HomeMy WebLinkAbout2012 CIP2012— 2016 Capital Improvement Plan 16,55 Crosstown f)IvJ NW, Andover, MN 5550+ Fkone: 763.755.51 oa Fax: 763.755.8925 www.ci.andovermn.us CITY OF ANDOVER 2012 — 2016 Capital Improvement Plan Table of Contents Introduction 2012 — 2016 Capital Improvement Plan Message ........................................................ ............................... 1 CIP Project Development & Process Authorization Schedule ..................................... ............................... 4 Graph — 2012 Expenditures By Department ................................................................. ............................... 6 Graph — 2012 CIP Expenditures By Year ..................................................................... ............................... 6 Five Year Summary of Expenditures By Department .................................................. ............................... 7 Five Year Summary of Revenue By Source ................................................................. ............................... 8 Five Year Summary of Projects By Department & Revenue Source ........................... ............................... 9 Improvements Five Year Summary of Expenditures By Department — Improvements ....................... ............................... 15 Five Year Summary of Revenue By Source — Improvements ...................................... ............................... 16 Five Year Summary of Projects By Department & Revenue Source — Improvements ............................... 17 Improvement Projects By Department CommunityCenter ................................................................................................. ............................... 20 Engineering............................................................................................................ ............................... 22 FacilityManagement .............................................................................................. ............................... 26 InformationTechnology ......................................................................................... ............................... 39 Parks& Recreation — Operations ........................................................................... ............................... 40 Parks& Recreation — Projects ................................................................................ ............................... 44 SanitarySewer ....................................................................................................... ............................... 52 StormSewer ........................................................................................................... ............................... 60 Streets/ Highways ................................................................................................. ............................... 61 Water...................................................................................................................... ............................... 83 Equipment Year Summary of Expenditures By Department — Equipment ..................................... ............................... 89 Five Year Summary of Revenue By Source — Equipment ........................................... ............................... 90 Five Year Summary of Projects By Department & Revenue Source — Equipment ...... ............................... 91 Equipment By Department CentralEquipment ................................................................................................. ............................... 94 CommunityCenter ................................................................................................. ............................... 97 Elections................................................................................................................. ............................... 98 FireDepartment ..................................................................................................... ............................... 99 Parks & Recreation — Operations ........................................................................... ............................... 111 SanitarySewer ....................................................................................................... ............................... 120 StormSewer ........................................................................................................... ............................... 124 Streets/ Highways ..................................................................... ............................... ............................125 Water.......................................................................................... ............................... ............................130 Appendix Road & Bridge Fund Projected Fund Balance .................................. ............................... ............................133 Park Improvement Fund Projected Fund Balance ........................................................ ............................... 134 Trail Fund Projected Fund Balance .................................................. ............................... ............................135 Water System Financial Projections ................................................. ............................... ............................136 Sewer System Financial Projections ................................................. ............................... ............................138 Storm Sewer System Financial Projections .................................................................. ............................... 140 1685 CROSSTOWN BOULEVARD N.W.. ANDOVER, MINNESOTA 55304 . (763) 755 -5100 FAX (763) 755 -8923 . WWW.CI.ANDOVER.MN.US TO: Mayor and Council Members FROM: Jim Dickinson, City Administrator / Finance Director SUBJECT: 2012 — 2016 Capital Improvement Plan DATE: October 18, 2011 INTRODUCTION On behalf of the City's Management Team, I am pleased to present the City of Andover's Capital Improvement Plan for years 2012 through 2016. The City's management team and their respective staff worked diligently to produce a document that was both practical, substantive in addressing needed capital improvements and insightful regarding the underlying factors associated with the City's rapidly changing suburban landscape. CAPITAL IMPROVEMENT PLAN GOALS ACKNOWLEDGE AND COMMUNICATE PUBLIC INFRASTRUCTURE PRIORITIES AND DYNAMICS ENSURE APPROPRIATE RESPONSES TO CHANGING INFRASTRUCTURE NEEDS AND DEMANDS DEVELOP A FINANCIAL ASSESSMENT OF CAPITAL RESOURCES AVAILABLE TO MEET FUTURE CAPITAL PROJECT PLANNING NEEDS INSTITUTE A STRATEGIC VISION PREDICATED ON MAINTAINING A HIGH QUALITY SERVICE INFRASTRUCTURE CAPABLE OF MEETING THE NEEDS OF OUR CITIZENS FOR TODAY AND TOMORROW The purpose of the City's Capital Improvement Plan (CIP) is to identify, prioritize and address community needs through careful long -term capital planning and balanced public investment in supporting physical infrastructure. To ensure that this commitment is both meaningful and achievable, appropriate capital improvement factors were given significant consideration in developing a CIP that addresses community priorities over the next five (5) years. The CIP will also provide a planning foundation for future needs assessments to ensure the City is appropriately responding to the critical infrastructure needs necessary for sustainable future growth. The CIP represents a beginning in terms of producing a comprehensive planning response to address changing capital needs by developing a project schedule that will lead to timely and cost - effective project completions. DISCUSSION The 2012 - 2016 CIP has been prepared as a strategic planning tool to assist the City Council in identifying proposed capital improvement projects over the next five years. With the inclusion of preliminary financing sources, appropriate background information citing needs and projected cost estimates, this document will provide Council with the needed information to begin the process for planning improvements that meet the City's physical infrastructure needs. Consequently, the CIP serves as a flexible guide plan to properly identify the critical components of the City's infrastructure, yet maintain flexibility in determining project timeframes, project scope and possible funding sources. The 2012 - 2016 CIP continues the emphasis of judiciously managing the City's limited resources by prudently planning for known and /or anticipated future capital expenditures. A critical step in the plan adoption process is the collaborative nature of plan review that involves the leadership of the City Council, the input of appointed Commissions and staff, and most importantly, affected residents of the community. Consequently, the strategic value of this plan lies in the acknowledgement of future needs by the governing body and the effective communication of those needs to the general public during project development stages. Likewise, the availability and preliminary designation of fiscal resources to serve both current and future needs is critical to the achievement of plan outcomes that meet with Council approval. Following the approval of the plan, feasibility studies are performed, affected constituencies are notified to formally disseminate and receive public feedback on proposed project plans. This process culminates with the City Council considering all relevant information and making a final decision on whether to proceed with the proposed capital improvement. The public process that supports the advancement of these projects from inception to completion is engendered in the CIP project development and authorization schedule. Formalizing the steps in the CIP project advancement process serves a number of purposes and ensures that the Council and public are kept well informed regarding project purposes and desired outcomes, estimated project costs, funding sources, progress and final status. It should be emphasized that projects will require approval in various stages of project development by the City Council in accordance with approved policies. The objectives of the 2012 - 2016 Capital Improvement Plan are to present a comprehensive capital improvement program that communicates efforts: ➢ to ensure that community priorities are reflected in the capital investment plans of each City department; ➢ to provide a consolidated financial picture of anticipated expenditures and outline recommended funding strategies to underwrite anticipated capital improvements; ➢ to document and communicate capital improvement processes for City projects that will ensure consistency, a full appreciation of both the costs and benefits of proposed capital investments, and raises the level of public understanding regarding the City's public improvement processes; ➢ to provide information on the fiscal impacts of capital investment plans on total City finances; and ➢ to effectively plan for public improvements that support community needs in the areas of private development infrastructure, transportation, public safety, parks and recreation, utilities, and commercial /industrial growth through fiscally responsible economic development initiatives. Accordingly, this document attempts to recognize known or perceived capital improvement needs, but as with any plan recognizes that social, economic and political considerations will by necessity determine final project outcomes. The major categories of expenditures that are identified within the CIP include, but are not limited to: 1. New Public Facilities Planning 2. Street Construction, Maintenance and Reconstruction 3. Utility Construction, Maintenance and Reconstruction 4. Construction, Maintenance and Upgrade of Parks, Playgrounds and Trails 5. Capital Improvements to Existing Facilities 6. Private development infrastructure 7. Capital equipment and vehicle planning needs (Equipment purchases to be determined through normal budgetary process) The City Council, consequently, accepts this document with the provision that capital improvement planning is subject to the dynamics of community growth, political leadership and acknowledges that other unanticipated needs may take precedence over planned projects. RECOMMENDATION The 2012 - 2016 Capital Improvement Plan is the product of collaborative planning efforts by City staff, Park and Recreation Commission, Community Center Advisory Commission and the City Council. Projects have been introduced based on 1) anticipated future growth trends articulated in the City's current Comprehensive Plan, 2) the natural cycle of deterioration and decay evident in all physically constructed and engineered improvements in the more established areas of the community and 3) capital deficiencies or infrastructure issues brought to the City's attention through a variety of sources. Capital expenditures identified within the CIP are the best estimates available, and once the CIP is adopted, will be reviewed and confirmed through individual feasibility reports where appropriate. I am appreciative of the commitment, good judgment and expertise that each department has contributed to the capital improvement planning process. Respectfully submitted, Jim Dickinson City Administrator CIP PROJECT DEVELOPMENT AND PROCESS AUTHORIZATION SCHEDULE The following process is a Council /staff guideline for authorizing public improvement projects. As this process is controlled by State Statute and other influencing environmental factors, it is subject to change and should be viewed as a guide to assist the Council and public in understanding the public improvement process used by City staff. A separate Council meeting would facilitate each step in the process, and accomplishment of respective activities. As a result, the process time frame is a significant factor affecting City staffs ability to properly manage and complete approved Council ordered projects within budget and on time. 1. Council Approval of Annual CIP Projects by City Resolution will authorize the following outcomes: a) Staff and /or Consultant preparation of project feasibility studies b) Staff preparation of detailed financial review of project funding sources c) Neighborhood Meeting may be held prior to Feasibility Study subject to need and type of project. TIME FRAME: October - November of each preceding year. 2. Presentation of Feasibility Study a) Feasibility Study Components: 1) Review of Project Engineering and Construction Estimates 2) Total Project Costs (All related project costs, i.e. land, soft costs) 3) Project Financial Plan/Fiscal Implications (Engineering/Finance) 4) Authorization to develop a Preliminary Assessment Roll, if any, for the Public Hearing. (Engineering) • If Council accepts Feasibility Study, A Resolution "Accepting Feasibility Study and Setting Date for Public Hearing on the Project" when appropriate (Engineering Department) would initiate the following: 1) Notices mailed to affected Residents per statute requirements no less than 10 days before Public Hearing. (Engineering) 2) Public Hearing Notice is published. Two publications one week apart, with the second publication no less than three days before the hearing. (Engineering /City Clerk) TIME FRAME: February- March -April -May of current year. 3. Neighborhood Meeting — City staff will hold neighborhood project meetings, when appropriate, to review and present Project Feasibility Studies, answer questions and meet with affected property owners. These meetings will include a question and answer component designed specifically to bring awareness to the property owner, obtain citizen input and produce an understanding of the purposes behind the City's attempts to construct public improvements in the affected area. TIME FRAME: Following the presentation of the Feasibility Study to Council, but prior to the holding of a Public Hearing by Council. 4. Council holds a Public Hearing when appropriate for following purposes: a) Presentation of Project (Engineering Department) b) Presentation of Preliminary Special Assessment Rolls and Financing Implications (Engineering/Finance Department) c) Council to hear Affected Resident Input d) Council determines whether to "order" the public improvement • A Council Resolution is drafted "Ordering the Project and Authorizing Preparation of Plans and Specifications" (Engineering Department). Council may ORDER THE IMPROVEMENT after the public hearing is closed or at a subsequent Council Meeting within 6 months of the public hearing date. (Statutory Requirement - Council Resolution ordering project must be approved on 415 Council vote if it is Council initiated project with assessments). • If Council decides to reject the project as presented, a Council vote should be taken to officially determine the final status of the project. TIME FRAME: April- May -June of current year 5. Plans and Specifications are presented to Council for approval. (Engineering Department) a) A Council Resolution is drafted authorizing the following: 1) Accepting and Approving Project Plans and Specifications 2) Authorizing the Advertisement for Project Bids. Bids are developed and invitation to Bid is processed. Bid opening date is no less than 3 weeks after publication. (Engineering) 3) Authorize staff to pursue an appropriate funding mechanism to underwrite project costs TIME FRAME: May -June of each year 6. Council Acceptance of Project Bids and Awarding of Contracts would authorize the following outcomes: a) A Council Resolution is drafted "Accepting Project Bids and Awarding Contracts" (Engineering) b) Initiation of Project Construction and work (Engineering) TIME FRAME: April- May -June -July of current year. 7. Project Completion a) Council Acceptance of Project b) Final Presentation and Review of Project Costs versus Project Budget by Finance Department. c) If Special Assessments are financing a portion of the Project, A Council Resolution "Setting the Special Assessment Hearing for Project #" is adopted at this same meeting. (Engineering/Finance) TIME FRAME: Upon completion of project. 8. If Special Assessments would finance a portion of the projects costs, Council Holds a Special Assessment Hearing to review the following: a) Affected Property owners would be officially notified per statute no less than two weeks prior to Special Assessment Hearing. (Clerk/Engineering) b) Public Notice is published no less than two weeks prior to Special Hearing per statute (Clerk/Engineering) c) Staff prepares a proposed roll and Council Approves Final Assessment Roll (Engineering/Finance) d) Council consideration of Assessment Appeals and Requested Deferrals filed prior to hearing or during the hearing. e) Meets M.S. Chapter 429 statutory requirements • A Council Resolution is drafted "Adopting Final Special Assessment Roll "(Engineering), and is adopted at this meeting. TIME FRAME: October/November of current year depending on finalization of project and status of completion. 61 CITY OF ANDOVER 2012 CIP Expenditures By Department per. O Engineering Parks - Proj. Parks - 2 O Sanitary Sewer 6.52% 1.25% 2.52% Info Tech Water Storm Sewer 0.62% 17.38% Fire 0.47% 2.07% Facility Mgmt. 1.56% Streets/ Hig hways 64.74% CITY OF ANDOVER 2012 CIP Expenditures By Year 2016 $3,760,000 2015 $12,935,000 2014 $4,331,000 2013 $6,265,000 2012 $6,413,600 2011 Adopted $3,988,000 $- $3,000,000 $6,000,000 $9,000,000 $12,000,000 $15,000,000 City of Andover, MN Capital Plan 2012 thru 2016 DEPARTMENT SUMMARY Department 2012 2013 2014 2015 2016 Total Central Equipment 47,000 35,000 82,000 Community Center 18,000 12,000 30,000 Elections 110,000 110,000 Engineering 418,000 166,000 183,000 216,000 218,000 1,201,000 Facility Management 100,000 1,836,000 27,000 5,293,000 130,000 7,386,000 Fire 133,000 600,000 1,070,000 84,000 1,887,000 Information Technology 40,000 40,000 Park & Rec - Operations 184,600 145,000 171,000 93,000 120,000 713,600 Park & Rec - Projects 80,000 15,000 15,000 215,000 15,000 340,000 Sanitary Sewer 161,400 130,000 357,000 3,400,000 1,355,000 5,403,400 Storm Sewer 30,000 35,000 190,000 45,000 50,000 350,000 Streets /Highways 4,152,000 3,095,000 2,201,000 1,862,000 1,872,000 13,182,000 Water 1,114,600 115,000 70,000 1,680,000 2,979,600 TOTAL 6,413,600 6,265,000 4,331,000 12,935,000 3,760,000 33,704,600 7 City of Andover, MN Capital Plan 2012 tiim 2016 FUNDING SOURCE SUMMARY Source 2012 2013 2014 2015 2016 Total Assessments 788,000 240,000 201,000 1,174,000 1;320;000 3,723,000 Building Fund 1,500,000 1,500,000 Capital Equipment Reserve 300,000 300,000 Capital Projects Levy 192,500 106,000 97,000 128,000 100,000 623,500 Comm Ctr Operations 32,000 18,000 12,000 100,000 162,000 Construction Seal Coat Fund 4,000 1,000 11,000 23,000 39,000 Equipment Bond 348,100 830,000 1,618,000 142,000 50,000 2,988,100 G.O. Bond 5,235,000 5,235,000 Municipal State Aid Funds 2,562,000 1,561,000 498,000 4,621,000 Park Dedication Funds 80,000 15,000 15,000 215,000 15,000 340,000 Road & Bridge Funds 1,151,000 1,195,000 1,319,000 1,713,000 1,702,000 7,080,000 Sanitary Sewer Fund 25,900 97,500 178,500 301,900 Sewer Revenue Bonds 2,000,000 250,000 2,250,000 Sewer Trunk Fund 67,000 22,000 268,500 1,260,000 110,000 1,727,500 State Grant 220,000 110,000 330,000 Storm Sewer Fund 30,000 67,500 40,000 45,000 50,000 232,500 Water Fund 109,100 115,000 70,000 970,000 1,264,100 Water Trunk Fund 804,000 88,000 25,000 30,000 40,000 987,000 GRAND TOTAL 6,413,600 6,265,000 4,331,000 12,935,000 3,760,000 33,704,600 8 City of Andover, MN Capital Plan 2012 thru 2016 PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project# Priority 2012 2013 2014 2015 2016 Total Central Equipment Replacement - Hotsy Pressure Washer 14- 48800 -01 3 7,000 7,000 Equipment Bond 7,000 7,000 Replacement - Service Truck 14- 48800 -02 2 40,000 40,000 Equipment Bond 40,000 40,000 Replacement - Floor Sweeper 15- 48800 -01 3 35,000 35,000 Equipment Bond 35,000 35,000 Central Equipment Total 47,000 35,000 82,000 Community Center Replacement - Carpet(Flooring 13- 44000 -01 1 10,000 10,000 Comm Ctr Operations 10,000 10,000 Replacement - Ice Edger 13- 44300 -02 1 8,000 8,000 Comm Ctr Operations 8,000 8,000 Replacement - Rink Boards 15- 44300 -01 2 12,000 12,000 Comm Ctr Operations 12,000 12,000 Community Center Total 18,000 12,000 30,000 Elections Replacement - Voting Equipment 13- 41310 -01 1 110,000 110,000 State Grant 110,000 110,000 Elections Total 110,000 110,000 Engineering New Development Projects 12- 41600 -01 1 85,000 110,000 115,000 140,000 150,000 600,000 Sewer Trunk Fund 67,000 