HomeMy WebLinkAboutMay 27, 2021rAl
1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100
FAX (763) 755-8923 . WWW.ANDOVERMN.GOV
Park & Recreation Commission Workshop Session Meeting
May 27, 2021
6:00 P.M. Meet at Andover City Hall
A. Call to Order
B. Discuss 2022-2026 Park Playground Equipment Replacement Plan, Cont.
C. Discuss 2022-2026 Park Capital Improvement Plan, Cont.
D. Discuss 2022-2026 Trail Capital Improvement Plan, Cont.
E. Adjournment
Note: Some or all members of the Andover Park and Recreation Commission may
participate in the May 27, 2021 Park and Recreation Commission meeting
by telephone or video conference rather than by being personally present
at the Park and Recreation Commission regular meeting place at the
Andover City Hall, 1685 Crosstown Boulevard NW, Andover, MN 55304.
Members of the public can physically attend, although there is very limited
seating in the City Council Chambers as appropriate social distancing will
be done by the Commission and visitors.
9 C I T Y" 0 F
N OVFR^
j6D
1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100
FAX (763) 755-8923 • WWW.ANDOVERMN.GOV
TO: Park & Recreation Commission
CC: David D. Berkowitz, Director of Public Works/City EngineerV3
FROM: Todd J. Haas, Assistant Public Works Director
SUBJECT: B. Discuss 2022-2026 Park Playground Equipment Replacement Plan, Cont.
DATE: May 27, 2021
INTRODUCTION
The Park and Recreation Commission is requested to continue discussing the 2022-2026 Park
Playground Equipment Replacement Plan that is being recommended by staff and consider
request from the Strootman Park neighborhood to replace the playground equipment that was
removed in 2020 with new equipment.
DISCUSSION
The target date for the Parks Maintenance Department to submit the draft 2022-2026 CIP
Playground Equipment Replacement Plan is June 4, 2021. Listed below is the existing
playground equipment that is recommended for replacement (or be refurbished) over the next 5
years which may include improvements to the fall zones.
2022 — Prairie Knoll Park (originally installed in 2005) and Rose Park (originally installed in
2004). Proposed budget impact is $100,000. Note: The Strootman Park neighborhood submitted
a petition at the last meeting (May 3, 2021) requesting the City reconsider replacing the
playground equipment that was removed from the park in 2020. The Park and Recreation
Commission options regarding Strootman Park is as follows:
A. Stay with the original plan that was approved in 2019 (see Attachment A). If the
Commission were to stay with the original plan, the Tilted Sky Runner, Walking
the Plank and the 3'd Bay swing set would be funded from the Park Improvement
Fund (Park Dedication Funds) since they are considered new items and not
replacement items.
B. Approve the purchase of a new playground equipment for ages 2-12 year old's.
This would be funded from the playground equipment replacement fund with the
understanding that Rose Park playground equipment replacement would be
funded from the cell tower revenues that have been received over the past few
years. Under this option, the Tilted Sky Runner, Walking the Plank, and the 31
Bay swing set at Strootman Park would not be installed and would be removed
from the plan permanently. Also, the spring ride closest to the Walking the Plank
may need to be removed to allow a new playground structure to be installed.
Under this scenario, no curb edging would need to be removed. See Attachment B
that identifies the new playground equipment and layout.
2023 — Hills of Bunker Lake West Park (originally installed in 2004) and Hidden Creek East
Park (originally installed in 2002). Proposed budget impact is $100,000.
2024 — Woodland Estates Park (originally installed in 2006), Oakview Park (originally installed
in 2006) and Shady Knoll Park (originally installed in 2005). Staff is recommending
increasing the proposed budget impact to $150,000 to replace the 3 playgrounds.
2025 — Meadows of Round Lake Park (originally installed in 2008), Creekview Crossing Park
(originally installed in 2007) and Oak Bluff Park (originally installed in 2006). Staff is
recommending increasing the proposed budget impact to $150,000 to replace the 3
playgrounds.
2026 — Country Oaks Park (originally installed in 2005), Fox Meadows Park (originally installed
in 2006), Hidden Creek South Park (originally installed in 2006) and Woodland Crossing
Park (originally installed in 2008). Staff is recommending increasing the proposed budget
impact to $150,000 to replace the 3 playgrounds.
The playground equipment identified can be moved up or down a year depending on the
condition of the equipment, ADA requirements, entrapments, fall zones and handicapped
accessibility.
