City Council Workshop
Tuesday, October 24, 2017
Conference Rooms A & B
1. Call to Order-6:00 p.m.
2. Joint Meeting with Park & Recreation Commission — Engineering
A. Review of the Existing and Future Park Facilities Chart/I6 -39D
B. Review of the Park Replacement List for 2018 -2022
C. Update of the 2018 -2022 CIP for Parks
D. Update on the 2018 -2022 CIP for Playground Equipment Replacement
3. 2018 Budget Development Discussions — Administration
4. 2017 Budget Progress Reports -Administration
5. 2017 City Investments Review— Administration
6. Discuss 2018 Council Meeting Dates — Administration
7. Other Business
8. Adjournment
1685 CROSSTOWN BOULEVARD N.W. *ANDOVER, MINNESOTA 55304 a (763) 755 -5100
FAX (763) 755 -8923 • WWW.ANDOVERMN.GOV
TO: Mayor and City Council
CC: Jim Dickinson, City Administrator
David D. Berkowitz, Director of li rrs y Engineer
Park and Recreation Commission
FROM: Todd J. Haas, Assistant Public Works Director
SUBJECT: 2A. Review of the Existing and Future Park Facilities Chart /16 -39D
DATE: October 24, 2017
INTRODUCTION
The City Council is requested to review the Existing and Future Park Facilities Chart, Project 16-
39D.
DISCUSSION
Attached is the Existing and Future Park Facilities Chart for your review. The column on the left
side of the spreadsheet is the description of existing items in the current park system. The middle
column is the improvements (new) the Park and Recreation Commission is recommending for
each park. The right column identifies the replacement items that will be necessary at some point
including the year it is anticipated to be replaced along with the estimated cost. The Park and
Recreation Commission has had numerous work sessions over the past 2 years discussing and
evaluating each park. On September 7, 2017 the Commission approved the final draft for the
proposed improvements (middle column) for the upcoming joint meeting with the City Council.
Page 29 of the spreadsheet identifies the grand total for each of the columns. A narrative is
attached regarding the Parks Inventory Replacement Plan (right hand column of the Existing and
Future Park Facilities Chart).
Based on the proposed future facilities (middle column of the Existing and Future Park Facilities
Chart) that are being recommended by the Park and Recreation Commission of $16,338,686 the
new park dedication would be approximately $3334 per unit. The current park dedication fee for
2017 is $3038 per unit. To determine the new park dedication fee, staff is using Met Council's
2040 ultimate buildout of household units of 15,400. As of right now we have estimated that
there are currently 10,500 household units in Andover. The household units do not include the
Rural Reserve area which will be a standalone if and when that area develops. If the City Council
determines to add or eliminate items from the Future Facilities (middle column) the park
dedication fee could go up or go down.
ACTION REQUIRED
The City Council is requested to review and discuss the Existing and Future Park Facilities Chart
and determine if there are any proposed improvements (middle column) from any of the parks
that should be added or removed from the chart.
Respectfully submitted,
4MW
Todd J. Haas
Attachments: Parks Inventory Replacement Summary Existing and Future Park Facilities Chart
Spreadsheet ✓
Parks Inventory Replacement Summary
• We only looked at items that were either $2,500 or above in value (within our current
inventory) or items that would have significant value when they are replaced in the
future.
• We are using a 15 -year life cycle for playground structures
• Due to the 15 -year cycle, 2018 has many playground structures that would be due for
replacement
• Some replacement items were grouped together for each park to significantly reduce
costs and minimize the impact on the use of the park
• Other lifecycles used for these calculations:
o 15 years for wood chips & border (unless new playground structure will fit into
existing fall zone area).
o 15 -20 years for fences (with or without mow strips)
o 30 years for asphalt (which generally includes trails)
o 40 -50 years for concrete sidewalks
• We used a 5% /year increase for replacement cost estimates
• Annual maintenance costs were used for the following (instead of full replacement costs
for ballfield construction, irrigation systems, facility replacement, lighting replacement):
o Ag lime material for baseball fields (Approx. $1,000 /year per field)
o Ballfield & soccer field maintenance including any or all of the following: seeding,
regrading, irrigation maintenance ($4,000 - $5,000 /year per field)
o Facility maintenance for park buildings (Approx. $5,000 /year per building)
o Lighting maintenance costs ('"$1,000 per field that has lighting)
o Class 5 parking lot maintenance ($1,000- $5,000 per lot)
• If we don't include annual maintenance costs for these assets, we would have to list
them as entire replacement costs, which would significantly increase our replacement
cost totals.
City of ANDOVER
2017 Existing and Future Park Facilities Chart
Page 1 of 29
JQTYJ DESCRIPTION (EXISTING) UNIT PRICE TOTAL PRICE FUTURE FACILITIES TOTAL PRICE REPLACEMENT ITEMS j ESTIMATED COSTS
1 Duck House 40.00 $ 40.00 Sustainable Landscaping & Trees 1 $ 1,000.00
1 Park Name Sign 250.00 $ 250.00 FUTURE EQUIPMENT TOTAL 1 000.00
CEDAR CREST EQUIPMENT TOTAL $ 290.00 A I r
No Current Facilities
No Future Facilities
2
1 "No Motorized Vehicles" Sign
28.00
$ 56.00
Landscaping
$ 2,500.00 1 Annual
Field Maintenance: Regrade, Reseed, Irrigation
$ 10,000.00
1
Class -V Parking Lot
5,000.00
$ 5,000.00
Security Light
$ 5,000.00 2021
Playground Structure (15 Year Cycle)
$ 55,000.00
1
Park Name Sign w /Landscaping
550.00
$ 550.00
ADA Access Trail (500'x $50.00 p /I /ft)
$ 25,000.00 2026
950'x 10' Chain Link Fence
$ 46,600.00
1
Security Light (Connexus Owned Light)
-
$ -
Pave Parking Lot (45 Stalls)
$ 67,500.00 2026
185 yds Engineered Wood Fiber
$ 7,400.00
1
Shelter - Medium with concrete pad
4,279.00
$ 4,279.00
Bleachers w/ concrete Pad
$ 7,500.00 2026
50x50 Asphalt Basketball Court
$ 19,900.00
20
Bluebird House
15.00
$ 300.00
Field Lights
$ 250,000.00 2047
Medium Shelter with Concrete Pad - Replacement
$ 146,000.00
6
Private Property / No Trespassing Signs
25.00
$ 150.00
Medium Shelter Upgrades
$ 5,000.00 w
REPLACEMENT ITEMS TOTAL:
$ 284,900.00
2
Trash Can
155.00
$ 310.00
FUTURE EQUIPMENT TOTAL
$ 362,500.00
6 Junior Soccer Goals
$ 14,300.00
1
Recycle Bin
155.00
$ 155.00
Land Purchase - (House and Land -7.16 Acres)
$ 190,000.00 2030
(2) 3 -Row Bleachers
$ 7,400.00
1
Sign - Tobacco Free Zone
24.00
$ 24.00
Large Shelter (20 x 40) w /Concrete Pad
$ 45,000.00 2030
(6) 16' Aluminum Players Benches
$ 8,750.00
2
Park Bench (CB2 Style)
220.00
$ 440.00
Medium Shelter Upgrades
$ 5,000.00
REPLACEMENT ITEMS TOTAL:
$ 281,250.00
1 1950'x
10' Chain Link Fence - 2006
17,563.00
$ 17,563.00
4 Picnic Tables
$ 3,600.00
1
4.5" Gooseneck Basketball System
600.00
$ 600.00
New Field Grading and seeding
$ 250,000.00
1
270'x 4' concrete sidewalk
1,900.00
$ 1,900.00
Field Lighting
$ 250,000.00
1
GameTime Clifford Saddlemate
800.00
$ 800.00
FUTURE EQUIPMENT TOTAL
1,167,100.00
1
GameTime 4 Place Single Post Swing set
1,200.00
$ 1,200.00
1
185 yds Engineered Wood Fiber
2,800.00
$ 2,800.00 ,
1
Horse Spring Ride
700.00
$ 700.00
1
GameTime Play Structure - 2006
26,368.76
$ 26,368.76
1
50x50 Asphalt Basketball Court
7,500.00
$ 7,500.00
1
10' Concrete Base Picnic Table
180.00
$ 180.00
1
Medium Shelter and Concrete Pad - 2017
33,800.00
$ 33,800.00
1
Irrigation Well with Pump and Controls - 2017 - Estimate
190,000.00
$ 190,000.00
1
Irrigation System and Meter - 2017 - Estimate
17,500.00
$ 17,500.00
FOX MEADOWS EQUIPMENT TOTAL
312 175.76
1
"No Motorized Vehicles" Sign
28.00
$ 28.00
Warming House /Restrooms & Storage /Mtg Room
$ 250,000.00 Annual
Field Maintenance: Regrade, Reseed, Irrigation
$ 15,000.00
1
"No Horseback Riding" Sign
25.00
$ 25.00
Additional Irrigation System Improvements
$ 5,000.00 2018
Replace Medium Shelter and Concrete Pad
$ 30,000.00
1
Class -V Parking Lot (large) - 2010
10,000.00
$ 10,000.00
Security Light (2) **
$ 10,000.00 2019
Replace Playground Structure w/ Larger One
$ 46,300.00
1
Grill
108.00
$ 108.00
Septic System
$ 7,500.00 2019
Border Magic Edging w /Fiber Chip Fall one
$ 10,900.00
2
Hockey Goal
250.00
$ 500.00
Pave Parking Lot w/ C & G (60 -90 Stalls)
$ 135,000.00 2030
Hockey Rink with Lights
$ 115,000.00
1
Hockey Rink with Lights - 2010
43,358.42
$ 43,358.42
Landscaping - Trees
$ 1,000.00 2030
2 Sets of Soccer Goals - Regulation Size
$ 8,000.00
1
Park Bench CB2 Style
170.00
$ 170.00
1/2 Basketball Court
$ 7,500.00 2030
Trail Through Park
$ 25,600.00
1
Park Name Sign (old style)
250.00
$ 250.00
Bleachers w/ Pads (1 Soccer fields)
$ 7,500.00 2030
6 Junior Soccer Goals
$ 14,300.00
1
Park Name Sign w /Landscaping
550.00
$ 550.00
Land Purchase - (House and Land -7.16 Acres)
$ 190,000.00 2030
(2) 3 -Row Bleachers
$ 7,400.00
1
Picnic Table - 3 section concrete
900.00
$ 900.00
Large Shelter (20 x 40) w /Concrete Pad
$ 45,000.00 2030
(6) 16' Aluminum Players Benches
$ 8,750.00
1
Picnic Table - child
150.00
$ 150.00
Medium Shelter Upgrades
$ 5,000.00
REPLACEMENT ITEMS TOTAL:
$ 281,250.00
2
Security Light (Connexus Owned Light)
-
$
4 Picnic Tables
$ 3,600.00
2
Set of Soccer Goals - Regulation Size
1,500.00
$ 3,000.00
New Field Grading and seeding
$ 250,000.00
1
Shelter - Medium with concrete pad
4,279.00
$ 4,279.00
Field Lighting
$ 250,000.00
1
Security Light near medium shelter Connexus Owned Light)
-
$
FUTURE EQUIPMENT TOTAL
1,167,100.00
C:\UsersV.grode \Desktop \Park Inventory - 2017 - Updated 10 -06 -2017
City of ANDOVER
2017 Existing and Future Park Facilities Chart
Page 2 of 29
QTYJ
DESCRIPTION (EXISTING)
UNIT PRICE
TOTAL PRICE
FUTURE FACILITIES
TOTAL PRICE
REPLACEMENT ITEMS
ESTIMATED COSTS
1
Soccer Complex w /Irrigation - 2010
249,356.44
$
249,356.44
4
Trash Cans
155.00
$
620.00
1
Trail Through Park - 2010
9,675.00
$
9,675.00
1
Ride - car spring
800.00
$
800.00
1
Ride - motorcycle spring
700.00
$
700.00
1
Ride - horse spring
700.00 1
$
700.00
1
Concrete pad for portable toilet & trash can
250.00
$
250.00
11
Bluebird houses
20.00
$
220.00
1
Gametime Playground Equipment -2004
13,384.69
$
13,384.69
1
Sign - Tobacco Free Zone
24.00
$
24.00
2
Stairs for Warming House
500.00
$
1,000.00
1
Swing Set - Four Place
1,700.00
$
1,700.00
6
Junior Soccer Goals
900.00
$
5,400.00
2
Bleachers - 3 Row
1,400.00
$
2,800.00
6
16' Aluminum Players Benches
550.00
$
3,300.00
10
Benches for Warming House
100.00
$
1,000.00
1
Border Magic Edging w /Fiber Chip Fall Zone - 2004
5,000.00
$
5,000.00 .
1
Concrete Edge w /Fiber Chip Fall Zone
1,800.00
$
1,800.00
1
Field Development Recognition Sign
700.00
$
700.00
Warming House Furnishin s -
1
Fire Extinguisher
35.00 1
$
35.00
1
Rules Sign
50.00
$
50.00
1
Hours Sign
50.00
$
50.00
1
Clock
10.00
$
10.00
1
Flooring
400.00
$
400.00
1
Electrical Hook Up for warming house
1,500.00
$
1,500.00
1
Power cord for warming house
150.00
$
150.00
1
1st Aid Kit
-
$
-
HAWKRIDGE EQUIPMENT TOTAL
go
1
Park Bench CB2 Style
170.00
$
17Landscaping
around Park Sign
$
1,000.00
2029
Playground Structure (15 year)
$
46,000.00
1
Park Name Sign w /Landscaping
550.00
$
550.00
Medium Shelter w /Concrete Pad
$
30,000.00
2029
Concrete Edging w/ Wood Fiber Chip Fall Zones
$
10,500.00
1
Security Light (Connexus Owned)
-
$
-
2 Picnic Tables w /Concrete
$
1,800.00
2030
Asphalt Path
$
7,750.00
1
Trash Can
155.00
$
155.00
1/2 Basketball Court
$
7,500.00
REPLACEMENT ITEMS TOTAL:
64 250.00
1
Asphalt Path
2,917.35
$
2,917.35
FUTURE EQUIPMENT TOTAL
40 300.00
1
Wire Cyclone Fence - 147'
750.00
$
750.00
1
GameTime Play Structure - 2014
21,848.00
$
21,848.00
1
Concrete Pad with Picnic Table 8'
600.00
$
600.00
1
Concrete Edging w/Wood Fiber Chip Fall Zones - 2014
5,000.00
$
5,000.00
1
Swing Set - Four Place
1,700.00
$
1,700.00
LANGSETH EQUIPMENT TOTAL
33 690.35
3
Trash Cans
155.00
$
465.00
Landscaping
nnual
�W.Ilfield Maintenance: Regrade, Reseed
$
5,000.00
1
Sign - Tobacco Free Zone
24.00
$
24.00
Security Light
"$25,000.00
nnual
Ag Lime Material
$
1,000.00
1
260'x 8' Chain Link Fence - 2006
4,956.00
$
4,956.00
New Outfield fence (8') and Mow Strips (1 Field)
2026
260' x 8' Chain Link Fence
$
13,150.00
x 16' Chain Link Backstop Sections - 2006
6,600.00
$
6,600.00
Playground Equipment (2 -12 yr. old)
2026
20' x 16' Chain Link Backstop Sections
$
17,500.00
1
Bleacher / Dugout pads - 2006
7,948.70
$
7,948.70
Paved Parking Lot
2031
Asphalt Trail
$
16,600.00
1
Asphalt Trail
4,893.41
$
4,893,41
Irrigation System and Meter
$
17,500.OD
2036
Bleacher / Dugout pads
$
34,300.00
1
Ball Field - 2006
27,674.57
$
27,674,57
Irrigation Well with Pump and Controls
$
190,000.00
REPLACEMENT ITEMS TOTAL:
87 550.00
1
Class V Parkin Lot - 2006
11,644.02
$
11,644.02
Medium Shelter w /Concrete Pad
$
30,000.00
C: \Users \j.grode \Desktop \Park Inventory - 2017 - Updated 10 -06 -2017
City of AND OVER
2017 Existing and Future Park Facilities Chart
Page 3 of 29
QTY
DESCRIPTION (EXISTING)
UNIT PRICE
TOTAL PRICE
FUTURE FACILITIES
TOL387 ICE
REPLACEMENT ITEMS
ESTIMATED COSTS
1
Park Name Sign w /Landscaping
720.00
$ 720.00
FUTURE EQUIPMENT TOTAL
$ 500.00
1
Bases - 2
180.00
$ 180.00
_
1
Double 1 st Base
125.00
$ 125.00
1
Home Plate
60.00
$ 60.00
1
Pitchers Rubber
45.00
$ 45.00
1
Bollard Metal
180.00
$ 180.00
3
Bluebird Houses
20.00
$ 60.00 --
2
Players Benches Aluminum
300.00
$ 600.00
2
Bat Racks /Holders
45.00
$ 90.00
1
Concrete Sidewalk 30'
250.00
$ 250.00
-
1
Recycle Bin
155.00
$ 155.00
1
Bleacher 3 /Seat Small
1,400.00
$ 1,400.00
LUNDS NORTH EQUIPMENT TOTAL
68 070.70
1
v
Message Board (3 sided)
600.00
$ 600.00
No Future Facilities Anticipated
1
Rules Sign
100.00
$ 100.00
2
No Motorized Vehicle Signs
28.00
$ 56.00
1
Property Border Signs
30.00
$ 30.00 .
