Loading...
HomeMy WebLinkAboutWK - March 23, 20219k.NDON . 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV City Council Workshop Tuesday, March 23, 2021 Council Chambers 1. Call to Order — 6:00 p.m. 2. Site Visioning Constance Free Church Andover/ Station19 Architects —Administration 3. Discuss Fields of Winslow Cove and Prairie Road Intersection Connections/Pedestrian Crossings — Planning/Engineering 4. Discuss Requested Future Improvements to Dog Park in Bunker Hills Regional Park — Engineering 5. Discuss Andover Outdoor Pickleball Study/21-15 — Engineering 6. Review Final Draft for Future Improvements Zones A -D/2020 Existing and Future Facilities Chart — Engineering 7. Discuss Comprehensive Plan Text Amendment - Planning 8. Andover Community Center (ACC) Financial Update / Facility Utilization Discussion - Administration 9. Discuss Transition from Andover Community Center Advisory Commission — Administration 10. December 2020 re -audit General Fund Budget Progress Report -Administration 11. Other Topics 12. Adjournment All members of the Andover City Council will participate in the March 23, 2021 Special City Council meeting by telephone or video conference rather than by being personally present at the City Council's regular meeting place at the Andover City Hall, 1685 Crosstown Boulevard NW, Andover, MN 55304. City Staff will be present at City Hall for the meeting. Members of the public can physically attend, although there is very limited seating in the Andover Senior Center as appropriate social distancing will be done by the City Staff and visitors. 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 . (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV TO: Mayor and Councilmembers FROM: Jim Dickinson, City Administrator SUBJECT: Site Visioning Constance Free Church Andover / Stationl9 Architects DATE: March 23, 2021 INTRODUCTION 0 Constance Free Church in Andover (16150 Constance Boulevard NW) is working with Stationl9 Architects to vision for the future of their existing site and facility to better serve Constance Free Church members and the Andover Community. As part of the Strategic Master Planning process Stationl9 and the Constance Free Church leaders would like to engage with Andover Community Leaders to discuss how Constance Free can be an integral part of the Andover community. Are there uses for the greater community that Constance Free can provide in collaboration with the city? DISCUSSION Stationl9 Architects (Nicole Thompson) and the Constance Free Church leaders (Pastor Randy & Pastor Sean) will be present at the workshop to discuss their Strategic Master Planning process and gather feedback from the Council. Attached are some sample questions from Station 19 Architects they may be asking the Council at the workshop. ACTION REQUESTED Receive a brief presentation and provide feedback to Stationl9 Architects and the Constance Free Church leaders. submitted, Jim FREE CHURCH ANDOVER, STATION =C19 ANDOVER,R, MN PROJECT #4577 02 /16 / 2021 - COMMUNITY LEADERS ARCHITECTS. INC. COMMUNITY / CITY LEADERS LISTENING QUESTIONS EXAMPLES OF POTENTIAL QUESTIONS: 1. As the city of Andover grows - What are some important services that are needed or desired? 2. What Ideas Is the city cultivating to fill those needs, but are trying to find the right partner? 3. How can Constance Free be a good partner & great neighbor to support & address some of those needs? 4. What does the city see as the highest & best use of Constance Free's property? 5. How has the city partnered with private / public partnerships in the past? STATIONI9.COM • 2001 UNIVERSITY AVENUE SE, SUITE 100. MPLS, MN 55414 • 612.623.1800 C I T bVg ��,ND R` 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV TO: Mayor and Council Members CC: Jim Dickinson, City FROM: Joe Janish, Community Development rec or Dave Berkowitz, Director of Public Wor ity Engineer SUBJECT: Discuss Fields of Winslow Cove and Prairie Road Intersection Connections/Pedestrian Crossings— Planning/Engineering DATE: March 23, 2021 ACTION REQUESTED Consider direction to staff and developer in regards to intersection connections/pedestrian crossings. DISCUSSION On December 1, 2020 City Council reviewed a sketch plan for what has been named "Fields of Winslow Cove." During review of the sketch plan City Council emphasized pedestrian traffic be considered as part of the development process. The sketch plan originally did not include park property, however the preliminary plat now includes two locations; one on each side of Prairie Road. Park At this time the developer is proposing left and right turn lanes into the development. Staff and developer have had conversations related to intersection improvements to allow for pedestrian to cross Prairie Road NW. With the level of concern that City Council expressed for pedestrians crossing Prairie Road NW due to the development, staff and developer are looking for direction on the intersection improvements expected and input on crossing of Prairie Road NW. Prairie Road NW is considered a Major Collector in the Comprehensive Plan. The Transportation Plan also includes Proposed Regional Trails which identifies Prairie Road NW as a future City Regional Trail location. Staff would like to discuss how and when the regional trail segment should be constructed. Prairie Road NW is currently a 55 mph roadway and it is not expected to have a reduced speed to 35 mph as it does south of Andover Boulevard as there will be much fewer access points than south of Andover Boulevard. ACTION REQUESTED Staff and developer will be looking to discuss in further detail with you on the following items: -Pedestrians crossing Prairie Road NW, -Trail locations and segments, !aspect y submitted, Joe Janish Community Development Director ATTACHMENTS: City Council Meeting Minutes December 1, 2020. Lager Copy of map included in write up Transportation Plan Proposed Regional Trails Plan Regular Andover City Council Meeting Minutes – December 1, 2020 Page 5 alssiring on an annual basis that local government bonded indebtedness payments are made. Mr. Di son stated the County is requesting a resolution that would update all or a portion of previous rtified bonded indebtedness levies. He announced the 2021 City of Andover Debt Service Bu s current and up to date. Motion by Barthel, Seconded ukkila, to adopt Resolution No. R093-20 updating Certified Bonded Indebtedness for 2021. Moti taken by roll call: Councilmember Barthel: aye Councilmember Butler: aye Councilmember Bukkila: aye Councilmember Holthus: aye Mayor Trude: aye Motion carried unanimously. SKETCHIPLANNED UNIT DEVELOPMENT (PUD) CONCEPT PLANREVIEW — FIELDS OF WINSLOW COVE — PID #' S. 23-32-24-41-0001, 23-32-29-42-0003, 23-32- 24-43-0005, 23-32-24-44-0001,24-32-24-31-0001, 24-32-24-32-0001, 24-32-24-33-0001,24- 32-24-34-0001,24-32-24-43-0001 — U. S. HOME CORPORATION DBA LENNAR, LLC APPLICANT City Planner Hellegers stated the Council is asked to review the sketch plan and provide comments to the applicant. He explained the Planning and Zoning Commission reviewed the plan and held a public hearing. Mr. Hellegers stated the Park and Recreation Commission also reviewed the sketch plan. Mr. Hellegers reviewed the definition and purpose of a PUD and sketch plan. He identified the location of the development and stated it encompasses 240 acres. Mr. Hellegers gave background information on the Comprehensive Plan, density requirements, and how it relates to the current development proposal. He indicated it is located within the MUSA boundaries and is zoned Urban Residential Low and Urban Residential Medium. Mr. Hellegers presented the sketch plan and stated there are many wetland acres on the property limiting areas that can be developed. He stated three different types of homes are proposed: villas, and two types of single-family homes. Mr. Hellegers addressed the access points into the development. He reviewed the application with the Council as presented in the staff report, addressing housing styles, screening and buffering, tree preservation, and wetlands. Mr. Hellegers explained the PUD review criteria and the proposed PUD standards. Mayor Trude asked if the side yard and front yard setbacks are identified. Mr. Hellegers replied the City does not have the setbacks at this point in time. Mr. Hellegers explained the next steps in the process. He stated the project is proposed to be graded in two phases and built in four phases. Mr. Hellegers explained the ghost plat areas and access points to undeveloped properties. He presented a sketch showing tree preservation and removal. Mayor Trude asked Mr. Hellegers to display the overall acreage and how it relates to the Comprehensive Plan density. Mr. Hellegers replied 284 lots are dedicated to 65 -foot single- Regular Andover City Council Meeting Minutes—December I, 2020 Page 6 family homes. He stated the overall density is 2.9 units per acre and the Met Council wants the City to have 3 units per acre. He explained the villa product has a density of 4 units per acre. Mayor Trude stated the Council does not want to be more generous with density than needed. She said the majority of development is Urban Residential Low and only a small portion is Urban Residential Medium. Mr. Hellegers replied 18 acres are dedicated to the villas which are Urban Residential Medium, and the remaining acres are Urban Residential Low. Councilmember Bukkila asked Mr. Hellegers to review the proposed PUD standards. He explained the standards include deviations from standard lot width, depth, lot area, block length, and cul-de-sac length. Councilmember Holthus stated there are a lot of unknowns and she would like to have more information. Mr. Hellegers went into detail about the proposed lots and housing styles. Councilmember Bukkila asked if the proposed streets were up to code. Mr. Hellegers replied they are proposed at 60 feet which is City Code. Mayor Trude stated one of the tradeoffs of not having an apartment building in the Comprehensive Plan on Bunker Lake Boulevard was having townhomes or other products with smaller lot sizes that are owner -occupied. Associate Planner Griffiths reported the 73 villa homes over 18.1 net acres resulted in 4 units per acre. Mayor Trude stated villas tend to be more senior based housing. She said she does not mind that type of product having a smaller lot, but she is not sure about the 65 -foot lots. Councilmember Bukkila asked for a compare/contrast between standard development and the PUD request. Mr. Griffiths displayed the chart showing the PUD deviations. He replied more information will come with the Preliminary Plat review. Councilmember Bukkila asked how many units would be able to be built using the City's standard procedure. Mr. Griffiths replied his estimate is that 452 homes could be built on the acres with the R-4 district standards. Councilmember Barthel asked if the developer did not decide to use a PUD and clear cut and fill everything, they could get 452 homes on the property. Mr. Griffiths replied that is correct. Mr. Griffiths stated if this came forward as a normal plat and not a PUD, there would be no required discussions on tree preservation. Councilmember Holthus asked about the trail crossing Prairie Road. She said she is concerned about the location of the crossing and the safety of pedestrians. She asked what the status was of a railroad underpass to the west side of the railroad tracks. Public Works Director/City Engineer Berkowitz replied the City is also concerned about the safety of the Prairie Road crossing and will discuss it with the developer. Mr. Berkowitz referred to the question about the railroad underpass. He stated the City is waiting on the EAW to be completed for the development and they will have more information about the level of the Regular Andover City Council Meeting Minutes —December 1, 2020 Page 7 groundwater. Mr. Berkowitz stated they have been having discussions with BNSF Railroad and have shared information with the developer. Councilmember Holthus inquired about Palm Street connecting the new development to the existing neighborhood and what the transition from the R-4 to R-1 would look like. Mr. Hellegers replied there will need to be a buffer between the R-1 and R-4 district. He stated the 80 -foot lots would be the transition from the new development to the R-1 lots. Councilmember Holthus asked how far away Prairie Knoll Park is and if there would be a trail along Prairie Road. Mr. Hellegers replied the long-term plan is to have a trail along Prairie Road. Mayor Trude stated she believes it is about a half -mile for kids to walk to get to Prairie Knoll Park. Mr. Berkowitz replied the northern edge of the development is a half -mile from the southern edge. He stated the trail along Prairie Road is part of the Regional Trail Plan and they have asked the developer to grade the trail as part of their project. Councilmember Holthus replied it will be very valuable to have the trail along Prairie Road. Mayor Trude asked if a trail is required because it is a State Aid Route. Mr. Berkowitz replied it is a requirement along Prairie Road but not in the interior of the development. Councilmember Holthus asked what kind of traffic controls will be in the development and along Prairie Road. Mr. Berkowitz replied Prairie Road is a major collector street and will likely not have any controlled intersections. He stated there will be intersection improvements by adding left and right turn lanes. He said the developer is required to provide a traffic analysis identifying the impacts to existing roads and intersections. Mr. Berkowitz stated the City worked with the developer to plan traffic calming designs to the interior of the development. Councilmember Bukkila asked staff to help point out specific areas under discussion. She asked if there would be additional lights or medians along Prairie Road. Mr. Berkowitz replied that is in discussion and will be part of the Preliminary Plat Review. He stated lighting can be included in the feedback given to the developer and added to the plan. Councilmember Bukkila said there are have been significant accidents on Prairie Road where the road curves. She said this may be an opportunity to create a safer road as the City adds more homes to the area. Councilmember Bukkila stated she would like to see medians and good lighting. Councilmember Bukkila asked for more information about the buffers. Mayor Trude stated she would like more information about tree preservation. Josh Metzer, Lennar Homes, came forward and stated they are interested in a PUD to offer smaller lots with a mix of products. He stated the 65 -foot lot width is the standard they build on for a 50 -foot -wide home with a 7%2 foot side yard setback. He stated the villas are 40 feet wide with a 7 %2 foot side yard setback. He stated the 80 -foot lots would be used as premier lots and a transition to the R-1 homes. He indicated they typically look at 25 -foot front and Regular Andover City Council Meeting Minutes —December 1, 2020 Page 8 back yard setbacks. Mr. Metzer stated they are looking for a PUD because if they had to follow the 80 -foot lot width, they would have to impact wetlands and bring in a lot of fill. He stated the PUD is allowing them to preserve trees, creating open space and a meandering ditch, and trail loops. Mr. Metzer stated they are looking at the railroad underpass to see if it is feasible. He said they will try to preserve trees along the eastern and southern border. He said wherever they are not able to preserve, they will plant trees. Mr. Metzer stated there are areas that have been impacted by Oak Wilt and those trees will have to come down anyway. Mayor Trude asked why they planned on taking down trees to the border on the north and said it would be nice to save a few rows of trees. Mr. Metzer replied the road is being pushed to the north to avoid impacting the wetland, which results in taking down more trees. He said if the studies show they do not need to push the road as far north, they can save more trees. Mr. Metzer said it is uncommon to provide a buffer in similarly zoned areas in the MUSA. Mayor Trude asked Mr. Metzer to talk about the proposed trails. Mr. Metzer replied they plan on paved trails throughout the development. Mayor Trude stated the east side does not have access to a park and she would like to see one. Mr. Metzer stated the Park and Recreation Commission indicated they would look for a neighborhood park near University Avenue when the surrounding areas develop. Mr. Metzer stated they will be completing an EAW with a traffic study and will address the crossing at Prairie Road. Mayor Trude expressed the positive aspects of the plan including the wetlands with a variety of wildlife. She asked if the developer planned on preserving trees along the ditch. Mr. Metzer replied they are going to save as many trees as possible. He said they will be meandering the ditch, so it looks like a natural stream instead of a straight line. Mayor Trude said there was a lot of Oak Wilt in the area and many trees were cut down. Mr. Metzer said they will be taking down any trees with Oak Wilt. Mr. Metzer explained their timeline stating they would like to present a pre -plat in March and a final plat in April. He said they would start grading on the western half of the property where the utilities will be brought in. He stated they would hope to have model construction in the fall and sell after that. Mr. Metzer stated the project would take around 8 years to build and sell. Councilmember Butler state he would like to see maximum tree preservation including a buffer of trees on the north end. He said they would like to preserve the pines on the southeast end. Councilmember Butler stated he is concerned about the crossing of Prairie Road and feels that it will be a problem. He stated he wants to see a good plan to get people to and from parks and making sure there is safe pedestrian access. Councilmember Butler stated if there is a safe crossing at Prairie Road, he could see delaying of a park on the eastside until more land develops. Regular Andover City Council Meeting Minutes —December 1, 2020 Page 9 Councilmember Bukkila asked where a potential park would go on the east side. Mayor Trude said there are a lot of natural amenities on the east side, but she would like to see a park. Mr. Griffiths stated the recommendation of the Park and Recreation Commission was to find land east of the development to build a park. Mayor Trude stated there is a lot of wetland to the east. Mr. Metzer said there are upland areas to continue the road to the east. Mr. Berkowitz stated there is also upland closer to University Avenue. Councilmember Bukkila asked the width of the buffer to the east and south. Mr. Hellegers replied there is no width requirement. Mr. Hellegers stated the proposed width is difficult to determine. Mr. Hellegers stated buffering was a concern of the neighboring properties and could include tree preservation or planting of trees. Councilmember Bukkila stated she would like to preserve the natural buffer because it takes too long for something to be planted and grow. She stated she is looking for road safety on Prairie Road, sufficient buffers, and if the City is going to make concessions on lot widths, amenities need to be clearly stated by the developer. Councilmember Barthel stated he agrees with natural buffering on the south and east side. He said he agrees with Councilmember Bukkila that taking down trees and then planting new ones takes too much time to grow. Councilmember Barthel said safety on Prairie Road is going to be an issue. He said there needs to be lighting at each entry point. Councilmember Barthel stated he would like to see a park on the eastside at some point. He stated safe access across Prairie Road is important. Councilmember Barthel stated there may be too many lots and he would like to see the number of lots lowered to increase the width of the 65 -foot lots. He stated there is future development to the southeast and would propose a stub street at that cul-de-sac. Mayor Trude replied that there are two property owners to the south, one owned by a developer (Mark Smith) and one by a private citizen (Shawn Smith). Mr. Berkowitz replied the developer to the south (Mark Smith) has requested utilities stubbed in and stated the property to the north of that (Shawn Smith) will be difficult to develop. Councilmember Barthel stated he is concerned the owner in the middle will be landlocked if there is no connection planned from the proposed development. Mr. Berkowitz replied that staff will contact Shawn Smith to discuss access to their property for future development. Mr. Metzer stated if a stub street was built off the cul-de-sac, they would have to remove a large number of trees to build the road to the property line. Mayor Trude said the Shawn Smith family built their home around 5 years ago and service to Mark Smith's property is going to be complicated. Mr. Dickinson stated there would be connections at 148th Lane and 146th Lane across for the Mark Smith property on the east side of Prairie Road. Mayor Trude stated this development is 240 acres and she would like to see a park on the east side of Prairie Road. Mayor Trude stated the smaller lots will not allow for a playset in the backyard. She said the trails are nice, but it is ideal to have a park. Mayor Trude stated the land to the east of this is marshy and would be best suited for villa style homes which do not Regular Andover City Council Meeting Minutes —December 1, 2020 Page 10 usually have children. Mayor Trude asked if sewer could be extended to the east. Mr. Berkowitz stated there is a significant amount of upland that can accommodate a road and a good number of lots. He stated the sewer and water would need a lift station to make the connection to University Avenue. Mayor Trude stated she would like to see fewer lots, and some wider lots should be allowed to allow for a rambler style home, and the railroad underpass connection on the west side. Councilmember Holthus stated she would like to see significant tree preservation, a safe trail crossing at Prairie Road, an underpass at the railroad, a park on the east side, and a trail along Prairie Road. Councilmember Bukkila would like to see a trail on Prairie Road, a plan for a park, and the railroad underpass. She said things are significant in this area and if they do not happen, there is going to be re-evaluation. Mayor Trude stated if the underpass does not happen a park will need to be built in this area to accommodate all the families. Mayor Trude said the Holasek family has been around for generations. She gave background information on the family stating they have been impacted by development and it is now their turn to develop. She stated many people are upset and complain that the City is responsible. She said it is up to the private owner and they have a right to develop. Mayor Trude said the family has waited a long time to develop, longer than many other farmers. She stated it is sad to see the land and trees go, but the City has to respect property rights and allow fair and reasonable development. Mayor Trude stated the City's hands are tied to some extent because of the Met Council's control over the sewer system. She said the City has a lot of single-family homes, but just not on the smaller lots. Mayor Trude stated the Council does not take the decision lightly and it is a hard change to see. She asked if anyone wanted to help the family preserve their history, they can reach out to the daughter. She said the family wants to preserve their history but in order to do that, they have to sell their land. Mr. Metzer stated he understands the concerns about the buffers, crossing at Prairie Road, location for a park, and he will take the comments and incorporate them into the plan. Mayor Trude stated the developer can check in with staff on a regular basis and they will bring items to a workshop as needed. Mayor Trude stated there have been a lot of interest from the community. She said they will read and address the comments, but the development is not under the control of the City. She stated the City will apply and monitor code. Mr. Dickinson summarized the issues and concerns of the Council. He stated staff has a grasp Regular Andover City Council Meeting Minutes —December 1, 2020 Page 11 of what Council is looking for. He thanked Mr. Metzer for attending and the Council for their review. n Mayor Trude stated no decisions were made tonight. She said it was a conversation about the plans and ideas for this area. She said the plans might change as studies are completed. VID 19 UPDATE City ministrator Dickinson updated the Council on the primary changes to the COVID-19 response ince the last meeting. He stated the Governor's Executive Order goes through December &h. Mr. Dickinson stated the City has been dealing with the impact of the dial back and ha oked at opening up the walking track and were told no. He said the YMCA is able to hold youlkenrichment programs. Mr. Dickinson said the City has been working with businesses to see Ilow the City can help. He said liquor license fees have been reduced as a result of COVID. Dickinson stated he has reached out to State and Federal officials indicating small businees are hurting in Andover and across Minnesota. He stated something needs to be do at the State and Federal level to help businesses. Mr. Dickinson stated the City hks been impacted by staff illnesses and encourage the public to be patient with the City and busialesses that are having staffing issues. He stated the City will monitor and follow the State euide es. Councilmember Butler asked if the City as going to flood rinks. Mr. Dickinson replied the City will flood and have outdoor rinks; the Bather just is not cooperating. ADMINISTRATOR'S REPORT City Staff updated the Council on the administration d city department activities, legislative updates, updates on development/CIP projects, and me ing reminders/community events. (Administrative Staff Activities) — Mr. Dickinson stated th City is at 130 new home permits. He updated the Council on a siren replacement project. Mr. DIr.,kinson stated there will be one more meeting of Council this year. He said the City newsletter isRut and residents are needed for City Commissions. He stated