Loading...
HomeMy WebLinkAbout2010 CIP2010² 2014 Capital Improvement Plan 1685 Crosstown Blvd NW, Andover, MN 55304 Phone: 763.755.5100 Fax: 763.755.8923 www.ci.andover.mn.us CITY OF ANDOVER 2010 – 2014 Capital Improvement Plan Table of Contents Introduction 2010 – 2014 Capital Improvement Plan Message ....................................................................................... 1 CIP Project Development & Process Authorization Schedule .................................................................... 4 Graph – 2010 Expenditures By Department ................................................................................................ 6 Graph – 2010 CIP Expenditures By Year .................................................................................................... 6 Five Year Summary of Expenditures By Department ................................................................................. 7 Five Year Summary of Revenue By Source ................................................................................................ 8 Five Year Summary of Projects By Department & Revenue Source .......................................................... 9 Improvements Five Year Summary of Expenditures By Department – Improvements ...................................................... 15 Five Year Summary of Revenue By Source – Improvements ..................................................................... 16 Five Year Summary of Projects By Department & Revenue Source – Improvements ............................... 17 Improvement Projects By Department Engineering ........................................................................................................................................... 20 Facility Management ............................................................................................................................. 22 Parks & Recreation – Operations .......................................................................................................... 36 Parks & Recreation – Projects ............................................................................................................... 37 Sanitary Sewer ...................................................................................................................................... 39 Storm Sewer .......................................................................................................................................... 47 Streets / Highways ................................................................................................................................ 48 Water ..................................................................................................................................................... 70 Equipment Year Summary of Expenditures By Department – Equipment .................................................................... 83 Five Year Summary of Revenue By Source – Equipment .......................................................................... 84 Five Year Summary of Projects By Department & Revenue Source – Equipment ..................................... 85 Equipment By Department Central Equipment ................................................................................................................................ 88 Community Center ................................................................................................................................ 91 Elections ................................................................................................................................................ 92 Engineering ........................................................................................................................................... 93 Fire Department .................................................................................................................................... 94 Parks & Recreation – Operations .......................................................................................................... 105 Planning & Zoning ................................................................................................................................ 112 Sanitary Sewer ...................................................................................................................................... 113 Storm Sewer .......................................................................................................................................... 115 Streets / Highways ................................................................................................................................ 116 Water ..................................................................................................................................................... 120 Appendix Road & Bridge Fund Projected Fund Balance............................................................................................. 121 Park Improvement Fund Projected Fund Balance ....................................................................................... 122 Trail Fund Projected Fund Balance ............................................................................................................. 123 Water System Financial Projections ............................................................................................................ 124 Sewer System Financial Projections ............................................................................................................ 126 Storm Sewer System Financial Projections ................................................................................................. 128   1685 CROSSTOWN BOULEVARD N.W. ANDOVER, MINNESOTA 55304 (763) 755-5100 FAX (763) 755-8923 WWW.CI.ANDOVER.MN.US TO: Mayor and Council Members FROM: Jim Dickinson, City Administrator / Finance Director SUBJECT: 2010 - 2014 Capital Improvement Plan DATE: October 20, 2009 INTRODUCTION On behalf of the City’s Management Team, I am pleased to present the City of Andover’s Capital Improvement Plan for years 2010 through 2014. The City’s management team and their respective staff worked diligently to produce a document that was both practical, substantive in addressing needed capital improvements and insightful regarding the underlying factors associated with the City’s rapidly changing suburban landscape. CAPITAL IMPROVEMENT PLAN GOALS AC CKNOWLEDGE AND OMMUNICATE I PUBLIC NFRASTRUCTURE PRIORITIES AND DYNAMICS EAR NSUREPPROPRIATE ESPONSES TO CHANGING INFRASTRUCTURE NEEDS AND DEMANDS DFACR EVELOP A INANCIALSSESSMENT OF APITALESOURCES AVAILABLE TO MEET FUTURE CAPITAL PROJECT PLANNING NEEDS ISV NSTITUTE A TRATEGICISION PREDICATED ON MAINTAINING A HIGH QUALITY SERVICE INFRASTRUCTURE CAPABLE OF MEETING THE NEEDS OF OUR CITIZENS FOR TODAY AND TOMORROW The purpose of the City’s Capital Improvement Plan (CIP) is to identify, prioritize and address community needs through careful long-term capital planning and balanced public investment in supporting physical infrastructure. To ensure that this commitment is both meaningful and achievable, appropriate capital improvement factors were given significant consideration in developing a CIP that addresses community priorities over the next five (5) years. The CIP will also provide a planning foundation for future needs assessments to ensure the City is appropriately responding to the critical infrastructure needs necessary for sustainable future growth. The CIP represents a beginning in terms of producing a comprehensive planning response to address changing capital needs by developing a project schedule that will lead to timely and cost-effective project completions. 1 DISCUSSION The 2010 - 2014 CIP has been prepared as a strategic planning tool to assist the City Council in identifying proposed capital improvement projects over the next five years. With the inclusion of preliminary financing sources, appropriate background information citing needs and projected cost estimates, this document will provide Council with the needed information to begin the process for planning improvements that meet the City’s physical infrastructure needs. Consequently, the CIP serves as a flexible guide plan to properly identify the critical components of the City's infrastructure, yet maintain flexibility in determining project timeframes, project scope and possible funding sources. The 2010 - 2014 CIP continues the emphasis of judiciously managing the City’s limited resources by prudently planning for known and/or anticipated future capital expenditures. A critical step in the plan adoption process is the collaborative nature of plan review that involves the leadership of the City Council, the input of appointed Commissions and staff, and most importantly, affected residents of the community. Consequently, the strategic value of this plan lies in the acknowledgement of future needs by the governing body and the effective communication of those needs to the general public during project development stages. Likewise, the availability and preliminary designation of fiscal resources to serve both current and future needs is critical to the achievement of plan outcomes that meet with Council approval. Following the approval of the plan, feasibility studies are performed, affected constituencies are notified to formally disseminate and receive public feedback on proposed project plans. This process culminates with the City Council considering all relevant information and making a final decision on whether to proceed with the proposed capital improvement. The public process that supports the advancement of these projects from inception to completion is engendered in the CIP project development and authorization schedule. Formalizing the steps in the CIP project advancement process serves a number of purposes and ensures that the Council and public are kept well informed regarding project purposes and desired outcomes, estimated project costs, funding sources, progress and final status. It should be emphasized that projects will require approval in various stages of project development by the City Council in accordance with approved policies. The objectives of the 2010 - 2014 Capital Improvement Plan are to present a comprehensive capital improvement program that communicates efforts: to ensure that community priorities are reflected in the capital investment plans of each City department; to provide a consolidated financial picture of anticipated expenditures and outline recommended funding strategies to underwrite anticipated capital improvements; to document and communicate capital improvement processes for City projects that will ensure consistency, a full appreciation of both the costs and benefits of proposed capital investments, and raises the level of public understanding regarding the City’s public improvement processes; to provide information on the fiscal impacts of capital investment plans on total City finances; and to effectively plan for public improvements that support community needs in the areas of private development infrastructure, transportation, public safety, parks and recreation, utilities, and commercial/industrial growth through fiscally responsible economic development initiatives. Accordingly, this document attempts to recognize known or perceived capital improvement needs, but as with any plan recognizes that social, economic and political considerations will by necessity determine 2 final project outcomes. The major categories of expenditures that are identified within the CIP include, but are not limited to: 1.New Public Facilities Planning 2.Street Construction, Maintenance and Reconstruction 3.Utility Construction, Maintenance and Reconstruction 4.Construction, Maintenance and Upgrade of Parks, Playgrounds and Trails 5.Capital Improvements to Existing Facilities 6.Private development infrastructure 7.Capital equipment and vehicle planning needs (Equipment purchases to be determined through normal budgetary process) The City Council, consequently, accepts this document with the provision that capital improvement planning is subject to the dynamics of community growth, political leadership and acknowledges that other unanticipated needs may take precedence over planned projects. RECOMMENDATION The 2010 - 2014 Capital Improvement Plan is the product of collaborative planning efforts by City staff, Park and Recreation Commission, Community Center Advisory Commission and the City Council. Projects have been introduced based on 1) anticipated future growth trends articulated in the City’s current Comprehensive Plan, 2) the natural cycle of deterioration and decay evident in all physically constructed and engineered improvements in the more established areas of the community and 3) capital deficiencies or infrastructure issues brought to the City's attention through a variety of sources. Capital expenditures identified within the CIP are the best estimates available, and once the CIP is adopted, will be reviewed and confirmed through individual feasibility reports where appropriate. I am appreciative of the commitment, good judgment and expertise that each department has contributed to the capital improvement planning process. Respectfully submitted, Jim Dickinson City Administrator 3 CIP PROJECT DEVELOPMENT AND PROCESS AUTHORIZATION SCHEDULE The following process is a Council/staff guideline for authorizing public improvement projects. As this process is controlled by State Statute and other influencing environmental factors, it is subject to change and should be viewed as a guide to assist the Council and public in understanding the public improvement process used by City staff. A separate Council meeting would facilitate each step in the process, and accomplishment of respective activities. As a result, the process time frame is a significant factor affecting City staff’s ability to properly manage and complete approved Council ordered projects within budget and on time. 1.Council Approval of Annual CIP Projects by City Resolution will authorize the following outcomes: a) Staff and/or Consultant preparation of project feasibility studies b) Staff preparation of detailed financial review of project funding sources c) Neighborhood Meeting may be held prior to Feasibility Study subject to need and type of project. TIME FRAME: October-November of each preceding year. 2.Presentation of Feasibility Study a) Feasibility Study Components: 1) Review of Project Engineering and Construction Estimates 2) Total Project Costs (All related project costs, i.e. land, soft costs) 3) Project Financial Plan/Fiscal Implications (Engineering/Finance) 4) Authorization to develop a Preliminary Assessment Roll, if any, for the Public Hearing. (Engineering) If Council accepts Feasibility Study, A Resolution “Accepting Feasibility Study and Setting Date for Public Hearing on the Project” when appropriate (Engineering Department) would initiate the following: 1) Notices mailed to affected Residents per statute requirements no less than 10 days before Public Hearing. (Engineering) 2) Public Hearing Notice is published. Two publications one week apart, with the second publication no less than three days before the hearing. (Engineering/City Clerk) TIME FRAME: February-March-April-May of current year. 3.Neighborhood Meeting – City staff will hold neighborhood project meetings, when appropriate, to review and present Project Feasibility Studies, answer questions and meet with affected property owners. These meetings will include a question and answer component designed specifically to bring awareness to the property owner, obtain citizen input and produce an understanding of the purposes behind the City’s attempts to construct public improvements in the affected area. TIME FRAME: Following the presentation of the Feasibility Study to Council, but prior to the holding of a Public Hearing by Council. 4.Council holds a Public Hearing when appropriate for following purposes: a) Presentation of Project (Engineering Department) b) Presentation of Preliminary Special Assessment Rolls and Financing Implications (Engineering/Finance Department) c) Council to hear Affected Resident Input d) Council determines whether to “order” the public improvement 4 A Council Resolution is drafted “Ordering the Project and Authorizing Preparation of Plans and Specifications” (Engineering Department). Council may ORDER THE IMPROVEMENT after the public hearing is closed or at a subsequent Council Meeting within 6 months of the public hearing date. (Statutory Requirement - Council Resolution ordering project must be approved on 4/5 Council vote if it is Council initiated project with assessments). If Council decides to reject the project as presented, a Council vote should be taken to officially determine the final status of the project. TIME FRAME: April-May-June of current year 5.Plans and Specifications are presented to Council for approval. (Engineering Department) a)A Council Resolution is drafted authorizing the following: 1) Accepting and Approving Project Plans and Specifications 2) Authorizing the Advertisement for Project Bids. Bids are developed and invitation to Bid is processed. Bid opening date is no less than 3 weeks after publication. (Engineering) 3) Authorize staff to pursue an appropriate funding mechanism to underwrite project costs TIME FRAME: May-June of each year 6.Council Acceptance of Project Bids and Awarding of Contracts would authorize the following outcomes: a) A Council Resolution is drafted “Accepting Project Bids and Awarding Contracts” (Engineering) b) Initiation of Project Construction and work (Engineering) TIME FRAME: April-May-June-July of current year. 7.Project Completion a) Council Acceptance of Project b) Final Presentation and Review of Project Costs versus Project Budget by Finance Department. c) If Special Assessments are financing a portion of the Project, A Council Resolution “Setting the Special Assessment Hearing for Project #” is adopted at this same meeting. (Engineering/Finance) TIME FRAME: Upon completion of project. 8.If Special Assessments would finance a portion of the projects costs, Council Holds a Special Assessment Hearing to review the following: a) Affected Property owners would be officially notified per statute no less than two weeks prior to Special Assessment Hearing. (Clerk/Engineering) b) Public Notice is published no less than two weeks prior to Special Hearing per statute (Clerk/Engineering) c) Staff prepares a proposed roll and Council Approves Final Assessment Roll (Engineering/Finance) d) Council consideration of Assessment Appeals and Requested Deferrals filed prior to hearing or during the hearing. e) Meets M.S. Chapter 429 statutory requirements A Council Resolution is drafted “Adopting Final Special Assessment Roll”(Engineering), and is adopted at this meeting. TIME FRAME: October/November of current year depending on finalization of project and status of completion. 