20
Bluebird Houses
20.00
$ 400.00
Benches / Signage
$ 1,500.00
$ 1,500.00
1
Picnic table
$ 250.00
$ 250.00
MARTIN'S MEADOWS EQUIPMENT TOTAL
2 936.00
1
430' Infield Fence with Dugouts - 1999
_ 3,718.00
$ 3,718.00
Landscaping
$ 1,000.00 Annual
..-
Ballfield Maintenance: Regrade, Reseed, Irrigation
-
$ 5,000.00
1
450' Outfield Fence with Foul Poles w /Mow Strip - 1999
10,125.00
$ 10,125.00
Pave Parking Lot (45 Stall)
$ 67,500.00 Annual
Ag Lime Material
$ 1,000.00
1
Ag lime
4,000.00
$ 4,000.00
ADA Access Trail (750' x $50.00 p /I /ft)
$ 37,500.00 2018
Playground Structure
$ 42,000.00
1
Ball Field
3,000.00
$ 3,000.00
Medium Shelter w /Concrete Pad
$ 30,000.00 2024
430' Infield Fence with Dugouts
$ 12,600.00
1
Base Box - Large
325.00
$ 325.00
Concrete Picnic Table
$ 1,800.00 2024
450' outfield Fence with Foul Poles w /Mow Strip
$ 34,300.00
1
Class -V Parking Lot -Medium
4,000.00
$ 4,000.00
Digger for Sandbox
$ 1,000.00 2024
Fall Zone with Concrete Sidewalk
$ 10,200.00
1
Home Plate
60.00
$ 60.00
FUTURE EQUIPMENT TOTAL
$ 138,800.2002=j[22024
4' Cyclone Fence - 100' black vinyl coated Along Road
$ 11,500.00
2
Park Bench
170.00
$ 340.00
2040
Concrete Mow Strips and Dugout Pads
$ 19,700.00
1
Park Name Sign w /Landscaping
550.00
$ 550.00
REPLACEMENT ITEMS TOTAL:
$ 136,300.00
1
Picnic Table w /concrete pad
200.00
$ 200.00
1
Pitching Rubber
45.00
$ 45.00
1
Sandbox Fall Zone with Concrete Sidewalk
3,000.00
$ 3,000.00
1
Sandbox Enclosure Around Swing Set w/Timbers
950.00
$ 950.00
1
Set of Three Bases
200.00
$ 200.00
1
Swing Set - Four Place
1,604.33
$ 1,604.33
1
Security Light (Connexus Owned)
-
$ -
1
880' Yellow Protective Fence Rail Cover
528.00
$ 528.00
1
Aluminum Bleachers w /Concrete Pad
1,700.00
$ 1,700.00
1
Play Structure - Toddler 3 - 2000
4,200.00
$ 4,200.00
1
Play Structure - Mountain Trail - 2000
19,800.00
$ 19,800.00
1
Motorcycle Spring Ride
425.00
$ 425.00
1
Duck Spring Ride
425.00
$ 425.00
4
Trash Cans
155.00
$ 620.00
3
Recycle Bins
155.00
$ 465.00
2
Foul Pole Flags
25.00
$ 50.00
1
Sign - Tobacco Free Sign
24.00
$ 24.00
1
4' C clone Fence - 100' black vinyl coated - 1999
i 3,400.00
$ 3,400.00
C: \Users \j.grode \Desktop \Park Inventory - 2017 - Updated 10 -06 -2017
City of AND OVER
2017 Existing and Future Park Facilities Chart
Page 4 of 29
QTY
DESCRIPTION (EXISTING)
UNIT PRICE
TOTAL PRICE
FUTURE FACILITIES
TOTAL PRICE
REPLACEMENT ITEMS
ESTIMATED COSTS
2
16' Players Benches Aluminum
550.00
$ 1,100.00
155.00
$ 310.00 _
Curb around Parking Lot (400'x $15.00 p /I /f)
2
1
Irrigation System for Field - 2013
5,000.00
$ 5,000.00
2
Grills
125.00
$ 250.00
1
Grass Infield
3,500.00
$ 3,500.00
$ 1,000.00
FUTURE EQUIPMENT TOTAL
1
Soccer Field
1
Concrete Mow Strips and Dugout Pads
2,800.00
$ 2,800.00
Soccer /Football Goals - one set
1,600.00
$ 1,600.00
31,500.00
1
Concrete Pad for Toilet
150.00
$ 150.00
245 900.00
2
8" Concrete Pads to River
400.00
PINE HILLS SOUTH EQUIPMENT TOTAL
1
76 304.33
250.00
1
1
Duck Houses
25.00
$ 25.00
Landscaping
1
Parking Lot - Paved - 1999
7,105.00
$ 7,105.00 _
Bleachers w/ concrete Pad
2
Trash Cans
155.00
$ 310.00 _
Curb around Parking Lot (400'x $15.00 p /I /f)
2
Medium Shelter with Concrete Pad
3,200.00
$ 6,400.00
Irrigation System and Meter
2
Grills
125.00
$ 250.00
Irrigation Well with Pump and Controls
4
Picnic Tables Concrete 2 Section
250.00
$ 1,000.00
FUTURE EQUIPMENT TOTAL
1
Soccer Field
2,000.00
$ 2,000.00
21,600.00
1
Soccer /Football Goals - one set
1,600.00
$ 1,600.00
31,500.00
1
Concrete Sidewalk
450.00
245 900.00
2
8" Concrete Pads to River
400.00
1
Steel Bollard
250.00
1
180' Five foot Cyclone Fence
1,440.00
"$26,394.46
1
Walking Path - Asphalt Expanded 2002
26,394.46
1
Park Name Sign w /Landscaping
900.00
1
Monument Bench w /concrete edging
700.00
1
Concrete Edging Landscaping -trees
1,300.00
$ 1,300.00
1
Bat House
50.00
$ 50.00
1
Fishing Pier - gravel
3,800.00
1 $ 3,800.00
1
Sign - Tobacco Free Zone
24.00
$ 24.00
1
Sign - Handicap Parking
25.00
$ 25.00
1
Retaining Wall - Shelter
800.00
$ 800.00
1
Sign - Red Diamond
24.00
$ 24.00
1
No Trespassing w /Pole Sign
75.00
$ 75.00
1
Lacrosse Goal Set
500.00
$ 500.00
1
40' Split Rail Fence
210.00
$ 210.00
1
Sandbox w /Digger and Retaining Wall
1,500.00
$ 1,500.00
1
Swing Set - 6 place (4 poles)
2,400.00
$ 2,400.00
Ag Lime Material
1
Playground Retaining Wall
1,800.00
$ 1,800.00
2026
1
Concrete Edge w /Chip Fall Zone - 2015
5,000.00
$ 5,000.00
$ 30,000.00
1
Tether Ball Pole
250.00
$ 250.00
6,250.00
1
1 10' Concrete Canoe Landing - 2015
7,293.00
$ 7,293.00 If
$
1
Timber Rivers Park and Canoe Landing Sign
100.00
$ 100.00
2
No Unauthorized Vehicle Sign
30.00
$ 60.00
3
Bluebird House
2000 .
0
1
Burke Play Structure - 2015
36,972.00
0
2
No Motorized Vehicles Sign
30.00
0
TIMBER RIVERS EQUIPMENT TOTAL
6
2
Bluebird House
20.00
0
M$20,71
OWN i
Landscaping -Trees
1
Home Plate
60.00 0
Security Light
1
Park Bench
170.00 00
Pave Parking Lot - 46 Stalls
1
Pitching Rubber
45.00 0
Medium Shelter w /Concrete Pad
1
Powersca a - Medium - 2011
20,711.00 00
Bleachers 2
C: \Users \j.grode \Desktop \Park Inventory - 2017 - Updated 10 -06 -2017
$ 1,000.00
Annual
Field Maintenance: Regrade, Reseed (Non- Irrigated)
$
4,000.00
$ 7,500.00
2022
Walking Path - Asphalt
$
70,000.00
$ 6,000.00 =_
2024
Parking Lot - Paved
$
24,000.00
$ 17,500.00
2025
Fishing-Pier
$
3,800.00
$ 190,000.00
2030
Medium Shelter with Concrete Pad (1)
$
14,000.00
$ 222 000.00
2030
Playground Structure
$
77,000.00
2035
Concrete Edge w /Chip Fall Zone
$
21,600.00
2045
110' Concrete Canoe Landing
$
31,500.00
REPLACEMENT ITEMS TOTAL:
$
245 900.00
A-
$ 1,000.00
Annual
Field Maintenance: Regrade, Reseed, Irrigation
$
10,000.00
$ 5,000.00
Annual
Ag Lime Material
$
1,000.00
$ 69,000.00
2026
Playground Structure - Medium
$
43,000.00
$ 30,000.00
2026
Playground Surface w /Fiber Chips Fall Zone
$
6,250.00
$ 6,000.00
2036
Pavin Drivewa /Trail
$
32,000.00
City of ANDOVER
2017 Existing and Future Park Facilities Chart
Page 5 of 29
QTY
1
DESCRIPTION (EXISTING)
Set of Three Bases
UNIT PRICE
200.00
TOTAL PRICE
$ 200.00
FUTURE FACILITIES
Field Lighting
TOTAL PRICE
$ 250,000.00 2036
REPLACEMENT ITEMS
Fencing /Concrete Work
ESTIMATED COSTS
$ 109,000.00
3
Trash Cans
155.00
$ 465.00
FUTURE EQUIPMENT TOTAL
$ 361,000.00
REPLACEMENT ITEMS TOTAL:
$ 201,250.00
1
Park Name Sign w /Landscaping
900.00
$ 900.00
Grading /earthwork & erosion control
$ 50,000.00 30
Playground Structure
$ 52,500.00
2
Sign - on Cty 58
25.00
$ 50.00
Stormwater management improvements
$ 32,500.00 2030
Concrete Border w /Fiber Fall Zones
$ 10,500.00
1
Security Light (Connexus Owned)
-
$ -
_
_
330' 6' Black Cyclone Fence w /Mow Strip
$ 9,000.00
2
Bat Racks /Holders
45.00
$ 90.00
Paved trails 10' wide
$ 323,000.00 2033
Set Soccer /Football Goals
$ 7,400.00
1
Duck Spring Ride
700.00
$ 700.00
Wooden boardwalk 6' wide
$ 143,750.00 2033
Sets Full Size Soccer Goals
$ 8,000.00
1
Frog Spring Ride
900.00
1 $ 900.00
Pedestrian bridges
$ 60,000.00 2035
Fencing /Concrete Pads for Portable Restrooms
$ 43,300.00
1
Motorcycle Spring Ride
800.00
$ 800.00 .
Large community play area
$ 100,000.00
REPLACEMENT ITEMS TOTAL:
$ 148,700.00
1
Concrete Edging /Sidewalk
2,000.00
$ 2,000.00
Gazebo with concrete slab & 4 picnic tables
$ 85,000.00
1
Playground Surface w /Fiber Chips Fall Zone
3,000.00
$ 3,000.00
Misc. Site Amenities
$ 32,000.00
1
Concrete Pad 6'x 10'
130.00
$ 130.00 _
Potable well
$
1
Swing Set - 4 Place 3 Poles
1,700.00
$ 1,700.00
Septic & vault
$
AOOO*000
1
Recycle Bin
155.00
$ 155.00
Multi purpose building
$
1
Well Construction - 2016
181,655.00
$ 181,655.00 =
Storage shed
$
1
Power to Well
2,500.00
$ 2,500.00
Overlook @ pond /wetland demonstration area
$ 25,000.00
1
Irrigation System - 2016
17,600.00
$ 17,6D0.00
Prairie grass demonstration area
$ 16,250.00
1
Paving Driveway/Trail - 2016
12,000.00
$ 12,000.00
Expanded irrigation of common spaces
$ 50,000.00
1
Fencing /Concrete Work -2016
41,000.00
$ 41,000.00
Games court
$ 14,500.00
2
Ball Field Benches
500.00
$ 1,000.00
Sand volleyball court
$ 5,500.00
2
1 Soccer Benches
550.00
$ 1,100.00
Disc Golf
$ 5,000.00
1
Pedestrian Ramp /Sidewalk Material
1,500.00
$ 1,500.00
Landscape im rovements
$ 35,000.00
1
Ag lime Material - 2016
9,200.00
$ 9,200.00
1
Infield Sod
725.00
$ 725.00
1
Athletic Bluegrass Seed
1,800.00
$ 1,800.00
1
Class 5 - 2016
7,000.00
$ 7,000.00
TIMBER TRAILS EQUIPMENT TOTAL
1 $ -_ 309,196.00
1
Class -V Parking Lot - Small
4,000.00
$ 4,000.00
Mobilization
$ 62,000.00 ual
Field Maintenance: Regrade, Reseed, Irrigation
$ 15,000.00
6
Bench CB2 Style
220.00
$ 1,320.00
Removals /clearing & grubbing
$ 10,000.00 ual
r
Lighting Maintenance
$ 3,000.00
1
Park Name Sign - No Landscaping
250.00
$ 250.00
Grading /earthwork & erosion control
$ 50,000.00 30
Playground Structure
$ 52,500.00
1
Swing Set - Four Place 3 Pole
1,604.33
$ 1,604.33
Stormwater management improvements
$ 32,500.00 2030
Concrete Border w /Fiber Fall Zones
$ 10,500.00
1
Play Structure -Burke - 2015
19,800.00
$ 19,800.00
Add secondary entrance/exit from Tulip St (gravel)
$ 8,250.00 2033
330' 6' Black Cyclone Fence w /Mow Strip
$ 9,000.00
4
Trash Cans
155.00
$ 620.00
Paved trails 10' wide
$ 323,000.00 2033
Set Soccer /Football Goals
$ 7,400.00
4
Recycle Bins
155.00
$ 620.00
Wooden boardwalk 6' wide
$ 143,750.00 2033
Sets Full Size Soccer Goals
$ 8,000.00
1
330'6' Black Cyclone Fence w /Mow Strip
3,400.00
$ 3,400.00
Pedestrian bridges
$ 60,000.00 2035
Fencing /Concrete Pads for Portable Restrooms
$ 43,300.00
1
300' Split Rail Fence
1,550.00
$ 1,550.00
Large community play area
$ 100,000.00
REPLACEMENT ITEMS TOTAL:
$ 148,700.00
1
Set Soccer /Football Goals
2,800.00
$ 2,800.00
Gazebo with concrete slab & 4 picnic tables
$ 85,000.00
2
Sets Full Size Soccer Goals
1,500.00
$ 3,000.00
Misc. Site Amenities
$ 32,000.00
3
Field Name Signs
100.00
$ 300.00
Potable well
$
1
Concrete Border w /Fiber Fall Zones - 2015
5,000.00
$ 5,000.00
Septic & vault
$
AOOO*000
8
Handicap Parking Signs
25.00
$ 200.00
Multi purpose building
$
20
Bluebird Houses
20.00
$ 400.00
Storage shed
$
1
Lighting - 2013
59,645.00
$ 59,645.00
Overlook @ pond /wetland demonstration area
$ 25,000.00
1
Irrigation - 2013
188,129.00
$ 188,129.00
Prairie grass demonstration area
$ 16,250.00
1
Ball Fields - 2013
842,142.00
$ 842,142.00
Expanded irrigation of common spaces
$ 50,000.00
1
Fencing /Concrete Pads for Portable Restrooms- 2015
16,337.00
$ 16,337.00
Games court
$ 14,500.00
1
Playground - 2015
26,983.00
$ 26,983.00
Sand volleyball court
$ 5,500.00
PINE HILLS NORTH EQUIPMENT TOTAL
1 178 100.33
Disc Golf
$ 5,000.00
Landscape im rovements
$ 35,000.00
C: \Users \j.grode \Desktop\Park Inventory - 2017 - Updated 10 -06 -2017
City of ANDOVER
2017 Existing and Future Park Facilities Chart
Page 6 of 29
QTY
DESCRIPTION (EXISTING)
UNIT PRICE
TOTAL PRICE
FUTURE FACILITIES
TOTAL PRICE
REPLACEMENT ITEMS
ESTIMATED COSTS
Turf Seed
$ 33,250.00
Fiber Blanket
$ 135,000.00
Electrical expansion & trail lighting
$ 160,000.00
FUTURE EQUIPMENT TOTAL
2 046 000.00
Islam,
L!A
ai Ut �j=Mx
No Current Facilities
nr w-�+ -t
c, s`, 'a .h' _...a z�,c..,,
-,r�
fr'-
Park ID Signs (2)
$ 1,000.00
g
_� '� �3' a., ifzT> _ ..�,,....3.. ..,. ....us. e.'d0.ia
°.Wm,.s'�rk.
1
PrimeTime Play Structure - Medium - 2005
30,771.03
FUTURE EQUIPMENT TOTAL
1,000.00
No Future Facilities Anticipated
2020
No Current Facilities
$
64,000.00
Park ID Signs
$ 500.00
525.00
$
525.00
FUTURE EQUIPMENT TOTAL
$__ _ _ 500.00
$
6,250.00
CAUsers\.grode \Desktop\Park Inventory - 2017 - Updated 10 -06 -2017
No Current Facilities
No Future Facilities Anticipated
Islam,
�,
1
PrimeTime Play Structure - Medium - 2005
30,771.03
$
30,771.03
No Future Facilities Anticipated
2020
Playground Structure - Medium
$
64,000.00
1
Motorcycle Spring Toy
525.00
$
525.00
2020
Playground Surface Wood Fiber
$
6,250.00
1
Clifford Spring Toy
525.00
$
525.00
2020
Concrete Curbing & sidewalk
$
30,000.00
1
Car Spring Toy
800.00
$
800.00
2025
Basketball Court
$
8,500.00
1
Four Place Swing Set
1,800.00
$
1,800.00
2025
Climbing Wall / Pod
$
10,900.00
1
Concrete Curbing & sidewalk
11,306.25
$
11,306.25
REPLACEMENT ITEMS TOTAL:
$
119 650.00
1
Park Sign
550.00
$
550.00
1
Stamped, colored concrete around sign
270.00
$
270.00
1
Basketball Court
3,192.84
$
3,192.84
3
Park Bench CB2 Frame
219.52
$
658.57
1
Gooseneck Basketball System
600.00
$
600.00
1
Irrigation system
1,185.71
$
1,185.71
1
8' Picnic Table Concrete 2 legs
500.00
$
500.00
1
Sign - Adopt A Park
25.00
$
25.00
1
GT Climbing Wall / Pod
4,100.00
$
4,100.00
1
Playground Surface Wood Fiber
3,000.00
$
3,000.00
1
Security Light
400.00
$
400.00
1
Recycle Bin
155.00
$
155.00
1
Trash Can
155.00
$
155.00
1
Handicap Swing
450.00
1 $
450.00
COUNTRY OAKS EQUIPMENT TOTAL
60 969.40
HM
1
Park Name Sign
MEM
550.00
$
550.00
No Future Facilities Anticipated
2022
Shelter - Medium with Concrete Pad
$
30,000.00
1
Shelter - Medium with Concrete Pad
4,279.00
$
4,279.00
2031
Playground Structure
$
48,000.00
1
Playground Structure - 2016
23,000.00
$
23,000.00
2031
Concrete Border and Fall Zone
$
10,500.00
1
Sidewalk and Pedestrian Ramp
3,000.00
$
3,000.00
2046
Sidewalk and Pedestrian Ramp
$
13,000.00
1
Concrete Border and Fall Zone
5,000.00
$
5,000.00
2046
Two Stall Parking Area
$
17,300.00
1
Two Stall Parking Area
4,000.00
$
4,000.00
REPLACEMENT ITEMS TOTAL:
118 800.00
1
L
Steel Bollard
250.00
$
250.00
1
Recycle Bin
155.00
$
155.00
1
Trash Can
155.00
$
155.00
CAUsers\.grode \Desktop\Park Inventory - 2017 - Updated 10 -06 -2017
City of ANDOVER
2017 Existing and Future Park Facilities Chart
Page 7 of 29
QTY.
