Loading...
HomeMy WebLinkAboutFebruary 18, 20211685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.AN DOVE RM N.GOV Regular Park & Recreation Commission Meeting February 18, 2021 7:00 P.M. Meet at Andover City Hall 1. Call to Order 2. Resident Forum 3. Approval of Minutes (2/4/21 Regular and Workshop) 4. Agenda Approval 5. Information Regarding Prairie Knoll Park North Parking Lot Construction Plans/20-18 6. Consider a Larger Replacement Shelter/Hawkridge Park/21-12 7. Outstanding Items 8. 9. Chair's Report 10. Adjournment 7:15 P.M. Or Shortly Thereafter Workshop Session A. Reconsider Future Improvements/2020 Existing and Future Park Facilities Chart/Park Zone D B. Adjournment Note: Some or all members of the Andover Park and Recreation Commission may participate in the February 18, 2021 Park and Recreation Commission meeting by telephone or video conference rather than by being personally present at the Park and Recreation Commission regular meeting place at the Andover City Hall,1685 Crosstown Boulevard NW, Andover, MN 65304. Members of the public can physically attend, although there is very limited seating in the City Council Chambers as appropriate social distancing will be done by the Commission and visitors. mim It 10 1- — I i 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV To: Park and Recreation Commission -rsN CC: x,, David D. Berkowitz, Director of Public Works/City Engineer From: Todd J. Haas, Assistant Public Works Director Subject: 5. Information Regarding Prairie Knoll Park North Parking Lot Construction Plan/20-18 Date: February 18, 2021 INTRODUCTION This item is for information for the Park and Recreation Commission regarding Prairie Knoll Park North Parking Lot Construction Plan, Project #20-18. The parking is planned to be paved this upcoming construction season. A copy of the plan is in the side pocket of the packet for your review. The parking lot will have a total of 110 parking stalls. The parking lot will not have concrete curbing around the perimeter of the parking lot but there are 3 raised concrete islands identified on the plan to control vehicle movement. The project will be bid with the Tom Anderson Trail Reconstruction. The bid opening is scheduled for March 31, 2021. As far as security lighting plan, 5 lights have been approved by the City Council. Staff will coordinate the installation lights with Connexus Energy as part of the construction. ACTION REQUESTED No action is necessary as this item is for information purposes only. Respectfully submitted, Todd J. Haas Attachment: Map of the park; Copy of the parking plan (located inside pocket of packet) ANfnovER Prairie Knoll Park Date Created: February 09, 2021 T`NN 1 it Disclaimer: The provider makes no representation or warranties with respect to the reuse of this data. ,. N i 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV To: Park and Recreation Commission * CC: -Is David D. Berkowitz, Director of Public Works/City Engineer From: Todd J. Haas, Assistant Public Works Director/Parks Coordinator Subject: 6. Consider a Larger Replacement Shelter/Hawkridge Park/21-12 Date: February 18, 2021 INTRODUCTION The Park and Recreation Commission is requested to consider a larger replacement shelter at Hawkridge Park, Project 21-12. DISCUSSION As you know the existing playground equipment at Hawkridge Park is scheduled to be replaced later this spring. The Parks Maintenance Department has indicated that the shelter is due for replacement and since other improvements such ADA accessibility needs to be provided to the new equipment and to the existing shelter, it is recommended that the existing shelter also be replaced. Currently the Parks Maintenance Department has $35,000 available for these types of improvements. It has been determined with maintenance funds available, the shelter will be replaced this summer. The existing shelter is a 20 ft x 20 ft shelter. The Commission does have the option to recommend increasing the size of the shelter to a 24 ft x 24 ft shelter. The quote that we have received of the shelters are as follows: • 20 ft x 20 ft is $32,685.00 (includes shelter, engineered drawings, footings, concrete slab, and labor) • 24 ft x 24 ft is $40,614.00 (includes shelter, engineered drawings, footings, concrete slab, and labor) If the Park and Recreation Commission would like to construct the larger 24 ft x 24 ft shelter, Park Dedications funds would be needed to cover the difference of $7,929 from a 20 ft x 20 ft to a 24 ft x 24 ft. If there is no interest in a larger shelter, the Parks Maintenance funds will cover the cost of the new shelter from the maintenance funds. This park is designated as a Community Playfield and generally is one of the more active parks during the summer months. The soccer associations will be requesting the use of the fields for the upcoming season. BUDGETIMPACT Depending on the size of the shelter the Park and Recreation Commission is recommending, most of the funding would come from the Park Maintenance Fund. Note: If the larger shelter is recommended, this will need to be approved by City Council since this was not identified in the Capital Improvement Plan (CIP). ACTION REQUESTED The Park and Recreation Commission is requested to consider a larger replacement shelter at Hawkridge Park, Project 21-12. Respectfully submitted, Todd J. Haas Attachment: Location map of area; Aerial view of the park; Picture of the proposed shelter ANPOVER Hawkridge Park ........................................ ff ......... 