applications are due December 1 k (Public Works) — Mr. Berkowitz stated the City will flood rinks when t weather is cold. He said flooding may start December 13`" and takes 2 weeks to get ice establis d. Mr. Berkowitz said they have delivered picnic tables to the rink locations for people to chang into their skates if the warming houses are not open. Mr. Berkowitz updated the Council on the dIT and overlay project and public hearing. He updated the Council on park projects. Mr. Berkowit announced that it will be a very busy for development projects and plat approvals. (Development) — Mr. Hellegers updated the Council on agenda items coming to the and Zoning Commission for December 8`h Park Nowthen Oak Grove Document Path M:IGISJa'a PlanninglProecls\Tran$prp4on Plan 2017%Translprtatlon_Plon 20R Figu,.". rtl East Bethe , , ""4 A Ham Lake Blaine TRANSPORTATION PLAN L E G E N D Proposed Regional Trails City .. County Existing Trails �i City County �i Existing Roads Proposed Collector Roadway Existing Roadway ,'� A Minor Arterial �i B Minor Arterial Major Collector �i Minor Collector Local Water �, Railroad ff-1 Parks df Schools Proposed Regional Trails Plan Figure 11 Revised February 2018 C I T Y ND O 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 . (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV TO: Mayor and Council Members CC: Jim Dickinson, City Administrato FROM: David D. Berkowitz, Director of Public Works/City Engineer SUBJECT: Discuss Requested Future Improvements to Dog Park in Bunker Hills Regional Park - Engineering DATE: March 23, 2021 0 INTRODUCTION8 The City Council is requested to discuss requested future improvements to the outdoor Dog Park in Bunker Hills Regional Park. DISCUSSION In 2013 the Cities of Andover and Coon Rapids entered into a Joint Powers Agreement with Anoka County to jointly construct and maintain an outdoor Dog Park in Coon Rapids located within Bunker Hills Regional Park, referred to as Bunker Hills Dog Park. The City contributed labor and funding to get the dog park constructed and now additional improvement requests are coming in. Requested improvements are as follows: • Lighting Parking Lot and park area $24,000 (City has already committed to $8000 max contribution in 202 1) • Water/Dog Drinking Fountain $24,000 • Paving Parking Lot and Concrete Slab $75,000 • Shelter/Shade Structure $40,000 Improvement costs are split three ways so Andover's contribution would be approximately $47,000, preferably for construction in 2022. Actual participation would be based on final construction cost and the Cities and/or County would self perform any work that can be done to reduce costs. BUDGETIMPACT The funding would likely come from Park Improvement Funds. ACTION REQUIRED The City Council is requested to discuss requested fixture improvements to the outdoor Dog Park in Bunker Hills Regional Park and direct staff on if such improvements should be considered in the 2022-2026 Capital Improvement Plan. ectfi111y submitted, ( O David D. Berkowitz Attachment: Aerial Location Map of Bunker Hills Dog Park Ate .OVER Bunker Hills Dog Park Date Created: March 12, 2021 Disclaimer: The provider makes no representation or warranties with respect to the reuse of this data. 0161 U0 0 "AttA 0 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV To: Mayor and City Council CC: Jim Dickinson, City Administ� David D. Berkowitz, Director o Publi orks/City Engineeri:o From: Todd J. Haas, Assistant Public Work'S�Qir�ctor/Parks Coordinator Subject: Discuss Andover Outdoor Pickleball Study/21-15 - Engineering Date: March 23, 2021 INTRODUCTION The City Council is requested to review the Andover Outdoor Pickleball Study prepared by WSB, Project 21-15. DISCUSSION Attached is a copy of the outdoor pickleball study for your review. At the January City Council workshop meeting, staff reviewed three potential locations (City Campus, Prairie Knoll Park, and Pine Hills North Athletic Facility) to study. Identified in the study are the pros and cons and cost estimate for a 6 -court and 8 -court facilities for the City Campus and Pine Hills North Athletic Facility sites. Also identified in the study are the pros and cons and an estimated cost for a 6 -court facility within the existing hockey rink at Prairie Knoll Park. Listed below are cities near Andover that have outdoor pickleball courts: • City of Coon Rapids Riverwind Community Center - 6 outdoor courts (new as of 2020) Moor Park — 3 outdoor courts • City of Blaine Hidden Ponds Park — 3 outdoor courts (new as of 2020) Lexington Athletic Complex — 4 outdoor courts (relatively new complex) • City of Anoka George Enloe Park — 4 outdoor courts Sunny Acres Park — 4 outdoor courts • City of Champlin Oak Creek Park — 1 outdoor court Paul Wethern Park — 2 outdoor courts • City of Brooklyn Park Norwood Park - 6 outdoor courts Mayor and Council Members March 23, 2021 Page 2 of 2 Listed below are other cities in the Metro area with outdoor pickleball courts: • City of Eagan Quarry Park — 8 outdoor courts (Eagan is constructing 9 more outdoor courts this summer) • City of Woodbury Pioneer Park — 2 outdoor courts Shawnee Park — 6 outdoor courts • City of Forest Lake Fenway Park — 7 outdoor courts Attached is information from the Andover Community Center regarding the use of indoor pickleball for the last 4 years. The Park and Recreation Commission reviewed the study at their meeting on March 4, 2021 and is recommending the pickleball court facility be located at the City Campus north of Public Works on the west side of Tower Drive. The Commission did not identify how many courts should be considered but left the option open for either a 6 -court or an 8 -court facility at some point in the future. The Commission also recommended that the facility be identified in the Park Capital Improvement Plan for potential construction in 2025. The Commission will need to continue to evaluate the Park Improvement Funds over the next few years to see if it will warrant moving the project up to an earlier year. Attached is the is the current Park Improvement Fund Projected Fund Balance report with an estimated 50 new platted lots in 2021-2023 for your information. ACTION REQUESTED The City Council is requested to review the findings of the outdoor pickleball study prepared by WSB and provide guidance to staff and the Park and Recreation Commission on how to proceed with the implementation of the improvements within the 2022-2026 Capital Improvement Plan. Respectfully submitted, Todd J. Haas Cc: Jim Lindahl, Park and Recreation Commission Chair (copy sent by e-mail) Jim Peden, Andover Resident Pickleball Player (copy sent by e-mail) ,✓ Attachrr�ents: Andover Outdoor Pickleball Study; Park Commission Meeting MinutFs of 3/4/21,✓Draft 2022-2026 Park CIp Park Improvement Fund Projected Fund Balance, ACC Indoor Pickleball Use Numbers✓ E 0 U Z Z w N Memorandum To: Dave Berkowitz, Director of Public Works / City Engineer From: Jeff Feulner, PLA Date: 02/23/2021 Re: Outdoor Pickleball Study Andover City project 21-15 WSB Project No. 017457-000 DRAFT - ANDOVER OUTDOOR PICKLEBALL STUDY Summary: This Outdoor Pickleball Study was created for the City of Andover. After reviewing 14 park and open space locations in Andover's system, three sites were selected to be evaluated for future pickleball facilities. The sites include the City Campus north of Public Works, Prairie Knoll Park and Pine Hills North Athletic Facility. All three sites are viable for a pickleball development, but each site has unique opportunities and constraints that impact the cost and effectiveness of such a facility for the City. Sites were selected for review based on a number of criteria: - Location / Proximity to residential properties (noise concerns) - Access — both vehicular and pedestrian - Available Space within the park / open space - Parking — either existing or area to expand - Nearby complimentary elements — other park elements such as buildings, shelters, playgrounds, courts or fields - Restroom availability - Shade potential - Lighting potential The following pages include five (5) pickleball facility layout options that were explored within the three park sites, highlighting the strengths and weaknesses of each site, and providing preliminary cost information to construct the improvements. Site improvements can be evaluated based on the costs of each element to determine the best overall solution for the City. Some elements, such as divider fencing, can make the user experience more pleasant, but are not required to create a successful pickleball facility. Site Recommendation: Based on this information and feedback from City Council, City staff, and the City of Andover Parks and Recreation Commission, is recommended as the preferred site for an outdoor Pickleball facility within the City of Andover. K1 17457-0=AdminT=\017457-000 Andwer Pickleball Study.docx Andover Pickleball Study 02/23/2021 Page 2 Site location options '.: c a d "t at an aft i 1 Ares i � 11 f s f� - PINE HILLS NORTH ATH. FACILITY LOCATION 3 1 906 Hoibw Palk w (] $ 77 t . Kelsay Round Lake Park CIN CAMPUS Ham Lor i LOCATION 1 O PRAIRIE KNOLL PARK r j LOCATION 2 '.` Golf 0lub i ;amen _ 1 B Ovrynd oon Raolds 1 0 ... a y�J- Village Btagwr H�a Golf a aF. E..)• The three sites selected for the outdoor pickleball study are in 3 distinct locations across the City. Location 1: City Campus / North of public works facility: Centrally located near City Hall and the Community Center, this location is geographically closest to the center of Andover. This location is also near Elementary, Middle and High Schools. Location 2: Prairie Knoll Park: Located on the East side of Andover, this established park has the existing infrastructure to support a pickleball development. Location 3: Pine Hills North Athletic Facility: Located in the West side of Andover, this park has significant space for expansion of facilities. K:\017457-000\Admin\Docs\017457-000 Andover Pickleball Swdy.dmx Andover Pickleball Study 02/23/2021 Page 3 I s SHELTER ••• lT \ LOCATION 1: CITY CAMPUS Option A: Eight pickleball courts constructed in yard space north of the public works facility. Large and open, this level area would be an ideal candidate for a court facility, though complimentary elements would be required. Area could support dedicated parking lot for the new facility. Pros: • Location: Centrally located within city with no residential properties nearby • Nearby Complimentary elements: Close proximity to other indoor/outdoor recreation (Community Center) • Access: Ample vehicular access with abundant parking nearby in Community Center facility • Utilities: Lighting / electrical service available in close proximity (existing lights in yard area) • Restroom: Restroom / drinking fountains located in Community Center Cons: • No existing shade • Access: Existing parking is across Tower Drive, creating pedestrian crossing concerns • Location: Public Works yard dust and noise K:\017457-000VWmin\Docs\017457-000 Andover Pickleball Study.docx Andover Pickleball Study 02/23/2021 Page 4 CITY CAMPUS Option A Item # Item Qty Unit Unit Price Cost 1 Pickleball Court 8 EA $27,025 $ 216,200 Includes: A Concrete Maintenance Strip 75 LF $20 $ 1,500 B Bituminous Pavement 250 SY $40 $ 10,000 C 10' Chain Link Fence 75 LF $75 $ 5,625 D 6' Divider Fence 75 LF $60 $ 4,500 E Acrylic Color Surfacing and Striping 250 SY $10 $ 2,500 F Net and Post System 1 EA $2,500 $ 2,500 G Practice Board 1 EA $400 $ 400 2 20'x 20' Shelter 1 EA $53,000.00 $ 53,000 Includes: A Shelter and footings 1 EA $35,000 $ 35,000 B Concrete Flatwork & Sidewalk 1800 SF $10 $ 18,000 3 Light 4 EA $10,000 $ 40,000 4 Drinking Fountain 1 EA $6,000 $ 6,000 Subtotal: $ 315,200 Recommended Contingency (20%) $ 63,040 Est. Admin / Design Costs (20%) $ 75,648 Total: $ 453,888 To add the oickleball facility of this size in this location, costs will range from approximately $246.240 to $453,888. • Minimum improvements include items 1B, 1C, 1E, 1F, and 213 from the table above and come to a total cost of $246,240. • Implementation of all items from the table above come to a total cost of $453,888. K:\017457-000%Admin\Dom\017457-000 Andover Pickleball SWdy.docx Andover Pickleball Study 02/23/2021 Page 5 ( EX. PARKINGI 77 STALLS- I -- a �l I (6) PICKLE BALL COURTS �----�"— AREA W �, >r of r w SHELTER p F EX PARKING c >. 2 STALLS _ Y CA S rt �� LOCATION 1: CITY CAMPUS Option B: Six court layout surrounding shelter / plaza area, constructed in yard space north of public works facility. Large and open, this level area would be an ideal candidate for a court facility and complimentary elements. Pros: • Location: Centrally located within city with no residential properties nearby • Nearby Complimentary elements: Close proximity to other indoor/outdoor recreation (Comm. Center) • Access: Ample vehicular access with abundant parking nearby in Community Center facility • Utilities: Lighting / electrical service available in close proximity (existing lights in yard area) • Restroom: Restroom / drinking fountains located in Community Center Cons: • No existing shade • Access: Existing parking is across Tower Drive, creating pedestrian crossing concerns • Location: Public Works yard dust and noise K\017457-000Wdmin\Daeat017457-000 Andover Pickleball Study.d= Andover Pickleball Study 02/23/2021 Page 6 CITY CAMPUS Option B - MAX Item # Item Qty Unit Unit Price Cost 1 Pickleball Court 6 EA $27,025 $ 162,150 Includes: A Concrete Maintenance Strip 75 LF $20 $ 1,500 B Bituminous Pavement 250 SY $40 $ 10,000 C 10' Chain Link Fence 75 LF $75 $ 5,625 D 6' Divider Fence 75 LF $60 $ 4,500 E Acrylic Color Surfacing and Striping 250 SY $10 $ 2,500 F Net and Post System 1 EA $2,500 $ 2,500 G Practice Board 1 EA $400 $ 400 2 20' x 20' Shelter and Plaza Area 1 EA $67,000 $ 67,000 Includes: A Shelter and footings 1 EA $35,000 $ 35,000 B Concrete Flatwork & Sidewalk 3200 SF $10 $ 32,000 3 Light 4 EA $10,000 $ 40,000 4 Drinking Fountain 1 EA $6,000 $ 6,000 Subtotal: $ 275,150 Recommended Contingency (20%) $ 55,030 Est. Admin / Design Costs (20%) $ 66,036 Total: $ 396,216 To add the Pickleball facility of this size in this location, costs will range from aooroximately $189.720 to $396,216. • Minimum improvements include items 1 B, 1C, 1 E, 1 F, and 26 from the table above and come to a total cost of $189,720. • Implementation of all items from the table above come to a total cost of $396,216. K:\017457-0OOWdmintD=\017457-000 Andover Pickleball Study. d= Andover Pickleball Study 02/23/2021 Page 7 EXISTING LIGHT POLE (TYP) y ` mm ,(6) PICKLE BALL COURTS BASKETBALL�-- •. COURT EXISTING * `EXISTING BLEACHERS BUILDING 4 EX. PARKING OPTIONAL SHELTER 87 STALLS .� PLAZA AREA 146T8 LN NW LOCATION 2: PRAIRIE KNOLL PARK Six court layout in existing Hockey rink facility. Due to multi -use facility needs, net posts would need to be removable and divider fencing would not be feasible. Pros: • Parking: Accessible existing parking • Level area—minimal grading required • Lighting: Rink Lighting in place Cons: • Complimentary Elements: Potential displaced hockey rink/skating • Complimentary Elements: Seasonal use / changeover between uses • No divider fencing between courts in multi-purpose facility • Location: Residential to south • Shade: Limited shelter space for shade • Parking: Parking capacity during athletic events • Flooding / poor drainage in rink area may accelerate degradation of pavement surface K:\017457-000Wdmin\D=u 017457-000 Andover Pickleball Study.docx n Andover Pickleball Study 02/23/2021 Page 8 Prairie Knoll Park Item # Item Qty Unit Unit Price Cost 1 Removals 1 LS $15,000 $ 15,000 2 Pickleball Court 6 EA $28,150 $ 168,900 Includes: A Concrete Maintenance Strip 75 LF $20 $ 1,500 B Bituminous Pavement 250 SY $40 $ 10,000 C 10' Chain Link Fence 75 LF $75 $ 5,625 D 6' Divider Fence (seasonal / removable) 75 LF $75 $ 5,625 E Acrylic Color Surfacing and Striping 250 SY $10 $ 2,500 F Net and Post System 1 EA $2,500 $ 2,500 G Practice Board 1 EA $400 $ 400 3 20'x 20' Shelter 1 EA $49,000 $ 49,000 Includes: A Shelter and footings 1 EA $35,000 $ 35,000 B Concrete Flatwork 1400 SF $10 $ 14,000 Subtotal: $ 232,900 Recommended Contingency (20%) $ 46,580 Est. Admin / Design Costs (20%) $ 55,896 Total: $ 335,376 To add the oickleball facility of this size in this location costs will range from approximately $199.800 to $335,376. • Minumum improvements include items 1, 213, 2C, 2E & 2F from the table above and come to a total cost of $199,800. • Implementation of all items from the table above come to a total cost of $335,376. K:\017457-000\Hdmin\Do \017457-000 Andover Pickleball Swdy.docx Andover Pickleball Study 02/23/2021 Paae 9 a it _�, •___�� ,m _ __—_ '-- -__� - �—yam/ fi l 1 I ' s (8) PICKLE BALL - Ex. PARKING COURTS 11IIEX PARKING X II 57 STALLS •SHELTER OPOSED PARKING -_f ADD 18 STALLS PLAZA AREA ��- _ 14 g AL., T� �V 161STAVE NW LOCATION 3: PINE HILLS NORTH ATHLETIC FACILITY Option A: Eight pickleball courts constructed in open space west of soccer fields. Large and open, this area could be an ideal candidate for a court facility, though significant grading and removal of natural elements would need to take place. Area could support expanded parking lot for the new facility and has room for shelter or other amenities. Pros: • Parking: Existing parking lots throughout park. Easily expandable. • Access: Easy vehicular access from 161s1 Ave NW • Location: Natural surrounding environment • Available Space: Large park with significant open space available Cons: • Significant grading / earthwork • Location: Loss of natural space • No lighting in place • Location: Less convenient location within city • Location: Residential properties to West • No restroom facility in close proximity • Impacts original Master Plan layout • Parking: Dust from parking lot. CIP identifies parking lot paving in 2022 K:\017457-000Ndmin\Doca\017457-000 Andover Pickleball SNdy.docx Andover Pickleball Study 02/23/2021 Page 10 PINE HILLS NORTH Option A Item # Item Qty Unit I Unit Price Cost 1 Removals 1 EA$5,000 $ 5,000 2 Grading 1 EA $20,000 $ 20,000 3 Pickleball Court 8 EA $27,025 $ 216,200 Includes: A Concrete Maintenance Strip 75 LF $20 $ 1,500 B Bituminous Pavement 250 SY $40 $ 10,000 C 10' Chain Link Fence 75 LF $75 $ 5,625 D 6' Divider Fence 75 LF $60 $ 4,500 E Acrylic Color Surfacing and Striping 250 SY $10 $ 2,500 F Net and Post System 1 EA $2,500 $ 2,500 G Practice Board 1 EA $400 $ 400 4 Unpaved Parking (18-20 Stall) 1 EA $8,750 $ 8,750 Includes: A Gravel Material 125 CY $70 $ 8,750 5 Light 4 EA $10,750 $ 43,000 6 20'x 20' Shelter and Plaza Area 1 EA $57,000 $ 57,000 Includes: A Shelter and footings 1 EA $35,000 $ 35,000 B Concrete Flatwork 2200 SF $10 $ 22,000 Subtotal: $ 349,950 Recommended Contingency (20%) $ 69,990 Est. Admin / Design Costs (20%) $83,988 Total: $ 503,928 To add the Pickleball facility of this size in this location, costs will range from approximately $286,200 to $503,928. • Min umum improvements include items 1, 2, 3B, 3C, 3E, 3F, 4 & 6B from the table above and come to a total cost of $286,200. • Implementation of all items from the table above come to a total cost of $503,928. K:\017457-000 Wdmin\Docs\017457-000 Andover Pickleball Swdy.doc Andover Pickleball Study 02/23/2021 Paoe 11 r-- PROPOSE ADD is r LOCATION 3: PINE HILLS NORTH ATHLETIC FACILITY Option B: Six pickleball courts constructed in open space west of soccer fields. Large and open, this area could be an ideal candidate for a court facility, though significant grading and removal of natural elements would need to take place. Area could support expanded parking lot for the new facility and has ample room for shelter, plaza space and other amenities. Pros: • Parking: Existing parking lots throughout park. Easily expandable. • Access: Easy vehicular access from 161 et Ave NW • Location: Natural surrounding environment • Available Space: Large park with significant open space available Cons: • Significant grading / earthwork required • Location: Loss of natural space • No lighting in place • Location: Less convenient location within city • Location: Residential properties to West • No restroom facility in close proximity • Impacts original Master Plan layout • Parking: Dust from parking lot. CIP identifies parking lot paving in 2022 K:\077457-000WAmintD=NO17457-000 Andover Picldeball Study.docx Andover Pickleball Study 02/23/2021 Page 12 PINE HILLS NORTH Option B Item # Item Qty Unit Unit Price Cost 1 Removals 1 LS $5,000 $ 5,000 2 Grading 1 LS $20,000 $ 20,000 3 Pickleball Court 6 EA $27,025 $ 162,150 Includes: A Concrete Maintenance Strip 75 LF $20 $ 1,500 B Bituminous Pavement 250 SY $40 $ 10,000 C 10' Chain Link Fence 75 LF $75 $ 5,625 D 6' Divider Fence 75 LF $60 $ 4,500 E Acrylic Color Surfacing and Striping 250 SY $10 $ 2,500 F Net and Post System 1 EA $2,500 $ 2,500 G Practice Board 1 EA $400 $ 400 4 Unpaved Parking (15-20 Stall) 1 EA $7,000 $ 7,000 Includes: A Gravel Material 100 CY $70 $ 7,000 5 Light 4 EA $10,750 $ 43,000 6 20'x 20' Shelter and Plaza Area 1 FA $47,000 $ 47,000 Includes: A Shelter and footings 1 EA $35,000 $ 35,000 B Concrete Flatwork 1200 SF $10 $ 12,000 7 Bituminous Trail 90 SY $30 $ 2,700 Subtotal: $ 286,850 Recommended Contingency (20%) $ 57,370 Est. Admin / Design Costs (20%) $ 68,844 Total: $ 413,064 To add the pickleball facility of this size in this location, costs will range from approximately $228.168 to $413,064. • Minumum improvements include items 1, 2, 36, 3C, 3E, 3F, 4 & 7 from the table above and come to a total cost of $228,168. • Implementation of all items from the table above come to a total cost of $413,064. K:\017457-000WdminOD \017457-000 Andover Pickleball SNdy.dom DRAFr PARKAND RECREATION COMMISSION MEETING —MARCH 4, 2021 MINUTES The Regular Bi -Monthly Meeting of the Andover Park and Recreation Commission was called to order by Chair Lindahl on March 4, 2021, 7:00 p.m., at the Andover City Hall, 1685 Crosstown Boulevard NW, Andover, Minnesota. Commissioners Present: Chair Jim Lindahl, Commissioners Jake Widmyer, Tracy Strombeck, Sophia Newton, Shane Stenzel, and Scott Roth Commissioners Absent: None Also Present: Assistant Public Works Director, ToddHaqv Interim Parks Maintenance Supervisor,Seeger RESIDENT FORUM No one appeared before the Commission. APPROVAL OFMINUTES February 18, 2021 Regular Meeting Motion by Stenzel, secondedby idmyer, to approve the February 18, 2021 Regular Meeting minutes as presente otion passed unanimously. February 18,ZWo Meeting Motion by S by Widmyer, to approve the February 18, 2021 Workshop Meeting min. Motion passed unanimously. OF THE AGENDA lVion by Widmyer, seconded by Strombeck, to approve the agenda as presented. Motion passed unanimously. REVIEW OF PICKLEBALL COURT COST ESTIMATE REPORTIRSB/21-15 The Park and Recreation Commission is asked to review the Andover Outdoor Pickleball Study prepared by WSB. Assistant Public Works Director Haas explained what pickleball Regular Andover Park & Recreation Commission Meeting Minutes — March 4, 2021 Page 2 is and displayed pictures of the sport and the layout of the court. Mr. Haas stated three sites were identified as possible locations. He explained things that were considered included location, proximity to neighbors, access to parking and trails, space within the park, additional park amenities, restrooms, shade, and lighting. Mr. Haas stated WSB prepared five pickleball options at three sites and each has their strength and weaknesses. Mr. Haas identified the locations: City Hall Complex (1), Prairie Knoll Park (2), and Pine Hills North (3). Mr. Haas presented Location 1, Option A, located on the City Hall Campus with an 8 -court facility and adjacent shelter. He indicated the cost range of Location 1, Option A is $216,000 to $453,000 depending on how many additional amenities the City would like to have included. Mr. Haas presented Location 1, Option B, a 6 -court facility with the shelter incorporated into the courts. The cost range of this option is $162,000 to $390,000 depending on what amenities the City would like to have included. Mr. Haas presented Location 2, Prairie Knoll Park, with 6 courts located on the hockey rink. He stated the difficulty in this option is installing and removing fences for the pickleball season. Mr. Haas said shade and parking is limited at this location. The cost range for Location 2 is $200,000 to $335,376 depending on additional amenities the City would like to have included. Mr. Haas presented Location 3, Option A, located at Pine Hills North with 8 courts. The cost range for this option is $286,000 to $503,000. Mr. Haas presented Location 3, Option B with 6 courts. He explained there would need to be significant grading and drainage work. He stated the parking lot is gravel and may be paved in 2022 based on the current CIP. The cost of this option ranges from $228,000 to $413,000 depending on amenities the City would like to have included. Mr. Haas explained staff is looking for which option the Commission prefers and which amenities they would like. Mr. Haas provided a list of cities around the metro area with pickleball facilities. Commissioner Strombeck asked if the striping is painted or a sticker. Mr. Haas replied the lines are painted. Commissioner Strombeck asked how long a pickleball court pavement will last until it needs to be redone. Mr. Haas replied 25-35 years depending on normal maintenance of the surface and that surface water drains properly. The courts will need to be periodically painted. Jim Peden, 15011 Swallow Street NW, came forward and thanked the Commission for considering pickleball courts. He stated the sport is growing. He commented that cities spend lots of money on youth sports facilities and pickleball is primarily played by adults and seniors. Mr. Peden explained the North Star Pickleball Association began just over a year ago and has over 300 members. Mr. Peden asked what kind of support the City needs from Regular Andover Park & Recreation Commission Meeting Minutes — March 4, 2021 Page 3 the pickleball group. He stated he prefers the City Hall Campus location. Mr. Peden commended the Commission for conducting the study and gathering input in order to make a decision that is best for the community. Mr. Peden suggested the City build the primary structure and add amenities through donations. Commissioner Strombeck asked how many Andover