Loading...
HomeMy WebLinkAboutMarch 4, 2021• 1685 CROSSTOWN BOULEVARD N.W.. ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV Regular Park & Recreation Commission Meeting March 4, 2021 7:00 P.M. Meet at Andover City Hall 1. Call to Order 2. Resident Forum 3. Approval of Minutes (2/18/21) 4. Agenda Approval 5. Review of Pickleball Court Cost Estimate Report/WSB/21-15 6. Reschedule March 18, 2021 Meeting 7. Outstanding Items 8. 9. Chair's Report 10. Adjournment 7:15 P.M. Or Shortly Thereafter Workshop Session A. Constance Free Church Vison/Best Use of the Site/Station 19 B. Review of Final Draft for Future Improvements Zones A-D/2020 Existing and Future Park Facilities Chart C. Discuss Andover Community Center/Goals & Role of the Park and Recreation Commission D. Adjournment Note: Some or all members of the Andover Park and Recreation Commission may participate in the March 4, 2021 Park and Recreation Commission meeting by telephone or video conference rather than by being personally present at the Park and Recreation Commission regular meeting place at the Andover City Hall, 1685 Crosstown Boulevard NW, Andover, MN 55304. Members of the public can physically attend, although there is very limited seating in the City Council Chambers as appropriate social distancing will be done by the Commission and visitors. 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 - (763) 755-5100 FAX (763) 755-8923 - WWW.ANDOVERMN.GOV To: Park and Recreation Commission CC: David D. Berkowitz, Director of Public Works/City Engineer From: Todd J. Haas, Assistant Public Works Director Subject: 5. Review of Pickleball Court Cost Estimate Report/WSB/21-15 Date: March 4, 2021 The Park and Recreation Commission is requested to review the Andover Outdoor Pickleball Study prepared by WSB, Project 21-15. DISCUSSION A copy of the pickleball study is in the side pocket of the packet for your review. Three potential locations (City Campus, Prairie Knoll Park, and Pine Hills North Athletic Facility) were previously identified by the City Council this past January. WSB has identified in the study the pros and cons including estimates for a 6-court and for an 8-court facility at City Campus and Pine Hills North Athletic Facility. Also identified in the study includes the pros and cons along with the estimate for a 6-court facility within the existing hockey rink at Prairie Knoll Park. The report is anticipated be presented to the City Council at the end of March for their consideration. ACTION REQUESTED The Park and Recreation Commission is requested to review the pickleball study and recommended the location of the facility, number of courts that should be constructed along with any amenities such as a shelter, lighting of the courts and/or a drinking fountain that should be considered. Respectfully submitted, Todd J. Haas Attachments: Outdoor Pickleball Study (located in the side pocket of the packet) • i r1► ,V. 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV To: Park and Recreation Commission CC: David D. Berkowitz, Director of Public Works/City Engineer From: Todd J. Haas, Assistant Public Works Director Subject: 6. Reschedule March 18, 2021 Meeting Date: March 4, 2021 INTRODUCTION The Park and Recreation Commission is requested to consider rescheduling the March 18, 2021 meeting. DISCUSSION The rescheduling of the meeting is dependent on if any of the Park and Recreation Commission members are on vacation the week of March 15". The Anoka Hennepin School District will be on break the week of March 15s' so it may be necessary to reschedule the March 18t6 meeting to March 25w to approve the 2021 spring -summer schedules for use of fields. The Commission does have the option of postponing the approval of the schedules until the April I' since there will be a meeting to review the survey results of Wild Iris Park. If the Commission recommends scheduling the meeting on April 1', the March 18s' meeting will be posted as canceled and staff will contact the associations about the rescheduling of the meeting. ACTION REQUESTED The Park and Recreation Commission is requested to consider rescheduling the March 18, 2021 meeting. Respectfully submitted, _A�1 Todd J. Haas 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 . (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV TO: Park & Recreation Commission CC: David D. Berkowitz, Director of Public Works/City Engineer FROM: Todd J. Haas, Asst. Public Works Director --re SUBJECT: 7. Review Outstanding Items/Maintenance Update DATE: March 4, 2021 Issues list as of 2/26/21 UPDATE OFANDOVER COMMUNITY CENTER — Commissioner Strombeck will provide an update at the meeting. COMPLETED PROJECTS — ON -GOING PROJECTS - • Update of Park Dedication Improvement Fund Quarterly Report — Next quarterly report is scheduled in April. • Update of Ouarterly Sheriffs Department Report on Park Patrol & Vandalism — Next quarterly report is scheduled in April. • Prairie Knoll Park North Parking Lot Improvements — The bid opening is scheduled for March 31, 2021. As far as lighting of the north parking lot, it has been approved by City Council to install 5 Traditionaire Security Lights as per the original plan. The lights will be installed as part of the construction of the parking lot by Connexus Energy. • Update of the 2021 Park Dedication Study — Item is on the workshop portion of the agenda to review the most updated draft of Zones A-D before it is presented to the City Council for their review. City Council has approved the park dedication fee of $4400 per unit for 2021. • Sunshine Park Playground Equipment Replacement — The playground equipment has been ordered. It will take 6-8 weeks to be delivered. Installation will be done by Parks Maintenance staff. • Hawkridae Park Plavground Equipment Replacement — The playground equipment has been ordered. It will take 6-8 weeks to be delivered. Installation will be done by as a neighborhood community build. • Woodland Meadows Park Plavground Equipment Replacement — The playground equipment has been ordered. It will take 6-8 weeks to be delivered. Installation will be done by as a neighborhood community build. • Wild Iris Park Playground Equipment Replacement — As mentioned at the last meeting on February 4 h, the Parks Maintenance Department has received approval to carryover $50,000 from 2020 to 2021 for playground equipment replacement. Staff has notified the neighborhood about participating in survey and to see if any of the neighbors are interested in helping in the selection of the new equipment. The neighborhood has been invited to discuss the results of the survey at the April 1, 2021 meeting. • Bike Youth/Trail — The tree and brush removal has been completed. Signage identifying the rules/guidelines and direction of travel will be made over the winter with installation to be done sometime in the spring. To keep the bikers from crossing and damaging the maintained lawn areas by the Well Pumphouse #6, a fence may need to be installed. The trail entrance will be located most likely on the east side of the wooded area by the existing paved trail and parking lot area. • Pickleball Update — Item is on the agenda. City Staff will be presenting the report and cost estimates based on the 3 locations that were identified by the City Council. ON -HOLD PROJECTS — None at the time. OTHER ITEMS OFINTEREST — • Update of Pedestrian Trails: Trails that are planned to be reconstructed: ❖ 2021 — Tom Anderson Trail (along Coon Creek east of Hanson Blvd) 2022 -- Kelsey Round Lake Park Trail (Note: The reconstruction of the trail will most likely be pushed out for reconstruction for another 3-5 years) The City Council has reviewed the engineering consultant analysis report recently regarding proposed Railroad Underpass trail to connect internal developments from Winslow Cove 2"d Addition to the east side of the railroad to determine if the project is feasible. Staff has been discussing with a potential developer regarding a possible cost share to construct the railroad underpass. • Update of Scheduling Park and Recreation Commission meeting at a City Park or Facility — The Commission will need to determine if you would like to have a meeting at one of the City parks in 2021. If you have any questions or comments regarding any of the items mentioned above or any items relating to parks or projects, feel free to contact Todd Haas or Dave Berkowitz at the City. Staff recommends the Commission continue reviewing the City Council meeting minutes that you receive by e-mail as to discussions of various projects the City Council has been working on or is considering. Note: If you have any items that you would like to add to the list, let me know at the meeting. Weekly Parks Maintenance Update(Terry eegerl 02/12/21 • Completed trash and recycling service for all parks and trails. • Snow Removal of parking lots and trails, as needed. • Cleaned and serviced snow removal equipment. • Continued servicing and flooding outdoor ice rinks. • Cleaned extra Public Works storage racks to be moved to the 2" floor of Sunshine Building. 02/19/21 • Completed trash and recycling service for all parks and trails. • Snow removal of parking lots and trails, as needed. • Cleaned and serviced snow removal equipment. • Continued servicing and flooding outdoor ice rinks. • Reorganized shop equipment. 1685 CROSSTOWN BOULEVARD N.W.. ANDOVER, MINNESOTA 55304 . (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV TO: Park & Recreation Commission CC: David D. Berkowitz, Director of Public Works/City Engineer FROM: Todd J. Haas, Assistant Public Works Director SUBJECT: A. Constance Free Church Vision/Best Use of the Site/Station 19 DATE: March 4, 2021 Station 19 Architects, Inc. has requested to be on the agenda to discuss the vision of Constance Free Church. DISCUSSION Nicole Thompson of Station 19 Architects, Inc. will be attending the meeting to discuss this with the Park and Recreation Commission. Attached are examples of potential questions that may be asked by Station 19 Architects, Inc. ACTION REQUIRED The Park and Recreation Commission is requested to review the potential questions and be prepared to answer them. Respectfully submitted, Todd J. Haas Cc: Nicole Thompson, Station 19 Architects, Inc. (copy sent by e-mail) Attachment: List of potential questions that may be asked by Station 19 Architects, Inc.; Location Map of Constance Free Church CONSTANCE FREE CHURCH ANDOVER. MN PROJECT #4577 02 / 16 / 2021 - COMMUNITY LEADERS COMMUNITY / CITY LEADERS LISTENING QUESTIONS STATION dig ARCHITECTS, INC. 1. As the city of Andover grows - What are some important services that are needed or desired? 2. What ideas is the city cultivating to fill those needs, but are trying to find the right partner? 3. How can Constance Free be a good partner & great neighbor to support & address some of those needs? 4. What does the city see as the highest & best use of Constance Free's property? 5. How has the city partnered with private / public partnerships in the past? .. ,. I 6 1 ,. I,. JIB 1 ANOVER Constance Free Church Date Created: February 24, 2021 Disclaimer. The provider makes no representation or warranties with respect to the reuse of this data. 1685 CROSSTOWN BOULEVARD N.W.. ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV TO: Park & Recreation Commission CC: David D. Berkowitz, Director of Public Works/City Engineer FROM: Todd J. Haas, Assistant Public Works Director SUBJECT: B. Review of Final Draft for Future Improvements Zones A-D/2020 Existing and Future Park Facilities Chart DATE: March 4, 2021 INTRODUCTION The Park and Recreation Commission is requested to review the final draft for future improvements for Zones A-D. As of right, approximately $4.2M of improvements have been either reduced or removed by the Park and Recreation Commission for Zones A-D. The target for reducing or removing improvements is around $4.4M. Please review the spreadsheet located in the side pocket of the packet of all the parks/facilities to determine if there are any additional changes should be made. Before the Park Dedication Study can be updated, the City Council will be requested to review the draft spreadsheet recommended by the Park and Recreation Commission. The recommended draft improvements will be presented to the City Council at the next workshop meeting that is scheduled on March 23, 2021. ACTION REQUIRED The Park and Recreation Commission is requested to review the final draft for future improvements for Zones A-D. Respectfully submitted, 440�/40� Todd J. Haas Attachment: Draft 2020 Park Facilities Chart for Zones A-D (review noddle column on spreadsheet located in the side pocket of packet) 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV TO: Park & Recreation Commission CC: David D. Berkowitz, Director of Public Works/City Engineer FROM: Todd J. Haas, Assistant Public Works Director SUBJECT: C. Discuss Andover Community Center/Goals & Role of the Park and Recreation Commission DATE: March 4, 2021 INTRODUCTION The Park and Recreation Commission has requested this item be on the workshop portion of the agenda for discussion. DISCUSSION Based on discussion from the last workshop meeting on February 18, 2021, the Park and Recreation Commission requested staff to include an item on this agenda about what the goals and/or role they should be involved with regarding the Andover Community Center. ACTION REQUIRED As determined by the Park and Recreation Commission. Respectfully submitted, Todd J. Haas Memorandum To: Dave Berkowitz, Director of Public Works / City Engineer From: Jeff Feulner, PLA Date: 02/23/2021 Re: Outdoor Pickleball Study Andover City project 21-15 WSB Project No. 017457-000 DRAFT - ANDOVER OUTDOOR PICKLEBALL STUDY Summary: WSO N This Outdoor Pickleball Study was created for the City of Andover. After reviewing 14 park and open 3 space locations in Andover's system, three sites were selected to be evaluated for future pickleball facilities. The sites include the City Campus north of Public Works, Prairie Knoll Park and Pine Hills North Athletic Facility. All three sites are viable for a pickleball development, but each site has unique a opportunities and constraints that impact the cost and effectiveness of