71 2448 -TI8030 18000 18001 t< MIDGE 18001 wl 17930 17931 2521 2451 2421 2701 2600 2700 2640 27140 17800 2711 2661 2631 2601 2520 2450 2420 17801 2451 2421 17773 V 2710 I 2660 I, 2620 I 2550 I 2320 1 2450 1 2420 2760 117680 / ) ( 17651 1 2557 1 2525 1 17700 18030 18031 18040 2351 Im 18001 r 2221 1 17900 1117901 1179001 17850 I 1 17831 1 178501 17800 17800 17750 17751 17750 2350 2300 2250 2367 2315 2265 Date Created: February 09, 2021 Disclaimer: The provider makes no representation or warranties with respect to the reuse of this data. 0 V R Hawkridge Park 2521 18001 Cj k Jn e 0 n2451 G Date Created: February 09, 2021 Disclaimer- The provider makes no representation or warranties with respect to the reuse of this data. 14 fj M i WF� 64 .. SAW 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV TO: Park & Recreation Commission CC: David D. Berkowitz, Director of Public Works/City Engineer�3 FROM: Todd J. Haas, Asst. Public Works Director SUBJECT: 7. Review Outstanding Items/Maintenance Update DATE: February 18, 2021 Issues list as of 2/12/21 UPDATE OFANDOVER COMMUNITY CENTER AD VISOR Y BOARD — Commissioner Strombeck will provide an update at the meeting. ON -GOING PROJECTS - • Update of Park Dedication Improvement Fund Quarterly Report — Next quarterly report is scheduled for April. • Update of Quarterly Sheriffs Department Report on Park Patrol & Vandalism — Next quarterly report is scheduled for April. • Prairie Knoll Park North Parking Lot Improvements — Item is on the agenda. The bid opening is scheduled for March 31, 2021. As far as lighting of the north parking lot, it has been approved by City Council to install 5 Traditionalre Security Lights as per the original plan. The lights will be installed as part of the construction of the parking lot by Connexus Energy. • Update of the 2021 Park Dedication Study — City Council has approved the park dedication fee of $4400 per unit for 2021. The Council also directed staff along with Park and Recreation Commission to re-evaluate the proposed future improvements in Zones A-D to see if any of the proposed improvements should be reduce or removed. Zone D is on the workshop portion of the agenda. • Sunshine Park Playground Equipment Replacement — The playground equipment has been ordered. It will take 6-8 weeks to be delivered. Installation will be done by Parks Maintenance staff. • Hawkridge Park Plavground Eauipment Replacement — The playground equipment has been ordered. It will take 6-8 weeks to be delivered. Installation will be done by as a neighborhood community build. • Woodland Meadows Park Plavground Equipment Replacement — The playground equipment has been ordered. It will take 6-8 weeks to be delivered. Installation will be done by as a neighborhood community build. • Wild Iris Park Playground Equipment Replacement — As mentioned at the last meeting on February 41h, the Parks Maintenance Department has received approval to carryover $50,000 from 2020 to 2021 for playground equipment replacement. Staff has notified the neighborhood about participating in survey and to see if any of the neighbors are interested in helping in the selection of the new equipment. Bike Youth/Trail — The tree and brush removal has been completed. Signage identifying the rules/guidelines and direction of travel will be made over the winter with installation to be done sometime in the spring. To keep the bikers from crossing and damaging the maintained lawn areas by the Well Pumphouse #6, a fence may need to be installed. The trail entrance will be located most likely on the east side of the wooded area by the existing paved trail and parking lot area. Pickleball Update — The engineering consultant (WSB) is in the process of preparing cost estimate for a pickleball facility that will include the proposed location of the courts and how many courts should be built along with other amenities that could be considered (parking lot and access, benches, shelter, etc.). WSB will be presenting the information at the March 4, 2021 meeting. The cost of the study is being funded from the Park Improvement Fund. ON -HOLD PROJECTS — None at the time. OTHER ITEMS OFINTEREST — • Update of Pedestrian Trails: Trails that are planned to be reconstructed: ❖ 2021 — Tom Anderson Trail (along Coon Creek east of Hanson Blvd) ❖ 2022 -- Kelsey Round Lake Park Trail (Note: The reconstruction of the trail will most likely be pushed out for reconstruction for another 3-5 years) The City Council has reviewed the engineering consultant analysis report recently regarding proposed Railroad Underpass trail to connect internal developments from Winslow Cove 2"d Addition to the east side of the railroad to determine if the project is feasible. Staff has been discussing with a potential developer regarding a possible cost share to construct the railroad underpass. • Update of Scheduling Park and Recreation Commission meeting at a City Park or Facility — The Commission will need to determine if you would like to have a meeting at one of the City parks in 2021. If you have any questions or comments regarding any of the items mentioned above or any items relating to parks or projects, feel free to contact Todd Haas or Dave Berkowitz at the City. Staff recommends the Commission continue reviewing the City Council meeting minutes that you receive by e-mail as to discussions of various projects the City Council has been working on or is considering. Note: If you have any items that you would like to add to the list, let me know at the meeting. 1 /29/21 • Completed trash and recycling service for all parks and trails. • Snow Removal of parking lots and trails, as needed. • Continued servicing and flooding outdoor ice rinks. • Cleaned and serviced snow removal equipment. • Replaced Park signs at Woodland Crossings and Country Oaks 02/05/21 • Completed trash and recycling service for all parks and trails. • Snow Removal of parking lots and trails, as needed. • Continued servicing and flooding outdoor ice rinks. • Cleaned and serviced snow removal equipment. 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 . (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV TO: Park & Recreation Commission CC: David D. Berkowitz, Director of Public Works/City Engineer FROM: Todd J. Haas, Assistant Public Works Director Jason Grode, Parks Maintenance Supervisor SUBJECT: A. Reconsider Future Improvements/2020 Existing and Future Park Facilities Chart/Park Zone D DATE: February 18, 2021 The Park and Recreation Commission is requested to reconsider future improvements of the 2020 Existing Park and Future Park Facilities Chart for Zone D as directed by the City Council. The City Council at their workshop meeting on November 24, 2020 was in favor of increasing the park dedication fee for 2021 to $4400 per unit. The City Council also directed the Park and Recreation Commission to re-evaluate the proposed identified improvements in each zone to determine if any of the future improvements should be removed or reduce. Attached is the spreadsheet for Zone D that identifies in red the future improvements that should be removed or in yellow the future improvements that should be reduced as recommended by staff. Zone D currently has 27 parks. Below identifies Zone D by category: Mini Parks in Zone D (12 parks) • Chesterton Commons #62D • Creek View Crossing 466D • Hartfiel's #68D (Undeveloped) • Hickory Meadows #69D • Moore Estates #73D (Undeveloped) • Nordeen's #74D • Red Oaks East #77D (Undeveloped) • Red Oaks West #78D • Shady Knoll #82D • Sophies #83D • The Oaks #85D • Woodland Estates #86D Neighborhood Parks in Zone D (7 parks) • Andover Lions #59D • City Hall Park Complex#1/Purple Park #63D • Hidden Creek East #70D • Hills of Bunker Lake West #71D • Landlocked #72D (Undeveloped) • Oak Bluff#75D • Redwood #79D (Undeveloped) Community Playfields in Zone D (6 parks) • Andover Station North #60D • City Hall Outdoor Hockey Complex #63D • Eveland Fields #67D • Prairie Knoll #76D • Shadowbrook East 480D • Sunshine Park #84D Community Parks in Zone D (0 parks) Special Use Park in Zone D (0 parks) Linear Parks in Zone D (2 parks) • Coon Creek Park/Tom Anderson Trail #62D • Shadowbrook West #81D With the Metropolitan Council's most recent predicted buildout for 2040 of 13,500 households (previous projected household was 15,400), it was suggested by the City Council that some of the future park improvements may not be necessary and should be at least re-evaluated to see if they should be removed as an improvement or if the improvement should be reduced in size which would reduce the funding amount. Once the Commission has made the necessary changes to each of the Zones A-D, staff will bring this back to the City Council for review and approval before the next update to the Park Dedication Study and Park Dedication fee. At this point, staff will be presenting the Park and Recreation Commission recommended changes to the City Council workshop at the end of March. ACTION REQUIRED The Park and Recreation Commission is requested to reconsider future improvements of the 2020 Existing Park and Future Park Facilities Chart for Zone C as directed by the City Council. Respectfully submitted, Todd J. Haas Attachment: Map of Zone D; Draft 2020 Park Facilities Chart for Zone D (see middle column on spreadsheet -copy in the side pocket of packet) oyy.® A tz-,l Cra 1. ;c ,,,� ,�� SCOON CREEK 1 .1 el M_ ` 31 n A vrx t vrxRr nx. w a caMRMn m to ®AR�TW z `J M wx+snooxs MO N'L:m M M`n,am ED IT M LW03lIH 2 Q iA I IWS&RADD mo ImL46U0 WRERl g 1IA EP.RI BMDRE W f 1L1 VALLEY V®R' g qqoO rry� !�491'a---- ``2 >I+s,,•>,� inamcxan� Q y�DJ3mt: �YOAU !p R 3 y tie DA[1611 LDW m� �1 c? avoDlwMmm�e G In WDaOLA Aow no ANREMW N 4T �V IDC UNDRIAW tef. rneel'SOce Q 'sXp. i.n BID LgWARDLACEI nD DI.,n ,]C ORMACRC9 r161ST NC 1®DENCREEIIN AV E BLVD j c a:+ uc ImDENCREERm »c RELZTRamo4 mv[.e me WAW 30 .yy �CONSTANCE n" Il41C L/ rs ,n 41C IAHM W : NWODWW ORM no ABC YIEASAMOIIS A6s BBC UYMBBC 30518 O C Q .Arv.rr.,, AID RPIWLACE aM me DMU=ff N d��V'u0 ne W.Daus a e�nurr.v oo � can M t'� r Rj :vxp nz.v. sm 8,=ft ImA.RE no mD.s1Ex'taNca aao CDTCAa1PDtou ��i .ATbe/v mo CDTEAI.LCLq mo CCONCIIP Dm CRtiv :w Cac no EnLANDa®.Da h D�Db:809 No o E .•" TIMOR tW gCEO c"RIC ADDM IODDENCRe�e nD Im1 -2 no DMEDAel LAlIl1L.oCKtD U.0 4i/ :s,MAls>n. no rooaEa Eavn. Tw IpHDLM r nq.,rs n: no OAa:BLUn 40 PRAIXD.0rtA4 brv,i[ n no REDO %9aMT v ,ego A DOVER BLVD v.A r.-rv,rs..v ne REEDWWD T r % wu sMDDWEROOL] .Ll BID aM "RDCR' no aMDTRNgl BID 3111INSHE no 1718� ... n6 ,occgmDw, a. r :-:Rrn.sn t .Td R.H Bqm L/rf: il. �' ir: ,l.'PRLSSLIA city F A Avdov B Andov: : •m.nz>n C Aodun G D ADdow ,•m.usaa E ADOkt r,.xD.rsau F Anoka G Anokt City of ANDOVER 2020 Existing and Future Park Facilities Chart Page 1 of 10 TY 'ANDOVER 8 DESCRIPTION ER LAKEB BOULEVARD NW-19.04 ACUNIT RES 1 280'Cyclone Fence with Mow Ship _ - - _ 1 A91ime 2,715.00 Beginning FUTURE FACILITIES TOTAL PRICE REPLACEMENT ITEMS ESTIMATED COSTS $ _ - Security Light 5 ],50000 Annual Ballfieltl Maintenance: Re ratle, Resee_q Irrigation _ - _- _ 9 $ 5,000.00 $ 2,715,00 Annual Ag Li me Mate no $ 1,000.W $ 36,14440 _ Small Shelter wl Picnic Tables S 2g000.00 $ 1,00000 Bleachers $ 7,500.00. 2032 PI round Structure § g7.000.00 a 1,000.00 New Ouifleltl Fence (8') w/ Maw StripStrip(1 Field) $ 33,750.00 2037 2W' ne Fence with Mow Strip $ 16,000.00 $ 20000_ FUTURE EQUIPMENT TOTAL_ E 6875000 2037 W apace AsphaBParkin Lolw/Cums $ 76,0.0000 E 60.00 52037 Backstop Fence, Max Sid a, Ou outs, Bleacher Pads $ 92.000.00 $ 17500 REPLACEMENT ITEMS TOTAL: 257000.00 E 4 00 .. _--_-- $ 155.00 -- a 315,00 1 Pla mood Structure-2017 36,144.40 1 Bell Field 11000.00 2 Aluminum Players Benches w/Concree Pad 500.00 1 1 M HMOae$ sof Three Hama Plate to 200.00 60.00 1 1 30 Space Asphalt Parkin Lot w/CurOs Pi Rubber 17,5W.D0 45.00 1 Trash Can 156.00 1 Concrete ADA Pad 315.W 1 Handicap PeddnO Sign 50.00 $ 5000-- 1 1 Backstop Fence, Maw Strips, Dugaula, Beecher Pals Recycle On 21,293.00 155.W E 11,293A0 $ 155,00 1 Im ation-2017 21A".30 $ 21664.30 E 3.47768 - i Set of 3 OtmJ0m Eaerclae Equipment i 3,4T7.88 ANDOVER LION. PARK EQUIPMENT TOTIU. 105 774.58 g ) $ 5,000.00 Annual E 273 W4 ge Annual $ 97907582 Landscaping ($1,0w) �5. Annual f 2]346331 Smell Picnic Shelterw/Picnic TeWe $ 20,00000 Annual $ $ 1,80000 1 Netfin - Around Concasaen Area E _ _ ID,000.00 2026 $ 185.00 Park Benches Co E 1,000.00 2026 E 800.00 72 Basketball Court § 15=00 2026 E 1,80000 :. FUTURE EQUIPMENT TOTAL 61000.00 2028 $ 30,00000 " 2028 $ 3,W0.00 ': __- _ 2038 $ 2,170 00 !i 20M Ballfield Maintenance: R retle, Resaeq Inigatian $ 15 A0 GOD ANDOVER STATION NORTH- 1823139TH LANE NW 218 979,W5.82 1 Ballfield Development 1 1 Bu ltlin w/ Fields ms, storage, concessions, etc.-2008 stornsimctionw/Irtn.Itn Uphting oft Fields 275,87431 273,483.31 (e9...... Reseed,n9gati Facilty Maintenance Li hti 'Maintenance 2FieNa 01W.W a 3000 ,WO.W 3 &eachere 9,g99.33 6 15 Players Bench Aluminum 300.DO Ag Lime Material E 3000.00 3 8 1 3 4 14 Foul Rubbers Foul PostSion wh/Flage Parka nwheeininp wall block Dugouts Picnic Tables 12' Concrete Trash Cans 550M 125.W 1,800.00 10,000.00 eoa.00 155.00 Tiled VV Wheel E 7,300.DD 2W a s engineered wom fiber round Stucture Fance around round BaNn C eSet ScoreDoaMs setN3 12' x 12' I R, lastf 3) Partin Lot - Relaostr M REPLACEMENT ITEM. TOTAL: $ 11,2WA0 $ 11100000 $ 25,000.00 $ 7,2W.W $ 32.