Loading...
HomeMy WebLinkAbout2008 CIP2008² 2012Capital Improvement Plan 1685 Crosstown Blvd NW, Andover, MN 55304 Phone: 763.755.5100 Fax: 763.755.8923 www.ci.andover.mn.us This page left blank intentionally. CITY OF ANDOVER 2008 – 2012 Capital Improvements Plan Table of Contents Introduction 2008 – 2012 Capital Improvement Plan Message.......................................................................................1 CIP Project Development & Process Authorization Schedule....................................................................4 Graph – 2008 Expenditures By Department................................................................................................6 Graph – 2008 CIP Expenditures By Year....................................................................................................6 Five Year Summary of Expenditures By Department.................................................................................7 Five Year Summary of Revenue By Source................................................................................................8 Five Year Summary of Projects By Department & Revenue Source..........................................................9 Improvements Five Year Summary of Expenditures By Department – Improvements......................................................15 Five Year Summary of Revenue By Source – Improvements.....................................................................16 Five Year Summary of Projects By Department & Revenue Source – Improvements...............................17 Improvement Projects By Department Community Center................................................................................................................................20 Engineering...........................................................................................................................................21 Facility Management.............................................................................................................................23 Parks & Recreation – Operations..........................................................................................................37 Parks & Recreation – Projects...............................................................................................................38 Sanitary Sewer......................................................................................................................................52 Storm Sewer..........................................................................................................................................58 Streets / Highways................................................................................................................................61 Water.....................................................................................................................................................95 Equipment Year Summary of Expenditures By Department – Equipment....................................................................107 Five Year Summary of Revenue By Source – Equipment..........................................................................108 Five Year Summary of Projects By Department & Revenue Source – Equipment.....................................109 Equipment By Department Central Equipment................................................................................................................................112 Community Center................................................................................................................................116 Elections................................................................................................................................................119 Engineering...........................................................................................................................................120 Facility Management.............................................................................................................................121 Fire Department....................................................................................................................................123 Parks & Recreation – Operations..........................................................................................................132 Planning & Zoning................................................................................................................................139 Sanitary Sewer......................................................................................................................................140 Storm Sewer..........................................................................................................................................142 Street Signs...........................................................................................................................................144 Streets / Highways................................................................................................................................145 Water.....................................................................................................................................................153 Appendix Road & Bridge Fund Projected Fund Balance............................................................................................155 Park Improvement Fund Projected Fund Balance.......................................................................................156 Trail Fund Projected Fund Balance.............................................................................................................157 Water System Financial Projections............................................................................................................158 Sewer System Financial Projections............................................................................................................160 This page left blank intentionally.   1685 CROSSTOWN BOULEVARD N.W. ANDOVER, MINNESOTA 55304 (763) 755-5100 FAX (763) 755-8923 WWW.CI.ANDOVER.MN.US TO: Mayor and Council Members FROM: Jim Dickinson, City Administrator / Finance Director SUBJECT: 2008 - 2012 Capital Improvement Plan DATE: November 20, 2007 INTRODUCTION On behalf of the City’s Management Team, I am pleased to present the City of Andover’s Capital Improvement Plan for years 2008 through 2012. The City’s management team and their respective staff worked diligently to produce a document that was both practical, substantive in addressing needed capital improvements and insightful regarding the underlying factors associated with the City’s rapidly changing suburban landscape. CAPITAL IMPROVEMENT PLAN GOALS AC CKNOWLEDGE AND OMMUNICATE I PUBLIC NFRASTRUCTURE PRIORITIES AND DYNAMICS EAR NSUREPPROPRIATE ESPONSES TO CHANGING INFRASTRUCTURE NEEDS AND DEMANDS DFACR EVELOP A INANCIALSSESSMENT OF APITALESOURCES AVAILABLE TO MEET FUTURE CAPITAL PROJECT PLANNING NEEDS ISV NSTITUTE A TRATEGICISION PREDICATED ON MAINTAINING A HIGH QUALITY SERVICE INFRASTRUCTURE CAPABLE OF MEETING THE NEEDS OF OUR CITIZENS FOR TODAY AND TOMORROW The purpose of the City’s Capital Improvement Plan (CIP) is to identify, prioritize and address community needs through careful long-term capital planning and balanced public investment in supporting physical infrastructure. To ensure that this commitment is both meaningful and achievable, appropriate capital improvement factors were given significant consideration in developing a CIP that addresses community priorities over the next five (5) years. The CIP will also provide a planning foundation for future needs assessments to ensure the City is appropriately responding to the critical infrastructure needs necessary for sustainable future growth. The CIP represents a beginning in terms of producing a comprehensive planning response to address changing capital needs by developing a project schedule that will lead to timely and cost-effective project completions. 1 DISCUSSION The 2008 - 2012 CIP has been prepared as a strategic planning tool to assist the City Council in identifying proposed capital improvement projects over the next five years. With the inclusion of preliminary financing sources, appropriate background information citing needs and projected cost estimates, this document will provide Council with the needed information to begin the process for planning improvements that meet the City’s physical infrastructure needs. Consequently, the CIP serves as a flexible guide plan to properly identify the critical components of the City's infrastructure, yet maintain flexibility in determining project timeframes, project scope and possible funding sources. The 2008 - 2012 CIP continues the emphasis of judiciously managing the City’s limited resources by prudently planning for known and/or anticipated future capital expenditures. A critical step in the plan adoption process is the collaborative nature of plan review that involves the leadership of the City Council, the input of appointed Commissions and staff, and most importantly, affected residents of the community. Consequently, the strategic value of this plan lies in the acknowledgement of future needs by the governing body and the effective communication of those needs to the general public during project development stages. Likewise, the availability and preliminary designation of fiscal resources to serve both current and future needs is critical to the achievement of plan outcomes that meet with Council approval. Following the approval of the plan, feasibility studies are performed, affected constituencies are notified to formally disseminate and receive public feedback on proposed project plans. This process culminates with the City Council considering all relevant information and making a final decision on whether to proceed with the proposed capital improvement. The public process that supports the advancement of these projects from inception to completion is engendered in the CIP project development and authorization schedule. Formalizing the steps in the CIP project advancement process serves a number of purposes and ensures that the Council and public are kept well informed regarding project purposes and desired outcomes, estimated project costs, funding sources, progress and final status. It should be emphasized that projects will require approval in various stages of project development by the City Council in accordance with approved policies. The objectives of the 2008 - 2012 Capital Improvement Plan are to present a comprehensive capital improvement program that communicates efforts: to ensure that community priorities are reflected in the capital investment plans of each City department; to provide a consolidated financial picture of anticipated expenditures and outline recommended funding strategies to underwrite anticipated capital improvements; to document and communicate capital improvement processes for City projects that will ensure consistency, a full appreciation of both the costs and benefits of proposed capital investments, and raises the level of public understanding regarding the City’s public improvement processes; to provide information on the fiscal impacts of capital investment plans on total City finances; and to effectively plan for public improvements that support community needs in the areas of private development infrastructure, transportation, public safety, parks and recreation, utilities, and commercial/industrial growth through fiscally responsible economic development initiatives. Accordingly, this document attempts to recognize known or perceived capital improvement needs, but as with any plan recognizes that social, economic and political considerations will by necessity determine 2 final project outcomes. The major categories of expenditures that are identified within the CIP include, but are not limited to: 1. New Public Facilities Planning 2. Street Construction, Maintenance and Reconstruction 3. Utility Construction, Maintenance and Reconstruction 4. Construction, Maintenance and Upgrade of Parks, Playgrounds and Trails 5. Capital Improvements to Existing Facilities 6. Private development infrastructure 7. Capital equipment and vehicle planning needs (Equipment purchases to be determined through normal budgetary process) The City Council, consequently, accepts this document with the provision that capital improvement planning is subject to the dynamics of community growth, political leadership and acknowledges that other unanticipated needs may take precedence over planned projects. RECOMMENDATION The 2008 - 2012 Capital Improvement Plan is the product of collaborative planning efforts by City staff, the Park and Recreation Commission and the City Council. Projects have been introduced based on 1) anticipated future growth trends articulated in the City’s 2020 Comprehensive Plan, 2) the natural cycle of deterioration and decay evident in all physically constructed and engineered improvements in the more established areas of the community and 3) capital deficiencies or infrastructure issues brought to the City's attention through a variety of sources. Capital expenditures identified within the CIP are the best estimates available, and once the CIP is adopted, will be reviewed and confirmed through individual feasibility reports where appropriate. I am appreciative of the commitment, good judgment and expertise that each department has contributed to the capital improvement planning process. Respectfully submitted, Jim Dickinson City Administrator / Finance Director 3 CIP PROJECT DEVELOPMENT AND PROCESS AUTHORIZATION SCHEDULE The following process is a Council/staff guideline for authorizing public improvement projects. As this process is controlled by State Statute and other influencing environmental factors, it is subject to change and should be viewed as a guide to assist the Council and public in understanding the public improvement process used by City staff. A separate Council meeting would facilitate each step in the process, and accomplishment of respective activities. As a result, the process time frame is a significant factor affecting City staff’s ability to properly manage and complete approved Council ordered projects within budget and on time. 1. Council Approval of Annual CIP Projects by City Resolution will authorize the following outcomes: a) Staff and/or Consultant preparation of project feasibility studies b) Staff preparation of detailed financial review of project funding sources c) Neighborhood Meeting may be held prior to Feasibility Study subject to need and type of project. TIME FRAME: October-November of each preceding year. 2. Presentation of Feasibility Study a) Feasibility Study Components: 1) Review of Project Engineering and Construction Estimates 2) Total Project Costs (All related project costs, i.e. land, soft costs) 3) Project Financial Plan/Fiscal Implications (Engineering/Finance) 4) Authorization to develop a Preliminary Assessment Roll, if any, for the Public Hearing. (Engineering) If Council accepts Feasibility Study, A Resolution “Accepting Feasibility Study and Setting Date for Public Hearing on the Project” when appropriate (Engineering Department) would initiate the following: 1) Notices mailed to affected Residents per statute requirements no less than 10 days before Public Hearing. (Engineering) 2) Public Hearing Notice is published. Two publications one week apart, with the second publication no less than three days before the hearing. (Engineering/City Clerk) TIME FRAME: February-March-April-May of current year. 3. Neighborhood Meeting – City staff will hold neighborhood project meetings, when appropriate, to review and present Project Feasibility Studies, answer questions and meet with affected property owners. These meetings will include a question and answer component designed specifically to bring awareness to the property owner, obtain citizen input and produce an understanding of the purposes behind the City’s attempts to construct public improvements in the affected area. TIME FRAME: Following the presentation of the Feasibility Study to Council, but prior to the holding of a Public Hearing by Council. 4. Council holds a Public Hearing when appropriate for following purposes: a) Presentation of Project (Engineering Department) b) Presentation of Preliminary Special Assessment Rolls and Financing Implications (Engineering/Finance Department) c) Council to hear Affected Resident Input d) Council determines whether to “order” the public improvement 4 A Council Resolution is drafted “Ordering the Project and Authorizing Preparation of Plans and Specifications” (Engineering Department). Council may ORDER THE IMPROVEMENT after the public hearing is closed or at a subsequent Council Meeting within 6 months of the public hearing date. (Statutory Requirement - Council Resolution ordering project must be approved on 4/5 Council vote if it is Council initiated project with assessments). If Council decides to reject the project as presented, a Council vote should be taken to officially determine the final status of the project. TIME FRAME: April-May-June of current year 5. Plans and Specifications are presented to Council for approval. (Engineering Department) a) A Council Resolution is drafted authorizing the following: 1) Accepting and Approving Project Plans and Specifications 2) Authorizing the Advertisement for Project Bids. Bids are developed and invitation to Bid is processed. Bid opening date is no less than 3 weeks after publication. (Engineering) 3) Authorize staff to pursue an appropriate funding mechanism to underwrite project costs TIME FRAME: May-June of each year 6. Council Acceptance of Project Bids and Awarding of Contracts would authorize the following outcomes: a) A Council Resolution is drafted “Accepting Project Bids and Awarding Contracts” (Engineering) b) Initiation of Project Construction and work (Engineering) TIME FRAME: April-May-June-July of current year. 7. Project Completion a) Council Acceptance of Project b) Final Presentation and Review of Project Costs versus Project Budget by Finance Department. c) If Special Assessments are financing a portion of the Project, A Council Resolution “Setting the Special Assessment Hearing for Project #” is adopted at this same meeting. (Engineering/Finance) TIME FRAME: Upon completion of project. 8. If Special Assessments would finance a portion of the projects costs, Council Holds a Special Assessment Hearing to review the following: a) Affected Property owners would be officially notified per statute no less than two weeks prior to Special Assessment Hearing. (Clerk/Engineering) b) Public Notice is published no less than two weeks prior to Special Hearing per statute (Clerk/Engineering) c) Staff prepares a proposed roll and Council Approves Final Assessment Roll (Engineering/Finance) d) Council consideration of Assessment Appeals and Requested Deferrals filed prior to hearing or during the hearing. e) Meets M.S. Chapter 429 statutory requirements A Council Resolution is drafted “Adopting Final Special Assessment Roll”(Engineering), and is adopted at this meeting. TIME FRAME: October/November of current year depending on finalization of project and status of completion. 5 CITY OF ANDOVER 2008 CIP Expenditures By Department Water Parks & Rec-Oper. 14.75% 1.31% Comm Ctr Street Signs 0.34% Parks & Rec-Proj. 1.71% 4.12% Fire Engineering 5.93% 5.89% Storm Sewer 2.43% Facility Mgmt. 14.17% Streets/Highways 49.33% CITY OF ANDOVER 2008 CIP Expenditures By Year $3,819,250 2012 2011 $5,607,631 2010$12,759,082 $7,905,369 2009 $4,970,644 2008 2007 Adopted $5,514,842 $-$3,000,000$6,000,000$9,000,000$12,000,000$15,000,000 6 City of Andover, MN Capital Plan 20082012 thru DEPARTMENT SUMMARY Department20082009201020112012Total Central Equipment42,00035,00028,000105,000 Community Center17,0007,00015,000 39,000 Elections110,000 110,000 Engineering293,000331,000354,000355,000356,000 1,689,000 Facility Management704,37939,0004,118,000342,000110,000 5,313,379 Fire295,000450,000940,000390,0002,075,000 Park & Rec - Operations65,000188,50045,000177,00045,000520,500 Park & Rec - Projects205,000285,000545,00025,00075,0001,135,000 Planning & Zoning25,000 25,000 Sanitary Sewer757,0002,965,0001,250,000 4,972,000 Storm Sewer121,00052,000203,00054,00055,000 485,000 Street Signs85,00085,000 Streets / Highways2,452,2652,227,9692,801,6822,866,6312,937,25013,285,797 Water733,0003,500,900627,400120,000241,0005,222,300 4,970,6447,905,36912,759,0825,607,6313,819,25035,061,976 GRAND TOTAL 7 City of Andover, MN Capital Plan 20082012 thru FUNDING SOURCE SUMMARY 20082009201020112012Total Source Assessments242,889306,182696,9591,427,709472,9273,146,666 Building Fund318,379 318,379 Capital Equipment Reserve292,000300,000592,000 Capital Projects Levy88,00022,000133,00024,00047,500 314,500 Central Equipment Fund7,00035,00028,00070,000 Community Center Operations42,0007,00015,00032,00096,000 Construction Seal Coat Fund278,91981,654150,62637,48146,119 594,799 Equipment Bond670,0001,073,500940,000522,000208,0003,413,500 G.O. Bond4,085,000 4,085,000 General Fund62,00055,00063,00055,000235,000 Municipal State Aid Funds360,000321,750563,250780,500539,2502,564,750 Park Improvement Funds205,000285,000545,00025,00075,000 1,135,000 R & B - Crack Seal & Seal Coat435,789468,585798,219776,313722,4223,201,328 R & B - Overlays728,668596,798777,628777,628879,532 3,760,254 R & B - Pedestrian Trail52,00053,00054,00055,00056,000270,000 R & B - Reserve256,00063,00065,00067,00069,000 520,000 Sanitary Sewer Fund30,000160,00065,000255,000 Sewer Revenue Bonds2,000,000250,0002,250,000 Sewer Trunk Fund170,500684,000800,000150,000150,000 1,954,500 Storm Sewer Fund91,00089,000203,00054,00055,000492,000 Water Fund93,00050,00050,000120,00080,500 393,500 Water Revenue Bonds3,450,9003,450,900 Water Trunk Fund616,500124,000727,400150,000331,0001,948,900 4,970,6447,905,36912,759,0825,607,6313,819,25035,061,976 GRAND TOTAL 8 City of Andover, MN Capital Plan 20082012 thru PROJECTS & FUNDING SOURCES BY DEPARTMENT DepartmentProject#Priority20082009201020112012 Total Central Equipment Replacement - Hotsy Pressure Washer09-48800-0137,0007,000 Central Equipment Fund7,0007,000 Mobile Lifts09-48800-02135,000 35,000 Equipment Bond35,00035,000 Replacement - Floor Sweeper10-48800-01135,00035,000 Central Equipment Fund35,00035,000 Replacement - Service Truck11-48800-01228,000 28,000 Central Equipment Fund28,00028,000 42,00035,00028,000105,000 Central Equipment Total Community Center Additional Basketball Hoop08-44000-0127,5007,500 Community Center Operations7,5007,500 Kitchen Equipment - Fryer/Grill08-44000-0229,5009,500 Community Center Operations9,5009,500 Battery Pack Replacement - Zamboni09-44000-0127,0007,000 Community Center Operations7,0007,000 