,000 150,000 Total Funding Sources 2017 150,000 2018 2019 2020 2021 150,000 Total Comm Ctr Operations 150,000 150,000 Total 150,000 150,000 Budget Impact/®ther k new floor will insure a safe place for all our users and events. It will give us an opportunity to restripe the floor with better consideration given o our user base. There will also be some upfront savings on maintenance costs with a new floor. 34 Capital Plan City ®f Andover, MN Project # 17-42400-01 Project same Emergency Operations Center Improvement 2017 thi it 2021 Type Improvement Department Emergency Management Useful Life 15 Years Contact Fire Chief Category Improvements Priority 1 -High Description Construct a functional Emergency Operational Center (EOC) by improving workable space at fire station #1 located at 13578 Crosstown Blvd. The improvements include light station modifications, technology improvements, lockable cabinets/storage, hand-held and stationary radios. funds will be used to resurface the flooring on the upper level of the fire station, cut a new door into a wall, add new technology such as -ns, phones, WiFi, Map Boards, and change locks so the EOC can be secured. Justification ederal and State law requires local governments to develop and maintain an Emergency All -Hazard Operations Plan. In that plan we are equired to identify a primary and alternate EOC location. Fire station #1 has a lot of unused space that would convert well into an EOC with nuch less cost than starting new. The improvements would also allow a dual purpose for emergency personnel to train and meet using the same Expenditures 2017 2018 2019 2020 2021 Total Construction Office Equipment/Furniture Technology Improvements 25,000 15,000 10,000 8,000 7,500 25,000 17,500 23,000 Total Funding Sources 40,000 2017 18,000 2018 7,500 2019 2020 2021 65,500 Total Capital Equipment Reserve 40,000 18,000 7,500 65,500 Total 40,000 18,000 7,500 65,500 Budget Impact/Other Although we have had a workable emergency plan for several years, Andover has relied upon the County to assist us during emergencies. In 2014, the Fire Chief was tasked with improving the emergency operations plan so that it could be implemented and operational in a very short time. This effort will require funds to improve the Emergency Operations Center so effective coordination can occur should the city suffer an emereencv disaster. Capital Flan 2017 th i+ 2021 /".4- --C A -A .v ... A AMT Justification Che development phasing is identified in the City's Comprehensive Plan. Jote: All private development construction is dependent upon market conditions, plat approval and normal City development procedures. Expenditures 2017 2018 2019 2020 2021 Total Construction 160,000 160,000 165,000 175,000 180,000 840,000 Total 160,000 160,000 165,000 175,000 180,000 840,000 Funding Sources 2017 2018 2019 2020 2021 Total Sewer Trunk Fund 117,000 117,000 120,000 125,000 125,000 604,000 Water Trunk Fund 43,000 43,000 45,000 50,000 55,000 236,000 Total 160,000 160,000 165,000 175,000 180,000 840,000 Budget Impact/Mer additional maintenance of streets, storm sewer, water main and sanitary sewer will result. Additional streets will be added for snowplowing. K% Capital Flan 2017 th i+ 2021 Justification City trails are in need of general maintenance including crack filling and fog sealing to maintain the high level of service to pedestrian walkers, bikers and roller bladers. A 5 -year capital improvement plan was prepared for the City to identify and prioritize the necessary repairs. Expenditures 2017 2018 2019 2020 2021 Total Improvement 50,000 55,000 60,000 65,000 70,000 300,000 Total Funding Sources 50,000 2017 55,000 2018 60,000 2019 65,000 2020 70,000 2021 300,000 Total Road & Bridge Funds 50,000 55,000 60;000 65,000 70,000 300,000 Total 50,000 55,000 60,000 65,000 70,000 300,000 Budget Impact/Other ks the City trail system begins to age, routine preventative maintenance such as crack filling and fog sealing becomes a necessity. The naintenance will allow for a longer service life for the trail system throughout the city. 37 Capital Flan 2017 th i+ 2021 �•, r ♦ t ,rev Justification Expansion of the City's trail and sidewalk system provides more recreational and exercise opportunities along with an alternative mode of transportation. These segments provide key connections to other existing trail and sidewalk routes. Expenditures 2017 2018 2019 2020 2021 Total Improvement 565,000 225,000 265,000 710,000 400,000 2,165,000 Funding Sources Total 565,000 2017 225,000 2018 265,000 2019 710,000 2020 400,000 2021 2,165,000 Total Grant Trail Funds 565,000 225,000 265,000 710,000 4003000 265,000 1,900,000 Total 565,000 225,000 265,000 710,000 400,000 2,165,000 nual inspection and sweeping; and general maintenance including bituminous patching, crack filling and fog sealing to maintain the high level service to pedestrians. 38 9LNA6Vk* Ca ital Improvement Plan p p Project Name: TRAIL IMPROVEMENTS CROSSTOWN BOULEVARD TRAIL - EAST SIDE (2017) L E G E N D Project Location Lots/Parcels [� Park Water Right of Way City Limits Document Path: H:\Gisdata\Engineering\Projects\CIP_2016.mxd 0 310 620 930 Feet 39 Location Map 9LNA6Vk* Ca ital Improvement Plan (2018) p p Project Name: TRAIL IMPROVEMENTS ANDOVER BLVD FROM BLUEBIRD ST TO VALE ST L E G E N D Project Location Lots/Parcels [� Park Water Right of Way City Limits Document Path: H:\Gisdata\Engineering\Projects\CIP_2016.mxd 0 150 300 450 Feet 40 Location Map 9LNA6Vk* Ca ital Improvement Plan (2019) p p Project Name: TRAIL IMPROVEMENTS KENSINGTON ESTATES 7TH ADD TO ANDOVER STATION NORTH L E G E N D Project Location Lots/Parcels Park Water Right of Way City Limits Document Path: H:\Gisdata\Engineering\Projects\CIP_2016.mxd 0 100 200 300 Feet 41 Location Map 9LNA6Vk* Ca ital Improvement Plan (2020) p p Project Name: TRAIL IMPROVEMENTS CROSSTOWN BLVD TRAIL - 159TH AVE TO XEON ST L E G E N D Project Location Lots/Parcels ED Park Water Right of Way City Limits Document Path: H:\Gisdata\Engineering\Projects\CIP_2016.mxd N W E S 0 200 400 600 Feet 42 Location Map 9LNA6Vk* Ca ital Improvement Plan (2021) p p Project Name: TRAIL IMPROVEMENTS VERDIN ST 161STAVE TO 163RD LANE L E G E N D Project Location Lots/Parcels [� Park Water Right of Way City Limits Document Path: H:\Gisdata\Engineering\Projects\CIP_2016.mxd N W E S 0 150 300 450 Feet 43 Location Map Capital Flan 2017 th i+ 2021 Justification Many trail segments in the City are reaching 25+ years in age. There are segments that are in need of reconstruction to help maintain the level of service expected in the trail system by residents. Expenditures 2017 2018 2019 2020 2021 Total Construction 60,000 80,000 100,000 120,000 140,000 500,000 Total Funding Sources 60,000 2017 80,000 2018 100,000 2019 120,000 2020 140,000 2021 500,000 Total Road & Bridge Funds 60,000 80,000 100,000 120,000 140,000 500,000 Total 60,000 80,000 100,000 120,000 140,000 500,000 Budget Impact/Mer Zeconstruction of trail segments in need will help reduce short and long term maintenance costs necessary to keep them serviceable. It will also mprove the safety of the trail system. 44 Capital Flan City ®f Andover, MN Project # 17-41600-05 Project Name Pedestrian Curb Ramp Replacements 2017 thru 2021 Type Improvement Department Engineering Useful Life 25 Years Contact DPW / City Engineer Category Improvements Priority 1 -High Description This project will result in the City trails and sidewalks being in compliance with the Americans with Disabilities Act by replacing existing pedestrian curb ramps to meet standards. Justification The Americans with Disability Act requires that all public facilities be accessible to those with disabilities. As a part of the ADA, pedestrian curl ramps are required to follow strict standards to ensure they are accessible. Numerous pedestrian ramps in the City are not in compliance with the ADA. This project works towards bring our trail and sidewalk system into compliance by replacing multiple ramps each year. Expenditures 2017 2018 2019 2020 2021 Total Improvement 15,000 16,000 17,000 18,000 19,000 85,000 Total 15,000 16,000 17,000 18,000 19,000 85,000 Funding Sources 2017 2018 2019 2020 2021 Total Road & Bridge Funds 15,000 16,000 17,000 18,000 193000 85,000 Total 15,000 16,000 17,000 18,000 19,000 85,000 Budget Impact/Other Chis will help bring City facilities into compliance with the Americans with Disabilities Act. Capital Flan City of Andover, MN 2017 tlii it 2021 Project\ame LED Crosswalk Warning System Type Improvement Department Engineering �rt Useful Life 15 Years Contact DPW / City Engineer[ Category Improvements Priority 1 -High Description A solar powered Rectangular Rapid Flash Beacon LED Crosswalk Warning System will be constructed on Crosstown Blvd at 149th Ave to enhance the awareness of the pedestrian crossing that currently exists. Justification Fhere has been concern at this intersection that a pedestrian crossing exists but motorist frequently do not stop for pedestrians. This warning system will enhance the visibility of the crossing when the push button is activated. Expenditures 2017 2018 2019 2020 2021 Total Improvement 21,000 21,000 Total Funding Sources 21,000 2017 2018 2019 2020 2021 21,000 Total Road & Bridge Funds 21,000 21,000 Total 21,000 21,000 Budget Impact/Other t Capital Flan 2017 th i+ 2021 Justification Completing periodic maintenance on the City parking lots, similar to City streets, will extend the overall design life of the pavement and reduce and/or prolong costly repairs. Expenditures 2017 2018 2019 2020 2021 Total Improvement 90,000 130,000 30,000 30,000 30,000 310,000 TOW Funding Sources 90,000 2017 130,000 2018 30,000 2019 30,000 2020 30,000 2021 310,000 Total Capital Equipment Reserve Comm Ctr Operations 30,000 60,000 130,000 30,000 30,000 30,000 250,000 60,000 Total 90,000 130,000 30,000 30,000 30,000 310,000 ining the parking lots will result in less annual maintenance for public works and prolong the life of the pavements. 47 Capital Flan City ®f Andover, MN 2017 th it 2021 Project # 17-41900-02 Project Name Replacement -Carpet/ Tile p'A Q0.. Type Improvement Department Facility Management Useful Life 10 Years Contact DPW / City Engineer Category Improvements Priority 2 - Medium maµ W Description —---] LA The replacement of carpet and tile in appropriate areas of all City buildings where deemed necessary. An annual review of all areas will be done to determine the order of replacement. Justification The buildings get a lot of use and, despite the appropriate cleaning and maintenance, the carpeting and tile will need to be replaced. Expenditures 2017 2018 2019 2020 2021 Total Facility Maintenance 10,000 10,000 10,000 30,000 Total 10,000 10,000 10,000 30,000 Funding Sources 2017 2018 2019 2020 2021 Total Capital Equipment Reserve 10,000 10,000 10,000 30,000 Total 10,000 10,000 10,000 30,000 Budget Impact/Other Che carpet and tile replacement will be needed in order to keep the buildings in good repair. Due to heavy use, it is anticipated that all carpeted and the areas will need to be replaced. 48 Capital Flan City ®f Andover, MN Project # 17-41900-04 Project\ame Public Works Relocation/ Expansion Type Improvement Useful Life 30 Years + Category Facility Management 2017 tlii it 2021 Department Facility Management Contact DPW / City Engineer Priority 1 -High Description Construction of a new Public Works facility as identified in the approved City Campus Expansion Master Plan. Phase I - Construct a new Vehicle Maintenance Shop, including a wash bay, cold storage building and fuel island/canopy. 2017 and 2018 includes a study to determine what type of space is needed, a preliminary design, a high-level cost estimation and other necessary information needed to make a decision on whether to move forward with construction. 'hase II - Construct a new Public Works Building, including office space and heated storage garage. The start date has not been determined Justification )ue to the increase of vehicles, equipment and supplies now used by the City of Andover, this vehicle storage building and vehicle maintenance epair shop is badly needed. It is not cost effective to have vehicles or other equipment stored outside. Minnesota's four seasons are way too hard )n them and it makes for a much cleaner operation. The vehicle maintenance repair shop has been needed for a long time. The area now used has loors that are not wide enough and the work areas for the hydraulic hoist are way too small. Also with the amount of equipment now maintained )v our staff. the area is much too small to run a completely safe operation. Expenditures 2017 2018 2019 2020 2021 Total Planning/Design 50,000 450;000 500,000 Improvement 8,500,000 8,500,000 Total 50,000 450,000 8,500,000 9,000,000 Funding Sources 2017 2018 2019 2020 2021 Total Capital Equipment Reserve 50,000 50,000 G.O. Bond 450,000 8,500,000 8,950,000 Total 50,000 450,000 8,500,000 9,000,000 Budget Impact/Other This will impact the life of the vehicles and other equipment by being stored inside and to house our vehicle maintenance mechanics. Over the years, the cost savings have been shown when the proper maintenance of our equipment can be implemented. This building will provide a safe, productive, and healthv operational area for Citv emplovees that will benefit the Citv of Andover for manv vears. 49 Capital Flan 2017 th i+ 2021 /".4- --C A -A .v ... A AMT Justification Che cement floor in Building A spalds due to daily traffic and salt. Sealing of the floors should be repeated every 4 years to retain the integrity c he floor surface. Without this process, the cement floor would deteriorate and have to be replaced. It is much more cost effective to perform the naintenance than to replace the entire floor. Expenditures 2017 2018 2019 2020 2021 Total Facility Maintenance 25,000 25,000 Total 25,000 25,000 Funding Sources 2017 2018 2019 2020 2021 Total Capital Equipment Reserve 25,000 25,000 Total 25,000 Budget Impact/Other 'roper maintenance extends the life of the cement floor, thus not having to replace it before its life expectancy is up. 50 25,000 Capital Flan City ®f Andover, MN Project # 19-41900-05 Project Name Pedestrian Tunnel Under Crosstown Blvd. Type Improvement Useful Life 30 Years + Category Facility Management 2017 th it 2021 Department Facility Management Contact DPW / City Engineer Priority 1 -High Description This would be a pedestrian underpass walkway under Crosstown to accommodate pedestrian traffic from a possible development of a parking lot or other sports fields on the north side of Crosstown Boulevard that could cross under Crosstown Boulevard to Sunshine Park Facilities or just connect to the city's trail system. Justification This item was discussed at a Council Workshop with the Public Works Department Managers February 16th, 2006. For safety and easy access for crossing Crosstown Boulevard from a future park and/or parking lot on the north side of Crosstown Boulevard to Sunshine Park on the south side; or just getting to the city trail system the quickest and safest way will be a pedestrian underpass under Crosstown Boulevard. Expenditures 2017 2018 2019 2020 2021 Total Improvement 450,000 450,000 Total 450,000 450,000 Funding Sources 2017 2018 2019 2020 2021 Total G.O. Bond 450,000 450,000 Total 450,000 450,000 Budget Impact/Other 'onnecting of these area's through an underpass will not only benefit pedestrians crossing the roadway, but will also provide a safe passage for )ersonnel and smaller equipment. 61 Capital Flan City ®f Andover, MN Project # 19-41900-06 Project same Memorial - Veterans Memorial Type Improvement Useful Life 20 Years Category Improvements Description k memorial to honor Andover veterans. 2017 thn, 2021 Department Facility Management Contact DPW / City Engineer Priority 1 -High Justification Che City would like to construct a memorial to honor Andover veterans. Expenditures 2017 2018 2019 2020 2021 Total Improvement 10,000 10,000 Total Funding Sources 2017 10,000 2018 2019 2020 2021 10,000 Total Capital Equipment Reserve 10,000 10,000 Total 10,000 10,000 Budget Impact/Other yn increase in annual maintenance. 6Y: Capital Flan City ®f Andover, MN ect # 20-41900-01 2017 th i+ 2021 Justification This is a necessary maintenance item to ensure the long term integrity of the municipal buildings. Expenditures 2017 2018 2019 2020 2021 Total Facility Maintenance 85,000 85,000 'row 85,000 85,000 Funding Sources 2017 2018 2019 2020 2021 Total Capital Equipment Reserve 48,000 48,000 Comm Ctr Operations 12,000 12,000 Water Fund 25,000 25,000 Total Budget Impact/Other Chis will reduce the amount of long term maintenance and repair to the municipal buildings. 