Loading...
HomeMy WebLinkAbout08-27-249 C I T Y 0 FA UNDOVE 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 . (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV Andover Planning and Zoning Commission Meeting Agenda August 27, 2024 Andover City Hall Council Chambers 7:00 p.m. 1. Call to Order 2. Pledge of Allegiance 3. Approval of Minutes — July 23, 2024 Regular Meeting 4. Public Hearing: Interim Use Permit (IUP) — Interim Performance Standards - 3160 162°d LN NW — PID# 16-32-24-23-0005 — Randy Ferguson (Applicant) 5. Other Business 6. Adjournment ?CN T Y O F DOVE 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 . (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV TO: Planning and Zoning Commissioners FROM: Jake Griffiths, Associate Planner SUBJECT: Approval of Minutes DATE: August 27, 2024 ACTION REQUESTED The Planning & Zoning Commission is requested to approve the July 23, 2024 regular meeting minutes. 6 7 PLANNING AND ZONING COMMISSIONMEETING — JULY 23, 2024 8 9 The Regular Bi-Monthly Meeting of the Andover Planning and Zoning Commission was 10 called to order by Chairperson Godfrey on July 23, 2024, 7:00 p.m., at the Andover City 11 Hall, 1685 Crosstown Boulevard NW, Andover, Minnesota. 12 13 Commissioners present: Chairperson Karen Godfrey, Commissioners Scott Hudson, 14 Nick Loehlein, Chuck Naughton, Jon Shafto, Pat Shuman 15 Jr., and Ryan Winge. 16 17 Commissioners absent: None 18 19 Also present: Community Development Director Joe Janish, City Planner 20 Peter Hellegers, Planning Intern Abigail Turner 21 22 PLEDGE OFALLEGL4NCE 23 24 APPROVAL OF MINUTES 25 26 June 11, 2024, Regular Meeting 27 28 City Planner Hellegers noted on page 2 line 19 it should read: "Mr. Janish ... ". 29 30 Motion by Loehlein, seconded by Shuman, to approve the minutes of the June 11, 2024, 31 Regular Meeting as presented. Motion carried on a 5-ayes, 0-nays, 2-present (Shafto and 32 Winge), 0-absent vote. 33 34 PUBLIC HEARING. Sketch Plan Review — Unaddressed Property 16xxx Ward Lake 35 Drive NW, PID#11-32-24-41-0003 — SW Wold Construction, Inc. (Applicant) 36 37 City Planner Hellegers stated that the Planning Commission is asked to review a sketch 38 plan for a single-family PUD residential development by SW Wold Construction hie. The 39 staff report for the proposed Sketch Plan was provided for Commission consideration. 40 41 The City received an application for a sketch plan showing a 21-lot single-family rural 42 residential on the site. The site is in the northeast quadrant of the community, 43 approximately three quarters of a mile north of the intersection of 161' Avenue NW and 44 Crosstown Boulevard NW. The site is bordered by the railroad tracks on the west side of 45 the site and Ward Lake Drive on the east side of the property. The Country Oaks North 46 residential development is just west of the railroad tracks and the homes from that mixed Regular Andover Planning and Zoning Commission Meeting - Dra t Minutes — July 23, 2024 Page 2 1 urban/rural residential development back up to the development site. The site also abuts 2 the Deerwood Estates rural residential development along the southerly side of the 3 proposed development site. 4 5 Mr. Hellegers reviewed conformance with local and regional plans and ordinances. The 6 entire 33.7-acre site (11-32-24-41-0003) is located outside of the Metropolitan Urban 7 Service Area (MUSA) boundary. The property is guided in the 2018 Comprehensive Plan 8 as Rural Residential, a designation that calls for densities of 0.0 to 0.4 units per acre. The 9 proposed 21-lot development would exceed that standard with a density of 0.6 units per 10 acre. The proposed development includes deviations from City Codes that are proposed to i l be addressed through the PUD process. 12 13 The site would have two access points; one at the south end of the development on 14 Sycamore Street, and the other at the northeastern portion of the development accessing 15 Ward Lake Drive. The proposed access points were identified on a map. Future 16 development to the north (not proposed) would provide another possible connection point 17 which also was shown on a map. 18 19 The subject property is zoned R-1 Single Family Rural and there is not a request to change 20 the zoning of the property. City Code requirements for the R-1 zoning district include a 21 minimum lot size of 2.5 acres and minimum lot width of 300 feet measured at the front 22 yard setback line. The applicant is proposing to have a range of lot sizes, some of which 23 would deviate from the R-1 standards with both lot size, lot width and depth. Comparable 24 single-family lot widths for these reduced size rural lots can be found at the north end of 25 the Country Oaks North development, located just west of the railroad tracks. 