Loading...
HomeMy WebLinkAbout2006 CIP2006 — 2010 Capital Improvement Phan 1 685 Crosstown F)Ivd NW, Andover, MN 55304 Phone: 765.755.5100 rax. 765-755.8925 www.cf.andover.mn.us This page left blank intentionally. CITY OF ANDOVER 2006 — 2010 Capital Improvements Plan Table of Contents Introduction 2006 — 2010 Capital Improvement Plan Message ........................................................ ............................... 1 CIP Project Development & Process Authorization Schedule ..................................... ............................... 4 Graph — 2006 Expenditures By Department ................................................................. ............................... 7 Graph— CIP Expenditures By Year .............................................................................. ............................... 7 Five Year Summary of Expenditures By Department .................................................. ............................... 8 Five Year Summary of Revenue By Source ................................................................. ............................... 9 Five Year Summary of Projects By Department & Revenue Source ........................... ............................... 10 Improvements Five Year Summary of Expenditures By Department — Improvements ....................... ............................... 15 Five Year Summary of Revenue By Source — Improvements ...................................... ............................... 16 Five Year Summary of Projects By Department & Revenue Source — Improvements ............................... 17 Improvement Projects By Department Engineering............................................................................................................ ............................... 20 FacilityManagement .............................................................................................. ............................... 22 Parks& Recreation — Operations ........................................................................... ............................... 32 Parks& Recreation — Projects ................................................................................ ............................... 33 SanitarySewer ....................................................................................................... ............................... 54 Streets/ Highways ................................................................................................. ............................... 58 Water...................................................................................................................... ............................... 99 Equipment Year Summary of Expenditures By Department — Equipment ..................................... ............................... 113 Five Year Summary of Revenue By Source — Equipment ........................................... ............................... 114 Five Year Summary of Projects By Department & Revenue Source — Equipment ...... ............................... 115 Equipment By Department Building.................................................................................................................. ............................... 118 CentralEquipment ................................................................................................. ............................... 119 Engineering............................................................................................................ ............................... 121 FacilityManagement .............................................................................................. ............................... 124 FireDepartment ..................................................................................................... ............................... 126 Parks& Recreation — Operations ........................................................................... ............................... 136 Planning& Zoning ................................................................................................. ............................... 141 StormSewer ........................................................................................................... ............................... 142 StreetSigns ............................................................................................................ ............................... 143 Streets/ Highways ................................................................................................. ............................... 144 Water...................................................................................................................... ............................... 150 Appendix Road & Bridge Fund Projected Fund Balance ............................................................. ............................... 151 Park Improvement Fund Projected Fund Balance ........................................................ ............................... 152 Trail Fund Projected Fund Balance .............................................................................. ............................... 153 Water System Financial Projections ............................................................................. ............................... 154 Sewer System Financial Projections ............................................................................. ............................... 155 This page left blank intentionally. 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755 -5100 FAX (763) 755 -8923 • WWW.CI.ANDOVER.MN.US TO: Mayor and Council Members FROM: Jim Dickinson, City Administrator / Finance Director SUBJECT: 2006 - 2010 Capital Improvement Plan DATE: December 6, 2005 INTRODUCTION On behalf of the City's Management Team, I am pleased to present the City of Andover's Capital Improvement Plan for years 2006 through 2010. The City's management team and their respective staff worked diligently to produce a document that was both practical, substantive in addressing needed capital improvements and insightful regarding the underlying factors associated with the City's rapidly changing suburban landscape. CAPITAL IMPROVEMENT PLAN GOALS ACKNOWLEDGE AND COMMUNICATE PUBLIC INFRASTRUCTURE PRIORITIES AND DYNAMICS ENSURE APPROPRIATE RESPONSES TO CHANGING INFRASTRUCTURE NEEDS AND DEMANDS DEVELOP A FINANCIAL ASSESSMENT OF CAPITAL RESOURCES AVAILABLE TO MEET FUTURE CAPITAL PROJECT PLANNING NEEDS INSTITUTE A STRATEGIC VISION PREDICATED ON MAINTAINING A HIGH QUALITY SERVICE INFRASTRUCTURE CAPABLE OF MEETING THE NEEDS OF OUR CITIZENS FOR TODAY AND TOMORROW The purpose of the City's Capital Improvement Plan (CIP) is to identify, prioritize and address community needs through careful long -term capital planning and balanced public investment in supporting physical infrastructure. To ensure that this commitment is both meaningful and achievable, appropriate capital improvement factors were given significant consideration in developing a CIP that addresses community priorities over the next five (5) years. The CIP will also provide a planning foundation for future needs assessments to ensure the City is appropriately responding to the critical infrastructure needs necessary for sustainable future growth. The CIP represents a beginning in terms of producing a comprehensive planning response to address changing capital needs by developing a project schedule that will lead to timely and cost - effective project completions. nTQCT NIU(IN The 2006 - 2010 CIP has been prepared as a strategic planning tool to assist the City Council in identifying proposed capital improvement projects over the next five years. With the inclusion of preliminary financing sources, appropriate background information citing needs and projected cost estimates, this document will provide Council with the needed information to begin the process for planning improvements that meet the City's physical infrastructure needs. Consequently, the CIP serves as a flexible guide plan to properly identify the critical components of the City's infrastructure, yet maintain flexibility in determining project timeframes, project scope and possible funding sources. The 2006 - 2010 CIP continues the emphasis of judiciously managing the City's limited resources by prudently planning for known and /or anticipated future capital expenditures. A critical step in the plan adoption process is the collaborative nature of plan review that involves the leadership of the City Council, the input of appointed Commissions and staff, and most importantly, affected residents of the community. Consequently, the strategic value of this plan lies in the acknowledgement of future needs by the governing body and the effective communication of those needs to the general public during project development stages. Likewise, the availability and preliminary designation of fiscal resources to serve both current and future needs is critical to the achievement of plan outcomes that meet with Council approval. Following the approval of the plan, feasibility studies are performed, affected constituencies are notified to formally disseminate and receive public feedback on proposed project plans. This process culminates with the City Council considering all relevant information and making a final decision on whether to proceed with the proposed capital improvement. The public process that supports the advancement of these projects from inception to completion is engendered in the CIP project development and authorization schedule. Formalizing the steps in the CIP project advancement process serves a number of purposes and ensures that the Council and public are kept well informed regarding project purposes and desired outcomes, estimated project costs, funding sources, progress and final status. It should be emphasized that projects will require approval in various stages of project development by the City Council in accordance with approved policies. The objectives of the 2006 - 2010 Capital Improvement Plan are to present a comprehensive capital improvement program that communicates efforts: ➢ to ensure that community priorities are reflected in the capital investment plans of each City department; ➢ to provide a consolidated financial picture of anticipated expenditures and outline recommended funding strategies to underwrite anticipated capital improvements; ➢ to document and communicate capital improvement processes for City projects that will ensure consistency, a full appreciation of both the costs and benefits of proposed capital investments, and raises the level of public understanding regarding the City's public improvement processes; ➢ to provide information on the fiscal impacts of capital investment plans on total City finances; and ➢ to effectively plan for public improvements that support community needs in the areas of private development infrastructure, transportation, public safety, parks and recreation, utilities, and commercial /industrial growth through fiscally responsible economic development initiatives. Accordingly, this document attempts to recognize known or perceived capital improvement needs, but as with any plan recognizes that social, economic and political considerations will by necessity determine K final project outcomes. The major categories of expenditures that are identified within the CIP include, but are not limited to: 1. New Public Facilities Planning 2. Street Construction, Maintenance and Reconstruction 3. Utility Construction, Maintenance and Reconstruction 4. Construction, Maintenance and Upgrade of Parks, Playgrounds and Trails 5. Capital Improvements to Existing Facilities 6. Private development infrastructure 7. Capital equipment and vehicle planning needs (Equipment purchases to be determined through normal budgetary process) The City Council, consequently, accepts this document with the provision that capital improvement planning is subject to the dynamics of community growth, political leadership and acknowledges that other unanticipated needs may take precedence over planned projects. RECOMMENDATION The 2006 - 2010 Capital Improvement Plan is the product of collaborative planning efforts by City staff, the Park and Recreation Commission and the City Council. Projects have been introduced based on 1) anticipated future growth trends articulated in the City's 2020 Comprehensive Plan, 2) the natural cycle of deterioration and decay evident in all physically constructed and engineered improvements in the more established areas of the community and 3) capital deficiencies or infrastructure issues brought to the City's attention through a variety of sources. Capital expenditures identified within the CIP are the best estimates available, and once the CIP is adopted, will be reviewed and confirmed through individual feasibility reports where appropriate. I am appreciative of the commitment, good judgment and expertise that each department has contributed to the capital improvement planning process. Respectfully submitted, Jim Dickinson City Administrator / Finance Director 3 CIP PROJECT DEVELOPMENT AND PROCESS AUTHORIZATION SCHEDULE The following process is a Council /staff guideline for authorizing public improvement projects. As this process is controlled by State Statute and other influencing environmental factors, it is subject to change and should be viewed as