5 CITY OF ANDOVERCITY OF ANDOVER 2010 CIP Expenditures By Department2010 CIP Expenditures By Department Parks -Proj.Parks -Proj. WaterWater 1%1% 3%3% FireFire Parks -Oper.Parks -Oper. EngineeringEngineering Storm SewerStorm Sewer 13%13% 3%3% 3%3% 3%3% Facility Mgmt.Facility Mgmt. 2%2% Streets/HighwaysStreets/Highways 72%72% CITY OF ANDOVER 2010 CIP Expenditures By Year $6,216,000 2014 $14,734,000 2013 $10,007,000 2012 $7,376,900 2011 $1,710,500 2010 $3,803,000 2009 Adopted $-$3,000,000 $6,000,000 $9,000,000 $12,000,000 $15,000,000 $18,000,000 6 City of Andover, MN Capital Plan 20102014 thru DEPARTMENT SUMMARY Department20102011201220132014Total Central Equipment7,00065,00072,000 Community Center7,000 7,000 Elections110,000 110,000 Engineering54,000135,000211,000232,000238,000 870,000 Facility Management33,00032,0004,675,0001,985,00037,000 6,762,000 Fire225,000635,000565,000109,000340,0001,874,000 Park & Rec - Operations53,50045,000245,000120,00095,000558,500 Park & Rec - Projects15,00065,00015,00015,00015,000125,000 Planning & Zoning25,000 25,000 Sanitary Sewer822,0001,065,0002,250,0001,250,000 5,387,000 Storm Sewer53,000204,00055,00056,00057,000 425,000 Streets / Highways1,227,0002,311,0002,468,0001,837,0002,854,00010,697,000 Water50,0003,010,900676,0008,065,0001,330,00013,131,900 1,710,5007,376,90010,007,00014,734,0006,216,000 40,044,400 GRAND TOTAL Monday, September 28, 2009 7 City of Andover, MN Capital Plan 20102014 thru FUNDING SOURCE SUMMARY 20102011201220132014Total Source Assessments222,000523,000946,000446,0002,004,5004,141,500 Building Fund1,500,000 1,500,000 Capital Equipment Reserve225,000300,000525,000 Capital Projects Levy86,500187,000102,50080,00082,000 538,000 Central Equipment Fund7,00065,00072,000 Community Center Operations7,00032,00039,000 Construction Seal Coat Fund86,0004,00016,00010,00010,000 126,000 Equipment Bond925,0001,135,000184,000390,0002,634,000 G.O. Bond4,265,000450,000 4,715,000 Municipal State Aid Funds895,000200,000527,0001,227,0002,849,000 Park Improvement Funds15,00065,00015,00015,00015,000125,000 Road & Bridge Funds955,5001,016,5001,624,5001,161,0001,320,500 6,078,000 Sanitary Sewer Fund225,000225,000 Sewer Revenue Bonds2,000,000250,000 2,250,000 Sewer Trunk Fund625,000750,00035,000145,0001,555,000 Storm Sewer Fund70,500168,50072,50056,00057,000 424,500 Water Fund50,00055,000145,50065,00070,000385,500 Water Revenue Bonds2,665,9008,000,00010,665,900 Water Trunk Fund15,000396,000140,000645,000 1,196,000 1,710,5007,376,90010,007,00014,734,0006,216,000 GRAND TOTAL 40,044,400 Monday, September 28, 2009 8 City of Andover, MN Capital Plan 20102014 thru PROJECTS & FUNDING SOURCES BY DEPARTMENT DepartmentProject#Priority20102011201220132014 Total Central Equipment Replacement - Hotsy Pressure Washer12-48800-0137,0007,000 Central Equipment Fund7,0007,000 Replacement - Service Truck13-48800-01230,000 30,000 Central Equipment Fund30,00030,000 Replacement - Floor Sweeper13-48800-02335,00035,000 Central Equipment Fund35,00035,000 72,000 7,00065,000 Central Equipment Total Community Center Replacement - Zamboni Battery Pack11-44000-0127,0007,000 Community Center Operations7,0007,000 7,0007,000 Community Center Total Elections Replacement - Voting Equipment11-41310-011110,000 110,000 Capital Projects Levy110,000110,000 110,000 110,000 Elections Total Engineering New Development Projects10-41600-01180,000125,000175,000180,000 560,000 Sewer Trunk Fund65,000100,00035,000145,000345,000 Water Trunk Fund15,00025,000140,00035,000215,000 Pedestrian Trail Maintenance10-41600-02154,00055,00056,00057,00058,000280,000 Road & Bridge Funds54,00055,00056,00057,00058,000280,000 Replacement - Blazer #1111-41600-01230,00030,000 Equipment Bond30,00030,000 54,000135,000211,000232,000238,000870,000 Engineering Total Facility Management Annual Parking Lot Maintenance10-41900-01123,00024,00025,00026,00027,000 125,000 Capital Projects Levy23,00024,00025,00026,00027,000125,000 Carpet / Tile Replacement10-41900-02210,00010,00010,000 30,000 Capital Projects Levy10,00010,00010,00030,000 Building A - Seal Floor11-41900-0218,0009,000 17,000 Capital Projects Levy8,0009,00017,000 Surface Seal all Brick Structures12-41900-01175,000 75,000 Capital Projects Levy22,50022,500 Monday, September 28, 2009 9 DepartmentProject#Priority20102011201220132014 Total Community Center Operations32,00032,000 Water Fund20,50020,500 Roof Replacements12-41900-021300,000300,000 Capital Equipment Reserve300,000300,000 Addition to Storage Building & Vehicle Maint. Shop112-41900-032,200,0002,200,000 G.O. Bond2,200,0002,200,000 Fire St. #2 Addition with additional land purchase12-41900-042885,000885,000 G.O. Bond885,000885,000 Salt Storage Building12-41900-051400,000400,000 G.O. Bond400,000400,000 Recycling Building & Fence12-41900-061250,000250,000 G.O. Bond250,000250,000 Attached Storage Building12-41900-071250,000250,000 G.O. Bond250,000250,000 Relocate Fuel Station w/ Canopy12-41900-082280,000280,000 G.O. Bond280,000280,000 Land Purchase13-41900-0111,500,0001,500,000 Building Fund1,500,0001,500,000 Pedestrian Tunnel Under Crosstown Blvd.13-41900-021450,000450,000 G.O. Bond450,000450,000 33,00032,0004,675,0001,985,00037,0006,762,000 Facility Management Total Fire Replacement - Fire Engine #1110-42200-011225,000 225,000 Capital Equipment Reserve225,000225,000 Replacement - Ladder Truck #1111-42200-011500,000500,000 1,000,000 Equipment Bond500,000500,0001,000,000 Replacement - Fire Chief's Vehicle11-42200-02245,000 45,000 Equipment Bond45,00045,000 Replacement - Rescue #1111-42200-03250,000 50,000 Equipment Bond50,00050,000 Replacement - Fire Marshall Vehicle11-42200-04240,000 40,000 Equipment Bond40,00040,000 Replacement - Grass #3112-42200-01245,000 45,000 Equipment Bond45,00045,000 New - Water/Ice rescue boat12-42200-02120,000 20,000 Equipment Bond20,00020,000 Replacement - Utility #413-42200-01232,000 32,000 Equipment Bond32,00032,000 Replacement - Utility #513-42200-02232,000 32,000 Equipment Bond32,00032,000 Replacement - Grass #2113-42200-03245,000 45,000 Equipment Bond45,00045,000 Replacement - Tanker #1114-42200-012340,000 340,000 Equipment Bond340,000340,000 1,874,000 225,000635,000565,000109,000340,000 Fire Total Park & Rec - Operations Replace/Repair Play Structures - Various Parks10-45000-01145,00045,00045,00045,00045,000225,000 Capital Projects Levy45,00045,00045,00045,00045,000225,000 New - Zero turn mower110-45000-028,5008,500 Monday, September 28, 2009 10 DepartmentProject#Priority20102011201220132014 Total Capital Projects Levy8,5008,500 Replacement - Large Capacity Lawnmower #58012-45000-011112,000 112,000 Equipment Bond112,000112,000 Replacement - Toro Groundsmaster, #55912-45000-02123,000 23,000 Equipment Bond23,00023,000 Replacement - One Ton Truck w/ Plow, #59912-45000-03265,000 65,000 Equipment Bond65,00065,000 Replacement - One Ton Truck w/ Plow #50313-45000-01265,000 65,000 Equipment Bond65,00065,000 Replacement - Trailer, T-55413-45000-02210,00010,000 Equipment Bond10,00010,000 Replacement - One Ton Crew Cab Pickup #50214-45000-01150,000 50,000 Equipment Bond50,00050,000 53,50045,000245,000120,00095,000558,500 Park & Rec - Operations Total Park & Rec - Projects Annual Miscellaneous Park Projects10-45001-01115,00015,00015,00015,00015,00075,000 Park Improvement Funds15,00015,00015,00015,00015,00075,000 Irrigation Improvements11-45001-01250,00050,000 Park Improvement Funds50,00050,000 15,00065,00015,00015,00015,000125,000 Park & Rec - Projects Total Planning & Zoning Replacement - Ford Taurus #1512-41500-01225,000 25,000 Equipment Bond25,00025,000 25,000 25,000 Planning & Zoning Total Sanitary Sewer Crosstown Blvd Trunk Sewer Line11-48200-011400,000 400,000 Sewer Trunk Fund400,000400,000 Replacement - One Ton Truck w/ Plow #9011-48200-02165,00065,000 Sanitary Sewer Fund65,00065,000 New - Jet/Vac Truck11-48200-031357,000 357,000 Sanitary Sewer Fund160,000160,000 Sewer Trunk Fund160,000160,000 Storm Sewer Fund37,00037,000 Yellow Pine Lift Station12-48200-011650,000 650,000 Sewer Trunk Fund650,000650,000 Bunker Lake Boulevard Sanitary Sewer12-48200-021415,000 415,000 Assessments415,000415,000 Rural Reserve Trunk Sanitary Sewer13-48200-0112,250,0001,250,000 3,500,000 Assessments250,0001,000,0001,250,000 Sewer Revenue Bonds2,000,000250,0002,250,000 5,387,000 822,0001,065,0002,250,0001,250,000 Sanitary Sewer Total Storm Sewer Storm Sewer Improvements10-48300-01153,00054,00055,00056,00057,000275,000 Storm Sewer Fund53,00054,00055,00056,00057,000275,000 Replacement - Elgin Street Sweeper #16911-48300-011150,000150,000 Equipment Bond90,00090,000 Monday, September 28, 2009 11 DepartmentProject#Priority20102011201220132014 Total Storm Sewer Fund60,00060,000 425,000 53,000204,00055,00056,00057,000 Storm Sewer Total Streets / Highways Annual Street Seal Coat Project10-43100-011225,000383,000342,000420,000452,0001,822,000 Construction Seal Coat Fund84,0004,00015,0009,0009,000121,000 Road & Bridge Funds141,000379,000327,000411,000443,0001,701,000 Annual Street Crack Seal Project10-43100-02120,000108,000109,000194,000431,000 Construction Seal Coat Fund2,0001,0001,0001,0005,000 Road & Bridge Funds18,000107,000108,000193,000426,000 Annual Street Reconstruction10-43100-031888,000672,0001,405,000693,000746,000 4,404,000 Assessments222,000168,000351,000173,000186,5001,100,500 Road & Bridge Funds666,000504,0001,054,000520,000559,5003,303,500 Annual Pavement Markings10-43100-04119,00020,00021,00022,00023,000105,000 Road & Bridge Funds19,00020,00021,00022,00023,000105,000 Annual Curb Replacement10-43100-05140,00041,00042,00043,00044,000210,000 Road & Bridge Funds40,00041,00042,00043,00044,000210,000 Bridge Scour Repairs10-43100-06135,00035,00035,000105,000 Road & Bridge Funds17,50017,50017,50052,500 Storm Sewer Fund17,50017,50017,50052,500 Municipal State Aid Routes / New & Reconstruct11-43100-011830,000200,000550,0001,120,000 2,700,000 Assessments65,00023,000168,000256,000 Municipal State Aid Funds765,000200,000527,000952,0002,444,000 Replacement - Dump Truck w/ Snow Removal #19711-43100-021200,000 200,000 Equipment Bond200,000200,000 Intersection Upgrades11-43100-031130,000275,000 405,000 Municipal State Aid Funds130,000275,000405,000 Replacement - Dump Truck w/ Snow Removal #19812-43100-011150,000 150,000 Equipment Bond150,000150,000 Replacement - One Ton Truck w/ Plow #13212-43100-02165,00065,000 Equipment Bond65,00065,000 Replacement - Water Tanker #16312-43100-032100,000 100,000 Equipment Bond100,000100,000 1,227,0002,311,0002,468,0001,837,0002,854,00010,697,000 Streets / Highways Total Water Rehabilitation of Wells10-48100-01150,00055,00060,00065,00070,000300,000 Water Fund50,00055,00060,00065,00070,000300,000 Construct Clearwell at WTP11-48100-0112,665,9002,665,900 Water Revenue Bonds2,665,9002,665,900 Water Main Improvements11-48100-021290,000550,000840,000 Assessments290,000550,000840,000 Construct Well #1012-48100-011181,000181,000 Water Trunk Fund181,000181,000 Bunker Lake Boulevard Water Main12-48100-021180,000180,000 Assessments180,000180,000 Demolish 500,000 Gallon Water Tower12-48100-031190,000190,000 Water Trunk Fund190,000190,000 Replacement - One Ton Truck w/ Plow #10512-48100-04165,00065,000 Water Fund65,00065,000 Construct Water Treatment Plant #213-48100-0118,000,0008,000,000 Water Revenue Bonds8,000,0008,000,000 Monday, September 28, 2009 12 DepartmentProject#Priority20102011201220132014 Total Water Main along South Coon Creek Drive14-48100-011710,000 710,000 Assessments100,000100,000 Water Trunk Fund610,000610,000 13,131,900 50,0003,010,900676,0008,065,0001,330,000 Water Total 1,710,5007,376,90010,007,00014,734,0006,216,00040,044,400 GRAND TOTAL Monday, September 28, 2009 13 This page left blank intentionally. 14 City of Andover, MN Capital Plan 20102014 thru DEPARTMENT SUMMARY Department20102011201220132014Total Engineering54,000135,000181,000232,000238,000840,000 Facility Management33,00032,0004,675,0001,985,00037,000 6,762,000 Park & Rec - Operations45,00045,00045,00045,00045,000 225,000 Park & Rec - Projects15,00065,00015,00015,00015,000 125,000 Sanitary Sewer400,0001,065,0002,250,0001,250,000 4,965,000 Storm Sewer53,00054,00055,00056,00057,000275,000 Streets / Highways1,227,0002,111,0002,153,0001,837,0002,854,00010,182,000 Water50,0003,010,900611,0008,065,0001,330,00013,066,900 1,477,0005,852,9008,800,00014,485,0005,826,00036,440,900 GRAND TOTAL Monday, September 28, 2009 15 City of Andover, MN Capital Plan 20102014 thru FUNDING SOURCE SUMMARY 20102011201220132014Total Source Assessments222,000523,000946,000446,0002,004,5004,141,500 Building Fund1,500,000 1,500,000 Capital Equipment Reserve300,000300,000 Capital Projects Levy78,00077,000102,50080,00082,000 419,500 Community Center Operations32,00032,000 Construction Seal Coat Fund86,0004,00016,00010,00010,000126,000 G.O. Bond4,265,000450,000 4,715,000 Municipal State Aid Funds895,000200,000527,0001,227,0002,849,000 Park Improvement Funds15,00065,00015,00015,00015,000 125,000 Road & Bridge Funds955,5001,016,5001,624,5001,161,0001,320,5006,078,000 Sewer Revenue Bonds2,000,000250,0002,250,000 Sewer Trunk Fund465,000750,00035,000145,000 1,395,000 Storm Sewer Fund70,50071,50072,50056,00057,000327,500 Water Fund50,00055,00080,50065,00070,000 320,500 Water Revenue Bonds2,665,9008,000,00010,665,900 Water Trunk Fund15,000396,000140,000645,000 1,196,000 1,477,0005,852,9008,800,00014,485,0005,826,00036,440,900 GRAND TOTAL Monday, September 28, 2009 16 City of Andover, MN Capital Plan 20102014 thru PROJECTS & FUNDING SOURCES BY DEPARTMENT DepartmentProject#Priority20102011201220132014 Total Engineering New Development Projects10-41600-01180,000125,000175,000180,000560,000 Sewer Trunk Fund65,000100,00035,000145,000345,000 Water Trunk Fund15,00025,000140,00035,000215,000 Pedestrian Trail Maintenance10-41600-02154,00055,00056,00057,00058,000280,000 Road & Bridge Funds54,00055,00056,00057,00058,000280,000 54,000135,000181,000232,000238,000840,000 Engineering Total Facility Management Annual Parking Lot Maintenance10-41900-01123,00024,00025,00026,00027,000 125,000 Capital Projects Levy23,00024,00025,00026,00027,000125,000 Carpet / Tile Replacement10-41900-02210,00010,00010,000 30,000 Capital Projects Levy10,00010,00010,00030,000 Building A - Seal Floor11-41900-0218,0009,000 17,000 Capital Projects Levy8,0009,00017,000 Surface Seal all Brick Structures12-41900-01175,000 75,000 Capital Projects Levy22,50022,500 Community Center Operations32,00032,000 Water Fund20,50020,500 Roof Replacements12-41900-021300,000300,000 Capital Equipment Reserve300,000300,000 Addition to Storage Building & Vehicle Maint. Shop112-41900-032,200,0002,200,000 G.O. Bond2,200,0002,200,000 Fire St. #2 Addition with additional land purchase12-41900-042885,000885,000 G.O. Bond885,000885,000 Salt Storage Building12-41900-051400,000400,000 G.O. Bond400,000400,000 Recycling Building & Fence12-41900-061250,000250,000 G.O. Bond250,000250,000 Attached Storage Building12-41900-071250,000250,000 G.O. Bond250,000250,000 Relocate Fuel Station w/ Canopy12-41900-082280,000280,000 G.O. Bond280,000280,000 Land Purchase13-41900-0111,500,0001,500,000 Building Fund1,500,0001,500,000 Pedestrian Tunnel Under Crosstown Blvd.13-41900-021450,000 450,000 G.O. Bond450,000450,000 33,00032,0004,675,0001,985,00037,0006,762,000 Facility Management Total Park & Rec - Operations Monday, September 28, 2009 17 DepartmentProject#Priority20102011201220132014 Total Replace/Repair Play Structures - Various Parks10-45000-01145,00045,00045,00045,00045,000 225,000 Capital Projects Levy45,00045,00045,00045,00045,000225,000 45,00045,00045,00045,00045,000225,000 Park & Rec - Operations Total Park & Rec - Projects Annual Miscellaneous Park Projects10-45001-01115,00015,00015,00015,00015,000 75,000 Park Improvement Funds15,00015,00015,00015,00015,00075,000 Irrigation Improvements11-45001-01250,000 50,000 Park Improvement Funds50,00050,000 125,000 15,00065,00015,00015,00015,000 Park & Rec - Projects Total Sanitary Sewer Crosstown Blvd Trunk Sewer Line11-48200-011400,000400,000 Sewer Trunk Fund400,000400,000 Yellow Pine Lift Station12-48200-011650,000650,000 Sewer Trunk Fund650,000650,000 Bunker Lake Boulevard Sanitary Sewer12-48200-021415,000415,000 Assessments415,000415,000 Rural Reserve Trunk Sanitary Sewer13-48200-0112,250,0001,250,0003,500,000 Assessments250,0001,000,0001,250,000 Sewer Revenue Bonds2,000,000250,0002,250,000 400,0001,065,0002,250,0001,250,0004,965,000 Sanitary Sewer Total Storm Sewer Storm Sewer Improvements10-48300-01153,00054,00055,00056,00057,000 275,000 Storm Sewer Fund53,00054,00055,00056,00057,000275,000 275,000 53,00054,00055,00056,00057,000 Storm Sewer Total Streets / Highways Annual Street Seal Coat Project10-43100-011225,000383,000342,000420,000452,0001,822,000 Construction Seal Coat Fund84,0004,00015,0009,0009,000121,000 Road & Bridge Funds141,000379,000327,000411,000443,0001,701,000 Annual Street Crack Seal Project10-43100-02120,000108,000109,000194,000431,000 Construction Seal Coat Fund2,0001,0001,0001,0005,000 Road & Bridge Funds18,000107,000108,000193,000426,000 Annual Street Reconstruction10-43100-031888,000672,0001,405,000693,000746,000 4,404,000 Assessments222,000168,000351,000173,000186,5001,100,500 Road & Bridge Funds666,000504,0001,054,000520,000559,5003,303,500 Annual Pavement Markings10-43100-04119,00020,00021,00022,00023,000105,000 Road & Bridge Funds19,00020,00021,00022,00023,000105,000 Annual Curb Replacement10-43100-05140,00041,00042,00043,00044,000210,000 Road & Bridge Funds40,00041,00042,00043,00044,000210,000 Bridge Scour Repairs10-43100-06135,00035,00035,000105,000 Road & Bridge Funds17,50017,50017,50052,500 Storm Sewer Fund17,50017,50017,50052,500 Municipal State Aid Routes / New & Reconstruct11-43100-011830,000200,000550,0001,120,000 2,700,000 Assessments65,00023,000168,000256,000 Municipal State Aid Funds765,000200,000527,000952,0002,444,000 Intersection Upgrades11-43100-031130,000275,000 405,000 Municipal State Aid Funds130,000275,000405,000 Monday, September 28, 2009 18 DepartmentProject#Priority20102011201220132014 Total 10,182,000 1,227,0002,111,0002,153,0001,837,0002,854,000 Streets / Highways Total Water Rehabilitation of Wells10-48100-01150,00055,00060,00065,00070,000 300,000 Water Fund50,00055,00060,00065,00070,000300,000 Construct Clearwell at WTP11-48100-0112,665,900 2,665,900 Water Revenue Bonds2,665,9002,665,900 Water Main Improvements11-48100-021290,000550,000 840,000 Assessments290,000550,000840,000 Construct Well #1012-48100-011181,000 181,000 Water Trunk Fund181,000181,000 Bunker Lake Boulevard Water Main12-48100-021180,000180,000 Assessments180,000180,000 Demolish 500,000 Gallon Water Tower12-48100-031190,000 190,000 Water Trunk Fund190,000190,000 Construct Water Treatment Plant #213-48100-0118,000,0008,000,000 Water Revenue Bonds8,000,0008,000,000 Water Main along South Coon Creek Drive14-48100-011710,000 710,000 Assessments100,000100,000 Water Trunk Fund610,000610,000 50,0003,010,900611,0008,065,0001,330,00013,066,900 Water Total 1,477,0005,852,9008,800,00014,485,0005,826,00036,440,900 GRAND TOTAL Monday, September 28, 2009 19 thru Capital Plan 20102014 of Andover, MN City 10-41600-01 Project # New Development Projects Project Name DepartmentEngineering TypeImprovement Useful Life50 YearsContactDPW / City Engineer CategoryNew Development Projects Priority1 - High Description New developments include the construction of sanitary sewer, water main, storm sewers and streets. Since the majority of the improvement projects are being privately installed by the developer, the following expenditures are the city's share for trunk water and sewer improvements. Note: All private development construction is dependent upon market conditions, plat approval and normal City development procedures. Justification The development phasing is identified in the City's Comprehensive Plan. Expenditures20102011201220132014Total 80,000125,000175,000180,000560,000 Construction 80,000125,000175,000180,000560,000 Total Funding Sources20102011201220132014Total Sewer Trunk Fund 65,000100,00035,000145,000345,000 Water Trunk Fund 15,00025,000140,00035,000215,000 80,000125,000175,000180,000560,000 Total Budget Impact/Other Additional maintenance of streets, storm sewer, water main and sanitary sewer will result. Additional streets will be added for snowplowing. Monday, September 28, 2009 20 thru Capital Plan 20102014 of Andover, MN City 10-41600-02 Project # Pedestrian Trail Maintenance Project Name DepartmentEngineering TypeImprovement Useful Life10 YearsContactDPW / City Engineer CategoryImprovements Priority1 - High Description This project provides maintenance such as patching, crack filling and restoration for the city's pedestrian and park trail system. Justification City trails are in need of general maintenance including bituminous patching, crack filling and restoration to maintain the high level of service to pedestrian walkers, bikers and roller bladers. A 5-year capital improvement plan was prepared for the City to identify and prioritize the necessary repairs. Expenditures20102011201220132014Total 54,00055,00056,00057,00058,000280,000 Improvement 54,00055,00056,00057,00058,000280,000 Total Funding Sources20102011201220132014Total Road & Bridge Funds 54,00055,00056,00057,00058,000280,000 54,00055,00056,00057,00058,000280,000 Total Budget Impact/Other As the city trail system begins to age, general maintenance such as bituminous patching, crack filling and restoration becomes a necessity. The maintenance will allow for a longer service life for the trail system throughout the city. Monday, September 28, 2009 21 thru Capital Plan 20102014 of Andover, MN City 10-41900-01 Project # Annual Parking Lot Maintenance Project Name DepartmentFacility Management TypeImprovement Useful Life10 YearsContactDPW / City Engineer CategoryImprovements Priority1 - High Description Yearly maintenance of the City parking lots is necessary to extend their useful lives. Parking lots that need maintaining include those at the City Hall complex, Public Works, Community Center, at City parks, and at the Fire Stations. Yearly maintenance may include crack sealing, seal coating, and mill and overlays. Maintenance will generally be completed with the street zones, or on an as needed basis. Justification Completing periodic maintenance on the City parking lots, similar to City streets, will extend the overall design life of the pavement and reduce and/or prolong costly repairs. Expenditures20102011201220132014Total 23,00024,00025,00026,00027,000125,000 Improvement 23,00024,00025,00026,00027,000125,000 Total Funding Sources20102011201220132014Total Capital Projects Levy 23,00024,00025,00026,00027,000125,000 23,00024,00025,00026,00027,000125,000 Total Budget Impact/Other Maintaining the parking lots will result in less annual maintenance for public works and prolong the life of the pavements. Monday, September 28, 2009 22 thru Capital Plan 20102014 of Andover, MN