26 27 Each of the lots will be served by private well and septic systems. The sketch shows septic 28 drain field locations for each lot. The City Code requires two drain field locations with a 29 combined area totaling 5,000 square feet per lot. 30 31 There are a significant number of trees at the southeasterly portion of the site that the 32 developer is proposing to preserve as a wooded buffer between the development and the 33 existing residences to the south. As part of the PUD process, the applicant is required to 34 submit a tree protection plan showing trees to be preserved. This will be required during 35 the preliminary plat process. 36 37 The 2013 National Wetlands Inventory (NWI 2013) does not indicate wetlands on the 38 property. However, a wetland delineation will be required if the applicant continues to 39 move forward. 40 41 The developer is responsible to obtain all necessary permits (Minnesota Department of 42 Natural Resources, U.S. Army Corp of Engineers, Lower Rum River Watershed 43 Management Organization, Minnesota Pollution Control Agency, and any other agency 44 that may have an interest in the site). Initial contact shall be made with the City 45 Engineering Department regarding this item. Regular Andover Planning and Zoning Commission Meeting - Dra t Minutes — July 23, 2024 Page 3 1 2 Once the overall layout of the sketch has been agreed upon and direction provided, the 3 applicant will prepare a grading plan, hydrology calculations and a soils report that will be 4 reviewed by the City, an engineering consultant, and the Lower Rum River Watershed 5 Management Organization. The LRRWMO will need to review the preliminary plat and 6 the applicant will need to address any items. 7 8 The Andover Review Committee (ARC) conducted an initial review of the sketch plan 9 and has submitted their comments to the applicant. Staff suggests the comments be to reviewed as part of the sketch plan process. 11 12 The current Master Park Plan does not identify parkland in this area. The applicant is 13 requesting a Planned Unit Development (PUD) as part of this development and flexibility 14 in the bulk area standards including size, dimension, and density. The proposed conceptual 15 PUD standards were reviewed. 16 17 Mr. Hellegers reviewed the City Code standards for PUD Review that the proposed 18 development would need to be addressed at the Preliminary Plat/PUD review stage. This 19 sketch plan requires a Preliminary Plat, Conditional Use Permit/Planned Unit 20 Development and Final Plat. 21 22 The sketch plan will be forwarded to the City Council for their feedback on August 7, 23 2024. Based on the feedback received throughout the sketch plan process, the developer 24 would modify the layout and make applications for Preliminary Plat, PUD and Final Plan 25 and submittals to seek their desired outcome. 26 27 The Planning Commission is asked to hold a public hearing this evening, take public 28 feedback on the proposed Sketch Plan/Concept PUD, and informally advise the applicant 29 through feedback on the proposed project. Attached for Planning Commission 30 consideration were the Location Map, City Staff Comments dated July 15, 2024, Public 31 Comments Received (None), Sketch PUD Narrative and Sketch Plan/PUD Concept Plan. 32 The City Council is expected to review this sketch plan at their scheduled meeting on 33 Wednesday, August 7, 2024. 34 35 Commissioner Shafto referred to the list of staff comments sent back to the applicant and 36 asked if the sketch plan was before or after receiving the comments. Mr. Hellegers stated 37 the sketch plan being reviewed is the one that the comments were based on. 38 39 Chair Godfrey opened the public hearing at 7:13 p.m. 40 41 Mr. Dean Marquette, 727 170t' Lane, presented a signed petition from the residents. They 42 are opposed to the PUD as presented with four points of concern. The concerns are zoning 43 and compliance, pedestrian and biking safety, road speed limit, road maintenance on Ward 44 Lake Drive, assessments, future development, lot sizes, adherence to the comprehensive 45 plan, overgrowth in rural areas, traffic impact, increased traffic, access to development, Regular Andover Planning and Zoning Commission Meeting - Draft Minutes — July 23, 2024 Page 4 1 2'/2 acre lot maximum. There are 17 signatures on the petition representing 13-14 2 residences. 3 4 Mr. Christopher Wik, 16683 Sycamore Street NW, stated he signed the petition. His 5 entrance onto Sycamore is very private and quiet. He does not see a reason for a through 6 street as there is an entrance from Ward Lake Drive. He suggested creating an entrance 7 from Ward Lake and having 2 cul-de-sacs. He has three small children. He wants lots to 8 be 2 '/2 acres. His other concern is there is an easement on his property. If the City is not 9 going to use that they should relinquish that in the future. 