22,000 90,000 110,000 110,000 399,000 Water Trunk Fund 18,000 88,000 25,000 30,000 40,000 201,000 Pedestrian Trail Maintenance 12- 41600 -02 1 58,000 56,000 68,000 76,000 68,000 326,000 Road & Bridge Funds 58,000 56,000 68,000 76,000 68,000 326,000 Bunker Lake Boulevard Trail 12- 41600 -03 1 275,000 275,000 Municipal State Aid Funds 55,000 55,000 State Grant 220,000 220,000 Engineering Total 418,000 166,000 183,000 216,000 218,000 1,201,000 Facility Management Surface Seal all Brick Structures 12- 41900 -01 1 75.000 75.000 Capital Projects Levy 22,500 22,500 Comm Ctr Operations 32,000 32,000 Water Fund 20,500 20,500 9 Department Project# Priority 2012 2013 2014 2015 2016 Total Annual Parking Lot Maintenance 12- 41900 -02 Capital Projects Levy 28,000 Comm Ctr Operations 236.000 Land Purchase 13- 41900 -01 Building Fund 28,000 Carpet/ Tile Replacement 13- 41900 -03 Capital Projects Levy Roof Replacements 13- 41900 -04 Capital Equipment Reserve 100,000 Building A - Seal Floor 15- 41900 -01 Capital Projects Levy Addition to Storage Building & Vehicle Maint. Shop 15- 41900 -02 G.O. Bond 1,500,000 Recycling Building & Fence 15- 41900 -03 G.O. Bond 1,500,000 Attached Storage Building 15- 41900 -04 G.O. Bond 10,000 Relocate Fuel Station w/ Canopy 15- 41900 -05 G.O. Bond 10,000 Fire St. #2 Addition with additional land purchase 15- 41900 -06 G.O. Bond 20,000 Pedestrian Tunnel Under Crosstown Blvd. 15- 41900 -07 G.O. Bond Facility Management Total 300,000 (Fire 300,000 Replacement - Fire Chiefs Vehicle 12- 42200 -01 Equipment Bond 300,000 Replacement - Rescue #11 12- 42200 -02 Equipment Bond 20,000 Replacement - Hydraulic Rescue Cutters 12- 42200 -03 Equipment Bond New - Thermal Imaging Camera 12- 42200 -04 Equipment Bond 20,000 Replacement - Ladder Truck #11 13- 42200 -01 Equipment Bond 3,000,000 Replacement - Grass #31 14- 42200 -01 Equipment Bond Replacement - Grass #21 14- 42200 -02 Equipment Bond 3,000,000 Replacement - Tanker #11 14- 42200 -03 Equipment Bond 300,000 Replacement - Fire Marshall Vehicle 14- 42200 -04 Equipment Bond Replacement - Utility #4 15- 42200 -01 Equipment Bond 300,000 Replacement - Utility #5 15- 42200 -02 Equipment Bond 300,000 New - Water /Ice rescue boat 15- 42200 -03 Equipment Bond 1 25,000 26,000 27,000 28,000 130,000 236.000 25,000 26,000 27,000 28,000 30,000 136,000 100,000 100,000 1 1,500,000 1,500,000 1,500,000 1,500,000 2 10,000 10,000 20,000 10,000 10,000 20,000 1 300,000 300,000 300,000 300,000 1 20,000 20,000 20,000 20,000 1 3,000,000 3,000,000 3,000,000 3,000,000 1 300,000 300,000 300,000 300,000 1 300,000 300,000 300,000 300,000 2 300,000 300,000 300,000 300,000 2 885,000 885,000 885,000 885,000 1 450,000 450,000 450,000 450,000 100,000 1,836,000 27,000 5,293,000 130,000 7,386,000 2 45,000 45,000 45,000 45,000 2 55,000 55,000 55,000 55,000 1 13,000 13,000 13,000 13,000 1 20,000 20,000 20,000 20,000 1 600,000 600,000 1,200,000 600,000 600,000 1,200,000 2 45,000 45,000 45,000 45,000 2 45,000 45,000 45,000 45,000 2 340,000 340,000 340,000 340,000 2 40,000 40,000 40,000 40,000 2 32,000 32,000 32,000 32,000 2 32,000 32,000 32,000 32,000 1 20,000 20,000 20,000 20,000 10 Department Project# Priority 2012 2013 2014 2015 2016 Total Fire Total 45,000 45,000 45,000 Information Technology Springbrook Version 7 12- 41420 -01 Capital Projects Levy 45,000 Information Technology Total 45,000 (Park & Rec - Operations 1 25,000 Replace /Repair Play Structures - Various Parks 12- 45000 -01 Capital Projects Levy 25,000 Replace /Repair Major Park Projects - Various Parks 12- 45000 -02 Capital Projects Levy 25,000 New - Cab and Snow Blower Attachment 12- 45000 -03 Equipment Bond 1 9,000 Sanitary Sewer Fund 200,000 New - Trail Plow Attachment 12- 45000 -04 Equipment Bond 4,500 Replacement -10 Ft Wide Trail Mower #583 12- 45000 -05 Equipment Bond Sunshine Park - Parking Lot Security Lighting 12- 45000 -06 Capital Projects Levy Replacement - One Ton Truck w/ Plow #599 13- 45000 -01 Equipment Bond 1 5,600 Replacement - Trailer #T -554 13- 45000 -02 Equipment Bond Replacement - One Ton Truck w/ Plow #503 14- 45000 -01 Equipment Bond Replacement - Bobcat #610 14- 45000 -02 Equipment Bond 1 65,000 Replacement - Toro Groundsmaster #559 15- 45000 -01 Equipment Bond Replacement - One Ton Crew Cab Pickup #502 16- 45000 -01 Equipment Bond Park & Rec - Operations Total 65,000 1 35,000 Park & Rec - Projects Annual Miscellaneous Park Projects 12- 45001 -01 Park Dedication Funds 35,000 Sunshine Park - West Parking Lot 12- 45001 -02 Park Dedication Funds Hickory Meadows 12- 45001 -03 Park Dedication Funds 65,000 Irrigation Project - Small 12- 45001 -04 Park Dedication Funds 65,000 Park Redesign / Major Irrigation Improvements 15- 45001 -01 Park Dedication Funds Park & Rec - Projects Total 65,000 2 10,000 �Sanitary Sewer 133,000 600,000 1,070,000 84,000 1,887,000 1 40,000 40,000 40,000 40,000 40,000 40,000 1 45,000 45,000 45,000 45,000 45,000 225,000 45,000 45,000 45,000 45,000 45,000 225,000 1 25,000 25,000 25,000 25,000 25,000 125,000 25,000 25,000 25,000 25,000 25,000 125,000 1 9,000 200,000 200,000 200,000 9,000 4,500 15,000 15,000 215,000 15,000 340,000 4,500 4,500 4,500 1 5,600 5,600 5,600 5,600 1 65,000 65,000 65,000 65,000 1 35,000 35,000 35,000 35,000 2 65,000 65,000 65,000 65,000 2 10,000 10,000 10,000 10,000 2 65,000 65,000 65,000 65,000 2 36,000 36.000 36,000 36,000 1 23,000 23.000 23,000 23,000 1 50,000 50,000 50,000 50,000 184,600 145,000 171,000 93,000 120,000 713,600 1 15,000 15,000 15,000 15,000 15,000 75,000 15,000 15,000 15,000 15,000 15,000 75,000 1 35,000 35,000 35,000 35,000 1 25,000 25,000 25,000 25,000 1 5,000 5,000 5,000 5,000 2 200,000 200,000 200,000 200,000 80,000 15,000 15,000 215,000 15,000 340,000 is Department Project# Priority 2012 2013 2014 2015 2016 Total Sanitary Sewer Extensions 12- 48200 -01 Assessments 500,000 Sewer Trunk Fund Annual Street Seal Coat Project Radio System Upgrade 12- 48200 -02 Sanitary Sewer Fund Road & Bridge Funds Replacement - 3/4 Ton Truck w/ Plow #90 13- 48200 -01 Sanitary Sewer Fund Construction Seal Coat Fund Replacement - One Ton Truck w/ Plow #94 13- 48200 -02 Sanitary Sewer Fund Annual Street Reconstruction Storm Sewer Fund Assessments Replacement - JetNac Truck #99 14- 48200 -02 Sanitary Sewer Fund Annual Pavement Markings Sewer Trunk Fund Road & Bridge Funds Yellow Pine Lift Station 15- 48200 -01 Sewer Trunk Fund Road & Bridge Funds Rural Reserve Trunk Sanitary Sewer 15- 48200 -02 Assessments Assessments Sewer Revenue Bonds Municipal State Aid Funds Sanitary Sewer Total Intersection Upgrades 12- 43100 -07 Municipal State Aid Funds Storm Sewer Storm Sewer Improvements 12- 48300 -01 Storm Sewer Fund 190,000 Replacement- Elgin Street Sweeper #169 14- 48300 -01 Equipment Bond 1 753,000 Storm Sewer Total 35,000 35,000 40,000 40,000 150,000 150,000 500,000 Streets / Hiahways Annual Street Seal Coat Project 12- 43100 -01 Construction Seal Coat Fund 190,000 Road & Bridge Funds 105,000 Annual Street Crack Seal Project 12- 43100 -02 Construction Seal Coat Fund 387,000 Road & Bridge Funds 740,000 Annual Street Reconstruction 12- 43100 -02 Assessments Road & Bridge Funds 20,000 Annual Pavement Markings 12- 43100 -04 Road & Bridge Funds 387,000 Annual Curb Replacement 12- 43100 -OE Road & Bridge Funds 1 Municipal State Aid Routes / New & Reconstruct 12- 43100 -OE Assessments 205,000 Municipal State Aid Funds Intersection Upgrades 12- 43100 -07 Municipal State Aid Funds 3,000 New - Front -End Loader 12- 43100 -OE Equipment Bond 190,000 Replacement - Ditch mowing tractor and mowers 13- 43100 -01 Equipment Bond 1 753,000 Replacement - One Ton Truck w/ Plow #132 13- 43100 -02 Equipment Bond 850,000 1 140,000 35,000 35,000 40,000 40,000 150,000 150,000 500,000 105,000 745,000 140,000 35,000 190,000 45,000 105,000 245,000 1 355,000 442,000 387,000 500,000 740,000 500,000 1 21,400 10,000 20,000 21,400 21,400 442,000 387,000 755,000 720,000 21,400 1 65,000 191,000 167,000 205,000 65,000 65,000 1,000 1,000 3,000 65,000 2 65,000 190,000 166,000 202,000 65,000 1 753,000 32,500 804,000 856,000 850,000 32,500 188,000 32,500 201,000 214,000 215,000 32,500 1 525,000 357,000 642,000 635,000 357,000 1 25,000 26,000 178,500 29,000 31,000 178,500 25,000 26,000 178,500 29,000 31,000 178,500 1 43,000 44,000 650,000 46,000 650,000 42,000 43,000 44,000 650,000 46,000 650,000 1 1,626,000 433,000 2,250,000 1,250,000 3,500,000 220,000 65,000 250,000 1,000, 000 1,250, 000 1,982,000 1,561,000 433,000 2,000,000 250,000 2,250,000 161,400 130,000 357,000 3,400,000 1,355,000 5,403,400 1 30,000 30,000 1 35,000 35,000 40,000 40,000 150,000 150,000 45,000 45,000 50,000 50,000 200,000 200,000 150,000 150,000 30,000 35,000 190,000 45,000 50,000 350,000 1 355,000 442,000 387,000 765,000 740,000 2,689,000 4,000 10,000 20,000 34,000 351,000 442,000 387,000 755,000 720,000 2,655,000 1 110,000 103,000 191,000 167,000 205,000 776,000 1,000 1,000 3,000 5,000 110,000 103,000 190,000 166,000 202,000 771,000 1 753,000 700,000 804,000 856,000 850,000 3,963,000 188,000 175,000 201,000 214,000 215,000 993,000 565,000 525,000 603,000 642,000 635,000 2,970,000 1 25,000 26,000 27,000 29,000 31,000 138,000 25,000 26,000 27,000 29,000 31,000 138,000 1 42,000 43,000 44,000 45,000 46,000 220,000 42,000 43,000 44,000 45,000 46,000 220,000 1 2,202,000 1,626,000 433,000 41261,000 220,000 65,000 285,000 1,982,000 1,561,000 433,000 3,976,000 1 525,000 65,000 590,000 525,000 65,000 590,000 1 140,000 140,000 140,000 140,000 1 90,000 90,000 90,000 90,000 1 65,000 65,000 65,000 65,000 im Department Project# Priority 2012 2013 2014 2015 2016 Total Replacement -Dump Truck w/ Snow Removal #198 14- 43100 -01 Equipment Bond 70,000 Replacement - Water Tanker #163 14- 43100 -02 Equipment Bond 70,000 Streets Highways Total 265,000 1 1,026,000 Water Rehabilitation of Wells 12- 48100 -01 Water Fund Water Main Improvements 12- 48100 -02 Assessments 786,000 Water Trunk Fund Radio System Upgrade 12- 48100 -03 Water Fund WTP Generator Upgrade 13- 48100 -01 Water Fund 28,600 Water Meter Reading System AMI /AMR 15- 48100 -01 Water Fund 28,600 Water Total 50,000 GRAND TOTAL 1 150,000 150,000 150,000 150,000 2 100,000 100,000 100,000 100,000 4,152,000 3,095,000 2,201,000 1,862,000 1,872,000 13,182,000 1 60,000 65,000 70,000 70,000 265,000 60,000 65,000 70,000 70,000 265,000 1 1,026,000 710,000 1,736,000 240,000 710,000 950,000 786,000 786,000 1 28,600 28,600 28,600 28,600 1 50,000 50,000 50,000 50,000 2 900,000 900,000 900,000 900,000 1,114,600 115,000 70,000 1,680,000 2,979,600 6,413,600 6,265,000 4,331,000 12,935,000 3,760,000 33,704,600 13 This page left blank i itentionally. . 14 City of Andover, MN Capital Plan 2012 thru 2016 DEPARTMENT SUMMARY Department 2012 2013 2014 2015 2016 Total Community Center 10,000 12,000 22,000 Engineering 418,000 166,000 183,000 216,000 218,000 1,201,000 Facility Management 100,000 1,836,000 27,000 5,293,000 130,000 7,386,000 Information Technology 40,000 40,000 Park & Rec - Operations 105,000 70,000 70,000 70,000 70,000 385,000 Park & Rec - Projects 80,000 15,000 15,000 215,000 15,000 340,000 Sanitary Sewer 140,000 3,400,000 1,355,000 4,895,000 Storm Sewer 30,000 35,000 40,000 45,000 50,000 200,000 Streets /Highways 4,012,000 2,940,000 1,951,000 1,862,000 1,872,000 12,637,000 Water 1,086,000 65,000 70,000 780,000 2,001,000 TOTAL 6,011,000 5,137,000 2,356,000 11,893,000 3,710,000 29,107,000 15 City of Andover, MN Capital Plan 2012 tiim 2016 FUNDING SOURCE SUMMARY Source 2012 2013 2014 2015 2016 Total Assessments 788,000 240,000 201,000 1,174,000 1;320;000 3,723,000 Building Fund 1,500,000 1,500,000 Capital Equipment Reserve 300,000 300,000 Capital Projects Levy 192,500 106,000 97,000 128,000 100,000 623,500 Comm Ctr Operations 32,000 10,000 12,000 100,000 154,000 Construction Seal Coat Fund 4,000 1,000 11,000 23,000 39,000 G.O. Bond 5,235,000 5,235,000 Municipal State Aid Funds 2,562,000 1,561,000 498,000 4,621,000 Park Dedication Funds 80,000 15,000 15,000 215,000 15,000 340,000 Road & Bridge Funds 1,151,000 1,195,000 1,319,000 1,713,000 1,702,000 7,080,000 Sewer Revenue Bonds 2,000,000 250,000 2,250,000 Sewer Trunk Fund 67,000 22,000 90,000 1,260,000 110,000 1,549,000 State Grant 220,000 220,000 Storm Sewer Fund 30,000 35,000 40,000 45,000 50,000 200,000 Water Fund 80,500 65,000 70,000 70,000 285,500 Water Trunk Fund 804,000 88,000 25,000 30,000 40,000 987,000 GRAND TOTAL 6,011,000 5,137,000 2,356,000 11,893,000 3,710,000 29,107,000 I City of Andover, MN Capital Plan 2012 thru 2016 PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project# Priority 2012 2013 2014 2015 2016 Total Community Center Replacement - Carpet/Flooring 13- 44000 -01 1 10;000 10,000 Comm Ctr Operations 10,000 10,000 Replacement - Rink Boards 15- 44300 -01 2 12,000 12,000 Comm Ctr Operations 12,000 12,000 Community Center Total 10,000 12,000 22,000 Engineering New Development Projects 12- 41600 -01 1 85,000 110,000 115,000 140;000 150;000 600,000 Sewer Trunk Fund 67,000 22,000 90,000 110,000 110,000 399,000 Water Trunk Fund 18,000 88,000 25,000 30,000 40,000 201,000 Pedestrian Trail Maintenance 12- 41600 -02 1 58,000 56,000 68,000 76,000 68,000 326,000 Road & Bridge Funds 58,000 56,000 68,000 76,000 68,000 326,000 Bunker Lake Boulevard Trail 12- 41600 -03 1 275,000 275,000 Municipal State Aid Funds 55,000 55,000 State Grant 220,000 220,000 Engineering Total 418,000 166,000 183,000 216,000 218,000 1,201,000 Facility Management Surface Seal all Brick Structures 12- 41900 -01 1 75,000 75,000 Capital Projects Levy 22,500 22,500 Comm Ctr Operations 32,000 32,000 Water Fund 20,500 20,500 Annual Parking Lot Maintenance 12- 41900 -02 1 25,000 26,000 27,000 28,000 130,000 236,000 Capital Projects Levy 25,000 26,000 27,000 28,000 30,000 136,000 Comm Ctr Operations 100,000 100,000 Land Purchase 13- 41900 -01 1 1,500,000 1,500,000 Building Fund 1,500,000 1,500,000 Carpet/ Tile Replacement 13- 41900 -03 2 10,000 10,000 20,000 Capital Projects Levy 10,000 10,000 20,000 Roof Replacements 13- 41900 -04 1 300,000 300,000 Capital Equipment Reserve 300,000 300,000 Building A - Seal Floor 15- 41900 -01 1 20,000 20,000 Capital Projects Levy 20,000 20,000 Addition to Storage Building & Vehicle Maint. Shop 15- 41900 -02 1 3,000,000 3,000,000 G.O. Bond 3,000,000 3,000,000 Recycling Building & Fence 15- 41900 -03 1 300,000 300,000 G.O. Bond 300,000 300,000 Attached Storage Building 15- 41900 -04 1 300,000 300,000 G.O. Bond 300,000 300,000 Relocate Fuel Station w/ Canopy 15- 41900 -05 2 300,000 300,000 IVA Department Project# Priority 2012 2013 2014 2015 2016 Total G.O. Bond 300,000 300,000 Fire St. #2 Addition with additional land purchase 15- 41900 -06 2 885,000 885,000 G.O. Bond 885,000 885,000 Pedestrian Tunnel Under Crosstown Blvd. 15- 41900 -07 1 450,000 450,000 G.O. Bond 450,000 450,000 Facility Management Total 100,000 1,836,000 27,000 5,293,000 130,000 7,386,000 Information Technology Springbrook Version 7 12- 41420 -01 1 40,000 40,000 Capital Projects Levy 40,000 40,000 Information! Technology Total 40,000 40,000 Park & Rec - Operations Replace /Repair Play Structures - Various Parks 12- 45000 -01 1 45,000 45,000 45,000 45,000 45,000 225,000 Capital Projects Levy 45,000 45,000 45,000 45,000 45,000 225,000 Replace /Repair Major Park Projects - Various Parks 12- 45000 -02 1 25,000 25,000 25,000 25,000 25,000 125,000 Capital Projects Levy 25,000 25,000 25,000 25,000 25,000 125,000 Sunshine Park - Parking Lot Security Lighting 12- 45000 -06 1 35,000 35,000 Capital Projects Levy 35,000 35,000 Park & Rec - Operations Total 105,000 70,000 70,000 70,000 70,000 385,000 Park & Rec - Projects Annual Miscellaneous Park Projects 12- 45001 -01 1 15,000 15,000 15,000 15,000 15,000 75,000 Park Dedication Funds 15,000 15,000 15,000 15,000 15,000 75,000 Sunshine Park - West Parking Lot 12- 45001 -02 1 35,000 35,000 Park Dedication Funds 35,000 35,000 Hickory Meadows 12- 45001 -03 1 25,000 25,000 Park Dedication Funds 25,000 25,000 Irrigation Project- Small 12- 45001 -04 1 5,000 5,000 Park Dedication Funds 5,000 5,000 Park Redesign / Major Irrigation Improvements 15- 45001 -01 2 200,000 200,000 Park Dedication Funds 200,000 200,000 Park & Rec - Projects Total 80,000 15,000 15,000 215,000 15,000 340,000 Sanitary Sewer Sanitary Sewer Extensions 12- 48200 -01 1 140,000 500,000 105,000 745,000 Assessments 140,000 105,000 245,000 Sewer Trunk Fund 500,000 500,000 Yellow Pine Lift Station 15- 48200 -01 1 650,000 650,000 Sewer Trunk Fund 650,000 650,000 Rural Reserve Trunk Sanitary Sewer 15- 48200 -02 1 2,250,000 1,250,000 3,500,000 Assessments 250,000 1,000,000 1,250,000 Sewer Revenue Bonds 2,000,000 250,000 2,250,000 Sanitary Sewer Total 140,000 3,400,000 1,355,000 4,895,000 Storm Sewer Storm Sewer Improvements 12- 48300 -01 1 30,000 35,000 40,000 45,000 50,000 200,000 Storm Sewer Fund 30,000 35,000 40,000 45,000 50,000 200,000 18 Department Project# Priority 2012 2013 2014 2015 2016 Total Storm Sewer Total 35,000 40,000 45,000 Streets / Highways Annual Street Seal Coat Project 12- 43100 -01 Construction Seal Coat Fund 387,000 Road & Bridge Funds 740,000 Annual Street Crack Seal Project 12- 43100 -02 Construction Seal Coat Fund Road & Bridge Funds 20,000 Annual Street Reconstruction 12- 43100 -03 Assessments 387,000 Road & Bridge Funds 720,000 Annual Pavement Markings 12- 43100 -04 Road & Bridge Funds 191,000 Annual Curb Replacement 12- 43100 -05 Road & Bridge Funds Municipal State Aid Routes / New & Reconstruct 12- 43100 -06 Assessments 3,000 Municipal State Aid Funds 110,000 Intersection Upgrades 12- 43100 -07 Municipal State Aid Funds 202,000 Streets / Highways Total 1 753,000 700,000 804,000 Water Rehabilitation of Wells 12- 48100 -01 Water Fund 175,000 Water Main Improvements 12- 48100 -02 Assessments 993,000 Water Trunk Fund 525,000 Water Total GRAND TOTAL 30,000 35,000 40,000 45,000 50,000 200,000 1 355,000 442,000 387,000 765,000 740,000 2,689,000 4,000 10,000 20,000 34,000 351,000 442,000 387,000 755,000 720,000 2,655,000 1 110,000 103,000 191,000 167,000 205,000 776,000 1,000 1,000 3,000 5,000 110,000 103,000 190,000 166,000 202,000 771,000 1 753,000 700,000 804,000 856,000 850,000 3,963,000 188,000 175,000 201,000 214,000 215,000 993,000 565,000 525,000 603,000 642,000 635,000 2,970,000 1 25,000 26,000 27,000 29,000 31,000 138,000 25,000 26,000 27,000 29,000 31,000 138,000 1 42,000 43,000 44,000 45,000 46,000 220,000 42,000 43,000 44,000 45,000 46,000 220,000 1 2,202,000 1,626,000 433,000 41261,000 220,000 65,000 285,000 1,982,000 1,561,000 433,000 3,976,000 1 525,000 65,000 590,000 525,000 65,000 590,000 4,012,000 2,940,000 1,951,000 1,862,000 1,872,000 12,637,000 1 60,000 65,000 70,000 70,000 265,000 60,000 65,000 70,000 70,000 265,000 1 1,026,000 710,000 1,736,000 240,000 710,000 950,000 786,000 786,000 1,086,000 65,000 70,000 780,000 2,001,000 6,011,000 5,137,000 2,356,000 11,893,000 3,710,000 29,107,000 19 Capital Plan City of Andover, MN Project # 13- 44000 -01 Project Name Replacement- Carpet /Flooring Type Improvement Useful Life 10 Years Category Improvements 2012 thru 2016 Department Community Center Contact Comm Ctr Manager Priority 1 -High Description Replacement of carpet /flooring for offices /front entry. Justification Carpet is original to the facility and will need to be replaced at some point. Expenditures 2012 2013 2014 2015 2016 Total Improvement 10,000 10,000 Total 10,000 10,000 Funding Sources 2012 2013 2014 2015 2016 Total Comm Ctr Operations 10,000 10,000 Tom 10,000 10,000 Budget Impact/Other This will be funded from the Community Center operation budget. W Capital Plan City of Andover, MN Project # 15- 44300 -01 Project Name Replacement -Rink Boards Type Improvement Useful Life 10 Years Category Improvements 2012 thru 2016 Department Community Center Contact Comm Ctr Manager Priority 2 - Medium Description Replace the white poly and yellow kick plates on the rink boards. Justification To ensure a safe and proper playing area, the rink boards and kick plates need to be replaced after 10 years of wear and tear. It also gives us an opportunity to inspect all of the frames and alignment issues from the expansion and contraction of the sand floor. Expenditures 2012 2013 2014 2015 2016 Total Facility Maintenance 12,000 12,000 Total 12,000 12,000 Funding Sources 2012 2013 2014 2015 2016 Total Comm Ctr Operations 12,000 12,000 Total 12,000 12,000 Budget Impact/Other There will be less maintenance initially; but as they age, the maintenance will increase as well. QI Capital Flan City of Andover, MN Project # 12- 41600 -01 Project Name New Development Projects Type Improvement Useful Life 50 Years Category New Development Projects 2012 thru 2016 Department Engineering Contact DPW / City Engineer Priority 1 - High Description New developments include the construction of sanitary sewer, water main, storm sewers and streets. Since the majority of the improvement projects are being privately installed by the developer, the following expenditures are the city's share for trunk water and sewer improvements. Justification The development phasing is identified in the City's Comprehensive Plan. Note: All private development construction is dependent upon market conditions, plat approval and normal City development procedures. Expenditures 2012 2013 2014 2015 2016 Total Construction 85,000 110,000 115,000 140,000 150,000 600,000 Total 85,000 110,000 115,000 140,000 150,000 600,000 Funding Sources 2012 2013 2014 2015 2016 Total Sewer Trunk Fund 67,000 Water Trunk Fund 18,000 22,000 88,000 90,000 25,000 110,000 30,000 110,000 40,000 399,000 201,000 Total 85,000 110,000 115,000 140,000 150,000 600,000 Budget Impact/Other kdditional maintenance of streets, storm sewer, water main and sanitary sewer will result. Additional streets will be added for snowplowing. M Capital Flan City of Andover, MN Project # 12- 41600 -02 Project Name Pedestrian Trail Maintenance 2012 thru 2016 Type Improvement Department Engineering Useful Life 10 Years Contact DPW / City Engineer Category Improvements Priority 1 - High rr..s Description This project provides maintenance such as patching, crack filling and restoration for the city's pedestrian and park trail system. Justification City trails are in need of general maintenance including bituminous patching, crack filling and restoration to maintain the high level of service to pedestrian walkers, bikers and roller bladers. A 5 -year capital improvement plan was prepared for the City to identify and prioritize the necessar Expenditures 2012 2013 2014 2015 2016 Total Improvement 58,000 56,000 68,000 76,000 68,000 326,000 Total Funding Sources 58,000 2012 56,000 2013 68,000 2014 76,000 2015 68,000 2016 326,000 Total Road & Bridge Funds 58,000 56,000 68,000 76,000 68,000 326,000 Total 58,000 56,000 68,000 76,000 68,000 326,000 Budget Impact/Otheff ks the city trail system begins to age, general maintenance such as bituminous patching, crack filling and restoration becomes a necessity. The naintenance will allow for a longer service life for the trail system throughout the city. 23 Capital Flan City of Andover, MN Project # 12- 41600 -03 Project Name Bunker Lake Boulevard Trail Type Improvement Useful Life 30 Years + Category Trail Construction Description 2012 thru 2016 Department Engineering Contact DPW / City Engineer Priority 1 - High A bituminous trail is proposed to be constructed along the north side of Bunker Lake Boulevard from Round Lake Boulevard to approximately 550' east of 38th Avenue. Anoka County Parks is applying for a grant that would require a 20% local match which would be 10% County, 10% City. Note: If grant is not approved, the trail would be funded through state aid. Justification This trail would tie into a proposed trail also along the north side of Bunker Lake Boulevard from 550' east of 38th Avenue to the western City limits that will be constructed with the reconstruction of Bunker Lake Boulevard in the summer of 2012. Once completed, these two trail segments would result in a regional trail system that would extend along Bunker Lake Boulevard from the western City limits to just west of the rail road tracks. Expenditures 2012 2013 2014 2015 2016 Total Improvement 275,000 275,000 Total 275,000 275,000 Funding Sources 2012 2013 2014 2015 2016 Total Municipal State Aid Funds State Grant Total 55,000 220,000 55,000 220,000 275,000 275,000 Budget Impact/Other kdditional annual maintenance costs, such as crack sealing, sweeping, and sealing. 