DESCRIPTION (EXISTING)
UNIT PRICE
TOTAL PRICE
FUTURE FACILITIES
TOTAL PRICE
REPLACEMENT ITEMS
ESTIMATED COSTS
I
Bluebird House
20.00
$
1
Picnic Table - child
150.00
$ 1
I
Picnic Table - 2 section concrete
500.00
$
FOREST MEADOWS EQUIPMENT TOTAL
$ 41,059.00
1
Oak Hollow Undeveloped Park Sign
M,
M
100.0
100.0
10 .. -]
Park Sion & Landscaping
5F
$ 1,000.00
1
No Snowmobiling Sign
100.00
$ 100.00
Security Light
$ 5,000.00
1
No Hunting Sign
100.00
$ 100. 00
Playground Equipment (2-5 & 5-12 yr. old)
$ 60,000.00
1
4 x 4 Wood Sign Post
50.00
$ 50.00
FUTURE EQUIPMENT TOTAL
$ 66,000.00
OAK HOLLOW EQUIPMENT TOTAL
350'00
$ 350.00
1
GameTime Play Structure - 2006
27,164.916
$7 27,164.96
Security Light
i$ 5,000.00 2021
Playground Structure
56,500.00
1
Park Name Sign w/Landscaping
550.00
$ 550.00
0 '0
Picnic Table
$ 500.00 2021
200 cu yds Engineered Wood Fiber
$ 7,500.00
1
Sign - Tobacco Free Zone
24.00
_
$ 24.00+
Irrigation
$ 10,000.00
REPLACEMENT ITEMS TOTAL:
$ 64,000.00
1
39' Boarder Magic Edging
280.00
$ 280.00
Sandbox and Digger
$ 5,000.00
1
Trash Can
155.00
$ 155.00
FUTURE EQUIPMENT TOTAL
$ 20,500.00
1
Recycle Bin
155.00
$ 155.00
1
200 cu yds Engineered Wood Fiber
3,600.00
$ 3,600.00
1
240'x 5' Concrete Sidewalk
1,800.00
$ 1,800.00
2
Park Benches 6' CB2
250.00
$ 500.00
1
Four Place Swing Set
1,800.00
$ 1,800.00
-
1
Volcano Climber
2,100.00
$ 2,100.00
1
Handicap Swing
450.00
1 $ 450.00
OAKVIEW EQUIPMENT TOTAL
$ 35 575.95
1
GameTime Playground Equipment -2008
32,41:111:1 1:14
$ 32,489.84
Irrigation
40,0 010+02023
Playground Structure
$ 67,500.00
1
Park Sign w/Retaining Wall
1,600.00
$ 1,600.00
FUTURE EQUIPMENT TOTAL
40,000.00 2028
Shelter w/concrete slab
$ 32,000.00
1
Sign -Wetand Buffer
275.00
$ 275.00
2028
50 x 50 Asphalt Basketball
ball Court
$ 20,000.00
2
16' Park Benches C62
250.00
$ 5000.00 0.00
ITEMS TOTAL:
$ 119,500.00
1
Trash Can
155.00
$ 155.00
1
8' Picnic Table Concrete Leg
600.00
$ 600.00
1
8'x18' Steel Shelter w/concrete slab
12,000.00
$ 12,000
1
Basketball Hoop and Backboard
700.00
$ 700.00 00
1
165' -5'Sidewalk
1,250.00
$ 1,250.00
1
153 - 12" Curbing
350.00
$ 350.00
1
Swing Set 4 Place
1,800.00
$ 1,800.00
1
100 cu yds Engineered Wood Fibers
1,800.00
$ 1,800.00
2
Saddlemates
600.00
0 0 0 0
$ 1,200.00
$ 1 2
1
50 x 50 Asphalt Basketball Court
7,500.00
7 , 5
$ 7,500.00
0 0 0 0
1
Sign-Blue Gama Grass Project
100.00
$ 100.00
$ 1 0 0 0 0
WOODLAND CROSSINGS EQUIPMENT TOTAL
62319.84
$ 62,
4202
I
120' Split Rail Fence
625.00
$ 625.00
625 00
No Future Facilities Anticipated
6
2026
Playground Structure -Large
$ 24,000.00
I
Four Place Swing Set
1,900.00 $ 1,900.00
2026
2026
Concrete Edging Wood Fiber Surface
$ 10,500.00
1
Asphalt Path
765.00 $ 765.00
765. 00
REPLACEMENT ITEMS TOTAL:
$ 34,500.00
1
Park Bench B2
F- 1-7000 1 $4 170.00
1 0 00
1
11
Park Name Sign w/Landscaping
1 550.00 1 $ 55000 1
1
C:\Users\j.grode\Desktop\ParK Inventory - 2017-Updated 10-06-2017
City of ANDOVER
2017 Existing and Future Park Facilities Chart
Page 8 of 29
QTY
DESCRIPTION (EXISTING)
UNIT PRICE
TOTAL PRICE
FUTURE FACILITIES
TOTAL PRICE
REPLACEMENT ITEMS
ESTIMATED COSTS
1
Picnic Table w /Concrete 2 Section Pad
600.00
$ 600.00
2023
Fence 550' Cyclone Fence
$ 12,000.00
1
Powerscape - Large - 1995/2011
11,500.00
$ 11,500.00
5,000.DO
REPLACEMENT ITEMS TOTAL:
594 650.00
1
Trash Can
155.00
$ 155.00
Small Shelter w/ Picnic Table and grill
$
1
Recycle Bin
155.00
$ 155.00
1
Concrete Edging Wood Fiber Surface - 2011
5,000.00
$ 5,000.00
25,000.00
1
WOODLAND MEADOWS EQUIPMENT TOTAL
500.00
$ 21 420.00
FUTURE EQUIPMENT TOTAL
1
�«nm+mm.•.rrw _ ,w.
Playground Structure - 2016
19,315.31
vww h-n r.3-'v -
gg� 'wPi� 4Z Sx xv
a dnWw'�i'..Iae:'ia' SG»'w^'.`ax.- ��.-g. _.. .'-
$ 19,315.311
'^ s..+.pv .i. d= €§�F f.' �1 �Fi'tt Y-s'x�:..
.-ar.r rs "- d�'- -? ?c +e -J.:b: ,�,.%rr4nC. ,. .. ..,,. roseir &tom- _`[.- . -nti +':
No Future Facilities Anticipated
i.��i„;'p.
...a�m� �.... - �YV'r
cn nr4z_xsdw";a Xxie .. �
2031
- -b. abs =iau " -.+: - '.ys•°' ,rrvv°`.y`
1• '� "_nl S.�.T'..f i ^�-.- -
. vx . .. mx.,s x'�•- 'xe'.rvc4.s"^°' .+... v.T �.�i°.'."w..^..-•i-
Playground Structure, Wood Fiber, Digger and Border
4" : -_.
� � .. i-i �=�u.r- -.fir.- _
+ -..m1 s- n- '- ..yam:..
$ 46,000.00
1
Asphalt parking lot - 2016
7,000.00
$ 7,000.00
2036
Asphalt parking lot
$ 18,500.00
1
Shelter -2016
19,098.00
$ 19,098.00
2,000.00
2036
Shelter
$ 50,700.00
1
Sand Digger - 2016
775.00
$ 775.00
1
Duck House
REPLACEMENT ITEMS TOTAL:
$ 115,200.00
1
Park and Open Space Sign - 2016
465.73
$ 465.73
5,000.00
2027
Rolling Dock 6'x 40'
$ 10,000.00
1
lWood Fiber -2016
1,981.81
$ 1,981.81
108.00
FUTURE EQUIPMENT TOTAL
2
Concrete Picnic Tables - 2016
565.20
$ 1,130.40
1
Park Name Sign w /Landsca in
550.00
$
550.00
MAPLE VIEW EQUIPMENT TOTAL
49 766.25
2037
Parkin Lot
$ 262,000.00
1
Fence 550' Cyclone-2 00 3
4,500.00
$ 4,500.00
No Future Facilities Anticipated
2018
Playground Structure
$ 11,000.00
1
Four Place Swing Set
1,300.00
$ 1,300.00
2023
Fence 550' Cyclone Fence
$ 12,000.00
1
Backhoe Digger
360.00
$ 360.00
5,000.DO
REPLACEMENT ITEMS TOTAL:
594 650.00
1
Duck Spring Ride
425.00
$ 425.00
Small Shelter w/ Picnic Table and grill
$
1
Horse Spring Ride
425.00
$ 425.00
1
Trash Can
155.00
$ 155.00
25,000.00
1
Sandbox with Concrete
500.00
$ 500.00
FUTURE EQUIPMENT TOTAL
1
GameTime Play Structure -2003
5,340.06
$ 5,340.06
TOTLOT EQUIPMENT TOTAL
13 005.06
C: \Users \j.grode \Desktop\Park Inventory - 2017 - Updated 10 -06 -2017
Park Sign & Landscaping
$
1,000.00
Security Light
$
5,000.DO
Small Shelter w/ Picnic Table and grill
$
10,000.00
ADA Access Trail (500'x $50.00 p /I /ft)
$
25,000.00
CREEKRIDGE EQUIPMENT TOTAL
FUTURE EQUIPMENT TOTAL
41 000.00
2
Concrete Picnic Tables - 12'
1,000.00
$
2,000.00
Landscaping
$
1,000.00
2027
Sidewalk - 310' x 5
$ 15,400.00
1
Duck House
15.00
$
15.00
Security Light
$
5,000.00
2027
Rolling Dock 6'x 40'
$ 10,000.00
1
Grill
108.00
$
108.00
FUTURE EQUIPMENT TOTAL
6,000.00
2037
Large Shelter w /Concrete Pad & Security Light
$ 114,000.00
1
Park Name Sign w /Landsca in
550.00
$
550.00
2037
Parkin Lot
$ 262,000.00
1
Sidewalk - 310' x 5 - 2007
5,800.00
$
5,800.00
2037
Rain Garden
$ 22,750.00
1
Large Shelter w /Concrete Pad & Security Light - 2007
26,321.24
$
26,321.24
2037
Concrete Boat Landing
$ 30,000.00
1
Sitting Bench CB2
340.00
$
340.00
REPLACEMENT ITEMS TOTAL:
454 150.00
1
Sign - City Code
25.00
$
25.00
2
Trash Cans
155.00
$
310.00
5
Bird houses
20.00
$
100.00
2
Sign - Handicap Parking
25.00
$
50.00
1
Sign -No Boat Trailer Parking
25.00
$
25.00
1
Cyclone Fence 6' w /primary slats 270'
2,160.00
$
2,160.00
1
Parkin Lot - 2007
98,842.53
$
98,842.53
C: \Users \j.grode \Desktop\Park Inventory - 2017 - Updated 10 -06 -2017
City of AND OVER
2017 Existing and Future Park Facilities Chart
Page 9 of 29
QTY
DESCRIPTION (EXISTING)
UNIT PRICE
TOTAL PRICE
FUTURE FACILITIES
TOTAL PRICE
REPLACEMENT ITEMS
ESTIMATED COSTS
1
Sign - Dog Waste
25.00
$ 25.00
FUTURE EQUIPMENT TOTAL
$ 5,000.00 2028
Concrete Edging w/Wood Fiber Fall Zone
$ 8,300.00
1
Concrete Pad for Toilet 8' x 16'
450.00
$ 450.00
0 2028
Playground Structure
$ 40,500.00
1
Rolling Dock 6'x 40'- 2007
3,800.00
$ 3,800.00
REPLACEMENT ITEMS TOTAL:
$53,800.00
1
Rain Garden - 2007
8,576.63
$ 8,576.63
1
Sign Board w/Various Signs
300.00
$ 300.00
3
CROOKED LAKE BOAT LANDING EQUIPMENT TOTAL
155.00
149 798.40
1
No Current Facilities
155.00
$ 155.00
Sustainable Landscaping & Trees
$ 1,000.00
ME
1
Picnic Table
250.00
$ 250.00
FUTURE EQUIPMENT TOTAL
$ 1,000.00
1
"No Alcoholic Beverages" Sign
12.00
$ 12.00
Security Light
$ 5,000.00 2025
Three - Section Back Stop
$ 5,000.00
1
Basketball Goal and Net
475.00
$ 475.00
FUTURE EQUIPMENT TOTAL
$ 5,000.00 2028
Concrete Edging w/Wood Fiber Fall Zone
$ 8,300.00
1
Four Place Swing Set
1,300.00
$ 1,300.00
0 2028
Playground Structure
$ 40,500.00
1
Hard Court - Basketball
1,500.00
$ 1,500.00
REPLACEMENT ITEMS TOTAL:
$53,800.00
1
Park Bench
170.00
$ 170.00
1
Three - Section Back Stop
1,183.00
$ 1,183.00
3
Trash Cans
155.00
$ 465.00
1
Recycle Bin
155.00
$ 155.00
1
Picnic Table
250.00
$ 250.00
1
Park Name Sign w /Landscaping
550.00
$ 550.00
1
45 ft. Border - Magic Edging
325.00
$ 325.00
1
Sign - Tobacco Free Zone
24.00
$ 24.00
1
Concrete Edging w/Wood Fiber Fall Zone - 2013
4,000.00
$ 4,000.00
1
GameTime Play Structure -2013
19,498.44
$ 19,498.44
1
Backhoe Digger
360.00
$ 360.00
1
Car Spring Ride
425.00
$ 425.00
GREEN ACRES EQUIPMENT TOTAL
30 692.44
3
"No Motorized Vehicles" Sign
28.00
$ 84.00
Landscaping
$ 1,000.00 Annual
Field Maintenance: Regrade, Reseed, Irrigation
$ 10,000.00
1
Six Place Swing Set
1,900.00
$ 1,900.00
Dugouts
$ 10,000.00 Annual
Ag Lime Material
$ 1,000.00
1
w /Sod Infield
4,000.00
$ 4,000.00
Shelter (Medium) w/ picnic table
$ 20,000.00 2020
Playground Structure
$ 48,600.00
1
Ball Field
3,000.00
$ 3,000.00
Scoreboards (soccer & ballfield)
$ 20,000.00 2020
Wood Chips
$ 13,000.00
1
Base Box - Large
50.00
$ 50.00
Irrigation Upgrades
$ 10,000.00 2022
128'- 6' Fence w /Mow Strip
$ 13,800.00
1
Basketball Pad
1,100.00
$ 1,100.00
Raise Ballfield Fencing Height to 8'
$ 15,000.00 2022
160'- 4' Sideline Fence w /Mow Strip
$ 7,000.00
1
Basketball Pole, Backboard, Rim and Net
425.00
$ 425.00
Field Lighting
$ 250,000.00 2022
480'- 8' Outfield Fence w /Mow Strip
$ 32,300.00
1
Irrigation System - 2001
49,220.00
$ 49,220.00
FUTURE EQUIPMENT TOTAL
326 000.00 2022
Soccer Goals - Regulation Set
$ 8,000.00
1
KidTime Small - 2000/2005
12,824.00
$ 12,824.00
2031
Concrete dugout pads
$ 47,000.00
1
Merry Go Round Ride
1,400.00
$ 1,400.00
2032
Walking Trail - Asphalt
$ 45,000.00
1
ParkingLot - Asphalt -
57,000.00
$ 57,000.00
2032
ParkingLot - Asphalt
$ 246,000.00
1
Home Plate
60.00
$ 60.00
REPLACEMENT ITEMS TOTAL:
$ 471,700.00
2
1 Park Benches w/ concrete pads
250.00
$ 500.00
2
Park Name Sign (1 old, 1 new style)
250.00
$ 500.00
1
Picnic Table
300.00
$ 300.00
1
Pitching Rubber
45.00
$ 45.00
1
Powers cape (Medium) - includes small, med & Ig arch -
20,000.00
$ 20,000.00
2
Security Light (Connexus Owned)
-
$ -
1
Set of Three Bases
200.00
$ 200.00
1
Six - Section Backstop w/ Six - Section Overhang Cage
1,564.00
$ 1,564.00
1
Skating Rink
1,000.00
$ 1,000.00
C:\Users\ .grode \Desktop \Park Inventory - 2017 - Updated 10 -06 -2017
City of ANDOVER
2017 Existing and Future Park Facilities Chart
Page 10 of 29
QTYJ
DESCRIPTION (EXISTING)
UNIT PRICE
TOTAL PRICE
FUTURE FACILITIES
TOTAL PRICE
REPLACEMENT ITEMS
ESTIMATED COSTS
1
Soccer /Football Field
3,000.00
$ 3,000.00
44,000.00
1
Park Bench
1
Soccer Goals - Regulation Set
2,995.00
$ 2,995.00
1,00
2021
Engineered Wood Fiber
1
Bleachers -4 Tier Aluminum w/ Concrete Pad
1,700.00
$ 1,700.00
250.00
$
250.00
1
Aluminum Players Benches - 15' Set
500.00
$ 500.00
REPLACEMENT ITEMS TOTAL:
51 100.00
1
1
128'- 6' Fence w /Mow Strip - 2002
5,155.84
$ 5,155.84
155.00
1
160'- 4' Sideline Fence w /Mow Strip - 2002
2,674.80
$ 2,674.80
1
Trash Can
155.00
1
480'- 8'Outfield Fence w /Mow Strip - 2002
12,169.15
$ 12,169.15
1
Concrete dugout pads
10,893.38
$ 10,893.38
24.00
$
24.00
1
Baseball Field Layout -2001
8,036.00
$ 8,036.00
1
8' x 14' Concrete Picnic Table Pad
1
Wood Chips
6,400.00
$ 6,400.00
1
Concrete Curb
1,800.00
$ 1,800.00
1150 yds Engineered Wood Fibers
2,700.00
$
4
Trash Cans
155.00
$ 620.00
2
Recycle Bins
155.00
$ 310.00
$
245.00
1
Walking Trail - Asphalt
10,500.00
$ 10,500.00
1
255'x 4' Concrete Sidewalk Boards
1
Whale Spring Ride
450.00
$ 450.00
1
Motorcycle Spring Ride
450.00
$ 450.00
250.00
$
250.00
2
Handicap Parking Sign
25.00
$ 50.00
1
1
GameTime Play Structure - 2000/2005
14,430.75
$ 14,430.75
4f24
3
Arch Climbers - large, medium, small
200.00
$ 600.00
1
Clifford Spring Ride
700.00
2
Foul Pole Flags
25.00
$ 50.00
1
Concrete Picnic Table wl2' Pad
900.00
$ 900.00
1,700.00
$
1,7
1
40' Fence Added to 4' Sideline Fence
500.00
$ 500.00
HIDDEN CREEK SOUTH EQUIPMENT TOTAL
1
No Pepper Drills Sign
25.00
$ 25.00
2
Metal Bat Holders
25.00
$ 50.00
1
180' Yellow Fence Cover
180.00
$ 180.00 ,
1
HIDDEN CREEK NORTH EQUIPMENT TOTAL
$ 239,611.92
$
40,0ew
Trail (possible Grant funds)
$
1
GameTime Play Structure - 2006
16,638.24
$
16,638.24
Landscaping
$
1,000.00 rA
2021
Playground Structure
$
44,000.00
1
Park Bench
100.00
$
100.00
FUTURE EQUIPMENT TOTAL
1,00
2021
Engineered Wood Fiber
$
7,100.00
1
Park Name Sign (old style)
250.00
$
250.00
REPLACEMENT ITEMS TOTAL:
51 100.00
1
Recycle Bin
155.00
$
155.00
1
Trash Can
155.00
$
155.00
1
Sign - Tobacco Free Zone
24.00
$
24.00
1
8' x 14' Concrete Picnic Table Pad
900.00
$
900.00
1
1150 yds Engineered Wood Fibers
2,700.00
$
2,700.00
1
35 linear ft. border - Magic Edging
245.00
$
245.00
1
255'x 4' Concrete Sidewalk Boards
1,800.00
$
1,800.00
1
Picnic Table w/10' Concrete Pad
250.00
$
250.00
1
Motorcycle Spring Ride
450.00
$
4f24
1
Clifford Spring Ride
700.00
$
7
1
Four Place, 3 pole Swing Set
1,700.00
$
1,7
HIDDEN CREEK SOUTH EQUIPMENT TOTAL
26 0
1
380' Adjustable Bridge - 1994
40,000.00
$
40,0ew
Trail (possible Grant funds)
$
325,000.00
2024
380' Adjustable Brid e - Replacement
$
100,000.00
40
Bluebird Houses
15.00
$
6rk
Sign 8, Landscaping (2 locations)
$
2,000.00
2026
Parking Lot - Asphalt (includes entrance) - Replacement
$
220,000.00
10
Duck Houses
22.50
$
2curity
Light (2)
$
10,000.00
2026
Trail - North /South Asphalt - Replacement
$
610,000.00
5
Trash Cans
155.00
$
7ature
Play Area (5 Total)
$
60,000.00
REPLACEMENT ITEMS TOTAL:
$
930,000.00
4
Red Diamond Sign
28.00
$
1icnic
Shelter with Vault Restroom and Tables
$
150,000.00
2
Handica Parkin Sin
28.00
$
ock
$
22,500.00
CAL1sers\j.grode \Desktop \Park Inventory - 2017- Updated 10 -06 -2017
City of ANDOVER
2017 Existing and Future Park Facilities Chart
Page 11 of 29
QTYJ
5
DESCRIPTION (EXISTING)
Park Bench
UNIT PRICE
100.00
TOTAL PRICE
$ 500.00
_ FUTURE FACILITIES
Concrete Flatwork near Parking Area
TOTAL PRICE El
$ 20,000.00
REPLACEMENT ITEMS
ESTIMATED COSTS
1
Park Name Sign
250.00
$ 250.00
Boardwalk (2,000 LF)
$ 1,045,000.00
550.00
$
1
Parking Lot -Asphalt (includes entrance) -1996
51,000.00
$ 51,000.00
Benches on Concrete Pad (8 Total)
$ 20,000.00
1
Picnic Table w /Concrete 2 Section
1
Security Light (Connexus Owned)
-
$ -
Picnic Tables on Concrete Pad (6 total)
$ 20,000.00
15,000.00
REPLACEMENT ITEMS TOTAL:
2
Steel Bollard Posts
60.00
$ 120.00 1
Artistictinterpretive Nature Nodes (10 Total)
$ 20,000.00
1,800.00
FUTURE EQUIPMENT TOTAL
1
Trail - North /South - Asphalt - 1996
141,000.00
$ 141,000.00
Wayfinding Signage/Trail Identification /Distance Markers
$ 26,000.00
155.00
4
Dog Waste Disposals
80.00
$ 320.00
Restoration /Landscaping
$ 50,000.00 .