10 11 Ms. Rhonda Ganske, 2159 153`d Lane NW, stated if this is going to remain R-1 zoned 12 property these are large deviations from the City Code. Much smaller deviations have 13 been requested by private citizens and have not been granted. It is not fair they would be 14 approved for a developer. She does not see it necessary for the properties to blend with the 15 existing properties. 16 17 Mr. Jeff Sims, 16526 Sycamore Street NW, stated the purpose of the 2'/2 acre lots was to 18 support the septic systems. He wants to have the City research this. 19 20 Mr. Josh Delich, 17265 Ward Lake Drive, stated he was astonished when he heard what 21 was going on. He recently built a home in Andover. They followed all the requirements of 22 the City. They seem to be going backwards as to what previous residents were asked to 23 do. He asked what the future is of the dirt road. There are safety concerns. He has reported 24 speeds on the road to the Police Department. This will increase the flow and the amount of 25 traffic in the area. He wants to see 2%2 acre lots. Decisions are being made based on 26 economics rather than the safety of residents. 27 28 Ms. Erica Dahlin, 16825 Ward Lake Drive, stated she has lived there for over 30 years. 29 She agrees with everything that has been said. She does not see any green space, or a park 30 identified on the PUD. No drainage ponds either. 31 32 Ms. Laurel Schedin, 16642 Ward Lake Drive, stated she has lived in Andover for 40 33 years. She understands change is going to happen. She appreciates them leaving the trees. 34 She thinks it could be worse. She asked about the right-of-way to the south of this 35 development and the 167th Avenue easement. 36 37 Mr. Luke Sims, 16526 Sycamore Street NW, stated he has lived in Andover his whole life. 38 The concerns that parents have for their children, the children feel the same way. He has 39 never had to worry about safety concerns in his neighborhood. It would be sad to see the 4o neighborhood compromised with the development. 41 42 Ms. Kari Hefnider, 17011 Ward Lake Drive, stated they have lived there for 18 years. 43 They moved to Andover for the rural aspect. A precedent is being set which will be 44 detrimental to the area. 45 Regular Andover Planning and Zoning Commission Meeting - Draft Minutes — July 23, 2024 Page 5 1 Mr. Craig Wensmann, Bogart, Pederson & Associates, 13076 1" Street in Becker, 2 representing the developer, stated he took notes during the resident comments. They 3 looked at Mr. Wold's request for developing the land and at the zoning map. He shared a 4 zoning map of the entire area and explained that they look at how the development will 5 affect the community. They focused on the rural residential areas and analyzed the 6 remaining undeveloped acreage. They looked at growth potential looking forward, noting 7 there is limited space available for the future. They wanted to be good stewards of the 8 remaining land and to minimize the impact to the adjacent landowners. He stated they 9 wanted to limit traffic on Ward Lake Drive, move houses as far away from the neighbors 10 as possible and to preserve the trees. With the general zoning, if working within the rules, 11 he noted they cannot control how these lots are built on. On a PUD, the City and 12 developer can determine where the growth occurs to preserve the natural elements. The 13 concept provided is slightly outdated. He stated the cul-de-sac was reduced in length and 14 driveways were eliminated on Ward Lake Drive. Storm water ponds were placed to 15 restrict homes to be too close to the neighbors. 16 17 Mr. Wensmann explained the second design they came up with makes more of a rural feel. 18 They will use more frequent rain gardens and storm water basins, the basins are scattered 19 to preserve the natural habitat, and the new concept shows .6 per acre. He noted that Ward 20 Lake Drive may need some maintenance but there will be more taxpayers to share the tax 21 burden for maintenance on the road. Twenty-one lots are proposed. It is difficult to fund 22 projects with aging roads. He explained the lots will generate approximately $5,000 per lot 23 for the City. $500,000 over ten years. The PUD flexibility will cover costs for the 24 infrastructure and help pay for road maintenance across the City. He noted that Sycamore 25 Street has the hammerhead style easement and could be vacated back to the property 26 owners. They are not opposed to a second cul-de-sac. He stated they do a lot of rural 27 developments and all 2% acre lots do not have 2'/2 acres of buildable area. This is a prime 28 piece of property where 100% of the land could support a septic system. He explained that 29 all open space is not developable, and rules and laws do change, and they need to be 30 forward looking. 