a guide to assist the Council and public in understanding the public improvement process used by City staff. A separate Council meeting would facilitate each step in the process, and accomplishment of respective activities. As a result, the process time frame is a significant factor affecting City staff's ability to properly manage and complete approved Council ordered projects within budget and on time. 1. Council Approval of Annual CIP Projects by City Resolution will authorize the following outcomes: a) Staff and /or Consultant preparation of project feasibility studies b) Staff preparation of detailed financial review of project funding sources c) Neighborhood Meeting may be held prior to Feasibility Study subject to need and type of project. TIME FRAME: October - November of each preceding year. 2. Presentation of Feasibility Study a) Feasibility Study Components: 1) Review of Project Engineering and Construction Estimates 2) Total Project Costs (All related project costs, i.e. land, soft costs) 3) Project Financial Plan /Fiscal Implications (Engineering /Finance) 4) Authorization to develop a Preliminary Assessment Roll, if any, for the Public Hearing. (Engineering) • If Council accepts Feasibility Study, A Resolution "Accepting Feasibility Study and Setting Date for Public Hearing on the Project" when appropriate (Engineering Department) would initiate the following: 1) Notices mailed to affected Residents per statute requirements no less than 10 days before Public Hearing. (Engineering) 2) Public Hearing Notice is published. Two publications one week apart, with the second publication no less than three days before the hearing. (Engineering /City Clerk) TIME FRAME: February- March - April -May of current year. 3. Neighborhood Meeting — City staff will hold neighborhood project meetings, when appropriate, to review and present Project Feasibility Studies, answer questions and meet with affected property owners. These meetings will include a question and answer component designed specifically to bring awareness to the property owner, obtain citizen input and produce an understanding of the purposes behind the City's attempts to construct public improvements in the affected area. 4 TIME FRAME: Following the presentation of the Feasibility Study to Council, but prior to the holding of a Public Hearing by Council. 4. Council holds a Public Hearing when appropriate for following purposes: a) Presentation of Project (Engineering Department) b) Presentation of Preliminary Special Assessment Rolls and Financing Implications (Engineering /Finance Department) c) Council to hear Affected Resident Input d) Council determines whether to "order" the public improvement • A Council Resolution is drafted "Ordering the Project and Authorizing Preparation of Plans and Specifications" (Engineering Department). Council may ORDER THE IMPROVEMENT after the public hearing is closed or at a subsequent Council Meeting within 6 months of the public hearing date. (Statutory Requirement - Council Resolution ordering project must be approved on 415 Council vote if it is Council initiated project with assessments). • If Council decides to reject the project as presented, a Council vote should be taken to officially determine the final status of the project. TIME FRAME: April- May -June of current year 5. Plans and Specifications are presented to Council for approval. (Engineering Department) a) A Council Resolution is drafted authorizing the following: 1) Accepting and Approving Project Plans and Specifications 2) Authorizing the Advertisement for Project Bids. Bids are developed and invitation to Bid is processed. Bid opening date is no less than 3 weeks after publication. (Engineering) 3) Authorize staff to pursue an appropriate funding mechanism to underwrite project costs TIME FRAME: May -June of each year 6. Council Acceptance of Project Bids and Awarding of Contracts would authorize the following outcomes: a) A Council Resolution is drafted "Accepting Project Bids and Awarding Contracts" (Engineering) b) Initiation of Project Construction and work (Engineering) TIME FRAME: April- May- June -July of current year. 7. Project Completion a) Council Acceptance of Project b) Final Presentation and Review of Project Costs versus Project Budget by Finance Department. 5 c) If Special Assessments are financing a portion of the Project, A Council Resolution "Setting the Special Assessment Hearing for Project #" is adopted at this same meeting. (Engineering /Finance) TIME FRAME: Upon completion of project. 8. If Special Assessments would finance a portion of the projects costs, Council Holds a Special Assessment Hearing to review the following: a) Affected Property owners would be officially notified per statute no less than two weeks prior to Special Assessment Hearing. (Clerk/Engineering) b) Public Notice is published no less than two weeks prior to Special Hearing per statute (Clerk/Engineering) c) Staff prepares a proposed roll and Council Approves Final Assessment Roll (Engineering /Finance) d) Council consideration of Assessment Appeals and Requested Deferrals filed prior to hearing or during the hearing. e) Meets M.S. Chapter 429 statutory requirements • A Council Resolution is drafted "Adopting Final Special Assessment Roll" (Engineering), and is adopted at this meeting. TIME FRAME: October/November of current year depending on finalization of project and status of completion. Cei CITY OF ANDOVER 2006 CIP Expenditures By Department Water 1.67% Fire Sewer Central Equip 6.22% Parks & Rec -Prof. 0.11% 0.62% 13.66% Engineering 7.51% Parks & Rec -Oper. 2.67% Storm Sewer - 2.64% Facility Mgmt. - -_ Streets /Highways 2.09% 62.82% CITY OF ANDOVER 2006 CIP Expenditures By Year 2010 $3,127,906 2009 $6,978,820 2008 $8,080,366 2007 $4,667,002 2006 $5,690,013 2005 Adopted $11,141,374 $- $370007000 $670007000 $970007000 $1270007000 7 Capital Plan City of Andover, MN DEPARTMENT SUMMARY 2006 tnru 2010 Department 2006 2007 2008 2009 2010 Total Building 22,000 22,000 Central Equipment 6,000 30,000 36,000 Engineering 427,500 399,000 290,000 349,000 351,000 1,816,500 Facility Management 119,000 460,000 571,717 8,000 1,158,717 Fire 35,000 128,000 325,000 400,000 890,000 1,778,000 Park & Rec - Operations 152,000 60,000 40,000 40,000 40,000 332,000 Park & Rec - Projects 777,386 965,080 150,000 260,000 525,000 2,677,466 Planning & Zoning 20,000 20,000 Sanitary Sewer 353,650 600,000 953,650 Storm Sewer 150,000 150,000 Street Signs 75,000 75,000 Streets / Highways 3,574,477 2,059,922 3,108,649 4,277,820 1,263,906 14,284,774 Water 95,000 478,000 2,995,000 1,622,000 50,000 5,240,000 Total 5,690,013 4,667,002 8,080$66 6,978,820 3,127,906 28,544,107 Capital Plan City of Andover, MN SOURCES OF REVENUE SUMMARY 2006 tnru 2010 Source 2006 2007 2008 2009 2010 Total Assessments 544,704 389,014 362,235 1,126,102 112,362 2,534,417 Building Fund 515,217 515,217 Capital Equipment Reserve 20,000 242,000 262,000 Capital Projects Levy 169,000 22,000 191,000 Central Equipment Fund 6,000 30,000 36,000 Construction Seal Coat Fund 34,726 23,075 109,463 79,140 4,791 251,195 DNR Grant 20,000 20,000 Drainage & Mapping Fund 5,000 5,000 Equipment Bond 497,000 815,000 365,000 451,000 890,000 3,018,000 Federal Funds 270,000 825,000 1,095,000 G.O. Bond 642,386 450,000 1,092,386 General Fund 50,000 57,000 40,000 48,000 195,000 Municipal State Aid Funds 1,514,400 1,234,150 1,574,500 4,323,050 Other Municipality 10,000 10,000 Park Improvement Funds 140,000 945,080 150,000 260,000 525,000 2,020,080 R & B - Crack Seal & Seal Coat 324,897 384,795 616,331 508,452 425,977 2,260,452 R & B - Overlays 571,750 638,038 630,470 814,626 627,776 3,282,660 R & B - Pedestrian Trail 47,000 48,000 49,000 50,000 51,000 245,000 R & B - Reserve 19,000 15,000 16,000 17,000 18,000 85,000 ROW Utility Management 5,000 5,000 Sanitary Sewer Fund 5,000 5,000 Sewer Revenue Bonds 600,000 600,000 Sewer Trunk Fund 523,900 175,500 120,500 124,000 150,000 1,093,900 Storm Sewer Fund 5,000 5,000 Trail Funds 60,000 60,000 100,000 230,000 75,000 525,000 Water Fund 105,000 45,000 62,500 50,000 50,000 312,500 Water Revenue Bonds 2,950,000 2,950,000 Water Trunk Fund 170,250 366,500 120,500 799,000 150,000 1,606,250 Total 5,690,013 4,667,002 8,080,366 6,978,820 31127,906 28,544,107 9 Capital Plan City of Andover, MN PROJECTS BY DEPARTMENT AND FUNDING SOURCE 2006 thru 2010 Department Project# Priority 2006 2007 2008 2009 2010 Total Building 1,480,500 Sewer Trunk Fund 170,250 175,500 Replacement - Blazer #5 07- 42400 -01 2 150,000 22,000 Water Trunk Fund 22,000 Equipment Bond 175,500 120,500 22,000 150,000 22,000 Building Total 06- 42000 -02 1 47,000 229000 49,000 229000 Central Equipment 245,000 R & B - Pedestrian Trail 47,000 48,000 A/C Recovery /Recycling/ Recharging Equipment 06- 49950 -01 1 6,000 245,000 GPS 6,000 Central Equipment Fund 6,000 6,000 Canopy for Fuel Island 09- 49950 -01 3 5,000 30,000 30,000 Central Equipment Fund 5,000 Drainage & Mapping Fund 30,000 30,000 Central Equipment Total 69000 5,000 309000 369000 Engineering New Development Projects 06- 42000 -01 1 340,500 351,000 241,000 248,000 300,000 1,480,500 Sewer Trunk Fund 170,250 175,500 120,500 124,000 150,000 740,250 Water Trunk Fund 170,250 175,500 120,500 124,000 150,000 740,250 Pedestrian Trail Maintenance 06- 42000 -02 1 47,000 48,000 49,000 50,000 51,000 245,000 R & B - Pedestrian Trail 47,000 48,000 49,000 50,000 51,000 245,000 GPS 06- 42000 -03 1 40,000 40,000 Capital Projects Levy 5,000 5,000 Drainage & Mapping Fund 5,000 5,000 Park Improvement Funds 5,000 5,000 R & B - Reserve 5,000 5,000 ROW Utility Management 5,000 5,000 Sanitary Sewer Fund 5,000 5,000 Storm Sewer Fund 5,000 5,000 Water Fund 5,000 5,000 Replacement - Total Station 09- 42000 -02 1 21,000 21,000 Equipment Bond 21,000 21,000 Replacement - Blazer #11 09- 42000 -03 2 30,000 30,000 Equipment Bond 30,000 30,000 Engineering Total 4279500 3999000 2909000 3499000 3519000 198169500 Facility Management Carpet Replacement 06- 41940 -01 2 10,000 10,000 10,000 30,000 Capital Projects Levy 10,000 10,000 General Fund 10,000 10,000 20,000 City Hall Garage Expansion 06- 41940 -02 1 20,000 20,000 Capital Projects Levy 20,000 20,000 Auxiliary Power Generator 06- 41940 -03 1 20,000 20,000 10 Department Project# Priority 2006 2007 2008 2009 2010 Total Capital Equipment Reserve Building A - Seal Floor Capital Projects Levy General Fund Cold Storage Bld- Waterproof Walls Capital Projects Levy Mezzanine Area - Building A Capital Projects Levy Public Works Development Planning Capital Projects Levy Electric Scissor Lift Equipment Bond Water Fund Fire St. #2 Addition and Parking Lot Improve. G.O. Bond Surface Seal all Brick Structures Capital Projects Levy Water Fund Land Purchase Building Fund Facility Management Total 1199000 4609000 5719717 89000 191589717 Fire 20,000 06- 41960 -01 1 6,000 6,000 06- 41960 -02 1 8,000 Rescue Trucks 8,000 06- 41960 -03 2 20,000 40,000 20,000 06- 41960 -04 1 10,000 Equipment Bond 10,000 06- 41960 -05 1 25,000 40,000 20,000 5,000 07- 41950 -01 2 08- 41940 -01 1 08- 41960 -01 1 1199000 4609000 5719717 89000 191589717 Fire 20,000 7,000 8,000 21,000 6,000 7,000 8,000 15,000 Rescue Trucks 8,000 1 8,000 40,000 20,000 20,000 Equipment Bond 10,000 10,000 40,000 25,000 20,000 New Mobile Data Terminals in Fire Trucks 5,000 450,000 450,000 450,000 450,000 39,500 39,500 22, 000 22, 000 17,500 17,500 515,217 515,217 515,217 515,217 1199000 4609000 5719717 89000 191589717 Fire Rescue Trucks 06- 42200 -01 1 35,000 40,000 75,000 Equipment Bond 35,000 40,000 75,000 New Mobile Data Terminals in Fire Trucks 07- 42200 -01 2 30,000 30,000 Equipment Bond 30,000 30,000 Water /Ice rescue boat 07- 42200 -02 1 20,000 20,000 Equipment Bond 20,000 20,000 Replacement - Hydraulic Rescue Equipment 07- 42200 -03 2 30,000 30,000 Equipment Bond 30,000 30,000 Hose Washer /Tester 07- 42200 -04 2 8,000 8,000 Equipment Bond 8,000 8,000 Replacement - Fire Marshall Vehicle 08- 42200 -01 2 30,000 30,000 Equipment Bond 30,000 30,000 Replacement - Fire Tanker #31 08- 42200 -02 1 295,000 295,000 Equipment Bond 295,000 295,000 Replacement - Fire Engine #11 09- 42200 -01 1 400,000 400,000 Equipment Bond 400,000 400,000 Replacement - Ladder Truck #11 10- 42200 -01 1 850,000 850,000 Equipment Bond 850,000 850,000 Replacement - Fire Chiefs Vehicle 10- 42200 -02 2 40,000 40,000 Equipment Bond 40,000 40,000 Fire Total 359000 1289000 3259000 4009000 8909000 197789000 Park & Rec - Operations Replacement - Cushman Truckster #546 06- 45200 -01 1 22,000 22,000 Equipment Bond 22, 000 22, 000 Replacement -1 -ton Dump w/ Snow Removal #511 06- 45200 -02 1 60,000 60,000 Equipment Bond 60,000 60,000 Lawn Sweeper 06- 45200 -03 1 30,000 30,000 Equipment Bond 30,000 30,000 11 Department Project# Priority 2006 2007 2008 2009 2010 Total Replace /Repair Play Structures - Various Parks Capital Projects Levy General Fund Replacement - Self- Propelled 48" Sweeper Equipment Bond Park & Rec - Operations Total Park & Rec - Projects Woodland Estates 4th Park Park Improvement Funds Fox Meadows Park Park Improvement Funds Prairie Knoll Park - Phase 11 Park Improvement Funds Oakview Park Park Improvement Funds Andover Station North Complex G.O. Bond Park Improvement Funds Annual Miscellaneous Projects Park Improvement Funds Terrace Park Park Improvement Funds Crooked Lake Boat Landing DNR Grant Park Improvement Funds Strootman Park Park Improvement Funds Forest Meadows Park Park Improvement Funds Andover Lions