1
3
Park Map Signs
175.00
$ 525.00 A
FUTURE EQUIPMENT TOTAL
1,770,5
1
Park Sign w /Landscaping Block
2,300.00
$ 2,300.00 =_
1,500.00
$
1,500.00
2
Bat Houses
60.00
$ 120.00
1
Volleyball Pole & Net Set
3
Signs - DNR Cooperation Grant
25.00
$ 75.00
1
Sign - Prairie Restoration Information
25.00
$ 25.00
$
1,900.00
4
Signs -wood directional along roads Round Lk Blvd
125.00
$ 500.00 ,
Sign - Tobacco Free Zone
24.00
$
3
No Motorized Vehicles Allowed Signs
28.00
$ 84.00
1
135'x 5' concrete sidewalk
3
Forest Enhancement Sign
25.00
$ 75.00
KELSEY ROUND LAKE EQUIPMENT TOTAL
240'x 1' concrete curbing
S 238.662.00
600.00
$
600.00
1
Park Bench
425.00
170.00
$
170.00
Security Light
$
5,000.00 2024
Playground Structure
$ 40,000.00
1
Park Name Sign w /Landscaping
1,000.00 2023
550.00
$
550.00
Landscaping
$
1,000.00 2024
Wood Fiber Fall Zone
$ 8,300.00
1
Picnic Table w /Concrete 2 Section
1
200.00
$
200.00
1/2 Basketball Court
$
15,000.00
REPLACEMENT ITEMS TOTAL:
$ 48 300.00
1
Four Place Swing Set
$ 19,025.78
1,800.00
$
1,800.00
FUTURE EQUIPMENT TOTAL
1
21 000.00
155.00
$ 155.00
1
Trash Can
155.00
$
155.00
155.00
$ 155.00
1
Recycle Bin
Landscape Wall Around Park Sign
155.00
$
155.00
1
1 Swing Set -3 pole w/2 swings, 2 baby swings
1
Volleyball Court
1,500.00
$
1,500.00
1
Clifford Spring Ride
700.00
$ 700.00
1
Volleyball Pole & Net Set
475.00
$
475.00
$ 700.00
1
70' Retaining wall block & landscaping
3,400.00
1,900.00
$
1,900.00
1
Sign - Tobacco Free Zone
24.00
$
24.00
1
135'x 5' concrete sidewalk
1,100.00
$
1,100.00
1
240'x 1' concrete curbing
600.00
$
600.00
1
GameTime Play Structure - 2009
18,748.98
$
18,748.98
1
Wood Fiber Fall Zone - 2009
4,000.00
$
4,000.00
1
Concrete Pad
200.00
1 $
200.00
MEADOW WOOD (NORTH) EQUIPMENT TOTAL
31 577.98
No Current Facilities
Sustainable Landscaping & Trees
$
1,000.00
1
Car Spring Ride
425.00
$ 425.00
Landscaping
$ 1,000.00 2023
Playground Structure
$ 40,000.00
1
Park Bench
170.00
$ 170.00
FUTURE EQUIPMENT TOTAL
1,000.00 2023
Woodchip Fall Zone
$ 10,000.00
1
Park Name Sign
250.00
$ 250.00
2028
108' Retaining Wall
$ 9,000.00
1
Picnic Table w /Concrete Pad
225.00
$ 225.00
REPLACEMENT ITEMS TOTAL:
59 000.00
1
PrimeTime Play Structure - 2008
19,025.78
$ 19,025.78
1
Trash Can
155.00
$ 155.00
1
Recycle Bin
155.00
$ 155.00
1
Landscape Wall Around Park Sign
1,200.00
$ 1,200.00
1
1 Swing Set -3 pole w/2 swings, 2 baby swings
2,200.00
$ 2,200.00
1
Clifford Spring Ride
700.00
$ 700.00
1
Frog Spring Ride
700.00
$ 700.00
1
11 08' Retainin Wall - 2008
3,400.00
$ 3,400.00
C: \Users \j.grode \Desktop \Park Inventory - 2017 - Updated 10 -06 -2017
City of AND OVER
2017 Existing and Future Park Facilities Chart
Page 12 of 29
QTY
DESCRIPTION (EXISTING)
UNIT PRICE
TOTAL PRICE
FUTURE FACILITIES
TOTAL PRICE
REPLACEMENT ITEMS
ESTIMATED COSTS
1
Wood Chip Fall Zone - 2008
4,800.00
$ 4,800.00
New Outfield Fence (8') w/ Mow Strip (1 Field)
$ 33,750.00 Annual
Ag Lime Material
$ 1,000.00
1
120'x 1' Concrete Curbing
450.00
$ 450.00
Medium Shelter w/ Picnic Tables and grill
$ 20,000.00 2028
Concrete Border w/Wood Fiber Fall Zone
$ 8,300.00
1
100'x 5' Concrete Sidewalk
800.00
$ 800.00
FUTURE EQUIPMENT TOTAL
$ 64 750.00 2028
Playground Structure
$ 30,800.00
1
Sign - Tobacco Free Zone
24.00
$ 24.00
1/2 Basketball Court
2033
60 linear ft 16' High Backstop Fence
$ 20,000.00
1
MEADOWS OF ROUND LAKE EQUIPMENT TOTAL
360.00
$ 34.679.78
FUTURE EQUIPMENT TOTAL
2035
12 Space Asphalt Parking Lot w /Concrete Curb
$ 79,000.00
1
lAglime
4,000.00
$ 4,000.00
Landscaping
$ 1,000.00 2 Annual
Ballfield Maintenance: Regrade & Reseed
$ 5,000.00
1
12 Space Asphalt Parking Lot w /Concrete Curb - 2005
18,320.00
$ 18,320.00
New Outfield Fence (8') w/ Mow Strip (1 Field)
$ 33,750.00 Annual
Ag Lime Material
$ 1,000.00
1
Ball Field
4,565.00
$ 4,565.00
Medium Shelter w/ Picnic Tables and grill
$ 20,000.00 2028
Concrete Border w/Wood Fiber Fall Zone
$ 8,300.00
1
Elephant Spring Ride
425.00
$ 425.00
FUTURE EQUIPMENT TOTAL
$ 64 750.00 2028
Playground Structure
$ 30,800.00
1
Horse Spring Ride
425.00
$ 425.00
1/2 Basketball Court
2033
60 linear ft 16' High Backstop Fence
$ 20,000.00
1
Backhoe Digger
360.00
$ 360.00
FUTURE EQUIPMENT TOTAL
2035
12 Space Asphalt Parking Lot w /Concrete Curb
$ 79,000.00
1
Two Place Swing Set
1,300.00
$ 1,300.00
REPLACEMENT ITEMS TOTAL:
144 100.00
1
Park Bench
170.00
$ 170.00
3
Trash Cans
155.00
$ 465.00
1
Recycle Bin
155.00
$ 155.00
1
Picnic Table
250.00
$ 250.00
2
Players Benches 15' Aluminum
300.00
$ 600.00
1
60 linear ft 16' High Backstop Fence
7,500.00
$ 7,500.00
1
1235 linear ft 2' wide Mow Strip
500.00
$ 500.00
2
Bat Racks /Holders
50.00
1 $ 100.00
1
Home Plate
60.00
$ 60.00
1
Sign - Handicap Parking
25.00
$ 25.00
1
Park Name Sign w /Landscaping
550.00
$ 550.00
1
43 linear ft Border Magic Edging
310.00
$ 310.00
1
3 Row Bleachers
1,700.00
$ 1,700.00
1
Security Light (Connexus Owned)
-
$ -
1
Double First Base
125.00
$ 125.00
1
Set 2nd & 3rd Bases
180.00
$ 180.00
1
Pitching Rubber
45.00
$ 45.00
1
Concrete Border w/Wood Fiber Fall Zone
4,000.00
$ 4,000.00
1
Bluebird House
15.00
$ 15.00
1
GameTime Play Structure - 2013
14,792.16
$ 14,792.16
NORTHWOODS EAST EQUIPMENT TOTAL
60 937.16
1
Class -V Parking Lot - Small
500.00
$ 500.00
Landscaping
$ 1,000.00 N Annual
I Field Maintenance: Regrade & Reseed
$ 5,000.00
1
Park Bench
170.00
$ 170.00
Security Light
$ 5,000.00 11 2032
1225'- 5' Cyclone Fence w /Mow Strip
$ 9,000.00
1
Park Name Sign
250.00
$ 250.00
Pave Parking Lot (15 Stall)
$ 22,500.00 2032
Tennis Courts (2), Pavement with Fencing
$ 212,000.00
2
Reels - Tennis net
62.00
$ 124.00
Volleyball Court
$ 3,500.00
REPLACEMENT ITEMS TOTAL:
$ 226 000.00
2
Sets Post - Tennis net
453.00
$ 906.00
1/2 Basketball Court
$ 15,000.00
2
Soccer Field
3,000.00
$ 6,000.00
FUTURE EQUIPMENT TOTAL
47 000.00
1
Shelter - Small
1,800.00
$ 1,800.00
1
225'- 5' Cyclone Fence w /Mow Strip
3,385.00
$ 3,385.00
2
Tennis Courts, Pavement with Fencing
40,000.00
$ 80,000.00
2
Tennis Nets
185.00
$ 370.00
1
Trash Can
155.00
$ 155.00
1
Recycle Bin
155.00
$ 155.00
1
Picnic Table- Concrete 10' w /concrete pad
500.00
$ 500.00
1
Sign - Tobacco Free Zone
24.00
$ 24.00
1
40 linear ft Border Magic Edging
280.00
$ 280.00
C: \Users \j.grode \Desktop \Park Inventory - 2017 - Updated 10 -06 -2017
City of ANDOVER
2017 Existing and Future Park Facilities Chart
Page 13 of 29
QTY
DESCRIPTION (EXISTING)
UNIT PRICE
TOTAL PRICE
FUTURE FACILITIES
TOTAL PRICE
REPLACEMENT ITEMS
ESTIMATED COSTS
1
Lights on Posts (4)
2,500.00
$ 2,500.00
Security Lights (2)
$ 10,000.00 "Annual
Ag Lime Material
$ 2,000.00
1
Landwater Conservation Sign
25.00
$ 25.00
ADA Trail Access
$ 25,000.00 2018
Shelter with Concrete Pad - Large
$ 25,000.00
1
NORTHWOODS WEST EQUIPMENT TOTAL
900.00
97 144.00
1/2 Basketball court
$ 15,000.00 2019
Playground Structure
$ 30,000.00
1
Pitching Rubber
45.00
$ 45.00
FUTURE EQUIPMENT TOTAL
51 000.00 2019
150 cu yds Engineered Wood Fiber
$ 5,500.00
1
"No Motorized Vehicles" Sign
28.00
$ X28.00
Landscaping
$ 1,000.00 2027
Concrete Edging w/Wood Fiber Fall Zone
$ 8,300.00
1
420' Cyclone Fence with 12' Gate with Mow Strip
10,200.00
$ 10,200.00.
Security Lig
I I ' 2027
Playground Structure
$ 50,000.00
5
Bluebird House
15.00
$ 75.00:
1/2 Basketball Court
$ 15,000.00. 2032
420' Cyclone Fence with 12' Gate with Mow Strip
$ 27,000.00
1
Four -Place Swing Set
1,300.00
$ 1,300.00
Volleyball Court
$ 2,500.00
REPLACEMENT ITEMS TOTAL:
85 300.00
1
Park Name Sign w /Landscaping
550.00
$ 550.00
ADA Access Trail to play area (75'x $50.00 plf)
$ 3,750.00
1
Picnic Table Concrete 8' Pad
200.00
$ 200.00
FUTURE EQUIPMENT TOTAL
23 500.00
1
Security Light (Connexus)
-
$ -
1
Skating Rink
500.00
$ 500.00
1
Trash Can
155.00
$ 155.00 '
1
Sign -Tobacco Free Zone
24.00
$ 24.00
t
2
Frisbee Baskets
100.00
$ 200.00
1
Concrete Edging w/Wood Fiber Fall Zone
4,000.00
$ 4,000.00
1
Park Bench
170.00
$ 170.00
1
Playground Structure - 2012
23,601.51
$ 23,601.51
1
PLEASANT OAKS EQUIPMENT TOTAL
1,950.00
$ 41,003.51
f_ No Current Facilities Woodduck and Bluebird Houses $ 500.00
FUTURE EQUIPMENT TOTAL S 500.00
2
Home Plate
60.00
$ 120.00
Landscaping
$ 1,000.00 1 Annual
Ballfield Maintenance: Regrade, Reseed, Irrigation
$ 10,000.00
1
Park Bench
170.00
$ 170.00
Security Lights (2)
$ 10,000.00 "Annual
Ag Lime Material
$ 2,000.00
1
Park Name Sign
250.00
$ 250.00
ADA Trail Access
$ 25,000.00 2018
Shelter with Concrete Pad - Large
$ 25,000.00
1
Picnic Table w/3 Section Concrete
900.00
$ 900.00
1/2 Basketball court
$ 15,000.00 2019
Playground Structure
$ 30,000.00
1
Pitching Rubber
45.00
$ 45.00
FUTURE EQUIPMENT TOTAL
51 000.00 2019
150 cu yds Engineered Wood Fiber
$ 5,500.00
1
Security Light (Connexus Owned)
-
$ -
2035
New Ballfield Fencing w/ Mow Strips
$ 160,000.00
2
Set of Three Bases
200.00
$ 400.00
2045
Asphalt Parking Lot
$ 225,000.00
1
New Ballfield Fencing w /Mow Strips
59,959.70
$ 59,959.70.