31 32 Mr. Scott Wold, SW Wold Construction, 2260 221' Avenue NW in Oak Grove, stated 33 they were the developer of the adjacent property across the railroad tracks. They worked 34 with the same landowner and with the City to amend the Comprehensive Plan to push 150 35 units through the area. They want to do the same thing in the R-1 zoning, noting the 36 wildlife will remain. Mr. Wold stated this is a prime piece of land for development and the 37 best use of this property is to grow roofs. There is a big wetland off Ward Lake that cannot 38 be built on as it is a wetland. He stated one of the first plans was for 29 lots and they are 39 looking forward to working with the Andover Staff and Council. 40 41 Mr. Harry Haluptzok, 16971 Ward Lake Drive, stated he owns the 117 acres across from 42 this project. He suggested keeping the 2%z acre lots and adding a loop to the road. 43 Ms. Lauren Schedin, 16642 Ward Lake Drive, asked about the loop road and how would 44 the trees be preserved and be good stewards of the land. She asked how it would work 45 with the two cul-de-sacs. She is concerned about preserving the natural environment. Regular Andover Planning and Zoning Commission Meeting - Draft Minutes —July 23, 2024 Page 6 1 2 Community Development Director Janish said typically as developments occur there have 3 been temporary cul-de-sacs with the intentions for those roadways to connect in the future. 4 The Fire Department and emergency services like to pursue having multiple accesses to 5 developments for when there are issues and one of the accesses is blocked. A connection 6 at Sycamore provides another access for the development to the south as well as this 7 proposed development to have access for emergency services. Sycamore has been slated 8 as a temporary cul-de-sac with the intention that it would be connected as some time in the 9 future. The U-shaped road idea would deviate from that. 10 l i Commissioner Loehlein asked how 11 lots doubled and why there is so much more 12 density. Mr. Wensmann stated the difference is 300-foot lot width and 80-foot. 13 Commissioner Loehlein wondered why 20 lots are in the PUD. He sees both preservation 14 and increased density. Mr. Wensmann stated they want to be good stewards of the land 15 and reduce the tax burden. 16 17 Chair Godfrey closed the public hearing at 8:05 p.m. 18 19 Commissioner Shafto addressed why there is no park in this development, noting the Park 20 Commission is recommending cash in lieu of land. He thanked everyone for coming to the 21 meeting. He has some concerns about the density. He is not against using it as a PUD. He 22 is struggling with 21 houses. He does not see it as a transition because of the railroad. It 23 does not match the density on the other side of the railroad tracks. 24 25 Commissioner Loehlein stated he agrees with Commissioner Shafto's comments. He 26 encouraged the developer to listen and implement the comments heard this evening. If the 27 straight City Code were followed, the brownies approach from Mr. Wensmann's sketch, 28 that would be worse. This plan is better since it preserves the trees, but it is too dense. 29 30 Commissioner Hudson stated the way this is currently zoned it would be for 12-13 lots. If 31 lots were combined the developer could end up with 12-13 lots and still preserve the trees. 32 The density is too high. There is not a 1-acre lot anywhere in this area. There are too many 33 deviations from the Code in his opinion. The lots need to be bigger and there needs to be 34 less lots. 35 36 Commissioner Winge stated he would like to see 2'/2 acre lots. 37 38 Chair Godfrey stated she appreciates everyone coming to provide their feedback. She 39 thinks this is a little too dense, noting there are guidelines for a reason. She is concerned 4o about the number of variances. She looks forward to more specifics on the PUD. She 41 would like to see what is included in the PUD. 42 43 The City Council is expected to review this sketch plan at their scheduled meeting on 44 Wednesday, August 7, 2024. 45 Regular Andover Planning and Zoning Commission Meeting - Draft Minutes — July 23, 2024 Page 7 1 PUBLIC HEARING: City Code Amendments — City Code II-3-6-B-2: Residential Lots 2 Lacking Municipal Sanitary Sewer — City of Andover. 3 4 Planning Intern Abigail Turner reviewed in administering the City Code, City staff 5 recently found an outdated requirement relative to residential lots lacking municipal 6 sanitary sewer which states: "The building pad shall be required to have a finished grade 7 of at least six feet above the seasonal high-water mark." Since the adoption of this City 8 Code requirement in the early 2000s, there have been changes to the floodplain and 9 groundwater regulations that make this requirement obsolete. Accordingly, the City of to Andover Engineering Department is recommending that this requirement be deleted from 11 the City Code. As this City Code requirement has been outdated for some time, deleting it 12 will not create any substantial policy change. Attached for Commission consideration 13 were a draft Resolution of Approval and a draft Summary Ordinance for Publication. 