City 10-41900-02 Project # Carpet / Tile Replacement Project Name DepartmentFacility Management TypeImprovement Useful Life10 YearsContactDPW / City Engineer CategoryEquipment Priority2 - Medium Description The replacement of carpet and tile in appropriate areas of all City buildings where deemed necessary. An annual review of all areas will be done to determine the order of replacement. Justification The buildings get a lot of use and, despite the appropriate cleaning and maintenance, the carpeting and tile will need to be replaced. Expenditures20102011201220132014Total 10,00010,00010,00030,000 Facility Maintenance 10,00010,00010,00030,000 Total Funding Sources20102011201220132014Total Capital Projects Levy 10,00010,00010,00030,000 10,00010,00010,00030,000 Total Budget Impact/Other The carpet and tile replacement will be needed in order to keep the buildings in good repair. Due to heavy use, it is anticipated that all carpeted and tile areas will need to be replaced. Monday, September 28, 2009 23 thru Capital Plan 20102014 of Andover, MN City 11-41900-02 Project # Building A - Seal Floor Project Name DepartmentFacility Management TypeImprovement Useful Life2 YearsContactDPW / City Engineer CategoryFacility Management Priority1 - High Description Apply a sealant to the cement floor in Building A (large garage). Justification The cement floor in Building A spalds due to daily traffic and salt. Sealing of the floors should be repeated every 2 years to retain the integrity of the floor surface. Without this process, the cement floor would deteriorate and have to be replaced. It is much more cost effective to perform the maintenance than to replace the entire floor. Expenditures20102011201220132014Total 8,0009,00017,000 Facility Maintenance 8,0009,00017,000 Total Funding Sources20102011201220132014Total Capital Projects Levy 8,0009,00017,000 8,0009,00017,000 Total Budget Impact/Other Proper maintenance extends the life of the cement floor, thus not having to replace it before its life expectancy is up. Monday, September 28, 2009 24 thru Capital Plan 20102014 of Andover, MN City 12-41900-01 Project # Surface Seal all Brick Structures Project Name DepartmentFacility Management TypeImprovement Useful Life5 yearsContactDPW / City Engineer CategoryFacility Management Priority1 - High Description A surface sealing application would be initiated for all brick and/or block municipal buildings. The buildings include: City Hall, Public Works, Fire Station 1, 2, & 3, Sunshine Park Building, Prairie Knoll Park Building, Andover Station North Park Building, Community Center and all utility department buildings such as the pump houses and treatment facility. Justification This is a necessary maintenance item to ensure the long term integrity of the municipal buildings. Expenditures20102011201220132014Total 75,00075,000 Facility Maintenance 75,00075,000 Total Funding Sources20102011201220132014Total Capital Projects Levy 22,50022,500 Community Center Operations 32,00032,000 Water Fund 20,50020,500 75,00075,000 Total Budget Impact/Other This will reduce the amount of long term maintenance and repair to the municipal buildings. Monday, September 28, 2009 25 thru Capital Plan 20102014 of Andover, MN City 12-41900-02 Project # Roof Replacements Project Name DepartmentFacility Management TypeImprovement Useful Life20 YearsContactDPW / City Engineer CategoryFacility Management Priority1 - High Description Remove and replace the existing membrane on the following roofs: City Hall & Senior Center and Fire Stations 1 & 2. City Hall & Senior Center $220,000 Fire Station #1 $45,000 Fire Station #2 $35,000 Justification The roofs are coming of age and and have been receiving annual maintenance for cracking, minor leaks and seams popping. They will continue to be watched and inspected annually to determine when it becomes cost efficient to replace the whole roof. Expenditures20102011201220132014Total 300,000300,000 Improvement 300,000300,000 Total Funding Sources20102011201220132014Total Capital Equipment Reserve 300,000300,000 300,000300,000 Total Budget Impact/Other Annual inspections and maintenance will be monitored to determine when it becomes cost effective to completely replace the entire roof. Monday, September 28, 2009 26 thru Capital Plan 20102014 of Andover, MN City 12-41900-03 Project # Addition to Storage Building & Vehicle Maint. Shop Project Name DepartmentFacility Management TypeImprovement Useful Life30 Years +ContactDPW / City Engineer CategoryFacility Management Priority1 - High Description An addition to the north end of Bldg A and be the same in size, 100' x 250' with a 75' x 140' addition to the northwest side of the new vehicle storage garage for the vehicle maintenance shop. This building will be built with cement panels to match the present vehicle garage and would screen Public Works operations from the Community Center/YMCA as proposed in a joint meeting with the Mayor and City Council. Justification Due to the increase of vehicles, equipment and supplies now used by the City of Andover, this vehicle storage building and vehicle maintenance repair shop is badly needed. It is not cost effective to have vehicles or other equipment stored outside. Minnesota's four seasons are way too hard on them and it makes for a much cleaner operation. The vehicle maintenance repair shop has been needed for a long time. The area now used has doors that are not wide enough and work areas for the hydraulic hoist are way too small. Also with the amount of equipment now maintained by our staff, the area is much too small to run a completely safe operation. Expenditures20102011201220132014Total 2,200,0002,200,000 Improvement 2,200,0002,200,000 Total Funding Sources20102011201220132014Total G.O. Bond 2,200,0002,200,000 2,200,0002,200,000 Total Budget Impact/Other This will impact the life of the vehicles and other equipment by being stored inside and to house our vehicle maintenance mechanics. Over the years, the cost savings have been shown when the proper maintenance of our equipment can be implemented. This building will provide a safe, productive, and healthy operational area for City employees that will benefit the City of Andover for many years. Monday, September 28, 2009 27 thru Capital Plan 20102014 of Andover, MN City 12-41900-04 Project # Fire St. #2 Addition with additional land purchase Project Name DepartmentFacility Management TypeImprovement Useful Life30 YearsContactFire Chief CategoryImprovements Priority2 - Medium Description The addition of one bay to the apparatus area and expanding the existing parking lot to allow for more room and parking space. The project also includes a mill and overlay of the existing parking lots at Station #1 and #2. The additional land would be used to expand the station #2 site to include a training facility that will allow for the appropriate outdoor fire and rescue training, including all types of required live fire scenarios. Justification The additional space to the building will allow for all vehicles to be parked in front of an exit door. The firefighters will not have to move a vehicle in order to get another one out of the building. The additional bay will also make clean up operations after an event much easier. The firefighters will not have to move vehicles out of the building in order to clean hose and equipment. The additional parking space will provide for much needed hard surface training area and more vehicle parking. Replacement of the existing parking lots is necessary due to the heavy fire vehicle traffic. The current use of old houses to be demolished by burning for training purposes is becoming harder to do because of E.P.A. and P.C.A. standards and requirements. The concept of a county wide regional fire training center with joint funding should be considered as a viable option for the station #2 site. Expenditures20102011201220132014Total 250,000250,000 Land Acquisition 35,00035,000 Equipment Improvement 600,000600,000 885,000885,000 Total Funding Sources20102011201220132014Total 885,000885,000 G.O. Bond 885,000885,000 Total Budget Impact/Other The additional space will make all fire operations more efficient at this building. Vehicles will not have to be moved in order to get others out and clean-up will be much easier and faster. As part of this project it is suggested that the City look to purchase additional land adjacent to station #2. The building addition is needed but now is the time to also plan for future fire department needs. The strategic planning would call for a fire department training site where outdoor and live burn training could be accomplished. The additional land would be used to expand the station #2 site to include a training facility that will allow for the appropriate outdoor fire and rescue training, including all types of required live fire scenarios. A training building used for rescue and live fire scenarios should also be considered. Monday, September 28, 2009 28 thru Capital Plan 20102014 of Andover, MN City 12-41900-05 Project # Salt Storage Building Project Name DepartmentFacility Management TypeImprovement Useful Life30 Years +ContactDPW / City Engineer CategoryFacility Management Priority1 - High Description This salt storage building would be 40' x 50' x 25' high. The City would be able to purchase a season's worth of salt and keep it stored inside this structure out of the elements. All environmental specifications would be met for this type of storage. This facility would be built to blend in with the rest of the City complex and not a sight distraction within the campus. Justification At the present time the City purchases salt from Anoka County, which has been done since the City was first adopted. This puts us at the mercy of the county operations, causing situations such as what time someone will be there to load our trucks and whether they have an adequate supply of salt on hand. We have had good working relations with the county, but they also would like to see us be able to store our own winter supply. Cost savings is also a large part of having our own storage. We can purchase product for less cost and eliminate the 15% administration cost. This building will pay for itself over a short period of time. Expenditures20102011201220132014Total 400,000400,000 Construction 400,000400,000 Total Funding Sources20102011201220132014Total G.O. Bond 400,000400,000 400,000400,000 Total Budget Impact/Other Having this building right here on campus will save a great deal of personnel time, trucking, and fuel costs. The salt not used could be returned to the storage building and not dumped outside where it gets wet, damaged, or becomes an environmental problem. Monday, September 28, 2009 29 thru Capital Plan 20102014 of Andover, MN City 12-41900-06 Project # Recycling Building & Fence Project Name DepartmentFacility Management TypeImprovement Useful Life15-20 YearsContactDPW / City Engineer CategoryFacility Management Priority1 - High Description This structure will have to be larger than the present building so more recycled materials can be stored inside reducing the chance of the lighter materials blowing out. There also needs to be more room for outside storage including a paved drive surface, it being completely fenced, better security lighting, and updated security camera's. The new location would be located north of the water treatment facility and the building would be constructed of materials that would blend in with the rest of the public works campus. Justification At the present location we have just plain run out of room! The recycling center will have to be moved if the new addition of the vehicle storage building is approved. Also as clean as we try to keep this area, it is probably not the best neighbor to the Community Center since items sometimes blow out of the recycling storage yard. Also it would be best to keep the large trucks off of Tower Drive for safety reasons, due to narrow streets and a lot of pedestrian traffic. Expenditures20102011201220132014Total 250,000250,000 Construction 250,000250,000 Total Funding Sources20102011201220132014Total G.O. Bond 250,000250,000 250,000250,000 Total Budget Impact/Other In the new location we will most likely be able to keep a closer watch on the area. It will still be within the area of the public works so there would be no extra cost in maintenance of the grounds and with a larger area it will be more customer friendly. Monday, September 28, 2009 30 thru Capital Plan 20102014 of Andover, MN City 12-41900-07 Project # Attached Storage Building Project Name DepartmentFacility Management TypeImprovement Useful Life25 YearsContactDPW / City Engineer CategoryFacility Management Priority1 - High Description Three sided building approximately 25' x 50'. It would be used to store equipment not sensitive to the changing temperatures and weather conditions but out of direct sunlight. It would also help to screen the facility. Justification Part of the Public Works site expansion. Protect outdoor vehicles and equipment from changing weather conditions. Expenditures20102011201220132014Total 250,000250,000 Construction 250,000250,000 Total Funding Sources20102011201220132014Total G.O. Bond 250,000250,000 250,000250,000 Total Budget Impact/Other Monday, September 28, 2009 31 thru Capital Plan 20102014 of Andover, MN City 12-41900-08 Project # Relocate Fuel Station w/ Canopy Project Name DepartmentFacility Management TypeImprovement Useful Life20 YearsContactDPW / City Engineer CategoryFacility Management Priority2 - Medium Description Relocate the fueling station and install two (2) new 10,000 gallon fuel tanks and possibility keep the 2,000 gallon diesel fuel tank for an alternative fuel like E85. Also, install a canopy to cover the fuel pumps and Gasboy fuel monitoring equipment. Justification The canopy would keep the fuel pumps, gasboy equipment, operators dry and help keep sun, rain and snow damage to a minimum. It would also keep the fuel in the tanks from getting contaminated. The larger tanks will allow us to have tanker drops of 7,500 gallons of fuel, saving us money and the frequency of the drops that we now have. The tanks are approximately 18 years old and are warranteed for 30 years. The pumps were installed in 1999 and are in good shape. Expenditures20102011201220132014Total 280,000280,000 Improvement 280,000280,000 Total Funding Sources20102011201220132014Total G.O. Bond 280,000280,000 280,000280,000 Total Budget Impact/Other The larger tanks will allow us to have a tanker drops of 7,500 gallons of fuel, saving us money and the frequency of the drops that we now have. Monday, September 28, 2009 32 thru Capital Plan 20102014 of Andover, MN City 13-41900-01 Project # Land Purchase Project Name DepartmentFacility Management TypeImprovement Useful LifeUnassignedContactDPW / City Engineer CategoryImprovements Priority1 - High Description Purchase land west of the Public Works building to be used for a salt storage building, material storage, recycling center and future facility expansion. The City's is currently under contract to purchase this property. The City management team will be evaluating and assisting with the planning and future expansion for the Public Works Facility. Adequate property is necessary to insure that future needs of the community can be met. Justification This is the last opportunity to purchase this property and keep city facilities together in one complex. Future site expansion opportunities are limited without additional property. Expenditures20102011201220132014Total 1,500,0001,500,000 Land Acquisition 1,500,0001,500,000 Total Funding Sources20102011201220132014Total Building Fund 1,500,0001,500,000 1,500,0001,500,000 Total Budget Impact/Other There is a large cost savings in keeping facilities together, in addition to, having our own salt storage area on the property. The recycling center would be moved away from the park and Community Center improving the general appearance of the area. It would also provide a large storage area for the seal coat rock, sweeping, etc. Open land areas in Andover will soon be a thing of the past. Monday, September 28, 2009 33 &DSLWDO,PSURYHPHQW3ODQ 3URMHFW1DPH LAND PURCHASE IGHTINGALE N FOX ESTATES HOLLOW ES 4TH  ORIAL BLVD &LW\+DOO 3DUN&RPSOH[ ND   ATES 6XQVKLQH3DUN Location Map /(*(1' Project Location Lots/Parcels Park 03156301,260 Water Feet Right of Way City Limits 34 thru Capital Plan 20102014 of Andover, MN City 13-41900-02 Project # Pedestrian Tunnel Under Crosstown Blvd. Project Name DepartmentFacility Management TypeImprovement Useful Life30 Years +ContactDPW / City Engineer CategoryFacility Management Priority1 - High Description This would be a pedestrian underpass walkway under Crosstown to accommodate pedestrian traffic from a possible development of a parking lot or other sports fields on the north side of Crosstown Boulevard that could crossunder Crosstown Boulevard to Sunshine Park Facilities or just connect to the cities trail system. Justification This item was discussed at a Council Workshop with the Public Works Department Managers February 16th 2006. For safety and for easy access for crossing Crosstown Boulevard from a future park and/or future parking lot on the north side of Crosstown Boulevard to Sunshine Park on the South side, or just getting to the city trail system the quickest and safest way will be a pedestrian underpass under Crosstown Boulevard. Expenditures20102011201220132014Total 450,000450,000 Improvement 450,000450,000 Total Funding Sources20102011201220132014Total G.O. Bond 450,000450,000 450,000450,000 Total Budget Impact/Other Connecting of these area's through an underpass will not only benefit pedestrians crossing the roadway, but will also provide a safe passage for personnel and smaller equipment. Monday, September 28, 2009 35 thru Capital Plan 20102014 of Andover, MN City 10-45000-01 Project # Replace/Repair Play Structures - Various Parks Project Name DepartmentPark & Rec - Operations TypeImprovement Useful Life10 YearsContactDPW / City Engineer CategoryPark Improvements Priority1 - High Description Repair to fall zones and achieve ADA accessibility. Replacement of playground equipment and other major replacements, such as short fences on ball fields, soccer goals, and any area of play that does not meet safety specifications. The proposed rebuilds are as follows: 2010 - Timber Trails Park & Nordeen's Park 2011 - Pleasant Oaks Park & Woodland Meadows Park 2012 - Green Acres Park & Northwoods East Park 2013 - Langseth Park & Andover Lions Park Justification Old equipment no longer meets ADA requirements, such as entrapments, fall zones and handicap accessibility. Working to bring the parks up to meet all safety requirements. Expenditures20102011201220132014Total 45,00045,00045,00045,00045,000225,000 Equipment 45,00045,00045,00045,00045,000225,000 Total Funding Sources20102011201220132014Total 45,00045,00045,00045,00045,000225,000 Capital Projects Levy 45,00045,00045,00045,00045,000225,000 Total Budget Impact/Other Less maintenance and will meet all safety requirements. Wednesday, September 30, 2009 36 thru Capital Plan 20102014 of Andover, MN City 10-45001-01 Project # Annual Miscellaneous Park Projects Project Name DepartmentPark & Rec - Projects TypeImprovement Useful LifeUnassignedContactAsst.Public Works Director CategoryPark Improvements Priority1 - High Description This is for unforeseen or requested miscellaneous projects that may arise during the year, requested by the public, staff, City Council or the Parks and Recreation Commission for each year. Justification This gives flexibility to the City to do certain small-sized projects that may be warranted; for example, purchase of soccer goals. This funding has been recommended by the Park & Recreation Commission. Expenditures20102011201220132014Total 15,00015,00015,00015,00015,00075,000 Improvement 15,00015,00015,00015,00015,00075,000 Total Funding Sources20102011201220132014Total Park Improvement Funds 15,00015,00015,00015,00015,00075,000 15,00015,00015,00015,00015,00075,000 Total Budget Impact/Other Allows the Park and Recreation Commission to address a variety of different needs throughout the year. Monday, September 28, 2009 37 thru Capital Plan 20102014 of Andover, MN City 11-45001-01 Project # Irrigation Improvements Project Name DepartmentPark & Rec - Projects TypeImprovement Useful Life20 YearsContactAsst.Public Works Director CategoryPark Improvements Priority2 - Medium Description The Park Commission would like to begin making irrigation improvements to one of the existing parks within the city. The parks they are considering is one of the following: Oak Bluff, Andover Lions, Wild Iris, Hills of Bunker Lake West, Fox Meadows, and Timber Trails. Justification By providing irrigation to the parks will allow the grass to grow better and provide a better playing surface area to play on. Expenditures20102011201220132014Total 50,00050,000 Improvement 