such a facility for the City. Sites were selected for review based on a number of criteria: - I onation / Prnximity to ragidentinl nrnnertieg rnniga enncerngl - Access — both vehicular and pedestrian - Available Space within the park / open space - Parking — either existing or area to expand - Nearby complimentary elements — other park elements such as buildings, shelters, playgrounds, courts or fields M - Restroom availability y Shade potential ° Lighting potential a w i The following pages include five (5) pickleball facility layout options that were explored within the three 2 park sites, highlighting the strengths and weaknesses of each site, and providing preliminary cost information to construct the improvements. Site improvements can be evaluated based on the costs of each element to determine the best overall solution for the City. Some elements, such as divider fencing, w can make the user experience more pleasant, but are not required to create a successful pickleball t facility. Site Recommendation: 0 Based on this information and feedback from City Council, City staff, and the City of Andover Parks and WRecreation Commission, is recommended as the preferred site for an outdoor Pickleball a facility within the City of Andover. a z w x KM7457-WD miMDwc 1745MW Mdmer Pickleball SNdy.do Andover Pickleball Study 02/23/2021 Page 2 Site location options: r 4 "F. crno Am n ILI I PINE HILLS NORTH ATH. FACILITY I M LOCATION 3 v0ek Holbw Park 0 r i Kelsey Rwnd lake Park CITYCAMPUS Hem Lek, LOCATION 1 ' PRAIRIE KNOLL PARK LOCATION 2 ,. .o.r.r. _. Ao var - ee _O Wi'arr .v0lage A rdalesFe Oaks Gulf Glub o (y Reylona'G„k Bunker Hill. Golf Uie The three sites selected for the outdoor pickleball study are in 3 distinct locations across the City Location 1: City Campus / North of public works facility: Centrally located near City Hall and the Community Center, this location is geographically closest to the center of Andover. This location is also near Elementary, Middle and High Schools. Location 2: Prairie Knoll Park: Located on the East side of Andover, this established park has the existing infrastructure to support a pickleball development. Location 3: Pine Hills North Athletic Facility: Located in the West side of Andover, this park has significant space for expansion of facilities. K:W17457-OOONdmin\DOLSW17457-000 Andover Pickleball Study.do" Andover Pickleball Study 02/23/2021 Page 3 I I EX. PARKINGI " 77 STALLS-+--,. (8) PICKLE BALL ' i C COURTS 4 \ of � SHELTER ----Eli ;T W O E PARKING c 'w •�'��_ � 2STALLS Y CA r r ,y !_-1 LOCATION 1: CITY CAMPUS Option A: Eight pickleball courts constructed in yard space north of the public works facility. Large and open, this level area would be an ideal candidate for a court facility, though complimentary elements would be required. Area could support dedicated parking lot for the new facility. Pros: • Location: Centrally located within city with no residential properties nearby • Nearby Complimentary elements: Close proximity to other indoor/outdoor recreation (Community Center) • Access: Ample vehicular access with abundant parking nearby in Community Center facility • Utilities: Lighting / electrical service available in close proximity (existing lights in yard area) • Restroom: Restroom / drinking fountains located in Community Center Cons: • No existing shade • Access: Existing parking is across Tower Drive, creating pedestrian crossing concerns • Location: Public Works yard dust and noise K:1017457-000WdminlDom\017457-000 Andwer Pickleball Study.do= Andover Pickleball Study 02/23/2021 Page 4 CITY CAMPUS Option A Item # Item City Unit Unit Price Cost 1 Pickleball Court 8 EA $27,025 $ 216,200 Includes: A Concrete Maintenance Strip 75 LF $20 $ 1,500 B Bituminous Pavement 250 SY $40 $ 10,000 C 10' Chain Link Fence 75 LF $75 $ 5,625 D 6' Divider Fence 75 LF $60 $ 4,500 E Acrylic Color Surfacing and Striping 250 SY $10 $ 2,500 F Net and Post System 1 EA $2,500 $ 2,500 G Practice Board 1 EA $400 $ 400 2 20' x 20' Shelter 1 EA $53,000.00 $ 53,0D0 Includes: A Shelter and footings 1 EA $35,000 $ 35,000 B Concrete Flatwork & Sidewalk 1800 SF $10 $ 28,000 3 Light 4 EA $10,000 $ 40,000 4 Drinking Fountain 1 EA $6,000 $ 6,000 Subtotal: $ 315,200 Recommended Contingency (20%) $ 63,040 Est. Admin / Design Costs (20%) $ 75,648 Total: $ 453,888 To add the oickleball facility of this size in this location, costs will range from aDDroximately $246.240 to $463,888. • Minimum improvements include items 1B, 1C, 1E, 1F, and 213 from the table above and come to a total cost of $246,240. • Implementation of all items from the table above come to a total cost of $453,888. K\017457-000\Admin\Docs\017457-000 Andover PicMeball Study.doc Andover Pickleball Study 02/23/2021 Page 5 % EX. PARKIN • a ^� I 77STALLS- - PLAZA LLI AREA If > �• Q I LIJ Atl ' SHELTER Ir p—' f— EX PARKING • 2 STALLS n ry Y CA � � I r LOCATION 1: CITY CAMPUS Option B: Six court layout surrounding shelter / plaza area, constructed in yard space north of public works facility. Large and open, this level area would be an ideal candidate for a court facility and complimentary elements. Pros: • Location: Centrally located within city with no residential properties nearby • Nearby Complimentary elements: Close proximity to other indoor/outdoor recreation (Comm. Center) • Access: Ample vehicular access with abundant parking nearby in Community Center facility • Utilities: Lighting / electrical service available in close proximity (existing lights in yard area) • Restroom: Restroom / drinking fountains located in Community Center Cons: • No existing shade • Access: Existing parking is across Tower Drive, creating pedestrian crossing concerns • Location: Public Works yard dust and noise K:1017457-OOO1Admin\Docs1017457-000 Andover Pickleball Study.d= Andover Pickleball Study 02123/2021 Page 6 CITY CAMPUS Option B - MAX Item If Item Ctty Unit Unit Price Cost 1 Pickleball Court 6 EA $27,025 $ 162,150 Includes: A Concrete Maintenance Strip 75 LF $20 $ 1,500 B Bituminous Pavement 250 SY $40 $ 10,000 C 10' Chain Link Fence 75 LF $75 $ 5,625 D 6' Divider Fence 75 LF $60 $ 4,500 E Acrylic Color Surfacing and Striping 250 SY $10 $ 2,500 F Net and Post System 1 EA $2,500 $ 2,500 G Practice Board 1 EA $400 $ 400 2 20' x 20' Shelter and Plaza Area 1 EA $67,000 $ 67,000 Includes: A Shelter and footings 1 EA $35,000 $ 35,000 B Concrete Flatwork & Sidewalk 3200 SF $10 $ 32,000 3 Light 4 EA $10,000 $ 40,000 4 Drinking Fountain 1 EA $6,000 $ 6,000 Subtotal: $ 275,150 Recommended Contingency (20%) $ 55,030 Est. Admin / Design Costs (20%) $ 66,036 Total: $ 396,216 To add the Dickleball facility of this size in this location, costs will range from aoproximately $189,720 to 396 216. • Minimum improvements include items 1 B, 1 C, 1 E, 1 F, and 2B from the table above and come to a total cost of $189,720. • Implementation of all items from the table above come to a total cost of $396,216. K:1017457-000yWmin10ou1017457-000 Andover PicMeball Studydoc Andover Pickleball Study 02/23/2021 Page 7 2 �a �4 ,r Ex. PARKING 87 STALLS LIGHT POLE (TYP) PICKLE BALL COURTS V EXISTING BLEACHERS OPTIONAL SHELTER PLAZA AREA LOCATION 2: PRAIRIE KNOLL PARK Six court layout in existing Hockey rink facility. Due to multi -use facility needs, net posts would need to be removable and divider fencing would not be feasible. Pros: • Parking: Accessible existing parking • Level area — minimal grading required • Lighting: Rink Lighting in place Cans: • Complimentary Elements: Potential displaced hockey rink/skating • Complimentary Elements: Seasonal use / changeover between uses • No divider fencing between courts in mufti -purpose facility • Location: Residential to south • Shade: Limited shelter space for shade • Parking: Parking capacity during athletic events • Flooding I poor drainage in rink area may accelerate degradation of pavement surface K:\017457-OOOWdmin\Docs\017457-000 Andover Picklebell Study.do" Andover Pickleball Study 02/23/2021 Page 8 Prairie Knoll Park Item # Item Qty Unit Unit Price Cost 1 Removals 1 LS $15,000 $ 15,000 2 Pickleball Court 6 EA $28,150 $ 168,900 Includes: A Concrete Maintenance Strip 75 LF $20 $ 1,500 B Bituminous Pavement 250 SY $40 $ 10,000 C 10' Chain Link Fence 75 LF $75 $ 5,625 D 6' Divider Fence (seasonal / removable) 75 LF $75 $ 5,625 E Acrylic Color Surfacing and Striping 250 SY $10 $ 2,500 F Net and Post System 1 EA $2,500 $ 2,500 G Practice Board 1 EA $400 $ 400 3 20' x 20' Shelter 1 EA $49,000 $ 49,000 Includes: A Shelter and footings 1 EA $35,000 $ 35,000 B Concrete Flatwork 1400 SF $10 $ 14,000 Subtotal: $ 232,900 Recommended Contingency (20%) $ 46,580 Est. Admin / Design Costs (20%) $ 55,896 Total: $ 335.376 To add the Pickleball facility of this size in this location, costs will range from approximately $199.800 to 335 376. • Minumum improvements include items 1, 2B, 2C, 2E & 2F from the table above and come to a total cost of $199,800. • Implementation of all items from the table above come to a total cost of $336,376. K:1017457-000%Admin\Doce1017457-000 Andover PicMeball SNdy.d= Andover Pickleball Study 02/23/2021 Page 9 EX. PARKING tSLpICKLE,BALL . _ l COURTS J i "EX. PARKING c PROPOSED TARRING SHELTER ' PROPOSED PARKING PLAZAAREAADD 18 4' -- � , \ 161 ST AVE NW /"`""-.—".-* LOCATION 3: PINE HILLS NORTH ATHLETIC FACILITY Option A: Eight pickleball courts constructed in open space west of soccer fields. Large and open, this area could be an ideal candidate for a court facility, though significant grading and removal of natural elements would need to take place. Area could support expanded parking lot for the new facility and has room for shelter or other amenities. Pros: • Parking: Existing parking lots throughout park. Easily expandable. • Access: Easy vehicular access from 161s1 Ave NW • Location: Natural surrounding environment • Available Space: Large park with significant open space available Cons: • Significant grading / earthwork • Location: Loss of natural space • No lighting in place • Location: Less convenient location within city • Location: Residential properties to West • No restroom facility in close proximity • Impacts original Master Plan layout • Parking: Dust from parking lot. CIP identifies parking lot paving in 2022 K W17457-OOOWdnninlDocs1017457-000 Andover Pickleball Sludy.d= Andover Pickleball Study 02/23/2021 Page 10 PINE HILLS NORTH Option A Item # Item City Unit Unit Price Cost 1 Removals 1 EA $5,000 $ 5,000 2 Grading 1 EA $20,000 $ 20,000 3 Pickleball Court 8 EA $27,025 $ 216,200 Includes: A Concrete Maintenance Strip 75 LF $20 $ 1,500 B Bituminous Pavement 250 SY $40 $ 30,000 C 10' Chain Link Fence 75 LF $75 $ 5,625 D 6' Divider Fence 75 LF $60 $ 4,500 E Acrylic Color Surfacing and Striping 250 SY $10 $ 2,500 F Net and Post System 1 EA $2,500 $ 2,500 G Practice Board 1 EA $400 $ 400 4 Unpaved Parking (18-20 Stall) 1 EA $8,750 $ 8,750 includes: Gravel Material 125 CY $70 $ 8,750 S Light 4 EA $10,750 $ 43,000 6 20' x 20' Shelter and Plaza Area 1 EA $57,000 $ 57,000 Includes: Shelter and footings 1 EA $35,000 $ 35,000 Concrete Flatwork 2200 SF $10 $ 22,000 Subtotal: $ 349,950 Recommended Contingency (20%) $ 69,990 Est. Admin / Design Costs (20%) $ 83,988 Total: $ 503,928 To add the Pickleball facility of this size in this location, costs will range from approximately $286.200 to 503 928. • Minumum improvements include items 1, 2, 3B, 3C, 3E, 3F, 4 & 6B from the table above and come to a total cost of $286,200. • Implementation of all items from the table above come to a total cost of $603,928. K W17457-000%dminToca1017457-000 Andover Pickleball Study.dou Andover Pickleball Study 02/23/2021 Page 11 Z . PROPOSED PARKING a ADD 13 STALLS \ IL J 4 S' ~1 5f }ice—t � • Ex. PARKING... - ' t 1 Ex. PARKING SHELTER (rz 5T STALLS PLAZA AREA -- I 161STAVE NW LOCATION 3: PINE HILLS NORTH ATHLETIC FACILITY Option 6: Six pickleball courts constructed in open space west of soccer fields. Large and open, this area could be an ideal candidate for a court facility, though significant grading and removal of natural elements would need to take place. Area could support expanded parking lot for the new facility and has ample room for shelter, plaza space and other amenities. Pros: • Parking: Existing parking lots throughout park. Easily expandable. • Access: Easy vehicular access from 161s' Ave NW • Location: Natural surrounding environment • Available Space: Large park with significant open space available Cons: • Significant grading / earthwork required • Location: Loss of natural space • No lighting in place • - Location: Less convenient location within city • Location: Residential properties to West • No restroom facility in close proximity • Impacts original Master Plan layout • Parking: Dust from parking lot. CIP identifies parking lot paving in 2022 M017457-0001Admin\Docs1017457-000 Andover PicWeball Study.dom Andover Pickleball Study 02/23/2021 Page 12 PINE HILLS NORTH Option B Item # Item Qty Unit Unit Price Cost 1 Removals 1 LS $5,000 $ 5,000 2 Grading 1 LS $20,000 $ 20,000 3 Pickleball Court 6 EA $27,025 $ 162,150 Includes. A Concrete Maintenance Strip 75 LF $20 $ 1,500 B Bituminous Pavement 250 SY $40 $ 10,000 C 10' Chain Link Fence 75 LF $75 $ 5,625 D 6' Divider Fence 75 LF $60 $ 4,500 E Acrylic Color Surfacing and Striping 250 SY $10 $ 2,500 F Net and Post System 1 EA $2,500 $ 2,500 G Practice Board 1 EA $400 $ 400 4 Unpaved Parking (15-20 Stall) 1 EA $7,000 $ 7,000 Includes: A Gravel Material 100 CY $70 $ 7,000 5 Light 4 EA $10,750 $ 43,000 6 20' x 20' Shelter and Plaza Area 1 EA $47,000 $ 47,000 Includes: A Shelter and footings 1 EA $35,000 $ 35,000 B Concrete Flatwork 1200 SF $10 $ 12,000 7 Bituminous Trail 90 SY $30 $ 2,700 Subtotal: $ 286,850 Recommended Contingency (20%) $ 57,370 Est. Admin / Design Costs (20%) $ 68,844 Total: $ 413,064 Minumum improvements include items 1, 2, 313, 3C, 3E, 3F, 4 & 7 from the table above and come to a total cost of $228,168. Implementation of all items from the table above come to a total cost of $413,064. K\017457-000%Admin\Doc M7457-000 Andover Pickleball SWdyxoc .4 ,,i City of ANDOVER 2020 Existing and Future Park Facilities Chart r-+ew1 B Pagel of 5 QW.1 DESCRIPTION tEXISTING) UNIT PRICE