53 85,000 85,000 Capital Flan City ®f Andover, MN Project # 17-45000-01 Project Name Replace/Repair Play Structures -Various Parks Type Improvement Useful Life 10 Years Category Park Improvements Description 2017 thn, 2021 Department Park & Rec - Operations Contact DPW / City Engineer Priority 1 -High Repair to fall zones and achieve ADA accessibility. Replacement of playground equipment and other major replacements, such as short fences on ball fields, soccer goals, and any area of play that does not meet safety specifications. The proposed rebuilds are as follows: 2017 - Chesterton Commons 2018 - Shadowbrook East 2019 - Pine Hills South 2020 - Terrace Park 2021 - Strootman Park Justification Old equipment no longer meets ADA requirements, such as entrapments, fall zones and handicap accessibility. Working to bring the parks up to meet all safety requirements. Expenditures 2017 2018 2019 2020 2021 Total Equipment 50,000 50,000 50,000 50,000 50,000 250,000 Funding Sources Total 50,000 2017 50,000 2018 50,000 2019 50,000 2020 50,000 2021 250,000 Total General Fund 50,000 50,000 50,000 50,000 50,000 250,000 Total 50,000 50,000 50,000 50,000 50,000 250,000 Budget Impact/Other ,ess maintenance and will meet all safety requirements. 54 AM6MRCapital Improvement Plan (2017) Project Name: REPLACE/REPAIR PLAY STRUCTURES CHESTERTON COMMONS H C0 N w ~w J N U w J O0 ►= w Q D � J m PJB rs�r k 9G O H O LU LU 154TH AVE JO O� 55 GAO L E G E N D Project Location Lots/Parcels Park Water Right of Way City Limits Document Path: H:\Gisdata\Engineering\Projects\CIP_2016.mxd 0 100 200 300 Feet55 AM6MRCapital Improvement Plan Project Name: REPLACE/REPAIR PLAY STRUCTURES SHADOWBROOK EAST J L E G E N D Project Location Lots/Parcels Park Water Right of Way City Limits Document Path: H:\Gisdata\Engineering\Projects\CIP_2016.mxd 0 250 500 750 Feet56 61 (2018) AM6MRCapital Improvement Plan (2019) Project Name: PINE HILLS SOUTH 161 ST AVE Pine Hills a_ J D H L E G E N D Project Location Lots/Parcels Park Water Right of Way City Limits Document Path: H:\Gisdata\Engineering\Projects\CIP_2016.mxd N w E s 0 50 100 150 Feet57 ASbMRCapital Improvement Plan (2020) Project Name: TERRACE PARK F- 00 C0 135TH LN C0 C0 v N GSz R ORGN`O ORCHID ST a 135TH AVE Terrace Park � s�s PJ CT CIO as a° L E G E N D Project Location Lots/Parcels Park Water Right of Way City Limits Document Path: H:\Gisdata\Engineering\Projects\CIP_2016.mxd 0 50 100 150 Feet58 ASbMRCapital Improvement Plan (2021) Project Name: STROOTMAN PARK co h- �Q C40 ¢° 3 �yqV� RUM RIVER L E G E N D Project Location Lots/Parcels Park Water Right of Way City Limits Document Path: H:\Gisdata\Engineering\Projects\CIP_2016.mxd 0 100 200 300 Feet59 Capital Flan City ®f Andover, MN 2017 th i+ 2021 Project # 17-45000-02 Project Name Replace/Repair Major Park Projects -Various Parks ........ Justification ks the Andover park system continues to age there is a need for major replacement projects that cost in excess of $10,000 per project. These tems can not be replaced through the Parks maintenace budget because of the high cost of the replacement. Current projects that are in need nclude the replacement of the outfield fencing and parking lot reconstruction within City Parks. Each year a specific project will be identified. Expenditures 2017 2018 2019 2020 2021 Total Improvement 25,000 25,000 25,000 25,000 25,000 125,000 Total 25,000 25,000 25,000 25,000 25,000 125,000 Funding Sources 2017 2018 2019 2020 2021 Total General Fund 25,000 25,000 25,000 25,000 25,000 125,000 Total 25,000 25,000 25,000 25,000 25,000 125,000 Budget Impact/Other Zeplacements and rebuilds will reduce the ongoing maintenance that is needed to keep park facilities useable and safe. 60 Capital Flan City ®f Andover, MN Project # 17-45001-01 Project Name Annual Miscellaneous Park Projects Type Improvement Useful Life Unassigned Category Park Improvements 2017 tlii it 2021 Department Park & Rec - Projects Contact Asst.Public Works Director Priority 1 -High Description This is for unforeseen or requested miscellaneous projects that may arise during the year, requested by the public, staff, City Council or the Park and Recreation Commission each year. Justification This gives flexibility to the City to do certain small -sized projects that may be warranted; for example, purchase soccer goals. This funding has been recommended by the Park and Recreation Commission. Expenditures 2017 2018 2019 2020 2021 Total Improvement 15,000 15,000 15,000 15,000 15,000 75,000 Total 15,000 15,000 15,000 15,000 15,000 75,000 Funding Sources 2017 2018 2019 2020 2021 Total Park Dedication Funds 15,000 15,000 15,000 15,000 153000 753000 Budget Impact/Other Total 15,000 15,000 15,000 15,000 15,000 75,000 61 Capital Flan 2017 th i+ 2021 Justification For the size of this park, it is under utilized. Due to the condition of the existing field and the lack of a good playing surface, the field needs to be upgraded with irrigation. An additional smaller field adjacent to the full size field will give the associations another place to practice and/or play Expenditures 2017 2018 2019 2020 2021 Total Improvement 457,300 457,300 Total Funding Sources 457,300 2017 2018 2019 457,300 2020 2021 Total Park Dedication Funds 457,300 457,300 Total 457,300 457,300 Budget Impact/Other 'ontinued annual maintenance. ANbMRCapital Improvement Plan (2017) Project Name: FOX MEADOWS v LU 0 J 159TH AVE Fox Meadows of yq�F ti 157TH AVE L E G E N D Project Location Lots/Parcels Park Water Right of Way City Limits Document Path: H:\Gisdata\Engineering\Projects\CIP_2016.mxd 0 150 300 450 Feet63 Capital Flan City ®f Andover, MN 'roject # 17-45001-03 'roject same Pine Hills North - Phase 11 2017 tlir l+ 2021 Type Improvement Department Park & Rec - Projects Useful Life 20 Years Contact Asst.Public Works Director Category Improvements Priority 1 -High Description Phase II of the new sporting complex will include the construction of a storage building (identified for 2017) funded by donations from the athletic associations as recommended by the Park and Recreation Commission. 2020 includes the paving of existing and/or newly created parking 'he land was purchased in 2012. The fields were graded, irrigated and seeded in 2013. There will be other improvements down the road icluding concession/storage buildings, large playground structure, ect. )ther Droiect improvements will be completed as funds become available. Justification )ue to the growth of soccer, football, and lacrosse, an additional sports complex was necessary to keep up with demand so that the existing fields ire not over -used which allows those fields additional time to recover between games and practices. Paving is necessary to reduce the dust during try times of the year. Paving will also allow vehicles to park in designated parking stalls once the parking lot is striped. Drivers at times create nore distance between vehicles when parking their vehicle on a gravel lot. k storage building is also being requested by the Park Commission so that the associations have additional storage for their equipment. Expenditures 2017 2018 2019 2020 2021 Total Improvement 100,000 400,000 500,000 TOW Funding Sources 100,000 2017 2018 400,000 2019 2020 2021 500,000 Total Capital Equipment Reserve Donations Park Dedication Funds 100,000 280,000 120,000 280,000 100,000 120,000 Total 100,000 400,000 500,000 Budget Impact/Other adding new items to the facility will put additional burdens on existing park staff and budgets. 64 AM6MRCapital Improvement Plan (2020) Project Name: PINE HILLS NORTH lip irk L E G E N D Project Location Lots/Parcels Park Water Right of Way City Limits Document Path: H:\Gisdata\Engineering\Projects\CIP_2016.mxd Pine Hills 0 250 500 750 Feet65 RD -LN N Capital Flan 2017 th i+ 2021 Justification Since most of the City parks have sandy soils, irrigation is pretty much the only way to keep the grass green and the area looking good otherwise the area will turn to dirt and will be unsightly. Expenditures 2017 2018 2019 2020 2021 Total Improvement 20,000 20,000 20,000 60,000 Total 20,000 20,000 20,000 60,000 Funding Sources 2017 2018 2019 2020 2021 Total Park Dedication Funds 20,000 20,000 20,000 60,000 Budget Impact/Other 'ontinued annual maintenance. Total 20,000 20,000 20,000 66 60,000 Capital Flan City ®f Andover, MN Project # 17-45001-05 Project same Nordeen's Park Basketball Court 2017 thn, 2021 Type Improvement Department Park & Rec - Projects Useful Life 15 Years Contact Asst.Public Works Director Category Improvements Priority 1 -High Description To install a new basketball court at the request of neighborhood petition that was submitted in 2016. Justification 3ased on interest from the neighborhood it has been determined that a basketball court would provide another option for residents to do when here are visiting the park. Expenditures 2017 2018 2019 2020 2021 Total Improvement 7,500 7,500 Total 7,500 7,500 Funding Sources 2017 2018 2019 2020 2021 Total Park Dedication Funds 7,500 7,500 Total 7,500 Budget Impact/Other 'ontinued annual maintenance. 67 7,500 ASbMRCapital Improvement Plan (2017) Project Name: NORDEEN'S PARK 156TH AVE CO w W M z L E G E N D Project Location Lots/Parcels Park Water Right of Way City Limits Document Path: H:\Gisdata\Engineering\Projects\CIP_2016.mxd Nordeen I 0 50 100 Feet68 Capital Flan City ®f Andover, MN Project # 19-45001-02 Project Name Wild Iris Park Irrigation and Water Service Type Improvement Useful Life 15 Years Category Park Improvements 2017 th it 2021 Department Park & Rec - Projects Contact Asst.Public Works Director Priority 1 -High Description Irrigate the existing ball field and surrounding amendities. Justification )ue to the condition of the existing ball field and the lack of a good playing surface, the field needs to be upgraded with irrigation. The ballfield ;ould be used by other associations if baseball does not schedule the use of the field in the fall. Expenditures 2017 2018 2019 2020 2021 Total Improvement 42,500 42,500 Total Funding Sources 2017 42,500 2018 2019 2020 2021 42,500 Total Park Dedication Funds 42,500 42,500 Total 42,500 42,500 Budget Impact/Other 'ontinued annual maintenance. 69 AM6MRCapital Improvement Plan (2020) Project Name: WILD IRIS PARK N ~ ~ U CO m Q 7 Ci U D I = H 139TH LN —F O, O, 00 139TH AVE LL F.(— MFt m' m Wild Iris Park U w —1-38TH-LN — w J 0 U -38�y o m w Y a J Z D O BUNKER LAKE BLVD L E G E N D Project Location Lots/Parcels Park Water Right of Way City Limits Document Path: H:\Gisdata\Engineering\Projects\CIP_2016.mxd 0 150 300 450 Feet70 Capital Flan City ®f Andover, MN roject # 17-48200-01 rolect Fame Q-4.— Q.—aw Fv+nn mnnc Useful Life 50 Years Category Improvements Justification 2017 th it 2021 Contact DPW / City Engineer Priority I -High Che Aztec Estates Lift Station will need upgrades/improvements to handle flows projected once development fills in on the properties adjacent to 3unker Lake Boulevard and east of 7th Avenue. Che Crosstown Boulevard trunk sanitary sewer would be extended to serve properties adjacent to Crosstown Boulevard and east of the railroad racks and ultimately east of Prairie Road. The extension has been recommended through the sanitary sewer report (2004 Sanitary Sewer Zeport), subsequent studies of the system, and the updated Comprehensive Plan. Timing of this project is contingent upon development east of he railroad tracks. Expenditures 2017 2018 2019 2020 2021 Total Improvement 105,000 500,000 605,000 Total Funding Sources 105,000 2017 500,000 2018 2019 605,000 2020 2021 Total Assessments Sewer Trunk Fund 105,000 500,000 105,000 500,000 Total 105,000 500,000 605,000 Budget Impact/Mer additional routine maintenance including televising and cleaning will be required. VA AM6MRCapital Improvement Plan Project Name: SANITARY SEWER IMPROVEMENTS AZTEC ESTATES LIFT STATION UPGRADES CO Lift—S'tatio'n-#'l L E G E N D Project Location Lots/Parcels Park Water Right of Way City Limits Document Path: H:\Gisdata\Engineering\Projects\CIP_2016.mxd Pleasant Oaks Park ROUNDLAKE Lift Station#5 N W E s 0 350 700 1,050 Feet72 (2017) Rose Park ANbMRCapital Improvement Plan (2018) Project Name: SANITARY SEWER IMPROVEMENTS CROSSTOWN BLVD SANITARY SEWER EXTENSION L m �s Project Location Lots/Parcels J M m � Z 1, City Limits -158TH AVE—N O o;o G r FST N� n, 157TH AVE 9�0 Moore states �� N NW ON 1.1. a J� 1.55T,H�P Landlocked Park � z W � G 2 5� 154TH -LN �G L E G E N D Project Location Lots/Parcels Park Water Right of Way City Limits Document Path: H:\Gisdata\Engineering\Projects\CIP_2016.mxd 0 250 500 750 Feet73 Capital Flan City ®f Andover, MN Project # 17-48200-03 Project same Lift Station #4 Upgrade 2017 tlii it 2021 Type Improvement Department Sanitary Sewer Useful Life 10 Years Contact DPW / City Engineer Category Utilities Priority 1 -High Description Lift Station 94 needs to have the pumps increased to handle the additional flows from the surrounding area and also the new developments to the north and east. Justification dVith the new additions to the north and east of lift station 94, the flows have increased putting the lift station at it's capacity. Lift stations 96 and 0 pump into the sanitary sewer system that serves lift station 94 and these additional flows have put lift station 94 to the designed capacity at the )resent time. As more homes are added, the capacity will be more than what the lift station can handle. Expenditures 2017 2018 2019 2020 2021 Total Improvement 50,000 50,000 Total 50,000 50,000 Funding Sources 2017 2018 2019 2020 2021 Total Sewer Trunk Fund 50,000 50,000 Total 50,000 Budget Impact/Other 74 50,000 AM6MRCapital Improvement Plan (2017) Project Name: SANITARY SEWER IMPROVEMENTS LIFT STATION #4 UPGRADES N co -J L— Z 158TH AVE a C0 z .9D O �O OCET ST } LU O,Q q�Fs r Lift Station #4 rSsry�N 9G O F- 155 T jy�ti 155TH LN L E G E N D Project Location Lots/Parcels Park Water Right of Way City Limits Document Path: H:\Gisdata\Engineering\Projects\CIP_2016.mxd 0 100 200 300 Feet75 Capital Flan City ®f Andover, MN Project # 18-48200-01 Project Name Yellow Pine Lift Station 2017 th it 2021 _ Type Improvement Department Sanitary Sewer f Useful Life 50 Years Contact DPW / City Engineer Category Improvements Priority I -High 1 rum Description Install a lift station at Yellow Pine Street to divert flow from the Bluebird Street trunk line to the Pinewood trunk line. The wet well for this lift station was constructed in 2005 as a part of the Crosstown Boulevard Improvements Project. Justification This lift station will allow additional capacity in the Bluebird Street trunk line to serve adjacent properties until the year 2025. This project is development dependent. Expenditures 2017 2018 2019 2020 2021 Total Improvement 650,000 650,000 Total Funding Sources 2017 650,000 2018 2019 2020 2021 650,000 Total Sewer Trunk Fund 650,000 650,000 Total 650,000 Budget Impact/®ther Zoutine monitoring and maintenance of the lift station will be required. re 650,000 AXbMRCapital Improvement Plan (2018) Project Name: SANITARY SEWER IMPROVEMENTS YELLOW PINE LIFT STATION V 5�N LN 5T 0 �5 v 7SSr 155TH LN 15TH AVE w 155T O5 H'PJ w rssry a al ��Jo 3\ 5gO c �.54TH AVE 1.52ND LN ophie's Pa IO Purple Park J DO Z O City Hall N Park Complex #1 Q 5 ins �y� a� M--l6-.--;T--150TH l6-.D150T-H L -N -� N Z G) w m m Y' Cl) 149TH -L -N L E G E N D Project Location Lots/Parcels Park Water Right of Way City Limits Document Path: H:\Gisdata\Engineering\Projects\CIP_2016.mxd 0 350 700 1,050 Feet77 Capital Flan 2017 th it 2021 Useful Lite 3U Years t Category Utilities Justification contact lir w i wiry rngmeer Priority 1 -High vlaintaining the City's storm sewer system improves water quality and public safety, and reduces the need for costly repairs in the future. Zepairing and maintaining these systems also allows public works to focus on and comply with requirements of the NPDES program, such as )ipe cleaning, inspections, and sweeping. Expenditures 2017 2018 2019 2020 2021 Total Improvement 55,000 60,000 60,000 62,000 65,000 302,000 TOW 55,000 60,000 60,000 62,000 65,000 302,000 Funding Sources 2017 2018 2019 2020 2021 Total Storm Sewer Fund 55,000 60,000 603000 62,000 65,000 302,000 Total 55,000 60,000 60,000 62,000 65,000 302,000 Budget Impact/Other Zepairing problem areas in the storm sewer system will reduce the yearly maintenance needs placed on the public works personnel. 78 Capital Flan 2017 th it 2021 /".4_ _-C A —A .v ... A AMT Useful Life 8 Years Category Improvements Justification Contact DPW / City Engineer Priority I -High Teal coating will extend the useful life of roads by protecting the bituminous from oxidation due to adverse weather conditions (sun, rain, wind, know, etc.). The prevention of oxidation will prolong the useful life of the pavement and defer the need for a costly reconstruction. Seal coating ilso improves the skid resistance of the roadway surface by increasing the friction between vehicle tires and the roadway. For roadways that are searing the end of their useful life cycle, seal coating can help hold them together until the roadways are programmed for reconstruction. Expenditures 2017 2018 2019 2020 2021 Total Construction 725,000 250,000 260,000 275,000 285,000 1,795,000 Total 725,000 250,000 260,000 275,000 285,000 1,795,000 Funding Sources 2017 2018 2019 2020 2021 Total Road & Bridge Funds 725,000 250,000 260,000 275,000 285,000 1,795,000 Total 725,000 250,000 260,000 275,000 285,000 1,795,000 Budget Impact/Other 3xtending the life of the street will reduce routine maintenance (Crack sealing, pot hole patching, overlays, etc.) and extend the overall design ife of the pavement. Seal coating will also help to hold deteriorating streets together until they can be scheduled for reconstruction. 