Loading...
HomeMy WebLinkAboutMay 27, 2021rAl 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 . WWW.ANDOVERMN.GOV Park & Recreation Commission Workshop Session Meeting May 27, 2021 6:00 P.M. Meet at Andover City Hall A. Call to Order B. Discuss 2022-2026 Park Playground Equipment Replacement Plan, Cont. C. Discuss 2022-2026 Park Capital Improvement Plan, Cont. D. Discuss 2022-2026 Trail Capital Improvement Plan, Cont. E. Adjournment Note: Some or all members of the Andover Park and Recreation Commission may participate in the May 27, 2021 Park and Recreation Commission meeting by telephone or video conference rather than by being personally present at the Park and Recreation Commission regular meeting place at the Andover City Hall, 1685 Crosstown Boulevard NW, Andover, MN 55304. Members of the public can physically attend, although there is very limited seating in the City Council Chambers as appropriate social distancing will be done by the Commission and visitors. 9 C I T Y" 0 F N OVFR^ j6D 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV TO: Park & Recreation Commission CC: David D. Berkowitz, Director of Public Works/City EngineerV3 FROM: Todd J. Haas, Assistant Public Works Director SUBJECT: B. Discuss 2022-2026 Park Playground Equipment Replacement Plan, Cont. DATE: May 27, 2021 INTRODUCTION The Park and Recreation Commission is requested to continue discussing the 2022-2026 Park Playground Equipment Replacement Plan that is being recommended by staff and consider request from the Strootman Park neighborhood to replace the playground equipment that was removed in 2020 with new equipment. DISCUSSION The target date for the Parks Maintenance Department to submit the draft 2022-2026 CIP Playground Equipment Replacement Plan is June 4, 2021. Listed below is the existing playground equipment that is recommended for replacement (or be refurbished) over the next 5 years which may include improvements to the fall zones. 2022 — Prairie Knoll Park (originally installed in 2005) and Rose Park (originally installed in 2004). Proposed budget impact is $100,000. Note: The Strootman Park neighborhood submitted a petition at the last meeting (May 3, 2021) requesting the City reconsider replacing the playground equipment that was removed from the park in 2020. The Park and Recreation Commission options regarding Strootman Park is as follows: A. Stay with the original plan that was approved in 2019 (see Attachment A). If the Commission were to stay with the original plan, the Tilted Sky Runner, Walking the Plank and the 3'd Bay swing set would be funded from the Park Improvement Fund (Park Dedication Funds) since they are considered new items and not replacement items. B. Approve the purchase of a new playground equipment for ages 2-12 year old's. This would be funded from the playground equipment replacement fund with the understanding that Rose Park playground equipment replacement would be funded from the cell tower revenues that have been received over the past few years. Under this option, the Tilted Sky Runner, Walking the Plank, and the 31 Bay swing set at Strootman Park would not be installed and would be removed from the plan permanently. Also, the spring ride closest to the Walking the Plank may need to be removed to allow a new playground structure to be installed. Under this scenario, no curb edging would need to be removed. See Attachment B that identifies the new playground equipment and layout. 2023 — Hills of Bunker Lake West Park (originally installed in 2004) and Hidden Creek East Park (originally installed in 2002). Proposed budget impact is $100,000. 2024 — Woodland Estates Park (originally installed in 2006), Oakview Park (originally installed in 2006) and Shady Knoll Park (originally installed in 2005). Staff is recommending increasing the proposed budget impact to $150,000 to replace the 3 playgrounds. 