Park Park Improvement Funds Hawkridge Park Improvements Park Improvement Funds Park & Rec - Projects Total Planning & Zoning Replacement - Ford Taurus #15 Equipment Bond Planning & Zoning Total Sanitary Sewer Crosstown Blvd Trunk Sewer Line Sewer Trunk Fund Yellow Pine Lift Station Sewer Revenue Bonds Sanitary Sewer Total Storm Sewer Replacement - Street Sweeper #171 Capital Projects Levy 06- 45200 -04 2 40,000 40,000 40,000 40,000 40,000 200,000 40,000 40,000 40,000 40,000 40,000 40,000 160,000 07- 45200 -01 2 20,000 20,000 20,000 20,000 1529000 609000 409000 409000 409000 3329000 06- 45201 -01 1 15,000 1509000 2609000 5259000 296779466 07- 41910 -01 2 20,000 15,000 20,000 15,000 20,000 20,000 15,000 06- 45201 -02 1 10,000 06- 49450 -01 1 353,650 353,650 10,000 10,000 353,650 08- 49450 -01 1 600,000 10,000 06- 45201 -03 1 35,000 600,000 600,000 150,000 185,000 9539650 35,000 150,000 185,000 06- 45201 -04 1 50,000 50,000 50,000 50,000 06- 45201 -05 1 642,386 760,080 1,402,466 642,386 642,386 760,080 760,080 06- 45201 -99 1 25,000 25,000 25,000 25,000 25,000 125,000 25,000 25,000 25,000 25,000 25,000 125,000 07- 45201 -01 1 55,000 55,000 55,000 55,000 07- 45201 -02 1 125,000 125,000 20,000 20,000 105,000 105,000 08- 45201 -01 1 100,000 100,000 100,000 100,000 08- 45201 -02 1 25,000 25,000 25,000 25,000 09- 45201 -01 1 85,000 85,000 85,000 85,000 10- 45201 -01 1 500,000 500,000 500,000 500,000 7779386 9659080 1509000 2609000 5259000 296779466 07- 41910 -01 2 20,000 20,000 20,000 20,000 209000 209000 06- 49450 -01 1 353,650 353,650 353,650 353,650 08- 49450 -01 1 600,000 600,000 600,000 600,000 3539650 6009000 9539650 06- 43150 -01 1 150,000 150,000 50,000 50,000 12 Department Project# Priority 2006 2007 2008 2009 2010 Total Equipment Bond 100,000 100,000 Storm Sewer Total 1509000 1509000 Street Suns Replacement - Sign Truck #410 07- 43170 -01 2 75,000 75,000 Equipment Bond 75,000 75,000 Street Signs Total 759000 759000 Streets / Highways Annual Street Seal Coat Project 06- 43100 -01 1 263,615 203,084 550,569 471,092 313,212 1,801,572 Construction Seal Coat Fund 29,726 6,807 96,220 78,330 4,791 215,874 R & B - Crack Seal & Seal Coat 233,889 196,277 454,349 392,762 308,421 1,585,698 Annual Street Crack Seal Project 06- 43100 -02 1 96,008 204,786 175,225 116,500 117,556 710,075 Construction Seal Coat Fund 5,000 16,268 13,243 810 35,321 R & B - Crack Seal & Seal Coat 91,008 188,518 161,982 115,690 117,556 674,754 Annual Street Mill and Overlay 06- 43100 -03 1 736,454 1,027,052 967,705 835,228 740,138 4,306,577 Assessments 164,704 389,014 337,235 20,602 112,362 1,023,917 R & B - Overlays 571,750 638,038 630,470 814,626 627,776 3,28Z660 Annual Pavement Markings 06- 43100 -04 1 14,000 15,000 16,000 17,000 18,000 80,000 R & B - Reserve 14,000 15,000 16,000 17,000 18,000 80,000 Municipal State Aid Routes / New & Reconstruct 06- 43100 -05 1 1,554,400 859,150 2,608,000 5,021,550 Assessments 180,000 25,000 208,500 413,500 Federal Funds 270,000 825,000 1,095,000 Municipal State Aid Funds 1,104,400 834,150 1,574,500 3,513,050 Signal Upgrade - Bunker Lake Blvd /Round Lake Blvd 06- 43100 -06 1 20,000 20,000 Municipal State Aid Funds 10,000 10,000 Other Municipality 10,000 10,000 Intersection Upgrades 06- 43100 -07 1 600,000 400,000 1,000,000 Assessments 200,000 200,000 Municipal State Aid Funds 400,000 400,000 800,000 Dump Truck w/ Snow Removal 06- 43100 -09 1 190,000 190,000 Equipment Bond 190,000 190,000 Replacement - Tree Chipper #509 06- 43100 -10 1 40,000 40,000 Equipment Bond 40,000 40,000 Construct Bikeway/ Walkway Corridors 06- TRAIL -01 1 60,000 60,000 100,000 230,000 75,000 525,000 Trail Funds 60,000 60,000 100,000 230,000 75,000 525,000 Replacement - Dump Truck w/ Snow Removal #197 07- 43100 -01 1 200,000 200,000 Equipment Bond 200,000 200,000 Self contained spray patcher 07- 43100 -02 1 150,000 150,000 Equipment Bond 150,000 150,000 Replacement - Dump Truck w/ Snow Removal #195 07- 43100 -03 1 200,000 200,000 Equipment Bond 200,000 200,000 Replacement - Hot Asphalt Box 08- 43100 -01 1 40,000 40,000 Equipment Bond 40,000 40,000 Streets / Highways Total 395749477 290599922 391089649 492779820 192639906 1492849774 Water Replacement -1 -ton Van #67 06- 49400 -01 1 40,000 40,000 Water Fund 40,000 40,000 Rehabilitation of Wells 06- 49400 -02 1 40,000 45,000 45,000 50,000 50,000 230,000 Water Fund 40,000 45,000 45,000 50,000 50,000 230,000 Water System Security Improvements 06- 49400 -03 1 15,000 15,000 Water Fund 15,000 15,000 13 Department Project# Priority 2006 2007 2008 2009 2010 Total Water Tower Painting 07- 49400 -01 1 350,000 350,000 Capital Equipment Reserve 242,000 242,000 Water Trunk Fund 108,000 108,000 143rd Ave Water Main Improvements 07- 49400 -02 1 83,000 83,000 Water Trunk Fund 83,000 83,000 Construct Water Tower 08- 49400 -01 1 2,950,000 2,950,000 Water Revenue Bonds 2,950,000 2,950,000 Water Main along South Coon Creek Drive 09- 49400 -01 1 500,000 500,000 Water Trunk Fund 500,000 500,000 Demolish 500,000 Gallon Water Tower 09- 49400 -02 1 175,000 175,000 Water Trunk Fund 175,000 175,000 Chapman's Addition Water Main Improvements 09- 49400 -03 1 325,000 325,000 Assessments 325,000 325,000 Smith's Green Acres Water Main Improvements 09- 49400 -04 1 572,000 572,000 Assessments 572,000 572,000 Water Total 959000 4789000 299959000 196229000 509000 592409000 GRAND TOTAL 596909013 496679002 890809366 699789820 391279906 2895449107 14 Capital Plan City of Andover, MN DEPARTMENT SUMMARY 2006 tnru 2010 Department 2006 2007 2008 2009 2010 Total Engineering 387,500 399,000 290,000 298,000 351,000 1,725,500 Facility Management 74,000 460,000 571,717 8,000 1,113,717 Park & Rec - Operations 40,000 40,000 40,000 40,000 40,000 200,000 Park & Rec - Projects 727,386 965,080 150,000 260,000 525,000 2,627,466 Sanitary Sewer 353,650 600,000 953,650 Streets / Highways 3,344,477 1,509,922 3,068,649 4,277,820 1,263,906 13,464,774 Water 55,000 478,000 2,995,000 1,622,000 50,000 5,200,000 Total 4,982,013 3,852,002 7,715$66 6,497,820 2,237,906 25,285,107 15 Capital Plan City of Andover, MN SOURCES OF REVENUE SUMMARY 2006 tnru 2010 Source 2006 2007 2008 2009 2010 Total Assessments 544,704 389,014 362,235 1,126,102 112,362 2,534,417 Building Fund 515,217 515,217 Capital Equipment Reserve 242,000 242,000 Capital Projects Levy 114,000 22,000 136,000 Construction Seal Coat Fund 34,726 23,075 109,463 79,140 4,791 251,195 DNR Grant 20,000 20,000 Federal Funds 270,000 825,000 1,095,000 G.O. Bond 642,386 450,000 1,092,386 General Fund 50,000 57,000 40,000 48,000 195,000 Municipal State Aid Funds 1,514,400 1,234,150 1,574,500 4,323,050 Other Municipality 10,000 10,000 Park Improvement Funds 85,000 945,080 150,000 260,000 525,000 1,965,080 R & B - Crack Seal & Seal Coat 324,897 384,795 616,331 508,452 425,977 2,260,452 R & B - Overlays 571,750 638,038 630,470 814,626 627,776 3,282,660 R & B - Pedestrian Trail 47,000 48,000 49,000 50,000 51,000 245,000 R & B - Reserve 14,000 15,000 16,000 17,000 18,000 80,000 Sewer Revenue Bonds 600,000 600,000 Sewer Trunk Fund 523,900 175,500 120,500 124,000 150,000 1,093,900 Trail Funds 60,000 60,000 100,000 230,000 75,000 525,000 Water Fund 55,000 45,000 62,500 50,000 50,000 262,500 Water Revenue Bonds 2,950,000 2,950,000 Water Trunk Fund 170,250 366,500 120,500 799,000 150,000 1,606,250 Total 4,982,013 3,852,002 7,715,366 6,497,820 2,237,906 25,285,107 ire Capital Plan City of Andover, MN PROJECTS BY DEPARTMENT AND FUNDING SOURCE 2006 thru 2010 Department Project# Priority 2006 2007 2008 2009 2010 Total Engineering New Development Projects Sewer Trunk Fund Wafer Trunk Fund Pedestrian Trail Maintenance R & B - Pedestrian Trail Engineering Total Facility Management Carpet Replacement Capital Projects Levy General Fund City Hall Garage Expansion Capital Projects Levy Building A - Seal Floor Capital Projects Levy General Fund Cold Storage Bld- Waterproof Walls Capital Projects Levy Mezzanine Area - Building A Capital Projects Levy Public Works Development Planning Capital Projects Levy Fire St. #2 Addition and Parking Lot Improve. G.O. Bond Surface Seal all Brick Structures Capital Projects Levy Water Fund Land Purchase Building Fund Facility Management Total Park & Rec - Operations Replace /Repair Play Structures - Various Parks Capital Projects Levy General Fund Park & Rec - Operations Total Park & Rec - Projects 06- 42000 -01 1 340,500 351,000 241,000 248,000 300,000 1,480,500 170,250 175,500 120,500 124,000 150,000 740,250 170,250 175,500 120,500 124,000 150,000 740,250 06- 42000 -02 1 47,000 48,000 49,000 50,000 51,000 245,000 47,000 48,000 49,000 50,000 51,000 245,000 3879500 3999000 2909000 2989000 3519000 197259500 06- 41940 -01 2 10,000 10,000 10,000 191139717 10,000 40,000 40,000 40,000 40,000 200,000 10,000 10,000 06- 41940 -02 1 20,000 40,000 40,000 20,000 40,000 40,000 160,000 06- 41960 -01 1 6,000 409000 7,000 2009000 6,000 7,000 06- 41960 -02 1 8,000 8,000 06- 41960 -03 2 20,000 20,000 06- 41960 -04 1 10,000 10,000 07- 41950 -01 2 450,000 450,000 08- 41940 -01 1 39,500 22, 000 17,500 08- 41960 -01 1 515,217 515,217 8,000 8,000 30,000 10,000 20,000 20,000 20,000 21,000 6,000 15,000 8,000 8,000 20,000 20,000 10,000 10,000 450,000 450,000 39,500 22, 000 17,500 515,217 515,217 749000 4609000 5719717 89000 191139717 06- 45200 -04 2 40,000 40,000 40,000 40,000 40,000 200,000 40,000 40,000 40,000 40,000 40,000 40,000 160,000 409000 409000 409000 409000 409000 2009000 17 Department Project# Priority 2006 2007 2008 2009 2010 Total Woodland Estates 4th Park 06- 45201 -01 Park Improvement Funds 471,092 Fox Meadows Park 06- 45201 -02 Park Improvement Funds 6,807 Prairie Knoll Park - Phase II 06- 45201 -03 Park Improvement Funds 15,000 Andover Station North Complex 06- 45201 -05 G.O. Bond 392,762 Park Improvement Funds 10,000 Annual Miscellaneous Projects 06- 45201 -99 Park Improvement Funds 116,500 Terrace Park 07- 45201 -01 Park Improvement Funds 16,268 Crooked Lake Boat Landing 07- 45201 -02 DNR Grant 185,000 Park Improvement Funds 188,518 Strootman Park 08- 45201 -01 Park Improvement Funds 185,000 Forest Meadows Park 08- 45201 -02 Park Improvement Funds 835,228 Andover Lions Park 09- 45201 -01 Park Improvement Funds 389,014 Hawkridge Park Improvements 10- 45201 -01 Park Improvement Funds 642,386 Park & Rec - Projects Total 760,080 Sanitary Sewer 814,626 Crosstown Blvd Trunk Sewer Line 06- 49450 -01 Sewer Trunk Fund 25,000 Yellow Pine Lift Station 08- 49450 -01 Sewer Revenue Bonds 125,000 Sanitary Sewer Total 25,000 Streets / Highways 25,000 Annual Street Seal Coat Project 06- 43100 -01 Construction Seal Coat Fund 55,000 R & B - Crack Seal & Seal Coat 2,608,000 Annual Street Crack Seal Project 06- 43100 -02 Construction Seal Coat Fund 55,000 R & B - Crack Seal & Seal Coat 208,500 Annual Street Mill and Overlay 06- 43100 -03 Assessments 125,000 R &B - Overlays 825,000 Annual Pavement Markings 06- 43100 -04 R & B - Reserve 20,000 Municipal State Aid Routes / New & Reconstruct 06- 43100 -05 Assessments 20,000 Federal Funds 105,000 Municipal State Aid Funds Signal Upgrade - Bunker Lake Blvd /Round Lake Blvd 06- 43100 -06 Municipal State Aid Funds Other Municipality Intersection Upgrades 06- 43100 -07 1 15,000 203,084 550,569 471,092 313,212 15,000 15,000 6,807 96,220 78,330 4,791 15,000 1 10,000 196,277 454,349 392,762 308,421 10,000 10,000 204,786 175,225 116,500 117,556 10,000 1 35,000 16,268 13,243 150,000 185,000 35,000 188,518 161,982 150,000 117,556 185,000 1 642,386 760,080 967,705 835,228 740,138 1,402,466 642,386 389,014 337,235 20,602 112, 362 642,386 571,750 760,080 630,470 814,626 627,776 760,080 1 25,000 25,000 25,000 25,000 25,000 125,000 25,000 25,000 25,000 25,000 25,000 125,000 1 55,000 859,150 2,608,000 55,000 180,000 55,000 25,000 208,500 55,000 1 125,000 825,000 125,000 1,104, 400 20,000 834,150 1,574,500 20,000 1 20,000 105,000 105,000 1 100,000 100,000 10,000 100,000 100,000 1 25,000 25,000 25,000 25,000 1 85,000 85,000 85,000 85,000 1 500,000 500,000 500,000 500,000 7279386 9659080 1509000 2609000 5259000 296279466 1 353,650 353,650 353,650 353,650 1 600,000 600,000 600,000 600,000 3539650 6009000 9539650 1 263,615 203,084 550,569 471,092 313,212 1,801,572 29,726 6,807 96,220 78,330 4,791 215,874 233,889 196,277 454,349 392,762 308,421 1,585,698 1 96,008 204,786 175,225 116,500 117,556 710,075 5,000 16,268 13,243 810 35,321 91,008 188,518 161,982 115,690 117,556 674,754 1 736,454 1,027,052 967,705 835,228 740,138 4,306,577 164,704 389,014 337,235 20,602 112, 362 1,023,917 571,750 638,038 630,470 814,626 627,776 3,28Z 660 1 14,000 15,000 16,000 17,000 18,000 80,000 14,000 15,000 16,000 17,000 18,000 80,000 1 1,554,400 859,150 2,608,000 5,021,550 180,000 25,000 208,500 413,500 270,000 825,000 1,095,000 1,104, 400 834,150 1,574,500 3,513,050 1 20,000 20,000 10,000 10,000 10,000 10,000 1 600,000 400,000 1,000,000 18 Department Project# Priority 2006 2007 2008 2009 2010 Total Assessments 200,000 200,000 Municipal State Aid Funds 400,000 400,000 800,000 Construct Bikeway/ Walkway Corridors 06- TRAIL -01 1 60,000 60,000 100,000 230,000 75,000 525,000 Trail Funds 60,000 60,000 100,000 230,000 75,000 525,000 Streets / Highways Total 3,3449477 195099922 390689649 492779820 192639906 1394649774 Water Rehabilitation of Wells 06- 49400 -02 1 40,000 45,000 45,000 50,000 50,000 230,000 Water Fund 40,000 45,000 45,000 50,000 50,000 230,000 Water System Security Improvements 06- 49400 -03 1 15,000 15,000 Water Fund 15,000 15,000 Water Tower Painting 07- 49400 -01 1 350,000 350,000 Capital Equipment Reserve 242,000 242,000 Water Trunk Fund 108,000 108,000 143rd Ave Water Main Improvements 07- 49400 -02 1 83,000 83,000 Water Trunk Fund 83,000 83,000 Construct Water Tower 08- 49400 -01 1 2,950,000 2,950,000 Water Revenue Bonds 2,950,000 2,950,000 Water Main along South Coon Creek Drive 09- 49400 -01 1 500,000 500,000 Water Trunk Fund 500,000 500,000 Demolish 500,000 Gallon Water Tower 09- 49400 -02 1 175,000 175,000 Water Trunk Fund 175,000 175,000 Chapman's Addition Water Main Improvements 09- 49400 -03 1 325,000 325,000 Assessments 325,000 325,000 Smith's Green Acres Water Main Improvements 09- 49400 -04 1 572,000 572,000 Assessments 572,000 572,000 Water Total 559000 4789000 299959000 196229000 509000 592009000 GRAND TOTAL 499829013 398529002 797159366 694979820 292379906 2592859107 19 Capital Plan 2006 thru 2010 Justification The develoment phasing is identified in the City's Comprehensive Plan. Expenditures 2006 2007 2008 2009 2010 Total Construction 340,500 351,000 241,000 248,000 300,000 1,480,500 Total 3409500 3519000 2419000 2489000 3009000 194809500 Funding Sources 2006 2007 2008 2009 2010 Total Sewer Trunk Fund 170,250 Water Trunk Fund 170,250 175,500 175,500 120,500 120,500 124,000 124,000 150,000 150,000 740,250 740,250 Total 3409500 351,000 2419000 2489000 300,000 194809500 Operational Impact/Other I Additional maintenance of streets, storm sewer, water main and sanitary sewer will result. Additional streets will be added for snowplowing. 