Beginning- FUTURE FACILITIES TOTAL PRICE c _ REPLACEMENT ITEMS 1A CEDAR CREST 3680 173RD LANE NW-248 ACRES -�.y,.; 1 D House 1 Park Name Si 4000 $ 4000 Sustainable Landscaping& Trees E 100000 _ _ 9gin _ 250,00 $ 250,00 FUTURE EQUIPMENT TOTAL 100000 r CEDAR CREST EQUIPMENT TOTAL § 290.00 - 2A CEDAR CREST UTATE-3909174TH AVENUE air -08 AB RESNo Ci,rent Facilities NO Future Facilities Anticipated 3A FOX MEADOWS 16000 FOX STREET NW-1256ACRE6� _ - 2 'NO Motodzetl Veh s" Sign 28.00 $ 5600 Landscaping § 2 500.00 Annual Field Maintenance: Regrade, Resenq Irrigation 1 Class Parking Lot _ 5,000.00 $ 5,00_000 Security Light $ 7.500,00 2026 Playground Structure (20 Year Cycle) 1 Park Name Sign w/Landscaping 550.00 $ 550.00-wilif_ - - 20 Bluebird House 15.00 $ 300.00' s8250,g00 204] Medlum Shelter with Concrete -Pad-Replacement 6 T.sh Property/No Trespassing Signs 55.00 $ 31000 REPLACEMENT ITEMS TOTAL: 2 Trash Can __ 155.DO $ 310.00 FUTURE EQUIPMENT TOTAL 1000D.00 - 1 Rec cle Bin - ---- - - - Y 124 0 $ 15500 ESTIMATED COSTS - G $ _ 10,00100 $ 75,000.DO § 148,000.00 231000.00 1 _ 'Sign-Tobeccc Free Zone 24.00. § 24.00 i -- -- - - 2 'Park Bench(Call 5 Ie Style) 220.00 ---- - $ 440.00 $ 17,563 § 800.00 - S - - 1 950'X kUnk Fence-20D6tem _ _ 1],60000 - - 1 ..re 4.5" Gooseneck Basketball System 600 00 1 270' x 4' concrete sublevel 1,900.00 1 Gamerm, CliBord Saddlemate -800001 i 1 GamOTime 4 Place Single Post Swing set 185 yds Engineered Wood Fiber He Spring Ride _ Gamal Play Structure-2006 1,2D0.00 2,BW 00 ]00.00 28,368.76 g1 $ �.980000 $ 70000 § 26.368.76 - - -- - - 1 50Asphalt Basketball Court ],500.00 $ ] 0.00 _ $ 18180.00 - - -- 1 10- Co CODcrete Base Picnic Table 180.00 - - - - - F .,.w .., > �.... Field Manten Regrede, Reseed lmgat ^n S 15.00000 Repleca Medium Shelter and Concrete Pad $ 30,000.00 BeNe�Mag igEd�n9 wCer Chi Fail Zone § 1 5�300.00 ,900.00 Hack Rink wBh Lights ,000.00 2 Sets of Soccer Goals - Regulation Size $ 8,000.00 1 F Itl mShelter n _ 1 Medium Shelter and Concrete Pad -201] 35,122.23 E _ 153 ]10.0]_ - $ 3512223 $ 18420553- E 12905.53- - 1 ImgaOon Wellwith Pumpand 1 Img i nSell wt and Meter- orcr _ _ 12,905.53 2017 s 209 112,905.53 FOXMEADOWSEQUIPMENTTOTAL IA HAWKRIDGE-18001 VERDIN STREET NW-1314ACREA No Motorized S 4$253939 - ..... uselResirooma aStOrage/Mtg Room $ 25.00_ Aad onalMm OR ,..-t Irrigation System Improvements 00,00 Security Light 1t 0.00B.00 _,,. �,.5 alsd g 25000000 Annual $ 500000 _2021 1 _ _ NO Horseback Riding"Sign-1500 CAss LUi e)-2010 10,C00.�5 1 GDII pN Sap0c5 segm(2)^ - g 2000000 2 - Hockey Goal 250.00 Hockey Rink with1 g 2010 43,358.42 Padc Bench CB2 Sryle 1]000 Park Name Sign (old style) 250.00 Park Name Si nw/Lanisceping _ Swum Picnic -3 section_ 900.W'$ -2021 E 50000 Pave Parkin Lot w/C$G 60.905talis) $ 135000.00 2030 ( $ 43358.42 Landscaping -Trees $ 100000 2030 $ 1]000 _ 2030 $ 25000 Bleachers w/ Pads(1 Soccerfieltls) $ ]500.00. 2030 $ 550.00 "no Purchase -(Hous $ 19000000 2030 - 900,00 Large Shelter Upgrades and Land-].i6Acres) $ 15000 ShdUr9 Gngreta Pad/Sldewalk §5,000) $ 1000000 S 4Picnic Tables IS 360000 _ $ _ 42]900 Fell 9 (�50001 - ) E 2500000 2030 $ 3,00000 New Feld Gradin and _seeding( After Land Purchase $ 25000000 • Is_-- $ - FUTURE EQUIPMENT TOTAL 1162100.00 - $ 249,356.44 - $ 620.00 $- $6]5.00 It 80000 - 1 1 1 1 Treil ThmuBh Park _ $ 25,6DDO 6Junlor Soccer Goals 2 3- O Row Bleachers _ E _ 14,300.00 $ ],400.00 1 i _Table Pcnic Table-ch110 _ 15000 6)18'Aluminum Players Benchae ( REPLACEMENT ITEMS TOTAL: $ 8,]50.00 281260.00 2 Security Light (Connems Owned Light) 2 Set of Soccer Goals Regulation Size 1,50000 1 1 1 4 Shelter -Medium w8n concreteipad Seep nry Li M near medium shelter(Comebuts Owned Light) Soccer Complex w4rti�a0on-2010 Tash Cerra TrailThmu hPar6-2010 6,2]9.00 - - - - -- - -- - - - 249,356.44 155.0 1 9,675.00 1 Ride - car spring _ 800.00 1 Ride- motorcycle spring 700,00 $ ]0000 1 'Ride _ - horse spring - ]00.00 $ _ 700.00 - $ 25000 _ - $ 22000 1 Concrete pad for portable toilet 8 trash can 250.00 1 - - 11 Bluebird houses 20.M - - - - - 1 Gamatime Playground Equipment -2004 13,384.89 -.- _ -_ § 13,384.69 _ 1 Sign -Tobacco Free Zone _ 24.00 $ 24.00 E 1,000.00 $ 170000 - - $ 5,400.00 $ 2,80000 - -- 2 _ Stairs for Wartninq House 500W - 1 _ Swing Set - Four Place 1,]00.00 6 Junior Soccer Goals _ _ 90000 - - 2 _ Bleachers-3 Row - 1,4DO" -- - HAEngineering\Parks\Parks InventoWark Inventory - 2021 - Updated 2-22-2021 City of ANDOVER 2020 Existing and Future Park Facilities Chart Page 2 of 5 owl DESCRIPTION (EXISTING) UNIT PRICE Beginning i FUTURE FACILITIES TOTAL PRICE REPLACEMENT ITEMS ESTIMATED COSTS 8 i6' Plumin rm Players Benches 550.DO $ 3,300.00 10 Benches for Warming House 100.00 E 1,000 00-- 1 Border Ma is Edging w/Fiber Chip Fell zone -20M Eyx.W $ _ 5,00000 _.._ 1 ConcEtlge weber CNP Fall Zooe 1.800.00 $ 1,800.00 1 Flald Deretevelopment Recognition Sin 700.W $ 70000 Wxbn House Fumishinae- - 1 _ _ FireEExtinguisher 35.00 $ 35.00 _ -- 1 Rules Sign 50.00 $ 5000 1 _ Hours Sin 5).W _ $ 50.00 1 Clock 10.00 $ 10.Do _ _ -- 1 Flooring _ 40000L;3; 4M 001 ElscVical Hook Up for warming house 1,500.W1500001 Power cord for waning hose 151150,001 is[Aid Kit -GE A _ EQUIPMENT TOTAL LANGSETH-3M1174TH LANE NW-167 ACRES 3943.66 17000 $ i]0.00 55000 $ 55000 - $ _ - -.: Landscaping around Pad Sign $ 1,000.00 2029 Medium Shelterw/Concrete Pad($30,000) $ 15px0.00 2029 2 Concrete Picnic Tables_ _ S _ 1,80000_ 2.030 _- Playground Stmcture(15y"'i __ $ 46000.00 1 Park Bench CB25tyle $ 10,500.00 Concrete Edging w/ Wood Fiber COlp Fell Zones 1 Paris Name Sign w/Landscapin9 Asphalt Path E 775D.00 1 _ iSecunty Light Connexus Owned) REPLACEMENT ITEM_ S TOTAL:- 64 260.00 1 Trash Can 155.00 $ 155.00 _ 1 Asphalt Path _ 2,917.35 750.00 $ 2,117.35 E_ 75000 FUTURE_ EQUIPMENT TOTAL 17800.00 1 _ Wine Cyclone Fence -14T _ _ 1 _ GameTime Play Structure - 2014 21,848.00 E 21.848.00 _'_ _ 1 Concrete Pad withPicnic Table 8' 500.00 _ $ Six 00 _. - - - 1 Concrete Edging wNJood Fiber Chip Fell Zane.-2014 5,000.00 $ _ 5,00000 1 70000 5 3,690.00 E 33690.35 155.00 _ $ 465.00 Landscaping $ 2,59000 Annual 2400 $ 24.00 Security Light $ 7500.00 Annual - 2026 4,95E00 $ 49560020' 6 00.00 $ 6,60000Playgrountl Equipment (2-12 yr. oltl) Basic $50,000) $ 20,000.00 2026 7,9_48.70 $ ],948]p 2031 4,893.41 $ 4.89341 20M 27674.57 $ 2767457 j 11,644.02 $ 11,644,02 MMlumaheMrWu ncmWPed(6mellShelbr) (W.D10) $ 20000.001 720 XI $ 72000 FUTURE EQUIPMENT TOTAL $ 50000.00Doub 1 . _Swing SetFourPlace LANGSETHEQUIPMENTTOTAL EQUIPMENT NORTH -2640166TH AVENU NW0404ACRE5 -- Ballfield Maintenance: Regrade, Reseed $ 500000 Ag Lime Material __$ 1000.00 260' x 6' Chain Link Fence $ 13150 00 3A TUUNDash Cans Sign - Tobacco Free Zone 1 1 260'xein Link Fence-2006 20'x 18' Chain Llnk Backstop SecSons1 x ain Link Backstop Seoul - 20M AspbaBTmil $ 16,6W.00 Bleacugout pads-2W6 'Bleacher/Dugout pads $ 34,30000Ball 1 Asphll _ REPLACEMENT ITEMS TOTAL: 87660.001 F20M _ _ Classrking_ Lot-2006 Park Sign w/Lzndsca ing FM- - 125.00 $ 12500i __1 DoubBae_e 125.00 $ 125.00 Home 60,00 ',$ 60001 Pitchbber 45,00 $ 45001 � __ Bolleral 180.00 $ 180.00 __ 3 Bluebird Houses _ 20.W $ 60.00 _ 2 Players Benches Aluminum 3W.00 _ $ 600.00 _ 2 Bat RacksRlolders 45.00 E 9000 _ 1 Concrete Sidewalk 30' 250.00 $ 25000 E 155.00 "q _ --- 1 Bin 15500 .Recycle 1 Bleacher 3/Seat Small _ LUNOS NORTH EQUIPMENT TOTAL J -_. NAVAJOSTREETNW 6411 DOWis i 1,400W $ 140000 _ $ 68070.70 1 $ _ 600.00_ 1 No Future Facilities Anticipated $ 100o0 _ $ 56 00 ACRES _ D" ..,.»<;Yrot.-., 1A Massa a Board tl5�,17101 600.00 1 .Rules Sign _ 10000 2 No Motorized Von Signs 0 28 0011 $ 3000 _ 1 Property Bother Signs 30.00'. 20 BlureebiM Houses 20.00 E 40000 $ 150000 $ 25000 , f 2936.00 - $ 3,718.00 Landsca in $ 1,000.00 Annual Serfad Maintenance : Re retie Reseed lm anon 1 Benches/Bignaga 1,soo od 1 Pcrictable 250.00 IMARTIN'SMEADOWSEQUIPMENTTOTAL _.._ BA PINE HILLS SOUTN- 36361615T AVENUE NW-608 ACRES -- $ 5p0000 1 1430'In6eltl Fence with Du oms-1999 1 3,71800 .`"p H:\Bnglneenng\Parks\Parks lnventoMPark Inventory -2021-Updated 2-22-2021 City ofAND OVER Page 3 of 2020 Existing and Future Park Facilities Chart DESCRIPTION ExISTING)_ I UNITPRICE Beglnnin9 i FUTURE FACILITIES TOTAL PRICE REPLACEMENT ITEMS ESTIMATED COSTS 1 '450'Outfield Fancy with Foul Pelee wlMow Strip-1599 10,125.00 $ 10,125.00 Pave Paddn Lot (455te1U 'S 87,50000 _Annual Ag Lima Material $ 11%IO Ip 1 Ag lime _ �4,000.00 $ 4,000.00 ... ��ncm�cnic Table 2024 2024 E 1,800.00 2029 2024 203E 2040 _ 130'Infleld Fenm with Dugouts E 12,800.00 1 1 Ball Fieltl _ _ Beee Box -large _ 3,000.00 325A0 $ 3,000A0 $ 325.00 E 4,000.00 { E 80.00 450' Out .Id Fence with Foul Poles wrMov_Strip Fall Zona with Concrete Sidewalk $ 34,300.00 $ 10,21p,00 1 Home M Parking Lot- Medium Home Plate 4,000.00 80.00 FUTURE EQUIPMENT TOTAL 4' Cyclone Fence -100 black vinyl weletl AlongRoad S 11,500.00 1 Playground Structure § ]5,000.00 2 Perk Bench 1T0.00 E 3W 00_ _ Concrete Mow Strips and Dugout Pads § 19 ]00 00 7 1 Park theme Sign wAantlsoping _ Four -section Backstop w/ ove_rhead 550.00 2,398.00 E _ 5:00 j, $ 2,398.01) '+ - - REPLACEMENT ITEMS TOTAL: 119 J00.00 1 Monte Table w/concrete pad _ 200 00 $ 200.00 _ - 1 Pitching Rubber 45.00 $ 45.00 - 1 Sandbox Fall Zone wlth Concrete Sidewalk �_ 3,000 00 $ 3,000.00- 1 Sandbox Emotes ure Around Swing Set wfrmbers __ 950.00 $ 950.0M 1 Set of Three Bases 200.00 S 200.ad - - 1 Swin Set -Four Place-- 1 Security Light (Commove Owned) 1 880' Vallow Protective Fence Rail Cover _ 528.00 E 526.00 5 - - - - 1 ---Al- n-inum Bleachers wfConcrate Pad 1,700.00 § 1,100A0 ,,' - - - - - 1 Dlahment Play Structure-Todtl2018R1 5,846.34 E 420000 -- 1 rah Play Saudure 5-12-2018 Refurbishment _ 16,298.06 E 1980000 I - 1 Motorcycle Spring Ride 425.00 _ $ 42500 - - 1 Duck Sunni Ride 425.0M S- _ 4 .Trash Cans 155.0C $ 620,00 - - - 3 _ 2 Recycle Bins _ 155.00 $ 2500 $ 5000 Foul Pole Flags _ - - 1 Si n-Tobacco Free Slid 24.M $ _ 2400- 1 2 14Cyclone Fence-1 Merrick vinyl coatatl-1999 _ _3,400.00 $ 340000 $ 1,100 - - - 16' Players Benches Aluminum 550.00 1 IM a non Systemlor Field-2013 _ 5.000.00 $ 5,00000' - 1 Grass Infield 3,500.00 § _ - 1 _.. Concrete Mow Strips and Di Pads 2,800 00 15000 1 Concrete Pad for Toilet PINE HILLS SOUTH EQUIPMENT TOTAL 9A TIMBER RIVER- 16980 BARIUM STREET NW-e]e ACRES _$ _ 2 800 00 - - - $ 15000 TB T02.33 -. --- Lantlscapmg $ 100000 Ann I Field �g ( Walk Maintenance Regratle Relied (Non Imgaled) $ 4,000.00 'mg Path Asphalt -- - $ 70,00000 Cum around Parkin Lot 400' x $15.00 PICA) 600000 2024 Parpn9 Lot -Paved E 2d,00000 -205 Concrete Ed ew/Chip Fall Zone _ $ 21,600.00 FUTURE EQUIPMENT TOTAL _ 2045 110 round SVuctura $ ]T,000.00 rum Shelter with Concrete Ped $ _ 30,000.00 2040 Metl ]00000 2045 11 Concrete Canoe Land ing, $ 31,500.00 ium Shelter with Concrete Pad $ 30,OD0.00 _ _ REPLACEMENT ITEMS TOTAL: 288100.00 - -� _ 25.00 T,10500 155.00 3250.00 $ 2500 1 Duck Houses - 1 2 - Panting Lot Paved 1999 Trash Cans ium er _ - - $ ]IDS MO $ 310 00 S 25000 E 100000 $ 2,000.00 6 $ 145000 $ 800.00 E 600.M0 2 Grills 12500 4 Picnic TabhastCOnc�ieteo25ecliontl 1 _ Soccer Foot 1 Goals -one set 1.600.00 1,450.00 1 2 Concrete Concrete Sidewalk S" Concrete Pads to River 45000 400.00 1 Steal Bollard 250.00 $ 25000 $ 1440.00 $ 26394.46 E 900.00 E 70000 E $ 5000 $ _ 380000 S 2d.00 E - -+-- - - - - - - -- - - �+y - - "- - - - - - 1 180'Five hot Cyclone Fence 1,d4000 26,394.48 9001 ]0000 _ 1,300.00 5000 3,800x0 1 Walking Path- Asphalt Expanded 2002 1 Park Name Sign wAantlscaping 1 Monument Bench wlwncrete adding _ 1 Concrete Edging Landscaping -bees_ 1 Bat House _ 1 Fuhng Per -gravel _ 1 Sign Tobacco Free Zone -Pa_24M - - --- l _ - - - - - - _ ndicap 1 ReSigreng Henan- Shelter _ 1 .Retie Wall -Shelter 1 (Sign -Red Diamond 2500 600.00 24.00 25,00 - E 82500 § 24.00 - y S 75.00- 'q $ 500.0046 - - $ _ 21000- $ 1,50000 - - -- 1-lNo Trespassing w/Pole Sign 75.00 1 1 Lacrosse Goal Set _ _ Rail Fence _ 500 00 210.00 , 1 Sandloa Santlbox wlDiggerend Ralaining Wall 1,500.00 1 Ewing Set-6 lace4ples) 2,40000 $ _ I Playground Retarning Wall 1 Concert, Eddaw/CM Fall Zone-2015 1,80000 5,000.00 5000.00 0000 H:1Enginee Ing\Parks\Parks Inventory\Park Inventory - 2021 - Updated 2-22-2021 City of ANDOVER 2020 Existing and Future Park Facilities Chart Page 4 of 5 QTYI DESCRIPTION (EXISTING) UNIT PRICE Inning FUTURE FACILITIES TOTAL PRICE REPLACEMENT ITEMS ESTIMATED COSTS 1 Tether BnII Pole 250.M $ 250.00 -_ 1 110'Connete Canoe Landing -2015 7,293.00 $ 7,293.00 - 1 Timber Rivera Park and Canoe Lendin Sin 100.00 $ 10000 2 No Unnithorizi Vehicle Sign 30.00 $ 6000 _ 3 1 _ Bluebird] House Burke PlaydVehire- 2000 38,972 B 60.00 $ 36.9go 0c $ 60 G0 Sign 2 No Motorized Vehicles Sign TIMBER RIVERS EQUIPMENT TOTAL 10A TIMBER TRAILS- 17761 AZTEC STREET NW-]05 ACRES S. 30.00 - _ E 111.92].46 $ 10ndscaping_.00 Lahsdb $ 60.00 Security Light Field Maintenance'. Regrets, Reseed Irngation _ Ag Lime Material Playground SWduro-Medium _ 20.01 60.00 $ _10,000.00 $ 1,000.00 $ 43,000.00 $ _ 1, 00000 Annual _E 7,50000 Annual E 610X0.00 2026 2 1 Bluebird House _ Home Plate 1 Park Bench 1]5.00 _ $ 170.00 PaveParkingLot -46Stells _ 1 Pitching Rubber 45.00 $ 45 00 $ 20,711.00 $ 200.00 $ da500 $ _ 90000 Medium Shetterw/Concrete Pao E 30,000 00 2026 Playground Surface bear Celpa Fell Zone $ 8,250.00 _ E_ 32,00000 $ 109,000.00 1 'Powerscepe-Madium-2011 20711.00 2036 2036 Paving Driveway/Trail FencingConchat, Wad 1 Set of Three Bases 200.00 3 _ Trash Cana _ 155,00 FUTURE EQUIPMENT TOTAL 10]SOO.Oo REPLACEMENT ITEMS TOTAL: 201260.00 1 _ Park Name Sign val-andscaping 900.00 2 1 Sign - on Cty 58 Security UBht (Connexus Owned) _ 2500 - $ 50.00 $ -- 2 olders SetFood 45.00 $ 9000 1 _ Duck Spring Ride 700.00 _ $ 700.00 1 _ ig Spring Ride Frobring 900 00 $ 00 1 Motorcycle Sring Ride 80000 no E _ 60000_ E 1 _ Concrete Edging/Sldewalk 2.000.00 1 Playground Surface will Chips Fell Zone _ 3,000.00 $ 1 _ Concrete Pad 6' x 19 130.00 $ 130 00 _. 