Regular Park & Recreation Commission Meeting
May 5th, 2022
7:00 P.M. Meet at Andover City Hall
1. Call to Order
2. Resident Forum
3. Approval of Minutes (04-21-22)
4. Community Center 1st Quarter Report/Administration
5. Outstanding Items
6. Other Items or Updates
7. Chairs Report
8. Adjournment
7:16 P.M. Or Shortly Thereafter Workshop Session
A. Discuss 2023-2027 Park Capital Improvement Plan (Cont.)
B. Discuss 2023-2027 Trail Capital Improvement Plan (Cont.)
C. Adjournment
PARKAND RECREATION COMMISSIONMEETING —APRIL 21, 2022
MINUTES
The Regular Bi-Monthly Meeting of the Andover Park and Recreation Commission was called
to order by Vice -Chairperson Widmyer on April 21, 2022 7:00 p.m., at the Andover City Hall,
1685 Crosstown Boulevard NW, Andover, Minnesota.
Commissioners Present: Commissioners Kristin Lackie, Sophia Newton, Shane Stenzel,
Tracy Strombeck, Reuben Ustimchuck, and Jake Widmyer
Commissioners Absent: Chairperson Jim Lindahl and Commissioner Tracy Strombeck
Also Present: Parks & Streets Operations Manager, Jason Baumunk
RESIDENT FORUM
No one appeared before the Commission.
APPROVAL OFMINUTES
April 7, 2022 Regular Meeting
Motion by Stenzel, seconded by Newton, to approve the April 7, 2022 Regular Meeting minutes
as presented. Motion passed 5 ayes, 2 absent (Lindahl and Strombeck).
CONSIDER NIGHINGALE VILLAS PRELIMINAR Y PLA T PARK DEDICATION
REQUIREMENTS
The Park and Recreation Commission is requested to consider Park Dedication requirements
for Nightingale Villas. Brian Theis, Tamarack Development, came forward to present his
development project. Mr. Theis stated Quinn Street will connect with Nightingale.
Regular Andover Park & Recreation Commission Meeting
Minutes — April 21, 2022
Page 2
Commissioner Stenzel asked what parks are closest to the development. Parks & Streets
Operations Manager Baumunk stated Purple Park is just a few blocks away and Woodland is
also nearby.
Motion by Stenzel, seconded by Newton, to accept cash -in -lieu of land for Park Dedication for
Nightingale Villas. Motion passed 5 ayes, 2 absent (Lindahl and Strombeck).
RECOMMEND 2023-2027 PARK PLAYGROUND EQUIPMENT REPLACMENT PLAN
The Park and Recreation Commission is requested to review and make a recommendation to
the City Council for the 2023-2027 Park Playground Equipment Replacement Plan. Parks &
Streets Operations Manager Baumunk explained that staff has completed playground
inspections and is recommending parks for playground replacement.
Vice -Chairperson Widmyer asked if things would need to be moved around as in the past. Mr.
Baumunk stated staff are comfortable with the list and the parks identified need replacement.
Motion by Stenzel, seconded by Newton, to recommend the 2023-2027 Park Playground
Equipment Plan to the City Council. Motion passed 5 ayes, 2 absent (Lindahl and Strombeck).
DISCUSS 2021 MOVIE IN THE PARK
The Park and Recreation Commission is requested to discuss and set a date for the 2022 Movie
in the Park event. The Commission discussed dates and reached consensus to hold the movie
on Friday, August 26, 2022. Commissioner Newton suggested placing signs along busy routes
to advertise for the event. Parks & Streets Operations Manager Baumunk stated staff will
promote the movie heavily. Commissioner Newton stated White Rabbit may be interested in
operating their food truck at the event.
PARK DEDICA TION IMPROVEMENT FUND 1ST QUARTERLYREPORT
The Park and Recreation Commission is requested to review the quarterly report of the Park
Improvement Fund.
ANOKA COUNTYSHERIFF'S DEPARTMENT 1ST QUARTERLYREPORT
The Park and Recreation Commission is requested to review the quarterly report of the Anoka
County Sheriffs Department.
OUTSTANDING ITEMS
1. Completed Projects: nothing new to report.
2. On -going Projects: Equipment has been ordered for Rose, Prairie Knoll, and Strootman
playgrounds.
3. On -Hold Projects: Youthibike trail.
Regular Andover Park & Recreation Commission Meeting
Minutes — April 21, 2022
Page 3
4. Updates from Previous Meetings: The Nature Preserve Commission will be discussing
passive parks at their next meeting.
5. Other Items of Interest: Trail Segment 1 (Crosstown to 159s' Avenue) is being planned
and may not be ready to be installed in 2023 due to the complexity of the plans. The
Commission discussed meeting at a park prior to a meeting. Staff received bids for the
Sunshine Park ballfield fencing. Staff is meeting with athletic associations.
6. Parks Maintenance Update: presented in the staff report.
OTHER ITEMS
Parks & Streets Operations Manager Baumunk met with the YMCA for yoga and dance in the
park. He also met with a group looking to reserve the sand volleyball court at Sunshine Park to
host a youth volleyball camp.
CHAIR'S REPORT
Nothing to report.
ADJOURNMENT
Motion by Stenzel, seconded by Newton, to adjourn the meeting at 7:26 p.m. Motion passed 5
ayes, 2 absent (Lindahl and Strombeck).
Respectfully Submitted,
Shari Kunza, Recording Secretary
Timesaver Off Site Secretarial, Inc.
PARKAND RECREATION COMMISSION WORKSHOP MEETING
APRIL 21, 2022 MINUTES
The Workshop Meeting of the Andover Park and Recreation Commission was called to order
by Vice -Chairperson Widmyer on April 21, 7:30 p.m., at the Andover City Hall, 1685
Crosstown Boulevard NW, Andover, Minnesota.
Commissioners Present: Commissioners Kristin Lackie, Sophia Newton, Shane
Stenzel, Tracy Strombeck, Reuben Ustimchuck, and Jake
Widmyer
Commissioners Absent: Chairperson Jim Lindahl and Commissioner Tracy Strombeck
Also Present: Parks & Streets Operations Manager, Jason Baumunk
DISCUSS 2023-2027 PARK CAPITAL IMPROVEMENT PLAN
The Park and Recreation Commission is requested to discuss the 2023-2027 Park Capital
Improvement Plan (CIP). Mr. Baumunk stated the Park and Recreation Commission can
budget the CIP in zones. The Park and Recreation Department discussed the Park CIP and
asked staff to make a list of their priorities. They discussed using the $25,000 miscellaneous
project budget to complete smaller projects.
DISCUSS 2023-2027 TRAIL CAPITAL IMPROVEMENT PLAN
The Park and Recreation Commission is requested to review and discuss the Trail Capital
Improvement Plan (CIP). Mr. Baumunk stated he checked into grants for Safer Routes to
School and found the City does not qualify for it. Mr. Baumunk researched the Trail
Connection Grant and found that the goal is to construct a trail that connects where people
live to a significant resource.
The Park and Recreation Commission discussed a trail in the Catchers Creek East
Development and staff have not heard back from the Mohlencamp family for an easement.
The Park and Recreation Commission discussed alternative trail options for this
neighborhood.
The Park and Recreation Commission discussed the importance of trails, trail connections,
and having a trail Master Plan.
Andover Park & Recreation Commission Workshop Meeting
Minutes —April 21, 2022
Page 2
ADJOURNMENT
Motion by Stenzel, seconded by Ustimchuck, to adjourn the meeting at 8:17 p.m. Motion
passed 5 ayes, 2 absent (Lindahl and Strombeck).
Respectfully Submitted,
Shari Kunza, Recording Secretary
Timesaver Off Site Secretarial, Inc.
LIY O F
OWE
1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100
FAX (763) 755-8923 • WWW.ANDOVERMN.GOV
TO:
Park & Recreation Commissioners
FROM:
Jim Dickinson, City Administrator '
SUBJECT:
March 2022 Andover Community C Update
DATE:
May 5, 2022
Attached for Commission review is the Andover Community Center (ACC) Budget Summary
Report for Budget Year 2022. The reports reflect activity through March 2022, comparative data
with March 2021 and the entire year of 2021 (Pre -Audit).
March 2022
Coming off 2020 imposed COVID restrictions shutting down the entire facility mid -March of
2020, the facility was allowed to reopen in a restricted capacity early January 2021. The ACC
operated at near full capacity for close to twelve months in 2021 making current year (2022)
activities comparable to the previous year.
2022 Revenues are ahead by percentage comparison to 2021, this is due to assorted reasons
attributed to successful sports seasons, payment timing and advertising. 2022 expenses are also a
few percentage points ahead of 2021 primarily in salaries and operating costs. 2022 Full capacity
reflects additional utility costs and hiring challenges have required the use of more full-time
staffing overtime hours rather than the use of part-time staffing.