2025 — Meadows of Round Lake Park (originally installed in 2008), Creekview Crossing Park (originally installed in 2007) and Oak Bluff Park (originally installed in 2006). Staff is recommending increasing the proposed budget impact to $150,000 to replace the 3 playgrounds. 2026 — Country Oaks Park (originally installed in 2005), Fox Meadows Park (originally installed in 2006), Hidden Creek South Park (originally installed in 2006) and Woodland Crossing Park (originally installed in 2008). Staff is recommending increasing the proposed budget impact to $150,000 to replace the 3 playgrounds. The playground equipment identified can be moved up or down a year depending on the condition of the equipment, ADA requirements, entrapments, fall zones and handicapped accessibility. BUDGETIMPACT The General Fund budget impact for replacement/repair of various playground equipment is proposed at $100,000 for each of the next 2 years, then $150,000 moving forward (years 2024 - 2026). ACTION REQUIRED The Park and Recreation Commission is requested to continue discussions on the 2022-2026 Park Playground Equipment Replacement Plan that is being recommended by staff. Respectfully submitted, '/�iJ� Todd J. Haas CC: Tonya Schewe, Resident (copy sent by e-mail) Attachments: Attachments A and B CONC. ................................................rr..oe..mmmmn vim/ � , �` ' -•�� '` - - - �iim < ` . 1. \�. • / j' "� i %y A / EXIST. GRAVEL PARKING LOT SIYQ.E i' = 20'-0' stlp Br MOC wasc we . , /1MINN"OTA.Wj5CONSjlo-nznze " .cvme,vz.. arvsz.n �. ••.•.••• rL�i�l[11V/V' 1�1/V�■�/�Ai�/ M-w.z ezzs.zs Stootmn Park T6 NMr61E IV19pY fl 1MF>nP _••••• fa, zW-s.csoso ■9[aa. N.nmw.o N: asD s.n n i7��l7B' e...,, „r.�,.,.,roo,mAndmw, MInnesm wmn use �""s"4 Wdwd livc.�.16z. MS PLAN FWAUIRE=A FINI=HM GRADE RESCXtea+ 3-4-20 DWG. 010088H 0 GameTime• A ft ck rner�4 3 PT21027 ACTIVE Bison River Model # PT21027 The new standard for affordable play, PrimeTime play systems pack an enormous amount of play value into compact designs. The smaller footprint of PrimeTime commercial playground equipment requires less surfacing and has a lower overall cost. Specifications Product Line PrimeTime Length 36' Width 40' Age Range 2 to 5 Years Fall Height 5' Model View j� Tee. Po�.�k �a<am� sa.m rm. ., Wr.r-[ Nm Brvl3< i3-SGrv1 SInRE 1&b"f nMeml PrckYaR CWnter Number of Children System Features T". 45-50 Crawl Tubes Plastic Roof Timbers Top View Designing award -winning playgrounds since 1929 Complies with ASTM standards before it leaves the factory. Cenifed Installer Network - GameTime trained for Game -rime playgrounds. . 1 K. - , I> 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV TO: Park & Recreation Commission CC: David D. Berkowitz, Director of Public Works/City Engineer FROM: Todd J. Haas, Assistant Public Works Director SUBJECT: C. Discuss 2022-2026 Park Capital Improvement, Cont. DATE: May 27, 2021 The Park and Recreation Commission is requested to continue discussing the 2022-2026 Park Capital Improvement Plan (CIP). DISCUSSION The target date for draft CIP is June 4, 2021. Attached are two spreadsheets for the Park and Recreation Commission to consider. Spreadsheet A indicates paying off the Andover Community Center debt in the year 2022 and/or 2023 which is subject to receiving the anticipated park dedications fees that are collected for new developments. Spreadsheet B is to pay off the Andover Community Center debt over a projected 10-year period as to what has been currently done over the past couple years. Neither spreadsheet includes a pickleball facility in the CIP spreadsheet as discussed at the meeting on May 3, 2021. If the Park and Recreation Commission would like to pay off the dept in 2022 (and/or in 2023), based on the Projected Fund Balance (Spreadsheet A), the Commission could consider paving the parking lots at Pine Hills North Facility and Pine Hills South Park in 2023. Under this scenario, the Commission could consider other improvements in 2023-2026 as follows: Oak Bluff Park basketball court, Sunshine Park safety netting, ASN safety netting, Prairie Knoll Park warming house expansion, and