50,00050,000 Total Funding Sources20102011201220132014Total Park Improvement Funds 50,00050,000 50,00050,000 Total Budget Impact/Other Yearly maintenance will be required in addition to the cost of utilities (water, electricty, etc.) Wednesday, September 30, 2009 38 thru Capital Plan 20102014 of Andover, MN City 11-48200-01 Project # Crosstown Blvd Trunk Sewer Line Project Name DepartmentSanitary Sewer TypeImprovement Useful Life50 YearsContactDPW / City Engineer CategoryImprovements Priority1 - High Description Extend sanitary sewer trunk along Crosstown Boulevard from the railroad tracks east to Prairie Road. It will be necessary to jack the sanitary sewer underneath the railroad. Justification The trunk sanitary sewer will be extended to serve properties adjacent to Crosstown Boulevard and east of the railroad tracks and ultimately east of Prairie Road. The extension has been recommended through the sanitary sewer report (2004 Sanitary Sewer Report), subsequent studies of the system, and the updated Comprehensive Plan. This project is contingent upon the development east of the railroad tracks. Expenditures20102011201220132014Total 400,000400,000 Improvement 400,000400,000 Total Funding Sources20102011201220132014Total Sewer Trunk Fund 400,000400,000 400,000400,000 Total Budget Impact/Other Additional routine maintenance including televising and cleaning will be required. Monday, September 28, 2009 39 Capital Improvement Plan 4VSNIGX2EQI CROSSTOWN BLVD SEWER LINE FIELDS OAKS MILLER'S WOODS 18 MILLER'S WOODS 2ND 158TH AVE MOORES ESTATES Moores Estates PRAIRIE OAKS Sophie's Park Location Map L E G E N D Project Location Lots/Parcels Park 03657301,460 Water Feet Right of Way 40 City Limits thru Capital Plan 20102014 of Andover, MN City 12-48200-01 Project # Yellow Pine Lift Station Project Name DepartmentSanitary Sewer TypeImprovement Useful Life50 YearsContactDPW / City Engineer CategoryImprovements Priority1 - High Description Install a lift station at Yellow Pine Street to divert flow from the Bluebird Street trunk line to the Pinewood trunk line. The wet well for this lift station was constructed in 2005 as a part of the Crosstown Boulevard Improvements Project. Justification This lift station will allow additional capacity in the Bluebird Street trunk line to serve adjacent properties until the year 2020. This project is development dependent. Expenditures20102011201220132014Total 650,000650,000 Improvement 650,000650,000 Total Funding Sources20102011201220132014Total Sewer Trunk Fund 650,000650,000 650,000650,000 Total Budget Impact/Other Routine monitoring and maintenance of the lift station will be required. Monday, September 28, 2009 41 'ETMXEP-QTVSZIQIRX4PER 4VSNIGX2EQI YELLOW PINE LIFT STATION 7,%; 7+0)2 1336)7)78%8)7 1SSVIW )WXEXIW +6)=3%/7 46%-6-)3%/7 'LIWXIVXSR 'SQQSRW4EVO Sophie's Park  'MX],EPP 4EVO'SQTPI\   7YRWLMRI4EVO Location Map 0)+)2( Project Location Lots/Parcels Park 05501,1002,200 Water Feet Right of Way 42 City Limits thru Capital Plan 20102014 of Andover, MN City 12-48200-02 Project # Bunker Lake Boulevard Sanitary Sewer Project Name DepartmentSanitary Sewer TypeImprovement Useful Life50 YearsContactDPW / City Engineer CategoryImprovements Priority1 - High Description Extend sanitary sewer west from Blackfoot Street / Bunker Lake Boulevard to just east of 7th Avenue. Justification The sanitary sewer will be extended to serve properties adjacent to Bunker Lake Boulevard and east of 7th Avenue. The extension is included in the City's updated Comprehensive Plan. Construction would be in conjunction with Anoka County reconstructing Bunker Lake Boulevard in this vicinity. A feasibility report was prepared for this project in 2007. Considerable cost savings could be achieved if this project is constructed with the roadway reconstruction. Expenditures20102011201220132014Total 415,000415,000 Improvement 415,000415,000 Total Funding Sources20102011201220132014Total Assessments 415,000415,000 415,000415,000 Total Budget Impact/Other Additional routine maintenance including televising and cleaning will be required. Monday, September 28, 2009 43 Capital Improvement Plan 4VSNIGX2EQI BUNKER LAKE BOULEVARD SANITARY SEWER (2012) Pleasant Oaks Park ANDOVER DEHNS ADD BOUNDRY Dehn's Park COMM PLAT 1 DEHNS 2ND ADD Creekridge Park WOODLAND GOLF WANDERSEE KADLEC 2ND ADD ADD VILLAS 7 ROSELLAS AZTEC ESTATES ADD 116 QUICKSTROM ADD WOODLAND POND Rose Park 140TH AVE NORTHGLEN 4TH ADD 9 NORTHGLEN 139TH AVE 138TH LN Wild Iris Park WOODLAND CREEK LOCAL OIL ADD 116 136TH LN CHAPMANS CHAPMANS 2ND ADD3RD ADD 136TH AVE CHAPMANSCHAPMANS ADD 4TH ADD CHAPMANS CHAPMANS 5TH ADD 6TH ADDWOODLAND TERRACE 3RD ADD Terrace Park ’ Location Map L E G E N D Project Location Lots/Parcels Park 05501,1002,200 Water Feet Right of Way City Limits 44 thru Capital Plan 20102014 of Andover, MN City 13-48200-01 Project # Rural Reserve Trunk Sanitary Sewer Project Name DepartmentSanitary Sewer TypeImprovement Useful Life50 YearsContactDPW / City Engineer CategoryUnassigned Priority1 - High Description Extension of trunk sanitary sewer from Bunker Lake Boulevard approximately parallel to Coon Crook to serve the Rural Reserve area. The sanitary sewer will be constructed through existing neighborhoods and along South Coon Creek Drive then north into the Rural Reserve Area. It is anticipated that the extension through the Rural Reserve may be constructed the following year, or as the market demands. Justification The trunk sanitary sewer will be extended to serve future development of the Rural Reserve. The timing of this extension will be market driven based upon developer timelines for the Rural Reserve. The extension has been recommended in the Trunk Sanitary Sewer Analysis for Designated Rural Reserve Areas. Expenditures20102011201220132014Total 2,250,0001,250,0003,500,000 Construction 2,250,0001,250,0003,500,000 Total Funding Sources20102011201220132014Total Assessments 250,0001,000,0001,250,000 Sewer Revenue Bonds 2,000,000250,0002,250,000 2,250,0001,250,0003,500,000 Total Budget Impact/Other Additional routine maintenance including televising and cleaning will be required. Monday, September 28, 2009 45 Capital Improvement Plan 4VSNIGX2EQI RURAL RESERVE TRUNK SANITARY SEWER 7 59 9 20 20 20 20 78 N ENCHANTED DR 58 9 158TH LN 20 20 154TH LN 154TH AVE 7 78 VETERAN'S MEMORIAL BLVD VETERAN'S MEMORIAL BLVD 18 78 149TH LN 6392( 18 9 0%/) 146TH LN 146TH AVE 146TH AVE 78 18 7 140TH AVE 18 78 9 139TH AVE 138TH LN 138TH AVE 137TH LN BUNKER LAKE BLVD 116 116 116 116 Location Map L E G E N D Project Location Lots/Parcels 01,5503,1006,200 Park Feet Water 46 City Limits thru Capital Plan 20102014 of Andover, MN City 10-48300-01 Project # Storm Sewer Improvements Project Name DepartmentStorm Sewer TypeImprovement Useful Life30 Years +ContactDPW / City Engineer CategoryUtilities Priority1 - High Description Each year, areas of the City are identified where improvements are required to maintain our storm sewer system. Maintenance items include replacement of failing culverts, catch basins, and storm sewer pipes, erosion issues at storm sewer outfalls, and dredging of ponds and ditches. Justification Maintaining the City's storm sewer system improves water quality and public safety, and reduces the need for costly repairs in the future. Repairing and maintaining these systems also allows public works to focus on and comply with requirements of the NPDES program, such as pipe cleaning, inspections, and sweeping. Expenditures20102011201220132014Total 53,00054,00055,00056,00057,000275,000 Improvement 53,00054,00055,00056,00057,000275,000 Total Funding Sources20102011201220132014Total Storm Sewer Fund 53,00054,00055,00056,00057,000275,000 53,00054,00055,00056,00057,000275,000 Total Budget Impact/Other Repairing problem areas in the storm sewer system will reduce the yearly maintenance needs placed on the public works personnel. Monday, September 28, 2009 47 thru Capital Plan 20102014 of Andover, MN City 10-43100-01 Project # Annual Street Seal Coat Project Project Name DepartmentStreets / Highways TypeImprovement Useful Life8 YearsContactDPW / City Engineer CategoryPark Improvements Priority1 - High Description This project provides for a seal coat of the streets. Due to reduced budgets and escalating fuel and material prices, funding is not available for complete maintenance on an entire zone on an annual basis as has been the historical practice. Each year, staff will determine an area that can be seal coated within the allotted budget based upon current estimated project costs. This plan has the following areas tentatively planned for sealcoating as follows: 2010: Remainder of Zone 7 2011: West 1/2 of Zone 8 2012: East 1/2 of Zone 8 2013: East 1/2 of Zone 1 2014: West 1/2 of Zone 1 Justification Seal coating will extend the useful life of roads by protecting the bituminous from oxidation due to adverse weather conditions (sun, rain, wind, snow, etc.). The prevention of oxidation will prolong the useful life of the pavement and defer the need for a costly reconstruction. Seal coating also improves the skid resistance of the roadway surface by increasing the friction between vehicle tires and the roadway. New developments and reconstructed areas are typically seal coated within three to four years after they are paved. Expenditures20102011201220132014Total 225,000383,000342,000420,000452,0001,822,000 Construction 225,000383,000342,000420,000452,0001,822,000 Total Funding Sources20102011201220132014Total Construction Seal Coat Fund 84,0004,00015,0009,0009,000121,000 Road & Bridge Funds 141,000379,000327,000411,000443,0001,701,000 225,000383,000342,000420,000452,0001,822,000 Total Budget Impact/Other Extending the life of the street will reduce routine maintenance (Crack sealing, pot hole patching, overlays, etc.) and extend the overall design life of the pavement. Monday, September 28, 2009 48 thru Capital Plan 20102014 of Andover, MN City 10-43100-02 Project # Annual Street Crack Seal Project Project Name DepartmentStreets / Highways TypeImprovement Useful Life8 YearsContactDPW / City Engineer CategoryStreets/Highways Priority1 - High Description This project provides for crack sealing of the streets. Due to budget restraints and escalating fuel and material prices, funding is not available for complete maintenance on an entire zone on an annual basis. Each year, staff will determine an area that can be crack sealed within the allotted budget based upon current estimated project costs. This plan has the following areas tentatively planned for crack sealing as follows: 2010: Remainder of Zone 8 2011: No crack seal project in 2011 2012: East 1/2 of Zone 1 2013: West 1/2 of Zone 1 2014: Full Zone 2 Justification The sealing of street cracks will significantly extend the useful life of the streets. This will extend the time frame when a costly street reconstruction project will be necessary. The sealing of cracks in the street surface reduces/eliminates water from entering the road base and subgrade. This process reduces the freeze/thaw cycles of the subgrade, maintaining the integrity of the road. Crack sealing is completed in a particular zone one year prior to seal coating. This allows the crack sealing material to cure and minimize bleed through once seal coated. New developments and reconstructed areas requiring crack seal are not shown on the attached maps. These areas are typically crack sealed three years after they are paved. Expenditures20102011201220132014Total 20,000108,000109,000194,000431,000 Construction 20,000108,000109,000194,000431,000 Total Funding Sources20102011201220132014Total 2,0001,0001,0001,0005,000 Construction Seal Coat Fund 18,000107,000108,000193,000426,000 Road & Bridge Funds 20,000108,000109,000194,000431,000 Total Budget Impact/Other Sealing the street cracks will reduce routine maintenance by eliminating the source of degradation resulting from moisture in the road subgrade. Monday, September 28, 2009 49 thru Capital Plan 20102014 of Andover, MN City 10-43100-03 Project # Annual Street Reconstruction Project Name DepartmentStreets / Highways TypeImprovement Useful Life20 YearsContactDPW / City Engineer CategoryStreets/Highways Priority1 - High Description The Street Reconstruction projects will consist of milling the existing street surface and constructing a new asphalt surface. Minor shouldering and restoration work will be included with the project. In developments that have existing bituminous curb or no curb or ditch, concrete curb and gutter will be constructed. 25% of the total project costs are assessed to the benefiting properties in each development. This program helps to maintain the integrity and value of the community's street infrastructure. Areas to be reconstructed are listed below. The timing of reconstruction of developments more than two years out may be revised as street conditions and ratings are reviewed on an annual basis. Additional developments may be added to the schedule or projects moved up if it is advantageous to reconstruct them in conjunction with other nearby projects. 2010 - Woodland Meadows - South Half 2011 - Rolling Forest, Genthon Ponds, Flintwood Street, Aud. Sub. 137, East Brook Terrace 2012 - Stenquist Addition, Makah Street, 159th Ave (7th Ave to Roanoke St.) 2013 - Johnson's Oakmount Terrace, Ivywood Estates 2014 - Lakeview Terrace, Lundgren Oakridge, Kemps Addition, Country Estates, Howard-Temple Addition Justification The streets in these neighborhoods are generally in excess of 25 years old and are in need of rehabilitation. The intent of this program is to provide the community with a high quality transportation system and maintain a constant upkeep of the City's street infrastructure. Expenditures20102011201220132014Total 888,000672,0001,405,000693,000746,0004,404,000 Construction 888,000672,0001,405,000693,000746,0004,404,000 Total Funding Sources20102011201220132014Total 222,000168,000351,000173,000186,5001,100,500 Assessments 666,000504,0001,054,000520,000559,5003,303,500 Road & Bridge Funds 888,000672,0001,405,000693,000746,0004,404,000 Total Budget Impact/Other The rehabilitation of the streets will reduce the routine maintenance (crack sealing, pot hole patching, etc..) in the area. Long term, this reconditioning will prolong the structural stability of the roadway making for a longer serviceable life. Monday, September 28, 2009 50 Capital Improvement Plan 4VSNIGX2EQI ANNUAL STREET RECONSTRUCTION (2010) WOODLAND MEADOWS - SOUTH HALF 59 WOODLAND MEADOWS 2ND ADD ’ Location Map L E G E N D Project Location Lots/Parcels Park 02955901,180 Water Feet Right of Way City Limits 51 Capital Improvement Plan 4VSNIGX2EQI ANNUAL STREET RECONSTRUCTION (2011) EAST BROOK TERRACE/AUDITORS SUB. 137 116 Crooked Lake Boat Landing AUD SUB 102 LAKEVIEW TERRACE Hidden Creek North Park HIDDEN CREEK HOWARD-TEMPEL COUNTRY EST ADDITION KEMPS ADD EAST BROOK TERRACE MATTSON & DEGARDNER Hidden Creek South Park CR LK 134TH AVE AUD SUB NO 137 LUNDGREN OAKRIDGE ADDITION ’ Location Map L E G E N D Project Location Lots/Parcels Park 0235470940 Water Feet Right of Way City Limits 52 Capital Improvement Plan 4VSNIGX2EQI ANNUAL MILL AND OVERLAY (2011) ROLLING FOREST ’ Location Map L E G E N D Project Location Lots/Parcels Park 03056101,220 Water Feet Right of Way City Limits 53 Capital Improvement Plan 4VSNIGX2EQI ANNUAL STREET RECONSTRUCTION (2011) GENTHON PONDS AND FLINTWOOD STREET 58 18 ’ Location Map L E G E N D Project Location Lots/Parcels Park 03056101,220 Water Feet Right of Way City Limits 54 Capital Improvement Plan 4VSNIGX2EQI ANNUAL STREET RECONSTRUCTION (2012) STENQUIST ADDITION, 159TH AVE AND MAKAH ST ECHO HILLS RUSSELL-STACK ADDITION 58 158 7 164TH LN 164TH AVE STACK'S WOODS CASTNER ADD. SILVER MEADOWS WEST STENQUIST ADDITION 7 ALADDIN ACRES REG LAND SURVEY NO 126 N ENCHANTED DR REG LAND SURVEY REG LAND NO 081 SURVEY NO. 072 FOX 58 159TH AVE MEADOWS RUM RIVER RANCH ESTATES Fox Meadows KIOWA TERRACE 20 RUM RIVER FOREST INDIAN MEADOWS Strootman Park ’ Location Map L E G E N D Project Location Lots/Parcels Park 06251,2502,500 Water Feet Right of Way City Limits 55 Capital Improvement Plan 4VSNIGX2EQI ANNUAL STREET RECONSTRUCTION (2013) IVYWOOD ESTATES 149TH LN IVYWOOD ESTATES INDIAN MEADOWS River Trails Park Meadowood North Park ’ Location Map L E G E N D Project Location Lots/Parcels Park 02705401,080 Water Feet Right of Way City Limits 56 Capital Improvement Plan 4VSNIGX2EQI ANNUAL STREET RECONSTRUCTION (2013) JOHNSON'S OAKMOUNT TERRACE Meadows of Round Lake Park 146TH AVE DEHNS ADD Dehn's Park DEHNS 2ND ADD ’ Location Map L E G E N D Project Location Lots/Parcels Park 0215430860 Water Feet Right of Way City Limits 57 Capital Improvement Plan ANNUAL STREET RECONSTRUCTION (2014) 4VSNIGX2EQI LAKEVIEW TERRACE, LUNDGREN OAKRIDGE ADDITION, KEMPS ADDITION, COUNTRY ESTATES AND HOWARD TEMPEL ADDITION TOWNHOMES OF WOODLAND 138th Ave Park CREEK BUNKER LAKE BLVD 116 Crooked Lake Boat Landing AUD SUB 102 LAKEVIEW TERRACE Hidden Creek North Park HIDDEN CREEK MEADOW CREEK ESTATES HOWARD-TEMPEL COUNTRY EST ADDITION KEMPS ADD EAST BROOK TERRACE MATTSON & DEGARDNER CR LK 134TH AVE AUD SUB NO 137 LUNDGREN OAKRIDGE ADDITION ’ Location Map L E G E N D Project Location Lots/Parcels Park 02655301,060 Water Feet Right of Way City Limits 58 thru Capital Plan 20102014 of Andover, MN City 10-43100-04 Project # Annual Pavement Markings Project Name DepartmentStreets / Highways TypeImprovement Useful Life1-2 YearsContactDPW / City Engineer CategoryImprovements Priority1 - High Description The pavement striping for City streets is conducted one time per year. This includes centerline striping and shoulder striping. Striping enhances the safety of the roadway by directing traffic to the correct lane movement. The Federal Highway Administration is currently reviewing reflective standards for pavement markings. In the near future the City may have to stripe twice per year to meet new standards. If this is approved, it will double the cost of pavement markings per year. Justification Striping is required through the local and state agencies. A reflective standard is required. Restriping annually maintains the pavement markings to the required standards. Expenditures20102011201220132014Total 19,00020,00021,00022,00023,000105,000 Improvement 19,00020,00021,00022,00023,000105,000 Total Funding Sources20102011201220132014Total Road & Bridge Funds 19,00020,00021,00022,00023,000105,000 19,00020,00021,00022,00023,000105,000 Total Budget Impact/Other The pavement markings are contracted out each year adding virtually no operational impact. Monday, September 28, 2009 59 thru Capital Plan 20102014 of Andover, MN City 10-43100-05 Project # Annual Curb Replacement Project Name DepartmentStreets / Highways TypeImprovement Useful Life30 YearsContactDPW / City Engineer CategoryStreets/Highways Priority1 - High Description Damaged and failing concrete curb and gutter throughout the City needs to be repaired or replaced to help maintain the integrity of the roadway system. Replacing damaged or failing sections of curb and gutter helps with drainage of the roadway and prolongs the life of the street system. Justification The majority of the concrete curb and gutter throughout the City is in relatively good condition. However, there are isolated areas that need rehabilititation every year. Failing or damaged sections of concrete curb and gutter are removed and replaced. Replacing damaged sections of concrete curb and gutter maintains the integrity of and prolongs the life of the City's street infrastructure. Expenditures20102011201220132014Total 40,00041,00042,00043,00044,000210,000 Construction 40,00041,00042,00043,00044,000210,000 Total Funding Sources20102011201220132014Total Road & Bridge Funds 40,00041,00042,00043,00044,000210,000 40,00041,00042,00043,00044,000210,000 Total Budget Impact/Other Repairing failing or damaged sections of curb and gutter reduces the routine maintenance required by the public works department. Monday, September 28, 2009 60 thru Capital Plan 20102014 of Andover, MN City 10-43100-06 Project # Bridge Scour Repairs Project Name DepartmentStreets / Highways TypeImprovement Useful Life15-20 YearsContactDPW / City Engineer CategoryImprovements Priority1 - High Description The City is required to complete inspections of all bridges within the City. Inspections have determined that repairs are necessary under the bridges to prevent scouring and erosion of the areas adjacent to the bridge abutments. Justification Repairs to prevent scouring adjacent to the bridge abutments are necessary to maintain the integrity of the bridges in the City. Expenditures20102011201220132014Total 35,00035,00035,000105,000 Improvement 35,00035,00035,000105,000 Total Funding Sources20102011201220132014Total Road & Bridge Funds 17,50017,50017,50052,500 Storm Sewer Fund 17,50017,50017,50052,500 35,00035,00035,000105,000 Total Budget Impact/Other The project will reduce erosion and annual maintenance costs required with the bridges. It will also reduce the potential for more costly repairs in the future should significant scouring continue. Monday, September 28, 2009 61 thru Capital Plan 20102014 of Andover, MN City 11-43100-01 Project # Municipal State Aid Routes / New & Reconstruct Project Name DepartmentStreets / Highways TypeImprovement Useful Life20 YearsContactDPW / City Engineer CategoryStreets/Highways Priority1 - High Description The following projects are proposed to be constructed and/or rehabilitated to meet State Aid Standards. The rehabilitation projects will consist of milling the existing street surface, constructing concrete curb and gutter where it does not exist, repairing storm sewer systems, and improving storm drainage. 