79 Capital Flan City ®f Andover, MN Project # 17-43100-02 Project Name Annual Street Crack Seal Project 2017 th it 2021 Type Improvement Department Streets/ Highways Useful Life 8 Years Contact DPW / City Engineer Category Improvements Priority 1 -High Description This project provides for crack sealing of the streets. Each year one of the nine full zones in the City is crack sealed. The following areas are tentatively planned for crack sealing as shown. Areas nearing reconstruction, those seal coated recently to hold together, or with severe cracking are excluded from this project as determined by the Engineering and Public Works Departments. 2017: Zone 4/NW Corner of Zone 5 2018: Zone 5 2019: Zone 6 2020: Zone 7 2021: Zone 8 Justification The sealing of street cracks will significantly extend the useful life of the streets. This will extend the time frame when a costly street reconstruction project will be necessary. The sealing of cracks in the street surface reduces/eliminates water from entering the road base and subgrade. This process reduces the freeze/thaw cycles of the subgrade, maintaining the integrity of the road. Crack sealing is completed in one zone per year and in new developments and reconstructed areas two to three years after they are paved. Expenditures 2017 2018 2019 2020 2021 Total Construction 160,000 170,000 245,000 290,000 375,000 1,240,000 Total Funding Sources 160,000 2017 170,000 2018 245,000 2019 290,000 2020 375,000 2021 1,240,000 Total Construction Seal Coat Fund Road & Bridge Funds 17,000 143,000 8,000 162,000 10,000 235,000 10,000 280,000 10,000 365,000 55,000 1,185,000 Total 160,000 170,000 245,000 290,000 375,000 1,240,000 the street cracks will reduce routine maintenance by eliminating a major source of street degradation resulting from moisture in the 80 Capital Flan City ®f Andover, MN Project 4 17-43100-03 Project Name Annual Pavement Markings 2017 th it 2021 Type Improvement Department Streets/ Highways Useful Life 1-2 Years Contact DPW / City Engineer Category Improvements Priority 1 -High Description The pavement striping for City streets is conducted one time per year. This includes centerline striping and shoulder striping. Striping enhances the safety of the roadway by directing traffic to the correct lane movement. The Federal Highway Administration is currently reviewing reflective standards for pavement markings. In the near future, the City may have to stripe twice per year to meet new standards. If this is approved, it will double the cost of pavement markings per year. Justification Striping is required through the local and state agencies. A reflective standard is required. Restriping annually maintains the pavement markings to the required standards. Expenditures 2017 2018 2019 2020 2021 Total Improvement 42,000 44,000 46,000 48,000 50,000 230,000 TOW Funding Sources 42,000 2017 44,000 2018 46,000 2019 48,000 2020 50,000 2021 230,000 Total Road & Bridge Funds 42,000 44,000 46,000 48,000 50,000 230,000 Total 42,000 44,000 46,000 48,000 50,000 230,000 Budget Impact/Other Che pavement markings are contracted out each year freeing staff for other duties. 81 Capital Flan City ®f Andover, MN 2017 th it 2021 Project # 17-43100-04 Project Name Annual Curb Replacement Type Improvement Department Streets/ Highways Useful Life 30 Years Contact DPW / City Engineer Category Improvements Priority 1 -High Description Damaged and failing concrete curb and gutter throughout the City needs to be repaired or replaced to help maintain the integrity of the roadway system. Replacing damaged or failing sections of curb and gutter helps with drainage of the roadway and prolongs the life of the street system. Justification Che majority of the concrete curb and gutter throughout the City is in relatively good condition. However, there are isolated areas that need ehabilitation every year. The failing or damaged sections of concrete curb and gutter are removed and replaced. Replacing damaged sections of ;oncrete curb and gutter maintains the integrity of and prolongs the life of the City's street infrastructure. Expenditures 2017 2018 2019 2020 2021 Total Improvement 50,000 52,000 54,000 56,000 58,000 270,000 Total 50,000 52,000 54,000 56,000 58,000 270,000 Funding Sources 2017 2018 2019 2020 2021 Total Road & Bridge Funds 50,000 52,000 543000 56,000 58,000 270,000 Total 50,000 52,000 54,000 56,000 58,000 270,000 Budget Impact/Other Zepairing failing or damaged sections of curb and gutter reduces the routine maintenance required by the public works department. 82 Capital Flan City ®f Andover, MN Project # 17 -43100 -OS Project same Municipal State Aid Routes / New & Reconstruct 2017 thru 2021 Type Improvement Department Streets/ Highways Useful Life 20 Years Contact DPW / City Engineer Category Improvements Priority 1 -High Description The following projects are proposed to be constructed and/or rehabilitated to meet State Aid Standards. 2017: University Ave Overlay (157th to 161st) $130,000* 168th Lane (Round Lake Blvd to Verdin) $1,170,000 2018: 143rd Avenue Reconstruction (Xenia St to Round Lake Blvd) $370,000 Crosstown Blvd Overlay (Hanson Blvd to 161st Ave) $450,000 2019: University Ave Recon (Andover Blvd to 157th) $690,000* Hanson Blvd (Jay Street to Crosstown Blvd) $1,000,000 2020: Prairie Road Overlay (Andover Blvd to Bunker Lake Blvd) $350,000 2021: Jay Street Overlay (Bunker Lake Blvd to Hanson Blvd) $290,000 *This is Andover's portion of these project costs. The City of Ham Lake would fund the remaining 50% of these project costs. Justification Upgrades to existing roadways are needed to maintain the integrity of the City's State Aid roadway infrastructure. New Municipal State Aid routes are necessary to provide access to current and future developments. Expenditures 2017 2018 2019 2020 2021 Total Construction 1,300,000 820,000 1,690,000 350,000 290,000 434503000 TOW 1,300,000 820,000 1,690,000 350,000 290,000 4,450,000 Funding Sources 2017 2018 2019 2020 2021 Total Assessments 243,000 75,500 144,000 15,000 15,000 492,500 Municipal State Aid Funds 1,057,000 744,500 1,546,000 335,000 275,000 3,957,500 Total 1,300,000 820,000 1,690,000 350,000 290,000 4,450,000 the roads will reduce the amount of routine maintenance along these sections of roadway and provide a safer and higher quality system. 83 AM6MRCapital Improvement Plan (2017) Project Name: STATE AID ROUTES OVERLAY UNIVERSITY AVE - 157TH TO 161ST CONSTANCE BLVD H 0 a0', .z W .o IJ ,O W 'a I� W z L E G E N D Project Location Lots/Parcels Park Water Right of Way City Limits Document Path: H:\Gisdata\Engineering\Projects\CIP_2016.mxd N W E s 0 250 500 750 Feet84 ASNbMRCapital Improvement Plan (2017) Project Name: STATE AID ROUTES RECONSTRUCTION 168TH LANE (ROUND LAKE BLVD TO VERDIN) \� V 172ND AVE white oaksN� w Q N J) 171_S-T-AV_E a 1.70TH-LN 1 170TH=LN 170TH_!- 0 O O N 1 �6�9-T_H L'N o o T- > 169TH -LN W E:LL Y VI J 1 -68TH -LN U 7�-2— UJ— OR 1:6.7-T-H=LN cI 167TH=AVE 4Q/ O N Z foo w ,w 1^66TH=AVE Lund's North 1_64T_H_LN 1.6_4TH=LN L E G E N D Project Location Lots/Parcels Park Water Right of Way City Limits Document Path: H:\Gisdata\Engineering\Projects\CIP_2016.mxd 0 400 800 1,200 Feet85 NDOVEI Capital Improvement Plan (2018) Project Name: STATE AID ROUTES RECONSTRUCTION 143RD AVENUE (ROUND LAKE BLVD TO XENIA ST) 1�y�N AVE N W W LL .L z OV G o z w 144T HA -v n O a E Nco -+ a z w X 143RD AVE C21) w z z J o O W O � 142ND LN J m Y "J O 00O Z O OI m N Location Map L E G E N D N Project Location w E Lots/Parcels Park s 0 Water Right of Way City Limits 0 150 300 450 Feet86 Document Path: H:\Gisdata\Engineering\Projects\CIP_2016.mxd 9N6MR^ Ca ital Im rovement Plan (201s) p p Project Name: STATE AID ROUTES OVERLAY CROSSTOWN BLVD (HANSON BLVD TO 161 STAVE) D Park City Hall k Complex #1 L E G E N D Project Location Lots/Parcels Document Path: H:\Gisdata\Engineering\Projects\CIP_2016.mxd —1 6`1 -ST 0 450 900 1,350 Feet 87 M. Park Water Right of Way City Limits Document Path: H:\Gisdata\Engineering\Projects\CIP_2016.mxd —1 6`1 -ST 0 450 900 1,350 Feet 87 M. AM6MRCapital Improvement Plan Project Name: STATE AID ROUTES RECONSTRUCTION UNIVERSITY AVE - ANDOVER BLVD TO 157TH AVE Prairie Knoll Park COON CREEK L E G E N D Project Location Lots/Parcels Park Water Right of Way City Limits Document Path: H:\Gisdata\Engineering\Projects\CIP_2016.mxd 0 650 1,300 1,950 Feet88 (2019) AM6MRCapital Improvement Plan (2020) Project Name: STATE AID ROUTES OVERLAY PRAIRIE ROAD (ANDOVER BLVD TO BUNKER LAKE BLVD) Andover Lions Park L E G E N D Project Location Lots/Parcels Park Water Right of Way City Limits Document Path: H:\Gisdata\Engineering\Projects\CIP_2016.mxd COON -CREEK Shadowbrook West Park BUNKERLAKE N W E s 0 350 700 1,050 Feet90 BLVD AM6MRCapital Improvement Plan (2021) Project Name: STATE AID ROUTES OVERLAY JAY STREET (HANSON BLVD TO BUNKER LAKE BLVD) n er S Ball Field Complex I1J O Hills of Bun er J Q Lake West Park m W �4U A39TH�LN z TygV��� z co Z' ti 2 39TH - E Q H '38ry�H co a �38ryq �E 138TH AVE �i m' SERVICE RD BUNKER LAKE BLVD � c Z � � N O L E G E N D Project Location Lots/Parcels Park Water Right of Way City Limits Document Path: H:\Gisdata\Engineering\Projects\CIP_2016.mxd N W E s 0 250 500 750 Feet91 Capital Flan City ®f Andover, MN Project # 17-43100-06 Project Name Annual Street Reconstruction 2017 th it 2021 Type Improvement Department Streets/ Highways Useful Life 20 Years Contact DPW / City Engineer Category Improvements Priority 1 -High Description The Street Reconstruction projects will consist of milling the existing street surface and constructing a new asphalt surface. Minor shouldering and restoration work will be included with the project. In developments that have existing bituminous curb or no curb or ditch, concrete curb and gutter will be constructed. 25% of the total project costs are assessed to the benefiting properties in each development. This program helps to maintain the integrity and value of the community's street infrastructure. Areas to be reconstructed are listed below. The timing of reconstruction of developments more than two years out may be revised as street conditions and ratings are reviewed on an annual basis. Additional developments may be added to the schedule or projects moved up if it is advantageous to reconstruct them in conjunction with other nearby projects. 2017 - Lund's Evergreen Estates 2nd - 5th Additions 2018 - Andover Bdy Commission Plat 1 / Shirley's Estates 2019 - Area east of Crooked Lake 2020 - Alladin Acres, Enchanted Drive Area 2021- Andover West, Indian Meadows 2nd Addition, Lunds Round Lake Estates Justification The streets in these neighborhoods are generally in excess of 25 years old and are in need of rehabilitation. The intent of this program is to provide the community with a high quality transportation system and maintain a constant upkeep of the City's street infrastructure. Expenditures 2017 2018 2019 2020 2021 Total Construction 1,236,000 821,000 1,143,000 1,092,000 1,268,000 5,560,000 Total Funding Sources 1,236,000 2017 821,000 2018 1,143,000 2019 1,092,000 2020 1,268,000 2021 5,560,000 Total Assessments Road & Bridge Funds 309,000 927,000 205;000 6163000 286,000 857,000 273,000 819,000 317,000 951,000 1,390,000 4,170,000 Total 1,236,000 821,000 1,143,000 1,092,000 1,268,000 5,560,000 Budget Impact/Other Che rehabilitation of the streets will reduce the routine maintenance (crack sealing, pot hole patching, etc..) in the area. Long term, this econditioning will prolong the structural stability of the roadway making for a longer serviceable life. MA AM6MRCapital Improvement Plan (2017) Project Name: ANNUAL STREET RECONSTRUCTION LUND'S EVERGREEN ESTATES 2ND -5TH ADDITIONS ; L E G E N D Project Location Lots/Parcels Park Water Right of Way City Limits Document Path: H:\Gisdata\Engineering\Projects\CIP_2016.mxd N W E s 0 300 600 900 Feet93 NDOVEI Capital Improvement Plan (2018) Project Name: ANNUAL STREET RECONSTRUCTION ANDOVER BOUNDARY COM. PLAT 1 & SHIRLEYS ESTATES ROUNDLAKE y�N AVE 1 y c co UJ W / .4 Z V n o z w 144TNAVe JO Nn � > i -4 a X 20 OJ 143RD AVE C0 N Lu Wu - Fn Z 0 J O Z w Z Location Map L E G E N D N Project Location W E Lots/Parcels Park S Water Right of Way City Limits 0 150 300 450 Feetg4 Document Path: H:\Gisdata\Engineering\Projects\CIP_2016.mxd AM6MRCapital Improvement Plan (2019) Project Name: ANNUAL STREET RECONSTRUCTION AREA EAST OF CROOKED LAKE. L E G E N D Project Location BUNKER LAKE BLVD SERVICE RD Water Right of Way o0 City Limits ke B O m Lan m x Ch O m 'J 0 N 01 w 135TH LN w COON CREEK w 135TH AVE _ 135T_H CSR 135TH AVE CROOKEDLAKE T F 134TH -LN 134TH AVE Q UJ = cn NO Tn UJ w T33RD-LN Q UJ 0 w L E G E N D Project Location Lots/Parcels Park Water Right of Way City Limits Document Path: H:\Gisdata\Engineering\Projects\CIP_2016.mxd 0 200 400 600 Feet95 AM6MRCapital Improvement Plan Project Name: ANNUAL STREET RECONSTRUCTION ALLADIN ACRES & ENCHANTED DRIVE AREA 1 -ST 0=0 L E G E N D Project Location Lots/Parcels Park Water Right of Way City Limits Document Path: H:\Gisdata\Engineering\Projects\CIP_2016.mxd IE`D E 0 250 500 750 Feet96 (2020) 9066�V�R Capital Improvement Plan (2021) Project Name: ANNUAL STREET RECONSTRUCTION ANDOVER WEST, INDIAN MEADOWS 2ND ADDITION & LUNDS ROUND LAKE ESTATES RUM RIVER '2 H L E G E N D Project Location Lots/Parcels Park Water Right of Way City Limits Document Path: H:\Gisdata\Engineering\Projects\CIP_2016.mxd N W E S 0 400 800 1,200 Feet97 Pleasant Kelsey Round Lake Park ROUNDLAKE Capital Flan City ®f Andover, MN Project # 17-43100-07 Project Name Intersection Upgrades 2017 th it 2021 Type Improvement Department Streets/ Highways Useful Life 25 Years Contact DPW / City Engineer Category Improvements Priority 1 -High Description The following are projects that are tentatively identified for improvements. Exact timing is subject to change. 2018 - Construction of a traffic signal at South Coon Creek Drive and Round Lake Blvd ($285,000) if warrants are met. 2021 - Crosstown Blvd / Crosstown Drive Intersection. Improvements could include separating the southbound right turning movement onto Crosstown Drive to improve safety ($275,000). 2021 - Nightingale Street / Crosstown Blvd Intersection. A round about with two pedestrian underpasses is being submitted for HSIP grant funding. Timing of this project would be dependant upon award of a grant ($1,800,000). Grants typically require a minimum 10% City match. Justification Intersection upgrades are necessary due to the increased development and demands on the transportation system, the need for safety improvements, and to comply with Anoka County Highway Department requirements. Expenditures 2017 2018 2019 2020 2021 Total Construction 285;000 2,075,000 2,360,000 Total Funding Sources 2017 285,000 2018 2019 2,075,000 2020 2021 2,360,000 Total Grant 1,600,000 1,600,000 Municipal State Aid Funds 285,000 475,000 760,000 Total 285,000 2,075,000 2,360,000 )act/Mer s will improve the flow of traffic and will improve the safety of vehicles, pedestrians and bicyclists 98 Capital Flan 2017 111 i+ 2021 Justification Ongoing improvements are needed to maintain the integrity of the gravel roadways. Between 3/4 to 1 mile of gravel road will be improved per year by adding 2 to 3 inches of class 5 aggregate. Expenditures 2017 2018 2019 2020 2021 Total Improvement 15,000 15,000 15,000 15,000 15,000 75,000 Total 15,000 15,000 15,000 15,000 15,000 75,000 Funding Sources 2017 2018 2019 2020 2021 Total Road & Bridge Funds 15,000 15,000 15,000 15,000 153000 753000 Total 15,000 15,000 15,000 15,000 15,000 75,000 Budget Impact/Other 100 Capital Flan 2017 th it 2021 f".4_ -C A —A .v ... A AMT Useful Life 20 Years Category Improvements Justification Contact DPW / City Engineer Priority 1 -High Ashen streets are designed, it is assumed that about 20 years into their life cycle an overlay is constructed to extend the useful life of the )avement. It is crucial that only roads that do not have major distresses are overlayed, as significant distresses will reflect through an overlay and Vs effects would not be long lasting. An overlay on a structurally sound road can prolong it's useful life by 15 plus years. Expenditures 2017 2018 2019 2020 2021 Total Construction 400,000 400,000 800,000 Tom 400,000 400,000 800,000 Funding Sources 2017 2018 2019 2020 2021 Total Assessments 100,000 100,000 200,000 Road & Bridge Funds 300,000 300,000 600,000 Total 400,000 400,000 800,000 Budget Impact/Other overlaying a structurally sound road will prolong it's useful life a minimum of 15 years, and also reduce routine annual maintenance required ;ompared to an older roadway surface (pothole patching, crack sealing, etc.) Capital Flan City ®f Andover, MN Project # 17-48100-01 Project Same Rehabilitation of Wells 2017 th it 2021 Type Improvement Department Water Useful Life 7 Years Contact DPW / City Engineer Category Improvements Priority 1 -High Description The motor, pump and column pipe are taken out for inspection and worn parts are replaced. The well is televised to determine the depth and condition. If the well is at or close to the original drill depth everything is put back in place. The well may need to be cleaned out to the original depth if there is a substantial decrease in the depth. Justification To make sure the well is operational to what it is designed for and to correct any problems that may affect our ability to produce the amount of water needed to meet the demand, a complete inspection and maintenance overhall is performed on each well a minimum of once every seven (7) years. This maintenance will also maximize the pumping rate of the well. Expenditures 2017 2018 2019 2020 2021 Total Improvement 50,000 50,000 50,000 50,000 50,000 250,000 Total 50,000 50,000 50,000 50,000 50,000 250,000 Funding Sources 2017 2018 2019 2020 2021 Total Water Fund 50,000 50,000 503000 50,000 50,000 250,000 Total 50,000 50,000 50,000 50,000 50,000 250,000 Budget Impact/Other Chis would be done at such a time that it would not affect the demand needs of the system. Typically done late fall. 111M Capital Flan 2017 th it 2021 (-itv of AnAnxrt-r XW 10--.o MVV oiectName AXI-io.