BUDGETIMPACT
The General Fund budget impact for replacement/repair of various playground equipment is
proposed at $100,000 for each of the next 2 years, then $150,000 moving forward (years 2024 -
2026).
ACTION REQUIRED
The Park and Recreation Commission is requested to continue discussions on the 2022-2026
Park Playground Equipment Replacement Plan that is being recommended by staff.
Respectfully submitted,
'/�iJ�
Todd J. Haas
CC: Tonya Schewe, Resident (copy sent by e-mail)
Attachments: Attachments A and B
CONC.
................................................rr..oe..mmmmn
vim/ � , �` ' -•�� '` - - -
�iim
< `
. 1. \�. • / j' "� i
%y A /
EXIST.
GRAVEL
PARKING
LOT
SIYQ.E i' = 20'-0' stlp Br MOC
wasc we . , /1MINN"OTA.Wj5CONSjlo-nznze " .cvme,vz.. arvsz.n
�. ••.•.••• rL�i�l[11V/V' 1�1/V�■�/�Ai�/ M-w.z ezzs.zs Stootmn Park
T6 NMr61E IV19pY fl 1MF>nP _••••• fa, zW-s.csoso
■9[aa. N.nmw.o N: asD s.n n i7��l7B' e...,, „r.�,.,.,roo,mAndmw, MInnesm
wmn use �""s"4 Wdwd livc.�.16z.
MS PLAN FWAUIRE=A FINI=HM GRADE RESCXtea+ 3-4-20 DWG. 010088H
0
GameTime•
A ft ck rner�4 3 PT21027
ACTIVE
Bison River
Model # PT21027
The new standard for affordable play, PrimeTime play systems
pack an enormous amount of play value into compact designs.
The smaller footprint of PrimeTime commercial playground
equipment requires less surfacing and has a lower overall cost.
Specifications
Product Line
PrimeTime
Length
36'
Width
40'
Age Range
2 to 5 Years
Fall Height
5'
Model View
j�
Tee. Po�.�k
�a<am� sa.m rm.
., Wr.r-[
Nm Brvl3< i3-SGrv1
SInRE
1&b"f nMeml
PrckYaR
CWnter
Number of Children
System Features
T".
45-50
Crawl Tubes
Plastic Roof
Timbers
Top View
Designing award -winning playgrounds since 1929 Complies with ASTM standards before it leaves the factory. Cenifed Installer Network - GameTime trained for Game -rime playgrounds.
. 1 K. - , I>
1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100
FAX (763) 755-8923 • WWW.ANDOVERMN.GOV
TO: Park & Recreation Commission
CC: David D. Berkowitz, Director of Public Works/City Engineer
FROM: Todd J. Haas, Assistant Public Works Director
SUBJECT: C. Discuss 2022-2026 Park Capital Improvement, Cont.
DATE: May 27, 2021
The Park and Recreation Commission is requested to continue discussing the 2022-2026 Park
Capital Improvement Plan (CIP).
DISCUSSION
The target date for draft CIP is June 4, 2021. Attached are two spreadsheets for the Park and
Recreation Commission to consider. Spreadsheet A indicates paying off the Andover
Community Center debt in the year 2022 and/or 2023 which is subject to receiving the
anticipated park dedications fees that are collected for new developments. Spreadsheet B is to
pay off the Andover Community Center debt over a projected 10-year period as to what has been
currently done over the past couple years. Neither spreadsheet includes a pickleball facility in the
CIP spreadsheet as discussed at the meeting on May 3, 2021.
If the Park and Recreation Commission would like to pay off the dept in 2022 (and/or in 2023),
based on the Projected Fund Balance (Spreadsheet A), the Commission could consider paving
the parking lots at Pine Hills North Facility and Pine Hills South Park in 2023. Under this
scenario, the Commission could consider other improvements in 2023-2026 as follows: Oak
Bluff Park basketball court, Sunshine Park safety netting, ASN safety netting, Prairie Knoll Park
warming house expansion, and Hidden Creek North Park medium shelter.
Below are the proposed future facilities improvements that were presented at the meeting on
May 3, 2021 for Zones A-D.