Storage Building10-44000-01215,00015,000 Community Center Operations15,00015,000 17,0007,00015,00039,000 Community Center Total Elections Voting Equipment10-41310-011110,000 110,000 Capital Projects Levy110,000110,000 110,000 110,000 Elections Total Engineering New Development Projects08-41600-011241,000248,000300,000300,000300,000 1,389,000 Sewer Trunk Fund120,500124,000150,000150,000150,000694,500 Water Trunk Fund120,500124,000150,000150,000150,000694,500 Pedestrian Trail Maintenance08-41600-02152,00053,00054,00055,00056,000270,000 R & B - Pedestrian Trail52,00053,00054,00055,00056,000270,000 Replacement - Blazer #1109-41600-01230,00030,000 Equipment Bond30,00030,000 293,000331,000354,000355,000356,0001,689,000 Engineering Total Facility Management 9 DepartmentProject#Priority20082009201020112012 Total Surface Seal all Brick Structures08-41900-01165,00075,000 140,000 Capital Projects Levy22,00022,50044,500 Community Center Operations25,00032,00057,000 Water Fund18,00020,50038,500 Land Purchase08-41900-021468,379468,379 Building Fund318,379318,379 Capital Equipment Reserve50,00050,000 Sewer Trunk Fund50,00050,000 Water Trunk Fund50,00050,000 Annual Parking Lot Maintenance08-41900-03121,00022,00023,00024,00025,000115,000 Capital Projects Levy21,00022,00023,00024,00025,000115,000 Phone System08-41900-041100,000100,000 Equipment Bond80,00080,000 Sanitary Sewer Fund10,00010,000 Water Fund10,00010,000 Facility Maintenance Vehicle08-41900-05150,000 50,000 Equipment Bond50,00050,000 Building A - Seal Floor09-41900-0117,0008,000 15,000 General Fund7,0008,00015,000 Carpet Replacement09-41900-02210,00010,00010,00010,000 40,000 General Fund10,00010,00010,00010,00040,000 Pedestrian Tunnel Under Crosstown Blvd.10-41900-011300,000 300,000 G.O. Bond300,000300,000 Addition to Storage Building & Vehicle Maint. Shop10-41900-0211,850,000 1,850,000 G.O. Bond1,850,0001,850,000 Fire St. #2 Addition with additional land purchase10-41900-032885,000 885,000 G.O. Bond885,000885,000 Salt Storage Building10-41900-041350,000350,000 G.O. Bond350,000350,000 Recycling Building & Fence10-41900-051250,000 250,000 G.O. Bond250,000250,000 Attached Storage Building10-41900-061200,000200,000 G.O. Bond200,000200,000 Relocate Fuel Station w/ Canopy10-41900-072250,000 250,000 G.O. Bond250,000250,000 Roof Replacements11-41900-011300,000300,000 Capital Equipment Reserve300,000300,000 704,37939,0004,118,000342,000110,0005,313,379 Facility Management Total Fire Replacement - Fire Tanker #3108-42200-011295,000295,000 Equipment Bond295,000295,000 Replacement - Fire Engine #1109-42200-011400,000400,000 Equipment Bond400,000400,000 Replacement - Fire Marshall Vehicle09-42200-02230,00030,000 Equipment Bond30,00030,000 Water/Ice rescue boat09-42200-03120,000 20,000 Equipment Bond20,00020,000 Replacement - Ladder Truck #1110-42200-011900,000900,000 Equipment Bond900,000900,000 Replacement - Fire Chief's Vehicle10-42200-02240,000 40,000 Equipment Bond40,00040,000 Replacement - Tanker #1111-42200-012300,000300,000 10 DepartmentProject#Priority20082009201020112012 Total Equipment Bond300,000300,000 Replacement - Grass #2111-42200-02245,000 45,000 Equipment Bond45,00045,000 Replacement - Grass #3111-42200-03245,000 45,000 Equipment Bond45,00045,000 2,075,000 295,000450,000940,000390,000 Fire Total Park & Rec - Operations Replace/Repair Play Structures - Various Parks08-45000-01145,00045,00045,00045,00045,000225,000 Capital Projects Levy45,00045,000 General Fund45,00045,00045,00045,000180,000 Replacement - Utility Box on Sign Truck08-45000-02120,00020,000 Equipment Bond20,00020,000 Replacement - Large Capacity Lawnmower #58009-45000-011112,000 112,000 Equipment Bond112,000112,000 Replacement - Toro Groundsmaster, #55909-45000-02123,000 23,000 Equipment Bond23,00023,000 Zero turn mower09-45000-0318,500 8,500 Equipment Bond8,5008,500 Replacement - Trailer, T-55411-45000-0129,000 9,000 Equipment Bond9,0009,000 Replacement - One Ton Pick Up w/Plow, #59911-45000-02265,000 65,000 Equipment Bond65,00065,000 Replacement - One ton truck w/ Plow #50311-45000-03258,000 58,000 Equipment Bond58,00058,000 520,500 65,000188,50045,000177,00045,000 Park & Rec - Operations Total Park & Rec - Projects Skate Board Park08-45001-011100,000100,000 Park Improvement Funds100,000100,000 Woodland Crossing Park08-45001-02145,000 45,000 Park Improvement Funds45,00045,000 Andover Station North Ball Field Facility08-45001-03135,00035,000 Park Improvement Funds35,00035,000 Annual Miscellaneous Projects08-45001-99125,00025,00025,00025,00025,000 125,000 Park Improvement Funds25,00025,00025,00025,00025,000125,000 Sophies South Park09-45001-01175,00075,000 Park Improvement Funds75,00075,000 Prairie Knoll Park - Phase III09-45001-021150,000150,000 Park Improvement Funds150,000150,000 Andover Lions Park09-45001-03135,00050,00085,000 Park Improvement Funds35,00050,00085,000 Hawkridge Park Improvements10-45001-011520,000520,000 Park Improvement Funds520,000520,000 205,000285,000545,00025,00075,0001,135,000 Park & Rec - Projects Total Planning & Zoning Replacement - Ford Taurus #1509-41500-01225,000 25,000 Equipment Bond25,00025,000 11 DepartmentProject#Priority20082009201020112012 Total 25,000 25,000 Planning & Zoning Total Sanitary Sewer New Jet/Vac Truck09-48200-011357,000 357,000 Sanitary Sewer Fund160,000160,000 Sewer Trunk Fund160,000160,000 Storm Sewer Fund37,00037,000 Crosstown Blvd Trunk Sewer Line09-48200-021400,000400,000 Sewer Trunk Fund400,000400,000 Rural Reserve Trunk Sanitary Sewer10-48200-0112,250,0001,250,000 3,500,000 Assessments250,0001,000,0001,250,000 Sewer Revenue Bonds2,000,000250,0002,250,000 Yellow Pine Lift Station10-48200-021650,000 650,000 Sewer Trunk Fund650,000650,000 Replacement - 1-ton truck with plow equipment10-48200-03165,000 65,000 Sanitary Sewer Fund65,00065,000 4,972,000 757,0002,965,0001,250,000 Sanitary Sewer Total Storm Sewer Storm Sewer Improvements08-48300-01151,00052,00053,00054,00055,000265,000 Storm Sewer Fund51,00052,00053,00054,00055,000265,000 New Track Backhoe08-48300-02270,00070,000 Sanitary Sewer Fund15,00015,000 Storm Sewer Fund40,00040,000 Water Fund15,00015,000 Replacement - Elgin Street Sweeper10-43100-011150,000 150,000 Storm Sewer Fund150,000150,000 485,000 121,00052,000203,00054,00055,000 Storm Sewer Total Street Signs Replacement - Sign Truck #41008-43300-01185,00085,000 Equipment Bond85,00085,000 85,00085,000 Street Signs Total Streets / Highways Annual Street Seal Coat Project08-43100-011542,608362,100752,363629,476619,3312,905,878 Construction Seal Coat Fund255,74361,481146,22331,91740,332535,696 R & B - Crack Seal & Seal Coat286,865300,619606,140597,559578,9992,370,182 Annual Street Crack Seal Project08-43100-021172,100188,139196,482184,318149,210 890,249 Construction Seal Coat Fund23,17620,1734,4035,5645,78759,103 R & B - Crack Seal & Seal Coat148,924167,966192,079178,754143,423831,146 Annual Street Mill and Overlay08-43100-031971,557795,7301,036,8371,036,8371,172,7095,013,670 Assessments242,889198,932259,209259,209293,1771,253,416 R & B - Overlays728,668596,798777,628777,628879,5323,760,254 Annual Pavement Markings08-43100-04120,00021,00022,00023,00024,000 110,000 R & B - Reserve20,00021,00022,00023,00024,000110,000 Annual Curb Replacement08-43100-05141,00042,00043,00044,00045,000215,000 R & B - Reserve41,00042,00043,00044,00045,000215,000 Rail Road Quiet Zones / Wayside Horns08-43100-061330,000 330,000 Municipal State Aid Funds160,000160,000 12 DepartmentProject#Priority20082009201020112012 Total R & B - Reserve170,000170,000 Municipal State Aid Routes / New & Reconstruct08-43100-071429,000751,000674,000719,000 2,573,000 Assessments107,250187,750168,500179,750643,250 Municipal State Aid Funds321,750563,250505,500539,2501,929,750 Intersection Upgrades08-43100-081225,000275,000500,000 Municipal State Aid Funds200,000275,000475,000 R & B - Reserve25,00025,000 Replacement - Hot Asphalt Box08-43100-09140,000 40,000 Equipment Bond40,00040,000 Truck mounted attenuator(TMA)08-43100-10135,000 35,000 Equipment Bond25,00025,000 Sanitary Sewer Fund5,0005,000 Water Fund5,0005,000 Extend Frame on #196 for Add'l Attachments08-43100-11175,00075,000 Equipment Bond75,00075,000 Replacement - Water Tanker09-43100-012100,000100,000 Equipment Bond100,000100,000 Asphalt Paving Machine09-43100-02190,00090,000 Equipment Bond90,00090,000 Replacement - Dump Truck w/ Snow Removal #19709-43100-041200,000200,000 Equipment Bond200,000200,000 Replacement - Dump Truck w/snow removal #19812-43100-011150,000150,000 Equipment Bond150,000150,000 Replacement - One ton truck w/ Plow #13212-43100-02158,00058,000 Equipment Bond58,00058,000 2,452,2652,227,9692,801,6822,866,6312,937,25013,285,797 Streets / Highways Total Water Rehabilitation of Wells08-48100-01145,00050,00050,00055,00060,000 260,000 Water Fund45,00050,00050,00055,00060,000260,000 Water Tower Painting08-48100-021600,000 600,000 Capital Equipment Reserve242,000242,000 Water Trunk Fund358,000358,000 Construct Test Wells No. 10 & 1108-48100-03188,00088,000 Water Trunk Fund88,00088,000 Construct Clearwell at WTP09-48100-0212,665,900 2,665,900 Water Revenue Bonds2,665,9002,665,900 WTP Reclaim Tank Addition09-48100-031785,000785,000 Water Revenue Bonds785,000785,000 Water Main along South Coon Creek Drive10-48100-011409,400409,400 Water Trunk Fund409,400409,400 Demolish 500,000 Gallon Water Tower10-48100-021168,000168,000 Water Trunk Fund168,000168,000 Replacement - 1-ton pick up truck #10511-48100-02165,00065,000 Water Fund65,00065,000 Construct Well #1012-48100-011181,000181,000 Water Trunk Fund181,000181,000 733,0003,500,900627,400120,000241,0005,222,300 Water Total 4,970,6447,905,36912,759,0825,607,6313,819,25035,061,976 GRAND TOTAL 13 This page left blank intentionally. 14 City of Andover, MN Capital Plan 20082012 thru DEPARTMENT SUMMARY Department20082009201020112012Total Community Center15,00015,000 Engineering293,000301,000354,000355,000356,000 1,659,000 Facility Management554,37939,0004,118,000342,000110,000 5,163,379 Park & Rec - Operations45,00045,00045,00045,00045,000 225,000 Park & Rec - Projects205,000285,000545,00025,00075,000 1,135,000 Sanitary Sewer400,0002,900,0001,250,0004,550,000 Storm Sewer51,00052,00053,00054,00055,000265,000 Streets / Highways2,302,2651,837,9692,801,6822,866,6312,729,25012,537,797 Water733,0003,500,900627,40055,000241,000 5,157,300 4,183,6446,460,86911,459,0824,992,6313,611,25030,707,476 GRAND TOTAL 15 City of Andover, MN Capital Plan 20082012 thru FUNDING SOURCE SUMMARY 20082009201020112012Total Source Assessments242,889306,182696,9591,427,709472,9273,146,666 Building Fund318,379 318,379 Capital Equipment Reserve292,000300,000592,000 Capital Projects Levy88,00022,00023,00024,00047,500 204,500 Community Center Operations25,00015,00032,00072,000 Construction Seal Coat Fund278,91981,654150,62637,48146,119594,799 G.O. Bond4,085,000 4,085,000 General Fund62,00055,00063,00055,000235,000 Municipal State Aid Funds360,000321,750563,250780,500539,250 2,564,750 Park Improvement Funds205,000285,000545,00025,00075,0001,135,000 R & B - Crack Seal & Seal Coat435,789468,585798,219776,313722,4223,201,328 R & B - Overlays728,668596,798777,628777,628879,532 3,760,254 R & B - Pedestrian Trail52,00053,00054,00055,00056,000270,000 R & B - Reserve256,00063,00065,00067,00069,000 520,000 Sewer Revenue Bonds2,000,000250,0002,250,000 Sewer Trunk Fund170,500524,000800,000150,000150,000 1,794,500 Storm Sewer Fund51,00052,00053,00054,00055,000265,000 Water Fund63,00050,00050,00055,00080,500298,500 Water Revenue Bonds3,450,900 3,450,900 Water Trunk Fund616,500124,000727,400150,000331,0001,948,900 4,183,6446,460,86911,459,0824,992,6313,611,25030,707,476 GRAND TOTAL 16 City of Andover, MN Capital Plan 20082012 thru PROJECTS & FUNDING SOURCES BY DEPARTMENT DepartmentProject#Priority20082009201020112012 Total Community Center Storage Building10-44000-01215,00015,000 Community Center Operations15,00015,000 15,000 15,000 Community Center Total Engineering New Development Projects08-41600-011241,000248,000300,000300,000300,0001,389,000 Sewer Trunk Fund120,500124,000150,000150,000150,000694,500 Water Trunk Fund120,500124,000150,000150,000150,000694,500 Pedestrian Trail Maintenance08-41600-02152,00053,00054,00055,00056,000 270,000 R & B - Pedestrian Trail52,00053,00054,00055,00056,000270,000 293,000301,000354,000355,000356,0001,659,000 Engineering Total Facility Management Surface Seal all Brick Structures08-41900-01165,00075,000 140,000 Capital Projects Levy22,00022,50044,500 Community Center Operations25,00032,00057,000 Water Fund18,00020,50038,500 Land Purchase08-41900-021468,379 468,379 Building Fund318,379318,379 Capital Equipment Reserve50,00050,000 Sewer Trunk Fund50,00050,000 Water Trunk Fund50,00050,000 Annual Parking Lot Maintenance08-41900-03121,00022,00023,00024,00025,000115,000 Capital Projects Levy21,00022,00023,00024,00025,000115,000 Building A - Seal Floor09-41900-0117,0008,000 15,000 General Fund7,0008,00015,000 Carpet Replacement09-41900-02210,00010,00010,00010,00040,000 General Fund10,00010,00010,00010,00040,000 Pedestrian Tunnel Under Crosstown Blvd.10-41900-011300,000 300,000 G.O. Bond300,000300,000 Addition to Storage Building & Vehicle Maint. Shop10-41900-0211,850,000 1,850,000 G.O. Bond1,850,0001,850,000 Fire St. #2 Addition with additional land purchase10-41900-032885,000 885,000 G.O. Bond885,000885,000 Salt Storage Building10-41900-041350,000 350,000 G.O. Bond350,000350,000 Recycling Building & Fence10-41900-051250,000 250,000 G.O. Bond250,000250,000 Attached Storage Building10-41900-061200,000 200,000 G.O. Bond200,000200,000 17 DepartmentProject#Priority20082009201020112012 Total Relocate Fuel Station w/ Canopy10-41900-072250,000 250,000 G.O. Bond250,000250,000 Roof Replacements11-41900-011300,000 300,000 Capital Equipment Reserve300,000300,000 5,163,379 554,37939,0004,118,000342,000110,000 Facility Management Total Park & Rec - Operations Replace/Repair Play Structures - Various Parks08-45000-01145,00045,00045,00045,00045,000 225,000 Capital Projects Levy45,00045,000 General Fund45,00045,00045,00045,000180,000 45,00045,00045,00045,00045,000225,000 Park & Rec - Operations Total Park & Rec - Projects Skate Board Park08-45001-011100,000100,000 Park Improvement Funds100,000100,000 Woodland Crossing Park08-45001-02145,000 45,000 Park Improvement Funds45,00045,000 Andover Station North Ball Field Facility08-45001-03135,000 35,000 Park Improvement Funds35,00035,000 Annual Miscellaneous Projects08-45001-99125,00025,00025,00025,00025,000 125,000 Park Improvement Funds25,00025,00025,00025,00025,000125,000 Sophies South Park09-45001-01175,000 75,000 Park Improvement Funds75,00075,000 Prairie Knoll Park - Phase III09-45001-021150,000 150,000 Park Improvement Funds150,000150,000 Andover Lions Park09-45001-03135,00050,000 85,000 Park Improvement Funds35,00050,00085,000 Hawkridge Park Improvements10-45001-011520,000 520,000 Park Improvement Funds520,000520,000 1,135,000 205,000285,000545,00025,00075,000 Park & Rec - Projects Total Sanitary Sewer Crosstown Blvd Trunk Sewer Line09-48200-021400,000 400,000 Sewer Trunk Fund400,000400,000 Rural Reserve Trunk Sanitary Sewer10-48200-0112,250,0001,250,0003,500,000 Assessments250,0001,000,0001,250,000 Sewer Revenue Bonds2,000,000250,0002,250,000 Yellow Pine Lift Station10-48200-021650,000650,000 Sewer Trunk Fund650,000650,000 400,0002,900,0001,250,0004,550,000 Sanitary Sewer Total Storm Sewer Storm Sewer Improvements08-48300-01151,00052,00053,00054,00055,000 265,000 Storm Sewer Fund51,00052,00053,00054,00055,000265,000 265,000 51,00052,00053,00054,00055,000 Storm Sewer Total Streets / Highways Annual Street Seal Coat Project08-43100-011542,608362,100752,363629,476619,331 2,905,878 18 DepartmentProject#Priority20082009201020112012 Total Construction Seal Coat Fund255,74361,481146,22331,91740,332535,696 R & B - Crack Seal & Seal Coat286,865300,619606,140597,559578,9992,370,182 Annual Street Crack Seal Project08-43100-021172,100188,139196,482184,318149,210890,249 Construction Seal Coat Fund23,17620,1734,4035,5645,78759,103 R & B - Crack Seal & Seal Coat148,924167,966192,079178,754143,423831,146 Annual Street Mill and Overlay08-43100-031971,557795,7301,036,8371,036,8371,172,7095,013,670 Assessments242,889198,932259,209259,209293,1771,253,416 R & B - Overlays728,668596,798777,628777,628879,5323,760,254 Annual Pavement Markings08-43100-04120,00021,00022,00023,00024,000 110,000 R & B - Reserve20,00021,00022,00023,00024,000110,000 Annual Curb Replacement08-43100-05141,00042,00043,00044,00045,000 215,000 R & B - Reserve41,00042,00043,00044,00045,000215,000 Rail Road Quiet Zones / Wayside Horns08-43100-061330,000 330,000 Municipal State Aid Funds160,000160,000 R & B - Reserve170,000170,000 Municipal State Aid Routes / New & Reconstruct08-43100-071429,000751,000674,000719,0002,573,000 Assessments107,250187,750168,500179,750643,250 Municipal State Aid Funds321,750563,250505,500539,2501,929,750 Intersection Upgrades08-43100-081225,000275,000 500,000 Municipal State Aid Funds200,000275,000475,000 R & B - Reserve25,00025,000 12,537,797 2,302,2651,837,9692,801,6822,866,6312,729,250 Streets / Highways Total Water Rehabilitation of Wells08-48100-01145,00050,00050,00055,00060,000260,000 Water Fund45,00050,00050,00055,00060,000260,000 Water Tower Painting08-48100-021600,000600,000 Capital Equipment Reserve242,000242,000 Water Trunk Fund358,000358,000 Construct Test Wells No. 10 & 1108-48100-03188,00088,000 Water Trunk Fund88,00088,000 Construct Clearwell at WTP09-48100-0212,665,900 2,665,900 Water Revenue Bonds2,665,9002,665,900 WTP Reclaim Tank Addition09-48100-031785,000 785,000 Water Revenue Bonds785,000785,000 Water Main along South Coon Creek Drive10-48100-011409,400 409,400 Water Trunk Fund409,400409,400 Demolish 500,000 Gallon Water Tower10-48100-021168,000 168,000 Water Trunk Fund168,000168,000 Construct Well #1012-48100-011181,000 181,000 Water Trunk Fund181,000181,000 5,157,300 733,0003,500,900627,40055,000241,000 Water Total 30,707,476 4,183,6446,460,86911,459,0824,992,6313,611,250 GRAND TOTAL 19 Capital Plan 20082012 thru of Andover, MN City 10-44000-01 Project # Storage Building Project Name Priority TypeImprovement2 - Medium Useful LifeContact 25 YearsComm Ctr Manager Category Building ConstructionDepartmentCommunity Center Description Storage Building / Garage for future equipment purchases. The building would be added to the north end of the field house using the existing wall as part of the new structure. Justification As the Community Center continues to grow and acquire more recreational equipment, tables, chairs etc., there will be a lack of storage space. We would only buy equipment if there was a need for it in the field house and if it would help increase rental hours. Some of the equipment would be rented out to users and create additional revenues. Expenditures20082009201020112012Total 15,00015,000 Construction 15,00015,000 Total Funding Sources20082009201020112012Total 15,00015,000 Community Center Operations 15,00015,000 Total Operational Impact/Other The additional space would provide storage for equipment and would need to have electricity and heat. This space would free up some space in what has already become a crowded field house storage room. 20 Capital Plan 20082012 thru of Andover, MN City 08-41600-01 Project # New Development Projects Project Name Priority TypeImprovement1 - High Useful LifeContact 50 YearsDPW / City Engineer Category New Development ProjectsDepartmentEngineering Description New developments include the construction of sanitary sewer, water main, storm sewers and streets. Since the majority of the improvement projects are being privately installed by the developer, the following expenditures are the city's share for trunk water and sewer improvements. Note: All private development construction is dependent upon market conditions, plat approval and normal City development procedures. Justification The develoment phasing is identified in the City's Comprehensive Plan. Expenditures20082009201020112012Total 241,000248,000300,000300,000300,0001,389,000 Construction 241,000248,000300,000300,000300,0001,389,000 Total Funding Sources20082009201020112012Total 120,500124,000150,000150,000150,000694,500 Sewer Trunk Fund 120,500124,000150,000150,000150,000694,500 Water Trunk Fund 241,000248,000300,000300,000300,0001,389,000 Total Operational Impact/Other Additional maintenance of streets, storm sewer, water main and sanitary sewer will result. Additional streets will be added for snowplowing. 21 Capital Plan 20082012 thru of Andover, MN City 08-41600-02 Project # Pedestrian Trail Maintenance Project Name Priority TypeImprovement1 - High Useful LifeContact 10 YearsDPW / City Engineer Category ImprovementsDepartmentEngineering Description This project provides maintenance such as patching, crack filling and restoration for the city's pedestrian and park trail system. Justification City trails are in need of general maintenance including bituminous patching, crack filling and restoration to maintain the high level of service to pedestrian walkers, bikers and roller bladers. A 5-year capital improvement plan was prepared for the City to identify and prioritize the necessary repairs. Expenditures20082009201020112012Total 52,00053,00054,00055,00056,000270,000 Improvement 52,00053,00054,00055,00056,000270,000 Total Funding Sources20082009201020112012Total 52,00053,00054,00055,00056,000270,000 R & B - Pedestrian Trail 52,00053,00054,00055,00056,000270,000 Total Operational Impact/Other As the city trail system begins to age, general maintenance such as bituminous patching, crack filling and restoration becomes a necessity. The maintenance will allow for a longer service life for the trail system throughout the city. 22 Capital Plan 20082012 thru of Andover, MN City 08-41900-01 Project # Surface Seal all Brick Structures Project Name Priority TypeImprovement1 - High Useful LifeContact 5 yearsDPW / City Engineer Category Facility ManagementDepartmentFacility Management Description A surface sealing application would be initiated for all brick and/or block municipal buildings. The buildings include: City Hall, Public Works, Fire Station 1, 2, & 3, Sunshine Park Building, Prairie Knoll Park Building, Andover Station North Park Building, Community Center and all utility department buildings such as the pump houses and treatment facility. Justification This is a necessary maintenance item to ensure the long term integrity of the municipal buildings. Expenditures20082009201020112012Total 65,00075,000140,000 Facility Maintenance 65,00075,000140,000 Total Funding Sources20082009201020112012Total 22,00022,50044,500 Capital Projects Levy 25,00032,00057,000 Community Center Operations 18,00020,50038,500 Water Fund 65,00075,000140,000 Total Operational Impact/Other This will reduce the amount of long term maintenance and repair to the municipal buildings. 