24 ANLb Y O F OVE Capital Improvement Plan Project Name: BUNKER LAKE BOULEVARD TRAIL NEW CONSTRUCTION iNIMM M-tr. n N L E G E N D W E Project Location Lots /Parcels s Fri Park Water 0 500 1,000 2,000 Right of Way Feet City Limits 25 "vos Q 6 Q z a m w Y Q Z D w Rose Park CHP.Pn1ANS 3RD ADD Capital Flan City of Andover, MN Project # 12- 41900 -01 Project Name Surface Seal all Brick Structures Type Improvement Useful Life 5 years Category Facility Management 2012 thru 2016 Department Facility Management Contact DPW / City Engineer Priority 1 - High Description A surface sealing application would be initiated for all brick and/or block municipal buildings. The buildings include: City Hall, Public Works, Fire Station 1, 2, & 3, Sunshine Park Building, Prairie Knoll Park Building, Andover Station North Park Building, Community Center and all utility department buildings such as the pump houses and treatment facility. Justification This is a necessary maintenance item to ensure the long term integrity of the municipal buildings. Expenditures Facility Maintenance 2012 2013 2014 75,000 Total 75,000 2015 2016 Total 75,000 75,000 Funding Sources 2012 2013 2014 2015 2016 Total Capital Projects Levy 22,500 22,500 Comm Ctr Operations 32,000 32,000 Water Fund 20,500 20,500 Total 75,000 75,000 Budget Impact/Other � This will reduce the amount of long term maintenance and repair to the municipal buildings. `1: Capital Flan City of Andover, MN Project # 12- 41900 -02 Project Name Annual Parking Lot Maintenance 2012 thru 2016 Type Improvement Department Facility Management Useful Life 10 Years Contact DPW / City Engineer Category Improvements Priority 1 - High Description Yearly maintenance of the City parking lots is necessary to extend their useful lives. Parking lots that need maintaining include those at the City Hall complex, Public Works, Community Center, at City parks, and at the Fire Stations. Yearly maintenance may include crack sealing, seal coating, and mill and overlays. Maintenance will generally be completed with the street zones, or on an as needed basis. In 2016 the Community Center will be evaluated for resurfacing. Justification Completing periodic maintenance on the City parking lots, similar to City streets, will extend the overall design life of the pavement and reduce and/or prolong costly repairs. Expenditures 2012 2013 2014 2015 2016 Total Improvement 25,000 26,000 27,000 28,000 130,000 236,000 Total 25,000 26,000 27,000 28,000 130,000 236,000 Funding Sources 2012 2013 2014 2015 2016 Total Capital Projects Levy 25,000 26,000 27,000 28,000 30,000 136,000 Comm Ctr Operations 100,000 100,000 Tom 25,000 26,000 27,000 28,000 130,000 236,000 Budget Impact/Other Vlaintaining the parking lots will result in less annual maintenance for public works and prolong the life of the pavements. 27 Capital Flan City of Andover, MN Project # 13- 41900 -01 Project Name Land Purchase 2012 di u 2016 Type Improvement Department Facility Management Useful Life Unassigned Contact DPW / City Engineer Category Improvements Priority I - High Description Purchase land west of the Public Works building to be used for material storage, recycling center and future facility expansion. The City's is currently under contract to purchase this property. The City management team will be evaluating and assisting with the planning and future expansion for the Public Works Facility. Adequate property is necessary to insure that future needs of the community can be met. Justification This is the last opportunity to purchase this property and keep city facilities together in one complex. Future site expansion opportunities are limited without additional property. Expenditures 2012 2013 2014 Land Acquisition 1,500,000 Total 1,500,000 2015 2016 Total 1,500,000 1,500,000 Funding Sources 2012 2013 2014 2015 2016 Total Building Fund 1,500,000 1,500,000 Total 1,500,000 1,500,000 Budget Impact/Otheff There is a large cost savings in keeping facilities together. The recycling center would be moved away from the park and Community Center improving the general appearance of the area. It would also provide a large storage area for the seal coat rock, sweeping, etc. Open land areas in Andover will soon be a thine of the Dast. 28 ANLb Y O F 6V Capital Improvement Plan Project Name: LAND PURCHASE Capital Plan City of Andover, MN 2012 thru 2016 Type Improvement Department Facility Management 1 Useful Life 10 Years Contact DPW / City Engineer T Category Improvements Priority 2 - Medium Description The replacement of carpet and tile in appropriate areas of all City buildings and Community Center where deemed necessary. An annual review of all areas will be done to determine the order of replacement. Justification The buildings get a lot of use and, despite the appropriate cleaning and maintenance, the carpeting and tile will need to be replaced Expenditures 2012 2013 2014 2015 2016 Total Facility Maintenance 10,000 10,000 20,000 Total 10,000 10,000 20,000 Funding Sources 2012 2013 2014 2015 2016 Total Capital Projects Levy 10,000 10,000 20,000 Tom 10,000 10,000 20,000 Budget Impact/Other The carpet and tile replacement will be needed in order to keep the buildings in good repair. Due to heavy use, it is anticipated that all carpeted and tile areas will need to be replaced. [cit Capital Flan City of Andover, MN Project # 13- 41900 -04 Project Name Roof Replacements Type Improvement Useful Life 20 Years Category Facility Management 2012 thru 2016 Department Facility Management Contact DPW / City Engineer Priority 1 - High Description Remove and replace the existing membrane on the following roofs: City Hall & Senior Center and Fire Stations 1 & 2. City Hall & Senior Center $220,000 Fire Station #1 $45,000 Fire Station #2 $35,000 Justification The roofs are coming of age and and have been receiving annual maintenance for cracking, minor leaks and seams popping. They will continue to be watched and inspected annually to determine when it becomes cost efficient to replace the whole roof Expenditures 2012 2013 2014 2015 2016 Total Improvement 300,000 300,000 Total Funding Sources 2012 300,000 2013 2014 300,000 2015 2016 Total Capital Equipment Reserve 300,000 300,000 ToW 300,000 300,000 Budget Impact/Other knnual inspections and maintenance will be monitored to determine when it becomes cost effective to completely replace the entire roof 31 Capital Flan City of Andover, MN Project # 15- 41900 -01 Project Name Building A -Seal Floor Type Improvement Useful Life 2 Years Category Facility Management 2012 thru 2016 Department Facility Management Contact DPW / City Engineer Priority 1 - High Description kpply a sealant to the cement floor in Building A (large garage). Justification The cement floor in Building A spalds due to daily traffic and salt. Sealing of the floors should be repeated every 4 years to retain the integrity c the floor surface. Without this process, the cement floor would deteriorate and have to be replaced. It is much more cost effective to perform the maintenance than to replace the entire floor. Expenditures 2012 2013 2014 2015 2016 Total Facility Maintenance 20,000 20,000 Total 20,000 20,000 Funding Sources 2012 2013 2014 2015 2016 Total Capital Projects Levy 20,000 20,000 Total 20,000 20,000 Budget Impact/Other � Proper maintenance extends the life of the cement floor, thus not having to replace it before its life expectancy is up. 10% Capital Flan City of Andover, MN 2012 thru 2016 Project # 15- 41900 -02 Project Name Addition to Storage Building & Vehicle Maint. Shop Type Improvement Useful Life 30 Years + Category Facility Management Department Facility Management Contact DPW / City Engineer Priority 1 - High Description An addition to the north end of Bldg A and be the same in size, 100'x 250' with a 75'x 140' addition to the northwest side of the new vehicle storage garage for the vehicle maintenance shop. This building will be built with cement panels to match the present vehicle garage and would screen Public Works operations from the Community Center /YMCA as proposed in a joint meeting with the Mayor and City Council. Justification Due to the increase of vehicles, equipment and supplies now used by the City of Andover, this vehicle storage building and vehicle maintenance repair shop is badly needed. It is not cost effective to have vehicles or other equipment stored outside. Minnesota's four seasons are way too hard on them and it makes for a much cleaner operation. The vehicle maintenance repair shop has been needed for a long time. The area now used has doors that are not wide enough and work areas for the hydraulic hoist are way too small. Also with the amount of equipment now maintained by our staff, the area is much too small to run a completely safe operation. Expenditures 2012 2013 2014 2015 2016 Total Improvement 3,000,000 3,000,000 Total 3,000,000 3,000,000 Funding Sources 2012 2013 2014 2015 2016 Total G.O. Bond 3,000,000 3,000,000 Total 3,000,000 3,000,000 Budget Impact/Other This will impact the life of the vehicles and other equipment by being stored inside and to house our vehicle maintenance mechanics. Over the years, the cost savings have been shown when the proper maintenance of our equipment can be implemented. This building will provide a safe, Droductive_ and healthv operational area for Citv emDlovees that will benefit the Citv of Andover for manv years. 33 Capital Flan City of Andover, MN Project # 15- 41900 -03 Project Name Recycling Building & Fence Type Improvement Useful Life 15 -20 Years Category Facility Management Description 2012 thru 2016 Department Facility Management Contact DPW / City Engineer Priority 1 - High This structure will have to be larger than the present building so more recycled materials can be stored inside reducing the chance of the lighter materials blowing out. There also needs to be more room for outside storage including a paved drive surface, it being completely fenced, better security lighting, and updated security camera's. The new location would be located north of the water treatment facility and the building would be constructed of materials that would blend in with the rest of the public works campus. Justification At the present location we have just plain run out of room! The recycling center will have to be moved if the new addition of the vehicle storage building is approved. Also as clean as we try to keep this area, it is probably not the best neighbor to the Community Center since items sometimes blow out of the recycling storage yard. Also it would be best to keep the large trucks off of Tower Drive for safety reasons, due to narrow streets and a lot of pedestrian traffic. Expenditures 2012 2013 2014 2015 2016 Total Construction 300,000 300,000 Total 300,000 300,000 Funding Sources 2012 2013 2014 2015 2016 Total G.O. Bond 300,000 300,000 Total 300,000 300,000 Budget Impact/Other In the new location we will most likely be able to keep a closer watch on the area. It will still be within the area of the public works so there would be no extra cost in maintenance of the grounds and with a larger area it will be more customer friendly. 34 Capital Flan City of Andover, MN Project # 15- 41900 -04 Project Name Attached Storage Building Type Improvement Useful Life 25 Years Category Facility Management 2012 thr u 2016 Department Facility Management Contact DPW / City Engineer Priority 1 - High Description Three sided building approximately 25' x 50'. It would be used to store equipment not sensitive to the changing temperatures and weather conditions but out of direct sunlight. It would also help to screen the facility. Justification Part of the Public Works site expansion. Protect outdoor vehicles and equipment from changing weather conditions. Expenditures 2012 2013 2014 2015 2016 Total Construction 300,000 300,000 Total 300,000 300,000 Funding Sources 2012 2013 2014 2015 2016 Total G.O. Bond 300,000 300,000 Budget Impact/Other Total 300,000 300,000 K1 Capital Flan City of Andover, MN Project # 15- 41900 -05 Project Name Relocate Fuel Station w/ Canopy Type Improvement Useful Life 20 Years Category Facility Management 2012 thru 2016 Department Facility Management Contact DPW / City Engineer Priority 2 - Medium Description Zelocate the fueling station and install two (2) new 10,000 gallon fuel tanks and possibility keep the 2,000 gallon diesel fuel tank for an ilternative fuel like E85. Also, install a canopy to cover the fuel pumps and Gasboy fuel monitoring equipment. Justification The canopy would keep the fuel pumps, gasboy equipment, operators dry and help keep sun, rain and snow damage to a minimum. It would also keep the fuel in the tanks from getting contaminated. The larger tanks will allow us to have tanker drops of 7,500 gallons of fuel, saving us money and the frequency of the drops that we now have. The tanks are approximately 20 years old and are warranteed for 30 years. The pumps were installed in 1999 and are in good shape. Expenditures 2012 2013 2014 2015 2016 Total Improvement 300,000 300,000 Total 300,000 300,000 Funding Sources 2012 2013 2014 2015 2016 Total G.O. Bond 300,000 300,000 Total 300,000 300,000 Budget Imnpact/Other The larger tanks will allow us to have a tanker drops of 7,500 gallons of fuel, saving us money and the frequency of the drops that we now have. 9 Capital Flan City of Andover, MN Project # 15- 41900 -06 Project Name Fire St. #2 Addition with additional land purchase Type Improvement Useful Life 30 Years Category Improvements Description 2012 thru 2016 Department Facility Management Contact Fire Chief Priority 2 -Medium The addition of one bay to the apparatus area and expanding the existing parking lot to allow for more room and parking space. The project also includes a mill and overlay of the existing parking lots at Station #1 and #2. The additional land would be used to expand the station #2 site to include a training facility that will allow for the appropriate outdoor fire and rescue training, including all types of required live fire scenarios. Justification The additional space to the building will allow for all vehicles to be parked in front of an exit door. The firefighters will not have to move a vehicle in order to get another one out of the building. The additional bay will also make clean up operations after an event much easier. The firefighters will not have to move vehicles out of the building in order to clean hose and equipment. The additional parking space will provide for much needed hard surface training area and more vehicle parking. Replacement of the existing parking lots is necessary due to the heavy fire vehicle traffic. The current use of old houses to be demolished by burning for training purposes is becoming harder to do because of E.P.A. and P.C.A. standards and requirements. The concept of a county wide regional fire training center with joint funding should be considered as a viable option for the station #2 site. Expenditures 2012 2013 2014 2015 2016 Total Land Acquisition Equipment Improvement 250,000 35,000 600,000 250,000 35,000 600,000 Total Funding Sources 2012 885,000 2013 2014 2015 2016 885,000 Total G.O. Bond 885,000 885,000 Total 885,000 885,000 Budget Impact/Other The additional space will make all fire operations more efficient at this building. Vehicles will not have to be moved in order to get others out and clean -up will be much easier and faster. As part of this project it is suggested that the City look to purchase additional land adjacent to station #2. The building addition is needed but now is the time to also plan for future fire department needs. The strategic planning would call for a fire department training site where outdoor and live burn training could be accomplished. The additional land would be used to expand the station #2 site to include a training facility that will allow for the appropriate outdoor fire and rescue training, including all types of required live fire scenarios. A trainine buildine used for rescue and live fire scenarios should also be considered. 37 Capital Flan City of Andover, MN Project # 15- 41900 -07 Project Name Pedestrian Tunnel Under Crosstown Blvd. Type Improvement Useful Life 30 Years + Category Facility Management 2012 thru 2016 Department Facility Management Contact DPW / City Engineer Priority 1 - High Description This would be a pedestrian underpass walkway under Crosstown to accommodate pedestrian traffic from a possible development of a parking lot or other sports fields on the north side of Crosstown Boulevard that could crossunder Crosstown Boulevard to Sunshine Park Facilities or just connect to the cities trail system. Justification This item was discussed at a Council Workshop with the Public Works Department Managers February 16th 2006. For safety and for easy access for crossing Crosstown Boulevard from a future park and/or future parking lot on the north side of Crosstown Boulevard to Sunshine Park on the South side, or just getting to the city trail system the quickest and safest way will be a pedestrian underpass under Crosstown Boulevard. Expenditures 2012 2013 2014 2015 2016 Total Improvement 450,000 450,000 Total 450,000 450,000 Funding Sources 2012 2013 2014 2015 2016 Total G.O. Bond 450,000 450,000 Total 450,000 450,000 Budget Impact/Otheff Connecting of these area's through an underpass will not only benefit pedestrians crossing the roadway, but will also provide a safe passage for personnel and smaller equipment. 38 Capital Flan City of Andover, MN Project # 12- 41420 -01 Project Name Springbrook Version 7 Type Improvement Useful Life 5 years Category Information Technology 2012 thr u 2016 Department Information Technology Contact Scott Allen Priority 1 - High Description Upgrade the financial software system from version 6.04 to version 7NET. This expenditure is for additional training and the cost of migrating data from the old version to the new version. Justification The current software system (v6.O4) has had about ten upgrades since purchased in 2005. While v6.O4 is still supported and maintained, it is no longer getting any new enhancements. The v7.NETprocesses information on a server rather than on the user's workstation, completing jobs much more quickly. There are also a lot of "drill- down" options when inputting data and researching information. Expenditures 2012 2013 2014 2015 2016 Total Technology Improvements 40,000 40,000 Total 40,000 40,000 Funding Sources 2012 2013 2014 2015 2016 Total Capital Projects Levy 40,000 40,000 Budget Impact/Other Total 40,000 40,000 K� 1 Capital Flan City of Andover, MN Project # 12- 45000 -01 Project Name Replace/Repair Play Structures -Various Parks Type Improvement Useful Life 10 Years Category Park Improvements 2012 thru 2016 Department Park & Rec - Operations Contact DPW / City Engineer Priority 1 - High Description Repair to fall zones and achieve ADA accessibility. Replacement of playground equipment and other major replacements, such as short fences on ball fields, soccer goals, and any area of play that does not meet safety specifications. The proposed rebuilds are as follows: 2012 - Pleasant Oaks Park & Woodland Meadows Park 2013 - Green Acres Park & Northwoods East Park 2014 - Lan seth Park & Andover Lions Park Justification Old equipment no longer meets ADA requirements, such as entrapments, fall zones and handicap accessibility. Working to bring the parks up to meet all safety requirements. Expenditures 2012 2013 2014 2015 2016 Total Equipment 45,000 45,000 45,000 45,000 45,000 225,000 Tom 45,000 45,000 45,000 45,000 45,000 225,000 Funding Sources 2012 2013 2014 2015 2016 Total Capital Projects Levy 45,000 45,000 45,000 45,000 45,000 225,000 Total 45,000 45,000 45,000 45,000 45,000 225,000 Budget Impact/Other .ess maintenance and will meet all safety requirements. Chi, Capital Flan City of Andover, MN 2012 thru 2016 Project # 12- 45000 -02 Project Name Replace/Repair Major Park Projects -Various Parks Type Improvement Useful Life Category Park Improvements Department Park & Rec - Operations Contact DPW / City Engineer Priority 1 - High Description 2012 - Replacement of outfield fences for the four large fields at Sunshine Park. Justification As the Andover park system continues to age there is a need for major replacement projects that cost in excess of $10,000 per project. These items can not be replaced through the Parks maintenace budget because of the high cost of the replacement. Current projects that are in need include the replacement of the outfields fencing at Sunshine Park and parking lot reconstruction within City Parks. Each year a specific project will be identified. Expenditures 2012 2013 2014 2015 2016 Total Improvement 25,000 25,000 25,000 25,000 25,000 125,000 Total 25,000 25,000 25,000 25,000 25,000 125,000 Funding Sources 2012 2013 2014 2015 2016 Total Capital Projects Levy 25,000 25,000 25,000 25,000 25,000 125,000 Total 25,000 25,000 25,000 25,000 25,000 125,000 Budget Impact/Other Replacements will reduce the ongoing maintenance that is needed to keep Park facilities useable and safe. Alrl ANLb Y o r OVE Capital Improvement Plan Project Name: PARK IMPROVEMENTS SUNSHINE PARK O � City Hall z m rk Complex #1 tE-T L N z D r M City Hall C ampus co Hockey Rinks H TH_LN W C� �O U O W C/) Sunshine Park a � 09TH- HAVE p U p J m z O z a 148TH L/� _ PINEWOOD ESTATES 7 48T'yAVE 147THIN,0 F..