2011: Nightingale Street (Crosstown Blvd - 161st Ave) $830,000 2012: Bunker Lake Boulevard (Round Lake Blvd - 7th Ave) $200,000 (County Project) 2013: Prairie Road (Andover Blvd - Crosstown Blvd) $410,000 147th Avenue (7th Avenue to 300' east of Guarani) $140,000 2014: South Coon Creek Drive (Round Lake Blvd - Crosstown) $1,120,000 Justification Upgrades needed to maintain the integrity of the City's State Aid roadway infrastructure. Expenditures20102011201220132014Total 830,000200,000550,0001,120,0002,700,000 Construction 830,000200,000550,0001,120,0002,700,000 Total Funding Sources20102011201220132014Total 65,00023,000168,000256,000 Assessments 765,000200,000527,000952,0002,444,000 Municipal State Aid Funds 830,000200,000550,0001,120,0002,700,000 Total Budget Impact/Other Rehabilitating the roads will reduce the amount of routine maintenance along these sections of roadway and provide a safer and higher quality transportation system. Monday, September 28, 2009 62 Capital Improvement Plan 4VSNIGX2EQI MUNICIPAL STATE AID ROUTES RECONSTRUCT 2011 20 20 SHADY OAK 78 MAPLE HOLLOW COVE CHESTERTON PRAIRIE COMMONS COVE NORTH 2ND ANOKA CO HWY R/W PLAT 02 Woodland Crossings 158TH LN Park CHESTERTON OAK VIEW PARK COMMONS NORTH CARDINAL RIDGE CAMBRIDGE ESTATES 2ND SHAW'S GLEN GREY OAKS NIGHTINGALE ESTATES 2ND NIGHTINGALE 154TH LN WOODLAND 154TH AVE ESTATES 3RD NIGHTINGALE Chesterton ESTATES Commons Park FOX ESTATES 6TH ADD HOLLOW 78 WOODLAND ESTATES 4TH VETERAN'S MEMORIAL BLVD Woodland Estates Park VETERAN'S MEMORIAL BLVD City Hall Park Complex #1 WOODLAND ESTATES 2ND 18 ’ Location Map L E G E N D Project Location Lots/Parcels Park 05001,0002,000 Water Feet Right of Way City Limits 63 Capital Improvement Plan 4VSNIGX2EQI MUNICIPAL STATE AID ROUTES RECONSTRUCT 2012 Pleasant Oaks Park ANDOVER DEHNS ADD BOUNDRY Dehn's Park COMM PLAT 1 DEHNS 2ND ADD Creekridge Park WOODLAND GOLF WANDERSEE KADLEC 2ND ADD ADD VILLAS 7 ROSELLAS AZTEC ESTATES ADD 116 QUICKSTROM ADD WOODLAND POND Rose Park 140TH AVE NORTHGLEN 4TH ADD 9 NORTHGLEN 139TH AVE 138TH LN Wild Iris Park WOODLAND CREEK LOCAL OIL ADD 116 136TH LN CHAPMANS CHAPMANS 2ND ADD3RD ADD 136TH AVE CHAPMANSCHAPMANS ADD 4TH ADD CHAPMANS CHAPMANS 5TH ADD 6TH ADDWOODLAND TERRACE 3RD ADD Terrace Park ’ Location Map L E G E N D Project Location Lots/Parcels Park 05501,1002,200 Water Feet Right of Way City Limits 64 Capital Improvement Plan 4VSNIGX2EQI MUNICIPAL STATE AID ROUTES RECONSTRUCT 2013 149TH LN IVYWOOD ESTATES INDIAN MEADOWS 2ND ADD River LUNDS ROUND LAKE ESTATES Trails Park Meadowood North Park Meadowood South Park Meadows of Round Lake Park 146TH AVE Pleasant Oaks Park DEHNS ADD Dehn's Park DEHNS 2ND ADD ’ Location Map L E G E N D Project Location Lots/Parcels Park 03406801,360 Water Feet Right of Way City Limits 65 Capital Improvement Plan 4VSNIGX2EQI MUNICIPAL STATE AID ROUTES OVERLAY 2013 MOORES ESTATES Moores Estates Nordeen's Landlocked Park NORDEEN ADDITION PRAIRIE OAKS Sophie's Park Prairie BARNES ROLLING OAKS 2ND ADD Knoll Park Oak Bluff Park 145TH LN BARNES ROLLING OAKS ’ Location Map L E G E N D Project Location Lots/Parcels Park 06001,2002,400 Water Feet Right of Way City Limits 66 Capital Improvement Plan 4VSNIGX2EQI MUNICIPAL STATE AID ROUTES RECONSTRUCT 2014 WOODLAND ESTATES 6392( 9 0%/) Round Lake Boat Landing KENSINGTON ESTATES SHADY KNOLL 18 Creekridge Park WOODLAND GOLF KADLEC 2ND ADD VILLAS CROSSTOWN MEADOWS WOODLAND POND Green SMITHS QUICKSTROM Acres 2ND ADD Park ADD GREEN ACRES KENSINGTON North Woods Red Oaks ESTATES 5TH North Woods West Park West Park East Park Rose Park RED OAKS MANOR 3RD ADD 140TH AVE 18 RED OAKS MANOR WOODLAND CREEK NORTHWOODS ADDITION 2ND ADD PLAT 2 RED OAKS RED OAKS MANOR 4TH MANOR 2ND ADD NORTHGLEN 138TH LN WOODLAND CREEK RED OAKS MANOR CREEKHAVEN DEVONSHIRE ’ Location Map L E G E N D Project Location Lots/Parcels Park 06001,2002,400 Water Feet Right of Way City Limits 67 thru Capital Plan 20102014 of Andover, MN City 11-43100-03 Project # Intersection Upgrades Project Name DepartmentStreets / Highways TypeImprovement Useful Life25 YearsContactDPW / City Engineer CategoryImprovements Priority1 - High Description 2011 - Intersection improvements to improve safety at Crosstown Drive and Crosstown Boulevard ($130,000). 2014 - Construction of a traffic signal at South Coon Creek Drive and Round Lake Blvd. Minor lane widening may be needed but turn lane construction would not be included in this project ($275,000). Justification Intersection upgrades are necessary due to the increased development and demands on the transportation system, the need for safety improvements, and to comply with Anoka County Highway Department requirements. Expenditures20102011201220132014Total 130,000275,000405,000 Construction 130,000275,000405,000 Total Funding Sources20102011201220132014Total Municipal State Aid Funds 130,000275,000405,000 130,000275,000405,000 Total Budget Impact/Other Improvements will improve the flow of traffic and will improve the safety of vehicles, pedestrians and bicyclists. Monday, September 28, 2009 68 Capital Improvement Plan 4VSNIGX2EQI INTERSECTION UPGRADES 9 0%/) Round Lake Boat Landing KENSINGTON ESTATES ANDOVER BOUNDRY COMM PLAT 1 South Coon Creek Dr & Round Lake Blvd (2014) SHADY KNOLL Creekridge Park WOODLAND GOLF WANDERSEE KADLEC 2ND ADD ADD VILLAS ROSELLAS ADD WOODLAND POND Green SMITHS QUICKSTROM Acres 2ND ADD Crosstown Dr & Crosstown Blvd (2011) Park ADD WOODLAND GREEN ACRES POND North Woods Red Oaks North Woods West Park West Park East Park Rose Park RED OAKS MANOR 3RD ADD 140TH AVE 18 RED OAKS MANOR WOODLAND CREEK NORTHWOODS ADDITION 2ND ADD PLAT 2 RED OAKS 9 MANOR 2ND ADD NORTHGLEN 138TH LN WOODLAND CREEK CREEKHAVEN DEVONSHIRE ESTATES TOWNHOMES LOCAL OIL ADD OF WOODLAND 138th Ave Park CREEK BUNKER LAKE BLVD 116 116 116 Crooked Lake Boat Landing AUD SUB 102 LAKEVIEW TERRACE Hidden Creek 136TH LN North Park MARKETPLACE CHAPMANS CHAPMANSHIDDEN CREEK ANDOVER ’ Location Map L E G E N D Project Location Lots/Parcels Park 06251,2502,500 Water Feet Right of Way City Limits 69 thru Capital Plan 20102014 of Andover, MN City 10-48100-01 Project # Rehabilitation of Wells Project Name DepartmentWater TypeImprovement Useful Life7 YearsContactDPW / City Engineer CategoryImprovements Priority1 - High Description The motor, pump and column pipe are taken out for inspection and worn parts are replaced. The well is televised to determine the depth and condition. If the well is at or close to the original drill depth everything is put back in place. The well may need to be cleaned out to the original depth if there is a substantial decrease in the depth. Justification To make sure the well is operational to what it is designed for and to correct any problems that may affect our ability to produce the amount of water needed to meet the demand. A complete inspection and maintenance overhall is performed on each well a minimum of once every seven (7) years. This maintenance will also maximize the pumping rate of the well. Expenditures20102011201220132014Total 50,00055,00060,00065,00070,000300,000 Improvement 50,00055,00060,00065,00070,000300,000 Total Funding Sources20102011201220132014Total Water Fund 50,00055,00060,00065,00070,000300,000 50,00055,00060,00065,00070,000300,000 Total Budget Impact/Other This would be done at such a time that it would not affect the demand needs of the system. Typically done late fall. Monday, September 28, 2009 70 thru Capital Plan 20102014 of Andover, MN City 11-48100-01 Project # Construct Clearwell at WTP Project Name DepartmentWater TypeImprovement Useful Life50 YearsContactDPW / City Engineer CategoryImprovements Priority1 - High Description Construct a 2 million gallon clearwell adjacent to the water treatment plant. Justification In order to adequately supply treated water at an acceptable pressure to the entire distribution system in Andover, a two million gallon clearwell must be constructed near the water treatment plant. The existing 500,000 water tower in the southwest part of town would be demolished as part of this process. Construction of this clearwell and demolition of the existing 500,000 gallon tower would eliminate the low pressure zone currently in the southwest part of town. Expenditures20102011201220132014Total 2,665,9002,665,900 Construction 2,665,9002,665,900 Total Funding Sources20102011201220132014Total Water Revenue Bonds 2,665,9002,665,900 2,665,9002,665,900 Total Budget Impact/Other Additional maintenance and monitoring would be required of the Sewer and Water department. Monday, September 28, 2009 71 thru Capital Plan 20102014 of Andover, MN City 11-48100-02 Project # Water Main Improvements Project Name DepartmentWater TypeImprovement Useful Life50 YearsContactDPW / City Engineer CategoryImprovements Priority1 - High Description Install water main, hydrants, and service lines to provide water service to the existing residential neighborhoods. The following projects are proposed to be constructed along with the planned reconstruction of the streets in these areas: 2011: East Brook Terrace/Aud. Sub. No. 137 ($290,000) 2014: Lakeview Terrace Area ($550,000) Justification The roadways in these developments are proposed to be reconstructed. Sanitary sewer is located in these areas, but not City water. Should these neighborhoods desire to have access to City water within the next 30-40 years it would be cost beneficial to install the water main while the roadways are being constructed. Expenditures20102011201220132014Total 290,000550,000840,000 Improvement 290,000550,000840,000 Total Funding Sources20102011201220132014Total Assessments 290,000550,000840,000 290,000550,000840,000 Total Budget Impact/Other Additional maintenance and flushing requirements for the water main system will result. Monday, September 28, 2009 72 Capital Improvement Plan 4VSNIGX2EQIWATER MAIN IMPROVEMENTS EAST BROOK TERRACE/AUDITORS SUB. 137 (2011) LAKEVIEW TERRACE AREA (2014) DEVONSHIRE ESTATES 138th Ave Park LAKEVIEW TERRACE AREA (2014) BUNKER LAKE BLVD 116 Crooked Lake Boat Landing AUD SUB 102 LAKEVIEW TERRACE Hidden Creek North Park HIDDEN CREEK MEADOW CREEK ESTATES HOWARD-TEMPEL COUNTRY EST ADDITION KEMPS ADD EAST BROOK TERRACE 2014 MATTSON & DEGARDNER Hidden Creek South Park CR LK 2011 134TH AVE AUD SUB NO 137 LUNDGREN OAKRIDGE ADDITION EAST BANK TERRACE/AUDITORS SUB. 137 (2011) ’ Location Map L E G E N D Project Location Lots/Parcels Park 02805601,120 Water Feet Right of Way City Limits 73 thru Capital Plan 20102014 of Andover, MN City 12-48100-01 Project # Construct Well #10 Project Name DepartmentWater TypeImprovement Useful Life25 YearsContactDPW / City Engineer CategoryImprovements Priority1 - High Description Construct well #10 in Shadowbrook 2nd Addition on an existing city-owned lot to provide municipal water due to the increased demand. Justification As the City's population continues to grow, the demand for municipal water increases. Continuing to add wells to the City's water system is essential to meet the demand. Expenditures20102011201220132014Total 181,000181,000 Improvement 181,000181,000 Total Funding Sources20102011201220132014Total Water Trunk Fund 181,000181,000 181,000181,000 Total Budget Impact/Other Increase energy and operating costs to the water system. Monday, September 28, 2009 74 Capital Improvement Plan 4VSNIGX2EQI CONSTRUCT WELL NO. 10 (2012) CONSTRUCT WATER TREATMENT PLANT (2013) Location Map L E G E N D Project Location Lots/Parcels Park 0175350700 Water Feet Right of Way 75 City Limits thru Capital Plan 20102014 of Andover, MN City 12-48100-02 Project # Bunker Lake Boulevard Water Main Project Name DepartmentWater TypeImprovement Useful Life50 YearsContactDPW / City Engineer CategoryImprovements Priority1 - High Description Extend water main west from Blackfoot Street / Bunker Lake Boulevard to just east of 7th Avenue. Justification The water main will be extended to serve properties adjacent to Bunker Lake Boulevard and east of 7th Avenue. Construction would be in conjunction with Anoka County reconstructing Bunker Lake Boulevard in this area. A feasibility report was prepared for this project in 2007. Considerable cost savings could be achieved if this project is constructed with the roadway reconstruction. Expenditures20102011201220132014Total 180,000180,000 Improvement 180,000180,000 Total Funding Sources20102011201220132014Total Assessments 180,000180,000 180,000180,000 Total Budget Impact/Other Additional maintenance and flushing requirements for the water main system will result. Monday, September 28, 2009 76 Capital Improvement Plan 4VSNIGX2EQI BUNKER LAKE BOULEVARD WATER MAIN (2012) Pleasant Oaks Park ANDOVER DEHNS ADD BOUNDRY Dehn's Park COMM PLAT 1 DEHNS 2ND ADD Creekridge Park WOODLAND GOLF WANDERSEE KADLEC 2ND ADD ADD VILLAS 7 ROSELLAS AZTEC ESTATES ADD 116 QUICKSTROM ADD WOODLAND POND Rose Park 140TH AVE NORTHGLEN 4TH ADD 9 NORTHGLEN 139TH AVE 138TH LN Wild Iris Park WOODLAND CREEK LOCAL OIL ADD 116 136TH LN CHAPMANS CHAPMANS 2ND ADD3RD ADD 136TH AVE CHAPMANSCHAPMANS ADD 4TH ADD CHAPMANS CHAPMANS 5TH ADD 6TH ADDWOODLAND TERRACE 3RD ADD Terrace Park ’ Location Map L E G E N D Project Location Lots/Parcels Park 05501,1002,200 Water Feet Right of Way City Limits 77 thru Capital Plan 20102014 of Andover, MN City 12-48100-03 Project # Demolish 500,000 Gallon Water Tower Project Name DepartmentWater TypeImprovement Useful LifeUnassignedContactDPW / City Engineer CategoryImprovements Priority1 - High Description Demolish the existing 500,000 gallon water tower located on the west side of town. Justification The existing 500,000 gallon water tower will be demolished and replaced by a new two million gallon water tower so the City's water distribution system can be managed under one pressure zone, providing treated water to all residents on the system. Expenditures20102011201220132014Total 190,000190,000 Improvement 190,000190,000 Total Funding Sources20102011201220132014Total Water Trunk Fund 190,000190,000 190,000190,000 Total Budget Impact/Other Maintenance of the existing water tower will no longer be required. Monday, September 28, 2009 78 thru Capital Plan 20102014 of Andover, MN City 13-48100-01 Project # Construct Water Treatment Plant #2 Project Name DepartmentWater TypeImprovement Useful Life30 YearsContactDPW / City Engineer CategoryImprovements Priority1 - High Description Construct Water Treatment Plant No. 2 in Shadowbrook Development. Justification According to the Water Comprehensive Plan, the time table for the second water treatment facility will be needed at this time. The water treatment plant that went on line in October 2003 is nearing the designed maximum for the amount of water treated per day. By adding this plant in the Shadowbrook area, flows and pressures will also increase benefiting the entire system. This will also minimize the need to operate wells 2 and 3 that are having some quality issues. Expenditures20102011201220132014Total 8,000,0008,000,000 Construction 8,000,0008,000,000 Total Funding Sources20102011201220132014Total Water Revenue Bonds 8,000,0008,000,000 8,000,0008,000,000 Total Budget Impact/Other There will be additional costs for operating, such as electricity, natural gas and chemicals. Monday, September 28, 2009 79 Capital Improvement Plan 4VSNIGX2EQI CONSTRUCT WELL NO. 10 (2012) CONSTRUCT WATER TREATMENT PLANT (2013) Location Map L E G E N D Project Location Lots/Parcels Park 0175350700 Water Feet Right of Way 80 City Limits thru Capital Plan 20102014 of Andover, MN City 14-48100-01 Project # Water Main along South Coon Creek Drive Project Name DepartmentWater TypeImprovement Useful Life50 YearsContactDPW / City Engineer CategoryImprovements Priority1 - High Description Install a 12" water main along South Coon Creek Drive from 145th Avenue to Crosstown Boulevard. Justification Construction of a water main along South Coon Creek Drive will allow the existing water distribution system between the east and west sides of town to be looped. The only existing connection between the two parts of town is along Bunker Lake Boulevard. Looping of the system will allow treated water to be continuously supplied to all residents in town on the water system. It will also help alleviate the pressure variance that is experienced between the east and west sides of town. South Coon Creek Boulevard is scheduled for reconstruction in 2013. It would be advantageous to construct the water main concurrently with the roadway reconstruction. Expenditures20102011201220132014Total 710,000710,000 Improvement 710,000710,000 Total Funding Sources20102011201220132014Total Assessments 100,000100,000 Water Trunk Fund 610,000610,000 710,000710,000 Total Budget Impact/Other Additional maintenance and flushing requirements for the water main system will result. Construction of this system would make management of the water distribution system for the City as a whole easier by eliminating the two pressure zones. Monday, September 28, 2009 81 This page left blank intentionally. 82 City of Andover, MN Capital Plan 20102014 thru DEPARTMENT SUMMARY Department20102011201220132014Total Central Equipment7,00065,00072,000 Community Center7,000 7,000 Elections110,000 110,000 Engineering30,000 30,000 Fire225,000635,000565,000109,000340,000 1,874,000 Park & Rec - Operations8,500200,00075,00050,000333,500 Planning & Zoning25,00025,000 Sanitary Sewer422,000422,000 Storm Sewer150,000 150,000 Streets / Highways200,000315,000 515,000 Water65,000 65,000 233,5001,524,0001,207,000249,000390,000 3,603,500 GRAND TOTAL Monday, September 28, 2009 83 City of Andover, MN Capital Plan 20102014 thru FUNDING SOURCE SUMMARY 20102011201220132014Total Source Capital Equipment Reserve225,000225,000 Capital Projects Levy8,500110,000 118,500 Central Equipment Fund7,00065,00072,000 Community Center Operations7,000 7,000 Equipment Bond925,0001,135,000184,000390,0002,634,000 Sanitary Sewer Fund225,000225,000 Sewer Trunk Fund160,000 160,000 Storm Sewer Fund97,00097,000 Water Fund65,000 65,000 233,5001,524,0001,207,000249,000390,0003,603,500 GRAND TOTAL Monday, September 28, 2009 84 City of Andover, MN Capital Plan 20102014 thru PROJECTS & FUNDING SOURCES BY DEPARTMENT DepartmentProject#Priority20102011201220132014 Total Central Equipment Replacement - Hotsy Pressure Washer12-48800-0137,0007,000 Central Equipment Fund7,0007,000 Replacement - Service Truck13-48800-01230,000 30,000 Central Equipment Fund30,00030,000 Replacement - Floor Sweeper13-48800-02335,00035,000 Central Equipment Fund35,00035,000 72,000 7,00065,000 Central Equipment Total Community Center Replacement - Zamboni Battery Pack11-44000-0127,0007,000 Community Center Operations7,0007,000 7,0007,000 Community Center Total Elections Replacement - Voting Equipment11-41310-011110,000 110,000 Capital Projects Levy110,000110,000 110,000 110,000 Elections Total Engineering Replacement - Blazer #1111-41600-01230,000 30,000 Equipment Bond30,00030,000 30,000 30,000 Engineering Total Fire Replacement - Fire Engine #1110-42200-011225,000225,000 Capital Equipment Reserve225,000225,000 Replacement - Ladder Truck #1111-42200-011500,000500,0001,000,000 Equipment Bond500,000500,0001,000,000 Replacement - Fire Chief's Vehicle11-42200-02245,00045,000 Equipment Bond45,00045,000 Replacement - Rescue #1111-42200-03250,00050,000 Equipment Bond50,00050,000 Replacement - Fire Marshall Vehicle11-42200-04240,00040,000 Equipment Bond40,00040,000 Replacement - Grass #3112-42200-01245,00045,000 Equipment Bond45,00045,000 New - Water/Ice rescue boat12-42200-02120,00020,000 Monday, September 28, 2009 85 DepartmentProject#Priority20102011201220132014 Total Equipment Bond20,00020,000 Replacement - Utility #413-42200-01232,000 32,000 Equipment Bond32,00032,000 Replacement - Utility #513-42200-02232,000 32,000 Equipment Bond32,00032,000 Replacement - Grass #2113-42200-03245,000 45,000 Equipment Bond45,00045,000 Replacement - Tanker #1114-42200-012340,000 340,000 Equipment Bond340,000340,000 225,000635,000565,000109,000340,0001,874,000 Fire Total Park & Rec - Operations New - Zero turn mower110-45000-028,5008,500 Capital Projects Levy8,5008,500 Replacement - Large Capacity Lawnmower #58012-45000-011112,000112,000 Equipment Bond112,000112,000 Replacement - Toro Groundsmaster, #55912-45000-02123,00023,000 Equipment Bond23,00023,000 Replacement - One Ton Truck w/ Plow, #59912-45000-03265,00065,000 Equipment Bond65,00065,000 Replacement - One Ton Truck w/ Plow #50313-45000-01265,00065,000 Equipment Bond65,00065,000 Replacement - Trailer, T-55413-45000-02210,00010,000 Equipment Bond10,00010,000 Replacement - One Ton Crew Cab Pickup #50214-45000-01150,00050,000 Equipment Bond50,00050,000 8,500200,00075,00050,000333,500 Park & Rec - Operations Total Planning & Zoning Replacement - Ford Taurus #1512-41500-01225,000 25,000 Equipment Bond25,00025,000 25,00025,000 Planning & Zoning Total Sanitary Sewer Replacement - One Ton Truck w/ Plow #9011-48200-02165,00065,000 Sanitary Sewer Fund65,00065,000 New - Jet/Vac Truck11-48200-031357,000 357,000 Sanitary Sewer Fund160,000160,000 Sewer Trunk Fund160,000160,000 Storm Sewer Fund37,00037,000 422,000 422,000 Sanitary Sewer Total Storm Sewer Replacement - Elgin Street Sweeper #16911-48300-011150,000150,000 Equipment Bond90,00090,000 Storm Sewer Fund60,00060,000 150,000150,000 Storm Sewer Total Streets / Highways Monday, September 28, 2009 86 DepartmentProject#Priority20102011201220132014 Total Replacement - Dump Truck w/ Snow Removal #19711-43100-021200,000 200,000 Equipment Bond200,000200,000 Replacement - Dump Truck w/ Snow Removal #19812-43100-011150,000 150,000 Equipment Bond150,000150,000 Replacement - One Ton Truck w/ Plow #13212-43100-02165,000 65,000 Equipment Bond65,00065,000 Replacement - Water Tanker #16312-43100-032100,000 100,000 Equipment Bond100,000100,000 515,000 200,000315,000 Streets / Highways Total Water Replacement - One Ton Truck w/ Plow #10512-48100-04165,00065,000 Water Fund65,00065,000 65,000 65,000 Water Total 233,5001,524,0001,207,000249,000390,0003,603,500 GRAND TOTAL Monday, September 28, 2009 87 thru Capital Plan 20102014 of Andover, MN City 12-48800-01 Project # Replacement - Hotsy Pressure Washer Project Name DepartmentCentral Equipment TypeEquipment Useful Life10 YearsContactDPW / City Engineer CategoryFacility Management Priority3 - Low Description New stationary pressure washer fueled by natural gas. Justification A new washer would operate more efficiently and save time and money by having fewer break downs. The new washer would run on natural gas rather than on kerosene. Expenditures20102011201220132014Total 7,0007,000 Equipment 7,0007,000 Total Funding Sources20102011201220132014Total Central Equipment Fund 7,0007,000 7,0007,000 Total Budget Impact/Other Less break downs, saving time and money. Not having to send people out to buy fuel for it would also save money. Harder to get parts for. Monday, September 28, 2009 88 thru Capital Plan 20102014 of Andover, MN City 13-48800-01 Project # Replacement - Service Truck Project Name DepartmentCentral Equipment TypeEquipment Useful Life10 YearsContactDPW / City Engineer CategoryStreets/Highways Priority2 - Medium Description Replace Unit #371, a 2001 S10 Ext Cab 4x4 truck with 60,000 miles. This truck averages about 7,000 miles a year and by 2013 it will have approximately 80,000 miles. The new truck would be a crew cab and also have a tailgate lift. Justification To assist mechanics with jobs outside the shop such as parts runs, schooling, vehicle repair and moving equipment around, a larger and roomier vehicle is needed. The current vehicle would make a good intern or spare vehicle or kept as a runner/drop truck. Expenditures20102011201220132014Total 30,00030,000 Vehicles 30,00030,000 Total Funding Sources20102011201220132014Total Central Equipment Fund 30,00030,000 30,00030,000 Total Budget Impact/Other A bigger vehicle would increase operating costs - fuel and maintenance. Monday, September 28, 2009 89 thru Capital Plan 20102014 of Andover, MN City 13-48800-02 Project # Replacement - Floor Sweeper Project Name DepartmentCentral Equipment TypeEquipment Useful Life15 YearsContactDPW / City Engineer CategoryFacility Management Priority3 - Low Description Replace Unit #324, a 1991 Floor Sweeper/Scrubber. With the addition of new buildings in the future, it will be more economical to purchase a new unit that is faster and more efficient. Justification The floors are not cleaned as often as they should be because the current sweeper's washing and vacuum systems are worn out and parts are getting harder to find. The sweeper works well outside because we only use the broom portion of the machine. The present machine works well for the area that we now have but if we expand the area, we will need to be able to clean the area faster and do it more efficiently. Expenditures20102011201220132014Total 35,00035,000 Equipment 35,00035,000 Total Funding Sources20102011201220132014Total Central Equipment Fund 35,00035,000 35,00035,000 Total Budget Impact/Other A new machine would have less maintenance issues even with using it more often. Monday, September 28, 2009 90 thru Capital Plan 20102014 of Andover, MN City 11-44000-01 Project # Replacement - Zamboni Battery Pack Project Name DepartmentCommunity Center TypeEquipment Useful Life7 YearsContactComm Ctr Manager CategoryFacility Management Priority2 - Medium Description Replacement Battery Pack for the Electric Zamboni. Justification The battery pack that drives the Zamboni should to be replaced every 5-7 years. Over time, the batteries will hold less and less of a charge and eventually have to be replaced. Expenditures20102011201220132014Total 7,0007,000 Vehicles 7,0007,000 Total Funding Sources20102011201220132014Total Community Center Operations 7,0007,000 7,0007,000 Total Budget Impact/Other The Zamboni is a necessary part of the operations of the ice arena, and without it we would not be able to keep the facility open. The hope is that with the preventative maintenance program that is in place, we can achieve the maximum amount of time available on the battery pack before it has to be replaced. Monday, September 28, 2009 91 thru Capital Plan 20102014 of Andover, MN City 11-41310-01 Project # Replacement - Voting Equipment Project Name DepartmentElections TypeEquipment Useful Life15 YearsContactCity Clerk CategoryEquipment Priority1 - High Description New electronic voting equipment for 10 precincts. Justification A Federal mandate to comply with HAVA - Help America Vote Act. The current equipment is non-compliant. Expenditures20102011201220132014Total 110,000110,000 Equipment 110,000110,000 Total Funding Sources20102011201220132014Total Capital Projects Levy 110,000110,000 110,000110,000 Total Budget Impact/Other Continued storage and maintenance of all the equipment. Monday, September 28, 2009 92 thru Capital Plan 20102014 of Andover, MN City 11-41600-01 Project # Replacement - Blazer #11 Project Name DepartmentEngineering TypeEquipment Useful Life10 YearsContactDPW / City Engineer CategoryEquipment Priority2 - Medium Description Replace Unit #11, a 1995 S10 Blazer with 68,000 miles. The Engineering Department puts about 5,000 miles per year on this vehicle, and after 14 years, it will have approximately 80,000 miles on it. This unit could make a good intern vehicle or spare vehicle if needed. Justification This vehicle is an Engineering Tech inspection vehicle and needs to be available for inspections and surveying. Expenditures20102011201220132014Total 30,00030,000 Equipment 30,00030,000 Total Funding Sources20102011201220132014Total Equipment Bond 30,00030,000 30,00030,000 Total Budget Impact/Other Lower maintenance costs and downtime. Monday, September 28, 2009 93 thru Capital Plan 20102014 of Andover, MN City 10-42200-01 Project # Replacement - Fire Engine #11 Project Name DepartmentFire TypeEquipment Useful Life20 YearsContactFire Chief CategoryEquipment Priority1 - High Description Replace Unit #4882, a 1991 Pierce Lance pumper truck with 27,500 miles. The expected life span of this vehicle is between 20 and 25 years. The truck is starting to have higher and higher maintenance costs and should be replaced within the next three to five years. This will make for an ideal back up pumper as is required by the I.S.O. if the city can afford to keep this vehicle. We would look to sell the existing back up pumper #12 currently located at station #1. One half of the cost ($225,000) was budgeted in 2009. Justification The current engine is working fine but is starting to have more day to day repairs. As with any vehicle that is 18 years old, some parts can be harder to find and take longer to receive for needed repairs. The fire department can not afford to have vehicles down for extended periods of time. It would be appropriate to start the replacement of a number of vehicles that were originally purchased in 1990/91. The intent is to replace those vehicles purchased in 1990 over an appropriate period of time and in a priority order so that the vehicles do not get to be a maintenance burdon and are still able to be used as first response emergency vehicles. Expenditures20102011201220132014Total 225,000225,000 Vehicles 225,000225,000 Total Funding Sources20102011201220132014Total Capital Equipment Reserve 225,000225,000 225,000225,000 Total Budget Impact/Other The new technology will allow firefighters to respond and conduct fire suppression activities, rescue operations, and other required activities in a safer and more efficient manner. The maintenance costs can be lowered as well. Some of the new technology items include increasing the capability to transport more firefighters to the scene, internal plumbed foam suppressant system, climate controlled cab can be used for firefighter rehabilitation, much better visibility when driving to emergencies, better maneuverability, and new designs make it much easier to enter and exit the cab area. In addition to the new emergency lighting standards that will make it easier to see the truck while responding and also while parked at the scene. Monday, September 28, 2009 94 thru Capital Plan 20102014 of Andover, MN City 11-42200-01 Project # Replacement - Ladder Truck #11 Project Name DepartmentFire TypeEquipment Useful Life20 YearsContactFire Chief CategoryEquipment Priority1 - High Description Replace Unit #4885, a 1991 Pierce 75' ladder truck with 20,000 miles. The new ladder truck would be a 100 foot aerial platform, which includes a bucket at the end of the ladder for firefighter safety. The 100 foot reach will allow for the fire department to perform rescue and suppression activities in buildings that we can not currently reach. Justification The City is required by the I.S.O. to have this type of vehicle available for use because of the building heights allowed in Andover. The new platform style truck versus the current straight ladder will be much safer for firefighter activities and fire suppression activities. The new vehicles have safety sensors and weight distribution gauges that will keep the operators from making mistakes while operating the truck that could be very costly or dangerous. The newer buildings in Andover are getting taller with more green space between the building and a hard surface making it much more difficult to reach some of them because of the height restrictions of the current ladder truck. Expenditures20102011201220132014Total 500,000500,0001,000,000 Equipment 500,000500,0001,000,000 Total Funding Sources20102011201220132014Total Equipment Bond 500,000500,0001,000,000 500,000500,0001,000,000 Total Budget Impact/Other The use of an aerial device can be very dangerous if not performed properly. A new platform truck will allow firefighters to perform the most dangerous of activities as required from time to time, and know that they have the right piece of equipment to do the job. The larger and taller buildings now being built in Andover will require this type of equipment. The current ladder truck has been fairly dependable with not many major repairs needed. The maintenance costs are going up for this vehicle and the trade in value may be going down as the truck gets older. The new bucket style of truck will also be much safer conditions for firefighters performing suppression activities. The new ladder truck can be equipped to have pre-plumbed breathing air in the bucket for extended use and also high intensity lighting mounted on the bucket will greatly increase site visibility. Firefighters will no longer have to carry heavy equipment up the ladder but rather can swing the bucket down to the ground to pick it up. The larger cab design will allow for transporting more firefighters and also can be used for rehabilitation of staff when needed. The bucket design will also allow for two master stream devices mounted near the top of the bucket to be used for extinguishment for very large types of fires. The over head visibility at the scene will also help the incident commander make vital decisions regarding the tactics and strategies to be used. Monday, September 28, 2009 95 thru Capital Plan 20102014 of Andover, MN City 11-42200-02 Project # Replacement - Fire Chief's Vehicle Project Name DepartmentFire TypeEquipment Useful Life10 YearsContactFire Chief CategoryEquipment Priority2 - Medium Description Replace Unit #4806, a 2002 Chevrolet Tahoe with 68,300 miles and is used by the Fire Chief. Justification In order to keep the first line emergency responding vehicles in the proper operating conditions, it is important to replace equipment when needed. The current vehicle has worked very well and should be evaluated for repair history and maintenance costs as the replacement date gets closer. The annual mileage put on this vehicle is approximately 10,000. The vehicle is still in good shape and should be evaluated for replacement as scheduled. Expenditures20102011201220132014Total 45,00045,000 Equipment 45,00045,000 Total Funding Sources20102011201220132014Total Equipment Bond 45,00045,000 45,00045,000 Total Budget Impact/Other The Chief's vehicle is used by the Chief to respond to emergency incidents. The vehicle has to be in good shape and able to provide safe and protective transportation when responding to all types of incidents. The vehicle also carries all of the Chief's protective gear and equipment needed to help conduct fire investigations. The Chief regularly uses the vehicle to conduct interviews while on the scene with property owners and also uses the truck to provide a place for fire victims to sit out of the elements while they are waiting for relatives or the Red Cross to respond to the scene. Monday, September 28, 2009 96 thru Capital Plan 20102014 of Andover, MN City 11-42200-03 Project # Replacement - Rescue #11 Project Name DepartmentFire TypeEquipment Useful Life15 YearsContactFire Chief CategoryEquipment Priority2 - Medium Description Replace Unit #4899, a 1997 GMC truck with 16,500 miles. This truck is used as the primary response vehicle to all medical incidents for station #1. This truck responds to about 300 calls per year and is the busiest vehicle in use by the fire department other than the Chief's and Fire Marshall's vehicles. Justification The current truck has very little maintenance issues as of 2009. Because this is the primary vehicle used to respond to medical calls for station #1 it is very important to keep this vehicle in top condition and always available to respond. The anticipated life span is 15 years and may be able to be extended if the maintenance costs stay in line. It would be a benefit to Station #1 if the new vehicle would be purchased with a four door cab rather than the current extended cab so that additional firefighters could respond to major medical incidents. Expenditures20102011201220132014Total 50,00050,000 Equipment 50,00050,000 Total Funding Sources20102011201220132014Total Equipment Bond 50,00050,000 50,00050,000 Total Budget Impact/Other If the replacement vehicle is a four door cab, station #1 firefighters could respond with only one vehicle to major incidents such as a heart attack, and would not have to take two vehicles to the scene in order to get the appropriate staffing there. The replacement vehicle will also respond to vehicle crash scenes with additional equipment needed that could be stored on this truck. Monday, September 28, 2009 97 thru Capital Plan 20102014 of Andover, MN City 11-42200-04 Project # Replacement - Fire Marshall Vehicle Project Name DepartmentFire TypeEquipment Useful Life10 YearsContactFire Chief CategoryEquipment Priority2 - Medium Description Replace Unit #4801, a 1997 S10 Blazer with over 60,000 miles and used by the Fire Marshall. Justification The Fire Marshall's vehicle is anticipated to have approximately 70,000 miles on it by the year 2011, and the ability to respond to an emergency with a dependable vehicle needs to be considered. There have been more maintenance issues with this vehicle, and although most have been minor, the occurrences are increasing and the costs will also start to increase as the vehicle gets older. Expenditures20102011201220132014Total 40,00040,000 Vehicles 40,00040,000 Total Funding Sources20102011201220132014Total Equipment Bond 40,00040,000 40,00040,000 Total Budget Impact/Other The new vehicle will be used for day to day inspections and also emergency responses when the Fire Marshall is available to assist at the incident including medical calls. It is crucial that the Fire Marshall's vehicle be in good operating order to perform all of the functions needed. This vehicle is also used to help conduct all of the fire investigations and the appropriate equipment needs to be stored in the vehicle. The fire department needs to have a very dependable vehicle to perform all of the functions listed. Monday, September 28, 2009 98 thru Capital Plan 20102014 of Andover, MN City 12-42200-01 Project # Replacement - Grass #31 Project Name DepartmentFire TypeEquipment Useful Life20 YearsContactFire Chief CategoryEquipment Priority2 - Medium Description Replace Unit #4893, a 1991 Ford 4x4 grass vehicle with 21,900 miles. This also has been used as medical response truck for station #3. Now that the fire department has a separate vehicle that will be used to respond to medical calls, the new grass trucks will be designed to function for one primary purpose and will allow for new wildfire technologies to be put on the truck. Justification The fire department has now purchased new vehicles for rescue calls only and this will allow for the new grass trucks to have an extended life expectancy. The current grass vehicles have worked very hard responding to both wildfire and medical types of calls during most of the life of the trucks. The grass trucks also have many engine hours on them due to idling conditions while at grass fires and medical calls. By using separate vehicles for each function both the grass fire vehicle and assigned medical vehicle will last for at least 15 years or more. Expenditures20102011201220132014Total 45,00045,000 Equipment 45,00045,000 Total Funding Sources20102011201220132014Total Equipment Bond 45,00045,000 45,00045,000 Total Budget Impact/Other The fire department will be looking to purchase a smaller and more maneuverable vehicle when it is time to replace the grass trucks. The current full size pick up trucks, while capable of handling larger tanks and more weight, can be difficult to use when the need to negotiate around obstacles during wildfires arises. The grass vehicles will be a four wheel drive type and should probably have winches mounted on the front of the vehicle. The smaller and more maneuverable vehicles should be less expensive but yet perform much better when using the off road functions and features. Monday, September 28, 2009 99 thru Capital Plan 20102014 of Andover, MN City 12-42200-02 Project # New - Water/Ice rescue boat Project Name DepartmentFire TypeEquipment Useful Life15 YearsContactFire Chief CategoryEquipment Priority1 - High Description A small boat designed and built to perform water and ice rescues. Justification Andover does not currently have a rescue boat. The boat would be used to perform ice and water rescues. The boat will make these specific types of rescues safer for all responders. The boat will allow firefighters to perform rescue work rather than waiting for a boat to arrive and perform recovery work. Expenditures20102011201220132014Total 20,00020,000 Equipment 20,00020,000 Total Funding Sources20102011201220132014Total Equipment Bond 20,00020,000 20,00020,000 Total Budget Impact/Other Boat will make an easier and safer rescue for all responders and parties being rescued. The boat will save lives and make it safer for firefighters who have to enter the water or crawl on the ice. The current method of having firefighters wear wet suits and try to swim or crawl on the ice to the victim is not very safe or recommended if we can avoid it. The boat will help get the rescuer and victim out of the situation faster and safer. Monday, September 28, 2009 100 thru Capital Plan 20102014 of Andover, MN City 13-42200-01 Project # Replacement - Utility #4 Project Name DepartmentFire TypeEquipment Useful Life15 