residents play pickleball. Mr. Peden stated prior to COVID, they would get 60-80 people per day playing at the Community Center. Mr. Peden replied he does not have the breakdown of Andover residents. Toni Peden, 15011 Swallow Street NW, came forward and said they have no way of knowing how many players are Andover residents but she estimates hundreds. She stated more kids are playing pickleball too. Ms. Peden thanked the Commission for listening and looking at options for 6 and 8 court facilities. Commissioner Miskowiec asked why courts couldn't be east -west facing. Mr. Peden replied the sun interferes with playing as it rises and sets. He stated most tennis courts are oriented the same way. Mr. Haas stated hockey rinks are built the same way. Mr. Haas stated if the Commission prefers the City Hall Campus, there is a shelter from the YMCA site that can be relocated which will save on costs. Mr. Peden stated other cities bring in portable restrooms. He said it is nice to have restrooms and drinking fountains, but it is not necessary. He explained the biggest thing is the configuration to allow for future amenities. Mr. Haas said there is some lighting at the City Hall Campus site that could be looked at and players can use the Community Center restrooms. Chair Lindahl asked if the City has talked to the Community Center about access to restrooms. Mr. Haas stated the restrooms in the Community Center are public. Commissioner Stenzel asked what a pickleball court is made of. Mr. Haas replied it is blacktop/asphalt with paint. Commissioner Stenzel said one court is about 300 cubic feet of asphalt and at today's prices should be around $1200. He said their calculation is $90 a square foot. He said there is no price break for adding multiple courts. Commissioner Stenzel thinks the cost is too high. Mr. Peden explained the court is 20'x44' but there needs to be an additional 10 feet around it. Mr. Haas stated the project will be competitively bid. Commissioner Stenzel asked if there was room to do this inhouse. Mr. Haas replied the City might be able to get the site prepped, but the project will be built by the contractor. Mr. Peden stated the City of Cambridge built 8 new courts for around $100,000. Commissioner Roth asked if Mr. Haas has talked to the other cities and asked how they financed the facility. Mr. Haas stated he has information from Blaine but not other cities. Regular Andover Park & Recreation Commission Meeting Minutes — March 4, 2021 Page 4 Mr. Haas stated the City recommends the concrete mow strip around the perimeter of the facility for maintenance reasons. Mr. Haas showed a picture of a pickleball court and recommended the fence between the courts, so games do not interfere with each other when games are going on. Commissioner Strombeck stated she would love to build the courts if they had the money. She stated she would like to push it into 2026 due to money and to give the new Council time to weigh in on the project. Commissioner Strombeck recommended the City Hall Campus location and take out the shelter. Chair Lindahl asked if the Commission was in favor of the City Hall Campus and how many courts they preferred. Chair Lindahl stated he supports 6 courts and the City Hall Campus. Commissioner Newton agreed on the City Hall Campus and 6 courts. Commissioner Widmyer agreed on the City Hall Campus, no shelter or use the former YMCA shelter, and 6 courts. Commissioner Roth agreed on the City Hall Campus, 6 courts, and no shelter. Commissioner Stenzel agreed on the City Hall Campus, 6 to 8 courts. Commissioner Strombeck agreed that 8 courts are acceptable but to hold off on all other amenities. She reiterated pushing it out to 2026. Commissioner Miskowiec agreed that the City Hall Campus is the best location, but he does not like the numbers. He recommended calling Cambridge to see how they built their courts cheaply. Commissioner Miskowiec agreed to eliminate all extra amenities. Chair Lindahl asked if the cost estimate was based on today's costs or 2024-25 projected pricing. Mr. Haas replied it is based on today's costs. He stated WSB has built courts around the Twin Cities and they have provided their best estimate. Mr. Haas stated the cost of steel and oil prices are on the rise. Chair Lindahl stated if the project is put off too far, the cost will just continue to go up. Commissioner Miskowiec stated prices may go down, too. Commissioner Stenzel asked if there was a benefit to setting a top amount the City is willing to spend. Chair Lindahl asked what year the Commission would like the courts constructed. Commissioner Newton stated she would like to see it built sooner than later. Regular Andover Park & Recreation Commission Meeting Minutes — March 4, 2021 Page 5 Commissioner Widmyer asked what Council wanted from the Commission. Mr. Haas explained Council is looking for a recommendation on location, number of courts, amenities, and the year to be constructed. Commissioner Widmyer stated there is money in the CIP for the City Hall Campus. He said he is okay leaving it in 2025 or pushing it back a year or two. Commissioner Roth stated he needs to understand the budget better. He said he would like to know the amount budgeted for the project before he decides on the number of courts and amenities. He stated he would advise pushing the project back until they understand how much money the City can allocate. Commissioner Stenzel stated he recommends sticking with the CIP the Commission recommended and the Council approved. Commissioner Strombeck stated she supports 2026 because if extra money comes in, they can bump it up, but they can't always bump it back. Commissioner Miskowiec agreed to push the project to 2026 because of the funding. Chair Lindahl stated the project is in the CIP for 2025 with a budget of $450,000 which fits most of the options presented by WSB. Chair Lindahl supported leaving the project in 2025 and pushing it back if the budget can't support it. He stated the sport is popular, fills a need, and people over 55 are the primary taxpayer in the City. Commissioner Stenzel stated the CIP is reviewed every year and the project can be reevaluated annually. Motion by Lindahl, seconded by Stenzel, to recommend the project staying in 2025, located at City Hall Campus, and the number of courts depending on what the City can get for the $450,000 budget. Commissioner Strombeck stated she noticed things take a while to come down the pipe and this project came from the previous Council. She wanted the current Council to have a say. Chair Lindahl replied the current Council is in support of it as several of the members from the previous Council are on the current Council. Motion passed 6 ayes, 1 nay (Miskowiec) Mr. Peden came forward and said that money is an issue and if the Pickleball Association came up with private money, the project could be started sooner. The Commission stated yes, it could be built sooner if there were contributing funds. Mr. Peden stated the Pickleball Association will investigate fund raising options. Mr. Peden explained there is a need for this facility and pickleball is becoming popular. Chair Lindahl stated the project can be moved up but it is budget dependent. Regular Andover Park & Recreation Commission Meeting Minutes — March 4, 2021 Page 6 Mr. Haas stated the item will go to the Council Workshop on March 23, 2021. RESCHEDULE MARCH 18, 2021 MEETING Public Works Director Haas stated the Commission is asked to consider resc uling the March 18, 2021 meeting due to spring break. Mr. Haas stated the items on the a da can wait until April 1 st and the main topic will be field use scheduling. Motion by Wiztver, seconded by Miskowiec, to cancel the March 18, 2021 meeting. Motion passed un imously. OUTSTANDING ITE 1. Andover Comm ty Center Advisory Committee Update: Commissioner Strombeck stated she es not have an update from Mr. Sutherland. She stated this topic will be covered in workshop. 2. Completed Projects: noth new to report 3. On-going Projects: Mr. Haa eviewed the remaining on-going items. Mr. Haas stated there will be a bid opening r Prairie Knoll Park at the end of March. Mr. Haas stated Hawkridge and Woodland eadows community build will be scheduled sometime in May and could occur on a same day. He stated Commission will hold a neighborhood information meeting fo ild Iris Park on April 1, 2021. Mr. Haas stated the signs for the Bike Youth Trail w be installed soon. 4. On -Hold Projects — nothing new to report. 5. Other Items of Interest — Mr. Haas provided date on pedestrian trails. 6. Parks Maintenance Update: Mr. Seeger stated th arks Maintenance Department is in a transition period from winter to summer projec CHAIR'S REPORT Nothing to report ADJOURNMENT Motion by Stenzel, seconded by Newton, to adjourn the meeting at 7:58 p.m. Motion passed unanimously. Respectfully Submitted, Shari Kunza, Recording Secretary TimeSaver Off Site Secretarial, Inc. Projected Sources of Revenue Park Dedication Fee - Residential Units Park Dedication Fee - Residential ($4,400/unit) less: Contribution to Comm Ctr Expan (50%) Donation / Contribution Capital Projects Levy - Park Improvements Total Revenues Available Projected Commitments Prairie Knoll Park - Pave north parking lot Pickleball Study Pine Hills North - Phase II parking lot Hawkridge Shelter Enlargement New Pickleball Facility Annual Miscellaneous Projects Total Commitments Revenues Over (Under) Expenditures CITY OF ANDOVER Park Improvement Fund Projected Fund Balance Estimate 2021 2022 2023 2024 2025 2026 TOTALS 50 50 50 25 25 25 $ 220,000 $ 220,000 $ 220,000 $ 110,000 $ 110,000 $ 110,000 $ 990,000 (202,604) (163,142) (110,000) (110,000) (55,000) (55,000) (695,746) 15,000 15,000 15,000 15,000 15,000 15,000 90,000 32,396 71,858 125,000 15,000 70,000 70,000 384,254 230,000 230,000 10,000 10,000 120,000 120,000 7,929 7,929 450,000 450,000 15,000 15,000 15,000 15,000 15,000 15,000 90,000 262,929 135,000 15,000 15,000 465,000 15,000 907,929 (230,533) (63,142) 110,000 - (395,000) 55,000 Fund Balance as of December 31, 2020 679,748 Fund Balance Brought Forward 449,215 386,073 496,073 496,073 101,073 Ending Fund Balance ** $ 449,215 $ 386,073 $ 496,073 $ 496,073 $ 101,073 $ 156,073 **Target - $50,000 to create a contingency for any project overages. Dedicated Funds Available for: Rose Park - tower rental fee $ 41,552 ACC Indoor Pickleball Use Resident Non -Resident Total Non- Resident 2017 10162 2018 12233 2019 2975 9643 12618 76.42% Jan - March 2020* 1074 2988 4062 73.56% Jan - Feb 2021** 152 498 650 76.62% *2020 - Covid Closures, Covid Restrictions, Facility Closed due to repair/resurface of fieldhouse floor ** 2021 Covid Restriction on number of paricipants in fieldhouse at one time, players slow to return NOTE: The number that is tracked is each time and individual plays and equates for multiple trips of one individual. I T Y • Fj^ ° 1685 CROSSTOWN BOULEVARD N.W.. ANDOVER, MINNESOTA 55304 . (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV TO: Mayor and City Council CC: Jim Dickinson, City Administrate4*crks/City David D. Berkowitz, Director of Engineer"" Jim Lindahl, Park and Recreationn Chair FROM: Todd J. Haas, Assistant Public Works Director SUBJECT: Review Final Draft for Future Improvements Zones A -D / 2020 Existing and Future Park Facilities Chart/Zones A -D DATE: March 23, 2021 INTRODUCTION The City Council is requested to review the final draft for future improvements for Zones A -D Existing and Future Park Facilities Chart as recommended by the Park and Recreation Commission. DISCUSSION Attached are the proposed future improvements for Zones A -D (middle column) as recommended by the Park and Recreation Commission. The Commission has been evaluating all parks/facilities over the past few months based on direction from the City Council. With Metropolitan Council's most recent predicted buildout for 2040 of 13,500 households (previous projected household was 15,400), it was requested by the City Council that the Park and Recreation Commission re-evaluate proposed park improvements to see if future facilities should be removed or reduced in size which would reduce the funding amount needed. The column on the left side of the spreadsheet is the description of existing items in the current park system. The middle column is the improvements (new) the Park and Recreation Commission is recommending for each park. The right column identifies the replacement items that will be necessary at some point as recommended by the Commission including the year it is anticipated to be replaced along with the estimated cost. The current Park Dedication fee for 2021 is $4400 per unit. The City Council previously requested that the Park and Recreation Commission consider reducing or eliminating future improvements so that it is more in line with the $4400 fee that was approved, and the improvements identified will meet the needs of the park system based on the Metropolitan's Council 2040 population projections. Based on review by the Park and Recreation Commission on items to be reduced or items that were eliminated along with the cost of inflation, the park dedication fee does not need to be changed. Mayor and Council Members March 23, 2021 Page 2 of 2 By eliminating or reducing the improvements recommended by the Commission, the new grand total of future improvements would be $12,739,095 (previous amount was $16,704,745). When reviewing the spreadsheet, improvements identified in red are recommended to be eliminated and improvements in yellow are recommended to be reduced to a lesser amount (in a couple cases it was increased) for that item. ACTION REQUIRED The City Council is requested to review the final draft for future improvements for Zones A -D Existing and Future Park Facilities Chart as recommended by the Park and Recreation Commission. Respectfull y submiitted,, Todd J. Haas Cc: Jim Lindahl, Park and Recreation Commission Chair (copy sent by e-mail) / Attachments: Existing and Future Park Facilities Chart Spreadsheet; Map of Zones A -D✓ LRn L a G a N D ParksPreserveQPark Zone191STAVE 15 Perk Number /\/"eN1i arul 4A- , 1y /�/osbib»ar OA 278 � A Ci Features 19B i / SA rmx.rE Comprehensive Plan Figure 5.1 21 B City Map Key for Parks &City Features . 13A ^ 266 ""^E 1A LJ 7A 12A ° A o F A i 28B • _ m 9y4 anx AVE ®I--1 22B o� O 6A� 206 1A .�uoe a, Fwsra J � coxerax�xcje� el.w BA 59,E 24B � ✓23B 1 JJ /46C 5 341 .Lmmm a �i B2D 36C ` 86 –CL '." .�' 5 7 740 43C $ - 630 83a p .w 37C 39C. I, ROUND S6 /75D 670 N \J� LaXr 76D a 38CJ� 45C ._,..... 680. 421. 30C acoox exeex oowxaLw 69D r43C 82D— .:85" e, 32C r 41 CI40C1� 7D 1600 850 .... cxym A.Jm,., E.ammn.a uE.n�mrn car=u.Jm..rmR 48C 1590 Makal.., A.. pllcv .wr. cm.v Aa..mr<om.. '44C BOi �10 BOD .. a w•R _ .. City Features: v Adwv C'y NJI II CmpWvr Siu r. 0.kv vwM JJIe GAmI _, I Ae6, EI mw / LnekeJ Ltr Elemnw5e]wl P R¢xl'ry Crnm y Jv N'gl.Sliml JFrtEve®.1 VRm Rrtr.—" k47 35C--700 G S y I A.m wu- wmtr r. r,awmn n mRe �.w r Amv. coma ngn..y ormnm.m I rmsxnmllo '' Anvb Cewry Por6Muvlemrcv 1/LeV�Y Ct^Nm AUJwy VYe»�»✓.NNewrsmi,mm r. W.rgy.p r: AeN.Cvvn'SRenPV O10¢ .V Mmqum Cmwl Poq«I mm. x.ow.wrvvvklv«vpA._rlllw r.¢v QTY. DESCRIPTION (EXISTING) UNIT PRICE Beginning 1A CEDAR CREST - 3680 -173RD LANE NW - 2.48 ACRES 1 Duck House 40.00 $ 40.00 1 Park Name Sign 250.00 $ 250.00 CEDAR CREST EQUIPMENT TOTAL $ 290.00 2A CEDAR CREST ESTATE - 3909 174TH AVENUE NW - 0.88 ACRES No Current Facilities Motorized Vehicles" Is -V Parkina Lot Park Name Sign w/Landscaping Bluebird House Private Property / No Trespassing Signs Trash Can Recycle Bin Sign - Tobacco Free Zone Park Bench (CB2 Style) 950'x 10' Chain Link Fence - 2006 4.5" Gooseneck Basketball System 270'x 4' concrete sidewalk GameTime Clifford Saddlemate GameTime 4 Place Single Post Swing set 185 yds Engineered Wood Fiber Horse Spring Ride GameTime Play Structure - 2006 50x50 Asphalt Basketball Court 10' Concrete Base Picnic Table Medium Shelter and Concrete Pad -2017 Irrigation Well with Pump and Controls - 2017 Irrigation System and Meter - 2017 FnY MCAnnWA rn1 IIPMFPNT TnTAI "No Motorized Vehicles" Sign "No Horseback Riding" Sign Class -V Parking Lot (large) - 2010 Grill Hockey Goal Hockey Rink with Lights - 2010 Park Bench CB2 Style Park Name Sign (old style) Park Name Sign w/Landscaping Picnic Table - 3 section concrete Picnic Table - child ty Light (Connexus Owned Ligh Soccer Goals - Regulation Size r - Medium with concrete pad ty Light near medium shelter (C r Complex w/Irrigation - 2010 Cans hrouah Park - 2010 1 Ride - City of ANDOVER FUTURE FACILITIES TOTAL PRICE Sustainable Landscaping & Trees $ 1,000.00 FUTURE EQUIPMENT TOTAL $ 1,000.00 No Future Facilities Anticipated Page 1 of 6 ESTIMATED COSTS 28.00 $ 56.00 Landscaping $ 2.500.00 Annual Field Maintenance: Regrade, Reseed, Irrigation $ 10,000.00 _ 5,000.00 $ 5,000.00 Security Light _ i 7.500.00 - 2026 .,Playground Structure (20 Year Cycle) - $ 75,000.00 550.00 $ 550.00 A57MMMI.,.... . _ 20,000.00 2021 Border Magic Edging w/Fiber Chip Fall Zone 15.00 $ 300.00 $ $ - 20_47 Medium Shelter with Concrete Pad -Replacement $ 146,000.00 _ 25.00 $ 150.00 Medium-Sk, 5, $ - 4 ; REPLACEMENT ITEMS TOTAL: $ 231 000.00 155.00 $ 310.00 8,000.00 FUTURE EQUIPMENT TOTAL $ 10,000.00 170.00 155.00 $ 155.00 $ 25,600.00 250.00_ $ _ 250.00 Bleachers w/ Pads (1 Soccer fields) $ 24.00 $ 24.00 $ 14,300.00 550.00 900.00 150.00 - $ _ _ $ $ $ 550.00 900.00 150.00 - 'Land Purchase - (House and Land -7.16 Acres) Large Shelter Upgrades ( $45,000) Shelter Concrete Pad/Sidewalk ($5,000) 4 Picnic Tables $ $ $ $ 220.00 $ 440.00 $ $ $ 7,400.00 8,750.00 281 250.00 1,500.00 _ 3,000.00 New Field Grading and seeding (After Land Purchase)$ 17,563.00 $ 17,563.00 Field Lighting - Donation 4,279.00 $0 _ 4,279.00 Lighting $ 600.00 $ 600.00 - 9,356.44 $ $ - 249,356.44 _Field j FUTURE EQUIPMENT TOTAL $ 1,900.00 $ 1,900.00 155.00 _ 620.00 800.00 $ 800.00 1,200.00 $ 1,200.00 700.00 26,368.76 7,500.00 $ $ $ $ $ 700.00 26,368.76 7,500.00 $ $ 180.00 35,122.23 Annual _Field Maintenance: Regrade, Reseed, Irrigation 2021 Replace Medium Shelter and Concrete Pad $ $ $ 180.00 153,710.07 35,122.23 0,000.00 184,204.80 $ 184,204.80 $ 12,905.53 2021 $ 12,905.53 46,300.00 108.00 $ $ 452,539-39 $ 20,000.00 2021 28.00 25.00 $ $ 28.00 _ 25.00 Warming House/Restrooms & Storage/Mtg Room Additional Irrigation System Improvements $ $ _ _250,000.00 5,000.00 Annual _Field Maintenance: Regrade, Reseed, Irrigation 2021 Replace Medium Shelter and Concrete Pad $ $ 15,000.00 30,000.00 0,000.00 $ 10,000.00 Security Light (2)*` $ 15,000.00 2021 Replace Playground Structure w/ Larger One $ 46,300.00 108.00 $ 108.00 Septic System $ 20,000.00 2021 Border Magic Edging w/Fiber Chip Fall Zone $ 10,900.00 250.00 $ 500.00 Pave Parking Lot w/ C & G (60-90 Stalls) $ 135,000.00 2030 Hockey Rink with Lights $ 115,000.00 3,358.42 $ 43,358.42 Landscaping - Trees $ 1,000.00 2030 2 Sets of Soccer Goals - Regulation Size $ 8,000.00 170.00 $ 170.00 2030 Trail Through Park $ 25,600.00 250.00_ $ _ 250.00 Bleachers w/ Pads (1 Soccer fields) $ 7,500.00 2030 6 Junior Soccer Goals $ 14,300.00 550.00 900.00 150.00 - $ _ _ $ $ $ 550.00 900.00 150.00 - 'Land Purchase - (House and Land -7.16 Acres) Large Shelter Upgrades ( $45,000) Shelter Concrete Pad/Sidewalk ($5,000) 4 Picnic Tables $ $ $ $ 190,000.00 25,000.00 10,000.00 3,600.00 2030 2030 (2) 3 -Row Bleachers (6) 16' Aluminum Players Benches REPLACEMENT ITEMS TOTAL: $ $ $ 7,400.00 8,750.00 281 250.00 1,500.00 $ 3,000.00 New Field Grading and seeding (After Land Purchase)$ 250,000.00 4,279.00 $ 4,279.00 Lighting $ 250,000.00 - 9,356.44 $ $ - 249,356.44 _Field j FUTURE EQUIPMENT TOTAL $ 1162100.00 155.00 $ 620.00 800.00 I $ 800.00 H:\Engineering\Parks\Parks Inventory\Park Inventory - 2021 - Updated 3-9-2021 1 Ride - motorcycle 1 Ride - horse sprir 1 Concrete pad for 11 Bluebird houses 1 Gametime Playgr DESCRIPTION toilet & trash can Apment-2004 1 Sign - Tobacco Free Zone 2 Stairs for Warming House 1 Swing Set - Four Place 6 Junior Soccer Goals 2 Bleachers -3 Row 6 16' Aluminum Players Benches 10 Benches for Warming House 1 Border Magic Edging w/Fiber Chip Fall Zone - 2004 1 Concrete Edda w/Fiber Chip Fall Zone 1 1 1 1 1 Electrical Hook Up for warming house 1 Power cord for warming house 1 1 st Aid Kit HAWKRIDGE EQUIPMENT TOTAL ' 1^ Park Bench CB2 Style 1 Park Name Sign w/Landscaping 1 Security Light (Connexus Owned) 1 Trash Can 1 Asphalt Path 1 Wire Cyclone Fence - 147' 1 Gamerrime Play Structure - 2014 1 Concrete Pad with Picnic Table 8' 1 Concrete Edging w/Wood Fiber Chip Fall Zones - 2014 1 Swing Set - Four Place LANGSETH EQUIPMENT TOTAL 6A LUNDS NORTH -2640166TH AVENUE NW -4.01 AC 3 Trash Cans 1 Sign - Tobacco Free Zone 1 260'x 8' Chain Link Fence - 2006 1 20'x 16' Chain Link Backstop Sections - 2006 1 Bleacher / Dugout pads - 2006 1 Asphalt Trail 1 Ball Field - 2006 1 Class V Parking Lot -2006 1 Park Name Sign w/Landscaping 1 Bases - 2 1 Double 1st Base 1 Home Plate 1 Pitchers Rubber 1 Bollard Metal City of ANDOVER 155.00 $ 465.00 /�v/�v L�Albl,lllg auu EULLUc rain Eat,uiuca %-,uarL S 2,500.00 UNIT PRICE 24.00 Beginning FUTURE FACILITIES Security Light TOTAL PRICE REPLACEMENT ITEMS 700.00 $ 700.00 4,956.00 2026 260'x 8' Chain Link Fence 700.00 $ 700.00 250.00 $ 250.00 $ 20,000.00 2026 20'x 16' Chain Link Backstop Sections 7,948.70 20.00 $ 220.00 Asphalt Trail 4,893.41 13,384.69 $ 13,384.69 2036 Bleacher/ Dugout pads 27,674.57 $ 24.00 $ 24.00 500.00 $ 1,000.00 REPLACEMENT ITEMS TOTAL: 11,644.02 $ 11,644.02 Medium Shelter w/Concrete Pad (Small Sheller) ($30,000) 1,700.00 $ 1,700.00 720.00 $ 720.00 FUTURE EQUIPMENT TOTAL 900.00 $ 5,400.00 1,400.00 $ 2,800.00 $ 180.00 550.00 $ 3,300.00 $ 125.00 100.00 $ 1,000.00 $ 60.00 5,000.00 $ 5,000.00 . 45.00 _ 1,800.00 $ 1,800.00 _ 180.00 _ 700.00 $ 700.00 35.00 $ 35.00 50.00 $ 50.00 50.00 $ 50.00 10.00 $ 10.00 400.00 $ 400.00 1,500.00 $ 1,500.00 150.00 $ 150.00 $ 363,943.55 170.00 S 170.00 Landscaping around Park Sign $ 1,000.00 2029 Playground Structure (15 year) 550.00 $ 550.00 Medium Shelter w/Concrete Pad ($30,000) $ 15,000.00 2029 Concrete Edging w/ Wood Fiber Chip Fall Zones - $ - 2 Concrete Picnic Tables $ 1,800.00 2030 Asphalt Path 155.00 $ 155.00 REPLACEMENT ITEMS TOTAL: 2,917.35 $ 2,917.35 _ FUTURE EQUIPMENT TOTAL $ 17 800.00 750.00 $ 750.00 21,848.00 $ 21,848.00 600.00 $ 600.00_ 5,000.00 $ 5,000.00 1,700.00 $ 1,700.00 $ 33,690.35 155.00 $ 465.00 Landscaping S 2,500.00 Annual Ballffeld MaintenanceRegrade, Reseed 24.00 $ 24.00 Security Light S 7,500.00 Annual Ag Lime Material 4,956.00 $ 4,956.00 2026 260'x 8' Chain Link Fence 6,600.00 $ 6,600.00 Playground Equipment (2-12 yr. old) Basic ($50,000) $ 20,000.00 2026 20'x 16' Chain Link Backstop Sections 7,948.70 $ 7,948.70 Payed PaFki_ _ _$67-,2031 Asphalt Trail 4,893.41 $ 4,893.41 2036 Bleacher/ Dugout pads 27,674.57 $ 27,674.57 REPLACEMENT ITEMS TOTAL: 11,644.02 $ 11,644.02 Medium Shelter w/Concrete Pad (Small Sheller) ($30,000) $ 20,000.00 " 720.00 $ 720.00 FUTURE EQUIPMENT TOTAL $ 50,000.00 180.00 $ 180.00 125.00 $ 125.00 60.00 $ 60.00 45.00 $ 45.00 _ 180.00 $ 180.00 _ H:\Engineering\Parks\Parks Inventory\Park Inventory - 2021 - Updated 3-9-2021 Page 2 of 6 ESTIMATED COSTS $ 46,000.00 $ 10,500.00 $ 7.750.00 $ 5,000.00 $ 1,000.00 $ 13,150.00 $ 17,500.00 City of 'AND 0 VER 2020 Existing and Future Park Facilities Chart Page 3 of 6 QTY. DESCRIPTION (EXISTING) UNIT PRICE Beginning FUTURE FACILITIES TOTAL PRICE REPLACEMENT ITEMS ESTIMATED COSTS 3 Bluebird Houses 20.00 $ 60.00 2 Players Benches Aluminum 300.00 $ 600.00 2 _ Bat Racks/Holders 45.00 $ 90.00 1 Concrete Sidewalk 30' 250.00 $ 250.00 1 Recycle Bin 155.00 $ 155.00 1 Bleacher3/Seat Small 1,400.00 1 $ 1,400.00 LUNDS NORTH EQUIPMENT TOTAL I $ 68 070.70 7A MARTIN'S MEADOWS -17101 NAVAJO STREET NW - 54.11 ACRES 1 Message Board (3 sided) 600.00 $ 600.00 No Future Facilities Anticipated 1 Rules Sign 100.00 $ 100.00 2 _ _ No Motorized Vehicle Signs 28.00 $ 56.00 _ 1 Property Border Signs 30.00 $ 30.00 20 Bluebird Houses 20.00 $ 400.00 1 Benches/ Signage 1,500.00 $ 1,500.00 1 Picnic table 250.00 $ 250.00 MARTIN'S MEADOWS EQUIPMENT TOTAL $ 2,936.00 8A PINE HILLS SOUTH -3536 161ST AVENUE NW - 5.08 ACRES 1 430' Infield Fence with Dugouts- 1999 3,718.00 $ 3,718.00 Landscaping $ 1,000.00 Annual Ballfield Maintenance. Regrade, Reseed, Irrigation $ 5,000.00 1 450' Outfield Fence with Foul Poles w/Maw Strip - 1999 10,125.00 $_ 10,125.00 Pave Parking Lot (45 Stall) $ 67,500.00 Annual Ag Lime Material $ 1,000.00 1 _ Ag lime 4,000.00 $ _ 4,000.00 2024 430' Infield Fence with Dugouts $ 12,600.00 1 Ball Field 3,000.00 $ 3,000.00 2024_ 450' Outfield Fence with Foul Poles w/Mow Strip $ _3_4,300.00 1 Base Box - Large 325.00 $ 325.00 Concrete Picnic Table $ 1,800.00 202.4 Fall Zone with Concrete Sidewalk $ 10,200.00 1 Class -V Parking Lot - Medium 4,000.00 $ 4,000.00 _ ,. ,. _._ .....,. .. ., 2024 4' Cyclone Fence -100' black vinyl coated Along Road $_ 11,500.00 1 Home Plate 60.00 $ 60.00 FUTURE EQUIPMENT TOTAL $ 70 300.00 2033 Playground Structure $ 75,000.00 2 Park Bench 170.00 $ 340.00 2040 Concrete Mow Strips and Dugout Pads $ 19,700.00 1 Park Name Sign w/Landscaping 550.00 $ 550.00 REPLACEMENT ITEMS TOTAL: $ 169 300.00 1 Four -section Backstop w/ overhead 2,398.00 $ 2,398.00 1 Picnic Table w/concrete pad 200.00 $ 200.00 1 Pitching Rubber 45.00 $ 45.00 _ 1 Sandbox Fall Zone with Concrete Sidewalk 3,000.00 $ 3,000.00 1 Sandbox Enclosure Around Swing Set wrrimbers 950.00 $ 950.00 1 Set of Three Bases 200.00 $ 200.00 1 Swing Set- Four Place 1,604.33 $ 1,604.33 1 Security Light (Connexus Owned) - $ - 1 880' Yellow Protective Fence Rail Cover 528.00 $ 528.00 1 Aluminum Bleachers w/Concrete Pad 1,700.00 $ 1,700.00 1 Play Structure - Toddler - 2018 Refurbishment 5,846.34 $ 4,200.00 1 Play Structure 5-12 - 2018 Refurbishment 16,298.06 $ 19,800.00 1 Motorcycle Spring Ride 425.00 $ 425.00 1 Duck Spring Ride 425.00 $ 425.00 4 Trash Cans 155.00 $ 620.00 3 Recycle Bins 155.00 $ 465.00 2 Foul Pole Flags 25.00 $ 50.00 1 Sign - Tobacco Free Sign 24.00 $ 24.00 1 4' Cyclone Fence -100' black vinyl coated -1999 3,400.00 $ 3,400.00 2 16' Players Benches Aluminum 550.00 $ 1,100.00 1 Irrigation System for Field - 2013 5,000.00 $ 5,000.00'_ _ 1 Grass Infield 3,500.00 $ 3,500.00 1 Concrete Mow Strips and Dugout Pads 2,800.00 $ 2,800.00 1 Concrete Pad for Toilet 150.00 1 $ 150.00 PINE HILLS SOUTH EQUIPMENT TOTAL $ 78 702.33 _ HAEngineering\Parks\Parks Inventory\Park Inventory - 2021 - Updated 3-9-2021 1 DESCRIPTION Duck Houses" Parking Lot - Paved -1999 Trash Cans Medium Shelter with Concrete Pad Grills Picnic Tables Concrete 2 Section Soccer Field Soccer/Football Goals - one set Concrete Sidewalk 8" Concrete Pads to River Steel Ballard 180' Five foot Cyclone Fence Walking Path - Asphalt Expanded 2002 Park Name Sign w/Landscaping Monument Bench w/concrete edama Bat House Fishing Pier -gravel Sign - Tobacco Free Zone Sign - Handicap Parking Retaining Wall - Shelter Sign - Red Diamond No Trespassing w/Pole Sign Lacrosse Goal Set 40' Split Rail Fence Sandbox w/Digger and Retaining Wall Swing Set - 6 place (4 poles) Playground Retaining Wall Concrete Edge w/Chip Fall Zone - 2015 Tether Ball Pole 110' Concrete Canoe Landing - 2015 Timber Rivers Park and Canoe Landing No Unauthorized Vehicle Sign Bluebird House Burke Play Structure - 2015 No Motorized Vehicles Sign TIMBER RIVERS EQUIPMENT TOTAL TIMBER TRAILS - 17761 AZTEC STRE Bluebird House Home Plate Park Bench rerscape - Medium - 2011 of Three Bases :h Cans ( Name Sign w/Landscaping _ t - on Cty 58 urity Light (Connexus Owned) Racks/Holders k Spring Ride 3 Spring Ride orcycle Spring Ride UNIT PRICE Beginning City of ANDOVER na suture nark raenittes Lnart FUTURE FACILITIES 25.00 Annual Field Maintenance: Regrade,_Rese_ed (Non -Irrigated) $ 25.00 Landscaping 7,105.00 125.00 $ 7,105.00 250.00 155.00 Security Light $ 310.00 Curb around Parking Lot 3 200 00 $ 6 400 00 hPf"A111 REPLACEMENT ITEMS $ 1,000.00 Annual Field Maintenance: Regrade,_Rese_ed (Non -Irrigated) _ 2022 WalkingPath- Asphalt (400' x $15_.00 p/I/f) $ _ 6,000.00 125.00 Parking Lot- Paved $ 250.00 Playground Structure Security Light 250.00 _ 1 Concrete Edge w/Chip Fall Zone $ 1,000.00 Medium Shelter with Concrete Pad Pave Parking Lot - 46 Stalls 2,000.00 _ Medium Shelter with Concrete Pad $ 2,000.00 110' Concrete Canoe Landing Medium Shelterw/Concrete Pad 1,600.00 REPLACEMENT ITEMS TOTAL: $ 1,600.00 Bleachers 450.00 $ 450.00 400.00 $ 800.00_ FUTURE EQUIPMENT TOTAL 250.00 $ 250.00 1,440.00 $ 1,440.00 26,394.46 $ 26,394.46 _ 900.00 $ 900.00 Bleachers - Donation 700.00 $ 700.00 1,300.00 $ 1,300.00 50.00 $ 50.00 3,800.00 $ 3,800.00 24.00 $ 24.00 25.00 $ 25.00 800.00 $ 800.00 24.00 $ 24.00 75.00 ', $ 75.00 500.00 $ 500.00 210.00 $ 210.00 1,500.00 $ 1,500.00 2,400.00 $ 2,400.00 1,800.00 $ 1,800.00 5,000.00 $ 5,000.00 250.00 $ 250.00 7,293.00 $ 7,293.00 . 