�. L E G E N D Project Location Lots /Parcels Fri Park Water Right of Way City Limits aMl,. 11, 71 d-- . 0 212.5 425 Feet 42 850 Capital Flan City of Andover, MN Project # 12- 45000 -06 Project Name Sunshine Park -Parking Lot Security Lighting 2012 thru 2016 Type Improvement Department Park & Rec - Operations Useful Life 20 Years Contact DPW / City Engineer Category Improvements Priority I - High Description To install security / safety lighting for the large parking lot at Sunshine Park. Justification Due to the number of practices and games played at Sunshine Park after daylight hours, it is necessary to provide parking lot lighting to allow individuals a safer access to and from vehicles. It will also give drivers better visability when driving through the parking lot area. Expenditures 2012 2013 2014 2015 2016 Total Improvement 35,000 35,000 Total 35,000 35,000 Funding Sources 2012 2013 2014 2015 2016 Total Capital Projects Levy 35,000 35,000 Total 35,000 35,000 Budget Impact/Other Routine maintenance will be required for bulb replacement. 43 Capital Plan City of Andover, MN 2012 thru 2016 Project # 12- 45001 -01 Project Name Annual Miscellaneous Park Projects Type Improvement Department Park & Rec - Projects Useful Life Unassigned Contact Asst.Public Works Director Category Park Improvements Priority 1 -High Description This is for unforeseen or requested miscellaneous projects that may arise during the year, requested by the public, staff, City Council or the Parks and Recreation Commission for each year. Justification This gives flexibility to the City to do certain small -sized projects that may be warranted; for example, purchase of soccer goals. This funding has been recommended by the Park & Recreation Commission. Expenditures 2012 2013 2014 2015 2016 Total Improvement 15,000 15,000 15,000 15,000 15,000 75,000 Tom 15,000 15,000 15,000 15,000 15,000 75,000 Funding Sources 2012 2013 2014 2015 2016 Total Park Dedication Funds 15,000 15,000 15,000 15,000 15,000 75,000 Total 15,000 15,000 15,000 15,000 15,000 75,000 Budget Impact/Other k1lows the Park and Recreation Commission to address a variety of different needs throughout the year. 44 Capital Flan City of Andover, MN 2012 thru 2016 r., Type Improvement Department Park & Rec - Projects Useful Life 20 Years Contact Asst.Pubtic Works Director '{ Category Park Improvements Priority 1 - High Description ?ave the south half of the existing west parking lot. Currently the north half is already paved with concrete curb and gutter Justification Since Sunshine Park is considered the largest community park and is the focal point of athletic activities, the Park and Recreation Commission is recommending that the parking lot be paved with concrete curb and gutter. Expenditures Improvement 2012 2013 2014 35,000 Total 35,000 2015 2016 Total 35,000 35,000 Funding Sources 2012 2013 2014 2015 2016 Total Park Dedication Funds 35,000 35,000 Total 35,000 35,000 Budget Impact/Other Routine maintenance will be required to upkeep the park including painting of parking lot, crack sealing and seal coating. M ANLb Y o r OVE Capital Improvement Plan Project Name: PARK IMPROVEMENTS SUNSHINE PARK O � City Hall z m rk Complex #1 tE-T L N z D r M City Hall C ampus co Hockey Rinks H TH_LN W C� �O U O W C/) Sunshine Park a � 09TH- HAVE p U p J m z O z a 148TH L/� _ PINEWOOD ESTATES 7 48T'yAVE 147THIN,0 F..�. L E G E N D Project Location Lots /Parcels Fri Park Water Right of Way City Limits aMl,. 11, 71 d-- . 0 212.5 425 Feet 46 850 Capital Flan City of Andover, MN Project # 12- 45001 -03 Project Name Hickory Meadows Type Improvement Useful Life 10 Years Category Park Improvements 2012 thru 2016 Department Park & Rec - Projects Contact Asst.Public Works Director Priority 1 - High Description Install new playground equipment at Hickory Meadows Park. Justification due to the need and request by the Hickory Meadows neighborhood, the Park and Recreation Commission is recommending the installation of a )layground for 2 -12 year olds. Expenditures 2012 2013 2014 2015 2016 Total Improvement 25,000 25,000 Total 25,000 25,000 Funding Sources 2012 2013 2014 2015 2016 Total Park Dedication Funds 25,000 25,000 Total 25,000 25,000 Budget Impact/Other Routine maintenance will be required to upkeep the park equipment. 47 ANLb Y O F OVE Q Capital Improvement Plan Project Name: PARK IMPROVEMENTS (2012) HICKORY MEADOWS PARK ANDOVER BLVD N L E G E N D W E Project Location Lots /Parcels s Fri Park Water 0 145 290 580 Right of Way Feet City Limits 48 Hi Lk Me d C '--L z C)) W 1_ HICKORY MEADO J ,W H z w w fy 0 Of w 4U/ Capital Flan City of Andover, MN Project # 12- 45001 -04 Project Name Irrigation Project -Small Type Improvement Useful Life 10 Years Category Park Improvements 2012 thru 2016 Department Park & Rec - Projects Contact Asst.Public Works Director Priority 1 - High — -..V Description The Park and Recreation Commission would like to begin making irrigation improvements to some of the existing parks within the city. The park they are recommending for 2012 to irrigate is Woodland Estates Park. Justification By providing irrigation to this park, the grass will grow better and provide a better playing surface area to play on. It will also blend in better with the surrounding neighborhood as the neighbors have irrigated yards. Expenditures 2012 2013 2014 2015 2016 Total Improvement 5,000 5,000 Total 5,000 5,000 Funding Sources 2012 2013 2014 2015 2016 Total Park Dedication Funds 5,000 5,000 Total 5,000 5,000 Budget Impact/Other Yearly maintenance will be required in addition to the cost of utilities (water, electricity, etc.) 49 ANLb Y O F OVE Capital Improvement Plan Project Name: PARK IMPROVEMENTS (2012) WOODLAND ESTATES PARK F`6TH ADD 1 00ou ,W 1Z Z VETERAN'S-MEMORIAL BLVD L E G E N D odl Project Location Lots /Parcels Fri Park Water s Right of Way City Limits 1.53RD=LN woo CO O � ) SAP VETE D m Z 0 � m ;u-- T U) F ,o =Z � WOODLA 1:51 ST- E 15 -1� M!, . 120 240 480 Feet 50 W odl nd stat s Par 1.53RD=LN woo CO O � ) SAP VETE D m Z 0 � m ;u-- T U) F ,o =Z � WOODLA 1:51 ST- E 15 -1� M!, . 120 240 480 Feet 50 Capital Plan City of Andover, MN Project # 15- 45001 -01 Project Name Park Redesign /Major Irrigation Improvements Type Improvement Useful Life 20 Years Category Park Improvements 2012 thru 2016 Department Park & Rec - Projects Contact Asst.Public Works Director Priority 2 - Medium F Description The Park and Recreation Commission is recommending to reconstruct an existing park with athletic facilities and provide irrigation for the reconstructed park. Justification Similar to what was done at Hawkridge Park, when parks and /or fields get outdated or they do not meet today's standard, they need to be redesigned to meet the needs and expectations of those using them. Expenditures 2012 2013 2014 2015 2016 Total Improvement 200,000 200,000 Total 200,000 200,000 Funding Sources 2012 2013 2014 2015 2016 Total Park Dedication Funds 200,000 200,000 Budget Impact/Other° Yearly maintenance will be required. Total 200,000 200,000 62 Capital Flan City of Andover, MN Project # 12- 48200 -01 Project Name Sanitary Sewer Extensions 2012 thru 2016 Type Improvement Department Sanitary Sewer Useful Life 50 Years Contact DPW / City Engineer Category Improvements Priority 1 - High Description Sanitary sewer extensions are necessary in areas within the MUSA boundary for future development. The following projects are proposed: 2012: Extend sanitary sewer west along Bunker Lake Boulevard from Blackfoot Street to east of 7th Avenue ($140,000). 2015: Extend sanitary sewer trunk along Crosstown Boulevard from just west of the railroad tracks east to Prairie Road ($500,000). 2016: Upgrades to Aztec Estates Lift Station (105,000) I Justification I The Bunker Lake Boulevard sanitary sewer extension would serve properties east of 7th Avenue adjacent to Bunker Lake Boulevard. The extension is included in the City's updated Comprehensive Plan. Construction would be in conjunction with Anoka County reconstructing Bunker Lake Boulevard in this vicinity. Considerable cost savings could be achieved if this project is constructed with the roadway Crosstown Boulevard trunk sanitary sewer would be extended to serve properties adjacent to Crosstown Boulevard and east of the railroad ks and ultimately east of Prairie Road. The extension has been recommended through the sanitary sewer report (2004 Sanitary Sewer )ort), subsequent studies of the system, and the updated Comprehensive Plan. Timing of this project is contingent upon development east of railroad tracks. Aztec Estates Lift Station will need upgrades /improvements to handle flows projected once development fills in on the properties adjacent to ker Lake Boulevard and east of 7th Avenue. Expenditures 2012 2013 2014 2015 2016 Total Improvement 140,000 500,000 105,000 745,000 Total 140,000 500,000 105,000 745,000 Funding Sources 2012 2013 2014 2015 2016 Total Assessments 140,000 105,000 245,000 Sewer Trunk Fund 500,000 500,000 Total 140,000 500,000 105,000 745,000 Budget Impact/Other kdditional routine maintenance including televising and cleaning will be required. 6% A�LbWg um L E G E N D Project Location Lots /Parcels Park Water Right of Way City Limits Capital Improvement Plan Project Name: SANITARY SEWER IMPROVEMENTS (2012) BUNKER LAKE BLVD Pleasant Oaks Park N W E S 0 412.5 825 1,650 Feet 53 Wild Iris Park A A 6 A m W Y Q I:Z•Ii�fFlip C A 7. 3RD ADD ANLb Y O F 6V Capital Improvement Plan Project Name: SANITARY SEWER IMPROVEMENTS CROSSTOWN BLVD m FIELDS AVE p L159T/y 9�F MILLER'S WOODS W MILLER'S WOODS'2ND 1:58TH AVE=N m \ 158THAVEI 1- U } U) 158TH.AVE O 0 W of MOORES ESTATES N_ �0�53 OR ��S��gTO� SOp�IIE S SAN � �1 V Park W �C5 O 0 J J W >C W } PRAIRIE OAKS J� 154TH LN P SOP E'S OUTH\ Q G�� J a 152ND LN L E G E N D aMl,. 11, 71 d-- . 0 250 500 Feet 54 1,000 Project Location Lots /Parcels Fri Park Water Right of Way City Limits aMl,. 11, 71 d-- . 0 250 500 Feet 54 1,000 ANLb Y O F 6V Capital Improvement Plan Project Name: AZTEC ESTATES LIFT STATION IMPROVEMENTS 2016 -1 AZTEC'ESTA S 88B e mmm� v0 4z p' COMM-PLAT 1 w,-U) > LU Q O �LU i �L- _'�►f14 WANDERSEE ADD N L E G E N D W E Project Location Lots /Parcels s Fri Park Water 0 175 350 700 Right of Way Feet City Limits 55 POND A � 1-� J U m 2� LL ROS�LAS Y ADD mss, w Q J o- Aztec Estates j Lift Station O WOODLAND N L E G E N D W E Project Location Lots /Parcels s Fri Park Water 0 175 350 700 Right of Way Feet City Limits 55 POND A � 1-� Capital Flan City of Andover, MN Project # 15- 48200 -01 Project Name Yellow Pine Lift Station 2012 thru 2016 Type Improvement Department Sanitary Sewer Useful Life 50 Years Contact DPW / City Engineer Category Improvements Priority 1 - High Description Install a lift station at Yellow Pine Street to divert flow from the Bluebird Street trunk line to the Pinewood trunk line. The wet well for this lift station was constructed in 2005 as a part of the Crosstown Boulevard Improvements Project. Justification This lift station will allow additional capacity in the Bluebird Street trunk line to serve adjacent properties until the year 2020. This project is development dependent. Expenditures 2012 2013 2014 2015 2016 Total Improvement 650,000 650,000 Total 650,000 650,000 Funding Sources 2012 2013 2014 2015 2016 Total Sewer Trunk Fund 650,000 650,000 Total 650,000 650,000 Budget Impact/Other � Routine monitoring and maintenance of the lift station will be required. 67: A�LbWg a 1.ny nail rk Corrn'— 0 J in Z 0 Z Q 0 J 07 Z 0 U) Z Q Capital Improvement Plan Project Name: SANITARY SEWER IMPROVEMENTS (2015) YELLOW PINE LIFT STATION N L E G E N D R E Project Location Lots /Parcels s Park Water 0 320 640 1,280 t' Right of Way Feet City Limits 57 Capital Flan City of Andover, MN Project # 15- 48200 -02 Project Name Rural Reserve Trunk Sanitary Sewer 2012 thru 2016 Type Improvement Department Sanitary Sewer Useful Life 50 Years Contact DPW / City Engineer Category Unassigned Priority I - High Description Extension of trunk sanitary sewer from Bunker Lake Boulevard approximately parallel to Coon Crook to serve the Rural Reserve area. The sanitary sewer will be constructed through existing neighborhoods and along South Coon Creek Drive then north into the Rural Reserve Area. It is anticipated that the extension through the Rural Reserve may be constructed the following year, or as the market demands. Justification The trunk sanitary sewer will be extended to serve future development of the Rural Reserve. The timing of this extension will be market driven based upon developer timelines for the Rural Reserve. The extension has been recommended in the Trunk Sanitary Sewer Analysis for Designated Rural Reserve Areas. Expenditures 2012 2013 2014 2015 2016 Total Construction 2,250,000 1,250,000 3,500,000 Total 2,250,000 1,250,000 3,500,000 Funding Sources 2012 2013 2014 2015 2016 Total Assessments 250,000 1,000,000 1,250,000 Sewer Revenue Bonds 2,000,000 250,000 2,250,000 Total 2,250,000 1,250,000 3,500,000 Budget Impact/Other kdditional routine maintenance including televising and cleaning will be required. 58 Capital Flan City of Andover, MN Project # 12- 48300 -01 Project Name Storm Sewer Improvements 2012 thru 2016 Type Improvement Department Storm Sewer Useful Life 30 Years + Contact DPW / City Engineer Category Utilities Priority 1 - High Description Each year, areas of the City are identified where improvements are required to maintain our storm sewer system. Maintenance items include replacement of failing culverts, catch basins, and storm sewer pipes, erosion issues at storm sewer outfalls, and dredging of ponds and ditches. Justification Maintaining the City's storm sewer system improves water quality and public safety, and reduces the need for costly repairs in the future. Repairing and maintaining these systems also allows public works to focus on and comply with requirements of the NPDES program, such as pipe cleaning, inspections, and sweeping. Expenditures 2012 2013 2014 2015 2016 Total Improvement 30,000 35,000 40,000 45,000 50,000 200,000 Total 30,000 35,000 40,000 45,000 50,000 200,000 Funding Sources 2012 2013 2014 2015 2016 Total Storm Sewer Fund 30,000 35,000 40,000 45,000 50,000 200,000 Total 30,000 35,000 40,000 45,000 50,000 200,000 Budget Impact/Otheff Zepairing problem areas in the storm sewer system will reduce the yearly maintenance needs placed on the public works personnel. 60 Capital Flan City of Andover, MN Project # 12- 43100 -01 Project Name Annual Street Seal Coat Project Type Improvement Useful Life 8 Years Category Streets /Highways Description 2012 thru 2016 Department Streets /Highways Contact DPW / City Engineer Priority 1 - High This project provides for a seal coat of the streets. Due to reduced budgets and escalating fuel and material prices, funding is not available for maintenance on an entire zone on an annual basis as has been the historical practice. Each year, staff will determine an area that can be seal coated within the allotted budget based upon current estimated project costs. This plan has the following areas tentatively planned for sealcoating as follows: 2012: East 1/2 of Zone 8 2013: East 1/2 of Zone 1 2014: West 1/2 of Zone 1 2015: Full Zone 2 2016: Full Zone 3 Justification Seal coating will extend the useful life of roads by protecting the bituminous from oxidation due to adverse weather conditions (sun, rain, wind, snow, etc.). The prevention of oxidation will prolong the useful life of the pavement and defer the need for a costly reconstruction. Seal coating also improves the skid resistance of the roadway surface by increasing the friction between vehicle tires and the roadway. New developments and reconstructed areas are typically seal coated within three to four years after they are paved. Expenditures 2012 2013 2014 2015 2016 Total Construction 355,000 442,000 387,000 765,000 740,000 2,689,000 Total 355,000 442,000 387,000 765,000 740,000 2,689,000 Funding Sources 2012 2013 2014 2015 2016 Total Construction Seal Coat Fund 4,000 Road & Bridge Funds 351,000 442,000 387,000 10,000 755,000 20,000 720,000 34,000 2,655,000 Total 355,000 442,000 387,000 765,000 740,000 2,689,000 Budget Impact/Other Extending the life of the street will reduce routine maintenance (Crack sealing, pot hole patching, overlays, etc.) and extend the overall design life of the pavement. 61 Capital Flan City of Andover, MN Project # 12- 43100 -02 Project Name Annual Street Crack Seal Project Type Improvement Useful Life 8 Years Category Streets /Highways 2012 thru 2016 Department Streets /Highways Contact DPW / City Engineer Priority 1 - High Description This project provides for crack sealing of the streets. Due to budget restraints and escalating fuel and material prices, funding is not available for maintenance on an entire zone on an annual basis. Each year, staff will determine an area that can be crack sealed within the allotted budget based upon current estimated project costs. This plan has the following areas tentatively planned for crack sealing as follows: 2012: East 1/2 of Zone 1 2013: West 1/2 of Zone 1 2014: Full Zone 2 2015: Full Zone 3 2016: Full Zone 4 Justification The sealing of street cracks will significantly extend the useful life of the streets. This will extend the time frame when a costly street reconstruction project will be necessary. The sealing of cracks in the street surface reduces /eliminates water from entering the road base and subgrade. This process reduces the freeze /thaw cycles of the subgrade, maintaining the integrity of the road. Crack sealing is completed in a particular zone one year prior to seal coating. This allows the crack sealing material to cure and minimize bleed through once seal coated. developments and reconstructed areas requiring crack seal are not shown on the attached maps. These areas are typically crack sealed three after thev are vaved. Expenditures 2012 2013 2014 2015 2016 Total Construction 110,000 103,000 191,000 167,000 205,000 776,000 Total 110,000 103,000 191,000 167,000 205,000 776,000 Funding Sources 2012 2013 2014 2015 2016 Total Construction Seal Coat Fund 1,000 Road & Bridge Funds 110,000 103,000 190,000 1,000 166,000 3,000 202,000 5,000 771,000 Total 110,000 103,000 191,000 167,000 205,000 776,000 Budget Impact/Other Sealing the street cracks will reduce routine maintenance by eliminating the source of degradation resulting from moisture in the road subgrade. 62 Capital Flan City of Andover, MN Project # 12- 43100 -03 Project Name Annual Street Reconstruction Type Improvement Useful Life 20 Years Category Streets /Highways Description 2012 thru 2016 Department Streets /Highways Contact DPW / City Engineer Priority 1 - High The Street Reconstruction projects will consist of milling the existing street surface and constructing a new asphalt surface. Minor shouldering and restoration work will be included with the project. In developments that have existing bituminous curb or no curb or ditch, concrete curb and gutter will be constructed. 25% of the total project costs are assessed to the benefiting properties in each development. This program helps to maintain the integrity and value of the community's street infrastructure. Areas to be reconstructed are listed below. The timing of reconstruction of developments more than two years out may be revised as street conditions and ratings are reviewed on an annual basis. Additional developments may be added to the schedule or projects moved up if it is advantageous to reconstruct them in conjunction with other nearby projects. 2012 - Johnson's Oakmount Terrace, Ivywood Estates 2013 - Stenquist Addition 2014 - Makah Street, 159th Ave (7th Ave to Marystone Blvd.) 2015 - Lakeview Terrace, Lundgren Oakridge, Kemps Addition, Country Estates, Howard - Temple Addition 12016 - Prairie Meadows, Lan seth -Thrane 1 st and 2nd Additions Justification The streets in these neighborhoods are generally in excess of 25 years old and are in need of rehabilitation. The intent of this program is to provide the community with a high quality transportation system and maintain a constant upkeep of the City's street infrastructure. Expenditures 2012 2013 2014 2015 2016 Total Construction 753,000 700,000 804,000 856,000 850,000 3,963,000 Total 753,000 700,000 804,000 856,000 850,000 3,963,000 Funding Sources 2012 2013 2014 2015 2016 Total Assessments 188,000 Road & Bridge Funds 565,000 175,000 525,000 201,000 603,000 214,000 642,000 215,000 635,000 993,000 2,970,000 Total 753,000 700,000 804,000 856,000 850,000 3,963,000 The rehabilitation of the streets will reduce the routine maintenance (crack sealing, pot hole patching, etc..) in the area. Long term, this reconditioning will prolong the structural stability of the roadway making for a longer serviceable life. 63 A�Lbblw Capital Improvement Plan Project Name: ANNUAL STREET RECONSTRUCTION (2012) JOHNSON'S OAKMOUNT TERRACE 1-- 3 147TH AVE I _ 146TH �- N Meadows M -d L �O Lake Par �,9 i�6THT p146T�H O r- AVt KO 0 E O p - L 0 F—I , E - O' M 145TH'L-N ��' �: IF "�--�< � N ' --(F -I �'�" --'J 1054 L E G E N D Project Location Lots /Parcels Park Water Right of Way City Limits 145TH AVE DEHNSADD I 144THTN- DEHNS 2ND ADD N W E S 0 162.5 325 Feet 64 650 51 Deh n's A�Lbblw Capital Improvement Plan Project Name: ANNUAL STREET RECONSTRUCTION (2012) IVYWOOD ESTATES ESTATES River Trails Park f� O p0? ) A o N L E G E N D W E Project Location Lots /Parcels S Park Water 0 200 400 800 t' Right of Way Feet City Limits 65 i 1 H "L"N "'i M ACapital Improvement Plan NLbWg Proj ect Name: ANNUAL STREET RECONSTRUCTION (2013) STENQUIST ADDITION CASTNER ADD. REG pl-62ND LN i? LAND SURVEY NO. 072 STENQUIST ADDITION I 1'61'ST' L'N 160TH'M m i� gi O u ~ Q d Q O REG LAND Q� z O SURVEY NO 072 159TH AVE M RIVER T A RNCH ESTATES Location Map N L E G E N D R' E Project Location Lots /Parcels s Park Water 0 215 430 860 Right of Way Feet City Limits 66 A�LbWg Capital Improvement Plan Project Name: ANNUAL STREET RECONSTRUCTION (2014) 159TH AVE AND MAKAH ST I I Y r Capital Improvement Plan NDOVE Pro ect Name: ANNUAL STREET RECONSTRUCTION (2015) LAKEVIEW TERRACE, LUNDGREN OAKRIDGE ADDITION, KEMPS ADDITION, COUNTRY ESTATES AND HOWARD TEMPEL ADDITION mi ""TOWNHOMES OF WOODLAND CREEK 137TH AVE BUNKER'LAKE-BLVD W CREEK ESTATES 1 0 v L E G E N D Project Location Lots /Parcels Park Water Right of Way City Limits CR LK OAKRIDGE ADDITION N R' E S 0 240 480 960 Feet 68 AUD SUB1102 ER LAKE BLV Hidden Creek North Park PEE "AL-1 O O' �a EASTBROOK Dr p TERRACE C, D . I H 'E m 13 I4T LN W n ILI, AVE ui VO I AN DOVE Capital Improvement Plan Project Name: ANNUAL STREET RECONSTRUCTION (2016) PRAIRIE MEADOWS N L E G E N D W E Project Location Lots /Parcels s Fri Park Water 0 250 500 1,000 Right of Way Feet City Limits 69 171 ST AVE �j DEER 1707- - o� H��N _ 170TH LN N OAKS � SYLVES I ER ADD �I Q Z PRAIRIE 169TH _ LN 0 MEADOWS J m W Q J 0 Z �16$TH_LN TIMBER MEADOWS �I al al N L E G E N D W E Project Location Lots /Parcels s Fri Park Water 0 250 500 1,000 Right of Way Feet City Limits 69 AT Y o F Capital Improvement Plan N DOVE Project Name: ANNUAL STREET RECONSTRUCTION (2016) LANGSETH - THRANE 1STAND 2NDADDITIONS VE 0 J m Langseth Y n 174TH_LN a :D z LANGSETH OLESEN 2ND �� �� � 0 o O 1�1G� �q PINE ACRES 174TH-- �_ 11.74_Tly'gVE ADDITION !0i p! 2ND ADD 'O LANGSETH THRANE I LANGSETH 173RD -LN -T-- -7 2ND ADD THRANE ADD � Location Map N L E G E N D ui W E Project Location + 1� Lots /Parcels s -i t� i)-T-c Fri Park Water 0 175 350 700 Right of Way Feet City Limits 70 Capital Flan City of Andover, MN Project # 12- 43100 -04 Project Name Annual Pavement Markings 2012 thru 2016 Type Improvement Department Streets /Highways Useful Life 1 -2 Years Contact DPW / City Engineer Category Improvements Priority 1 - High Description The pavement striping for City streets is conducted one time per year. This includes centerline striping and shoulder striping. Striping enhances the safety of the roadway by directing traffic to the correct lane movement. The Federal Highway Administration is currently reviewing reflective standards for pavement markings. In the near future the City may have to stripe twice per year to meet new standards. If this is approved, it will double the cost of pavement markings per year. Justification I Striping is required through the local and state agencies. A reflective standard is required. Restriping annually maintains the pavement markings to the required standards. Expenditures 2012 2013 2014 2015 2016 Total Improvement 25,000 26,000 27,000 29,000 31,000 138,000 Total 25,000 26,000 27,000 29,000 31,000 138,000 Funding Sources 2012 2013 2014 2015 2016 Total Road & Bridge Funds 25,000 26,000 27,000 29,000 31,000 138,000 Total 25,000 26,000 27,000 29,000 31,000 138,000 Budget Impact/Other The pavement markings are contracted out each year adding virtually no operational impact. 