Loading...
HomeMy WebLinkAboutJune 17, 2021E 1685 CROSSTOWN BOULEVARD N.W.. ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV Regular Park & Recreation Commission Meeting Meet at Wild Iris Park (3719 Bunker Lake Boulevard NW) June 17, 2021 7:00 P.M. Meet at Wild Iris Park 1. Call to Order 2. Resident Forum 3. Approval of Minutes (5/27/21 4. Agenda Approval 5. Update of Joint Meeting with 6. Outstanding Items 7. 8. Chair's Report 9. Adjournment Workshop and 6/3/21 Regular) City Council 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 . (763) 755-5100 FAX (763) 755-8923 • WWW.AN DOVE RM N.GOV TO: CC: FROM: SUBJECT: DATE: Park & Recreation Commission David D. Berkowitz, Director of Public Works/City Engineer Todd J. Haas, Assistant Public Works Director 5. Update of Joint Meeting with City Council June 17, 2021 This item is regarding the agenda for the joint meeting scheduled with the City Council on Tuesday, June 22, 2021. The joint meeting is scheduled with the City Council which will start at 6:00 pm. Below are the items that will be discussed along with some detail regarding each of the items: A. Discuss the 2022-2026 CIP for Playground Equipment Replacement for Parks. B. Discuss the 2022-2026 CIP New Trail Segment Improvements. C. Discuss the 2022-2026 CIP for Trail Reconstruction Improvements in Parks. D. Discuss the 2022-2026 CIP for Parks. E. Discuss Andover Community Center/Request for Information by the Commission F. Discuss User Fees for Use of Parks/Facilities by Associations/Groups G. Discuss Programming -Activities H. Other Business Chairman Lindahl with staff will lead into each of the items with the City Council and the rest of the Commissioners can join once Chairman Lindahl is done presenting the item. This item is regarding the agenda items to be discussed at the joint meeting scheduled with the City Council on Tuesday, June 22, 2021. Respectfully submitted, Todd J. Haas 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV TO: Park & Recreation Commission CC: Adle David D. Berkowitz, Director of Public Works/City Engineer FROM: Todd J. Haas, Asst. Public Works Director ?011, SUBJECT: 6. Review Outstanding Items/Maintenance Update DATE: June 17, 2021 Issues list as of 6/11/21 COMPLETED PROJECTS — ON -GOING PROJECTS - • Update of Park Dedication Improvement Fund Ouarterly Report — Item is on the agenda in July. • Update of Ouarterly Sheriffs Department Report on Park Patrol & Vandalism — Item is on the agenda in July. • Prairie Knoll Park North Parkine Lot Improvements & the Tom Anderson Trail alone Coon Creek — The parking lot is near completion. The security lights have been installed by Connexus Energy but will not activated until later once the parking lot is close to be completed. Paving is anticipated to be completed by mid to late June. • Sunshine Park Playground Equipment Replacement — Some preliminary grading work has been done at the park. Parks Maintenance staff is on schedule to install the playground equipment within the next few weeks. • Hawkridge Park Shelter Replacement — It is anticipated the contractor will begin construction on the footing the week of June 14'. We have not heard as to when the shelter will be delivered but the contractor has indicated to City staff they will start installing the shelter as soon as it has been delivered. • Wild Iris Park Playground Equipment Replacement — The playground equipment has been ordered. The neighborhood selected a structure for the 5-12 year old age group. Also, the swing set will be replaced along with replacing a couple spring rides with 1 new spring ride and a new 2 seat buck a bout. The installation of the equipment will also be done as a community build. Timing for the community build will be determined later once'staff has received notice of when the equipment is anticipated to be delivered. • Bike Youth/Trail — The trail is ready for use by the public. The signage for the rules/guidelines and direction of travel are close to be completed by Parks Maintenance staff. The trail entrance is located on the east side of the wooded area by the existing paved trail and south parking lot area in Sunshine Park. • Joint Meeting with City Council — The Park and Recreation Commission is scheduled to meet with the City Council on June 22, 2021, at 6 pm. Item is the agenda. ON -HOLD PROJECTS — None at the time. OTHER ITEMS OF INTEREST — • Update of Pedestrian Trails: Trails that are planned to be reconstructed: •S 2024 or Beyond -- Kelsey Round Lake Park Trail (Note: The reconstruction of the trail will most likely be pushed out for reconstruction for another 3-5 years). Note: This trail reconstruction is eligible for a MNDNR grant. The City would need to apply for the grant a year in advance of the proposed construction. This would also apply to the existing boardwalk at the north end of the park that is poor condition. • Update of Scheduline Park and Recreation Commission meeting at a City Park or Facility — The Commission is meeting at Wild Iris Park. If you have any questions or comments regarding any of the items mentioned above or any items relating to parks or projects, feel free to contact Todd Haas or Dave Berkowitz at the City. Staff recommends the Commission continue reviewing the City Council meeting minutes that you receive by e-mail as to discussions of various projects the City Council has been working on or is considering. Note: If you have any items that you would like to add to the list, let me know at the meeting. 