YearsContactFire Chief CategoryEquipment Priority2 - Medium Description Replace Unit #4804, a 2000 GMC Sonoma ext. cab 4x4 small utility pick up with 25,100 miles. This truck is used as a station response vehicle by the Officers assigned to each station. The fire department has three of these vehicles and each are fully equipped to be first responder vehicles to all types of incidents that the fire department will respond to. Justification The utility vehicles are used by Fire Department Officers to respond directly to the scene of the incident so that they can evaluate for additional equipment needed and also render immediate first aid and care to those who need it. The first responding vehicles are usually on the scene within five to six minutes of the original page as compared to seven or eight minutes for a vehicle responding from the fire station. The time span is critical for all types of major events. Knowing as quickly as possible what the conditions and situations at the scene will make for a much safer response by other vehicles and helps all others prepare for the incident as the first fire officer has already informed incoming trucks what is going on. Expenditures20102011201220132014Total 32,00032,000 Vehicles 32,00032,000 Total Funding Sources20102011201220132014Total 32,00032,000 Equipment Bond 32,00032,000 Total Budget Impact/Other With their vehicle responding directly to the scene, the fire officer can cancel others if they are not needed and/or slow them to routine so that the response is safer for responders and others who are on the highway. Having a fire officer at an incident early is very beneficial for planning tactics prior to all of the other fire vehicles getting there. All fire conditions can be evaluated and thought out by the fire officer so that they can be better prepared to oversee fire suppression activities. Monday, September 28, 2009 101 thru Capital Plan 20102014 of Andover, MN City 13-42200-02 Project # Replacement - Utility #5 Project Name DepartmentFire TypeEquipment Useful Life15 YearsContactFire Chief CategoryEquipment Priority2 - Medium Description Replace Unit #4805, a 2000 GMC Sonoma ext. cab 4x4 small utility pick up with 26,100 miles. This truck is used as a station response vehicle by the Officers assigned to each station. The fire department has three of these vehicles and each are fully equipped to be first responder vehicles to all types of incidents that the fire department will respond to. Justification The utility vehicles are used by Fire Department Officers to respond directly to the scene of the incident so that they can evaluate for additional equipment needed and also render immediate first aid and care to those who need it. The first responding vehicles are usually on the scene within five to six minutes of the original page as compared to seven or eight minutes for a vehicle responding from the fire station. The time span is critical for all types of major events. Knowing as quickly as possible what the conditions and situations at the scene will make for a much safer response by other vehicles and helps all others prepare for the incident as the first fire officer has already informed incoming trucks what is going on. Expenditures20102011201220132014Total 32,00032,000 Vehicles 32,00032,000 Total Funding Sources20102011201220132014Total 32,00032,000 Equipment Bond 32,00032,000 Total Budget Impact/Other With their vehicle responding directly to the scene, the fire officer can cancel others if they are not needed and/or slow them to routine so that the response is safer for responders and others who are on the highway. Having a fire officer at an incident early is very beneficial for planning tactics prior to all of the other fire vehicles getting there. All fire conditions can be evaluated and thought out by the fire officer so that they can be better prepared to oversee fire suppression activities. Monday, September 28, 2009 102 thru Capital Plan 20102014 of Andover, MN City 13-42200-03 Project # Replacement - Grass #21 Project Name DepartmentFire TypeEquipment Useful Life20 YearsContactFire Chief CategoryEquipment Priority2 - Medium Description Replace Unit #4892, a 1991 Ford 4x4 grass vehicle with 21,100 miles This has also been used as a medical response unit for Station #2. Now that the fire department has a separate vehicle that will be used to respond to medical calls, the new grass trucks will be designed to function for one primary purpose and will allow for new wildfire technologies to be put on the truck. Justification The fire department has now purchased new vehicles for rescue calls only and this will allow for the new grass trucks to have an extended life expectancy. The current grass vehicles have worked very hard responding to both wildfire and medical types of calls during most of the life of the trucks. The grass trucks also have many engine hours on them due to idling conditions while at grass fires and medical calls. By using separate vehicles for each function, both the grass fire vehicle and assigned medical vehicle will last for at least 15 years or more. Expenditures20102011201220132014Total 45,00045,000 Vehicles 45,00045,000 Total Funding Sources20102011201220132014Total Equipment Bond 45,00045,000 45,00045,000 Total Budget Impact/Other The fire department will be looking to purchase a smaller and more maneuverable vehicle when it is time to replace the grass trucks. The current full size pick up trucks, while capable of handling larger tanks and more weight, can be difficult to use when the need to negotiate around obstacles during wildfires arises. The grass vehicles will be a four wheel drive type and should probably have winches mounted on the front of the vehicle. The smaller and more maneuverable vehicles should be less expensive but yet perform much better when using the off road functions and features. Monday, September 28, 2009 103 thru Capital Plan 20102014 of Andover, MN City 14-42200-01 Project # Replacement - Tanker #11 Project Name DepartmentFire TypeEquipment Useful Life20 YearsContactFire Chief CategoryEquipment Priority2 - Medium Description Replace Unit #4889, a 1991 International tanker with 8,900 miles and about 900 engine hours. Justification This vehicle will be 22 years old in 2013. The all wheel drive vehicle has worked extremely well as a tanker that can be used at all types of fires including wildfires, where the off road capabilities have proven to be very valuable. There have been no significant problems with this vehicle and the replacement need has to be re-evaluated in 2013 but it is very important that we keep this vehicle current and up to date with the latest firefighting technologies. The current vehicle has a rear mounted pumping system that requires constant maintenance and usually more than one person to operate the truck and pump at a fire scenario. The proposed new tanker will have remote operational capabilities that will make operating the truck with only one person a reality. The current manually-operated pump has many drawbacks and limitations due to the need for more than one person to operate efficiently and safely. Expenditures20102011201220132014Total 340,000340,000 Vehicles 340,000340,000 Total Funding Sources20102011201220132014Total 340,000340,000 Equipment Bond 340,000340,000 Total Budget Impact/Other The new vehicle will probably have a larger tank and also the capability for only one person to operate during a fire situation. The maintenance costs for a newer vehicle will also have a budget impact in that there should be much less maintenance costs for the first half of the lifespan of the vehicle. The newer vehicle will also be expected to last longer because of the updates in the manufacturing process. The newer styles and metal fabrication help to reduce rusting and deterioration of the vehicle. The new vehicle should be produced so that the driver can dump water from chutes installed on both sides and from the rear of the truck. Currently water can be discharged only from a large rear outlet or with the manual pump system installed at the back of the truck. Monday, September 28, 2009 104 thru Capital Plan 20102014 of Andover, MN City 10-45000-02 Project # New - Zero turn mower Project Name DepartmentPark & Rec - Operations TypeEquipment Useful Life10 YearsContactDPW / City Engineer CategoryEquipment Priority1 - High Description Purchase an additional zero turn mower. Justification A zero turn mower is more efficient when mowing around the buildings, trees and other obstacles that are found in the city parks and campus grounds. This would also extend the life of the current Toro mowers. Expenditures20102011201220132014Total 8,5008,500 Equipment 8,5008,500 Total Funding Sources20102011201220132014Total Capital Projects Levy 8,5008,500 8,5008,500 Total Budget Impact/Other The zero turn mowers are faster to operate around buildings and trees thus saving time and money by being more productive. The zero turn mower is about 1/3 the cost of a Toro Groundsmaster. Monday, September 28, 2009 105 thru Capital Plan 20102014 of Andover, MN City 12-45000-01 Project # Replacement - Large Capacity Lawnmower #580 Project Name DepartmentPark & Rec - Operations TypeEquipment Useful Life10 YearsContactDPW / City Engineer CategoryEquipment Priority1 - High Description Replace Unit #580, a 1999 Toro 580 large capacity mower with 2,722 hours. This machine is averaging 200 - 300 hours per year and by 2012 it will have approximately 3,500 hours. Justification Maintenance costs are starting to accumulate and it should be traded in while it still has some value. Expenditures20102011201220132014Total 112,000112,000 Equipment 112,000112,000 Total Funding Sources20102011201220132014Total Equipment Bond 112,000112,000 112,000112,000 Total Budget Impact/Other Higher maintenance cost, possibly more break downs and lower trade-in value. Wednesday, September 30, 2009 106 thru Capital Plan 20102014 of Andover, MN City 12-45000-02 Project # Replacement - Toro Groundsmaster, #559 Project Name DepartmentPark & Rec - Operations TypeEquipment Useful Life10 YearsContactDPW / City Engineer CategoryEquipment Priority1 - High Description Replace Unit #559, a 1999 Toro Groundsmaster 328 with 1,893 hours. Justification This unit is run all year and maintenance costs are starting to accumulate. Expenditures20102011201220132014Total 23,00023,000 Equipment 23,00023,000 Total Funding Sources20102011201220132014Total Equipment Bond 23,00023,000 23,00023,000 Total Budget Impact/Other Higher maintenance cost, possibly more break downs and lower trade-in value. Monday, September 28, 2009 107 thru Capital Plan 20102014 of Andover, MN City 12-45000-03 Project # Replacement - One Ton Truck w/ Plow, #599 Project Name DepartmentPark & Rec - Operations TypeEquipment Useful Life10 YearsContactDPW / City Engineer CategoryEquipment Priority2 - Medium Description Replace Unit # 599, a 2000 F450 1-ton with 47,200 miles. These trucks are on the move all year and average about 5,000 miles per year. Justification This truck is used everyday; hauling material, equipment, people and also plowing snow in the winter. The snow plowing puts a lot of wear and tear on the engine, transmission and other drive line components. Expenditures20102011201220132014Total 65,00065,000 Vehicles 65,00065,000 Total Funding Sources20102011201220132014Total Equipment Bond 65,00065,000 65,00065,000 Total Budget Impact/Other Being that this is a front line unit, we need to know that we can count on it everyday. Cost to operate it have only gone up $.04 per mile last year but those costs will continue to rise in the coming years. With preventative maintenance, we might be able to extend its useful life. Monday, September 28, 2009 108 thru Capital Plan 20102014 of Andover, MN City 13-45000-01 Project # Replacement - One Ton Truck w/ Plow #503 Project Name DepartmentPark & Rec - Operations TypeEquipment Useful Life10 YearsContactDPW / City Engineer CategoryEquipment Priority2 - Medium Description Replace Unit #503, a 2001 Ford F-450 dump truck with a 9' Fisher snow plow with 62,700 miles on it. Justification This unit will be 12 years old and should have approximately 80,000 miles on it. The maintenance costs will be monitored to determine when this vehicle should be replaced. Expenditures20102011201220132014Total 65,00065,000 Equipment 65,00065,000 Total Funding Sources20102011201220132014Total Equipment Bond 65,00065,000 65,00065,000 Total Budget Impact/Other Less cost per mile to operate and less break downs. Monday, September 28, 2009 109 thru Capital Plan 20102014 of Andover, MN City 13-45000-02 Project # Replacement - Trailer, T-554 Project Name DepartmentPark & Rec - Operations TypeEquipment Useful Life10 YearsContactDPW / City Engineer CategoryEquipment Priority2 - Medium Description Replace Unit #T-554 , a tandem axle trailer with GVW rating of 10,000 - 12,000 lbs. It was recently sand blasted and repainted top to bottom extending its useful life a few more years. Justification This is the main trailer for the Parks Department. It was the first and only trailer that was designed for hauling mowers and it has worked out great. Expenditures20102011201220132014Total 10,00010,000 Equipment 10,00010,000 Total Funding Sources20102011201220132014Total Equipment Bond 10,00010,000 10,00010,000 Total Budget Impact/Other More parks can only mean moving more equipment to them. Monday, September 28, 2009 110 thru Capital Plan 20102014 of Andover, MN City 14-45000-01 Project # Replacement - One Ton Crew Cab Pickup #502 Project Name DepartmentPark & Rec - Operations TypeEquipment Useful Life10 YearsContactDPW / City Engineer CategoryEquipment Priority1 - High Description Replace Unit #502, a 2002 F350 crew cab pickup with 50,500 miles on it. Justification This truck is used for pulling a large trailer around the city with mowing equipment in the spring, summer and fall along with the summer part- time help. In the winter months, it is pulling equipment that is used to clear the ice skating rinks. A crew cab that can transport a mowing crew and all their equipment is an ideal situation. Expenditures20102011201220132014Total 50,00050,000 Equipment 50,00050,000 Total Funding Sources20102011201220132014Total Equipment Bond 50,00050,000 50,00050,000 Total Budget Impact/Other Less cost per mile to operate and fewer break downs. Monday, September 28, 2009 111 thru Capital Plan 20102014 of Andover, MN City 12-41500-01 Project # Replacement - Ford Taurus #15 Project Name DepartmentPlanning & Zoning TypeEquipment Useful Life10 YearsContactComm. Dev. Director CategoryEquipment Priority2 - Medium Description Replace Unit #15, a 1995 Taurus with 73,700 miles. This unit averages 3,000 to 5,000 miles a year. Justification By 2012, this vehicle will have 84,000 miles on it. This vehicle could be used as an intern vehicle or for city employees attending seminars/training. Expenditures20102011201220132014Total 25,00025,000 Equipment 25,00025,000 Total Funding Sources20102011201220132014Total Equipment Bond 25,00025,000 25,00025,000 Total Budget Impact/Other A new vehicle will decrease maintenance costs and improve productivity. This car could be kept and used for interns and possibly replace one of the old blazers that has 168,000 miles on it. The Central Equipment Department would like to recommend looking at an alternative fuel vehicle/hybrid. Monday, September 28, 2009 112 thru Capital Plan 20102014 of Andover, MN City 11-48200-02 Project # Replacement - One Ton Truck w/ Plow #90 Project Name DepartmentSanitary Sewer TypeEquipment Useful Life10 YearsContactDPW / City Engineer CategoryEquipment Priority1 - High Description Replace Unit #90, a 1997 Dodge W250 with snow removal equipment and 71,700 miles. Justification This truck will be monitored over the next couple of years to determine the appropriate time for replacement. It will be replaced with a one ton truck and modern snow removal equipment to make snow removal faster and more efficient. Expenditures20102011201220132014Total 65,00065,000 Equipment 65,00065,000 Total Funding Sources20102011201220132014Total Sanitary Sewer Fund 65,00065,000 65,00065,000 Total Budget Impact/Other The new truck will have decreased maintenance issues and the modern snow equipment will make snow removal faster and more efficient. Monday, September 28, 2009 113 thru Capital Plan 20102014 of Andover, MN City 11-48200-03 Project # New - Jet/Vac Truck Project Name DepartmentSanitary Sewer TypeEquipment Useful Life15-20 YearsContactDPW / City Engineer CategoryEquipment Priority1 - High Description The new vehicle is a combination jet/vac unit, Model 2115 Positive Displacement Unit (PD Unit) used for cleaning sanitary and storm sewers. This unit will carry up to 2000 gallons of water and 600 feet of jetting hose. Justification Approximately 13 miles or 15% of the sanitary sewer system is trunk mains with diameters of 12" - 36". These trunk mains are flowing near capacity in some areas at the present time. By removing the sedimentation in these pipes the flow line will drop giving more room for additional flows. In turn this could put on hold the addition of the designated lift station to by pass certain areas for a year or more. This type of unit can also clean flared end sections in back yards and sedimentation ponds within a reasonable distance. This would allow some areas to be cleaned without having to enter properties. Also with two trucks in operation more of the storm and sanitary sewer systems could be maintained to meet goals as set up in the NPDES program. At the present time most of the departments efforts are geared towards the storm sewer system because of the many failures and neglect that has taken place in the past. There are thirty six square miles of storm sewer systems and ninety miles of sanitary systems. The storm sewers are maintained from the spring of the year and ending in the fall. The sanitary system is then maintained during the winter months when conditions are less than favorable. Expenditures20102011201220132014Total 357,000357,000 Equipment 357,000357,000 Total Funding Sources20102011201220132014Total 160,000160,000 Sanitary Sewer Fund 160,000160,000 Sewer Trunk Fund 37,00037,000 Storm Sewer Fund 357,000357,000 Total Budget Impact/Other This truck will help save time with cleaning of the system. It will also allow the system to be cleaned under heavy flows which cannot be done with the machine currently being used. This type of VAC truck will allow the operators to clean more of the system without having to stop because the truck cannot handle the flows. It would save time by not having to plug mains and risk backups into basements because of some unforeseen difficulty. By having two jet vac trucks in operation at the same time, more of the storm and sanitary sewer systems could be maintained on an annual basis to meet goals as set by the department and NPDES program. Monday, September 28, 2009 114 thru Capital Plan 20102014 of Andover, MN City 11-48300-01 Project # Replacement - Elgin Street Sweeper #169 Project Name DepartmentStorm Sewer TypeEquipment Useful Life10 YearsContactDPW / City Engineer CategoryEquipment Priority1 - High Description Replace Unit #169, a 2000 Elgin sweeper with approximately 3,548 hours. Justification The maintenance cost of this machine has risen $0.84 per hour in the last year alone. Maintenance costs continue to rise and it will need to be monitored as to the timing of replacement. Expenditures20102011201220132014Total 150,000150,000 Vehicles 150,000150,000 Total Funding Sources20102011201220132014Total Equipment Bond 90,00090,000 Storm Sewer Fund 60,00060,000 150,000150,000 Total Budget Impact/Other We will need to monitor the costs closely over the next few years and make a decision at that time. This machine only runs about a month and a half a year. Monday, September 28, 2009 115 thru Capital Plan 20102014 of Andover, MN City 11-43100-02 Project # Replacement - Dump Truck w/ Snow Removal #197 Project Name DepartmentStreets / Highways TypeEquipment Useful Life10 YearsContactDPW / City Engineer CategoryEquipment Priority1 - High Description Replace unit #197, a 1996 LT9000 tandem axle dump truck and snow removal equipment with 62,900 miles on it. Justification This is one of the remaining few units with a manual transmission in it. It's difficult and tiring to operate the snow removal equipment and change gears at the same time. Less operations in the cab will keep the driver alert for longer periods of time during those long snow removal days and nights. Expenditures20102011201220132014Total 200,000200,000 Equipment 200,000200,000 Total Funding Sources20102011201220132014Total Equipment Bond 200,000200,000 200,000200,000 Total Budget Impact/Other Changing to an automatic transmission and newer snowplow controls will give us more attentive and less fatigued drivers after many hours of service. Monday, September 28, 2009 116 thru Capital