20 Capital Plan 2006 thru 2010 Justification City trails are in need of general maintenance including bituminous patching, crack filling and restoration to maintain the high level of service to pedestrian walkers, bikers and roller bladers. A 5 -year capital improvement plan was prepared for the City to identify and prioritize the necessary repairs. Expenditures 2006 2007 2008 2009 2010 Total Improvement 47,000 48,000 49,000 50,000 51,000 245,000 Total 479000 489000 499000 509000 519000 2459000 Funding Sources 2006 2007 2008 2009 2010 Total R & 6 - Pedestrian Trail 47,000 48,000 49,000 50,000 51,000 245,000 Total 479000 489000 499000 509000 519000 2459000 Operational Impact/Other I As the city trail system begins to age, general maintenance such as bituminous patching, crack filling and restoration becomes a necessity. The maintenance will allow for a longer service life for the trail system throughout the city. 21 Capital Plan 2006 thru 2010 Justification The buildings get a lot of use and, despite the appropriate cleaning and maintenance, the carpeted area will need to be replaced. The intent of the replacement is to get the carpet out of the fire stations where it maybe should not have been installed in the first place. We could clean the existing and "get by" for a few years but the fire department believes that replacing the carpet with a different type of material's will be much more cost efficient to do. The carpet should not be in heavy traffic areas where training and other fire activities are taking place. Expenditures 2006 2007 2008 2009 2010 Total Facility Maintenance 10,000 10,000 10,000 30,000 Total Funding Sources 109000 2006 109000 2007 109000 2008 2009 309000 2010 Total Capital Projects Levy General Fund 10,000 10,000 10,000 10,000 20,000 Total 109000 10,000 109000 309000 Operational Impact/Other I The carpet replacement will be needed in order to keep the buildings in good repair. Due to heavy use, it is anticipated that all carpeted area will need to be replaced. PIX Capital Plan 2006 thru 2010 Justification Security and protection for all vehicles from vandalism and weather conditions. Expenditures 2006 2007 2008 2009 2010 Total Improvement 20,000 20,000 Total 209000 20,000 Funding Sources 2006 2007 2008 2009 2010 Total Capital Projects Levy 20,000 20,000 Total 209000 Operational Impact/Other Overall savings in the life of equipment. 23 20,000 Capital Plan City of Andover, MN Project # 06- 41960 -01 Project Name Building A - Seal Floor Type Improvement Useful Life 2 Years Category Facility Management Description Use a sealant on cement floor in Building A (large garage). 2006 thru 2010 Priority I -High Contact PW Superintendent Department Facility Management Justification The cement floor in building a will spald due to salt and traffic from daily vehicles use.This sealing of the floors should be repeated every 2 years to retain the integrity of the floor surface. Without this process, the cement floor would deteriorate and would have to be replaced. It is much more cost effective to perform the maintenance than to replace the entire floor. Expenditures 2006 2007 2008 2009 2010 Total Facility Maintenance 6,000 7,000 8,000 213000 Total 69000 7,000 89000 219000 Funding Sources 2006 2007 2008 2009 2010 Total Capital Projects Levy 6,000 6,000 General Fund 7,000 8,000 15,000 Total 69000 79000 89000 219000 Operational Impact/Other I Gives use a much longer life of the cement floor, than having to replace it before its life expectancy is up. 24 Capital Plan City of Andover, MN Project # 06- 41960 -02 Project Name Cold Storage Bld- Waterproof Walls 2006 thru 2010 Type Improvement Priority 1 -High Useful Life 10 Years Contact PW Superintendent Category Improvements Department Facility Management Description Waterproof walls in the Cold Storage building by installing fiberglass panels four feet up the wall from the floor and include necessary trim and caulking. Justification The existing walls are deteriorating due to age, water usage and equipment stored in the building. The fiberglass panels will eliminate water absorption in the walls. If the panels are not installed, water will seep through to the structural columns that support the building. Expenditures 2006 2007 2008 2009 2010 Total Improvement 8,000 8,000 Total 89000 8,000 Funding Sources 2006 2007 2008 2009 2010 Total Capital Projects Levy 8,000 8,000 Total 89000 Operational Impact/Other I Less maintenance and repairs will be required. 25 8,000 Capital Plan 2006 thru 2010 Justification Having a mezzanine works great for storage; items are up out of the way and do not get damaged. Similar to the east mezzanine, this mezzanine will be assembled by city staff. Utilizing wasted space is a large cost savings to the city. Expenditures 2006 2007 2008 2009 2010 Total Improvement 20,000 20,000 Total 209000 20,000 Funding Sources 2006 2007 2008 2009 2010 Total Capital Projects Levy 20,000 20,000 Total 209000 20,000 Operational Impact/Other I As the city grows, there becomes more and more supplies that we have to be keep in stock. We have overhead space available in building A for another mezzanine like the one we built two years ago. It is a very cost effective and efficient way to utilize overhead storage space that we wouldn't normally use. Capital Plan City of Andover, MN Project # 06- 41960 -04 Project Name public Works Development Planning Type Improvement Useful Life 5 -10 years Category Facility Management Description Provide a master plan for Public Works expansion. 2006 thru 2010 Priority 1 -High Contact PW Superintendent Department Facility Management Justification The master plan would allow for the ultimate buildout of the Public Works Facility, including buildings and yard space. Expenditures 2006 2007 2008 2009 2010 Total Planning /Design 10,000 10,000 Total 109000 10,000 Funding Sources 2006 2007 2008 2009 2010 Total Capital Projects Levy 10,000 10,000 Total 109000 Operational Impact/Other MA 10,000 Capital Plan 2006 thru 2010 Justification The additional space to the building will allow for all vehicles to be parked in front of an exit door. The firefighters will not have to move a vehicle in order to get another one out of the building. The additional bay will also make clean up operations after an event much easier. The firefighters will not have to move vehicles out of the building in order to clean hose and equipment. The auxiliary power generator would allow all functions of the building to work during a power outage, including pumping water from the well and opening the doors. The additional parking space will provide for much needed hard surface training area and more vehicle parking. Replacement of the existing parking lots is necessary due to the heavy fire vehicle traffic. Expenditures 2006 2007 2008 2009 2010 Total Equipment 35,000 35,000 Improvement 415,000 415,000 Total 4509000 4509000 Funding Sources 2006 2007 2008 2009 2010 Total G.O. Bond 450,000 450,000 Total 4509000 4509000 Operational Impact/Other The additional space will make all fire operations more efficient at this building. Vehicles will not have to be moved in order to get others out and clean -up will be much easier and faster. The power supply will allow for normal operations at the station at all times and would also allow the building to be used as an emergency operations center if needed. 28 Capital Plan 2006 thru 2010 Justification This is a necessary maintenance item to ensure the long term integrity of the municipal buildings. Expenditures 2006 2007 2008 2009 2010 Total Facility Maintenance 39,500 39,500 Total 39,500 39,500 Funding Sources 2006 2007 2008 2009 2010 Total Capital Projects Levy 22,000 22,000 Water Fund 17,500 17,500 Total 399500 399500 Operational Impact/Other I This will reduce the amount of long term maintenance and repair to the municipal buildings. 29 Capital Plan 2006 thru 2010 Justification This is the last opportunity to purchase this property and keep city facilities together in one complex. Future site expansion opportunities are limited without additional property. Expenditures 2006 2007 2008 2009 2010 Total Land Acquisition 515,217 515,217 Total 515,217 515,217 Funding Sources 2006 2007 2008 2009 2010 Total Building Fund 515,217 515,217 Total 515,217 515,217 Operational Impact/Other Large cost savings in keeping facilities together. Another large savings is having a salt storage area on the property. The recycling center would be moved away from the parks and this would help maintain cleaner parks on the complex. It would also provide a large storage area for the seal coat rock, sweeping, etc. Open land areas in Andover will soon be a thing of the past. 0 A C I T Y o F Capital Improvement Plan NDOVET11 Project Name: LAND PURCHASE Capital Plan City of Andover, MN 2006 thru 2010 Project # 06- 45200 -04 Project Name Replace/Repair Play Structures - Various Parks Type Improvement Useful Life 10 Years Category Park Improvements Priority 2 - Medium Contact PW Superintendent Department Park & Rec - Operations r Description Repair to fall zones and achieve ADA accessibility. Replacement of playground equipment and other major replacements, such as short fences on ball fields, soccer goals, or any area of play that does not meet safety specifications. Justification Old equipment no longer meets ADA requirements, such as entrapments, fall zones or handicap accessibility. Working to bring the parks up to meet all safety requirements. Expenditures 2006 2007 2008 2009 2010 Total Equipment 40,000 40,000 40,000 40,000 40,000 200,000 Total 409000 409000 409000 409000 409000 2009000 Funding Sources 2006 2007 2008 2009 2010 Total Capital Projects Levy 40,000 40,000 General Fund 40,000 40,000 40,000 40,000 160,000 Total 409000 40,000 409000 409000 409000 2009000 Operational Impact/Other I Less maintenance and will meet all safety requirements. 32 Capital Plan City of Andover, MN Project # 06- 45201 -01 Project Name woodland Estates 4th Park 2006 thru 2010 Type Improvement Priority 1 -High Useful Life 25 Years Contact City Engineer Category Equipment Department Park & Rec - Projects Description At this point, the type of improvements to the park have not been identified. The Woodland Estates neighborhood is still exploring options for the park, although is appears they are leaning towards new playground equipment. Justification Currently, the park has no activities available to the residents. With the park being the only one in the area west of Nightingale Street, this project has been recommended by the Park & Recreation Commission. Expenditures 2006 2007 2008 2009 2010 Total Construction 15,000 15,000 Total 159000 15,000 Funding Sources 2006 2007 2008 2009 2010 Total Park Improvement Funds 15,000 15,000 Total 159000 Operational Impact/Other I Additional long -term maintenance and ultimately replacement will be necessary. 33 15,000 A C I T Y o F Capital Improvement Plan NDOVEkJ4 Project Name: WOODLAND ESTATES PARK ry W D Z Q J a. - VET ri NS MEMORIAL tX ' -flrr 151 STAVE 151 STAVE LEGEND Location Map N ROW W E Lots / Parcels S Water Features 310 155 0 310 Feet City Limits Project Location Z W Capital Plan City of Andover, MN Project # 06- 45201 -02 Project Name Fox Meadows Park Type Improvement Useful Life 20 years Category Equipment Description Construct new basketball court. 2006 thru 2010 Priority 1 -High Contact City Engineer Department Park & Rec - Projects Justification Since the park is classified as a neighborhood, additional recreation opportunities should be considered. Current amenities include playground equipment, one soccer field and a new frisbee golf course. This project has been recommended by the Park & Recreation Commission. Expenditures 2006 2007 2008 2009 2010 Total Equipment 10,000 10,000 Total 109000 10,000 Funding Sources 2006 2007 2008 2009 2010 Total Park Improvement Funds 10,000 10,000 Total 109000 Operational Impact/Other I Additional long -term maintenance and ultimately replacement will be necessary. 