100.00 $ 100.00 30.00 $ 60.00 _ 20.00 S 60.00 36,972.00 S 36,972.00 30.00 $ 60.00 $ 111,927.46 hPf"A111 REPLACEMENT ITEMS $ 1,000.00 Annual Field Maintenance: Regrade,_Rese_ed (Non -Irrigated) _ 2022 WalkingPath- Asphalt (400' x $15_.00 p/I/f) $ _ 6,000.00 2024 Parking Lot- Paved $ 2030 Playground Structure Security Light 2035 _ 1 Concrete Edge w/Chip Fall Zone FUTURE EQUIPMENT TOTAL $ 7,000.00 2040 Medium Shelter with Concrete Pad Pave Parking Lot - 46 Stalls 2040 _ Medium Shelter with Concrete Pad $ 2045 110' Concrete Canoe Landing Medium Shelterw/Concrete Pad 711.00 REPLACEMENT ITEMS TOTAL: 20.00 S 40.00 Landscaping - Trees 60.00 $ 60.00 Security Light 170.00 $ 170.00 Pave Parking Lot - 46 Stalls 45.00 $ 45.00 Medium Shelterw/Concrete Pad 711.00 $ 20,711.00 Bleachers 200.00 $ 200.00 155.00 $ 465.00 FUTURE EQUIPMENT TOTAL 900.00 $ 900.00 25.00 $ 50.00 45.00 $ 90.co Bleachers - Donation 700.00 $ 700.00 900.00 $ 900.00 800.00 $ 800.00 H:\Engineering\Parks\Parks Inventory\Park Inventory - 2021 - Updated 3-9-2021 $ 1,000.00 Annual Field Maintenance: Regrade, Reseed, Irrigation $ 7,500.00 Annual Ag Lime Material $ 69,000.00 2026 Playground Structure - Medium $ 30,000.00 2026 Playground Surface w/Fiber Chips Fall Zone 2036 Paving Drivewaylrrail 2036 Fencing/Concrete Work 107.500.00 REPLACEMENT ITEMS TOTAL: $0 ". Page 4 of 6 ESTIMATED 77 21 31 10,000.00 1,000.00 43,000.00 6,250.00 City of ANDOVER MU hmstme and Puture Park Pac111ttes C;ttart Page 5 of 6 QTY.1 DESCRIPTION (EXISTING) UNIT PRICE Beginning FUTURE FACILITIES TOTAL PRICE REPLACEMENT ITEMS ESTIMATED COSTS 1 Concrete Edging/Sidewalk 2,000.00 $ 2,000.00 1 Playground Surface w/Fiber Chips Fall Zone 3,000.00 $ 3,000.00 1 Concrete Pad 6' x 10' 130.00 $ 130.00 1 Swing Set -4 Place 3 Poles 1,700.00 $ 1,700.00 1 Recycle Bin 155.00 $ 155.00 _ 1 Well Construction -2016 211,457.75 $ 211,457.75 1 Irrigation System - 2016 11,480.70 $ 11,480.70 1 Paving Drivewayrrrail - 2016 13,625.60 $ 13,625.60 1 Fencing/Concrete Work - 2016 40,866.00 $ 40,866.00 2 Ball Field Benches 500.00 $ 1,000.00 2 _ Soccer Benches 550.00 $ 1,100.00 1 Pedestrian Ramp/Sidewalk Material 1,500.00 $ 1,500.00 1 Ag lime Material - 2016 9,200.00 $ 9,200.00 1 Infield Sod 725.00 $ 725.00 1 Athletic Bluegrass Seed 1,800.00 $ 1,800.00 1 Class 5 - 2016 7,000.00 $ 7,000.00 TIMBER TRAILS EQUIPMENT TOTAL $ 331,871.05 - 11A PINE HILLS NORTH - 3535 161ST AVENUE NW - 42.20 ACRES 1 Class -V Parking Lot - Small 4,000.00 S 4,000.00 Mobilization $ 62,000.00 Annual Field Maintenance: Regrade, Reseed, Irrigation $ 15,000.00 6 lBench CB2 Style 220.00 $ Removals/clearing & grubbing $ 10,000.00 Annual Lighting Maintenance $ 3,000.00 1 _ Park Name Sign - No Landscaping 250.00 _ $ _ _ _1,320.00 250.00 Grading/earthwork & erosion control $ 50,000.00 2030 Playground Structure $ 52,500.00 1 Swing Set - Four Place 3 Pole 1,604.33 $ 1,604.33 Stormwater management improvements $ 32,500.00 2030 _Concrete Border w/Fiber Fall Zones $ 10,500.00 1 Play Structure - Burke - 2015 19,800.00 $ 19,800.00 Add secondary entrance/exit from Tulip St (gravel) $ 8,250.00 2033 330'6' Black Cyclone Fence w/Mow Strip $ 9,000.00 4 Trash Cans 155.00 $ 620.00 Paved trails 10' wide $ 323,000.00 2033 Set Soccer/Football Goals $ 7,400.00 4 Recycle Bins 155.00 $ 620.00 Wooden boardwalk 6' wide $ 143,750.00 2033 Sets Full Size Soccer Goals $ 8,000.00 1 330'6' Black Cyclone Fence w/Mow Strip 3,400.00 $ 3,400.00 Pedestrian bridges $ 60,000.00 2035 Fencing/Concrete Pads for Portable Restrooms $ 43,300.00 1 300' Split Rail Fence 1,550.00 $ 1,550.00 Large community play area $ 100,000.00 . REPLACEMENT ITEMS TOTAL: $ 148 700.00 1 Set Soccer/Football Goals 2,800.00 $ 2,800.00 Gazebo with concrete slab & 4 picnic tables $ 85,000.00 2 Sets Full Size Soccer Goals 1,500.00 $ 3,000.00 Misc. Site Amenities $ 32,000.004 3 Field Name Signs 100.00 $ 300.00 Potable well $ 10,000.00 1 Concrete Border w/Fiber Fall Zones - 2015 5,000.00 $ 5,000.00 Septic & vault $ 105,000.00 8 Handicap Parking Signs 25.00 $ 200.00 Multi purpose building $ 450,000.00 20 Bluebird Houses 20.00 $ 400.00 Storage shed $ 95,000.00 - 1 Lighting - 2013 59,645.00 $ 59,645.00 Overlook @ pond/wetland demonstration area $ 25,000.00 1 Irrigation -2013 188,129.00 $ 188,129.00 Prairie grass demonstration area $ 16,250.00_ _ 1 Ball Fields - 2013 842,142.00 $ 842,142.00 Expanded irrigation of common spaces $ 50,000.00 1 Fencing/Concrete Pads for Portable Restrooms- 2015 16,337.00 $ 16,337.00 Games court $ 14,500.00 _ 1 Playground -2015 26,983.00 $ 26,983.00 Sand volleyball court $ 5,500.00 PINE HILLS NORTH EQUIPMENT TOTAL $ 1,178,100.33 Disc Golf $ 5,000.00 Landscape improvements $ 35,000.00 _ Turf Seed $ 33,250.00 Fiber Blanket $ 135,000.00 Electrical expansion & trail lighting $ 160,000.00 rk dedication portion) 120,000.00 1_..--- -- -- FUTURE EQUIPMENT TOTAL $ 2,166,000.00 12A VALLEY VIEW -3929 169TH AVENUE NW - 8.86 ACRES No Current Facilities Park ID Signs (2) $ 1,000.00 FUTURE EQUIPMENT TOTAL $ 1,000.00 13A WHITE OAKS - 2740 172ND AVENUE NW - 9.24 ACRES No Current Facilities Park ID Signs (2) $ 1,000.00 FUTURE EQUIPMENT TOTAL $ 1,000.00 H:\Engineering\Parks\Parks Inventory\Park Inventory - 2021 - Updated 3-9-2021 City of ANDOVER Page 6 of 6 2020 Existing and Future Park Facilities Chart QTY. DESCRIPTION (EXISTING) UNIT PRICE Beginning FUTURE FACILITIES TOTAL PRICE REPLACEMENT ITEMS ESTIMATED COSTS AREA "A" EXISTING SUBTOTAL: $ 2,622,071 A 6 AREA "A" FUTURE EQUIPMENT SUBTOTAL: $ 3,593,700.00 AREA "A" REPLACEMENT SUBTOTAL: $ 1,471,400.00 H:\Engineering\Parks\Parks Inventory\Park Inventory - 2021 - Updated 3-9-2021 DESCRIPTION 19B BIRCH RIDGE - 1450 181ST AVENUE NW - 11.21 ACRES No Current Facilities 1 PrimeTime Play Structure - Medium - 200.5_ _ 1 Motorcycle Spring Toy 1 Clifford Spring Toy 1 Car Spring Toy 1 Four Place Swing Set 1 Concrete Curbing & sidewalk 1 Park Sign 1 Stamped, colored concrete around sign 1 Basketball Court 3 Park Bench CB2 Frame 1 8' Picnic Table Concrete 2 legs 1 Sign - Adopt A Park 1 GT Climbing Wall / Pod 1 Playground Surface Wood Fiber 1 Security Light 1 Recycle Bin 1 Trash Can 1 Handicap Swing COUNTRY OAKS EQUIPMENT TOTAL 1 Park Name Sign 1 Shelter - Medium with Concrete Pad 1 Playground Structure -2016 1 Sidewalk and Pedestrian Ramp 1 Concrete Border and Fall Zone 1 Two Stall Parking Area 1 Steel Bollard 1 Recycle Bin 1 Trash Can 1 Bluebird House 1 Picnic Table - child 1 Picnic Table - 2 section concrete 'FOREST MEADOWS EQUIPMENT TOTAL 1 Oak Hollow Undeveloped Park Sign 1 No Snowmobiling Sign 1 No Hunting Sign 1 4 x 4 Wood Sign Post OAK HOLLOW EQUIPMENT TOTAL 1 GameTimePlay Structure -2006 1 Park Name Sign w/Landscaping 1_ Sign - Tobacco Free Zone UNIT PRICE 30,771.03 525.00 $ $ 30,771.03 525.00 279.00 525.00 $ 525.00 $ 800.00 $ 800.00 3,000.00 1,800.00 $ 1,800.00 000.00 11,306.25 $ 11,306.25 $ 550.00 $ 550.00 155.00 270.00 $ 270.00 20.00L 3,192.84 $ 3,192.84 219.52 $ 658.57 500.00 600.00 $ 600.00 1,185.71 $ 1,185.71 500.00 $ 500.00 25.00 $ 25.00 4,100.00 $ 4,100.00 3,000.00 $ 3,000.00 400.00 $ 400.00 155.00 $ 155.00 155.00 45.0.00_1 $ $ $ 155.00 450.00 60,969.40 City of ANDOVER Page 1 of 2 1.U2U Existing and Puture Park Pac11tt1es Chart I I FUTURE FACILITIES I TOTAL PRICE i� REPLACEMENT ITEMS ESTIMATED COSTS 550.00 S 550.00 279.00 _ $ _ 4,279.00 _ 107.00 $ 22,107.00 000.00 $ 3,000.00 000.00 $ 5,000.00 000.00 $ 4,000.00 250.00 $ 250.00 155.00 $ 155.00 155.00 _ $ 155.00 20.00L 20.00 150.00150.00 500.00 500.00 $ 40,166.00 No Future Facilities Anticipated No Future Facilities Anticipated 2026 Playground Structure - Medium _ $ 64,000.00 2026 Playground Surface Wood Fiber $ 6,250.00 2026 Concrete Curbing & sidewalk $ 30,000.00 2026 Basketball Court $ 8,500.00 2026 Climbing Wall / Pod $ 10,900.00 _$ $ 24.00 REPLACEMENT ITEMS TOTAL: $ 119,650.00 No Future Facilities Anticipated 100.00 $ 100.00 Park Sign & Landscaping 100.00 $ 100.00 56 100.00 $ 100.00 $ 7 50.00 $ 50.00 $ 64. $ 350.00 27,164.96 $ 27,164.96_ Security Light 550.00 550.00 Picnic Table 24.00 _$ $ 24.00 _ Irrigation ($10,000) H:\Engineering\Parks\Parks Inventory\Park Inventory - 2021 - Updated 3-9-2021 FUTURE EQUIPMENT TOTAI 2022 Shelter - Medium with Concrete Pad (Eliminate???) $ 30,000.00 2046 Sidewalk and Pedestrian Ramp $ 13,000.00 2046_ 'Two Stall Parking Area $ 17,300.00 REPLACEMENT ITEMS TOTAL: $ 60 300.00 T- - $ 1,000.00 $ 7,500.00 2024 IPlayground Structure$ 56 $ 500.00 2024 200 cu yds Engineered Wood Fiber $ 7 $ 15,000.00 1 REPLACEMENT ITEMS TOTAL: $ 64. City ofAND OVER zuzu hmstme an4 Puture rarx ractnttes unart Page 2 of 2 QTY. DESCRIPTION (EXISTING) UNIT PRICE 1,900.00 $ Beginning FUTURE FACILITIES 1 Park Bench CB2 TOTAL PRICE REPLACEMENT ITEMS ESTIMATED COSTS 1 39' Boarder Magic Edging 280.00 $ 280.00 Sandbox and Digger $ 5,000.00 1 Trash Can 155.00 $ 155.00 FUTURE EQUIPMENT TOTAL $ 28,000.00 1 Recycle Bin 155.00 $ 155.00 1 200 cu yds Engineered Wood Fiber 3,600.00 $ 3,600.00 1 240'x 5' Concrete Sidewalk 1,800.00 $ 1,800.00 2 Park Benches V CB2 250.00 $ 500.00 1 Four Place Swing Set 1,800.00 $ 1,800.00 1 Volcano Climber 2,100.00 $ _ 2,100.00 1 Handicap Swing 450.00 $ 450.00 _ OAKVIEW EQUIPMENT TOTAL $ 38,578.96 25B WOODLAND CROSSINGS -15827 JAY STREET NW - 5.21 ACRES GameTime Playground Equipment -2008 32,489.84 $ 32,489.84 Irrigation ($40,000) $ 20,000.00 2026 Playground Structure 67,500.00 1 Park Sign w/Retaining Wall 1,600.00 $ 1,600.00 FUTURE EQUIPMENT TOTAL $ 20 000.00 _ _ _ _ _ 2028 Shelter w/concrete slab _$ $ 32,000.00 1 Sign - Wetland Buffer 275.00 $ 275.00 2028 50 x 50 Asphalt Basketball Court $ 20,000.00 2 6' Park Benches CB2 250.00 $ 500.00 REPLACEMENT ITEMS TOTAL: $ 119 500.00 1 Trash Can 155.00 $ 155.00 1 8' Picnic Table Concrete Leg 600.00 $ 600.00 1 8'x18' Steel Shelterw/concrete slab 12,000.00 $ 12,000.00 1 Basketball Hoop and Backboard 700.00 $ 700.00 1 165' - 5' Sidewalk 1,250.00 $ 1,250.00 1 153 -12" Curbing 350.00 $ 350.00 1 Swing Set 4 Place 1,800.00 $ 1,800.00 1 100 cu yds Engineered Wood Fibers 1,800.00 $ 1,800.00 2 Saddlemates 600.00 $ 1,200.00 1 50 x 50 Asphalt Basketball Court 7,500.00 $ 7,500.00 1 Sign -Blue Gama Grass Project 100.00$ 100.00 WOODLAND CROSSINGS EQUIPMENT TOTAL $ 62.319.84 1 120' Split Rail Fence 625.00 $ 1 Four Place Swing Set 1,900.00 $ 1 Asphalt Path 765.00 $ 1 Park Bench CB2 170.00 $ 1 Park Name Sign w/Landscaping 550.00 $ 1 Picnic Table w/Concrete 2 Section Pad 600.00 $ 1 Powerscape -Large -1995/2011 15,051.56 $ 1 Trash Can 155.00 $ 1 Recycle Bin 155.00 $ Concrete Edging Wood Fiber Surface -2011 5,000.00 $ WOODLAND MEADOWS EQUIPMENT TOTAL $ MAPLE VIEW PARK -1251 167TH AVENUE NW - 44.27 ACRES _ Playground Structure - 2016 Asphalt parking lot -2016 Shelter - 2016 Sand Digger -2016 Park and Open Space Sign - 2016 Wood Fiber- 2016 27,685.31 $ 16,300.00 $ 28,239.00 $ 775.00 $ 465.73 $ 1,981.81 $ 565.20 $ Concrete Picnic Tables - 2016 MAPLE VIEW EQUIPMENT TOTAL AREA "B" EXISTING SUBTOTAL: $ $ H:\Engineering\Parks\Parks Inventory\Park Inventory - 2021 - Updated 3-9-2021 625.00 No Future Facilities Anticipated 1,900.00 2021 Playground Structure - Large $ 2021 Concrete Edging Wood Fiber Surface $ 765.00 REPLACEMENT ITEMS TOTAL: $ 170.00 550.00_ 600.00 15,051.56 155.00 155.00 5,000.00 24,971.56 27,685.31 16,300.00 28,239.00 775.00 465.73 1.981.81 AREA "B" FUTURE EQUIPMENT SUBTOTAL: 2031Playground Structure, Wood Fiber, Digger and Border $ 46,000.00 2036 Asphalt parking lot $ 18,500.00 2036 Shelter Is 50,700.00 REPLACEMENT ITEMS TOTAL: I$ 115.200.00 AREA "B" REPLACEMENT SUBTOTAL: City of ANDOVER UU 1' ULI FUTURE zyI IJOIn Myc-IUI LWI - LOO, IJO In MYC1YVC IYYY-.YVHVmco $ 2,000.00 Landscaping 1 Fence 550' Cyclone - 2003 _ _ _ 4,50_0.00 $ 4,500.00 No Future Facilities Anticipated _ 1 Four Place Swing Set 1,300.00 $ 1,300.00 1 Backhoe Digger 360.00 $ 360.00 REPLACEMENT ITEMS 1 Duck Spring Ride 425.00 $ 425.00 1 Horse Spring Ride 425.00 $ 425.00 1 Trash Can 155.00 $ 155.00 1 Sandbox with Concrete 500.00 $ 500.00 1 GameTime Play Structure -2009 5,340.06 $ 5,340.06 20.00 TOTLOT EQUIPMENT TOTAL $ $ 13,005.06 25.00 30C CREEKRIDGE -3216 S. COON CREEK DRIVE - 2.76 ACRES 50.00 25.00 155.00 $ 25.00 Park Sign & Landscaping $ 1,000.00 250.00 $ CREEKRIDGE EQUIPMENT TOTAL 8,842.53 FUTURE EQUIPMENT TOTAL $ 1,000.00 $ 98,842.53 v 1 . IwvnclJ cnnc ovn 1 cM Iw -caw u 2 Concrete Picnic Tables -12' 1 Duck House 1 Grill 1 Park Name Sign w/Landscaping 1 Sidewalk -310'x5-2007 1 Large Shelter w/Concrete Pad & Security Light - 2007 1 Sitting Bench CB2 1 Sign - City Code 2 Trash Cans 5 Bird houses 2 Sign - Handicap Parking 1 Sign -No Boat Trailer Parking 1 Cyclone Fence 6' w/primary slats 270' 1 Parking Lot - 2007 1 Sign - Dog Waste 1 Concrete Pad for Toilet 8' x 16' 1 Rolling Dock U x 40'- 2007 1 Rain Garden - 2007 1 Sign Board w/Various Signs CROOKED LAKE BOAT LANDING EQUIPMENT TOTAL 1,000.00 Sidewalk -310'x5 $ 2,000.00 Landscaping 15.00 2037 $ 15.00 Security Light 108.00 Concrete Boat Landinc $ 108.00 FUTURE EQUIPMENT TOTAL $ 1 550.00 $ 550.00 5,800.00 12.00 $ 5,800.00 Security Light $ 7 6,321.24 475.00 $ 26,321.24 340.00 1,300.00 $ 340.00 25.00 1,500.00 $ 25.00 155.00 170.00 $ 310.00 20.00 1,183.00 $ 100.00 25.00 155.00 $ 50.00 25.00 155.00 $ 25.00 2,160.00 250.00 $ 2,160.00 8,842.53 $ 98,842.53 25.00 $ 25.00 450.00 $ 450.00 3,800.00 $ 3,800.00 8,576.63 $ 8,576.63 300.00 S 300.00 FUTURE EQUIPMENT TOTAL $ 1,000.00 2027 Sidewalk -310'x5 $ 7,500.00 2027 Rolling Dock 6'x 40' 2037 Large Shelter w/Concrete Pad & Security Light 2037 Parking Lot 2037 _ Rain Garden 2037 Concrete Boat Landinc 04l UCn11 J - 1"Y z V Vmn 111 J 1 RCC 1 IYYY - L.JL mIi No Current Facilities Sustainable Landscaping & Trees $ 1 FUTURE EQUIPMENT TOTAL $ 1 33C GREEN ACRES -14141 IVYWOOD STREET NW - 1.08 ACRES 1 "No Alcoholic Beverages" Sign 12.00 $ 12.00 Security Light $ 7 _ 1 Basketball Goal and Net 475.00 $ 475.00 1 Four Place Swing Set 1,300.00 $ 1,300.00 1 Hard Court- Basketball 1,500.00 $ 1,500.00 1 Park Bench 170.00 $ 170.00 1 Three -Section Back Stop 1,183.00 $ 1,183.00 3 Trash Cans 155.00 $ 465.00 1 Recycle Bin 155.00 $ 155.00 1 Picnic Table 250.00 $ 250.00 H:\Engineering\Parks\Parks Inventory\Park Inventory - 2021 - Updated 3-9-2021 REPLACEMENT ITEMS TOTAL: Page 1 of 8 15,400.00 10,000.00 114,000.00 262,000.00 22,750.00 30,000.00 454.150.00 2028 Concrete Edging w/Wood Fiber Fall Zone $ 8 2028 IPlayground Structure $ 40 REPLACEMENT ITEMS TOTAL: S 48 City of ANDOVER 2020 Existing and Future Park Facilities Chart Page 2 of 8 QTY. DESCRIPTION (EXISTING) UNIT PRICE Beginning FUTURE FACILITIES TOTAL PRICE REPLACEMENT ITEMS ESTIMATED COSTS 1 Park Name Sign w/Landscaping 550.00 $ 550.00 1 45 ft. Border - Magic Edging 325.00 $ 325.00 1 Sign - Tobacco Free Zone 24.00 $ 24.00 1 Concrete Edging w/Wood Fiber Fall Zone - 2013 4,000.00 $ 4,000.00 1 GameTime Play Structure -2013 19,498.44 $ 19,498.44 1 Backhoe Digger 360.00 $ 360.00 1 Car Spring Ride 425.00 1$ 425.00 GREEN ACRES EQUIPMENT TOTAL $ 30,692.44 FUTURE EQUIPMENT TOTAL $ 7,500.00 34C HIDDEN CREEK NORTH - 2620 BUNKER LAKE BLVD. NW - 8.41 ACRES 3 "No Motorized Vehicles" Sign 28.00 $ _84.00 Landscaping $ 1,000.00 Annual Field Maintenance: Regrade, Reseed, Irrigation $ 10,000.00 1 Six Place Swing Set 1,900.00 $ 1,900.00 Dugouts $ 10,000.00 Annual Ag Lime Material $ 1,000.00 1 w/Sod Infield 4,000.00 $ 4,000.00 Shelter (Medium) w/ picnic table $ 40,000.00 2020 Playground Structure"' $ 48,600.00 1 Ball Field 3,000.00 $ 3,000.00 2020 Wood Chips" $ 13,000.00 1 Base Box - Large 50.00 $ 51 lmgafionUpgrades $ 10,000.00 2022 '128'-6'Fencew/Mow Strip $ 13,800.00 1 Basketball Pad 1,100.00 $ 1,100.00 Raise Ballfield Fencing Height to 8' $ 15,000.00 2022 160'- 4' Sideline Fence w/Mow Strip $ 7,000.00 1 Basketball Pole, Backboard, Rim and Net 425.00 $ 425.00 Park Lighting (Parking Lot, Trails, etc.) [$40,000] $ 15,000.00 2022 480'- 8' Outfield Fence w/Mow Strip $ 32,300.00 1 Irrigation System - 2001 49,220.00 $ 49,220.00 2022 Soccer Goals - Regulation Set $ 8,000.00 1 KidTime Small - 2000/2005 12,824.00 $ 12,824.00 2031 Concrete dugout pads $ 47,000.00 1 Merry Go Round Ride 1,400.00 $ 1,400.00 2032 Walking Trail -Asphalt $ 45,000.00 1 Parking Lot - Asphalt - 57,000.00 $ 57,000.00 2032 Parking Lot -Asphalt $ 246,000.00 1 Home Plate 60.00 $ 60.00 Scoreboards - Donation $0 REPLACEMENT ITEMS TOTAL: $ 471 700.00 2 Park Benches w/ concrete pads 250.00 $ 500.00 i 2 Park Name Sign (1 old, 1 new style) 250.00 $ 500.00 1 Picnic Table 300.00 $ 300.00 1 Pitching Rubber 45.00 $ 45.00 1 Powers cape (Medium) - includes small, med & Ig arch - 20,000.00 $ 20,000.00 _ 2 Security Light (Connexus Owned) - $ - _ 1 Set of Three Bases 200.00 $ 200.00 1 Six -Section Backstop w/ Six -Section Overhang Cage 1,564.00 $ 1,564.00 1 Skating Rink 1,000.00 $ 1,000.00 1 Soccer/Football Field 3,000.00 $ 3,000.00 1 Soccer Goals - Regulation Set 2,995.00 $ 2,995.00 1 Bleachers -4 Tier Aluminumw/Concrete Pad 1,700.00 $ 1,700.00 1 Aluminum Players Benches -15' Set 500.00 $ 500.00 1 128' - 6' Fence w/Mow Strip - 2002 5,155.84 $ 5,155.84 1 160'- 4' Sideline Fence w/Mow Strip - 2002 2,674.80 $ 2,674.80 1 480'- 8'Outfield Fence w/Mow Strip - 2002 12,169.15 $ 12,169.15 1 Concrete dugout pads 10,893.38 $ 10,893.38 j 1 Baseball Field Layout -2001 8,036.00 $ 8,036.00 1 lWood Chips 6,400.00 $ 6,400.00 1 Concrete Curb 1,800.00 $ 1,800.00 4 Trash Cans 155.00 $ 620.00 2 Recycle Bins 155.00 $ 310.00 1 Walking Trail -Asphalt 10,500.00 $ 10,500.00 1 Whale Spring Ride 450.00 $ 450.00 1 Motorcycle Spring Ride 450.00 $ 450.00 2 Handicap Parking Sign 25.00 $ 50.00 1 GameTime Play Structure - 2000/2005 14,430.75 $ 14,430.75 3 Arch Climbers - large, medium, small 200.00 $ 600.00 2 Foul Pole Flags 25.00 $ 50.00 1 Concrete Picnic Table w12' Pad 900.00 $ 900.00 1 40' Fence Added to 4' Sideline Fence 500.00 $ 500.00 1 No Pepper Drills Sign 25.00 $ 25.00 2 Metal Bat Holders 25.00 $ 50.00 H:\Engineering\Parks\Parks Inventory\Park Inventory - 2021 - Updated 3-9-2021 180' Yellow Fence Cover HIDDEN CREEK NORTI- 1 _ GameTime Play Structure - 2006 1 Park Bench 1 Park Name Sign (old style) 1 Recycle Bin 1 Trash Can 1 Sign - Tobacco Free Zone 1 8'x 14' Concrete Picnic Table Pad 1 150 yds Engineered Wood Fibers 1 35 linear ft. border - Magic Edging 1 255' x 4' Concrete Sidewalk Boards 1 Picnic Table w/10' Concrete Pad 1 Motorcycle Spring Ride 1 Clifford Spring Ride 1 Four Place, 3 pole Swing Set HIDDEN CREEK SOUTH EQUIPMENT TOTAL 1 380' Adjustable Bridge - 1994 40 Bluebird Houses 10 Duck Houses 5 Trash Cans 4 Red Diamond Sign 2 Handicap Parking Sign 5 Park Bench 1 Park Name Sign 1 Parking Lot - Asphalt (includes entrance) -1996 1 Security Light (Connexus Owned) 2 Steel Bollard Posts 1 Trail - North/South - Asphalt -1996 Bat Houses Signs - DNR Cooperation Grant Sign - Prairie Restoration Information Signs -wood directional along roads Round Lk Blvd No Motorized Vehicles Allowed Signs Forest Enhancement Sign KELSEY ROUND LAKE EQUIPMENT TOTAL Park Bench Park Name Sign w/Landscaping Picnic Table w/Concrete 2 Section Four Place Swing Set Trash Can Recycle Bin Volleyball Court Volleyball Pole & Net Set 70' Retaining wall block & landscaping Sign - Tobacco Free Zone City of ANDOVER Page 3 of 8 _40,000.00 $ luzu Exisung anQ runare rarx racinues unan $ 226,000.00 2024 UNIT PRICE $ Beginning FUTURE FACILITIES TOTAL PRICE REPLACEMENT ITEMS ESTIMATED COSTS 180.00 $ 180.00 Parking Lot -Asphalt (includes entrance) -Replacement $ 220,000.00 22.50 $ 239,611.92 FUTURE EQUIPMENT TOTAL $ 91,000.00 f` 15,000.00 2026 ACRES $ 610,000.00 155.00 $ 775.00 16,638.24 $ 16,638.24 Landscaping $ 1,000.00 2022 Playground Structure $ 35,000.00 100.00 $ 100.00 112.00 2022 Engineered Wood Fiber $ 5,000.00 250.00 $ 25000 REPLACEMENT ITEMS TOTAL: $ 40 000.00 155.00 $ 155.00 $ _ 22,500.00 01 155.00 $ _ 155.00 100.00 $ 500.00 24.00 $ 24.00'i 900.00 $ _ 900.00 250.00 Boardwalk (2,000 LF) (Other Funding) $ 2,700.00 $ 2,700.00 51,000.00 $ 245.00 $ 245.00 20,000.00 1,800.00 $ 1,800.00 - Picnic Tables on Concrete Pad (6 total) $ 250.00 $ 250.00 60.00 $ 450.00 $ 450.00 20,000.00 700.00 $ 700.00 141,000.00 Wayrinding Signage hail Ident. /Distance Markers ($26000) $ 1,700.00 $ 1,700.00 80.00 $ _40,000.00 $ 40,000.00 Additional New Trails (possible Grant funds) $ 226,000.00 2024 380' Adjustable Bridge -Replacement $ 100,000.00 15.00 $ 600.00 Park Sign & Landscaping (2 locations) $ 2,000.00 2026 Parking Lot -Asphalt (includes entrance) -Replacement $ 220,000.00 22.50 $ 225.00 Security Light (2) $ 15,000.00 2026 Trail - North/South Asphalt- Replacement $ 610,000.00 155.00 $ 775.00 Nature Play Area (5 Total) $ 60,000.00 24.00 REPLACEMENT ITEMS TOTAL: $ 930 000.00 28.00 $ 112.00 Picnic Shelter with Vault Restroom and Tables $ 150,000.00 28.00 $ 56.00 Dock _ _ $ _ 22,500.00 01 100.00 $ 500.00 Concrete Flatwork near Parking Area $ 000000 20,000.00 250.00 $ 250.00 Boardwalk (2,000 LF) (Other Funding) $ 1,045,000.00 51,000.00 $ 51,000.00 Benches on Concrete Pad (8 Total) $ 20,000.00 - $ - Picnic Tables on Concrete Pad (6 total) $ 20,000.00'- 60.00 $ 120.00 Artistictinterpretive Nature Nodes (10 Total) $ 20,000.00 141,000.00 $ 141,000.00 Wayrinding Signage hail Ident. /Distance Markers ($26000) $ 10,000.00 80.00 $ 320.00 Restoration/Landscaping ($50,000) $ 25,000.00 175.00 $ 525.00 2,300.00 $ 2,300.00 60.00 $ 120.00 25.00 $ 75.00 25.00 $ 25.00 125.00 $ 500.00 28.00 $ 84.00 25.00 $ 75.00 $ 238,662.00 ACRES $ 170.00 $ 170.00 Security L 550.00 $ 550.00 Landscaping 200.00 $ 200.00 1/2 Basketball Court 1,800.00 $ 1,800.00 155.00 $ 155.00 155.00 $ 155.00 1,500.00 $ 1,5moo 475.00 $ 475.00 1,900.00 $ 1,900.00 24.00 $ 24.00 H:\Engineering\Parks\Parks Inventory\Park Inventory - 2021 - Updated 3-9-2021 FUTURE EQUIPMENT TOTAL _ $ _ 7,500.00 2024 $ 1,000.00 _ 2024 ound Structure $ Fiber Fall Zone $ REPLACEMENT ITEMS TOTAL: $ 40,000.00 1 No Current Facilities ayI IYICMUVYYJ wr RVUIYU L nI -Yu9u i%uin L tim 1YYY -Al mMmQo $ 1 Car Spring Ride 1 Park Bench 1 Park Name Sign 1 Picnic Table w/Concrete Pad 1 PrimeTime Play Structure - 2008 425.00 170.00. 250.00 225.00 19,025.78 QTY. DESCRIPTION (EXISTING) UNIT PRICE $ 1 135'x 5' concrete sidewalk 1,100.00 $ 1 240'x 1' concrete curbing 600.00 $ 1 GameTime Play Structure - 2009 18,748.98 $ 1 Wood Fiber Fall Zone - 2009 1 Concrete Pad MEADOW WOOD (NORTH) EQUIPMENT TOTAL 38C MEADOWOOD SOUTH - 4568 147TH LANE NW - 0.34 ACRES 4,000.00 200.00 $ $ $ No Current Facilities ayI IYICMUVYYJ wr RVUIYU L nI -Yu9u i%uin L tim 1YYY -Al mMmQo $ 1 Car Spring Ride 1 Park Bench 1 Park Name Sign 1 Picnic Table w/Concrete Pad 1 PrimeTime Play Structure - 2008 425.00 170.00. 