71 Capital Flan City of Andover, MN Project # 12- 43100 -05 Project Name Annual Curb Replacement Type Improvement Useful Life 30 Years Category Streets /Highways 2012 thru 2016 Department Streets /Highways Contact DPW / City Engineer Priority 1 - High Description Damaged and failing concrete curb and gutter throughout the City needs to be repaired or replaced to help maintain the integrity of the roadway system. Replacing damaged or failing sections of curb and gutter helps with drainage of the roadway and prolongs the life of the street system. Justification The majority of the concrete curb and gutter throughout the City is in relatively good condition. However, there are isolated areas that need rehabilititation every year. Failing or damaged sections of concrete curb and gutter are removed and replaced. Replacing damaged sections of concrete curb and gutter maintains the integrity of and prolongs the life of the City's street infrastructure. Expenditures 2012 2013 2014 2015 2016 Total Improvement 42,000 43,000 44,000 45,000 46,000 220,000 Total 42,000 43,000 44,000 45,000 46,000 220,000 Funding Sources 2012 2013 2014 2015 2016 Total Road & Bridge Funds 42,000 43,000 44;000 45,000 46,000 220,000 Total 42,000 43,000 44,000 45,000 46,000 220,000 Budget Impact/Other Repairing failing or damaged sections of curb and gutter reduces the routine maintenance required by the public works department. r`a Capital Flan City of Andover, MN jeer # 12- 43100 -06 jeet Name Municipal State Aid Routes/ New & Reconstruct Type Improvement Useful Life 20 Years Category Streets /Highways Description 2012 thru 2016 Department Streets /Highways Contact DPW / City Engineer Priority 1 - High The following projects are proposed to be constructed and/or rehabilitated to meet State Aid Standards. The rehabilitation projects will consist of milling the existing street surface, replacing bituminous curb with concrete curb and gutter, repairing storm sewer systems, and improving storm drainage. 2012: Bunker Lake Boulevard (Round Lake Blvd - 7th Ave) $250,000 (County Project) South Coon Creek Drive (Round Lake Blvd - Crosstown) $1,300,000 147th Avenue (7th Avenue to 300' east of Guarani) $216,000 133rd Avenue (Crosstown Blvd to Hanson Blvd) $436,000 2013: Nightingale Street (Crosstown Blvd - 161st Ave) $989,000 Station Parkway (Crosstown Blvd - Hanson Blvd) $637,000 2014: Prairie Road (Andover Blvd - Crosstown Blvd) $433,000 2015: Justification Upgrades needed to maintain the integrity of the City's State Aid roadway infrastructure Budget Impact/Other Rehabilitating the roads will reduce the amount of routine maintenance along these sections of roadway and provide a safer and higher quality transportation system. 73 Expenditures 2012 2013 2014 2015 2016 Total Construction 2,202,000 1,626,000 433,000 4,261,000 Total Funding Sources 2,202,000 2012 1,626,000 2013 433,000 2014 2015 4,261,000 2016 Total Assessments Municipal State Aid Funds 220,000 1,982,000 65,000 1,561,000 433,000 285,000 3,976,000 Total 2,202,000 1,626,000 433,000 4,261,000 Budget Impact/Other Rehabilitating the roads will reduce the amount of routine maintenance along these sections of roadway and provide a safer and higher quality transportation system. 73 A�LbWg Capital Improvement Plan Project Name: MUNICIPAL STATE AID ROUTES RECONSTRUCT 2012 A�LbWg Capital Improvement Plan Project Name: MUNICIPAL STATE AID ROUTES RECONSTRUCT 2012 ANLb Y O F 6V Capital Improvement Plan Project Name: MUNICIPAL STATE AID ROUTES RECONSTRUCT 2012 137TFI'L'N < ANDOVERSTATION NORTH 2ND AI DD BUNKER LAKE BLVD ANDOVER Ij ANDOVER ��%\� MARKETPL'ACE PANKONIN ADD {= MARKETPLACE AND 0 EAST ANDOVER 2ND MARKETPLACE co �� EAST,2ND H p COMMERCIAL LL' EN AG -ES �' �9 > I Q ANDOVER STATION II �rATTS'GA" M PARx 0 a ®'yPP� ❑❑ o�- —CIR s%' ❑❑ ❑ CO CO 35TH U10, m ®® 9T�ON P{(Wy U SUNRIDGE HIDDEN'CREEK ,7/� 135TH AVE lST 3RD ADD 135T':L- - 9�sr 9GF Hidde HII IE ICRE ST PHEASANT F ECHO WOODS 9 F F creek (n ` 1 5TH ADD 134TH -LN l 1 co, yGG � East Park 4TH,AVE 3 E Z G _ �\ a --S F J J Cn m Z Q�AST Q HIDDEN'CREEK z 134TH AVE a C0 2' PO E-" '? EAST zrm ADD co F 133RD LN a' (\�' Z — EMERALD GLEN �rZ) Z U) HANSON MEAD O S1 133RD AVE 133RD AVE N L E G E N D W E Project Location Lots /Parcels s Park Water 0 375 750 1,500 Right of Way Feet City Limits 76 A�Lbblw Capital Improvement Plan Project Name: MUNICIPAL STATE AID ROUTES RECONSTRUCT 2012 ANLb Y O F OVE Capital Improvement Plan Project Name: MUNICIPAL STATE AID ROUTES MILL AND OVERLAY 2013 eT Q z NORTH 3RD ADD h 13g RED OAKS TN <N z I F-7 rc PARKSIDE'AT NOR2NDADD RED �OAKS MANOR�HJ ANDOVER,STATIOZND ADD 'Q �— 139TH AVE PARKSIDE AT ANDOVER STATION OSAG� F- 138TH:LN ANDOVER STATION } —U) 138TH-AVE NORTH ¢ p —RED DAKS J E) > m J MANOR Z J j N 1-3 HAVE O >C/) LLSTHiD o II z 137TH "L"N rc _ TM a 7NJORTH ADD 2ND DOVER STATION ti BUNKER LAKE BLVD Ll �,5 ANDOVER IC ANDOVER JN MARKETPLAACE PANKONIN ADD MARKETPLACE EAST ANDOVER � C �� ANDOVER 2: 2ND MARKETPLACE CO S F-• p COMMERCIAL EN ACRE ��D > ¢ ANDOVER STATION II wA.�SGARD Z¢ Z PARx qR�a A o TC S O A 1 [�y70 =_CIR O 135T ❑❑ ❑ 0 �T N PKWY CO) SUNRIDGE HIDDEN CREEK �� b EAST 3RD 135TH AVE ADD - S 135.T.FI.LN� osr �y9 Hidde HIID IE I CREEK EAST PHEASANT 4 ECHO WOODS Creek J i 1ATH'A H as l I J 5TH ADD U) Et Park T.H.AVE o EJz �9 c = �\ ( y a MEn DD2-S (d m. ¢ HIDDEN CREEx Z 134.T.HlAVE 2. � EAST 2 I— 133RD LN 0 a' ��� �— EMERALD GLEN RD LN z �I._. 133RD = AVE � HANSON MEADOWS+ 133RD AVE N L E G E N D W E Project Location Lots /Parcels S Park Water 0 375 750 1,500 Right of Way Feet City Limits 78 Y o Capital Improvement Plan ANLb O V l� Project Name: MUNICIPAL STATE AID ROUTES RECONSTRUCT 2013 161ST AVE ~ SHADY OAK �, .Z. � � 'COVE MAPLE HOLLO IJ o' -z- /o w�160T,H AVE ❑ ,Q. HESTERTON C M W OZ PRAIRIE YCOMONS coo {Z Z COVE��NORTH = o m: '¢ ANOxn co xwY Rnv PLAT 02 759TH.AVE 158TH LNJ]J 158TH LN noainna c.ss,ngs nE Park CHE�STERTON Z 158TH AVE I COS eMONS^ ~ U - NORTH 158TH AVE CARDINAL RIDGE �i Orr -ra OS ?58TH AVE, i9 �j1 NORTH VALLEY RIDGE W, W aoi LCROSSVyG$ Vyg$S Z_ �_ 5'7i�'C1P CAMBRIDGE ESTATES ?3, 157TH LN_�� Y �� 9 SHAW'S W Q O 156.TH.LN (z of hD� ~ i� w e m 156TH AVE- RR GREY OAK 1'S5TH LN gig iS�S`t � w SZP NIGHTINGALE � PvE p�9C5 00 154TH -LN .2.P ESTATES 2ND Z� ^� NIGHTINGALE J I 154TH.LN N Ssry� 154TH LN WOODLANDAVE ESTATES 3RD I N J q`F \ NIGHTINGALE F m 7 ESTATES 2 H Z Z z K• FOX —;_Z (n s ti 6TH ADD '� W ESTATES Q�J� z z �o gxoLLOw i 1.54T_h_ ?.,7E C6 iQ, 1.53RD_LN VVETERAN'S j o C E ORiq�� o Le�L N{ Q WOODLANDESTATESaTH VETERAN'S.MEM_ORIAL BLVD Purple Park SwP VETERAN'S MEMORIAL BLVD d g �To G z City Hall s /N 'M m z mPark Complex #1 Qum p �7T 151ST LN 0 U1WOODLAND �(ESTATES 2ND � 'A 01' is-- ES VE 15.1 ST AVE D m city xaii amP s G� C � Hockey ink z ti rn N L E G E N D _ Project Location Lots /Parcels Park Water Right of Way City Limits N W E S 0 500 1,000 Feet 79 2,000 ANLb Y O F OVE Capital Improvement Plan Project Name: MUNICIPAL STATE AID ROUTES RECONSTRUCT 2014 MOORE3ESTATES 157T H, AVE is t?Sr OOMMO�E 3R MAN�H FL—LL156TH AV55TI- �U155TH AVE w � AiAE2IE OAKS J� '--j--154TH EN \rs9 9 P p c3� f SOPH.'S'SOUTHl, 2 P A\ 51�� 752ND LN 00 N� YF�< O� At[,LS'3N.o W1NSL``� ti� N yg2� F y,,R EN U 150TH LN I> z w 'U O, 4 H LN SM�75 Rpzz�G I °qKS ui m z; p w 148TH-- N M; M � opF l Prair EARNESROLLmGOAKS ie Zem ADD Knoll Park o: eimr � C!y al � 146TH LN ti D 'ISM qe JE rL -p P 1 O_O }fib Z d 4 5 BARNES ROLLING OAKS v X' 145THAVE' ANDOVER BLVD ANDOVER BLVD N L E G E N D W E Project Location Lots /Parcels S Park Water 0 625 1,250 2,500 Right of Way Feet City Limits 80 Capital Flan City of Andover, MN 'roject # 12- 43100 -07 'roject Name Intersection Upgrades 2012 thru 2016 Type Improvement Department Streets /Highways Useful Life 25 Years Contact DPW / City Engineer Category Improvements Priority 1 - High Description 2012 - Construction of a traffic signal at South Coon Creek Drive and Round Lake Blvd ($275,000) if warrants are met. 2012 - Intersection improvements at Crosstown Boulevard / Crosstown Drive ($250,000) if warrants are met. 2014 - Construction of a traffic signal at Hanson Boulevard and 161st Avenue. Anoka County Highway Department received a Highway Safety Improvement Program (HSIP) grant for the majority of this project. The City will pay for our proportionate share of costs exceeding the grant Justification Intersection upgrades are necessary due to the increased development and demands on the transportation system, the need for safety improvements, and to comply with Anoka County Highway Department requirements. Expenditures 2012 2013 2014 2015 2016 Total Construction 525,000 65,000 590,000 Total 525,000 65,000 590,000 Funding Sources 2012 2013 2014 2015 2016 Total Municipal State Aid Funds 525,000 65,000 590,000 Total 525,000 65,000 590,000 Budget Impact/Other Improvements will improve the flow of traffic and will improve the safety of vehicles, pedestrians and bicyclists. 81 omlov,� 0 Capital Flan City of Andover, MN Project # 12- 48100 -01 Project Name Rehabilitation of Wells 2012 thr u 2016 Type Improvement Department Water Useful Life 7 Years Contact DPW / City Engineer Category Improvements Priority 1 - High Description The motor, pump and column pipe are taken out for inspection and worn parts are replaced. The well is televised to determine the depth and condition. If the well is at or close to the original drill depth everything is put back in place. The well may need to be cleaned out to the original depth if there is a substantial decrease in the depth. Justification To make sure the well is operational to what it is designed for and to correct any problems that may affect our ability to produce the amount of water needed to meet the demand. A complete inspection and maintenance overhall is performed on each well a minimum of once every seven (7) years. This maintenance will also maximize the pumping rate of the well. Expenditures 2012 2013 2014 2015 2016 Total Improvement 60,000 65,000 70,000 70,000 265,000 Total 60,000 Funding Sources 2012 65,000 2013 70,000 2014 70,000 2015 2016 265,000 Total Water Fund 60,000 65,000 70,000 70,000 265,000 Total 60,000 65,000 70,000 70,000 265,000 Budget Impact/Other � This would be done at such a time that it would not affect the demand needs of the system. Typically done late fall. 83 Capital Flan City of Andover, MN Project # 12- 48100 -02 Project Name Water Main Improvements 2012 thru 2016 Type Improvement Department Water Useful Life 50 Years Contact DPW / City Engineer Category Improvements Priority 1 - High Description Install water main, hydrants, and service lines to provide water service to existing areas in the City that are not currently served with City water. The following projects are proposed to be constructed along with the planned reconstruction of the streets in these areas: 2012: South Coon Creek Drive - 143rd Ave to Crosstown Blvd ($886,000) 2012: Bunker Lake Blvd - Blackfoot Street to 7th Ave ($140,000) 2015: Lakeview Terrace Area ($710,000) Justification The water main along South Coon Creek Drive would allow for the existing water distribution system between the east and west sides of town to be looped. The only existing connection between the two parts of town is along Bunker Lake Boulevard. Looping of the system will allow treated water to be continuously supplied to all residents in town on the water system and it will set the system up to alleviate the pressure variance that is experienced between the east and west sides of town when a clear well is constructed at a future date. A majority of this system would be funded by the Water Trunk Fund. water main along Bunker Lake Boulevard will be extended to serve properties adjacent to Bunker Lake Boulevard and east of 7th Avenue. struction would be in conjunction with Anoka County reconstructing Bunker Lake Boulevard in this area. All of this system would be ssed to the benefiting properties. roadways in the Lakeview Terrace areas east of Crooked Lake are proposed to be reconstructed in 2015. It is cost beneficial to install the x main in this area while the roadways are beine constructed. Expenditures 2012 2013 2014 2015 2016 Total Improvement 1,026,000 710,000 1,736,000 Total 1,026,000 710,000 1,736,000 Funding Sources 2012 2013 2014 2015 2016 Total Assessments 240,000 710,000 950,000 Water Trunk Fund 786,000 786,000 Total 1,026,000 710,000 1,736,000 Budget Impact/Other kdditional maintenance and flushing requirements for the water main system will result. 84 Capital Improvement Plan Project Name: WATER MAIN IMPROVEMENTS (2012) SOUTH COON CREEK BLVD 7 M I mmmcmmi WOODLAND POND Z ADD j West Park E [ < < ■ ■r' 140TH LN as ;v tiO c 140T 140TH AVE ILAZ�`` WOODLAND CREEK gl y 4TH•AND pp,C JZ1� NORTHVOODSADDIUCN r �z 21. ADD 139TH'L'N 9`tiD �� I P AT2 i OU 139TH'L'N 9� Qn Nrd � P 139TH AVE !;rK, �ZI 9TH AVE qdD -p� 00 os�H�P .5�00 0�1��0 �4 O N L E G E N D W E Project Location Lots /Parcels S Park Water 0 400 800 1,600 t' Right of Way Feet City Limits 85 A�LbWg um L E G E N D Project Location Lots /Parcels Park Water Right of Way City Limits Capital Improvement Plan Project Name: WATER MAIN IMPROVEMENTS (2012) BUNKER LAKE BLVD Pleasant Oaks Park N W E S 0 412.5 825 1,650 Feet 86 Wild Iris Park A A 6 A m W Y Q I:Z•Ii�fFlip C A 7. 3RD ADD A�LbWg mi 37iTOWNHOMES OF_7C01 7i DLAND EK 137TH AVE BUNKER'LAKE'B L E G E N D Project Location Lots /Parcels Park Water Right of Way City Limits Capital Improvement Plan Project Name: WATER MAIN IMPROVEMENTS (2015) LAKEVIEW TERRACE AREA W\ O I V gm 0 230 460 Feet 87 CR LK w 920 NKER LAKE BLV Hidden Creek North Park EST MPEL BElfti DI�TION0�To - O DD EASTIBROOK M TERRACE �M 134TH LN ER-r-- W m �- G 0 Ll AVE w E This page left blank i itentionally. . 88 89 City of Andover, MN Capital Plan 2012 thru 2016 DEPARTMENT SUMMARY Department 2012 2013 2014 2015 2016 Total Central Equipment 47,000 35,000 82,000 Community Center 8,000 8,000 Elections 110,000 110,000 Fire 133,000 600,000 1,070,000 84,000 1,887,000 Park & Rec - Operations 79,600 75,000 101,000 23,000 50,000 328,600 Sanitary Sewer 21,400 130,000 357,000 508,400 Storm Sewer 150,000 150,000 Streets /Highways 140,000 155,000 250,000 545,000 Water 28,600 50,000 900,000 978,600 TOTAL 402,600 1,128,000 1,975,000 1,042,000 50,000 4,597,600 89 Olt, City of Andover, MN Capital Plan 2012 tiim 2016 FUNDING SOURCE SUMMARY Source 2012 2013 2014 2015 2016 Total Comm Ctr Operations 8,000 8,000 Equipment Bond 348,100 830,000 1,618,000 142;000 50;000 2,988,100 Sanitary Sewer Fund 25,900 97,500 178,500 301,900 Sewer Trunk Fund 178,500 178,500 State Grant 110,000 110,000 Storm Sewer Fund 32,500 32,500 Water Fund 28,600 50,000 900,000 978,600 GRAND TOTAL 402,600 1,128,000 1,975,000 1,042,000 50,000 4,597,600 Olt, City of Andover, MN Capital Plan 2012 thru 2016 PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project# Priority 2012 2013 2014 2015 2016 Total Central Equipment Replacement - Hotsy Pressure Washer 14- 48800 -01 3 7,000 7,000 Equipment Bond 7,000 7,000 Replacement - Service Truck 14- 48800 -02 2 40,000 40,000 Equipment Bond 40,000 40,000 Replacement - Floor Sweeper 15- 48800 -01 3 35,000 35,000 Equipment Bond 35,000 35,000 Central Equipment Total 47,000 35,000 82,000 Community Center Replacement - Ice Edger 13- 44300 -02 1 8,000 8.000 Comm Ctr Operations 8,000 8,000 Community Center Total 8,000 8,000 Elections Replacement - Voting Equipment 13- 41310 -01 1 110,000 110,000 State Grant 110,000 110,000 Elections Total 110,000 110,000 (Fire Replacement - Fire Chiefs Vehicle 12- 42200 -01 2 45,000 45,000 Equipment Bond 45,000 45,000 Replacement - Rescue #11 12- 42200 -02 2 55,000 55,000 Equipment Bond 55,000 55,000 Replacement - Hydraulic Rescue Cutters 12- 42200 -03 1 13,000 13,000 Equipment Bond 13,000 13,000 New - Thermal Imaging Camera 12- 42200 -04 1 20,000 20,000 Equipment Bond 20,000 20,000 Replacement - Ladder Truck #11 13- 42200 -01 1 600,000 600,000 1,200,000 Equipment Bond 600,000 600,000 1,200,000 Replacement - Grass #31 14- 42200 -01 2 45,000 45,000 Equipment Bond 45,000 45,000 Replacement - Grass #21 14- 42200 -02 2 45,000 45,000 Equipment Bond 45,000 45,000 Replacement - Tanker #11 14- 42200 -03 2 340,000 340,000 Equipment Bond 340,000 340,000 Replacement - Fire Marshall Vehicle 14- 42200 -04 2 40,000 40,000 Equipment Bond 40,000 40,000 Replacement - Utility #4 15- 42200 -01 2 32,000 32,000 91 Department Project# Priority 2012 2013 2014 2015 2016 Total Equipment Bond 32,000 32,000 Replacement - Utility #5 15- 42200 -02 2 32,000 32,000 Equipment Bond 32,000 32,000 New- Water /Ice rescue boat 15- 42200 -03 1 20,000 20,000 Equipment Bond 20,000 20,000 Fire Total 133,000 600,000 1,070,000 84,000 1,887,000 Park & Rec - Operations New- Cab and Snow Blower Attachment 12- 45000 -03 1 9,000 9,000 Equipment Bond 4,500 4,500 Sanitary Sewer Fund 4,500 4,500 New - Trail Plow Attachment 12- 45000 -04 1 5,600 5,600 Equipment Bond 5,600 5,600 Replacement - 10 Ft Wide Trail Mower #583 12- 45000 -05 1 65,000 65,000 Equipment Bond 65,000 65,000 Replacement - One Ton Truck w/ Plow #599 13- 45000 -01 2 65,000 65,000 Equipment Bond 65,000 65,000 Replacement - Trailer #T -554 13- 45000 -02 2 10,000 10,000 Equipment Bond 10,000 10,000 Replacement - One Ton Truck w/ Plow #503 14- 45000 -01 2 65,000 65,000 Equipment Bond 65,000 65,000 Replacement - Bobcat #610 14- 45000 -02 2 36,000 36,000 Equipment Bond 36,000 36,000 Replacement - Toro Groundsmaster #559 15- 45000 -01 1 23,000 23,000 Equipment Bond 23,000 23,000 Replacement - One Ton Crew Cab Pickup #502 16- 45000 -01 1 50,000 50,000 Equipment Bond 50,000 50,000 Park & Rec - Operations Total 79,600 75,000 101,000 23,000 50,000 328,600 Sanitary Sewer Radio System Upgrade 12- 48200 -02 1 21,400 21,400 Sanitary Sewer Fund 21,400 21,400 Replacement - 3/4 Ton Truck w/ Plow #90 13- 48200 -01 1 65,000 65,000 Sanitary Sewer Fund 65,000 65,000 Replacement - One Ton Truck w/ Plow #94 13- 48200 -02 2 65,000 65,000 Sanitary Sewer Fund 32,500 32,500 Storm Sewer Fund 32,500 32,500 Replacement - JetNac Truck #99 14- 48200 -02 1 357,000 357,000 Sanitary Sewer Fund 178,500 178,500 Sewer Trunk Fund 178,500 178,500 Sanitary Sewer Total 21,400 130,000 357,000 508,400 Storm Sewer Replacement- Elgin Street Sweeper #169 14- 48300 -01 1 150,000 150,000 Equipment Bond 150,000 150,000 Storm Sower Total 150,000 150,000 Streets / Highways New- Front -End Loader 12- 43100 -08 1 140,000 140,000 Equipment Bond 140,000 140,000 0% Department Project# Priority 2012 2013 2014 2015 2016 Total Replacement - Ditch mowing tractor and mowers 13- 43100 -01 Equipment Bond Replacement - One Ton Truck w/ Plow #132 13- 43100 -02 Equipment Bond Replacement - Dump Truck w/ Snow Removal #198 14- 43100 -01 Equipment Bond 65,000 Replacement - Water Tanker #163 14- 43100 -02 Equipment Bond Streets / Highways Total 65,000 Water Radio System Upgrade 12- 48100 -03 Water Fund 150,000 WTP Generator Upgrade 13- 48100 -01 Water Fund Water Meter Reading System AMI /AMR 15- 48100 -01 Water Fund 100,000 Water Total 100,000 GRAND TOTAL 1 90,000 90,000 90,000 90,000 1 65,000 65,000 65,000 65,000 1 150,000 150,000 150,000 150,000 2 100,000 100,000 100,000 100,000 140,000 155,000 250,000 545,000 1 28,600 28,600 28,600 28,600 1 50,000 50,000 50,000 50,000 2 900,000 900,000 900,000 900,000 28,600 50,000 900,000 978,600 402,600 1,128,000 1,975,000 1,042,000 50,000 4,597,600 93 Capital Flan City of Andover, MN Project # 14- 48800 -01 Project Name Replacement - Hotsy Pressure Washer 2012 thru 2016 Type Equipment Department Central Equipment Useful Life 10 Years Contact DPW / City Engineer Category Equipment Priority 3 -Low Description Zeplace the existing stationary pressure washer with a new diesel - powered, portable pressure washer. Justification A new washer would operate more efficiently and save time and money by having fewer break downs. It would also run on diesel fuel rather than on kerosene. Expenditures 2012 2013 2014 2015 2016 Total Equipment 7,000 7,000 Total 7,000 7,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Bond 7,000 7,000 Tom 7,000 7,000 Budget Impact/Other � Less break downs, saving time and money. Not having to send people out to buy fuel for it would also save money. Harder to get parts for. 94 Capital Flan City of Andover, MN Project # 14- 48800 -02 Project Name Replacement- Service Truck Type Equipment Useful Life 10 Years Category Streets /Highways 2012 thru 2016 Department Central Equipment Contact DPW / City Engineer Priority 2 -Medium Description Replace Unit #371, a 2001 S 10 Ext Cab 4x4 truck with 74,224 miles. This truck averages about 7,000 miles a year and by 2014 it will have approximately 86,000 miles. The new truck would be a crew cab and also have a tailgate lift. Justification To assist mechanics with jobs outside the shop such as parts runs, vehicle repair and moving equipment around, a larger and roomier vehicle is Expenditures 2012 2013 Vehicles Total 2014 2015 2016 Total 40,000 40,000 40,000 40,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Bond 40,000 40,000 Tom 40,000 40,000 Budget Impact/Other k bigger vehicle would increase operating costs - fuel and maintenance, but would have many more uses. 4i Capital Flan City of Andover, MN Project # 15- 48800 -01 Project Name Replacement -Floor Sweeper 2012 thru 2016 Type Equipment Department Central Equipment Useful Life 15 Years Contact DPW / City Engineer Category Equipment Priority 3 -Low Description Replace Unit #324, a 1991 Floor Sweeper /Scrubber. With the addition of new buildings in the future, it will be more economical to purchase a new unit that is faster and more efficient. This machine is used to sweep up around the maintenance buildings and in the recycling center. Justification The floors are not cleaned as often as they should be because the current sweeper's washing and vacuum systems are worn out and parts are getting harder to find. The sweeper works well outside because we only use the broom portion of the machine. The present machine works well for the area that we now have but if we expand, we will need to be able to clean faster and more efficiently. Expenditures 2012 2013 2014 2015 2016 Total Equipment 35,000 35,000 Total 35,000 35,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Bond 35,000 35,000 Total 35,000 35,000 Budget Impact/Other � k new machine would have less maintenance issues even with using it more often. 