=.00 a 32,DWIX, $ 3W000.W 6017W.00 1 12'Inigation Shed -2006 ],5W.W 500 2036 3 Sin - Hantlkep Parldn0 Sign 25.0075.10' _- _- _ 4 Sign - No Parking 25.00100.00 - -- 1 Sign - Overflow Parkin 25.0025A0 'BluebiN Houses MIX)320.00 "'.2851inearg 4' FenceerSlidin Hill1,800.00800.002 Saddlemates 700.00400.001 Swin set-4 Piece I'Spi W800.001 8'Banoh 250.002W.001 A Spdn Pad 1,2, 0000.001 Met Sy Wheel 3,500.005W.W1 2W cu aen ineered woad fiber 5,400.0000.001 W linearfl VConcrete Bowden 900.0000,W1 I t51inlear R 2' Canvas, Bolder 7W.00WW1 901inea T Cocree BOrder GameTime PM E ul -MN round-2008 475.00475A0i S3,53am,539.95 1 Fence arountl playground 11,747.57 $ 11,747.57 1 Scereboanls iset of 3)-2006 7,500.00 $ 7,500.00 1 Batfing Cage Set -20DS 21700.00 $ 2,700.00 1 Perking Lot w/Lighting-2006 80,D00.00 $ 80,00aw 3 Home Plates 60.00 $ 18001) 9 Ball Field Distance Signs 20.01) § iWW 1 No Papper Drills Signs 25.W tt 25.00 9 1 Set of Bases BIMin HiO Light-200S 200A0 2.5pp.0p f S0000 $ 250000 . 1 Handimp Swing 450.00 $ 450.00 1 Duek House 26.00 f 25.00 1 V Metal Picnic Tablew/Cancree Pad 2W.W $ 2W00 3 Concrete TaDle w/B 19enchas m $ WSW 2Smell 2_� i Recyce Bin 1 BeIMe10 UIMN of East Field I 155.00 1W.M.D0 It 310.00 $180,000 ANDOVER STATION NORTH EQUIPMENT TOTAL 1 99$ 8$4,85 6ID CHE TERTON COMMONS - t414 /55th AVENUE NW -.fit ACRES "� C:\Usersltoddh\AppDatHLL-Om Aicrosofi\Windo SVNetCache\Content.Ou80ak'ABHDDGXN1Park inventory -2020-Updated 12-3-2020 City of ANDOVER 2020 Existing and Future Park Facilities Chart Page 2 of 10 TY 1 1 DESCRIPTIONIEXISTNG) Welkin Palk- Paved -2007 Gametme Pl mund Structure-2017 UNIT PRICE 3,950.00 32,733.64 Beginning E : 50.0D $ 32,731M FUTURE FACILITIES hilgailonS m and new water service FUTURE EQUIPMENT TOTAL TOTAL PRICE t E 40,000.00 2032 40ugo.og 2037 REPLACEMENT ITEMS Pleypmund Structure WaIH Pam -Paved ESTIMATED COSTS E 63,500.00 E 17,000.00 1 Four Place Swin Set 1,30000 S 1,300.00 REPLACEMENT ITEMS TOTAL: 80 500.00 1 1 By Concrete E ing Table steel tube fram0 4W.W 200.00 E 400.00 $ 200.D0 1 Trash Can S are Fable 140.0) $ 140,M 1 SandboxwiNTmbela 1.50:1.00 $ 1,500.00 - 2 Trell Gates 1,250.DO $ 2_500.00 - - - 1 Paris Name Si n w/1andseapin 550.00 $ 55000 - - - - - Facil -- - Li htn Maintenance $ 500000 n Maintenance $ 200000 Perking Lot Class V Atltl material as needed 8 5,000.00 2Hocke Rinksw/Fencrng and 4 Light Pales - Replace m S 110000.00 1 R aBin IM.00 S 15500- - $ - 43423.54 NW-262 ,� .' S ,. Mnual 2G.W0.00 $ 40 - � $ 14; 000.00 FUTURE EQUIPMENT TOTAL 3b00.00 Annual ,200.00 Ann ot 4§2 $ 4.MO00 i 2031 1 security Ugh (Connaxue 0.vned2 CHESTERTONCOMMONSEQUIPMENTTOTAL 63D CITY CAMPUS HOCKEYCOMPLEX 1885CROSSTOWN BLVD Hocks Rink w/Fencing end 4 Light Pales w/16 Lights-2011 1 Wermin House 4 H NM 1 Parkin Lot Gassy 1 Picnic Table 25D.00 $ 250.00 - REPLACEMENT ITEMS TOTAL: 124000.00 4 Trash Cans 1S6.OD 20.00 $ SW.01) S 40.01) _ 2 Lock Boxes - _ - 2 1 Fire ExOnguishers CO Alarm Detector 55.00 25.00 $ 110.00 $ 25.00 - _ _ 1 Wannl House Hours in 25.0D $ 25.00 4 Plastic Round Tabled 25.00 $ 100.00 - - 2 Pending Lot Lights 3 Security Lights on Building CITYCAMPUSHOCKEYCOMPLEX EQUIPMENT TOTAL 64D CITY HALL COMPLEXIMIPU '' -.6U CROS T 1 340' C Fence b Soccer Feld 42 2.501 200,W $ $ODD.OD $ 600.DO 198970.00 - - - VO NW-b1:28.ACRE$ 4,760.00 $ 4,76000 Rayyrvund Upgratle (SlgneMe Pickleball Courts (4) $ 450,000. Conabury Center Pmjec t Balance (TOmugh/213120) $ 624 Annual Feel Maintenance: R ride, Reseed, I aeon $ 10,M.00 1 1 clone Infx6tle211,=.DO _ $ 20.000,00 - $ 3,00000 Annual 2027 Lima Maemal 340'C one Fence by Soccer FbM #2 E 1,00 = $ 12,BOO.OD 1 6a0Fiel 1Wth matron 3,000.00 1 Baaketbell oat, net and backboard! 415.00 E 475.00 FUTURE EQUIPMENT TOTAL 2.274 854AO 2027 Fendrq around!Bell Field • Re am $ 10,900.00 4 Players Bench - 9 _ 100.00 $ 400,00 ''1.. _ 2090 2030 2090 2034 20U 2 Shakers- La North Parldn Lot Blectrop Trails PI muntl SWdure - i Large' Sandbox w/Digger $ 124000.00 $ M,OWA0 $ 25,000.00 $ 100 000.00 $ 5,000.00 1 1 2 Bike Rack _ Bleacher Bluebird House 216.00 1,785.W 15.00 426.00 $ 21600 '' E 1,78500 $ 3000 : $ - 42500 i.: 1 _ Cars 'n Ritle 1 Dinosaur Spring Rid. _ -- _ 525.00 $ 525,00 ''. REPLACEMENT REMS TOTAL• 361 $M.00 1 1 2 1 Fencing around Ban Field- 2002 - Field Number Sign _ Foul Line Pole Flaps Four -Section Backst0 3,200.AD M.00 M.00 /,564.00 $ 3,200.00 E $ 44,00 1 $ 5 Trash Cans wit Tops 140.00 $ 700.00 2 1 Grill - Large Home Plat 340.00 80.00 $ 680.00 $ -._ 60.00 1 3 Motorcycle Spring Ride Perk Bench 36D.00 170.00 S 360.00 $ 510.00 - Z Pitchm Rubber 45.DD $ 90.00 _ 2 Pl. uM Structure - 2019 82,712.11 $ 82,712.11 1 1 ReMlning Well - Rock Sandbox wim Tangent 2,000.00 2,500.00 $ 2.000.00 $ 2.600.00 _. 2 1 Security Li ht(Con eonw, Owls Set of Three Suisse. NewStyle w/Double Fiat Base - 200.00 $ $ 20D.D0 _ 2 1 Sheler - Lem. Sheller - Small 23,437.50 12W.00 It 46,575.00 $ 1=.00 _ -- 1 Soccer Fieltlwdhl ' anon 3,000.00 $ 3,01)D.00 1 Soccer Goal -Junior-Sala 700.00 $ 700.00 1 Vol all Net 62.00 S U2.00 - 1 VW aOPob-Sel 228.00 S 228.00 - 1 NoMParldn Lot 3500000 I $ 3b,00000 _ 1 1 3 Blacidop TraitExpanded! awn Set-4swinpa2baby) Picnic Table - concrete 12' 9,B150.00 1,900.00 1000.00 E 9,880.DO S 1900.00 1 $ 3000.00 - . . C:\Users\toddhAppData\Locel\MicrosoPoWlndow NetCache\ConlenLOud ok41BHDDGXMPark Inventory-2020-Updated 12-3-2020 City of ANDOVER 2020 Existing and Future Park Facilities Chart Page 3 of 10 TY 2 DESCRIPTION(EXISTING) Sign - Handica Parting UNIT PRICE 25.00 I Beginning $ 50,00 .j FUTURE FACILITIES TOTAL PRICE REPLACEMENT ITEMS ESTIMATED COSTS 1 Sign- DNR Assisted Plural00 _ 25. $ 2600 �? 1 a 10 Hodoey Beck Stop 1,800.W $ T800 00 1 30'x 30'Conuete Stab1,200.00 f 1,200.00 1 Mete[ Bdlerd 180. W S 180 00 <_ 1 220' Yellow Plasdc Fence Top _ no. W E 220.00 � 1 Metal Bet Haiti 25.00 $ 25,00 4t 2 Metal Picnlc Tables 8' - 300.00 E 600.00 ;{:. 1 Surroillanca Sign 25 M $ 25,00 4 Rai Bun. 155.00 $- CIWHALLCOMPLEX e11PURPLE EQUIPMENT TOTALMKINEW ' - EAST'OF HANSONBL NoCurrentFecllitias _. B8O CREEKVIEW CROSSING- 14271 YELLOW PINE STREET MIN-.63 ON COON CREEK-3].66 ACRES 4900000 87,50000 - ILandscapng and Benches FUTURE EQUIPMENT TOTAL Landscaping $ 1,001100 2025 Playgmund5tture$ FUTURE EQUIPMENT TOTAL 1 0o6.a0 2025 i180 cu yd5 Engineered Wood Fiber 2030SmaIl Sheller w/Picnic Tables REPLACEMENT ITEMS TOTAL: ACRES „�.,,-'µ $ 240000 $ 95000 '. 