14 15 Chair Godfrey opened the public hearing at 8:17 p.m. 16 17 No one appeared to address the Commission. 18 19 Chair Godfrey closed the public hearing at 8:19 p.m. 20 21 Motion by Loehlein, seconded by Shafto, to recommend the City Council approve the 22 Resolution and Summary Ordinance for Publication Amendments to City Code Title 11: 23 Subdivision, Chapter 3: Lots, Section B: Buildability Requirements. Motion carried on a 24 7-ayes, 0-nays vote 25 26 OTHER BUSINESS. 27 28 Mr. Janish stated the Comprehensive Plan Amendment went before the City Council and 29 the Council made a recommendation to submit the amendment to the Met Council. Met 30 Council provided their thumbs up on the project. The adoption of the amendment and the 31 bids were then approved at the same City Council meeting. 32 33 Chair Godfrey asked about the AT&T Tower. Mr. Janish stated AT&T has reached out to 34 City Staff and indicated they want to add more antennas to the tower which would require 35 going back through the Conditional Use Permit process. 36 37 ADJOURNMENT 38 39 Chair Godfrey adjourned the meeting at 8:25 p.m. 40 41 Respectfully Submitted, 42 43 44 Debbie Wolfe, Recording Secretary 45 TimeSaver Off Site Secretarial, Inc. 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV TO: Planning & Zoning Commissioners CC: Joe Janish, Community Development Directof /" FROM: Jake Griffiths, Associate Planner (763) 755-5100 SUBJECT: Public Hearing: Interim Use Permit (IUP) — Interim Performance Standards - 3160 162"d LN NW — PID# 16-32-24-23-0005 — Randy Ferguson (Applicant) DATE: August 27, 2024 BACKGROUND Interim performance standards are intended to establish an alternative level of site improvements for properties located in the rural industrial area generally referred to as the Hughs/Westview industrial park. The City acknowledges that the lack of municipal utilities limits the development potential of these properties. Interim performance standards are intended to allow for continued use, expansion, and redevelopment with a level of site improvement that is commensurate with the development potential of properties in this area. Interim performance standards are reviewed through an Interim Use Permit (IUP) application and if approved may continue until such time as City sewer and water are extended into the area. At that time, any future expansion or redevelopment of the affected properties shall be required to fully conform with the City Code. DISCUSSION The applicant is requesting interim performance standards for an expansion of their existing gravel parking area and a new concrete parking area for their employees that would not have any curbing. The lack of curbing v. providing curb, and the use of a gravel parking lot are the only two deviations to the City Code being requested as part of this application. Along with their request, the applicant is proposing to install additional landscaping and a chain link fence with slating to further provide screening for the site. The applicant's narrative and map outlining their request is attached for review. The City of Andover Engineering Department has reviewed the request and is comfortable with what is being proposed. Review Criteria City Code 12-14-8-C-2 states that applications for interim performance standards shall be reviewed based on the following review criteria: a. Existing appearance of the building and site; The site is located on the corner of Round Lake Blvd 1VW and 162nd LNNW. It is well maintained with existing landscaping and a principal structure which meets City Code requirements for architectural compatibility. To City staff's knowledge their have not been any previous requests for interim performance standards at this property. b. Compatibility of the proposed site development plan with the other industrial properties in the area; There are a number of properties in the Hughs/Westview industrial park area that have gravel parking areas and parking lots with no curbing. Proposed landscaping and screening would also be similar to other properties in the area. The site previously has had approval for a smaller gravel parking area, and the proposed expansion is similar to others which already exist in the area. c. Effect of the proposed use and the proposed site development plan on the adjacent residential neighborhood, including traffic, noise, glare, buffers, and environmental impacts. City Code 12-15-8-D states that the Planning Commission shall recommend an interim use permit and the Council shall issue such interim use permit only if it finds that such use at the proposed location: 1. Will not create an excess burden on parks, streets, and other public facilities; The proposed use will not create an excess burden on parks, streets, or other public facilities. 