Also provided is an ACC historical perspective of actual costs dating back to 2015. This is the
reporting previously provided to the ACC Advisory Commission. This report also provides history
on debt service payments and the property tax levy assigned to debt and operations.
Pre Audit 2021
As the Commission well knows, the year 2020 was a difficult year, in part because of the expansion
construction, but heavily with imposed COVID restrictions shutting down the entire facility mid -
March of 2020 and then finally allowed to reopen in a restricted capacity early January 2021. The
ACC had some form of operations all twelve months of 2021 since the reopening. The 2021
activities are difficult to compare to 2020 with only the first three months of 2020 containing full
operations.
The pre -audit actuals through December 2021 when compared to the 2021 Budget are favorable
relative to revenues, and expenditures are below budget. In Administration's opinion, while the
expenditures are below budget, which may look good from a budget perspective, but is not
reflective of how Administration would like to see the facility operate. Having adequate staffing
was a challenge during 2021, and while the financial result was positive for 2021, the stretching
of the current staffing to produce the result is not sustainable.
It is anticipated the Pre -Audit numbers will be finalized in early May.
FACILITY UPDATES (December. January, February, March, & April):
Please refer to the attached ACC Facility Update for the Major Events by month and monthly
Walking Track activity. Major events are fewer as the sports seasons transition in April, but this
does not mean ACC is not busy as rentals remain strong, there just is not a lot of April events. The
bad weather and slow start to spring has helped ACC sell additional turf time. Fieldhouse activities
are strong as well as people are stuck inside.
ACC HIGHLIGHTS — Field House focus....
Below are a few report excerpts to provide some recent details:
FIELD HOUSE ADMISSIONS
Basketball
Open Pickleball
Volleyball
Skills & Drills
let Quarter 2022 (Jan, Feb, I I 522,785.00
Ist
Mar u rter 2019 (Jan, Feb, I $23,118.00
ACC has seen admissions revenues return to comparable numbers prior to COVID. Daily
admission fees have gone up $1/admission since 2019 so overall the number of people is still down
but is trending the right direction. There was some fear that our seniors and pickleball would suffer,
but the numbers are showing a continued come back. ACC is again offering pickleball skills and
drills and ACC will also have lessons starting in May where players will need to pre -register for
the program as it will fill quickly.
Also attached as requested by the Commission is a 4th Quarter 2021 Admissions and a 1 st Ouarter
2022 Admissions Report specifically for Pickleball.
FIELDHOUSE PROGRAMS (}INDOOR SOCCER)
1st Quarter 2022 (Jan, Feb, March) I I I Sg gss.00
1st Quarter 2019 (Jan, Feb,
S�,ss5.00
March
FIELD HOUSE ADVERTISING
12022 (ESTIMATE) I 1 1 $24,100.00
2019 $14,000.00
UTILIZATION, COURTS 1.2.3.4
Reservation Date: From Jan 1, 2022, through Mar 31, 2022,
Schedule Type: External Reservation, Internal Reservation
Reservation Site: Andover Community Center
Facility: Court 1, Court 2, Court 3, Court 4
Facility / Equipment! Instructor
Name (Number)
Court 1 ()
Court 2 Q
Court 3 Q
Court 4 ()
Days
Days
Hours
Hours
Average
Available
Reserved
Available (24)
Reserved
"Hours per day
90
90
2,160.00
1,180.92
13.11
90
90
2,160.00
1,163.25
12.92
90
90
2,160.00
1,133.17
12.58
90
83
2,160.00
711.34
7.90
Hours per day include all bookings in the fieldhouse, many of which are not hourly rentals.
-Private Rentals, practices, tournaments, special events are hourly/daily rental fees.
-Open Gym, Basketball, Pickleball, Volleyball, etc. are daily admission fees.
-After School Program is a free program with no revenue.
MEMBERSHIP USEAGE REPORT
505 Resident Passes Redeemed for FH Admissions
112 Resident Passes Redeemed for IA Admissions
617 Resident Passes Redeemed
These are the free passes that Andover Residents can get for admissions to ACC activities. Each
household can get fifteen (15) free passes with an account set up. These passed are valued at
$5/each.
PROGRAMS -
ACC has a spring soccer session starting March 26 in the Sports Complex on the turf. A Spring
Learn to Skate is back, ACC is offering a 6-week program on Thursday nights starting March 24th.
Both programs have over one hundred (100) participants each.
CONCESSIONS -
A Request For Proposal (RFP) was posted and closed on April 7th. ACC received two separate
proposals. The proposals are currently being reviewed by Community Center, Finance &
Administration. The goal is to secure a vendor in the next few weeks and get them started this
summer to get set up, train, and be ready to go full time in September.
STAFFING -
The new Assistant Manager (replacing a 17-year employee) started on March 7fl' and the new
fulltime Building Supervisor started on March I'.
All around, ACC staffing is currently in good shape, although we are always looking for part-time
staffing year-round.
SCHEDULING -
Scheduling for winter 2022-23 is almost complete. The coming season is anticipated to be as busy
as the 2021-2022 season if not busier. ACC is in contact with all our user groups to better
understand how we can better address their needs for the coming year.
ACTION REQUESTED
Administration will review the staff report and discuss the attached reports with the Commission
at the meeting.
Attachments
RBVErvEs
Charges for services
Ice Rental
Turf Rental
Track
Fieldhome Rental
Proshop
Vending
Advertising
Total Charges Forservices
CITYOFANDOVER
Community Center Budget SummaryTotals
Budget Yeu•2021
2021 202E
Budget Mar YTD %Bud Pre -Audit Budget Mar YTD %Bud
$ 668,000
$ 168,278
70,000
1,688
948
270,000
78,586
15,000
2,790
16,000
905
50,000
5,100
1,089,000
258,295
25%
S 823,857
Ufa
3,782
da
3,950
29%
220,527
19%
9,606
6%
7,763
10°%
84,700
24%
1,154,185
S 729,000 S
242,187
33%
50,000
561
1%
Z500
1,838
Ewa
240,000
133,325
56%
13,000
4,373
34%
15,000
71001
47%
63,000
17,066
27%
1,112,500
406,351
37%
Miscellaneous
140,000
17,796
13%
122,139
138,000
29,687
22%
Totalrevenues
1,229,000
276,091
1,276,324
I,250,500
436,039
2021
1r
EXPENDITURES
Budget
Mar YTD
%Bud
PrnAudit
Budget
l dim"F
%Bud
Current:
Salaries& benefits
757,753
137,024
18%
692,744
770,110
176,421
23%
Depsmnemal
105,100
25,183
24%
82,655
93,100
18,202
20%
Operating
635,197
92,924
15%
515,308
599,233
11M40
20%
Professional servioes
154,375
13,197
9%
95,130
224,525
34,103
15%
Capital outlay
-
We
30,000
16,575
55%
Current 1,652,425 268,228 16% 1,375,837 1,716,968 364,241 21%
Revenue wer(uader) expeffie (423,425) 7,863 -2% _ (99.513) (466,468) 71,797 -15%
Other financing sources (ores)
General Property Tax Levy
155,000