1 Basket ball Patl Asphslt 73'x 42' _A2.Q0.WW ll pi board, net and rim00 1 Buck-about00 Perk Name Sign 0 $ 963.00 :1 $ 550 00 1o,gah.99 66600.00 1 PnmeTlme Pl Structure-200747 E 23512471 Sew" U ht Cwandus Owned)$ 1 Shelter -Small $ 1,W0.00SA PIars SWIMSet-Short00 $ 1,90000i SOR&Order-M is Edging00 $ 350,00 Trash Can 00 $ 155,00180 w s Ermine s ed Wood Fiber- 200h - 1 a261in. FL x 4' Sitlewalk 1,W5.00 $ 1,975.00 1 Park Bench 25000 E 250.00 2 Saddle Metes 701 E 1,40000 1 Stan - Tobacad, Free Zone 24W $ 24.00 - 1 Sandbox 50000 $ 56000 1 R e Bin 155.00 $ 15500 4 40284.47 3,637.40 $ _ 3,837.40 _ Small Shelter w/ Picnic table($20,000) $ 10,00000 _Annual Field Maintenance: Regrets, Reseed imgetion ],g34.00$ ],434.00 Scoreboards - MitltlleB NOCh Fields $ 20,000.00 Annual Ag Lime Material 5.712.70 $ 5,71270 __ Dugouts - Middle& Ncnh Fields $ 20,000,00 2022 3W-B'Fence alongro arty 0rre 1t1,53].jj $ 10,53Z86 _ Medium Shelter wf Picnic Table B grill $ 20,000.00 2M 900-6'Fence along n line _ 23,75TIM) $ 23.757.89 Raise BalMeltl Fencing Height to 8' $ 45,000.00 sass 30D- 4'bak[fieltl fence w/mav aM 3,929.83 $ 11.789.50 _ _ _ FUTURE EQUIPMENT TOTAL 115000.00 sass 384'-B'belMeltl fence w/mow able 10,857.33 f ffi,572.00 2022 1,146'- a bell fence w/ mow ships - Ail Fields Q062.8/ S 6,062.01 sass BaGmro Six Section 67D CREEKVIEWCROSSING EOUIPMENT-TOTAL - evils DFIELD$-2275 ANDOVER BLVD NW- 7.07 acams $ 15,000.00 1 380'-8'Fence along property line-2002 900'-6'Fence along property line-2002 1 1 300'- 4'ballfall fence w/mow she s-2002 $ 3,g00.00 1 SB4'-B'balMeldfenca .1 am aVipe-2002 $ 1g20D.00 $ 20,000.00 1 1,146'- 8' DelMeltl fence w/mow strips -2002 § 5 000.00 15.000.00 3 Beckslo Siz Section-ZW2 $ 3 Concrete for Bden!-2002e-sW2 $ 63,000.00 1 Messlad Benches 8 Mesas Boats-2002 - $ 32.W0.00 $ 6700.DO 1 Ird ation-20M 27,126.33 52]15.73 $ 2],126.33 $ 52,715.M _ _ _ - - 2022 -_ 2022 tease Sixsection BeningSoduarbCage 2Plae 1 Parkin Lot 35 Spaces -20M j 140,000.00 1; 26,000OD $ 230,000.00 $ 90.000,00 3 B 3 3 Home Plates Pitching Rubbers Douala First Bases Sets of is4 2n0 Beans, 3rd Berea 87.00 2(10.00 200.00 25.00 155.00 E M1.00 $ 600.00 $ 600.00 $ 75.00 $ 1,395,00 _ _- _ - _ _ 2032 2032 _ 2032 2032 Concreb Ped far neacrer/Dugouts Benches, S Message Board Parking Lot 353 tee Coachella all Dugouts - South Field 3 9 Reed! si nq Treat Cana REPLACEMENT ITEMS TOTAL: 69591 1 BalMeltl design/development 124184.44 S 124,184.44 - - 4 16' aluminum pliyars, batches 300.00 $ 1,200.00 2 Is metal players benches 900.00 E 800.00 1 Park Signvorandscaping 750.00 $ 760.00 B Foul Posts W Flags 110.00 $ e80.00 - - 1 Picnic Table 16 Concrete 3 Plew 800.00 $ 90000 1 4501inaerRYeilow Fence 380,00 § 380.00 !At 1 Scoreboard Elecbonb-2011 8,413.00 S 8,413.0p 3 Bleachers 1,71N1.00 $ 2 Cwcrata Slock outs 10,000.00 E 20,000.00 1 Sew M Cwrrevm zus O § C:\UWMVoddhWppDat LLL RMicrosoMWindowsVNetCache\Content.OWleok"BHDDGXN\Parklnventory-2020-Updated 1232020 City of AADOVER 2020 Existing and Future Park Facilities Chart DESCRIPTION (EXISTING) UNIT PRICE I Beginning FUTuee FACILI IIl winL-1. •��•���•••� •••�••� le Fall Ordinance Sign 25.00 $ 25.0o _ _ - g Cage 2 Place 2,500.00 $ _ As Blns 155A0 $ 46So0 is I AND FIELDS EQUIPMENT TOTAL FIEVS HANSON BLVD 3ANDOVER BLVD. 'ment Fault.. -14T ACRES YY Sustainable Landscaping &Treed da. - J 000.00 FUTURE EQUIPMENT TOTAL QRV MF DOWS 300144TH AVENUE NW-77 sere. [Time Play Structure 2012 22,565.37 $ Name Sign -� 11457 $ rate Picnic Table -2Leg 500.00 $ J2565.3] 454.57 SOCOo � f`- Future Park Expansion �: Irrigation System Expansion 1rz basketball court r• 1500000 2027 $ 500000 2042' �$ 15,00000+ Playground St cl re Concrete Enclosure wlaock Fall Wall REPLACEMENT ITF PNce Swing Set 1,300.00 $ 1,300.00_ SwIl Plonk ShaOarw/Picnic TeNe ($20,000) $ ig000.0 _ Feel 6' 170.00 S 170.00 FUTURE EQUIPMENT TOTAL 45000.00 - -. nM EnUoeurew_/D_Iock Retaining Wall 761Z7911 ]51719g I _ _ _ ilia. 155A0 $ ISSW! I __. 15eo Landscaping I S 50o.00 '.1 _ Small Shelter w/ Picnic Table($20,000) _ oi, -,S 1 Plcnic Table 250.00 E 250.00 1 Powenpe caStructure -MediuMamall-2002 30,731.42 $ 30,731.42 1 ADAAccess Pad$ 1,550.00 E Wage 1 Su Pll Svmg Setw/ADASw4ngaM Accesa Pad 1,900.00 $ 1,E00.00 1 Security U ht (Cannexu$ Own $ 2 Trash Cans 155.00 $ 310A0 1 14 Piece Asphalt Parkkg lot w/Cemant Curb-2002 22,364.01 $ 1.364.01 1 IN -as aftTrail 4,01OA5 E 4,010.45 1 Supper Goals - Jr. Set 1,025.06 $ 1,025.08 1 Park Name Sign whandscapng 900.00 $ 900.OD 1 Cook Spring Ride d50.00 E 450.00 1 Sgn- Handica Perking 25.00 E 25.00 1 Sign - Refwbished Park Sign 500.DO $ 500.00 1 Sign - robe= Erse Zane 24.00 It 24.00 1 Recycle Be 155.Do $ 155.00 2 _L CB2 Park Bench 2211.00 $ 44obo 1 _ Concrete Pad wklaMbeO Well 5,O6B.118 S,DIi6.98 $42,000.00 1 Sidmalk and Conaeta Edging - 2,000.00 E1 Wocdilber Surf[. 2,D00.00 E20 00A0HIDDEN CREEK EAST EQUIPMENT TOTAL D F BUNKER LAKE WEST- 557139TH LANE NW -6.76 ACRIEMi SeI] Authorized Vehicle Sign w/Post 75.00 $75.00 FUTURE EqU 1 00000 10,000.00 11.000.00 Landscaping - $ 1 000 on Annual B New DUMald Fence(6)WMow Stnp(1 Feld) $ 33,750eO nnua _ Bleachers wl concrete Pad IS7,500.00 2023 P _ ADA Access Trail(125 x MOD PAM) $ 6,250.00 20M C Pave Existing Parking Lot w/modest, C BG $ 45,000,00 2036 F Page 4 of 10 ESTIMATED COSTS -- $ so00001 1 7 - CdUsers\toddhl PPDaW\Lo KMicrosoMVVndo MNetCache\ConWnt.Ou0ook\4BHDDGXN1Park Inventory -2020-Updated 12-3.2020 r City of ANDOVER Page 5 of 10 2020 Existing and Future Park Facilities Chart TY 1 1 DESCRIPTION(E)USTIND) Minibik0 Spring Toy UNIT PRICE 525.00 Beginning $ 525.00 FUTURE FACILITIES I - - _-- TOTAL PRICE REPLACEMENT ITEMS ESTIMATED COSTS 1 Concrete Sidewalk BorderwlWood Chips-2004 3,100.00 S 3.100.00 1 Palk Name Sign wllandsceping - - 800.00 $ 600.00 1 Retaining Wall for Sign 1,600.00 $ 1,400.00 1 Sign - No Paddrig On Gress Security Light (Comm Owned) 25.00 $ 25.00 1 $ _ 2 Metal Bat Holders 25.00 It 50.00 1 Wood Duck House 22.50 $ =SO 1 _ Dog Pot Dispenser 80.00 $ W 00 i Re a Bin 155.00 $ 155.00 _ 1 Fending Backatag Dugouts, Sidelines wl0oncrete Maw Strips, 16,01 $ 16, 006.32 HILLS OF BUNKER LAKE WEST EQUIPMENT TOTAL E 82.662.53 7212 LANDLOCKED- 15543 PRAIRIE ROAD -2.25 ACRES No Curtent Facilities No Future Facilities Anticipated 730 MOORES ESTATES- 905 CRO$STOWN RLVO NW-0.83 ACRES ' No Current Facilities _ I Park Sign 8 Landscaping. � 'ySecurity Light _ Playground Equipment (2-5 & 5-12 yr. old) _ l igabon System i. Trailsfor ADAaocese(25Cs$50.00plf) FUTURE EQUIPMENT TOTAL 1 74D NORDEEN'S- 15535 JUNIPER STREET NW-.05 ACRES t Four Place Swing Set 1,30000 $ 1,3000 No Future Facilities Anticipated as $ 1 D00 00 ' $ ],500.00 $ 60,000 00 $ 50,000 00 _ $ 12500a0 _ 1 1311000.00 2026 2027 Playground Structure $ 46,000,00 $kating Rink Re airs-Gmdin $ 8,000.00 1 60'Concrete Sidewalk 500.00 $ Son 00 -: _ 1 Frog Sprang Ride 525.00 $ 525 0o I`' 2047 i2 Basketball Court $ 17,001 i Pad