-Aii.,;., 7..,.......o..,o.,�� Useful Life 50 Years Category Improvements Justification Contact DPW / City Engineer Priority 1 -High Che roadways in the Andover Boundary Commission Plat 1 and along 143rd Avenue between Round Lake Blvd and Woodbine Street are )roposed to be reconstructed in 2018. The connection along 143rd Avenue would be considered a trunk improvement as it would provide a ooped connection for over 170 parcels west of this connection. Che roadways in the Lakeview Terrace areas east of Crooked Lake are proposed to be reconstructed in 2019. t is cost beneficial to install the water main in these areas while the roadways are being constructed. Expenditures 2017 2018 2019 2020 2021 Total Improvement 640,000 710,000 1,350,000 TOW 640,000 710,000 1,350,000 Funding Sources 2017 2018 2019 2020 2021 Total Assessments 500,000 710,000 1,210,000 Water Trunk Fund 140,000 140,000 Total 640,000 710,000 Budget Impact/Other additional maintenance and flushing requirements for the water main system will result. 103 1,350,000 AM6MRCapital Improvement Plan (2018) Project Name: WATER MAIN IMPROVEMENTS 143RD AVE, ANDOVER BOUNDARY COM. PLAT 1 & SHIRLEYS ESTATES L E G E N D ROUNDLAKE Oft Project Location Lots/Parcels ant Park Water Right of Way ks Park City Limits AVE Cl) G w C� C w z a o z U w 144TH AVE Cn O � 0O co z a JO z �v vQ 143RD AVE 4 0 Nw N O Z F m o z v 0-- 0 o � z L E G E N D Project Location Lots/Parcels Park Water Right of Way City Limits Document Path: H:\Gisdata\Engineering\Projects\CIP_2016.mxd 0 150 300 450 Feel 04 AM6MRCapital Improvement Plan (2019) Project Name: WATER MAIN IMPROVEMENTS AREA EAST OF CROOKED LAKE L H Project Location C0 P J Right of Way City Limits _O D fn J I N N W 135TH LN J W COON CREEK 2 � w ,35TH CIR 135TH AVE CROOKEDLAKE 134TH LN --T 1 -34TH AVE Cn Cn Cn LU 133RD LN w 0 w L E G E N D Project Location Lots/Parcels Park Water Right of Way City Limits Document Path: H:\Gisdata\Engineering\Projects\CIP_2016.mxd 0 150 300 450 Feel 05 This page left blank intentionally. `11r City of Andover, MN Capital Plan 2017 thru 2021 DEPARTMENT SUMMARY Department 2017 2018 2019 2020 2021 Total Building 35,000 35,000 Central Equipment 40,000 40,000 Community Center 30,000 14,000 37,000 83,000 164,000 Emergency Management 45,000 45,000 45,000 45,000 180,000 Engineering 33,500 33,500 Facility Management 160,000 160,000 Finance 150,000 150,000 Fire 100,000 190,000 510,000 635,000 55,000 1,490,000 Information Technology 12,000 12,000 Park & Rec - Operations 200,000 225,000 166,000 27,000 618,000 Planning & Zoning 30,000 30,000 Sanitary Sewer 460,000 100,000 560,000 Storm Sewer 220,000 200,000 420,000 Street Signs 10,000 10,000 Streets / Highways 155,000 220,000 460,000 220,000 1,055,000 Water 30,000 108,000 900,000 1,038,000 TOTAL 1,190,000 1,003,500 2,240,000 1,204,000 358,000 5,995,500 107 108 City of Andover, MN Capital Plan 2017 thru 2021 FUNDING SOURCE SUMMARY Source 2017 2018 2019 2020 2021 Total Capital Equipment Reserve 680,000 57,000 195,000 80,000 35,000 1,047,000 Comm Ctr Operations 30,000 14,000 10,000 83,000 137,000 Equipment Bond 688,500 1,111,000 1,082,000 220,000 3,101,500 G.O. Bond 12,000 12,000 General Fund 20,000 20,000 20,000 20,000 20,000 100,000 Sanitary Sewer Fund 245,000 116,000 361,000 Sewer Trunk Fund 230,000 230,000 Storm Sewer Fund 16,000 16,000 Water Fund 15,000 76,000 900,000 991,000 GRAND TOTAL 1,190,000 1,003,500 2,240,000 1,204,000 358,000 5,995,500 108 City of Andover, MN Capital Plan 2017 thru 2021 PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project# Priority 2017 2018 2019 2020 2021 Total (Building Replacement - Small Extended Cab Pick Up #8 19-42300-01 1 35,000 35,000 Equipment Bond 35,000 35,000 Building Total 35,000 35,000 Central Equipment Replacement - Service Truck #371 18-48800-01 Equipment Bond Central Equipment Total 40,000 Community Center Replacement - Skate Sharpener 18-44200-01 Comm Ctr Operations Replacement - Pickleball Inserts/Net System 18-44400-01 Comm Ctr Operations New- Inflatables 18-44400-03 Comm Ctr Operations 10,000 Replacement - Zamboni Battery Pack 19-44300-06 Comm Ctr Operations 10,000 Replacement - Scissor Lift 20-44000-01 Equipment Bond Replacement - Kaivac Cleaning System 20-44000-05 Comm Ctr Operations Replacement - Camera/Security System 20-44000-06 G.O. Bond Replacement - Floor Scrubber 21-44000-01 Comm Ctr Operations 10,000 Replacement - Electric Edger 21-44300-02 Comm Ctr Operations 10,000 Replacement - Evaporative Condenser 21-44300-03 Comm Ctr Operations Community Center Total 14,000 Emergency Management Replacement - Emergency Sirens 17-42400-02 Capital Equipment Reserve 15,000 Emergency Management Total 15,000 Engineering Replacement - Data Collector/Total Station 18-41600-01 2 40,000 40.000 40,000 40,000 40,000 40,000 1 10,000 10,000 10,000 10,000 1 10,000 10,000 10,000 10,000 1 10,000 10,000 10,000 10,000 1 14,000 14,000 14,000 14,000 1 15,000 15,000 15,000 15,000 1 10,000 10,000 10,000 10,000 1 12,000 12,000 12,000 12,000 1 15,000 15,000 15,000 15,000 1 8,000 8,000 8,000 8,000 1 60,000 60.000 60,000 60,000 30,000 14,000 37,000 83,000 164,000 1 45,000 45,000 45,000 45,000 180.000 45,000 45,000 45,000 45,000 180,000 45,000 45,000 45,000 45,000 180,000 109 33,500 33.500 Department Project# Priority 2017 2018 2019 2020 2021 Total Equipment Bond 33,500 33,500 Engineering Total 33,500 33,500 Facility Management Replacement - Security Management System 17-41900-03 1 100,000 100,000 Capital Equipment Reserve 100,000 100,000 HD Cabling - City Hall 17-41900-05 1 60,000 60,000 Capital Equipment Reserve 60,000 60,000 Facility Management Total 160,000 160,000 Finance Financial / Payroll System Upgrade / Replacement 19-41400-01 1 150,000 150,000 Capital Equipment Reserve 150,000 150,000 Finance Total 150,000 150,000 Fire Replacement - Turnout Gear 17-42200-01 1 20,000 20,000 203000 20,000 20,000 100,000 General Fund 20,000 20,000 20,000 20,000 20,000 100,000 Replacement - Extrication (Rescue) Equipment 17-42200-02 1 80,000 80,000 Capital Equipment Reserve 80,000 80,000 Replacement - Grass #31 18-42200-01 1 85,000 85,000 Equipment Bond 85,000 85,000 Replacement - Grass #21 18-42200-02 1 85,000 85,000 Equipment Bond 85,000 85,000 Replacement - Tanker #11 19-42200-01 1 400,000 400,000 Equipment Bond 400,000 400,000 Replacement - Grass Utility Vehicle (UTV) #4813 19-42200-03 1 45,000 45,000 Equipment Bond 45,000 45,000 Replacement -1999 GMC Sonoma Truck (U-10) #4810 19-42200-05 2 45,000 45,000 Equipment Bond 45,000 45,000 Replacement - SCBA Compressors 20-42200-01 1 130,000 130,000 Equipment Bond 130,000 130,000 Replacement -800 MHz radios 20-42200-02 1 35,000 35,000 70,000 Capital Equipment Reserve 35,000 35,000 70,000 Replacement - Engine 21 #4884 20-42200-03 1 450,000 450,000 Equipment Bond 450,000 450,000 Fire Total 100,000 190,000 510,000 635,000 55,000 1,490,000 Information Technology Smartboard Addition 18-41420-01 1 12,000 12,000 Capital Equipment Reserve 12,000 12,000 Information Technology Total 12,000 12,000 Park & Rec - Operations Replacement - One Ton Crew Cab Pickup #502 17-45000-03 1 50,000 50,000 Capital Equipment Reserve 50,000 50,000 New- Trail Machine 17-45000-04 1 150,000 150,000 Capital Equipment Reserve 150,000 150,000 Replacement - One Ton Truck w/ Plow #599 18-45000-01 1 80,000 80,000 Is[$] Department Project# Priority 2017 Equipment Bond 17-41500-01 New - Wood Chipper Tow -Behind 18-45000-02 1 Equipment Bond 55,000 Replacement - Bobcat Track Loader #610 18-45000-03 1 Equipment Bond Replacement - Jet/Vac Truck #99 Replacement - Small Extended Cab Truck #76 18-45000-04 1 Equipment Bond Sewer Trunk Fund New -'Y Snow Plow for #09-589 18-45000-05 1 Equipment Bond Sanitary Sewer Fund Replacement - Water Tanker #161 19-45000-01 1 Equipment Bond Storm Sewer Replacement - Trailer #T555 19-45000-02 1 Equipment Bond Equipment Bond Replacement -Cushman Field Dresser#547 20-45000-01 1 Equipment Bond Park & Rec - Operations Total Planning & Zoning 80,000 Replacement - Planning Vehicle #7 17-41500-01 Capital Equipment Reserve 30,000 Planning & Zoning Total 55,000 30,000 1 460,000 Sanitary Sewer Replacement - Jet/Vac Truck #99 17-48200-02 Sanitary Sewer Fund 230,000 Sewer Trunk Fund Replacement -One Ton Utility Truck #69 18-48200-02 Sanitary Sewer Fund 100,000 Sanitary Sewer Total 100,000 Storm Sewer 460,000 Replacement- Tymco Street Sweeper #172 18-48300-01 Equipment Bond 220,000 Replacement- Elgin Street Sweeper #169 19-48300-01 Equipment Bond 220,000 Storm Sewer Total 200,000 200,000 Street Signs Sign Design Software and Plotter 17-43300-01 Capital Equipment Reserve 420,000 Street Signs Total Streets / Highways 10,000 Replacement - One Ton Truck w/ Plow #134 17-43100-11 Capital Equipment Reserve New - One Ton Truck w/ Regular Box w/ Lift & Plow 17-43100-12 Capital Equipment Reserve New - Bobcat paver 17-43100-13 Capital Equipment Reserve 2018 2019 80,000 20,000 20,000 55,000 55,000 55,000 55,000 15,000 15,000 150,000 150,000 16,000 16,000 2020 2021 27,000 27,000 200,000 225,000 166,000 27,000 Total 80,000 20,000 20,000 55,000 55,000 55,000 55,000 15,000 15,000 150,000 150,000 16,000 16,000 27,000 27,000 618,000 1 30,000 80,000 30.000 30,000 1 55,000 30,000 30,000 55,000 30,000 1 460,000 20,000 460,000 230,000 230,000 230,000 230,000 1 100,000 100,000 100,000 100,000 460,000 100,000 560,000 1 220,000 220,000 221,000 220,000 1 200,000 200,000 200,000 200,000 220,000 200,000 420,000 2 10,000 10,000 10,000 10,000 10,000 10,000 1 80,000 80,000 80,000 80,000 1 55,000 55,000 55,000 55,000 1 20,000 20,000 20,000 20,000 ISE Department Project# Priority 2017 New - Dump Truck w/ snow removal 19-43100-01 1 Equipment Bond Replacement - Dump Truck w/ Snow removal #198 20-43100-01 1 Equipment Bond Sanitary Sewer Fund Replacement - Bobcat S185 #120 20-43100-02 1 Equipment Bond Replacement - 3/4 Ton Utility Truck #66 Replacement - One Ton Truck w/ Plow #133 20-43100-03 1 Equipment Bond Replacement - Side by Side UTV #70 Replacement - Backhoe Loader #80 20-43100-04 2 Equipment Bond Storm Sewer Fund Replacement - Dump Truck w/ Snow removal #200 21-43100-01 1 Equipment Bond Streets / Highways Total 30.000 15,000 Water Replacement - Dodge Dakota #95 17-48100-02 Sanitary Sewer Fund Water Fund 1 Replacement - 3/4 Ton Utility Truck #66 18-48100-02 Water Fund Replacement - Side by Side UTV #70 18-48100-03 Sanitary Sewer Fund 1 Storm Sewer Fund Water Fund Water Meter Reading System AMI/AMR 19-48100-01 Water Fund Water Total GRAND TOTAL 155,000 2018 2019 220,000 220,000 2020 2021 220,000 220,000 50,000 50,000 80,000 80,000 110,000 110,000 220;000 220,000 220,000 460,000 220,000 Total 220,000 220,000 220,000 220,000 50,000 50,000 80,000 80,000 110,000 110,000 220,000 220,000 1,055,000 1 30,000 30.000 15,000 15,000 15,000 15,000 1 60,000 60.000 60,000 60,000 1 48,000 48.000 16,000 16,000 16,000 16,000 16,000 16,000 2 900,000 900,000 900,000 900,000 30,000 108,000 900,000 1,038,000 1,190,000 1,003,500 2,240,000 1,204,000 358,000 5,995,500 INVA Capital Flan City ®f Andover, MN Project # 19-42300-01 Project Name Replacement -Small Extended Cab Pick Up #8 2017 th it 2021 Type Equipment Department Building Useful Life 10 Years Contact Building Official Category Equipment Priority 1 -High ..- Description Zeplace unit 98, a 2004 Chevrolet Colorado pick up truck with 10 1, 13 1 miles. Justification Chis truck is out daily with inspections and maintenance costs are going up. Expenditures 2017 2018 2019 2020 2021 Total Equipment 35,000 35,000 Total Funding Sources 2017 2018 35,000 2019 2020 35,000 2021 Total Equipment Bond 35.000 35,000 Total Budget Impact/Other ,ess break downs saving the City time and money. INK? 35,000 35,000 Capital Flan City of Andover, MN Project # 18-48800-01 2017 th i+ 2021 Justification Chis truck averages about 7,000 miles a year and by 2018 it will have approximately 125,000 miles. To assist mechanics with jobs outside the shop such as parts runs, vehicle repair and moving equipment around; a larger and roomier vehicle is needed. Expenditures 2017 2018 2019 2020 2021 Total Vehicles 40.000 40.000 HMI Funding Sources 2017 2018 2019 2020 2021 Total Equipment Bond 40,000 40,000 Total 40,000 Budget Impact/Other k bigger vehicle would increase operating costs - fuel and maintenance, but would have many more uses. IMEI 40,000 Capital Flan 2017 th i+ 2021 Justification Che skate sharpener is 12 years old. Expenditures 2017 2018 2019 2020 2021 Total Equipment 10,000 10,000 Total 10,000 10,000 Funding Sources 2017 2018 2019 2020 2021 Total Comm Ctr Operations 10,000 10,000 Total 10,000 Budget Impact/Other 'ro Shop rentals and sharpening services have always been very positive. IM&I 10,000 Capital Plan 2017 rhru 2021 Justification 'ickleball has become a huge use for the Community Center. Staff spends 45 minutes a day setting up and taking down portable nets. A net system with poles that slide into a drilled sleeve in the ground will provide a better playing experience and save on staff time. Expenditures 2017 2018 2019 2020 2021 Total Improvement 10,000 10,000 Total 10,000 10,000 Funding Sources 2017 2018 2019 2020 2021 Total Comm Ctr Operations 10,000 10,000 Total 10,000 10,000 Budget Iffipactl0ther )verall cost of the new posts/nets will provide a better playing experience along with savings on the amount of time it takes staff to set up and ear down the nets. (fill Capital Flan City ®f Andover, MN Project # 18-44400-03 Project same New - Inflatables 2017 th it 2021 Type Equipment Department Community Center Useful Life 10 Years Contact Comm Ctr Manager Category Equipment Priority 1 -High Description Inflatables (jumpers) are used in the field house and are a big part of our tot programs and birthday parties. Justification 'urrently renting inflatables as needed. The purchase would be offset by the rental fees, in addition to, having them available at all times. Expenditures 2017 2018 2019 2020 2021 Total Equipment 10,000 10,000 Total 10,000 10,000 Funding Sources 2017 2018 2019 2020 2021 Total Comm Ctr Operations 10,000 10,000 Total 10,000 Budget Impact/®ther Jew inflatable costs are offset by the rental of them to birthday parties and special events. ISVA 10,000 Capital Flan City of Andover, MN Project # 19-44300-06 Project Name Replacement - Zamboni Battery Pack Type Equipment Useful Life 7 Years Category Equipment Description 3eplace the battery pack for the electric Zamboni. Justification 2017 th it 2021 Department Community Center Contact Comm Ctr Manager Priority 1 -High Che battery pack that drives the Zamboni should be replaced every 5-7 years. Over time, the batteries will hold less of a charge and eventually lave to be replaced. Expenditures 2017 2018 2019 2020 2021 Total Vehicles 14.000 14.000 "+ii✓f I Funding Sources 2017 2018 2019 2020 2021 Total Comm Ctr Operations 14,000 14,000 Total 14,000 14,000 Budget Impact/Other Che Zamboni is a necessary part of the operations of the ice arena; and without it, we would not be able to keep the facility open. With the )reventative maintenance program that is in place, we have achieved the maximum amount of time available on the battery pack before it has to )e replaced. None of the 36 individual cells have been replaced as of vet but the battery pack will be 6 vears old in 2018. IMN Capital Flan 2017 111 i+ 2021 Justification The scissor lift will be 15 years old and operating costs continue to rise. Expenditures 2017 2018 2019 2020 2021 Total Equipment 15,000 15,000 Tom Funding Sources 2017 15,000 2018 2019 2020 2021 15,000 Total Equipment Bond 15,000 15,000 Total 15,000 15,000 Budget Impact/Other "P1 Capital Flan 2017 1/11,1/ 2021 Justification After 12 plus years, the current Kaivac system will be in need of replacement. Expenditures 2017 2018 2019 2020 2021 Total Equipment 10,000 10,000 Tom 10,000 10,000 Funding Sources 2017 2018 2019 2020 2021 Total Comm Ctr Operations 10,000 10,000 Total Budget Impact/®ther )verall cost of the new cleaning system will help keep the facility well maintained. 