41- Capital Flan City of Andover, MN Project # 13- 44300 -02 Project Name Replacement -lee Edger 2012 thru 2016 Type Equipment Department Community Center Useful Life 15 Years Contact Comm Ctr Manager Category Equipment Priority 1 - High Description k new battery powered ice edger would replace our present gas powered ice edger. Y tsy�� PI Justification With the new concerns and law regarding internal combustion engines running indoors, this would eliminate a lot of those concerns. It would also requires less costly monitoring equipment and reduce the amount of paper work that needs to be filed to the State of Minnesota. It is also safer for all of the people in the Community Center. Expenditures 2012 2013 2014 2015 2016 Total Equipment 8,000 8,000 Total 8,000 8,000 Funding Sources 2012 2013 2014 2015 2016 Total Comm Ctr Operations 8,000 8,000 Total 8,000 8,000 Budget Impact/Otheff Save time and money by cutting down on monitoring equipment and time filing the paper work. It is also safer for all people using the Communitv Center. The old machine could be used on the outside rinks or sold. 97 Capital Plan City of Andover, MN Project # 13- 41310 -01 Project Name Replacement -Voting Equipment Type Equipment Department Elections Useful Life 15 Years Contact City Clerk Category Equipment Priority 1 -High Description slew electronic voting equipment for 10 precincts. 2012 thru 2016 Ll_ Justification A Federal mandate to comply with HAVA - Help America Vote Act. The current equipment is non - compliant. Expenditures 2012 2013 2014 2015 2016 Total Equipment 110,000 110,000 Total 110,000 110,000 Funding Sources 2012 2013 2014 2015 2016 Total State Grant 110,000 110,000 Total 110,000 110,000 Budget Impact/Other Continued storage and maintenance of all the equipment. 98 Capital Flan City of Andover, MN Project # 12- 42200 -01 Project Name Replacement -Fire Chiefs Vehicle Type Equipment Useful Life 10 Years Category Equipment Department Fire Contact Fire Chief Priority 2 -Medium 2012 di u 2016 Description Zeplace Unit #4806, a 2002 Chevrolet Tahoe with 86,037 miles and is used by the Fire Chief Justification In order to keep the first line emergency responding vehicles in the proper operating conditions, it is important to replace equipment when needed. The current vehicle has worked very well and should be evaluated for repair history and maintenance costs as the replacement date gets closer. The annual mileage put on this vehicle is approximately 10,000. The vehicle is still in good shape and should be evaluated for replacement as scheduled. Expenditures 2012 2013 2014 2015 2016 Total Equipment 45,000 45,000 Total 45,000 45,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Bond 45,000 45,000 Total 45,000 45,000 Budget Impact/Other The Chief s vehicle is used by the Chief to respond to emergency incidents. The vehicle has to be in good shape and able to provide safe and protective transportation when responding to all types of incidents. The vehicle also carries all of the Chief s protective gear and equipment needed to help conduct fire investigations. The Chief regularly uses the vehicle to conduct interviews while on the scene with property owners and also uses the truck to provide a place for fire victims to sit out of the elements while they are waiting for relatives or the Red Cross to respond to the scene. 99 Capital Flan City of Andover, MN Project # 12- 42200 -02 Project Name Replacement -Rescue #11 Type Equipment Useful Life 15 Years Category Equipment Department Fire Contact Fire Chief Priority 2 -Medium 2012 thru 2016 Description Zeplace Unit #4899, a 1997 GMC truck with 19,355 miles. This truck is used as the primary response vehicle to all medical incidents for station 11. This truck responds to about 300 calls per year and is the busiest vehicle in use by the fire department other than the Chief s and Fire darshall's vehicles. Justification The current truck has very little maintenance issues as of 2011. Because this is the primary vehicle used to respond to medical calls for station #1 it is very important to keep this vehicle in top condition and always available to respond. The anticipated life span is 15 years and may be able to be extended if the maintenance costs stay in line. It would be a benefit to Station #1 if the new vehicle would be purchased with a four door cab rather than the current extended cab so that additional firefighters could respond to major medical incidents. Expenditures 2012 2013 2014 2015 2016 Total Equipment 55,000 55,000 Total 55,000 55,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Bond 55,000 55,000 Total 55,000 55,000 Budget Impact/Other If the replacement vehicle is a four door cab, station #1 firefighters could respond with only one vehicle to major incidents such as a heart attack, and would not have to take two vehicles to the scene in order to get the appropriate staffing there. The replacement vehicle will also respond to vehicle crash scenes with additional eauinment needed that could be stored on this truck. 100 Capital Flan City of Andover, MN Project # 12- 42200 -03 Project Name Replacement- Hydraulic Rescue Cutters Type Equipment Useful Life 10 Years Category Equipment Department Fire Contact Fire Chief Priority 1 - High 2012 di u 2016 Description The funds requested are for the purchase of two new hydraulic rescue cutters. The new cutters are designed to cut thru the latest and hardest of steel products used in the manufacturing of newer vehicles. The new cutters will be placed at station #2 and #3. The cutters are rated to be about four times stronger than the current cutters in use by the fire department for vehicle extrication. Justification The current cutters can not cut thru the new boron steel used as protection posts in most new vehicles. The fire department must be able to remove and cut thru the side posts when extricating a trapped victim from a vehicle that has crashed or been seriously damaged. Expenditures 2012 2013 2014 2015 2016 Total Equipment 13,000 13,000 Funding Sources Total 13,000 2012 2013 13,000 2014 2015 2016 Total Equipment Bond 13,000 13,000 Total 13,000 13,000 Budget Impact/Other IN Capital Flan City of Andover, MN Project # 12- 42200 -04 Project name New- Thermal Imaging Camera Type Equipment Useful Life 5 years Category Equipment Description Department Fire Contact Fire Chief Priority 1 - High 2012 di u 2016 ,r s The fire department uses the themal imaging camera(s) to help locate spots or areas of high or unusually high heat. The camera is a very valuable tool that helps firefighters locate hot spots behind walls or ceilings that can not be seen with your eyes or felt with your hands. The technology allows firefighters to locate humans, animals and other areas of high heat that otherwise can be missed because of the heavy smoke and fire conditions. Justification The camera will allow firefighters to locate hot spots that may have been missed thus creating a potential for a fire rekindling or reigniting after the fire department has left the scene. A thermal imaging camera is also used to locate a human being who may be trapped in a fire and because of heavy smoke conditions not seen by firefighters searching for victims. The camera does a great job helping to scan a room much faster while looking for heat sources including the human being or animal. Expenditures 2012 2013 2014 2015 2016 Total Equipment 20,000 20,000 Total 20,000 20,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Bond 20,000 20,000 Budget Impact/Other Total 20,000 20,000 I18Y' Capital Flan City of Andover, MN Project # 13- 42200 -01 Project Name Replacement -Ladder Truck #11 Type Equipment Useful Life 20 Years Category Equipment Description Department Fire Contact Fire Chief Priority 1 - High 2012 di u 2016 Replace Unit #4885, a 1991 Pierce 75' ladder truck with 19,930 miles. The new ladder truck would be a 100 foot aerial platform, which includes a bucket at the end of the ladder for firefighter safety. The 100 foot reach will allow for the fire department to perform rescue and suppression activities in buildings that we can not currently reach. Justification The City is required by the I.S.O. to have this type of vehicle available for use because of the building heights allowed in Andover. The new platform style truck versus the current straight ladder will be much safer for firefighter activities and fire suppression activities. The new vehicles have safety sensors and weight distribution gauges that will keep the operators from making mistakes while operating the truck that could be very costly or dangerous. The newer buildings in Andover are getting taller with more green space between the building and a hard surface making it much more difficult to reach some of them because of the height restrictions of the current ladder truck. Expenditures 2012 2013 2014 2015 2016 Total Equipment 600,000 600,000 1,200,000 Total 600,000 600,000 1,200,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Bond 600,000 600,000 1,200,000 Total 600,000 600,000 1,200,000 Budget Impact/Other The use of an aerial device can be very dangerous if not performed properly. A new platform truck will allow firefighters to perform the most dangerous of activities as required from time to time, and know that they have the right piece of equipment to do the job. The larger and taller buildings now being built in Andover will require this type of equipment. The current ladder truck has been fairly dependable with not many major repairs needed. The maintenance costs are going up for this vehicle and the trade in value may be going down as the truck gets older. The new bucket style of truck will also be much safer conditions for firefighters performing suppression activities. The new ladder truck can be equipped to have pre - plumbed breathing air in the bucket for extended use and also high intensity lighting mounted on the bucket will greatly increase site visibility. Firefighters will no longer have to carry heavy equipment up the ladder but rather can swing the bucket down to the ground to pick it up. The larger cab design will allow for transporting more firefighters and also can be used for rehabilitation of staff when needed. The bucket design will also allow for two master stream devices mounted near the top of the bucket to be used for extinguishment for very large types of fires. The over head visibility at the scene will also help the incident commander make vital decisions regarding the tactics an strategies to be used. 103 Capital Flan City of Andover, MN Project # 14- 42200 -01 Project Name Replacement- Grass #31 Type Equipment Useful Life 20 Years Category Equipment Department Fire Contact Fire Chief Priority 2 -Medium 2012 di u 2016 Description teplace Unit #4893, a 1991 Ford 4x4 grass vehicle with 22,301 miles. This also has been used as medical response truck for station #3. Now hat the fire department has a separate vehicle that will be used to respond to medical calls, the new grass trucks will be designed to function for me primary purpose and will allow for new wildfire technologies to be put on the truck. Justification The fire department has now purchased new vehicles for rescue calls only and this will allow for the new grass trucks to have an extended life expectancy. The current grass vehicles have worked very hard responding to both wildfire and medical types of calls during most of the life of the trucks. The grass trucks also have many engine hours on them due to idling conditions while at grass fires and medical calls. By using separate vehicles for each function both the grass fire vehicle and assigned medical vehicle will last for at least 15 years or more. This vehicle also pulls the trailer that holds the Polaris 6X6(G -32) Expenditures 2012 2013 2014 2015 2016 Total Equipment 45,000 45,000 Total 45,000 45,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Bond 45,000 45,000 Total 45,000 45,000 Budget Impact/Other The fire department will be looking to purchase a smaller and more maneuverable vehicle when it is time to replace the grass trucks. The current full size pick up trucks, while capable of handling larger tanks and more weight, can be difficult to use when the need to negotiate around obstacles during wildfires arises. The grass vehicles will be a four wheel drive type and should probably have winches mounted on the front of the vehicle. The smaller and more maneuverable vehicles should be less expensive but yet perform much better when using the off road functions and features. 104 Capital Flan City of Andover, MN Project # 14- 42200 -02 Project Name Replacement- Grass #21 Type Equipment Useful Life 20 Years Category Equipment Department Fire Contact Fire Chief Priority 2 -Medium 2012 di u 2016 a Description teplace Unit #4892, a 1991 Ford 4x4 grass vehicle with 21,315 miles This has also been used as a medical response unit for Station #2. Now hat the fire department has a separate vehicle that will be used to respond to medical calls, the new grass trucks will be designed to function for me primary purpose and will allow for new wildfire technologies to be put on the truck. Justification The fire department has now purchased new vehicles for rescue calls only and this will allow for the new grass trucks to have an extended life expectancy. The current grass vehicles have worked very hard responding to both wildfire and medical types of calls during most of the life of the trucks. The grass trucks also have many engine hours on them due to idling conditions while at grass fires and medical calls. By using separate vehicles for each function, both the grass fire vehicle and assigned medical vehicle will last for at least 15 years or more. Expenditures 2012 2013 2014 2015 2016 Total Vehicles 45,000 45,000 Total 45,000 45,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Bond 45,000 45,000 Total 45,000 45,000 Budget Impact/Other The fire department will be looking to purchase a smaller and more maneuverable vehicle when it is time to replace the grass trucks. The current full size pick up trucks, while capable of handling larger tanks and more weight, can be difficult to use when the need to negotiate around obstacles during wildfires arises. The grass vehicles will be a four wheel drive type and should probably have winches mounted on the front of the vehicle. The smaller and more maneuverable vehicles should be less expensive but yet perform much better when using the off road functions and features. 105 Capital Flan City of Andover, MN Project # 14- 42200 -03 Project Name Replacement- Tanker #11 Type Equipment Useful Life 20 Years Category Equipment Department Fire Contact Fire Chief Priority 2 -Medium 2012 di u 2016 Description teplace Unit #4889, a 1991 International tanker with 8,859 miles and about 900 engine hours. Justification This vehicle will be 23 years old in 2014. The all wheel drive vehicle has worked extremely well as a tanker that can be used at all types of fires including wildfires, where the off road capabilities have proven to be very valuable. There have been no significant problems with this vehicle and the replacement need has to be re- evaluated in 2014 but it is very important that we keep this vehicle current and up to date with the latest firefighting technologies. The current vehicle has a rear mounted pumping system that requires constant maintenance and usually more than one person to operate the truck and pump at a fire scenario. The proposed new tanker will have remote operational capabilities that will make operating the truck with only one person a reality. The current manually- operated pump has many drawbacks and limitations due to the need for more than one person to operate efficiently and safely. Expenditures 2012 2013 2014 2015 2016 Total Vehicles 340,000 340,000 Total Funding Sources 2012 340,000 2013 2014 2015 340,000 2016 Total Equipment Bond 340,000 340,000 Total 340,000 340,000 Budget Impact/Other The new vehicle will probably have a larger tank and also the capability for only one person to operate during a fire situation. The maintenance costs for a newer vehicle will also have a budget impact in that there should be much less maintenance costs for the first half of the lifespan of the vehicle. The newer vehicle will also be expected to last longer because of the updates in the manufacturing process. The newer styles and metal fabrication help to reduce rusting and deterioration of the vehicle. The new vehicle should be produced so that the driver can dump water from chutes installed on both sides and from the rear of the truck. Currently water can be discharged only from a large rear outlet or with the manual numb system installed at the back of the truck. 106 Capital Flan City of Andover, MN Project # 14- 42200 -04 Project Name Replacement -Fire Marshall Vehicle Type Equipment Useful Life 10 Years Category Equipment Department Fire Contact Fire Chief Priority 2 -Medium 2012 di u 2016 Description Zeplace Unit #4801, a 1997 S 10 Blazer with over 63,212 miles and used by the Fire Marshall. Justification The Fire Marshall's vehicle is anticipated to have approximately 75,000 miles on it by the year 2013, and the ability to respond to an emergency with a dependable vehicle needs to be considered. There have been more maintenance issues with this vehicle, and although most have been minor, the occurrences are increasing and the costs will also start to increase as the vehicle gets older. Expenditures 2012 2013 2014 2015 2016 Total Vehicles 40,000 40,000 Total 40,000 40,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Bond 40,000 40,000 Total 40,000 40,000 Budget Impact/Other The new vehicle will be used for day to day inspections and also emergency responses when the Fire Marshall is available to assist at the incident including medical calls. It is crucial that the Fire Marshall's vehicle be in good operating order to perform all of the functions needed. This vehicle is also used to help conduct all of the fire investigations and the appropriate equipment needs to be stored in the vehicle. The fire department needs to have a very dependable vehicle to Derform all of the functions listed. 107 Capital Flan City of Andover, MN Project # 15- 42200 -01 Project Name Replacement- Utility #4 Type Equipment Useful Life 15 Years Category Equipment Department Fire Contact Fire Chief Priority 2 -Medium 2012 di u 2016 Description Zeplace Unit #4804, a 2000 GMC Sonoma ext. cab 4x4 small utility pick up with 31,658 miles. This truck is used as a station response vehicle )y the Officers assigned to each station. The fire department has three of these vehicles and each are fully equipped to be first responder vehicles o all types of incidents that the fire department will respond to. Justification The utility vehicles are used by Fire Department Officers to respond directly to the scene of the incident so that they can evaluate for additional equipment needed and also render immediate first aid and care to those who need it. The first responding vehicles are usually on the scene within five to six minutes of the original page as compared to seven or eight minutes for a vehicle responding from the fire station. The time span is critical for all types of major events. Knowing as quickly as possible what the conditions and situations at the scene will make for a much safer response by other vehicles and helps all others prepare for the incident as the first fire officer has already informed incoming trucks what is going on. Expenditures 2012 2013 2014 2015 2016 Total Vehicles 32,000 32,000 Total Funding Sources 2012 32,000 2013 2014 2015 2016 32,000 Total Equipment Bond 32,000 32,000 Total 32,000 32,000 Budget Impact/Other With their vehicle responding directly to the scene, the fire officer can cancel others if they are not needed and/or slow them to routine so that the • esponse is safer for responders and others who are on the highway. Having a fire officer at an incident early is very beneficial for planning actics prior to all of the other fire vehicles getting there. All fire conditions can be evaluated and thought out by the fire officer so that they can )e better Drenared to oversee fire sunnression activities. 