Bench CB2 220A0 $ 220.00 REPLACEMENT ITEMS TOTAL: 71 000.00 i Park Name Sign wAarMua in 550.00 $ 550.00 1 _ _ _ _ Picnic Table (steel tube made) - 250.00 $ 250.00 1 1 Powersca-Mediam-2011 22,194.00 $ 22,196.00 1 Sandboltwith DiMr 1,500.00 $ 1,5D0.00 1 Security Light (Cone rus Owned) $ 1 Skating Rink 3,000.00 $ 3,000.00 1 Trash Can (square plastic) 155.00 $ 155.00 -' Recycle Bin - 155.00 1 $ 155.00 1 Border- 37 Tin. Ft. Magic Edging 260.00 $ 26000 $ 525.00 1 Toucan Sam Spring Ride Si 1 _ Concrete Edging Play Structure 2,000,00 $ 2,000.00 1 Wood Fiber Sun.. 2.001 $ 2,000.00 $ 60,00 1 BM House Hockey Nets 60.00 2 30040 $ 600,00 1 12 Basketball Court (2017) 8.372.16 $ 8,372.16 NORDEEN'S EQUIPMENT TOTAL BLUFF -14757 BLUEBIRD $ 44166.16 17000 $ 17000 L ndscaping $ 1 00000 1 Park Bench Field Maintenance: Regrets, Rowed, initiation $ 5,000.00 1 _ _ _ _Annual Pad Name Sign wlLandscaping 550,00 $ 550 00 J 12 Basketball Coun 1 $ 15000 00 2025 Playground Structure 10 Space Asphalt Parking Lot-2000 18,950.00 $ 16,95000 Small Shelter $ 20000.00 2023 160 cu yds Engineered Wood Fiber Plcnic Table Concrete $ 200,00 FUTURE EQUIPMENT TOTAL 000.00 2038 ISS asi As halt Parkin Lot $ 40,00000 1 $ 5,600.00 1 $ 82,000.00 1 _ _ _ _._�20000 PowerSca s Play Structure -20M 19,222.49 $ 19,222.49 _ _ _ $ 120000 $ 3,00000 REPLACEMENT ITEMS TOTAL: 1$ 800.00 1 Four Place Swing Set 1,200A0 3,00 N 1 _ Soccer Field 1 Tried Can 155.00 $ 155.00 i Recycle Bin 155.00 Fence -40'Split Ran _. 2,160.00 $ 155.00 I $ -- _-- 2,16D.00 2 Signs - HandicaParking 25.00 $ 50.00 _ - 1 SewMy Light (Connelwe Conrad _ _ Saddle Mates $ - 2 _ 70D.00 $ 1,400.00 1 73'linear05' Sidewalk 550.00 $ 550.DO 1 1]0linaarft l2"Curb _ 160 cu yds Engineered Wood Fiber 400.00 S 100.00 1 2,700.a0 f 2 700.00 1 38' linear R Border magic Edging 28D00 I $ man C:Wsem\toddhWppData\Loc RMicrosoft\WndowsVNetCache\Content.0utlook\4BHDDGXN\Pad Inventory -2020-Updated 12-3-2020 City of ANDOVER 2020 Existing and Future Park Facilities Chart Page 6 of 10 QW.1 1 1 DESCRIPTION(EXISTINGI Soccer Goal Set Regulation -- Im our System UNITPRICE 1,50000 28,815.69 Beginning FUTURE FACILITIES TOTAL PRICE Is 15001, $ 2661569 _ _ 1 E 79,23010 $ 15000 Landscaping $ 1,000.00 : Annual 00000 Warming House Addition $ 10000000 -Annual $ 2,000.00 Pave 1 Large and 1 Small Parking Lot - $ 180,000.00 NAnmal $ 8,000 00 Treil from NORh &East Iota to East geltl (700z 50 plf) $ 35,000.00 2022 S 4,000.00 _ Pave Hockey Rink with Corpnte Upgrade $ 25, 2022 $ 91,0iX _ _ FUTURE EQUIPMENT TOTAL 341000.00 2W5 $ 139.034 00 _. _ _ _ 2025 $ 3.700.00 _ 20M § 2,800.00 2035 $ 4,200,00 1 _ 2035 S 8,459.10 _, _ _ 20M $ 650.00 _ _ 20M $ S000 2035 $ 2200.00 _. 20M REPLACEMENT ITEMS Field Maintenance: Regrade, Reseed Irrigation Building Maintenence ESTIMATED COSTS 16D OAK BLUFF EQUIPMENT TOTAL PRAIRIE KNOLL- 14800 PRAIRIE ROAD NW-19.38 ACRES $ 15,000.00 $ 5,000.00 10 1 Bluebird House 1500 Glass-V Parking Lot - Large '. 4,000.OT 1 Class-V Parking Lot -Small 2,00(1 _ I Lighting Maintenance $ 3,000.00 1 Sliding HIII and WlMllle Potts 8,000.00 Playground SVudure E 45,000.00 1 lkin WaPath-As eft 4.000100 Concrete Sidewalk Border wAvtodcIrlps Lsnde.pe Wall around Perk Sin $ 7,91M.00 1 Stonagrannianning Hounfieetroom Building 91000.00 E f0,W0.00 1 Irrigation System 139,034.00 8' x 110' Chain link fence f 11.501)1 1 Landscape Well 3.700.00 Scaeboarda Eltndh nic $ 53.M.00 2 SoccerlFootball Goal Sete 1.400.00 2 war of brow aluminum bill $ 35,000.00 1 8' x 110 Chain linkfence 4.21 Asphalt Base Hockey Rink & Fencln & Hookey Boards $ 35,000.00 1 Shelter wood name, concrete d 8,4%00 Weill Path - As haft $ 18,000.00 2 1Z Concrete Bare Picnic Tabha 325.00 $litlin Hill R airs and Ice roue Wildlife Pontl $ 5,00 1 2 Authorized Venice Only Signs 25.00 Sheltermod frame, whereas, pad) -Replacement $ 370D0.00 2 Removable BaskeWall Backboard Poles 1,100 00 Parkin Loh Awl $ s000.00 g 2 26 Net Poles (east soccer 200.00 $ 400.00 _ _ REPLACEMENT ITEMS TOTAL: 2 Hooke Goals _ 3W.00 $ 600.00 1 Parking Lots Asphalt 137,968.00 $ 137,968.00 3 Handicap No Parking Signs 25.00 $ 75.D0 _ 9 No Parking Signs 2500 $ 225.W 15 Garbage Cana Pleetic Style 17500 $ 2,625.00 1 Over Flow Parking Sign _ 25.00 $ 25.OD 2 Preine Knoll Park Regulations Sin 12500 $ 250.00 2 Emergency Parkin On S 25,00 $ 50.00 2 8' Perk Benches w/Pad 25G W $ 500.00 - I _ 1 Car Spring Rlda ill § 800.00 1 Motorcycle Spring RMe 525.00 $ 525,00 1 Mid. Spring Rid. 525.00 $ 525.00 1 Four Place Siang Set wMandicap Swing 1,801 $ 180000 ". $ 3600oo -3 i Concrete Sidewalk Border whvoodo l s 3,00000 8 Benches inside Warming House 100.00 $ 800.00'. 4 Fire EzOngulsher 5500 $ 22000 $ 18000 1 Metal Storage Cabinet 1W.M 1 Warming House Hours Sin 25.00 $ 25.00 2 Slgn- Tobacco Free Zone 2500 $ 5000 8 La a Metal Poles & Lights Soccer Fields, Hockey & Sliding Hit 26,660.75 S 213,286.01 - 1 Wood Duck House 40.00 $ 40.00 $ 75.00 3 Private Prop urty/No Trespassing Signs 25.00 1 Gamer. Play SbucWre-2005 21,566.00 S 21,566.00 2 Scoreboard Electronic 26960.13 $ 53,920.25 1 20' x W Net 875.00 $ 875.00 2 12' x W Conael0 Pads 1,300.00 $ 2,60000 6 Seourity Ughl Comaxus Owne l) $ 2 Grills - Charcoal 7W00 $ 1,400.0D _-- 2 Park Name Signs wiLardscal 750.DO $ 1.5001 1 W Black Parronted Pipe 24000 $ 240.00 1 4' x ISO' Back Chaanlank Fen. 1,800.0 $ 1,801 - 2 5-mw aluminum bleachere 4,064.00 $ 8,128.00 1 Kill Box 20.00 $ 21 1 R.I. Table 250.00 $ 250.00 1 AsphaltBede Hoi Rink & Brunei 12,015.00 § 12,015.00 i CO Detector 25.00 $ 25.00 1 1 Soccer Goal Set Junlars 900.00 S 901 2 2 Lacrosse G.81Sets Tnil Bollards 500.00 § 1,000.00 , 4 Recycle Blns 15sw § 620.00 PRAIRIE KNOLL EOUIPMEW TOTAL 742106.26 77D RED OAKS EAST -14046 NIGHTINGALE STREET NW - 55 ACRES NO Curtent Facilities Ipuplalnal Landscaping & Trees $ 2,51 $ 3 500.00 C:\Users\toddhWppDaa\LomPMjcrosoa\WlndawsUNetCache\Content.OWlookWBHDDGXMPark Inventory- 2020 - Updaad 1232020 � a City of ANDOVER Page 7 of 10 2020 Existing and Future Park Facilities Chart QTY. DESCRIPTION (EXISTING) 78D RED OAKS WEST- 14068 RAVEN STREET NW-296 ACRES UNIT PRICE Beginning FUTURE FACILITIES _ 475.00 $ 950.00 _jondscaping -;" "" 3,500.00'IS 3.500.00 FUTURE EQUIPMENT TOTILL TOTAL PRICE REPLACEMENT ITEMS - ., 1000.0 Poll Structure ESTIMATED COSTS $ 3500000 2 Basketball Goal antl Net _ - 1 'Basketball Pad -2007 _2026 S100g.00 2037 Basketball Pad Balked _ $ 15,000.00 1 Four -Play Swing Sal 1,300.00 100.00 501 $ 1,300,00 :;" $ 300.00 $ 500.00 