-
0%
154534
155,000
- 0%
Investment iaw=
-
(1,112)
n/a
1,094
-
- n1a
Rental I Leese Pymt
638,000
483,783
76%
635,026
638,000
490,678 77%
Transfers out
(300,000)
(300,000)
100%
(300,000)
(300,000)
(300,000) 100%
Total financing sources(md)
493,000
192,671
37%
490,654
493,000
190,678 39%
CITY OF AN➢OVER, MINNESOTA
Andover Community Center / YMCA Historical Comparison
Pre - Audlt
2015
2016
2017
2018
2019
2020
2021
2022
Vmw
Actual
Actual
Actual
Actual
Actual
Actual
Pre -Audit
Budget
Charges far services
Ice Rental
$ 400,619
$ 405,990
$ 392,828
$ 435,716
$ 442,995
$ 361,796
$ 823,857
S 729,000
$ 242,187
Turf Rental
-
-
-
-
-
3,782
50,000
561
Track
-
-
-
-
-
301
3,950
2,500
1,838
Fieldhouse Rental
187,007
199,286
215,089
218,667
220,225
133,126
220,527
240,000
133,325
Proshop
9,258
9,412
9,247
8,606
9,690
4,394
9,606
13,000
4,373
Vending
9,279
8,588
9,182
7,470
8,427
6,148
7,763
15,000
7,001
Advertising
31,758
26,450
38,819
34,000
40,850
8,000
84,700
63,000
17,066
Cbarges for services
637,921
649,726
665,165
704,459
722,177
513,765
1,154,185
1,112,500
406,351
Miscellaneous
174,788
136,552
136,149
142,768
131,386
110,781
122,139
138,000
29,687
Total revenues
812,709
786,278
801,314
947,227
853563
624546
1,276324
1250,500
436,038
Expenditures:
Current:
Salaries & benefits
439,304
451332
481,926
501,108
533,044
503,842
692,744
770,110
176,421
Departmental
74,949
77,945
65,612
76,448
66,570
74,809
82,655
93,100
18,202
Operating
388,492
364,935
364242
352,067
330,084
345,588
515,308
599233
118,940
Professional services
142,602
106,381
125,034
104,076
77,818
129,261
85,130
214,525
34,103
Capital outlay
47,859
4,900
11,442
39,888
100,000
30,000
16,575
Current
1,045,347
1,048,452
1,041,714
1,045,141
1,047,404
1,153,500
1,375,837
1,706,968
364,241
Revrnm over under ez
(232,638)
(262,174)
(240,400)
(197,914)
(193,841)
(528,954)
(99,513)1
(456.468)1
71,797
Other financing sources (uses)
General Property Tax Ievy
-
-
-
-
-
-
154,534
155,000
-
Investment income
(11078)
2,190
2,779
5,780
16,107
6,793
1,094
-
-
Rental / Lease Pymt
638,220
640,303
641,691
637,150
636,803
635,629
635,026
638,000
490,678
Transfers out
(300,000)
(300,000)
(300,000)
(300,000)
(300,000)
(300,000)
(300,000)
(300,000)
(300,000)
Total financing sources (uses)
337,142
342,493
344,470
342,930
352,910
342,422
490,654
493,000
190,678
Net increase (decrease) in fund balance
104,504
80,319
104,070
145,016
159,069
(186,532)
391,141
36,532
262,475
Fund balance (deficit) - January l
(48,364)
56,140
136,459
240,529
385,545
544,614
358,082
749223
749223
Fund balance(deficit)- December 31
$ 56,140
$ 136,459
$ 240,529
$ 385,545
$ 544,614
$ 358,012
$ 749223
$ 785,755
$ ],011,698
Fund Balance Detail:
FB - Replac Res for Common Space
$ 143,702
$ 154,449
$ 179,283
$ 173,560
$ 200,606
$ 190,067
$ 216,790
$ 241,790
$ 241,790
FB - Unassigncd
(87,562)
(17,990)
61246
211,985
344,008
168,015
532,433
543,965
769,908
$ 56,140
$ 136,459
$ 240,529
$ 385,545
$ 544,614
$ 358,082
$ 749223
$ 785,755
$ 1,011,696
mar 20G0Payrnemrnt Bonds (P+n
$ 1,214,906
$ 1216$06
$ 1213,731
S 1211,481
$ 1208,931
$ 1,215,981
$ 1212,631
$ 1.213,931
$ 1,213,931
2019A 00 Abatement Bonds (P+I)
$ 1214.906
-
$ 1216,506
-
-
-
$ 1208y31
590,150
819,725
$ 2,032356
1,109,755
$ 2323.686
1,109,755
$ 2,323.686
S 1,806,131
$ 1211,481
S 1213,731
INWT"Uvy
2012C GO Abatement Bonds
$ 975,632
$ 977332
$ 974,418
$ 972,055
$ 969,378
$ 976,780
$ 973263
$ 974,629
$ 974,628
2019A GO Abatement Bonds
-
-
-
-
-
1,001,090
976,966
1,014,065
1,014,065
Community Center Operations
-
-
-
-
S 972,055
-
$ 969378
-
$ 1,977,870
155,000
$ 2,105,229
155,000
$ 2,143,693
155,000
$ 2343,693
$ 974,418
$ 977332
$ 975,632
COMMUNITY CENTER
FACILITY UPDATE
DECEMBER 2021
DEC 2-AHS GIRLS HOCKEY VS. ROGERS
DEC 3-FLEX HOCKEY
DEC 4-AHS GIRLS VS. WARROAD
DEC 4-5-HOLIDAY CRAFT SALE
DEC 7-AHS GIRLS VS. ARMSTRONG
DEC 9-AHS BOYS VS. OSSEO
DEC 10-AHS GIRLS VS. EDEN PRAIRIE
DEC 11-AHS BOYS VS HOLY FAMILY
DEC 14-16-AAA IN-HOUSE GIRLS BASKETBALL PLAYOFFS
DEC 18-AHS GIRLS VS ELK RIVER
DEC 19-MN PREMIERE V'BALL JAMBOREE
DEC 21-AHS BOYS VS. DULUTH EAST
DEC 23-AHS BOYS VS BLAINE
DEC 23 JAN 2-NO SCHOOL -EXTRA DAYTIME ACTIVITIES
DEC 25-FACILITY CLOSED
DEC 29-MN PREMIERE-V'BALL CAMP
DEC 31-HOMETOWN HOCKEY -NEW YEARS FESTIVAL
TRACK CHECK IN IS REQUIRED. MONDAY-FRIDAY, 6 30AM-4 30PM.
NUMBERS BELOW REFLECT THOSE CHECKED IN DURING THESE TIMES.
JAN 1619
FEB 2068
MARCH 1571
APRIL 982
MAY 471
JUNE 462
JULY 508
AUG 496
SEPT 656
OCT 495
NOV 939
DEC 1494
JAN 14-INDOOR SOCCERI WINTER SESSION -REGISTRATION IS OPEN
COMMUNITY CENTER
FACILITY UPDATE
JANUARY 2022
JAN 6-AHS BOYS HOCKEY VS. TOTING -GRACE
JAN 8-9-MN PREMIER V'BALL TOURNAMENT
JAN 13-AHS BOYS HOCKEY VS ARMSTRONG
JAN 14-AHS GIRLS HOCKEY VS STILLWATER
JAN 15-AHS BOYS HOCKEY VS. ANOKA
JAN 15-WINTER SOCCER PROGRAM STARTS
JAN 15-AAA BASKETBALL LEAGUE -SEASON STARTS
JAN 17-HOMETOWN HOCKEY-2022 TRYOUTS
JAN 18-AHS GIRLS HOCKEY VS. BLAINE
JAN 22-AAA BASKETBALL LEAGUE
JAN 27-AHS BOYS HOCKEY VS. ELK RIVER
JAN 29-AHS BOYS HOCKEY VS. ROGERS
JAN 29-AAA BASKETBALL LEAGUE
JAN 30-MN PREMIER V'BALL TOURNAMENT
JAN 31-AHS GIRLS HOCKEY VS OSSEO
TRACK CHECK IN IS REQUIRED, MONDAY-FRIDAY, 6 30AM-4 30PM
NUMBERS BELOW REFLECT THOSE CHECKED IN DURING THESE TIMES.
JAN 1619
FEB 2068
MARCH 1571
APRIL 982
MAY 471
JUNE 462
JULY 508
AUG 496
SEPT 556
OCT 495
NOV 939
DEC 1494
PROGRAMS
JAN 15-INDOOR SOCCER [WINTER SESSION- 118 KIDS -SOLD OUT
# a�� V E R
ITY CENTER
FACILITY UPDATE
FEBRUARY2022
FEB 3-AHS GIRLS HOCKEY VS WAYZATA
FEB 5-AHS BOYS HOCKEY VS CENTENNIAL
FEB 5-AAA IN-HOUSE BASKETBALL
FEB 10-AHS GIRLS HOCKEY -SECTION PLAYOFF
FEB 12-AHS GIRLS HOCKEY -SECTION PLAYOFF
FEB 12-AHS BOYS HOCKEY VS MAPLE GROVE
FEB 12-AAA IN-HOUSE BASKETBALL
FEB 13-MN PREMIERE VOLLEYBALL TOURNAMENT
FEB 19-D10 YOUTH HOCKEY PLAYOFFS
FEB 19-AAA IN-HOUSE BASKETBALL
FEB 20-D10 YOUTH HOCKEY PLAYOFFS
FEB 22-AHS BOYS HOCKEY -SECTION PLAYOFFS
FEB 26-D10 YOUTH HOCKEY PLAYOFFS
FEB 26-AAA IN=HOUSE BASKETBALL
FEB 27-MN PREMIERE VOLLEYBALL TOURNAMENT
TRACK CHECK IN IS REQUIRED. MONDAY-FRIDAY, 6 30AM-4 30PM.
NUMBERS BELOW REFLECT THOSE CHECKED IN DURING THESE TIMES.
JAN -1846
FEB-TBD
2021 TOTAL CHECK IN-11.661
PROGRAMS
MARCH 24-SPRING LEARN TO SKATE STARTS
MARCH 26-SPRING INDOOR SOCCER STARTS
� ANDVER
COMMUNITY CENTER
FACILITY UPDATE
MARCH 2O22
MARCH 3-4-ICE OUT SPORTS COMPLEX
MARCH 4-6. 9, 10 -AAA IN-HOUSE BASKETBALL PLAYOFFS
MARCH 6-MN PREMIERE VOLLEYBALL TOURNAMENT
MARCH 7,8.10,11.12-D10 YOUTH HOCKEY PLAYOFFS
MARCH 11-21-SPRING BREAK -EXTRA ACTIVITIES
MARCH 12-NO SUBURBAN HOME SHOW
MACH 19-SPRING CRAFT SALE
MARCH 19-20-TITAN ALL STAR HOCKEY SHOWCASE
MARCH 24-SPRING LEARN TO SKATE LESSONS BEGIN
MARCH 26-27- HOMETOWN HOCKEY TOURNAMENT
MACH 26-SPRING SOCCER PROGRAM BEGINS
MARCH 26-27-MN PREMIERE VOLLEYBALL TOURNAMENT
TRACK CHECK IN IS REQUIRED. MONDAY-FRIDAY. 6 30AM-4 30PM.