REPLACEMENT ITEMS TOTAL:
$ 457 500.00
1
Shelter with Concrete Pad - Large
4,279.00
$ 4,279.00
1
Swing Set - Four Place
1,300.00
$ 1,300.00
5
Trash Cans
155.00
$ 775.00
3
Recycle Bin
155.00
$ 465.00
1
Gametime Play Structure - 2004
13,384.68
$ 13,384.68
1
Sign - Tobacco Free Zone
24.00
$ 24.00
1
Spring Ride - Car
425.00
$ 425.00
1
Spring Ride - Duck
425.00
$ 425.00
1
Spring Ride - Motorcycle
425.00
$ 425.00
4
Bat Racks / Holders
45.00
$ 180.00
1
150 cu yds Engineered Wood Fiber
2,600.00
$ 2,600.00
1
275 ft. Border- Magic Edging
1,950.00
$ 1,950.00
2
Bleachers
1,700.00
$ 3,400.00
4
Benches 15'
450.00
$ 1,800.00
1
Irrigation System
89,931.98
$ 89,931.98
2
Ball Fields w /Grass Infields
7,000.00
$ 14,000.00
1
A s halt Parkin n Lot - 2015
52,011.60
$ 52,011.60
C: \Users \j.grode \Desktop \Park Inventory - 2017 - Updated 10 -06 -2017
City of ANDOVER
2017 Existing and Future Park Facilities Chart
Page 14 of 29
QTY
DESCRIPTION (EXISTING)
UNIT PRICE
TOTAL PRICE
FUTURE FACILITIES
TOTAL PRICE
REPLACEMENT ITEMS
ESTIMATED COSTS
ROSE EQUIPMENT TOTAL
249 220.96
1
"No Hunting on Lake" Sign
14.00
$ 14.00:
Security Light
$ 5,000.00 Annual
Parking Lot Repairs (Class V Gravel)
MR
$ 1,000.00
1
Class V Parking Lot (medium) 4,500.00
$ 4,500.00
Park Sign & Landscaping
$ 1,000.00
REPLACEMENT ITEMS TOTAL:
1,000.00
2
Wood Duck House
25.00
$ 50.00
Construct Boat Landing & Pave Surface Road
$ 50,000.00
ROUND LAKE BOAT LANDING EQUIPMENT TOTAL
4,664.00
Dredging
$ 2,500.00
Roll -in Dock
$ 5,000.00
FUTURE EQUIPMENT TOTAL
63,50
1
Ballfield Fencing
12,884.54
$ 12,884.54
Park Sign & Landscaping
$ 1,000.00 ' Annual
Ballfield Maintenance: Regrade & Reseed
$ 5,000.00
1
Ball Field
19,548.55
$ 19,548.55
Security Light (2)
$ 10,000.00 Annual
Ag Lime Material
$ 1,000.00
2
Bird House
15.00
$ 30.00
Pave Parking Lot (Canoe Area - 10 stalls)
_
$ 15,000.00 2018
Shelter
$ 18,000.00
1
Class -V Parking Lot - Large
6,000.00
$ 6,000.00
ADA Access Trail to River (150' x $50.00 plf)
$ 7,500.00 2018
Playground Structure
$ 44,100.00
1
Four Place Swing Set
1,300.00
$ 1,300.00
New Outfield (8ft) Fencing w/ mow strip
$ 33,750.00 2027
Ballfield Fencing
$ 34,200.00
1
Home Plate
60.00
$ 60.00
Dredge Existing Wetland
$ 5,000.00
REPLACEMENT ITEMS TOTAL:
102 300.00
1
Motorcycle Spring Ride
425.00
$ 425.00
Pave Ballfield Parking Lot (30 stalls)
$ 50,000.00 _
1
Park Bench w/ Concrete Pad
170.00
$ 170.00
FUTURE EQUIPMENT TOTAL
122 250.00
1
Picnic Table - 3 section concrete
200.00
$ 200.00
1
Picnic Table - small
300.00
$ 300.00
1
Pitching Rubber
45.00
$ 45.00
1
Set of Three Bases
200.00
$ 200.00
1
Shelter - Small
1,600.00
$ 1,600.00
1
Shelter with Concrete Pad - Large
4,279.00
$ 4,279.00
4
Trash Cans
155.00
$ 620.00
1
Recycle Bin
155.00
$ 155.00
1
GameTime Play Structure - 2002
14,940.00
$ 14,940.00
1
Security Light (Connexus Owned)
-
$ -
1
ADA Access Pads
1,560.00
$ 1,560.00
1
Duck Spring Ride
450.00
$ 450.00
1
Backhoe Digger Ride
375.00
$ 375.00
1
Bleacher - 3 Section Aluminum
1,500.00
$ 1,500.00
1
Sign - Tobacco Free Zone
24.00
$ 24.00
2
Players Benches -16' Aluminum
300.00
$ 600.00
1
Park Name Sign w /Landscaping
1,800.00
$ 1,800.00
1
130' Chain Link Fence 4' black vinyl coated
1,400.00
$ 1,400.00
5
Bat Houses
.20.00
$ 100.00
2
Metal Bat Holders
45.00
00
1
30' Concrete Sidewalk
200.00
00
STROOTMAN EQUIPMENT TOTAL
09
ON
1
Canoe Landing
1,400.00
00
1
Class -V Parking Lot - Small
500.00
00
1
Park Name Sign
225.00
.00
!!I
2
Barricade Post - Set
150.00
.00
1
Trash Can
155.00
.00
2
"No Motorized Vehicle" Sign
25.00
.00
2
Bluebird Houses
15.00
.00
3
Wood Duck House
40.00
.00
1
Si n - Slow No Wake
75.00
.00
CAUsersy.grode0esktop\Park Inventory - 2017 - Updated 10 -06 -2017
City of AND OVER
2017 Existing and Future Park Facilities Chart
Page 15 of 29
QTY
DESCRIPTION (EXISTING)
UNIT PRICE
TOTAL PRICE
FUTURE FACILITIES
TOTAL PRICE
REPLACEMENT ITEMS
ESTIMATED COSTS
1
Sign - Construction Fund
24.00
$ 24.00
2
Sign - Bradley Launch
250.00
$ 500.00
STROOTMAN CANOE LANDING EQUIPMENT TOTAL
3,379.00
1
Pt PY STREET F}W .
Aglime
4,000.00
i
$ 4,000.00
' 4
Landscaping
mss_
$ 1,000.00 Annual
W E20 r p
Ballfield Maintenance: Regrade, Reseed, Irrigation
$ 5,000.00
1
Backhoe Digger
298.00
$ 298.00
Security Light
$ 5,000.00 A Annual
Ag Lime Material
$ 1,000.00
1
Ball Field
3,000.00
$ 3,000.00
New Outfield Fence (8') w/ Mow Strip (1 Field)
$ 33,750.00 2018
Sandbox w /Concrete Walk and Retaining Wall
$ 9,000.00
4
Benches Players 8'
100.00
$ 400.00
Medium Shelter w/ Picnic Tables and grill
$ 20,000.00 - 2018
ADA Pads to Powerscape Units
$ 14,400.00
1
Four - Section Backstop
1,564.00
$ 1,564.00
Tennis /Pickleball Courts w/ Lights
$ 50,000.00 2018
Playground Structure
$ 44,100.00
1
Home Plate
60.00
$ 60.00
Bleachers w/ concrete Pad
$ 7,500.00 2027
Walking Trail - Asphalt
$ 40,000.00
1
Park Bench
170.00
$ 170.00
FUTURE EQUIPMENT TOTAL
$ 117 250.00 2037
Parking Lot 27 Spaces
$ 248,000.00
1
Fencing with Mow Strip -2015
16,088.79
$ 16,088.79
2035
Fencing with Mow Strip
$ 43,000.00
1
Irrigation
22,669.64
$ 22,669.64
REPLACEMENT ITEMS TOTAL:
$ 404 500.00
1
Park Name Sign w /Landscaping
550.00
$ 550.00
1
Picnic Table
200.00
$ 200.00
1
Pitching Rubber
45.00
$ 45.00
1
Sandbox w /Concrete Walk and Retaining Wall
3,400.00
$ 3,400.00
1
Security Light (Connexus Owned)
-
$ -
1
Set of Three Bases
200.00
$ 200.00
1
Shelter - Smallw /Concrete Pad
1,200.00
$ 1,200.00
1
Four Place Swing Set w /ADA Swing and Pad
1,300.00
$ 1,300.00
2
ADA Pads to Powerscape Units
2,716.00
$ 5,432.00
1
Powerscape Medium/small -2002
31,004.83
$ 31,004.83
1
Duck Spring Ride
425.00
$ 425.00
1
Motorcycle Spring Ride
425.00
$ 425.00
1
Car Spring Ride
625.00
$ 625.00
2
Trash Cans
155.00
$ 310.00
1
Walking Trail - Asphalt
12,810.00
$ 12,810.00
1
Parking Lot 27 Spaces - 2007
57,406.05
$ 57,406.05
1
Basketball Pole and Goal
700.00
$ 700.00
1
40 linear ft 6' Sidewalk
250.00
$ 250.00
1
90 linear ft 4' Sidewalk
550.00
$ 550.00
1
40 linear ft Border Magic Edging
290.00
$ 290.00
1
20' Retaining Wall around Tree
750.00
$ 750.00
1
Sand Volleyball Court 46'x 80'
700.00
$ 700.00
1
240 linear ft Volleyball Court Edging
1,680.00
$ 1,680.00
1
Volleyball Net and Post Set
475.00
$ 475.00
1
Sign - Tobacco Free Zone
24.00
$ 24.00
TERRACE EQUIPMENT TOTAL
169 002.31
2
"No Motorized Vehicles" Sign
28.00
$ 56.00
Irrigation System (2018)
$ 15,000.00 Annual
Ballfield Maintenance: Regrade & Reseed
$ 5,000.00
1
Basketball Pad Asphalt
4,200.00
$ 4,200.00
FUTURE EQUIPMENT TOTAL
15 000.00 Annual
Ag Lime Material
$ 1,000.00
1
Basketball Pole /Backboard /Rim /Net
475.00
$ 475.00
2018
Playground Structure - 5 -12
$ 41,000.00
1
Sixty (60) Place Asphalt Parking Lot w /Curb, Field Relocation -2002
38,900.00
$ 38,900.00
2018
Playground Structure - Playsense - 2 to 5
$ 33,000.00
1
Aglime
5,618.33
$ 5,618.33
2018
Wood Chip Fall Zone
$ 13,800.00
1
Ball Field
11,224.71
$ 11,224.71
2022
Six Section Backstop w/ Dugouts Cement
$ 25,800.00
1
Home Plate
60.00
$ 60.00
2022
124' Six foot Fence w/ mow strip
$ 8,000.00
1
Pitching Rubber
45.00
$ 45.00
2022
364' Eight foot Outfield Fence w/ Mow Strip
$ 14,600.00
1
Set of Three Bases
135.00
$ 135.00
2032
Basketball Pad Asphalt
$ 11,100.00
1
Six Section Backstop w /Du outs Cement
9,704.50
$ 9,704.50
2032
Sixty (60) Place Asphalt Parking Lot w /Curb
$ 168,000.00
C: \Users \j.grode \Desktop \Park Inventory - 2017 - Updated 10-06 -2017
City of ANDOVER
2017 Existing and Future Park Facilities Chart
Page 16 of 29
QTYJ
DESCRIPTION (EXISTING)
UNIT PRICE
TOTAL PRICE
$ 2,006.16
FUTURE FACILITIES
TOTAL PRICE
REPLACEMENT ITEMS
ESTIMATED COSTS
1
104' Four foot Sideline Fence w /Mow Strip
2,006.16
$ 2,715.00
2032
Walking Path - Asphalt Expanded
$ 179,000.00
1
124' Six foot Fence w/ mow strip
3,031.80
$ 3,031.80
$ 32,190.00
Medium Shelter w/ Picnic Tables and grill
REPLACEMENT ITEMS TOTAL:
500 300.00
1
364' Eight foot Outfield Fence w /Mow Strip
5,507.32
$ 5,507.32
$ 1,000.00
Bleacher w/ concrete pad
$ 7,500.00 2032
Playground Structure
2
15' Aluminum Players Benches
250.00
$ 500.00
$ 1,000.00
New Outfield Fence (8') w/ Mow Strip (1 Field)
$ 33,750.00 2037
280' Cyclone Fence with Mow Strip
1
Shelter - Small
1,600.00
$ 1,600.00
$ 200.00
FUTURE EQUIPMENT TOTAL
$ 126,250.00 2037
30 Space Asphalt Parking Lot w /Curbs
3
Trash Cans
155.00
$ 465.00
$ 60.00
2037
Backstop Fence, Mow Strips, Dugouts, Bleacher Pads
1
Recycle Bin
155.00
$ 155.00
$ 17,500.00
REPLACEMENT ITEMS TOTAL:
1
Walking Path - Asphalt Expanded
41,447.00
$ 41,447.00
$ 45.00
�,
1
Gametime Play Structure - 2002
15,548.23
$ 15,548.23
$ 155.00
1
Playsense Design 301 - 2002
12,572.27
$ 12,572.27
$ 315.00
1
Swing Set - (2 swings /2 baby)
1,400.00
$ 1,400.00
$ 50.00
2
Foul Posts
25.00
$ 50.00
$ 21,293.00
1
Picnic Table Concrete 10' w /concrete pad
500.00
$ 500.00
$ 155.00
2
Foul Pole Flags
25.00
$ 50.00
$ 3,477.88
1
Park Bench w /concrete pad
400.00
$ 400.00
$ 83.855.88
1
Wood Chip Fall Zone
5,200.00
$ 5,200.00
1
Concrete Curb Around Fall Zone
1,300.00
$ 1,300.00
1
Park Name Sign w /Landscaping
550.00
$ 550.00
1
Security Light (Connexus Owned)
-
$
1
Bleacher Aluminum 3 Row
1,700.00
$ 1,700.00
1
Horse Spring Ride
450.00
$ 450.00
1
Motorcycle Spring Ride
450.00
$ 450.00
1
Dog Bag Dispenser for Waste
75.00
$ 75.00
2
Bat Racks / Holders
45.00
$ 90.00
1
Sign - Handicap Parking
25.00
$ 25.00
1
Sign - Dog Waste
25.00
$ 25.00
1
Sign - Tobacco Free Zone
24.00
$ 24.00
1
No Pepper Drills Sign
25.00
$ 25.00
1
Vehicle Parking in Designated Areas Sign
25.00
$ 25.00
1
160' Yellow Fence Cover
160.00
i $ 160.00
1
280' Cyclone Fence with Mow Strip
3,700.00
1 $ 3,700.00
Security Light
$ 5,000.00 11 Annual
Ballfield Maintenance: Regrade, Reseed, Irrigation
$ 5,000.00
1
Aglime
2,715.00
$ 2,715.00
Irrigation System (2017)
$ 60,000.00 Annual
Ag Lime Material
$ 1,000.00
1
Playground Structure - 2017
32,190.00
$ 32,190.00
Medium Shelter w/ Picnic Tables and grill
$ 20,000.00 2032
Set of 3 Outdoor Exercise Equipment
$ 10,000.00
1
Ball Field
1,000.00
$ 1,000.00
Bleacher w/ concrete pad
$ 7,500.00 2032
Playground Structure
$ 67,000.00
2
15' Aluminum Players Benches w /Concrete Pad
500.00
$ 1,000.00
New Outfield Fence (8') w/ Mow Strip (1 Field)
$ 33,750.00 2037
280' Cyclone Fence with Mow Strip
$ 16,000.00
1
Bases - Set of Three
200.00
$ 200.00
FUTURE EQUIPMENT TOTAL
$ 126,250.00 2037
30 Space Asphalt Parking Lot w /Curbs
$ 76,000.00
1
Home Plate
60.00
$ 60.00
2037
Backstop Fence, Mow Strips, Dugouts, Bleacher Pads
$ 92,000.00
1
30 Space Asphalt Parking Lot w /Curbs
17,500.00
$ 17,500.00
REPLACEMENT ITEMS TOTAL:
267 000.00
1
Pitching Rubber
45.00
$ 45.00
1
Trash Can
155.00
$ 155.00
1
Concrete ADA Pad
315.00
$ 315.00
1
Handicap Parking Sign
50.00
$ 50.00
1
Backstop Fence, Mow Strips, Dugouts, Bleacher Pads
21,293.00
$ 21,293.00
1
Recycle Bin
155.00
$ 155.00
1
Set of 3 Outdoor Exercise Equipment
3,477.88
$ 3,477.88
ANDOVER LIONS PARK EQUIPMENT TOTAL
$ 83.855.88
C. \Users \j.grode\Desktop \Park Inventory - 2017 - Updated 10 -06 -2017
City of ANDOVER
2017 Existing and Future Park Facilities Chart
Page 17 of 29
QTY DESCRIPTION (EXISTING) UNIT PRICE TOTAL PRICE FUTURE FACILITIES TOTAL PRICE REPLACEMENT ITEMS ESTIMATED COSTS
1
Ballfield Development & Construction w/ Irrigation
979,075.82
$ 979,075.82 g
Landscaping
$ 5,000.00 Annual
Ballfield Maintenance: Regrade, Reseed, Irrigation
$ 15,000.00
1
Building w/ Restrooms, storage, concessions, etc.. -2008
275,874.98
$ 275,874.98 '
Ballfield Lighting (East field)
$ 75,000.00 Annual
Facility Maintenance
$ 5,000.00
1
Lighting of 2 Fields
273,463.31
$ 273,463.31:
Medium Picnic Shelter w/ Picnic Table and Grill
$ 20,000.00 Annual
Lighting: Maintenance ( 2 Fields and Sliding Hill)
$ 3,000.00
3
Bleachers
9,699.33
$ 29,098.00
Small Picnic Shelter w/ Picnic Table and Grill
$ 10,000.00 - Annual
Ag Lime Material
$ 3,000.00
6
15' Players Bench Aluminum
300.00
$ 1,800.00
Netting - Around Concession Area
$ 10,000.00 2023
Tilted Sky Wheel
$ 7,300.00
3
Pitching Rubbers
55.00
$ 165.00
Park Benches (6)
$ 1,020.00 :_ 2023
280 cu yds engineered wood fiber
$ 11,250.00
6
Foul Posts w /Flags
125.00
$ 750.00
1/2 Basketball Court
$ 15,000.00 2023
Playground Structure
$ 111,000.00
1
Park Sign w /retaining wall block
1,800.00
$ 1,800.00
FUTURE EQUIPMENT TOTAL
$ 136 020.00 .. 2028
Fence around playground
$ 25,000.00
3
Dugouts
10,000.00
$ 30,000.00
2028
Batting Cage Set
$ 7,200.00
4
Picnic Tables 12' Concrete
900.00
$ 3,600.00
2036
Scoreboards (set of 3)
$ 32,000.00
14
Trash Cans
155.00
$ 2,170.00
2036
12' x 12' Irrigation Shed
$ 32,000.00
1
12'x 12' Irrigation Shed - 2006
7,500.00
$ 7,500.00
2036
Parking Lot - Replacement
$ 350,000.00
3
Sign - Handicap Parking
25.00
$ 75.00
REPLACEMENT ITEMS TOTAL:
$ 601,750.00
4
Sign - No Parking
25.00
$ 100.00
1
Sign - Overflow Parking
25.00
$ 25.00
16
Bluebird Houses
20.00
$ 320.00
1
265 linear ft 4' Fence for Sliding Hill
1,800.00
$ 1,800.00
2
Saddlemates
700.00
$ 1,400.00
1
Swing set -4 Place
1,800.00
$ 1,800.00
1
6' Bench
250.00
$ 250.00
1
Spring Pad
1,200.00
$ 1,200.00
1
Tilted Sky Wheel
3,500.00
$ 3,500.00
1
280 cu yds engineered wood fiber
5,400.00
$ 5,400.00
1
138 linear ft 1' Concrete Border
900.00
$ 900.00
1
145 linear ft 2' Concrete Border
700.00
$ 700.00
1
90 linear ft 3' Concrete Border
475.00
$ 475.00
1
GameTime Play Equip - MN Playground - 2008
53,539.95
$ 53,539.95
1
Fence around playground
11,747.57
$ 11,747.57
1
Scoreboards (set of 3) - 2006
7,500.00
$ 7,500.00
1
Batting Cage Set - 2008
2,700.00
$ 2,700.00
1
Parking Lot w /Lighting - 2006
80,000.00
$ 80,000.00
3
Home Plates
60.00
$ 180.00
9
Ball Field Distance Signs
20.00
$ 180.00
1
No Pepper Drills Signs
25.00
$ 25.00
3
Set of Bases
200.00
$ 600.00
1
Sliding Hill Light - 2006
2,500.00
$ 2,500.00
1
Handicap Swing
450.00
$ 450.00
1
Duck House
25.00
$ 25.00
1
8' Metal Picnic Table w /Concrete Pad
250.00
$ 250.00
3
Small Concrete Table w /Benches
195.00
$ 585.00
2
Recycle Bin
155.00
$ 310.00
1
Dog Pot Waste
80.00
$ 80.00
ANDOVER STATION NORTH EQUIPMENT TOTAL
1 $ 1.783.914.63
1
Walking Path - Paved - 2007
3,950.00
$
3,950.00
Irrigation System
$ 40,000.00 2032
Playground Structure
$ 63,500.00
1
Gametime Playground Structure - 2017
30,545.00
$
30,545.00
FUTURE EQUIPMENT TOTAL
40 000.00 2037