120 10,000 10,000 Capital Flan 2017 111 i+ 2021 Justification The current in-house analog cameras are outdated and in need of replacement. Safety and security of our users and facility is always important. Expenditures 2017 2018 2019 2020 2021 Total Equipment 12,000 12,000 Tom Funding Sources 2017 12,000 2018 2019 2020 2021 12,000 Total G.O. Bond 12,000 12,000 Total 12,000 12,000 Budget Impact/Other IPA Capital Flan City ®f Andover, MN Project # 21-44000-01 Project Name Replacement- Floor Scrubber 2017 th it 2021 Type Equipment Department Community Center Useful Life 10 Years Contact Comm Ctr Manager Category Equipment Priority 1 -High a y Description 3eplace the floor scrubber that is used daily in the community center. Justification Wer 6 years, it will be time to replace the floor scrubber that is used as part of facility maintenance. Expenditures 2017 2018 2019 2020 2021 Total Equipment 15,000 15,000 Total 15,000 15,000 Funding Sources 2017 2018 2019 2020 2021 Total Comm Ctr Operations 15.000 15.000 Total Budget Impact/Other k new machine should provide some efficiencies in both time and material used. 1"� 15,000 15,000 Capital Flan 2017 1/11,1/ 2021 Project # 21-44300-02 Project Name Replacement -Electric Edger VJelUl Llle 1V Icalb Category Equipment I OHLaCL 10111111 l U 1V1Q11Qg G1 Priority 1 -High Justification After 10+ years, it will be time to replace the edger that is used as part of ice rink maintenance. Expenditures 2017 2018 2019 2020 2021 Total Equipment 8,000 8,000 Total 8,000 8,000 Funding Sources 2017 2018 2019 2020 2021 Total Comm Ctr Operations 8,000 8,000 Total 8,000 8,000 Budget Impact/®ther 123 Capital Flan City of Andover, MN 2017 tlii it 2021 Project # 21-44300-03 Project Name Replacement -Evaporative Condenser R Type Equipment Department Community Center Useful Life 25 Years Contact Comm Ctr Manager Category Equipment Priority 1 - High f, Description 3eplace the evaporative condenser. This is one of the main components of the refrigeration system that displaces the heat absorbed from the rink loor in the cooling process. Justification Without this piece of equipment, we would not be able to keep the floor cool or make ice Expenditures 2017 2018 2019 2020 2021 Total Equipment 60,000 60,000 Total 60,000 60,000 Funding Sources 2017 2018 2019 2020 2021 Total Comm Ctr Operations 60,000 60,000 Total 60,000 60,000 Budget Impact/Other 124 Capital Plan City ®f Andover, MN Project # 17-42400-02 Project Name Replacement -Emergency Sirens Type Equipment Useful Life 15 Years Category Equipment Description 3eplace 12 emergency sirens, three per year. 2017 thru 2021 Department Emergency Management Contact Building Official Priority 1 -High Justification Che sirens were variously installed between the years of 2001 and 2003. Various upgrades have been made to existing installations and the system has grown and evolved to what it is today. There are presently twelve (12) siren installations throughout the City. Substantial naintenance concerns have come to light in several of the siren installations. Water has entered main electrical cabinets, panels and control ;abinets and corrosion has been observed on the control boards. Expenditures 2017 2018 2019 2020 2021 Total Equipment 45,000 45,000 45,000 45,000 180,000 TOW 45,000 45,000 45,000 45,000 180,000 Funding Sources 2017 2018 2019 2020 2021 Total Capital Equipment Reserve 45,000 45,000 45,000 45,000 180,000 Budget Impact/Other Total 45,000 45,000 45,000 45,000 IK -1 180,000 Capital Flan City ®f Andover, MN Project # 18-41600-01 Project Name Replacement -Data Collector/Total Station 2017 tlii it 2021 Type Equipment Department Engineering Useful Life 10 Years Contact DPW / City Engineer Category Equipment Priority 1 -High Description 3eplace data collector and Total Station survey equipment. Justification ks technology changes and survey equipment ages, it is important to have reliable and efficient equipment to perform the mutilple projects that ire completed each year. Expenditures 2017 2018 2019 2020 2021 Total Equipment 33,500 33,500 Total 33,500 33,500 Funding Sources 2017 2018 2019 2020 2021 Total Equipment Bond 33,500 33,500 Total Budget Impact/Other 33,500 IPZ1 33,500 Capital Flan City ®f Andover, MN Project # 17-41900-03 Project Name Replacement -Security Management System Type Equipment Useful Life 15 Years Category Facility Management 2017 tlii it 2021 Department Facility Management Contact Fire Chief Priority 1 -High Description kdd a security management system to city hall, public works and all the fire stations to provide asset security tracking and better control of )uildine access. Justification Chere is currently no way to tell who has come into the buildings and when equipment is taken out of the building. With the growing threat of )utside groups looking to disable our critical infrastructure, it is imparitive that we secure our buildings and manage who is coming and going vithin them. current hiring model of the fire department has shown to have a turnover rate of at least two people leaving per year. That requires us to ige all of the door codes once that person leaves. New technology would allow us to change codes immediately and/or lock out a specific on so they could not enter the station. request is to install a new security system with cameras to better secure our assets so we are prepared at all times to respond to calls. The ice of securine our fire staitons is recommended by FEMA and Homeland Securtv as Dart of a sound emereencv Drenaredness Dlan. Expenditures 2017 2018 2019 2020 2021 Total Technology Improvements Total Funding Sources Capital Equipment Reserve Budget Impact/Other 100,000 100,000 2017 2018 2019 2020 2021 100,000 100,000 100,000 Total 100,000 Total 100,000 100,000 `PAIA Capital Flan City of Andover, MN Project # 17-41900-05 Project\ame HD Upgrade - City Hall Council Chambers 2017 tlii it 2021 Type Equipment Department Facility Management Useful Life 5 years Contact Finance Manager Category Equipment Priority 1 -High Description Jpgrade the monitors on the dais and the video switching equipment, and provide the necessary equipment to allow individuals to display content rom their laptops. This would upgrade the video in the council chambers to HD along with a couple of necessary audio upgrades. Justification This project would give the council chambers HD capabilities in addition to allowing the use of tablets to present information Expenditures 2017 2018 2019 2020 2021 Total Technology Improvements 60,000 60,000 Total 60,000 60,000 Funding Sources 2017 2018 2019 2020 2021 Total Capital Equipment Reserve 60,000 60,000 Total 60,000 Budget Impact/Other 128 60,000 Capital Plan City ®f Andover, MN Project # 19-41400-01 Project Name Financial/ Payroll System Upgrade /Replacement Type Equipment Useful Life 10 Years Category Equipment 2017 tlii it 2021 Department Finance Contact Finance Manager Priority 1 -High Description Jpgrade or replace the current financial/payroll software program. Justification Che financial and payroll systems are the primary tools utilized by the Finance Department to provide financial and payroll services to the City. Che current system is due for an upgrade so it's time to explore moving to the "cloud" with our current vendor or exploring other options. Expenditures 2017 2018 2019 2020 2021 Total Technology Improvements 150,000 150,000 Total 150,000 150,000 Funding Sources 2017 2018 2019 2020 2021 Total Capital Equipment Reserve 150,000 150,000 Total Budget Impact/Other 129 150,000 150,000 Capital Flan City ®f Andover, MN Project # 17-42200-01 Project Name Replacement- Turnout Gear Type Equipment Department Fire Useful Life 5 years Contact Fire Chief Category Equipment Priority 1 -High Description 2017 th it 2021 3eplace worn turnout gear. The turnout gear consists of a coat and bunker pants with suspenders. Other personal protective gear includes helmets, )oots, nomex hood, goggles and appropriate protective gloves. Justification Fhe turnout gear is worn by firefighters for fire suppression activities and does need to be replaced on a regular basis. The life span of the gear lepends on how active the firefighter is and what condition(s) the gear may have been exposed to during normal use. The current firefighter urnout gear is seven years old and is beginning to show wear and tear. Expenditures 2017 2018 2019 2020 2021 Total Equipment 20,000 20,000 20,000 20,000 20,000 100,000 Total 20,000 20,000 20,000 20,000 20,000 100,000 Funding Sources 2017 2018 2019 2020 2021 Total General Fund 20,000 20,000 20,000 20,000 20,000 100,000 Total 20,000 20,000 20,000 20,000 20,000 100,000 Budget Impact/Other ive years is considered to be the average life span of firefighter turnout gear. 130 Capital Flan City ®f Andover, MN Project # 17-42200-02 Project Name Replacement- Extrication (Rescue) Equipment Type Equipment Useful Life 15 Years Category Equipment Description Department Fire Contact Fire Chief Priority 1 -High 2017 thi it 2021 Replace three (3) sets of hydraulic power equipment used to extricate people from vehicles and machinery. Each set goes on a fire engine at each station. Due to technological advancements we will be changing to battery operated power tools. This will reduce the overall cost of the equipment compared to the current style we have which requires a hydralic pump, lines, and the tools. Maintenance costs will be reduced and this will also free up area in the fire engine compartments which is always an issue. Justification This request is to replace three sets of hydraulic power equipment used to cut people from vehicles and machinery. Technology to improve the strength and weight of vehicles has changed the metals they use to build them. One such metal is Boron. This super strong metal is now being placed inside many vehicles to support the roof and windshild from crushing the driver should a rollover occur. Because the metal is so strong, our current tools cannot cut through it leaving us unable to properly extricate the patient as quickly as we could. Technology has also improved the size and weight of the eauinment reducing space needs and Dhvsical exertion on the firefighters. Expenditures 2017 2018 2019 2020 2021 Total Equipment Funding Sources 80,000 Total 80,000 2017 2018 2019 2020 2021 Capital Equipment Reserve 80,000 Budget Impact/Other 80,000 80,000 Total 80,000 Total 80,000 80,000 191 Capital Flan City ®f Andover, MN Project # 18-42200-01 2017 111 i+ 2021 Justification The fire department has now purchased new vehicles for rescue calls only and this will allow for the new grass trucks to have an extended life expectancy. The current grass vehicles have worked very hard responding to both wildfire and medical types of calls during most of the life of the trucks. The grass trucks also have many engine hours on them due to idling conditions while at grass fires and medical calls. By using separate vehicles for each function, both the grass fire vehicle and assigned medical vehicle will last for at least 15 years or more. This vehicle also pulls the trailer that holds the Polaris 6X6(G-32). We will also need to replace the slide in pump which is as old as the truck. The price includes the trucks. numn. liehtine nackaee and decals. Expenditures 2017 2018 2019 2020 2021 Total Equipment Funding Sources Equipment Bond Budget Impact/Other 85,000 Total 85,000 2017 2018 2019 2020 2021 85,000 85,000 85,000 Total 85,000 Total 85,000 85,000 Che fire department will be looking to purchase a smaller and more maneuverable vehicle when it is time to replace the grass trucks. The current ull size pick up trucks, while capable of handling larger tanks and more weight, can be difficult to use when the need to negotiate around )bstacles during wildfires arises. The grass vehicles will be a four wheel drive type and should probably have winches mounted on the front of he vehicle. The smaller and more maneuverable vehicles should be less expensive but yet perform much better when using the off road functions and features. I 19 Capital Flan 2017 111 it 2021 Citv of Andover_ MN —j—, ^ 15-4LLUU-UL rojectName RPn1nrPmPnt - G'racc #21 Useful Life 20 Years Category Equipment Justification Contact Fire Chief Priority 1 -High Che fire department has now purchased new vehicles for rescue calls only and this will allow for the new grass trucks to have an extended life ;xpectancy. The current grass vehicles have worked very hard responding to both wildfire and medical types of calls during most of the life of rucks. The grass trucks also have many engine hours on them due to idling conditions while at grass fires and medical calls. By using separate lehicles for each function, both the grass fire vehicle and assigned medical vehicle will last for at least 15 years or more. Expenditures 2017 2018 2019 2020 2021 Total Vehicles 85,000 85,000 'row 85,000 85,000 Funding Sources 2017 2018 2019 2020 2021 Total Equipment Bond 85,000 85,000 Total Budget Impact/Other 85,000 85,000 Che fire department will be looking to purchase a smaller and more maneuverable vehicle when it is time to replace the grass trucks. The current ull size pick up trucks, while capable of handling larger tanks and more weight, can be difficult to use when the need to negotiate around )bstacles during wildfires arises. The grass vehicles will be a four wheel drive type and should probably have winches mounted on the front of he vehicle. The smaller and more maneuverable vehicles should be less expensive but yet perform much better when using the off road functions and features. 133 Capital Flan City ®f Andover, MN Project # 19-42200-01 2017 tlii i+ 2021 Justification This vehicle will be 28 years old in 2019. The all wheel drive vehicle has worked extremely well as a tanker that can be used at all types of fires including wildfires, where the off road capabilities have proven to be very valuable. There have been no significant problems with this vehicle and the replacement need has to be re-evaluated in 2019 but it is very important that we keep this vehicle current and up to date with the latest firefighting technologies. The current vehicle has a rear mounted pumping system that requires constant maintenance and usually more than one person to operate the truck and pump at a fire scenario. The proposed new tanker will have remote operational capabilities that will make operating the truck with only one person a reality. The current manually -operated pump has many drawbacks and limitations due to the need for more than one person to overate efficiently and safely. Expenditures 2017 2018 2019 2020 2021 Total Vehicles Funding Sources Equipment Bond Budget Impact/Other 400,000 TOW 400,000 2017 2018 2019 2020 2021 400,000 400,000 400,000 Total 400,000 Total 400,000 400,000 The new vehicle will probably have a larger tank and also the capability for only one person to operate during a fire situation. The maintenance costs for a newer vehicle will also have a budget impact in that there should be much less maintenance costs for the first half of the lifespan of the vehicle. The newer vehicle will also be expected to last longer because of the updates in the manufacturing process. The newer styles and metal fabrication help to reduce rusting and deterioration of the vehicle. The new vehicle should be produced so that the driver can dump water from chutes installed on both sides and from the rear of the truck. Currently, water can be discharged only from a large rear outlet or with the manual pump system installed at the back of the truck. 134 Capital Flan 2017 111 i+ 2021 Project # 19-42200-03 Project Name Replacement -Grass Utility Vehicle (UTV) 94813 u Nclul Llle LJ -LV I ca1J Category Equipment Justification I-OULUCL Pllc l 111Ul Priority 1 -High J-1 This vehicle is used to fight wildland fires over heavy terrain. It carries a water pump to firefighters so they can fight fire deep in the woods. It i ighter than a truck and can reach areas a truck cannot go. The equipment has limitations as it was not designed to carry water and personnel as ,ve use it. It was designed for "recreational use" and we turned it into industrial use. That brings challenges and limitations as other vehicle ,ould carry more water and be built to support more personnel. We would like to retire this vehicle as a grass vehicle and use it as a rescue and medical responder on our park trails and city events. We would ike to purchase a more industrialized vehicle to hold more water for fighting fires and more personnel to assist on the scene while deep in the ,voods. Expenditures 2017 2018 2019 2020 2021 Total Equipment 45,000 45,000 Total 45,000 45,000 Funding Sources 2017 2018 2019 2020 2021 Total Equipment Bond 45,000 45,000 Total 45,000 45,000 Budget Impact/Mer iNO Capital Flan 2017 th i+ 2021 Justification Che use of smaller quick response vehicles provides great efficiency over our larger trucks. This truck is equipped with tools to handle incidents ike smoke alarm checks, carbon monoxide alarms, medicals and the like. Typically staffed with one person, the duty officer using this truck esponds to lower priority calls as a single unit rather than paging the entire station or stations out. This saves cost. Che current truck is rusting and over 15 years old. These trucks are not designed to last this long but our service department has kept them up cicely. We are asking to replace this truck with a similar truck to provide the same service. Expenditures 2017 2018 2019 2020 2021 Total Vehicles 45,000 45,000 Total 45,000 45,000 Funding Sources 2017 2018 2019 2020 2021 Total Equipment Bond 45,000 45,000 Total 45,000 45,000 Budget Impact/Othea vlore efficient and less maintenance costs. 