Plan 20102014 of Andover, MN City 12-43100-01 Project # Replacement - Dump Truck w/ Snow Removal #198 Project Name DepartmentStreets / Highways TypeEquipment Useful Life10 YearsContactDPW / City Engineer CategoryEquipment Priority1 - High Description Replace unit #198, a 2000 dump truck with front mounted snow removal equipment with almost 28,800 miles on it. Justification This truck will be 12 years old and will be getting close to the end of its life cycle. It will be re-evaluated each year to determine when to replace it. Expenditures20102011201220132014Total 150,000150,000 Equipment 150,000150,000 Total Funding Sources20102011201220132014Total Equipment Bond 150,000150,000 150,000150,000 Total Budget Impact/Other Less cost per mile to operate and better use of snow plow equipment. Monday, September 28, 2009 117 thru Capital Plan 20102014 of Andover, MN City 12-43100-02 Project # Replacement - One Ton Truck w/ Plow #132 Project Name DepartmentStreets / Highways TypeEquipment Useful Life10 YearsContactDPW / City Engineer CategoryEquipment Priority1 - High Description Replace unit #132, a 2001 Ford F-450 dump truck with a 9 foot Fisher snow plow with 75,700 miles on it. This unit plows cul-de-sacs and hauls equipment and materials through out the year. Justification By 2012, this truck will be 11 years old and have approximately 95,000 miles on it. It will be re-evaluated each year to determine when to replace it. Expenditures20102011201220132014Total 65,00065,000 Equipment 65,00065,000 Total Funding Sources20102011201220132014Total Equipment Bond 65,00065,000 65,00065,000 Total Budget Impact/Other Less cost per mile to operate but it might work out as a good summer time vehicle. Monday, September 28, 2009 118 thru Capital Plan 20102014 of Andover, MN City 12-43100-03 Project # Replacement - Water Tanker #163 Project Name DepartmentStreets / Highways TypeEquipment Useful Life15 YearsContactDPW / City Engineer CategoryEquipment Priority2 - Medium Description Replace Unit #163, a 1986 water tanker with 65,826 miles. Justification The old tanker was partially refurbished a few years ago because the floor and tank had rusted out. A new water truck would handle the job tasks better and more efficiently. A recently purchased water tanker with its cab over design and short turning radius has been a great asset to the public works staff. Expenditures20102011201220132014Total 100,000100,000 Vehicles 100,000100,000 Total Funding Sources20102011201220132014Total Equipment Bond 100,000100,000 100,000100,000 Total Budget Impact/Other The design of the new water tanker make it very efficient to operate and pleasure to use. The front adjustable nozzle is particularly liked by the public works staff. Monday, September 28, 2009 119 thru Capital Plan 20102014 of Andover, MN City 12-48100-04 Project # Replacement - One Ton Truck w/ Plow #105 Project Name DepartmentWater TypeEquipment Useful Life10 YearsContactDPW / City Engineer CategoryEquipment Priority1 - High Description Replace unit #105, a 1994 Ford F-250 pick up truck with snow removal equipment and 105,900 miles. Justification By 2012, this truck will be 17 years old with over 110,000 miles on it. This truck will be replaced with a 1-ton truck with modern snow removal equipment. Expenditures20102011201220132014Total 65,00065,000 Equipment 65,00065,000 Total Funding Sources20102011201220132014Total Water Fund 65,00065,000 65,00065,000 Total Budget Impact/Other A new truck will have lower maintenance cost and better snow removal equipment. Both items will save time and money. Monday, September 28, 2009 120 CITY OF ANDOVER Road & Bridge Funds - Rollup Projected Fund Balance 200920102011201220132014TOTALS Projected Sources of Revenue Est. Annual MSA Construction Allocation$ 687,353$ 558,863$ 1,006,901$ 388,099$ 980,000$ 980,547$ 4,601,763 State Aid Street Bonds - Principal (160,000) (170,000) (215,000) (220,000) (230,000) (230,000) (1,225,000) Available MSA Construction for Other Commitments 527,353 388,863 791,901 168,099 750,000 750,547 3,376,763 Est. Annual Maintenance Allocation 428,057 335,521 335,521 335,521 335,521 335,521 2,105,662 State Aid Street Bonds - Interest (78,583) (49,325) (21,009) (16,115) (10,765) (4,785) (180,582) General Fund Commitment (185,007) (190,557) (196,274) (196,274) (202,162) (202,162) (1,172,436) Available MSA Maintenance for Other Commitments 164,467 95,639 118,238 123,132 122,594 128,574 752,644 Total MSA Available for other Commitments 691,820 484,502 910,139 291,231 872,594 879,121 691,820 Federal Funds - - - - - - - Assessments* 200,000 222,000 233,000 351,000 196,000 354,000 1,556,000 Tax Levy 1,202,909 1,054,829 1,133,706 1,160,078 1,187,169 1,214,996 6,953,687 Total Revenues Available 2,094,729 1,761,331 2,276,845 1,802,309 2,255,763 2,448,117 9,201,507 Projected Commitments MSA - New & Reconstruct Routes -480,000 830,000 200,000 550,000 1,120,000 3,180,000 MSA - Intersection Upgrades- - 130,000 - - 275,000 405,000 MSA - Transfer to Debt Service - 500,000 - - - - 500,000 R & B - Pavement Markings 17,000 19,000 20,000 21,000 22,000 23,000 122,000 R & B - Curb Replacement 42,000 40,000 41,000 42,000 43,000 44,000 252,000 R & B - New & Reconstruct Routes - - - - - - - R & B - Bridge Scour Repairs - 17,500 17,500 17,500 - - 52,500 R & B - Seal Coating 315,000 141,000 379,000 327,000 411,000 443,000 2,016,000 R & B - Crack Sealing 45,000 18,000 - 107,000 108,000 193,000 471,000 R & B - Overlays 875,000 888,000 672,000 1,405,000 693,000 746,000 5,279,000 Pedestrian Trail Maintenance 53,000 54,000 55,000 56,000 57,000 58,000 333,000 Total Commitments 1,827,000 1,677,500 2,144,500 2,175,500 1,884,000 2,902,000 12,610,500 Revenues Over (Under) Expenditures 267,729 83,831 132,345 (373,191)371,763 (453,883)$ (3,408,993) Fund Balance as of December 31, 2008 2,497,381 Fund Balance Brought Forward 2,765,110 2,848,941 2,981,286 2,608,095 2,979,858 Ending Fund Balance$ 2,765,110$ 2,848,941$ 2,981,286$ 2,608,095$ 2,979,858$ 2,525,975 * Assuming collected in same year 121 CITY OF ANDOVER Park Improvement Fund Projected Fund Balance 200920102011201220132014TOTALS Projected Sources of Revenue Park Dedication Fee $2,944 per unit platted units 25 25 25 25 25 25 Anticipated Park Dedication Fee$ 406,272 $ 38,272$ 73,600$ 73,600$ 73,600$ 73,600$ 73,600 72,461 Commercial / Residential - Andover Station NEst. - 25,000 47,461 - - - DNR Grant / Donations 15,000 15,000 - - - - - Capital Projects Levy - Park Improvements 352,765 55,715 59,410 59,410 59,410 59,410 59,410 Total Revenues Available 846,498 108,987 158,010 180,471 133,010 133,010 133,010 Projected Commitments Annual Miscellaneous Projects 100,000 25,000 15,000 15,000 15,000 15,000 15,000 Debt Service Payments DS - Ballfields (Final 2015) 777,954 129,659 129,659 129,659 129,659 129,659 129,659 Andover Station North Building - carryforward 25,871 25,871 Irrigation Improvements 50,000 50,000 Total Commitments$ 953,825 180,530 144,659 194,659 144,659 144,659 144,659 Revenues Over (Under) Expenditures (71,543) (14,188) (11,649) (11,649) (11,649) 13,351 Fund Balance as of December 31, 2008 78,720 Fund Balance Brought Forward (5,309) (16,958) 7,177 20,528 6,340 $ (16,958)(5,309)$ (28,607)$ Ending Fund Balance *$20,528 $ 7,177$ 6,340 *Target - $50,000 to create a contingency for any project overages. Note: Debt Service has priority, platted units will have to be determined prior to any projects moving forward. Debt service payments are assessments for the construction of ballfields at Andover Station North. Payments are based on 5.5% interest for 8 years. 122 CITY OF ANDOVER Trail Fund Projected Fund Balance 200920102011201220132014TOTALS Projected Sources of Revenue Trail Fee $671 per unit platted units 25 25 25 25 25 25 Trail Fee$ 16,775$ 16,775$ 16,775$ 100,650 $ 16,775$ 16,775$ 16,775 - - - - - - - Total Revenues Available 16,775 16,775 16,775 100,650 16,775 16,775 16,775 Projected Commitments No projects planned at this time - - - - - Total Commitments - - - - - -$ - Revenues Over (Under) Expenditures 16,775 16,775 16,775 16,775 16,775 16,775 Fund Balance as of December 31, 2008 54,864 Fund Balance Brought Forward 88,414 105,189 121,964 71,639 71,639 Ending Fund Balance *$ 105,189$ 121,964$ 138,739 $ 71,639$ 88,414$ 88,414 *Target - 10% of current years commitments to create a contingency for any project overages. ** It is anticipated that all projects will not be fully expended by the end of the year, and future projects will be contingent on additional revenues. 123 CITY OF ANDOVER Water System Financial Projections EstimateForcast Year 20072008200920102011201220132014 Inflation Factor3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0% Ave. Use (gal per user per qtr)40,690 35,821 40,900 40,900 40,900 40,900 40,900 40,900 Acres Added 25 25 25 25 25 25 New Connections 50 35 35 35 35 35 New Customers 100 35 35 35 35 35 Residential Accounts 5,857 5,908 Commercial/Institutional Accts 131 136 Total Accounts 5,988 6,044 6,144 6,179 6,214 6,249 6,284 6,319 2.29%0.94% Rates Base Rate$ 9.78$ 10.27$ 10.78$ 11.32$ 11.88$ 12.48$ 13.10$ 13.76 Use Rate$ 1.44$ 1.54$ 1.65$ 1.77$ 1.89$ 2.02$ 2.16$ 2.31 Connection Charge$ 2,920$ 3,154$ 3,406$ 3,678$ 3,973$ 4,291$ 4,634$ 5,005 Area Charge$ 2,675$ 2,889$ 3,120$ 3,370$ 3,639$ 3,930$ 4,245$ 4,584 Base Rate7.0%5.0%5.0%5.0%5.0%5.0%5.0%5.0% Use Rate6.7%6.9%7.1%7.0%7.0%7.0%7.0%7.0% Connection Charge8.0%8.0%8.0%8.0%8.0%8.0%8.0%8.0% Area Charge8.0%8.0%8.0%8.0%8.0%8.0%8.0%8.0% EstimateForcast Enterprise Fund - Water Operations 20072008200920102011201220132014 Cash flows from operating activities: Receipts from customers and users$ 1,951,459$1,961,739$2,028,000$2,113,977$2,265,876$2,428,400$2,602,868$ 2,790,159 Payment to suppliers (741,144) (686,273) (709,720) (788,353) (812,004) (836,364) (861,455) (887,298) Payment to employees (374,019) (378,904) (408,665) (379,474) (390,858) (402,584) (414,661) (427,101) Net from operating activities 836,296 896,562 909,615 946,150 1,063,014 1,189,452 1,326,752 1,475,759 Cash flows from noncapital financing activities: Receipt of advances from other funds - - - - - - - - Transfers in 57,671 163,469 165,643 89,191 137,273 140,255 143,475 146,953 Transfers out (141,625) (145,874) (150,250) (150,250) (154,758) (159,400) (164,182) (169,108) Net from noncapital financing activities (83,954) 17,595 15,393 (61,059) (17,485) (19,145) (20,707) (22,155) Cash flows from capital and related financing activities: Acquisition of capital assets (6,500) (29,037) (980,000) (50,000) (2,720,900) (145,500) (8,065,000) (70,000) Receipt of bonds 6,570,000 - 930,000 - 2,665,900 -8,000,000 - Payment on debt (847,685) (1,014,374) (1,015,585) (1,113,025) (1,115,036) (7,866,267) (1,095,758) (1,891,403) Proceeds from the sale of capital assets - - - - - - - - Net from capital and related financing activities 5,715,815 (1,043,411) (1,065,585) (1,163,025) (1,170,036) (8,011,767) (1,160,758) (1,961,403) Cash flows from investing activities: Investment income 138,461 300,036 281,146 281,146 281,146 281,146 25,000 25,000 Net increase in cash and cash equivalents 6,606,618 170,782 140,569 3,212 156,639 (6,560,314) 170,287 (482,798) Cash and cash equivalents - January 1 1,075,454 7,682,072 7,852,854 7,993,423 7,996,635 8,153,274 1,592,960 1,763,247 Cash and cash equivalents - December 31$ 7,682,072$7,852,854$7,993,423$7,996,635$8,153,274$ 1,592,960$ 1,763,247$ 1,280,449 124 CITY OF ANDOVER Water System Financial Projections EstimateForcast Capital Projects Fund - Water Trunk 20072008200920102011201220132014 Revenues Connection Charges624,068$ $ 253,728$ $ 139,047$ 150,170$ 162,184$ 175,159 $ -128,747 Area Charges 90,979 98,258 106,118 114,608 - - - 84,240 Interest 177,021 143,983 50,000 25,000 25,000 25,000 25,000 25,000 Special Assessment 58,079 51,442 40,000 40,000 50,000 50,000 50,000 50,000 Replacement Reserve - - - - - - - - Other 23,745 - - - - - - - Total 882,913 449,153 90,000 277,987 305,026 323,428 343,302 364,766 Expenses Debt Service - - - - - - - - Capital Outlay 168,560 518,634 124,000 396,000 850,000 585,000 - 305,000 Xfer Out 57,671 163,469 165,643 89,191 137,273 140,255 143,475 146,953 Total 226,231 682,103 289,643 89,191 442,273 536,255993,475731,953 Net Increase (Decrease) in Fund Balance 656,682 (232,950) (199,643) 188,796 (137,247) (212,827) (650,173) (367,187) Fund Balance - January 1 2,530,117 3,186,799 2,953,849 2,754,206 2,943,002 2,805,755 2,592,927 1,942,754 Fund Balance - December 31$ 3,186,799$2,953,849$2,754,206$2,943,002$2,805,755$ 2,592,927$ 1,942,754$ 1,575,568 Capital Projects Wells Rehab Wells$ 50,000$ 50,000$ 55,000$ 60,000$ 65,000$ 70,000 Construct Well # 10 181,000 Trunk New Development Projects 124,000 15,000 25,000 140,000 35,000 Water Main Improvements 290,000 550,000 Water Main along South Coon Creek 710,000 Plant Construct Clear Well @ WTP 2,665,900 Surface Seal Brick Structures 20,500 Demo tower 190,000 WTP reclaim tank addition 930,000 Construct WTP #2 8,000,000 Equipment 65,000 Total$$ 3,025,90050,000$$ 541,500$ 8,915,000$ 655,000 $ -$ -1,104,000 Funded by Operations$ 50,000$ 50,000$ 55,000$ 145,500$ 65,000$ 70,000 $ -$ - Funded by Infrastructure/Trunk 396,000 850,000 585,000 - - 124,000 - 305,000 Funded by debt - - 930,000 - 2,665,900 -8,000,000 - Total$$ 3,025,90050,000$$ 541,500$ 8,915,000$ 655,000 $ -$ -1,104,000 Debt Rate5.00%5.50%5.50%5.50%5.50%5.50%5.50%5.50% Term 10 10 10 10 15 15 15 15 AADS$ $ $ -$ -$ -$ -265,592$ -797,005$ - Cumulative DS$ $ 265,592$ 1,062,597 $ -$ -$ -$ -$ -265,592 Current DS$ 847,685$1,014,374$1,027,133$1,113,025$1,115,036$ 7,600,675$ 830,166$ 828,806 125 CITY OF ANDOVER Sanitary Sewer System Financial Projections EstimateForcast Year 20072008200920102011201220132014 Inflation Factor3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0% Acres Added 2525 25 25 25 25 New Connections 50 35 35 35 35 35 New Customers 100 35 35 35 35 35 Residential Accounts 6,773 6,823 Commercial SACs 1,270 1,316 Total Accounts 8,043 8,139 8,239 8,274 8,309 8,344 8,379 8,414 3.05%1.19% Rates Base Rate$ 53.81$ 55.96$ 57.64$ 59.37$ 61.15$ 62.98$ 64.87$ 66.82 Connection Charge$ 387$ 402$ 418$ 435$ 452$ 470$ 489$ 509 Area Charge$ 1,434$ 1,491$ 1,551$ 1,613$ 1,678$ 1,745$ 1,814$ 1,887 Base Rate4.0%4.0%4.0%3.0%3.0%3.0%3.0%3.0% Connection/Area4.0%3.9%4.0%4.0%4.0%4.0%4.0%4.0% Area Charge4.0%4.0%4.0%4.0%4.0%4.0%4.0%4.0% Estimate Forcast Enterprise Fund - Sanitary Sewer Operations 20072008200920102011201220132014 Cash flows from operating activities: Receipts from customers and users$ 1,721,270$1,827,287$1,944,000$2,014,883$2,057,391$ 2,127,180$ 2,199,328$ 2,273,913 Payment to suppliers (892,164) (1,005,174) (1,081,436) (1,201,752) (1,237,805) (1,274,939) (1,313,187) (1,352,582) Payment to employees (228,840) (295,695) (285,565) (279,012) (287,382) (296,004)(304,884)(314,030) Net from operating activities 600,266 526,418 576,999 534,119 532,204 556,238 581,257 607,300 Cash flows from noncapital financing activities: Transfers out - Replacement Reserve (350,000) (350,000) (350,000) (400,000) (400,000) (400,000) (400,000) (500,000) Transfers out (44,000) (45,320) (46,680) (46,680) (48,080) (49,523) (51,008) (52,539) Net from noncapital financing activities (394,000) (395,320) (396,680) (446,680) (448,080) (449,523) (451,008) (552,539) Cash flows from capital and related financing activities: Acquisition of capital assets (6,500) (56,165) (8,000) - (225,000) - - - Proceeds from the sale of capital assets - - - - - - - - Net from capital and related financing activities (6,500) (56,165) (8,000) - (225,000) - - - Cash flows from investing activities: Investment income 77,459 64,509 30,000 40,000 50,000 50,000 50,000 50,000 Net increase in cash and cash equivalents 277,225 139,442 202,319 127,439 (90,877) 156,715 180,249 104,761 Cash and cash equivalents - January 1 1,426,693 1,703,918 1,843,360 2,045,679 2,173,118 2,082,241 2,238,956 2,419,205 Cash and cash equivalents - December 31$ 1,703,918$1,843,360$2,045,679$2,173,118$2,082,241$2,238,956$2,419,205$ 2,523,966 126 CITY OF ANDOVER Sanitary Sewer System Financial Projections EstimateForcast Capital Projects Fund - Sewer Trunk 20072008200920102011201220132014 Revenues Connection Charges205,556$ $ 1,175$ 15,215$ 15,824$ 16,457$ 17,115$ 17,800 $ - Area Charges 41,939 43,617 45,361 47,176 - - - 40,326 Interest 126,348 122,750 60,000 50,000 50,000 50,000 50,000 50,000 Special Assessment 28,493 131,888 20,000 20,000 30,000 30,000 50,000 50,000 Replacement Reserve 350,000 350,000 350,000 400,000 400,000 400,000 400,000 500,000 Bond Proceeds 1,250,000 - - - - - -2,250,000 Other 428 - - - - - - - Total 710,825 605,813 430,000 525,541 537,763 540,073 2,812,476 1,914,975 Expenses Debt Service - - - - - - -298,502 Capital Outlay 86,672 26,813 124,000 750,000 2,285,000 1,395,000 - 625,000 Total 86,672 26,813 124,000 750,0002,285,0001,693,502 - 625,000 Net Increase (Decrease) in Fund Balance 624,153 579,000 306,000 525,541 (87,237) (209,927) 527,476 221,473 Fund Balance - January 1 1,529,977 2,154,130 2,733,130 3,039,130 3,564,671 3,477,434 3,267,507 3,794,984 Fund Balance - December 31$ 2,154,130$2,733,130$3,039,130$3,564,671$3,477,434$ 3,267,507$ 3,794,984$ 4,016,457 Capital Projects Infrastructure New Development Projects$ 124,000$ 65,000$ 100,000$ 35,000$ 145,000 Crosstown Blvd Trunk 400,000 Yellow Pine Lift Station 650,000 Rural Reserve Trunk 2,250,000 1,250,000 Equipment 9,000 - 385,000 Total$ $ $ 750,000$ 2,285,000$ 1,395,000 $ -$ -133,000$ -850,000 Funded by Operations$ 9,000$ $ -$ -$ -225,000$ -$ -$ - Funded by Infrastructure/Trunk 750,000 35,000 145,000 - - 124,000 - 625,000 Funded by debt 1,250,000 - - - - - -2,250,000 Total$ $ $ 750,000$ 2,285,000$ 1,395,000 $ -$ -133,000$ -850,000 Debt Rate5.00%5.50%5.50%5.50%5.50%5.50%5.50%5.50% Term 10 1010 10 10 10 10 10 AADS$ $ 165,835 $ -$ -$ -$ -$ -$ -298,502 Cumulative DS$ $ -$ -$ -$ -$ -$ -$ -298,502 Current DS $ -$ -$ -$ -$ -$ -$ -$ - 127 CITY OF ANDOVER Storm Sewer System Financial Projections EstimateForcast Year 20072008200920102011201220132014 Inflation Factor3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0% New Customers 3535 35 35 35 Residential - Urban / Rural (units) 9,236 9,270 9,270 9,305 9,340 9,375 9,410 9,445 Multiple Dwelling (acres) 187 201 201 201 201 201 201 201 Comm / Industrial (acres) 314 336 336 336 336 336 336 336 Schools / Churches (acres) 245 249 249 249 249 249 249 249 Rates (Qtrly) Residential - Urban / Rural - per unit$ 6.19$ 6.33$ 6.78$ 6.98$ 7.19$ 7.41$ 7.63$ 7.86 Multiple Dwelling - per acre$ 13.61$ 13.92$ 14.92$ 15.37$ 15.83$ 16.30$ 16.79$ 17.30 Comm / Industrial - per acre$ 26.00$ 26.60$ 28.51$ 29.37$ 30.25$ 31.15$ 32.09$ 33.05 Schools / Churches - per acre$ 12.36$ 12.64$ 13.55$ 13.96$ 14.38$ 14.81$ 15.25$ 15.71 Residential - Urban / Rural - per unit0.0%2.3%7.1%3.0%3.0%3.0%3.0%3.0% Multiple Dwelling - per acre0.0%2.3%7.2%3.0%3.0%3.0%3.0%3.0% Comm / Industrial - per acre0.0%2.3%7.2%3.0%3.0%3.0%3.0%3.0% Schools / Churches - per acre0.0%2.3%7.2%3.0%3.0%3.0%3.0%3.0% EstimateForcast Enterprise Fund - Storm Sewer Operations 20072008200920102011201220132014 Cash flows from operating activities: Receipts from customers and users$ 285,046$ 292,488$ 311,000$ 327,000$ 336,422$ 347,552$ 359,046$ 370,918 Payment to suppliers (149,723) (130,929)(140,229) (200,933) (206,961) (213,170) (219,565) (226,152) Payment to employees (138,325) (155,867) (161,879) (187,326) (192,946) (198,734) (204,696) (210,837) Net from operating activities (3,002) 5,692 8,892 (61,259) (63,485) (64,352) (65,215) (66,071) Cash flows from noncapital financing activities: Payment of advances to other funds - - - - - - - - Transfers out (15,000) (10,000) (10,000) - - - - - Net from noncapital financing activities (15,000) (10,000) (10,000) - - - - - Cash flows from capital and related financing activities: Acquisition of capital assets (5,000) (45,864) (18,000) - (97,000) - - - Proceeds from the sale of capital assets - - - - - - - - Net from capital and related financing activities (5,000) (45,864) (18,000) - (97,000) - - - Cash flows from investing activities: Investment income 7,368 4,696 2,000 1,000 1,000 1,000 1,000 1,000 Net increase in cash and cash equivalents (15,634) (45,476) (17,108) (60,259) (159,485) (63,352) (64,215) (65,071) Cash and cash equivalents - January 1 157,846142,212 79,62896,736 19,369 (140,116) (203,468) (267,683) Cash and cash equivalents - December 31$ 142,212$ 96,736$ 79,628$ 19,369$ (140,116)$ (203,468)$ (267,683)$ (332,754) Capital Projects Infrastructure Storm Sewer Improvements$ 52,000$ 53,000$ 54,000$ 55,000$ 56,000$ 57,000 Bridge Scour Repairs 17,500 17,500 17,500 Equipment New Jet / Vac Truck 37,000 Trailer-Mounted Grout Plant 21,000 Replacement - Street Sweeper #169 60,000 Total$ 73,000$ 70,500$ 168,500$ 72,500$ 56,000$ 57,000 $ -$ - Funded by Operations$ 73,000$ 70,500$ 168,500$ 72,500$ 56,000$ 57,000 $ -$ - Funded by Infrastructure/Trunk - - - - - - - - Funded by debt - - - - - - - - Total$ 73,000$ 70,500$ 168,500$ 72,500$ 56,000$ 57,000 $ -$ - 128