NUMBERS BELOW REFLECT THOSE CHECKED IN DURING THESE TIMES
JAN -1846
FEB-1960
MARCH-
2021 TOTAL CHECK IN-11,661
PROGRAMS
MARCH 24-SPRING LEARN TO SKATE STARTS
MARCH 26-SPRING INDOOR SOCCER STARTS
ANDS VER
COMMUNITY CENTER
FACILITY UPDATE
APRIL 2022
APRIL 4-10-JUST BETWEEN FRIENDS KIDS SALE
APRIL 17 - FACILITY CLOSED
APRIL 23-24 - MN PREMIER VOLLEYBALL TOURNAMENT
TRACK CHECK IN IS REQUIRED. MONDAY-FRIDAY. 6 30AM-4 30PM.
NUMBERS BELOW REFLECT THOSE CHECKED IN DURING THESE TIMES.
1AN - 1846
FEB -1960
MARCH - 2054
MARCH -MAY -SPRING LEARN TO SKATE
MARCH -MAY - SPRING INDOOR SOCCER
4th Quarter 2021 Admissions Report Pickleball
Receipt Date(Time: From Oct 1, 2021 12:00 AM through Dec 31, 2021
Transaction Site: Andover Community Center
Department: Admissions
POS Product: Open Pickleball, Skills & Drills Pickleball
Product Dept. Gross Qty
Open Pickleball
Admissions
977
Skills & Drills
Adssions
mi
67
Total:
4th Quarter 2021 POS Sales Report Punch Cards
Product
Receipt Date/Time: From Oct 1, 2021 12:00 AM through Dec 31, 2021
Transaction Site: Andover Community Center
Department: Admissions
POS Product: Punch Card
Total:
1,044
Gross
292
Est. that 75% of Punch Cards are purchased for Pickleball admissions = 219 Punch Cards
Six admissions per Punch Card = 1,314 1,314
4th Quarter Resident Special Membership
Estimated Pickleball Admissions 212
Grand Total: 2,570
1st Quarter 2022 Admissions Report Pickleball
Receipt Date/Time: From Jan 1, 2022 12:00 AM through Mar 31, 2022
Transaction Site: Andover Community Center
Department: Admissions
POS Product: Open Pickleball, Skills & Drills Pickleball
Product Dept. Gross Qty
Open Pickleball
jAdmissions
1,126
Skills & Drills
Admissions
109
Total: 1,235
1st Quarter 2022 POS Sales Report
Product
Receipt DatefTime: From Oct 1, 2021 12:00 AM through Dec 31, 2021
Transaction Site: Andover Community Center
POS Product: Punch Card
Total:
Gross
284
Est. that 75% of Punch Cards are purchased for Pickleball admissions = 213 Punch Cards
Six admissions per Punch Card = 1,278 1,278
1st Quarter 2022 Resident Special Membership
Estimated Pickleball Admissions 504
Grand Total: 3,017
1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100
FAX (763) 755-8923 • WWW.ANDOVERMN.GOV
TO: Park & Recreation Commission
CC: David D. Berkowitz, Director of Public Works/City Engineer
FROM: Jason Baumunk, Parks & Streets Operations Manager
SUBJECT: 5.Outstanding Items
DATE: May 5, 2022
Current items as of 04/28/22
COMPLETED PROJECTS
• The Community Garden — Some drainage improvements were made around the garden area. The
garden has been tilled and will be ready for opening date of May 2"d. All plots are sold for the
season.
• ASN Pitching mounds — Staff rebuilt the three pitching mounds at Andover Station North baseball
fields. Over time they wear down and create maintenance and drainage issues.
ON -GOING PROJECTS —
• Rose Park Playground Improvements (2022) — Final design was approved, and equipment has
been ordered. Waiting to hear back on an available install date so we can schedule the
neighborhood build.
• Prairie Knoll Park Playground Improvements (2022) — Final design was approved, and
equipment has been ordered. Waiting to hear back on an available install date so we can schedule
the neighborhood build.
• Strootman Park (2022) — Final design was approved, and equipment has been ordered. Waiting
to hear back on an available install date so we can schedule the neighborhood build.
ON -HOLD PROJECTS —
• Bike Youth/Trail — Staff is trying to contact the induvial who helped set up this project to get
him onsite for a design plan. Project will be worked on in the spring.
UPDATES FROM PREVIOUS MEETINGS
• Movie in the Park — Scheduled for August 26 h, 2022 - Movie still needs to be selected.
• Nature Preserve Commission/Passive Parks — This item is on the agenda to be discussed at the
May 4d Nature Preserve Commission meeting.
OTHER ITEMS OF INTEREST —
• Update of Pedestrian Trails:
•3 2023 or Bed-- Kelsey Round Lake Park Trail. The reconstruction of the trail will
most likely be pushed out for reconstruction for another 2-5 years. Staff met with
the MN DNR staff recently to evaluate the condition of the existing boardwalk and
the trail. The DNR representative indicated that the boardwalk and trail are beyond
repair and indicated that both would be eligible for a DNR funding by applying for
an Outdoor Recreation Grant. The application has been submitted to the DNR for
the funding the boardwalk. The trail replacement could be applied for in early
winter of 2023 or 2024 since most likely only one application would be awarded at
a time and not in the same year. Also, by applying for grants in different years, the
City can determine how they would fund both projects at part of the 5-year Capital
Improvement Plan since the City will be responsible for a portion of the matching
grant for the reconstruction.
49 Trail Segment 1 - Crosstown Boulevard to 159e Ave. Engineering staff is currently
working through the details of this project that it set to happen in 2023. This trail is
set to connect from Xeon and Crosstown Blvd. to 159d' Ave and Crosstown Blvd.
Due to the size and complexity of project, design work has started early.
•S Coon Creek Restoration Project —Work has stopped until June when they will finish
up some items and complete the restoration.
upua[e ui acneuunne rairK anu mecreattun l,umml85ion meCnne at a %-ILV rarK Vr raeuILV —
Staff would like to hold the June 160' meeting at Prairie Knoll Park. This park will see a new
playground in 2022. It does have a shelter with tables to meet at. The building is on the 2023 CIP
for remodel/replacement.
Sunshine Park Ballfield Fencine
2021 Park & Recreation maintenance budget money was carried forward to replace the backstop
fencing at fields 1-4 at Sunshine Park in 2022. This will include 80' of the fence along the
baselines. Staff determined the fence was getting curled out enough that it is starting to become a
safety hazard. Bids are in and work should start any day.
• Oyenine of Athletic Fields for Shrine
Staff made the decision to soft open the athletic fields at of Thursday April 21 S1. The following
expectation were sent to the Associations.
1. Please refrain from wear cleats for practice at this time to help prevent damage to the soft turf.
2. Ifyou are doing drills, please keep a close eye on the turf/ag lime and move locations frequently as
to not tear up one spot.
3. If you encounter afield that is too wet to not cause damage, deep footprints in the ag lime and
destroy turf, please stay off for the day.
4. Do your best in these conditions to help us keep the fields in the best shape possible. We want to see
the teams get out on the felds for the season but need to keep our facilities from damage as well.
If you have any questions or comments regarding any of the items mentioned above or any items relating
to parks or projects, feel free to contact Jason Baumunk or Dave Berkowitz at the City. Staff recommends
the Commission continue reviewing the City Council meeting minutes that you receive by e-mail as to
discussions of various projects the City Council has been working on or is considering.
Note: If you have any items that you would like to add to the list, let me know at the meeting.
04/22/2022
• Trash and recycling at all winter locations were serviced.
• Trails and sidewalks continue to be blown off and swept this week as part of the spring cleanup.
• Staff is working on playground inspections and addressing any issues found.
• Bids were finalized for fence repair/replacement at Sunshine Parks backstops. Fencing is curled and
creating a potential safety hazard. Work should start soon.
• Staff is working on all CIP items associated with the Parks Department.
• Athletic fields are still too wet and soft for staff to get on and prep for the season. Bases were
installed and we soft opened the athletic fields on the afternoon Thursday April 21'. The
associations were given criteria for use to limit any damage to the turf and infields.
• The pitching mounds at ASN baseball fields are getting rebuilt currently. They should be ready for
use for the first scheduled games.
4/28/22
• Trash and recycling at all winter locations were serviced.
• Both of our trail machines used for cleaning sidewalks and trails are down this week, so no progress
was made on spring cleaning of trails.