108 Capital Flan City of Andover, MN Project # 15- 42200 -02 Project Name Replacement- Utility #5 Type Equipment Useful Life 15 Years Category Equipment Department Fire Contact Fire Chief Priority 2 -Medium 2012 di u 2016 Description Zeplace Unit #4805, a 2000 GMC Sonoma ext. cab 4x4 small utility pick up with 32,133 miles. This truck is used as a station response vehicle )y the Officers assigned to each station. The fire department has three of these vehicles and each are fully equipped to be first responder vehicles o all types of incidents that the fire department will respond to. Justification The utility vehicles are used by Fire Department Officers to respond directly to the scene of the incident so that they can evaluate for additional equipment needed and also render immediate first aid and care to those who need it. The first responding vehicles are usually on the scene within five to six minutes of the original page as compared to seven or eight minutes for a vehicle responding from the fire station. The time span is critical for all types of major events. Knowing as quickly as possible what the conditions and situations at the scene will make for a much safer response by other vehicles and helps all others prepare for the incident as the first fire officer has already informed incoming trucks what is going on. Expenditures 2012 2013 2014 2015 2016 Total Vehicles 32,000 32,000 Total Funding Sources 2012 32,000 2013 2014 2015 2016 32,000 Total Equipment Bond 32,000 32,000 Total 32,000 32,000 Budget Impact/Other With their vehicle responding directly to the scene, the fire officer can cancel others if they are not needed and/or slow them to routine so that the • esponse is safer for responders and others who are on the highway. Having a fire officer at an incident early is very beneficial for planning actics prior to all of the other fire vehicles getting there. All fire conditions can be evaluated and thought out by the fire officer so that they can )e better Drenared to oversee fire sunnression activities. 109 Capital Flan City of Andover, MN Project # 15- 42200 -03 Projectname New - Water/Ice rescue boat Type Equipment Useful Life 15 Years Category Equipment Department Fire Contact Fire Chief Priority 1 - High Description k small boat designed and built to perform water and ice rescues. 2012 di u 2016 Justification kndover does not currently have a rescue boat. The boat would be used to perform ice and water rescues. The boat will make these specific ypes of rescues safer for all responders. The boat will allow firefighters to perform rescue work rather than waiting for a boat to arrive and )erform recovery work. A inflatable boat is a possible idea Expenditures 2012 2013 2014 2015 2016 Total Equipment 20,000 20,000 Total 20,000 20,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Bond 20,000 20,000 Total 20,000 20,000 Budget Impact/Other Boat will make an easier and safer rescue for all responders and parties being rescued. The boat will save lives and make it safer for firefighters who have to enter the water or crawl on the ice. The current method of having firefighters wear wet suits and try to swim or crawl on the ice to the victim is not very safe or recommended if we can avoid it. The boat will bell) act the rescuer and victim out of the situation faster and safer. 110 Capital Flan City of Andover, MN Project # 12- 45000 -03 Project Name New - Cab and Snow Blower Attachment 2012 thru 2016 Type Equipment Department Park & Rec - Operations Useful Life 10 Years Contact DPW / City Engineer Category Equipment Priority 1 - High Description k new 3 - point rear mounted snow blower and cab for one of the Parks tractors. The cost would be split between Parks and Utilities Department. Justification We have been renting a less efficient piece of equipment when we could buy an attachment for a tractor that we already own. By owning it, we can use it when we need to rather than when it is available. It would be used for clearing around ice rinks, parking lots and fire hydrants. Expenditures Equipment 2012 2013 2014 9,000 Total 9,000 2015 2016 Total 9,000 9,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Bond 4,500 4,500 Sanitary Sewer Fund 4,500 4,500 Total 9,000 9,000 Budget Impact/Other The the 3 - point snow blower and cab can be mounted on the John Deere tractor so it can be used at a moments notice. No time is spent going to and picking up a rented piece of equipent. By blowing the snow it can be placed more efficiently than by hauling and moving snow around with a bucket. 111 Capital Flan City of Andover, MN Project # 12- 45000 -04 Project Name New -Trail Plow Attachment 2012 thru 2016 Type Equipment Department Park & Rec - Operations Useful Life 10 Years Contact DPW / City Engineer Category Equipment Priority 1 - High Description ?arks department is looking to purchase a new hinge snow plow for use on the trail system. Presently they have a choice between a one way )low or a "V" plow. The hinge plow can be used as a straight plow, v plow or as inverted v plow for scooping snow. Justification The trail system as located all over the city and by roads of all different sizes. Many times when the machine is out plowing, the snow depth and consistancy of compaction is depended on the wind, trees and by the roads that it is near. Some of trails might have a minimal amount of snow so that the one way plow will work just fine. Other trails near county roads can have multiple lanes of snow plowed up and on to it making it impossible to get through. At which point they have to come back to public works and change plows. The straight plow and V plow are also of different widths. Expenditures 2012 2013 2014 2015 2016 Total Equipment 5,600 5,600 Total 5,600 5,600 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Bond 5,600 5,600 Total 5,600 5,600 Budget Impact/Otheff The hinge plow will eliminate the need for coming back to switching snow plows making the job of clearing the trail system much more efficient. 112 Capital Flan City of Andover, MN Project # 12- 45000 -05 Project Name Replacement - 10 Ft Wide Trail Mower #583 2012 thru 2016 Type Equipment Department Park & Rec - Operations Useful Life 10 Years Contact DPW / City Engineer Category Equipment Priority 1 - High Description Replace Unit #583, a 2001 Toro 4000 with 1,678 hours and is putting on about 175 hours a year. It mows in the city parks and along the trail system. In the future, it will be mowing the walking paths in the new open spaces. Justification Units cost have been going up steadily for the last few years. It gets used more every year with the addition of new trails. A lot of the trails that it is mowing are not ball field smooth which put more were and tear on the machine. Expenditures Equipment 2012 2013 2014 65,000 Total 65,000 2015 2016 Total 65,000 65,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Bond 65,000 65,000 Total 65,000 65,000 Budget Impact/Other � Less maintenace cost, less equipment down time. INK? Capital Flan City of Andover, MN Project # 13- 45000 -01 Project Name Replacement -One Ton Truck w/ Plow #599 2012 thru 2016 — 91 Type Equipment Department Park & Rec - Operations *ban � Useful Life 10 Years Contact DPW / City Engineer Category Equipment Priority 2 -Medium ° Description Replace Unit # 599, a 2000 F450 1 -ton with 55,819 miles. These trucks are on the move all year and average about 5,000 miles per year. They are used for hauling material and equipment and plowing cul -de -sacs. Justification This truck is used everyday; hauling material, equipment, people and also plowing snow in the winter. The snow plowing puts a lot of wear and tear on the engine, transmission and other drive line components. Expenditures 2012 2013 2014 2015 2016 Total Vehicles 65,000 65,000 Total 65,000 65,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Bond 65,000 65,000 Total 65,000 65,000 Budget Impact/Other 3eing that this is a front line unit, we need to know that we can count on it everyday. Cost to operate it have only gone up $.05 per mile last year )ut those costs will continue to rise in the coming years. With preventative maintenance, we might be able to extend its useful life. 114 Capital Flan City of Andover, MN Project # 13- 45000 -02 Project Name Replacement - Trailer #T -554 2012 thru 2016 Type Equipment Department Park & Rec - Operations Useful Life 10 Years Contact DPW / City Engineer Category Equipment Priority 2 -Medium Description Replace Unit #T-554, a tandem axle trailer with GVW rating of 10,000 - 12,000 lbs. It was recently sand blasted and repainted top to bottom extending its useful life a few more years. Justification This is the main trailer for the Parks Department. It was the first and only trailer that was designed for hauling mowers and it has worked out great. Expenditures 2012 2013 2014 2015 2016 Total Equipment 10,000 10,000 Total 10,000 10,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Bond 10,000 10,000 Total 1 0,000 1 0,000 Budget Impact/Other � More parks can only mean moving more equipment to them. INU Capital Plan City of Andover, MN Project # 14- 45000 -01 Project Name Replacement -One Ton Truck w/ Plow #503 2012 thru 2016 Type Equipment Department Park & Rec - Operations Useful Life 10 Years Contact DPW / City Engineer Category Equipment Priority 2 - Medium Description Replace Unit #503, a 2001 Ford F -450 dump truck with a 9' Fisher snow plow with 75,633 miles on it. Justification This unit will be 13 years old and will have approximately 85,000 miles on it. The maintenance costs have risen to $.46 a mile and will be monitored to determine when this vehicle should be replaced. Expenditures 2012 2013 Equipment Total 2014 2015 2016 Total 65,000 65,000 65,000 65,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Bond 65,000 65,000 Total 65,000 65,000 Budget Impact/Other Less cost per mile to operate and less break downs. ffb: Capital Flan City of Andover, MN Project # 14- 45000 -02 Project Name Replacement -Bobcat #610 2012 thru 2016 Type Equipment Department Park & Rec - Operations Useful Life 10 Years Contact DPW / City Engineer Category Equipment Priority 2 -Medium Description Zeplace unit #610, a 2007 T -190 Bobcat with 800 hours. This is a tracked skid steer which is more suited for working on the sand. Justification This unit is primary used in the Andover Parks Department to put in and take out play ground equipment. It is also used by other departments for loading trucks, stump grinding, building new hockey rinks, site preparations and moving material around at public works. It puts on over 300 hours a year. Expenditures 2012 2013 Equipment Total 2014 2015 2016 Total 36,000 36,000 36,000 36,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Bond 36,000 36,000 Total 36,000 36,000 Budget Impact/Other This unit is 3 years old and was on an annual trade -in program through Bobcat but that program is no longer available . The machine is running well but at around 1,200 hours the track system starts needing repairs. These repair costs can run from $4,000 to $6,000. Currently, the machine is worth about $21,000 on a trade -in, a new machine would cost about $36,000. 117 Capital Plan City of Andover, MN Project # 15- 45000 -01 Project Name Replacement- Toro Groundsmaster #559 2012 thru 2016 Type Equipment Department Park & Rec - Operations Useful Life 10 Years Contact DPW / City Engineer Category Equipment Priority 1 -High Description Replace Unit #559, a 1999 Toro Groundsmaster 328 with 1,972 hours. Justification This unit is run all year and maintenance costs are starting to accumulate. Expenditures 2012 2013 2014 2015 2016 Total Equipment 23,000 23,000 Total 23,000 23,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Bond 23,000 23,000 Tom 23,000 23,000 Budget Impact/Other Higher maintenance cost, possibly more break downs and lower trade -in value. IMN Capital Flan City of Andover, MN Project # 16- 45000 -01 Project Name Replacement - One Ton Crew Cab Pickup #502 2012 thru 2016 Type Equipment Department Park & Rec - Operations Useful Life 10 Years Contact DPW / City Engineer Category Equipment Priority 1 - High Description Zeplace Unit #502, a 2002 F350 crew cab pickup with 58,408 miles on it. Justification This truck is used for pulling a large trailer around the city with mowing equipment in the spring, summer and fall along with the summer part - time help. In the winter months, it is pulling equipment that is used to clear the ice skating rinks. A crew cab that can transport a mowing crew and all their equipment is an ideal situation. Expenditures 2012 2013 2014 2015 2016 Total Equipment 50,000 50,000 Total 50,000 50,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Bond 50,000 50,000 Total 50,000 50,000 Budget Impact/Other .ess cost per mile to operate and fewer break downs. The cost to operate this vehicle has increased $.43 per mile. We will continue to monitor 119 Capital Flan City of Andover, MN Project # 12- 48200 -02 Project Name Radio System Upgrade 2012 thr u 2016 Type Equipment Department Sanitary Sewer Useful Life 10 Years Contact DPW / City Engineer Category Improvements Priority 1 - High Description A new radio communication system is needed to come into compliance with the new FCC regulations starting on January 1, 2013. The FCC Narrowbanding Notice states all radio systems using VHF and UHF channels between 150 and 512 MHz must migrate to 12.5 KHz or lower to 6.25 KHz. Justification All sanitary sewer lift stations are using radios at the 25MHz bandwidth and must be in compliance with the new Narrowbanding regulation by January 1, 2013. There are currently 9 lift stations on the sanitary sewer system. Expenditures Equipment 2012 2013 2014 21,400 Total 21,400 2015 2016 Total 21,400 21,400 Funding Sources 2012 2013 2014 2015 2016 Total Sanitary Sewer Fund 21,400 21,400 Budget Impact/Other Total 21,400 21,400 IM81 Capital Flan City of Andover, MN Project # 13- 48200 -01 Project Name Replacement - 3/4 Ton Truck w/ Plow #90 2012 thru 2016 Type Equipment Department Sanitary Sewer Useful Life 10 Years Contact DPW / City Engineer Category Equipment Priority 1 - High Description Zeplace Unit #90, a 1997 Dodge W25O with snow removal equipment and 89,538 miles. Justification This truck will be monitored over the next couple of years to determine the appropriate time for replacement but at this time cost are holding steady. It will be replaced with a one ton truck and modern snow removal equipment to make snow removal faster and more efficient. Expenditures 2012 2013 2014 2015 2016 Total Equipment 65,000 65,000 Total 65,000 65,000 Funding Sources 2012 2013 2014 2015 2016 Total Sanitary Sewer Fund 65,000 65,000 Total 65,000 65,000 Budget Impact/Otheff The new truck will have decreased maintenance issues and the modern snow equipment will make snow removal faster and more efficient. 121 Capital Flan City of Andover, MN Project # 13- 48200 -02 Project Name Replacement -One Ton Truck w/ Plow #94 2012 thru 2016 Type Equipment Department Sanitary Sewer Useful Life 15 Years Contact DPW / City Engineer Category Utilities Priority 2 -Medium Description Zeplace unit #94, a 1998 one -ton truck w /plow with 89,147 miles on it. Justification Vehicle operational costs have been increasing and the truck is now 12 years old. The plow has multiple holes in it and all of the pivoting points are in need of replacement. The shift linkage has also gotten very sloppy with all of the forward and reverse shifting done during the snow plow seasons. These repairs are just a few that we are going to need to address in the near future. Expenditures 2012 2013 2014 2015 2016 Total Equipment 65,000 65,000 Total 65,000 65,000 Funding Sources 2012 2013 2014 2015 2016 Total Sanitary Sewer Fund 32,500 32,500 Storm Sewer Fund 32,500 32,500 Tom 65,000 65,000 Budget Impact/Other A more reliable truck would cost less to operate and maintain. The total cost of this vehicle will be split between Sanitary Sewer and Storm Sewer. 122 Capital Flan City of Andover, MN Project # 14- 48200 -02 Project Name Replacement - JetNac Truck #99 2012 thru 2016 Type Equipment Department Sanitary Sewer Useful Life 15 -20 Years Contact DPW / City Engineer Category Equipment Priority 1 - High Description Zeplace Unit #99, a 1999 Vactor jet /vac truck with 18,733 miles. The new vehicle will be able to carry up to 2000 gallons and 600 feet of jetting Justification Approximately 13 miles or 15% of the sanitary sewer system is trunk mains with diameters of 12" - 36 ". These trunk mains are flowing near capacity in some areas at the present time. By removing the sedimentation in these pipes, the flow line will drop giving more room for additional flows. In turn, this could put a hold on the addition of the designated lift station to by pass certain areas for a year or more. This type of unit can also clean flared end sections in back yards and sedimentation ponds within a reasonable distance. This would allow some areas to be cleaned without having to enter properties. At the present time, most of the department's efforts are geared towards the storm sewer system because of the many failures and neglect that has taken place in the past. There are thirty six square miles of storm sewer systems and ninety miles of sanitary systems. The storm sewers are maintained from the spring of the year and ending in the fall. The sanitary system is then maintained during the winter months when conditions are less than favorable. Expenditures 2012 2013 2014 2015 2016 Total Equipment 357,000 357,000 Total 357,000 357,000 Funding Sources 2012 2013 2014 2015 2016 Total Sanitary Sewer Fund 178,500 178,500 Sewer Trunk Fund 178,500 178,500 Total 357,000 357,000 Budget Impact/Otheff This truck will help save time with cleaning of the system. It will also allow the system to be cleaned under heavy flows which cannot be done with the machine currently being used. This type of VAC truck will allow the operators to clean more of the system without having to stop because the truck cannot handle the flows. It would save time by not having to plug mains and risk backups into basements because of some 123 Capital Plan City of Andover, MN Project # 14- 48300 -01 Project Name Replacement- Elgin Street Sweeper #169 2012 thru 2016 Type Equipment Department Storm Sewer Useful Life 10 Years Contact DPW / City Engineer Category Equipment Priority 1 -High Description Replace Unit #169, a 2000 Elgin sweeper with approximately 3,861 hours. Justification The maintenance cost of this machine has risen $6,000 in the last two years. Maintenance costs continue to rise and it will need to be monitored as to the timing of replacement. Expenditures 2012 2013 2014 2015 2016 Total Vehicles 150,000 150,000 Total 150,000 150,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Bond 150,000 150,000 Tom 150,000 150,000 Budget Impact/Other We will need to monitor the costs closely over the next few years and make a decision at that time. This machine only runs about a month and a half a year. 124 Capital Flan City of Andover, MN Project # 12- 43100 -08 Project Name New - Front -End Loader Type Equipment Useful Life 15 -20 Years Category Streets /Highways 2012 thru 2016 Department Streets /Highways Contact DPW / City Engineer Priority 1 - High Description Vew front -end loader to assist with moving snow, loading trucks and landscape projects. Justification The need for a second loader has come with keeping a lot of the projects in -house rather than having them outsourced. We have been borrowing front -end loaders from our surrounding cities for weeks at a time for the past few years. Expenditures 2012 2013 2014 2015 2016 Total Equipment 140,000 140,000 Total 140,000 140,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Bond 140,000 140,000 Total Budget Impact/Otheff 140,000 140,000 Vlore efficient use of time, equipment and personnel. No longer borrowing at the convenience of other cities and having to deal with the weather zncertainties and length of time to use. Budget Items 2012 2013 2014 2015 2016 Total Maintenance 140,000 140,000 Total 140,000 140,000 125 Capital Flan City of Andover, MN Project # 13- 43100 -01 Project Name Replacement - Ditch mowing tractor and mowers 2012 thru 2016 Type Equipment Department Streets /Highways Useful Life 15 -20 Years Contact DPW / City Engineer Category Streets /Highways Priority 1 - High Description Replace Unit #115, a 1993 John Deere model #6400 tractor with side and rear flail mowers. The tractor has 3,397 hours on it and puts about 175 hours a year mowing ditches. Justification I The tractor will be 19 years old in 2013 and maintenance costs have been steadily going up. The maintenance cost per hour is now $24.71. The metal on the mowers is getting thinnner and we have had to patch holes in 2009 and 2010. Expenditures 2012 2013 2014 2015 2016 Total Equipment 90,000 90,000 Total 90,000 90,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Bond 90,000 90,000 Tom 90,000 90,000 Budget Impact/Other � Lower maintenance cost and a more productive machine. IV4 Capital Flan City of Andover, MN Project # 13- 43100 -02 Project Name Replacement -One Ton Truck w/ Plow #132 2012 thru 2016 Type Equipment Department Streets /Highways Useful Life 10 Years Contact DPW / City Engineer Category Equipment Priority 1 - High Description v _ 1' y Replace Unit #132, a 2001 Ford F -450 dump truck with a 9 foot Fisher snow plow with 85,735 miles on it. This unit plows cul -de -sacs and hauls equipment and materials through out the year. Justification By 2013, this truck will be 12 years old and have approximately 95,000 miles on it. It will be re- evaluated each year to determine when to replace it. Cost to operate this unit are holding steady at $.46 per mile. Expenditures 2012 2013 2014 2015 2016 Total Equipment 65,000 65,000 Total 65,000 65,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Bond 65,000 65,000 Budget Impact/Other Less cost per mile to operate. Total 65,000 65,000 127 Capital Plan City of Andover, MN 2012 thru 2016 Project # 14- 43100 -01 Project Name Replacement -Dump Truck w/ Snow Removal #198 Type Equipment Department Streets/ Highways Useful Life 10 Years Contact DPW / City Engineer Category Equipment Priority 1 -High Description Replace unit #198, a 2000 dump truck with front mounted snow removal equipment with 33,534 miles on it. Justification This truck will be 14 years old and is getting close to the end of its life cycle. It will be re- evaluated each year to determine when to replace it. Expenditures 2012 2013 2014 2015 2016 Total Equipment 150,000 150,000 Total 150,000 150,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Bond 150,000 150,000 Tom 150,000 150,000 Budget Impact/Other Less cost per mile to operate and better use of snow plow equipment. Cost to operate this unit increased $.05 per mile. It is now costing $1.95 per mile to operate. 