23 Capital Plan 20082012 thru of Andover, MN City 08-41900-02 Project # Land Purchase Project Name Priority TypeImprovement1 - High Useful LifeContact UnassignedDPW / City Engineer Category ImprovementsDepartmentFacility Management Description Purchase land west of the Public Works building to be used for a salt storage building, material storage, recycling center and future facility expansion. The City's is currently under contract to purchase this property. The City management team will be evaluating and assisting with the planning and future expansion for the Public Works Facility. Adequate property is necessary to insure that future needs of the community can be met. Justification This is the last opportunity to purchase this property and keep city facilities together in one complex. Future site expansion opportunities are limited without additional property. Expenditures20082009201020112012Total 468,379468,379 Land Acquisition 468,379468,379 Total Funding Sources20082009201020112012Total 318,379318,379 Building Fund 50,00050,000 Capital Equipment Reserve 50,00050,000 Sewer Trunk Fund 50,00050,000 Water Trunk Fund 468,379468,379 Total Operational Impact/Other Large cost savings in keeping facilities together. Another large savings is having a salt storage area on the property. The recycling center would be moved away from the parks and this would help maintain cleaner parks on the complex. It would also provide a large storage area for the seal coat rock, sweeping, etc. Open land areas in Andover will soon be a thing of the past. 24 Capital Improvement Plan Project Name: LAND PURCHASE Location Map L E G E N D Right of Way Lots/Parcels Water 03456901,380 Park Feet City Limits 25 Project Location Capital Plan 20082012 thru of Andover, MN City 08-41900-03 Project # Annual Parking Lot Maintenance Project Name Priority TypeImprovement1 - High Useful LifeContact 10 YearsDPW / City Engineer Category ImprovementsDepartmentFacility Management Description Yearly maintenance of the City parking lots is necessary to extend their useful lives. Parking lots that need maintaining include those at the City Hall complex, Public Works, Community Center, at City parks, and at the Fire Stations. Yearly maintenance may include crack sealing, seal coating, and mill and overlays. Maintenance will generally be completed with the street zones, or on an as needed basis. Justification Completing periodic maintenance on the City parking lots, similar to City streets, will extend the overall design life of the pavement and reduce and/or prolong costly repairs. Expenditures20082009201020112012Total 21,00022,00023,00024,00025,000115,000 Improvement 21,00022,00023,00024,00025,000115,000 Total Funding Sources20082009201020112012Total 21,00022,00023,00024,00025,000115,000 Capital Projects Levy 21,00022,00023,00024,00025,000115,000 Total Operational Impact/Other Maintaining the parking lots will result in less annual maintenance for public works and prolong the life of the pavements. 26 Capital Plan 20082012 thru of Andover, MN City 09-41900-01 Project # Building A - Seal Floor Project Name Priority TypeImprovement1 - High Useful LifeContact 2 YearsDPW / City Engineer Category Facility ManagementDepartmentFacility Management Description Apply a sealant to the cement floor in Building A (large garage). Justification The cement floor in Building A spalds due to daily traffic and salt. Sealing of the floors should be repeated every 2 years to retain the integrity of the floor surface. Without this process, the cement floor would deteriorate and have to be replaced. It is much more cost effective to perform the maintenance than to replace the entire floor. Expenditures20082009201020112012Total 7,0008,00015,000 Facility Maintenance 7,0008,00015,000 Total Funding Sources20082009201020112012Total 7,0008,00015,000 General Fund 7,0008,00015,000 Total Operational Impact/Other Proper maintenance extends the life of the cement floor, thus not having to replace it before its life expectancy is up. 27 Capital Plan 20082012 thru of Andover, MN City 09-41900-02 Project # Carpet Replacement Project Name Priority TypeImprovement2 - Medium Useful LifeContact 10 YearsDPW / City Engineer Category EquipmentDepartmentFacility Management Description The replacement of carpet in appropriate areas of all City buildings where deemed necessary. An annual review of all areas will be done to determine the order of replacement. Justification The buildings get a lot of use and, despite the appropriate cleaning and maintenance, the carpeting will need to be replaced. Expenditures20082009201020112012Total 10,00010,00010,00010,00040,000 Facility Maintenance 10,00010,00010,00010,00040,000 Total Funding Sources20082009201020112012Total 10,00010,00010,00010,00040,000 General Fund 10,00010,00010,00010,00040,000 Total Operational Impact/Other The carpet replacement will be needed in order to keep the buildings in good repair. Due to heavy use, it is anticipated that all carpeted areas will need to be replaced. 28 Capital Plan 20082012 thru of Andover, MN City 10-41900-01 Project # Pedestrian Tunnel Under Crosstown Blvd. Project Name Priority TypeImprovement1 - High Useful LifeContact 30 Years +DPW / City Engineer Category Facility ManagementDepartmentFacility Management Description This would be a pedestrian underpass walkway under Crosstown to accommodate pedestrian traffic from a possible development of a parking lot or other sports fields on the north side of Crosstown Boulevard that could crossunder Crosstown Boulevard to Sunshine Park Facilities or just connect to the cities trail system. Justification This item was discussed at a Council Workshop with the Public Works Department Managers February 16th 2006. For safety and for easy access for crossing Crosstown Boulevard from a future park and/or future parking lot on the north side of Crosstown Boulevard to Sunshine Park on the South side, or just getting to the city trail system the quickest and safest way will be a pedestrian underpass under Crosstown Boulevard. Expenditures20082009201020112012Total 300,000300,000 Improvement 300,000300,000 Total Funding Sources20082009201020112012Total 300,000300,000 G.O. Bond 300,000300,000 Total Operational Impact/Other Connecting of these area's through an underpass will not only benefit pedestrians crossing the roadway, but will also provide a safe passage for personnel and smaller equipment.. 29 Capital Plan 20082012 thru of Andover, MN City 10-41900-02 Project # Addition to Storage Building & Vehicle Maint. Shop Project Name Priority TypeImprovement1 - High Useful LifeContact 30 Years +DPW / City Engineer Category Facility ManagementDepartmentFacility Management Description This is an addition to the present vehicle storage building. It will be added to the north end of the present building and be the same in size, 100' x 250' with a 75' x 140' addition to the northwest side of the new vehicle storage garage for the vehicle maintenance shop. This building will be built with cement panels to match the present vehicle garage and would screen Public Works operations from the Community Center/YMCA as proposed in a joint meeting with the Mayor and City Council. Justification Due to the increase of vehicles, equipment and supplies now used by the City of Andover, this vehicle storage building and vehicle maintenance repair shop is badly needed. It is not cost effective to have vehicles or other equipment stored outside. Minnesota's four seasons are way too hard on them and it makes for a much cleaner operation. The vehicle maintenance repair shop has been needed for a long time. The area now used has doors that are not wide enough and work areas for the hydraulic hoist are way too small. Also with the amount of equipment now maintained by our staff in the area is much too small to run a completely safe operation. Expenditures20082009201020112012Total 1,850,0001,850,000 Improvement 1,850,0001,850,000 Total Funding Sources20082009201020112012Total 1,850,0001,850,000 G.O. Bond 1,850,0001,850,000 Total Operational Impact/Other This will impact the life of the vehicles and other equipment by being stored inside and to house our vehicle maintenance mechanics. Over the years, the cost savings have been shown when the proper maintenance of our equipment can be implemented. This building will provide a safe, productive, and healthy operational area for City employees that will benefit the City of Andover for many years. 30 Capital Plan 20082012 thru of Andover, MN City 10-41900-03 Project # Fire St. #2 Addition with additional land purchase Project Name Priority TypeImprovement2 - Medium Useful LifeContact 30 YearsFire Chief Category ImprovementsDepartmentFacility Management Description The addition of one bay to the apparatus area, the purchase and storage of an auxiliary power generator, and expanding the existing parking lot to allow for more room and parking space. The project also includes a mill and overlay of the existing parking lots at Station #1 and #2. Justification The additional space to the building will allow for all vehicles to be parked in front of an exit door. The firefighters will not have to move a vehicle in order to get another one out of the building. The additional bay will also make clean up operations after an event much easier. The firefighters will not have to move vehicles out of the building in order to clean hose and equipment. The additional parking space will provide for much needed hard surface training area and more vehicle parking. Replacement of the existing parking lots is necessary due to the heavy fire vehicle traffic. Expenditures20082009201020112012Total 250,000250,000 Land Acquisition Equipment 35,00035,000 Improvement 600,000600,000 885,000885,000 Total Funding Sources20082009201020112012Total 885,000885,000 G.O. Bond 885,000885,000 Total Operational Impact/Other The additional space will make all fire operations more efficient at this building. Vehicles will not have to be moved in order to get others out and clean-up will be much easier and faster. As part of this project it is suggested that the City look to purchase additional land adjacent to station #2. The building addition is needed but now is the time to also plan for future fire department needs. The strategic planning would call for a fire department training site where outdoor and live burn training could be accomplished. The additional land would be used to expand the station #2 site to include a training facility that will allow for the appropriate outdoor fire and rescue training, including all types of required live fire scenarios. A training building used for rescue and live fire scenarios should also be considered. The current use of old houses to be demolished by burning for training purposes is becoming harder to do because of E.P.A. and P.C.A. standards and requirements. The concept of a county wide regional fire training center with joint funding should be considered as a viable option for the station #2 site. 31 Capital Plan 20082012 thru of Andover, MN City 10-41900-04 Project # Salt Storage Building Project Name Priority TypeImprovement1 - High Useful LifeContact 30 Years +DPW / City Engineer Category Facility ManagementDepartmentFacility Management Description This salt storage building would be 40' x 50' x 25' high. The City would be able to purchase a season's worth of salt and keep it stored inside this structure out of the elements. All environmental specifications would be met for this type of storage. This facility would be built to blend in with the rest of the City complex and not a sight distraction within the campus. Justification At the present time the City purchases salt from Anoka County, which has been done since the City was first adopted. This puts us at the mercy of the county operations, causing situations such as what time someone will be there to load our trucks and whether they have an adequate supply of salt on hand. We have had good working relations with the county, but they also would like to see us be able to store our own winter supply. Cost savings is also a large part of having our own storage. We can purchase product at $10.00 to 15.00 per ton less in addition to not paying a 15% administration fee for county personnel services. This building will pay for itself over a short period of time. Expenditures20082009201020112012Total 350,000350,000 Construction 350,000350,000 Total Funding Sources20082009201020112012Total 350,000350,000 G.O. Bond 350,000350,000 Total Operational Impact/Other Having this building right here on campus will save a great deal of personnel time, trucking, and fuel costs. The salt not used could be returned to the storage building and not dumped outside where it gets wet, damaged, or becomes an environmental problem. 32 Capital Plan 20082012 thru of Andover, MN City 10-41900-05 Project # Recycling Building & Fence Project Name Priority TypeImprovement1 - High Useful LifeContact 15-20 YearsDPW / City Engineer Category Facility ManagementDepartmentFacility Management Description This structure will have to be larger than the present building so more recycled materials can be stored inside reducing the chance of the lighter materials blowing out. There also needs to be more room for outside storage including a paved drive surface, it being completely fenced, better security lighting, and updated security camera's. The new location would be located north of the water treatment facility. The new building would be constructed of materials that would blend in with the rest of the public works campus. Justification At the present location we have just plain run out of room! The recycling center will have to be moved if the new addition of the vehicle storage building is approved. Also as clean as we try to keep this area, it is probably not the best neighbor to the Community Center since items sometimes blow out of the recycling storage yard. Also it would be best to keep the large trucks off of Tower Drive for safety reason, due to narrow streets and a lot of pedestrian traffic. Expenditures20082009201020112012Total 250,000250,000 Construction 250,000250,000 Total Funding Sources20082009201020112012Total 250,000250,000 G.O. Bond 250,000250,000 Total Operational Impact/Other In the new location we will most likely be able to keep a closer watch on the area. It will still be within the area of the public works so there would be no extra cost in maintenance of the grounds and with a larger area it will be more customer friendly. 33 Capital Plan 20082012 thru of Andover, MN City 10-41900-06 Project # Attached Storage Building Project Name Priority TypeImprovement1 - High Useful LifeContact 25 YearsDPW / City Engineer Category Facility ManagementDepartmentFacility Management Description Three sided building approximately 25' x 50'. It would be used to store equipment not sensitive to the changing temperatures and weather conditions but out of direct sunlight. It would also help to screen the facility. Justification Part of the Public Works site expansion. Protect outdoor vehicles and equipment from changing weather conditions. Expenditures20082009201020112012Total 200,000200,000 Construction 200,000200,000 Total Funding Sources20082009201020112012Total 200,000200,000 G.O. Bond 200,000200,000 Total Operational Impact/Other 34 Capital Plan 20082012 thru of Andover, MN City 10-41900-07 Project # Relocate Fuel Station w/ Canopy Project Name Priority TypeImprovement2 - Medium Useful LifeContact 20 YearsDPW / City Engineer Category Facility ManagementDepartmentFacility Management Description Relocate the fueling station and install two (2) new 10,000 gallon fuel tanks and possibility keep the 2,000 gallon diesel fuel tank for an alternative fuel like E85. Also, install a canopy to cover the fuel pumps and Gasboy fuel monitoring equipment. Justification The canopy would keep the fuel pumps, gasboy equipment, operators dry and help keep sun, rain and snow damage to a minimum. It would also keep the fuel in the tanks from getting contaminated. The larger tanks will allow us to have tanker drops of 7,500 gallons of fuel, saving us money and the frequency of the drops that we now have. The tanks are approximately 18 years old and are warranted for 30 years. The pumps were installed in 1999 and are in good shape. Expenditures20082009201020112012Total 250,000250,000 Improvement 250,000250,000 Total Funding Sources20082009201020112012Total 250,000250,000 G.O. Bond 250,000250,000 Total Operational Impact/Other The larger tanks will allow us to have a tanker drops of 7,500 gallons of fuel, saving us money and the frequency of the drops that we now have. 35 Capital Plan 20082012 thru of Andover, MN City 11-41900-01 Project # Roof Replacements Project Name Priority TypeImprovement1 - High Useful LifeContact 20 YearsCity Administrator Category Facility ManagementDepartmentFacility Management Description Remove and replace the existing membrane on the following roofs: City Hall & Senior Center and Fire Stations 1 & 2. City Hall & Senior Center $220,000 Fire Station #1 $45,000 Fire Station #2 $35,000 Justification The roofs are coming of age and and have been receiving annual maintenance for cracking, minor leaks and seams popping. They will continue to be watched and inspected annually to determine when it becomes cost efficient to replace the whole roof. Expenditures20082009201020112012Total 300,000300,000 Improvement 300,000300,000 Total Funding Sources20082009201020112012Total 300,000300,000 Capital Equipment Reserve 300,000300,000 Total Operational Impact/Other Annual inspections and maintenance will be monitored to determine when it becomes cost effective to completely replace the entire roof. 36 Capital Plan 20082012 thru of Andover, MN City 08-45000-01 Project # Replace/Repair Play Structures - Various Parks Project Name Priority TypeImprovement1 - High Useful LifeContact 10 YearsDPW / City Engineer Category Park ImprovementsDepartmentPark & Rec - Operations Description Repair to fall zones and achieve ADA accessibility. Replacement of playground equipment and other major replacements, such as short fences on ball fields, soccer goals, or any area of play that does not meet safety specifications. Justification Old equipment no longer meets ADA requirements, such as entrapments, fall zones or handicap accessibility. Working to bring the parks up to meet all safety requirements. Expenditures20082009201020112012Total 45,00045,00045,00045,00045,000225,000 Equipment 45,00045,00045,00045,00045,000225,000 Total Funding Sources20082009201020112012Total 45,00045,000 Capital Projects Levy 45,00045,00045,00045,000180,000 General Fund 45,00045,00045,00045,00045,000225,000 Total Operational Impact/Other Less maintenance and will meet all safety requirements. 37 Capital Plan 20082012 thru of Andover, MN City 08-45001-01 Project # Skate Board Park Project Name Priority TypeImprovement1 - High Useful LifeContact 10 YearsAsst.Public Works Director Category Park ImprovementsDepartmentPark & Rec - Projects Description Due to the poor condition and current location of the skate board equipment, the City needs to reinvest in a new permanent home for the skate board park with new skate equipment. The new location will be the northwest corner of Sunshine Park, just north of the existing small shelter between the existing trail and ball fields. Justification The existing skate board equipment has weakened structurally over the past few years due to the moving and set-up each spring and fall. The other issue is the current location of the equipment at Constance Free Church is not easily accessible by the public (which is usually youth) to either walk or ride bikes to the skate park. Locating the skate board park near the higher density areas and schools will attract many more users and will be located in an area where it is safe to get to. Expenditures20082009201020112012Total 100,000100,000 Improvement 100,000100,000 Total Funding Sources20082009201020112012Total 100,000100,000 Park Improvement Funds 100,000100,000 Total Operational Impact/Other Routine maintenance will be required to upkeep the park. 38 Capital Plan 20082012 thru of Andover, MN City 08-45001-02 Project # Woodland Crossing Park Project Name Priority TypeImprovement1 - High Useful LifeContact 15 YearsAsst.Public Works Director Category Park ImprovementsDepartmentPark & Rec - Projects Description Install playground equipment and landscape park improvements. Justification The park had a basketball court and shelter built in 2006. To complete the park, playground equipment is necessary for all ages from 2 - 12 years old. Also, a sidewalk from the street to the basketball court, shelter and playground equipment will be necessary to provide access to meet ADA requirements. Expenditures20082009201020112012Total 45,00045,000 Improvement 45,00045,000 Total Funding Sources20082009201020112012Total 45,00045,000 Park Improvement Funds 45,00045,000 Total Operational Impact/Other Additional long-term maintenance and ultimately replacement will be necessary. 39 Capital Improvement Plan Project Name: WOODLAND CROSSINGS PARK (2008) IMPROVEMENTS (PROJECT 08-45001-02) Location Map L E G E N D Project Location Lots/Parcels Park 0315510620 Water Feet Right of Way 40 City Limits Capital Plan 20082012 thru of Andover, MN City 08-45001-03 Project # Andover Station North Ball Field Facility Project Name Priority TypeImprovement1 - High Useful LifeContact 30 Years +Asst.Public Works Director Category Park ImprovementsDepartmentPark & Rec - Projects Description With the ball fields completed in 2006 and the building and the lighting of two ball fields completed in 2007, the addition of bleachers and playground equipment will complete the park. 2008 - $30,000 for playground equipment 2008 - $5,000 for one (1) 5 row bleacher. Note: Overflow parking would be shared with the adjacent businesses. Justification The five row bleacher is necessary to separate spectators from the building and the bleachers on the west and middle fields, which will allow more room for individuals standing in line to purchase concessions. The existing 10 row bleachers will remain at the west and middle fields, but will be relocated along the 1st or 3rd base lines. The playground equipment will allow families with children not playing baseball the opportunity to enjoy another activity. The playground equipment was not installed in 2007 due to the location not being finalized by the City. Expenditures20082009201020112012Total 35,00035,000 Improvement 35,00035,000 Total Funding Sources20082009201020112012Total Park Improvement Funds 35,00035,000 35,00035,000 Total Operational Impact/Other Additional long term maintenance and ultimately replacement will be necessary. 