Hidden Creek North Park medium shelter. Below are the proposed future facilities improvements that were presented at the meeting on May 3, 2021 for Zones A-D. Basketball Court at Oak Bluff Park -- $10,000. The Commission has mentioned that it would be nice to see if a basketball hoop could be placed in the existing parking lot versus building a new court. Due to liability and damage that could occur to vehicles parked in the parking lot from the basketball, it is recommended to construct a separated court. There are other parks where a basketball court could be constructed but are not included in the 2020 Existing and Future Park Facilities Chart for Zones A-D. They include the following: ASN, Hawkridge, Hickory Meadows, Hidden Creek East, Langseth, Lund's North, Northwoods West, Oakview, Pine Hills North, Pleasant Oaks, Rose and Timber Trails. Note: If the Commission would like to move forward in constructing any of these courts, the annual miscellaneous fund could be used. Paving of Parking Lots — Hawkridge ($135,000), Hills of Bunker Lake West ($45,000), Pine Hills North ($120,000-identified in current CIP for 2022/the remaining $280,000 will be funded from the Capital Equipment Reserve Fund), Pine Hills South ($67,000-this could be done as an alternate with Pine Hills North), Strootman ($60,000), and Timber Trails ($69,000). Fox Meadows and Lund's North Parks were also mentioned but are not identified to be paved in the 2020 Existing and Future Park Facilities Chart for Zones A- D. Note: If the Commission would like to move forward in paving either Fox Meadows and/or Lund's North Park parking lots, the future needs of the park system allocation funds could be used which is identified in the 2020 Existing and Future Park Facilities Chart. Parks that are Safety Concerns —Andover Station North (ASN) (estimate is $80,000) -- Install backstop netting for foul ball protection for spectators and vehicles for the west and middle fields. It has been suggested in the past by the Commission that the remaining funds to pay for the improvement would come as a donation from the baseball association; Sunshine Park Fields 1-4 (estimate is $160,000) -- Install high backstop netting for foul ball protection for spectators; Shadowbrook East North and South Fields (estimate is $80,000) -- Install high backstop netting for foul ball protection for spectators and properties adjacent to the fields. Note: Staff recently met with a contractor that installs backstop netting. Attached are pictures taken at the Blaine Baseball Complex located on Lexington Avenue just south of Main Street. The baseball safety netting that Blaine installed consists of a combination fencing and netting that is 40 feet in height (the bottom portion of the backstop is chain link fencing). The estimated cost identified in the CIP is for a 30-foot high netting (ground to top of the netting) at Sunshine Park is about $40,000 per field for a total of $160,000 for 4 fields. A portion of the $160,000 would be supplemented by the Public Works Parks Maintenance Fund for the value of the existing 4 backstops since it would be considered a replacement item. The same rational would also apply to ASN and Shadowbrook East Park as far as funding of the netting. New Building Construction — Hawkridge Park Warming House improvement with restrooms and a meeting room ($250,000); Pine Hills North New Building Construction ($450,000 for multi- purpose building/$10,000 for potable welt/ $105,000 for septic & vault); Prairie Knoll Park Warming House Expansion ($100,000). Note: Prairie Knoll Park Warming House Expansion was removed from the 2020 Existing and Future Park Facilities Chart by the Commission with the idea that the hockey association would donate the necessary funds to expand the warming house. With the number of residents using the free skating and hockey rinks, this warming house should be expanded to accommodate users of the park during the winter months. Note: With the anticipation of the