d - _ _ _ 3 1 Park Name Perk Name Sin _ 2037 Peih-Aephall $ 42.000.00 - -- REPLACEMENT ITEMS TOTAL: 8 OOOAO 1 bond 1,000.00 § 1,000.00 $ - 1 Saw' Light (Connews Owned) i Trash Can 156.00 $ 155.00 1 Welding Path -As hall-2007 - 9,7W.00 $ 9,7.00,00 1 Sign -Tobacco Free Zone 24.00 $ 24.00 1 PAml Play Structure-2007 16,4]5.54 $ i8,d75.54 z - - - 2 Saddle mates 700.00 $ 1,400,00 - 1 21V linear R 4' sidewalk 1,300.00 $ 1,300,00-' ILIAgineered woodfiber _ 2,201 1 $ 2,200.00 1 ISIS ft. Border- Magic Edging wAarradcapmg 250.00 1 $ 25000 1 _ RecyGa Bin 155.00 E 155 00 -- - RED OAKS WESTEQUIPMENT TOTAL 79D REDWOOD.13977 BLUEBIRD ATREETNW-S 82 ACRES $ 3920954 1 'No Fuure FadpOes Anbapatea _ a No Currentnt Facllitles _ SHADOWSROOK EAST- 137896DT4E�IiN1'ITSTR ET NW-t5.03ACRE5 9900 Ballfield Maintenance: Regrade, Reseed, Irrigation $ _ 10p00 OD Ag Lime Material $ 0000.00 9 $ 5062878 $ 3,00000 _Small § 600.00 _ $ 400.00 Field Lights $ 250,000,00 Annual Sheller w/ Picnic table (ball field area) I$ 20,000.00 Annual Raise Ballfieltl Fending Height to B' (2 Falds) $ 30.000.00 2022 FUTURE EQUIPMENT TOTAL E 30000000 20U _ _ 20M 2022 - 2032 1 51 Space Asphalt Parking Lot w/Cement Curb- 2002 50,628,78 Basketball Pad -2002 3,Doo Basketball Paso BeckboarQ Nal 600.00 1 1 6 Section Bal w/Overhan _ $-35,000.00 1 Sandbox - Small tm0w 7A6'-S'C one Fence Dugout WConcnM PatlMlow S $ 15,000.00 1 1 Car SpringPill825.00 Sewdry LlOn (Connexue Oened - E 825.00 ''. $ - 208'-d'C one Sideline Fence%sfMow Ship 8aZ- 6'Cyclone Oul6eto Ferae wNcer Sell,$ _ $ 9.000.00 30,0M.00 1 160' C cy Al Cyclone Farm Pond 2, 160.00 $ 2,160.00 Concreb Patl for Bleacher/Ougouls Paris Sign wA.andsca iIp Keystone wall $ 3],D00.00 $ 1 Four Place Sate Set w/ADA Set 1,300.00 $ 1,300.00 _ _ - - - - 2032 2 Baseball i7,]5234 $ _ _ 2032 2032 2032 2032 Playground Mittens, Wood! Chips and Border Aluminum Bleachers 5 Row _10,000.00 $ _ 89000.00 $ 35,001 2 and sInfi IrNreltl 7,625.44 15,650.88 $ 15,650.08 '! 2 2 2 Sal 3 Beaea Man Nome Plates Pitchin Rubbers 225.00 75.00 55.00 $ 450.00 <: $ 150.00 $ 110.00 "i 51 Space haK Paddng Lot w/Cemen Curb Basketball Pad REPLACEMENT ITEMS TOTAL: -$ 220.001 $ 13,IX10.00 §OS Houft 2 6 Seedon Beckebp w/Overhan-2002 6,627.40 S 13,25d.80--- - 1 248'-WCy,1 reFence Dugoutw/Concrete Padthil S9ip- 5,575A4 § 5,5]S.Od 1 208'-4'CGone Sideline Fence w/Mow Strip-2002 3,321.76 $ 3,321.76 - - 1 802'- S'Cydons Outfieltl Fence w/Mow Strip-2002 11,380.38 _ $ 11,380.38 - 1 Concede Pad forBleachenDugouts-2002 13.930.00 $ 13,00.00_`, - - 1 Parl Sign wA.andscaping Keystone wail 8,600.00 $ 3,600.00 1 Irrigation System -2W2 36,404.00 E 36,604.00- 4 Aluminum 15' Players Bench 250.00 _ $ 1,00000- 6 In Can 155.00 $ 93000 H11 1]5'-4'Oleck vl fence 1,800.00 $ 1,900.00 ' - - - - - -- PI mood E9ulpmen-2017 40,104.60 $ 40,109.80 1 Wood Chips and Border- 2017 4,515.% $ 4,515.96-- 1 Picnic Table Steel Flame 250.00 $ 250.00 - - - - -- -' -- 4 Foul Pole Fleas 25.00 $ 100.005 1 Sign - Tobacco Fee Zone 24.00 $ 24.00 1 MiniIAW Spring Toy .. 525.00 $ 525.00 5 Bluebird House 15.00 $ 75.00 - - - - - - - 2 SI na-No Pending 25,00 $ 50.00 - 2 Signs - Hand caParking 25.00 $ 50.00 3 e' Park Benches 250.00 $ 750.00 _ - 2 S' Piwic Table COnoteb N. 500.00 E 1,000.00 1 30MSa ty FenwC 175.00 $ 175.W - 2 Aluminum&eaaher, 5 Row-2002 4.001 $ 9000.00 --- '- -- -- -- 2 Wood Duck Houses 40,00 $ so.W 1 No Pepper Chile Sign 25.00 $ 25.00 1-- - 6 Field Distance S' ns 20.00 $ 120.00 2 Recycle Bins 155.OD $7 310.DD -- -- C:\Users\toddhVypData\Loc RMlcrosoMWindo \INetCache\Content.0 omk\4BHDDGXN\Park Inventory -2020-Updated 1232020 City of ANDOVER 2020 Existing and Future Park Facilities Chart Page 8 of 10 rf DESCRIPTION (EXISTING) 4 1 M,MI Bel Holders SHAOOWBROOKEASTEpUIPMENTTOT� 8115 lityll (WEST-BUNRERLAKEiff LDENRODST--1134ACRES No Current Facilities 211 PI.ANDER STREETNW-1.52 ACRE$ 82D SH�IIGLL UNITPRICE I Beginning I FUTURE FACILITIES 25O0 $ 100r00 $ 260,12a.99 - No Future Facili0ea Anticipated $_ 475.00 Landscaping mh 4]500 ,� 1,W000 $ _ 1,300.00 IniBeSon System end new welerselvDe (f40,00� 4,]55.55 8 4,755.55 Dredge Pond TOTAL PRICE REPLACEMENT ITEMS ESTIMATED COSTS $ 1 000.00 r, �n ♦vial. $ S.WO.W 2024 Pla grountl Structure _ _ E 4Q250O0 and 1 - Four-PWce Sat 2035 Herd Court -Basketball REPLACEMENT ITEMS TOTAL: $ 20,500.00 1 3ai HaN Court-BasKHball-2W5 88 ]60.00 2 Padr Bench "NO $ 340.00 FUTURE EQUIPMENT -TOTAL 6600a.W 1 Park Name Si n 250.00 $ 250.00 1 Sew' M (Connexua Owned) - _ $ - _ _ 1 Tash Can 155.00,$ 155.00 1 Reo/de Bin 155.00 Fs-155.00 1 MidbillS n Ride 525.W $ 525.00 1 Car S rim Ride BW.W $ 800.00 1 Clifford! Song Ride 525.00 $ S25.W 1 Waodduck Houas 40,00 $ 40.W 1 Concrete SidewNk BONarw/wooOCMPa 330.00 $ 330.00 _ _. 1 Si n-Tobacco Free Zone 24MU $ 24.00 1 3ign-Ado-A-Pedc 25.W $ 25.00 1 GemeTune Ple Shucnre-MOS SHApY KNOLL EQUIPMENT TOTAL 31 63.01 1 Gam rime Play Structure - 2010 M,594.56 $ 44,594.58 I Inigatlon Syadern f 40,0001 2026 2U40 I playground Structure, Sandi w/Digger 129 X 2O Snener w/Compore $ 96,000.00 $ 87,000.00 1 20' X 20' Shelter w/Coni-M10 15669.00 $ 15,569.OD 1 240 x1' Complete Cum 2,258.W $ 2.258.00 1 FUTURE EQUIPMENT TOTAL 600110.00 1 REPLACEMENT ITEMS TOTAL: 163000.a, 1 _ Saddlemate Ride 600.00 - $ 600.00 _.- 1 Fine Spring Ride ]W 00 S 700.00 1 Four Place Stating Set 1,700.00_ $ 1,700.00 _ 1 15' X 50' Asti Basketball Court 1,100.00 1 $ 1,10CW 1 Adoll Sin 25.0 $ 25.011 1 Tobaow Free Sign_ 24.01) $ 24.00 _.._ 1 Beskel0ali HOOP S 425.00 $ 425.00 _._. 1 _. Pi Table - Child 3W.00 $ 300.00 1 _ Picnic Te0le SW.W $ SW.W 1 C62 Frame Bench 2M.W S 220 00. 1 Palk Name Sign vanandscin 550000 $ 55000 1 _ Trash Can 155.W $ 155.00 1 Metal Park Benclt 170.W E 170.00 1 _ Balk BOX 1 SarMOOX w/Dlgger _ Rec &n 1,SOO 00 $ 1,500.00 1_. _. 1 155,00 $ 155,00 # _ _ SOPHIES'S EQUIPMENT TOTAL .