Basketball Court at Oak Bluff Park -- $10,000. The Commission has mentioned that it
would be nice to see if a basketball hoop could be placed in the existing parking lot
versus building a new court. Due to liability and damage that could occur to vehicles
parked in the parking lot from the basketball, it is recommended to construct a separated
court. There are other parks where a basketball court could be constructed but are not
included in the 2020 Existing and Future Park Facilities Chart for Zones A-D. They
include the following: ASN, Hawkridge, Hickory Meadows, Hidden Creek East,
Langseth, Lund's North, Northwoods West, Oakview, Pine Hills North, Pleasant Oaks,
Rose and Timber Trails. Note: If the Commission would like to move forward in
constructing any of these courts, the annual miscellaneous fund could be used.
Paving of Parking Lots — Hawkridge ($135,000), Hills of Bunker Lake West ($45,000),
Pine Hills North ($120,000-identified in current CIP for 2022/the remaining $280,000
will be funded from the Capital Equipment Reserve Fund), Pine Hills South ($67,000-this
could be done as an alternate with Pine Hills North), Strootman ($60,000), and Timber
Trails ($69,000). Fox Meadows and Lund's North Parks were also mentioned but are not
identified to be paved in the 2020 Existing and Future Park Facilities Chart for Zones A-
D. Note: If the Commission would like to move forward in paving either Fox Meadows
and/or Lund's North Park parking lots, the future needs of the park system allocation
funds could be used which is identified in the 2020 Existing and Future Park Facilities
Chart.
Parks that are Safety Concerns —Andover Station North (ASN) (estimate is $80,000) --
Install backstop netting for foul ball protection for spectators and vehicles for the west
and middle fields. It has been suggested in the past by the Commission that the remaining
funds to pay for the improvement would come as a donation from the baseball
association; Sunshine Park Fields 1-4 (estimate is $160,000) -- Install high backstop
netting for foul ball protection for spectators; Shadowbrook East North and South Fields
(estimate is $80,000) -- Install high backstop netting for foul ball protection for spectators
and properties adjacent to the fields.
Note: Staff recently met with a contractor that installs backstop netting. Attached are
pictures taken at the Blaine Baseball Complex located on Lexington Avenue just south of
Main Street. The baseball safety netting that Blaine installed consists of a combination
fencing and netting that is 40 feet in height (the bottom portion of the backstop is chain
link fencing). The estimated cost identified in the CIP is for a 30-foot high netting
(ground to top of the netting) at Sunshine Park is about $40,000 per field for a total of
$160,000 for 4 fields. A portion of the $160,000 would be supplemented by the Public
Works Parks Maintenance Fund for the value of the existing 4 backstops since it would
be considered a replacement item. The same rational would also apply to ASN and
Shadowbrook East Park as far as funding of the netting.
New Building Construction — Hawkridge Park Warming House improvement with
restrooms and a meeting room ($250,000); Pine Hills North New Building Construction
($450,000 for multi- purpose building/$10,000 for potable welt/ $105,000 for septic &
vault); Prairie Knoll Park Warming House Expansion ($100,000). Note: Prairie Knoll
Park Warming House Expansion was removed from the 2020 Existing and Future Park
Facilities Chart by the Commission with the idea that the hockey association would
donate the necessary funds to expand the warming house. With the number of residents
using the free skating and hockey rinks, this warming house should be expanded to
accommodate users of the park during the winter months. Note: With the anticipation of
the new residential development of approximately 400 new lots in the development
known as Fields of Winslow Cove located just to the north of Prairie Knoll Park, the park
will become more active during the winter months which will require the need for more
warming house space.
New and/or Rei lacement of Shelters —Pine Hills North Facility Gazebo ($85,000);
Hidden Creek North Medium Sized Shelter ($40,000); Kelsey Round Lake Park Picnic
Shelter with Vault Restrooms & Tables $150,000; Sunshine Park Medium or Large
Shelter between Fields 3 & 4 ($40,000 to $80,000) Note: A new shelter for Sunshine
Park is not identified in the 2020 Existing and Future Park Facilities Chart; Wild Iris Park
(replace existing small shelter with a medium sized shelter). Note: An upgrade of the
existing Wild Iris Park shelter was not identified in the 2020 Existing and Future Park
Facilities Chart.
As far as increasing the annual miscellaneous fund (which is currently $15,000 per year) to allow
more flexibility in completing projects, the Commission could increase this amount. Shown on
the Projected Fund Balance is the increase in the annual miscellaneous fund to $30,000 for each
of the next 5 years. This will allow the Commission to have more flexibility to complete some of
the smaller park items that may come up during the year either from resident requests and/or
from staff. For example, some recent projects that were not previously identified in the CIP or in
the Comprehensive Plan that will be done with the miscellaneous funds is parking lot lighting at
the Anoka County Dog Park facility and construction of the Bike Youth Trail at Sunshine Park.