new residential development of approximately 400 new lots in the development known as Fields of Winslow Cove located just to the north of Prairie Knoll Park, the park will become more active during the winter months which will require the need for more warming house space. New and/or Rei lacement of Shelters —Pine Hills North Facility Gazebo ($85,000); Hidden Creek North Medium Sized Shelter ($40,000); Kelsey Round Lake Park Picnic Shelter with Vault Restrooms & Tables $150,000; Sunshine Park Medium or Large Shelter between Fields 3 & 4 ($40,000 to $80,000) Note: A new shelter for Sunshine Park is not identified in the 2020 Existing and Future Park Facilities Chart; Wild Iris Park (replace existing small shelter with a medium sized shelter). Note: An upgrade of the existing Wild Iris Park shelter was not identified in the 2020 Existing and Future Park Facilities Chart. As far as increasing the annual miscellaneous fund (which is currently $15,000 per year) to allow more flexibility in completing projects, the Commission could increase this amount. Shown on the Projected Fund Balance is the increase in the annual miscellaneous fund to $30,000 for each of the next 5 years. This will allow the Commission to have more flexibility to complete some of the smaller park items that may come up during the year either from resident requests and/or from staff. For example, some recent projects that were not previously identified in the CIP or in the Comprehensive Plan that will be done with the miscellaneous funds is parking lot lighting at the Anoka County Dog Park facility and construction of the Bike Youth Trail at Sunshine Park. BUDGETIMPACT Depending on what the Commission would like to recommend for projects, the Finance Department has indicated to staff that the ending fund balance for each of the 5 years should have a minimum positive balance of $50,000.00 or more. ACTION REQUIRED The Park and Recreation Commission is requested to continue discussing the 2022-2026 Parks Capital Improvement Plan. Respectfully submitted, Todd J. Haas Attachments: Draft 2022-2026 Park Improvement Fund Projected Fund Balance Sheet (Spreadsheet A identifies paying off the Community Center debt eprly and Spreadsheet B identifies paying off the Co unity Center over a 10-year period), Pictures of the netting at Blaine Baseball Complex Projected Sources of Revenue Park Dedication Fee - Residential Units Park Dedication Fee - Residential ($4,400/unk) less: Contribution to Comm Ctr Expan' Donation / Contribution Capital Projects Levy - Park Improvements Total Revenues Available I Projected Commitments I Praide Knoll Park - Pave north packing lot Pickleball Study Hawkcdge Shelter Enlargement Pine Hills North - Phase II parking lot Pine Hills South - parking lot Oak Bluff- New Basketball Court Andover Station North - Safety Netting Sunshine Park - Safety Netting Hidden Creek North - Medium Shaker Prairie Knoll Park - Warming House Expansion CITY OF ANDOVER S repO S]ri �e } A Park Improvement Fund Estimate Projected Fund Balance tisn4(C.c 5 P4y 1� ofP- Co,N,.w,,r n t °G'/ (�evl.{rwq/ Cx�ae5iu^ 9Q.b+ �drd Ier°.. 2021 2022 2023 2024 2026 2026 TOTALS 50 50 50 25 25 25 $ 220,000 $ 220,000 $ 220,000 $ 110,000 $ 110,000 $ 110,000 $ 990.000 (202,604) (512,250) (110,000) - - - (824,854) 15,000 15.000 15.000 15,000 15,000 15,000 90,000 32,396 (277,250) 126,000 125,000 125,000 125,000 255,146 155,000 155,000 10,000 7.929 17,929 120,000 120.000 7 00 67.000 67,000 10,000 10,000 80,000 80,000 160,000 160,000 40.000 40,000 100,000 100,000 Annual Miscellaneous Projects 15,000 30,000 30,000 30.000 30,000 30,000 165,000 Total Commitments 187,929 30,000 217,000 120,000 190,000 170,000 914,929 Revenues Over (Under) Expenditures (165,533) (307,250) (92,000) 5,000 (85,000) (45,000) Fund Balance as of December 31, 2020 679,748 Fund Balance Brought Forward 524.216 216,965 124,965 129,985 64,965 Ending Fund Balance" $ 624,215 $ 216,965 $ 124,966 $ 129,965 $ 64,965 $ 19,965 Based on 50% of previous year's