Walking Path - Paved
$ 17,000.00
1
Four Place Swing Set
1,300.00
$
1,300.00
REPLACEMENT ITEMS TOTAL:
80 500.00
1
ADA Pad
1,902.62
$
1,902.62
1
60' Concrete Edging
400.00
$
400.00
1
Table steel tube frame
200.00
$
200.00
CALIsers\.grode \Desktop\Park Inventory -2017- Updated 10 -06 -2017
City of ANDOVER
2017 Existing and Future Park Facilities Chart
Page 18 of 29
QTY
DESCRIPTION (EXISTING)
UNIT PRICE
TOTAL PRICE
FUTURE FACILITIES
TOTAL PRICE
REPLACEMENT ITEMS
ESTIMATED COSTS
1
Trash Can (Square Plastic)
140.00
$ 140.00
FUTURE EQUIPMENT TOTAL
2 500.00 Annual
Lighting Maintenance
$ 2,000.00
1
Sandbox with Timbers
1,500.00
$ 1,500.00
Annual
Parking Lot Class V - Add material as needed
$ 5,000.00
2
Trail Gates
1,250.00
$ 2,500.00
2031
2 Hockey Rinks w /Fencing and 4 Light Poles - Replacement
$ 110,000.00
1
Park Name Sign w /Landscaping
550.00
$ 550.00
2018
_
$ 122,000.00
1
Recycle Bin
155.00
$ 155.00
2027
340' Cyclone Fence by Soccer Field #2
$ 12,600.00
1
Security Light (Connexus Owned)
-
$ -
2027
Fencing around Ball Field - Replacement
$ 10,900.00
2
CHESTERTON COMMONS EQUIPMENT TOTAL
55.00
$ 43,142.62
2030
2 Shelters - Large
$ 124,000.00
2
Hockey Rink w /Fencing and 4 Light Poles w/16 Lights -2011
20,000.00
$ 40,000.00
Landscaping
$ 2,500.00 '- Annual
Facility Maintenance
$ b,000.uu
1
Warming House
147,000.00
$ 147,000.00
FUTURE EQUIPMENT TOTAL
2 500.00 Annual
Lighting Maintenance
$ 2,000.00
4
Hockey Nets
300.00
$ 1,200.00
Annual
Parking Lot Class V - Add material as needed
$ 5,000.00
1
Parking Lot Class V
4,000.00
$ 4,000.00
2031
2 Hockey Rinks w /Fencing and 4 Light Poles - Replacement
$ 110,000.00
1
Picnic Table
250.00
$ 250.00
2018
REPLACEMENT ITEMS TOTAL:
$ 122,000.00
4
Trash Cans
155.00
$ 620.00
2027
340' Cyclone Fence by Soccer Field #2
$ 12,600.00
2
Key Lock Boxes
20.00
$ 40.00
2027
Fencing around Ball Field - Replacement
$ 10,900.00
2
Fire Extinguishers
55.00
$ 110.00
2030
2 Shelters - Large
$ 124,000.00
1
CO Alarm Detector
25.00
$ 25.00
2030
North Parking Lot
$ 93,000.00
1
Warming House Hours Sign
25.00
$ 25.00
2030
Blacktop Trails
$ 25,000.00
4
Plastic Round Tables
25.00
$ 100.00
REPLACEMENT ITEMS TOTAL:
$ 383,064.00
2
Parking Lot Lights
2,500.00
$ 5,000.00
3
Security Lights on Building
200.00
$ 600.00
1
CITY CAMPUS HOCKEY COMPLEX EQUIPMENT TOTAL
1,564.00
$ 198,970.00
1
340' Cyclone Fence by Soccer Field #2
4,760.00
$ 4,760.00
Playground Upgrade (Splash pad?, Signature Park)
$ 1,000,000.00 1 Annual
Field Maintenance: Regrade, Reseed, Irrigation
$ 10,000.00
1
Infields
20,000.00
$ 20,000.00
FUTURE EQUIPMENT TOTAL
1,000,000.00 Annual
Ag Lime Material
$ 1,000.00
1
Ball Field with Irrigation
3,000.00
$ 3,000.00
2017
Fencing around Ball Field - Repair
$ 1,564.00
1
Basketball goal, net and backboard
475.00
$ 475.00
2018
Playground Structure - 1 Large*
$ 100,000.00
4
Players Bench - 8'
100.00
$ 400.00
2018
Sandbox w/ Digger
$ 5,000.00
1
Bike Rack
216.00
$ 216.00
2027
340' Cyclone Fence by Soccer Field #2
$ 12,600.00
1
Bleacher
1,785.00
$ 1, 185.00
2027
Fencing around Ball Field - Replacement
$ 10,900.00
2
Bluebird House
15.00
$ 30.00
2030
2 Shelters - Large
$ 124,000.00
1
Car Spring Ride
425.00
$ 425.00
2030
North Parking Lot
$ 93,000.00
1
Dinosaur Spring Ride
525.00
$ 525.00
2030
Blacktop Trails
$ 25,000.00
1
Fencing around Ball Field - 2002
3,200.00
$ 3,200.00
REPLACEMENT ITEMS TOTAL:
$ 383,064.00
1
Field Number Sign
20.00
$ 20.00
2
Foul Line Pole Flags
22.00
$ 44.00
1
Four - Section Backstop
1,564.00
$ 1,564.00
5
Trash Cans with Tops
140.00
$ 700.00
2
Grill - Large
340.00
$ 680.00
1
Home Plate
60.00
$ 60.00
1
Motorcycle Spring Ride
360.00
$ 360.00
3
Park Bench
170.00
$ 510.00
2
Pitching Rubber
45.00
$ 90.00
2
Powerscape Play Structure - 2001
8,500.00
$ 17,000.00
1
Retaining Wall - Rock
2,000.00
$ 2,000.00
1
Sandbox with Timbers
2,500.00
$ 2,500.00
2
Security Light (Connexus Owned)
-
$ -
1
Set of Three Bases - New Style w /Double First Base
200.00
$ 200.00
2
Shelter - Large
23,437.50
$ 46,875.00
1
1 Shelter - Small
1 1,200.00
1 $ 1,200.00
C:\Users\.grode\Desktop \Park Inventory -2017- Updated 10 -06 -2017
City of AND OVER
2017 Existing and Future Park Facilities Chart
Page 19 of 29
QTY
DESCRIPTION (EXISTING)
UNIT PRICE
TOTAL PRICE
FUTURE FACILITIES
TOTAL PRICE
REPLACEMENT ITEMS
ESTIMATED COSTS
1
Soccer Field with Irrigation
3,000.00
$
3,000.00
1
Soccer Goal - Junior- Sets
700.00
$
700.00 '
1
Volleyball Net
62.00
$
62.00
1
Volleyball Pole - Set
226.00
$
226.00 `.
1
North Parking Lot
35,000.00
$
35,000.00
1
Blacktop Trails Expanded
9,660.00
$
9,660.00
1
Swing Set - (4 swings /2 baby)
1,900.00
$
1,900.00
3
Picnic Table - concrete 12'
1,000.00
$
3,000.00
2
Sign - Handicap Parking
25.00
$
50.00
1
Sign - DNR Assisted Funding
25.00
$
25.00 f
1
48 x 10 Hockey Back Stop
1,800.00
$
1,800.00 .
1
30'x 30' Concrete Slab
1,200.00
$
1,200.00
1
Metal Bollard
180.00
$
180.00
1
220' Yellow Plastic Fence Top
220.00
$
220.00
1
Metal Bat Holders
25.00
$
25.00
2
Metal Picnic Tables 8'
300.00
$
600.00 .
1
Surveillance Sign
25.00
$
25.00
4
Recycle Bins
155.00
$
620.00
CITY HALL COMPLEX #1 /PURPLE EQUIPMENT TOTAL
166 912.00
�1NkiE
° D 0 : °
:
a I
No Current Facilities
Landscaping
$
2,500.00 ,
FUTURE EQUIPMENT TOTAL
2,500.00
¢
�.a
ME NEW
1
Basketball Pad Asphalt 73' x 42'
2,400.00
$
2,400.00
Landscaping
$v
1,000.00
2022
Playground Structure
$
49,000.00
2
Basketball pole, board, net and rim
475.00
$
950.00
FUTURE EQUIPMENT TOTAL
1,000.00
2022
180 cu yds Engineered Wood Fiber
$
7,500.00
1
Buck -about
963.00
$
963.00
2030
Small Shelter w/ Picnic Table
L.10,000.00
1
Park Name Sign
550.00
$
550.00
REPLACEMENT ITEMS TOTAL:
66 500.00
1
PrimeTime Play Structure - 2007
23,512.47
$
23,512.47
1
Security Light (Connexus Owned)
$
-
1
Shelter - Small
1,600.00
$
1,600.00
1
Six Place Swing Set - Short
1,900.00
$
1,900.00
1
50 ft. Border- Magic Edging
350.00
$
350.00
1
Trash Can
155.00
$
155.00
1
180 cu yds Engineered Wood Fiber - 2007
3,600.00
$
3,600.00
1
326lin. Ft. x 4' Sidewalk
1,975.00
$
1,975.00
1
Park Bench
250.00
$
250.00
2
Saddle Mates
700.00
$
1,400.00
1
Sign - Tobacco Free Zone
24.00
$
24.00
1
Sandbox
500.00
$
500.00
1
1 Recycle Bin
155.00
$
155.00
CREEKVIEW CROSSING EQUIPMENT TOTAL
40 284.47
1
380'- 8' Fence along property line - 2002
3,837.40
$
3,837.40
Small Shelter w/ Picnic table
$
10,000.00
Annual Field Maintenance: Regrade, Reseed, Irrigation
$
15,000.00
1
900'- 6' Fence along property line - 2002
7,434.00
$
7,434.00
Scoreboards - Middle & North Fields
$
20,000.00 3
Annual
Ag Lime Material
$
3,000.00
1
300'- 4' ballfield fence w/ mow strips - 2002
51 712.70
$
5,712.70
Dugouts - Middle & North Fields
$
20,000.00 1
2022
380'- 8' Fence along property line
$
10,200.00
1
1384'- 6' ballfield fence w/ mow strips - 2002
10,537.86
$
10,537.86
Medium Shelter w/ Picnic Table & grill
$
20,000.00
2022
900'- 6' Fence along property line
$
20,000.00
1
11, 146' - 8' ballfield fence w/ mow strips - 2002
23,757.89
$
23,757.89
Raise Ballfield Fencing Height to 8'
$
45,000.00 2
2022
300'- 4' ballfield fence w/ mow strips
$
15,000.00
3
1 Backstop Six Section - 2002
3,929.83
$
11,789.50
FUTURE EQUIPMENT TOTAL
115 000.00 a
2022
1384'- 6' ballfield fence w/ mow strips
1 $
28,000.00
C: \Users \j.grode \Desktop \Park Inventory - 2017 - Updated 10 -06 -2017
City of ANDOVER
2017 Existing and Future Park Facilities Chart
Page 20 of 29
QTY
DESCRIPTION (EXISTING)
UNIT PRICE
TOTAL PRICE
FUTURE FACILITIES
TOTAL PRICE
REPLACEMENT ITEMS
ESTIMATED COSTS
3
Concrete Pad for Bleacher /Dugouts -2002
10,857.33
$ 32,572.00
Irrigation System Expansion
2022
1,146'- 8' ballfield fence w/ mow strips - All Fields
$ 63,000.00
1
Benches & Message Board -2002
6,062.81
$ 6,062.81
1/2 basketball court
2022
Backstop Six Section
$ 32,000.00
1
Irrigation - 2002
27,126.33
$ 27,126.33 a
Small Picnic Shelter w/ Picnic Table & grill
2022
Batting Cage 2 Place
$ 6,700.00
1
Parking Lot 35 Spaces - 2002
52,715.73
$ 52,715.73
FUTURE EQUIPMENT TOTAL
2031
Scoreboard Electronic
$ 17,000.00
3
Home Plates
67.00
$ 201.00
2032
Concrete Pad for Bleacher /Dugouts
$ 140,000.00
6
Pitching Rubbers
48.00
$ 288.00
94 2032
Benches & Message Board
$ 26,000.00
3
Double First Bases
200.00
$ 600.00
2032
Parking Lot 35 Spaces
$ 230,000.00
3
Sets of 1st, 2nd Bases, 3rd Bases
200.00
$ 600.00
a 2032
Concrete Block Dugouts - South Field
$ 90,000.00
3
Field signs
25.00
$ 75.00:
REPLACEMENT ITEMS TOTAL:
695 900.00
9
Trash Cans
155.00
$ 1,395.00
4
16' aluminum players benches
300.00
$ 1,200.00
2
15' metal players benches
300.00
$ 600.00
1
Park Sign w /Landscaping
750.00
$ 750.00
6
Foul Posts w/ Flags
110.00
$ 660.00
1
Picnic Table 16' Concrete 3 Piece
900.00
$ 900.00
1
450 linear ft Yellow Fence Cap
380.00
$ 380.00
1
Scoreboard Electronic - 2011
6,413.00
$ 6,413.00
3
Bleachers
1,700.00
$ 5,100.00
2
Concrete Block Dugouts
10,000.00
$ 20,000.00
1
Security Light (Connexus Owned)
-
$ -
1
Vehicle Parking Ordinance Sign
25.00
$ 25.00 '
1
Batting Cage 2 Place
2,500.00
$ 2,500.00
3
Recycle Bins
155.00
$ 465.00
EVELAND FIELDS EQUIPMENT TOTAL
$ 223,698.22
No Current Facilities § � Sustainable Landscaping & Trees 1 $ 1,000.00 a I
FUTURE EQUIPMENT TOTAL $ 1.000.00
1
GameTime Play Structure - 2012
22,565.37
$ 22,565.37
Future Park Expansion
$ 15,000.00 2027
Playground Structure
$ 47,000.00
1
Park Name Sign
454.57
$ 454.57
Irrigation System Expansion
$ 5,000.00 2042
Concrete Enclosure w /block Retaining Wall
$ 33,000.00
1
Concrete Picnic Table - 2 Leg
500.00
$ 500.00
1/2 basketball court
$ 15,000.00
REPLACEMENT ITEMS TOTAL:
$ 80,000.00
1
Four Place Swing Set
1,300.00
$ 1,300.00
Small Picnic Shelter w/ Picnic Table & grill
$ 10,000.00
Concrete Pad w /Handball Wall
$ 59,000.00
1
Park Bench - 6'
170.00
$ 170.00
FUTURE EQUIPMENT TOTAL
45 000.00
REPLACEMENT ITEMS TOTAL:
$ 237,000.00
1
Concrete Enclosure w /block Retaining Wall -2012
7,617.79
$ 7,617.79
1
Trash Can
155.00
$ 155.00
1
Irrigation System
1,500.00
$ 1,500.00
1
Sandbox with Digger
1,500.00
$ 1,500.00
1
Recycle Bin
155.00
$ 155.00
HICKORY MEADOWS EQUIPMENT TOTAL
35 917.73
1
Bluebird House
15.00
$ 15.00
Landscaping
$ 1,000.00 0 2018
Playground Structure
$ 64,000.00
1
Ice Rink
500.00
$ 500.00
Small Shelter w/ Picnic Table and grill
$ 10,000.00 2032
11 Place Asphalt Parking Lot w /Cement Curb
$ 97,000.00
1
Picnic Table
250.00
$ 250.00
112 Basketball Court
$ 15,000.00 2032
190' asphalt Trail
$ 17,000.00
1
Powerscape Structure - Medium /small - 2002
30,731.42
$ 30,731.42
FUTURE EQUIPMENT TOTAL
$ 26,000.00 2052
Concrete Pad w /Handball Wall
$ 59,000.00
1
ADA Access Pads
1,550.00
$ 1,550.00
REPLACEMENT ITEMS TOTAL:
$ 237,000.00
1
Six Place Swing Set WADA Swing and Access Pad
1,900.00
$ 1,900.00
1
Security Light (Connexus Owned)
-
$ -
2
Trash Cans
155.00
$ 310.00
C: \Users \j.grode \Desktop \Park Inventory - 2017 - Updated 10 -06 -2017
C:\Users\j.grode \Desktop \Park Inventory - 2017- Updated 10 -06 -2017
City of ANDOVER
Page 21 of 29
2017 Existing and Future Park Facilities Chart
QTY
DESCRIPTION (EXISTING)
UNIT PRICE
TOTAL PRICE
FUTURE FACILITIES
TOTAL PRICE
REPLACEMENT ITEMS
ESTIMATED COSTS
1
11 Place Asphalt Parking Lot w /Cement Curb - 2002
22,384.01
$
22,384.01
1
190' asphalt Trail
4,010.45
$
4,010.45
1
Soccer Goals - Jr. Set
1,025.06.
$
1,025.06
1
Park Name Sign w /Landscaping
900.00
$
900.00
1
Duck Spring Ride
450.00
$
450.00
1
Sign - Handicap Parking
25.00
$
25.00
1
Sign - Refurbished Park Sign
500.00
$
500.00
1
Sign - Tobacco Free Zone
24.00
$
24.00
1
Recycle Bin
155.00
$
155.00
2
CB2 Park Bench
220.00
$
440.00
1
Concrete Pad w /Handball Wall
5,088.96
$
5,088.96
1
Sidewalk and Concrete Edging
2,000.00
$
2,000.00
1
Wood fiber Surface
2,000.00
$
2,000.00
HIDDEN CREEK EAST EQUIPMENT TOTAL
74 258.90
1
Authorized Vehicle Sign w /Post
75.00
$
75.00.
Landscaping
$
1,000.00
Annual
Ballfield Maintenance: Regrade & Reseed
$
5,000.00
1
Aglime
4,000.00
$
4,000.00
New Outfield Fence (8) w/ Mow Strip (1 Field)
$
33,750.00
Annual
Ag Lime Material
$
1,000.00
2
Aluminum Bench - 15'
215.00
$
430.00
Bleachers w/ concrete Pad
$
7,500.00
2019
Playground Structure
$
52,000.00
1
Ball Field
3,000.00
$
3,000.00
ADA Access Trail (125' x $50.00 p /I /ft)
$
6,250.00
2034
Walking Path - Asphalt
$
78,500.00
1
Class -V Parking Lot - Medium
4,000.00
$
4,000.00
Pave Existing Parking Lot w/ concrete C & G
$
45,000.00
2034
Concrete Sidewalk Border w/Wood Chips
$
8,200.00
1
Four - Section Backstop
1,564.00
$
1,564.00
Irrigation System (2018)
$
50,000.00
2036
Fencing Backstop, Dugouts, Sidelines w /Concrete Mow Strips
$
29,000.00
1
Home Plate
60.00
$
60.00
FUTURE EQUIPMENT TOTAL
143 500.00
REPLACEMENT ITEMS TOTAL:
173 700.00
1
Pitching Rubber
45.00
$
45.00
1
Set of Three Bases
135.00
$
135.00
1
Steel Bollard Post
15.00
$
15.00
3
Trash Can
155.00
$
465.00
1
Walking Path -Asphalt -2004
18,150.00
$
18,150.00
1
Picnic Table
250.00
$
250.00
1
GameTime Play structure - 2004
24,804.71
$
24,804.71
2
Park Bench
250.00
$
500.00
1
Four Place Swing Set
1,600.00
$
1,600.00
1
Car Spring Toy
800.00
$
800.00
1
Clifford Spring Toy
525.00
$
525.00
1
Minibike Spring Toy
525.00 1
$
525.00
1
Concrete Sidewalk Borderw/Wood Chips -2004
3,100.00
$
3,100.00
1
Park Name Sign w /Landscaping
800.00
$
800.00
1
Retaining Wall for Sign
1,400.00
$
1,400.00
1
Sign - No Parking On Grass
25.00
$
25.00
1
Security Light (Connexus Owned)
-
-
2
Metal Bat Holders
25.00
50.00
1
Wood Duck House
22.50
22.50
1
Dog Pot Dispenser
80.00
80.00
1
Recycle Bin
155.00
155.00
L$77462.53
1
Fencing Backstop, Dugouts, Sidelines w /Concrete Mow Strips -2016
10,886.32
886.32
HILLS OF BUNKER LAKE WEST EQUIPMENT TOTAL
No Current Facilities
No Future Facilities Anticipated "
Imam= I
"Should Sell Property
C:\Users\j.grode \Desktop \Park Inventory - 2017- Updated 10 -06 -2017
City of AND OVER Page 22 of 29
2017 Existing and Future Park Facilities Chart
QTY
DESCRIPTION (EXISTING)
UNIT PRICE
TOTAL PRICE
FUTURE FACILITIES
TOTAL PRICE
REPLACEMENT ITEMS
ESTIMATED COSTS
No Current Facilities
Park Sign & Landscaping
$ 1,000.00
Security Light
$ 5,000.00
Playground Equipment ( 2 -5 & 5 -12 yr. old)
$ 60,000.00
Irrigation System
$ 50,000.00
Trails for ADA access (250' x $50.00 plf)
$ 12,500.00
FUTURE EQUIPMENT TOTAL
1 $ 128 500.00 .::.