•800 WJ NW-38.65 ACRE _ 8 ng _$ 29]]0SO _Lands $ 9240.00 Llghfing of Park ng lots(West and Bddh) $ 1,OW.W Annual Bditd Maintenance: R .Reseed,I S 45,OW.W 1 2,290' Cy done Outfield Fence- 1 Or High, Mc 10Gates FoulF 29,77000 2 6 210' 5'Cyclone Fen. wffd Mow Strip2014 4,6M 00 WW $ 30,O. $ 20,MO.M $ 5Q E 35, , ^- E 20,000.W $ 15,001 Annual Annual FeG Malntenence Ag Lime Material $ 5,000.W $ B4O00.W aVolield Fence will Dugout arch Concrete Pad-2014 3,BBO.W $ 2315000 J Soccer Field Shelter (South End of Pi $ 10,500.00 _ Skateboard Perk Expansion E 21,00000 Playground Equipment ( 5-12 yr. old) _ - $ 5,00000_ shoe Pll '+"'� ^' $ 85,000.00 ;:'. d(NorN Soc.r Reid) $ 111N000 0"_' D outs-2 Small Ball Eli E 77,869.W Trial to School (300'x$50.0) 2 3W'Cyclone Outlleld Ferace- 1V wfh Foul Poi- M14 5,250.00 Annual M21 2021 M22 h8 Maintenance Playground Structure Medium Size Sbudore Rock Wells Park Name Slip, Aephe6 Parking Lot - Le As ak Parld Lot - Small E Q000.W $ 48'agi f 7,BW.W E 20,0W.W $ 28O0W.W $ 65,WO.00 6 hdelds 3,WO.W 1 Warning Track 5,WO.W 1 Asphalt Pending 1pl- -1995 85,OW.00 1 1 Asphak Pe Lot-Sli-1995 _ AsphaH Party Lotw/Curb-51Spaces .1995 11=00 P.869.06 1 ANIa0dCansson Builds w Restroome-1995 215412.00 $ 215,412.W Raise Ballbeld Fendn H"M to B'(B Fields $ 9O000.W Aephak Parking Lot w/Curb-51 cgs $ 335,W0.W 6 BalEelds wiN migration 6,WO.W S 38.000.00 FUTURE EQUIPMENT TOTAL 77$500.00 4Bleadlers- Aluminum -Small S 85,OOO.W 1 Besketbell Court S,SW.W $ 3,SW.W :2a25 4Fl Poles f 2T.00D.W 2 Basketball Goal, Port eM Nat 47s.W $ 950.W large Aluminum Bbecher S 198,OW.W12 BM Hold.. M $3W.W Basketball Carat f 15,0W.W] Bendt-Concrete 180.W f 1,120.00 Sand Vona llCourt $ 17,OW.W9 Banch with SunahineL oonBeekCdedyna$ 2025.00 ScoreOsamis It 1MWO.W • C:\UsersltoddhVAppDataLLocaMAicroson\Wlndaw NetCache\Content.Outlook\4BHDDGXN\Padrinvemory-2020- Updated 12.3.2020 w City ofAND OVER 2020 Existing and Future Park Facilities Chart Page 9 of 10 TY 1 4 1 DESCRIPTION (EI(ISTINO) Bike Rackw/ConaMe Pad 2sachem-Aluminum-Small Block Flag Pd. Base Bluebird Houses _ Concrete Pads for Soccer Bleachers Concrete Pattie ler La eBleechem 1 done Fence 1505' Black Coated 150' - 4' Neck vinyl fence I knce w/ 8' la w/ sbi a rost I UNIT PRICE 225.00 6,000.00 650.00 e4ginnin9 =i $ 22500 _'-.. $ 32,00000 ,. E 650.00 `� $ 15060 '. $ 6,600.00 k $ 1,800.00 E 1,600 00 {i> $ 1.65000 $ 1,000.00 - $ 75000 i 12001 E f000000 $ 250.00 $ 75,00 l E 264.00 :) FUTURE FACILITIES - - I TOTAL PRICE 2031 2031 2032 REPLACEMENT ITEMS Skate Board Park Shelter, Hexagonal - Skate Park North Parking Lot I .g ,. ESTIMATED COSTS $ 1200 w E 501000.00 $ 97,000.DO 15 4 6 1 7 1 10.00 1,650.W 1,B00.00 EOOM 1,850.OD 1,000.00 _ - 20U 20M 2034 2034 2034 West Parking Lot Lights Dugout shelters 2,290' Cyclone OulSe d Felice-10' Hi h, N.o 10' Gates, F 220' Infield Fenw with out and Concrete Pad 350' Cyclone Outfield Face-10' wiM Foul Poles $ 70000OO S 96,000.00 $ ]9,W0.00 $ W,OW.w E 28,000.00 8 6 4 1 1 1 Double Double Firs[Beae Base Field Number$kgn Flag Pole -19B5 R a-Ametican Flag- Sunshine Perk Flag - Minnemta State 125.00 2,500.00 250.00 95.00 2035 2046 Welkin Pat- Asphalt Shelter/Grmbo REPLACEMENT ITEMS TOTAL: $ 63,000.00 E 1,200,000.00 3 146 100.00 12 Foul Pole Flags 22.00 6 2 6 6 34 1 2 3 Four -Section Backstop wkth Four -Section Overha Grills w/Slock Base Home Plate La a Aluminum Bleacher La a Plastic Garba a Can Monument -Concrete No Gott Sin No MosorheE Vehicle Sin 1'sca 0 1'aua0 60.00 12,500.00 155.00 $ 11,400.00 `. 6 2,60000 $ 36000 C $ 75.000.00 E 5,27000 350DO 20.00 $ 35000 $ 40.00 1 $ 120,00000 $ 40.00 s 22500 -- 1 2 IoigationS stem -1995 No Pete Sign 120,000.00 20.00 3 6 10 Pack Regulabons Sign Park Bench Phchln Rubber 75A0 100.00 45.00 $ 800.00 $ 450,06 'rl' $ 375.00 $ 488.00 : S 1,200,- $ 2,000.00 3 1 12 8 Planters - Concrete - Round Plashe Protective Cover ror Cyclone Fencing-78g' Players Barren Ple Bauch -ir 125.00 488.00 100.00 250.00 6 1 Po out Base Sets (2) Sand Volleyball Court w Timbers -2000 20aOO 4,DOD.00 $ 1,200.00 E 4,000.00 g - 4 Sea' Light (Connexvs Owned) 3 4 1 3 4 6 1 1 1 1 1 16 1 1 1 1 SOeear Fidtls-1995 $otter Goals -Re ulawn SeccedFootball Goele Steel Bollard Post Table/Bench - Coed n Trash CaMeer ins-PlasOe-Small Vo N Net Volleyball Poet - Set Welkin Path- Asphalt Fxpantletl-20p5 Sheter, Msaaa Bosn1, Table-1996 Twah Containers R e Bins Park Name Sign -2002 Rock Wells -2000 Small Pl. SWctme-2000 Shelter, Hexegonal Skate Park -2011 "man of SoccerrNltle-2003 8,=.m 1,890.00 2,200.OD moo 195.00 55.00 85.00 126.00 14,500.00 110,400.00 140.00 155A0 7400.00 3,800.OD 4,500.00 181005.55 $ 24, 00.00 $ 6,760.00 $ _ 2,20000 $ 180.00 S 78000 '. $ "0 On $ 65.00 $ 12500 (' E 14.500.00 E 110 to0.00 -` $ 140.00 :- $ 2.480.00 -. $ 7,400.00 $ 3,8000D $ 4.IiOaOO $ 18,008.55 1 2231225.00 $ 223225.00 9 HandicapParkin Lot Signs 25.(10 282.305.66 $ 225.00 1 _ U hOng of Bellfieltla-2004 $ 282,305.86 $ 3,000.00 6 12'Ccncrete plonk, tads, _ 00.0 0 500.0 9 1 1 Security Lights on Buikfin a C' o/Antlover Fla Skate Board Park-2011 B000 $ 1 Egg OD E 8000 44,863.00 1 $ 44,889.D0 1 1 Storage Container Fencing around well wlCarrwte Pad 2.400.00 BOOM 250,DO $ 2,400.00 $ BOOM 2 Concrete Pads for Tdlete $ $pg gg i 2 1 Four Place Swi Satldlemates m0khae Digger I'lloam 35000 400.00 $ 1,800.00 $ 7000D $ 400.DO C:\Users\toddhLAppDaWa Lo nMl,rosoMWkndo VNetCaehe\Content.OWookWBHDDGXNPerk Inventory -2020-Updated 1232020 City of ANDOVER 2020 Existing and Future Park Facilities Chart Page 10 of 10 awl 1 1 8 1 1 DESCRIPTION (EXISTING) 360' x V Concrete CUM Irrigation Well -2009 Scoreboards-2010 Nadh Padd Lot hN-2012 West Pelidng LotU hts-2012 UNIT PRICE 1,500.00 83,377.40 5,664.81 31 26.337.31 Beginning $ 1,500.00 E 893T/.40 $ 15,318.47 $ 38,480.01) $ -_ 26337.31 FUTURE FACILITIES TOTAL PRICE REPLACEMENT ITEMS - - - -- ESTIMATED COSTS 2 Swnboard$-from PreiHe Knoll 6,152.67 E 12,305.33 2 Scoreboard Installation - ham Praise K l 12,5,16.00 $ 25,092.00 12 Dugout Shelters-2002 _ 3.000.00 It _- 36.000.00 - - - 1 95' 5Cyclone Fence w/Mow Strip 1,000.00 $ 1,00000 SUNSHINE PARK EQUIPMENT TOTAL IE 1825 - 8513 THE OAKS- 14431 CROSSTOWN BLVD NW-1.33 ACRES Na Conant Fatigues No FUWre FBCIOtes Antidpaled ce $ ISO,WOODLANDESTATES-236m 3162ND LANE NW-927 ac„,,,,, _ '_....'� - 1 CB2 Frames 219.52 8 218.52 FUTURE EQUIPMENT TOTAL f 1,000.00 Tobacco Free Sign 24.00 $ 24.00 -ACEMENT 1 Gamenme Play Structure-2006 12,593.63 $ 12,593.63 E 100000 '_77!r 6,200.00 E 26,200.001 REMB TOTAL 200.00Treah Can 155.00 $ 155.00__.Gamenms4PlaceSinlePostSwi sat x 48' Concrete Sidewalk NameSi 1,600.00 350.00 550.00 $ 1,800005' $ 350.001 $ 550.0017U Pack nvuan Boarder Magic Edging 1,207.00 $ 1,2W.001 inpation System-2012 5,299.06 $ 5,299.1%1 Handica Send 450.00 $ 450.00_1 R cle Bin 155.00 E 155.00 - -- 000LANDESTATESEQUIPMENTTOTAL 22 B.a.11 - AREA"D" EXISITING SUBTOTAL: E 6241663.93 AREA"0" FUTURE EQUIPMENT SUBTOTAL: E 39081a4.00 AREA"D"REPLACEMENT SUBTOTAL E ]8504a0.00 C:\Users\toddh\APPData\LOMAMicroso t\W ndms\(NetCache\Content.OuUwk\48HODGXN\Park Inventory- 2020 - Updated 12-3-2020 w