250.00 225.00 19,025.78 $ $ $ $ $ 1 Trash Can 155.00 $ 1 Recycle Bin 155.00 $ 1 Landscape Wall Around Park Sign 1,200.00 $ 1 Swing Set -3 pole w/2 swings, 2 baby swings 2,200.00 $ 1 Clifford Spring Ride 700.00 $ 1 Frog Spring Ride 700.00 $ 1 108' Retaining Wall - 2008 3,400.00 $ 1 Wood Chip Fall Zone - 2008 4,800.00 $ 1 120'x 1' Concrete Curbing 1 100'x 5' Concrete Sidewalk_ 1 Sign - Tobacco Free Zone _ MEADOWS OF ROUND LAKE EQUIPMENT TOTAL 450.00 800.00 24.00 $ $ $ F$- 1 Aglime 1 12 Space Asphalt Parking Lot w/Cor 1 Ball Field 1 Elephant Spring Ride 1 Horse Spring Ride 1 Backhoe Digger 1 Two Place Swing Set 1 Park Bench 3 Trash Cans 1 Recycle Bin 1 Picnic Table 2 Players Benches 15' Aluminum - 1 60 linear ft 16' High Backstop Fence T-235 linear ft 2' wide Mow Strip 2 Bat Racks/Holders Row Bleachers ecurity Light (Co ouble First Base Dt 2nd & 3rd Ba: tching Rubber Curb -2005 1,100.00 600.00 18,748.98 4,000.00 200.00 31,577.98 425.00 170.00 250.00 225.00 19,025.78 155.00 155.00 700.00 700.00 3,400.00 4,800.00 450.00 800.00 24.00 City of ANDOVER Il0 i'utl FUTURE FUTURE EQUIPMENT TOTAL $ 23,500.00 I Page 4 of 8 Sustainable Landscaping & Trees $ 1,000.00 FUTURE EQUIPMENT TOTAL $ 1,000.00 Landscaping $ 1,000.00 2026 Playground Structure $ 40,000.00 2026 Woodchip Fall Zone $ 10,000.00 2028 1101Y Retaining Wall $ 9,000.00 FUTURE EQUIPMENT TOTAL TOTAL: 4,000.00 $ 4,000.00 Landscaping $ 1,000.00 ,;, Annual I Ballfield Maintenance: Regrade & Reseed $ 5,000.00 8,320.00 $ 18,320.00 ° Annual ,Ag Lime Material $ 1,000.00 4,565.00 $ 4,565.00. Medium Shelter w/ Picnic Tables (Small Shelter -$40,000) $ 20,000.00 2028 Concrete Border w/Wood Fiber Fall Zone $ 8,300.00 425.00 $ 425.00 2028 Playground Structure $ 30,800.00 425.00 $ 425.00 2033 60 linear ft 16' High Backstop Fence $ 20,000.00 360.00 $ 360.00 2035 12 Space Asphalt Parking Lot w/Concrete Curb $ 79,000.00 1,300.00 $ 1,300.00 REPLACEMENT ITEMS TOTAL: $ 144100.00 170.00 $ 170.00 155.00 $ 465.00 155.00 $ _ 155.00 250.00 $ 250.00 300.00 $ 600.00 7,500.00 $ 7,500.00 500.00 $ 500.00 50.00 $ 100.00 60.00 $ 60.00 25.00 $ 25.00 550.00 $ 550.00 310.00 $ 310.00 1,700.00 $ 1,700.00 125.00 $ 125.00 180.00 $ 180.00 45.00 $ 45.00 H:\Engineering\Parks\Parks Inventory\Park Inventory - 2021 - Updated 3-9-2021 1 Class -V Parking Lot - Small 1 Park Bench 1 Park Name Sign 2 Reels -Tennis net 2 Sets Post -Tennis net _ _ 500.00 170.00 250.00 62.00 453.00 $ $ $ $ $ 500.00 170.00 250.00 124.00 906.00 2 Soccer Field QTY. DESCRIPTION (EXISTING) UNIT PRICE 1 Shelter - Small Beginning 1 Concrete Borderw/Wood Fiber Fall Zone 4,000.00 $ 4,000.00 1 Bluebird House 15.00 $ 15.00 1 GameTime Play Structure - 2013 14,792.16 $ 14,792.16 155.00 NORTHWOODS EAST EQUIPMENT TOTAL 155.00 $ 60,937.16 '41C NORTHWOODS WEST - 2721 140TH LANE NW - 3.81 ACRES 155.00 1 Picnic Table -Concrete 10' w/concrete pad 500.00 1 Class -V Parking Lot - Small 1 Park Bench 1 Park Name Sign 2 Reels -Tennis net 2 Sets Post -Tennis net _ _ 500.00 170.00 250.00 62.00 453.00 $ $ $ $ $ 500.00 170.00 250.00 124.00 906.00 2 Soccer Field 3,000.00 $ 6,000.00 1 Shelter - Small 1,800.00 $ 1,800.00 1 225'- 5' Cyclone Fence w/Mow Strip 3,385.00 $ 3,385.00 2 Tennis Courts, Pavement with Fencing 40,000.00 $ 80,000.00 2 Tennis Nets 185.00 $ 370.00 1 Trash Can 155.00 $ 155.00 1 Recycle Bin 155.00 $ 155.00 1 Picnic Table -Concrete 10' w/concrete pad 500.00 $ 500.00 1 Sign - Tobacco Free Zone 24.00 $ 24.00 1 40 linear ft Border Magic Edging 280.00 $ 280.00 1 Lights on Posts (4) 2500.00 $ 2500.00 City of ANDOVER rid Nuture Yark Pacllrties Chart FUTURE FACILITIES I TOTAL PRICE Landscaping Security Light Pave Parkina Lot f 10 Stal FUTURE EQUIPMENT TOTAL 1 $ 21.000.00 71 1 REPLACEMENT $ _ _ 1,000.00 Annual Field Maintenance: Regrade & Reseed L$ 7,500.00 -ci $ 22,500.00 2032 Tennis Courts (2), Pavementwith Fencing 1 Landwater Conservation Sign 25.00 $ 25.00 NORTHWOODS WEST EQUIPMENT TOTAL $ 97,144.00 FUTURE EQUIPMENT TOTAL $ 31,000.00 REPLACEMENT ITEMS TOTAL: Page 5 of 8 COSTS 5,000.00 212 42C PLEASANT OAKS - 3857143RD AVENUE NW - 20.29 ACRES,.;1 1 "No Motorized Vehicles" Sign 28.00 $ _ _ 28.00 Landscaping $ 1,000.00 2027 Concrete Edging w/Wood Fiber Fall Zone $ 8,300.00 1 420' Cyclone Fence with 12' Gate with Mow Strip 10,200.00 $ 10,200.00 SeGwity Light $7,590 2027 Playground Structure $ 50,000.00 5 Bluebird House 15.00 $ 75.00 42 Basketball Gnu015;000 2032 420' Cyclone Fence with 12' Gate with Mow Strip $ 27,000.00 1 _ Four -Place Swing Set _ 1,300.00 $ 1,300.00_ REPLACEMENT ITEMS TOTAL: $ 85 300.00 1 Park Name Sign w/Landscaping 550.00 $ 550.00 ADA Access Trail to play area (75'x $50.00 plf) $ 3,750.00 1 Picnic Table Concrete 8' Pad 200.00 $ 200.00 1 Security Light (Connexus) - $ 1 Skating Rink 500.00 $ 500.00 1 Trash Can 155.00 $ 155.00 1 Sign - Tobacco Free Zone 24.00 $ 24.00 2 Frisbee Baskets 100.00 $ 200.00 1 Concrete Edging w/Wood Fiber Fall Zone 4,000.00 $ 4,000.00 1 Park Bench 170.00 $ 170.00 1 Playground Structure -2012 23,601.51 $ 23,601.51 PLEASANT OAKS EQUIPMENT TOTAL $ 41 003.51 FUTURE EQUIPMENT TOTAL 1 $ 4,750.00 43C RIVER TRAILS -4635 147TH LANE NW -12.85 ACRES No Current Facilities_ WoodOMiLand_Houses $ - - FUTURE EQUIPMENT TOTAL $ - 44C ROSE -14057 ROSE STREET NW - 4.97 ACRES 2 Home Plate 60.00 $ 120.00 Landscaping $0 Annual Ballfeld Maintenance: Regrade, Reseed, Irrigation $ 10,000.00 1 Park Bench 170.00 $ 170.00 Security Lights (2) $0 Annual Ag Lime Material $ _ 2,000.00 1 Park Name Sign 250.00 $ 250.00 ADA Trail Access (North side of Park to Parking lot) $0 2022 Playground Structure $ 40,000.00 1 Picnic Table w/3 Section Concrete 900.00 $ 900.00 1/2 Basketball court $0 2022 150 cu yds Engineered Wood Fiber $ 10,000.00 1 Pitching Rubber 45.00 $ 45.00 2035 New Ballfield Fencing w/ Mow Strips $ 160,000.00 1 Security Light (Connexus Owned) - $ - 2043 Medium Shelter $ 100,000.00 2 Set of Three Bases 200.00 $ 400.00 2045 Asphalt Parking Lot $ 225,000.00 H:\Engineering\Parks\Parks Inventory\Park Inventory - 2021 - Updated 3-9-2021 New Ballfield Fencing w/Mow Strips Swing Set - Four Place Trash Cans Recycle Bin Gametime Play Structure - 2004 Sign - Tobacco Free Zone Spring Ride - Car Spring Ride - Duck Spring Ride - Motorcycle Bat Racks / Holders 150 cu yds Engineered Wood Fiber 275 ft. Border- Magic Edging Bleachers Benches 15' Ball Fields w/Grass Infields Asphalt Parking Lot - 2015 Shelter with Concrete Pad - I Dugout Roofs ROSE EQUIPMENT TOTAL City of ANDOVER aria suture YarK Pacint1es ill 70 Note: Improvements to be funded by cell tower revenues 155.00 $ 775.00 155.00 $ _ 465.00 384.68 $ 13,384.68 24.00 $ 24.00 425.00 $ 425.00 425.00 $ 425.00 425.00 $ 425.00 45.00 $ 180.00 1,950.00 14.00 S $ 1,950.00 $ 1,700.00 1 Class V Parking Lot (medium) $ 3,400.00 _ Park Sign & Landscaping 450.00 1,000.00 $ 1,800.00 50.00 26,860.25 $ $ 26,860.25 $ 7,716.19 24.00 $ 15,432.37 2 Plavers Benches -16' Aluminum 47,769.86 $ $ 47,769.86 425.00 $ 41,348.13 $ 33,500.001 $ 9,400 00 200.00 $ 229,808.99 45C ROUND LAKE BOAT LANDING - 14604 ROUND LAKE BLVD NW - 3.51 ACRES FUTURE EQUIPMENT TOTAL ' $ ' 1 "No Hunting on Lake" Sign 14.00 S 14.00 Security Light $ 7,500.00 1 Class V Parking Lot (medium) 4,500.00 S 4,500.00 _ Park Sign & Landscaping $ 1,000.00 2 Wood Duck House 25.00 S 50.00 Construct Boat Landing & Pave from road to water ($50,000) $ 25,000.00 ROUND LAKE BOAT LANDING EQUIPMENT TOTAL $ 4,564.00 24.00 $ 1,300.00 2 Plavers Benches -16' Aluminum 60.00 $ $ $ 425.00 $ FUTURE EQUIPMENT TOTAL $ 33,500.001 Ballfield Fencing Ball Field Bird House Class -V Parking Lot- Large Four Place Swing Set Home Plate Motorcycle Spring Ride Park Bench w/ Concrete Pad Picnic Table - 3 section concrete Picnic Table - small Pitchinc Rubber - Small 12,884.54 4,279.00 $ 12,884.54 4 Trash Cans 19,548.55 $ $ 19,548.55 155.00 15.00 155.00 $ 30.00 $ 6,000.00 1 Bleacher -3 Section Aluminum 1 $ 6,000.00 1,500.00 1,300.00 24.00 $ 1,300.00 2 Plavers Benches -16' Aluminum 60.00 $ $ 60.00 425.00 $ 425.00 170.00 $ 170.00 200.00 $ 200.00 1 45.00 1 $ 45.00 !00.00 $ 200.00 1 Shelter with Concrete Pad -Large 4,279.00 $ 4,279.00 4 Trash Cans - 155.00 $ 620.00 11 IE le Bin 155.00 $ 155.00 ameTime Plav, Structure - 2002 14.940.00 $ 14.940.00 1 Security Light (Connexus Owned) - $ - 1 ADA Access Pads 1,560.00 $ 1,560.00 1 Duck Spring Ride 450.00 $ 450.00 1 Backhoe Digger Ride 375.00 $ 375.00 1 Bleacher -3 Section Aluminum 1,500.00 $ 1,500.00 1 Sign - Tobacco Free Zone 24.00 $ 24.00 2 Plavers Benches -16' Aluminum 300.00 $ 600.00 Name H:\Engineering\Parks\Parks Inventory\Park Inventory - 2021 - Updated 3-9-2021 REPLACEMENT ITEMS REPLACEMENT ITEMS TOTAL: Annual Parking Lot Repairs (Class V Gravel) REPLACEMENT ITEMS TOTAL: Park Sign & Landscaping 5 1,000.00 Annual Ballfield Maintenance: Regrade & Reseed $ - - Annual Ag Lime Material 2025 Shelter 2027 Ballfield Fencing 2035 Playground Structure $ REPLACEMENTI Pave Ballfield Parking Lot (30 stalls) Page 6 of 8 5,000.00 1,000.00 1 1 1 2 Canoe Landing Class -V Parking Lot - Small Park Name Sign Barricade Post - Set 1,400.00 500.00 225.00 150.00 $ $ $ $ 1,400.00 500.00 225.00 300.00 QTY. DESCRIPTION (EXISTING) UNIT PRICE $ Beginning 1 130' Chain Link Fence 4' black vinyl coated 1,400.00 $ 1,400.00 5 Bat Houses 20.00 $ 100.00 2 Metal Bat Holders 45.00 $ 90.00 1 30' Concrete Sidewalk 200.00 $ 200.00 1 STROOTMAN EQUIPMENT TOTAL 24.00 $ 70,856.09 1 1 1 2 Canoe Landing Class -V Parking Lot - Small Park Name Sign Barricade Post - Set 1,400.00 500.00 225.00 150.00 $ $ $ $ 1,400.00 500.00 225.00 300.00 1 Trash Can 155.00 $ 155.00 2 "No Motorized Vehicle" Sign 25.00 $ 50.00 2 Bluebird Houses 15.00 $ 30.00 3 Wood Duck House 40.00 $ 120.00 1 Sign - Slow No Wake 75.00 $ 75.00 1 Sign - Construction Fund 24.00 $ 24.00 2 Sign - Bradley Launch 250.00 $ 500.00 1 Security Light (Connexus Owned) _ - $ - 155.00 STROOTMAN CANOE LANDING EQUIPMENT TOTAL 310.00 $ 3,379.00 47C TERRACE - 13535 POPPY STREET NW - 7.33 ACRES 1 Parking Lot 27 Spaces - 2007 1 Basketball Pole and Goal 57,406.05 700.00 $ $ 1 Aglime 1 Backhoe Digger 1 Ball Field 4 Benches Players 8' 1 Four -Section Backstop 1 Home Plate _ 1 Park Bench 1 Fencing with Mow Strip -2015 1 irrigation 1 Park Name Sign w/Landscaping 4,000.00 298.00 3,000.00 100.00 1,564.00 60.00 170.00 16,088.79 18,682.00 550.00 $ $ $ $ $ $ $ $ $ $ 4,000.00 298.00 3,000.00 400.00 1,564.00 60.00 170.00 16,088.79 18,682.00 550.00 1 Picnic Table 200.00 $ 200.00 1 Pitching Rubber 45.00 $ 45.00 1 Sandbox w/Concrete Walk and Retaining Wall 3,400.00 $ 3,400.00 1 Security Light (Connexus Owned) - $ - 1 Set of Three Bases 200.00 $ 200.00 1 Shelter - Small w/Concrete Pad 1,200.00 $ 1,200.00 1 Four Place Swing Set w/ADA Swing and Pad 1,300.00 $ 1,300.00 1 Duck Spring Ride 425.00 $ 425.00 1 Motorcycle Spring Ride 425.00 $ 425.00 1 Car Spring Ride 625.00 $ 625.00 2 Trash Cans 155.00 $ 310.00 1 Walking Trail - Asphalt 12,810.00 $ 12,810.00 1 Parking Lot 27 Spaces - 2007 1 Basketball Pole and Goal 57,406.05 700.00 $ $ 57,406.05 700.00 1 40 linear ft 6' Sidewalk 250.00 $ 250.00 1 90 linear ft 4' Sidewalk 550.00 $ 550.00 1 40 linear ft Border Magic Edging 1 20' Retaining Wall around Tree 290.00 750.00 $ $ 290.00 750.00 1 Sand Volleyball Court 46'x 80' 700.00 $ 700.00 1 240 linear ft Volleyball Court Edging 1,680.00 $ 1,680.00 1 Volleyball Net and Post Set 475.00 $ 475.00 1 Sign - Tobacco Free Zone 24.00 $ 24.00 1 Gametime Plavaround Ecuioment $ 33,243.95 H:\Engineering\Parks\Parks Inventory\Park Inventory - 2021 - Updated 3-9-2021 City of ANDOVER no rut FUTURE FUTURE EQUIPMENT TOTAL $ 61,000.00 Pave Parking Lot (Canoe Area - 10 stalls) $ 25,000.00 ADA Access Trail to River (150'x $50.00 DIM $ 7.500.00 Landscaping Bleachers - Donation Page 7 of 8 $ 1,000.00 Annual Ballfeld Maintenance: Re_g_rade, Reseed, Irrigation $ 5,000.00 $ 7,500.00 Annual Ag Lime Material _ $ 1,000.00 2027 Walking Trail -Asphalt $ 40,000.00 2033_ Playground $ 1_00,000.00 Wood Chips Retaining Wall 2035 Fencing with Mow Strip $ 43,000.00 2037 Parking Lot 27 Spaces_ $ 248,000.00 EPLACEMENT �- RITEMS TOTAL: $ 437 000.00 DESCRIPTION roe. vn�u Irtw - 01 1. v ,n e 2 "No Motorized Vehicles" Sign 1 Basketball Pad Asphalt 1 Basketball Pole/Backboard/Rim/Net Field 1 Home Plate 1 Pitching Rubber 1 Set of Three Bases 1 Six Section Backstop w/Dugouts Cement 1 104' Four foot Sideline Fence w/Mow Stri 1 124' Six foot Fence w/ mow strip 1 364' Eight foot Outfield Fence w/Mow Stn 2 15' Aluminum Players Benches 1 Shelter - Small 3 Trash Cans 1 Recycle Bin 1 Walking Path - Asphalt Expanded 1 Gametime Play Structure - 2002 1 Playsense Design 301 - 2002 2 Foul Pole Flags 1 Park Bench w/concrete pad 1 Wood Chip Fall Zone 1 Concrete Curb Around Fall Zone 1 Park Name Sign w/Landscaping 1 Security Light (Connexus Owned) 1 Bleacher Aluminum 3 Row 1 Horse Spring Ride 1 Motorcycle Spring Ride 1 Dog Bag Dispenser for waste 2 Bat Racks / Holders 1 Sign - Handicap Parking 1 Sign - Dog Waste 1 Sign - Tobacco Free Zone 1 No Pepper Drills Sign 1 Vehicle Parking in Designated Areas Sig 1 160' Yellow Fence Cover 1 Irrigation system - 2018 UNIT PRICE Beginning $ 161,821.79 RES 38 CO S 59 00 4_,200.00. $ 4,200.00 475.00 $ 475.00 38,900.00 $ 38,900.00 5,618.33 $ 5,618.33 11,224.71 $ 11,224.71 60.00 $ 60.00 45.00 $ 45.00 135.00 $ 135.00 9,704.50 $ 9,704.50 2,006.16 $ 2,006.16 3,031.80 $ 3,031.80 5,507.32 $ 5,507.32 250.00 $ 500.00 1,600.00 $ 1,600.00 155.00 $ 465.00 155.00 $ 155.00 41,447.00 $ 41,447.00 15,548.23 $ 15,548.23 12,572.27 $ 12,572.27 1,400.00 $ 1,400.00 25.00 $ 50.00 500.00 $ 500.00 25.00 $ _50.00 400.00 $ 400.00 5,200.00 $ 5,200.00 1,300.00 $ 1,300.00 550.00 $ 550.00 1,700.00 $ 1,700.00 450.00 $ 450.00 450.00 $ 450.00 75.00 $ 75.00 45.00 $ 90.00 25.00 $ 25.00 25.00 $ 25.00 24.00 $ 24.00 25.00 $ 25.00 - 25.00 $ 25.00 _ 160.00 $ 160.00 38,165.29 $ 38,165.29 - - $ 203,915.61 City of ANDOVER na Puture Yark t'acniteS C11art FUTURE FACILITIES TOTAL PRICE FUTURE EQUIPMENT TOTAL i $ 8,500.00 1,637,524.97 H:\Engineering\Parks\Parks Inventory\Park Inventory - 2021 - Updated 3-9-2021 ITEMS Page 8 of 8 ESTIMATED Annual Ballfield Maintenance: Regrade & Reseed $ 5,000.00 _ Annual Ag Lime Material $ 1,000.00 2022 Six Section Backstop w/ Dugouts Cement $ 25,800.00 2022 124' Six foot Fence w/ mow strip $ 8,000.00 2022 364' Eight foot Outfield Fence w/ Mow Strip $ 14,600.00 2023 1 Playground Structure - 5-12 $ 41,000.00 2023 Playground Structure - Playsense - 2 to 5 $ 33,000.00 2023 Wood Chip Fall Zone $ 13,800.00 2032 BasketballPad Asphalt $ 11,100.00 2032 Sixty (60) Place Asphalt Parking Lot w/Curb $ 168,000.00 2032 lWalking Path - Asphalt Expanded $ 179,000.00 as REPLACEMENT ITEMS TOTAL: $ 500,300.00 FUTURE EQUIPMENT TOTAL $ - AREA "C" FUTURE EQUIPMENT SUBTOTAL: $ 1,963,250.00 AREA 'C" REPLACEMENT SUBTOTAL: QTY. DESCRIPTION (EXISTING) 59D ANDOVER LIONS - 948 BUNKER LAKE BOUL 1 280' Cyclone Fence with Mow Strip 1 Aglime 1 Playground Structure - 2017 1 Ball Field 2 15' Aluminum Players Benches w/Concrete Pad 1 Bases - Set of Three 1 Home Plate 1 30 Space Asphalt Parking Lot w/Curbs 1 Pitching Rubber 1 Trash Can 1 Concrete ADA Pad 1 Handicap Parking Sign 1 Backstop Fence, Mow Strips, Dugouts, Bleacher 1 Recycle Bin 1 Irrigation - 2017 1 Set of 3 Outdoor Exercise Equipment ANDOVER LIONS PARK EQUIPMENT TOTAL ouu ruvuvvcic airy I lull rvurt an -1o. 1 Ballfield Development & Constructic 1 Building w/ Restrooms, storage, cor 1 Lighting of 2 Fields 3 Bleachers 6 15' Players Bench Aluminum 3 Pitching Rubbers 6 Foul Posts w/Flags 1 Park Sign w/retaining wall block 3 Dugouts 4 Picnic Tables 12' Concrete 14 Trash Cans 1 12'x 12' Irrigation Shed - 2006 3 Sign - Handicap Parking 4 Sign - No Parking 1 Sign - Overflow Parking 16 Bluebird Houses 1 265 linear ft 4' Fence for Sliding Hill 2 Saddlemates 1 Swing set - 4 Place 1 6' Bench 1 Spring Pad 1 Tilted Sky Wheel 1 280 cu yds engineered wood fiber 1 38 linear It V Concrete Border 1 145 linear It 2' Concrete Border 1 90 linear It 3' Concrete Border 1 GameTime Play Equip - MN Playgr( 1 Fence around playground 1 Scoreboards (set of 3) - 2006 1 Batting Cage Set - 2008 1 Parking Lot w/Lighting-2006 3 Home Plates 9 Ball Field Distance Signs 1 No Pepper Drills Signs 3 Set of Bases LANE NW -2: bon etc.. -2008 -2008 City of ANDOVER 2ul-u misting ana ruture rarx racnittes Lean FUTURE FACILITIES ' TOTAL PRICE 79,075.82 Annual Ballfield Maintenance: Re $ 979,075.82 UNIT PRICE .04 ACRES 75,874.98 73,463.31 Beginning $ $ 2,715.00 $ 2,715.00 2026 Tilted Sky Wheel 36,144.40 $ 36,144.40 300.00 1,000.00 $ 1,000.00 2028 1 Fence around playground 500.00 $ 1,000.00 165.00 200.00 $ 200.00 $ $ $ $ 60.00 $ 60.00 17,500.00 $ 17,500.00 7,500.00 45.00 $ 45.00 155.00 $ 155.00 75.00 315.00 $ 315.00 $ 50.00 $ 50.00 21,293.00 155.00 21,664.30 3,477.88 $ $ $ $ 21,293.00 155.00 21,664.30 3,477.88 20.00 $ 105,774.58 City of ANDOVER 2ul-u misting ana ruture rarx racnittes Lean FUTURE FACILITIES ' TOTAL PRICE 79,075.82 Annual Ballfield Maintenance: Re $ 979,075.82 $ 20,000.00 75,874.98 73,463.31 $ $ 275,874.98 273,463.31 9,699.33 2026 Tilted Sky Wheel $ 29,098.00 300.00 $ 1,800.00 2028 1 Fence around playground 55.00 2028 Batting Cage Set $ 165.00 125.00 1,800.00 10,000.00 900.00 $ $ $ $ 7_50.00 1,800.00 30,000.00 3,600.00 155.00 $ 2,170.00 7,500.00 $ 7,500.00 25.00 $ 75.00 25.00 $ 100.00 25.00 $ 25.00 20.00 $ 320.00 1,800.00 $ 1,800.00 700.00 $ 1,400.00 1,800.00 $ 1,800.00 250.00 $ 250.00 1,200.00 $ 1,200.00 3,500.00 $ 3,500.00 5,400.00 $ 5,400.00 900.00 $ 900.00 700.00 $ 700.00_ 475.00 $ 475.00 53,539.95 11,747.57 7,500.00 $ $ $ 53,539.95 11,747.57- 7,500.00 2,700.00 $ 2,700.00 80,000.00 $ 80,000.00 60.00 $ 180.00 20.00 $ 180.00 25.00 $ 25.00 200.00 $ 600.00 H:\Engineering\Parks\Parks Inventory\Park Inventory - 2021 - Updated 3-9-2021 Small Shelter w/ Picnic Tables FUTURE EQUIPMENT TOTAL Bleachers - Donation Landscaping ($5,000) Small Picnic Shelter w/ Picnic Table Netting - Around Concession Area Park Benches (5) FUTURE EQUIPMENT TOTAL - Around Concessions Area - Donation REPLACEMENT ITEMS Annual Ballfield Maintenance: Regrade, Reseed, Irrigation Annual Ag Lime Material 2032 Playground Structure 2037 280' Cyclone Fence with Mow Strip 2037 30 Space Asphalt Parking Lot w/Curbs 2037 Backstop Fence, Mow Strips, Dugouts, Bleacher Pads REPLACEMENT ITEMS TOTAL: $ 1,000.00 Annual Ballfield Maintenance: Re Annual Facility Maintenance $ 20,000.00 Annual Lighting: Maintenance ( 2 Annual Ag Lime Material $10,000 2026 Tilted Sky Wheel $ 1,000.00 2026 280 cu yds engineered w( Structure 2026 Playground $ 32,000.00 2028 1 Fence around playground 2028 Batting Cage Set 2036 Scoreboards (set of 3) 2036 12' x 12' Irrigation Shed $1 2036 Parkins Lot- ReDlacemer and REPLACEMENT ITEMS TOTAL: Page 1 of 12 ESTIMATED COSTS $ 5,000.00 $ 1,000.00 $ 67,000.00 $ 16,000.00 $ 76,000.00 $ 15,000.00 $ 5,000.00 $ 3,000.00 $ _ 3,000.00 $ 7,300.00 $ 11,250.00 $ 111,000.00 $ 25,000.00 $ 7,200.00 $ 32,000.00 $ 32,000.00 $ 350,000.00 E 601.750.00 City of ANDOVER Page 2 of 12 ESTIMATE CHESTERTON COMMONS EQUIPMENT TOTAL $ 43,428.64 202U Existing and ruture Yark Pacilittes Uhart QTY.j DESCRIPTION (EXISTING) UNIT PRICE Beginning FUTURE FACILITIES 2 TOTAL PRICE F REPLACEMENT ITEMS 1 Sliding Hill Light -2006 2,500.00 $ 2,500.00 Warming House 147,000.00 $ 147,000.00 FUTURE EQUIPMENT TOTAL $ - Annual Lighting Maintenance _ $ 4 _ Hockey Nets 1 Handicap Swing 450.00 $ 450.00 $ 1 Parking Lot Class V 4,000.00 $ 1 Duck House 25.00 $ $ $ $ 25.00 250.00 585.00 310.00 $180,000 $ 1 8' Metal Picnic Table w/Concrete Pad 250.00 Picnic Table Ej $ 3 Small Concrete Table w/Benches 195.00 REPLACEMENT ITEMS TOTAL: 2 Recycle Bin 155.00 !' Trash Cans 1 Ballfield Lighting of East Field 180,000.00 _ 620.00 ANDOVER STATION NORTH EQUIPMENT TOTAL $ 1 963 834.63 Key Lock Boxes ". $ 62D CHESTERTON COMMONS -1414 155th AVENUE NW -.61 ACRES 2 Fire Extinguishers 55.00 1 Walking Path - Paved - 2007 3,950.00 $ 3,950.00 Irrigation System and new water service $ 40,000.00 2032 Playground Structure 1 Gametime Playground Structure - 2017 32,733.64 $ 32,733.64 FUTURE EQUIPMENT TOTAL $ 40 000.00 2037 Walking Path - Paved 1 Four Place Swing Set 1,300.00 $ 1,300.00 4 Plastic Round Tables REPLACEMENT ITEMS T 1 60' Concrete Edging 400.00 $ 400.00 2 Parking Lot Lights 2,500.00 1 Table (steel tube frame) 200.00 $ 200.00 3 Security Lights on Building 200.00 1 Trash Can (Square Plastic) 140.00 $ 140.00 CITY CAMPUS HOCKEY COMPLEX EQUIPMENT TOTAL 1 Sandbox with Timbers 1,500.00 $ 1,500.00 64D CITY HALL COMPLEX #1/PURPLE -1685 CROSSTOWN BLVD NW - 51.28 ACRES 2 Trail Gates 1,250.00 $ 2,500.00 4,760.00 $ 4,760.00 1 Park Name Sign w/Landscaping 550.00 $ 550.00 20,000.00 $ 20,000.00 1 Recvcle Bin 155.00 $ 155.00 3,000.00 $ 3,000.00 Page 2 of 12 ESTIMATE H:\Engineering\Parks\Parks Inventory\Park Inventory - 2021 - Updated 3-9-2021 63,500.00 17.000.00 5,000.00 2,000.00 5,000.00 110.000.00 10,000.00 1,000.00 CHESTERTON COMMONS EQUIPMENT TOTAL $ 43,428.64 63D CITY CAMPUS HOCKEY COMPLEX - 1885 CROSSTOWN BLVD NW - 2.52 acres 2 Hockey Rink w/Fencing and 4 Light Poles w/16 Lights -2011 20,000.00 $ 40,000.00 Annual Facility Maintenance $ 1 Warming House 147,000.00 $ 147,000.00 FUTURE EQUIPMENT TOTAL $ - Annual Lighting Maintenance _ $ 4 _ Hockey Nets 300.00 $ 1,200.00 Annual Parking Lot Class V -Add material as needed $ 1 Parking Lot Class V 4,000.00 $ 4,000.00 2031 2 Hockey Rinks w/Fencing and 4 Light Poles - Replacem $ 1 Picnic Table 250.00 $ 250.00 REPLACEMENT ITEMS TOTAL: $ 4 Trash Cans 155.00 $ 620.00 2 Key Lock Boxes 20.00 $ 40.00 2 Fire Extinguishers 55.00 $ 110.00 1 CO Alarm Detector 25.00 $ 25.00 1 Warming House Hours Sign 25.00 $ 25.00 _ 4 Plastic Round Tables 25.00 $ 100.00 _ 2 Parking Lot Lights 2,500.00 $ 5,000.00 3 Security Lights on Building 200.00 $ 600.00 CITY CAMPUS HOCKEY COMPLEX EQUIPMENT TOTAL $ 198 970.00 64D CITY HALL COMPLEX #1/PURPLE -1685 CROSSTOWN BLVD NW - 51.28 ACRES 1 340' Cyclone Fence by Soccer Field #2 4,760.00 $ 4,760.00 Playground Upgrade ( Signature Park) & Pickleball (4) $ 1,000,000.00 Annual Field Maintenance: Regrade, Reseed, Irrigation $ 1 Infields 20,000.00 $ 20,000.00 Annual'iAg Lime Material $ 1 Ball Field with Irrigation 3,000.00 $ 3,000.00 Community Center Projec t Balance (Through 12/31/20) $ 824,854.00 2027 340' Cyclone Fence by Soccer Field #2 $ 1 Basketball goal, net and backboard 475.00 $ 475.00 FUTURE EQUIPMENT TOTAL $ 1,824,854.00 2027 (Fencing around Ball Field - Replacement $ 4 Players Bench - 8 100.00 $ 400.00 2030 2 Shelters -Large $ 1 Bike Rack 216.00 $ 216.00 2030 North Parking Lot $ 1 Bleacher 1,785.00 $ 1,785.00 2030 Blacktop Trails $ 2 Bluebird House 15.00 $ 30.00 2034 Playground Structure -1 Large* $ 1 Car Spring Ride 425.00 $ 425.00 2034 Sandbox w/ Digger $ 1 Dinosaur Spring Ride 525.00 $ 525.00 1 Fencing around Ball Field - 2002 3,200.00 $ 3,200.00 REPLACEMENT ITEMS TOTAL: $ 1 Field Number Sign 20.00 $ 20.00 2 Foul Line Pole Flags 22.00 $ 44.00 1 Four -Section Backstop 1,564.00 $ _ _1,564.00 5 Trash Cans with Tops 140.00 $ 700.00 H:\Engineering\Parks\Parks Inventory\Park Inventory - 2021 - Updated 3-9-2021 63,500.00 17.000.00 5,000.00 2,000.00 5,000.00 110.000.00 10,000.00 1,000.00 City of 'ANDOVER 2020 Existin); and Future Park Facilities Chart Page 3 of 12 QTY. DESCRIPTION (EXISTING) UNIT PRICE Beginning FUTURE FACILITIES TOTAL PRICE REPLACEMENT ITEMS ESTIMATED COSTS 2 Grill - Large 340.00 $ 680.00 1 Home Plate 60.00 $ 60.00 _ 1 Motorcycle Spring Ride 360.00 $ 360.00 3 Park Bench 170.00 $ 510.00 2 Pitching Rubber 45.00 $ 90.00 2 _ Playground Structure -2019 82,712.11 $ 82,712.11 _ 1 Retaining Wall - Rock 2,000.00 $ 2,000.00 1 Sandbox with Timbers 2,500.00 $ 2,500.00 2 Security Light (Connexus Owned) - $ - 1 Set of Three Bases - New Style w/Double First Base 200.00 $ 200.00 2 Shelter - Large 23,437.50 $ 46,875.00 1 Shelter - Small 1,200.00 $ 1,200.00 1 Soccer Field with Irrigation 3,000.00 $ 3,000.00 1 Soccer Goal - Junior- Sets 700.00 $ 700.00 1 Volleyball Net 62.00 $ 62.00 1 Volleyball Pole - Set 226.00 $ 226.00 1 North Parking Lot 35,000.00 $ 35,000.00 1 Blacktop Trails Expanded 9,660.00 $ 9,660.00 1 Swing Set - (4 swings/2 baby) 1,900.00 $ 1,900.00 3 Picnic Table -concrete 12' 1,000.00 $ 3,000.00 2 Sign - Handicap Parking 25.00 $ 50.00 1 Sign - DNR Assisted Funding 25.00 $ 25.00 1 48 x 10 Hockey Back Stop 1,800.00 $ 1,800.00 1 30'x 30' Concrete Slab 1,200.00 $ 1,200.00 1 Metal Bollard 180.00 $ 180.00 1 220' Yellow Plastic Fence Top 220.00 $ 220.00 1 Metal Bat Holders 25.00 $ 25.00 2 Metal Picnic Tables 8' 300.00 $ 600.00 (I 1 Surveillance Sign 25.00 $ 25.00 _ 4 Recycle Bins 155.00$ 620.00 CITY HALL COMPLEX #1/PURPLE EQUIPMENT TOTAL $ 232,624.11 ' 65D COON CREEK PARKITOM ANDERSON - EAST OF HANSON BLVD. ON COON CREEK - 37.66 ACRES No Current Facilities Landscaping and Benches $ 2,500.00 _ FUTURE EQUIPMENT TOTAL $ 2,500.00 66.0_ CREEKVIEW CROSSING - 14271 YELLOW PINE STREET NW -.63 ACRES 1 Basketball Pad Asphalt 73'x 42' 2,400.00 $ 2,400.00 Landscaping $ 1,000.00 2025_ Playground Structure _ $ _ _ 49,000.00_ F 2 Basketball pole, board, net and rim 475.00 $ 950.00 FUTURE EQUIPMENT TOTAL $ 1,000.00 2025 180 cu yds Engineered Wood Fiber $ 7,500.00 1 Buck -about 963.00 $ _ 963.00 _ _ 2030 Small Shelter w/ Picnic Table $ 10,000.00 1 Park Name Sign 550.00 $ 550.00 REPLACEMENT ITEMS TOTAL: $ 66 500.00 1 PrimeTime Play Structure - 2007 23,512.47 $ 23,512.47 1 Security Light (Connexus Owned) - $ - 1 Shelter - Small 1,600.00 $ 1,600.00 1 Six Place Swing Set - Short 1,900.00 $ 1,900.00 1 50 ft. Border- Magic Edging 350.00 $ 350.00 1 Trash Can 155.00 $ 155.00 1 180 cu yds Engineered Wood Fiber - 2007 3,600.00 $ 3,600.00 1 3261in. Ft. x4' Sidewalk 1,975.00 $ 1,975.00 1 Park Bench 250.00 $ 250.00 2 Saddle Mates 700.00 $ 1,400.00 1 Sign - Tobacco Free Zone 24.00 $ 24.00 1 Sandbox 500.00 $ 500.00 1 Recycle Bin 155.00 $ 155.00 �- H:\Engineering\Parks\Parks Inventory\Park Inventory - 2021 - Updated 3-9-2021 City of ANDOVER 2020 Existing and Future Park Facilities Chart Page 4 of 12 QTY., DESCRIPTION (EXISTING) UNIT PRICE Beginning FUTURE FACILITIES TOTAL PRICE REPLACEMENT ITEMS ESTIMATED COSTS CREEKVIEW CROSSING EQUIPMENT TOTAL $ 40,284.47 67D EVELAND.FIELDS=2275 ANDOVER BLVD NW -7.07 acres 1 380' - 8' Fence along property line - 2002 3,837.40 $ 3,837.40Annual Field Maintenance: Regrade, Reseed, Irrigation $ 15,000.00 1 _ 900'- 6' Fence along property line -2002 7,434.00 $ 7,434.00 Annual Ag Lime Material $ _ 3,000.00 1 300'- 4' ballfield fence w/ mow strips - 2002 5,712.70 $ _ 5,712.70 Qugouts-A4d41e1 &_-PJer{p ielAs$2 ,g00 2022 380'- 8' Fence along property line $ 10,200.00 1 384'- 6' ballfield fence w/ mow strips - 2002 10,537.86 1 $ 10,537.86 2022 900'- 6' Fence along property line $ 20,000.00 1 1,146'- 8' ballfield fence w/ mow strips - 2002 23,757.89 $ 23,757.89 2022 300' -4' ballfield fence w/ mow strips $ 15,000.00 3 Backstop Six Section - 2002 3,929.83 $ 11,789.50 FUTURE EQUIPMENT TOTAL $ 2022 384'- 6' ballfield fence w/ mow strips $ 28,000.00 3 Concrete Pad for Bleacher/Dugouts -2002 10,857.33 $ 32,572.00 2022 1,146 - 8' ballfield fence w/ mow strips - All Fields $ 63,000.00 1 Benches & Message Board -2002 6,062.81 $ 6,062.81 2022 Backstop Six Section $ 32,000.00 1 Irrigation - 2002 27,126.33 $ 27,126.33 2022 Batting Cage 2 Place $ 6,700.00 1 Parking Lot 35 Spaces - 2002 52,715.73 $ 52,715.73 Scoreboards - Donation $0 2031 Scoreboard Electronic $ 17,000.00 3 Home Plates 67.00 $ 201.00 2032 Concrete Pad for Bleacher/Dugouts $ 140,000.00 6 Pitching Rubbers 48.00 $ 288.00 2032 Benches & Message Board $ 26,000.00 3 Double First Bases 200.00 $ 600.00 2032 Parking Lot 35 Spaces $ 230,000.00 3 Sets of 1st, 2nd Bases, 3rd Bases 200.00 $ 600.00 2032 Concrete Block Dugouts - South Field $ 90,000.00 3 Field signs 25.00 $ 75.00 _ _ REPLACEMENT ITEMS TOTAL: $ 695 900.00 9 Trash Cans 155.00 $ 1,395.00 1 Ballfield design / development 124,184.44 $ 124,184.44 4 16' aluminum players benches 300.00 $ 1,200.00 2 15' metal players benches 300.00 $ 600.00 1 