1
Four Place Swing Set
1,300.00
$ 1,300.00 ,
. =aa{
Anticipated
No Future Facilities �i �
gi{y �€ -«
°� i'� l(,g �""*7r ,:.., =.
�4 Nsr* =. �ti
L d, � .�
2026
_
-i. � _i -+r.: F„-
rt"� .�'�...
�� t uc
Playground Structure
g� _
0
$ 46,000.00
1
60' Concrete Sidewalk
500.00
$ 500.00
2027
Skating Rink Repairs - Grading
$ 8,000.00
1
Frog Spring Ride
525.00
$ 525.00
2047
1/2 Basketball Court
$ 17,000.00
1
Park Bench CB2
220.00
$ 220.00
REPLACEMENT ITEMS TOTAL:
$ 71 000.00
1
Park Name Sign w /Landscaping
550.00
$ 550.00
1
Picnic Table (steel tube frame)
250.00
$ 250.00
1
Powerscape - Medium - 2011
22,194.00
$ 22,194.00
1
Sandbox with Digger
1,500.00
$ 1,500.00
1
Security Light (Connexus Owned)
-
$ -
1
1 Skating Rink
3,000.00
$ 3,000.00
1
Trash Can (square plastic)
155.00
$ 155.00
1
Recycle Bin
155.00
$ 155.00
1
Border - 37 lin. Ft. Magic Edging
260.00
$ 260.00
1
Toucan Sam Spring Ride
525.00
$ 525.00
1
Concrete Edging Play Structure
2,000.00
$ 2,000.00
1
Wood Fiber Surface
2,000.00
$ 2,000.00
1
Bat House
60.00
$ 60.00
_
2
Hockey Nets
300.00
$ 600.00
1
1/2 Basketball Court (2017)
8,000.00
$ 8,000.00
NORDEEN'S EQUIPMENT TOTAL
43 794.00
1
Park Bench
170.00
$ 170.00
Landscaping
$ 1,000.00 Annual
Field Maintenance: Regrade, Reseed, Irrigation
$ 5,000.00
1
Park Name Sign w /Landscaping
550.00
$ 550.00
1/2 Basketball Court
$ 15,000.00 2023
Playground Structure
$ 40,000.00
1
18 Space Asphalt Parking Lot - 2008
18,950.00
$ 18,950.00
Medium Shelter
$ 20,000.00 1 2023
160 cu yds Engineered Wood Fiber
$ 5,600.00
1
Picnic Table Concrete
200.00
$ 200.00
FUTURE EQUIPMENT TOTAL
$ 36 000.00 N 2038
18 Space Asphalt Parking Lot
$ 82,000.00
1
Powerscape Play Structure - 2008
19,222.49
$ 19,222.49
REPLACEMENT ITEMS TOTAL:
132 600.00
1
Four Place Swing Set
1,200.00
$ 1,200.00
1
Soccer Field
3,000.00
$ 3,000.00
1
Trash Can
155.00
$ 155.00
1
Recycle Bin
155.00
$ 155.00
1
Fence - 40' Split Rail
2,160.00
$ 2,160.00
2
Signs - Handicap Parking
25.00
$ 50.00
1
Security Light (Connexus Owned)
-
$ -
2
Saddle Mates
700.00
1 $ 1,400.00
1
73' linear ft 5' Sidewalk
550.00
$ 550.00
1
170 linear ft 12" Curb
400.00
$ 400.00
1
160 cu yds Engineered Wood Fiber
2,700.00
$ 2,700.00
1
36' linear ft Border magic Edging
260.00
$ 260.00
1
Soccer Goal Set Regulation
1,500.00
$ 1,500.00
1
Irrigation System
26,615.69
$ 26,615.69
OAK BLUFF EQUIPMENT TOTAL
79 238.18
C: \Users \j.grode \Desktop \Park Inventory - 2017 - Updated 10 -06 -2017
City of ANDOVER
2017 Existing and Future Park Facilities Chart
Page 23 of 29
QTY
DESCRIPTION (EXISTING)
UNIT PRICE
TOTAL PRICE
FUTURE FACILITIES
TOTAL PRICE
REPLACEMENT ITEMS
ESTIMATED COSTS
10
Bluebird House
15.00
$ 150.00
Landscaping around park sign
$ 1,000.00 1 Annual
Field Maintenance: Regrade, Reseed, Irrigation
$ 15,000.00
1
Class -V Parking Lot - Large
4,000.00
$ 4,000.00
Warming House Addition
$ 100,000.00 .Annual
Building Maintenance
$ 5,000.00
1
Class -V Parking Lot - Small
2,000.00
$ 2,000.00
Pave 1 Large and 1 Small Parking Lot
$ 150,000.00 W.-Annual
Lighting Maintenance
$ 3,000.00
1
Sliding Hill and Wildlife Pond
8,000.00
$ 8,000.00
Trail from North & East lots to East field (700'x 50 plo
$ 35,000.00 ,- 2020
Playground Structure
$ 45,000.00
1
Walking Path - Asphalt
4,000.00
$ 4,000.00 a
Pave Hockey Rink with Concrete Upgrade
$ 25,000.00 2020
Concrete Sidewalk Border w /woodchips
$ 7,900.00
1
Storage/Warming House /Restroom Building
91,000.00
$ 91,000.00
FUTURE EQUIPMENT TOTAL
311,00 2025
Landscape Wall around Park Sign
$ 10,000.00
1
Irrigation System
139,034.00
$ 139,034.00
2025
8'x 1 10' Chain link fence
$ 11,500.00
1
Landscape Wall
3,700.00
$ 3,700.00
2035
Scoreboards Electronic
$ 531 000.00
2
Soccer /Football Goal Sets
1,400.00
$ 2,800.00
2035
2 sets of 5 -row aluminum bleachers
$ 35,000.00
1
8'x 1 10' Chain link fence
4,200.00
$ 4,200.00
2035
Asphalt Base Hockey Rink & Fencing & Hockey Boards
$ 35,000.00
1
Shelter (wood frame, concrete pad)
8,459.00
$ 8,459,00
2035
Walking Path - Asphalt
$ 18,000.00
2
12' Concrete Bare Picnic Tables
325.00
$ 650.00
2035
Sliding Hill Repairs and Improve Wildlife Pond
$ 5,000.00
2
Authorized Vehicle Only Signs
25.00
$ 50.00
2035
Shelter (wood frame, concrete pad) - Replacement
$ 37,000.00
2
Removable Basketball Backboard Poles
1,100.00
$ 2,200.00
2035
Parking Lots Asphalt
$ 600,000.00
2
25' Net Poles (east soccer field)
200.00
$ 400.00
REPLACEMENT ITEMS TOTAL:
$ 880,400.00
2
Hockey Goals
300.00
$ 600.00
1
Parking Lots Asphalt
137,968.00
$ 137,968.00
3
Handicap No Parking Signs
25.00
$ 75.00
9
No Parking Signs
5.00
$ 225.00
15
Garbage Cans Plastic Style
5.00
$ 2,625.00
1
Over Flow Parking Sign
5.00
$ 25.00
2
Prairie Knoll Park Regulations Sign
5.00
N250.00
$ 250.00
2
Emergency Parking Only Sign
5.00
$ 50.00 .
2
8' Park Benches w /Pad
$ 500.00
1
Car Spring Ride
0.00
$ 800.00
1
Motorcycle Spring Ride
525.00
$ 525.00
1
Whale Spring Ride
525.00
$ 525.00
1
Four Place Swing Set w /Handicap Swing
1,800.00
$ 1,800.00
1
Concrete Sidewalk Border w /woodchips
3,800.00
$ 3,800.00
8
Benches inside Warming House
100.00
$ 800.00
4
Fire Extinguisher
55.00
$ 220.00
1
Metal Storage Cabinet
180.00
$ 180.00
1
Warming House Hours Sign
25.00
$ 25.00
2
Sign - Tobacco Free Zone
25.00
$ 50.00 .
8
Large Metal Poles & Lights Soccer Fields, Hockey & Sliding Hill
26,660.75
$ 213,286.01
1
Wood Duck House
40.00
$ 40.00
3
Private Property /No Trespassing Signs
25.00
$ 75.00
1
GameTime Play Structure - 2005
21,566.00
$ 21,566.00
2
Scoreboard Electronic
6,152.67
$ 12,305.33
1
120'x 60' Net
875.00
$ 875.00
2
12'x 26' Concrete Pads
1,300.00
$ 2,600.00
6
Security Light (Connexus Owned)
-
$ -
2
Grills - Charcoal
700.00
$ 1,400.00
2
Park Name Signs w /Landscaping
750.00
$ 1,500.00
1
60' Black Perforated Pipe
240.00
$ 240.00
1
4'x 150' Black Chainlink Fence
1,600.00
$ 1,600.00
2
5 -row aluminum bleachers
4,064.00
$ 8,128.00
1
1 Keylock Box
20.00
$ 20.00
1
Picnic Table
250.00
$ 250.00
1
Asphalt Base Hockey Rink & Fencing
12,015.00
$ 12,015.00
1
CO Detector
25.00
$ 25.00
1
Soccer Goal Set Juniors
900.00
$ 900.00
C:\Users\ .grode \Desktop\Park Inventory - 2017 - Updated 10 -06 -2017
City of ANDOVER
2017 Existing and Future Park Facilities Chart
Page 24 of 29
QTY
DESCRIPTION (EXISTING)
UNIT PRICE
TOTAL PRICE
FUTURE FACILITIES
TOTAL PRICE
REPLACEMENT ITEMS
ESTIMATED COSTS
2
Lacrosse Goal Sets
500.00
$ 1,000.00
FUTURE EQUIPMENT TOTAL
11'0 00.00 2037
Basketball Pad
$ 15,000.00
2
Trail Bollards
180.00
$ 360.00 F
2037
Walking Path - Asphalt
$ 42,000.00
4
Recycle Bins
155.00
$ 620.00
REPLACEMENT ITEMS TOTAL:
92 000.00
1
PRAIRIE KNOLL EQUIPMENT TOTAL
500.00
$ 700,491.34
No Current Facilities 1 11 1 Sustainable Landscaping & Trees
2
Basketball Goal and Net
475.00
$ 950.00
Landscaping
$ 1,000.00 2022
Playground Structure
$ 35,000.00
1
Basketball Pad - 2007
3,500.00
$ 3,500.00
FUTURE EQUIPMENT TOTAL
11'0 00.00 2037
Basketball Pad
$ 15,000.00
1
Four -Place Swing Set
1,300.00
$ 1,300.00
2037
Walking Path - Asphalt
$ 42,000.00
3
Park Bench
100.00
$ 300.00
REPLACEMENT ITEMS TOTAL:
92 000.00
1
Park Name Sign
500.00
$ 500.00
1
Pond
1,000.00
$ 1,000.00
1
Security Light (Connexus Owned)
-
$ -
1
Trash Can
155.00
$ 155.00
1
Walking Path - Asphalt - 2007
9,700.00
$ 9,700.00
1
Sign - Tobacco Free Zone
24.00
$ 24.00
1
PrimeTime Play Structure - 2007
16,475.54
$ 16,475.54
2
Saddle mates
700.00
$ 1,400.00
1
210' linear ft 4' sidewalk
1,300.00
$ 1,300.00
1
115 cu yds engineered wood fiber
2,200.00
1 $ 2,200.00
1135
ft. Border - Magic Edging w /landscaping
250.00
1 $ 250.00
1
Recycle Bin
155.00
$ 155.00
RED OAKS WEST EQUIPMENT TOTAL
39 209.54
No Current Facilities
No Future Facilities Anticipated
1
51 Space Asphalt Parking Lot w /Cement Curb - 2002
50,628.78
$ 50,628.78
Elm
Field Lights
$ 250,000.00 Annual
Ballfield Maintenance: Regrade, Reseed, Irrigation
$ 10,000.00
1
Basketball Pad -2002
3,000.00
$ 3,000.00
Medium Shelter w/ Picnic table (ball field area)
$ 20,000.00 JjAnnual
Ag Lime Material
$ 2,000.00
1
Basketball Post, Backboard, Net
600.00
$ 600.00
Raise Ballfield Fencing Height to 8' (2 Fields)
$ 30,000.00 11 2022
6 Section Backstop w /Overhang
$ 35,000.00
1
Sandbox - Small
400.00
$ 400.00
FUTURE EQUIPMENT TOTAL
300 000.00 2 2022
248'- 6' Cyclone Fence Dugout w /Concrete Pad/Mow Strip
$ 15,000.00
1
Car Spring Ride
625.00
$ 625.00
M 2022
208'- 4' Cyclone Sideline Fence w /Mow Strip
$ 9,000.00
1
ISecurity Light (Connexus Owned)
-
$ -
2022
802'- 8' Cyclone Outfield Fence w /Mow Strip
$ 30,000.00
1
180' Cyclone Fence Along Pond
2,160.00
$ 2,160.00
2032
Concrete Pad for Bleacher /Dugouts
$ 37,000.00
1
Four Place Swing Set WADA Swing
1,300.00
$ 1,300.00
2032
Park Sign w /Landscaping Keystone wall
$ 10,000.00
2
Baseball Fields
18,752.24
$ 37,504.48
2032
Playground Structure, Wood Chips and Border
$ 89,000.00
2
and Grass Infield
7,825.44
$ 15,650.88
2032
Aluminum Bleachers 5 Row
$ 35,000.00
2
Set 3 Bases
225.00
1 $ 450.00
2032
51 Space Asphalt Parking Lot w /Cement Curb
$ 220,000.00
2
Home Plates
75.00
$ 150.00
2032
Basketball Pad
$ 13,000.00
2
Pitching Rubbers
55.00
$ 110.00
REPLACEMENT ITEMS TOTAL:
505 000.00
2
6 Section Backstop w /Overhang - 2002
6,627.40
$ 13,254.80
1
248'- 6' Cyclone Fence Dugout w /Concrete Pad /Mow Strip - 2002
5,575.04
$ 5,575.04
1
208'- 4' Cyclone Sideline Fence w /Mow Strip - 2002
3,321.76
$ 3,321.76
1
802'- 8' Cyclone Outfield Fence w /Mow Strip - 2002
11,380.38
$ 11,380.38
1
Concrete Pad for Bleacher /Dugouts - 2002
13,930.00
$ 13,930.00
1
Park Sign w /Landsca in Keystone wall
3,600.00
$ 3,600.00
C: \Users \j.grode \Desktop \Park Inventory - 2017 - Updated 10 -06 -2017
City of ANDOVER
2017 Existing and Future Park Facilities Chart
Page 25 of 29
QTYJ
DESCRIPTION (EXISTING)
UNIT PRICE
TOTAL PRICE
FUTURE FACILITIES
TOTAL PRICE
REPLACEMENT ITEMS
ESTIMATED COSTS
1
Irrigation System - 2002
36,404.00
$ 36,404.00
Irrigation System
$ 50,000.00 2035
Hard Court - Basketball
$ 20,500.00
4
Aluminum 15' Players Bench
250.DD
$ 1,000.00
Dredge Pond
$ 5,000.00
REPLACEMENT ITEMS TOTAL:
$ 66,750.00
6
Trash Can
155.00
$ 930.00
FUTURE EQUIPMENT TOTAL
56,0
1
175' - 4' black vinyl fence
1,900.00
$ 1,900.00
1
1
Playground Equipment, Wood Chips and Border- 2017
Picnic Table Steel Frame
42,615.70
250.00
$ 42,615.70 u
$ 250.00
4
Foul Pole Flags
25.00
$ 100.00 e
1
Sign -Tobacco Free Zone
24.00
$ 24.00
1
Minibike Spring Toy
525.00
$ 525.00
5
Bluebird House
15.00
$ 75.00
2
Signs - No Parking
25.00
$ 50.00
2
Signs - Handicap Parking
25.00
$ 50.00
3
6' Park Benches
250.00
$ 750.00
2
8' Picnic Table Concrete legs
500.00
$ 1,000.00
1
300' Safety Fence Cap
175.00
$ 175.00
2
Aluminum Bleachers 5 Row - 2002
4,000.00
$ 8,000.00
2
Wood Duck Houses
40.00
$ 80.00
1
No Pepper Drills Sign
25.00
$ 25.00
6
Field Distance Signs
20.00
$ 120.00
2
Recycle Bins
155.00
$ 310.00
4
Metal Bat Holders
25.00
$ 100.00
SHADOWBROOK EAST EQUIPMENT TOTAL
258 124.82
No Current Facilities
No Future
1
Basketball Goal and Net
475.00
$ 475.00
Landscaping
$ 1,000.00 2020
Playground Structure
$ 46,250.00
1
Four -Place Swing Set
1,300.00
$ 1,300.00
Irrigation System
$ 50,000.00 2035
Hard Court - Basketball
$ 20,500.00
1
Hard Court - Basketball - 2005
4,755.55
$ 4,755.55
Dredge Pond
$ 5,000.00
REPLACEMENT ITEMS TOTAL:
$ 66,750.00
2
Park Bench
170.00
$ 340.00
FUTURE EQUIPMENT TOTAL
56,0
1
Park Name Sign
250.00
$ 250.00
1
Security Light (Connexus Owned)
-
$ -
1
Trash Can
155.00
$ 155.00
1
Recycle Bin
155.00
$ 155.00
1
Minibike Spring Ride
525.00
$ 525.00
1
Car Spring Ride
800.00
$ 800.00
1
Clifford Spring Ride
525.00
$ 525.00
1
Woodduck House
40.00
$ 40.00
1
Concrete Sidewalk Border w/ woodchips
330.00
$ 330.00
1
Sign - Tobacco Free Zone
24.00
$ 24.00
1
Sign - Adopt -A -Park
25.00
$ 25.00
1
GameTime Play Structure - 2005
22,253.46
$ 22,253.46
SHADY KNOLL EQUIPMENT TOTAL
31 953.01
1
GameTime Play Structure - 2010
44,594.56
$ 44,594.56
Future Park Expansion
$ 10,000.00 2025
Playground Structure, Sandbox w/ Digger
$ 96,000.00
1
20'x 20' Shelter w /Concrete -2010
15,569.00
$ 15,569.00
Irrigation System
$ 40,000.00 1 2040
120'x 20' Shelter w /Concrete
$ 67,000.00
1
1240'x 1'Con rete Curb
2,258.00
$ 2,258.00
FUTURE EQUIPMENT TOTAL
$ 50,000.00
REPLACEMENT ITEMS TOTAL:
$ 163,000.00
1
1 Saddlemate Ride
600.00
$ 600.00
C: \Users \j.grode \Desktop \Park Inventory - 2017 - Updated 10 -06 -2017
City of AND OVER
2017 Existing and Future Park Facilities Chart
Page 26 of 29
QTY
DESCRIPTION (EXISTING)
UNIT PRICE
TOTAL PRICE
FUTURE FACILITIES
TOTAL PRICE
REPLACEMENT ITEMS
ESTIMATED COSTS
1
Fire Spring Ride
700.00
Lighting of Parking lots (west and south)
$ 30,000.00 Annual
Facility Maintenance
$ 5,000.00
1
Four Place Swing Set
1,700.00
$ 23,160.00
Soccer Field Shelter (South End of Park)
$ 20,000.00 Annual
Ag Lime Material
$ 6,000.00
1
45' x 50' Asphalt Basketball Court
1,100.00
A$7
Small storage area for Associations
$ 75,000.00 ' Annual
Lighting Maintenance
$ 8,000.00
1
Adopt -A -Park Sign
25.00
$ 21,000.00
Playground Equipment ( 5 -12 yr. old)
$ 35,000.00 2018
Playground Structure (Medium Size Structure)
$ 46,300.00
1
Tobacco Free Sign
24.00
$ 5,000.00
Horseshoe Pit
$ 2,500.00 2018
Rock Walls
$ 7,800.00
1
Basketball Hoop System
425.00
$ 65,000.00
Scoreboard (North Soccer Field)
$ 10,000.00 2022
Park Name Sign
$ 20,000.00
1
Picnic Table - Child
300.00
Dugouts - 2 Small Ball Fields
$ 20,000.00 2025
Asphalt Parkin Lot - Large
$ 280,000.00
1
Picnic Table
500.00
$ 500.00
Trail to School (300'x $50.00 plf)
$ 15,000.00 2025
Asphalt Parking Lot - Small
$ 65,000.00
1
CB2 Frame Bench
220.00
$ 220.00
Raise Ballfield Fencing Height to 8' (6 Fields)
$ 90,000.00 2025
Asphalt Parking Lot w /Curb - 51 Spaces
$ 335,000.00
1
Park Name Sign w /Landscaping
550.00
$ 550.00
FUTURE EQUIPMENT TOTAL
$ 298 500.00 2025
4 Bleachers - Aluminum - Small
$ 85,000.00
1
Trash Can
155.00
$ 155.00
2025
4 Flag Poles
$ 27,000.00
1
Metal Park Bench
170.00
$ 170.00
2025
Large Aluminum Bleacher
$ 198,000.00
1
Book Box
100.00
$ 100.00
2030
Basketball Court
$ 15,000.00
1
Sandbox w /Digger
1,500.00
$ 1,500.00
2030
Sand Volleyball Court
$ 17,000.00
1
Recycle Bin
155.00
$ 155.00
2030
Scoreboards
$ 120,000.00
1
SOPHIES'S EQUIPMENT TOTAL
225.00
$ 70,645.56
2031
Skate Board Park
$ 120,000.00
1
2,290' Cyclone Outfield Fence- 10' High, two 10' Gates, Foul Poles -2014
29,770.00
$ 29,770.00
Landscaping
$ 1,000.00 Annual
Ballfield Maintenance: Regrade, Reseed, Irrigation
$ 45,000.00
2
1210'5' Cyclone Fence with Mow Strip -2014
4,620.00
$ 91240.00
Lighting of Parking lots (west and south)
$ 30,000.00 Annual
Facility Maintenance
$ 5,000.00
6
220' Infield Fence with Dugout and Concrete Pad -2014
3,860.00
$ 23,160.00
Soccer Field Shelter (South End of Park)
$ 20,000.00 Annual
Ag Lime Material
$ 6,000.00
2
350' Cyclone Outfield Fence - 10' with Foul Poles - 2014
5,250.00
$ 10,500.00
Small storage area for Associations
$ 75,000.00 ' Annual
Lighting Maintenance
$ 8,000.00
6
Infields
3,500.00
$ 21,000.00
Playground Equipment ( 5 -12 yr. old)
$ 35,000.00 2018
Playground Structure (Medium Size Structure)
$ 46,300.00
1
Warning Track
5,000.00
$ 5,000.00
Horseshoe Pit
$ 2,500.00 2018
Rock Walls
$ 7,800.00
1
Asphalt Parking Lot - Large -1995
65,000.00
$ 65,000.00
Scoreboard (North Soccer Field)
$ 10,000.00 2022
Park Name Sign
$ 20,000.00
1
Asphalt Parking Lot - Small -1995
15,000.00
$ 15,000.00
Dugouts - 2 Small Ball Fields
$ 20,000.00 2025
Asphalt Parkin Lot - Large
$ 280,000.00
1
Asphalt Parking Lot w /Curb - 51 Spaces -1995
77,869.06
$ 77,869.06.