35 10,000 1 1), Capl*talq- RJJ L Project Name: FOX MEADOWS PARK City of Andover, Minnesota I ncorportated 1974 a � G lE DR /��2C� \yam O� )TH LN v \ N ENCHANTED )R:E i o w '` Q p CO 2 Y NCHANT g LU S ENCHANTED DR Q / 159TH AVE ~ O� i SOT Q �(S' CO Z O �s(9 U \\ Y P0 Mi �T 1 7TH 4` 157TH AVE Q w O_ Q � O U � ~ U Z Q O Y � Q 155TH AVE 155TH AVE U a w p w 2 � U co S'� OO \ Y 15 LEGEND Location Map a � � C ElR a0 0° OW N o� oo \ \ Lots / Parcels w E o O a 0 Water Features S oo \\ a qT 0 o° City Limits 00 500 0 500 Feet O Project Location 0 36 0 0 o Oa\ (out Capital Plan City of Andover, MN Project # 06- 45201 -03 Project Name prairie Knoll Park - Phase II Type Improvement Useful Life 25 Years Category Park Improvements 2006 thru 2010 Priority 1 -High Contact City Engineer Department Park & Rec - Projects �n Description 2006 - New playground equipment ($25,000) necessary for ages 2 - 5 years old would be installed and the purchase of three bleachers ($10,000) for the surrounding soccer /football fields. 2009 - The parking lot would be paved including concrete curb and gutter ($150,000). Justification Prairie Knoll Park is considered a regional city park and completion would bring it into compliance with City standards due to the increased use by the associations for both soccer and football. This project has been recommended by the Park & Recreation Commission. Expenditures 2006 2007 2008 2009 2010 Total Improvement 35,000 150,000 185,000 Total 359000 150,000 185,000 Funding Sources 2006 2007 2008 2009 2010 Total Park Improvement Funds 35,000 150,000 1853000 Total 359000 Operational Impact/Other I Additional long -term maintenance and ultimately replacement will be necessary. 37 150,000 185,000 1 1), Capl*talq- RJJ L Project Name: PRAIRIE KNOLL PARK City of Andover, Minnesota I ncorportated 1974 2A JE 1y15� P w z a o A� 150TH LN w 150TH LN w CD w w U) z 0 W X H J ¢ 148 LN a 148T KI F (G3 Z W LU ,48�y�N w w U F z W o � w 0 X U 146TH LN 146TH LN J� L D z 145TI I LN W_ a 0 F w W ILN a ANDOVER BL AND 144TH LN 0 U) x o0 UJ O¢ OG 143RD LN > 2 0� cS� ti w r43 _Z a 143RD AVE O W Y � 9L a 142ND LN LEGEND Location Map El a � � 0 CD ROW N X00 °o 0 Lots / Parcels w - E o a 0 Water Features s qT 0 o° City Limits 00 500 0 500 Feet O Project Location o o E o a� 38 � rout Capital Plan City of Andover, MN Project # 06- 45201 -05 Project Name Andover Station North Complex Type Improvement Useful Life 30 Years + Category Park Improvements 2006 thru 2010 Priority I -High Contact City Engineer Department Park & Rec - Projects Description Development and construction of an Athletic /Park Complex south of the WDE site. This complex will consist of three new fully fiirnished baseball fields, playground equipment, bituminous trails throughout the complex and a building to store equipment, to hold meetings and a concession area for the summer months. 3 Ball Fields - $225,000; Building - $250,000; Trail System - $75,000; Ballfield Lighting - $300,000; Playground Equipment - $100,000; Paved parking lot w/ concrete & gutter - $150,000; Irrigation - $100,000; Fencing - $125,000; Misc. items - $77,466. Note: Parking would be shared with the businesses. Justification Due to the lack of baseball fields with grass infields in the City, this site will be an ideal location for a baseball complex. There is a 200 foot buffer area just south of the WDE that can not be built on with any type of structure but this area is ideal for the outfield of the ball fields. By placing the outfield of each field in this area it facilitates this area to its fullest capacity. This project has been recommended by the Park & Recreation Commission. Expenditures 2006 2007 2008 2009 2010 Total Improvement 642,386 760,080 1,402,466 Total Funding Sources 6429386 2006 7609080 2007 2008 194029466 2009 2010 Total G.O. Bond Park Improvement Funds 642,386 760,080 642,386 760,080 Total 6429386 7609080 194029466 Operational Impact/Other I Routine maintenance will be required to upkeep the field and park. 1 1), q- RJJ L Capital Improvement Plan Project Name: ATHLETIC PARK /COMPLEX City of Andover, Minnesota SOUTH OF THE WIDE Incorportated 1974 40Ty`N N� 140TH LN Al G V� 140TH AVE CIO 7 r p 9Ty � r > L 39TH LN Q J o c� m Of z m z L CD ® m z U) co W 139TH AVE 139TH AVE Q 138TH L co D 2cu co U �Q 138TH LN O AVE 13 V t J J N' � N w z BUN U H U) W U) \ U O Q z_ El El ❑ ❑❑ ❑ ills, FI 11(' N PKWY > J m z 135TH AVE Cn &NZY Z z Q LEGEND Location Map El a � � 0 O ROW N X00 °o 0 0 Lots / Parcels w - E o ❑ a 0 Water Features S 0 o° City Limits 00 500 0 500 Feet ❑� Qo O Project Location 0 40 0 o a A 16, (out Capital Plan City of Andover, MN Project # 06- 45201 -99 Project Name Annual Miscellaneous Projects Type Improvement Useful Life Unassigned Category Park Improvements 2006 thru 2010 Priority 1 -High Contact City Engineer Department Park & Rec - Projects Description This is for unforeseen or requested miscellaneous projects that may arise during the year, requested by the public, staff, City Council or the Parks and Recreation Commission for each year. Justification This gives flexibility to the City to do certain small -sized projects that may be warranted; for example, purchase of soccer goals. This funding has been recommended by the Park & Recreation Commission. Expenditures 2006 2007 2008 2009 2010 Total Improvement 25,000 25,000 25,000 25,000 25,000 125,000 Total 259000 259000 259000 259000 259000 1259000 Funding Sources 2006 2007 2008 2009 2010 Total Park Improvement Funds 25,000 25,000 25,000 25,000 25,000 125,000 Total 259000 259000 259000 259000 259000 1259000 Operational Impact/Other I Allows the Park and Recreation Commission to address a variety of different needs throughout the year. 41 Capital Plan City of Andover, MN Project # 07- 45201 -01 Project Name Terrace Park 2006 thru 2010 i y Nr 1111PI v v ICHIC L r nun ty i- nigh Useful Life 25 Years Contact City Engineer J�; Category Park Improvements Department Park & Rec - Projects a - - � _" , c� VA � r �- .tea• Description Install new basketball court and parking lot with concrete curb and gutter along with completing a small section of trail to provide access to the playground equipment and the other portions of the park. Parking lot - $45,000; basketball court - $7,500; trail extension - $2,500. Justification The existing parking lot is currently gravel. Since this is located in an urban area, the parking lot should be paved and the neighborhood residents have requested a basketball court. Also, the trail to the playground area needs to be paved. This project has been recommended by the Park & Recreation Commission. Expenditures 2006 2007 2008 2009 2010 Total Construction 55,000 55,000 Total 55,000 55,000 Funding Sources 2006 2007 2008 2009 2010 Total Park Improvement Funds 55,000 55,000 Total 55,000 Operational Impact/Other I Additional long -term maintenance and ultimately replacement will be necessary. 42 55,000 1 1), q- RJJ L Capital Improvement Plan Project Name: TERRACE PARK City of Andover, Minnesota Incorportated 1974 135TH AVE r MARIGOLD m m m [I] 0 Cn a City Limits mELI m Location Of III ELI BUNKER LAKE BLVD e` N KE R LAKE BL w co W 0 F cn J Cn CW Q `'' 136TH OW < z aJ , E ' > .� J m A C� P w 136TH AVE z J � >- EIF G F- O o 0 C a = Cl) U 11) 0 134TH AVE Z 135TH LN � O 0 v Cl) G 135TH AVE O z F I r I 135TH AVE r MARIGOLD Lots / Parcels 0 Water Features City Limits OProject Location Of e` w Cn w J A C� z 0 134TH AVE F co 133RD LN LU C/) 4 Oc w 0 133RD LN > 0 (n Z) Cn 0 W LEGEND CD ROW Lots / Parcels 0 Water Features City Limits OProject Location (out N W E S 500 0 500 Feet 43 ' Capital Plan City of Andover, MN Project # 07- 45201 -02 Project Name Crooked Lake Boat Landing Type Improvement Useful Life 25 Years Category Park Improvements 2006 thru 2010 Priority 1 -High Contact City Engineer Department Park & Rec - Projects Description Construct new parking lot, install new dock and dredge boat landing area. N Justification The existing parking lot is beyond its normal maintenance requirements. Surface has deteriorated and a number of pot holes have been filled up to this point. A boat dock is necessary for individuals launching their boat. Also, the boat landing has silted in and needs to be removed to allow boats to maneuver. This project has been recommended by the Park & Recreation Commission. Expenditures 2006 2007 2008 2009 2010 Total Construction 125,000 125,000 Total 125,000 125,000 Funding Sources 2006 2007 2008 2009 2010 Total DNR Grant 20,000 20,000 Park Improvement Funds 105,000 105,000 Total Operational Impact/Other I Normal maintenance (sealcoating, striping, etc.) will be necessary. 125,000 44 125,000 1 1), q- RJJ L Capital Improvement Plan Project Name: CROOKED LAKE BOAT LANDING City of Andover, Minnesota Incorportated 1974 rout mm NKER LAKE BLVD Cb co !, J Q 0 Q J 135TH LN 135TH AVE 135TH CIR U) X TH AVE o w > D a z w Q 134TH L Z J D Ui - Y O CD� O U 134TH S 134TH AVE Cn U) Cn w w 133RD LEGEND Location Map CD ROW N a ° a�� 0 o� E, � � ❑° Lots / Parcels w E o a 0 Water Features S 0 City Limits o° 00 O Project Location 500 0 500 Feet no 00 oQa�� 45 rout Capital Plan City of Andover, MN Project # 08- 45201 -01 Project Name Strootman Park Type Improvement Useful Life 25 Years Category Park Improvements 2006 thru 2010 Priority 1 -High Contact City Engineer Department Park & Rec - Projects Description Reconstruct existing ballfield, replace fencing, and pave existing parking lot. Reconstruct existing ballfield with fencing $604)000 construct new parking lot for ball field $40,000 Justification Ballfield fencing(fencing needs to be replaced) does not meet League of MN Cities guidelines. Also, the parking lot needs to be paved with concrete curb and gutter along with storm sewer. This project has been recommended by the Park & Recreation Commission. Expenditures 2006 2007 2008 2009 2010 Total Construction 100,000 100,000 Total 100,000 100,000 Funding Sources 2006 2007 2008 2009 2010 Total Park Improvement Funds 100,000 100,000 Total Operational Impact/Other I Additional long -term maintenance and ultimately replacement will be necessary. Hei 100,000 100,000 Capital Improvement Plan Project Name: STROOTMAN PARK City of Andover, Minnesota Incorportated 1974 U4f R /VER LEGEND CD ROW Lots / Parcels 0 Water Features City Limits OProject Location rout Zo,, 157TH AVE w AVE 155TH AVE a O 1547- N z Q 153RD AVE v� 153R 0 D A w _ x 152N O 0 LL ti H � O O � � O J W 151ST AVE LU Q N W E S 500 0 500 Feet 47 z Capital Plan City of Andover, MN Project # 08- 45201 -02 Project Name Forest Meadows Park 2006 thru 2010 Type Improvement Priority I -High Useful Life 20 Years Contact City Engineer Category Equipment Department Park & Rec - Projects Description Install additional playground equipment for 2 -5 year old users. Justification This project has been recommended by the Park & Recreation Commission. 5. Y- Expenditures 2006 2007 2008 2009 2010 Total Construction 25,000 25,000 Total 25,000 25,000 Funding Sources 2006 2007 2008 2009 2010 Total Park Improvement Funds 25,000 25,000 Total Operational Impact/Other I Additional long -term maintenance and ultimately replacement will be necessary. 48 25,000 25,000 A C I T Y o F Capital Improvement Plan NDOVE01 Project Name: FOREST MEADOWS PARK Capital Plan City of Andover, MN Project # 09- 45201 -01 Project Name Andover Lions Park Type Improvement Useful Life 25 Years Category Park Improvements 2006 thru 2010 Priority I -High Contact City Engineer Department Park & Rec - Projects Description Install outfield fencing with mow strips for ballfield and install new irrigation system. 8 foot high fencing with mow strips - $35,000 and irrigate existing ballfield - $50,000. Justification The installation of an outfield fence will allow the ball to stay in play and also give the awesome feeling when a ball is hit for a home run. Also give the players a safer playing surface by installing a irrigation system. This project has been recommended by the Park & Recreation Commission. Expenditures 2006 2007 2008 2009 2010 Total Construction 85,000 85,000 Total 85,000 85,000 Funding Sources 2006 2007 2008 2009 2010 Total Park Improvement Funds 85,000 85,000 Total Operational Impact/Other I Additional long -term maintenance and ultimately replacement will be necessary. 50 85,000 85,000 1 1), q- RJJ L Capital Improvement Plan Project Name: ANDOVER LIONS PARK City of Andover, Minnesota Incorportated 1974 U) 9L 720 ND LN r~n 142ND LN Iq co of 2 > Q / J 141ST�� 142ND AVE ~ J�' 142ND AVE O QP Q � U) C 141S7. �N Q co 141ST AVE 1 140TH LN 1 0TH A Cr C cc LL 139TH AVE 138TH LN F1 V 138TH AVE w cor— Q 137TH �N J J N -_ � LN w z Q U LEGEND CD ROW Lots / Parcels 0 Water Features City Limits OProject Location (out 139TH AVE BL. N W E S 500 0 500 Feet 51 <,y Al v\ /Vo qYC � p 1 BUNKS LAK M ' VA r aim Capital Plan City of Andover, MN Project # 10- 45201 -01 2006 thru 2010 Justification I By continuing to improve the park system in Andover, the City provides a high quality parks and recreation complex to meet the growing needs of an active community. These improvements will provide high quality athletic and recreational opportunities to the residents. A warming house provides shelter and a restroom facility that can be used year around. The well and irrigation provide for a high quality athletic surface for soccer, baseball /softball activities and water for the restroom. Playground equipment provides activities for younger children and bleachers provide a safe and comfortable place for spectators. This project has been recommended by the Park & Recreation Commission. Expenditures 2006 2007 2008 2009 2010 Total Construction 500,000 500,000 Total 500,000 5009000 Funding Sources 2006 2007 2008 2009 2010 Total Park Improvement Funds 500,000 500,000 Total Operational Impact/Other 5009000 5009000 The construction of a warming house and restroom facility will increase the use and enjoyment of the park. Also, the construction of the storage /warming house /restroom facility will eliminate the need to rent a portable warming house and portable bathroom. The well construction will give the ability to ice the rinks from the on -site well and will eliminate the need to "tanker" water to the site from the Public Works facility on Crosstown Blvd. The playground equipment will reauire additional long -term maintenance and ultimate replacement will be necessarv. 