1 _ Swing Set-4 Pie 3 Poles _ 1,700.00 $ 1,700.00 _ 1 Recycle Bin _ 155.00 8 -_ 155.00 1 Well Conslrudion-2016 211.457.75_1 $ 2114--S 1 _ Irrigation System -2016 11,48070 $ 1148070 _ - 1 Paving Drivewa Rrail-2016 13,62560 $ 1362560 1 Fencing/Concrete Work -2016 40,86600 $ 4086600 2 Ball Field Benches 50000 $ 100000 2 Soccer Benches 55000 8 110000 1 Pedestrian Ramp/sidewalk Materiel I,500.00 $ 1,500.00 1 A41ime Materiel-2016 9,200,00 $ 9,200 G0 -_ _ _ 1 Infield Sod 725.00 725_00 1 1 _ Adiletic Bluegrass Seed Class 5-2016 1,800 X _$ $ 11800,00 $ ]00000 7,000.00 _ TIMBER TRAILS EQUIPMENT TOTAL PINE HILLS NORTH- 3635161ST AVENUE NW-4220 ACRES 4,00000 220.00 331871.06 $ A000.00 _8 132000 $ 250.00 Mobilization _ Removals/clearingg grubbing _ $ 62,000.00 Annual $ 1000000 Annual $_ 5000000_ _2030 11A Field Maintenance Regrade Reseed Irrigation Lighting Ma Structure _ $_ 1500000_ $ 1 Class-V Parking Lot - Small Bench CB2 Style _ -- -- Park Name Si n-NoI ntlacepiin 6 2,500.00 $ 52,500.00 E 10,500.00 Raygmund Structure GredingleaMwaM&erosion win mi 25000 1 Concrete Bortlerw�ber, Fall Zones 1 SwinB Sel-Four Plece3 Pole 160433 $ 180d.33 Slormwe[er Senligament improvemente $ 32500.00 2030 $ 8,250.00 _2033 E_ 323,000.00 _2033 �330 6' Black Cyclone Fence w/Mow Strip $ 9,000.00 Add secondary entrance/edt Rom Tulip St ( ravel 1 4 Play Structure - Burke - 2015 _ _ 19,8toom 1$ 19,800 00 _ E 62000 _Set Socown7oatball Goals It 7,400.00 Paved Voila 10' Wide Trash Cans 155.00 4 Recycle Bins 165.00 _ _ E 620.00 Wooden boartwalk V wide $ 143 750.00 2033 _ $ 60,00000 2035 Sets Full Size Soccer Goals $ 8.000.00 1 330' 6' Black Cydono Fence w/Maw Strip _ 3,400.00 $ 3,40000 PedesNan bridges 'Fencin Concrete P. for Portable Restmoms E 43,300.00 _ 1 _ _ 300' Split Rail Fence 1,550.00 $ 1155000 Large wmmunityplay area $ 100,000 00 REPLACEMENT ITEMS TOTAL_: 14E 700.00 $ 85,000.00 1 Sal Soccer/Football Goals 2,800.00 E 2,600,00 1 Gazebo with concrete slab &4 picnic tables 1 Misr. Site Amenities $ 32,00000 1.500.00 $ 300000 1 _$ _ 300 00 $ 500000 2 Seta Full Size Soccer Goals 3 _ Rald Name Signs 100 00 5p0000 Potable well _ Septic S vault _- $ _ 05,000.00 _ 1 Concrete Border w/Fiber Fall Zones-2015 8 Handicap Parkin Signs 25,00 $ 20000 $ 40000 5064500Overtook $ 188,129.00 Multi undoes building Storage shed bondMregand demonstration area $ 450000.00 $ 9500000 $ 25,OW00 _ 20 Bluell Houses 2000 1 59,645.001$ 1 Lighting -2013 Q Prone Brass demonstration area _ $ - 1625000 _ - - I ninglifion,-2013 188.129.00 1 Bali Fields - 2013 842, 142 00 _ $ 842,142.00 Expanded irrigation of common spaces E 1 1 Fencing/Concrete Pads for Portable RaeVooms-2015 $ 26,98300 $ 26,983.00 Games court _ $ 14,50000 _ Pla round-2015 26,98300 26,983.00 Sand volleyball corn $ 5,50000 $ 5,000.00 PINE HILLS NORTH EQUIPMENT TOTAL 1178100.33 ) Disc dolt .1 v H:\Engineedng\Parks\Parka Inventory,Park Inventory- 2021 - Updated 2-22-2021 City of AND0VER 2020 Existing and Future Park Facilities Chart q�'.l _ DESCRIPTION (EXISTING) UNIT PRICE Beginning_ i FUTURE FACILITIES TOTAL PRICE Landso_ TWSeapa improvements $ 33,000.00 —Fiber $ 33,000.00 _ - Fiber Blanket _ $ /35,000.00 FUTURE EQUIPMENT TOTAL S 2.166000.00 12A VALLEY VIEW- 2929169TH AVENUE NW-666 ACRES �~ Nc Current Facilities Pad ID Signs(2) S 1, 00000 FUTURE EQUIPMENT TOTAL _ S 1.000.00 13A WHITE OAKS- 2740172ND AVENUE NW-92A ACRES No Curren: Facilities Park ID Signs (2) S 1.00000 FUTURE EQUIPMENT TOTAL $ 1,000.00 AREA"A" EXISTING SUBTOTAL: $ 2622071.16 AREA "A' FUTURE EQUIPMENT SUBTOTAL: $ 369370000 AREA"A" REPLACEMENT SUET Page 5 of 5 HAEngineenngVcarkalPaft InventorylPad Inventory - 2021 - Updated 2-22-2021 City of ANDOVER 2020 Existing and Future Park Facilities Chart Page 1 of 2 QTY.1 DESCRIPTION (EXISTING) UNIT PRICE Beginning FUTURE FACILITIES TOTAL PRICE REPLACEMENT ITEMS ESTIMATED COSTS 198 BIRCH RIDGE- 14601815T AVENUENW-1121 ACRE No Current reciites No FVWraFaalNesA sdpat9d 20B COUNTRY OAKS - 1069 162ND LANEM 1.1 ACRES PnmayMotarstle atToture-Medium-2005 30771.03 !1$ 30)]103 No Future Fa lines Anticipated 2026 PlaygmundSWcture- Medium 1 _ - $ 64,000.00 Spring Y 525.00 '$ 525.00 _ - 2026 Playground Surface Wood Fiber $ _ 6,250.110 1 CliffordaSp_ Spring Toy 525.00 - $ 525 00 1 _ 2026 Concrete Curbing 8_sidewalk $ 30,000.00 Spring Toy 300.00 $ 80000 - - - FouS _ 2026 BeakeWal1 Court $ 8,5000p 1 Four Placeurb Set 1,800.00 5 1,30525 _ 2026 Climdng Well/Potl $ 10,901 1 Concrete Curbing 8 skewalk 11 306.25 E 11,30525 REPLACEMENT ITEMS TOTAL: 118 fi60.00 1 Park Sign 550.00 E 550.00 - -- - - - 1 Stamped, colonel wncrete around sign 2)D.00 $ 270.00 - - 1 Beskemell Court _ 3,19284 E 319284 - -- - 3 Pad Banch CM Frame 219 52 $ 658 br -- - _ 1 _ Gooeeneck Basketball System 800.00 E 60a- 1 ImgaBoo system 1,185.71 9 1,18571 - 1 B P wic Table Concrete 2 loge 500.Op $ 500 00 - 7 Sign Adopt A Pa* 2500.E 25I 1 GT Climbing Wall / Pod 100.00 _ 1 $ 4,100.00 - _ 1 Playground Surtew Wood Fiber 3,p00.00 E 3.000.00 - - - 1 Security Light 400.00 E 400.00 - -- - _ 1 Recycle Bin _itisucici s 155.00 1 Trash Can 155.00 $ 15500- _ 1 Handicap - _- 450.00 $ 450.00- -COUNTRY OAKS EQUIPMENT TOTAL 60,969.40 21B FOREST MEADOWS 10101)9TR AVENUE NW 663 ACRES ,: z..� ��u; `c ...x .,.. - • -. Park SignSo 9 50$ 55000 . NOFture Facilities Anticipated2022 - d#itt*z u: Shelter- Medium Whir Concrete Pad(Elmma[e+)�) E 30000.00 - - - - 1 ShelterName e witty Concrete Pad 4,550 $ 4.2)9 00 1 _ Playground SW .2018 22.107.00 . $ 22,10T.00 -Ramp _ 1 Sidewalk and Pedestrian 3,000.00 E 3,000.00 1 _ Concrete Rortler antl Fell Zone - - 5,00p.00 E 5 000 00 2049 2046 Sidewalk antl PedeaNan Ramp Tw Stall Parking Area T E 13,00000 § 1730p 1 Two Stall Parking Ara. 4,000.00 $ 4 000 00 _ 00 1 - Steel Bollem _ 250.00 E REPLACEMENT ITEMS TOTAL: 80 E00.00 1 R dean _ 155.Ip E 15500 $ 1 Trash Can 15500 155,00 P E 20 00 - 1 Blarabirtl House _ _ 20.00 - -- 1 Picnic Table-Griltl _ _ 150.00 E 15000 - - - 1 Picnic Table - 2 section wh.te 500.00 $ 500 FOREST MEADOWSEQUIPMENTTO$ 40.166.00 -- - - - ••+- ".; _, 4w 20B OAK XOLLOW •"a 199TH AVENtENW-689 ACRE 1 Oak Hollow Untleveloped Pad Sign 10000 8 10000 Park Sign &Landstaping $ 100000 _ Sign $ 10000 1 No SmoaarrHuni 10000 ___100.00 - Sign 1 NO HunOng Sign _ 150001$ - ---- - _ _ 1 Wood Sign Ppet _ _--5000 $ 5000 FUTURE EQUIPMENT TOTAL E 1.Oo0.00 OAK OAK HOLLOW EQUIPMENT TOTAL $ 350 60 *.. 24a OAKYIEW- 15851 AVOCET STREET NW-104ACRES -.. - x a_, ,. 1 Game Time Play SirucWne-2008 $ 2),16496 Sec my Light ..,5 _ .„.,.emu.. $ ,.. _2]_,16496 1 Park Name SlgnwRantlscaping 550.001E 550.00 rtPcnc Table )50000 2024:Playground Structure - $ 5650000 - $ ),50000 _- _ T _ 1 Slgn -Tobacco Free Zone 24 00 $ 500.00 _2024 200 w yds Engineeretl Wood Fiber _ g 24.00 Irrigation ($10,000) 1 39' Boarder Magic Edgmg 28000 $ 280.00 I Sandbox and Digger $ 15,000.00 REPLACEMENT ITEMS TOTAL: - - - $ 84 000.00 - _ _ _ 1 Trash Can 155.00 E 155.00 FUTURE EQUIPMENT 5,00000 f 2800000 _ _ _TOTAL i RecyG. Bin 155 00 S 1 2W a ds Engineered Wood Fiber 3. 00,00 : 155 00 E _ 3.60000- $ 1,800.00 f 500.00 - $ 1,800.00 -- Y - - - - - - - - - - 1 240'z5'Conaeta Sidewalk 1,M.00 2 Ped Benches 6' CB2 _ 250.00 1 _ Far Place Swing Set 1,800.d0 1 Volcano Climber -Handicap 2,10", _ $ 2,100.00 $ 45000 - - 1 Stang 450.00 OAKVIEW EQUIPMENTTOTAL 386)8.96 - H:IEngineeringlParksTarks InventorylPalk Inventory- 2021 - Updated 2-22-2021 City of ANDOVER 2020 Existing and Future Park Facilities Chart Page 2 of 2 pTV. DESCRIPTION(EXISTING) UNIT PRICE 255 WOODLAND CROSSINGS- 15827 JAY STREET NW •621 ACRES, Beglnnlnq FUTURE FACIUTIES _ TOTAL PRICE REPLACEMENT ITEMS ESTIMATED COSTS .n11 ,, ,......GYr. $ 32489.04 Imgation (y60,000) $ 1,60000 FUTURE EQUIPMENT TOTAL 20000.00 2028 PlaygroundStructurere '$ 67,50.00 1 Game'in Playground Equipment 32,48964 20 WO.W 2028 Shalbrwlwnueb slab E 32,000W i Park Slgn w/Rebinin Wall 1,800.00 2028 - _ 60 x 50 Asphalt Basketball Court REPLACEMENT ITEMS TOTAL: $ 20,00i 119 600.00 1 Sign - Wetland Buller 275.00 $ 275.00 $ 50000 _ -_ 2 8' Perk Benches C52 250.00 1 Trash Can 155.00 $ 15500 _ _ t 8' Picnic Table Concrete Lag 6W.W $ 600.00 1 6xl8' Steel Shelter wlconcreb slab 12,000.00 $ 12_,000.00 i Basketball Hoop and Backboard 700.00 $ 70000 1 165'-6Sidevalk 1,250.W 350.1)(1 $ 1.250.00 $ 35000 1 153 .12" Curbing - 1 Swing Set 4 Place "Iti $ 1,80000 _ 1 1Wru ds Engineered Wood Fibers 1160.00 BW.W $ 1,800.00- $ 1,200.00 2 Saddlemates -- 1 150x50 Aa M1alt Basketball Court T,SW.W f00.W $ 7,500.00 E 10000 1 Sign -Blue Gama Glass Projec[ -- WOODLAND CROSSINGS EQUIPMENT TOTAL WOODLAND MEADOWS- 2139172NO AVENUE NW-98 ACRES-, 62 319.84 _ 260 _ 625,00'$ 62500 1,9W.0011_S 190000 ]BS.W $ 16500 -� 1I No Future Facilities Anticipated _ 2021 2021 _ Playground Stucture - Large Concrab Ed in Wood Fiber SuRece _REPLACEMENT ITEMS TOTAL:• $ 24.0000 $ 10,5W.00 m6W.00 1 1 120 Spill Rail Fence _ _ Four Place Stain Set _ 1 Asphalt Path 1 1 1 _ Park Bench CB2 Park Name Sign w/Landscaping Picnic Table w/Concrete 2 Section Pad 1]O. d 550.00 600.00 $ 1T00o $ 55000 $ 60000 1 Powerewp0-La e-iB952011 15,051.58 E 15,051.56 1 Trash Can 155.00 E 155.00 1 1 Recycle Bin _ 155 Do $ 15500 1 Concrete Ed,, Wood Fiber Surface-2011 _ _ _ 5,000.00 $ 5,00000_- WOODLANDMEADOWSEQUIPMENTTOTAL E 24971.56 _ y9 ES are Structure Wood Fiber Digger Dortler $ 46000.00 -- R _ _ __ I _ B MAPLE VIEW9ARK 125116]TH AVENUE" AC __ _ $ 46,000,00 1 Playground Structure _ 27,68531 $ 2768531 No Future Facltes Ant mpaletl 203t PI ground 5ng lot $ 18500.00 1 Asphaltt-parkin lot 2016 I 16,23300 $ 2023900-. _ -_ _ -_- 2036 Shahan parking Shelte 1 an Digger-2018 T]S.W $ T]5.00 c REPLACEMENT IT EMS TOTAL: 116200.00 1 Park and O nS ace Sign -2016 _ 485]3 $ 465.]3 - - - - 1 Wood Riber-2016 1,961.81 $ 198181- 2 Concrete Picnic Tables-2016 565.20 $ 113040- -.__ - .- MAPLE VIEW EQUIPMENT TOTAL AREA"B" EXISTING SUBTOTAL: 303933.01 AREA"B" FUTURE EQUIPMENT SUBTOTAL: 49000.00 AREA"B" REPLACEMENT SUBTOTAL: 513160.00 HAI] ngineenng\Parks\Parks Inventory\Park Inventory - 2021 -Updated 2-22-2021 City of ANDOVER Pagel of 7 2020 Existing and Future Park Facilities Chart QTY. DESCRIPTIONIEXISTING) I UNIT PRICE Beganing_ FUTURE FACILITIES TOTAL PRICE _ REPLACEMENT ITEMS I ESTIMATED COSTS be 138TH AVE - TOT LOT- 2602138TH AVENUE NW-40 ACRES 1 Fence 550Cyclone _2003 _ _ 4,500. o0 $ 4,500.00 No Future Facilities Anticipated 1 Four Place Swing Set 1,300.00 $ 1,30000 1 � 360.00 f 360.00 - -" - - - 625.00 f 425.00 Duck Sp in id 1 Duck SPRpO Ride - REPLACEMENT -' -- ITEMS TOTAL: - _ 1 Horse Spring Ricks _ 425.00 S 425.00 _ 1 Trash Can _ 155.W z 15500-- 1 Sandi wRh Concrete Soo. Do S 50000 _ 1 GameTme Play Structure-2009 5,340.06 $ 5340.06 ,TOTLOT EQUIPMENT TOTAL _ 13005.06 30C CREEK D E 3216 S. COON CREEKOR -2T6 ACRES Park Sign E Landscaping $ 1,00000 CREEKRIOGE -EQUIPMENT TOTAL FUTURE EQUIPMENT TOTAL 31C CROOKED LAKE BOAT LANDING - 2980 BUNKER LAKE BOULEVARD - 2,51 ACRES 2 Concrete Picnic Tables-12 1_000.00 $ Z000_00 1 'Duck House _ _ 15.00 $ 15.00 1 Grills 100.00 $ 108.00 Landscaping $ 1,p00.00 Se_curiry Light q 7500.00 _ _ 202]'Sidewalk -310'x5 2027 Rolling DoGitor 203] Large Shelter wlConcrists, Pad S 15,400.00 -g _ 10,OOt1.00 & Security _ $ 114,000.00 1 Perk Name Sign wAandsCepin9 550.00 $ 550.00 1 Sidewalk -310'x5-20W 5,80000 $ 580000 1 Large Shelter w/Connete Pad 9 Security Light -2W7 26,32124 $ 2632124 _ _ _ _ _ (` 2037 Parkin Lot _ 2037 Rain Gallen 203] Concrete Boat Lending $ 262.000.00 $ _ 22)50.00 1 String Bench CB2 340.00 $_ 340.00 --: _-, $ 30.000.00 _ 1 Sign-Ci Code 25.00 $ 25,00 _ REPLACEMENT ITEMS TOTAL:' 464150.00 2 Trash Cans 155A0i 310.00- 5 BirE houses 2000 E 10000 - - - -� 2 Si n-Handicap Parting 2500 y 50.00 - 1 Bill Boat Trailer Parking _ 25.00 S 25.00- 1 Cyclone Fence 6 w/primary slats 270' 2,160,W b _ 2,160.00 - 1 'Parkin Lot -20W _ _ -. 98,842.53 § 98,842.53' - - --- 1 Sign - Dog Waste 25.00 S 25.00 1 Concrete Pad for Toilet 8'x 16' 45600 8 d5000 _ _ -- 1 Rollin Dock 6'x40'-200] _ _ $ 380000 - - 1 Rain 200J 8,5]6.83 $ 857663 6,576.63 - - Ed Mw 1 Sign Board wNenpus Signs 300.00- CROOKEDLAKEBOATLANDINGEQUIPMENTTOTAL S 149 ]9840 FUTURE EQUIPMENT TOTAL E 8.500.00 _ 32C DEHN'S- 1M32 GUARANI STREET NW - 2.32 ACRES i' N. Corrent Facilities Sustainable Landscaping $ 1000.00 FUTURE EQUIPMENT TOTAL fY"GREEN ACRES- 141411VYWOOD STREET NW-108 ACRE 1 _ "No Alcoholic Beverages"Sign _ _ _ 1200.S _ 1200 - - - Security Light_ $ 7,500.00 _ 1 Basket _ $ _ 47_500_ _ 2028 Concn;te Edging Mood Fiber Fall Zone $ 8,"0.00 wingoal SN61 300.00 1 Four Place Swing Set _ 1,300.00 $ 1300,00 _ _ - 202.8_ Playground Structure _ $ 40,500.00 1 ,Herd Court- Basketball 1,500,00 $ 150000'� - _ _ _ REPLACEMENT ITEMS TOTAL: 48800.00 1 Park Bendl 170.00 $ _ 1]0.00 nBack Stop 1,18300 $ 118300 3 Trash Cans 15500' E 46500 1 Trash Caro 155 00 $ 15500 - - _ 1 P'cnc Table 2W.00 $ 25000 1 Park Name Si n w/Lantlswping _ silk s 550.00 + - 1 45It. Solver - Magic Edging 325.00 $ _ 325.00- 1 S- n Tobacco Frea Zone _ 24.00 § 2400 Concrete EdgingMood Fiber Fall Zone -2013 $ 649864 __-- - - 1 Gameilay Structure,uStructure,2013 1$ 1400000 P9491 949B 44 - 1 DiggerBackhoo 36000 $ 38000 - - Y 1 Car Spring Ride _ 42500 8 42500 _ - GREEN ACRES EQUIPMENT TOTAL S 30.692.44 __L_ FUTURE EQUIPMENT TOTAL ]5p0.00 34C HIDDEN CREEK NORTH -2620BUNKER LAKE BLVD. NW-8.41 AC E HAEngineeringlParka\Parks InventorylPark Inventory- 2021 - Updated 2-22.2021 City of ANDOVER 2020 Existing and Future Park Facilities Chart Page 2 of 7 pTY 3 "No DESCRIPTION Motorized Vahides' Sign_ UNIT PRICE 28.M FUTURE FACILITIES Baginnln9900.00. $ 8400 Lentlscaping E TOTAL P0000.00 Annual PLACEMENT ITEMS $ 1,000.00 Annual'Field Maintenance: Regress, Reseed, IMgation Ume Metetlel ESTIMATED COSTS $ 10,OM.M 1 Stu Piece Swing Set 1,900.00 Dugouts E 1, _ _ you $ 400000 Sheller(Medium) w/picnic table $ 1,000.00 $ 40.000,00 2020 Playground Structure" 2020 Wood Chi n" $ 10,000.00 2022 128'- 6'Fence w/Mow Ship $ M'Bodm 1 w/Sotl Infield 6,000.00 $ 13,W0.00 1 Ball Field 3,000.M $ 3,000.00 $ 13,8W.00 1 Base Box Mudd $ 5000 $ 1,10000 , E 425.00 J $ 49,22000 $ 1282400_ ImgabiOn Uppredea E 7,OM.00 Raise BalMeld Fencing Height to 8' Park Lighting (Pecking Lot, Treils, etc.) [$40.DD0] $ 15,000.00 2022 $ 15,W0.00 2022 160'-4' Sitlalina Fenw N. Strip 1 1 Basketball Pad 1,100.00 480- B' Coll Fence wNt w Strip $ 32,31W.W Basketball Pole, Backboard, Rim and Net 425.00 $ 8,000.w 2022 Soccer Goals - Regulation Set 1 Irrigation Syshim -2001 49,220.00 _ Concrete dugout pads IS47,000.00 1 KidRma$men-2000/2005 12,824.00 _ - ` _ _2031 2032 2032 Welkin Thus - Asphalt _ ParlOng Lot - Asphalt REPLACEMENT ITEMS TOTAL: $ 45,000.00 $ 248,000.00 471 700.00 1 1 1 _ Me Go Round Ride PaMing Lot - Asphalt - Home Plate 1,400.00 57,000.00 60.00 $ 1,400,00 $ 57.000.00 E 60.00 _ 2 Park Benches w/ concrete Pads 250.W E 50000 2 Park Name Sign (1 old, 1 new le) 250.00 $ 500.00 '- 1 Picnic Table sol $ 300.00 - - -- 1 _ Pitching Rubber 45.M E 4500 1 Powers cape Medium - Includes small, med S 19 amh - 20,OOD00 $ 20,000 00 - , - - - 2 Sew' U ht (Connexus 0v ed) - 5 - 1 Sete Three Bases 200.W $ 20000 $ _ 1,564.00 $ 1,000.00_- $ soon 00 $ 270000 .. $ 1]0000 1 1 Six-Sa ion Backsbo w/six-Section Overhang Cage Sloshing Rink 1,584.00 loll 1 - -- 1 Soccer/Football Field 3,000.00 1 1 Soccer Goals -Re uminu Set _ Bleachers-4Tier Aluminumw/Concrete Petl 2,995.00 1 Numinum Players Benches -15' Sat _1,]0000 MO.M 0 $ 50000 - - 1 128'- 6' Fence w/Mow Sinp-2M2 51155.84 $ 5,15584 1 iW'-d' Sideline Fence wlMow Ship-2M2 2,674.W E 2,674.80- 1 480'- B'OuMald Fence w/Mav Strip-2M2 12,169.15 $ 1216915 - 1 Conmetedu out ads 10,693.38 $ 1089338 j 1 Baseball Field Layout -2001 8,03600 $ 803800 - 1 1 Wood Chips - 6.40000 $ _ Concrete Curb 1,800.00 $ 180000 E 620,00 _ _ -- d an Cana 155.0 2 Recycle Bins _ 15500 $ 310 00-'- I Wasing Tail - Asphalt 10,50000 S 10,50000 1 Whale Spring Ride 450.00 $ 450.00 ' _ - 1 Moto c c a Spring Ride 450.00 $ 45000 2 Handicap Parking Sign 25.M $ 50 00 1 GameTlme Play St111cWre-200MM5 14.430,75 $ 14,43075_- $ 60000 3 Arch Climbers - la e, medium. small 200.00 2 Foul Pole Flags 25,00 $ 50.00 1 Concrete Picnic Table wl2' Pad goodo $ 90000 $ 50000 1 _ 40' Fence Added to 4' Sideline Fancy 500.00 1 No Pepper DiEls Sig n 25.00 E 25.00- 2 Metal Bet Holders 25M It 5000- $ 18090 E 2g8.a11.9T FUTURE EQUIPMENT TOTAL $ 81 000.00 I ¢ 16,636.24 'Landscaping _ '$ 1,000.00 2022 Playground Swcture 35,000.00 $ 10000 _ 4Y 2022 Engineered Wood FlbeREPLACEMENT ITEMS TOTAL: 5,000DO 8 25000 - .I 40000.00 $ 15500 1 _. _ D Fence Cover HI". HIDDENENCREEK NORTH EQUIPMENT TOTAL RIDDEN CREEK- 3415 HIDDEN CREEK N 180.00 2 ACRES 16,638.14 10000 1 GameTime Play Stmcture-2006 1 Park Bench 1 Name Sign (Old style) 250.00 Recycle lCanln - 1 Them 155.M 1 Sign - Tobacco Freenne 2400 $ 2400 _ 1 8' x 14' Concrete Picnic Table Pad 900.00 $ 900.00 £ 1 150 yds Engineered Wood Fibers _ 2.700.00 $ 2,]0000- 1 35 linear e. border - Magic Edging 245.00 $ 24500_ _ - 1 255' x 4' Concrete Sidewalk Boards 1,80000 5 1,800900-- I _ Picnic Table w/10 Concrete Pad 250 M $ 250 00 1 _ Motorcycle Spring Ride 45000 E 450.00T -. 1 Clifford! Spring Ride _760.00 $ 700,00 1 Four Place, 3 pole Swing Set 1.700.110 $ 1 MOM '- HIDDEN CREEK SOUTH EQUIPMENT TOTAL 26 0672A : FUTURE EQUIPMENT TOTAL I1000.W -- H:1En6ineenng\Parks\Parks InventoryTark Inventory- 2021 - Updated 2-22-2021 City ofANDOVER Page 3 W] 2020 Existing and Future Park Facilities Chart OrInrl DESCRIPTION IEMSTING) _ UNITPRICE I Beginning i _ _FU_TURE FACILITIES TOTAL PRICE ROIINR 0 PARK =T66210rENIA STNIN46256ACRES _- 380'Atljustable Bdtlge-1994 40,000.00 $ 40,000.00 Additional New Trails (possible Grant Ponds) $ 228.000.00 2024 Bluebird Houses 1500 $ 60000 I1 Park Slon B_-Landscaping(2 locations) _ _ i_$ 2CCO 00 2026 IOuck Houses _ 22.50 $ 22500 Security Light(2) S 1500000 2026 - REPLACEMENT ITEMS 380Adjustable BridgeReplacement$ Parkin Lot- Asphalt includes en trance -Replacement ESTIMATED COSTS 100,00000 $ 220,000.00 JSCv1(EESEV 1 40 10 real-NoM/BouN Asphalt - Re larcement REPLACEMENT ITEMS TOTAL: _ $ 610,000.00 9J0 D00.00 5 To" Cans 155.00 E ]]5.00 NaturePlay Area (5 Total) _ $ 60.00000 4 2 'Ra001emond Sign 26.00 E 11200 :e Picnic SheM1ar wlm Vault Resfroom end Tables $ 56.00 'r Dock -- $ _ 150.000.00 $ 22 b00 00 'Handicap Parking Sign _ 28.00 - 5 Park Bench 100.00 Perk Name Sign _ 250.00 Parkin Lot- Asphalt (Includes entrance).1998 51,OW.W Security Light (Connexus Owned) - Steel Bill Pasts Sam Troil-NonhSouN-AspheO-1998 141,000.00 Dog Waste Dis eels 80.00 Pi Map Signs 175.00 wfi Park Sign .andscapinq Bloc _ 2,300.06 Bat Houses _ Saw Signs- ONR Cooperation Grant 25M Si n-Preitle Res[aretlon lWormagon 25.00 _ E_ 500.00 Concrete Rai near Parking Area $ 20,000.00 E _ 250.00 _ -__. .. 1,045000.00 S 51,00000 Benches on Concrete Pad(B Total)S 20, 000.00 _ g PicnicTables on Concrete Pad (8 total) $ 20.0::0 00 3 120 c0 1 Anistialnterpretive Nature Nodes (10 Total) 5 20,000.00 5 _ 141,00000 Vhyfll 8gne0e/trail ldent Misence Merkers($26000) $ 10,000.00 $ 32000 _ Restoragond.andscaping ($50,00) $ 25,000.00 $ 525.00 _8 _ 2,300.00 $ 120.00 $ 7500 8 2500 - 1 1 - - 1 2 - - 1 4 3 - 1 2 3 - I - 4 Signs -wood directional along read. Round Lk Blvd 125.00 $ _ 500.00 - 3 No Motorized Vehicles Allowed Signs 28.00 $ 84.00. 3 Forest Enhancement Sign 25.0018 75.00 KELSEYROUND LAKE EQUIPMENT TOTAL 238,662.00- 1 Park DOWOOONORTH-4619148TH AVENII RE " W' ". - Bench I _ 1]000 $ 1]0.00 1 Re*Name TalSi/Concre2 Sang -- ENW•SJ AC 55000 $ 200.00 1 Pimic Table w/Concrete25ec0on _ _ 200.00 $ 20000 1 Four Place SwingBe 1,80000 $ _ 180000 1 Trash Can 15500 i E 15500 - - - FUTURE EWIPMENTTOTAL 1635500.do �Secunty Light _ Landscapin4 _ 12 Basketball Court _ PAW-, $ ],50000 2024 E 1,000.00 2024 E 15,000.00 - - Playground Structure S 4000000 Wood Fiber Fall Zone S 8,300.00 REPLACEMENT ITEMS TOTAL: S 46300.00 - - 1 1 _ Re Ge Bin _ Volleyball Court - 155.00 1,W0.00 $ 15500 E _ 15100_0_ 1 Volleyball Pole B Net Set 475,00 $ 4]5.00.1rT $ 1,900.002 _ _-- 1 70' Retaining wail biack 8 landscaping 1,900.00 _ 1 Sgn- Tabs=Free Zone 24.00 _$ 24.00 - 1 136 x 5' concrete aitlewalk 1,100.00 § _ 1,1c0.00 $ 60000 _ 1 24V x 1' concrete mr0lnq 800.00 18p49.9B _ 1 GameTime PlayStructure - 2009 $ 18,748.98 1 Wood Fiber Fall Zone-2009 4,00000 § _ 4,000.00 i 1 Concrete Pad 200.00 $ 200 00- MEADOWW000(NORTH)EQUIPMENTTOTAL $ 31,577.90 FUTURE EQUIPMENT TOTAL g 23.500.00 SEC MEADCWOOD SOUTH- 4568147TH 1ANE MIN -084 ACRES No Current Facilities -Sustainable Landscaping BTrees $ 100000 FUTURE EQUIPMENT TOTAL $ 1.000.00- 39CMEADOWS OFROUND LAKE-4040146TH LANE NW-3T ACRE 1 :Car Spring Ride 1 425.00 $ 42500 Lands_ ing _ $ 100000 2026 1 Park UnionName _ _ _ _ 250.00 $ 1]000 2028 1 Park Name Sign 250.00 E 250 00 T 2028 _ T _ - _ 1 Picnic Table w/Concrela Pad _ 225.00 § 225 CO _ 1 PdmeTme Play Structure-2008 19,025.78 $ 1902578 - - - ym. Playground Structure _ S 40,000.00_ Woodchi Fall Zane _ $ 10,00000 108' RoWnlag Wag - $ - 9,000.00 _ REPLACEMENT ITEMS TOTAL: -- 59 000.00 1 Tmsh Can _ 155.00 S 15500- 1 (Recycle Bin _ 155.W $- S 1,200.00 1 Landsmpa Wall Around Park Sign Swing Set-3 pole e2 swings, 2 baby swings - _ 1.200 W - 1 2,200 W $ _ 2,200 00_ - - 1 CIIRord Spring Ride _ ]00 00 $ _ 700.00 $ 70000 1 Fmg Spring Ride 700.00 1 108'Rerainin Wall -2008 _ 3.00 ,460 § 3,40000 1 Wood Chip Fall Zone -20M 4,8MOO § _ _4,800.00 $ 450 00- 1 120' x 1' Concrete Curl 450.00 _ 1 100' x 5' Concrete Sitlewalk 800'00 E 80000 1 Sign _Tobacco Free Zane 24.00 $ - - MEADOWS OFROUND LAKE EQUIPMENT TOTAL 6T9.]8=. FUTURE EQUIPMENT TOTAL 1age .00 HAEngineeringUterkalPerks InvenlorylPark Inventory - 2021 - Updated! 2-22-2021 City of ANDOVER 2020 Existing and Future Park Facilities Chart Page 4 of 7 QTY. DESCRIPTION (EXISTING) _ _ _ I UNIT PRICE Beginning _ FUTURE FACILITIES _ 1 TOTAL PRICE REPLACEMENT ITEMS $ 4,000.00 Landscaping I$ 1,00000 Ann IBallfieltl Maintenance. Regrets B Rii $ 14.56500 Annual Ag LPlayima Malarial E 4,56500 Metlium Sltellerwl Picnic Tables (Small Shaltar-$40,000) $ 20000.00 '1: 202E Concrete Border w/vVOod Fiber Fall Zone E 425000 0 -- - 20M 601nearfl l6 High Bussel Cnce ITEMS TOTAL: E Sao 00 2035 12 Spam Asphalt Parking Lot w/Concrete Cum $ 1 30()00 _ $ 17000- $ 465.00 ESTIMATED COSTS S 5,000,00 S 100000 E 0,30000 40C NORTHWOODS EAST•1dOJ6 YUKON STREETNW-2.12ACRE5 1 iAgllme 1 12 Space Asphalt Parking Lot w/Concrete Curo_-2005 1 Ball Fill 4,00000 18,320.00 4,565.00 1 _ Spin Ride 425.00 Hors. St pring da $ - $ 79 000.00 ,000.00 1 - Bacti Digger 360.00 1 Two Place SwungSet 1,300.00 120000.00 100.00 1 Park Bench 170.00 3 Taah Cane 155.00 1 Recydie Bin 155.00 $ 155,00 1 Picnic Table 250.00 $ 25000 2 Players Benches 15' Aluminum 300.00 $ 800.00 1 601ineal 16'High Backst Fence 7,500.00 $ 7,50000 $ 500.00 1 _ 235linear R 2' wide Mow EMIR_ 500.00 2 Bel RecksMolders 50.00 $ 100.00 _.. 1--Home _ Plate 60.00 E 60.00 1 Sign - Handicap Parking 25.W E 2500 _. 1 Park Name Sign wilaundscain 55000 $ 550.00 1 1 40 linear It Border Magic Edging 310.00 E 31000 E 1,70000 $ 12500 $ 18000- $ 45.00 $ 4,00000 $ 1500 S 14,792,16 E 60937.t6 FUTURE EQUIPMENT TOTAL $ 21.000.00 1 $ 500.00 Landscaping_ _ $ 1,000,00 Annuall ield Maintenance Regratle & Reseed $ 500000 $ 170.00 Security Light ,$ 7,50000 $ 25000 Pave Parkin9Lot110Stall) _ $ 22,50000 2032_ Tennis Courts (2), Pavement with Fending $ 212,000.00 E 12400 REPLACEMENT ITEMS TOTAL: 217000.00 90600er $ 6,00000ter-Small 1 1 1 _ 3Row Bleaches Security Light (Cane Owned Double First Base 1,700.00 12500 1 _ Set 2nd&3rd Bases 180.00 1 PRNin Rubber 45.00 1 1 Concrete Border wANood Fiber Fell Zone Bluebl_M House 4,000.00 1500 14,792.1E 500.00 17000 250.00 1 Generous Play structure -2013 NORTHWOODS EAST EQUIPMENT TOTAL N RT W D f - T-2T21 140 -3.81 ACRE 41C 1 Class V Parking Lot- Small 1 Park Scorn 1 Park Name Sign _ net 82.00 Post -Tennis net 45300.E Field 3,00000 1,800.00 $ 1,80000- 5' C one Fence wNow SMp00 E 3,385.00is $ 80.00000 rls-Tennis Courts, Pavement WM Fending 40,000.00 nis Nets 185.00 E 37000h Can 155.00 $ 15500die Bin 155.00 $ 15500ic Table-Conoaro 10'w/conuero ed 500.00500.00 -Tobacco Free Zone 24.00 $ 24 00 $ 28000 _ 1 1 _ 40 linearfl Border Meglc Edg rig 280.00 Lights on Posed 2,500.01) $ 250000 1 _ Landwaler Conaenahon Sign 25.00 1 $ 2500 NORTHWOODS WEFT EQUIPMENT TOTAL 97144.00 FUTURE EQUIPMENT TOTAL 31000.00 PLEASANT OAKS- 3857143RD AVENUE NW-20.29 ACRES N M 1 r,,cd Vt le�'Sign 28.00 $ 2800 Landacaping $ 1000.00 2027 IConcrete Edging (Wood Fiber_ Fall Zone 420Cyclone Fence with 12'Gete with Mow Strip 10,200.00 $ _ 1020000 202] Playground Structure BlueblM House 1500 $ 7500 2032 420' Cyclone Fens with 12' Gatewi Mow SVip Four Place Swan Set 1,300 00 1 $ 1300.00 REPLACEMENT ITEM$ TOTAL $ B 300 00 $ 50,000.00 �- _- - 42C 1 1 5 $ 27.001 1 85 J00.00 1 Park Name Sign wlLandscaping 550.00 $ _ 55000 _ ADA Access Tall to play area (]5 z $50A0 p10 _ $ 1 Picnic Table Concrete 6' Pad 200.00 $ 200 00 1 SabiLight (Corm eaus) $ 1 _ Skal Rink Mom $ 50000 1 _ _ _ Trash Can 155.M E 155.00 1 Sign -Too.. Free Zone _ 24.00 $ 24.00 2 i _ _ Enabes Baskets lo0.00 $ 200.00 - $ 400000 - Concate EggingwM.d Fiber Fell Zone 4,0% 1 Park Bench 170.00 $ 170.00 HAEngineenngWarkslPatks Inventor/Perk Inventory- 2021 -Updated 2-22-2021 City ofANDOVER 2020 Existing and Future Park Facilities Chart Page 5 of 7 QTY1 TON (EXISTNG) One- UNIT PRICE Baglnnlnp FUTURE FACILITIES_ TOTALPRICE REPLACEMENTITEMS ESTIMATED COSTS 1 201 ',PlaYgrountl Stucture-2012 _ 23,601.51 $ 23,601.51 -- -- - - - PLEASANTOAKSEQUIPMENTTOTAL 41003.51 A I FUT_U_REE U1PMENT TOTAL $_ _ 4750.00 43C RIVER TRAILS -4535107TH LANE NW-1285 ACRE. INo Cunent Fec_il ues_ Weedd ka tlAWe§r9 Ho a $Sgp § �+'� a �.n wn _ FUTURE EQUIPMENT TOTAL S -- 44C ROSE- 14067 ROSE STREET NW-097 ACRES 2 Home am late - - _ 600D_$ 12000 ' Landsta ing _ 5 100000 Annual Edreld Ma Maintenance Regretle Reseed,_Inigation 10,000.00 1 1 .Park Bench Perk Name Sin g 1]0.00 3 250.00 S 17000 25000 _ _ Secu Li hts 2ima ( ___ _ $ tenet _ - -- $ y,lppgp - 1 Pic i ADA TreJ Access NOM Side GPerk to Parkin IM ( 15000.00 Structure E 40,000.00 c Table w/3 Section Concrete $ 90000 12 Basketballcourt § rAnnual 1509roatldterial Y Wood Fiber $ - 10,xi 1 PoG1mg Rubber d5 W g 45.00 - _Engineened " 1 Secerlty Light (Cannaxus Cwnetl) $ �$ _ _ 2035 New Ballfieltl FOnGnp w/ Moe Stnpa _ $ 160,000A0 2 Set of Three Bases 200 00 - 400.00 _ _ _ 2013 Medium Shelter g f 00,000.00 1 N. Bellfield Fencing wNovr Stil 59,959.70 $ 59,959]0 -- 2045 Asphalt Parting Lot E 225,000 00 1 _ Swing Set Four Place 1,300.0p s 13a0.00 _ - REPLACEMENT ITEMS TOTAL: Sp00effl -0.00 5 Thish Cans 155.00 $ 775.00 3 Rai Bin - - -- 155.00 $ 46500 - - - -._ 1 tr Gememe Play13,384 Y Stootum2004 t 3,384.68 E- _ 1 Sign Free Zone 2A00 E 2400 - 1 - - Spring Ride - Car _ -- 425.00 $ 42500 + - 1 Spring Ride - Duck 42500 E 42500 lOrcyGe L. 425.00 $ 425.00 - 4 4 BatR lIHal Bet Racks / Holders 45.00 $ 18000 1 150 cu yds Engineered Wood Fiber 2,600.00 $ 2,600.00 _ 1 275 ft. Bonder - Magic Edging -_ 1,95000 $ 1,950,00 - - 2 Bleachers 1,7o0.00 $ 3.400.00 T - - 4 Benches lS' 450.00 $ 1,80000. -- -- 1 Im ation System 26,860.25 8 26,86025 2 Ball Fields w/Gress Infields ])18.19 §- 1 Asphalt PeMing Lot -2015 _ 47,759.86 E 41769.85- 1 Shelter with Concrete Pad= Large _ E 41,348.13 1 'Dugout Roofs E _ 940000ROSE-EQUIPMENT _ TOTAL 229809.99 FUTURE EQUIPMENT TOTAL 56000.00 _ 43�-@OUNO LAKE BOAT LANDING -tYFi ROIINO`LeKE BL11U�fJW'] E1 ACRE 1 o 9Lake( Sign 1400 $ 14 00 Secun ht S 7 500 00 23 Annual Parking Lot Repairs (Class V Gravel) $ 1 1 iHunting Cla VParkin Lot metlium) 4,50000 $ 4,500.00 grit taping Parks &Landscapingah^m $ 100000 000.00 REPLACEMENT ITEMS TOTAL 1000.00 2 Wootl Duck House 2500 IS 5000 tructamtLa^tl rose to enter (g50,0pg) $ 2500000 ROUND IAKE BOAT LANDING EQUIPMENT TOTAL E- 456400--C -_ _ � - -� FUTURE EQUIPMENT TOTAL a3500.00 UC STROOTMAN - 4575164TH AVENUE NW -11 37 ACRES - 1 1 BBllfield Fencing _ 12.884 54 $ 12,884.54 PaM Sign 8 Lantl capi�iq S 1 000.00 Annual Bonfield Maintenance. Regrade 8 Reseed 5, 00e00 _ Ball Fieltl _ 19,54855 $ 19.548.55 $ __3 __ Annual Ag Lime Material b 1000.00 2 Bird House _ 1500 E _ 30,00 - 000 $ _ _ _ 2025 Shelter $ 1 Dial Parking Lot - Large _ 6,000.00 $ 6,000.00 ADA Appose T,.I-Rwer-(t50'-xi W gnPR) Sz690 $ 30,000-60 202] Ballfieltl 1 Four Place Swing Set 1,300.00 $ 1,300.00 NewOuHiN4($8}Fenugw4nawsla, ws1Y{ /-lyww_,np $33ISB 5 - Fencing § 3420p pp 1 Homa Plate 60.00 $ 60 00 .ncl .. - 2035 Plsyground3tructura E 35,W0.00 1 1 _ MOIoroyGe Spring Rid Park Bench w] Concrete Pad _ 425.00 $ 170.00 $ - 425 00 170 00 : Pave Ballfieltl Parking Lot (30 stalls) $ 7 n; - REPLACEMENT ITEMS TOTAL: 106 200.00 - - - - 1 Picnic Table- 3 section concrete 20000 $ 200,00 - 1 Plcnic Table -small 3WW $ 300.00 - - -- - 1 Pitching RODDer _ _ 4400 $ _: 45.00- 1 _ sat of Three Beses 200.Op- 1 _ Shelter -Small 1,6001 §- 1 Shelter WMContmte Pad -Large 4279.00 $ 4,27900= - 4 Trash Cans _ 155.00 $ 820D0 - - - 1 Reci Bin _ 155A0 $ 155.00 - - - - - I Gamal PlaYSWd m-201 14,94000 $ 14.940.00 1 ''Security Eight (Germans Gvned) -- _ $ - - - - - - 1 .ADA Access Pads 1,560.00 $- $ 1 Duck Spring Ride 450.00 HAEngineennglParkslPm-ks InventoWark Inventory- 2021 - Updated 2-22-2021 City ofAND OVER 2020 Existing and Future Park Facilities Chart Page 6 of 7 TY DESCRIPTION (E)USTING) UNR PRICE _ Beginning FUTURE FACILITIES TOTAL PRICE REPLACEMENT ITEMS _ ESTIMATED COSTS 1 Backhoe Digger Ride 375.00 $ 375.00 ' 1 Bleacher-3 Section Aluminum 1,500.00 E 150000_ 1 _ Sign -Tobacco Free Zone 24.00 E 2400 2 Pla are Benches-16' Aluminum 300.00 $ 60000 $ 1,80000 1 Park Name Sign )LOnd.capingi 1,800.00 .