• The Community Garden was tilled twice in preparation of it opening May 2"d. Plot boundaries will
be staked before opening.
The rebuild of the pitching mounds at ASN baseball fields were finished and turned out very nice.
• Work is being done getting the infields ready for the season now they are dry enough to work on.
Respectfully submitted
�C-�3N�'
Irr"51 : ,rmo"I 1P17
1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (783) 755-5100
FAX (783) 755-8923 • WWW.AN DOVE RM N.GOV
TO: Park & Recreation Commission
CC: David D. Berkowitz, Director of Public Works/City Engineer13
FROM: Jason Baumunk, Parks & Streets Operations Manager
SUBJECT: A. Discuss 2023-2027 Park Capital Improvement Plan (Cont.)
DATE: May 5, 2022
The Park and Recreation Commission is requested to continue discussing the 2023-2027 Park
Capital Improvement Plan (CIP) with a goal of having a recommendation draft by June 3rd.
DISCUSSION
Attached is a projected fund balance sheet that was prepared recently by the Finance Department
for your use. This projected fund balance does include a portion of the $1,000,000 that was
approved by the City Council to be used for the construction of the Community Center
Expansion. That contribution for the year needs to be determined and Finance Department
recommends that to be a maximum of $200,000.
Commission should review the future improvements planned in the Zone A-D spreadsheet and
determine what projects should be considered for the next 5 years. A dollar amount can be
identified for project TBD is each zone in years 2025-2027.
Below is the list of projects currently identified in the 2022-2026 CIP. Potential projects
identified by staff are indicated in italics.
2023
• Prairie Knoll Park — Warming House Expansion - $100,000
• Hidden Creek North — Medium Shelter - $40,000
• Lund's North Playground Equipment - $50,000
• Annual Misc. Projects - $25,000.
2024
• No projects identified.
• Annual Misc. Projects - $25,000.
• Staff is proposing anew Park at Fields of Winslow Cove - $150,000
2025
• No projects identified.
• Annual Misc. Proiects - $25,000.
2026
2027
No projects identified.
Annual Misc. Projects - $25,000
No projects identified.
Annual Misc. Projects - $25,000
Su¢eestions from Staff
Zone A
• Pave Hawk Ridge parking lot. - $150, 000
• Shelter at Lund's North - $30, 000
• Pave Timber Trails parking lot - $70, 000
• Pine Hills North — Items from the Master Plan
Zone B
• Oakview Park —Only park in Zone Bon list, dense neighborhood with new development.
Zone C
• Kelsey Round Lake Park — Items from Master Plan
• Strootman —Pave parking lot - $60, 000
• Strootman Canoe Landing — Pave lot - $60, 000. Trail to landing, $7, 500
Zone D
• Benches along Tom Anderson Trail- $2,500
• Hills of Bunker West — Pave Parking lot $45, 000
• Sophies —Irrigation - $30, 000
• Skateboard Parklmprovements/Expansion $30,000
BUDGETIMPACT
Depending on what the Commission would like to recommend for projects, the Finance
Department has indicated to staff that the ending fund balance for each of the 5 years should
have a minimum positive balance of $50,000.00 or more.
ACTION REQUIRED
The Park and Recreation Commission is requested to continue discussions on the 2023-2027
Parks Capital Improvement Plan with the goal of having a draft completed by June 3`a
Respectfully submitted,
Jason Baumunk
Attachments: Draft 2023-2027 Park Improvement Fund Projected Fund Balance Sheet, Kelsey
Round Lake Park Master Plan, Pine Hills North Master Plan, Future Facilities List by Zone.
Projected Sources of Revenue
Park Dedication Fee - Residential Units
Park Dedication Fee - Residential ($4,80IVurdt)
less: Contribution to Comm Ctr Expan `
Donation I Contribution
Capital Projects Levy - Park Improvements
Total Revenues Available
I Projected Commitments I
Pine Hills North - Phase II parking lot
Pine Hills South - parking lot
Oak Bluff - New Basketball Court
Prairie Knoll Park - Warming House Expansion
Hidden Creek North - Medium Shelter
Lunds North Playground Equipment
Annual Miscellaneous Projects
Total Commitments
Revenues Over (Under) Expenditures
CITY OF ANDOVER
Park lmprovemem Fund
Projected Fund Balance
Estimate
2022
2023 2024
2025
2026
2027
TOTALS
50
50 25
25
25
25
$ 240,300
$ 240,300 $ 120,150
$ 120,150
$ 120,150
$ 120,150
S 961,200
(163,143)
(321.490) (120,150)
(37,768)
-
-
(642,651)
15.000
15,000 15,000
15,000
15,000
15.000
90,000
92,157
(56.190) 15,000
97,382
135,150
135,150
408,649
120,000
120,000
67,E
67,000
10,000
10,000
100,000
100,000
40,000
40,000
50,000
50,000
25,000
25.000 25,000
25,000
25,000
25,000
150,000
222,000
215,000 25,000
25,000
25.000
25,000
537,000
(129,843)
(281,190) (10,000)
72,382
110,150
110,150
Fund Balance as of December 31, 2021 964,017
Fund Balance Brought Forward 834,174 562,984 542,984 615,366 725,516
Ending Fund Balance •• $ W4,174 $ 552AM $ 642,984 $ 615,386 $ 725,516 $ 835,61%
• Based on 50% of previous year's estimated park dedication wl a reconciliation of two years prior.
"Target - $60,000 to create a contingency for any project overages.
Dedicated Funds Available for.
Rose Park - tower rental fee $ 64,674
-r
New Wetland /•
Demonstration j
�
�/
Multi -use YY
Footbridge)•• Af�hletic 7tt♦
over ditch
\i Field
r" with
Lighting
i.
Sm
- Multi purpose Buildini 9
•;t• 50,3 40 ` - I concessions,
strooms I storage integrated nic shelter t1is. 4
D) d_
�i 1J � 1 JI`'�•: i
=�,•..
iArea �1
t,
Parluing
t _53 stalls
-24 rst.dls
r &Z
KELSEY ROUND LAKE NATURE PARK
MASTER PLAN
CITY OF ANDOVER, MN PARK AND RECREATION COMMISSION
AWWPI I'll,
F
Kelsey Round Lake Park Master Plan January 15, 2016
City of Andover, Park and Recreation Commission
Park Master Plan Summary:
This Master Plan was prepared for the City of Andover Park and Recreation Commission as an
update to the long range plan for this Community Park. A number of developments have been
proposed as part of this plan based on information provided by City Staff and the Andover Park
and Recreation Commission, as well as information obtained from the public input at
neighborhood meetings and through the web -based feedback tool, mysidewalk.com. The major
developments / re -developments include:
1. Development of a Picnic Shelter with Restroom Facility
2. Development of Smaller Picnic Areas
3. Enhanced Trail system with additional Loop Opportunities
4. Addition of a Dock on Round Lake
5. Development of a Nature Play Circuit
6. Enhanced Wayfinding Signage throughout the park
7. Introduce Interpretive Elements / Signage throughout
8. Add and replace seating options
9. Enhance existing Natural Systems/Habitat
10. Delineate Potential Native American Burial Area
11. Identify Maintenance programs or procedures
All illustrations prepared during this planning process are
provided in the "Graphic Attachments" section of this report.
The total estimated cost to construct these improvements is $1,957,530,00. A detailed
breakdown of the costs associated with each individual development is included in the "Cost
Analysis" (pages 4-5) section of this report.
Picnic Shelter with Rectroom Facility
This development will provide an area within the
park that may be used to host medium group
picnics/gatherings in a sheltered facility. This
improvement will be placed in close proximity to
the existing parking lot at the north entrance of
the park. Major improvement items include:
Covered picnic structure with tables, a vault
restroom system attached to the facility and a
small nature play area located near the structure.
This space is intended to be used by casual users,
medium sized groups and/or school groups.
-
WS�/R
Kelsey Round Lake Park
Andover. MN
Picnic Areas:
Two other areas have been identified in the Master Plan as additional picnic opportunities. One
is in the center of the site near a natural play element, while the second is at the far south end of
the site near the lake. These areas would be simple in nature —small clearings with 1-3 picnic
tables for park users to casually use. The picnic area at the south end of the site will be placed in
an upland area with views overlooking Round Lake.
Trails
During the master planning process, additional trails and trail connections were identified as
desired development opportunities. The Master Plan includes the addition of two connections
to the surrounding neighborhoods — one to the northeast side of the park and another to the
west. A third connection to the southeast is suggested, but would require the purchase of
additional park property or an acquired easement.
Existing trails within the park have several dead ends, so trail connections are planned to create
walking loops and gain access to a larger portion of the park. A trail along the upland ridge in the
south end of the park is proposed to create a closer connection to Round Lake.
Proposed trails are suggested to be primarily 8' wide bituminous where soil conditions are dry
and stable enough to support them. In other seasonally wet or wetland areas, a boardwalk
system is planned to make the trail connections.