41 'ETMXEP-QTVSZIQIRX4PER 4VSNIGX2EQI BALL FIELD FACILITY SOUTH OF THE WDE Location Map 0)+)2( City Limits Water 03406801,360 Park Feet Lots/Parcels 42 Project Location Capital Plan 20082012 thru of Andover, MN City 08-45001-99 Project # Annual Miscellaneous Projects Project Name Priority TypeImprovement1 - High Useful LifeContact UnassignedAsst.Public Works Director Category Park ImprovementsDepartmentPark & Rec - Projects Description This is for unforeseen or requested miscellaneous projects that may arise during the year, requested by the public, staff, City Council or the Parks and Recreation Commission for each year. Justification This gives flexibility to the City to do certain small-sized projects that may be warranted; for example, purchase of soccer goals. This funding has been recommended by the Park & Recreation Commission. Expenditures20082009201020112012Total 25,00025,00025,00025,00025,000125,000 Improvement 25,00025,00025,00025,00025,000125,000 Total Funding Sources20082009201020112012Total 25,00025,00025,00025,00025,000125,000 Park Improvement Funds 25,00025,00025,00025,00025,000125,000 Total Operational Impact/Other Allows the Park and Recreation Commission to address a variety of different needs throughout the year. 43 Capital Plan 20082012 thru of Andover, MN City 09-45001-01 Project # Sophies South Park Project Name Priority TypeImprovement1 - High Useful LifeContact 15 YearsAsst.Public Works Director Category Park ImprovementsDepartmentPark & Rec - Projects Description Install playground equipment and basketball court. The park was dedicated as part of the development of Sophies South. Since no park exists within the general area, it has been recommended to begin developing the park. Justification The improvements have been recommended by the Park & Recreation Commission. Expenditures20082009201020112012Total 75,00075,000 Improvement 75,00075,000 Total Funding Sources20082009201020112012Total 75,00075,000 Park Improvement Funds 75,00075,000 Total Operational Impact/Other Additional long-term maintenance and ultimately replacement will be necessary. 44 'ETMXEP-QTVSZIQIRX4PER 4VSNIGX2EQI SOPHIE'S SOUTH PARK Location Map 0)+)2( City Limits Water Park 0220440880 Lots/Parcels Feet Right of Way 45 Project Location Capital Plan 20082012 thru of Andover, MN City 09-45001-02 Project # Prairie Knoll Park - Phase III Project Name Priority TypeImprovement1 - High Useful LifeContact 25 YearsAsst.Public Works Director Category Park ImprovementsDepartmentPark & Rec - Projects Description The parking lot would be paved including concrete curb and gutter ($150,000) for the north end parking lot. The east parking, which is used for overflow parking may be paved if funding is available. Justification Prairie Knoll Park is considered a regional City park and completion of paving the parking lots would bring it into compliance with City standards due to the increased use by the soccer, football, lacrosse and hockey associations. This project has been recommended by the Park & Recreation Commission. Expenditures20082009201020112012Total 150,000150,000 Improvement 150,000150,000 Total Funding Sources20082009201020112012Total 150,000150,000 Park Improvement Funds 150,000150,000 Total Operational Impact/Other Additional long-term maintenance and ultimately replacement will be necessary. 46 'ETMXEP-QTVSZIQIRX4PER 4VSNIGX2EQI PRAIRIE KNOLL PARK PHASE III Location Map 0)+)2( City Limits Water Park 0337.56751,350 Lots/Parcels Feet Right of Way 47 Project Location Capital Plan 20082012 thru of Andover, MN City 09-45001-03 Project # Andover Lions Park Project Name Priority TypeImprovement1 - High Useful LifeContact 25 YearsAsst.Public Works Director Category Park ImprovementsDepartmentPark & Rec - Projects Description 2009 - Install an 8 foot high outfield fencing with mow strips for ball field ($35,000). 2012 - Install new irrigation system ($50,000). Justification The installation of an outfield fence will allow the ball to stay in play and also give the awesome feeling when a ball is hit for a home run. Also by installing an irrigation system this gives the players a safer playing surface. This project has been recommended by the Park & Recreation Commission. Expenditures20082009201020112012Total 35,00050,00085,000 Improvement 35,00050,00085,000 Total Funding Sources20082009201020112012Total 35,00050,00085,000 Park Improvement Funds 35,00050,00085,000 Total Operational Impact/Other Additional long-term maintenance and ultimately replacement will be necessary. 48 'ETMXEP-QTVSZIQIRX4PER 4VSNIGX2EQI ANDOVER LIONS PARK Location Map 0)+)2( City Limits Water Park 04158301,660 Lots/Parcels Feet Right of Way 49 Project Location Capital Plan 20082012 thru of Andover, MN City 10-45001-01 Project # Hawkridge Park Improvements Project Name Priority TypeImprovement1 - High Useful LifeContact 30 YearsAsst.Public Works Director Category Park ImprovementsDepartmentPark & Rec - Projects Description The project includes reconstructing the existing park. The proposed reconstruction of the park (as recommended by the Park Commission) is to include eliminating the existing ball field and regrade most of the park to allow for at least 2-4 new soccer fields in place of the existing ball field, one additional hockey rink and additional parking stalls to accommodate for the additional soccer fields. Storage building/restrooms/concessions - $209,000; drill well with pump & controls - $100,000; septic system - $7,500; pave existing parking lot - $135,000; irrigation for 4 fields - $50,000; bleachers with concrete pads (for the soccer fields) - $15,000; security light - $2,500; park signage and landscaping - $1,000. Justification By continuing to improve the park system in Andover, the City is providing high quality parks and recreation complex to meet the growing needs of an active community. These improvements will provide high quality athletic and recreational opportunities to the residents. A new building provides shelter, storage and a restroom facility that can be used year round. The well and irrigation provide for a high quality athletic surface for soccer fields and water for the restroom. There will be other items such as playground equipment and a basketball court that provides activities for younger children that will need to be considered by the City at some point in the future. This project has been recommended by the Park & Recreation Commission. Expenditures20082009201020112012Total 520,000520,000 Improvement 520,000520,000 Total Funding Sources20082009201020112012Total 520,000520,000 Park Improvement Funds 520,000520,000 Total Operational Impact/Other The construction of a warming house and restroom facility will increase the use and enjoyment of the park. Also, the construction of the storage/warming house/restroom facility will eliminate the need to rent a portable warming house and portable bathroom. The well construction will give the ability to flood the rinks from the on-site well and eliminate the need to "tanker" water to the site from the Public Works facility on Crosstown Blvd. Routine maintenance will still be required for upkeep of the park. 50 'ETMXEP-QTVSZIQIRX4PER 4VSNIGX2EQI HAWKRIDGE PARK Location Map 0)+)2( City Limits Water Park 03707401,480 Lots/Parcels Feet Right of Way 51 Project Location Capital Plan 20082012 thru of Andover, MN City 09-48200-02 Project # Crosstown Blvd Trunk Sewer Line Project Name Priority TypeImprovement1 - High Useful LifeContact 50 YearsDPW / City Engineer Category ImprovementsDepartmentSanitary Sewer Description Extend sanitary sewer trunk along Crosstown Boulevard from the railroad tracks east to Prairie Road. It will be necessary to jack the sanitary sewer underneath the railroad. Justification The trunk sanitary sewer will be extended to serve properties adjacent to Crosstown Boulevard and east of Prairie Road. The extension has been recommended through the sanitary sewer report (2004 Sanitary Sewer Report). This project is contingent upon the development east of the railroad tracks. Expenditures20082009201020112012Total 400,000400,000 Improvement 400,000400,000 Total Funding Sources20082009201020112012Total 400,000400,000 Sewer Trunk Fund 400,000400,000 Total Operational Impact/Other Additional routine maintenance including televising and cleaning will be required. 52 'ETMXEP-QTVSZIQIRX4PER 4VSNIGX2EQI CROSSTOWN BLVD SEWER LINE Location Map 0)+)2( Right of Way Lots/Parcels Water 04058101,620 Park Feet City Limits 53 Project Location Capital Plan 20082012 thru of Andover, MN City 10-48200-01 Project # Rural Reserve Trunk Sanitary Sewer Project Name Priority TypeImprovement1 - High Useful LifeContact 50 YearsDPW / City Engineer Category UnassignedDepartmentSanitary Sewer Description Extension of trunk sanitary sewer from Bunker Lake Boulevard approximately parallel to Coon Crook to serve the Rural Reserve area. The sanitary sewer will be constructed through existing neighborhoods and along South Coon Creek Drive then north into the Rural Reserve Area. It is anticipated that the extension through the Rural Reserve may be constructed the following year, or as the market demands. Justification The trunk sanitary sewer will be extended to serve future development of the Rural Reserve. The timing of this extension will be market driven based upon developer timelines for the Rural Reserve. The extension has been recommended in the Trunk Sanitary Sewer Analysis for Designated Rural Reserve Areas prepared by WSB and Associates. Expenditures20082009201020112012Total 2,250,0001,250,0003,500,000 Construction 2,250,0001,250,0003,500,000 Total Funding Sources20082009201020112012Total 250,0001,000,0001,250,000 Assessments 2,000,000250,0002,250,000 Sewer Revenue Bonds 2,250,0001,250,0003,500,000 Total Operational Impact/Other Additional routine maintenance including televising and cleaning will be required. 54 'ETMXEP-QTVSZIQIRX4PER 4VSNIGX2EQI RURAL RESERVE TRUNK SANITARY SEWER Location Map 0)+)2( Lots/Parcels Water 01,8503,7007,400 Park Feet City Limits 55 Project Location Capital Plan 20082012 thru of Andover, MN City 10-48200-02 Project # Yellow Pine Lift Station Project Name Priority TypeImprovement1 - High Useful LifeContact 50 YearsDPW / City Engineer Category ImprovementsDepartmentSanitary Sewer Description Install a lift station at Yellow Pine Street to divert flow from the Bluebird Street trunk line to the Pinewood trunk line. The wet well for this lift station was constructed in 2005 as a part of the Crosstown Boulevard Improvements Project. Justification This lift station will allow additional capacity in the Bluebird Street trunk line to serve adjacent properties until the year 2020. This project is development dependent. Expenditures20082009201020112012Total 650,000650,000 Improvement 650,000650,000 Total Funding Sources20082009201020112012Total 650,000650,000 Sewer Trunk Fund 650,000650,000 Total Operational Impact/Other Routine monitoring and maintenance of the lift station will be required. 56 'ETMXEP-QTVSZIQIRX4PER 4VSNIGX2EQI YELLOW PINE LIFT STATION Location Map 0)+)2( Right of Way Lots/Parcels Water 06251,2502,500 Park Feet City Limits 57 Project Location Capital Plan 20082012 thru of Andover, MN City 08-48300-01 Project # Storm Sewer Improvements Project Name Priority TypeImprovement1 - High Useful LifeContact 30 Years +DPW / City Engineer Category UtilitiesDepartmentStorm Sewer Description Each year, areas of the City are identified where improvements are required to maintain our storm sewer system. Maintenance items include replacement of failing culverts, catch basins, and storm sewer pipes, erosion issues at storm sewer outfalls, and dredging of ponds and ditches. 2008 - F.E.S. Repair in Meadowood Addition at 148th and Makah St. 2009 - Pond outlet in North Valley Ridge Justification Maintaining the City's storm sewer system improves water quality and public safety, and reduces the need for costly repairs in the future. Repairing and maintaining these systems also allows public works to focus on and comply with requirements of the NPDES program, such as pipe cleaning, inspections, and sweeping. Expenditures20082009201020112012Total 51,00052,00053,00054,00055,000265,000 Improvement 51,00052,00053,00054,00055,000265,000 Total Funding Sources20082009201020112012Total 51,00052,00053,00054,00055,000265,000 Storm Sewer Fund 51,00052,00053,00054,00055,000265,000 Total Operational Impact/Other Repairing problem areas in the storm sewer system will reduce the yearly maintenance needs placed on the public works personnel. 58 'ETMXEP-QTVSZIQIRX4PER Project Name: STORM SEWER IMPROVEMENTS (2008) MEADOWOOD F.E.S. Location Map L E G E N D Project Location Lots/Parcels Park 02505001,000 Water Feet Right of Way City Limits 59 'ETMXEP-QTVSZIQIRX4PER Project Name: STORM SEWER IMPROVEMENTS (2009) NORTH VALLEY RIDGE POND OUTLET Location Map L E G E N D Project Location Lots/Parcels Park 0422040880 Water Feet Right of Way City Limits 60 Capital Plan 20082012 thru of Andover, MN City 08-43100-01 Project # Annual Street Seal Coat Project Project Name Priority TypeImprovement1 - High Useful LifeContact 8 YearsDPW / City Engineer Category Park ImprovementsDepartmentStreets / Highways Description This project provides for a seal coat of the streets in the following maintenance zones: 2008 - Zone 6 2009 - Zone 7 2010 - Zone 8 and 9 2011 - Zone 1 2012 - Zone 2 Justification Seal coating will extend the useful life of roads by protecting the bituminous from oxidation due to adverse weather conditions (sun, rain, wind, snow, etc.). The prevention of oxidation will prolong the useful life of the pavement and defer the need for a costly reconstruction. Seal coating also improves the skid resistance of the roadway surface by increasing the friction between vehicle tires and the roadway. New developments and reconstructed areas requiring seal coating are not shown on the attached maps. These areas are typically seal coated within three to four years after they are paved. Expenditures20082009201020112012Total 542,608362,100752,363629,476619,3312,905,878 Construction 542,608362,100752,363629,476619,3312,905,878 Total Funding Sources20082009201020112012Total Construction Seal Coat Fund 255,74361,481146,22331,91740,332535,696 R & B - Crack Seal & Seal Coa 286,865300,619606,140597,559578,9992,370,182 542,608362,100752,363629,476619,3312,905,878 Total Operational Impact/Other Extending the life of the street will reduce routine maintenance (Crack sealing, pot hole patching, overlays, etc.) and extend the overall design life of the pavement. 61 'ETMXEP-QTVSZIQIRX4PER Project Name: ANNUAL STREET SEALCOAT PROJECT 2008 STREET SEALCOAT, ZONE 6 Location Map L E G E N D Project Location Lots/Parcels Park 02,5505,10010,200 Water Feet Right of Way 62 City Limits 'ETMXEP-QTVSZIQIRX4PER Project Name: ANNUAL STREET SEALCOAT PROJECT 2009 STREET SEALCOAT, ZONE 7 Location Map L E G E N D Project Location Lots/Parcels Park 09501,9003,800 Water Feet Right of Way 63 City Limits 'ETMXEP-QTVSZIQIRX4PER Project Name: ANNUAL STREET SEALCOAT PROJECT 2010 STREET SEALCOAT, ZONES 8 & 9 Location Map L E G E N D Project Location Lots/Parcels Park 01,9003,8007,600 Water Feet Right of Way 64 City Limits 'ETMXEP-QTVSZIQIRX4PER Project Name: ANNUAL STREET SEALCOAT PROJECT 2011 STREET SEALCOAT, ZONE 1 Location Map L E G E N D Project Location Lots/Parcels Park 01,1502,3004,600 Water Feet Right of Way 65 City Limits 'ETMXEP-QTVSZIQIRX4PER Project Name: ANNUAL STREET SEAL COAT PROJECT 2012 STREET SEAL COAT, ZONE 2 Location Map L E G E N D Project Location Lots/Parcels Park 01,1502,3004,600 Water Feet Right of Way 66 City Limits Capital Plan 20082012 thru of Andover, MN City 08-43100-02 Project # Annual Street Crack Seal Project Project Name Priority TypeImprovement1 - High Useful LifeContact 8 YearsDPW / City Engineer Category Streets/HighwaysDepartmentStreets / Highways Description The project provides for sealing of the street cracks in the following maintenance zones: 2008 - Zone 7 2009 - Zone 8 and 9 2010 - Zone 1 2011 - Zone 2 2012 - Zone 3 Justification The sealing of street cracks will significantly extend the useful life of the streets. This will extend the time frame when a costly street reconstruction project will be necessary. The sealing of cracks in the street surface reduces/eliminates water from entering the road base and subgrade. This process reduces the freeze/thaw cycles of the subgrade, maintaining the integrity of the road. Crack sealing is completed in a particular zone one year prior to seal coating. This allows the crack sealing material to cure and minimize bleed through once seal coated. New developments and reconstructed areas requiring crack seal are not shown on the attached maps. These areas are typically crack sealed three years after they are paved. Expenditures20082009201020112012Total 172,100188,139196,482184,318149,210890,249 Construction 172,100188,139196,482184,318149,210890,249 Total Funding Sources20082009201020112012Total 23,17620,1734,4035,5645,78759,103 Construction Seal Coat Fund 148,924167,966192,079178,754143,423831,146 R & B - Crack Seal & Seal Coa 172,100188,139196,482184,318149,210890,249 Total Operational Impact/Other Sealing the street cracks will reduce routine maintenance by eliminating the source of degradation resulting from moisture in the road subgrade. 67 'ETMXEP-QTVSZIQIRX4PER Project Name: ANNUAL STREET CRACK SEAL PROJECT 2008 STREET CRACK SEAL, ZONE 7 Location Map L E G E N D Project Location Lots/Parcels Park 09501,9003,800 Water Feet Right of Way 68 City Limits 'ETMXEP-QTVSZIQIRX4PER Project Name: ANNUAL STREET CRACK SEAL PROJECT 2009 STREET CRACK SEAL, ZONES 8 & 9 Location Map L E G E N D Project Location Lots/Parcels Park 01,9003,8007,600 Water Feet Right of Way 69 City Limits 'ETMXEP-QTVSZIQIRX4PER Project Name: ANNUAL STREET CRACK SEAL PROJECT 2010 STREET CRACK SEAL, ZONE 1 Location Map L E G E N D Project Location Lots/Parcels Park 01,1502,3004,600 Water Feet Right of Way 70 City Limits 'ETMXEP-QTVSZIQIRX4PER Project Name: ANNUAL STREET CRACK SEAL PROJECT 2011 STREET CRACK SEAL, ZONE 2 Location Map L E G E N D Project Location Lots/Parcels Park 01,2002,4004,800 Water Feet Right of Way 71 City Limits 'ETMXEP-QTVSZIQIRX4PER Project Name: ANNUAL STREET CRACKSEAL PROJECT 2012 STREET CRACKSEAL, ZONE 3 Location Map L E G E N D Project Location Lots/Parcels Park 01,7003,4006,800 Water Feet Right of Way 72 City Limits Capital Plan 20082012 thru of Andover, MN City 08-43100-03 Project # Annual Street Mill and Overlay Project Name Priority TypeImprovement1 - High Useful LifeContact 20 YearsDPW / City Engineer Category Streets/HighwaysDepartmentStreets / Highways Description The Street Mill and Overlay projects will consist of milling the existing street surface and constructing a new asphalt surface. Minor shouldering and restoration work will be included with the project. In developments that have existing bituminous curb or no curb or ditch, concrete curb and gutter will be constructed. 25% of the total project costs are assessed to the benefiting properties in each development. This program helps to maintain the integrity and value of the communities street infrastructure. Areas to be reconstructed are shown on the attached maps and are listed below. The timing of reconstruction of developments more than two years out may be revised as street conditions and ratings are reviewed on an annual basis. Additional developments may be added to the schedule or projects moved up if it is advantageous to reconstruct them in conjunction with other nearby projects. 2008 - Northglen Area, Grow Oakview Estates 2009 - Woodland Meadows - North Half 2010 - Woodland Meadows - South Half 2011 - Rolling Forest, Nordeen's Addition, Genthon Ponds, Flintwood Street 2012 - Stenquist Addition, Johnson's Oakmount Terrace, Ivywood Estates Justification The streets in these neighborhoods are generally in excess of 20 years old and are in need of rehabilitation. The intent of this Street Mill and Overlay is to provide the community with a high quality transportation system and maintain a constant upkeep of the City's street infrastructure. Expenditures20082009201020112012Total 971,557795,7301,036,8371,036,8371,172,7095,013,670 Construction 971,557795,7301,036,8371,036,8371,172,7095,013,670 Total Funding Sources20082009201020112012Total Assessments 242,889198,932259,209259,209293,1771,253,416 R & B - Overlays 728,668596,798777,628777,628879,5323,760,254 971,557795,7301,036,8371,036,8371,172,7095,013,670 Total Operational Impact/Other The rehabilitation of the streets will reduce the routine maintenance (Crack sealing, pot hole patching, etc..) in the area. Long term, this reconditioning will prolong the structural stability of the roadway making for a longer serviceable life. 73 'ETMXEP-QTVSZIQIRX4PER 4VSNIGX2EQI ANNUAL MILL AND OVERLAY (2008) NORTHGLEN. & NORTHGLEN 3RD ADD Location Map 0)+)2( Project Location Lots/Parcels Park 02905801,160 Water Feet Right of Way 74 City Limits Capital Improvement Plan Project Name: ANNUAL MILL AND OVERLAY (2008) GROW OAK VIEW ESTATES Location Map L E G E N D Project Location Lots/Parcels Park 03056101,220 Water Feet Right of Way 75 City Limits 'ETMXEP-QTVSZIQIRX4PER Project Name: ANNUAL MILL AND OVERLAY (2009) WOODLAND MEADOWS - NORTH HALF Location Map L E G E N D Project Location Lots/Parcels Park 03456901,380 Water Feet Right of Way 76 City Limits 'ETMXEP-QTVSZIQIRX4PER Project Name: ANNUAL MILL AND OVERLAY (2010) WOODLAND MEADOWS - SOUTH HALF Location Map L E G E N D Project Location Lots/Parcels Park 03456901,380 Water Feet Right of Way 77 City Limits 'ETMXEP-QTVSZIQIRX4PER Project Name: ANNUAL MILL AND OVERLAY (2011) ROLLING FOREST Location Map L E G E N D Project Location Lots/Parcels Park 03557101,420 Water Feet Right of Way 78 City Limits 'ETMXEP-QTVSZIQIRX4PER Project Name: ANNUAL MILL AND OVERLAY (2011) NORDEEN'S ADDITION Location Map L E G E N D Project Location Lots/Parcels Park 03557101,420 Water Feet Right of Way City Limits 79 'ETMXEP-QTVSZIQIRX4PER Project Name: ANNUAL MILL AND OVERLAY (2011) GENTHON PONDS AND FLINTWOOD STREET Location Map L E G E N D Project Location Lots/Parcels Park 03857701,540 Water Feet Right of Way City Limits 80 'ETMXEP-QTVSZIQIRX4PER Project Name: ANNUAL MILL AND OVERLAY (2012) STENQUIST ADDITION Location Map L E G E N D Project Location Lots/Parcels Park 0312.56251,250 Water Feet Right of Way 81 City Limits 'ETMXEP-QTVSZIQIRX4PER Project Name: ANNUAL MILL AND OVERLAY (2012) IVYWOOD ESTATES Location Map L E G E N D Project Location Lots/Parcels Park 0312.56251,250 Water Feet Right of Way City Limits 82 'ETMXEP-QTVSZIQIRX4PER Project Name: ANNUAL MILL AND OVERLAY (2012) JOHNSON'S OAKMOUNT TERRACE Location Map L E G E N D Project Location Lots/Parcels Park 02505001,000 Water Feet Right of Way City Limits 83 Capital Plan 20082012 thru of Andover, MN City 08-43100-04 Project # Annual Pavement Markings Project Name Priority TypeImprovement1 - High Useful LifeContact 1-2 YearsDPW / City Engineer Category ImprovementsDepartmentStreets / Highways Description The pavement striping for City streets is conducted one time per year. This includes centerline striping and shoulder striping. Striping enhances the safety of the roadway by directing traffic to the correct lane movement. Justification Striping is required through the local and state agencies. A reflective standard is required. Restriping annually maintains the pavement markings to the required standards. Expenditures20082009201020112012Total 20,00021,00022,00023,00024,000110,000 Improvement 20,00021,00022,00023,00024,000110,000 Total Funding Sources20082009201020112012Total 20,00021,00022,00023,00024,000110,000 R & B - Reserve 20,00021,00022,00023,00024,000110,000 Total Operational Impact/Other The pavement markings are contracted out each year adding virtually no operational impact. 