estimated park dedication w/ a reconciliation of two yea s prior "Target - $50,000 to create a contingency for any project overages. Dedicated Funds Available for. Rose Park - tower rental fee $ 41,552 Projected Sources of Revenue Park Dedication Fee - Residential Units Park Dedication Fee - Residential ($4,400/un8) less: Contribution to Comm Ctr Expan ` Donation / Contribution Capital Projects Levy - Park Improvements Total Revenues Available ) Projected Commitments ) Prairie Knoll Park - Pave north parking lot Picldeball Study Hawkridge Shelter Enlargement Pine Hills North - Phase II parking lot Pine Hills South - parking lot Oak Bluff - New Basketball Court Sunshine Park - Safety Netting - Andover Station North - Safety Netting Prairie Knoll Park - Warming House Expansion Hidden Creek North - Medium Shelter Annual Miscellaneous Projects Total Commitments CITY OF ANDOVER Park Improvement Fund Projected Fund Balance Estimate 2021 2022 2023 2024 Sprex40-e+ g 2026 2026 TOTALS 50 50 5o 25 25 25 $ 220,000 $ 220,0D0 $ 220,000 $ 110,000 $ 110.000 $ 110,000 $ 990,000 (202,604) (163,142) (110,000) (110,0W) (55,000) (55,000) (695,746) 15,000 15,000 15,000 15,000 15,000 15,000 90,000 32,396 71,858 125,000 16,000 70,000 70,000 384,254 166,000 155,000 10,000 10,000 7,929 7,929 120,000 120,000 67,000 67,000 10,000 10,000 -160,600 160,000 80,000 80,000 100,000 100,000 40,000 40,000 15,000 30,000 30,000 30,000 30,000 30,000 165,000 187,929 467,000 170,000 30,000 30,000 30,000 914,929 Revenues Over (Under) Expenditures (155,533) (395,142) (45,000) (15,000) 40,000 40,000 Fund Balance as of December 31, 2020 679,748 Fund Balance Brought Forward 524,215 129,073 84,073 69,073 109,073 Ending Fund Balance" $ 524,215 $ 129,073 $ 84,073 $ 69,073 $ 109,073 $ 149,073 " Based on 60% of previous year's estimated park dedication w/ a reconciliation of two years prior. "Target - $60,000 to create a contingency for any project overages. Dedicated Funds Available for: Rose Park - tower rental fee $ 41,552 CITY OF ANDOVER Park Improvement Fund Projected Fund Balance Estimate 2021 2022 2023 2024 2025 2026 TOTALS Projected Sources of Revenue Pads Dedication Fee - Residential Units 50 5o 50 25 25 25 Pads Dedication Fee - Residential (i4,400/un8) $ 220,000 S 220,000 S 220,000 S 110,000 i 110,000 i 110,000 i 990,000 less: Contribution to Comm Ctr Even (202,604) (196.142) (143,000) (143,000) (140,180) - (824,926) Donation / Contribution - - - Capital Projects Levy - Pack Improvements 15,000 15,000 15,000 15,D00 15,000 15,000 90,000 Total Revenues Available 32,396 38,80 92,000 (18,000) (15,180) 125,000 21WO74 Projected Commitments Prairie Knoll Pads - Pave north parking let 155,000 155,000 Pickleball Study 10,000 000 1,29 e Shelter En HaaAuidg Enlargement 7,929 7,929 Pine Hills North - Phase II parking let 120,000 120.000 Pine Hills South - parking let 67,000 67,000 Oak Bluff- New Basketball Court 10,000 10,000 Sunshine Park - Safety Netting 150,000 180,000 Andover Station North - Solely Netting 80,000 80,000 Prairie Knoll Pads - Warming House Eiryansion 100.000 100,000 Ridden Creek North - Medium Shelter 40,000 40.000 Annual Miscellaneous Projects 15,000 30,000 30,000 30,000 30,000 30,000 165,0D0 Total Commibnents 187.929 467,000 170,000 30.000 30,000 30,000 914,929 Revenues Over (Under) Fxpenituros (1561633) (428,142) (78.000) (48,0W) (48,180) Kom Fund Balance as of December 31, 2020 679,748 Fund Balance Brought Forward 524,215 96,073 18,073 calm (75,107) Ending Fund Balance" SS YL{,2'16 i 96.073 i 18A7s i L2.9 S n6.