05/29/21 • Mowing, trash and recycling service for Parks and Trails continued all week. • Concrete was poured at the Community Center to fill in a landscaped area that was problematic by the west entrance. • Most of the crew helped remove the turf at the Community Center. This was a joint effort with the Streets Department, CC and YMCA staff. • Work continued on irrigation startups and repairs. • Time was spent making a small training area for the Fire Department at Station #2. • First round of broad leaf spraying is scheduled to happen within the next week or two. We have noticed the pre -emergent weed control was not as effective this season. Likely due the lack of rain and the late irrigation start up due to late season freezing temps. • Staff is out mowing along trails this week as well. • Manager attended Park Commission Meeting. 6/5/21 • Mowing, trash and recycling service for Parks and Trails continued all week. • With the short week most of the time was spent keeping up on mowing. The rain and heat have really accelerated the grass growth. • Poison Ivy was sprayed along the trail system in Kelsey Round Lake Park. • Fields were prepped for a weekend baseball tournament. • Irrigation start-up and maintenance continued all week. • Manager attended Park Commission Meeting. Play Structures and Playgrounds Installed Park Name Years Replaced, Refurbished or Removed Notes 1 Andover Lions 1998 2017 2 Andover Station North 2008 2008: New Park 3 City Hall (Purple Park) 1996 2001 2019 2019: New 4 Chesterton 2000 2017 5 Country Oaks 2005 2005: New Park 6 Creekview Crossing 1992 1993 2007 7 Forest Meadows 1987 Removed 2001 2016 8 Fox Meadows 1991 2006 9 Green Acres 1983 1998 2013 10 Hawkridge 1988 2003 2021 2021:New Border/Structure/Chips 11 Hickory Meadows 2012 2012: New Park 12 Hidden Creek East 1992 2002 2015 (Partial) (2024) 2015: New border & wood chips 13 Hidden Creek North 1998 1991,'95(Partial) 2000 2005 (Partial) 2020: Full Replacement 14 Hidden Creek South 1988 2006 15 Hills of Bunker Lake West 1988 2004 (2023) 16 Langseth 1979 1999 2014 17 Maple View 2016 2016: New Park 18 Meadowood North 2009 19 Meadows of Round Lake 1995 1997 2008 20 Nordeen's 1997 2011 21 Northwoods East 1983 1998 2013 22 Oak Bluff 1991 1998 2008 23 Oak View 2006 (2024/2025) 2006: New Park 24 Pine Hills North 2015 2015: New Park 25 Pine Hills South 1979 2000 2018 (Refurb.) 2018: Refurbished 26 Pleasant Oaks 1984 1996 2012 27 Prairie Knoll 1988 2005 (2022) 28 Red Oaks West 1993 2007 29 Rose 1987 2004 (2022) 30 Shadowbrook East 2002 2017 31 Shady Knoll 1989 2005 (2024) 321 Sophie's 2010 2010: New Park 33 Strootman 1987 2002 2020 Downsized-Removed Structure 2000 2009 (Partial) 2009: Swings, Digger, Spring Toys 2000: Kidtime unit installed = Complete Rebuild Possible Refurbishment H:\Engineering\Parks\[Play Structures and Playgrounds Installed (Revised 2021).xlsx]Sheetl Plat/ Structures and Playgrounds Installed Park Name Years Replaced, Refurbished or Removed Notes 36 Timber Rivers 1999 2000 2015 37 Timber Trails 1996 2011 38 Tot Lot 138th 1985 2003 2009 (Partial) 39 Woodland Crossing 2008 2008: New Park 40 Woodland Estates 2006 2006: New Park 41 Woodland Meadows 1995 2021 2021:New Structures 2011 2011: New Borderand Chips 1987 2003 = Complete Rebuild Possible Refurbishment Replacement Recommended/Required REMOVALS 1 Crooked Lake Boat Landing 1982 Removed 1999 2 Creekridge 1990 Removed 2001 3 Northwoods West 1979 Removed 2004 H:\tngineering\Parks\[Play Structures and Playgrounds Installed (Revised 2021).xlsx]Sheetl 4 f• InventoryID Inventory Type Material Type Size Area Description Date Installed Last Inspection Date Park Name Park Address Id Inspection Date Inspected By Surfacing Installed Type of Surfacing Surfacing Needs to be Replaced/Installed Surfacing Notes Drainage is Satisfactory Drainage Notes Sharp Equipment Protective Caps Missing/Damaged Hazardous Protrusions Clothing Entanglement Hazards Crush or Shearing Points Trip Hazards Age Appropriate Signs Loose Fastening Devices Replace Fasteners Moving Parts Showing Wear Replace Moving Parts Tangled Swing Chains Worn Swing Hanger Bashings Worn or Cracked Swing Seats Hardware Notes Equipment Has Rust, Rot, Cracks, or Splinters Broken or Missing Components Damage to Fences, Benches, or Signs Equipment Securely Anchored Equipment Shows Vandalism Equipment Notes User Modifications to Equipement Correct Modifications Litter or Debris Present 1 6/10/1995 3/15/2021 WOODLAND MEADOWS 2139 172nd Ave NW 279 10/9/2019 Steve Thran #41270-0421 Im Yes 1 6/10/1995 3/15/2021 WOODLAND MEADOWS 2139172nd Ave NW 230 3/27/2019 Steve Thran #41270-0421 Yes No No No No No No No No No No No No Yes Yes No No No No No No No No No No No Yes Can replace tot seats Yes No No Yes No Cracked plastic on spiral slide not a hazard. Equipment needs replacement 24 years old No No Yes No No Yes No Equipment is 24 yrs old probably should be replaced or refurbished. Is showing rust No No Ivi