84 Capital Plan 20082012 thru of Andover, MN City 08-43100-05 Project # Annual Curb Replacement Project Name Priority TypeImprovement1 - High Useful LifeContact 30 YearsDPW / City Engineer Category Streets/HighwaysDepartmentStreets / Highways Description Damaged and failing concrete curb and gutter throughout the City needs to be repaired or replaced to help maintain the integrity of the roadway system. Replacing damaged or failing sections of curb and gutter helps with drainage of the roadway and prolongs the life of the street system. Justification The majority of the concrete curb and gutter throughout the City is in relatively good condition. However, there are isolated areas that need rehabilititation every year. Failing or damaged sections of concrete curb and gutter are removed and replaced. Replacing damaged sections of concrete curb and gutter maintains the integrity of and prolongs the life of the City's street infrastructure. Expenditures20082009201020112012Total 41,00042,00043,00044,00045,000215,000 Construction 41,00042,00043,00044,00045,000215,000 Total Funding Sources20082009201020112012Total 41,00042,00043,00044,00045,000215,000 R & B - Reserve 41,00042,00043,00044,00045,000215,000 Total Operational Impact/Other Repairing failing or damaged sections of curb and gutter reduces the routine maintenance required by the public works department. 85 Capital Plan 20082012 thru of Andover, MN City 08-43100-06 Project # Rail Road Quiet Zones / Wayside Horns Project Name Priority TypeImprovement1 - High Useful LifeContact 30 Years +DPW / City Engineer Category ImprovementsDepartmentStreets / Highways Description Construction of quiet zones or wayside horns in the central portion of the City require improvements to comply with rail road requirements. Construction of these improvements would result in crossings where trains would not need to blow their horns. Necessary improvements at 161st Avenue includes construction of a divided roadway section with concrete medians and sign installation, similar to Bunker Lake Boulevard. The Crosstown Boulevard crossing will have an Automated Horn System, similar to Andover Boulevard. These Automated Horn Systems will not require improvements to the roadway or existing crossing gates. Justification Improvements are planned at the following crossings: 2008 - Crosstown Blvd ($170,000) 2008 - 161st Avenue ($160,000) Expenditures20082009201020112012Total 330,000330,000 Construction 330,000330,000 Total Funding Sources20082009201020112012Total 160,000160,000 Municipal State Aid Funds 170,000170,000 R & B - Reserve 330,000330,000 Total Operational Impact/Other Improvements will enhance the quality of life for residents living adjacent to the crossings, resulting in less disruptions from the trains while providing safe crossings for vehicular and pedestrian traffic. 86 'ETMXEP-QTVSZIQIRX4PER Project Name: RAILROAD QUIET ZONES / WAYSIDE HORNS 2008 2008 Location Map L E G E N D Project Location Lots/Parcels Park 07501,5003,000 Water Feet Right of Way 87 City Limits Capital Plan 20082012 thru of Andover, MN City 08-43100-07 Project # Municipal State Aid Routes / New & Reconstruct Project Name Priority TypeImprovement1 - High Useful LifeContact 20 YearsDPW / City Engineer Category Streets/HighwaysDepartmentStreets / Highways Description The following projects are proposed to be constructed and/or rehabilitated to meet State Aid Standards. The rehabilitation projects will consist of milling the existing street surface, constructing concrete curb and gutter where it does not exist, and improving storm drainage. 2009: 157th Avenue (Prairie Road - University Avenue) $429,000 2010: South Coon Creek Drive (Round Lake Blvd - Crosstown) $751,000 2011: Prairie Road (Andover Blvd - Crosstown Blvd) $674,000 2012: Nightingale Street (Crosstown Blvd - 161st Ave) $719,000 Justification 2009: 157th Avenue (Prairie Road - University Ave) - Upgrade needed to maintain integrity of State Aid roadway infrastructure. 2010: South Coon Creek Drive (Round Lake Blvd - Crosstown) - Upgrade needed to maintain integrity of State Aid roadway infrastructure. 2011: Prairie Road (Andover Blvd - Crosstown Blvd) - Upgrade needed to maintain integrity of State Aid roadway infrastructure. 2012: Nightingale Street (Crosstown Blvd - 161st Ave) - Upgrade needed to maintain integrity of State Aid roadway infrastructure. Expenditures20082009201020112012Total Construction 429,000751,000674,000719,0002,573,000 429,000751,000674,000719,0002,573,000 Total Funding Sources20082009201020112012Total Assessments 107,250187,750168,500179,750643,250 Municipal State Aid Funds 321,750563,250505,500539,2501,929,750 429,000751,000674,000719,0002,573,000 Total Operational Impact/Other Rehabilitating the roads will reduce the amount of routine maintenance along these sections of roadway and provide a safer and higher quality transportation system. 88 'ETMXEP-QTVSZIQIRX4PER Project Name: MUNICIPAL STATE AID ROUTES RECONSTRUCT 2009 Location Map L E G E N D Project Location Lots/Parcels Park 04008001,600 Water Feet Right of Way 89 City Limits 'ETMXEP-QTVSZIQIRX4PER Project Name: MUNICIPAL STATE AID ROUTES RECONSTRUCT 2010 Location Map L E G E N D Project Location Lots/Parcels Park 07001,4002,800 Water Feet Right of Way 90 City Limits 'ETMXEP-QTVSZIQIRX4PER Project Name: MUNICIPAL STATE AID ROUTES RECONSTRUCT 2011 Location Map L E G E N D Project Location Lots/Parcels Park 07001,4002,800 Water Feet Right of Way 91 City Limits 'ETMXEP-QTVSZIQIRX4PER Project Name: MUNICIPAL STATE AID ROUTES RECONSTRUCT 2012 Location Map L E G E N D Project Location Lots/Parcels Park 06001,2002,400 Water Feet Right of Way 92 City Limits Capital Plan 20082012 thru of Andover, MN City 08-43100-08 Project # Intersection Upgrades Project Name Priority TypeImprovement1 - High Useful LifeContact 25 YearsDPW / City Engineer Category ImprovementsDepartmentStreets / Highways Description 2008 - Construction of a traffic signal at Hanson Blvd and 133rd Ave. This signal will include a cost share with the City of Coon Rapids and Anoka County ($150,000). Construction of undetermined improvements at Crosstown Blvd and Crosstown Drive to improve the safety of this intersection ($75,000). 2011 - Construction of a traffic signal at South Coon Creek Drive and Round Lake Blvd. Minor lane widening may be needed but turn lane construction would not be included in this project ($275,000). Justification Intersection upgrades are necessary due to the increased development and demands on the transportation system, the need for safety improvements, and to comply with Anoka County Highway Department requirements. Expenditures20082009201020112012Total 225,000275,000500,000 Construction 225,000275,000500,000 Total Funding Sources20082009201020112012Total 200,000275,000475,000 Municipal State Aid Funds 25,00025,000 R & B - Reserve 225,000275,000500,000 Total Operational Impact/Other Improvements will improve the flow of traffic and will improve the safety of vehicles, pedestrians and bicyclists. 93 'ETMXEP-QTVSZIQIRX4PER Project Name: INTERSECTION UPGRADES South Coon Creek Dr & Round Lake Blvd (2011) Hanson Blvd & 133rd Ave (2008) Location Map L E G E N D Project Location Lots/Parcels Park 01,2002,4004,800 Water Feet Right of Way 94 City Limits Capital Plan 20082012 thru of Andover, MN City 08-48100-01 Project # Rehabilitation of Wells Project Name Priority TypeImprovement1 - High Useful LifeContact 7 YearsDPW / City Engineer Category ImprovementsDepartmentWater Description The motor, pump and column pipe are taken out for inspection and worn parts are replaced. The well is televised to determine the depth and condition. If the well is at or close to the original drill depth everything is put back in place. The well may need to be cleaned out to the original depth if there is a substantial decrease in the depth. Justification To make sure the well is operational to what it is designed for and to correct any problems that may affect our ability to produce the amount of water needed to meet the demand. A complete inspection and maintenance overhall is performed on each well a minimum of once every seven (7) years. Well #3 is in line for this type of rehabilitation. This maintenance will also maximize the pumping rate of the well. Even though this is a peaking well and other issues are related to it, the maintenance is required to make sure the well works efficiently. Expenditures20082009201020112012Total 45,00050,00050,00055,00060,000260,000 Improvement 45,00050,00050,00055,00060,000260,000 Total Funding Sources20082009201020112012Total 45,00050,00050,00055,00060,000260,000 Water Fund 45,00050,00050,00055,00060,000260,000 Total Operational Impact/Other This would be done at such a time that it would not affect the demand needs of the system. Typically done late fall. 95 Capital Plan 20082012 thru of Andover, MN City 08-48100-02 Project # Water Tower Painting Project Name Priority TypeImprovement1 - High Useful LifeContact 15-20 YearsDPW / City Engineer Category ImprovementsDepartmentWater Description Painting of the water tower closest to City Hall, including the new City logo. Justification The tower is going to be in need of painting to maintain its appearance and to protect it from wear and tear. The new City logo should also be put on at this time. Expenditures20082009201020112012Total 600,000600,000 Improvement 600,000600,000 Total Funding Sources20082009201020112012Total 242,000242,000 Capital Equipment Reserve 358,000358,000 Water Trunk Fund 600,000600,000 Total Operational Impact/Other The tower may need to be taken off line in order to do this maintenance. The water treatment plant has a means of pumping into the system even when the tower is off line. Staff will have to look at the function of the system and determine the best case senario to keep the system operating. 96 Capital Plan 20082012 thru of Andover, MN City 08-48100-03 Project # Construct Test Wells No. 10 & 11 Project Name Priority TypeImprovement1 - High Useful LifeContact 15 YearsDPW / City Engineer Category ImprovementsDepartmentWater Description Construct test wells #10 & #11 in the Shadowbrook Development. Justification The water system has reached a point where the city needs to start planning for the next phase of improvements to the water system. A new well will be needed by the year 2012. Prior to drilling a new well, a pilot well is needed to determine the availability of water. Two locations have been identified for this to be done. One is the city owned property in the Shadowbrook Development and the other is at the Shadowbrook East Park at the north end. Expenditures20082009201020112012Total 88,00088,000 Improvement 88,00088,000 Total Funding Sources20082009201020112012Total 88,00088,000 Water Trunk Fund 88,00088,000 Total Operational Impact/Other The cost of this project at this time will have little, if no, impact to yearly operations. By doing this project now will keep costs down as other improvement projects come up in the next few years. 97 'ETMXEP-QTVSZIQIRX4PER Project Name: CONSTRUCT TEST WELLS NO. 10 &11 TEST WELL #10 TEST WELL #11 Location Map L E G E N D Project Location Lots/Parcels Park 02755501,100 Water Feet Right of Way 98 City Limits Capital Plan 20082012 thru of Andover, MN City 09-48100-02 Project # Construct Clearwell at WTP Project Name Priority TypeImprovement1 - High Useful LifeContact 50 YearsDPW / City Engineer Category ImprovementsDepartmentWater Description Construct a 2 million gallon clearwell adjacent to the water treatment plant. Justification In order to adequately supply treated water at an acceptable pressure to the entire distribution system in Andover, a two million gallon clearwell must be constructed near the water treatment plant. The existing 500,000 water tower in the southwest part of town would be demolished as part of this process. Construction of this clearwell and demolition of the existing 500,000 gallon tower would eliminate the low pressure zone currently in the southwest part of town. Expenditures20082009201020112012Total 2,665,9002,665,900 Construction 2,665,9002,665,900 Total Funding Sources20082009201020112012Total 2,665,9002,665,900 Water Revenue Bonds 2,665,9002,665,900 Total Operational Impact/Other Additional maintenance and monitoring would be required of the Sewer and Water department. 99 Capital Plan 20082012 thru of Andover, MN City 09-48100-03 Project # WTP Reclaim Tank Addition Project Name Priority TypeImprovement1 - High Useful LifeContact 30 YearsDPW / City Engineer Category ImprovementsDepartmentWater Description Add an additional 200,000 gallon reclaim tank and process piping to the water plant. Justification In order to maintain a certain level of operations and meet the demands of the water population, this tank would help in meeting this objective. Staff has noticed that during the high peaking months of May through September, the water plant needs to backwash the filters on a daily basis. With the single reclaim tank now in operation the daily operations will run into a difficulty with backwashing filters as there is not enough room to handle the flows required to meet the needs. As the population continues to increase more of a demand is put on the system to function at a high rate of production. With an increase in tank size the operations can continue without much interuption when more room is required for backwashing of the filters. Expenditures20082009201020112012Total 785,000785,000 Improvement 785,000785,000 Total Funding Sources20082009201020112012Total Water Revenue Bonds 785,000785,000 785,000785,000 Total Operational Impact/Other With additional storage for backwashing the filtering process would not need to be interupted by shutting down certain wells in order to keep the filters from over loading. With an increase in capacity the water plant filters would be able to operate fully keeping the amount of water filtered at it's highest capacity. 100 Capital Plan 20082012 thru of Andover, MN City 10-48100-01 Project # Water Main along South Coon Creek Drive Project Name Priority TypeImprovement1 - High Useful LifeContact 50 YearsDPW / City Engineer Category ImprovementsDepartmentWater Description Install a 12" water main along South Coon Creek Drive from 145th Avenue to Crosstown Boulevard. Justification Construction of a water main along South Coon Creek Drive will allow the existing water distribution system between the east and west sides of town to be looped. The only existing connection between the two parts of town is along Bunker Lake Boulevard. Looping of the system will allow treated water to be continuously supplied to all residents in town on the water system. It will also help alleviate the pressure variance that is experienced between the east and west sides of town. Coon Creek Boulevard is scheduled for reconstruction in 2008. It would be advantageous to construct the water main concurrently with the roadway reconstruction. Expenditures20082009201020112012Total 409,400409,400 Improvement 409,400409,400 Total Funding Sources20082009201020112012Total 409,400409,400 Water Trunk Fund 409,400409,400 Total Operational Impact/Other Additional maintenance and flushing requirements for the water main system will result. Construction of this system would make management of the water distribution system for the City as a whole easier by eliminating the two pressure zones. 101 'ETMXEP-QTVSZIQIRX4PER 4VSNIGX2EQI WATER MAIN ALONG SOUTH COON CREEK BLVD Location Map 0)+)2( Right of Way Lots/Parcels Water 07501,5003,000 Park Feet City Limits 102 Project Location Capital Plan 20082012 thru of Andover, MN City 10-48100-02 Project # Demolish 500,000 Gallon Water Tower Project Name Priority TypeImprovement1 - High Useful LifeContact UnassignedDPW / City Engineer Category ImprovementsDepartmentWater Description Demolish the existing 500,000 gallon water tower located on the west side of town. Justification The existing 500,000 gallon water tower will be demolished and replaced by a new two million gallon water tower so the City's water distribution system can be managed under one pressure zone, providing treated water to all residents on the system. Expenditures20082009201020112012Total 168,000168,000 Improvement 168,000168,000 Total Funding Sources20082009201020112012Total 168,000168,000 Water Trunk Fund 168,000168,000 Total Operational Impact/Other Maintenance of the existing water tower will no longer be required. 103 Capital Plan 20082012 thru of Andover, MN City 12-48100-01 Project # Construct Well #10 Project Name Priority TypeImprovement1 - High Useful LifeContact 25 YearsDPW / City Engineer Category ImprovementsDepartmentWater Description Construct well #10 in Shadowbrook 2nd Addition on an existing city-owned lot to provide municipal water due to the increased demand.. Justification As the City's population continues to grow, the demand for municipal water increases. Continuing to add wells to the City's water system is essential to meet the demand. Expenditures20082009201020112012Total 181,000181,000 Improvement 181,000181,000 Total Funding Sources20082009201020112012Total 181,000181,000 Water Trunk Fund 181,000181,000 Total Operational Impact/Other Increase energy and operating costs to the water system. 104 'ETMXEP-QTVSZIQIRX4PER Project Name: CONSTRUCT WELL NO. 10 (2012) Location Map L E G E N D Project Location Lots/Parcels Park 0318570740 Water Feet Right of Way 105 City Limits This page left blank intentionally. 106 City of Andover, MN Capital Plan 20082012 thru DEPARTMENT SUMMARY Department20082009201020112012Total Central Equipment42,00035,00028,000105,000 Community Center17,0007,000 24,000 Elections110,000 110,000 Engineering30,000 30,000 Facility Management150,000 150,000 Fire295,000450,000940,000390,0002,075,000 Park & Rec - Operations20,000143,500132,000295,500 Planning & Zoning25,00025,000 Sanitary Sewer357,00065,000 422,000 Storm Sewer70,000150,000 220,000 Street Signs85,000 85,000 Streets / Highways150,000390,000208,000748,000 Water65,00065,000 787,0001,444,5001,300,000615,000208,000 4,354,500 GRAND TOTAL 107 City of Andover, MN Capital Plan 20082012 thru FUNDING SOURCE SUMMARY 20082009201020112012Total Source Capital Projects Levy110,000110,000 Central Equipment Fund7,00035,00028,000 70,000 Community Center Operations17,0007,00024,000 Equipment Bond670,0001,073,500940,000522,000208,000 3,413,500 Sanitary Sewer Fund30,000160,00065,000255,000 Sewer Trunk Fund160,000160,000 Storm Sewer Fund40,00037,000150,000 227,000 Water Fund30,00065,00095,000 787,0001,444,5001,300,000615,000208,0004,354,500 GRAND TOTAL 108 City of Andover, MN Capital Plan 20082012 thru PROJECTS & FUNDING SOURCES BY DEPARTMENT DepartmentProject#Priority20082009201020112012 Total Central Equipment Replacement - Hotsy Pressure Washer09-48800-0137,0007,000 Central Equipment Fund7,0007,000 Mobile Lifts09-48800-02135,000 35,000 Equipment Bond35,00035,000 Replacement - Floor Sweeper10-48800-01135,00035,000 Central Equipment Fund35,00035,000 Replacement - Service Truck11-48800-01228,000 28,000 Central Equipment Fund28,00028,000 42,00035,00028,000105,000 Central Equipment Total Community Center Additional Basketball Hoop08-44000-0127,5007,500 Community Center Operations7,5007,500 Kitchen Equipment - Fryer/Grill08-44000-0229,5009,500 Community Center Operations9,5009,500 Battery Pack Replacement - Zamboni09-44000-0127,0007,000 Community Center Operations7,0007,000 17,0007,00024,000 Community Center Total Elections Voting Equipment10-41310-011110,000 110,000 Capital Projects Levy110,000110,000 110,000 110,000 Elections Total Engineering Replacement - Blazer #1109-41600-01230,00030,000 Equipment Bond30,00030,000 30,000 30,000 Engineering Total Facility Management Phone System08-41900-041100,000100,000 Equipment Bond80,00080,000 Sanitary Sewer Fund10,00010,000 Water Fund10,00010,000 Facility Maintenance Vehicle08-41900-05150,00050,000 Equipment Bond50,00050,000 109 DepartmentProject#Priority20082009201020112012 Total 150,000 150,000 Facility Management Total Fire Replacement - Fire Tanker #3108-42200-011295,000 295,000 Equipment Bond295,000295,000 Replacement - Fire Engine #1109-42200-011400,000 400,000 Equipment Bond400,000400,000 Replacement - Fire Marshall Vehicle09-42200-02230,000 30,000 Equipment Bond30,00030,000 Water/Ice rescue boat09-42200-03120,000 20,000 Equipment Bond20,00020,000 Replacement - Ladder Truck #1110-42200-011900,000900,000 Equipment Bond900,000900,000 Replacement - Fire Chief's Vehicle10-42200-02240,000 40,000 Equipment Bond40,00040,000 Replacement - Tanker #1111-42200-012300,000300,000 Equipment Bond300,000300,000 Replacement - Grass #2111-42200-02245,000 45,000 Equipment Bond45,00045,000 Replacement - Grass #3111-42200-03245,00045,000 Equipment Bond45,00045,000 2,075,000 295,000450,000940,000390,000 Fire Total Park & Rec - Operations Replacement - Utility Box on Sign Truck08-45000-02120,00020,000 Equipment Bond20,00020,000 Replacement - Large Capacity Lawnmower #58009-45000-011112,000112,000 Equipment Bond112,000112,000 Replacement - Toro Groundsmaster, #55909-45000-02123,00023,000 Equipment Bond23,00023,000 Zero turn mower09-45000-0318,5008,500 Equipment Bond8,5008,500 Replacement - Trailer, T-55411-45000-0129,0009,000 Equipment Bond9,0009,000 Replacement - One Ton Pick Up w/Plow, #59911-45000-02265,000 65,000 Equipment Bond65,00065,000 Replacement - One ton truck w/ Plow #50311-45000-03258,00058,000 Equipment Bond58,00058,000 20,000143,500132,000295,500 Park & Rec - Operations Total Planning & Zoning Replacement - Ford Taurus #1509-41500-01225,000 25,000 Equipment Bond25,00025,000 25,000 25,000 Planning & Zoning Total Sanitary Sewer New Jet/Vac Truck09-48200-011357,000357,000 Sanitary Sewer Fund160,000160,000 Sewer Trunk Fund160,000160,000 110 DepartmentProject#Priority20082009201020112012 Total Storm Sewer Fund37,00037,000 Replacement - 1-ton truck with plow equipment10-48200-03165,000 65,000 Sanitary Sewer Fund65,00065,000 422,000 357,00065,000 Sanitary Sewer Total Storm Sewer New Track Backhoe08-48300-02270,00070,000 Sanitary Sewer Fund15,00015,000 Storm Sewer Fund40,00040,000 Water Fund15,00015,000 Replacement - Elgin Street