52 1 1), q- RJJ L Capital Improvement Plan Project Name: HAWKRIDGE PARK City of Andover, Minnesota Incorportated 1974 -_ - — - - - - - - - - - - - U) � \ w ON a o � 180TH AVE U w co ❑ co I Q 180TH AVE O U w ry U O yn fl� 7 Q s — 179TH AVE w ❑ z a J Cn z z O 0 U LU > O J J Q 177TH LN 177TH LN c� TH L 177TH AVE n U) O J J a 176TH LN U) 176TH LN U) w C7 0 U Al \A C 176TH AVE a a 175TH LN L U) z � O w �O LEGEND Location Map a � 0 C 0 ❑ ❑ ROW N ao 0 Lots / Parcels w E o O a 0 Water Features S 0 o° City Limits 00 500 0 500 Feet O Project Location 0 53 0 0 o Oat (out Capital Plan City of Andover, MN Project # 06- 49450 -01 Project Name Crosstown Blvd Trunk Sewer Line 2006 thru 2010 Type Improvement Priority 1 -High Useful Life 50 Years Contact PW Superintendent Category Improvements Department Sanitary Sewer Description Extend sanitary sewer trunk along Crosstown Blvd from the railroad tracks east to Prairie Road. Justification The trunk sanitary sewer will be extended to serve properties adjacent to Crosstown Boulevard and east of Prairie Road. This extension has been recommended through the sanitary sewer report (2004 Sanitary Sewer Report). Expenditures 2006 2007 2008 2009 2010 Total Improvement 353,650 353,650 Total 3539650 3539650 Funding Sources 2006 2007 2008 2009 2010 Total Sewer Trunk Fund 353,650 353,650 Total 3539650 Operational Impact/Other I Additional routine maintenace will be required. 54 3539650 CITY OI' NDOVER14 Capital Improvement Plan Project Name: CROSSTOWN BLVD SEWER LINE ;5 i H LN Y �r 4� U it W G � L Q � v - w J� N W 7S H STERT N COMMONS R G �� v W J LU 153RD I n i LEGEND N ROW W E Lots / Parcels S (::D Water Features 850 425 0 City Limits Project Location 850 9 Feet Location Map ®a Z W 0_ P Capital Plan City of Andover, MN ect # 08- 49450 -01 2006 thru 2010 Justification This lift station will allow additional capacity in the Bluebird trunk line to serve adjacent properties until the year 2020. Expenditures 2006 2007 2008 2009 2010 Total Improvement 600,000 600,000 Total 600,000 600,000 Funding Sources 2006 2007 2008 2009 2010 Total Sewer Revenue Bonds 600,000 600,000 Total Operational Impact/Other I Routine monitoring and maintenance of the lift station will be required. M 600,000 600,000 1 4 C I T Y 0 F Capital Improvement Plan ND OVEN14 Project Name: YELLOW PINE LIFT STATION C) < LLJ 153RD I BLUEBIRD ST Ir 11 IPA LEGEND ROW (:D Lots /Parcels (:::D Water Features City Limits Project Location �'o s� WSL-11, I 350 175 0 350 '000 ��s U) < U) -J -J Location Map Capital Plan 2006 thru 2010 Justification I Seal coating will extend the useful life of roads by protecting the bituminous from oxidation due to adverse weather conditions (sun, rain, wind, snow, etc.). The prevention of oxidation will prolong the useful life of the pavement and defer the need for a costly reconstruction. Seal coating also improves the skid resistance of the roadway surface by increasing the friction between vehicle tires and the roadway. New developments requiring seal coating are not shown on the attached maps. Expenditures 2006 2007 2008 2009 2010 Total Construction 263,615 203,084 550,569 471,092 313,212 1,801,572 Total 2639615 2039084 5509569 4719092 3139212 19801,572 Funding Sources 2006 2007 2008 2009 2010 Total Construction Seal Coat Fund 29,726 R & B - Crack Seal & Seal Coa 233,889 6,807 196,277 96,220 454,349 78,330 392,762 4,791 308,421 215,874 1,585,698 Total 2639615 203,084 5509569 4719092 313,212 198019572 Operational Impact/Other I Extending the life of the street will reduce routine maintenance (Crack sealing, pot hole patching, overlays, etc.) and extend the overall design life of the pavement. 58 C I T Y 0 F NDOVE01 LEGEND ROW (:D Lots /Parcels (:::D Water Features City Limits Project Location qn� woomm Capital Improvement Plan Project Name: ANNUAL STREET SEAL COAT PROJECT 2006 STREET SEAL COAT, ZONE 3 RIDGE o TIMBER � I III IIE IITI III AILS "'I'VE I II IN� IIIIAIE 171-11 MITE OAK 1—TIR 14=/N EVY L "NV1E VL -T— I—N-N 11—N —NDL1 :11'T 111IT. I-- LN HLLS N ENCHANTEI o1 ., ENCHPNrEO OR I u— "E J FOX MEADOVIN ,crnr AIIE ,n E Location Map WSL-11, �, L7MA ki 17A., 2,400 1,200 0 2,400 4,800 Feet C I T Y 0 F NDOVE01 Capital Improvement Plan Project Name: ANNUAL STREET SEAL COAT PROJECT 2007 STREET SEAL COAT, ZONE 4 BIRO= RIDG u -- Li I 11E I 11T1 1-1 E IT - I-N o 1-ILN WARD 17- L� -1 LN �� 7-- \-1-4AKE WHITE OAKS f:HAWK W RIDGE WARD LAKE r"C 1 71- IN NONE NONE LEGEND ROW (:D Lots /Parcels (:::D Water Features City Limits Project Location WSL-11, �, L7MA ki 17A., 2,400 1,200 0 2,400 4,800 I Feet I Location Map A C I T Y 0 F Capital Improvement Plan ND OVEN Project Name: ANNUAL STREET SEAL COAT PROJECT 2008 STREET SEAL COAT, ZONE 5 I1400f �Y � �. I f�IIII� "I n �AFtSCOtd(LI� -_X u1 SUNSHINE Mw PRAIRIE KNOUL COON 'GREEk LL 11111111 OWN 4 C _rr "o _7 COON CAEE�' �_w _ 0 % BUNKER LAKE LEGEND ROW Lots /Parcels Water Features City Limits Project Location �, L7MA 3,000 1,500 0 3,000 6,000 — Feet Location Map C I T Y 0 F NDOVE01 Capital Improvement Plan Project Name: ANNUAL STREET SEAL COAT PROJECT 2009 STREET SEAL COAT, ZONE 6 LN 162ND LN ,T LU 111ST &E PINE HILLS 160THLK � UK -TH LN -TH \1 E 1 I@TH LN -TH A E _erT-L, 131THAVE 1,DT-E -TH LN 9i i5arHn3E 151H LN �7 -TH AUE m 154TH AVE FAT n ,56TH �1E 6LH LN 171 n i UP 1-TH W STN 155tH 15oTH AV E.- 1-TH LN 1.TH A, E 1511N LN ILTH LN -H LN 15 01111 11T11 -THLN 4TH LN ,54TH RE -T H I E F1 rjklll TN_ 5380 LN -D LN IET%R- 1-1PIAT 11ED LN 153RD AVE NE -PLAT iExixn s. 0 15386 AVE IE4-1 NE.11P11 B, I 14S y -rHAL L P .."L E . 11 ­NB LN 151 ST LN o 151 ST LN lu TEA U-NE 151S-E 15-1 LN SEY IND 150TH LN 131TULN Y KE 1-H.E ("A U N S '"'ARK 1"T I LN LN 145TH 14- LN I-. IN ,41TH LN 149TH 6 A E 141TH -TH LN 141TH I I 147FH LN LAKE 147TH E 141TH I E 14LTH LN 14-1 LN -]TH LN L /K N MVP 14LTH 4, E 14,3T� E 1-H LN COON CREEK LN 2T I fn 45TH IN 14 A-VE1 %ETH u 1TUED A E 144TH LN 14- 14- 4]E 14,',ID TLN 13- AVE 4- ry 14111, A 141-N 142RD LN U, 142ND LN 142ND LN "ND 11E 141N. 11 142ND I�E fn 7v COO� 1411T LN 14 1 IT LN 14 11 T LN 1-T.E 11RT" RE -A IAKI COON CREE 1��TN LN WITH A.T UITH 11 111TH rT 1. 14 ry 141TH E JAY BT 11 T 141TH I E r. EL TH ANDOVER 11- LN LIONS ED 1. LN PARK 139TH LN -H LN -THAIE PARK 130THAIE 1-- 11TH I E 1.TU.B 11TH 111TI LN AE I H I IIRTHAVE I I I�BTH LN 1-H LN ac 134TH D&T, H LN I 1ITH LN kqs t 1 KT- 1E tl 0* 11H -T-E BUNKER -E BLVD B-1- LL- BUNKER LNKE ... -.-E. LEGEND ROW (:D Lots /Parcels (:::D Water Features City Limits Project Location 2,250 1,125 0 2,250 4,500 Feet ITI Location Map I _:�,4� iNff LEGEND ROW (:D Lots /Parcels (:::D Water Features City Limits � Project Location Capital Improvement Plan Project Name: ANNUAL STREET SEAL COAT PROJECT 2010 STREET SEAL COAT, ZONE 7 KELSEY ROUND - 5�TI1 LN LAKE ROUND o (� Y U 147TH LN m 147TH LN LAKE 0 JO s 147TH AVE 147TH AVE 146 J pJ tNK6, 146TH LN 146TH AVE LN 1asTH w PLE SEN 145TH AVE OAKS COO/V CRH 145TH E 145TH AVE 9 144TH LN i ., a U 145TH AVE 1 r 145TH AVE 1 F z �rHA ycpOry w ¢ p VE C 7 QOa � ¢ m ➢ w x 143RD AVE 143RD AVE P m w r Oo Z w � 143RD AVE tFUA1`'ST 142ND LN COUNTY RD 116 BUNKER LAKE BLVD _ ' 141ST w 142NDAVE m O 141 ST LN w m 2 142ND LN i Q 142ND AVE r oCO s Q. JTu rvS 141 ST LN - 144TH LN 140TH LN I a J20 K 1 rc O AVE 141 ST AVE _ 3fDR e sd iAiG��,.d.3 ti� rts`" 140TH LN N 2 140TH AVE 140TH a U w i 139TH LN z m wl� AVE w w a w 1. n 139TH LN Z d 139TH LN =o rc p 1397H AVE O 40TH AVE r m w 139TH LN O i 139TH AVE m 139TH AVE O O� O O OS,l 139TH AVE N N 139TH LN WN -0 g �s 139TH AVE � o y - 1 138T LN 138TH LN 'Ty 138TH CT 1+�1 � H LN � 138TH LN 138THAVE �. 73j �5 p U 73i3THq� T%Y Nr�R < qir . o cn sT FgL n BUNKER LAKE BLVD BUNKER LAKE 6LVD C:RO4KED e 0 LANtu 136TH LN 5 0 F 13.THAVE Y w oH�MD a bc` rc 135TH LN 135TH AVE tiQ 135TH1 OF rc F V� �wv�(` 135TH LN w 135TH AVE 6'1ARIGOLD gT a.� F tn.^ 1 asTHc M 135TH AVE w A�IR,,,"4 Ci 134TH AVE a 133RD LN Q gTPGO o w 133RD LN z134TH O F 134TH AVE N w LN- -_ - 134TH AVE 133RD LN WSNI'LP'MAK ki 10.1 1,800 900 0 1,800 3,600 Location Map Capital Plan City of Andover, MN Project # 06- 43100 -02 Project Name Annual Street Crack Seal Project Type Improvement Useful Life 7 Years Category Streets /Highways 2006 thru 2010 Priority 1 -High Contact City Engineer Department Streets/ Highways Description I The project provides for sealing of the street cracks in the following maintenance zones: 2006 - Zone 4 2007 - Zone 5 2008 - Zone 6 2009 - Zone 7 2010 - Zone 1 Justification I The sealing of street cracks will significantly extend the useful life of the streets. This will extend the time frame when a costly street reconstruction project will be necessary. The sealing of cracks in the street surface reduces /eliminates water from entering the road base and subgrade. This process reduces the freeze /thaw cycles of the subgrade, maintaining the integrity of the road. Crack sealing is completed in a particular zone one year prior to seal coating. This allows the crack sealing material to cure and minimize bleed through once seal coated. New developments requiring crack seal are not shown on the attached maps. Expenditures 2006 2007 2008 2009 2010 Total Construction 96,008 204,786 175,225 116,500 117,556 710,075 Total 969008 2049786 1759225 1169500 1179556 710,075 Funding Sources 2006 2007 2008 2009 2010 Total Construction Seal Coat Fund 5,000 R & B - Crack Seal & Seal Coa 91,008 16,268 188,518 13,243 161,982 810 115,690 117,556 35,321 674,754 Total 969008 2041786 1759225 1169500 1179556 7109075 Operational Impact/Other I Sealing the street cracks will reduce routine maintenance by eliminating the source of degradation resulting from moisture in the road subgrade. 64 k I T Y O F DOVE Capital Improvement Plan Project Name: ANNUAL STREET CRACK SEAL PROJECT 2006 STREET CRACK SEAL, ZONE 4 BIRCH RIDGE I I MEMO El z MENEM f -� LEGEND ROW (:D Lots /Parcels (:::D Water Features City Limits � Project Location eWARE 1 AKE 9 LEMAN WMEN HE ENE F0 - I I - 0 1-IMIJENIN WSLI �, L7MA ki 1 V. -1 2,100 1,050 0 2,100 4,200 Feet Location Map A C I T Y 0 F Capital Improvement Plan NDOVE01 Project Name: ANNUAL STREET CRACK SEAL PROJECT 2007 STREET CRACK SEAL, ZONE 5 --Ah T 17, i,ws sE a `. ,ws.E.a. r r7 QT' HALL COMPLa SW SHINE PARK -4- PRAIRE KNOLL IT ISOON -CREEK l CO ON GREEK Vr-77 —9 ,FAIM, EEk!-L Eo MDO�R u0m PARK sj lu BUNKER LAKE LEGEND Location Map N L� ❑ ROW W E Fct:-, Lots / Parcels S Water Features 1E 2,900 1,450 0 2,900 5,800 City Limits TT!Tl Feet Project Location 0 El 2 C I T Y 0 F NDOVE01 r� WIND LN L PINE HILLS _Jl I 156THAVE 155TH LN 154TH LN ve 153PD 1-D &E 1A+1 1.157 LN 150 !H LN 1 . ROUND LA KE ,a 1-TH 11 ­T- ­RD Capital Improvement Plan Project Name: ANNUAL STREET CRACK SEAL PROJECT 2008 STREET CRACK SEAL, ZONE 6 -LN 151TH LN Br I-E 1-H LIN ­TH LN 156TH A1.E J ¢L1 155 FH LN 155TH \E 114TH LL my114TH.E 1`7 \­%­3 1E11P1AL 'ETE-3 I-RIAL 'ETEPANS IEIIIPI­_,r➢ CITY HALL PA K COMPI FX 41 151-1 151-4 151-E 15- LN 1,A1. LN -TH A,E rHavE tests -TH 1,E 155TH 1-H L 1-H LN 1-H 11E ISNTH VET 1-TH LN 154TH LN ­THA,E sa J 10" low MEN I'z LEGEND ROW (:D Lots /Parcels (:::D Water Features City Limits Project Location 2,100 1,050 0 2,100 4,200 0 1 Feet Location Map A C I T Y o F Capital Improvement Plan NDOVEA Project Name: ANNUAL STREET CRACK SEAL PROJECT 2009 STREET CRACK SEAL, ZONE 7 LEGEND ROW Lots /Parcels (::D Water Features City Limits � Project Location N W E S 1,400 700 0 1,400 2,800 Feet Location Map C I T Y 0 F NDOVER14 142ND LN 142ND LN I 142ND AVE O"'P 141ST UN 141ST AVE Capital Improvement Plan Project Name: ANNUAL STREET CRACK SEAL PROJECT 2010 STREET CRACK SEAL, ZONE 1 147TH AVE 147TH AVE rr 146TH UN L 146TH LN 146TH AVE X146 1 146TH AVE ur Qr LL w LN w 1450 TH S C;IjoN CREEK DR ANDOVER BLVD 145TH AVE 144RD A.V.- 144TH 1v wr w, <w w < G 143RD P, R- 111ND AVE o 0A wY 141ST UN wn z 142N D AVE 141ST LN OAKS 0A K S 010,0r FA r ar 149TH LN =ST 140TH LN EAST LLS 0 KE WEST w 140TH AVE o I JAY ST 139TH AVE j3gT 139 rty', I 139TH LN 139TH AVE 139TH AVE 138TH LN O OSAGE ST 138TH LN 138TH AVE � 138TH CT .1 138TH AVE �21TFH LN +4 BUNKER LAKE BLVD BUNKER LAKE BLVD BUNKER LAKE BLVD LAKE BOX �w: LANDIN,3, cllp��, 13.H LN W, rc TAT10N PKWY 116TH LN S 136TH AVE 1115TH AVE w W "'T 0 135TH LN 135TH LN 111TH LN 135TH AVE STATION PKWY 135TH 'IF, 135TH AVE 135TH AVE w L N 134TH AVE w 135TH AVE LIAR 'GOLD ST 10 1P 135TH LN 135TH AVE 135TH UN rc 0 :5 134TH LN 134TH LN ,,,A LN yr cg 1 ... Ell CREEK CAST 134TH AVE 134TH AVE CREEK UTH �34TH AVE 134TH AVE A z 134TH AVE 134TH AVE L. W 133RD LN, 133RD L N 133RD LN < 133RD LN A LEGEND ROW (:D Lots /Parcels (:::D Water Features City Limits Project Location N W S 1,400 700 0 1,400 2,800 Feet Location Map O LANDING O k" rH AVE TH A 11E z 145TH AVE > 3RD AVE J V 142N 141ST LN Y D AVE 141ST LN rc O E 140TH AVE 139TH LN o 139TH AVE 139TH AVE o LN 138TH LN 138TH AVE 140TH LN ROSL PARK C, 14 w� 139TH LN 139TH AVE 1 138 142ND LN 142ND LN I 142ND AVE O"'P 141ST UN 141ST AVE Capital Improvement Plan Project Name: ANNUAL STREET CRACK SEAL PROJECT 2010 STREET CRACK SEAL, ZONE 1 147TH AVE 147TH AVE rr 146TH UN L 146TH LN 146TH AVE X146 1 146TH AVE ur Qr LL w LN w 1450 TH S C;IjoN CREEK DR ANDOVER BLVD 145TH AVE 144RD A.V.