BUDGETIMPACT
Depending on what the Commission would like to recommend for projects, the Finance
Department has indicated to staff that the ending fund balance for each of the 5 years should
have a minimum positive balance of $50,000.00 or more.
ACTION REQUIRED
The Park and Recreation Commission is requested to continue discussing the 2022-2026 Parks
Capital Improvement Plan.
Respectfully submitted,
Todd J. Haas
Attachments: Draft 2022-2026 Park Improvement Fund Projected Fund Balance Sheet
(Spreadsheet A identifies paying off the Community Center debt eprly and Spreadsheet B
identifies paying off the Co unity Center over a 10-year period), Pictures of the netting at
Blaine Baseball Complex
Projected Sources of Revenue
Park Dedication Fee - Residential Units
Park Dedication Fee - Residential ($4,400/unk)
less: Contribution to Comm Ctr Expan'
Donation / Contribution
Capital Projects Levy - Park Improvements
Total Revenues Available
I Projected Commitments I
Praide Knoll Park - Pave north packing lot
Pickleball Study
Hawkcdge Shelter Enlargement
Pine Hills North - Phase II parking lot
Pine Hills South - parking lot
Oak Bluff- New Basketball Court
Andover Station North - Safety Netting
Sunshine Park - Safety Netting
Hidden Creek North - Medium Shaker
Prairie Knoll Park - Warming House Expansion
CITY OF ANDOVER
S repO S]ri �e } A
Park Improvement Fund
Estimate
Projected Fund Balance
tisn4(C.c 5 P4y 1� ofP- Co,N,.w,,r n t °G'/
(�evl.{rwq/ Cx�ae5iu^ 9Q.b+ �drd Ier°..
2021
2022 2023
2024
2026
2026 TOTALS
50
50 50
25
25
25
$ 220,000
$ 220,000 $ 220,000
$ 110,000
$ 110,000
$ 110,000 $ 990.000
(202,604)
(512,250) (110,000)
-
-
- (824,854)
15,000
15.000 15.000
15,000
15,000
15,000 90,000
32,396
(277,250) 126,000
125,000
125,000
125,000 255,146
155,000 155,000
10,000
7.929 17,929
120,000
120.000 7 00
67.000 67,000
10,000 10,000
80,000 80,000
160,000 160,000
40.000 40,000
100,000 100,000
Annual Miscellaneous Projects
15,000
30,000
30,000
30.000
30,000
30,000 165,000
Total Commitments
187,929
30,000
217,000
120,000
190,000
170,000 914,929
Revenues Over (Under) Expenditures
(165,533)
(307,250)
(92,000)
5,000
(85,000)
(45,000)
Fund Balance as of December 31, 2020
679,748
Fund Balance Brought Forward
524.216
216,965
124,965
129,985
64,965
Ending Fund Balance"
$ 624,215
$ 216,965
$ 124,966
$ 129,965
$ 64,965
$ 19,965
Based on 50% of previous year's estimated park dedication w/ a reconciliation of two yea s prior
"Target - $50,000 to create a contingency for any project overages.
Dedicated Funds Available for.
Rose Park - tower rental fee $ 41,552
Projected Sources of Revenue
Park Dedication Fee - Residential Units
Park Dedication Fee - Residential ($4,400/un8)
less: Contribution to Comm Ctr Expan `
Donation / Contribution
Capital Projects Levy - Park Improvements
Total Revenues Available
) Projected Commitments )
Prairie Knoll Park - Pave north parking lot
Picldeball Study
Hawkridge Shelter Enlargement
Pine Hills North - Phase II parking lot
Pine Hills South - parking lot
Oak Bluff - New Basketball Court
Sunshine Park - Safety Netting -
Andover Station North - Safety Netting
Prairie Knoll Park - Warming House Expansion
Hidden Creek North - Medium Shelter
Annual Miscellaneous Projects
Total Commitments
CITY OF ANDOVER
Park Improvement Fund
Projected Fund Balance
Estimate
2021 2022 2023 2024
Sprex40-e+ g
2026 2026 TOTALS
50
50
5o
25
25
25
$ 220,000
$ 220,0D0
$ 220,000
$ 110,000
$ 110.000
$ 110,000
$ 990,000
(202,604)
(163,142)
(110,000)
(110,0W)
(55,000)
(55,000)
(695,746)
15,000
15,000
15,000
15,000
15,000
15,000
90,000
32,396
71,858
125,000
16,000
70,000
70,000
384,254
166,000
155,000
10,000
10,000
7,929
7,929
120,000
120,000
67,000
67,000
10,000
10,000
-160,600
160,000
80,000
80,000
100,000
100,000
40,000
40,000
15,000
30,000
30,000
30,000
30,000
30,000
165,000
187,929
467,000
170,000
30,000
30,000
30,000
914,929
Revenues Over (Under) Expenditures (155,533) (395,142) (45,000) (15,000) 40,000 40,000
Fund Balance as of December 31, 2020 679,748
Fund Balance Brought Forward 524,215 129,073 84,073 69,073 109,073
Ending Fund Balance" $ 524,215 $ 129,073 $ 84,073 $ 69,073 $ 109,073 $ 149,073
" Based on 60% of previous year's estimated park dedication w/ a reconciliation of two years prior.