Park Sign w/Landscaping 750.00 $ 750.00 6 Foul Posts w/ Flags 110.00 $ 660.00 1 Picnic Table 16 Concrete 3 Piece 900.00 $ 900.00 1 450 linear ft Yellow Fence Cap 380.00 $ 380.00 1 Scoreboard Electronic -2011 6,413.00 $ 6,413.00 3 Bleachers 1,700.00 $ 5,100.00 2 Concrete Block Dugouts 10,000.00 $ 20,000.00 1 Security Light (Connexus Owned) - $ - 1 Vehicle Parking Ordinance Sign 25.00 $ 25.00 1 Batting Cage 2 Place 2,500.00 $ 2,500.00 -� 3 Recycle Bins $ 465.00 EVELAND FIELDS EQUIPMENT TOTAL _155_.00 $ 347 882.66 _ 68D HARTFIEL'S - HANSON BLVD. & ANDOVER BLVD. -1.47 ACRES No Current Facilities FUTURE EQUIPMENT TOTAL $ 69D HICKORY MEADOWS - 300 144TH AVENUE NW -.77 acres 1 GameTime Play Structure - 2012 22,565.37 $ 22,565.37 $ 2027 Playground Structure $ 47,000.00 1 _ Park Name Sign 454.57 $ 454.57 _.;; ^ c m c ^^^^ ^ c' 900 $ 2042 Concrete Enclosure w/block Retaining Wall $ 33,000.00 1 Concrete Picnic Table - 2 Leg 500.00 $ 500.00 $ REPLACEMENT ITEMS TOTAL: $ 80 000.00 1 _ Four Place Swing Set 1,300.00 $ 1,300.00 Small Picnic Shelter w/ Picnic Table ($10,000) S 20,000.00 1 Park Bench - 6' 170.00 $ 170.00 FUTURE EQUIPMENT TOTAL $ 20 000.00 1 Concrete Enclosure w/block Retaining Wall -2012 7,617.79 $ 7,617.79 1 Trash Can 155.00 $ 155.00 1 Irrigation System 1,500.00 $ 1,500.00 1 _ _ Sandbox with Digger 1,500.00 $ 1,500.00 1 Recycle Bin 155.00 $ _ 155.00 HICKORY MEADOWS EQUIPMENT TOTAL $ 35 917.73 70D HIDDEN CREEK EAST - 2156 135TH LANE NW - 2.72 ACRES 1 Bluebird House 15.00 $ 15.00 Landscaping $ 1,000.00 2024 Playground Structure $ 64,000.00 1 Ice Rink WNW $ 500.00 2032 11 Place Asphalt Parking Lot w/Cement Curb is 97,000.00 H:\Engineering\Parks\Parks Inventory\Park Inventory - 2021 - Updated 3-9-2021 QTY. DESCRIPTION (EXISTING) 1 Picnic Table 1 Powerscape Structure - Medium/small - 2002 1 ADA Access Pads 1 Six Place Swinq Set w/ADA Swinq and Access Pad 1 11 Place Asphalt Parking Lot w/Cement Curb - 2002 1 190' asphalt Trail 1 Soccer Goals - Jr. Set 1 Park Name Sign w/Landscaping 1 Duck Spring Ride 1 Sign - Handicap Parking 1 Sign - Refurbished Park Sign 1 Sign - Tobacco Free Zone 1 Recycle Bin 2 CB2 Park Bench 1 Concrete Pad w/Handball Wall 1 Sidewalk and Concrete Edging 1 Wood fiber Surface HIDDEN CREEK EAST EQUIPMENT TOTAL 71D HILLS OF BUNKER LAKE WEST -1557 139TH LANE I 1 Authorized Vehicle Sign w/Post 1 Aglime 2 Aluminum Bench -15' 1 Ball Field _ 1 Class -V Parking Lot - Medium 1 Four -Section Backstop 1 Home Plate 1 Pitching Rubber 1 Set of Three Bases 1 Steel Bollard Post 3Trash Can 1 WalkindPath-Asphalt-2004 -Time Play structure - 2004 Bench Place Swinq Set w/Wood Chips -2004 Park Name Sign w/Landscaping Retaining Wall for Sign Sign - No Parking On Grass Security Light (Connexus Owned) Metal Bat Holders Wood Duck House Dog Pot Dispenser Recycle Bin Fencing Backstop, Dugouts, Sidelines w/Concrete Mow HILLS OF BUNKER LAKE WEST EQUIPMENT TOTAL LANDLOCKED -15 No Current Facilities UNIT PRICE 250.00 $ 30,731.42 $ 1,550.00 $ 1,900.00 $ 155.00 $ 22,384.01 $ 4,010.45 $ 1,025.06 $ 900.00 $ 450.00 $ 25.00 $ 500.00 $ 24.00 $ 155.00 $ 220.00 $ 5,088.96 $ 2,000.00 $ 2,000.004_ ACRES 75.00 $ 4,000.00 $ 215.00 $ 3,000.00 $ 4,000.00 $ 1,564.00 $ 60.00 $ 45.00 $ 135.00 $ 15.00 $ 155.00 $ 18.150.00 $ 250.00 $ 600.00 $ 800.00 $ 525.00 $ 525.00 $ 100.00 $ 800.00 $ 400.00 $ 25.00 $ 25.00 $ 22.50 $ 80.00 $ H:\Engineering\Parks\Parks Inventory\Park Inventory - 2021 - Updated 3-9-2021 City of ANDOVER LuLu rxisting ana ruture ram raculues unan Beginning FUTURE FACILITIES TOTAL PRICE REPLACEMENT ITEMS 250.00 2032 190' asphalt Trail 30,731.42 FUTURE EQUIPMENT_ TOTAL_ $ 1,000.00 2052 Concrete Pad w/Handball Wall 1,550.00 REPLACEMENT ITEMS TOTAL: 1,900.00, 310.00 2,384.01 4,010.45 1,025.06 900.00 450.00 25.00 500.00 24.00 155.00 440.00 5.088.96 75.00 4,000.00 430.00 3,000.00 4,000.00 1,564.00 60.00 45.00 135.00 15.00 465.00 18,150.00 250.00 24,804.71 500.00 1,600.00 800.00 525.00 525.00 3,100.00 800.00 1,400.00 25.00 50.00 22.50 80.00 155.00 16.086.32 Landscaping $ 1,000.00 Annual Ballfeld Maintenance: Regrade & Reseed $ Annual Ag Lime Material $ ensretega 2023 Playground Structure $ 2034 Concrete Sidewalk Border w/Wood Chips $ Pave Existing Parking Lot w/ concrete C & G $ 45,000.00 2036 Fencing Backstop, Dugouts, Sidelines w/Concrete Mow S $ 2040 WalkingPath- Asphalt $ FUTURE EQUIPMENT TOTAL $ 46,000.00 REPLACEMENT ITEMS TOTAL: $ Bleachers - Donation No Future Facilities Page 5 of 12 17 5,000.00 1,000.00 5.2,000.00 8,200.00 29,000.00 150,000.00 DESCRIPTION (EXISTING) Mwwn.J CJ 1 M. .J - No Current Facilities 74D NORDEEN'S - 15535 JUNIPER STREET 1 Four Place Swing _Set 1 60' Concrete Sidewalk 1 Frog Spring Ride 1 Park Bench CB2 1 Park Name Sign w/Landscaping 1 Picnic Table (steel tube frame) 1 Powerscape - Medium - 2011 1 Sandbox with Digger 1 Security Light (Connexus Owned) 1 Skatinc Rink I ouiue, -a/ 1111. rt. rvjayiu auy11iy 1 Toucan Sam Spring Ride 1 Concrete Edging Play Structure 1 Wood Fiber Surface 1 Bat House 2 Hockey Nets 1 1/2 Basketball Court (2017) NORDEEN'S EQUIPMENT TOTAL 75D OAK BLUFF -14757 BLUEBIRD STREI 1 Park Bench 1 Park Name Sign w/Landscaping 1 18 Space Asphalt Parking Lot - 2000 1 Picnic Table Concrete 1 PowerScaoe Plav Structure - 2008 :car Field sh Can :ycle Bin ice - 40' Split Rail 1s - Handicap Parking :urity Light (Connexus Owned) Idle Mates linear ft 5' Sidewalk linear ft 12" Curb cu yds Engineered Wood Fiber linear It Border magic Edging cer Goal Set Regulation ation System 4 BLUFF EQUIPMENT TOTAL UNIT PRICE 1,300.00 $ 500.00 S 525.00 $ 220.00 $ 550.00 $ 250.00 $ 2,194.00 $ 1,500.00 $ 3,000.00 $ 155.00 $ 155.00 $ 260.00 $ 525.00 $ 2,000.00 $ 2,000.00 $ 60.00 $ 300.00 $ 8.372.16--$ 170.00 $ 550.00 $ 18,950.00 $ 200.00 $ 19,222.49 $ 1,200.00 $ 3.000.00--$ 155.00 $ 155.00 $ 2,160.00 $ 25.00 $ 700.00 $ 550.00 $ 400.00 $ 2,700.00 $ 260.00 $ H:\Engineering\Parks\Parks Inventory\Park Inventory - 2021 - Updated 3-9-2021 City of ANDOVER 2U2U hmstmg and suture Yark I,ac111t1es Uhart Beginning FUTURE FACILITIES TOTAL PRICE REPLACEMENT ITEMS Park Sign & Landscaping $ 1,000.00 Security Light $ 7,500.00 Playground Equipment (2-5 & 5-12 yr. old) $ 60,000.00 i:' Irrigation System $ 50,000.00 _ Trails for ADA access (250'x $50.00 plf) $ 12,500.00 FUTURE EQUIPMENT TOTAL $ 131,000.00 3=- 1,300.00 No Future Facilities Anticipated 170.00 525.00 220.00 550.00 250.00 .2,194.00 1,500.00 155.00 155.00 260.00 525.00 00 10, Page 6 of 12 2026 Playground Structure $ 2027 Skating Rink Repairs- Grading $ 2047 1/2 Basketball Court $ REPLACEMENT ITEMS TOTAL: $ 46, 000.00 8,000.00 17.000.00 600.00 Xry $372.16 - - - 4,166.16�"-�� 170.00 Landscaping $ 1,000.00 Annual Field Maintenance: Regrade, Reseed, Irrigation $ 5,000.00 550.00 1/2 Basketball Court & Hoop ($15,000) $ 1,000.00 2025 Playground Structure $ 40,000.00 8,950.00 2023 160 cu yds Engineered Wood Fiber $ 5,600.00 200.00 _ FUTURE EQUIPMENT TOTAL $ 2,000.00 2038 18 Space Asphalt Parking Lot $ 82,000.00 9,222.49 REPLACEMENT ITEMS TOTAL: $ 132 600.00 1,200.00 3,000.00 _ 155.00 155.00 2,160.00 50.00 1,400.00 550.00 400.00 2,700.00 260.00 1,500.00 6.615.69 City of ANDOVER 2020 Existing and Future Park Facilities Chart Page 7 of 12 QTY. 10 1 1 1 1 1 1 1 2 1 1 2 2 2 2 2 1 DESCRIPTION (EXISTING) Bluebird House Class -V Parking Lot - Large _ Class -V Parking Lot - Small Sliding Hill and Wildlife Pond Walking Path -Asphalt Storage/Warming House/Restroom Building Irrigation System Landscape Wall Soccer/Football Goal Sets 8'x 1 10'Chain link fence Shelter (wood frame, concrete pad) 12' Concrete Bare Picnic Tables Authorized Vehicle Only Signs Removable Basketball Backboard Poles 25' Net Poles (east soccer field) Hockey Goals Parking Lots Asphalt UNIT PRICE 15.00 4,000.00 2,000.00 8,000.00 4,000.00 91,000.00 139,034.00 3,700.00 1,400.00 4,200.00 8,459.00 325.00 25.00 1,100.00 200.00 300.00 137,968.00 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Beginning 150.00 4,000.00 2,000.00 8,000.00 4,000.00 91,000.00 139,034.00 3,700.00 2,800.00 4,200.00 8,459.00 650.00 50.00 2,200.00 400.00 600.00 137,968.00:-, FUTURE FACILITIES Landscaping $ Pave 1 Large and 1 Small Parking Lot $ Trail from North & East lots to East field (700'x 50 plf) $20k) $ FUTURE EQUIPMENT TOTAL $ Warming House Addition - Donation TOTAL PRICE REPLACEMENT ITEMS 1,000.00 Annual Field Maintenance: Regrade, Reseed, Irrigation Annual Building Maintenance 180,000.00 Annual 'Lighting Maintenance 20,000.00 2022 Playground Structure 202_2 !Concrete Sidewalk Border w/woodchips 201,000.00 2025 Landscape Wall around Park Sign 2025 8'x 1 10'Chain link fence 2035 Scoreboards Electronic 2035 2 sets of 5 -row aluminum bleachers $0 2035 Asphalt Base Hockey Rink & Fencing & Hockey Boards _ 2035 Walking Path -Asphalt 2035 Sliding Hill Repairs and Improve Wildlife Pond 2035 Shelter (wood frame, concrete pad) - Replacement 2035 Parking Lots Asphalt REPLACEMENT ITEMS TOTAI-q ESTIMATED COSTS $ 15,000.00 $ 5,000.00 $ 3,000.00 $ 45,000.00 $ 7,900.00 $ 10,000.00 $ 11,500.00 $ 53,000.00 $ 35,000.00 $ 35,000.00 $ 18,000.00 $ 5,000.00 $ 37,000.00 $ 600,000.00 $ 880 400.00 3 Handicap No Parking Signs 25.00 $ 75.00 9 No Parking Signs 25.00 $ 225.00 !; 15 Garbage Cans Plastic Style 175.00 $ 2,625.00 �° 1 Over Flow Parking Sign 25.00 $ 25.00 ;1- 2 Prairie Knoll Park Regulations Sign 125.00 $ 250.00 _ 2 Emergency Parking Only Sign 25.00 $ 50.001.! 2 8' Park Benches w/Pad 250.00 $ 500.00 1 Car Spring Ride 800.00 $ 800.00 1 Motorcycle Spring Ride 526.00 $ 525.00 1 1 Whale Spring Ride 525.00 $ 525.00 1 1 Four Place Swing Set w/Handicap Swing Concrete Sidewalk Border w/woodchips 1,800.00 3,800.00 $ $ 1,800.00 3,800.00 8 Benches inside Warming House 100.00 $ 800.00 4 1 1 2 8 1 3 Fire Extinguisher Metal Storage Cabinet Warming House Hours Sign Sign - Tobacco Free Zone Large Metal Poles & Lights Soccer Fields, Hockey & Sliding Hill Wood Duck House Private Property/No Trespassing Signs 55.00 180.00 25.00 25.00 26,660.75 40.00 25.00 $ $ $ $ $ $ $ 220.00 180.00 25.00 50.00 213,286.01 40.00 75.00 1 GameTimePlay Structure -2005 21,566.00 $ 21,566.00 2 Scoreboard Electronic 26,960.13 $ 53,920.25 1 2 20' x 60' Net 12'x 26' Concrete Pads 875.00 1,300.00 $ $ 875.00 2,600.00 6 Security Light (Connexus Owned) - $ 2 Grills - Charcoal 700.00 $ 1,400.00 2 Park Name Signs w/Landscaping 750.00 $ 1,500.00 1 1 2 1 1 1 1 1 2 2 4 60' Black Perforated Pipe 4'x 150' Black Chainlink Fence 5 -row aluminum bleachers Keylock Box Picnic Table Asphalt Base Hockey Rink & Fencing CO Detector Soccer Goal Set Juniors Lacrosse Goal Sets Trail Bollards Recycle Bins 240.00 1,600.00 4,064.00 20.00 250.00 12,015.00 25.00 900.00 500.00 180.00 155.00 $ $ $ $ $ $ $ $ $ $ $ 240.00 1,600.00 8,128.00 20.00 250.00 12,015.00 25.00 900.00 1,000.00 3_60.00 620.00 H:\Engineering\Parks\Parks Inventory\Park Inventory - 2021 - Updated 3-9-2021 City of ANDD VER Page 8 of 12 zuzu Existing ana ruture rarx racumes unarl: DESCRIPTION (EXISTING) UNIT PRICE Beginning FUTURE FACILITIES TOTAL PRICE REPLACEMENT ITEMS ESTIMATED COSTS PRAIRIE KNOLL EQUIPMENT TOTAL $ 742,106.26 No Current Facilities /OV RCII VMRJ YYCJI - IYV VO RMV CIY JIRCCI IYYY `L.JO MIiRCJ 2 Basketball Goal and Net 475.00 $ 950.00 2026 Playground Structure S 1 Basketball Padm2007 2007 S _ FUTURE EQUIPMENT TOTAL $ _ 2037 Basketball Pad $ 1 _ _ Four -Place Swing Set _3,500.00 1,300.00 S _3,500.00 1,300.00 2037 Walking Path -Asphalt $ 3 Park Bench 100.00 S 300.00 REPLACEMENT ITEMS TOTAL: $ 1 Park Name Sign 500.00 S 500.00 _ _ Basketball Pad -2002 1 Pond 1,000.00 5 1,000.00 Annual 1 Security Light (Connexus Owned) - $ - 600.00_ 1 Trash Can 155.00 $ 155.00 Sandbox - Small 1 Walking Path - Asphalt -2007 9,700.00 $ 9,700.00 _ 1 Sign - Tobacco Free Zone 24.00 $ 24.00 625.00 1 PrimeTime Play Structure - 2007 _ 16,475.54 $ 16,475.54 Security Light (Connexus Owned) 2 Saddle mates 700.00 $ 1,400.00 2022 1 210'linearft4'sidewalk 1,300.00 $ 1,300.00 2,160.00 1 115 cu yds engineered wood fiber 2,200.00 S 2,200.00 _ _ _ Four Place Swing Set WADA Swing 1 35 ft. Border - Magic Edging w/landscaping 250.00 S 250.00 2032 1 -Recycle Bin 155.00_ S 155.00 37,504.48 _ RED OAKS WEST EQUIPMENT TOTAL 2032 $ 39,209.54 and Grass Infield _ 79D REDWOOD - 13977 BLUEBIRD STREET NW - 5.82 ACRES No Current Facilities No Future Facilities Anticipated 80D SHADOWBROOK EAST -13789 BUTTERNUT STREET NW -15.03 ACRES 1 51 Space Asphalt Parking Lot w/Cement Curb - 2002 50,628.78 $ 50,628.7_8_ Annual Ballfield Maintenance_, R_eg_ rade, Reseed, Irrigat_io_n _ _ $ 1 _ _ Basketball Pad -2002 3,000.00 _ $ 3,000.00 _ _ Small Shelter w/ Picnic table (ball field area) $ 20,000.00 Annual Ag Lime Material $ 1 Basketball Post, Backboard, Net 600.00 $ 600.00_ Raise Ballfield Fencing Height to 8' (2 Fields) $ 30,000.00 2022 6 Section Backstop w/Overhang $ 1 Sandbox - Small 400.00 $ 400.00 FUTURE EQUIPMENT TOTAL $ 50 000.00 2022 248'- 6' Cyclone Fence Dugout w/Concrete Pad/Mow Stri $ 1 Car Spring Ride 625.00 $ 625.00 2022 208'- 4' Cyclone Sideline Fence w/Mow Strip $ 1 Security Light (Connexus Owned) - $ - 2022 802'- 8' Cyclone Outfield Fence w/Mow Strip $ 1 180' Cyclone Fence Along Pond 2,160.00 $ 2,160.00 2032 Concrete Pad for Bleacher/Dugouts _ $ 1 _ _ _ Four Place Swing Set WADA Swing 1,300.00 $ 1,300.00 Field Lighting - Donation $0 2032 Park Sign w/Landscaping Keystone wall $ 2 Baseball Fields 18,752.24 $ 37,504.48 2032 Playground Structure, Wood Chips and Border $ 2 and Grass Infield _ 7,825.44 $ 15,650.88_ 2032 Aluminum Bleachers 5 Row $ 2 Set 3 Bases 225.00 $ 450.00 2032 51 Space Asphalt Parking Lot w/Cement Curb $ 2 Home Plates 75.00 $ 150.00 2032 Basketball Pad $ 2 Pitching Rubbers 55.00 $ 110.00 REPLACEMENT ITEMS TOTAL: $ 2 6 Section Backstop w/Overhang - 2002 6,627.40 $ 13,254.80 1 248'- 6' Cyclone Fence Dugout w/Concrete Pad/Mow Strip - 20 5,575.04 $ 5,575.04 _ 1 208'- 4' Cyclone Sideline Fence w/Mow Strip - 2002 3,321.76 $ 3,321.76 1 802'- 8' Cyclone Outfield Fence w/Mow, Strip - 2002 11,380.38 $ 11,380.38 1 Concrete Pad for Bleacher/Dugouts - 2002 13,930.00 $ 13,930.00 1 Park Sign w/Landscaping Keystone wall 3,600.00 $ 3,600.00 1 Irrigation System - 2002 36,404.00 $ 36,404.00 4 Aluminum 15' Players Bench 250.00 $ 1,000.00 6 Trash Can 155.00 $ 930.00 1 175'- 4' black vinyl fence 1,900.00 $ 1,900.00 1 Playground Equipment -2017 40,104.80 $ 40,104.80 1 Wood Chips and Border- 2017 4,515.96 $ 4,515.96 HAEngineering\Parks\Parks Inventory\Park Inventory - 2021 - Updated 3-9-2021 35,000 00 15,000.00 10,000.00 DESCRIPTION (EXISTING) cnic Table Steel Frame - - - - - tul Pole Flags gn - Tobacco Free Zone nibike Spring Toy uebird House gns - No Parking gns - Handicap Parking Park Benches Picnic Table Concrete legs 10' Safety Fence Cap uminum Bleachers 5 Row - 2002 ood Duck Houses 4 Metal Bat Holders SHADOWBROOK EAST EQUIPMENT TOTAL 81D SHADOWBROOK WEST -BUNKER LAKE RE No Current Facilities 82D SHADY KNOLL - 2352 UPLANDER STREET h 1 Basketball Goal and Net 1 Four -Place Swing Set 1 Hard Court - Basketball - 2005 2 Park Bench 1 Park Name Sign 1 Security Light (Connexus Owned) 1 Trash Can _ 1 Recycle Bin 1 Minibike Spring Ride 1 Car Spring Ride 1 Clifford Spring Ride 1 Woodduck House 1 Concrete Sidewalk Border w/ woodchips 1 Sign - Tobacco Free Zone 1 Sign - Adopt -A -Park 1 GameTime Play Structure - 2005 SHADY KNOLL EQUIPMENT TOTAL 83D SOPHIE'S - 1170 152ND LANE NW -.78 acres 1 GameTime Play Structure -2010 1 20'x 20' Shelter w/Concrete -2010 1 240'x 1' Concrete Curb 1 Saddlemate Ride 1 Fire Spring Ride 1 Four Place Swing Set 1 45'x 50' Asphalt Basketball Court 1 Adopt -A -Park Sign 1 Tobacco Free Sign 1 Basketball Hoop System 1 Picnic Table - Child 1 Picnic Table 1 CB2 Frame Bench 475.00 $ 475.00 300.00 $ 1,300.00 755.55 $ 4,755.55 170.00 $ 2U UNIT PRICE $ Beginning $ 250.00 $ 250.00 $ 25.00 $ 100.00 155.00 24.00 $ 24.00 800.00 525.00 $ 525.00 $ 15.00 $ 75.00 40.00 25.00 $ 50.00 25.00 25.00 $ 50.00 25.00 24.00 425.00 300.00 500.00 220.00 250.00 $ 750.00 500.00 $ 1,000.00 175.00 $ 175.00 4,000.00 $ 8,000.00 40.00 $ 80.00 25.00 $ 25.00 20.00 $ 120.00 155.00 $ 310.00 25.00 $ 100.00 475.00 $ 475.00 300.00 $ 1,300.00 755.55 $ 4,755.55 170.00 $ 340.00 250.00 $ 250.00 $ 15,569.00 155.00 $ 155.00 155.00 $ 155.00 525.00 $ 525.00 800.00 $ 800.00 525.00 $ 525.00 40.00 330.00 $ $330.00 40.00 24.00 $ 24.00 25.00 1 $ 25.00 44,594.56 $ 44,594.56 15,569.00 $ 15,569.00 2,258.00 $ 2,258.00 600.00 $ 600.00 700.00 $ 700.00 1,700.00 $ 1,700.00 1,100.00 $ 1,100.00 25.00 24.00 425.00 300.00 500.00 220.00 $ $ $ $ $ $ 25.00 24.00 425.00 300.00 500.00 220.00 H:\Engineering\Parks\Parks Inventory\Park Inventory - 2021 - Updated 3-9-2021 City of ANDOVER Page 9 of 12 Existing an0 Puture YarK raC111t1es unart FUTURE FACILITIES TOTAL PRICE REPLACEMENT ITEMS ESTIMATED COSTS f No Future Facilities Anticipated $ 1,000.00 2024 Playground Structure $ 2035 Hard Court - Basketball $ REPLACEMENT ITEMS TOTAL: $ FUTURE EQUIPMENT TOTAL 1$ 1,000.00 Irrigation System ($40,000) FUTURE EQUIPMENT TOTAL I 2026 Playground Structure, Sandbox w/ Digger $ 2040 20'x 20' Shelter w/Concrete i$ REPLACEMENT ITEMS TOTAL: $ 46,250.00 1 96,000.00 67,000.00 163.000.00 City of ANDOVER tutu Existing ana rurure Yam raclnnes unan QTY. DESCRIPTION (EXISTING) UNIT PRICE Beginning FUTURE FACILITIES TOTAL PRICE REPLACEMENT ITEMS 1 Park Name Sign w/Landscaping 550.00 $ 550.00 155.00 $ 155.00 _ 170.00 $ 170.00 1 _ _ _ 1 Trash Can 1 Metal Park Bench 1 Book Box 100.00 $ 100.00 ti 1 Sandboxes/Digger 1,500.00 $ 1,500.00 5,000.00 1 Recycle Bin 1.55.00 $ 155.00 65,000.00 SOPHIES'S EQUIPMENT TOTAL _ _ ' $ 70,645.56 1 VYV 1 2 6 2 JVI\Jllll\L-IJVV Vf\VJJIVYII\VLY V. 1\1Y-JV.VV /\VI\GJ 2,290' Cyclone Outfield Fence - 10' High, two 10' Gates, Foul Pi 210' 5' Cyclone Fence with Mow Strip -2014 220' Infield Fence with Dugout and Concrete Pad -2014 350' Cyclone Outfield Fence -10' with Foul Poles - 2014 29,770.00 4,620.00 3,860.00 5,250.00 $ $ $ $ 29,770.00 9,240.00 23,160.00 10,500.00 6 Infields 3,500.00 $ 21,000.00 1 Warning Track 5,000.00 $ 5,000.00 1 Asphalt Parking Lot- Large -1995 65,000.00 $ 65,000.00 1 Asphalt Parking Lot - Small -1995 15,000.00 $ 15,000.00 1 Asphalt Parking Lot w/Curb - 51 Spaces -1995 77,869.06 $ 77,869.06 1 Athletic/Concession Buildinc with Restrooms -1995 215.412.00 $ 215.412.00 12 Bat Holders 25.00 $ 300.00 7 Bench -Concrete 160.00 $ 1,120.00 3 Bench with Sunshine Logo on Back - Concrete 675.00 $ 2,025.00 1 4 1 15 4 _ 6 Bike Rack w/Concrete Pad Bleachers - Aluminum - Small Block Flag Pole Base _ _ _ Bluebird Houses Concrete Pads for Soccer Bleachers Concrete Pads for Large Bleachers 225.00 8,000.00 650.00 10.00 1,650.00 600.00 $ $ $ $ _ $ _ $ _ 225.00 32,000.00 650.00 150.00 6,600.00 3,600.00 1 Cyclone Fence 150'-5' Black Coated 1,800.00 $ 1,800.00 1 150' - 4' black vinyl fence 1,650.00 $ 1,650.00 1 19'- 8' brown vinyl fence w/ 8' gate w/ strips 1,000.00 $ 1,000.00 6 Double First Base 125.00 $ 750.00 6 Field Number Sign 20.00 $ 120.00 4 Flag Pole -1995 2,500.00 $ 10,000.00 1 Flag - American 75.00 $ 75.00 1 Flag - Sunshine Park 250.00 $ 250.00 1 Flag - Minnesota State 75.00 $ 75.00 12 Foul Pole Flags 22.00 $ 264.00 6 Four -Section Backstop with Four -Section Overhang 1,900.00 $ 11,400.00 2 Grills w/Block Base 1,300.00 $ 2,600.00 6 Home Plate 60.00 $ 360.00 6 Large Aluminum Bleacher 12,500.00 $ 75,000.00 34 Large Plastic Garbage Can 155.00 $ 5,270.00 1 Monument - Concrete 350.00 $ 350.00 2 No Golfing Sign 20.00 $ 40.00 3 No Motorized Vehicle Sign 20.00 $ 60.00 1 Irrigation System -1995 120,000.00 $ 120,000.00 2 No Pets Sign 20.00 $ 40.00 3 Park Regulations Sign 75.00 $ 225.00 6 Park Bench 100.00 $ 600.00 10 Pitching Rubber 45.00 $ 450.00 3 Planters - Concrete - Round _ 125.00 $ 375.00 H:\Engineering\Parks\Parks Inventory\Park Inventory - 2021 - Updated 3-9-2021 Landscaping Skateboard Park FUTURE EQUIPMENT TOTAL Soccer Field Shelter - Donation Soreboards for North Field - Donation Hugouts for the 2 small baseball fields - Donation 1,000.00 Annual Ballfield Maintenance. Regrade, Reseed, Irrigation 30,000.00 Annual'FacilityMaintenance Annual Ag Lime Materal - 50,000.00 Annual Lighting Maintenance 2021_ Playground Structure (Medium Size Structure) 2021 Rock Walls 2022 Park Name Sign 2025 lAsphalt Parking Lot - Large 2025 lAsphalt Parking Lot - Small 2025 lAsphalt Parking Lot w/Curb - 51 Spaces 81,000.00 2025 4Bleachers - Aluminum -Small 2025 4 Flag Poles 2025 Large Aluminum Bleacher 2030 _ Basketball Court $0 2030 Sand Volleyball Court $0 2030 IScoreboards $0 2031 1 Skate Board Park 2031 Shelter, Hexagonal - Skate Park 2032 Parking Lot Lights 2032 _North West Parking Lot Lights 2032 Dugout shelters 2034 2,290' Cyclone Outfield Fence -10' High, two 10' Gs 2034 220' Infield Fence with Dugout and Concrete Pad 2034 350' Cyclone Outfield Fence -10' with Foul Poles 2035 Walking Path - Asphalt 2046 Shelter/Gazebo REPLACEMENT ITEMS T Page 10 of 12 ESTIMATED COSTS 1 45,000.00 5,000.00 6,000.00 8,000.00 46,300.00 7,800.00 27,000.00 198,000.00 15,000.00 17,000.00 120,000.00 120,000.00 50,000.00 97,000.00 QTY. DESCRIPTION (EXISTING) 1 Plastic Protective Cover for Cyclone Fencing - 12 Players Bench 8 Players Bench - 8' 6 Pop -out Base Sets (2) 1 Sand Volleyball Court with Timbers - 2000 4 Security Light (Connexus Owned) 3 Soccer Fields -1995. 4 Soccer Goals - Regulation 1 Soocer/Football Goals 3 Steel Bollard Post 4 Table / Bench - Concrete 8 Trash Containers - Plastic - Small 1 Volleyball Net 1 Volleyball Post - Set 1 Walking Path - Asphalt Expanded - 2005 1 Shelter, Message Board, Table -1996 1 Trash Containers 16 Recycle Bins 1 Park Name Sign - 2002 1 Rock Walls - 2000 1 Small Play Structure - 2000 1 Shelter, Hexagonal (Skate Park) - 2011 1 Lighting of Soccer fields - 2003 9 Handicap Parking Lot Signs 1 Lighting of Ballfields - 2004 6 12' Concrete picnic tables 9 Security Lights on Buildings 1 City of Andover Flag 1 Skate Board Park 4011 I Storage Container 1 Fencing around well w/Concrete Pad 2 Concrete Pads for Toilets 1 Four Place Swing 2 Saddlemates 1 Backhoe Digger 1 360' x 1' Concrete Curb 1 Irrigation Well - 2009 8 Scoreboards - 2010 1 North Parking Lot Lights - 2012 1 West Parking Lot Lights -2012 2 Scoreboards - from Prairie Knoll 2 Scoreboard Installation - from Prairie Knoll 12 Dugout Shelters - 2002 1 95'5' Cyclone Fence w/Mow Strip SUNSHINE PARK EQUIPMENT TOTAL 85D THE OAKS -14431 CROSSTOWN BLVD NW No Current Facilities RUZU, UNIT PRICE 12,593.63 219.52 Beginning 468.00 $ 468.00 100.00 $ 1,200.00 250.00 $ 2,000.00 _ 200.00 $ 1,200.00 4,000.00 $ 4,000.00 2,200.00 $ 60.00 $ 195.00 $ 55.00 $ 65.00 $ 125.00 $ 14,500.00 $ 110,400.00 $ 140.00 $ 155.00 $ 7,400.00 $ 3,800.00__$ 4,500.00 $ 200.00 $ 80.00 $ 4,863.00 $ 2,400.00 $ 600.00 $ 250.00 $ 1,800.00 $ 350.00 $ 400.00 $ 1,500.00 $ 3,377.40 $ 5,664.81 $ 6,480.00 $ 6.337.31 $ City of ANDOVER 1 GameTime Play Structure - 2006 _ 1 CB2 Frames _ 1 Tobacco Free Sign 1 Trash Can 12,593.63 219.52 $ $ 24,000.00 6,760.00 24.00 155.00 1,800.00 2,200.00 155.00 1,800.00 1 GameTime 4 Place Single Post Swing set 180.00 780.00 440.00 65.00 125.00 14,500.00 _ 110,400.00 140.00 2,480.00 7,400.00 3,800.00 4,500.00 18,006.55 223,225.00 _ 225.00 _ 282,305.66 _ 3,000.00 1,800.00 80.00 44,863.00 2,400.00 600.00 500.00 1,800.00 700.00 400.00 1,500.00 83,377.40 _ 45,318.47 36,480.00 26,337.31 12,305.33 25,092.00 36,00_0.00 1.000.00 1 GameTime Play Structure - 2006 _ 1 CB2 Frames _ 1 Tobacco Free Sign 1 Trash Can 12,593.63 219.52 $ $ 12,593.63 219.52 24.00 $ 24.00 155.00 1,800.00 $ 1 $ 155.00 1,800.00 1 GameTime 4 Place Single Post Swing set H:\Engineering\Parks\Parks Inventory\Park Inventory - 2021 - Updated 3-9-2021 anci ruture nark FUTURE FACILITIE7 No Future Facilities Anticipated :1es utlart TOTAL PRICE FUTURE EQUIPMENT TOTAL REPLACEMENT ITEMS Page 11 of 12 ESTIMATED COSTS Annual Irrigation System Maintenance $ 1,000.00 2025 Playground Structure $ 26,200.00 REPLACEMENT ITEMS TOTAL: $ 27 200.00 City of ANDD VER Page 12 of 12 QTY. DESCRIPTION (EXISTING) UNIT PRICE Beginning FUTURE FACILITIES TOTAL PRICE REPLACEMENT ITEMS ESTIMATED COSTS 1 5' x 46' Concrete Sidewalk 350.00 $ 350.00 1 Park Name Sign w/Landscaping 550.00 $ 550.00 _ 1 170' Boarder Magic Edging 1,207.00 $ 1,207.00 1 Irrigation System -2012 5,299.06 $ 5,299.06 1 Handicap Swing 450.00 $ 450.00 1 Recycle Bin 155.00 $ 155.00 _ WOODLAND ESTATES EQUIPMENT TOTAL $ 22,803.21 AREA "D" EXISITING SUBTOTAL: 6,241,668.83 AREA "D" FUTURE EQUIPMENT SUBTOTAL: $ 2,483,354.00 AREA "D" REPLACEMENT SUBTOTAL: $ 7,850,400.00 $ H:\Engineering\Parks\Parks Inventory\Park Inventory - 2021 - Updated 3-9-2021 DESCRIPTION (EXISTING) 2 Hockey Goals 4 Security Light on Building 1 Skating Rink 1 90' Sidewalk 2 Trash Can 1 Warming House 10 Warming House Bench 1 Warming House Heater 1 Warming House Open / Close Sign 1 Tobacco Free Sign 1 Rink & Warming House Hours Sign 1 Desk 2 Fire Extinguisher 1 CO Alarm/Detector Warming House 1 Smoke Detector Warming House 2 Chair Warming House 1 Clock Warming House 1 Key Cade Box 1 New Hockey Rink 1 Rink Lights CROOKED LAKE HOCKEY RINK EQUIPMENT TOTAL AREA "I" EXISTING SUBTOTAL: UNIT PRICE 250.00 $ 300.00 $ 1,000.00 $ 1,800.00 $ 155.00 $ 15,000.00 $ 25.00 $ 975.00 $ 80.00 $ 24.00 $ 25.00 $ 50.00 $ 25.00 $ 25.00 $ 25.00 $ 25.00 $ 15.00 $ 20.00 $ 23,431.46 $ HAEngineering\Parks\Parks Inventory\Park Inventory - 2021 - Updated 3-9-2021 Beginning 500.00 1,200.00 1,000.00 1,800.00 310.00 15,000.00 250.00 975.00 80.00 24.00 25.00 50.00 50.00 25.00 25.00 50.00 City of ANDOVER 11LA1)a1:fFYffiF liiLlMillfllli[a[/Li:iWATr31III r-R&MIALill FUTURE FACILITIES TOTAL PRICE REPLACEMENT ITEMS No Future Facilities Anticipated Annual Facility Maintenance 2030 New Hockey Rink 2030 Rink Lights "I" FUTURE EQUIPMENT SUBTOTAL: $ REPLACEMENT ITEMS TOTAL: AREA "I" REPLACEMENT Page 1 of 1 ESTIMATED COSTS $ 1,000.00 $ 75,000.00 DESCRIPTION (EXISTING) AREA "A" EXISTING SUBTOTAL: AREA "B" EXISTING SUBTOTAL: AREA "C" EXISTING SUBTOTAL: AREA "D" EXISITING SUBTOTAL: AREA'S" EXISTING SUBTOTAL: Neighborhood Park Future Community Play Field Area . Park Equipme ninistration Fee (30% of Proje PARK EQUIPMENT GRAND UNIT PRICE Beginning $ 2,622,071.16 $ 303,933.01 $ 1,637,524.97 $ 6,241,668.83 $ 61,710.02 H:\Engineering\Parks\Parks Inventory\Park Inventory - 2021 - Updated 3-12-2021 City of ANDOVER 2U2U Existme and Nuture Park Pactlrties Chart FUTURE FACILITIES TOTAL PRICE AREA "A" FUTURE EQUIPMENT SUBTOTAL: $ 3,593,700.00 ($4,080,700) AREA "B" FUTURE EQUIPMENT SUBTOTAL: $ 49,000.00 ($64,000) AREA "C" FUTURE EQUIPMENT SUBTOTAL: 1,963,250.00 ($2,354,500) AREA "D" FUTURE EQUIPMENT SUBTOTAL: $ 2,483,354.00 ($3,904,104) AREA "I" FUTURE EQUIPMENT SUBTOTAL: $ Future Neighborhood Park (Fields of Winslow Cove) $442,500 $ FUTURE EQUIPMENT TOTAL r Future Needs of the Park System ($2,000,000) $ FUTURE EQUIPMENT TOTAL $ 10,866,907.99 Future Park Equipment Total $ 3,260,072.40 Design/Administration Fee (30% of Project Cost) 14,126,980.39 FUTURE PARK EQUIPMENT GRAND TOTAL $ Difference 1 1,210,000.00 ADD Page 1 of 1 REPLACEMENT ITEMS ESTIMATED COSTS AREA "A" REPLACEMENT SUBTOTAL: $ 1,471,400.00 AREA "B" REPLACEMENT SUBTOTAL: $ 513,150.00 1 AREA "C" REPLACEMENT SUBTOTAL: AREA"D" REPLACEMENT SUBTOTAL: AREA"I" REPLACEMENT SUBTOTAL: GRAND TOTAL: NDOVE 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV TO: Mayor and Councilmembers CC: Jim Dickinson, City Administrator FROM: Joe Janish, Community Developmen ctor SUBJECT: Discuss Comprehensive Plan Text Amendment - Planning DATE: March 23, 2021 0 DISCUSSION On February 16, 2021 the City Council approved moving forward with a Comprehensive Plan Amendment that would allow for the "transferring" of units within the Urban Residential Low (URL) land use. This was determined to be needed as from time to time we will run into issues of meeting the 2.4 units per acre as defined in our current plan. Staff has submitted this text amendment to the Met Council for their review. At first it was indicated that the text amendment was incomplete, however after further consideration the Met Council determined that the text amendment is inconsistent with current Met Council policies. Staff had a zoom meeting with two Met Council staff members on March 15, 2021. During this conversation it was indicated as written the recommendation will be that the amendment is inconsistent and should not be enacted. Met Council staff indicated that the City has 15 acres of land that could be "reclassified" to a density of 1.75 acres and still remain compliant. City staff wanted to verify if City Council is interested in pursuing modifying the language to what Met Council has suggested, and have additional conversation related to the text amendment. ACTION REQUESTED The City Council is asked to provide feedback to staff. R p ct sub fitted, Joe Janis Community Development Director Attachments: Proposed Text Amendment Future Land Use Map Urban Residential Low Density (URL) district is established to create cohesive neighborhoods of single-family detached housing within the MUSA and with access to municipal sewer and water. Residential lots within this district are sized to allow efficient utilization of municipal infrastructure as well as to provide an area large enough to accommodate housing market demands. These neighborhoods must be protected from higher intensity uses with appropriate transitions. These transitions include natural features such as trees, wetlands, streams or major changes in topography. Man-made elements such as streets, parks or earth berms in combination with landscaping are also appropriate. When adjacent to arterial roadways, additional setback distance, landscaping and berms are required. Facilities that generate noise, traffic, and/or glare also require major separation from these neighborhoods. Minimum Lot Size Variable Density 2.4** to 4 units per acre PUD Density 4 units per acre City Utilities Required Corresponding Zoning Districts R-4 Single Family Urban Residential Type of Development Single -Family Detached Housing *Areas within the Metropolitan Urban Service Area (MUSA) are calculated using net density, areas outside of the MUSA are calculated using gross density. **Areas guided Urban Residential Low that are also within the Transitional Residential district may qualify for a reduction in minimum density requirements. See the Transitional Residential district text on Page 2-15 for more information and specific standards. Amendment to Page 2-15 Transitional Residential (TR) District contains properties within the MUSA that are currently zoned for rural residential uses (R-1, R-2, and R-3). These properties are guided for urban development in 5 -year stages as shown in Figure 2.5. Property designated Transitional Residential may only be platted under urban residential guidelines and served by municipal utilities. Lot splits may only occur without municipal services under the requirements of the City Code. Any subdivision of property that results in lots less than 2.5 acres in size must be served with municipal sewer and water. The Transitional Residential District also contains properties that when subdivided will have significant barriers to development. Therefore, properties that fall within the Urban Residential Low (URL) district and the Transitional Residential (TR) district at the time of preliminary plat application may qualify for a reduction in minimum density requirements. If a property meets three (3) or more of the criteria listed below, the City Council may approve a decrease in the minimum density requirements provided the proposed density does not fall below 1.75 units per acre: A. Adequate sanitary sewer or water capacity does not exist to develop the property at the minimum density. B. Previous subdivision of adjacent properties has provided limited access which restricts development potential. C. Meeting the minimum density would not be feasible due to the existence of poor soils, wetlands, floodplain, topography. hydrology or other limiting environmental condition. D. Property is located within a Shoreland District, Scenic River District, Wellhead Protection Area, or Drinking Water Supply Management Area due to State requirements towards limiting impacts to the above noted items. E. For infill type developments, the characteristics of the surrounding neighborhood would not support development of the property at the minimum density. In the event a density reduction is approved, the City Council shall also reallocate the difference in housing units to a property yet to be developed within the MUSA. The City Council will also ensure that any reallocation of density does not require a change to the property's guided land use. Alternatively, properties developed above the minimum density of its respective district shall count towards the reallocation difference. Any reallocation of housing units by the City Council shall maintain a planned overall density of 3.0 units per acre within the MUSA and maintain the City's Housing Affordability Goals. This shall be reported to the Metropolitan Council through the Plat Monitoring Program. 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV TO: FROM: SUBJECT: DATE: Mayor and Councilmembers Jim Dickinson, City Administrator Andover Community Center (ACC) Financial Update / Facility Utilization Discussion January 26, 2021 INTRODUCTION all Council direction from the January 26a' City Council workshop (minutes attached) was to eliminate the Andover Community Center Advisory Commission, provide regular updates on the Andover Community Center (ACC) to the City Council, hold user group meetings twice a year at the staff level, and provide updates and a public comment opportunity at the Park and Recreation Commission at least twice per year. Direction was also to have more clarity in the financial reports and to present the budget in a way the Council would understand and to accommodate Council's interest in an efficient operation. Attached for review is a Community Center Budget Summary Report for Budget Year 2021. The report reflects activity through February 2021, comparative data with February 2020 and Pre -audit data reflecting the entire year of 2020. As the Council well knows, the year 2020 was a difficult year, in part because of the expansion construction, but heavily with imposed COVID restrictions shutting down the entire facility mid- March of 2020 and finally being allowed a reopening in a restricted capacity early January 2021. The ACC has now been operating for two months, thus making the current year (2021) activities relatively comparable with the first two months of 2020. Administration & the Recreational Facility Manger will review and discuss the Community Center Budget Summary Report for Budget Year 2021 (through February) along with facility utilization data with the Council at the Workshop. FACILITY UTILIZATION DISCUSSION To assist discussion regarding facility utilization, attached are facility utilization summary reports for the months of January — February for the years 2019, 2020, and 2021 for the Ice Arena/Sports Complex and Field House. These summaries give therp ime hours available vs the hours that were scheduled. The reports do separate into weekday and weekend hours, demonstrating where available hours may be available. While getting 100% prime use is the ACC goal there are many contributing factors that may impact meeting that target identified below: For Ice rentals: • Holidays will result in open hours. When major holidays fall on Sat/Sun that results in a more prime hours not being used when compared to being closed for a holiday(s) on a weeknight(s). When the Andover High School (AHS) hockey teams have weeknight games the teams do not practice that day so the 3:00pm-5:30pm will likely sit open. Andover Huskies Youth Hockey Association (AHYHA) does buy a handful of these available times as schedules permit. • As ACC gets into mid/late February, AHYHA and AHS ice needs can become less as teams are eliminated from the playoff and Spring hockey has not yet started, ACC could see a 2- 3 -week window where some prime hours may go unused. In these situations, ACC looks to have additional open skate/open hockey sessions where there is a fee per participant rather than a sale of ice by the hour. For Fieldhouse: • With 3 gyms and now 4 gyms available, open time blocks can add up fast. For the gyms, ACC schedules 30 minutes between users when equipment needs to be swapped out, volleyball to basketball for example. Set up and tear down time for a major event can be multiple hours depending on the needs of the customer, resulting in open hours. History shows ACC gym users will start closer to 8:30am on weekends, leaving those early 7:00am times available. With most ACC hourly rate users focusing on youth sports, evenings for those users typically do not run late and may leave some 9:30/10:00pm times open. The Council should also keep in mind when looking at utilization that not all scheduled events are charged an hourly rate, many events like open skate, open hockey, open gym, open pickleball, open volleyball are pay to play with a daily admission. When ACC budgets each year focus is on the prime hours available, the original Performa guidance from 2004 and ACC's rental history when determining forecasted revenue. Using ACC's rental history, ACC has come to understand when the slowdowns will happen. If a consistent time block is not being used, ACC will look to add additional daily fee activities or in some cases ACC will create our own in-house programs. A couple examples of in-house programs are the indoor soccer program run in fall and winter. The indoor soccer program was developed many years ago as Saturday mornings were not being used consistently in the field house. Another in-house example is the ACC 3v3 Hockey League, this program runs Sunday mornings March, April, May. It should be noted that running in-house programs does require a lot of staff time, the 3 to 4 in-house programs ACC offers are successes, taking on more would likely require additional program staff support. Currently it is extremely hard to recruit staffing and addition costs would be difficult to offset with revenue. Renting any available hours is almost always preferred. SUMMARY The prime utilization of the ACC indicates that scheduling September — February is crucial. Schedules do lighten up in the Spring as the outdoor weather improves and even more in the heart of the Summer before ACC fires up again in September. ACC is continually looking for new users' groups for ice, turf, and fieldhouse to help bring additional revenue in the Spring & Summer "off-season" months. Administration and the Recreational Facility Manager will discuss with the Council at the workshop the current COVID restrictions impacting the facility and review current initiatives underway to fill those "off-season " months and non -prime available hours. submitted, CITY OF ANDOVER Community Center Budget Summary Totals Budget Year 2021 2020 2021 REVENUES Budget Feb YTD %Bud Pre - Audit Budget Feb YTD %Bud Charges for services Ice Rental $ 470,300 $ 24,746 5% $ 361,796 $ 668,000 $ 84,020 13% Turf Rental - - n/a - 70,000 - 0% Track - - n/a 301 - 738 n/a Fieldhouse Rental 218,000 39,351 18% 133,126 270,000 28,765 11% Proshop 12,000 1,888 16% 4,394 15,000 1,999 13% Vending 13,000 2,393 18% 6,148 16,000 378 2% Advertising 39,000 8,000 21% 8,000 50,000 1,500 3% Total Charges for services 752,300 76,378 10% 513,765 1,089,000 117,400 Il% Miscellaneous 140,000 3,065 2% 98,849 140,000 1,900 1% Total revenues 892,300 79,443 9% 612,614 1,229,000 119,300 10% 2021 2020 EXPENDITURES Budget Feb YTD % Bud Pre - Audit Budget Feb YTD % Bud Current: Salaries & benefits 629,296 86,493 14% 503,842 757,753 89,365 12% Departmental 79,100 9,910 13% 74,809 105,100 12,463 12% Operating 486,075 36,100 7% 345,588 635,197 54,897 9% Professional services 121,000 3,310 3% 62,166 154,375 3,226 2% Capital outlay 130,000 0% 130,500 n/a Current 1,445,471 135,813 9% 1,116,905 1,652,425 159,951 10% Revenue over (under) expense (553,171) (56,370) 10% (504,291) (423,425) (40,651) 10% Other financing sources (uses) General Property Tax Levy Investment income Rental / Lease Pymt Transfers out Total financing sources (uses) - (2,014) 638,000 476,760 (300,000) (300,000) 338,000 174,746 n/a - n/a 6,015 75% 635,629 100% (300,000) 5`22 341,644 155,000 - 0% - (1,112) n/a 638,000 483,568 76% (300,000) (300,000) 100% 493,000 182,456 37% Jet increase (decrease) in fund balance $ (215,171) $ 118,376 -55% $ (162,647) $ 69,575 $ 141,805 2049 Prime Hours - Utilization Summary 1/1/2019 - 2/28/2019 / Sun, Sat 17:00 AM - 10:30 PM Ice Arena Hours Maint Utilize Facility Available Hours Used Hours % Ice Arena 248.00 263.92 27.83 106.42% 248.00 263.92 27.83 106.42% Prime Hours - Utilization Summary 1/1/2019 - 2/28/2019 / Mon, Tues, Wed, Thurs, Fri 13:00 PM - 10:30 PM Ice Arena Hours Maint Utilize Facility Available Hours Used Hours % Ice Arena 322.50 282.25 28.83 87.52% 322.50 282.25 28.83 87.52% 1401 G LC 2 Prime Hours - Utilization Summary 1/1/2020 - 2/29/2020 / Sun, Sat/ 7:00 AM - 10:30 PM Ice Arena Facility Available Hours Used Hours % Ice Arena 263.50 263.50 27.83 100.00% 263.50 263.5 27.83 100.00% Prime Hours - Utilization Summary 1/1/2020 - 2/29/2020 / Mon, Tues, Wed, Thurs, Fri / 3:00 PM - 10:30 PM Ice Arena Hours Maint Utilize Facility Available Hours Used Hours % Ice Arena 322.50 293.17 28.83 90.90% 322.50 293.17 28.83 90.90% aoao 1Ce Prime Hours - Utilization Summary 1/1/2021 - 2/28/2021 / Sun, Sat / 7:00 AM - 10:30 PM Ice Arena, Sports Complex Facility Available Hours Used Ice Arena 279.00 Sports Complex 279.00 558.00 Prime Hours - Utilization Summary Maint Utilize Hours % 236.67 27.83 256.25 32.67 492.92 60.5 91.85% 1/1/2021 - 2/28/2021 / Mon, Tues, Wed, Thurs, Fri / 3:00 PM - 10:30 PM Ice Arena, Sports Complex Hours Maint Utilize Facility Available Hours Used Hours % Ice Arena 307.50 290.83 32.17 94.58% Sports Complex 307.50 271.25 35.75 88.21% 615.00 562.08 67.92 91.40% Prime Hours - Utilization Summary 1/1/2019 - 2/28/2019 / Sun, Sat/ 7:00 AM - 10:30 PM Court 1, Court 2, Court 3 Prime Hours - Utilization Summary 1/1/2019 - 2/28/2019 / Mon, Tues, Wed, Thurs, Fri / 3:00 PM - 10:30 PM Court 1, Court 2, Court 3 Facility Hours Hours Used Maint Utilize Facility Available Hours Used Hours % Court1 248.00 188.75 5.25 76.11% Court 2 248.00 193.00 5.00 77.82% Court3 248.00 189.25 7.50 76.31% 744.00 571 17.75 76.75% Prime Hours - Utilization Summary 1/1/2019 - 2/28/2019 / Mon, Tues, Wed, Thurs, Fri / 3:00 PM - 10:30 PM Court 1, Court 2, Court 3 Facility Hours Available Hours Used Maint Hours Utilize % Court 1 322.50 289.75 21.25 89.84% Court 2 322.50 282.00 21.00 87.44% Court 3 322.50 238.25 13.50 73.88% 967.50 810 55.75 83.72% Prime Hours - Utilization Summary 1/1/2020 - 2/29/2020 / Sun, Sat / 7:00 AM - 10:30 PM Court 1, Court 2, Court 3 Facility Available Hours Used Hours % Court1 263.50 194.50 6.00 73.81% Court 2 263.50 196.00 5.25 74.38% Court 3 263.50 197.00 9.00 74.76% Court 3 790.50 587.5 19.25 74.32% Prime Hours - Utilization Summary 1/1/2020 - 2/29/2020 / Mon, Tues, Wed, Thurs, Fri / 3:00 PM - 10:30 PM Court 1, Court 2, Court 3 qlc)'�o Q -c-;fo Hours Maint Utilize Facility Available Hours Used Hours Court 1 322.50 276.50 21.50 85.740/6 Court 2 322.50 265.00 21.50 82.17% Court 3 322.50 237.58 20.33 73.67% 967.50 779.08 63.33 80.53% qlc)'�o Q -c-;fo Prime Hours - Utilization Summary 1/1/2021 - 2/28/2021 / Sun, Sat / 7:00 AM - 10:30 PM Court 1, Court 2, Court 3, Court 4 Facility Hours Available Hours Used Maint Hours Utilize % Court 1 279.00 200.92 19.92 72.01% Court 2 279.00 200.17 18.92 71.74% Court 3 279.00 199.50 19.25 71.51% Court 4 279.00 164.25 13.75 58.87% Court 4 1,116.00 764.64 71.64 68.539/6 Prime Hours - Utilization Summary 1/1/2021 - 2/28/2021 / Mon, Tues, Wed, Thurs, Fri / 3:00 PM - 10:30 PM Court 1, Court 2, Court 3, Court 4 Hours Maint Utilize Facility Available Hours Used Hours Court 1 307.50 242.17 16.67 78.75% Court 2 307.50 232.67 16.42 75.66% Court 3 307.50 197.67 17.67 64.28% Court 4 307.50 207.17 13.42 67.37% 1,230.00 879.68 64.18 71.52% 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV TO: FROM: SUBJECT: DATE: Mayor and Councilmembers Jim Dickinson, City Administrator Discuss Transition from Andover Community Center Advisory Commission January 26, 2021 INTRODUCTION Council direction from the January 26th City Council workshop (January 26, 2021 City Council minutes attached) was to eliminate the Andover Community Center Advisory Commission, provide regular updates on the Andover Community Center (ACC) to the City Council, hold user group meetings twice a year at the staff level, and provide updates and a public comment opportunity at the Park and Recreation Commission at least twice per year. Direction was also to have more clarity in the financial reports and to present the budget in a way the Council would understand and to accommodate Council's interest in an efficient operation. Note: Administration has initiated a monthly ACC reporting, as part of a separate workshop agenda item Administration is providing an Andover Community Center (ACC) Financial Update to the Council. Also, a focus/discussion will be on Facility Utilization. Administration would like to clarify the January 26" Council direction relative to the transition from to the Andover Community Center Advisory Commission toward an Administradon/DepartmentHead relationship along with the Councils desired level of Park & Recreation Commission involvement and oversight. DISCUSSION Park & Recreation Commission Input: Recently the Park & Recreation Commission discussed the topic "Andover Community Center/Goals and Roles of the Park and Recreation Commission" (draft March 4, 2021 Park & Recreation Commission minutes are attached) and how they would perceive their role with the Community Center: The Park & Recreation Commission discussed may options of information they are looking for and reached consensus on the following (from the minutes): • Quarterly financial report o Profit and loss statements o Comparison from last year o Year to date budget status Monthly updates from ACC staff o Activities and events that are coming up. o Activities and events that just wrapped up. o New events, items of note, and highlights o Usage numbers o Utilization rate of facilities The Park & Recreation Commission identified the following areas of responsibility for the Park and Recreation Commission and ACC: • Provide guidance and input on activities and rentals. • Policy setting and policy oversight. • Reviewing information on what is programmed, how it is programmed, and the related budget items. • Reviewing rink and gym scheduling just as they review and approve field schedules. The Park & Recreation Commission also identified the following as areas of improvements in the relationship between the ACC, the Commission, and the public: • Increase in communication from the ACC. • Transparency with the budget and City subsidy — what do residents get for their money? • Change the perception that hockey runs the ACC. • More detailed information about the ACC provided to the public. • More space in the City Newsletter for the ACC Administration Input: Much of the information identified as desired by the Park & Recreation Commission above is currently available and can be provided to the Commission as it is available. Some items are as simple as individual Commissioners regularly viewing ACC social media platforms, other information can be provided by written updates and verbal updates at Commission meetings. Administration is in the process of working with the Recreation Facility Manager to develop an activities' update that can be utilized to inform Administration weekly, the Council monthly and the Parks & Recreation Commission Quarterly. The goal is to do this in a way that does not provide an added reporting burden. Administration anticipates the same reporting method can be CS) utilized to cover all. For instance, ACC currently provides a weekly update to Administration, Administration could use that format to update the Council and the Commission. Administration is committed to working with ACC Recreation Facility Manager to host user group meetings at least twice a year at the staff level. Administration is committed to working with ACC Recreation Facility Manager to provide updates to the Council and Commission monthly. Administration is committed to working with ACC Recreation Facility Manager to coordinate public comment opportunities by working collaboratively with the Park and Recreation Commission staff liaison and the Commission. COUNCIL DISCUSSION REQUESTED: Administration would like the Council to provide direction regarding the Councils' desired level oiPark & Recreation Commission involvement and oversight related to ACC policy setting and operations. nitted, am Andover City Council Workshop Meeting Minutes — January 26, 2021 Page 7 utilize excess density from any approved developments in the future and reallocate extra units to these properties. For example, if a development came in 10 units over the minimum density of its district, those 10 units could be reallocated to a different property so that it may develop at a lesser density. Mr. Janish presented the language in the amendment asked Council for their feedback. Mr. Dickinson stated the properties that are going to present density problems are parcels with 10 acres or less. He said larger parcels have more flexibility and can reach higher density rates to make up for the smaller parcels. Councilmember Barthel stated he is fine with the amendment because it gives Council flexibility. Mayor Bukkila stated she does not like it when the City has worked so hard to reach the required Comprehensive Plan objectives and asked why the City bends to the Met Council. Mr. Dickinson stated he advocates for the City to have the authority to develop as Council sees fit. The Met Council requires cities to have a minimum of 3 units per acre and Andover is exactly at 3 units per acre, Met Council would likely look at it differently if our Comprehensive Plan was slightly higher than 3.0. Mayor Bukkila stated she does not like the fact that if one landowner cannot develop at the 2.4 units per acre, then another landowner has to make up for that difference. Mr. Janish stated the bigger the development, the more flexibility there is. Mr. Janish stated the City is going to use the density the developers already have in their plan, place the extra in a "bank", and use the excess density to offset the loss in smaller developments. Councilmember Butler commented that this amendment prevents the need to ask for a Comprehensive Plan Amendment with every development that is below the minimum density. Mr. Dickinson stated that is the intent. Mr. Janish stated staff will track this process and report back to the Met Council on how it is working. Mr. Dickinson stated tackling the density requirement will be easier when the Rural Reserve gets sewer and water. The Council reached consensus to move forward with the Comprehensive Plan Amendment. Mayor Bukkila recessed the meeting at 7:55 p.m. Mayor Bukkila reconvened the meeting at 8:10 p.m. DISCUSS COMMUNITY CENTER COMMISSION BY-LAWS Mr. Dickinson explained he received feedback prior to the January 5a' City Council meeting about redefining the purpose of the Andover Community Center Advisory Commission. He indicated now would be a good time to make changes as new members are to be appointed to the Commission. Council direction was to review the by-laws and identify by-law changes. Mr. Dickinson explained the membership, terms, and purpose of the Commission and stated the City struggles with getting members from the business community. IN Andover City Council Workshop Meeting Minutes — January 26, 2021 Page 8 Mayor Bukkila stated the Commission is a group of Community Center users and not necessarily taxpayers. She said the Commission should have the purpose to serve the taxpayers and have a transparent perspective. She stated she does not have a solution, does not know if it is functional the way it is, and if it is purposeful. Mayor Bukkila stated the amount of information she has received has been inadequate. She said she does not get a full review of the fees at the Council level. Councilmember Butler stated there is a lot of time spent on fee review on the Commission. He said the purpose of the Commission has changed and suggested the Council review the Community Center budget and fees. He stated the Community Center Commission could function as an advisory board to provide recommendations for programs. Councilmember Barthel asked if the Community Center Advisory Commission is needed and can the Community Center operate as other City Departments, under the supervision of the City Administrator and reviewed by the Council. Mayor Bukkila stated she can see the users wanting to meet with the Community