Existing bituminous and boardwalk trails have some irregularities in the form of wear cracks and
loose or uneven boards. Repairs should be made to ensure adequate accessibility to all areas
throughout the park.
Dock on Round Lake
<,
A physical connection to the lake was identified during the
master planning process as a missing element with in
Kelsey Round Lake Park. While the site is situated directly
on the lake, the majority of the lake edge is thick, wetland
vegetation it hard to the larger
`".
K"r
making see or experience
,2,
body of water. The upland ridge towards the south end'
f
„t � •,
of the site comes closest the open water, making it an
ideal location for a dock structure reaching out to the+er;
open water. The dock structure is intended primarily for
viewing the lake and wildlife and fishing activities. The
krrr r 4
structure is not intended to be a launch point for canoes
f r xw,; yy, ;.!� ;`•
rF.
or kayaks.
i�.•
„r ,ig;�;5 :;-1
Nature Play Circuit,
Currently, the park does not include any built play areas for children. While there is a desire to
keep the park natural and free of typical play structures, there is also a need for exploration and
play areas throughout the park. Five areas have been identified for play features within the
park. These play areas should encourage nature based activities such as climbing, balancing,
jumping or swinging. Each of these features should be unique and mimic something found in
nature. These areas can be as simple as cut logs or stumps to climb, or as complex as a
simulated eagles nest for children to play in.
-
WS�/R
Kelsey ROL
Minding Signagge-.
Mapping and signage will be expanded throughout the park to enhance the user experience.
New signage should fit into the natural setting of the park using neutral color schemes and
natural materials. Maps and signage should be clear and concise and match the standards found
in the signage throughout the Andover parks system.
Additional signage should be placed as appropriate throughout the neighborhoods near the park
entrances to draw users to the park, as well as draw attention to the increased pedestrian
activity on the local streets near the park.
Interpretive Elements / Signage,
A number of features throughout the park can provide a unique and interesting educational
opportunity. Signage or demonstration areas throughout the park can highlight the following
features:
• Prairie Restoration
• Invasive plant / reforestation
• Wetlands —Natural vs. Constructed
• Birds / Wildlife / Habitat / Pollinators
• Round Lake
• Potential Native American burial area
• Historical clay mining / brick production
signage and exhibits should be clear and concise and match the standards found in the signage
throughout the Andover parks system. These elements should fit into the natural setting of the
park using neutral color schemes and natural materials.
Benches:
Currently benches throughout the park are located sporadically and are in disrepair. Eight areas
along the trails have been identified to receive new benches for park users to rest and enjoy this
nature park.
Natural Systems/Habitat,
Maintaining, preserving and enhancing existing natural systems and animal habitat were
determined as important missions for Kelsey Round Lake Park. Any development that takes place
within the park shall respect the current natural conditions and minimize disturbance within the
park. Existing riparian and prairie areas should be cleared of invasive plant species to maintain
their integrity and provide adequate habitat for the birds and animals which live within them.
Additional habitat opportunities such as bird and bat houses are encouraged to be added and
replaced throughout the park property.
Potential Native American Burial Area,
The area along the lake edge to the east has been previously identified as a potential Native
American Burial area. Due to the unknown limits or archeological verification of the mounds, this
area was avoided for future uses or development. An archeological exploration and study is
suggested to determine the limits and significance of this potential park feature.
A
WSB
Maintenance:
Proposed developments will bring a need for additional maintenance operations as they are
implemented. The following maintenance procedures are expected:
1. Picnic Shelter with Restroom Facility: Periodic cleaning and garbage pickup. Vault toilets
will need to be serviced with regular pumping (depending on level of use) as well as
periodic disinfectant / interior washing.
2. Smaller Picnic Areas: Small clearings will need regular mowing, garbage pickup and
monitored for vandalism damage.
3. Trail system: Trail system will require increased sweeping and snow removal operations.
Bituminous trails will require periodic crack sealing orsealcoating. Boardwalk trails
will require regular inspection and replacement for cracked, checked or loose boards.
4. Dock: Dock will need to betaken in and out of the lake annually for winter. Dock will
require regular inspection and replacement for cracked, checked or loose boards.
5. Nature play elements: Actual maintenance will be determined by final design and
construction type of each piece. Play features are intended to be natural in composition,
so they shouldn't need extensive maintenance procedures. Play features may need to
be changed or adjusted due to rot or decay of wood elements or surfaces. Woodchip
surfaces will need periodic replenishment and features will need to be monitored for
vandalism damage.
6. Signage and interpretive features: Elements will need to be monitored for vandalism
damage and periodically cleaned of dirt and debris.
7. Benches: Small clearings will need regular mowing, garbage pickup and monitored for
vandalism damage.
8. Enhance existing Natural Systems/Habitat
Cost Analysis:
The following tables provide a breakdown of the costs associated with each development, as well
as the level of priority as to which they should be addressed moving forward in development.
This cost estimate defines the estimated costs associated with each component of the master
plan. It is based on a combination of site -specific development requirements and projects of
similar size and complexity. These estimated costs are also based on having the work
completed by private contractors and specialists. It does not take into consideration work that
could be performed by City staff, volunteer groups, or by other means.
The cost figures are based on master plan level evaluation, which brings with it inherent
limitations. The costs are meant to establish general budgets useful for project phasing and
comparing the relative cost of one item to that of another. It should be expected that the
estimates will require refinement as the design progresses into more detail along with a higher
level of base mapping and geotechnical information. The costs are in 2016 dollars. Although
intended to be conservative, actual costs will vary depending on the year that each aspect of the
master plan is implemented, implementation parameters, economic conditions affecting bidding,
and unexpected site conditions found in the field during construction.
- Kelsey Round Lake Park
WSB Andover, MN
ITEM Low Nigh
Priority
1. Building Additions
1.01
Picnic Shelter with Vault Restroom and Tables
$100,000.00
$150,000.00
LOW
1.02
Dock
$16,500.00
$22,500.00
LOW
Subtotal:
1 $116,500.00
1 $172,500.00
c. ravemenz 1 narascape
Concrete Flatwork (sidewalk improvements
2.01 near parking area)
2.02 Bituminous Trails (5,400 LF @ 8' wide)
2.03 Boardwalk (2.000 LF)
3. Site Features
3.01 Benches on Concrete Pad (8 total)
3.02 Picnic Tables on Concrete Pad (6 total)
3.03 Artistic / Interpretive Nature Nodes (10
Wayfinding Signage/Trail
3.04 Identification/Distance Markers
3.05 Nature Play Area (5 total)
4. Restoration
4.01 FRestora
Subtotal:
Subtotal:
Subtotal:
SUBTOTAL
RECOMMENDED CONTINGENCY (20%)
ESTIMATED ADMINISTRATIVE / DESIGN COSTS (15%)
S. Existing Improvements
Boardwalk Repair assumed costs of boardwalk repair
5.01 is 113 cost of new boardwalk construction
5.02 Trail Repair
W.SR
TOTAL: $1,633,920.00 $1,957,530.00
Subtotal:
Graphic Attachments -
The following pages include reductions of the plans / illustrations prepared during this planning
process.
LOW
LOW
LOW
Kelsey Round Lake Park
MN
�a
J
Wetland Upland
Residential
153rd LN NW Properties
Residential
Propert es
3
Z i•„
S Wetland
o �4k«
0
v
_ 152nd INN W
Open Grass
rea- Dry?
Restored A
Prairie (tlry(
Dense, Wet
Vegetation
"I
-
WSR
r 61
J
�Ml
a
Round Lak'e7
LEGEND
Park Boundary
Burial Grounds
Wetlands
Prairie
Woodland
ke/se Round Lake Nature Par1c Ex15ti^g'Built Elements E•V j
ResiBenrial
Properties
N
O
L
N
`o Trail Dead End
9
w
-
WS✓R
i ZIZ 7�� -
L52n_d LN N W�
-
WS BB/Q
oN
uiiovri
mAll\ NRTMNµ VAR WRN
IOLEANDBOIKDFPB
.-.. NITVRE MTN
W[NICSNFLR9
WITN PFSi
F.
I
L.
/(r�T
F
ITOJ
PFFITORED DRAIR IEI
OD .,
r
WE TLLANDB
i"
ONNECEIONINTO
NEIGHBOIIHOOD
1.11E •.. --T-1-
r •
1(ll
tl
fPAL ...1.�
RCAEDWALi sMul
L
D««
LQOR THROUGH
NEIGHBORHO M
EXIVWC sTREU
K�' / SANG\ � �-0ICNN:ABFA
�,� � / ICLS � ♦ t,�, j
�;y�/ "�—ewvlDER SE,xruc
1fN.
r
�
KOYMDWALK �� ��y.�
`MTENTIOL fMM
TRMLASRR MAE
E MENT CM BE
ACQUIRED
A i
J.�
Tk
r
I
�%7
r.
TENMH
N1FPIGN NI
G1IOIMQ
ROUMD IAILE
pT/ .1E
�
YY
y.'