"Target - $60,000 to create a contingency for any project overages.
Dedicated Funds Available for:
Rose Park - tower rental fee $ 41,552
CITY OF ANDOVER
Park Improvement Fund
Projected Fund Balance
Estimate
2021
2022
2023
2024
2025
2026
TOTALS
Projected Sources of Revenue
Pads Dedication Fee - Residential Units
50
5o
50
25
25
25
Pads Dedication Fee - Residential (i4,400/un8)
$ 220,000
S 220,000
S 220,000
S 110,000
i 110,000
i 110,000
i 990,000
less: Contribution to Comm Ctr Even
(202,604)
(196.142)
(143,000)
(143,000)
(140,180)
-
(824,926)
Donation / Contribution
-
-
-
Capital Projects Levy - Pack Improvements
15,000
15,000
15,000
15,D00
15,000
15,000
90,000
Total Revenues Available
32,396
38,80
92,000
(18,000)
(15,180)
125,000
21WO74
Projected Commitments
Prairie Knoll Pads - Pave north parking let
155,000
155,000
Pickleball Study
10,000
000
1,29
e Shelter En
HaaAuidg Enlargement
7,929
7,929
Pine Hills North - Phase II parking let
120,000
120.000
Pine Hills South - parking let
67,000
67,000
Oak Bluff- New Basketball Court
10,000
10,000
Sunshine Park - Safety Netting
150,000
180,000
Andover Station North - Solely Netting
80,000
80,000
Prairie Knoll Pads - Warming House Eiryansion
100.000
100,000
Ridden Creek North - Medium Shelter
40,000
40.000
Annual Miscellaneous Projects
15,000
30,000
30,000
30,000
30,000
30,000
165,0D0
Total Commibnents
187.929
467,000
170,000
30.000
30,000
30,000
914,929
Revenues Over (Under) Fxpenituros
(1561633)
(428,142)
(78.000)
(48,0W)
(48,180)
Kom
Fund Balance as of December 31, 2020
679,748
Fund Balance Brought Forward
524,215
96,073
18,073
calm
(75,107)
Ending Fund Balance" SS YL{,2'16 i 96.073 i 18A7s i L2.9 S n6.+07) S 19AN
Bred on 50% of pmious yaaft estimated park dedication w/ a neoncba90n of two Yom prior
"Target - $50,000 to nneate a contingency far airy project overages.
Deacated Funs Available for.
Ross Park -tower enlai fee i 41,562
TCP RAL
LLD RAD
/\ 9uOV17 a
Fgnw w.:
'x ra o
J Y/
11 �a
IC—F•---10'_p•-
30�-D-
ET£tY 11,M POST WALL BE ♦R fta (DAVE.TER T\}TCAL PLAY LAYOUT
ACO FWAIATAF PER VMVFAOTUME} RETUNG
AmIr. pU,Y ( TO R P Aam BT PTf. SEE
PWI YEY! OETXU CIA It DIS FOR LOCH _
rE KRE FACED
34' APART
ACRE TDP M'D
wnw RAMS
T06)N
AF9 VELF SIEFL
RM up PCsr (Im.)
co ME
POST. CO'1a ER
POST. k Ot
POST
m KRE FACED
IS' APART OR
PUSS
3/a' Huss m��E rcomc (Tm) u�o.o.