- 144TH 1v wr w, <w w < G 143RD P, R- 111ND AVE o 0A wY 141ST UN wn z 142N D AVE 141ST LN OAKS 0A K S 010,0r FA r ar 149TH LN =ST 140TH LN EAST LLS 0 KE WEST w 140TH AVE o I JAY ST 139TH AVE j3gT 139 rty', I 139TH LN 139TH AVE 139TH AVE 138TH LN O OSAGE ST 138TH LN 138TH AVE � 138TH CT .1 138TH AVE �21TFH LN +4 BUNKER LAKE BLVD BUNKER LAKE BLVD BUNKER LAKE BLVD LAKE BOX �w: LANDIN,3, cllp��, 13.H LN W, rc TAT10N PKWY 116TH LN S 136TH AVE 1115TH AVE w W "'T 0 135TH LN 135TH LN 111TH LN 135TH AVE STATION PKWY 135TH 'IF, 135TH AVE 135TH AVE w L N 134TH AVE w 135TH AVE LIAR 'GOLD ST 10 1P 135TH LN 135TH AVE 135TH UN rc 0 :5 134TH LN 134TH LN ,,,A LN yr cg 1 ... Ell CREEK CAST 134TH AVE 134TH AVE CREEK UTH �34TH AVE 134TH AVE A z 134TH AVE 134TH AVE L. W 133RD LN, 133RD L N 133RD LN < 133RD LN A LEGEND ROW (:D Lots /Parcels (:::D Water Features City Limits Project Location N W S 1,400 700 0 1,400 2,800 Feet Location Map Capital Plan 2006 thru 2010 Justification The streets in these neighborhoods are in excess of 20 years old and are in need of rehabilitation. The intent of this Street Mill and Overlay is to provide the community with a high quality transportation system and maintain a constant upkeep of the City's street infrastructure. Expenditures 2006 2007 2008 2009 2010 Total Construction 736,454 1,027,052 967,705 835,228 740,138 4,306,577 Total 7369454 190279052 9679705 8359228 7409138 493069577 Funding Sources 2006 2007 2008 2009 2010 Total Assessments 164,704 R & 6 - Overlays 571,750 389,014 638,038 337,235 630,470 20,602 814,626 112,362 627,776 1,023,917 3,282,660 Total 7369454 190279052 9679705 8359228 7409138 493069577 Operational Impact/Other I The rehabilitation of the streets will reduce the routine maintenance (Crack sealing, pot hole patching, ect..) in the area. Long term, this reconditioning will prolong the structural stability of the roadway making for a longer serviceable life. 70 I \ C I T Y 0 F NDOVE01 U) LLJ z w 159TH AVE I V r 00 10 0 LEGEND ROW (:D Lots /Parcels (:::D Water Features City Limits Project Location C/) 0 z 0 U-1 Capital Improvement Plan Project Name: ANNUAL STREET MILL AND OVERLAY (2006) C/) 162ND LN 0 0 a_ I 1 An U) U) U) 0 <! 0 < < LLJ O W, ISIS' P LMAK ki 17A., 530 265 0 530 1,060 Feet ti co 3 U o: Fr r CO Z, GO fy_ 75,9 J" �T `,�r'FZ A{b� 4A iMFI ��q� Location Map kC 1 '1' Y O 1' NDOVE A■-�� Capital Improvement Plan Project Name: ANNUAL STREET MILL AND OVERLAY (2006) I 169TH LN bL N ti E LE 4T 167TH LN 167TH LN (1) U ca z z:) O U N O :X. U E S -r JA6TH AVE RD AV! o LUND'S w NORTH s zi HUNT RS ° �6 OLLO' A AVE. f LEGEND ROW (:D Lots /Parcels (:::D Water Features City Limits � Project Location -76, L� ki a 'kJ. J�. 168TH T A f F- U) z w U" z u1 620 310 0 620 1,240 Feet 164TH LN z w U z 0 Irf w r Location Map i C I T Y or NDOVER14 Capital Improvement Plan Project Name: ANNUAL STREET MILL AND OVERLAY (2007) 7THAVE 10 0 oV R D, IN :)TH AVE C-\, 17 176TH AVE b 7 ,-J-7fiIH LN C/) Z: I--I L-- I LEGEND ROW (:D Lots /Parcels (:::D Water Features City Limits Project Location N W S 510 255 0 510 1,020 Feet Location Map LLJ 0 z ilTi: CIR I--I L-- I LEGEND ROW (:D Lots /Parcels (:::D Water Features City Limits Project Location N W S 510 255 0 510 1,020 Feet Location Map k Nry or DOVE ITLUB Capital Improvement Plan Project Name: ANNUAL STREET MILL AND OVERLAY (2007) RE S U EY 08 FOX MEADOW LEGEND ROW (:D Lots /Parcels (:::D Water Features City Limits � Project Location S ENCHANTED DR x f TU PA 00AN� VjNTq�E S T Q w z tD w x N W E S 540 270 0 540 1,080 Feet w Q z Location Map A C I T Y o F Capital Improvement Plan NDOVEkM Project Name: ANNUAL STREET MILL AND OVERLAY (2007) A C I T Y 0 F Capital Improvement Plan ND OVEN Project Name: ANNUAL STREET MILL AND OVERLAY (2007) 0 IS4 TH 0 /V 0 C/) 10, z 1< Z) (D 153RD AVE 153RD AVE C/) I I I 59ND PINE 149TH LN 149TH AVE 2 N LEGEND ROW (:D Lots /Parcels (:::D Water Features City Limits Project Location I I k N OV R (f) x 0 �LL E 0 —10 151ST AVE I -J UJ N W S 540 270 0 540 1,080 Feet ro KELSEY ROUND LAKE I - 149TH AVE Location Map A C I T Y o F Capital Improvement Plan NDOVE01 Project Name: ANNUAL STREET MILL AND OVERLAY (2008) m 0 0 16a�H `N KO T A Q rJ M LEGEND ROW (:D Lots /Parcels (:::D Water Features City Limits � Project Location 17 C a_ J 0 h �o 170TH LN C D 0 A P R A I . 169T 169TH LN M E JA W Cn D >- � 4 a 0 a � 168TH LN w �i L. LOO U) a a 0 167TH LN r , 166TH LN J n Location Map U) w U) -1 0 r [if cra out N W E S 600 300 0 600 1,200 Feet kI NDOC T Y 0 F VEkt I LU 149TH LN 149TH AVE RIVER 148TH LN TRAILS Z .Q 148TH AVE i-- U) 0 0 147TH LN 147TH LN OWOOD uiu 146TH LN z 0- 146TH AVE U) 145TH LN LEGEND ROW (:D Lots /Parcels (:::D Water Features City Limits Project Location Capital Improvement Plan Project Name: ANNUAL STREET MILL AND OVERLAY (2008) LAKE 71- 149TH AVE 149TH AVE E ROUND .U) 0 CID LAKE 147TH LN OJ AVE 146TH LN NI w z S —D K '61 B L D SAO 14ETH LN Cn U) 46TH AVE U) 0- 0 0 145TH LN H LN 145TH AVE 145TH AVE co 7�1 AVE LL D 0 1,500 750 143RD AVE 143RD AVE w LU CREE 0 �u E 0 Z WR QUAY ST V, BUNKER LAKE BLVD 142ND AVE U) C) C) 141ST LN 141ST LN 4 lb I �Vc N W S 0 0- X13 1 40TH L N E PA U) Co LU LU U) < U) 0 H LN 0 Ir 0 140TH AVE LU 140TH AVE 140TH AE 0- LU U) co y D F-- 139TH LN 1 Tli L 139TH LN 139TH LN 0 U U) 139TH AVE 139TH AVE 139TH AUE 0 0 10 139Th 'dE L) Ir If 1. < M w U) 138TH LN 138TH LN 1M LD IRIS 138TH LN 138TH LN 138TH AVE 13F'H CT BUNKER LAKE BL\/L) o Location Map 1,500 ig Feet 0A,A,S U) AV' >- 115TH of LU 145TH L J U) AVE U) 10 LL TS U) CIO. >- F-- LU CD �< U) Q < 0 z of U) LU 144 AVE yC of 0 LLJ z LU 0 IPA x :D 143RD AVE 143RD AVE w LU CREE 0 �u E 0 Z WR QUAY ST V, BUNKER LAKE BLVD 142ND AVE U) C) C) 141ST LN 141ST LN 4 lb I �Vc N W S 0 0- X13 1 40TH L N E PA U) Co LU LU U) < U) 0 H LN 0 Ir 0 140TH AVE LU 140TH AVE 140TH AE 0- LU U) co y D F-- 139TH LN 1 Tli L 139TH LN 139TH LN 0 U U) 139TH AVE 139TH AVE 139TH AUE 0 0 10 139Th 'dE L) Ir If 1. < M w U) 138TH LN 138TH LN 1M LD IRIS 138TH LN 138TH LN 138TH AVE 13F'H CT BUNKER LAKE BL\/L) o Location Map 1,500 ig Feet k Nry or DOVE Capital Improvement Plan Project Name: ANNUAL STREET MILL AND OVERLAY (2009) 176TH AVE M � 175TH LN � 175TH LN 174TH AVE LAkG k p A IF LEGEND ROW (:D Lots /Parcels (:::D Water Features City Limits � Project Location M N W E S 400 200 0 400 L 1 1 174TH LN T It- rr 1741HHvE t Alnnl -1 Location Map A C I T Y o F Capital Improvement Plan NDOVEA Project Name: ANNUAL STREET MILL AND OVERLAY (2009) U Q I U °+ — U z ❑ QUAY ST 0 L F 142ND LL WOODLAND POND O w W U W W O Z � � N 142ND AVE 4txu ADD. U) Q 141 ST LN N p 141ST L hHU 11 ROSE 140TH LN PARK CO w O p of ❑ 0 140TH AVE p w 4`11 F C-D m LLI � -.D a_ w U) U) U) Cl) J Y � Q p U Q 139TH LN _ ❑ O C) T VLN N ❑ O o 0 U) 0 139TH AVE p 139TH AVE � 0 139TH AVE o S�. J O (� L) UJ z LO 138TH LN 138TH LN 8TH LN, 138TH LN U W Z 13�—H CT �c HOMES L ? ANA o C3 - — BUNKER LAKE BLVD u~, BUNKER LAKE BLVD � o (A J cn O C Q � J 136TH N z:. , d m � 136TH AVE U) w lk c U) ❑ s m R E 4 C TAT J 135TH CIR m LU f Y Q 139TH LN A 2 N 139TH AVE N I O M Lei e 134TH LN 4A F- T om` m o ,,y Z/ s� C _ L LA - Cl) ,A U w B A Ut Cl) .-., ch 110 w _ co w' < �N\o -J p CRG \R ❑ Of O U' of Q �G G z, 135T �G UJ L a R /GOLD 87 -,e 4-- -1 _ W' 4J LEGEND ROW Lots /Parcels (�:D Water Features City Limits � Project Location 870 435 0 870 Location Map R E X135fHLN - TR11 TAT J 135TH CIR m LU f Y Q ' 135TH AVE — LU O I O M Lei e 134TH LN 4A F- Location Map CITY OI' NDOVER14 Ir' Capital Improvement Plan Project Name: ANNUAL STREET MILL AND OVERLAY (2010) BUNKER LAKE BLVD h E T ,off H0` _ 135TH LIA 0 ill - w K Cn J W M J t-�25TH CIR m W Y 4 m :'E;H o R ER E '�� KIco ® _ u) 134TH AVE 134TH AVE U) Di J G J 11 3R w - Jr LEGEND ROW Lots /Parcels Water Features City Limits � Project Location WSL-11, �, L7MA ki 17A., 650 325 0 650 Location Map Capital Plan 2006 thru 2010 Justification Striping is required through the local and state agencies. A reflective standard is required. Restriping annually maintains the pavement markings to the required standards. Expenditures 2006 2007 2008 2009 2010 Total Improvement 14,000 15,000 16,000 17,000 18,000 80,000 Total 149000 159000 169000 179000 189000 809000 Funding Sources 2006 2007 2008 2009 2010 Total R & B - Reserve 14,000 15,000 16,000 17,000 18,000 80,000 Total 149000 159000 169000 179000 189000 809000 Operational Impact/Other I The pavement markings are contracted out each year adding virtually no operational impact. 82 Capital Plan City of Andover, MN 2006 thru 2010 Project # 06- 43100 -05 Project Name Municipal State Aid Routes / New & Reconstruct Type Improvement Useful Life 20 Years Priority I -High Contact City Engineer Category Streets /Highways Department Streets / Highways Description The following projects are proposed to be constructed and /or rehabilitated to meet State Aid Standards. The rehabilitation projects will consist of milling the existing street surface, constructing concrete curb and gutter where it does not exist, and improving storm drainage. *2006: Hanson Blvd (TH 242 - Bunker Lake Blvd) $600,000. 168th Lane (Verdin St - Crocus St) $167,400. Tulip Street $762,000. University Avenue (Constance Blvd. - 166th Ave.) $25,000 *2008: 143rd Ave (Round Lake Blvd -Xenia St) $152,250. 147th Ave (Guarani St - 7th Ave) $81,700. *2008: Nightingale Street (Crosstown Blvd - 161st Ave) $625,200. *2009: Hanson Blvd (Bunker Lake Blvd -Crosstown) $1,534,500. South Coon Creek Drive (Round Lake Blvd -Crosstown) $586,000. Crosstown Blvd (Andover Blvd - Hanson) $487,500. Justification *2006: Hanson Blvd (TH 242 - Bunker Lake Blvd) - City cost participation as part of County reconstruction project. 168th Lane (Verdin St - Crocus St) - Upgrade needed to maintain integrity of State Aid infrastructure. Surrounding area included in 2006 Overlay program. Tulip Street (161st Ave - Valley Drive) -New construction to accommodate additional traffic and provide access for the proposed Meadow Creek School. University Avenue (Constance Blvd. - 166th Ave.) - Reconstruct this segment by milling and overlaying. This project will be administered by Ham Lake through the JPA. *2008: 143rd Ave (Round Lake Blvd - Xenia St) - Upgrade needed to maintain State Aid route. 147th Ave (Guarani St - 7th Ave) - Upgrade needed to maintain integrity of roadway infrastructure and meet State Aid Standards. Nightingale Street (Crosstown Blvd - 161st Ave) - Upgrade needed to maintain integrity of State Aid roadway infrastructure. *2009: Hanson Blvd (Bunker Lake Blvd - Crosstown) - City cost participation as part of County reconstruction project. South Coon Creek Drive (Round Lake Blvd - Crosstown) - Upgrade needed to maintain integrity of roadway infrastructure and meet State Aid Standards. Crosstown Blvd (Andover Blvd - Hanson) - City cost participation as part of County reconstruction project. Expenditures 2006 2007 2008 2009 2010 Total Construction 1,554,400 859,150 2,608,000 5,021,550 Total 195549400 8599150 296089000 5,021,550 Funding Sources 2006 2007 2008 2009 2010 Total Assessments 180,000 25,000 208,500 413,500 Federal Funds 270,000 825,000 1,095,000 Municipal State Aid Funds 1,104,400 834,150 1,574,500 3,513,050 Total 195549400 8599150 296089000 590219550 Operational Impact/Other I Rehabilitating the roads will reduce the amount of routine maintenance along these sections of roadway and provide a safer and higher quality transportation system. 