1161'. Capital Flan City ®f Andover, MN Project # 20-42200-01 Project Name Replacement - SCBA Compressors Type Equipment Useful Life 15 Years Category Equipment Department Fire Contact Fire Chief Priority 1 -High 2017 tlii it 2021 Description 3eplace self contained breathing apparatus compressors at station 2 and 3. These compressors are used to fill breathing air into the bottles we Near on our backs to enter dangerous conditions. Justification Chese compressors are used to fill the air bottles firefighters use to breath in areas that are dangerous to our health. The compressor takes air iom the atmosphere and cleans it using high level filters to assure the firefighter is breathing fresh air to do their job. Che compressor then forces air into a small cylinder under high pressure so each firefighter has approximately 30 minutes of breathing time )efore they run out of air. These are specialized pieces of equipment, expensive, and require frequent maintenance to assure the air is clean and iot contaminated. Che current compressors have been with us for many years and currently requiring a lot of maintenance costs. Newer technology also allows us o save energy and fill our bottles in less time with less overall maintenance costs. Expenditures 2017 2018 2019 2020 2021 Total Equipment Funding Sources Equipment Bond Budget Impact/Other 130,000 TOW 130,000 2017 2018 2019 2020 2021 130,000 130,000 130,000 Total 130,000 Total 130,000 130,000 I16YA Capital Flan City ®f Andover, MN Project # 20-42200-02 Project Name Replacement - 800 MHz radios Type Equipment Useful Life 10 Years Category Equipment Description Department Fire Contact Fire Chief Priority 1 -High 2017 thi it 2021 The current 800 MHz. handheld and mobile radios used by the fire department and Public Works are no longer manufacturered. In addition, the service support for maintenance and repair for the same radios will not be available after 2019. The fire department currently has 37 hand held radios and has a need to increase to 40. The fire department also has 16 mobile radios mounted in vehicles or used as a base station at all three stations. The Public Works Department has 6 hand held radios that can be used to contact agencies on the 800 MHz. frequency. Justification Che current radios are no longer be manufacturered and service to repair the current radios will end in December of 2019. There will not be a stockpile of radios available to replace a radio that fails for any reason after 2019. In order to replace a radio that does not work and cannot be serviced the delivery time could take weeks for some new models. The proposal would be to gradually replace radios during the five year period vhen they can still be serviced and/or repaired. Keep in mind that the warranty period starts when the radio is purchased so as they are replaced ve can spread the warrantv Deriod out and not have to Durchase all radios at the same time in the future. Expenditures 2017 2018 2019 2020 2021 Total Equipment Total Funding Sources Capital Equipment Reserve Budget Impact/Other 35,000 35,000 35,000 35,000 2017 2018 2019 2020 2021 35,000 35,000 70,000 70,000 Total 70,000 Total 35,000 35,000 70,000 Che current pricing for the hand held radios is $3,300 each and $3,400 for each mobile. The total cost to replace every radio at one time would be ibout $207,000 if the radios are not encrypted. An additional cost of $500 for each radio would be needed if the agencies in Anoka County lecide that all radios should have encryption programming to block out others from hearing the conversations. The encrypted radio costs would )e approximately $238,000 138 Capital Flan City of Andover, MN Project # 20-42200-03 2017 tlii i+ 2021 Justification Chis truck is schedule to hit 20 years in 2017. The truck is showing signs of internal rusting of the tank and supports. Replacing and repairing his will be expensive and it is recommended that we sell the truck for the highest value prior to major repairs. Expenditures 2017 2018 2019 2020 2021 Total Equipment 450,000 450,000 Total 450,000 450,000 Funding Sources 2017 2018 2019 2020 2021 Total Equipment Bond 450,000 450,000 Total Budget Impact/Other 139 450,000 450,000 Capital Flan City ®f Andover, MN Project # 18-41420-01 Project Name Smartboard Addition Type Equipment Useful Life 10 Years Category Information Technology Description 'urchase a smartboard for the council chambers. 2017 tlii it 2021 Department Information Technology Contact IT Manager Priority 1 -High Justification Che current projector system is outdated and inefficient. Expenditures 2017 2018 2019 2020 2021 Total Technology Improvements 12,000 12,000 Total 12,000 12,000 Funding Sources 2017 2018 2019 2020 2021 Total Capital Equipment Reserve 12,000 12,000 Total Budget Impact/Other 12,000 140 12,000 Capital Flan City of Andover, MN oject # 17-45000-03 2017 th i+ 2021 Justification Chis truck is used for pulling a large trailer around the city with mowing equipment in the spring, summer and fall along with the summer part- ime help. In the winter months, it is pulling equipment that is used to clear the ice skating rinks. A crew cab that can transport a mowing crew and all their equipment is an ideal situation. Expenditures 2017 2018 2019 2020 2021 Total Equipment 50,000 50,000 Total 50,000 50,000 Funding Sources 2017 2018 2019 2020 2021 Total Capital Equipment Reserve 50,000 50,000 Total 50,000 50,000 Budget Impact/Other ,ess cost per mile to operate and fewer break downs. The cost to operate this vehicle has increased to $.50 per mile. IEN Capital Flan City ®f Andover, MN Project # 17-45000-04 Project'same New -Trail Machine 2017 th it 2021 Type Equipment Department Park & Rec - Operations Useful Life 10 Years Contact DPW / City Engineer Category Equipment Priority 1 -High Description This would be a new trail machine to assist in the clearing of snow in the winter and keeping them clean throught out the rest of the year. Justification Chis unit is used all year on the trail system. In the winter months its used to clear snow and the rest of the year its used to sweep the trails. It nust be readily available at all times during the winter to clear the pedestrian trails around the city. Expenditures 2017 2018 2019 2020 2021 Total Equipment 150,000 150,000 Total 150,000 150,000 Funding Sources 2017 2018 2019 2020 2021 Total Capital Equipment Reserve 150,000 150,000 Total 150,000 Budget Impact/Other ncreased maintenance costs with the addition of another trail machine. 1EN 150,000 Capital Flan 2017 th i+ 2021 Justification Maintenance cost are going up and this truck will be 18 years old. Expenditures 2017 2018 2019 2020 2021 Total Vehicles 80,000 80,000 Tom Funding Sources 2017 80,000 2018 2019 2020 2021 80,000 Total Equipment Bond 80,000 80,000 Total 80,000 80,000 Budget Impact/Other ;ave on repair cost and down time. 143 Capital Flan 2017 th i+ 2021 Justification Sharing the current machine, it is too big and and heavy to get down the trail system and into the open space areas are all concerns. Expenditures 2017 2018 2019 2020 2021 Total Equipment 20,000 20,000 Tom Funding Sources 2017 20,000 2018 2019 2020 2021 20,000 Total Equipment Bond 20,000 20,000 Total 20,000 20,000 Budget Impact/Other 3etter use of time, would not have to haul everthing out with smaller equipment, trees and branches could be chipped up on the spot. 144 Capital Flan City ®f Andover, MN ect # 18-45000-03 iect Name Replacement -Bobcat Track Loader #610 2017 thn, 2021 Type Equipment Department Park & Rec - Operations Useful Life 10 Years Contact DPW / City Engineer Category Equipment Priority 1 -High Description Zeplace unit 9610, a 2014 Bobcat T590 track loader with 642 hours. Justification Zeplace machine before the tracks and the idlers need to be replaced. We replaced the drive sprockets in the spring of 2016. Machine still has ,cry good resale at this time. Expenditures 2017 2018 2019 2020 2021 Total Equipment 55,000 55,000 Total Funding Sources 2017 55,000 2018 2019 2020 2021 55,000 Total Equipment Bond 55,000 55,000 Total 55,000 55,000 Budget Impact/Other 'ost are starting to go up. Capital Flan 2017 th i+ 2021 Justification Chis small truck would be replaced with a 3/4 ton truck and a snow plow. When all the one tons are out plowing, this vehicle would allow other staff to open up rinks and parking lots at the various parks. Expenditures 2017 2018 2019 2020 2021 Total Vehicles 55.000 55.000 HMI Funding Sources 2017 2018 2019 2020 2021 Total Equipment Bond 55,000 55,000 Total Budget Impact/Other 'heaper to operate than a one -ton 4 -wheel drive truck. 55,000 1EII. 55,000 Capital Flan 2017 th i+ 2021 Justification The present plow is multi- direcectional and is heavy enough to scape the trails clean but leaves a trail down the center. The trip edges have been reroaired a number of times. Expenditures 2017 2018 2019 2020 2021 Total Equipment 15,000 15,000 Total Funding Sources 2017 15,000 2018 2019 2020 2021 15,000 Total Equipment Bond 15,000 15,000 Total Budget Impact/®ther laving to go over the trail less times saves time and money. 15,000 IEVA 15,000 Capital Flan 2017 th i+ 2021 Justification This vehicle is used year round and in all types of weather. The frame and the truck components, ie. air tanks and crossmembers, were sandblasted in 2013 but are showing their age. Expenditures 2017 2018 2019 2020 2021 Total Equipment 150,000 150,000 Total Funding Sources 2017 150,000 2018 2019 2020 2021 150,000 Total Equipment Bond 150,000 150,000 Total 150,000 150,000 Budget Impact/Other Che truck frame was sand blasted and repainted once to try to slow down the rusting process. Being that the tank is stainless steel, we might be able to install it on to a new truck chassis saving some money. 148 Capital Flan City of Andover, MN Project # 19-45000-02 Project Name Replacement - Trailer #T-555 2017 th it 2021 Type Equipment Department Park & Rec - Operations Useful Life 10 Years Contact DPW / City Engineer Category Equipment Priority 1 -High n Description 3eplace unit #T-555, 1993 trailer that has under gone a number of refurberations. It would be replaced with a new galvanized trailer. Justification daintenance cost are going up and the steel on it is showing its 23 years of service. Expenditures 2017 2018 2019 2020 2021 Total Equipment 16,000 16,000 Total Funding Sources 2017 16,000 2018 2019 2020 2021 16,000 Total Equipment Bond 16,000 16,000 Total 16,000 16,000 Budget Impact/Other ,ess maintenace and down time. 149 Capital Flan City ®f Andover, MN Project # 20-45000-01 Project Name Replacement -Cushman Field Dresser #547 2017 tlii it 2021 Type Equipment Department Park & Rec - Operations Useful Life 15 Years Contact DPW / City Engineer Category Equipment Priority 1 -High Description 3eplace unit 9547, 1994 Cushman field dresser with 5,229 hours. Justification Chis unit is 22 years old and becoming a maintenance problem. It would be replaced with a vehicle that has more uses. Expenditures 2017 2018 2019 2020 2021 Total Equipment 27,000 27,000 Total Funding Sources 2017 27,000 2018 2019 2020 2021 27,000 Total Equipment Bond 27,000 27,000 Total Budget Impact/Other few machine and newer equipment, less break downs and better at doing all the infield work. 150 27,000 27,000 Capital Flan City ®f Andover, MN Project # 17-41500-01 Project Name Replacement -Planning Vehicle #7 2017 thm 2021 Type Equipment Department Planning & Zoning Useful Life 10 Years Contact Comm Dev Dir Category Equipment Priority 1 -High Description 3eplace unit 97, a 1999 S 10 Blazer with over 102,929 miles. Justification Chis vehicle is 17 years old and while the cost per mile is still low, these numbers are expected to go up do to its age and mileage. Expenditures 2017 2018 2019 2020 2021 Total Equipment 30,000 30,000 Total 30,000 30,000 Funding Sources 2017 2018 2019 2020 2021 Total Capital Equipment Reserve 30,000 30,000 Total 30,000 Budget Impact/Other ,ess break downs saving the City time and money. IN 30,000 Capital Flan 2017 th i+ 2021 City ®f Andover, MN Justification Approximately 13 miles or 15% of the sanitary sewer system is trunk mains with diameters of 12" - 36". These trunk mains are flowing near capacity in some areas at the present time. By removing the sedimentation in these pipes, the flow line will drop giving more room for additional flows. In turn, this could put a hold on the addition of the designated lift station to by-pass certain areas for a year or more. This type of unit can also clean flared end sections in back yards and sedimentation ponds within a reasonable distance without having to leave the pavement. At the present time, most of the department's efforts are geared towards the storm sewer system because of the many failures and neglect that has taken place in the past. There are thirty six square miles of storm sewer systems and ninety miles of sanitary systems. The storm sewers are maintain from the spring of the year and ending in the fall. The sanitary system is then maintained during the winter months when conditions are less than favorable. Expenditures 2017 2018 2019 2020 2021 Total Equipment Funding Sources Sanitary Sewer Fund Sewer Trunk Fund 460,000 Total 460,000 2017 2018 2019 2020 2021 230,000 230,000 Total 460,000 460,000 460,000 Total 230,000 230,000 460,000 Budget Impact/Other Chis truck will help save time with cleaning of the system. It will also allow the system to be cleaned under heavy flows which cannot be done vith the machine currently being used. This type of VAC truck will allow the operators to clean more of the system without having to stop )ecause the truck cannot handle the flows. It would save time by not having to plug mains and risk backups into basements because of some IM Capital Flan City ®f Andover, MN Project # 18-48200-02 Project Name Replacement -One Ton Utility Truck #69 2017 thn, 2021 Type Equipment Department Sanitary Sewer Useful Life Contact DPW / City Engineer Category Utilities Priority 1 -High Description Replace unit 969, a 2006 Ford F450 utility truck with a box and a crane that has 117,673 miles on it. It is proposed to be replaced with a 2 1/2 ton truck to allow for a bigger crane, power inverter and air compressor. Justification This truck will be 12 years old in 2018 and is starting to have mechanical issues. It is used daily in checking and repairing lift pumps that are used through out the City in our sanitary sewers. We have rebuilt the crane twice since we have owned the truck. Expenditures 2017 2018 2019 2020 2021 Total Vehicles 100,000 100,000 Total 100,000 100,000 Funding Sources 2017 2018 2019 2020 2021 Total Sanitary Sewer Fund 100,000 100,000 Total Budget Imipact/Other y new vehicle will be more dependable to operate. 100,000 153 100,000 Capital Flan 2017 th i+ 2021 Justification The maintenace cost are starting to increase because of its age and the box is wearing thin. A number of patches have been welded on it already. Expenditures 2017 2018 2019 2020 2021 Total Equipment 220,000 220,000 Tom Funding Sources 2017 220,000 2018 2019 2020 2021 220,000 Total Equipment Bond 220,000 220,000 Total 220,000 Budget Impact/Other looking to purchase a new, complete street sweeper with a stainless steel box to cut down on the maintenance cost. 154 220,000 Capital Flan 2017 th i+ 2021 Justification Maintenance costs continue to rise and it will need to be monitored as to the timing of replacement. Expenditures 2017 2018 2019 2020 2021 Total Vehicles 200,000 200,000 Tom Funding Sources 2017 200,000 2018 2019 2020 2021 200,000 Total Equipment Bond 200,000 200,000 Total 200,000 200,000 Budget Impact/®ther We will need to monitor the costs closely over the next few years and make a decision at that time. This machine only runs about a month and a calf a year. Capital Flan City ®f Andover, MN Project # 17-43300-01 Project Name Sign Design Software and Plotter 2017 th it 2021 Type Equipment Department Street Signs Useful Life 5 years Contact DPW / City Engineer Category Equipment Priority 2 - Medium Description 3eplace old sign design software and plotter with updated software and plotter to design and make warning and regulatory signs. Justification ks the sign design software and plotter become outdated there is a need to keep up with new software to provide efficiencies to the sign making Expenditures 2017 2018 2019 2020 2021 Total Equipment 10,000 10,000 Total 10,000 10,000 Funding Sources 2017 2018 2019 2020 2021 Total Capital Equipment Reserve 10,000 10,000 Total 10,000 Budget Impact/Other Che new software and plotter will provide increased productivity and efficiencies within the department. 