Sweeper10-43100-011150,000 150,000 Storm Sewer Fund150,000150,000 70,000150,000220,000 Storm Sewer Total Street Signs Replacement - Sign Truck #41008-43300-01185,00085,000 Equipment Bond85,00085,000 85,00085,000 Street Signs Total Streets / Highways Replacement - Hot Asphalt Box08-43100-09140,000 40,000 Equipment Bond40,00040,000 Truck mounted attenuator(TMA)08-43100-10135,00035,000 Equipment Bond25,00025,000 Sanitary Sewer Fund5,0005,000 Water Fund5,0005,000 Extend Frame on #196 for Add'l Attachments08-43100-11175,00075,000 Equipment Bond75,00075,000 Replacement - Water Tanker09-43100-012100,000100,000 Equipment Bond100,000100,000 Asphalt Paving Machine09-43100-02190,00090,000 Equipment Bond90,00090,000 Replacement - Dump Truck w/ Snow Removal #19709-43100-041200,000200,000 Equipment Bond200,000200,000 Replacement - Dump Truck w/snow removal #19812-43100-011150,000150,000 Equipment Bond150,000150,000 Replacement - One ton truck w/ Plow #13212-43100-02158,00058,000 Equipment Bond58,00058,000 150,000390,000208,000748,000 Streets / Highways Total Water Replacement - 1-ton pick up truck #10511-48100-02165,000 65,000 Water Fund65,00065,000 65,00065,000 Water Total 4,354,500 787,0001,444,5001,300,000615,000208,000 GRAND TOTAL 111 Capital Plan 20082012 thru of Andover, MN City 09-48800-01 Project # Replacement - Hotsy Pressure Washer Project Name Priority TypeEquipment3 - Low Useful LifeContact 10 YearsDPW / City Engineer Category Facility ManagementDepartmentCentral Equipment Description The existing Hotsy pressure washer is well used and becoming a high maintenance item. It has been inservice for almost 15 years. Justification A new washer would operate more efficiently and save time and money by having fewer break downs. The new washer would run on natural gas rather than on kerosene. Expenditures20082009201020112012Total 7,0007,000 Equipment 7,0007,000 Total Funding Sources20082009201020112012Total 7,0007,000 Central Equipment Fund 7,0007,000 Total Operational Impact/Other Less break downs, saving time and money. Not having to send people out to buy fuel for it would also save money. Harder to get parts for. 112 Capital Plan 20082012 thru of Andover, MN City 09-48800-02 Project # Mobile Lifts Project Name Priority TypeEquipment1 - High Useful LifeContact 15 YearsDPW / City Engineer Category EquipmentDepartmentCentral Equipment Description Mobile lifts used for lifting vehicles during service, inspections and repairs. Justification Increased efficiency in servicing vehicles. Expenditures20082009201020112012Total 35,00035,000 Equipment 35,00035,000 Total Funding Sources20082009201020112012Total 35,00035,000 Equipment Bond 35,00035,000 Total Operational Impact/Other Mobile lifts will provide a more efficient process to service City vehicles by allowing large fire trucks and plow trucks to be lifted, in addition to, mowers and other maintenance equipment. Operating Budget Impact20082009201020112012Total 35,00035,000 Maintenance 35,00035,000 Total 113 Capital Plan 20082012 thru of Andover, MN City 10-48800-01 Project # Replacement - Floor Sweeper Project Name Priority TypeEquipment1 - High Useful LifeContact 15 YearsDPW / City Engineer Category Facility ManagementDepartmentCentral Equipment Description Replace Unit #324, a 1991 Floor Sweeper/Scrubber. With the addition of new buildings, it will be more economical to purchase a new unit that is faster and more efficient. I don't believe that a bigger machine is what we need but one that is just more efficient. Justification The floors are not cleaned as often as they should be because the current sweeper's washing and vacuum portion is worn out and parts are getting harder to find. The sweeper works well outside because we only use the broom portion of the machine. The present machine works well for the area that we now have but if we double the area, we will need to be able to clean the area faster and do it more efficiently. Expenditures20082009201020112012Total 35,00035,000 Equipment 35,00035,000 Total Funding Sources20082009201020112012Total 35,00035,000 Central Equipment Fund 35,00035,000 Total Operational Impact/Other A new machine would have less maintenance issues even with using it more often. 114 Capital Plan 20082012 thru of Andover, MN City 11-48800-01 Project # Replacement - Service Truck Project Name Priority TypeEquipment2 - Medium Useful LifeContact 10 YearsDPW / City Engineer Category Streets/HighwaysDepartmentCentral Equipment Description Replace Unit #371, a 2001 S10 Ext Cab 4x4 truck with 34,000 miles. This truck averages about 7,000 miles a year and by 2011 it will have approximately 62,000 miles. The new truck should be able to carry 3 or 4 people and also have a tailgate lift. A crew cab truck set up with some of the same options that are on the #371 would be good. Justification To assist mechanics with jobs outside the shop such as parts runs, schooling, vehicle repair and moving equipment around. Many times this vehicle is not big enough to handle the job. A newer truck would help us work more efficiently. The current vehicle would make a good intern or spare vehicle or kept as a runner/drop truck. Expenditures20082009201020112012Total 28,00028,000 Vehicles 28,00028,000 Total Funding Sources20082009201020112012Total 28,00028,000 Central Equipment Fund 28,00028,000 Total Operational Impact/Other A bigger vehicle would increase operating costs - fuel and maintenance. 115 Capital Plan 20082012 thru of Andover, MN City 08-44000-01 Project # Additional Basketball Hoop Project Name Priority TypeEquipment2 - Medium Useful LifeContact 15-20 YearsComm Ctr Manager Category EquipmentDepartmentCommunity Center Description Add additional basketball hoop/backboard and all necessary components to the fieldhouse. Run electrical from the backboard to existing control panel. Justification Open Gym has become so popular in the winter months, that an additional hoop will help the overall experience for those who attend an open gym session. Other courts continued to be rented out to private users leaving only one or two courts for open gym. Expenditures20082009201020112012Total 7,5007,500 Equipment 7,5007,500 Total Funding Sources20082009201020112012Total 7,5007,500 Community Center Operations 7,5007,500 Total Operational Impact/Other The backboard will help with customer complaints about the overcrowding during open gym. Will allow more participants during summer camps. 116 Capital Plan 20082012 thru of Andover, MN City 08-44000-02 Project # Kitchen Equipment - Fryer/Grill Project Name Priority TypeEquipment2 - Medium Useful LifeContact 15-20 YearsComm Ctr Manager Category EquipmentDepartmentCommunity Center Description Add an auto fryer for expanding the menu at the Community Center concessions. Justification The addition of the fryer would allow the Community Center to expand its menu and bring in additional revenues. The YMCA and Sunshine Park would share in the cost to purchase. Expenditures20082009201020112012Total 9,5009,500 Equipment 9,5009,500 Total Funding Sources20082009201020112012Total 9,5009,500 Community Center Operations 9,5009,500 Total Operational Impact/Other The additional revenues from the sale of "hot" food items would help pay for the equipment over the years. The fryer would also be moved to Sunshine concessions over the summer months when they are in their busy season. According to the Anoka County Health Department we are already licensed to operate the fryer. 117 Capital Plan 20082012 thru of Andover, MN City 09-44000-01 Project # Battery Pack Replacement - Zamboni Project Name Priority TypeEquipment2 - Medium Useful LifeContact 7 YearsComm Ctr Manager Category Facility ManagementDepartmentCommunity Center Description Battery Pack for the Electric Zamboni. Justification The battery pack that drives the Zamboni has to be replaced every 5-7 years. Over time, the batteries will hold less and less of a charge and eventually have to be replaced. Expenditures20082009201020112012Total 7,0007,000 Vehicles 7,0007,000 Total Funding Sources20082009201020112012Total 7,0007,000 Community Center Operations 7,0007,000 Total Operational Impact/Other The Zamboni is a necessary part of the operation of the ice arena, and without it we would not be able to keep the facility open. The hope is that with the preventative maintenance program that is in place, we can achieve the maximum amount of time available on the battery pack before it has to be replaced. 118 Capital Plan 20082012 thru of Andover, MN City 10-41310-01 Project # Voting Equipment Project Name Priority TypeEquipment1 - High Useful LifeContact 15 YearsCity Clerk Category EquipmentDepartmentElections Description New electronic voting equipment for 10 precincts. Justification A Federal mandate to comply with HAVA - Help America Vote Act. The current equipment is non-compliant. Expenditures20082009201020112012Total 110,000110,000 Equipment 110,000110,000 Total Funding Sources20082009201020112012Total 110,000110,000 Capital Projects Levy 110,000110,000 Total Operational Impact/Other Continued storage and maintenance of all the equipment. 119 Capital Plan 20082012 thru of Andover, MN City 09-41600-01 Project # Replacement - Blazer #11 Project Name Priority TypeEquipment2 - Medium Useful LifeContact 10 YearsDPW / City Engineer Category EquipmentDepartmentEngineering Description Replace Unit #11, a 1995 S10 Blazer with 57,700 miles. The Engineering Department puts about 5,000 miles per year on this vehicle. After 14 years, it will have approximately 77,000 miles on it. This unit could make a good intern vehicle or spare vehicle if needed. Justification This vehicle is an Engineering Tech inspection vehicle and needs to be available for inspections and surveying. Expenditures20082009201020112012Total 30,00030,000 Equipment 30,00030,000 Total Funding Sources20082009201020112012Total 30,00030,000 Equipment Bond 30,00030,000 Total Operational Impact/Other Lower maintenance costs and downtime. 120 Capital Plan 20082012 thru of Andover, MN City 08-41900-04 Project # Phone System Project Name Priority TypeEquipment1 - High Useful LifeContact 10 YearsCity Administrator Category ImprovementsDepartmentFacility Management Description Phone System upgrade for City Hall, PW Building, Community Center, Water Treatment Plant and Fire Station #1. Most routine changes such as adding a user, setting up voice mail, resetting passwords, enabling the voice mail to email functionality can be done in house. These changes can be performed by our administrator anywhere that internet access is available. This equates to faster service and lower cost. And when we do need assistance from a technician most changes can happen remotely eliminating onsite service calls. Justification Current system is out of date and not fully supported. The upgrade can be maintained primarily by in-house IT staff. It has been mutually understood for some time that the day is coming soon that the City will be due to replace the 14 year old Merlin phone system. The current system is now obsolete and sometimes hard to get hardware for the phone system along with the Object World messaging system. While this is a very capable messaging system there is no local support available for the product. A number of years ago the City of Andover deployed this messaging system which was ahead of it’s time in terms of the functionality that it delivered. Since that time the phone system manufacturers have actively deployed advanced functionality on their messaging systems which has hurt Object World financially and shrunk their dealer base. To our knowledge there are no local support options for this product which leaves the City of Andover in a vulnerable position. If the messaging system were to crash it is a real possibility that it would not be restored to service, or at best have a lengthy outage while best efforts of non trained staff seek to restore it. Disaster avoidance: The current voice messaging system has the support issues listed above, but there are other issues with the phone system as well. We are currently working with old electronics with multiple points of failure which include modules, processor, messaging, and the cabinet. The likelihood of a failure is continuing to grow and reliable parts are getting harder to find. By implementing the ShoreTel system we will reduce the risk of phone k outages and message losses in numerous ways. This is an IP based system which means that it runs the voice traffic over the data networ Expenditures20082009201020112012Total 100,000100,000 Equipment 100,000100,000 Total Funding Sources20082009201020112012Total 80,00080,000 Equipment Bond Sanitary Sewer Fund 10,00010,000 Water Fund 10,00010,000 100,000100,000 Total Operational Impact/Other Maintenance support fees should be reduced due to in-house IT staff maintaining the system. 121 Capital Plan 20082012 thru of Andover, MN City 08-41900-05 Project # Replacement - Facility Maintenance Vehicle Project Name Priority TypeEquipment1 - High Useful LifeContact 10 YearsDPW / City Engineer Category EquipmentDepartmentFacility Management Description Replace unit #104, a Ford F-250 with 112,533 miles and snow removal equipment. Justification Current truck has high miles, becoming undependable and is starting to rust out. The new truck will have a utility box to store and lock tools and equipment in when running to various job sites. Expenditures20082009201020112012Total 50,00050,000 Facility Maintenance 50,00050,000 Total Funding Sources20082009201020112012Total 50,00050,000 Equipment Bond 50,00050,000 Total Operational Impact/Other A new truck with a utility box will make traveling to job sites more efficient by being able to carry a lot of the common tools and supplies on board rather than having to make multiple trips to retrieve them. It will also be more secure and safer by being able to lock the tools and supplies up in the body compartments and not having them lay in the bed of the box rolling around. Operating Budget Impact20082009201020112012Total Maintenance 50,00050,000 50,00050,000 Total 122 Capital Plan 20082012 thru of Andover, MN City 08-42200-01 Project # Replacement - Fire Tanker #31 Project Name Priority TypeEquipment1 - High Useful LifeContact 20 YearsFire Chief Category EquipmentDepartmentFire Description Replace fire tanker #31, a 1991 International / Alexis tanker with 8,600 miles. Justification This vehicle will be seventeen years old in 2008 and will most certainly need a major refurbishment or replacement. It would be recommended to replace and sell the existing vehicle as is so that our fire department will benefit from new vehicle technology that should last us for the next twenty years. The maintenance costs are starting to increase and the body work needed should be evaluated. The new tanker will have high technology flow meters, automated pump controls, a more efficient engine that creates less pollution in the station and on the road. Expenditures20082009201020112012Total 295,000295,000 Equipment 295,000295,000 Total Funding Sources20082009201020112012Total 295,000295,000 Equipment Bond 295,000295,000 Total Operational Impact/Other The new technology will allow firefighters to perform their jobs in a more efficient and safe manner. The newer technology will allow for just one operator to staff the vehicle for water shuttles to and from the fire scenes. Currently, we need at least two firefighters to operate the tanker properly. The newer controls and gauges will also help to make the vehicle much easier to pump and dump water as needed. Other items that will be improved include; electronic dump chutes for water control, inside cab controls for operator ease, larger pump that can be I.S.O. certified, better emergency lighting for responding to the scene, more storage room, roll up doors for safer access on the scene, pre plumbed suppressant foam supply, electronic/hydraulic dump tank lowering device, and the room needed for a second portable tank. 123 Capital Plan 20082012 thru of Andover, MN City 09-42200-01 Project # Replacement - Fire Engine #11 Project Name Priority TypeEquipment1 - High Useful LifeContact 20 YearsFire Chief Category EquipmentDepartmentFire Description Replace fire engine #11, a 1991 Pierce Lance pumper truck with 25,130 miles. Justification The current engine is working fine but is starting to have more day to day repairs. As with any vehicle that is 16 years old, some parts can be harder to find and take longer to receive for needed repairs. The fire department can not afford to have vehicles down for extended periods of time. Expenditures20082009201020112012Total 400,000400,000 Vehicles 400,000400,000 Total Funding Sources20082009201020112012Total 400,000400,000 Equipment Bond 400,000400,000 Total Operational Impact/Other The new technology will allow firefighters to respond and conduct fire suppression activities, rescue operations, and other required activities in a safer and more efficient manner. The maintenance costs can be lowered as well. Some of the new technology items include increasing the capability to transport more firefighters to the scene, internal plumbed foam suppressant system, climate controlled cab can be used for firefighter rehabilitation, much better visibility when driving to emergencies, better maneuverability, and new designs make it much easier to enter and exit the cab area. In addition the new emergency lighting standards will make it easier to see the truck while responding and also while parked at the scene. 124 Capital Plan 20082012 thru of Andover, MN City 09-42200-02 Project # Replacement - Fire Marshall Vehicle Project Name Priority TypeEquipment2 - Medium Useful LifeContact 10 YearsFire Chief Category EquipmentDepartmentFire Description Replace Unit # 4801, a 1997 S10 Blazer with 55,760 miles used by the Fire Marshall. We may want to evaluate what type of vehicle we will need for this position at the time of replacement. Justification The Fire Marshall's vehicle is anticipated to have approximately 65,000 miles on it by the year 2009, and the ability to respond to an emergency with a dependable vehicle needs to be considered. There have been more maintenance issues with this vehicle, and although most have been minor, the occurrences are increasing and the costs will also start to increase as the vehicle gets older. Expenditures20082009201020112012Total 30,00030,000 Vehicles 30,00030,000 Total Funding Sources20082009201020112012Total 30,00030,000 Equipment Bond 30,00030,000 Total Operational Impact/Other The new vehicle will be used for day to day inspections and also emergency responses when the Fire Marshall is available to assist at the incident including medical calls. It is crucial that the Fire Marshall's vehicle be in good operating order to perform all of the functions needed. This vehicle is also used to help conduct all of the fire investigations and the appropriate equipment needs to be stored in the vehicle. The fire department needs to have a very dependable vehicle to perform all of the functions listed. 125 Capital Plan 20082012 thru of Andover, MN City 09-42200-03 Project # Water/Ice rescue boat Project Name Priority TypeEquipment1 - High Useful LifeContact 15 YearsFire Chief Category EquipmentDepartmentFire Description A small boat designed and built to perform water and ice rescues. Justification Andover does not currently have a rescue boat. The boat would be used to perform ice and water rescues. The boat will make these specific types of rescues safer for all responders. The boat will allow firefighters to perform rescue work rather than waiting for a boat to arrive and perform recovery work. Expenditures20082009201020112012Total 20,00020,000 Equipment 20,00020,000 Total Funding Sources20082009201020112012Total 20,00020,000 Equipment Bond 20,00020,000 Total Operational Impact/Other Boat will make an easier and safer rescue for all responders and parties being rescued. The boat will save lives and make it safer for firefighters who have to enter the water or crawl on the ice. The current method of having firefighters wear wet suits and try to swim or crawl on the ice to the victim is not very safe or recommended if we can avoid it. The boat will help get the rescuer and victim out of the situation faster and safer. 126 Capital Plan 20082012 thru of Andover, MN City 10-42200-01 Project # Replacement - Ladder Truck #11 Project Name Priority TypeEquipment1 - High Useful LifeContact 20 YearsFire Chief Category EquipmentDepartmentFire Description Replace ladder truck #11, a 1991 Pierce 75' ladder truck with 16,650 miles. The new ladder truck would be a 100 foot aerial platform, which includes a bucket at the end of the ladder for firefighter safety. The 100 foot reach will allow for the fire department to perform rescue and suppression activities in buildings that we can not currently reach. Justification The city is required by the I.S.O. to have this type of vehicle available for use because of the building heights allowed in Andover. The new platform style truck versus the current straight ladder will be much safer for firefighter activities and fire suppression activities. It should be noted that the newest aerial truck equipment and technologies are better than what we are now using. The new vehicles have safety sensors and weight distribution gauges that will keep the operators from making mistakes while operating the truck that could be very costly or dangerous. The newer buildings in Andover are getting taller with more green space between the building and a hard surface making it much more difficult to reach some of them because of the height restrictions of the current ladder truck. Expenditures20082009201020112012Total 900,000900,000 Equipment 900,000900,000 Total Funding Sources20082009201020112012Total Equipment Bond 900,000900,000 900,000900,000 Total Operational Impact/Other The use of an aerial device can be very dangerous if not performed properly. A new platform truck will allow firefighters to perform the most dangerous of activities as required from time to time, and know that they have the right piece of equipment to do the job. The larger and taller buildings now being built in Andover will require this type of equipment. The current ladder truck has been fairly dependable with not many major repairs needed. The maintenance costs are going up for this vehicle and the trade in value may be going down as the truck gets older. The new bucket style of truck will also be much safer conditions for firefighters performing suppression activities. The new ladder truck can be equipped to have pre-plumbed breathing air in the bucket for extended use and also high intensity lighting mounted on the bucket will greatly increase site visibility. Firefighters will no longer have to carry heavy equipment up the ladder but rather can swing the bucket down to the ground to pick it up. The larger cab design will allow for transporting more firefighters and also can be used for rehabilitation of staff when needed. The bucket design will also allow for two master stream devices mounted near the top of the bucket to be used for extinguishment for very large types of fires. The over head visibility at the scene will also help the incident commander make vital decisions regarding the tactics and strategies to be used. 127 Capital Plan 20082012 thru of Andover, MN City 10-42200-02 Project # Replacement - Fire Chief's Vehicle Project Name Priority TypeEquipment2 - Medium Useful LifeContact 10 YearsFire Chief Category EquipmentDepartmentFire Description Replace unit #4806, a 2002 Chevrolet Tahoe which currently has approximately 47,450 miles on it and is used by the Fire Chief. Justification In order to keep the first line emergency responding vehicles in the proper operating conditions, it is important to replace equipment when needed. The current vehicle has worked very well and should be evaluated for repair history and maintenance costs as the replacement date gets closer. Expenditures20082009201020112012Total 40,00040,000 Equipment 40,00040,000 Total Funding Sources20082009201020112012Total 40,00040,000 Equipment Bond 40,00040,000 Total Operational Impact/Other The Chief's vehicle is used by the Chief to respond to emergency incidents. The vehicle has to be in good shape and able to provide safe and protective transportation when responding to all types of incidents. The vehicle also carries all of the Chief's protective gear and equipment needed to help conduct fire investigations. The Chief regularly uses the vehicle to conduct interviews while on the scene with property owners and also uses the truck to provide a place for fire victims to sit out of the elements while they are waiting for relatives or the Red Cross to respond to the scene. 