- 1 130' Chain Link Fence 4' black Any] waled 1,400.00 E 1,400.00 5 Bel Houses _ 20.00 Metal Bet Holden _ 45.00 $ 10000 - _ _ $ 90.00_' $ 200.00 2 _. 1 30'Concrete Sitlaw_alk _20000 STROOTMAN EQUIPMENT TOTAL - Canoe Lending_ _ 1,40000 $ 70856.09 FUTURE EQUIPMENT TOTAL Pave Parking Lot (Canoe Area -10 stalls) _ ADA Access Treil b River (150' x $50.00 pl0_ fit g00.00 u➢ �.._OOTMANC $ 1,40000 E 500 00 $ 225.00 $ 25,000.00 8 7 500 00 1 1 ClassV Padin i Lot - Email 500.00 1 Pad Name Sign 225.00 2 _ Barricade Post - Set 150.00 $ 30000 1 _ Trash Can 155.00 $ 15500 _ 2 "No Motored Vehicle" Sign 25.00 $ 50.00 $ 3000 _ 2 Bluebird Houses 15.00 3 Wood -Duck House 40.00 $ 12000 1 Si n-Slow No Wake 75.00 $ 75.00- $ 24.00 _ _ E 50000 `. $ - 3 379,00 FUTURE EQUIPMENT TOTAL - $ 4,030 00 Landscaping $ 1000.00 Annual - - _ - $ 298uO Security Light E 7,500,00 Annual § 3,000.00 1 202] $ 400.00 ' 2033 $ 1,584.00 1 Sign - Construction Fund 24.00 - 2 Sign - Sradle Launch 250.00 BalHield Maintenance Regrede, Reseed Ini ation 1 Security Light (Connexus Owned) STROOTMAN CANOE LANDING EQUIPMENT TOTAL 47C- TERRACE - 1363E POPPY STREET NW.7.33 ACRES - $ 5,00000 v�Wi w 4,000.00 1 AOlime Ag Llme Matenal E 1,000.00 1 BackhOa Digger 298,00 Welkin Trail -Asphalt Playground Wootl Chi s $ 40000.00 $ 100,000.00 i _ Bell FielO 3,00000 4 Banchea Ple ars 8' im.00 1 Four -Section Becketo 1,564.00 1 Home Plate 60.00 $ 6000 E 170 pp- 2 ;'". 2035 - Retaining Wall Fencing wl0l Mow Sing S 43,00000 1 Pad Bench 170.01) 1 _ Fencingwi0l Mow SWP-2015 16.088.79 _ $ 18,068. _ _ 203]_ Peeling Lot 27 Spaces _fflTOT� $ 248,000.00 REPLACEMENT 1 Inigati 18,682.00 $ 18,68200 _�. _ 1 Pad Name Sin wAandseapin0 550.00 $ 55000 1 _ Picnic Table 200.00 E 200.00 _ 1 PItGling Rubber 4S.00 E 4500 _. 1 Sandbox w/Concrete Walk end Retaining Wall 3,4001 $ 3,40000 - 1 Seou ity Light (Conn utus O.metl - $ 1 Set of Three Bases 200.00 $ 200001 Shaker- Small w]Concrete Pad 1,200.00 E 1,200001 Four Place Swing Set w/ADA Swin entl Ped 1,30000 $ 1,300,001Ouck Senn Ride 425.00 $ 425001 MMacyGe Bpnng Ride 425.00 $ 425001 Car Spring Ride 625.00 $ 625002 Trash Cans 155.00 E3100o1 Walking Trail-Asphell 1251000 $ 1 Parking Lot 27 Spaces -2007 57,406.05 $ 57,40605 _ - 1 Basketball Pole and Goal 700.00 $ ]00 00 1 40 linear It 6 Sidewalk 250.00 $ 250.00 1 1 901lnearfl dewalk 550.00 § 55000 _._ 401ineer fl Borter Magic Edging _ 290.00 $ 290 00 150.00 1 20' Retaining Well around Tree 750.00 $ _ - 1 Sand Volleyball Court 48' x 80' ]00.00 1 240linear ft Volleyball Court EOpinp 1,880.00 166000 1 _ _E_ Volleyball Net and Post Set 475.00 $ 475.00 Sign -Tabs. Free Zone 2400 $ 2400 EquTTOTAL $ 33,24395 Gamesome EQUIPMElaygroundNT TERRACEEQUIPMENTTOTAL $ 161,821.79 WILD IRIS .3719 BUNKER LAKE BOULEVARD NW -11 73 ACRES "No Motored Vehicles' Sign _ 2500 $ 56. DOAnnuel .Basketball Pad Asphalt 4,20000 $ 420000 _- FUTURE EQUIPMENT TOTAL 1 1 - BallOeld Maintenance: Regrede 8 Reseed AnnualA Lime Material _$ 5,000,00 'EBC 2 1 $ t000.O0 . H:lfngmeeringlParkslPads lnventoryTark lnven ory - 2021 - Updated 2-22-2021 City ofANDOVER 2020 Existing and Future Park Facilities Chart Page 7 of 7 TY DESCRIPTION(EXISTING) UNITPRICE _ Beginning FUTURE FACILITIES TOTAL PRICE_ REPLACEMENT fTEM3 O ESTIMATED COSTS S 1 1 Basketball PolelBackboao RdimR iet Slzry (60) Pia. Asphalt Perking Lot w/CurO, Field Ralocafion--' 475 00 3e,900.00 $ 475 00 $ 38 900 00 ' q _ 2022 2022 _ 2022 2023 Six SeNon Backstop w/ Dugouts Cement 126' Six foot Fan. w/ mow sto COS f i 1 1 lima Ball Field _ 5,618.33 11,224.71 § 581833 ;'.�� E 11,224.71 .I $ 60.00 - - - - Eight foot Outfield Fence w/Mow 3lri Ple round Structure-5-12 § 14,600.00 _ -Home Plate 60.00 1 1 1 1 1 1 Pdchin Rubber _ - Set ofTomeBasas Six Becton Backstop wlnugouts Cement faPFour foot $ideline Fence w/Maw Strip Sd foot Fence w/ mow atop 45.00 13500 9704.50 2,006.1E 3,031.80 E 45.00 $ 135,00 S 9,704.50 $ 200616 $ 3.031.80 $ 5.50732 ,'- r' ',' " 7. _ _ _ _ _ _ 2023 2023 2032 2032 _2032 Playground Strudura- Ple ense - 2 to 5 ro E 33,000.00 Wood Chip Fall Zone Basketball Pe0 Asphalt Sizy (80 Place Aspbett Parking Lo[w/Curb Welkin9 PaN -Asphalt Expanded REPLACEMENT ITEMS TOTAL: E 13,600.00 $ 11,100.00 E 168,000.00 f 1]9,00000 500 3g0.00 W_ ' 364' EgM foot Outfield Fen. w/Max Stop _ S50732 _ --- ' 2 15'Aluminum Players Bencltes _ 25000 S 500.00 - 1 Sheller - Small - 1.60000 $ _ 1600,00 $ 465.00 _ - - - - 3 Trash Cans 15500 - - - -- - - - - - 1 _ _ Recycle Bin 15500 $ 15500 - 1 Walking Path -Asphalt Expande0 41,447.00 $ 41447,00 E_ 15,548.23 $ 12,572.27. -- - _-- �.- - 1 Gametime Play Structure -2002 _ 1s 1 PlaYsense Design 301 -2002 ,548.23 12,572.27 -- - - 1 Swing Set-(2 SwmgsQ baby) 1A00.00 $ 1,40000 - - -- 2 Foul Posts 25ol) $ 5000 $ 500.00 - - - 1 Picnic Table Concrete IV w/concrete pad 50000 2 1 Foul Pole Flags Park Bench w/.nctste pad 2500 400.00 _ $ 5000 8 400 00 $ 5,200,00 $ 130000 E _' 550 00 $ S 170000 $ 45000 $ 450,00 S 7500- $ 90.00 E 2500 E- $ _ 24 00- $- $ _ _ 2s.00 $- $ 36,16529 § 203,916.61 1631624.97 - - - -- - - — -- _ - -- - - - - - --- - - -- _ - - - - - - i - -- - - - - FUTURE EQUIPMENT TOTAL' AREA "C'FUTURE EQUIPMENT SUBTOTAL: 2019260.00 AREA"C" REPLACEMENT SUBTOTAL: 4088860.00' I _ Wool Chip Fell Zone 5,2W.00 1 Concrete Curb Around Fall Zone _ 1,300.00 1 1 Park Name Sign w n.xu. C voe Secudy Ughl (Connexus OwneO)_ 550.00 1 1 1 BleacherAWminum 3 Raw Home S d Rile Motorcycle Spnng Ride _ - -1)0000 450,00 450.00 1 Dog Bag Dispenser for Waste 55W 2 1 Bat Racks / Holden Sign - Hendi.p Parking 45.00 25.00 1 1 1 S -Do9 WeaN _ Sgn - Tobacco Free Zone _ Mo Pepper Dnlle Sign 25.00 24-M 25.00 1 Vehicle Parking m Designated Areas Sign 25.00 1 1 _ 180' Yellow Fence Cover Imga5o_n system-2018 WILD IRIS EQUIPMENT TOTAL AREA"C"EXISTING SUBTOTAL: 38,165.29 HAEngmeedng\Parks\Parks Inventory'Palk Inventory- 2021 - Updated 2-22-2021 City ofAND OVER 2020 Existing and Future Park Facilities Chart Page 1 of 10 QTMII DESCRIPTION (EXISTING) UNIT PRICE Beginning 59D ANDOVER LIONS 948BUNKER LAKE BOULEVARD NW -19.04 ACRES 1 280Cyclone Fence with Mow Strip- - ice $ - 1 Aglime ---- 2,]15.001$ 2,71500 1 Playgrountl Stmdure-201] _ 36,144.40 $ 38,14440 1 Ball Field 1,000.00 § 1,000.00 2 15' Aluminum Players eenchea w/Conaele Pad 500.00 $ 1,000 00 1 Bases - Set of Throe 200.00 S 20000 _ 1 Home Plate 80.00 §- 60.00 __ 1 30 Spars Asphalt Perking Lot w/Curba 1],500.00 $ 1]50000 1 Pitching Rubber 5.00 8 .00 45 FUTURE FACILITIES TOTAL PRICE _ 'Small Shelter w/Picnic Tablas $ 20,000.00 _ FUTURE EQUIPMENT TOTAL S M.000.Oo - _ - REPLACEMENT ITEMS Annuaincil Maintenance: Regrade, Reseed lmgation Annusl'Ag Lime Mat adal _ _ 2032 Playgrouad Structure 203] 280' Cycone Fen. wlVl Max Strip 2037 30 Space Asphalt Parking LM w/CUMS 2037 Backstop Ferwe, Maw Strips, Dugouts Blaacher Pada - REPLACEMENT ITEMS TOTAL: ESTIMATED COSTS $ 500000 8 1,000.00 $ 18,000.00 E ]8,000.00 E 92,OOo.oO N7.M.00 1 Tas Trh Can 155.00 § 155.00 __ S 315.00 _ -- 1 Conrmte A Petl 315.00 -- - 1 Handicap Pal Sin 50.00 E 50.00 -- -' - 1 Bacial Fen., Mow Stril Dugouts Bleacher Pads- _ 211293.00 $ 21.293,00- 1 Re ce Bin _ 155.00 E 155.00 - - 1 litigation -201] 21,684301E 21,E6430 E 3.4]].88- IE 1a6]]4.58 979,075.82 S 2I5,87498 $ - 2]3,463.31 $ 29098.00 f 1,800.00 $ 165.00 S 750.00 $ 1,80000 _------ $ 30,000.00 _ $ 3,600.00 S 2,1]0_00 $ _7,500.00 - Landscaping ($5,0W) $ 1000.00 Small Picnic Sheltil Picnic Table 5 20,000.00 Park Benches Benches $ 1,000.00 _ FUTURE EQUIPMENT TOTAL E u.Dpb.ao _ _ _ _ Annal'Ballfield Maintenance: Regrade, Reseed, hell Annual Facility Maintenance A lLighting_Maintenance(2 Fields and SlitlinO Hill) Annual As Lime Material 2026 Tilled Sky WTeel wood$ 2026 280 du yes engineered wfiber 2026 _Playground Structure 2028 Fence around playground _ 2028 Batting Cage Set 203E S.reboartls (sat of 3) 2036 12'x 12'1mgabon Shed _ 2036 Parking Lot -Replacement 1 Sat 03 Outdoor ExercAse Equipment 1 44]].88 ANDOVERLIONSPARKEQUIPMENTTOTAL 60D ANDOVER STATION NORTH -1823139TH LANE NW-2218 '$ 15,000.00 $ - 5,000.00 1 Balifed Development 8 Conmaction wllm9ation 979,075. 82'$ Building w/ 874 98 oms,smre e, concessions, etc_-2008 273.483,31 1 1 Field Ughting aft Fields 2]3,483.31 $ 3,00l 3 Bleachers _ 96%_33 _ $ 3,0W 00 6 15' Players Bench Aluminum li 300,00 7,300.00 3 Rosining Rubbers _ 55.00 E 11,251 6 Foul Posts wage, _ 125.00 E 111,000.00 1 Park Sign w/reraining wall block 1,800.00 $ 25,001 3 Dugouts _ 10,000.00 _ $ ],200.00 4 _ Pi.ic Tables 12'Concrate Now Ig 32,000.00 14 1 Trash Cans _ 12' x 12'Inigallon Shed -2006 155.00 7,500A0 $ 32,000.00 $ 350,000.00 3 _ Sign - Handicap Pall _ 25.00 E 75.00 E 10000 $ _ 25.00 - -- - - REPLACEMENT ITEMS TOTAL: 601 T60.00 4 Sign - No Parking 2iii - 1 18 Sign - Ovil Parsing Bluebird Houses 25 M �- - - 2000 $ 320.00_ - - - 1 2851inearfit 4'Fence for sliding Hill _ _ 1,000.00 S 1,t10000 - - 2 Saddleral 700.00 f 1 Swingset -4 Place 1,800.00 1 _ 6'Bench 250,00 $ 250.00 -- 1 Spring Patl _ 1,200.00 §-- , S 3,500.00 1 Tilted Sk Wheal 3,500.00 - 1 260 cu yes engineered wood fiber _ 5,40000 $ 5.400.00 1 381inearR i' Concrete 9arder 900 Be $ 900.00 1 145 linear R 2' Concrete Boller 700.00 $ 70000 4]500 $__ 475.00 1 901inearfl Play 1 GameTima Pley Equipuip Border -MN Playground -2008 53,539.85 § 53,53995 1 Fence around playground _ - 11,747,57 $ 11]4].57 1 _ Scatraboares se of 3)-2006 _ ], 500.00 S 7,500.00 1 Ending Cage Set -2008 2,700.00,§ 2.700.00- 1 Pal Lot wA ghting -?006 _ 8goo000 ! $ 80,00000 1 _-- 3 Home Plates 6r1.00 5 18000 9 Bell Field Distance Signs _ 20 00 § 180.00 1 NOP er Dnlls Signs _ _ 25.00 $ 25.00 3 Set of Bases 200.00 $ 60000 1 Slitling Hill Light-2006 2,500.00 § 2,500.00-- 1 Hands. Swing ''�. 45000 i $ 45000 . _ _ - _ 1 Duck House 2500 $ 2500 1 8 Metal Picnic Table w/Concrete Patl T 25000 $ 250 00- 3 Small Concrete Tablew/Benches 5.00 $ 585.00 2 Recycle Bin JE:_ 15500 $ 310.00 1 Sales Lighting of East Reld 1 180,00000 $160,000 ANDOVER STATION NORTH EQUIPMENT TOTAL E 1.963834.63 62D CHE TERT N COMMONS-1414155th AVENUE NVV -.61 ACRES _ - __ _ - - _ - - - -- -- - - - - -' - -- - ' - _ - - - - H:\Engineedng\Parks\Parks Inventoryleark Inventory - 2021 - Updated 2-22-2021 City of ANDOVER 2020 Existing and Future Park Facilities Chart Page 2 of 10 owl 1 i DESCRIPTION (EXISTING) Walking Path -Pavetl-2007 Gameeme Playground Strvcture-2017 UNIT PRICE 3,95000 1 32,]33.8415 Beginning $ 3,950.00 ':' _ 32,733.64 FUTURE FACILITIES IMgetionS stem and new water service FUTURE EQUIPMENT TOTAL TOTAL PRICE E 40,000.00 40000.00 I 2032 2037 REPLACEMENT ITEMS PN ground Structure Wa1Hn PeM-Pavetl ESTIMATED COSTS $ 63,5m00 $ 17000.00 1 Four Place Sw1ng Set 1,300.00 $ 1,300.00 :. REPLACEMENT ITEMS TOTAL: 80 §00.00 1 80' Canorete Edging 40O 0M $ 40000 1 _ Table steel tube frame) 20(1 $ 200.00 -_ 1 Trash Can (Square Plastic) 140.00 $ 140.00 _ - - 1 Senate. with Trdi 1,500.00 E 1.50000 2 Trail Get. 1,250A0 $ 2,50000 1 Park Name Sign wllandsw ing 550.00 $ 550.00 t Recycle Bin _ 155.00 $ 15500 1 : Security Light(COnnexus Che - $ - CHESTERTON COMMONS EQUIPMENT TOTAL 69428.84 63D CITYCAMPUS HOCKEY COMPLEX- 1885 CROSSTOWN BLVDNW-252acrw 2 Hockey Rinkw/Fencing and4 Light Polesw/16 Lights-2011 20,00000 $ 40,00000 1 wid-ma House 147.000,00 $ 147,00000 4 Hockey Nets 30000 $ 1,200.00_t 1 Parking Lot Class V 4,00000 $ 4,000.00 _ FUTURE EQUIPMENT TOTAL Annual Annual Fadlity Melrrtenence Ughting Maintenance E 5,000.00 $ 2,00000 _ Annual Parking Lot Class V- Add material as needed iE 5,000.00 201 2HOc_key Rlnkaw/Fencingand4Li ht Poles -Re lamm E 110,000.00 _ 1 Picnic Table 250.be S 250.00 REPLACEMENT ITEMS TOTAL: 1 1 122000.00 4 Trunk Cane 155.00 _ $ 620.00 _ 2 Key Lock Boxes 20.00 § 40.00 2 Fire Extin uishem 55.00 E 110.OD -_ _ _. E 2500 _ 1 CO AJann Detector 25.00 _ 1 Warming House Hours Sign 25.00 § 2500 4 Plastic Round Tables 25.0 $ $ 2 PeM1Jn9 Lot Ughis 2,500.00 _ _ t Playground Upgrade ( Signature Pat) 8 Pill (4) $ 1,000,000 00 Annual Field Maintenance'. Regratle, passed Vngafon Annual Ag Lime Material Community Center Pr0jec t Balance (Through 12131/20) $ 824,654.00 2027 340' Cyclone Fends by Soccer Field $2 FUTURE EQUIPMENT TOTAL LL 824854.00 2027 Fencing around Ball Field - Replacement 3 Security Lights on Building 200.00 $ fi0000 $ 10.000.00 CITY CAMPUS HOCKEY COMPLEX EQUIPMENT TOTAL D CITY HALLCOMPLEX I. - N BLVD NW-61.28 $ 198970.00 ACRE $ __ 4,76000 _ § 2Q000.00 1 $ 3,000 00 E 47500 1 340' Cyclone Fend y Soccer Field 02 4.760.00 1 Infields _. 