4..
LEGEND
� W]WSfD WYx/nl
. >w�wuoececm+..
�nnNcxEmE.NE.
Q xK aA
ixwxc
g 1[KN
KELSEY ROUND LAKE NATURE PARK
MA.STEP PLAN
Future Facilities Chart. Taken from 2021 Park Dedication Study
Zone A
FUTURE FACILITIES TOTAL PRICE
Sustainable Landscaping & Trees $1,000.00 Cedar Crest
FUTURE EQUIPMENT TOTAL ., ,,,,,, ,,,, Cedar Crest
Landscaping
$2,500.00
Fox Meadows
Security Light
$7,500.00
Fox Meadows
FUTURE EQUIPMENT TOTAL
$10,000.00
Fox Meadows
Warming House/Restrooms & Storage/Mtg Room
$250,000.00
Hawkridge
Additional Irrigation System Improvements
$5,000.00
Hawkridge
Security Light (2)"
$15,000.00
Hawkridge
Septic System
$20,000.00
Hawkridge
Pave Parking Lot w/ C & G (60-90 Stalls)
$135,000.00
Hawkridge
Landscaping - Trees
$1,000.00
Hawkridge
Bleachers w/ Pads (1 Soccer fields)
$7,500.00
Hawkridge
Land Purchase - (House and Land-7.16 Acres)
$190,000.00
Hawkridge
14awlifidge
$10,000.00
Hawkridge
4 Picnic Tables
$3,600.00
Hawkridge
New Field Grading and seeding (After Land Purchase)
$250,000.00
Hawkridge
Field Lighting
$250,000.00
Hawkridge
FUTURE EQUIPMENT TOTAL
$1,162,100.00
Hawkridge
Landscaping around Park Sign
$1,000.00
Langseth
Medium Shelter w/Concrete Pad ($30,000)
$15,000.00
Langseth
2 Concrete Picnic Tables
$1,800.00
Langseth
FUTURE EQUIPMENT TOTAL
$17,800.00
Langseth
Future Facilities Chart. Taker, from 2021 Park Dedication study
Landscaping
Security Light
Playground Equipment (2-12 yr. old) Basic ($50,000)
Medium Shelter w/Concrete Pad (Small Shelter)
($30,000)
FUTURE EQUIPMENT TOTAL
Landscaping
Curb around Parking Lot (400' x $15.00 p/I/f)
FUTURE EQUIPMENT TOTAL
Landscaping - Trees
Security Light
Pave Parking Lot - 46 Stalls
Medium Shelter w/Concrete Pad
FUTURE EQUIPMENT TOTAL
Mobilization
Removals/clearing & grubbing
Grading/earthwork & erosion control
Stormwater management improvements
Add secondary entrance/exit from Tulip St (gravel)
Paved trails 10' wide
Wooden boardwalk 6' wide
Pedestrian bridges
Large community play area
Gazebo with concrete slab & 4 picnic tables
Misc. Site Amenities
Potable well
Septic & vault
$2,500.00
Lund's North
$7,500.00
Lund's North
$20,000.00
Lund's North
$20,000.00
Lund's North
$50,000.00
Lund's North
$1,000.00
Timber River
$6,000.00
Timber River
$7,000.00
Timber River
$1,000.00
Timber Trails
$7,500.00
Timber Trails
$69,000.00
Timber Trails
$30,000.00
Timber Trails
$107,500.00
Timber Trails
$62,000.00
Pine Hills North
$10,000.00
Pine Hills North
$50,000.00
Pine Hills North
$32,500.00
Pine Hills North
$8,250.00
Pine Hills North
$323,000.00
Pine Hills North
$143,750.00
Pine Hills North
$60,000.00
Pine Hills North
$100,000.00
Pine Hills North
$85,000.00
Pine Hills North
$32,000.00
Pine Hills North
$10,000.00
Pine Hills North
$105,000.00
Pine Hills North
Future Facilities Chart. Taken from 2021 Park Dedication Study
Multi -purpose building
$450,000.00
Pine Hills North
Storage shed
$95,000.00
Pine Hills North
Overlook @ pond/wetland demonstration area
$25,000.00
Pine Hills North
Prairie grass demonstration area
$16,250.00
Pine Hills North
Expanded irrigation of common spaces
$50,000.00
Pine Hills North
Games court
$14,500.00
Pine Hills North
Sand volleyball court
$5,500.00
Pine Hills North
Disc Golf
$5,000.00
Pine Hills North
Landscape improvements
$35,000.00
Pine Hills North
Turf Seed
$33,250.00
Pine Hills North
Fiber Blanket
$135,000.00
Pine Hills North
Electrical expansion & trail lighting
$160,000.00
Pine Hills North
Pave PaFking lot (park dad Gat GR P9Ft OR)
00
Pine Hills North
FUTURE EQUIPMENT TOTAL
$2,166,000.00
Pine Hills North
Park ID Signs (2)
$1,000.00
Valleyview
FUTURE EQUIPMENT TOTAL
$1,000.00
Valleyview
}-
Park ID Signs (2)
$1,000.00
White Oaks
FUTURE EQUIPMENT TOTAL
$1,000.00
White Oaks
Future Facilities Chart. Taken from 2021 Park Dedication Study
Zone B
Park Sign & Landscaping $1,000.00 Oak Hollow
FUTURE EQUIPMENT TOTAL Oak Hollow
Security Light
$7,500.00
Oakview
Picnic Table
$500.00
Oakview
Irrigation ($10,000)
$15,000.00
Oakview
Sandbox and Digger
$5,000.00
Oakview
FUTURE EQUIPMENT TOTAL
$28,000.00
Oakview
Irrigation ($40,000)
$20,000.00
Woodland Crossings
FUTURE EQUIPMENT TOTAL
$20,000.00
Woodland Crossings
Zone C
Park Sign & Landscaping
$1,000.00
Creekridge
FUTURE EQUIPMENT TOTAL
$1,000.00
Creekridge
Landscaping
$1,000.00
CL Boat Landing
Security Light
$7,500.00
CL Boat Landing
FUTURE EQUIPMENT TOTAL
$8,500.00
CL Boat Landing
Sustainable Landscaping & Trees
$1,000.00
Dehn's
FUTURE EQUIPMENT TOTAL
$1,000.00
Dehn's
Security Light
$7,500.00
Green Acres
FUTURE EQUIPMENT TOTAL
$7,500.00
Green Acres
N.,
Landscaping
$1,000.00
Hidden Creek North
Dugouts
$10,000.00
Hidden Creek North
Future Facilities Chart. Taken from 2021 Park Dedication Study
Shelter (Medium) w/ picnic table
$40,000.00
Hidden Creek North
Irrigation Upgrades
$10,000.00
Hidden Creek North
Raise Ballfield Fencing Height to 8'
$15,000.00
Hidden Creek North
Park Lighting (Parking Lot, Trails, etc.) [$40,000]
$15,000.00
Hidden Creek North
FUTURE EQUIPMENT TOTAL
$91,000.00
Hidden Creek North
Landscaping
$1,000.00
Hidden Creek South
FUTURE EQUIPMENT TOTAL
$1,000.00
Hidden Creek South
Additional New Trails (possible Grant funds)
$226,000.00
Kelsey Round Lake
Park Sign & Landscaping (2 locations)
$2,000.00
Kelsey Round Lake
Security Light (2)
$15,000.00
Kelsey Round Lake
Nature Play Area (5 Total)
$60,000.00
Kelsey Round Lake
Picnic Shelter with Vault Restroom and Tables
$150,000.00
Kelsey Round Lake
Dock
$22,500.00
Kelsey Round Lake
Concrete Flatwork near Parking Area
$20,000.00
Kelsey Round Lake
Boardwalk (2,000 LF) (Other Funding)
$1,045,000.00
Kelsey Round Lake
Benches on Concrete Pad (8 Total)
$20,000.00
Kelsey Round Lake
Picnic Tables on Concrete Pad (6 total)
$20,000.00
Kelsey Round Lake
Artistic/Interpretive Nature Nodes (10 Total)
$20,000.00
Kelsey Round Lake
Wayfinding SignagelTrail Ident. /Distance Markers
Kelsey Round Lake
($26000)
$10,000.00
Restoration/Landscaping ($50,000)
$25,000.00
Kelsey Round Lake
FUTURE EQUIPMENT TOTAL
$1,635,500.00
Kelsey Round Lake
Security Light
$7,500.00
Meadowood North
Landscaping
$1,000.00
Meadowood North
1/2 Basketball Court
$15,000.00
Meadowood North
FUTURE EQUIPMENT TOTAL
$23,500.00
Meadowood North
Future Facilities Chart. Taken from 2021 Park Dedication Study
Sustainable Landscaping & Trees $1,000.00 Meadowood South
FUTURE EQUIPMENT TOTAL $1,000.00 Meadowood South
Landscaping $1,000.00 Meadows of RL
FUTURE EQUIPMENT TOTAL $1,000.00 Meadows of RL
Landscaping
$1,000.00
Northwoods East
Medium Shelter w/ Picnic Tables (Small Shelter-
Northwoods East
$40,000)
$20,000.00
FUTURE EQUIPMENT TOTAL
$21,000.00
Northwoods East
Landscaping
$100000
Northwoods West
Security Light
$7,500.00
Northwoods West
Pave Parking Lot (10 Stall)
$22,500.00
Northwoods West
FUTURE EQUIPMENT TOTAL
$31,000.00
Northwoods West
Landscaping
$1,000.00
Pleasant Oaks
ADA Access Trail to play area (75' x $50.00 plf)
$3,750.00
Pleasant Oaks
FUTURE EQUIPMENT TOTAL
$4 750 00
Pleasant Oaks
Security Light
$7,500.00
Round Lake B.L.