128 Capital Plan 20082012 thru of Andover, MN City 11-42200-01 Project # Replacement - Tanker #11 Project Name Priority TypeEquipment2 - Medium Useful LifeContact 20 YearsFire Chief Category EquipmentDepartmentFire Description Replace tanker truck #11, a 1991 International tanker, which currently has 8,300 miles on it and about 900 engine hours. Justification This vehicle will be 21 years old in 2011. The all wheel drive vehicle has worked extremely well as a tanker that can be used at all types of fires including wildfires, where the off road capabilities have proven to be very valuable. There have been no significant problems with this vehicle and the replacement need has to be reevaluated in 2011 but it is very important that we keep this vehicle current and up to date with the latest firefighting technologies. The current vehicle has a rear mounted pumping system that requires constant maintenance and usually more than one person to operate the truck and pump at a fire scenario.The proposed new tanker will have remote operational capabilities that will make operating the truck with only one person a reality. The current manually-operated pump has many drawbacks and limitations due to the need for more than one person to operate efficiently and safely. Expenditures20082009201020112012Total Vehicles 300,000300,000 300,000300,000 Total Funding Sources20082009201020112012Total Equipment Bond 300,000300,000 300,000300,000 Total Operational Impact/Other The new vehicle will probably have a larger tank and also the capability for only one person to operate during a fire situation. The maintenance costs for a newer vehicle will also have a budget impact in that there should be much less maintenance costs for the first half of the lifespan of the vehicle. The newer vehicle will also be expected to last longer because of the updates in the manufacturing process. The newer styles and metal fabrication help to reduce rusting and deterioration of the vehicle. The new vehicle should be produced so that the driver can dump water from chutes installed on both sides and from the rear of the truck. Currently water can be discharged only from a large rear outlet or with the manual pump system installed at the back of the truck. 129 Capital Plan 20082012 thru of Andover, MN City 11-42200-02 Project # Replacement - Grass #21 Project Name Priority TypeEquipment2 - Medium Useful LifeContact 20 YearsFire Chief Category EquipmentDepartmentFire Description Replace grass vehicle #21, a 1991 Ford with 20,316 miles. This has also been used as a medical response unit for Station #2. Now that the fire department has a separate vehicle that will be used to respond to medical calls, the new grass trucks will be designed to function for one primary purpose and will allow for new wildfire technologies to be put on the truck. Justification The fire department has now purchased new vehicles for rescue calls only and this will allow for the new grass trucks to have an extended life expectancy. The current grass vehicles have worked very hard responding to both wildfire and medical types of calls during most of the life of the trucks. The grass trucks also have many engine hours on them due to idling conditions while at grass fires and medical calls. By using seperate vehicles for each function, both the grass fire vehicle and assigned medical vehicle will last for at least 15 years or more. Expenditures20082009201020112012Total 45,00045,000 Vehicles 45,00045,000 Total Funding Sources20082009201020112012Total 45,00045,000 Equipment Bond 45,00045,000 Total Operational Impact/Other The fire department will be looking to purchase a smaller and more maneuverable vehicle when it is time to replace the grass trucks. The current full size pick up trucks, while capable of handling larger tanks and more weight, can be difficult to use when the need to negotiate around obstacles during wildfires arises. The grass vehicles will be a four wheel drive type and should probably have winches mounted on the front of the vehicle. The smaller and more maneuverable vehicles should be less expensive but yet perform much better when using the off road functions and features. 130 Capital Plan 20082012 thru of Andover, MN City 11-42200-03 Project # Replacement - Grass #31 Project Name Priority TypeEquipment2 - Medium Useful LifeContact 20 YearsFire Chief Category EquipmentDepartmentFire Description Replace grass vehicle #31, a 1991 Ford with 21,200 miles. This also has been used as medical response truck for station #3. Now that the fire department has a separate vehicle that will be used to respond to medical calls, the new grass trucks will be designed to function for one primary purpose and will allow for new wildfire technologies to be put on the truck. Justification The fire department has now purchased new vehicles for rescue calls only and this will allow for the new grass trucks to have an extended life expectancy. The current grass vehicles have worked very hard responding to both wildfire and medical types of calls during most of the life of the trucks. The grass trucks also have many engine hours on them due to idling conditions while at grass fires and medical calls. By using separate vehicles for each function both the grass fire vehicle and assigned medical vehicle will last for at least 15 years or more. Expenditures20082009201020112012Total 45,00045,000 Equipment 45,00045,000 Total Funding Sources20082009201020112012Total 45,00045,000 Equipment Bond 45,00045,000 Total Operational Impact/Other The fire department will be looking to purchase a smaller and more maneuverable vehicle when it is time to replace the grass trucks. The current full size pick up trucks, while capable of handling larger tanks and more weight, can be difficult to use when the need to negotiate around obstacles during wildfires arises. The grass vehicles will be a four wheel drive type and should probably have winches mounted on the front of the vehicle. The smaller and more maneuverable vehicles should be less expensive but yet perform much better when using the off road functions and features. 131 Capital Plan 20082012 thru of Andover, MN City 08-45000-02 Project # Replacement - Utility Box on Sign Truck Project Name Priority TypeEquipment1 - High Useful LifeContact 10 YearsDPW / City Engineer Category EquipmentDepartmentPark & Rec - Operations Description Replace the sign utility box with a box suitable for the Parks Dept. This unit would be used to store tools used in the repair of sprinklers systems, play ground inspections and to haul around cement working tools. In addition to hauling mowers, it would move equipment and personnel to job sites around the city when needed. Justification More efficient place to store work tools and equipment in addition to transporting people to various job sites. Expenditures20082009201020112012Total 20,00020,000 Vehicles 20,00020,000 Total Funding Sources20082009201020112012Total 20,00020,000 Equipment Bond 20,00020,000 Total Operational Impact/Other A better equiped vehicle would save time by being able to store equipment and tools in the truck rather than hauling parts and tools around in 5- gallon buckets or boxes. By using the existing sign truck chassis, it would save about $30,000. 132 Capital Plan 20082012 thru of Andover, MN City 09-45000-01 Project # Replacement - Large Capacity Lawnmower #580 Project Name Priority TypeEquipment1 - High Useful LifeContact 10 YearsDPW / City Engineer Category EquipmentDepartmentPark & Rec - Operations Description Replace Unit #580, a 1999 Toro 580 large capacity mower with 2,000 hours. This machine is averaging 200 - 300 hours per year and by 2009 it will have approximately 2,500 hours. Justification Maintenance costs are starting to accumulate and it should be traded in while it still has some value. Maintenance costs rose $1.37 per hour over the previous year. Expenditures20082009201020112012Total 112,000112,000 Equipment 112,000112,000 Total Funding Sources20082009201020112012Total 112,000112,000 Equipment Bond 112,000112,000 Total Operational Impact/Other Higher maintenance cost, possibly more break downs and lower trade-in value. 133 Capital Plan 20082012 thru of Andover, MN City 09-45000-02 Project # Replacement - Toro Groundsmaster, #559 Project Name Priority TypeEquipment1 - High Useful LifeContact 10 YearsDPW / City Engineer Category EquipmentDepartmentPark & Rec - Operations Description Replace Unit #559, a 1999 Toro Groundsmaster 328 with 1,600 hours. Justification These units are run year round and average about 300 hours a year. With additional parks being added each year, the average number of operational hours that each machine puts on will increase. Expenditures20082009201020112012Total 23,00023,000 Equipment 23,00023,000 Total Funding Sources20082009201020112012Total 23,00023,000 Equipment Bond 23,00023,000 Total Operational Impact/Other Possibility of more costly breakdowns in the future along with higher everyday maintenance issues. 134 Capital Plan 20082012 thru of Andover, MN City 09-45000-03 Project # Zero turn mower Project Name Priority TypeEquipment1 - High Useful LifeContact 10 YearsDPW / City Engineer Category EquipmentDepartmentPark & Rec - Operations Description Purchase an additional zero turn mower. Justification A zero turn mower is more efficient when mowing around the buildings, trees and other obstacles that are found in the city parks and campus grounds. This would also extend the life of the current Toro mowers. Expenditures20082009201020112012Total 8,5008,500 Equipment 8,5008,500 Total Funding Sources20082009201020112012Total 8,5008,500 Equipment Bond 8,5008,500 Total Operational Impact/Other The zero turn mowers are faster to operate around buildings and trees thus saving time and money by being more productive. The zero turn mower is about 1/3 the cost of a Toro Groundsmaster. 135 Capital Plan 20082012 thru of Andover, MN City 11-45000-01 Project # Replacement - Trailer, T-554 Project Name Priority TypeEquipment2 - Medium Useful LifeContact 10 YearsDPW / City Engineer Category EquipmentDepartmentPark & Rec - Operations Description Replace Unit #T-554 , a tandem axle trailer with GVW rating of 10,000 - 12,000 lbs. We just had it sand blasted and repainted top to bottom extending it useful life a few more years. Justification This is the main trailer for the Parks Department. It was the first and only trailer that was designed for hauling mowers and it has worked out great. We would like to purchase another one just like it. Expenditures20082009201020112012Total 9,0009,000 Equipment 9,0009,000 Total Funding Sources20082009201020112012Total 9,0009,000 Equipment Bond 9,0009,000 Total Operational Impact/Other More parks can only mean moving more equipment to them. 136 Capital Plan 20082012 thru of Andover, MN City 11-45000-02 Project # Replacement - One Ton Pick Up w/Plow, #599 Project Name Priority TypeEquipment2 - Medium Useful LifeContact 10 YearsDPW / City Engineer Category EquipmentDepartmentPark & Rec - Operations Description Replace Unit # 599, a 2000 F450 1-ton with 37,000 miles. These trucks are on the move all year and average about 6,000 miles per year. Justification This truck is used everyday; hauling material, equipment, people and also plowing snow in the winter. The plowing of snow puts a lot of wear and tear on the engine, transmission and other drive line components. Expenditures20082009201020112012Total 65,00065,000 Vehicles 65,00065,000 Total Funding Sources20082009201020112012Total 65,00065,000 Equipment Bond 65,00065,000 Total Operational Impact/Other Being that this is a front line unit, we need to know that we can count on it everyday. Cost to operate it have only gone up $.22 per mile last year put those costs will continue to rise in the coming years. With preventative maintenance, we might be able to extend its useful life. 137 Capital Plan 20082012 thru of Andover, MN City 11-45000-03 Project # Replacement - One ton truck w/ Plow #503 Project Name Priority TypeEquipment2 - Medium Useful LifeContact 10 YearsDPW / City Engineer Category EquipmentDepartmentPark & Rec - Operations Description Replace unit #503, a 2001 Ford F-450 dump truck with a 9' Fisher snow plow. This unit currently has 38,000 mile on it. Justification This unit will be 10 years old and should have approximently 64,000 miles on it. The maintenance cost will be monitored to determine when this vehicle should be replaced. Expenditures20082009201020112012Total 58,00058,000 Equipment 58,00058,000 Total Funding Sources20082009201020112012Total 58,00058,000 Equipment Bond 58,00058,000 Total Operational Impact/Other Less cost per mile to operate and less break downs 138 Capital Plan 20082012 thru of Andover, MN City 09-41500-01 Project # Replacement - Ford Taurus #15 Project Name Priority TypeEquipment2 - Medium Useful LifeContact 10 YearsComm. Dev. Director Category EquipmentDepartmentPlanning & Zoning Description Replace Unit #15, a 1995 Taurus with 68,000 miles. This unit averages 4,000 to 6,000 miles a year. Justification By 2009, this vehicle will have 74,000 miles on it. This vehicle could be used as an intern vehicle or for city employees attending seminars/training. Expenditures20082009201020112012Total 25,00025,000 Equipment 25,00025,000 Total Funding Sources20082009201020112012Total 25,00025,000 Equipment Bond 25,00025,000 Total Operational Impact/Other A new vehicle will decrease maintenance costs and improve productivity. This car could be kept and used for interns and possibly replace one of the old blazers that has 168,000 miles on it. The Central Equipment Department would like to recommend looking at an alternative fuel vehicle/hybrid. 139 Capital Plan 20082012 thru of Andover, MN City 09-48200-01 Project # New Jet/Vac Truck Project Name Priority TypeEquipment1 - High Useful LifeContact 15-20 YearsDPW / City Engineer Category EquipmentDepartmentSanitary Sewer Description The new vehicle is a combination jet/vac unit, Model 2115 Positive Displacement Unit (PD Unit) used for cleaning sanitary and storm sewers. This unit will carry up to 2000 gallons of water and 600 feet of jetting hose. Justification Approximately 13 miles or 15% of the sanitary sewer system is trunk mains with diameters of 12" - 36". These trunk mains are flowing near capacity in some areas at the present time. By removing the sedimentation in these pipes the flow line will drop giving more room for additional flows. In turn this could put on hold the addition of the designated lift station to by pass certain areas for a year or more. This type of unit can also clean flared end sections in back yards and sedimentation ponds within a reasonable distance. This would allow some areas to be cleaned without having to enter properties. Also with two trucks in operation more of the storm and sanitary sewer systems could be maintained to meet goals as set up in the NPDES program. At the present time most of the departments efforts are geared towards the storm sewer system because of the many failures and neglect that has taken place in the past. There are thirty six square miles of storm sewer systems and ninety miles of sanitary systems. The storm sewers are maintained from the spring of the year and ending in the fall. The sanitary system is then maintained during the winter months when conditions are less than favorable. Expenditures20082009201020112012Total Equipment 357,000357,000 357,000357,000 Total Funding Sources20082009201020112012Total 160,000160,000 Sanitary Sewer Fund 160,000160,000 Sewer Trunk Fund Storm Sewer Fund 37,00037,000 357,000357,000 Total Operational Impact/Other This truck will help save time with cleaning of the system. It will also allow the system to be cleaned under heavy flows which cannot be done with the machine currently being used. This type of VAC truck will allow the operators to clean more of the system without having to stop because the truck cannot handle the flows. It would save time by not having to plug mains and risk backups into basements because of some unforeseen difficulty. By having two jet vac trucks in operation at the same time, more of the storm and sanitary sewer systems could be maintained on an annual basis to meet goals as set by the department and NPDES program. 140 Capital Plan 20082012 thru of Andover, MN City 10-48200-03 Project # Replacement - 1-ton truck with plow equipment Project Name Priority TypeEquipment1 - High Useful LifeContact 10 YearsDPW / City Engineer Category EquipmentDepartmentSanitary Sewer Description Replace unit #90, 1997 Dodge W250 with snow removal equipment and 50,520 miles. Justification This truck will be monitored over the next couple of years to determine the appropriate time for replacement. It will be replaced with a one ton truck and modern snow removal equipment to make snow removal faster and more efficient. Expenditures20082009201020112012Total 65,00065,000 Equipment 65,00065,000 Total Funding Sources20082009201020112012Total 65,00065,000 Sanitary Sewer Fund 65,00065,000 Total Operational Impact/Other The new truck will have decreased maintenance issues and the modern snow equipment will make snow removal faster and more efficient. 141 Capital Plan 20082012 thru of Andover, MN City 08-48300-02 Project # New Track Backhoe Project Name Priority TypeEquipment2 - Medium Useful LifeContact 15-20 YearsDPW / City Engineer Category EquipmentDepartmentStorm Sewer Description New larger rubber track backhoe to be used to clean out ditches and storm ponds. Justification Current equipment is not large enough to reach out as far as needed for cleaning sediment from storm water ponds and ditches. In most cases, this type of machine is needed as it has a 360 degree swing for getting rid of the material removed. Expenditures20082009201020112012Total 70,00070,000 Equipment 70,00070,000 Total Funding Sources20082009201020112012Total 15,00015,000 Sanitary Sewer Fund 40,00040,000 Storm Sewer Fund 15,00015,000 Water Fund 70,00070,000 Total Operational Impact/Other This new machine will allow the department to clean areas that require a larger unit. The machine presently being used is to small and cannot get to some areas of the system. More of the system could be cleaned without hiring a contractor. This could also be used in other departments such as for water main repairs, sanitary sewer services, etc. 142 Capital Plan 20082012 thru of Andover, MN City 10-43100-01 Project # Replacement - Elgin Street Sweeper Project Name Priority TypeEquipment1 - High Useful LifeContact 10 YearsDPW / City Engineer Category EquipmentDepartmentStorm Sewer Description Replace Unit #169, a 2000 Elgin sweeper with approximately 3,400 hours. Justification The maintenance cost of this machine has risen $.58 per hour in the last year alone. Maintenance costs continue to rise and it will need to me monitored as to the timing of replacement. Expenditures20082009201020112012Total 150,000150,000 Vehicles 150,000150,000 Total Funding Sources20082009201020112012Total 150,000150,000 Storm Sewer Fund 150,000150,000 Total Operational Impact/Other We will need to monitor the costs closely over the next few years and make a decision at that time. This machine only runs about a month and a half a year. 143 Capital Plan 20082012 thru of Andover, MN City 08-43300-01 Project # Replacement - Sign Truck #410 Project Name Priority TypeEquipment1 - High Useful LifeContact 10 YearsDPW / City Engineer Category EquipmentDepartmentStreet Signs Description Replace Unit #410, a 1995 F350 sign truck chassis with an enclosed box and 81,000 miles. This unit spends a fair amount of time idling at the job site while the hydraulics are being used to install or remove sign posts. The current truck design is not very user friendly. We are looking at a new designed sign truck body out there. Justification A better designed vehicle would provide safer and improved production while transporting and installing/removing signs. Expenditures20082009201020112012Total 85,00085,000 Equipment 85,00085,000 Total Funding Sources20082009201020112012Total 85,00085,000 Equipment Bond 85,00085,000 Total Operational Impact/Other Better designed utility box will carry the sign posts, hardware, signs and keeping it all organized will save time and be more productive. 144 Capital Plan 20082012 thru of Andover, MN City 08-43100-09 Project # Replacement - Hot Asphalt Box Project Name Priority TypeEquipment1 - High Useful LifeContact 10 YearsDPW / City Engineer Category EquipmentDepartmentStreets / Highways Description Replace a 1998 hot asphalt box donated by the Andover Lions Club. The new unit will be mounted to a flat bed roll off attachment for the new hook truck that arrived in the fall of 2006. Justification The current hot asphalt box is starting to experience maintenance issues and is wasting a lot of asphalt material by not keeping it warm. Expenditures20082009201020112012Total 40,00040,000 Equipment 40,00040,000 Total Funding Sources20082009201020112012Total 40,00040,000 Equipment Bond 40,00040,000 Total Operational Impact/Other By attaching it to a flat bed roll off, it can be loaded and unloaded in a matter of minutes and be used year round. 