^ WTM RAS Rm (Tm( ( i
n PYAr2 • DEPTR Or 0.AIY k rP01MC DrSM
D—QALLEIEE D BACKSTOP TYPICAL "%"ACMES 9CMGT401M
hVT TO SCALE
I
•
WMIR -- iii�
1685 CROSSTOWN BOULEVARD N.W.. ANDOVER, MINNESOTA 55304 . (763) 755-5100
FAX (763) 755-8923 • WWW.ANDOVERMN.GOV
TO: Park & Recreation Commission
CC: David D. Berkowitz, Director of Public Works/City Engineerb'CES
FROM: Todd J. Haas, Assistant Public Works Director
SUBJECT: D. Discuss 2022-2026 Trail Capital Improvement Plan, Cont.
DATE: May 27, 2021
The Park and Recreation Commission is requested to continue discussing the 2022-2026 Trail Capital
Improvement Plan (CIP).
DISCUSSION
The target date for draft CIP is Friday, June 4th. Below are the following segments that were discussed
last spring. Segments 1 and 3 were identified by the City Council in the 2021-2025 CIP. Note: It appears
at this point that there may not be enough funds to construct a Segment in 2022 so most likely the projects
will be moved back 1 year.
• Segment 1— 8' Bit. Trail along Crosstown Blvd from Xeon Street NW to Railroad Tracks (2022)
8' Bit. Trail along Crosstown Blvd from Railroad Tracks to 1571 Avenue (2022)
8' Bit. Trail along Crosstown Blvd from 15r Avenue to 1591 Avenue (2022)
• Segment 2 — 8' Bit. Trail along Station Parkway from Thrush Street to Partridge Circle (west leg)
8' Bit. Trail along Station Parkway from Partridge Street (east leg) to Hanson Blvd
• Segment 3 — 8' Bit. Trail along Verdin Street NW from 1611 Avenue to 163rd Lane (2024)
• Segment 4 — 8' Bit. Trail along Coon Creek from Prairie Road going east to the existing trail in
the Shadowbrook development. This project would most likely be eligible for MN
DNR funding. Note: There is one property (Mohlencamp's) that has yet to be
developed. So, until the property is developed, the City will not be able to construct
the trail along this segment until the necessary trail easements are dedicated.
• Segment 5 — 8' Bit. Trail from the west side of the railroad tracks to the east side of the tracks to
the new development called Fields of Winslow Cove which will require an
underpass under the tracks. At this point it does not appear to be likely that the
project will move forward.
A copy of the trail map identifying the segments is included in the side pocket of the packet.
The funding for the trails/sidewalk improvements have been using a combination of DNR Grants, general
funds and trail funds that have been received from new developments.
BUDGETIMPACT
The City Council will determine how the proposed trail improvements will be funded.
ACTION REQUIRED
The Park and Recreation Commission is requested to continue discussion on the 2022-2026 Trail Capital
Improvement Plan.
Respectfully submitted,
oo
Todd J. Haas
wxte+aaa
M
f
Ow
41, JLAXE) OUND LAKE
ROIANDIAAEM
I
i7.EADAM07
soar coos <.cs. ervo
e® f]
ROEEMDr
This map is provided by the City of Pndovar to guide people in the enjoyment
Of ourtmila when walking, running, m Ang or bikiro. Tr. displayed consist of
paved and unpaved surfaces. Paved surraw tells are blacldop and sidevelkx
Unpaved surime trails are wood chips. sail orsand. Nolallsunoundingtrails
are sham. Tel distances are appravimate.
IEAIRK
CROOR[D/ARE
Legend
— Paved Trail
— Proposed Trail
--_, Unpaved Trail
Sidewalk
County Treils
�n 3
w
oat
R.n
Trk
lC..* �.Arys
IF"(
East
' hrk
Trail Map
1" Bunker Underpass
t Railroad
tl Andover Schools
Water
Parks
0,1RNEk1'NIW( -
1 1
A
h�d,�o�el
r'crfioQ
nt s
AW
140NCEEEE y $
TQM. C y�M -IF
WVL Vr d
•krrlrk
RGmim.e TB d.--rt naa men <onm16. sme or . . . . . aa,e rad
wm va. es s...mm.m:ou:ea one n m a amtl w r rer<ann
qa a` ony. Eery�eFon m. mom m. ee emgae
crap .. 11 TM1aCM aMdrver tloe ,urepre Nrmt
n.e .n m,,.ee mrea,nm m.maacun
+mee.Rr not uec�oti�i« .a.rmr. Brae« ,
,re �uune�aeaaerwenonPsssioo.W .._._.���
I
.J
1
Segment 4
711AR IR®EUp