Center Manager. She said there is a purpose to bring in more revenue. Mayor Bukkila would like the taxpayers to have representation in fees and program ideas. Councilmember Nelson stated there are people who have good ideas for revenue so the Community Center can be successful. Mayor Bukkila stated it can be operated as a task force with members from the Council and public. Councilmember Barthel suggested having the task force include other Commissions such as parks and open spaces. Mayor Bukkila stated the parks have their own Commission and the public can address their ideas there. Councilmember Holthus asked if Council was suggesting the Community Center Advisory Commission should operate in the same manner as the Park & Recreation and Planning & Zoning Commissions with an open forum and public meeting. Mayor Bukkila replied it is more about what is the Community Center Advisory Commission's purpose, what the Council wants from them, and what Council wants on their shoulders. Councilmember Holthus asked how other cities operate and if they have Community Center Advisory Commissions. Mr. Dickinson stated it is rare and other cities invite the groups or residents to a meeting if they need input. Mayor Bukkila stated that is more of what she envisions. She agreed there could be stakeholders meeting. Mayor Bukkila suggested inviting organizations to meetings if they or the City felt the need. C�) Andover City Council Workshop Meeting Minutes —January 26, 2021 Page 9 Councilmember Butler suggested having the Park and Recreation Commission hold Community Center meetings once or twice per year to solicit input and provide recommendations and have user group meetings with the Community Center staff. Mayor Bukkila said there can be a list of Community Center users that are invited to these meetings. Councilmember Holthus asked how the City defines who is the leader of each group and will groups be missing out if there is not a formal organization or leader to speak from them. Mayor Bukkila said there will always be some hit and miss in finding stakeholders and the City needs to make their best effort to reach them. Councilmember Holthus asked what makes the Community Center Advisory Commission not sufficient. Mayor Bukkila stated the focus needs to be on being as profitable as possible. She stated the outside perspective is that users are running the Community Center and they are not looking out for the taxpayer interest. Councilmember Butler stated that could be a perception, but it is not reality. He said the user fees are set through research of other cities and set by the Advisory Commission. He suggested changing the perception by having the City Council approve the fees. Mr. Dickinson stated the Community Center is at the higher range of rates when compared with other facilities. Councilmember Bukkila said the perception is hockey is making all the decisions. She stated if a policy is a good business decision and in the best interest of the community, it makes sense. Councilmember Butler asked if the Community Center is a business or a community center. He gave the example of giving up some rental time in the field house to hold voting. He stated adding turf broadens the user groups and number residents using the Community Center. He supports the Community Center operating as efficiently as possible and asked if it is more important to broaden the user groups or to make more money. Councilmember Nelson stated he sees it as both, bringing in revenue and serving the community. Councilmember Barthel stated the Community Center is both revenue and community driven. He asked if the City needs a Community Center Advisory Commission or if the decision-making role can go to the City Council level. Councilmember Barthel stated the discussion tonight leads him to believe the City does not need an advisory commission. He suggested having two sessions a year to gather public input by community center staff. Andover City Council Workshop Meeting Minutes —January 26, 2021 Page 10 Councilmember Butler asked if the Council wanted an advisory commission, the Council, or staff to make decisions such as allowing voting at the Community Center. Councilmember Barthel responded that if Council wants staff to make the decisions, the Council needs to set the strategy and be clear on what they believe in. Mr. Dickinson stated the area where the City does not make money but spends money is after school programs. He said after school programming saves on public safety costs. Mr. Dickinson asked if the Council wants to make decisions at their level, the Park Commission, Community Center Advisory Commission, or some other way. Mr. Dickinson stated one of his goals is to have fewer meetings and he is looking to simplify the process. He stated the Community Center Manager is reporting to too many different entities: the users, the Advisory Commission, the City Administrator, and the City Council. The Community Center Manager is put in a tough position and other department heads are not put in that position. Mr. Dickinson suggested going to quarterly meetings if Council decided to maintain the Advisory Commission. He stated the City needs a mechanism to reach out to user groups and those that are unheard. Mayor Bukkila stated she is leaning towards no longer having an advisory commission for the Community Center and to elevate decisions to the Council. She said recreational aspects and community input can go to the Park & Recreation Commission. Councilmember Holthus agrees with Mayor Bukkila that the Park & Recreation Commission can take on the Community Center recreational aspect. She stated the Park and Recreation Commission can reach out to stakeholders. The Community Center Manager and the Parks Supervisor can partner at meetings. Councilmember Holthus said there are members on the Community Center Advisory Commission that would be ideal to serve on the Park and Recreation Commission. She asked if the number of members on the Park Commission can be increased because their role will change drastically by adding on the Community Center or change it over time. Councilmember Barthel stated it may be better to get rid of the Community Center Advisory Commission because they will be constantly changing the membership due to users of the Community Center changing. Mr. Sutherland stated he has struggled bringing items to the Advisory Commission and they were needed more when the Community Center first opened and during the expansion discussion. He could see meeting a couple times a year but does not see the need to be involved monthly or twice a month. He does like the idea of pulling in user groups once or twice a year. Mr. Sutherland suggested staff present Community Center updates at a Council workshop at least once per year. Mayor Bukkila polled Council on keeping the Community Center Advisory Commission. Andover City Council Workshop Meeting Minutes — January 26, 2021 Page 11 Councilmember Holthus stated Mr. Sutherland is correct that there is not much on the Advisory Commission meetings and many members missed meetings. She suggested merging the Community Center Advisory Commission with the Park and Recreation Commission. She wants to ensure the stakeholders are being heard and an opportunity to have a public forum. She said there is value in having a citizen group, but they do not need to meet monthly. Councilmember Holthus stated she would like to start having joint meetings with the City Commissions again. She summarized her position stating the Community Center Advisory Commission does not need to continue as they are now. Councilmember Butler stated his answer depends on how the Advisory Commission is replaced. The two important things are the opportunity for public forum and a user group meeting. He suggested the public forum be conducted by the Park and Recreation Commission and the user group meeting conducted by staff. Councilmember Nelson said it is good for the community to have input. He said the Advisory Commission can provide input by meeting less often. Councilmember Barthel stated no. Mayor Bukkila stated the Council has come to a consensus to eliminate the Community Center Advisory Commission. Council agrees that stakeholders should meet with the Community Center Manager twice yearly or as needed. She stated recreational opportunities can be communicated to the Park & Recreation Commission and financial or policy concerns should be brought to the City Council. Mr. Sutherland replied he is nervous about the Park Commission piece as they have been operating outside the Park Commission for 15 years. He asked how he should decide what goes to the Park Commission and what authority do they have. He said he would like the process to be clear. Mr. Dickinson stated a mechanism for residents needs to be implemented. He stated he envisions user group meetings twice per year. Mr. Dickinson envisions the Park and Recreation Commission receiving updates and discussing collaboration instead of making decisions about what is done in the building. Mayor Bukkila sees the Park and Recreation as the mechanism for public input. Mr. Dickinson said there will be input at the park and rec level but the most input is received at user group meetings. Councilmember Butler said part of the agenda can be a public forum when staff presents Community Center updates at the Park and Recreation Commission. He stated it would be a collaboration between the Community Center and the Park and Recreation Commission. Mayor Bukkila stated she likes that idea. 6 Andover City Council Workshop Meeting Minutes —January 26, 2021 Page 12 Mr. Sutherland stated he is okay with meeting with the Park & Recreation Commission once or twice per year. He said communication with user groups happen daily or weekly and does not know how a formal meeting would move forward because of the current frequent communication, but those meetings could identify other users. Mayor Bukkila suggested moving this forward as a pilot program to see if the meetings are productive. Mr. Dickinson stated he would attend the user group meetings with Mr. Sutherland. Mr. Dickinson will bring regular Community Center updates to the City Council much the same as he does for other city operations. Mayor Bukkila said she would like clarity in the financial reports and asked Mr. Dickinson to present the budget in a way the Council would understand. Mr. Dickinson stated staff will work to present the budget to accommodate Council's interest. Mayor Bukkila said she wants to see the revenues, expenditures, and what the taxpayers are paying for. She said Council can then decide if they are comfortable with the numbers or if they need to take action to reduce the loss. The Council reached consensus eliminate the Community Center Advisory Commission, provide regular updates to the City Council, hold user group meetings twice a year at the staff level, and provide updates and a public forum at the Park and Recreation Commission twice per year. ADJOURNMENT Motion by Barthel, Seconded by Butler, to adjourn. Motion was taken by roll call. Councilmember Barthel - aye Councilmember Butler— aye Councilmember Holthus - aye Councilmember Nelson - aye Mayor Bukkila -aye Motion carried unanimously. The meeting adjourned at 9:17 p.m. Respectfully submitted, Shari Kunza, Recording Secretary TimeSaver Off Site Secretarial, Inc. Andover Park & Recreation Commission Workshop Meeting Minutes — March 4, 2021 L)TA ' Page 3 C91 DISCUSS ANDOVER COMMUNITY CENTER/GOALS AND ROLES OF THE PARK AND RECREATION COMMISSION Commissioner Strombeck explained that 50% of Park Dedication fees of each year go to the Andover Community Center (ACC) until the $1M is paid. She stated that the City Council should have financial oversight and she thinks the Commission should have some oversight as well. She would like the Commission to receive financial reporting and has asked for it but has been told Mr. Sutherland is busy. Commissioner Strombeck wants to bridge the island from the ACC. She feels Mr. Sutherland doesn't need to provide all the updates and can delegate to other staff. She feels that more information from a variety of ACC staff members is better than random paragraphs currently provided. Commissioner Strombeck stated there is a breakdown in communication and the current system is not working. Chair Lindahl agreed there should be a partnership, but the Commission doesn't have its own staff to fulfill those duties. Commissioner Stenzel stated everyone knows when Andover football or baseball schedules get approved because it comes before the Park and Recreation Commission. He said the community doesn't know what is going on in the ACC because it doesn't get approved by a resident board. Commissioner Stenzel said Mr. Haas and Mr. Seeger provide maintenance updates at every meeting and he would like to see the same thing from the ACC. Commissioner Roth said that if he is asked what is going on at the ACC, he wouldn't know, because he is not getting the information. Commissioner Stenzel expressed the Commission is tasked to oversee Parks and Recreation and feels the ACC should fall under its umbrella in some manner. Mr. Haas recommended updating the role of the Park and Recreation Commission. Commissioner Strombeck stated the Commission is not looking to micromanage but now that the ACC is growing, there should be more people at the table. She feels residents should be more informed than a small paragraph in the newsletter. Commissioner Stenzel said the Commission is not trying to be a boss but trying to give guidance. He thinks the community would like that type of oversight. Commissioner Lindahl stated the Commission wants input and the opportunity to exchange ideas and not authority over the ACC. Commissioner Strombeck said she is looking for an exchange of information. Her intent is to help wherever she can, help the community grow, and make information more accessible. Commissioner Strombeck stated that quarterly reports were offered but she is not interested in them. She would like the information to be current and fresh. She is not looking for operational costs but for general numbers and a plan in place to have the ACC debt reduced. Andover Park & Recreation Commission Workshop Meeting 1 Minutes —March 4, 2021 Page 4 Chair Lindahl asked the Commission what type of information they were interested in receiving. Commissioner Roth stated reporting on what happened in the past is useless. He explained it's good to know and serves a purpose, but the leading metrics are the most important. He further explained that knowing if the ACC is on goal, behind, or ahead is helpful. He stated knowing the status of projected activity is helpful. Commissioner Roth would like regular updates from the ACC. The Commission discussed may options of information they are looking for and reached consensus on the following: • Quarterly financial report o Profit and loss statements o Comparison from last year o Year to date budget status • Monthly updates from ACC staff o Activities and events that are coming up o Activities and events that just wrapped up o New events, items of note, and highlights o Usage numbers o Utilization rate of facilities The Commission identified the following areas of responsibility for the Park and Recreation Commission and ACC: • Provide guidance and input on activities and rentals • Policy setting and policy oversight • Reviewing information on what is programmed, how it is programmed, and the related budget items • Reviewing rink and gym scheduling just as they review and approve field schedules The Commission identified the following as areas of improvements in the relationship between the ACC, the Commission, and the public: • Increase in communication from the ACC • Transparency with the budget and City subsidy — what do residents get for their money? • Change the perception that hockey runs the ACC • More detailed information about the ACC provided to the public • More space in the City Newsletter for the ACC Mr. Haas stated the Council will review the Commission's notes and discuss roles and responsibilities at the March 23 City Council Workshop. Chair Lindahl directed the discussion to the area of recreation programming. Commissioner Stenzel asked if there is capacity to have the discussion about programming beyond the Community Center and in the neighborhood parks. He stated there are lots of Andover Park & Recreation Commission Workshop Meeting Minutes — March 4, 2021 Page 5 opportunities and the parks are underutilized. Commissioner Stenzel asked if the Commission should get involved in programming. He identified day camps, community ed classes, summer camps, and structured programs as recreational opportunities. Mr. Haas explained the City Council would need to discuss any recreation program expansion as it would involve the addition of staff. Commissioner Stenzel stated there is programming in the ACC, but nothing is programmed outside of the building. Mr. Haas explained the ACC programs within its building and anything in the parks is directed through the Public Works Department. Chair Lindahl suggested the parks and recreation programming should be intertwined. Commissioner Stenzel stated there is a disconnect in recreation programming in the City and questioned if the residents are receiving what they are paying for. The Commission asked what ACC staff were doing in the summer if usage in the ACC drops during the warmer months. They asked if the ACC staff could offer summer programs when they are less busy inside. ADJOURNMENT Motion by Stenzel, seconded by Roth, to adjourn the meeting at 9:30 p.m. Motion passed unanimously. Respectfully Submitted, Shari Kunza, Recording Secretary TimeSaver Off Site Secretarial, Inc. 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 . (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV TO: FROM: SUBJECT: DATE: Mayor and Councilmembers Jim Dickinson, City Administrator December 2020 re -audit General Fund Budget Progress Report March 23, 2021 10. INTRODUCTION The City of Andover 2020 General Fund Budget contains a total revenue budget of $11,853,624 and total expenditures of $13,209,784. The final 2020 expenditure budget reflects an increase of $160,000 that was carried forward from 2019, amendments approved throughout 2020, and then reduced by $182,500 that will be carried forward to 2021. DISCUSSION Attached is the General Fund Budget Summary Totals - Budget Year 2020, reflecting (pre- audit/preliminary) year to date actuals through December 2020. Also provided is a General Fund Budget Summary Totals - Budget Year 2021 through February 2021 reflecting the adopted 2021 budget with 2020 carry forwards (Facility Management $55,000, Fire Department $25,000, Streets $15,000, Parks Maintenance $85,000, and Natural Resources Preservation $2,500)• The following represents Administration's directives and departmental expectations for 2020: 1. Expenditure budgets while approved, expenses are to meet with the spirit that needs are fulfilled first, expansions of service and special requests are to be reviewed with City Administration before proceeding. 2. Departments are to be committed to search for the best possible prices when purchasing goods and services. 3. Departments are to be committed to continually searching out new efficiencies and to challenge the status quo of how the City provides services. 4. Departments are to be committed to searching out collaborative opportunities to facilitate efficient and cost-effective utilization of governmental assets and personnel. 5. Departments are to be committed to developing effective, consistent and ongoing communications with City residents, businesses and other stakeholders. 6. Departments are to be cognizant that services provided are subject to available revenues and should not commit to services that are not sustainable. ACTION REQUESTED Receive a brief presentation and discuss the December 2020 (pre -audit) General Fund Budget ?ogress Report. submitted, Jim CITIOF ANDOVER General Fund Budget Summary Totals Budget Year 2020 Preliminary 2019 2020 REVENUES Budget Dec YTD %Bud Audit Budget Dec YTD %Bud General Property Tax $ 9,023,970 $ 8,864,720 98% $ 8,864,720 $ 9,392,032 $ 9,303,234 99% Licenses and Permits 384,900 855,831 222% 855,831 410,900 892,279 217% Intergovernmental 787,918 822,128 104°/ 822,128 839,694 861,178 103% Charges for Services 708,700 1,133,161 160% 1,133,161 736,210 1,070,899 145% Fines 75,250 62,349 83% 62,349 75,250 47,630 63% Investment Income 75,000 208,958 279% 208,958 75,000 148,974 199% Miscellaneous 134,300 192,058 143% 192,058 133,850 172,062 129% Transfers In 188,008 188,008 100% 188,008 190,688 190,688 100% Total Revenues S 11,378 046 S 12,327 213 108% $ 12,327 213 $ 11,853,624 $ 12 686,944 107 Total Expenditures $ 11,740,993 $ 11,100,098 95% $ 11,100,098 $ 13,209,784 $ 12,395,889 94% NET INCREASE (DECREASE) $ (362,947) $ 1,227,115 $ 1,227,115 S (1,356,160) S 291,055 2019 2020 EXPENDITURES Budget Dec YTD %Bud Audit Budget Dec YTD %Bud GENERAL GOVERNMENT Mayor and Council $ 107,751 $ 99,001 92% $ 99,001 $ 108,315 $ 95,519 88% Administration 215,952 211,898 98% 211,898 227,334 187,757 83% Newsletter 26,800 25,022 93% 25,022 25,000 22,156 89% Human Resources 28,771 15,843 55% 15,843 34,100 16,180 47% Attorney 197,041 191,782 97% 191,782 200,941 195,721 97% City Clerk 163,651 160,184 98% 160,184 170,000 166,221 98% Elections 65,640 20,452 31% 20,452 99,182 91,643 92% Finance 290,752 280,198 96% 280,198 308,356 294,502 96% Assessing 154,000 149,033 97% 149,033 159,000 154,482 97% Information Services 187,743 169,828 90% 169,828 194,725 187,703 96% Planning & Zoning 456,887 412,282 90% 412,282 490,296 453,133 92% Engineering 575,968 561,643 98% 561,643 605,481 566,224 94% Facility Management 695,944 547,400 79% 547,400 640,134 475,088 74% Total General Gov 3,166,900 2,844,566 90% 2,844,566 3,262,864 2,906,329 89% PUBLIC SAFETY Police Protection 3,183,610 3,183,610 100% 3,183,610 3,245,518 3,114,623 96% Fire Protection 1,471,101 1,391,251 95% 1,391,251 1,522,370 1,508,852 99% Protective Inspection 479,543 493,955 103% 493,955 507,910 519,183 102% Civil Defense 29,184 18,609 64% 18,609 29,936 17,227 58% Animal Control 5,950 4,367 73% 4,367 5,950 2,347 39% Total Public Safety 5169,388 5,091,792 98% 5,091,792 5,311,684 5,162,232 97% PUBLIC WORKS Streets and Highways 696,225 615,450 88% 615,450 733,070 686,989 94% Snow and Ice Removal 586,375 703,647 120% 703,647 631,937 496,668 79% Street Signs 227,527 202,995 89% 202,995 235,124 257,280 109% Traffic Signals 39,500 26,421 67% 26,421 40,000 23,044 58% Street Lighting 40,400 32,716 81% 32,716 40,400 34,211 85% Street Lights - Billed 180,500 145,604 81% 145,604 180,500 152,181 84% Park & Recreation 1,352,017 1,180,501 87% 1,180,501 1,472,590 1,426,232 97% Natural Resource Preservation 18,107 16,831 93% 16,831 11,716 9,821 84% Recycling 168,626 224,574 133% 224,574 193,971 228,124 118% Total Public Works 3,309,277 3,148,739 95% 3,148,739 3,539,308 3,314,550 94% OTHER Miscellaneous 56,828 6,501 11% 6,501 1,056,828 1,003,778 95% Youth Services 38,600 8,500 22% 8,500 39,100 9,000 23% Total Other 95,428 15,001 16% 15,001 1,095,928 1,012,778 92% Total Expenditures $ 11,740,993 $ 11,100,098 95% $ 11,100,098 $ 13,209,784 $ 12,395,889 94% NET INCREASE (DECREASE) $ (362,947) $ 1,227,115 $ 1,227,115 S (1,356,160) S 291,055 CITY OF ANDOVER General Fund Budget Summary Totals Budget Year 2021 2020 2021 REVENUES Budget Feb YTD %Bud Pre - Audit Budget Feb VTD %Bud General Property Tax $ 9,392,032 $ - 0% $ 9,303,234 $ 9,594,493 $ - 0% Licenses and Permits 410,900 87,397 21% 892,279 436,450 74,834 17% Intergovernmental 839,694 220,174.00 26% 861,178 819,874 200,183 24% Charges for Services 736,210 159,949 22% 1,070,899 752,360 86,973 12% Fines 75,250 5,268 7% 47,630 50,250 5,076 10% Investment Income 75,000 (41,073) -55% 148,974 75,000 (31,430) -42% Miscellaneous 133,850 14,559 II% 172,062 138,850 12,145 9% Transfers In 190,688 190,688 100% 190,688 212,031 212,031 100% Total Revenues S 11,853 624 S 636,962 5% S 12,696,944 $ 12,079 308 S 559,812 5% 2020 2021 EXPENDITURES Budget Feb YTD %Bud Pre - Audit Budget Feb YTD %Bud GENERAL GOVERNMENT Mayor and Council $ 108,315 $ 35,068 32% $ 95,519 $ 108,015 $ 34,735 32% Administration 227,334 33,556 15% 187,757 236,244 34,219 14% Newsletter 25,000 1,725 7% 22,156 25,000 3,695 15% Human Resources 34,100 7,270 21% 16,180 35,202 7,656 22% Attorney 200,941 16,317 8% 195,721 206,941 16,607 8% City Clerk 170,000 28,516 17% 166,221 176,206 28,197 16% Elections 99,182 2,456 2% 91,643 74,212 2,000 3% Finance 308,356 61,306 20% 294,502 320,768 70,001 22% Assessing 159,000 - 0% 154,482 161,000 - 0% Information Services 194,725 32,668 17% 187,703 213,738 32,109 15% Planning & Zoning 490,296 68,435 14% 453,133 504,204 70,125 14% Engineering 605,481 91,290 15% 566,224 631,401 88,411 14% Facility Management 640,134 64,443 10% 475,088 738,197 65,787 9% Total General Gov 3262,864 443,050 14% 2,906,329 3,431,128 453,542 13% PUBLICSAFETY Police Protection 3,245,518 811,380 25% 3,114,623 3,287,046 821,761 25% Fire Protection 1,522,370 206,615 14% 1,508,852 1,593,602 187,450 12% Protective Inspection 507,910 91,021 18% 519,183 533,561 74,408 14% Civil Defense 29,936 4,850 16% 17,227 26,844 4,067 15% Animal Control 5,950 200 3% 2,347 5,950 - 0% Total Public Safety 5,311 684 1,114,066 21 % 5,162,232 5,447 003 1,087,686 20% PUBLIC WORKS Streets and Highways 733,070 84,802 12% 686,989 788,241 107,974 14% Snow and Ice Removal 631,937 171,706 27% 496,668 675,888 159,410 24% Street Signs 235,124 32,711 14% 257,280 240,842 25,396 11% Tragic Signals 40,000 1,388 3% 23,044 40,000 1,868 5% Street Lighting 40,400 2,746 7% 34,211 40,400 3,022 7% Street Lights - Billed 180,500 10,085 6% 152,181 180,500 13,755 8% Park & Recreation 1,472,590 173,923 12% 1,426,232 1,600,640 165,676 10% Natural Resource Preservation 11,716 385 3% 9,821 16,883 299 2% Recycling 193,971 31,355 1694. 228,124 233,759 39,781 17% Total Public Works 3,539,308 509,101 14% 3,314,550 3,817,153 517,181 14% OTHER Miscellaneous 1,056,828 - 0% 1,003,778 56,828 - 0% Youth Services 39,100 - 0% 9,000 39,100 - 0% Total Other 1,095,928 0% 1,012,778 95,928 0% Total Expenditures $ 13,209,784 S 2,066,217 16% S 12,395,889 S 12,791,212 S 2,058,409 16% NET INCREASE (DECREASE) S (1,356,160) $ (1,429,255) $ 291,055 $ (711,904) S (1,498,597)