83 A C I T Y o F Capital Improvement Plan NDOVE01 Project Name: MUNICIPAL STATE AID ROUTES RECONSTRUCT 2006 v.J w (J z z H AVE ,A N D A T I N o T I- Cn JAY ST IP4 N O N r 1 _ 'E 'WATTP w Cn A N D 0 cn Q U S TAT I GARDEN � 0 m ®m❑ STATION PKWY i � 135TH AVE z a 134TH LN 134TH LN 4 17- Cn M *44 G 134TH AVE Cn �� m z L E N _ 133RD 0 J m Z O U) Z Q Eo z� 14 U 140TH VE a 0 14 11 c� Q 139TH AVE 138TH LN a a zco U j 4 W I LL J m - _ 1 r 138TH AVE ) z Q � J � ~ N w C/) 137TH LN } z U BUNKER LAKE BLVD LEGEND Location Map N ROW W E Lots / Parcels S Water Features 740 370 0 740 Feet City Limits Project Location A C I T Y o F Capital Improvement Plan NDOVEA Project Name: MUNICIPAL STATE AID ROUTES RECONSTRUCT 2006 70 It ai W 169TH LN " z JARTH-LN 167TH LN h r � I— U) Z (j O � O N U r Z U W LEG END Location Map N ❑Q ROW PFJ 0 Lots / Parcels o �� S D C� Water Features 1E 0 o 0 � y 300 150 0 300 600 City Limits Feet o �fl 0 Project Location El � ❑° � oat D C I T Y or NDOVER14 Capital Improvement Plan Project Name: MUNICIPAL STATE AID ROUTES RECONSTRUCT 2006 165TH AVP IS I I I - LEGEND ROW (:D Lots /Parcels (:::D Water Features City Limits Project Location 161STAVE PINF N W S 770 385 0 770 1,540 1 Feet 167TH LN -1 -A J Al 166TH LN 1 60 CQ) 0 LU --1 L641±i L' UZI' ■ a ■ ■ Location Map A C I T Y o F Capital Improvement Plan NDOVEA Project Name: MUNICIPAL STATE AID ROUTES RECONSTRUCT 2006 k Nry or DOVE .EN CS }x. LEGEND ROW (:D Lots /Parcels (:::D Water Features Capital Improvement Plan Project Name: MUNICIPAL STATE AID ROUTES RECONSTRUCT 2008 145TH AVE CD (n J m � w 144THAVE WSL-11, �, L7MA ki 17A., 300 150 0 300 600 City Limits Feet Project Location . AY 6 1 1 N H U Cn J D H U� O W (.) W W J 0 z O D Cn 142 N D AVE Location Map k Nry or DOVE 148TH LN M ADO 000 NORrH 148TH AVE � O Y 147TH LN � 146 TRT z a C/) 146TH AVE J 5. -1 0 Y 145TH LN LEGEND ROW (:D Lots /Parcels (:::D Water Features City Limits � Project Location Capital Improvement Plan Project Name: MUNICIPAL STATE AID ROUTES RECONSTRUCT 2008 149TH AVE z Q Q 147TH LN 145TH AVE Q Z (D W, ISIS' P LMAK ki 17A., 350 175 0 350 700 Feet U) z Q Q CD 147TH AVE MUGI NI 146TH LN I ME R UN P� O 146TH AVE 145TH LN 145TH AVE 145TH AVE Location Map C I T Y 0 F NDOVER14 Capital Improvement Plan Project Name: MUNICIPAL STATE AID ROUTES RECONSTRUCT 2008 F- 161 ST LN LO z w 1 11 61STAVE 161STAVE J LO w U) z I GOTH LN LL' M F- of z F- U) LO w w w 160TH AVE 0 < z 159TH LN w U) w < 159TH LN U) LO of LH 1-- Q LO < w (f) z 15 z z L n -J 159TH AVE LD z w LO 158TH LN z 4 158TH LN L) 1-- U) w 158TH AVE 1 E U) z w U) w (D < U) U) LU 0 -J 156TH AVE z 155TH LN z 154TH LN 154TH LN 154TH AVE � U) w LO z CI a 153RD LN Cl) il� w VETERANS MEMORIAL > 1-- Cl) VETERANS MEMORIAL w LU LO 0 < Z LU z VETERANS MEMORIAL BLVD z 151 ST LN 151 ST LN LO LO z w 151 ST AVE 151 STAVE x 1-- w U) 0 1-- 150TH LN w z C/) -T LO CD 0 C/) Qf 0 z J w 1-- af -J < 150TH AVE ff LO 150TH P�I� Lo w LEGEND ROW (:D Lots /Parcels (:::D Water Features City Limits Project Location 156TH LN U) z 155TH LN (D z 155TH AVE co Z z < z ILN co z 153RD LN U) z z BLUEBIRD ST CITY HALL CROSSTOWN BLVD SUNSHINE PARK N W S 850 425 0 850 1,700 1 1 Feet ok C) J oo Z w 0 L) C/) 0 z >< < F- co U) U) Iw w I y z Location Map 1-- JU) U) 155TH U) w 76 < 6 w U) w L) 0 w >< U) < '4/- 7 V 00 154TH AVE U) w (D 153RD LN BLUEBIRD ST CITY HALL CROSSTOWN BLVD SUNSHINE PARK N W S 850 425 0 850 1,700 1 1 Feet ok C) J oo Z w 0 L) C/) 0 z >< < F- co U) U) Iw w I y z Location Map 1-- JU) k NT Y o F Capital Improvement Plan DOVE Project Name: MUNICIPAL STATE AID ROUTES RECONSTRUCT 2009 �g1s T AV E CROSSTOWN BLVD > LO J ST J 150TH LN w m J NI O Z U UJ ~ O w 07 O> ' ,0TH LN Iz r ¢ � Q 150TH PvE SUNSHINE _ U) ~ H v PARK ❑ w w � iy J Y Z < < K W 'O w ❑ U � J O m 149TH AVE - 149TH LA 149TH LN �c cJ JAY ST ❑ J LEGEND N ROW Lots /Parcels Water Features City Limits � Project Location 1,200 600 W E S 0 ^" 140TH LN @ ` \A \�A N MXKE F BUNKER � WEST 2� ,, I Q& a y ti CF U 140TH nVE a 140Ty � N Location Map 1,200 ia Feet C I T Y 0 F NDOVER14 ROUND IffAKE B ROW (:D Lots /Parcels (:::D Water Features City Limits Project Location Capital Improvement Plan Project Name: MUNICIPAL STATE AID ROUTES RECONSTRUCT 2009 O 00 139TH AVE Y)A N W S 1,100 550 0 1,100 —7 co I iY CREEK I 8 COON 145TH AVE O U) Ll A F F z z AD z CY D ........ K OL LU > J a_ INN a_ si F-- < -J 14 < 0 CY 141 E NORTH RED NORTH VAJODS PAST %pic, VD S OAKS 140TH LN VA rE S T 1.11 rE S T 1 U) CD U U) U 0 W Of 140TH AVE 0 > U < Q IQ 139TH AVE 1397. IV 139TH LN 0 10, 0) U) z CY 1318TH- LN L>U 138TH AVE Location Map 2,200 M Feet k Nry or DOVE Capital Improvement Plan Project Name: MUNICIPAL STATE AID ROUTES RECONSTRUCT 2009 4ND LN I J1 CO3CN. CREEK gill • �.. ®�� :111 • 1,38-1H AVE ROW (:D Lots /Parcels Water Features City Limits � Project Location r-, 43R I cooA •Y c RFF�a qRk WSL-11, �, L7MA ki 17A., 1,300 650 0 1,300 2,600 Feet Capital Plan City of Andover, MN 2006 thru 2010 Type Improvement Priority 1 -High Useful Life 10 Years Contact City Engineer Category Streets /Highways Department Streets/ Highways u,� Description The existing lights in the traffic signal at Bunker Lake Boulevard and Round Lake Boulevard will be replaced with LED's. Justification LED's use less power than the current lights (90% reduction in energy costs can be realized) and they have a 7 -10 year replacement cycle. This is the last signal in the City that does not have LED lights. The long term energy cost savings exceeds the cost to replace the lights. Expenditures 2006 2007 2008 2009 2010 Total Technology Improvements 20,000 20,000 Total 209000 20,000 Funding Sources 2006 2007 2008 2009 2010 Total Municipal State Aid Funds 10,000 10,000 Other Municipality 10,000 10,000 Total 209000 Operational Impact/Other I Upgrade of the system will reduce annual maintenance and replacement costs. 94 20,000 Capital Plan City of Andover, MN ect # 06- 43100 -07 2006 thru 2010 Justification Intersection upgrades are necessary due to the increased development and demands on the transportation system, the need for safety improvements, and to comply with Anoka County Highway Department requirements. Expenditures 2006 2007 2008 2009 2010 Total Construction 600,000 400,000 1,000,000 Total 6009000 400,000 1,000,000 Funding Sources 2006 2007 2008 2009 2010 Total Assessments 200,000 200,000 Municipal State Aid Funds 400,000 400,000 800,000 Total 6009000 400,000 Operational Impact/Other I Improvements will improve the flow of traffic and will improve the safety of vehicles, pedestrians and bicyclists. 95 1,000,000 C I T Y 0 F NDOVER14 Capital Improvement Plan Project Name: COUNTY INTERSECTION UPGRADES 153RD AVE \,ETERANS MEMORIAL 'A -1 B! L—RD ST 153RD NVE I I IL SLVD Crosstown Blvd & Nightingale St (2006) CITY HAI 152ND LN SZ Ll ISISTAVE '151ST AVE iuh CROSSTOWN BLVD 0 O R, 150TH LN Z 0 TTF',. ca I OTH AVE SUNSHINE 0 S PARK *.-7 7 A, A NIm K) wOTH 149TH AVE 148 'Eff I I I I R OUND 1*8-n� AV SUNSHINE PA 14 1 AV 148TH AVE Ll I LAKE 147TH LN 47 HOT 147TH AVE 146TH IN 940b 141TH AVE 146TH AVE South Coon Creek Dr & Round Lake Blvd (2008) 115TH I',F tt S COON CREEKDR ANDOVER BLVD '145TH AVE 1417N A,C 144RDAVE 144TH— N A 1441,,, 0 0. RUN OLL LJ 143RDAW." 143RD AVE 143R13 AVE L O L F U °31 142ND IN QUAY ST 142ND LN 142N O 142,'D 'D X/E WOODLAND POND 142ND AVE 142ND AVE ZND ADD, 141STLN 141STLN 141STLI] 141STLI! 14 1 ST AVE TNORTH WOODS E Hanson Blvd & 139th Ave (2006) 140TH LN ROSE LL 143Td IN PAPK A, f*)TH AVE j 14�TH AVE E 139TH LN 1397H AVE 31 1 N O 139TH LN 139TH LN 139TH AVE 139TH AVE 139TH AVE 139TH AVE I B4TH X/E 1BNTR-E ANDOVER ATIONUQ 138TH LN 133TH LN N M�H LN 13,TH L11 73 8"', 1— AVE T H I q 138TH X/ 1-1 CT 138TH AVE 13M AVE. PARK 131LE LN I BUNKER LAKE BLVD L F 000, o 138TH LN HUNKER LAKE BLVD BUNKER LAKE BLVD Cp,OQKF.,b L A Vr. 12 ;5 135- LN 135TH AVE 134TH AVE "Lk" 133RD LN 133RD 1 LEGEND ROW (:D Lots /Parcels Water Features City Limits Project Location 11 A K kDL W W T AT T S STATION PKWY 111TH AVE GARDEN 135FH LN 135TH LN 135TH LN 135THCIR STATION PKUVY 135TH AVE 135TH 0 135TH AVE IL 0 134TH LN Hanson Blvd & 133rd Ave (2008).. < HanDEN CREEK 134TH AVE ',E 134TH AVE s L I R4TH AVE o<433R0 LN 133RD LN 133R I D N ""D NJE ki VA., 1,900 950 0 1,900 Location Map Capital Plan 2006 thru 2010 Justification Improve pedestrian and multi -modal access to various destinations within and externally to the city. The trails have reviewed by the Park and Recreation Commission. These trails that are proposed are a combination of interest by the Park Commission and City Council. Expenditures 2006 2007 2008 2009 2010 Total Construction 60,000 60,000 100,000 230,000 75,000 525,000 Total 609000 609000 1009000 2309000 759000 5259000 Funding Sources 2006 2007 2008 2009 2010 Total Trail Funds 60,000 60,000 100,000 230,000 75,000 525,000 Total 609000 609000 1009000 2309000 759000 5259000 Operational Impact/Other I Additional long -term maintenance and snowplowing will be necessary. 97 C I T Y 0 F Capital Improvement Plan NDOVER14 Project Name: TRAIL PROJECTS, 2006-2010 a Ova '000, 2007 7E BUNKE LAKE --'aMKER HILLS PARK KA G04'� PARK) 2007] LEGEND I Location Map IN R ®W W E (:D Lots / Parcels + S Water Features 4,250 2,125 0 4,25° Feet City Limits Project Location Capital Plan City of Andover, MN Project # 06- 49400 -02 Project Name Rehabilitation of Wells 2006 thru 2010 _W Type Improvement Priority I -High Useful Life 7 Years Contact PW Superintendent Category Improvements Department Water - -_ Description The motor, pump and column pipe are taken out for inspection and worn parts are replaced. The well is televised to determine the depth and condition. If the well is at or close to the original drill depth everything is put back in place. The well may need to be cleaned out to the original depth if there is a substantial decrease in the depth. Justification To make sure the well is operational to what it is designed for and to correct any problems that may affect our ability to produce the amount of water needed to meet the demand. A complete inspection and maintenance overhall is performed on each well a minimum of once every seven (7) years. Expenditures 2006 2007 2008 2009 2010 Total Improvement 40,000 45,000 45,000 50,000 50,000 230,000 Total 409000 459000 459000 509000 509000 2309000 Funding Sources 2006 2007 2008 2009 2010 Total Water Fund 40,000 45,000 45,000 50,000 50,000 230,000 Total 409000 459000 459000 509000 509000 2309000 Operational Impact/Other I This would be done at such a time that it would not affect the demand needs of the system. Typically done late fall. Capital Plan City of Andover, MN Project # 06- 49400 -03 Project Name water System Security Improvements Type Improvement Useful Life 20 Years Category Improvements Description Fencing around the water tower at city hall. 2006 thru 2010 Priority 1 -High Contact PW Superintendent Department Water Justification Improvements have been identified in the City's Water Distribution System Vulnerability Assessment. Safety improvements as identified will assist in keeping the municipal water supply safe for the residents. Expenditures 2006 2007 2008 2009 2010 Total Improvement 15,000 15,000 Total 159000 15,000 Funding Sources 2006 2007 2008 2009 2010 Total Water Fund 15,000 15,000 Total 159000 Operational Impact/Other 100 15,000 Capital Plan City of Andover, MN Project # 07- 49400 -01 Project Name water Tower Painting Type Improvement Useful Life 15 -20 Years Category Utilities 2006 thru 2010 Priority 1 -High Contact PW Superintendent Department Water Description Painting of the water tower closest to City Hall, including a new City logo. Justification The tower is going to be in need of painting to maintain its appearance and to protect it from wear and tear. A new City logo should also be put on the tower that show's what the City of Andover is about. Expenditures 2006 2007 2008 2009 2010 Total Improvement 350,000 350,000 Total 350,000 350,000 Funding Sources 2006 2007 2008 2009 2010 Total Capital Equipment Reserve 242,000 242,000 Water Trunk Fund 108,000 108,000 Total Operational Impact/Other I This is a scheduled maintenance that should be budgeted for. 350,000 101 350,000 Capital Plan City of Andover, MN Project # 07- 49400 -02 Project Name 143rd Ave Water Main Improvements Type Improvement Useful Life 50 Years Category Improvements 2006 thru 2010 Priority 1 -High Contact City Engineer Department Water + � �0 Description Water main would be constructed along 143rd Avenue from Round Lake Blvd to Woodbine Street. Water main stubs from the existing systems in Round Lake Boulevard and 143rd Avenue west of Woodbine Street are ready for connection. This section of water main would provide a looped system for the area south and west of Round Lake. Costs associated with construction of the water main would be paid for from the Trunk Water Fund. Justification 143rd Avenue is a State Aid route and is scheduled for mill and overlay in 2007 (roadway paid for through State Aid funds in the Overlay project). At this time it would be advantageous to install water main to serve adjacent properties and loop the distribution system while the streets are under construction. This line would function as a trunk line that would ultimately serve areas south and east of Round Lake that are not currently served with City water. Expenditures 2006 2007 2008 2009 2010 Total Construction 83,000 83,000 Total 83,000 83,000 Funding Sources 2006 2007 2008 2009 2010 Total Water Trunk Fund 83,000 83,000 Total 83,000 Operational Impact/Other I Additional maintenance and flushing requirements for the water main system will result. 102 83,000 1 1), q- RJJ L Capital Improvement Plan Project Name: 143RD AVENUE WATER MAIN City of Andover, Minnesota IMPROVEMENTS Incorportated 1974 (A 4A 1�%- a U) Q z w x 143RD AVE CD ROW Lots / Parcels 0 Water Features z City Limits OProject Location (out U) � w U) w Q D V O O COMMP U) UJ w r� z Q m 0 O O �I 4lC) U) O 7-7 LU 3:r (3LJ Q Z N W E S U) J U w Z D - -I W LL U) 10-0%1 LL WQ LU Q LU 47' �� 14 _AVE r_ ' 500 0 500 103 U il� 142ND AVE M UJ J r� DD Q Z O �I 4lC) W !w 142ND AV J 7-7 500 0 500 103 U il� 142ND AVE M Capital Plan City of Andover, MN ect # 08- 49400 -01 2006 thru 2010 Justification In order to adequately supply treated water at an acceptable pressure to the entire distribution system in Andover, a two million gallon water tower must be constructed near the water treatment plant. The existing 500,000 water tower in the southwest part of town would be demolished as part of this process. Construction of this tower and demolition of the existing 500,000 gallon tower would eliminate the low pressure zone currently in the southwest part of town. Expenditures 2006 2007 2008 2009 2010 Total Construction 2,950,000 2,950,000 Total 2,950,000 2,950,000 Funding Sources 2006 2007 2008 2009 2010 Total Water Revenue Bonds 2,950,000 2,950,000 Total 2,950,000 Operational Impact/Other I Additional maintenance and monitoring would be required of the Sewer and Water department. 104 2,950,000