20,000.00 S 1,000.00 _ 1 Ball Field wiN Irrigation 3,000.00 is 12,600.00 1 Basketball goal, net and backboard 4]5.00 $ 10,900A0 4 Playere Bench-8' 100.W $ 400.00 _ 2030 2Shelters Large $ 124,0W.W 1 I Bike Rada 216.W $ 216.00 _ _ 2030 North Parking Lot $ 93,000.00 i Bleacher 1,]85.00 4 178500 _ _ 2030 2034 20M BlacMo Trails _ E 25,mi 2 Bluebird House 15.M E 30. D0 Playground Structure -1 Large' $ 100,000.00 _ 1 _ Car Spring Ride 425.00 E 42500 '"� Sandbox Diggerw/_ E 5,000.00 1 Dinosaur Spring Ride 525.00 $ 52500 _ _ _ 1 Fending around Ball Field-2002 3.200.00 $ 320000 ? - REPLACEMENT ITEMS TOTAL: 381500.00 1 Field Number Sign 20.00 $ 20.00 2 Foul Lim Pole Flags 22.00 E 44.000(:. _ 1 Four -Section Backsto 1,564.00 $ 1,564.00- 5 Trash Cans Win Tops 1<0.00 $ ]00.00 2 Gml - Large 340.00 $ 680co 'h _ 1 _I Home Plate 80.W S 6000 1 _ Motorcyde Spring Ride 1 360W IS 36000z--` 3 Park Bench 1]0.00 $ 51006 2 _ 1 Phoining Rubber 2 PlaYground Structure-2019 82T12.11_ 1 Retaining Wall - Rock 2,000.00 § 2,000.00 1 Sandbox with Timbers 2,500.00 $ 2,50000 2 Security Light (Connems Oared) - $ - _ - t Setof Three Bases - Ndw Style w/Double First Use 200.00 $ 2W.00 2 _ Shelter - Large 23,437.50 E 46.87500 1 _ Shelter - Smarr 1.200.00 $ 120000 1 SoccerField with Irrigation 3,000.00 IS 3,000.00 $ 70000 E 6200 7 _. Soccer Goal - Junior- Sets 700.00 _ 1 'Volleyball Not 62.00 i Volleyball Pole Set 226.00 is 226.00. $ 35,ODD.OD $ 9,660.00 1 _ _ _ North Parking Lot 35,000.00 _.... _ 1 Blacktop Thais Expantlad 9,650.00 1_ Swing Set -4vinn s2 baby) 1,900.00 $ 1,900.00 f 300000 3 Picnic Table - candidate 12' 1,000.00 I 41EngineenngWarksWarks lnventoMPark Inventory, -2021-Updated 2-22-2021 City of ANDOVER 2020 Existing and Future Park Facilities Chart Page 3 of 10 TY DESCRIPTION (EXISTING) UNIT PRICE: Beginning FUTURE FACILITIES TOTAL PRICE REPLACEMENT ITEMS ESTIMATED COSTS 2 Sign - Handicap Parking 2500 $ 50.00 if _ 1 Sign- DNR Assisted Funding _ _ 25.00 $ 25.00 fy _ 1 46 x 10 Hockey Back Step 1,800.00 E 1 600 OD 'i" - 1 30' x 30' Concrete Slab 1,200.00 S 1,20000 1 Mehl Beland ta0D0 $ 180.00 - -- _ 1 220' Yl low Plastic Fence Top 220.00 $ 220.00 t9 _ 1 Metal Bet Hobere 25.00 $ 2500- ----- -- --- 2 Meld Pmnic Tables 8' 3D0.00 $ 60000 1 _ Surveillance Sign - - ---_25.00 $ --- 2500 - - - - -- 4 Rdrycle Bins - _ 155.00 $ 62000 - - - CITY HALL COMPLEX p1/PURPLE EQUIPMENT TOTAL WOO COON CREEK PARKROM ANDERSON EAST OF HANSON BLVD ON COON CREEK "3f 66 ACRE No Current Facititles Lendscaping end Benches_ 5 250000 FUTURE EQUIPMENT TOTAL S 25g0.00 ' 660 CREEMEW CROSSINGG .14271 YELL W PINE STREET NW,,63 ACRE ✓ 1 Basketball Pad Asphalt]3'x 42' 2,400.00 $ 2,40000 Landswpinq _ 5 I,C0000 2025 Playground Stroewe $ 49,000.00 2 Basketball pole boartl neteM tlm 4T500 $ 950D0 FUTURE EQUIPMENT TOTAL S 100000 202E 180 cuyda Engineered Wodd Fiber -$ ],50000 - 1 Buck -about 96300 $ _ 2030 Small Shelterwl Pieme Table $ 10,00000 550DO _ 1 Pam Name Sign _ 550.001E 55000 _ _ _"' REPLACEMENT ITEMS TOTAL: 66500.00 1 Primal Play $b11Cblre-200] 23,512.4] E 23,51247 - - - 1 Security Ughl connexus Owned) _ $ $ 1,60000 - 1 Shelter -Smell 1,500.00 - - 1 Six Place Sving Set - Short L900.00 E _ 1,goo00 - 1 50tt Border -Magic Edging 350.00 $ 35D 00 $ 155 G3 _ - - i Trash Can 155.00 - - 1 180 cu ytls En ineeretl Wood Fiber -200] 3,600.00 E__ 3,600.00- 1 326 Iln. Ft. x 4' Sidewalk _ 1.975,00 $ 19]500 _ 1 Park Bench _ 250.00 E 25000_ _ _ 2 Saddle Mates _ 700.00 $ 1,40000_ - 1 Sign -Tobacco Free Zone 24.00 E 2400 - - _ 1 Sandbox 500.00 $ 50000 - - 1 Bill Sm 155.00 S 15500 - - - CREEKW EVY CROSSING EQUIPMENT TOTALA 40 284.4] 67D EVELAND FIELD$- 2275 ANDOVER BLVD NW-]0] acres along erty S79-Bg0) Ann .l F Id Ma ntenance: Regrede, Reseeq lmgation $ 15,00l I 1 900- 6' Fence along propeM line-2002 ],43400 $ ]43400 Is-MiddleBNOAAFielss{HenNien}52&,ggg $ - Annal Ag Lime Material 3 3,000.00 --- 5,711270 $ _ 5711270 61sR-NophFiebs$26000 $_. 2022 360 B - Fence along preparty line $ 10.200,00 304- 1 6'cellgeld fence w/pm.Iships02002 -- p 2002 10,53786 $ 10,53].86 ,' 2022 900- 6' Fence along prop"line $ 2g000001 1,146'-8'ba0fieldfenwWmcwsams-jj23,75Z69 S 23,]5]89 '; 2022 300'- 4' ball8eld fence w/mow ships $ 15,000.00 3 BaUalop Six Section-2002 3929.83 $ _ 1178950 : FUTUREEQUIPIONI TAL 2022 384-6'palMeldfencew/mowstrips S 28,000.00 3 Concrete Pad for Bleacher/Dugauls -2001D85].33 $ 329200 I' 1146'-8' bailfieb fence w/maw sal s-All Fields $ 83.001 1 _2022 1chesMessage Boats -2002 6,C62.81 $ 606281 - 2022 Backalop SBa Section $ 32000.00 1 ,Imgetion-20D2 2],126.33 $ Z],12633 _ 2022 Bahing Cege2 Place E 6,]00001 PaAing Lot356pacea-2002 52,115]3 $ 52715.73 :._ 2031 Scoreboard EhidVonic g 1],000.00 _ _. _. 3 Home Plates 600 $$ 201 00 2032 Concrete Pad far Bleacher/Dugouta $ 140,000.00 _ 6 _ Pitching 48.00 $ 286 00 ,? 2032 Benches 8 Message Boats $ 26,000.00 - fat Bars _ 3 Double Flat Bases _ _ 200.00 § 600 00 2032 Packing Lot 35 Bpe_rne $ 230,000.00 -Bases 3 Sets of isp 2n0 Bases. 3rd 200.00 $ 600 00 '. _ 20M Concrete all Dugouts - South Flab $ 90.000.00 3 signs $ _ ]500 _ REPLACEMENT ITEMS TOTAL: 696900.00 Traseld 9 Trash Cana 5EM � _ 155.00 $ 1 395 00 : _ 1 'Ball6eld design/development 124,184.44 $ 124.18444 _ - - 4 16' aluminum players benches 300.00 $ 1,200.00 2 15' meet players benches _ WOOD $ 600.00 750.00'$ 750. DC 1 PaASignw/landscapin9 - 6 Foul Pasts w/Flags 11.0 $_ 660.00 1 Picnic Table 16' Concrete 3 Piece 900.00 § $ 38000 1 450linearfl Yellow Fence Cap_ 380.00 1 Scoreboartl Electronic-2011 6,413.1 $ 6,413.11 - 3 Bleachers __ 1p00.00 $ 5,10000 ='- 2 Concrete Block Dugouts 10,000.00 1 $ 20.00000 - - 1 SecurityLight Conne ms O.metl $ - - HAEngineering\ParksWarks InventorykPark Inventory - 2021 - Updated 2-22-2021 City of ANDOVER 2020 Existing and Future Park Facilities Chart Page 4 of 10 TY. DESCRIPTION (E%ISTING)Beginning FUTURE FACILITIES TOTAL PRICE REPLACEMENT ITEMS ESTIMATED COSTS 1 OMinence Slpn '. Page 25.00 $__ Setting 2 2.150.00 $ 2,500.00 3 RecyGe Bins2%� 465 00 EVELANO FIELDS EQUIPMENT TOTAL E 34] 982.66 I ✓� -" 8i$:" 'y ° s` r „-?c.. ,^msq^a+s=:lea 68D HARTFIEL'S- HANSONBLVD BANDOVER BLVD. - 1.47 ACRES -f-- Nc Current Facilities --- ___--- -_-- - FUTURE EQUIPMENT TOTAL .$ 68D HICKORY MEADOWS`e-201i44TH AVENUE NW -TT scree ✓ 1 Ge eORY Play St 225653] $ 22,565.3] 2W] Playground Structure - 3 4],000.00 1 Park Name Sign 454.57 $ 454.57 ■ 2042 Concrete Enclosurew/Mock Ret _ S 33,00000 1 Concrete Picnic Table-2 Lag 50000 $ 50000000.00 REPLACEMENTTEMS TOTlLLJ. 80 1 Four Place Swing Set 130_0.00 30 $ 1,0.00 Small Pimic Shelter wl Picnic Table($10,000) $ 2000000 1 Park Eaton -6' 1]0.00 - $ 17000 FUTURE EQUIPMENT TOTAL 20000.00 __ 1 Concrete Enclosure wNlock Real WaII-2012 7.61]]9'$ ?61]]9 1 fresh Con 155.00 $ 15500 1 Irrigated System 1,500A0 $ 1, 50000 1 _ Sandbox with Digger 1,500.00 E i, 500.00 1 Rac GBin e 155.00 $ 15500 HICKORY MEADOWS EQUIPMENT TOTAL 35 917.73 ]OD HIDDEN CREEK EAST- 2156135TH LANE NW-2.72 ACRE$ 1 Bluebird House 1500'$ 1500 Landscaping $ 1.000.00 2024 Playground Structure S 64, 000SD 1 Ice Rink 500.00 $ 500.00 _2032 11 Place Asphalt Parking Lot w/Cement Curb $ 9],00000 1 _ Pimic Table 250.00 $ 25000 _2032 180'aaDheltTrell _ E 1],000.00 1 Powemcape Structure -MeliuMsmall-2002 30.73142 _ $ 30,73142 _ FUTURE EQUIPMENT TOTAL 1000.00 2052 Concrete Pad wMandball Wall E 59.000.00 I ADAAccasa Pods 1'55000 _- $ 1,550.00 "' _ REPLACEMENT ITEMS TOTAL: 20T OOOAO 1 Six Place Swing Set w/ADA Swing and Access Pad 1,900A0 $ 1,90000 5 - --� 1 Security Light (Connexus Owned) - E - 2 Tresh Cans 155.00 E 310.00 $ 22,3M 01 1 11PIace Asphat Parking Lotw/Cement Curb -2W2 2$384.01 -- 1 190'asphalt Trzil 4,010.45 E 4,010.45 -._ 1 _ Soccer Goals - Jr. Set 1,025.08 $ 1,02506 $ 90000 1 Park Name Sign w(Landscaping 900A0 1 Durk Spring Ritle 450.00 E 450.00 1 Sign - HandicaPanting 25.00 E 2500 $ 52400__- i Sign-ReturOlahed Parka 500.00 1 Sign-leeBin Frea Zone 24.W $ 24.00 1 RacyGe Bin 155.00 220.00 $ -_ _ 15500 $ 44000 2 _ _ CS2 Park Bench 1 Concrete Pad wMandball Wall 5,088.96 2100(i _ $ _ 5.088.96 $ 2,00000 $ 2 000 00 1 'Sidewalkantl Concrete Edging Wood fiber Surface 1 2,000.00 HIDDEN CREEK EAST EQUIPMENT TOTAL HILLS OF BUNKER LAKE WEST-1557139TH LANE NW - 6.]6 ]6,258.90 ' Landscaping $ 1 00000 Annual Ballfield Maintenance: Regrade 6 Reseed - 5 5,000 OD 71 D ACRES 7500 $ 75.00 1 Authorized Vehicle Sign wlPost 1 'Aglime 4.000.00 21500 3,000.00 4,00000 $ 4,000.00 $ 43000 $ 3,00000 E - 4,00000 Pave Existing Parking Lot w/ concrete C 8 G $ 45,000.00 FUTURE EQUIPMENT TOTAL IE 46.000.00 Annual Ag Lime Material 2023 ConcPlaygreteSSbucWre 2034 Concrete Sitlawaik Border w/Wood Chips 20M Fending Backslap, Dugouts, Sidelines w/Concrete Mow: 2040 .Walking Path - Asphak _. REPLACEMENT ITEMS TOTAL: $ 1.000,00 $ 5a20(L00 $ 8,20000 $ 29p00.00 $ 150000.00 246200.00 2 •Aluminum Bench-15' 1 Ball Field 1 Class-V Parking Lot- Medium 1 Four -Section Backs[o 1,560W $ 1,564.00 1 Home Plate 80.00 45_00 E 6000 E 4500 1 PIsci Rubber 1 Set of Times Bases 13500 E 135.00_- .. - 1 _ _ Steal Bollard! Post 15.00 E 1500 3 _ Tresh Can 155.00 $ 46500 1 Wall Path - Asphalt -21x,il 16, 1:1) E 18,50.00 1 Pimic Table 250.W $ 5000 2 is 24,804.71 E 500.00 $ 1600.00 $ 80000 1 GameTme Play structure - 2004 24,804.71 _ 2 Park Bench 250.00 1 _ Four Place Swing Set 1,800.00 7 Car Spring Toy 00000 1 Clifford Spring TcY 52500 $ 525.00 H:lC=ngineenng\ParkMParks InventoMPark Inventory- 2021 - Updated 2-22-2021 City of ANDOVER 2020 Existing and Future Park Facilities Chart Page 5 of 10 QW1 DESCRIPTION (EXISTING) UNIT PRICE Beginning 4 I FUTURE FACILITIES TOTAL PRICE l7 REPLACEMENT ITEMS I ESTIMATED COSTS 1 Mlniblke Spring Toy 525.00 S 525.00 =: _ 1 Concrete Sidewalk BorderwM000 Chips-2004 3,100.00 i 3,100.00 tt_ Park Name Sign w/Landscaping 5bw� 80000 1 Retaining Well for Sign 1.4140000 1 Si n-NO Perltin On Grass 25.00 1 Sewnry liOM (Connexua Ownetl) 5000 _ 22.501 Dog Pot Dispenser _ 8000 $ 15500 1 Recycle Bin 155 00 1 Pending Backstop, Dugouts Sidelines w/Concrete Mow Strips- _ 16,09632 S 16.086.32 HILLS OF BUNKER LAKE WEST EQUIPMENT TOTAL a2.662.53 KED 16640 PRAIRIE ROAD - 2.25 ACRES n A �: . .&5 �.,. , �.. l` .w �, ]ID LANDLOCKED 6 �� $ NANDLOCurriet Facilities No Future FaaliOes Anticipated _I 73D M 906 C 083 ACRES ✓ ,� No Current Facilities Park Sign & Landscaping S 1,000,00 _ _ _ _ Sewtlty, Light $ 500.W - Playground Equipment (2-5&5-12 yr. old) $ 60,00000 _ Imgation System $ 50000.00 Trails for ADA access(250' x$50.00 p10 $ 1250000 _ FUTURE EQUIPMENT TOTAL $ 131000.00 74D NORDEEN'5-16535 JUNIPER STREET NW-.95 ACRES s� 1 Four Place Swin Set 1,300.00 300 00 No Fu[ure_Fadlities Antici atetl 20ffi Pla roun0 Stmcture 9 150000 p "'-_ 4 , $ 6000.00 00000 _ _ $ _ 202].iSklig Rink Repairs -Grading 1 60' Concrete Sidewalk 500.00 $ _ - 1 F Spring Ride 52500 $ 2047 1/2 Basketball COUM1 E 71,00000 ]1 000.00 225.00 1 Park BenGl CB2 220.00 8 220 00 REPLACEMENT ITEMS TOTAL: 1 Perk Name Sign w/Lantlarsyin 550.00 S 550.00 1 Punic Table (steel tube frame) 25D 00 1 $ 250.00 1 PowerscePit-Medium-2011 - 22,194.001 S 22, 194.00 $ 1,50000 1 Sandboxwhh Oil 1,50000 � Lent (Connexus Damao) s ng Rink 3,00000 S 3,00000n $ 15500de Can (square lactic 155.00 155.00 Bin er-3]IIn. FL Magic Etlging $ 155. D0 260.00 $ 2fi0D0an Sams rin Ride 52500$52500 2,00000�! crete Edging Play SWcture ENORDgEN'S Fiber Sur_f_ace 2p00.00 S 2,00000Housa000ks Nets 600,00asketi ll Court I201]) 8,37216 $ 8,372.16DEEN'S EQUIPMENT TOTAL $ 64166.16 750 OAK BLUFF - 14]5] BLUEBIRD STREET NIN 3.79 ACRE 1 'Park Bench $ 17000 Landscaping I$ 1,00000 Annual Field MaintenanceRegtatle, Reseed, Irrigation $ _ _ 5,000,00 _ _17000 1 IPat Name Sign w/Landscaping 550.00 $ 550.00 12 Basketball Court& Hoop($15,000) $ 1,000,W _2025 Playground Strus S 40p00.00 _ _ 1 18 Asphalt Panting Lot -2000 18,9500015 18,95000 20231160 w yds Engineered Wood Fiber $ 5,800.00 Sops 1 Piwic Tab Is Concrete 20000 $ 20000 FUTURE EQUIPMENT TOTAL 1 $ 2.000ho 2036 18Sam Asphalt Parkin Lat S 82,OW.00 _ 1 Power cape Play SWcture-20M _ 19,22249 $ _ 19,222.49_ �: REPLACEMENT ITEMS TOTAL: 132600.00 1 Four Place SWing Set 1,200.00 1 $ 120000 _ 1 Soccer Field 3.00000 $ 3,00000 . 1 Trash Can 155.Op $ 155.00 1 Recycle Bin 155.00 1 $ 15500 1 Fence -40'Split Rail 2,160.00 8 2, 1:000 2 $i ns-Hantlicap Parking _ 25.00 $ 0.D0 1 Security Light (Connexus OAmatl) - I $ - 2 Sedtlle Mates 70000 E 140000 � 1 73' linear R 5' Sidewalk 550.00 E 550.00 ' 1 1]0linearR l2"Curb 400.00 $ _ 400.00 1 160 w yd. Engineered Wood Fiber 2,700.00 $ _ _ 2,700.00 _ 1 36IinearitBorder magic Edging 260,00 $ 260001 H:\EngineeringtParkstParks InventoWar, Inventory- 2021 - Updated 2-22-2021 City of ANDOVER 2020 Existing and Future Perk Facilities Chart Page 6 of 10 TY 1 DESCRIPTION (EXISTING) UNIT PRICE Soccer GoalSet Reguletlon1,500.00 Beginning E 1500001 I FUTURE FACILITIES TOTAL PRICE REPLACEMENT ITEMS Irtipation System BLUFF EQUIPMENT TOTAL 28,615.89 E 2661569OAK 78.23818 1500 $ 15000 Landscaping $ 1,000,00 Ann al Field Mgaintenance: Regratle, Reead Imgaman 4000 Op $ _ 4,000.00 Ann al Buildin Maintenance 200000 $ 2,00000 Pave 1 Large and 1 Small Pan i, Lot 3 180,000.00 Annual Lighting Melntenenca 600000 $ 8.00000 Troll from NoM 4 East lae to East Bek(IDD'•50 plb Ili $ 20,00000 2022 Playgrountl Simaure 40000 $ 4,000,00 2022 Concrete Sidewalk Border wNrootichips 91.000.00 $ 91,000 00 _ FUTURE EQUIPMENT TOTAL S 201,000.00 2025 Landscape Well around Park Sign 139,034.00 $ 139,034.00 _ 2025 8'x110'Chainlinkfence 3,7W 00 $ 370000 _ 2035 Scoreboards Electronic _ 1,400.00 $ 2,80000 2035 2 sob M 5-row aluminum bleachers 4,200.00 S d 200 00 2035 Asphalt Base Hockey Rink § Foral $ Haekey BaaMs 8,459.00 $ 8,459 00 2035 Walking Park -As halt 325.00 $ 65000 _ 2035 Sliding Hill Repairs and Improve Wl7ROpla�ment 25.00 $ 50.00 �: _ 2035 Shelter(woodlree, wncreta pad)2 1,1D0.0$ 2,20000 _ _2035 Parton Lots Asphalt2 20C.00 $ 400 00 REPLACEME2 30000 $ 600co1 137,98800 E 13],968.00Handidep _ 2500 $ 75009 25A0 $ 22500 175.00 § 2,62500 2500 $ 25002 12500 E 250002 25.00 $ 5000 -- 25000 $ 50000 _ BW.00 E 800.00 _ 525.00 $ 52500 _ - 525.00 $ 52500 _ 1,8010.00 $ 1.800,00 - - 3,800.00 $ 3,800.00 10000 $ 80000 55.00 $ _220,00 180.00 $ 180.00 ZESnMAWDCOSTS ,000.00 76D PRAIRIE KNOLL -14800 PRAIRIE ROAD NW-19 38ACR 10 Bluebird House Class-V Parkin Lot -Large Clesa-V Padting Lot -Smell 1 ,000.001 ,001 1 Slltling Hill and Willi Pond Welkin Path -As herd ,000.001 ,900.W 1 StoregeMarming Houeesaestroom Building _ E 10,000.00 1 Iatian System fn _ IS it's 0.00 $ 53,000.00 1 _ Landscape Well _ 2 Sopcel7Fopetall Goal Sets $_ 35,000.00 1 B x 110' Chain link knee _ $ 35 000.00 1 Shelter (wood Name, wnueta pad) _ 2 12 Concrete Bare Picnic Tables 2 Authorized Vehicle Only Signs Removable Basketball Backboard Poles 25' Net Poles (east soccer field) Hocke Goals t$37.W0 Parltin9 Lob AaPhalt No Parking Signs No Parkin Si na 15 Garbage Cane Plastic Style 1 _ Over Flow Parkin Sign Preine Knoll Park Regulators Sign 2 Emergency Parking Only Sin typal Benches w/_P_ad 1 CarSpring Ride _ 1 MolofcyGe Spring Ride 1 Male Spring Ride 1 Four Place Swing SetwMandicep Swing 1 Concrete Sidewalk Bonder wiwoodehi a 8 Benchesinaide Wanning_House 4 1 Fre Extnuisher _ _ Metal Storage Cabinet 1 Warning House Hours Slgn 25.00 $ 25.00- 2 Sign_ robe= Free Zone 2500 $ 50.00 d $ 213.286.0t ' 8 La a Metal Poles &_Lights Soccer Fields, Hocks 8 Sliding Hil 26,661 - 1 Wootl luck House 40.M $ 40.00 :} 3 it a PropeMMo Trespassing Signs _ 25.W § 7560 1 Gamenme, Play Structures -2005 21.5Sga 0 $ 2156600 2 Scoreboard Electronic _ 269% .13 $ 53,920.25 1 20' x 60' Net _ 87500 $ 87500 . $ 2 600 00 2 12x 26' Concrete Pads 1,9d0.00 1 - 6 Secufky Light Connexus Owned) _ _ $ - - - - 2 Grills - Charcoal _ 70(1 $ 1,40000 0 $ 1, 50000 > 2 PaA Name Signswsandacaping 750.00 1 60' Black Pedoreted Pie _ 240. W E _ 240.00 _ 1 4' x 15V Black Chi Fence _ --_ 1,600.00 $ 1,600 00 E 8,12800 2 5-row aluminum bleechere. _ 4,064.00 1 Key look Be. _ 20.00 8 _ _ 2000._ 1 Picnic Table _ 25000 $ 25000 1 Asphalt Base Hockey Rink§ Fencing _ 1 12,015.00 $ 12,01500 - 1 CO Detector _ 25.00 E 25.00 1 Soccer Goal Set Juniors _ -No 00 § 900.00' 2 Lacrosse Goal Sets 500.00 $ 1.00000 2 Trail BOfisrdB _ 180.00 $ _ 360.00 4 Recycle Bins 155.00 $ 62000 -_._ _. PRAIRIEKNOLL EQUIPMENT TOTAL __ _E 742106.26 - 77D RED OAKS EAST '-14045 NIGHTINGALE STREET NW - 65 / _ T ACRES NO Curtent Facilities H:\€ngineenng\Parks\Parks Inventoly\Pefk Inventory- 2021 - Updated 2-22-2021 City of ANDOVER 2020 Existing and Future Park Facilities Chart Page 7 of 10 Owl W160-6i DESCRIPTION (EXISTING) WEST -14050 RAVEN STREET NIN - 3.96 ACRES Basketball Goal and Net_ Basketball Pad -2007 Four -Place Swing Sat 1 Park Bauch Park Name Sign Pantl Sewn Light Connexus Owned) Wash Can Walking Pat - Asphalt -2007 Sign - Tobooce Free Zone _ PrimeTime Play Structure - 2007 UNIT PRICE 4]6.00 3,500.00 1,300.00 00.00 500.00 1,000.00 - 15500 91 24.00 18,475.54 Beginning $ _ 95000 $ _ 3,500.00 $ 130000 $ 00 00 _ E 00.00 5 $ 100000 $ - -- E 155.00 $ 9,70000 $ 2400 E _ 16,475.54 FUTURE FACILITIES FUTURE EQUIPMENT TOTAL _ _ TOTAL PRICE REPLACEMENT ITEMS ID28 Playground Structure - 2037 Basketball Pap 2037 Walking Path -Asphaft _- _. _ REPLACEMENT ITEMS TO TAL: - - _ - - ESTIMATED COSTS S 35000.W $ _ 15,000.DO $ 42,000.00 9t 0p0.00 2 1 1 3 1 _ 1 1 1 1 1 1 2 Sedtlla mates _ 70000 $ 1,40000 $ 1,30000 1 210' linei 4' sidewalk _ 1,300.00 - - 1 115 cu yds engineered wootl fiber 1 35It Border - Ma is Edging aMandsfaping_ _ 1 Recycle Bin RED OAKS WEST EQUIPMENT TOTAL 791) REDWOOD- 13977 BLUEBIRD STREET NW-682 ACRES No Current Facilities 80D SHADOWBROOK MST -13788 WTTIERSILw-$iREETNW-1603 1 51 Space Asphalt Pa rking Lot w/Cement Curb-2002 1 Basketball Pad-2002 _ _ 1 IBeskei Post, Backboard, Net 1 1 Sani-Small 1 Car Spring Rida _ 1 Security00' CC JonetFar. Along Pod) _ 1 Four Place Swing Set w/ADA Swin 2 Baseball Folds 2,200 00 250.00 15500 I ACRES _ 50,62878 3,000.00:6 60000 401 825.00 2,160 00 1,300.00 iB)5224 IS _ 2,200.00 $ 250.00 S 15500 No Future Facilities Pnfkipeted� 5 5062878 ,.300000 Small Shelter w/ Picnic table (ball field area) $ _ 600.00 Rase Ballfield Fencing Height to 8(2 Fields) $ 40000 FUTURE EQUIPMENT TOTAL E 62500 _ $ 2,16000 - S 1,30000 E 37,504.48 - - Annual Ballfield Maintenance'. Regratle, Reseed, Irrigation $ $ 2300000 Annual Ag Lima Material _ E $ 30,000.00 2D22 6 Section Backstop w/Overhang S _ $ 50.000.00 2022 i240'-6' Cyclone Fens Dugout w(Concrete Patl/Mow Str.$ _ 2022 208'-4'Cyclone Sideline Fence wRdow Strip_ $ _2032 Concrete Cyclone Outfield Fenm w/Mow Strip4 Pad for Bleacher/Dupouts $ 2032 Park Sign w/Landswping Keystone wall _ g 2032 Playground Structure, Wood Chips and Border E _ 1000000 _ 2,000.00 35,000.00 15.000.00 9,000.00 30,000.00 37.001 f0,00p 00 89,000.00 2 and Grass lnfieltl _ _ ],82544 $ 15,65088 $ 45000 _ 2032 Aluminum Bleachers 5 Row _ $ 35,00000 E 220,000 00 2 Sat 3 Bases 225.00 _ 2032 51 Space Asphalt Parking Lot w/Cement Curb 2 Home Plates ]500 S 150.00 __ _ -' 2032 Basketball Pad $ 13,00000 2 Pitching Rubbers, 5500 $ 110.00 $ 13,254.80 $ 5.575.04 � _ - - REPLACEMENTITEMS TOTAL: 508000.00 2 6 Section Backstop w/Overman - 2002 _ _ _ _6,82].40 _ 1 248'-6' CYdone Fence Dugout w/Concrete Patl/Mow Stu -2 5,575.04 1 208' - 4'Cydone Sideline Fence wNiao Strip-2002 3.321,76 1 $ 3.321.76 E 11380.38 - - 1 802'-8'Cydone Outfield Fencew/Mow Strip-2002 11,380.38 - 1 Concrete Pad for Bleacher Dugouts-2002 13,930.00 S 13.930.00 _ 1 Perk Sign w/Landscaping Keystone wall Irrigation System -2002 - _ _ 3,600.00 $ 3,600D0: E 3640400- - 1 3i3,g04.a0 4 Aluminum 15' Playas Bench 260.00 $ 1,000.00 - - 6 Trash Can 175- 4' black vinyl fence - 155.W 1 $ 93000 - $ 190000 - 1 i 1,90000 - t Playground Equipment-2017 40,10480 IS 4010480 _ -- 1 1 Wood Chips and Border. 2017 _ _ Punic Table Steel Frame 4,515.95 $ 4,51596+ $ 25000 rf - - 250.00 4 Foul Pole Flags 2500 4 100.00 F --- 1 _.Sign - Tobacco Free Zone _ I Minibike Spring Toy 24.M $ 2400 $ 525.00: 1 _ 52500 _ - - 5 Bluebird House _ 1500 S 75.00 $ 50.00- $ 50.00-- 2 Si ns-No Parking _ 2500 2 Signs - Handicap Pending 25.00 3 6- Park Berl 250.00 $ 750.00 € - 2 V Picnic Table Concrete legs 500.00 $ 1,00000 - $ 175. DO d - - 1 30P Safety Fence Cap 17500 _ 2 Aluminum BleeUersS Raw-2002 4,W0.00 $ 8,000.00 2 Weotl puck Houses No Popper Dells Sin _ 40.00 $ 8000 $ 25.00 - -- 1 25.00 6 2 Field Distance Signs Re c cle Bins 20.00 155.00 $ 120.00 $ 310.00 - HA1Engineenng\Perks\Par1ds InventoryPark Inventory- 2021 - Updated 2-22-2021 ]TY. DESCRIPTION (EXISTING) 4 Metal Bat Holders SHADOWEROOK EAST EQUIPMENT TOTAL B10 SHADOWBROOK WEST - BUNKER LAKE RO INo Currant Facilities 82D SHADY KNOLL- 2352 UPLANDER STREETk 1 Basketball Goal and Net rime Play Structure - 2005 Y KNOLL EQUIPMENT T( IE-S-1170152ND LANE I Ome Play Structure 2010 O' Shatter w/Concrete-201 1' Concrete Curb _mate Ride Tong Ride lace Swino Set RICE 25 DD 47500 155.00 155.00 525.00 iii 525.00 _ 40,00 330.00 24.M 25,00 22,25346 1,100.00 $ 25.00 S 24.00 S 42500 $ 1 I ,Recycle Bin ISOPHIES'S EQUIPMENT TOTAL LSUNSHINE -1900 CROSSTOWN BLVD. NW - 38.66 ACRES 155.00 1 2 2,290 Cyclone uruffeld Fence - 10High, two 10' Gates Foul FI 210 5 Cyclone Fence with Mow Sold -2014 220 Infield Fence with Dugout and Concrete Pad -2014 350Cy4one Outf ldFnce- 10' with Foul Poles -2014 1 Infelda Warning Track - - -� 29,T]0.00 4,620.00 3,660.00 5,250.00 3,50000 5,00000 6 2 8 1 1 As haft Pa inB Lot- Large -1995 65,000.00 1 Asphatt Pal Lot-Small-1995 _ _ Asohah Parkin LotadCurd-51Soacee-1995 15,00000 7165906 1 Court Goal, Post and Net 9 increase Sunshine Logo on Back- Concrete City of ANDOVER 2020 Existing and Future Park Facilities Chart Page 6 of 10 ring - FUTURE FACILITIES TOTAL PRICE REPLACEMENT ITEMS ESTIM 10000 No Future Facilities Anticipated 47500 Lantl---I-- $ 1000.00 2024'Playground Structure 5 1,300.00 2035 Hard Court - Basketball 6 4,]55.55 REPLACEMENT ITEMS TOTAL:I$ 340.00 FUTURE EQUIPMENT TOTAL $ 1,Op0.0p 250.00_------ 155.00 15555.00 2500 253 46 953.01 594.56 56900 Irrigation System ($40,000) 256.00 FUTURE EQUIPMENT TOTAL 6D0 00 42500 300 00 - ----_ 500.00 220.00 550.00 155 DD 17000 ]0.6d5.56 29,170.00 _ Landscaping $ 1 00000 Annual. Ballfield Maintenance. Regrade, Reseed, Irrigati 9,240.00 Lighting of Parking lots (west and south) S.�I 30000.00 Annual Facility Maintenance 23,16000 $ "'i Annual At Lime Material 10,500,00 1 Skateboard Park Expansion 50000.00 Annual Lighting Maintenance 21,00000 5 - 2021 - Playground Structure(Medium Size Structure) _ 5.00000 , $ 2021 Rack Walls 65,000.00 Raxa,tear4lNeghb^oaaer-Ge14H9enatlaw$110.06 S 20U Park Name Sign 15,000.00 t &W F W ss & 2025 Asphaft Parl Loi Large P 69.06 2025 Aspraft Parking Lot- Small 215,412.00 2025 Asphatt Perking Lot w/Curb - 51 Spaces 36000.00 FUTURE EQUIPMENT TOTALI $ 81000.00 2025 4Bleachers - Aluminum -Small 3,500.00 2025 4 Flag Poles 95000 _ ' 2025 Large Aluminum Bleacher 30000 _ 203D Basketball Court _ 1 12000 2030 Sand Volleyball Court 2 D25 00 r 2030 Scoreboards s sfi,000.Da $ 6],00000 TOTAL: 163 000.00 45,000,00 - H:\Fngineedng\Parks\Parks Inventory\Park Inventory - 2021 - Updated 2-22-2021 City of ANDOVER 2020 Existing and Future Park Facilities Chart Page 9 of 10 owl t DESCRIPTION(E)USTINB) Bike Rack w/Cancreta Pad DNITPRICE Beginning 225.00 $ 225.00 �- FUTURE FACILITIES TOTAL PRICE I _. 2031 REPLACEMENT ITEMS Skate Boartl Park ESTIMATED COSTS E 120,000.00 4 Bleachers -Aluminum -Small 8,000.00 ' $ 32,650 00 $ 00 _ 2031 Hekao ate Paw Shelt E 50,000.00 i _ Block Fle Pole Base BSO.W 2032 t Ught Parkin Lot Li hts North P Hemp _ _ W,000.00 15 BIueNN HOuaea 10. W _ 150 $ 150.00 '� _ _ 2032 West West Packing Lot Lights _ ' S 70000.00 $ 4 Concrete Pads for S000er Bleachers 1,650.00 $ 6.60000 'r 2032 Dugout shatters $ 96,000.00 6 Concrete Pads for Large Bleachers S00.00 It 60000 _ _ 2034 2,290' Cyclone Outfield Fenpif 0' H' h, lwa 10' Gates, F E _ 79,000,W 1 Cycone Fence 15V-5' Black Coated 1,800.00 _- $ 1.800.00 _ i 150'- 4' bleck vinyl fence 1,650.00 $ 1.650.00 _ _ 2034 22O Infield FencewithDugout and Concrete Paid $ 62,000.00 1 _ 19'- trioni vinyl fence w/8'gate w/stops 1,000.W $ 1,00000 :� _ 2034.350'CyWne Outfield Fen" - ill' with Foul leis $ 28,100.00 E 63,00000 8 Double Flrst Base 12500 _ $ 750.00 20M Welkin Path -Asphalt _ 6 Fleltl Number Sign _ 20.W $ 12000 .% - _ 2048 SheltedGazebo_ E 1,200,000.00 4 Flag Pole -1995 215011 f_ 0,00000 '' REPLACEMENTITEMSTDTAL: 3145100.00 1 Flag -American 75.00 $ 7500 _ _ 1 _ Flag_ Sunshine Park _ 250.00 75.00 $ 25000 $ 7500 I _ _ Flag -Minnesota Suite 12 Foul Pale Flags 22.00 $ 26400 6 2 Four -Section BackamP wi6r Four -Section 0veMang 1,900. W $ 11,40000 Grills w/Blook Base 1,300.W W.W $ 2.60000 k E 360.00 r i -- _ 8 Home Plate 6 34 Large Aluminum Bleacher 1 12,5W.W 155.W $ 75,00000 $ 527000 _ La a Plastic Garbage Can 1 .Monument - Concrete 350.W _ $ 350.00 2 3 No Golfing Sign 20.W 20.00 i 120,OW.W $ 4000 E 6000 _ E 12000000 No- oto Sign Sys - 1 em -19 Imgetion System-1995 anon 2 No Pets Sign I 20W ]S.W $ 4000 $ 22500 3 Park Re ulations Sign 6 Park Bench 1W.00 45,00 125.00 $ 60000 $ 45000 1 $ 37500 10 _ 3 _ Pll_ching Rubber _ Planters - Concrete - Round i _ Plastic Protec i a Cover for Cyclone Fandn 780' 468.00 S 46600 �I 100.W $ 1.20000 - -- 250.00 E 2,00000 400000 $ 4,000.00 - $ _- 12 B Players Bench _ Pia ers Bench-8' 6 _ Pop -out Base Sets (2) 1 4 Sand Volleyball Courtwith Timbers-2000 _ SewUght(Connexua Owned) 3 iSoccer Fields -1995 8,00000 $ 4 1 - Soccer Goals - Regulation 1,69000 2.200.00 60,00 195.W SS.W 65 W $ 6.760.00 $ 2,200 00 $ 180.00 _ $ 78000 $ 440.00 $ 65.00 Soccer/Football Goals 3 Sleel Bollartl Post 4 Table l Bench - Concrete 8 _ Trash Containers - Plaeti_c-Small 1 Volleyball Net 1 1 ';Volleyball Post - Set _ 125W 14,500.00 110.4W.W 140.00 15500 F 7,40000 $ 125,00 _ 1 $ _ 14.50000 It 110, 000 14 E 14000 $ 740.00 $ - 2,4080.00 Walking Path- Asphalt Expanded-2005 1 Shelter, Message Board Table -1996 1 , ain14000 Trash Conters 16 _ Recycle Bin. 1 Park Name Sign -2W2 _ 1 Rock Wells-2000 3,800.W 4,5W.W 18,OW.55 223,225.W 25.W 282,305.66 5W.W 200 80.000 _ 44,863.3.001 2,400.000 6W.0.002 E 3,800.00 $ __._4,500.01 S 18,006.55 $ 223,225.00 $ 22500 E 28230566_ 000.00 $ 3L 0 00 1 _ Small Play Structure-20W 1 'Shelter, Him gonal(Slum, Park)-2011 1 9 Lightlng of Saccerfields-2W3 Handicap Parking Lot Signs 1 Lighting of Bellfields-2W4 _. 6 _ 9 12'Concrete picnic tables - _- _ Saw Li hts on Buildings 1 Cityof Andover Flag 1 'Skate Board Park-2011 _ Stara eContainer 1 Fencer around well w/Cancrsle Patl Concree Patls for Toilets 250.00.001 Four Place Swing 1,8W.00.002 'Saddlemetes 350.W.W1 Backhoe Di er 400.W.W H1EngineennglParkslParks InventoryAPark Inventory - 2021 - Updated 2-22-2021 City ofAND OVER 2020 Existing and Future Park Facilities Chart Page 10 of 10 TY 1 DESCRIPTION(EXISTING) 36U x 1' Concrete Curb UNITPRICE 1.S w Beginning $ 1,500.00 + FUTURE FACILITIES TOTAL PRICE REPLACEMENT ITEMS ESTIMATED COSTS 1 _ Irrigat'on Well -2009 033n.40 _ $ W,3]].40 9 SwreOoards.2010 - 5,664.01 $ 45.31547 $ 36,480.00 1 Nord Parldng Lot Lights - 2012 W,4W.W 1 Weat Penang Lot Lights-2012 26,337.31 $ 28.337.31 -- 2 Swretmal- from Prairie Knoll _ 6,152.67 $ 12,305.33 - $ 25,092.00 < -- 2 SwreboeN Installation - from Pneria Knoll 12,545.00 _ _- 12 Dugout Shaltars-2002 3,00000 $ 38,000 o0 1 95' 5' Cyclone Fence w/Mow Stop 1,000 00 $ 1, 000 00 - SUNSXINE PARK EQUIPMENT TOTAL 960 THE OAKS 1 NHEOAKSo C,r,ut Fa4431 CROSSTOWN BLVD NW-133ACRE8 IhBes 6J 1E NE NW-0.2T acre -20W a 12$93 fi3 1 Game -time PlayStructure- $ _ 12, 59363_ _ 1 CB2 Fremea 219.52 $ 21952 1_ Tobacw Free Slgn 24.00 E 2400 1 Trsh Can _15500 S 15500 Place Single Post Swing set 1,800.00 $ 180000 5' x 46'Connate Sidewalk 350.00 $ _350 00_1 Park Name Si 0 wAandsmping 55000 $ _ 550001 1l0'BoaNer Magic Edging _ 1,20] 00 $ 120] 00 stem-2012 _ 5,29906 $529906 .:1 Handicap Swing 450 o $ 45000"1 - - No Future FacJlhes_An_I¢ipaterl rrt1 � FUTURE EQUIPMENT TOTAL al ITlgaLon 5ysteT Maintenance $ 100000 �ayground Structure $2620000 REPLACEMENT ITEMS TOTAL. 27200.00 -GameTime4 _ jAu .,: S 2.Q3364.00 AREA"D" REPLACEMENT SUBTOTAL: 7850400.00 _ 155 W S 155 00In ESTATES EQUIPMENT TOTAL03.21 AREA"D" EXISITING SUBTOTAL: _$ 6S41 fi6883 AREA"D" FUTURE EQUIPMENT SUBTOTAL: H:\Engineenng\Parks\Parks Inventory\Park Inventory- 2021 - Updated 2-22-2021 City of ANDOVER 2020 Existing and Future Park Facilities Chart DESCRIPTION (EXISTING) UNIT PRICE Beginning AREA' A' EXISTING SUBTOTAL: f 39320TL15 AREA "B" EXISTING SUBTOTAL: f ]03933.01 AREA "C" EXISTING SUBTOTAL: $ 1. 5M5M 97 AREA -D" EXISITING SUBTOTAL: 6.2H,999.93 AREA "I" EXISTING SUBTOTAL: f 91.710.02 Neighborhood Padt Community Play Field Area Park EquiDmont Total _ DesigWMminisV on Fee(30%oil Pmlect Cos, $ PARR EQUIPMENT GRAND TOTAL FUTURE FACILITIES TOTAL PRICE AREA'A' FUTURE EQUIPMENT SUBTOTAL: f 3.993.TM.W 1a4.080,700) AREA "B' FUTURE EQUIPMENT SUBTOTAL: f /9 000.09 ($64,000I AREA'C' FUTURE EQUIPMENT SUBTOTAL: 2,019,250.00 I$2,354,500) AREA-0" FUTURE EQUIPMENT SUBTOTAL: I$3,904,104I AREA -I- FUTURE EQUIPMENT SUBTOTAL: $ I. Future NepM1Nrhw Park(Fields of KSnslor Core) 5442,500 $ 500=00 _ FUTURE EQUIPMENT TOTAL $ 500,000.00 Future Mi. ImpmvemOMs($2,".000) $ 1,000,00000 FUTURE EQUIPMENT TOTAL $ 1.we 000.m FUWm PaM EquipmeMTotal $ 9,935,309.00 DesioNAtlminumebon Fee (30%of PmieM Coati ADD 30% L�. REPLACEMENT ITEMS AREA'A' REPLACEMENT AREA "B" REPLACEMENT AREA'C"REPLACEMENT AREA "D'REPLACEMENT AREA "I" REPLACEMENT REPLACEMENT ITEMS GRAND Page 1 of i H'1EngimmnngtPafttParks InventotyWaM ImeMary-2021 - Updated 2-22-2021