+07) S 19AN Bred on 50% of pmious yaaft estimated park dedication w/ a neoncba90n of two Yom prior "Target - $50,000 to nneate a contingency far airy project overages. Deacated Funs Available for. Ross Park -tower enlai fee i 41,562 TCP RAL LLD RAD /\ 9uOV17 a Fgnw w.: 'x ra o J Y/ 11 �a IC—F•---10'_p•- 30�-D- ET£tY 11,M POST WALL BE ♦R fta (DAVE.TER T\}TCAL PLAY LAYOUT ACO FWAIATAF PER VMVFAOTUME} RETUNG AmIr. pU,Y ( TO R P Aam BT PTf. SEE PWI YEY! OETXU CIA It DIS FOR LOCH _ rE KRE FACED 34' APART ACRE TDP M'D wnw RAMS T06)N AF9 VELF SIEFL RM up PCsr (Im.) co ME POST. CO'1a ER POST. k Ot POST m KRE FACED IS' APART OR PUSS 3/a' Huss m��E rcomc (Tm) u�o.o. ^ WTM RAS Rm (Tm( ( i n PYAr2 • DEPTR Or 0.AIY k rP01MC DrSM D—QALLEIEE D BACKSTOP TYPICAL "%"ACMES 9CMGT401M hVT TO SCALE I • WMIR -- iii� 1685 CROSSTOWN BOULEVARD N.W.. ANDOVER, MINNESOTA 55304 . (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV TO: Park & Recreation Commission CC: David D. Berkowitz, Director of Public Works/City Engineerb'CES FROM: Todd J. Haas, Assistant Public Works Director SUBJECT: D. Discuss 2022-2026 Trail Capital Improvement Plan, Cont. DATE: May 27, 2021 The Park and Recreation Commission is requested to continue discussing the 2022-2026 Trail Capital Improvement Plan (CIP). DISCUSSION The target date for draft CIP is Friday, June 4th. Below are the following segments that were discussed last spring. Segments 1 and 3 were identified by the City Council in the 2021-2025 CIP. Note: It appears at this point that there may not be enough funds to construct a Segment in 2022 so most likely the projects will be moved back 1 year. • Segment 1— 8' Bit. Trail along Crosstown Blvd from Xeon Street NW to Railroad Tracks (2022) 8' Bit. Trail along Crosstown Blvd from Railroad Tracks to 1571 Avenue (2022) 8' Bit. Trail along Crosstown Blvd from 15r Avenue to 1591 Avenue (2022) • Segment 2 — 8' Bit. Trail along Station Parkway from Thrush Street to Partridge Circle (west leg) 8' Bit. Trail along Station Parkway from Partridge Street (east leg) to Hanson Blvd • Segment 3 — 8' Bit. Trail along Verdin Street NW from 1611 Avenue to 163rd Lane (2024) • Segment 4 — 8' Bit. Trail along Coon Creek from Prairie Road going east to the existing trail in the Shadowbrook development. This project would most likely be eligible for MN DNR funding. Note: There is one property (Mohlencamp's) that has yet to be developed. So, until the property is developed, the City will not be able to construct the trail along this segment until the necessary trail easements are dedicated. • Segment 5 — 8' Bit. Trail from the west side of the railroad tracks to the east side of the tracks to the new development called Fields of Winslow Cove which will require an underpass under the tracks. At this point it does not appear to be likely that the project will move forward. A copy of the trail map identifying the segments is included in the side pocket of the packet. The funding for the trails/sidewalk improvements have been using a combination of DNR Grants, general funds and trail funds that have been received from new developments. BUDGETIMPACT The City Council will determine how the proposed trail improvements will be funded. ACTION REQUIRED The Park and Recreation Commission is requested to continue discussion on the 2022-2026 Trail Capital Improvement Plan. Respectfully submitted, oo Todd J. Haas wxte+aaa M f Ow 41, JLAXE) OUND LAKE ROIANDIAAEM I i7.EADAM07 soar coos <.cs. ervo e® f] ROEEMDr This map is provided by the City of Pndovar to guide people in the enjoyment Of ourtmila when walking, running, m Ang or bikiro. Tr. displayed consist of paved and unpaved surfaces. Paved surraw tells are blacldop and sidevelkx Unpaved surime trails are wood chips. sail orsand. Nolallsunoundingtrails are sham. Tel distances are appravimate. IEAIRK CROOR[D/ARE Legend — Paved Trail — Proposed Trail --_, Unpaved Trail Sidewalk County Treils �n 3 w oat R.n Trk lC..* �.Arys IF"( East ' hrk Trail Map 1" Bunker Underpass t Railroad tl Andover Schools Water Parks 0,1RNEk1'NIW( - 1 1 A h�d,�o�el r'crfioQ nt s AW 140NCEEEE y $ TQM. C y�M -IF WVL Vr d •krrlrk RGmim.e TB d.--rt naa men <onm16. sme or . . . . . aa,e rad wm va. es s...mm.m:ou:ea one n m a amtl w r rer<ann qa a` ony. Eery�eFon m. mom m. ee emgae crap .. 11 TM1aCM aMdrver tloe ,urepre Nrmt n.e .n m,,.ee mrea,nm m.maacun +mee.Rr not uec�oti�i« .a.rmr. Brae« , ,re �uune�aeaaerwenonPsssioo.W .._._.��� I .J 1 Segment 4 711AR IR®EUp