2. Will not be injurious to the surrounding neighborhood or otherwise harm the public health, safety, and general welfare; The proposed use provides for additional landscaping and screening and is at a level of site improvement commensurate with other industrial properties in the area. The expansion of the gravel parking area and the use of no curbing is not anticipated to be injurious to the surrounding neighborhood or to otherwise harm the public health, safety, and general welfare. 3. Will not have a negative effect on values of property and scenic views; City staffdo not anticipate the proposed use will have a negative effect on the values of property or scenic views. 4. Will not impose additional unreasonable costs on the public; City staff do not anticipate the proposed use will impose additional unreasonable costs on the public. The applicant has indicated that if any gravel is trailed out of the parking area into the street that it would promptly be cleaned. City staff also have a history of working with property owners in the Hughs/Westview industrial park regarding street sweeping due to the number of gravel parking lots in the area. 5. Will be subjected to, by agreement with the owner, any conditions that the City Council has deemed appropriate for permission of the use, including a condition that the owner may be required to provide an appropriate financial surety to cover the cost of removing the interim use and any interim structures upon the expiration of the interim use permit. A draft resolution of approval with conditions is attached for review. City staff do not recommend any financial surety for the proposed use. ACTION REQUESTED The Planning & Zoning Commission is requested to hold a public hearing on the IUP request and make a recommendation to the City Council. ectfully submitted, <>4 Jake Griffiths � s" U Associate Planner Attachments Draft Resolution of Approval Draft Resolution of Denial Site Location Map Applicant's Narrative Applicant's Site Plan CC: Randy Ferguson, 3160 162"d LN NW, Andover, MN 55304 (Via Email) CITY OF ANDOVER COUNTY OF ANOKA STATE OF MINNESOTA 11= ►L6a 7 A RESOLUTION GRANTING AN INTERIM USE PERMIT FOR INTERIM PERFORMANCE STANDARDS AT PID# 16-32-24-23-0005, LEGALLY DESCRIBED AS: THE W 250 FT OF S 233 FT OF N 1984.99 FT OF W1/2 OF NWl/4 OF SEC 16 TWP 32 R 24 ANOKA CNTY, MN EX RD; SUBJ TO EASE OF REC WHEREAS, the applicant, requested an interim use permit for interim performance standards in order to accommodate an expansion of a gravel parking lot intended only to be used for vehicle parking and an employee parking area constructed with concrete and no curb; and, WHEREAS, the Planning and Zoning Commission held a public hearing on August 27, 2024; and, WHEREAS, the Planning and Zoning Commission finds the request would not have a detrimental effect upon the health, safety, and general welfare of the City of Andover; and WHEREAS, the Planning and Zoning Commission recommends to the City Council approval of the interim use permit. NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Andover hereby approves the interim use permit to allow for interim performance standards on said property with the following conditions: 1. Parking lot striping and installation of landscaping and fencing shall be completed to the satisfaction of the City by November 1, 2024. 2. Five trees are required on the north side of the site, and eight trees are required on the west side of the site. Locations and species shall be approved by the City's Natural Resources Technician. 3. Adequate accessible parking meeting all applicable requirements shall be provided. 4. A 6-foot chain link fence with slatting shall be installed facing 162nd LN NW and Round Lake Blvd NW to provide for screening. 5. The applicant shall be responsible for the cleaning of material from the public roadways as needed (may require multiple times a day) a minimum of daily. 