128 Capital Flan City of Andover, MN Project # 14- 43100 -02 Project Name Replacement -Water Tanker #163 2012 di u 2016 -s Type Equipment Department Streets /Highways Useful Life 15 Years Contact DPW / City Engineer Category Equipment Priority 2 -Medium Description Zeplace Unit #163, a 1986 water tanker with 66,985 miles. Justification The old tanker was partially refurbished a few years ago because the floor and tank had rusted out. A new water truck would handle the job tasks better and more efficiently. A recently purchased water tanker with its cab over design and short turning radius has been a great asset to the public works staff. Expenditures 2012 2013 2014 2015 2016 Total Vehicles 100,000 100,000 Total 100,000 100,000 Funding Sources 2012 2013 2014 2015 2016 Total Equipment Bond 100,000 100,000 Total 100,000 100,000 Budget Impact/Other The design of the new water tanker make it very efficient to operate and pleasure to use. The front adjustable nozzle is particularly liked by the public works staff. One that is mounted to a "hook style " frame might be a way of cutting cost and increasing use of one of our dump trucks durine the summer months. 129 Capital Flan City of Andover, MN Project # 12- 48100 -03 Project Name Radio System Upgrade 2012 thr u 2016 Type Equipment Department Water Useful Life 10 Years Contact DPW / City Engineer Category Improvements Priority 1 - High Description k new radio communication system is needed to come into compliance with the new FCC regulation starting on January 1, 2013. The FCC Jarrowbanding Notice states that all radio systems using VHF and UHF channels between 150 and 512 MIIz must migrate to 12.5 KHz or lower o 6.25 KHz. Justification k11 water system radios are at the 25 MIIz bandwidth and must be in compliance with the new Narrowbanding regulation by January 1, 2013 the water system is made up of 13 different sites. Expenditures Equipment 2012 2013 2014 28,600 Total 28,600 2015 2016 Total 28,600 28,600 Funding Sources 2012 2013 2014 2015 2016 Total Water Fund 28,600 28,600 Budget Impact/Other Total 28,600 28,600 19101 Capital Plan City of Andover, MN Project # 13- 48100 -01 Project Name WTP Generator Upgrade 2012 thru 2016 Type Equipment Department Water Useful Life 10 Years Contact DPW / City Engineer Category Improvements Priority 1 -High Description EPA has set new regulations for limiting hazardous air pollutants for existing stationary diesel generators. This regulation requires that some existing stationary generators be retrofitted with emissions controls equipment. The equipment needed for this is to be in place before May 3, 2013 so the project may need to start in 2012. Justification The stationary diesel generator in the water treatment plant meets the criteria for this retrofitt Expenditures 2012 2013 2014 2015 2016 Total Improvement 50,000 50,000 Total 50,000 50,000 Funding Sources 2012 2013 2014 2015 2016 Total Water Fund 50,000 50,000 Total Budget Impact/Other 50,000 50,000 Budget Items 2012 2013 2014 2015 2016 Total Supplies /Materials 50,000 50,000 Total 50,000 50,000 W11 Capital Flan City of Andover, MN Project # 15- 48100 -01 Project Name Water Meter Reading System AMI /AMR 2012 thru 2016 Type Equipment Department Water Useful Life 20 Years Contact DPW / City Engineer Category Improvements Priority 2 -Medium Description A meter reading system that will read all water meters by either a Fixed Base Reading System or a Drive By Radio Read System. The Fixed Bas( System is a system that is stationary with the means of reading all water meters from one or multiple points throughout the system. The Drive By System is a system where an employee drives through the water service area and gathers all the meter readings by way of a vehicle mounted computer and receiver. Justification It will allow the water utility to read meters with more efficiency and to provide customer's with more reliable readings. It will also increase revenues because the non reading or zero usage meters will be found earlier and repaired. With the present system, the utility waits for a minimum of a quarter before some meters are found to be faulty. There have been cases where a meter has been out of commision for two years before it was discovered to be non - functioning. Staff will have the ability to respond to customer concerns immediately and with documentation of customer usage. Expenditures 2012 2013 2014 2015 2016 Total Improvement 900,000 900,000 Total 900,000 900,000 Funding Sources 2012 2013 2014 2015 2016 Total Water Fund 900,000 900,000 Total 900,000 900,000 Budget Impact/Other The initial costs will be substantial but revenues will increase with the systems accuracy. Billing could be done for all customers on a monthly IBy, CITY OF ANDOVER Road & Bridge Funds - Rollup Projected Fund Balance Ending Fund Balance $ 4,227,648 $ 2,507,896 $ 1,749,401 $ 2,124,056 $ 2,687,849 $ 3,282,675 *Assuming collected in same year 133 2011 2012 2013 2014 2015 2016 TOTALS Projected Sources of Revenue Est. Annual MSA Construction Allocation $ 819,175 $ 1,014,024 $ 1,014,024 $ 1,014,024 $ 1,014,024 $ 1,014,024 $ 5,889,295 State Aid Street Bonds - Principal (220,000) (230,000) (230,000) (60,000) - - (740,000) Available MSA Construction for Other Commitments 599,175 784,024 784,024 954,024 1,014,024 1,014,024 5,149,295 Est. Annual Maintenance Allocation 369,119 348,110 348,110 348,110 348,110 348,110 2,109,669 State Aid Street Bonds - Interest (21,009) (16,115) (10,765) (5,625) - - (53,514) General Fund Commitment (196,274) (202,162) (208,227) (214,474) (220,908) (227,535) (1,269,581) Available MSA Maintenance for Other Commitments 151,836 129,833 129,118 128,011 127,202 120,575 786,575 Total MSA Available for other Commitments 751,011 913,857 913,142 1,082,035 1,141,226 1,134,599 751,011 Federal / State Funds - 220,000 - - - - 220,000 Assessments* 271,000 408,000 240,000 201,000 214,000 215,000 1,549,000 Tax Levy 1,119,885 1,079,391 1,084,363 1,109,620 1,135,567 1,162,227 6,691,053 Total Revenues Available 2,141,896 2,621,248 2,237,505 2,392,655 2,490,793 2,511,826 9,211,064 Projected Commitments MSA - New & Reconstruct Routes 376,000 2,477,000 1,626,000 433,000 - - 4,912,000 MSA- Intersection Upgrades 130,000 525,000 - 65,000 - - 720,000 MSA - Transfer to Debt Service - - - - - - - R & B - Pavement Markings 23,000 25,000 26,000 27,000 29,000 31,000 161,000 R & B - Curb Replacement 41,000 42,000 43,000 44,000 45,000 46,000 261,000 R & B - New & Reconstruct Routes - - - - - - - R & B - Bridge Scour Repairs 45,000 - - - - - 45,000 R & B- Seal Coating 391,000 351,000 442,000 387,000 755,000 720,000 3,046,000 R & B- Crack Sealing - 110,000 103,000 190,000 166,000 202,000 771,000 R & B- Overlays 708,000 753,000 700,000 804,000 856,000 850,000 4,671,000 Pedestrian Trail Maintenance 55,000 58,000 56,000 68,000 76,000 68,000 381,000 Total Commitments 1,769,000 4,341,000 2,996,000 2,018,000 1,927,000 1,917,000 14,968,000 Revenues Over (Under) Expenditures 372,896 (1,719,752) (758,495) 374,655 563,793 594,826 Fund Balance as of December 31, 2010 3,854,752 Fund Balance Brought Forward 4,227,648 2,507,896 1,749,401 2,124,056 2,687,849 Ending Fund Balance $ 4,227,648 $ 2,507,896 $ 1,749,401 $ 2,124,056 $ 2,687,849 $ 3,282,675 *Assuming collected in same year 133 Projected Sources of Revenue Park Dedication Fee $2,935 per unit platted units Park Dedication Fee - Residential Park Dedication Fee - Commercial Donation / Contribution Capital Projects Levy - Park Improvements Total Revenues Available Projected Commitments Hawkridge Park - Phase I Sophies Park Prairie Knoll Park - Northern Natural Gas Hidden Creek North Park - Tower Rental Skate Board Park Hawkridge Park - Phase 11 Sunshine Park - West Parking Lot Hickory Meadows Irrigation Project - Small Park Redesign /Major Irrigation Project Annual Miscellaneous Projects Total Commitments Revenues Over (Under) Expenditures Fund Balance as of December 31, 2010 Fund Balance Brought Forward Ending Fund Balance ** CITY OF ANDOVER Park Improvement Fund Projected Fund Balance 2011 2012 2013 2014 2015 2016 TOTALS 51,706 51,706 61,500 61,500 61,500 61,500 61,500 61,500 369,000 113,206 61,500 61,500 61,500 61,500 61,500 420,706 5,794 5,794 8,797 8,797 1,963 1,963 2,350 2,350 58,000 58,000 24,000 24,000 35,000 35,000 25,000 25,000 5,000 5,000 200,000 200,000 15,000 15,000 15,000 15,000 15,000 15,000 90,000 115,904 80,000 15,000 15,000 215,000 15,000 455,904 (2,698) (18,500) 46,500 46,500 (153,500) 46,500 141,502 138,805 120,305 166,805 213,305 59,805 $ 138,805 $ 120,305 $ 166,805 $ 213,305 $ 59,805 $ 106,305 * *Target - $50,000 to create a contingency for any project overages. 134 CITY OF ANDOVER Trail Fund Projected Fund Balance 2011 2012 2013 Projected Sources of Revenue Trail Fee $688 per unit platted units - - - Trail Fee $ - $ - $ - Total Revenues Available Projected Commitments Bunker Lake Blvd Trail 2014 2015 2016 TOTALS Total Commitments Revenues Over (Under) Expenditures - - - - - - Fund Balance as of December 31, 2010 71,547 Fund Balance Brought Forward 71,547 71,547 71,547 71,547 71,547 Ending Fund Balance" $ 71,547 $ 71,547 $ 71,547 $ 71,547 $ 71,547 $ 71,547 "Target - 10% of current years commitments to create a contingency for any project overages. "" It is anticipated that all projects will not be fully expended by the end of the year, and future projects will be contingent on additional revenues. `KR Year Inflation Factor Ave. Use (gal per user per qtr) Acres Added New Connections New Customers Residential Accounts CommerciaMnstitational Accts Total Accounts Rates Base Rate Use Rate Connection Charge Area Charge Base Rate Use Rate Connection Charge Area Charge Enterprise Fund - Water Operations Cash flows from operating activities: Receipts from customers and users Payment to suppliers Payment to employees Net from operating activities Cash flows from noncapital financing activities: Transfers in Transfers out Net from noncapital financing activities Cash flows from capital and related financing activities: Acquisition of capital assets Receipt of bonds Payment on debt Proceeds from the sale of capital assets Net from capital and related financing activities Cash flows from investing activities: Investment income Net increase in cash and cash equivalents Cash and cash equivalents - January 1 Cash and cash equivalents - December 31 CITY OF ANDOVER 6,041 2,133,977 $ 2,183,977 $ 2,280,331 $ 2,370244 $ Water System Financial Projections 2,560,692 139 142 (732,455) (766,598) Actual Estimate (813,284) (837,682) Forecast 6,112 6,183 2009 2010 2011 2012 2013 2014 2015 2016 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0°0 40,642 40,175 40,250 40,250 40,250 40,250 40,250 40.250 5 5 5 5 5 5 10 10 10 10 10 10 35 35 35 35 35 35 5,973 6,041 2,133,977 $ 2,183,977 $ 2,280,331 $ 2,370244 $ 2,463,652 $ 2,560,692 139 142 (732,455) (766,598) (789,596) (813,284) (837,682) (862,813) 6,112 6,183 6,200 6,235 6,270 6,305 6,340 6,375 1.13% 1.16% 995,650 1,003,533 1,064,474 1,117,911 1,173,749 1,232,091 $ 10.78 $ 11.32 $ 11.89 $ 11.89 $ 12.19 $ 12.49 $ 12.80 $ 13.12 $ 1.65 $ 1.77 $ 1.89 $ 1.89 $ 1.96 $ 2.02 $ 2.10 $ 2.17 $ 3,406 $ 3,678 $ 3,972 $ 3,972 $ 4,131 $ 4,296 $ 4,468 $ 4,647 $ 3,120 $ 3,370 $ 3,640 $ 3,640 $ 3,786 $ 3,937 $ 4,095 $ 4,258 5.0% 5.0% 5.0% 0.0% 2.5% 2.5% 2.5% 2.5% 7.1% 7.3% 6.8% 0.0% 3.5% 3.5% 3.5% 3.5% 8.0% 8.0% 8.0% 0.0% 4.0% 4.0% 4.0% 4.0% 8.0% 8.0% 8.0% 0.0% 4.0% 4.0% 4.0% 4.0% Actual Estimate Forecast 2009 2010 2011 2012 2013 2014 2015 2016 $ 2,193,431 $ 2,033,996 $ 2,133,977 $ 2,183,977 $ 2,280,331 $ 2,370244 $ 2,463,652 $ 2,560,692 (365,707) (1,016,170) (732,455) (766,598) (789,596) (813,284) (837,682) (862,813) (395,430) (406,910) (405,872) (413,846) (426,261) (439,049) (452221) (465,787) 1,432,294 610,916 995,650 1,003,533 1,064,474 1,117,911 1,173,749 1,232,091 995,664 (541,595) (43,490) (6,709,358) (10,450) 84,704 (766,919) 254,883 165,643 89,191 - 7,134 - - - - (150,250) (150,250) (150,250) (150,250) (154,758) (159,400) (164,182) (169,108) 15,393 (61,059) (150,250) (143,116) (154,758) (159,400) (164,182) (169,108) (776,911) (258,971) (55,000) (109,100) (115,000) (70,000) (970,000) - 1,025,000 - - - - - - - (1,025,157) (1,113,025) (1,115,036) (7,600,675) (830,166) (828,806) (831,486) (833,101) (777,068) (1,371,996) (1,170,036) (7,709,775) (945,166) (898,806) (1,801,486) (833,101) 325,045 280,544 281,146 140,000 25,000 25,000 25,000 25,000 995,664 (541,595) (43,490) (6,709,358) (10,450) 84,704 (766,919) 254,883 7,852,854 8,848,518 8,306,923 8,263,433 1,554,075 1,543,625 1,628,329 861,409 $ 8,848,518 $ 8,306,923 $ 8,263,433 $ 1,554,075 $ 1,543,625 $ 1,628,329 $ 861,409 $ 1,116,292 1191111 CITY OF ANDOVER Water System Financial Projections 137 Actual Estimate Forecast Capital Projects Fund - Water Trunk 2009 2010 2011 2012 2013 2014 2015 2016 Revenues Connection Charges $ 18,033 $ 40,766 $ 24,190 $ 39,720 $ 41,309 $ 42,961 $ 44,680 $ 46.467 Area Charges - - - 18,200 18,928 19,685 20,473 21.291 Interest 63,106 50,892 40,000 50,000 50,000 50,000 50,000 50.000 Special Assessment 39,164 80,726 61,680 50,000 80,000 80,000 80,000 100,000 Replacement Reserve - - - - - - - - Other - 246,714 - - - - - - XferIn - 242,000 - - - - - - Total 120,303 661,098 125,870 157,920 190,237 192,646 195,152 217,758 Expenses Debt Service - - - - - - - Capital Outlay 234,909 267,934 500,000 1,044,000 88,000 25,000 740,000 40,000 Xfer Out 165,643 89,191 - 7,134 - - - - Total 400,552 357,125 500,000 1,051,134 88,000 25,000 740,000 40,000 Net Increase (Decrease) in Fund Balance (280249) 303,973 (374,130) (893,214) 102,237 167,646 (544,848) 177,758 Fund Balance - January 1 2,953,849 2,673,600 2,977,573 2,603,443 1,710,229 1,812,466 1,980,112 1,435,264 Fund Balance - December 31 $ 2,673,600 $ 2,977,573 $ 2,603,443 $ 1,710229 $ 1,812,466 $ 1,980,112 $ 1,435,264 $ 1,613,022 Capital Projects Wells Rehab Wells $ 60,000 $ 65,000 $ 70,000 $ 70,000 Trunk New Development Projects 18,000 88,000 25,000 30,000 40,000 Water Main Improv - South Coon Creek Dr 886,000 Water Main Improv - Bunker Lake Blvd 140,000 Water Main Improv - Lakeview Terrace 710,000 Plant Surface Seal Brick Structures 20,500 Equipment 28,600 50,000 Automated Meter Reading System 900,000 Total $ - $ - $ - $ 1,153,100 $ 203,000 $ 95,000 $ 1,710,000 $ 40,000 Funded by Operations $ - $ - $ - $ 109,100 $ 115,000 $ 70,000 $ 970,000 $ - Funded by Infrastructure/Trunk - - - 1,044,000 88,000 25,000 740,000 40,000 Funded by debt - - - - - Total $ - $ - $ - $ 1,153,100 $ 203,000 $ 95,000 $ 1,710,000 $ 40,000 Debt Rate 5.50% 5.50% 5.50% 5.50% 5.50% 5.50% 5.50% 5.50% Term 10 10 10 15 15 15 15 15 AADS $ - $ - $ - $ - $ - $ - $ - $ - Cumulative DS $ - $ - $ - $ - $ - $ - $ - $ - Current DS $ 1,027,133 $ 1,113,025 $ 1,115,036 $ 7,600,675 $ 830,166 $ 828,806 $ 831,486 $ 833,101 137 Year Inflation Factor Acres Added New Connections New Customers Residential Accounts Commercial SACS Total Accounts Rates Base Rate Connection Charge Area Charge Base Rate Connection/Area Area Charge Enterprise Fund - Sanitary Sewer Operations Cash flows from operating activities: Receipts from customers and users Payment to suppliers Payment to employees Net from operating activities Cash flows from noncapital financing activities: Transfers out - Replacement Reserve Transfers out Net from noncapital financing activities Cash flows from capital and related financing activities: Acquisition of capital assets Proceeds from the sale of capital assets Net from capital and related financing activities Cash flows from investing activities: Investment income Net increase in cash and cash equivalents Cash and cash equivalents - January 1 Cash and cash equivalents - December 31 CITY OF ANDOVER Sanitary Sewer System Financial Projections Actual Estimate _ 2009 2010 2011 Forcast 2012 2013 2014 2015 2016 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 5 5 5 5 5 5 47,717 34,826 10 10 10 10 10 10 35 35 35 35 35 35 6,888 6,968 86,409 197,000 187,616 133,288 339,524 368,364 1,364 1,390 2,216,663 2,303,072 2,500,072 2,687,688 2,820,975 3,160,499 8,252 8,358 8,393 8,428 8,463 8,498 8,533 8,568 1.39% 1.28% 2,303,072 $ 2,500,072 $ 2,687,688 $ 2,820,975 $ 3,160,499 $ 3,528,863 $ 57.64 $ 57.64 $ 57.64 $ 59.37 $ 61.15 $ 62.98 $ 64.87 $ 66.82 $ 418 $ 418 $ 418 $ 435 $ 452 $ 470 $ 489 $ 509 $ 1,551 $ 1,551 $ 1,551 $ 1,613 $ 1,678 $ 1,745 $ 1,814 $ 1,887 3.0% 0.0% 0.0% 3.0% 3.0% 3.0% 3.0% 3.0% 4.0% 0.0% 0.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% 0.0% 0.0% 4.0% 4.0% 4.0% 4.0% 4.0% Actual Estimate Forcast 2009 2010 2011 2012 2013 2014 2015 2016 $ 1,936,536 $ 1,968,591 $ 1,970,000 $ 2,014,883 $ 2,120,059 $ 2,190,979 $ 2,264291 $ 2,340,074 (1,026,200) (1,147,612) (1,174,334) (1,070,694) (1,102,815) (1,135,899) (1,169,976) (1205,076) (303,710) (286,163) (302,577) (313209) (322,605) (332283) (342252) (352,519) 606,626 534,816 493,089 630,980 694,639 722,796 752,062 782,479 (350,000) (400,000) (400,000) (400,000) (400,000) (400,000) (400,000) (400,000) (46,680) (46,680) (46,680) (48,080) (49,523) (51,008) (52,539) (54,115) (396,680) (446,680) (446,680) (448,080) (449,523) (451,008) (452,539) (454,115) (7,322) - - (25,900) (97,500) (178,500) - - (7,322) - - (25,900) (97,500) (178,500) - - 47,717 34,826 40,000 40,000 40,000 40,000 40,000 40,000 250,341 122,962 86,409 197,000 187,616 133,288 339,524 368,364 1,843,360 2,093,701 2,216,663 2,303,072 2,500,072 2,687,688 2,820,975 3,160,499 $ 2,093,701 $ 2,216,663 $ 2,303,072 $ 2,500,072 $ 2,687,688 $ 2,820,975 $ 3,160,499 $ 3,528,863 138 Capital Projects Fund - Sewer Trunk Revenues Connection Charges Area Charges Interest Special Assessment Replacement Reserve Bond Proceeds Other Total Expenses Debt Service Capital Outlay Total Net Increase (Decrease) in Fund Balance Fund Balance - January 1 Fund Balance - December 31 CITY OF ANDOVER Sanitary Sewer System Financial Projections Actual Estimate _ 2009 2010 2011 Forcast 2012 2013 2014 2015 2016 $ 2,086 $ 7,320 $ 2,926 $ 4,347 $ 4,521 $ 4,702 $ 4,890 $ 5,086 - - - 8,065 8,388 8,723 9,072 9,435 83,072 74,872 48,378 50,000 50,000 50,000 50,000 50,000 24,572 20,803 24,161 20,000 20,000 20,000 20,000 50,000 350,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 - - - - - - 2250,000 1,250,000 2,996 - - - - - - - 462,726 502,995 475,465 482,412 482,909 483,425 2,733,962 1,764,521 - - - - - - - 298,502 60,972 137,630 1,000 207,000 22,000 268,500 3,510,000 1,465,000 60,972 137,630 1,000 207,000 22,000 268,500 3,510,000 1,763,502 401,754 365,365 474,465 275,412 460,909 214,925 (776,038) 1,018 2,733,130 3,134,884 3,500249 3,974,714 4,250,126 4,711,035 4,925,961 4,149,923 $ 3,134,884 $ 3,500,249 $ 3,974,714 $ 4,250,126 $ 4,711,035 $ 4,925,961 $ 4,149,923 $ 4,150,941 Ca ital Projects . - Infrastructure New Development Projects $ 67,000 $ 22,000 $ 90,000 $ 110,000 $ 110,000 Sanitary Sewer Ext - Bunker Lake Blvd 140,000 Sanitary Sewer Ext - Crosstown Blvd 500,000 Aztec Estates Lift Station Upgrade 105,000 Yellow Pine Lift Station 650,000 Rural Reserve Trunk 2250,000 1,250,000 Equipment 25,900 97,500 357,000 Total $ - $ - $ - $ 232,900 $ 119,500 $ 447,000 $ 3,510,000 $ 1,465,000 Funded by Operations $ - $ - $ - $ 25,900 $ 97,500 $ 178,500 $ - $ - Funded by Infrastructure/Tmnk - - - 207,000 22,000 268,500 1,260,000 215,000 Funded by debt - - - - - - 2250,000 1,250,000 Total $ - $ - $ - $ 232,900 $ 119,500 $ 447,000 $ 3,510,000 $ 1,465,000 Rate 5.50% 5.50% 5.50% 5.50% 5.50% 5.50% 5.50% 5.50% Term 10 10 10 10 10 10 10 10 AADS $ - $ - $ - $ - $ - $ - $ 298,502 $ 165,835 Cumulative DS $ - $ - $ - $ - $ - $ - $ - $ 298,502 Current DS 139 Year Inflation Factor New Customers Residential - Urban / Rural (units) Multiple Dwelling (acres) Comm / Industrial (acres) Schools / Churches (acres) Rates (Qtrly) Residential - Urban / Rural - per unit Multiple Dwelling - per acre Comm / Industrial - per acre Schools / Churches - per acre Residential - Urban / Rural - per unit Multiple Dwelling - per acre Comm / Industrial - per acre Schools / Churches - per acre Enterprise Fund - Storm Sewer Operations Cash flows from operating activities: Receipts from customers and users Payment to suppliers Payment to employees Net from operating activities Cash flows from noncapital financing activities: Payment of advances to other funds Transfers out Net from noncapital financing activities Cash flows from capital and related financing activities: Acquisition of capital assets Proceeds from the sale of capital assets Net from capital and related financing activities Cash flows from investing activities: Investment income Net increase in cash and cash equivalents Cash and cash equivalents - January 1 Cash and cash equivalents - December 31 Capital Projects Infrastructure Storm Sewer Improvements Equipment Replacement - One -ton Plow truck #94 Total Funded by Operations Funded by Infrastructme/Trunk Funded by debt Total $ 6.78 $ CITY OF ANDOVER 7.33 $ 7.70 $ 8.08 $ 8.49 $ 8.91 $ Storm Sewer System Financial Projections $ 14.92 $ 15.37 $ 16.14 $ 16.95 $ 17.79 $ Actual Estimate 20.60 $ 28.51 $ Forcast 31.15 $ 32.71 $ 2009 2010 2011 2012 2013 2014 2015 2016 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 2.9% 35 35 35 35 35 35 9,525 9,533 9,568 9,603 9,638 9,673 9,708 9,743 190 223 223 223 223 223 223 223 349 349 349 349 349 349 349 349 282 282 282 282 282 282 282 282 $ 6.78 $ 6.98 $ 7.33 $ 7.70 $ 8.08 $ 8.49 $ 8.91 $ 9.36 $ 14.92 $ 15.37 $ 16.14 $ 16.95 $ 17.79 $ 18.68 $ 19.62 $ 20.60 $ 28.51 $ 29.37 $ 31.15 $ 32.71 $ 34.34 $ 36.06 $ 37.86 $ 39.76 $ 13.55 $ 13.96 $ 14.66 $ 15.39 $ 16.16 $ 16.97 $ 17.82 $ 18.71 7.1% 2.9% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% 7.2% 3.0% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% 7.2% 3.0% 6.1% 5.0% 5.0% 5.0% 5.0% 5.0% 7.2% 3.0% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% Actual Estimate Forcast 2009 2010 2011 2012 2013 2014 2015 2016 $ 318,883 $ 344,552 $ 347,500 $ 347,000 $ 353,598 $ 374,466 $ 396,436 $ 419,568 (90,647) (97,041) (134,403) (155,603) (160,271) (165,079) (170,032) (175,133) (207,548) (187,066) (201,588) (207,071) (213,283) (219,682) (226,272) (233,060) 20,688 60,445 11,509 (15,674) (19,956) (10,295) 133 11,375 (10,000) (10,000) (10,000) (10,000) (10,000) (10,000) (10,000) (10,000) (10,000) (10,000) (17,093) - - - (32,500) - - - (17,093) - - - (32,500) - - - 2,158 3,227 2,000 2,000 1,000 1,000 1,000 1,000 (4,247) 63,672 13,509 (13,674) (61,456) (19,295) (8,867) 2,375 96,736 92,489 156,161 169,670 155,996 94,540 75245 66,377 $ 92,489 $ 156,161 $ 169,670 $ 155,996 $ 94,540 $ 75,245 $ 667377 $ 68,753 $ 30,000 $ 35,000 $ 40,000 $ 45,000 $ 50,000 32,500 $ - $ - $ - $ 30,000 $ 67,500 $ 40,000 $ 45,000 $ 50,000 $ - $ - $ - $ 30,000 $ 67,500 $ 40,000 $ 45,000 $ 50,000 $ - $ - $ - $ 30,000 $ 67,500 $ 40,000 $ 45,000 $ 50,000 140