Loading...
HomeMy WebLinkAboutOctober 1, 2002 () u (~cvv CITY OF ANDOVER ,L\YìÛf1Yì i()-75~^ \/ ) 1685 CROSSTOWN BOULEVARD N.W. . ANDOVER, MINNESOTA 55304. (763) 755-5100 " FAX (763) 755-8923. WWW.Cl.ANDOVER.MN.US . Andover Economic Development Authority Meeting Tuesday, October 1~ 2002 6:15 p.m. Conference Room A 1. Call to Order 2. Approval of Minutes - Septemþer 17,2002 3. Consider Hanson Builders for the Andover Station Residential Site 4. Appoint Consulting Engineering Firm on Andover Station North Development Site Plan/02;.33 5. Other Business (J 6. Adjourriment o f \ 0 ~) U CITY of ANDOVER ANDOVER ECONOMIC DEVELOPMENT A UTHORITY MEETING OCTOBER 1, 2002 - MINUTES A Meeting of the Andover Economic Development Authority was called to order by Vice President Julie Trude, October 1,2002,6: 15 p.m., at the Andover City Hall, 1685 Crosstown Boulevard NW, Andover, Minnesota. Present: President Gamache (arrived at 6:20 p.m.), Commissioners Mike Knight, Ken Orttel(arrived at 6:30 p.m.); Voting resident members Terri Hokanson (arrived at 6:25 p.m.) and Robert Nowak; and Non-voting resident members Edward Schultz Absent: Commissioner Don Jacobson; Non-voting resident members Fred Larson Also present: Community DevelopmentDirector"Will Neumeister City Finance Director, Jim Dickinson (J City Engineer, Scott Erickson Others APPROVAL OF MINUTES September 17, 2002: Correct as written. MOTION by Trude, Seconded by Nowak, approval of the Minutes as written. Motion carried on a 3 Aye, 0 Nay, 4 Absent vote. CONSIDER HANSON BUILDERS FOR THE ANDOVER STATION RESIDENTIAL SITE Community Development Director Neumeister explained with the withdrawal ofBOZ Construction for the residential development of the Andover Station site, United Properties and staff have met with Mr. Dean Hanson of Hanson Builders, Inc. to discuss his company's interest in this site. Mr. Neumeister introduced Mr. Hanson to the Board. Mr. Hanson discussed additional information on his company and his vision for the residential development of this site. 0 Mr. Nowak asked if all units have to have three stall garages. Mr. Hanson stated some houses would have two garages and some would be three dep,ending on lot size. Commissioner Trude asked if the demand is there for the three car garages in townhomes. Mr. Hanson stated there is because the extra stall is not only for vehicles but for accessories, such as boats. 0 0 0 Andover Economic Development Authority Meeting Minutes - October 1, 2002 Page 2 Mr. Hanson stated the covenants would stipulate that the garage must remain clean to allow the vehicles to be parked in there and he stated covenants on the townhomes will be more stringent than on a single family home because they want to keep the area neat and tidy. Commissioner Knight asked how wide the streets would be. Mr. Hanson stated the streets would be thirty feet wide. Commissioner Trude pointed out the high number of sidewalks in the development. Mr. Hanson stated they want to make it a pedestrian neighborhood with the ability to shop in the neighboring stores, so there will be more sidewalks than in a normal neighborhood. Mr. Hanson summarized his business with the Commission and discussed the features of the townhomes. He stated $239,900 would be the starting amount for the two-story townhomes and the small one levels would start at $209,000.00. He stated these townhomes would be geared towards empty nesters and single adults. , , (J Commissioner Knight asked if any of the townhomes were built for storm protection. Mr. , i Hanson stated they do not have basements but they are putting hurricane straps on all the houses. . f President Gamache asked if there were any sidewalks internally in Station Parkway. Mr. Hanson ; stated the only sidewalks running internally are along the gazebo and Station Parkway. Mr. Nowak asked if Villa Lane has access to Station Parkway. Mr. Hanson stated this is a private road only allowing residents to their driveways. Commissioner Orttel asked how many units would be in the development. Mr. Hanson stated there are forty-four houses total. Commissioner Orttel asked how much revenue they would lose with fewer houses. Mr. Neumeister stated they would lose park dedication revenue and loss of revenue on the houses not built. Commissioner Trude stated Villa Park would provide parking for guests except on Villa Lane. I She asked what the residents on Villa Lane would do for parking. Mr. Hanson stated there , would be room to pull into the cul-de-sac and still be able to access the garages and there would be ample parking on adjacent streets. Motion by Trude, Seconded by Nowak, to approve Hanson Builders for the proposed housing and site development concept. Motion carried unanimously. CJ - -) ,~-\ / . \ , ......'" '..~ () Andover Economic Development Authority Meeting Minutes - October 1,2002 Page 3, ! ¡ , APPOINT COUNSULTING ENGINEERING FIRM ON ANDOVER STATION NORTH DEVELOPMENT SITE PLAN/02-33 ¡ , City Engineer Erickson stated in response to the EDA direction to begin the development process for the Andover Station North site, a request for proposals (RFP) was developed and distributed to six consulting engineering firms. The RFP review process has been completed and a qualified consulting engineering firm is being recommended to the Economic Development Authority for ¡ consideration. ; Mr. Erickson further discussed the information and budget impact with the Board. Motiol1 by Trude, Seconded by Knight, to authorize the appointment of SEH to provide the engineering consulting services for the development ofthe Andover Station North commercial site, Project 02-33. Motion carried unanimously. ; Mr. Nowak asked if there were other bids. Mr. Erickson stated there were six that responded and ; : four were interviewed. \ \~ OTHER BUSINESS There was no other business. Motiol1 by Trude, Seconded by Knight, to adjourn. Motion carried unanimously. The meeting adjourned at 6:59 p.m. Respectfully submitted, Susan Osbeck, Recording Secretary ; , ., (J