10,000 Capital Flan City ®f Andover, MN Project # 17-43100-11 Project Name Replacement -One Ton Truck w/ Plow #134 2017 th it 2021 Type Equipment Department Streets/ Highways Useful Life 10 Years Contact DPW / City Engineer Category Equipment Priority 1 -High Description Zeplace unit 9134, a 2004 Ford F-450 dump truck and 9' snow plow with 83,128 miles. Justification Chis unit will be 13 years old and maintenance costs are on the rise. Expenditures 2017 2018 2019 2020 2021 Total Equipment 80,000 80,000 Total 80,000 80,000 Funding Sources 2017 2018 2019 2020 2021 Total Capital Equipment Reserve 80,000 80,000 Total 80,000 Budget Impact/Other ,ess breakdowns and maintenance costs. 80,000 Capital Flan City ®f Andover, MN 2017 thn, 2021 Project # 17-43100-12 Project'same New - One Ton Truck w/ Regular Box w/ Lift & Plow Type Equipment Department Streets/ Highways Useful Life 10 Years Contact DPW / City Engineer Category Equipment Priority 1 -High Description Vew one ton 4x4 truck with a regular box, tail gate lift and a snow plow. Justification Chis pick-up will be used for plowing snow in the winter and the lift gate will used for removing large dead animals and lifting/transporting ;quipment to job sites. Expenditures 2017 2018 2019 2020 2021 Total Equipment 55,000 55,000 Total 55,000 55,000 Funding Sources 2017 2018 2019 2020 2021 Total Capital Equipment Reserve 55,000 55,000 Total 55,000 Budget Impact/Other 3etter use of personnel and equipment. 158 55,000 Capital Flan City ®f Andover, MN Project # 17-43100-13 Project same New - Bobcat paver 2017 th it 2021 Type Equipment Department Streets/ Highways Useful Life 15 Years Contact DPW / City Engineer Category Equipment Priority 1 -High Description k bobcat style paver for paving/patching roads, shoulders and trails. Justification vlore efficient way to repair the trail system and patching of the larger area's of the street. Expenditures 2017 2018 2019 2020 2021 Total Equipment 20,000 20,000 Total 20,000 20,000 Funding Sources 2017 2018 2019 2020 2021 Total Capital Equipment Reserve 20,000 20,000 Total 20,000 20,000 Budget Impact/Other 3etter use of people and equipment. 159 Capital Flan City ®f Andover, MN Project # 19-43100-01 Project Name New - Dump Truck w/ snow removal 2017 th it 2021 Type Equipment Department Streets/ Highways Useful Life 10 Years Contact DPW / City Engineer Category Equipment Priority 1 -High Description W Purchase an additional dump truck with snow removal equipment moving the oldest truck into a back-up position in case of breakdowns during a snow emergency. Justification Currently there is no backup truck to use during a snow emergency if a truck breaks down. This purchase would allow the oldest truck to be set aside as a replacement when a plow truck breaks down. Expenditures 2017 2018 2019 2020 2021 Total Equipment 220,000 220,000 Total 220,000 220,000 Funding Sources 2017 2018 2019 2020 2021 Total Equipment Bond 220,000 220,000 Total Budget Impact/Other ncrease in operational costs. 160 220,000 220,000 Capital Flan 2017 th i+ 2021 Justification Maintenance costs are starting to go up and getting parts for a 17 year old truck are getting harder to find and are more costly once they are found. Expenditures 2017 2018 2019 2020 2021 Total Equipment 220,000 220,000 Tom Funding Sources 2017 220,000 2018 2019 2020 2021 220,000 Total Equipment Bond 220,000 220,000 Total 220,000 Budget Impact/Other k new truck will be more efficient to operate, repair costs should be lower making it cheaper to operate. 220,000 Capital Flan 2017 th i+ 2021 Justification Chis unit is primarily used by the Streets Department to run the mill machine to grind asphalt when patching. It is also used by other departments or loading trucks, stump grinding, moving material and snow blowing the Recycling Center. A bigger machine with high-flow hydraulics is )roposed. Expenditures 2017 2018 2019 2020 2021 Total Equipment 50,000 50,000 Tom 50,000 50,000 Funding Sources 2017 2018 2019 2020 2021 Total Equipment Bond 50,000 50,000 Total Budget Impact/®ther ks this unit accumulates more hours, maintenance cost will continue to increase as well. I"M 50,000 50,000 Capital Flan City ®f Andover, MN Project # 20-43100-03 Project Name Replacement -One Ton Truck w/ Plow #133 2017 th it 2021 Type Equipment Department Streets/ Highways Useful Life 10 Years Contact DPW / City Engineer Category Equipment Priority 1 -High Description 3eplace unit 9133, a 2004 Ford F450 dump truck and 9' snow plow and aluminum box cover(for chipping trees in to it) with 48,883 miles. Justification Chis unit will be 15 years old and getting close to the end of its life cycle. It will be re-evaluated each year to determine the proper time for Expenditures 2017 2018 2019 2020 2021 Total Equipment 80,000 80,000 Total Funding Sources 2017 80,000 2018 2019 2020 2021 80,000 Total Equipment Bond 80,000 80,000 Total Budget Impact/Other ,ess breakdowns and maintenance costs. 163 80,000 80,000 Capital Flan City ®f Andover, MN Project # 20-43100-04 Project Name Replacement - Backhoe Loader #80 2017 1/11,1/ 2021 Justification Replace with a large tractor and snow blade/bucket for better use of equipment and cheaper than purchasing another front-end loader. Expenditures 2017 2018 2019 2020 2021 Total Equipment 110,000 110,000 Total Funding Sources 2017 110,000 2018 2019 2020 2021 110,000 Total Equipment Bond 110,000 110,000 Total 110,000 110,000 Budget Impact/Other 3etter use and cheaper to operate. 164 Capital Flan 2017 th i+ 2021 Justification Maintenance cost are starting to go up and getting parts for a 17 year old truck are getting harder to find and are more costly once they are found. Expenditures 2017 2018 2019 2020 2021 Total Equipment 220,000 220,000 Tom Funding Sources 2017 220,000 2018 2019 2020 2021 220,000 Total Equipment Bond 220,000 220,000 Total Budget Impact/Other k new truck will be more efficient to operate, repair costs should be lower making it cheaper to operate. 220,000 220,000 Capital Flan City ®f Andover, MN ect # 17-48100-02 iect Name Replacement - Dodge Dakota #95 2017 thn, 2021 Type Equipment Department Water Useful Life 10 Years Contact DPW / City Engineer Category Utilities Priority 1 -High Description 3eplace unit 995, a 2000 Dodge Dakota pick up with 125,000 miles on it. Justification t is presently 16 years old and maintenance cost are starting to go up. It is at the end of its life cycle. Expenditures 2017 2018 2019 2020 2021 Total Vehicles 30,000 30,000 Total Funding Sources 30,000 2017 2018 2019 2020 2021 30,000 Total Sanitary Sewer Fund Water Fund 15,000 15,000 15,000 15,000 Total Budget Impact/®ther 30,000 30,000 ,ess break downs, less cost 1[Y'. Capital Flan City ®f Andover, MN ect # 18-48100-02 iect Name Replacement - 3/4 Ton Utility Truck #66 2017 thn, 2021 Type Equipment Department Water Useful Life 10 Years Contact DPW / City Engineer Category Utilities Priority 1 -High Description Zeplace unit 966, a 2006 Ford F250 pickup with a utility box that has 114,000 miles. Justification daintenance cost are going up and it is at the end of it's life cycle. Expenditures 2017 2018 2019 2020 2021 Total Vehicles 60,000 60,000 Total Funding Sources 2017 60,000 2018 2019 2020 2021 60,000 Total Water Fund 60,000 60,000 Total 60,000 60,000 Budget Impact/Other ,ess breakdowns. IMA Capital Flan City of Andover, MN Project # 18-48100-03 Project Name Replacement -Side by Side UTV #70 2017 thn, 2021 Type Equipment Department Water Useful Life 10 Years Contact DPW / City Engineer Category Utilities Priority 1 -High Description Replace unit 970, a 2004 IR 5600 Toolcat with 1,214 miles on it. A replacement for this unit should be capable of doing the same type of work as unit 970 but needs to have more power to do the job efficiently. The new unit shall be able to haul materials into and out of a job with ease. It shall also be equiped with hydraulics to use many different type of attachments such as a plow, snowblower, auger and any other attachment suited for this machine. Justification The current unit is under powered to do a lot of the backyard hauling where any type of grade change is present. The unit cannot climb up a maximum grade of a 10:1 slope while carrying a load and even has a hard time on level ground. Although the machine is used for a variety of uses like plowing snow or moving other equipment around, it still needs to be a more complete piece of equipment to use on a daily basis. This new unit will replace both the present John Deere Gator 993 and the Bobcat Toolcat 970. Expenditures 2017 2018 2019 2020 2021 Total Equipment 48,000 48,000 Total Funding Sources 2017 48,000 2018 2019 2020 2021 48,000 Total Sanitary Sewer Fund Storm Sewer Fund Water Fund 16,000 16,000 16,000 16,000 16,000 16,000 Total 48,000 48,000 Budget Impact/Other 168 Capital Flan City ®f Andover, MN Project # 19-48100-01 Project Name Water Meter Reading System AMI/AMR 2017 th it 2021 Type Equipment Department Water Useful Life 20 Years Contact DPW / City Engineer Category Improvements Priority 2 - Medium Description A meter reading system that will read all water meters by either a Fixed Base Reading System or a Drive By Radio Read System. The Fixed Base System is a system that is stationary with the means of reading all water meters from one or multiple points throughout the system. The Drive By System is a system where an employee drives through the water service area and gathers all the meter readings by way of a vehicle mounted computer and receiver. Justification It will allow the water utility to read meters with more efficiency and to provide customer's with more reliable readings. It will also increase revenues because the non reading or zero usage meters will be found earlier and repaired. With the present system, the utility waits for a minimum of a quarter before some meters are found to be faulty. Staff will have the ability to respond to customer concerns immediately and with documentation of customer usage. Expenditures 2017 2018 2019 2020 2021 Total Improvement 900,000 900,000 Total 900,000 900,000 Funding Sources 2017 2018 2019 2020 2021 Total Water Fund 900,000 900,000 Total 900,000 900,000 Budget Impact/Other Che initial costs will be substantial but revenues will increase with the systems accuracy. Billing could be done for all customers on a monthly 169 This page left blank intentionally. IVAN CITY OF ANDOVER Road & Bridge Funds - Rollup Projected Fund Balance Ending Fund Balance $ 4,330,339 $ 3,719,395 $ 3,611,885 $ 2,953,919 $ 3,175,613 $ 3,046,603 * Assuming collected in same year 171 2016 2017 2018 2019 2020 2021 TOTALS Projected Sources of Revenue Est. Annual MSA Construction Allocation $ 630,121 $ 1,161,947 $ 1,161,947 $ 1,161,947 $ 1,161,947 $ 1,161,947 $ 6,439,856 Est. Annual Maintenance Allocation 387,316 387,316 387,316 387,316 387,316 387,316 2,323,896 General Fund Commitment (227,535) (234.361) (241,392) (248,634) (256,093) (263,775) (1,471,790) Available MSA Maintenance 159,781 152,955 145,924 138,682 131,223 123,541 852,106 Total MSA Available for other Commitments 789,902 1,314,902 1,307,871 1,300,629 1,293,170 1,285,488 789,902 Federal / State Funds - - - - - 1,600,000 1,600,000 Assessments* 1,053,000 552,000 380,500 430,000 388,000 332,000 3,135,500 LGA - Local Government Aid 2,706 - - - - - 2,706 Tax Levy 1,150,984 1,179,154 1,204,119 1,231,405 1,259,523 1,288,503 7,313,688 Total Revenues Available 2,996,592 3,046,056 2,892,490 2,962,034 2,940,693 4,505,991 12,841,796 Projected Commitments MSA - New & Reconstruct Routes 2,600,000 1,300,000 820,000 1,690,000 350,000 290,000 7,050,000 MSA- Intersection Upgrades - - 285,000 - - 2,075,000 2,360,000 R & B - Pavement Markings 40,000 42,000 44,000 46,000 48,000 50,000 270,000 R & B - Curb Replacement 50,000 50,000 52,000 54,000 56,000 58,000 320,000 R & B - New & Reconstruct Routes 693,000 1,236,000 821,000 1,143,000 1,092,000 1,268,000 6,253,000 R & B - Seal Coating 460,000 725,000 250,000 260,000 275,000 285,000 2,255,000 R & B - Crack Sealing 225,000 143,000 162,000 235,000 280,000 365,000 1,410,000 R & B - Gravel Road Improvements 15,000 15,000 15,000 15,000 15,000 15,000 90,000 R & B - Overlays - - 400,000 - 400,000 - 800,000 Pedestrian Trail Reconstruction 50,000 60,000 80,000 100,000 120,000 140,000 550,000 Pedestrian Trail Curb Ramp Replacements - 15,000 16,000 17,000 18,000 19,000 85,000 Pedestrian LED Crosswalk Warning System - 21,000 - - - - 21,000 Pedestrian Trail Maintenance 45,000 50,000 55,000 60,000 65,000 70,000 345,000 Total Commitments 4,178,000 3,657,000 3,000,000 3,620,000 2,719,000 4,635,000 21,809,000 Revenues Over (Under) Expenditures (1,181,408) (610,944) (107,510) (657,966) 221,693 (129,009) Fund Balance as of December 31, 2015 5,511,747 Fund Balance Brought Forward 4,330,339 3,719,395 3,611,885 2,953,919 3,175,613 Ending Fund Balance $ 4,330,339 $ 3,719,395 $ 3,611,885 $ 2,953,919 $ 3,175,613 $ 3,046,603 * Assuming collected in same year 171 CITY OF ANDOVER Park Improvement Fund Projected Fund Balance 2016 2017 2018 2019 2020 2021 TOTALS Projected Sources of Revenue Park Dedication Fee - Residential Units 50 25 25 25 25 Park Dedication Fee - Residential ($2,952/unit) $ 365,830 $ 147,600 $ 73,800 $ 73,800 $ 73,800 $ 73,800 $ 808,630 Park Dedication Fee - Commercial - - - - - - - Donation / Contribution - 100,000 - - - - 100,000 Capital Projects Levy - Park Improvements 15,000 15,000 15,000 15,000 15,000 15,000 90,000 Total Revenues Available 380,830 262,600 88,800 88,800 88,800 88,800 998,630 Projected Commitments Rose Park - tower rental fee 4,635 4,635 Lions Park - irrigation 17,042 17,042 Kelsey Round Lake Park - Master Plan 9,665 9,665 Timber Trails Park - Renovation 284,000 284,000 Terrace Park- Irrigation R Water Service 35,000 35,000 Sunshine Park - Scoreboard Wring R Design 27,000 27,000 Irrigation Project- Small 20,000 20,000 20,000 60,000 Nordeen's Park - Basketball court 7,500 7,500 Fox Meadows - Reconstruction 457,300 457,300 Pine Hills North - Phase II Storage Building (Donations) 100,000 100,000 Parking Lot w/ Curb (30% Park Dedication) 120,000 120,000 WId Iris Park- Irrigation R Water Service 42,500 42,500 Annual Miscellaneous Projects 15,000 15,000 15,000 15,000 15,000 15,000 90,000 Total Commitments 392,342 599,800 35,000 35,000 177,500 15,000 1,254,642 Revenues Over (Under) Expenditures (11,512) (337,200) 53,800 53,800 (88,700) 73,800 Fund Balance as of December 31, 2015 376,632 Fund Balance Brought Forward 365,120 27,920 81,720 135,520 46,820 Ending Fund Balance `" $ 365,120 $ 27,920 $ 81,720 $ 135,520 $ 46,820 $ 120,620 **Target - $50,000 to create a contingency for any project overages. 172 CITY OF ANDOVER Trail Fund Projected Fund Balance Projected Commitments 8' Bituminous Trail along Crosstown Blvd - Coon Creek Bridge to S. Coon Creek Dr 5' Concrete Sidewalk along Bunker Lk Blvd - Yukon St to Hidden Creek North Park 8' Bituminous Trail and Boardwalk along Crosstown Blvd - Bunker Lk Blvd to 140th Ave 8' Bituminous Trail along Andover Blvd - Bluebird St to Vale St 10' Bituminous Trail along WIDE site - Kennsington Estates 7th Add. to Andover Station North 8' Bituminous Trail along Crosstown Blvd - Xeon St to railroad tracks Railroad tracks to 157th Ave 157th Ave to 159th Ave 8' Bituminous Trail along Verdin St - 161st Ave to 163rd Lane Total Commitments Revenues Over (Under) Expenditures Fund Balance as of December 31, 2015 Fund Balance Brought Forward Ending Fund Balance * 220,000 220,000 55,000 55,000 565,000 565,000 225,000 225,000 265,000 265,000 165,000 165,000 300,000 300,000 245,000 245,000 400,000 400,000 275,000 565,000 225,000 265,000 710,000 400,000 $ 2,440,000 74,474 (525,800) (205,400) 19,600 (690,400) (380,400) 347,400 421,874 (103,926) (309,326) (289,726) (980,126) $ 421,874 $ (103,926) $ (309,326) $ (289,726) $ (980,126) $ (1,360,526) *Target - 10% of current years commitments to create a contingency for any project overages. ** It is anticipated that all projects will not be fully expended by the end of the year, and future projects will be contingent on additional revenues. 