Park Sign & Landscaping
$1,000.00
Round Lake B.L.
Construct Boat Landing & Pave from road to water
Round Lake B.L.
($50,000)
$25,000.00
FUTURE EQUIPMENT TOTAL
Round Lake B.L.
$33,500.00
Park Sign & Landscaping
$1,000.00
Strootman
Pave Ballfield Parking Lot (30 stalls)
$60,000.00
Strootman
FUTURE EQUIPMENT TOTAL
$61,000.00
Strootman
Pave Parking Lot (Canoe Area - 10 stalls)
Strootman Canoe
$25,000.00
Landing
ADA Access Trail to River (150' x $50.00 plf)
Strootman Canoe
$7,500.00
Landing
FUTURE EQUIPMENT TOTAL
Strootman Canoe
$32,500.00
Landing
Future Facilities Chart. Taken from 2021 Park Dedication Study
Landscaping
Security Light
FUTURE EQUIPMENT TOTAL
x
Zone D
Small Shelter w/ Picnic Tables
FUTURE EQUIPMENT TOTAL
Landscaping ($5,000)
Small Picnic Shelter w/ Picnic Table
Netting - Around Concession Area
Park Benches (5)
FUTURE EQUIPMENT TOTAL
Netting - Around Concessions Area — Donation?
Irrigation System and new water service
$1,000.00 Terrace
$7,500.00 Terrace
$8,500.00 Terrace
$20,000.00 Andover Lions
$20,000.00 Andover Lions
$1,000.00
ASN
$20,000.00
ASN
$10,000
ASN
$1,000.00
ASN
$32,000.00
ASN
$10,000
ASN
$40,000.00
Chesterton Commons
FUTURE EQUIPMENT TOTAL
$40,000.00
Chesterton Commons
Playground Upgrade (Signature Park) & Pickleball (4)
City Campus
$1,000,000.00
41/Purple
Community Center Project t Balance (Through
City Campus
12/31/20)
$824,854.00
41/Purple
FUTURE EQUIPMENT TOTAL
City Campus
$1,824,854.00
#1/Purple
r:
Landscaping and Benches
Coon Creek Park /$2,500.00
Tom Anderson
FUTURE EQUIPMENT TOTAL
Coon Creek Park /
2,500.00
Tom Anderson
Landscaping
$1,000.00
Creekview Crossing
FUTURE EQUIPMENT TOTAL
$1,000.00
Creekview Crossing
. Future Facilities Chart. Taken from 2021 Park Dedication Study
Small Picnic Shelter w/ Picnic Table ($10,000)
FUTURE EQUIPMENT TOTAL
Landscaping
FUTURE EQUIPMENT TOTAL
Landscaping
Pave Existing Parking Lot w/ concrete C & G
FUTURE EQUIPMENT TOTAL
Park Sign & Landscaping
Security Light
Playground Equipment ( 2-5 & 5-12 yr. old)
Irrigation System
Trails for ADA access (250' x $50.00 plf)
FUTURE EQUIPMENT TOTAL
Landscaping
FUTURE EQUIPMENT TOTAL
Landscaping
Trail from North & East lots to East field (700' x 50 plf)
$20k)
FUTURE EQUIPMENT TOTAL
$20,000.00 Hickory Meadows
e'n nnn nn Hickory Meadows
$1,000.00 Hidden Creek East
$1,000.00 Hidden Creek East
$1,000.00
Hills of Bunker West
$45,000.00
Hills of Bunker West
$46,000.00
Hills of Bunker West
4t
$1,000.00
Moores Estates
$7,500.00
Moores Estates
$60,000.00
Moores Estates
$50,000.00
Moores Estates
$12,500.00
Moores Estates
5131,000.00
Moores Estates
$1,000.00
Oak Bluff
$2,000.00
Oak Bluff
$1,000.00
Prairie Knoll
$-180,000.00
Prairie Knoll
$20,000.00
Prairie Knoll
m
Prairie Knoll
Small Shelter w/ Picnic table (ball field area) $20,000.00 Shadowbrook East
Raise Ballfeld Fencing Height to 8' (2 Fields) $30,000.00 Shadowbrook East
FUTURE EQUIPMENT TOTAL $50,000.00 Shadowbrook East
Landscaping $1,000.00 Shady Knoll
FUTURE EQUIPMENT TOTAL $1,000.00 Shady Knoll
i 0
Future Facilities Chart. Taken from 2021 Park Dedication Study
Irrigation System ($40,000)
$30,000.00
Sophie's
FUTURE EQUIPMENT TOTAL
$30,000.00
Sophie's
Landscaping
$1,000.00
Sunshine
Lighting of Parking lots (west and south)
$30,000.00
Sunshine
Skateboard Park Expansion
$50,000.00
Sunshine
FUTURE EQUIPMENT TOTAL
$81,000.00
Sunshine
1685 CROSSTOWN BOULEVARD N.W.. ANDOVER, MINNESOTA 55304 • (763) 755-5100
FAX (763) 755-8923 . WWW.ANDOVERMN.GOV
TO: Park & Recreation Commission
CC: David D. Berkowitz, Director of Public Works/City Engineer-t43
FROM: Jason Baumunk, Parks & Streets Operations Manager
SUBJECT: B. Discuss 2023-2027 Trail Capital Improvement Plan (Cont.)
DATE: May 5, 2022
The Park and Recreation Commission is requested to continue discussion to prioritize the
proposed trail for the 2023-2027 Trail Capital Improvement Plan (CIP).
DISCUSSION
This is a continuation of the discussion on the 2023-2027 Trail CIP. The target date for draft CIP
is Friday, June 3rd. Below are the following segments in order of priority that were identified by
the City Council in the 2022-2026 CIP.
• Segment 1 — 8' Bit. Trail along Crosstown Blvd from Xeon Street NW to Railroad Tracks
8' Bit. Trail along Crosstown Blvd from Railroad Tracks to 1570' Avenue
8' Bit. Trail along Crosstown Blvd from 157`^ Avenue to 159°i Avenue
(2023)
❖ Preliminarily design for this segment has begun.
• Segment 2 — 8' Bit. Trail along Station Parkway from Thrush Street to Partridge Circle
8' Bit. Trail along Station Parkway from Partridge Street to Hanson.
(2024)
• Segment 3 — 8' Bit. Trail along Verdin Street NW from 161" Avenue to 163`d Lane
(2025)
• Segment 4 — 8' Bit. Trail along Coon Creek from Prairie Road going east to the existing
trail in the Shadowbrook development. This project would most likely be
eligible for MN DNR funding. Note: There is one property (Mohlencamp's)
that has yet to be developed. Until the property is developed, or a trail
easement is obtained, the City will not be able to construct the trail along
this segment.
(2026)
BUDGETIMPACT
The City Council will determine how the proposed trail improvements will be funded.
ACTION REQUIRED
The Park and Recreation Commission is requested to prioritize the four proposed trail segments
to be identified in the 2023-2027 Trail Capital Improvement Plan. Final recommendation is
planned for the May 19' regular Park and Recreation Commission meeting.
Respectfully submitted,
�—A6-Z-3 1�-�
Jason Baumunk
Attachments: Trail Map including purposed segments.
FOX MEADOWS
40
4V
CIA
Trail Ma
Le4eii
c t T v
Bunker Underpass
o r
ANDOVE
This map is provided by the City ofAndover to guide people in the enjoyment
Paved Trail
-i
Railroad
of our trails when walking, running, rolling or biking. Trails displayed consist of
— Proposed Trail
ne
paved and unpaved surfaces. Paved surface trails are blacktop and sidewalks.
Unpaved surface trails are Not
—Unpaved Trail
®
Andover Schools
oiduimpr: this document has been complied using inhenaeon gathered
horn s for
wood chips, soil or sand. all surrounding trails
are shown. Trail distances are approximate.
—Sldewalk
Water
vaduus gowminem somas and to W used reference
puryoses only Every shad hes been made to ensure the comygdenes
meeew eeuseewexed msure'�mntnfeivr�mordrWio represent
—Count Trails