6. The Permit shall only provide for deviations to the City Code relative to the expansion of the gravel parking area and the lack of curb on the employee parking area. All other requirements of the City Code are required to be fully complied with. 7. The Permit may continue until City sewer and water are extended into the Hughs/Westview industrial park area. At that time, any future expansion or redevelopment of the subject property shall be required to fully conform to the City Code. Adopted by the City Council of the City of Andover on this 3rd day of September 2024. ATTEST Michelle Harmer, City Clerk CITY OF ANDOVER Sheri Bukkila, Mayor CITY OF ANDOVER COUNTY OF ANOKA STATE OF MINNESOTA A RESOLUTION DENYING AN INTERIM USE PERMIT FOR INTERIM PERFORMANCE STANDARDS AT PID# 16-32-24-23-0005, LEGALLY DESCRIBED AS: THE W 250 FT OF S 233 FT OF N 1984.99 FT OF WI/2 OF NW1/4 OF SEC 16 TWP 32 R 24 ANOKA CNTY, MN EX RD; SUBJ TO EASE OF REC WHEREAS, the applicant, requested an interim use permit for interim performance standards in order to accommodate an expansion of a gravel parking lot intended only to be used for vehicle parking and an employee parking area constructed with concrete and no curb; and, WHEREAS, the Planning and Zoning Commission held a public hearing on August 27, 2024; and, WHEREAS, the Planning and Zoning Commission finds the request would have a detrimental effect upon the health, safety, and general welfare of the City of Andover; and WHEREAS, the Planning and Zoning Commission recommends to the City Council denial of the interim use permit. NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Andover hereby denies the interim use permit to allow for interim performance standards on said property based on the following findings of fact: 1. 2. 3. Adopted by the City Council of the City of Andover on this 3rd day of September 2024. ATTEST Michelle Hartner, City Clerk CITY OF ANDOVER Sheri Bukkila, Mayor CitA I nr_atinn Date Created: August 12. 2024 Disclaimer. The provider makes no representation or warranties with respect to the reuse of this data. AVI ��Wl 763412-2641 Andover. MN aiNaoln&. 8/9/24 RE: City of Andover —Review #2 --- 3160 162nd Lane NW IUP To Planning Commission and City Council. Thank you for listening to our request. My Name is Randy Ferguson, I am the President/Owner of All Vac Inc/AVI Services. All Vac is a regional vacuum excavation company. I have been serving the Midwest for the past 17 years. I bought the building in Andover in 2020.1 strive to keep a clean, appealing corner lot that is not an eye sore. The lawn is mowed weekly, fertilized 5 times a year, and the buildings are power washed annually. The company is a busy building on Mondays and Fridays, typically with some Saturday work from time to time. I also work with our neighbors to reduce/eliminate any impact our company might have on them. I am requesting that we be able to keep the gravel parking area for our heavy use equipment and trailers. In addition, we would like to keep the concrete and gravel areas with no curbing instead of having to install curbs. This would be in line with the other properties/neighbors in the area. This would not take away value from our property or the neighboring properties. If at any point there is gravel brought into the street, it would be removed with our bobcat and swept up. I have made many improvements to the property since being in here 2020. The parking lot was expanded for employee parking only. I removed the concrete cell tower equipment room bunker to open the yard. I reduced the fenced -in storage area. I added 40 feet of recycled gravel to the north of the existing parking lot for truck and trailer parking. I rebuilt the sign on Round Lake Boulevard and added light for the flagpole, added fuel tanks, repaired the front siding due to storm damage, and added a streetlight in the back corner for security. The fuel tanks that I added are compliant with the City Code. They are 950- gallon tanks. AVI _Ml 763-412-2641 Andover, MN nlNac(nc,com In compliance with the city's request, I will add hedge/landscaping/screening to the area facing 162nd Lane and Round Lake Blvd using a 6-foot chain link fence with PVC slats. On the outside of the fence, I will do 2 staggered rows of evergreen trees. With trees in each row staggered with a maximum of 12 feet. Regarding the parking lot, we will comply with all parking requirements for the south end of the parking lot including the white painted stripes; not less than 4 inches wide. The first parking stall when coming in is 30 feet from the right-of-way and the area will be striped accordingly, 10x18. The parking stalls are reflected din yellow on the scaled drawing. I will provide an accessible space so there will be an access aisle on the north side of the handicap parking space. This is reflected on the scaled drawing in blue. We will work on getting the installation of the hedging/landscaping/fencing by October 15, 2024. The parking lot stripping will be completed by September 30th, 2024. Sincerely, Randy Ferguson President/Owner All Vac Inc/AVI Services avelTruck and Trailer Parking asignated Handicap Parking Striped Parking Spots 10X18 Fenced Storage Area Orange -Shop =Existing Sign Black -Fencing Green Circle -Trees Scale-1 inch-20 Feet