173 2016 2017 2018 2019 2020 2021 TOTALS Projected Sources of Revenue Trail Fee $784 per unit platted units 50 25 25 25 25 Trail Fee $ 99,474 $ 39,200 $ 19,600 $ 19,600 $ 19,600 $ 19,600 $ 217,074 Grant - - - 265,000 - - 265,000 Operating Transfer In 250,000 250,000 Total Revenues Available 349,474 39,200 19,600 284,600 19,600 19,600 732,074 Projected Commitments 8' Bituminous Trail along Crosstown Blvd - Coon Creek Bridge to S. Coon Creek Dr 5' Concrete Sidewalk along Bunker Lk Blvd - Yukon St to Hidden Creek North Park 8' Bituminous Trail and Boardwalk along Crosstown Blvd - Bunker Lk Blvd to 140th Ave 8' Bituminous Trail along Andover Blvd - Bluebird St to Vale St 10' Bituminous Trail along WIDE site - Kennsington Estates 7th Add. to Andover Station North 8' Bituminous Trail along Crosstown Blvd - Xeon St to railroad tracks Railroad tracks to 157th Ave 157th Ave to 159th Ave 8' Bituminous Trail along Verdin St - 161st Ave to 163rd Lane Total Commitments Revenues Over (Under) Expenditures Fund Balance as of December 31, 2015 Fund Balance Brought Forward Ending Fund Balance * 220,000 220,000 55,000 55,000 565,000 565,000 225,000 225,000 265,000 265,000 165,000 165,000 300,000 300,000 245,000 245,000 400,000 400,000 275,000 565,000 225,000 265,000 710,000 400,000 $ 2,440,000 74,474 (525,800) (205,400) 19,600 (690,400) (380,400) 347,400 421,874 (103,926) (309,326) (289,726) (980,126) $ 421,874 $ (103,926) $ (309,326) $ (289,726) $ (980,126) $ (1,360,526) *Target - 10% of current years commitments to create a contingency for any project overages. ** It is anticipated that all projects will not be fully expended by the end of the year, and future projects will be contingent on additional revenues. 173 CITY OF ANDOVER Capital Equipment Reserve Fund Projected Fund Balance Ending Fund Balance $ 477,070 $ 344,070 $ 389,070 $ 361,570 $ 173,570 $ 348,570 174 2016 2017 2018 2019 2020 2021 TOTALS Projected Sources of Revenue Capital Projects Levy 250,000 250,000 250,000 250,000 250,000 250,000 1,500,000 Capital Equipment Purchases Levy - 500,000 - - - - 500,000 Donations 2,000 2,000 - - - - 4,000 Miscellaneous Revenues Q006 6,000 Total Revenues Available 258,000 7521000 2501000 2501000 2509000 2501000 2,010,000 Projected Commitments Annual Parking Lot Maintenance 30,000 30,000 130,000 30,000 30,000 30,000 280,000 Andover Lions Park 19,980 19,980 Pine Hills North Parking Lot 280,000 280,000 Replacement - Crooked Lake School Hockey Rink 7,490 7,490 Microsoft Upgrade 15,000 15,000 Public Works / Community Center Master Planning 11,484 11,484 Replacement - SCBAs 250,000 250,000 Add/Replace - Server 20,000 20,000 Replacement -800 MHz Radios 35,000 35,000 35,000 105,000 Sign Design Software 8 Plotter 10,000 10,000 Replacement - Secunty Management System 100,000 100,000 Replacement - Planning Vehicle #7 30,000 30,000 Public Works Relocation / Expansion 50,000 50,000 ACC / YMCA Expansion 75,000 75,000 Replacement- Extrication (Rescue) Equipment 80,000 80,000 Replacement - One Ton Truck w/ Plow #134 80,000 80,000 New - One Ton Truck w/ Regular Box w/ Lift 8 Plow 55,000 55,000 New- Bobcat Paver 20,000 20,000 Replacement - One Ton Crew Cab Pickup #502 50,000 50,000 New - Trail Machine 150,000 150,000 Replacement - CarpeUTle 10,000 10,000 10,000 30,000 Replacement - Emergency Sirens 45,000 45,000 45,000 45,000 180,000 Emergency Operations Center Improvements 40,000 18,000 7,500 65,500 HD Cabling - City Hall 60,000 60,000 Smartboard Addition 12,000 12,000 Financial / Payroll System Upgrade / Replacement 150,000 150,000 Building A - Seal Floor 25,000 25,000 Memorial - Veterans Memorial 10,000 10,000 Surface Seal all Brick Structures 48,000 48,000 Natural Disaster Reserve 350,000 350,000 OCTV - Council Chambers 93,663 93,663 Total Commitments 832,617 8859000 2059000 277,500 438,000 759000 2,713,117 Revenues Over (Under) Expenditures (574,617) (1339000) 459000 (27,500) (188,000) 1759000 Fund Balance as of December 31, 2015 1,051,687 Fund Balance Brought Forward 477,070 344,070 389,070 361,570 173,570 Ending Fund Balance $ 477,070 $ 344,070 $ 389,070 $ 361,570 $ 173,570 $ 348,570 174 This page left blank intentionally. CTTY OF ANDOVER Water System Financial Projections Estimate Forecast Year 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Inflation Factor 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% Ave. Use (gal per user per qtr) 41,662 37,400 32,000 34,000 35,000 35,000 35,000 35,000 35,000 35,000 Acres Added 5 5 5 5 5 New Connections 10 to 10 10 to New Customers 35 35 35 35 35 Residential Accounts 6,161 6,218 6,276 6,325 6,325 Cor mercial/lustitutional Accts 142 149 153 155 155 Total Accounts 6,303 6,367 6,429 6,480 6,480 6,515 6,550 6,585 6,620 6,655 1.02% 0.97% 0.79% 0.79% Rates Base Rate $11.89 $12.19 $12.50 $12.81 $13.13 $13.46 $13.79 $14.14 $14.49 $14.86 Use Rate $1.89 $1.96 $1.98 $1.98 $2.12 $2.19 $2.27 $2.35 $2.43 $2.52 Connection Charge $3,972 $4,131 $4,296 $4,296 $4,647 $4,833 $5,026 $5,227 $5,436 $5,654 Area Charge $3,640 $3,786 $3,937 $3,934 $4,258 $4,428 $4,605 $4,790 $4,981 $5,181 Base Rate 0.0% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% Use Rate 0.0% 3.7% l_0% 0.0% 7.1% 3.5% 3.5% 3.5% 3.5% 3.5% Connection Charge 0.0% 4.0% 4.0% 0.0% 8-2 4.0% 4.0% 4.0% 4.0% 4.0% Area Charge 0.0% 4.0% 4.0% -0.1% 8-2 4.0% 4.0% 4.0% 4.0% 4.0% Estimate Forecast Enterprise Fund- Water Operations 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Cash flaws from operating activities: Receipts from customers and users $ 2,551,954 $ 2,305,675 $ 2,178,391 $ 2,741,777 $ 2,470,186 $ 2,452,052 $ 2,543,926 $ 2,639,346 $ 2,738,448 $ 2,841,373 Payment to suppliers (1,015,656) (742,008) (745,176) (825,038) (933,500) (985,315) (1,014,874) (1,045,321) (1,076,680) (1,108,981) Payment to employees (405,159) (382,518) (408,441) (408,276) (446,234) (460,299) (474,108) (488,331) (502,981) (518,071) Net from opemtiug activities 1,131,139 1,181,149 1,024,774 1,508,463 1,090,452 1,006,438 1,054,943 1,105,694 1,158,786 1,214,322 Cash flaws from noncapital financing activities: Transfers in 7,134 4,242 20,737 58,249 85,096 54,228 40,530 12,332 12,826 13,339 Transfers out (150,250) (150,250) (150,250) (150,250) (150,250) (150,250) (150,250) (150,250) (150,250) (150,250) Net from noncapital financing activities (143,116) (146,008) (129,513) (92,001) (65,154) (96,022) (109,720) (137,918) (137,424) (136,911) Cash flaws from capital and related financing activities: Acquisition ofcapital assets - - - (2,863) - (15,000) (76,000) (900,000) - - Paymentondebt (7,600,675) (830,166) (828,807) (831,486) (833,101) (828,751) (833,338) (826,776) (829,045) (824,706) Proceeds from the sale of capital assets 4,000 Net from capital and related financing activities (7,600,675) (826,166) (828,807) (834,349) (833,101) (843,751) (909,338) (1,726,776) (829,045) (824,706) Cash flaws from investing activities: Investment income 286,720 (7,318) 44,576 23,913 15,000 15,000 15,000 15,000 15,000 15,000 Net increase in cash and cash equivalents (6,325,932) 201,657 111,030 606,026 207,197 81,665 50,885 (744,000) 207,317 267,705 Cash and cash equivalents - January 1 8,267,714 1,941,782 2,143,439 2,254,469 2,860,495 3,067,692 3,149,357 3,200,242 2,456,241 2,663,559 Cash and cash equivalents - December 31 $ 1,941,782 $ 2.143.439 $ 2,254,469 $ 2,860,495 $ 3.067,692 $ 3,149,357 $ 3200.242 $ 2,456,241 $ 2,663.559 $ 2931,264 176 CITY OF ANDOVER Water System Financial Projections 177 Estimate Forecast Capital Projects Fond - Water Trunk 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Revenues Coumection Charges $ 118,495 $ 332,853 $ 487,928 $ 309,873 $ 231,598 $ 48,329 $ 50,262 $ 52,272 $ 54,363 $ 56,538 Area Charges - - - - - 22,142 23,027 23,948 24,906 25,903 Interest 54,177 (19,830) 71,236 35,034 25,000 25,000 25,000 25,000 25,000 25,000 Special Assessment 59,440 34,216 37,274 42,342 286,072 30,000 30,000 30,000 30,000 30,000 Replacement Reserve - - - - - - - - - - Xfer In Total 232,112 347,239 596,438 387,249 542,670 125,470 128,289 131,221 134,270 137,440 Expenses Debt Service - - - - - - - - - - Capital Outlay 784 973,950 183,920 112,150 470,792 43,000 683,000 755,000 50,000 55,000 XferOut 7,134 4,242 20,737 58,249 85,096 54,228 40,530 12,332 12,826 13,339 Total 7,918 978,192 204,657 170,399 555,888 97,228 723,530 767,332 62,826 68,339 Net Increase (Decrease) in Fuud Balance 224,194 (630,953) 391,781 216,850 (13,218) 28,242 (595,241) (636,111) 71,444 69,101 FuudBalance -January1 2,652,691 2,876,885 2,245,932 2,637,713 2,854,563 2,841,345 2,869,587 2,274,347 1,638,235 1,709,679 FuudBalance - December 31 $ 2,876,885 $ 2,245,932 $ 2,637,713 $ 2,854,563 $ 2,841,345 $ 2,869,587 $ 2,274,347 $ 1,638,235 $ 1,709,679 $ 1,778,780 Capital Projects Wells Rehab Wells Trunk 50,000 50,000 50,000 50,000 50,000 New Development Projects 43,000 43,000 45,000 50,000 55,000 Water Main Improvements 640,000 710,000 Plant 25,000 Equipment 15,000 76,000 Automated Meter Reading System 900,000 Total $ $ $ $ $ $ 108,000 $ 809,000 $ 1,705,000 $ 125,000 $ 105,000 Funded by Operations $ - $ - $ - $ - $ - $ 65,000 $ 126,000 $ 950,000 $ 75,000 $ 50,000 Funded by Imiastructure/T-k - - - - - 43,000 683,000 755,000 50,000 55,000 Funded by debt Total $ $ $ $ $ $ 108,000 $ 809,000 $ 1,705,000 $ 125,000 $ 105,000 Debt Rate 5.50% 5.50% 5.50% 5.50% 5.50% 5.50% 5.50% 5.50% 5.50% 5.50% Term to 10 to 10 15 15 15 15 15 15 AADS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Cumulative DS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Current DS $ 7,600,675 $ 830,166 $ 828,806 $ 831,487 $ 833,101 $ 828,751 $ 833,338 $ 826,776 $ 829,045 $ 824,706 177 178 CITY OF ANDOVER Sanitary Sewer System Financial Projections Actual Estimate Forecast Year 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Inflation Factor 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% Acres Added 5 5 5 5 5 5 New Connections 10 10 10 10 10 10 New Customers 35 35 35 35 35 35 Residential Accounts 7,093 7,130 7,177 7,238 7,511 Commercial SACS 1,411 1,479 1,499 1,691 1,517 Total Accounts 8,504 8,609 8,676 8,929 9,063 9,098 9,133 9,168 9,203 9,238 1.23% 0.78% 2.92% 1.50% Rates Base Rate $59.37 $59.37 $59.37 $59.37 $59.37 $61.15 $62.99 $64.88 $66.82 $68.83 Connection Charge $435 $435 $435 $435 $435 $452 $470 $489 $509 $529 Area Charge $1,613 $1,613 $1,613 $1,613 $1,613 $1,678 $1,745 $1,814 $1,887 $1,962 Base Rate 0.0% 0.0% 0.0% 0.0% 3.0% 3.0% 3.0% 3.0% 3.0% Counection/Area 0.0% 0.0% 0.0% 0.0% 4.0% 4.0% 4.0% 4.0% 4.0% Area Charge 0.0% 0.0% 0.0% 0.0% 4.0% 4.0% 4.0% 4.0% 4.0% Actual Estimate Forecast Enterprise Fund- Sanitary Sewer Operations 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Cash flows from operating activities: Receipts from customers and users $ 2,035,033 $ 1,964,283 $ 1,938,680 $ 2,244,730 $ 2,152,281 $ 2,225,411 $ 2,300,991 $ 2,379,103 $ 2,459,832 $ 2,543,262 payment to suppliers (1,051,249) (1,182,075) (1,156,406) (1,185,024) (1,347,613) (1,385,412) (1,426,974) (1,469,784) (1,513,877) (1,559,293) payment to employees (294,583) (287,648) (295,075) (320,710) (337,491) (349,622) (360,111) (370,914) (382,041) (393,503) Net from operating activities 689,201 494,560 487,199 738,996 467,177 490,377 513,906 538,406 563,913 590,466 Cash flows from noncapital financing activities: Transfers out- Replacement Reserve (400,000) (400,000) (400,000) (400,000) (400,000) (400,000) (400,000) (400,000) (400,000) (400,000) Transfers out (46,680) (46,680) (46,680) (46,680) (46,680) (46,680) (48,080) (49,523) (51,008) (52,539) Net from noucapital financing activities (446,680) (446,680) (446,680) (446,680) (446,680) (446,680) (448,080) (449,523) (451,008) (452,539) Cash flows from capital and related financing activities: Acquisition of capital assets (4,482) (54,573) - (81,749) - (245,000) (116,000) - - - proceeds from the sale of capital assets - 4,000 - - - - - - - Net from capital and related financing activities (4,482) (50,573) - (81,749) - (245,000) (116,000) - - - Cash flows from investing activities: Investment income 45,390 (15,205) 68,423 31,306 30,000 30,000 30,000 30,000 30,000 30,000 Net increase in cash and cash equivalents 283,429 (17,898) 108,942 241,873 50,497 (171,303) (20,174) 118,883 142,905 167,927 Cash and cash equivalents - January 1 2,408,924 2,692,353 2,674,455 2,783,397 3,025,270 3,075,767 2,904,464 2,884,290 3,003,173 3,146,077 Cash and cash equivalents - December 31 $ 2.692353 $ 2,674,455 $ 2,783,397 $ 3.025,270 $ 3.075.767 $ 2.904,464 $ 2,884,290 $ 3.003,173 $ 3,146,077 $ 3,314,005 178 Expenses CITY OF ANDOVER Sanitary Sewer System Financial Projections - - - - - - - - Actual Capital Outlay Estimate 211,190 134,943 Forecast 110,000 502,000 Capital Projects Fund - Sewer Trunk 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Revennes 1,267,000 120,000 125,000 125,000 Net Increase(Decrease) in Fund Balmce 570,275 296,676 623,628 540,137 Connection Charges $ 51,707 $ 103,775 $ 188,898 $ 96,094 $ 147,780 $ 4,524 $ 4,705 $ 4,893 $ 5,089 $ 5,292 Area Charges - - - - - 8,388 8,723 9,072 9,435 9,812 Interest 98,205 (19,019) 156,454 75,978 50,000 50,000 50,000 50,000 50,000 50,000 Special Assessment 23,659 23,110 13,219 27,195 20,000 105,000 20,000 20,000 20,000 20,000 Replacement Reserve 400,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 other $ $ $ 747,000 $ 1,383,000 $ 120,000 $ 125,000 $ 125,000 Funded by Operations Total 573,571 507,866 758,571 599,267 617,780 567,912 483,428 483,965 484,524 485,105 Expenses Debt Service - - - - - - - - - - Capital Outlay 3,296 211,190 134,943 59,130 110,000 502,000 1,267,000 120,000 125,000 125,000 Total 3,296 211,190 134,943 59,130 110,000 502,000 1,267,000 120,000 125,000 125,000 Net Increase(Decrease) in Fund Balmce 570,275 296,676 623,628 540,137 507,780 65,912 (783,572) 363,965 359,524 360,105 Fund Balance - January 1 4,051,214 4,621,489 4,918,165 5,541,793 6,081,930 6,589,710 6,655,622 5,872,050 6,236,015 6,595,539 Fund Balance - December 31 $ 4.621.489 S 4.918.165 $ 5541.793 $ 6.081930 $ 6589.710 $ 6,655.622 $ 5.872.050 $ 6.236.015 $ 6.595.539 $ 6.955.643 Capital Projects Infrastructure New Development Projects $ 117,000 $ 117,000 $ 120,000 $ 125,000 125,000 Sanitary S ewer Ext - Crosstown Blvd 500,000 Aztec Estates Lift Station Upgrade 105,000 Lift Station 44 Upgrade 50,000 Yellow Pine Lift Station 650,000 Equipment 475,000 116,000 Total S $ $ $ $ $ 747,000 $ 1,383,000 $ 120,000 $ 125,000 $ 125,000 Funded by Operations S - $ - $ - S - $ - $ 245,000 $ 116,000 $ - $ - $ - Funded byInfrastructure/Tnmk - - - - - 502,000 1,267,000 120,000 125,000 125,000 Funded by debt Total $ $ $ $ $ $ 747,000 $ 1,383,000 $ 120,000 $ 125,000 $ 125,000 Debt Rate 5.50% 5.50% 5.50% 5.50% 5.50% 5.50% 5.50% 5.50% 5.50% 5.50% Term 10 10 10 10 10 10 10 10 10 10 AADS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - CumulativeDS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Current DS 179 CITY OF ANDOVER Storm S- System Fioao eial PrOjeefi- Actual Esfimate Forecast Yem 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Inflation Factor 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% New Customers 35 35 35 35 35 Residential- Urban/Rural (units) 9,66'9,66 9,697 9,749 9,750 9,785 9,820 9,855 9,890 9,925 Multiple Dwelling (acros) 223 228 232 235 235 235 235 235 235 235 Comm/Industrial (acros) 349 401 412 409 412 412 412 412 412 412 Schools/Churches (acros) 282 282 282 282 282 282 282 282 282 282 Rates (Qtely) Residential -Urban/Rural -per ..if $ 7.70 $ 8.09 $ 8.49 $ 8.91 $ 9.36 $ 9.83 $ 10.32 $ 10.84 $ 11.38 $ 11.95 Multiple Dwelling - per acre $ 16.95 $ 17.80 $ 18.69 $ 19.62 $ 20.60 $ 21.63 $ 22.71 $ 23.85 $ 25.04 $ 26.29 Comm/Industrial -per acre $ 32.71 $ 34.35 $ 36.07 $ 37.87 $ 39.76 $ 41.75 $ 43.84 $ 46A3 $ 48.33 $ 50.74 Schools/Churches -per acre $ 1539 $ 16.16 $ 16.97 $ 17.82 $ 18.71 $ 19.65 $ 20.63 $ 2L66 $ 22.74 $ 23.88 Residential -Urban/Rural -per ..if 5.0% 5.0% 5.0% 4.9% 5.1% 5.0% 5.0% 5.09/. 5.0% 5.0% Multiple Dwelling -per acre 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% Comm/Industrial -per acre 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% Schools/Churches -per acre 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% Acteal Esfimate Forcast Entapdse Fund -Storm S-ff Operations 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Cash flows from opff ting activities: Receipts from customers and users $ 371,816 $ 367,958 $ 376,260 $ 462,208 $ 456,902 $ 471,163 $ 496,094 $ 522,339 $ 549,969 $ 579,057 Payment to suppliers (94,942) (134,050) (412,240) (155,178) (200,535) (210,096) (216,399) (222,891) (229,578) (236,465) Payment to employees (195,321) (185,072) (192,958) (212,555) (217,095) (223,367) (230,068) (236,970) (244,079) (251,402) Net from operating activities 81,553 48,836 (228,938) 94,475 39,272 37,700 49,627 62,478 76,313 91,190 Cash flows from noncoital financing activities: Transfers out (14,600) (28,000) (28,000) Cash flows from capital and related fi-mg activities: Acquisition of capital assets - (25,152) - (2,863) - - (16,000) - - - Proceeds from the sale of c.phl assets Net from capital and related financing activities (25,152) (2,863) (16,000) Cash flows from investing activities: Inv tm-t income 4,481 (308) 2,970 708 1,000 1,000 1,000 1,000 1,000 1,000 Net increase m cash and cash equivalents 86,034 23,376 (225,968) 92,320 40,272 38,700 34,627 48,878 49.313 64-190 Cash and cash equivalents- January 1 142,271 228,305 251,681 25,713 118,033 158,305 197,005 231,632 280,510 3'_9-S'_3 Cash and cash equivalents- December 31 $ 228,305 $ 251-681 S 25-713 S 118-033 S 158-305 S 197-005 S 231-632 S 280-510 S 329,823 S 394-013 Capidl Praj acts InfmsWCNre Storm Sewer Improvements S 55,000 $ 60,000 $ 60,000 S 61000 S 65-000 Equipment 16,000 Total S S S S S $ 55,000 $ 76,000 $ 60.000 S 61000 S 65-000 Funded by Opaations S - S - S - $ - $ - $ 55,000 $ 60,000 $ 60,000 S 61000 S 65-000 Funded by lnfrashuct-/hunk - - - - - - - - - - Fnnded by debt Total S S S S S S 11-000 S 60-000 S 60-000 S 61000 S 65-000 180