145 Capital Plan 20082012 thru of Andover, MN City 08-43100-10 Project # Truck mounted attenuator(TMA) Project Name Priority TypeEquipment1 - High Useful LifeContact 10 YearsDPW / City Engineer Category EquipmentDepartmentStreets / Highways Description This is a truck mounted crash barrier with a message board that will help warn oncoming motorist and protect our workers when they are working on streets. Justification With more roads being added to the City transportation system annually, we need to be concerned about safety of everyone on them, both maintenance personnel and motorists. Safety rules for working on roads and keeping work crews safe are getting tighter every year. This is a big step in protecting not only the worker but the motorist too. It will also communicate to them what is going on that piece of road so that they might want to find a different route. Expenditures20082009201020112012Total 35,00035,000 Equipment 35,00035,000 Total Funding Sources20082009201020112012Total 25,00025,000 Equipment Bond 5,0005,000 Sanitary Sewer Fund 5,0005,000 Water Fund 35,00035,000 Total Operational Impact/Other The attenuator will be mounted to an existing truck and should help improve the safety of those on the roadway. 146 Capital Plan 20082012 thru of Andover, MN City 08-43100-11 Project # Extend Frame on #196 for Add'l Attachments Project Name Priority TypeEquipment1 - High Useful LifeContact 10 YearsDPW / City Engineer Category EquipmentDepartmentStreets / Highways Description Extend the frame on unit #196, a 1996 dump truck with 39,000 miles. By extending the current frame, installing a hydraulic hook, replacing the box with a new V- Box sander, and reconfiguring the front wing to a rear wing set up; this truck can be used year round sharing the attachments with the hook truck purchased in 2006. Justification Unit 196 has a 9 foot long box which is on the short side for carrying materials and has a front mounted wing. It is very difficult to load because the loader bucket is almost 9 1/2 feet wide. Performing snow plowing and salting operation makes this truck less desirable than any others in the fleet because of the front mounted wing. This truck will get used all year round with the various attachments. Expenditures20082009201020112012Total 75,00075,000 Vehicles 75,00075,000 Total Funding Sources20082009201020112012Total 75,00075,000 Equipment Bond 75,00075,000 Total Operational Impact/Other We would save ($83,000) on the cost of a new truck chassis and hydraulics because a lot of the hydraulics and plow will convert over. By converting the unit to a rear wing plow, we will save both time and money by only having to plow and scrape the streets one time rather than twice. We already have a flat bed and "A" frame from a previous order so we can use that on this truck in the summer for hauling equipment and debris. 147 Capital Plan 20082012 thru of Andover, MN City 09-43100-01 Project # Replacement - Water Tanker Project Name Priority TypeEquipment2 - Medium Useful LifeContact 15 YearsDPW / City Engineer Category EquipmentDepartmentStreets / Highways Description Replace Unit #163, a 1986 water tanker with 63,000 miles. Justification The old tanker was partially refurbished a few years ago because the floor and tank had rusted out. A new water truck would handle the job tasks better and more efficiently. A recently purchased water tanker with its cab over design and short turning radius has been a great asset to the public works staff. Expenditures20082009201020112012Total 100,000100,000 Vehicles 100,000100,000 Total Funding Sources20082009201020112012Total 100,000100,000 Equipment Bond 100,000100,000 Total Operational Impact/Other The design of the new water tanker make it very efficient to operate and pleasure to use. The front adjustable nozzle is particularly liked by the public works staff. 148 Capital Plan 20082012 thru of Andover, MN City 09-43100-02 Project # Asphalt Paving Machine Project Name Priority TypeEquipment1 - High Useful LifeContact 20 YearsDPW / City Engineer Category EquipmentDepartmentStreets / Highways Description Asphalt paving machine used for overlay and trails. The City currently does not own a paver which we have an increasing need for due to the deterioration of city streets. Justification Due to increasing repairs to city streets, the city has a need to own a paver. It could also be used for trails. Expenditures20082009201020112012Total 90,00090,000 Equipment 90,00090,000 Total Funding Sources20082009201020112012Total 90,00090,000 Equipment Bond 90,00090,000 Total Operational Impact/Other Not having to rent one, being able to use it when it fits in to our time schedule rather than having to see when one is available to rent. Share cost with another city is an option. 149 Capital Plan 20082012 thru of Andover, MN City 09-43100-04 Project # Replacement - Dump Truck w/ Snow Removal #197 Project Name Priority TypeEquipment1 - High Useful LifeContact 10 YearsDPW / City Engineer Category EquipmentDepartmentStreets / Highways Description Replace unit #197, a 1996 LT9000 tandem axle dump truck and snow removal equipment with 55,000 miles on it. Justification This is one of the remaining few units with a manual transmission in it. It's difficult and tiring to operate the snow removal equipment and change gears at the same time. Less operations in the cab will keep the driver alert for longer periods of time during those long snow removal days and nights. Expenditures20082009201020112012Total 200,000200,000 Equipment 200,000200,000 Total Funding Sources20082009201020112012Total 200,000200,000 Equipment Bond 200,000200,000 Total Operational Impact/Other Changing to an automatic transmission and newer snowplow controls will give us more attentive and less fatigued drivers after many hours of service. 150 Capital Plan 20082012 thru of Andover, MN City 12-43100-01 Project # Replacement - Dump Truck w/snow removal #198 Project Name Priority TypeEquipment1 - High Useful LifeContact 10 YearsDPW / City Engineer Category EquipmentDepartmentStreets / Highways Description Replace unit #198, a 2000 dump truck with front mounted snow removal equipment with almost 25,000 miles on it. We estimate that by 2012 this truck will have around 50,000 miles on it. Justification This truck will be 12 years old and will be getting close to the end of its life cycle. It will be re-evaluated each year to determine when to replace it. Expenditures20082009201020112012Total 150,000150,000 Equipment 150,000150,000 Total Funding Sources20082009201020112012Total 150,000150,000 Equipment Bond 150,000150,000 Total Operational Impact/Other Less cost per mile to operate and better use of snow plow equipment 151 Capital Plan 20082012 thru of Andover, MN City 12-43100-02 Project # Replacement - One ton truck w/ Plow #132 Project Name Priority TypeEquipment1 - High Useful LifeContact 10 YearsDPW / City Engineer Category EquipmentDepartmentStreets / Highways Description Replace unit #132, a 2001 Ford F-450 dump truck with a 9 foot Fisher snow plow. This unit plows cal-de-sacs and hauls around equipment and materials through out the year. Justification This truck will be 11 years old by then and will have 120,000 miles on it. Currently it has 62,000 miles on it and cost per mile to operate will most likely be on the rise. It will be re-evaluated each year to determine when to replace it. Expenditures20082009201020112012Total 58,00058,000 Equipment 58,00058,000 Total Funding Sources20082009201020112012Total 58,00058,000 Equipment Bond 58,00058,000 Total Operational Impact/Other Less cost per mile to operate but it might work out as a good summer time vehicle. Operating Budget Impact20082009201020112012Total 58,00058,000 Maintenance 58,00058,000 Total 152 Capital Plan 20082012 thru of Andover, MN City 11-48100-02 Project # Replacement - 1-ton pick up truck #105 Project Name Priority TypeEquipment1 - High Useful LifeContact 10 YearsDPW / City Engineer Category EquipmentDepartmentWater Description Replace unit #105, a 1994 Ford F-250 pick up truck with snow removal equipment and 100,725 miles. Justification By 2011, this truck will be 17 years old with over 115,000 miles on it and at the end of its useful life. This truck will be replaced with a 1-ton truck with modern snow removal equipment. Expenditures20082009201020112012Total 65,00065,000 Equipment 65,00065,000 Total Funding Sources20082009201020112012Total 65,00065,000 Water Fund 65,00065,000 Total Operational Impact/Other A new truck wil have lower maintenance cost and better snow removal equipment. Both items will save time and money. Operating Budget Impact20082009201020112012Total 65,00065,000 Maintenance 65,00065,000 Total 153 This page left blank intentionally. 154 CITY OF ANDOVER Road & Bridge Funds - Rollup Projected Fund Balance 200720082009201020112012TOTALS Projected Sources of Revenue Est. Annual MSA Construction Allocation$ 150,000$ 756,064$ 756,064$ 756,064$ 756,064$ 756,064$ 3,930,320 2001 State Aid Road Bond Pymt - Principal (150,000) (155,000) (160,000) (170,000) (175,000) (185,000) (995,000) Available MSA Construction for Other Commitments 601,064 596,064 586,064 581,064 571,064 2,935,320 - Est. Annual Maintenance Allocation 324,028 324,028 324,028 324,028 324,028 324,028 1,944,168 2001 State Aid Road Bond Pymt - Interest (91,298) (85,120) (78,583) (71,568) (64,063) (56,050) (446,682) General Fund Commitment (174,386) (179,618) (185,006) (190,556) (196,273) (202,161) (1,128,000) Available MSA Maintenance for Other Commitments 58,344 59,290 60,439 61,904 63,692 65,817 369,486 Total MSA Available for other Commitments 58,344 660,354 656,503 647,968 644,756 636,881 718,698 Federal Funds 488,000 488,000 - - - - - Assessments* 873,092 242,889 306,182 446,959 427,709 472,927 2,769,758 Tax Levy 1,101,754 1,157,606 1,182,288 1,224,056 1,267,695 1,313,293 7,246,692 Total Revenues Available 2,521,190 2,060,849 2,144,973 2,318,983 2,340,160 2,423,101 11,223,148 Projected Commitments MSA - New & Reconstruct Routes 1,338,600 429,000 751,000 674,000 719,0003,911,600 - MSA - Intersection Upgrades175,000 200,000 275,000 650,000 - - - MSA - Rail Road Quiet Zones 150,000 160,000 310,000 - - - - R & B - Pavement Markings 15,000 20,000 21,000 22,000 23,000 24,000 125,000 R & B - Curb Replacement 40,000 41,000 42,000 43,000 44,000 45,000 255,000 R & B - Rail Road Quiet Zones 170,000 170,000 - - - - - R & B - New & Reconstruct Routes 146,300 146,300 - - - - - R & B - Intersection Upgrades 25,000 25,000 - - - - - R & B - Seal Coating 245,667 286,865 300,619 606,140 597,559 578,999 2,615,849 R & B - Crack Sealing 80,726 148,924 167,966 192,079 178,754 143,423 911,872 R & B - Overlays 957,970 971,557 795,730 1,036,837 1,036,837 1,172,709 5,971,640 Pedestrian Trail Maintenance 48,000 52,000 53,000 54,000 55,000 56,000 318,000 Total Commitments 3,197,263 2,075,346 1,809,315 2,705,0562,884,150 2,739,131 15,410,261 Revenues Over (Under) Expenditures (676,073) (14,497) 335,658 (386,073) (543,990)(316,030)$(4,187,113) Fund Balance as of December 31, 20063,052,193 Fund Balance Brought Forward 2,376,120 2,361,624 2,697,282 2,311,208 1,767,218 Ending Fund Balance$2,376,120$2,361,624$ 2,697,282$ 2,311,208$ 1,767,218$ 1,451,188 * Assuming collected in same year 155 CITY OF ANDOVER Park Improvement Fund Projected Fund Balance 200720082009201020112012TOTALS Projected Sources of Revenue Park Dedication Fee $2,515 per unit platted units 50 50 50 50 50 50 Anticipated Park Dedication Fee$ 125,750$ 125,750$ 125,750$ 125,750$ 125,750$ 125,750$ 754,500 Commercial / Residential - Andover Station N 80,390 78,733 78,733 100,000 47,461 - 385,317 DNR Grant 62,500 - - 62,500 - - - Capital Projects Levy - Park Improvements 56,000 57,680 57,680 57,680 57,680 57,680 344,400 Total Revenues Available 324,640 262,163 262,163 283,430 230,891 183,430 1,546,717 Projected Commitments Annual Miscellaneous Projects 25,000 25,000 25,000 25,000 25,000 25,000 150,000 Debt Service Payments DS - Ballfields (Final 2015) 129,659 129,659 129,659 129,659 129,659 648,295 - A DS - Site Improvements 157,742 157,742 Andover Station North - Bldg - City 73,000 73,000 Andover Station North - Bldg - ABA 105,000 105,000 Andover Station North - Lighting 283,000 283,000 Andover Station North - Bleachers 22,261 22,261 Andover Station North - Playground 65,000 35,000 100,000 Strootman Park 40,000 40,000 Terrace Park 55,000 55,000 Crooked Lake Boat Landing 125,000 125,000 Skate Board Park 100,000 100,000 Woodland Crossing Park 45,000 45,000 Sophies South Park 75,000 75,000 Prairie Knoll Park 150,000 150,000 Hawkridge Park 520,000 520,000 Andover Lions Park 35,000 50,000 85,000 Total Commitments 951,003 334,659 414,659 674,659 154,659 204,659 2,734,298 Revenues Over (Under) Expenditures (626,363) (72,496) (152,496) (391,229) 76,232 (21,229) Fund Balance as of December 31, 2006 822,240 Fund Balance Brought Forward 195,877 123,381 (29,115) (420,344) (344,112) Ending Fund Balance *$ 195,877$ 123,381$ (29,115)$ (420,344)$ (344,112)$ (365,341) *Target - 10% of current years commitments to create a contingency for any project overages. Debt service payments are assessments for the construction of ballfields at Andover Station North. Payments are based on 5.5% interest for 8 years. A The Assessment for Andover St N Site Improvements was paid off immediately since that area has paid over $160k in park fees thus saving over $40k in interest… 156 CITY OF ANDOVER Trail Fund Projected Fund Balance 200720082009201020112012TOTALS Projected Sources of Revenue Trail Fee $612 per unit platted units 50 50 50 50 50 50 Trail Fee$ 30,600$ 30,600$ 30,600$ 183,600 $ 3 0,600$ 3 0,600$ 3 0,600 - - - - - - - Total Revenues Available 30,600 30,600 30,600 183,600 3 0,600 3 0,600 3 0,600 Projected Commitments North side of Crosstown Blvd - Nightingale St to Hanson Blvd 110,000 1 10,000 Woodland Crossing Trail - City Share 1 1,684 1 1,684 - - - Total Commitments 121,684$ 121,684 - - - - - Revenues Over (Under) Expenditures (91,084) 30,600 30,600 30,600 3 0,600 3 0,600 Fund Balance as of December 31, 2006 1 54,406 Fund Balance Brought Forward 93,922 124,522 155,122 6 3,322 6 3,322 Ending Fund Balance *$ 124,522$ 155,122$ 185,722 $ 6 3,322$ 9 3,922$ 9 3,922 *Target - 10% of current years commitments to create a contingency for any project overages. ** It is anticipated that all projects will not be fully expended by the end of the year, and future projects will be contingent on additional revenues. 157 CITY OF ANDOVER Water System Financial Projections ActualEstimateForcast Year20052006200720082009201020112012 Inflation Factor3.00%3.00%3.00%3.00%3.00%3.00%3.00%3.00% Ave. Use (gal per user per qtr)37,859 38,935 41,000 41,000 41,000 41,000 41,000 41,000 Acres Added 50 50 35 35 35 35 35 35 New Connections 150 100 50 50 50 50 50 New Customers 150 100 100 100 50 50 50 Residential Accounts 5,541 5,723 Commercial/Institutional Accts 116 131 Total Accounts 5,657 5,854 5,954 6,054 6,154 6,204 6,254 6,304 Rates Base Rate 8.87 9.14 9.78 10.27 10.78 11.32 11.89 12.48 Use Rate 1.31 1.35 1.44 1.55 1.65 1.77 1.89 2.03 Connection Charge 2,503 2,704 2,920 3,154 3,406 3,678 3,973 4,290 Area Charge 2,294 2,477 2,675 2,889 3,120 3,370 3,639 3,930 Connection/Area8.0%8.0%8%8%8%8%8%8% Base Rate5.0%3.0%5%5%5%5%5%5% Use Rate7%7%7%7%7%7% Operations Revenues Use+Base 1,581,838 1,719,086 1,740,000 1,783,247 1,934,536 2,081,4202,239,405 2,409,325 Meters 46,316 22,563 25,000 25,000 25,000 25,000 25,00025,000 Permit Fees11,350 3,100 5,000 5,000 5,000 5,000 5,000 5,000 Penalties 21,638 30,129 20,000 20,000 20,000 20,000 20,000 20,000 Interest 14,174 25,152 18,000 15,000 15,000 15,000 15,000 15,000 Xfer In 57,671 163,469 145,289 148,912 152,825 157,051 - 167,424 Other 5,692 4,258 11,000 4,000 4,000 4,000 4,000 4,000 Bond Proceeds - - - - - - - - Total 1,681,008 1,971,712 1,876,671 2,015,716 2,148,825 2,299,332 2,461,230 2,635,376 Expenses Operations 1,035,752 1,162,950 1,162,815 1,221,222 1,257,859 1,295,594 1,334,462 1,374,496 Debt Service 754,392 746,721 745,663 748,228 749,439 1,098,019 1,101,305 1,103,238 Capital Outlay 66,196 33,487 60,000 93,000 50,000 50,000 120,00080,500 Replacement Reserve - - - - - - - - Total 1,856,340 1,943,158 1,968,478 2,062,450 2,057,298 2,443,613 2,555,767 2,558,234 Cash Balance Net Increase (Decrease) (175,332) 28,554 (91,807) (46,734) 91,528 (144,281) (94,538) 77,142 Balance 1,046,900 1,075,454 983,647 936,913 1,028,441 884,160 789,622 866,764 158 CITY OF ANDOVER Water System Financial Projections Estimate ActualForcast Year20052006200720082009201020112012 Infrastructure / Trunk Revenues Connection Charges961,261 302,053 157,680292,000 170,294 183,918 198,631 214,522 Area Charges 101,115 109,204 117,941 127,376 137,566 - - 93,625 Interest 79,891 109,258 75,000 50,000 25,000 25,000 25,000 25,000 Special Assessment 130,910 44,596 50,000 50,000 50,000 - - - Replacement Reserve - - - - - - - - Other 2,210 - Total 1,174,272 455,907 510,625 358,795 354,499 326,858 351,007 377,088 Expenses Debt Service - - - - - - - - Capital Outlay 976,847 49,137 299,100 616,500 124,000 727,400 150,000 331,000 Xfer Out 57,671 163,469 145,289 148,912 152,825 157,051 - 167,424 Total 976,847 216,561 356,771 779,969 269,289 876,312 302,825 488,051 Fund Balance Balance Brought Forward 2,093,346 2,290,771 2,530,117 2,683,9712,262,797 2,348,007 1,798,553 1,846,735 Annual Surplus/Deficit 197,425 239,346 153,854 (421,174) 85,210(549,454)48,182 (110,963) Balance 2,290,771 2,530,117 2,683,971 2,262,797 2,348,007 1,798,553 1,846,735 1,735,772 FB Designations Replacement Reserve 1,147,000 1,147,000 1,147,000 1,147,000 1,147,000 1,147,000 1,147,000 1,147,000 Working Cash Flow 1,143,771 1,383,117 1,536,971 1,115,797 1,201,007 651,553 699,735 588,772 2,290,771 2,530,117 2,683,971 2,262,797 2,348,007 1,798,553 1,846,735 1,735,772 Capital Projects Wells Rehab Wells 45,000 45,000 50,000 50,000 55,000 60,000 Sealing of Well #1 10,000 Construct Test Wells #10 & 11 88,000 Cunstruct Well # 10 181,000 Trunk New Development Projects 175,500 120,500 124,000 150,000 150,000 150,000 MSA Routes - New / Reconstruct 123,600 Water Main along South Coon Creek 409,400 Plant Land Purchase 50,000 Paint water tower 358,000 Construct Clear Well @ WTP 2,665,900 Surface Seal Brick Structures 18,000 20,500 Demo tower 168,000 WTP reclaim tank addition 785,000 Construct WTP #2 Equipment New Track Backhoe 15,000 Phone System10,000 Truck-mounted Attenuator 5,000 1ton Truck w/ snow eq 65,000 GPS 5,000 Total709,500 3,624,900 777,400 270,000 411,500 - - 359,100 Funded by Operations 60,000 93,000 50,000 50,000 120,000 80,500 - 105,000 Funded by Infrastructure/Trunk 299,100 616,500 124,000 727,400 150,000 331,000 - 170,250 Funded by debt - - - - 3,450,900 - - - Total 359,100 709,500 3,624,900 777,400 270,000 411,500 - 275,250 Debt Rate5.00%5.00%5.00%5.50%5.50%5.50%5.50%5.50% Term 10 10 10 10 15 15 15 15 AADS - - - - 343,798 - - - Cumulative DS 343,798 343,798 - - - - - 343,798 Current DS WTP 741,393 746,720 745,663 748,228 749,439 754,221 757,507 759,440 17.5% of Connection / Area Charges is used to support the WTP 159 CITY OF ANDOVER Sewer System Financial Projections Estimate ActualForcast Year20052006200720082009201020112012 Inflation Factor - expenses3.00%3.00%3.00%3.00%3.00%3.00%3.00%3.00% Acres Added 50 50 35 35 35 35 35 35 New Connections 100 50 50 50 50 50 New Customers 100 100 100 50 50 50 Residential Accounts 6,435 6,619 Commercial SACs 1,215 1,246 Total Services 7,650 7,865 7,965 8,065 8,165 8,215 8,265 8,315 Rates Base Rate 49.75 51.74 53.81 55.96 57.64 59.37 61.15 62.98 Connection Charge 361 372 387 402 418 435 452 470 Area Charge 1,340 1,379 1,434 1,491 1,551 1,613 1,678 1,745 Connection/Area2.8%3%4%4%4%4%4%4% Base Rate4%4%4%4%3%3%3%3% Operations Revenues Base Use 1,469,656 1,607,561 1,725,320 1,805,270 1,882,522 1,950,898 2,021,619 2,094,715 Penalties 19,646 27,362 15,000 15,000 15,000 15,000 15,000 15,000 Interest 33,192 51,555 45,000 45,000 45,000 45,00045,000 45,000 Other 7,624 2,950 5,000 5,000 5,000 5,000 5,0005,000 Total1,530,118 1,689,428 1,790,320 1,870,270 1,947,522 2,015,898 2,086,619 2,159,715 Expenses Operations 1,143,982 1,152,359 1,306,258 1,433,099 1,476,092 1,520,375 1,565,986 1,612,966 Debt Service 7,000 - - - - - - - Capital Outlay 61,173 - 5,000 30,000 160,000 865,000 - - Replacement Reserve - 300,000 350,000 350,000 400,000 400,000 450,000 500,000 Total 1,212,155 1,452,359 1,661,258 1,813,099 2,036,092 2,785,375 2,015,986 2,112,966 Cash Balance Annual Surplus/Deficit 317,963 237,069 129,062 57,171 (88,570) (769,477) 70,633 46,749 Balance 1,189,624 1,426,693 1,555,755 1,612,926 1,524,356 754,879 825,512 872,262 Infrastructure/Trunk Revenues Connection Charges 350,165 70,080 38,700 20,100 20,900 21,750 22,600 23,500 Area Charges - - 50,190 52,18554,285 56,455 58,730 61,075 60,000 Interest 37,532 72,424 60,000 60,000 60,00060,00060,000 Replacement Reserve - 300,000 350,000 350,000 400,000 400,000 450,000 500,000 Special Assessments 94,484 42,687 30,000 40,000 40,000 290,000 1,040,000 40,000 Other 48,122 - Total 530,303 485,191 528,890 522,285 575,185 828,205 1,631,330 684,575 Expenses Debt Service - 14,626 - - - 192,368 358,203 358,203 Capital Outlay 455,017 - 207,000 170,500 524,000 800,000 150,000 150,000 Total 455,017 14,626 207,000 170,500 524,000 992,368 508,203 508,203 Fund Balance Balance Brought Forward 984,126 1,059,412 1,529,977 1,851,867 2,203,652 2,254,837 2,090,674 3,213,801 Annual Surplus (Deficit) 75,286 470,565 321,890 351,785 51,185 (164,163) 1,123,127 176,372 Balance 1,059,412 1,529,977 1,851,867 2,203,652 2,254,837 2,090,674 3,213,801 3,390,173 FB Designations Replacement Reserve- - 350,000 700,000 1,000,000 1,000,000 1,400,000 1,800,000 Working Cash Flow 1,059,4121,529,9771,501,867 1,503,652 1,254,837 1,090,674 1,813,801 1,590,173 1,059,412 1,529,977 1,851,867 2,203,652 2,254,837 2,090,674 3,213,801 3,390,173 Capital Projects Infrastructure New Development Projects 175,500 120,500 124,000 150,000 150,000 150,000 Land Purchase 50,000 Crosstown Blvd Trunk 400,000 Yellow Pine Lift Station 650,000 Lift Station #1 Upgrage 25,000 MSA Routes - New / Reconstruct 6,500 Rural Reserve Sanitary Trunk 2,250,000 1,250,000 Equipment 5,000 30,000 160,000 65,000 Total - - 212,000 200,500 684,000 3,115,000 1,400,000 150,000 Funded by Operations - 5,000 5,000 30,000 160,000 865,000 - - Funded by Infrastructure/Trunk - 523,900 207,000 170,500 524,000 800,000 150,000 150,000 Funded by debt - - - - - 1,450,000 1,250,000 - - 528,900 212,000 200,500 684,000 3,115,000 1,400,000 150,000 Debt Interest Rate5.00%5.00%5.00%5.50%5.50%5.50%5.50%5.50% Term1010101010101010 DS Annualized - - - - - 192,368 165,835- Total Annual Debt Service- - - - - 192,368 358,203 358,203 Total Annual Debt Service - - - - - 192,368 192,368 192,368 - - - - 165,835 165,835 160