Trail to School (300'x $50.00 plf)
$ 15,000.00 2025
Asphalt Parking Lot - Small
$ 65,000.00
1
Athletic/Concession Building with Restrooms - 1995
215,412.00
1 $ 215,412.00
Raise Ballfield Fencing Height to 8' (6 Fields)
$ 90,000.00 2025
Asphalt Parking Lot w /Curb - 51 Spaces
$ 335,000.00
6
Ballfields with Irrigation - 2001
6,000.00
$ 36,000.00
FUTURE EQUIPMENT TOTAL
$ 298 500.00 2025
4 Bleachers - Aluminum - Small
$ 85,000.00
1
Basketball Court
3,500.00
$ 3,500.00
2025
4 Flag Poles
$ 27,000.00
2
Basketball Goal, Post and Net
475.00
$ 950.00
2025
Large Aluminum Bleacher
$ 198,000.00
12
Bat Holders
25.00
$ 300.00
2030
Basketball Court
$ 15,000.00
7
Bench - Concrete
160.00
$ 1,120.00
2030
Sand Volleyball Court
$ 17,000.00
3
Bench with Sunshine Logo on Back -Concrete
675.00
$ 2,025.00
2030
Scoreboards
$ 120,000.00
1
Bike Rack w /Concrete Pad
225.00
$ 225.00
2031
Skate Board Park
$ 120,000.00
4
Bleachers - Aluminum - Small
8,000.00
$ 32,000.00
2031
Shelter, Hexagonal - Skate Park
$ 50,000.00
1
Block Flag Pole Base
650.00
$ 650.00
2032
North Parking Lot Lights
$ 97,000.00
15
Bluebird Houses
10.00
$ 150.00
2032
West Parking Lot Lights
$ 70,000.00
4
Concrete Pads for Soccer Bleachers
1,650.00
$ 6,600.00
2032
Dugout shelters
$ 96,000.00
6
Concrete Pads for Large Bleachers
600.00
$ 3,600.00
2034
2,290' Cyclone Outfield Fence-10' High, two 10' Gates, Foul Poles
$ 79,000.00
1
Cyclone Fence 150' -5' Black Coated
1,800.00
$ 1,800.00
2034
210' 5' Cyclone Fence with Mow Strip
$ 25,000.00
1
150'- 4' black vinyl fence
1,650.00
$ 1,650.00
2034
220' Infield Fence with Dugout and Concrete Pad
$ 62,000.00
1
19'- 8' brown vinyl fence w/ 8' gate w/ strips
1,000.00
$ 1,000.00
2034
350' Cyclone Outfield Fence -10' wfth Foul Poles
$ 28,000.00
6
Double First Base
125.00
$ 750.00
2035
Walking Path - Asphalt
$ 63,000.00
6
Field Number Sign
20.00
$ 120.00
2046
Shelter /Gazebo
$ 1,200,000.00
4
Flag Pole - 1995
2,500.00
$ 10,000.00
REPLACEMENT ITEMS TOTAL:
3,170,100.00
1
Flag - American
75.00
$ 75.00
1
Flag - Sunshine Park
250.00
$ 250.00
1
Flag - Minnesota State
75.00
$ 75.00
12
Foul Pole Flags
22.00
$ 264.00
6
Four - Section Backstop with Four - Section Overhang
1,900.00
$ 11,400.00
2
Grills w /Block Base
1,300.00
$ 2,600.00
C: \Users\.grode \Desktop \Park Inventory -2017- Updated 10 -06 -2017
City of AND OVER
2017 Existing and Future Park Facilities Chart
Page 27 of 29
QTY
DESCRIPTION (EXISTING)
UNIT PRICE
TOTAL PRICE
FUTURE FACILITIES
TOTAL PRICE
REPLACEMENT ITEMS
ESTIMATED COSTS
6
Home Plate
60.00
$ 360.00
6
Large Aluminum Bleacher
12,500.00
$ 75,000.00
34
Large Plastic Garbage Can
155.00
$ 5,270.00
1
Monument - Concrete
350.00
$ 350.00
2
No Golfing Sign
20.00
$ 40.00
3
No Motorized Vehicle Sign
20.00
$ 60.00
1
Irrigation System - 1995
120,000.00
$ 120,000.00
2
No Pets Sign
20.00
$ 40.00
3
Park Regulations Sign
75.00
$ 225.00
6
Park Bench
100.00
$ 600.00
10
Pitching Rubber
45.00
$ 450.00
3
Planters - Concrete - Round
125.00
$ 375.00
1
Plastic Protective Cover for Cyclone Fencing -780'
468.00
$ 468.00
12
Players Bench
100.00
$ 1,200.00
8
Players Bench - 8'
250.00
$ 2,000.00
6
Pop -out Base Sets (2)
200.00
$ 1,200.00
1
Sand Volleyball Court with Timbers - 2000
4,000.00
$ 4,000.00
4
Security Light (Connexus Owned)
-
$ -
3
Soccer Fields -1995
8,000.00
$ 24,000.00
4
Soccer Goals - Regulation
1,690.00
$ 6,760.00
1
Soccer /Football Goals
2,200.00
$ 2,200.00
3
Steel Bollard Post
60.00
$ 180.00
4
Table / Bench - Concrete
195.00
$ 780.00
8
Trash Containers - Plastic - Small
55.00
$ 440.00
1
Volleyball Net
65.00
$ 65.00
1
Volleyball Post - Set
125.00
$ 125.00
1
Walking Path - Asphalt Expanded -2005
14,500.00
$ 14,500.00
1
Shelter, Message Board, Table - 1996
110,400.00
$ 110,400.00
1
Trash Containers
140.00
$ 140.00
16
Recycle Bins
155.00
$ 2,480.00
1
Park Name Sign - 2002
7,400.00
$ 7,400.00
1
Rock Walls - 2000
3,800.00
$ 3,800.00
1
Small Play Structure - 2000
4,500.00
$ 4,500.00
1
Shelter, Hexagonal (Skate Park) - 2011
18,006.55
$ 18,006.55
1
Lighting of Soccer fields - 2003
223,225.00
$ 223,225.00
9
1 Handicap Parking Lot Signs
25.00
$ 225.00
1
Lighting of Ballfields - 2004
282,305.66
$ 282,305.66
6
12' Concrete picnic tables
500.00
$ 3,000.00
9
Security Lights on Buildings
200.00
$ 1,800.00
1
City of Andover Flag
80.00
$ 80.00
1
Skate Board Park -2011
44,863.00
$ 44,863.00
1
Storage Container
2,400.00
1 $ 2,400.00
1
Fencing around well w /Concrete Pad
600.00
$ 600.00
2
Concrete Pads for Toilets
250.00
$ 500.00
1
Four Place Swing
1,800.00
$ 1,800.00
2
Saddlemates
350.00
$ 700.00
1
Backhoe Digger
400.00
$ 400.00
1
360'x 1' Concrete Curb
1,500.00
$ 1,500.00
1
Irrigation Well - 2009
83,377.40
$ 83,377.40
8
Scoreboards - 2010
51664.81
$ 45,318.47
1
North Parking Lot Lights - 2012
36,480.00
$ 36,480.00
1
West Parking Lot Lights -2012
26,337311
$ 26,337.31
C: \Users\.grode \Desktop \Park Inventory -2017- Updated 10 -06 -2017
City of ANDOVER
2017 Existing and Future Park Facilities Chart
Page 28 of 29
QTY
DESCRIPTION (EXISTING)
UNIT PRICE
TOTAL PRICE
FUTURE FACILITIES
TOTAL PRICE
REPLACEMENT ITEMS
ESTIMATED COSTS
12
Dugout Shelters - 2002
3,000.00
$ 36,000.00
2030
New Hockey Rink
$ 75,000.00
1
95' 5' Cyclone Fence w /Mow Strip
1,000.00
$ 1,000.00
2030
Rink Lights
$ 73,000.00
1
SUNSHINE PARK EQUIPMENT TOTAL
1,800.00
1 788 381.45
REPLACEMENT ITEMS TOTAL:
149 000.00
mm�my.{
9T7a0
y�....,m.,. _z... .��
-R6, iK = °�T "-�'r °['
No Current Facilities
Lv
'., ' ,
i y. iF5 Wrw
q ,. 9
k3
.cAfc.A P.pp-
9 v � ��' '.. -r
a�. 3�✓M I
PREMIUM
No Future Facilities Anticipated
eC u5 cL =s i dl+y.i.
°i ,'-' �+- .- Flu
x xvi.n., v . =-2 n�v=r=<'-€'ztin.^G'. -.
1
�iCt`I STfkiE 9m, M-Ntm
GameTime Play Structure - 2006
Elms
12,593.63
11
$ 12,593.63
n
MEMMMIUMN-
Landscaping
$ 1,000.00 Annual
Irrigation System Maintenance
$ 1,000.00
1
CB2 Frames
219.52
$ 219.52
FUTURE EQUIPMENT TOTAL
$ 1,000.00 2021
Playground Structure
$ 26,200.00
1
Tobacco Free Sign
24.00
$ 24.00:
REPLACEMENT ITEMS TOTAL:
$ 27,200.00
1
Trash Can
155.00
$ 155.00
1
GameTime 4 Place Single Post Swing set
1,800.00
$ 1,800.00
1
5'x 46' Concrete Sidewalk
350.00
$ 350.00 ,
1
Park Name Sign w /Landscaping
550.00
$ 550.00
1
170' Boarder Magic Edging
1,207.00
$ 1,207.00
1
Irrigation System -2012
5,299.06
$ 5,299.06
1
Handicap Swing
450.00
$ 450.00
1
Recycle Bin
155.00
$ 155.00
1
WOODLAND ESTATES EQUIPMENT TOTAL
15.00
$ 22 803.21
2
Hockey Goals
250.00
$ 500.00
No Future Facilities Anticipated
Annual
Facility Maintenance
$ 1,000.00
4
Security Light on Building
300.00
$ 1,200.00.
2030
New Hockey Rink
$ 75,000.00
1
Skating Rink
1,000.00
$ 1,000.00
2030
Rink Lights
$ 73,000.00
1
90' Sidewalk
1,800.00
$ 1,800.00
REPLACEMENT ITEMS TOTAL:
149 000.00
2
Trash Can
155.00
$ 310.00
1
Warming House
15,000.00
$ 15,000.00
10
Warming House Bench
25.00
$ 250.00
1
Warming House Heater
975.00
$ 975.00
1
Warming House Open / Close Sign
80.00
$ 80.00
1
Tobacco Free Sign
24.00
$ 24.00
1
Rink & Warming House Hours Sign
25.00
$ 25.00
1
Desk
50.00
$ 50.00
2
Fire Extinguisher
25.00
$ 50.00
1
CO Alarm /Detector Warming House
25.00
$ 25.00
1
Smoke Detector Warming House
25.00
$ 25.00
2
Chair Warming House
25.00
$ 50.00
1
Clock Warming House
15.00
$ 15.00
1
Key Code Box
20.00
$ 20.00
1
New Hockey Rink
17,440.46
$ 17,440.46
1
Rink Lights
16,879.56
$ 16,879.56
CROOKED LAKE HOCKEY RINK EQUIPMENT TOTAL
$ ss 719.02
Park
FUTURE EQUIPMENT
C: \Users \j.grode \Desktop \Park Inventory - 2017 - Updated 10 -06 -2017
City of ANDOVER
2017 Existing and Future Park Facilities Chart
Page 29 of 29
QTY
DESCRIPTION (EXISTING)
UNIT PRICE
TOTAL PRICE
FUTURE FACILITIES
TOTAL PRICE
REPLACEMENT ITEMS
ESTIMATED COSTS
Future Community Play Field Area
$
2,000,000.00
FUTURE EQUIPMENT TOTAL
2 000 000.00
7
Park Equipment Total
$
10,175,827.22
Future Park Equipment Total
$
12,568,220.00
Design /Administration Fee (30% of Project Cost)
$
3,052,748.17
Design /Administration Fee (30% of Project Cost)
$
3,770,466.00
PARK EQUIPMENT GRAND TOTAL
$
13,228,575.39
FUTURE PARK EQUIPMENT GRAND TOTAL
$
16,338,686.00
REPLACEMENT ITEMS GRAND TOTAL:
$ 14,669,914.00
C: \Users \j.grode \Desktop \Park Inventory - 2017- Updated 10 -06 -2017
14' _.. N D 06 VWE
1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755 -5100
FAX (763) 755 -8923 • WWW.ANDOVERMN.GOV
TO: Mayor and City Council
CC: Jim Dickinson, City Administratc
David D. Berkowitz, Director of
Park and Recreation Commission
Works /City Engineer,
FROM: Todd J. Haas, Assistant Public Works Director
SUBJECT: 2B. Review of the Park Replacement List for 2018 -2022
DATE: October 24, 2017
INTRODUCTION
The City Council is requested to review the Park Replacement List for 2018 -2022.
DISCUSSION
Attached is the proposed 2018 -2022 Park Replacement List that has been prepared by Public
Works staff. As you can see by the list the replacement costs vary from year to year depending on
items that need to be replaced in that specific year.
Staff has discussed the replacement items in the past with the City Council and Park Commission
but not in detail that is being presented. Staff has been able to update what is currently in the park
system and put together a replacement plan for the next 5 years. The current funding for
playground equipment replacements and upgrades is at $50,000 a year. In the past few years that
funding has been enough to replace one playground structure but not enough to replace two.
Based on the industry standard of commercial playground equipment they should be replaced
about every 15 years or so. With having a total of 45 existing playground structures to maintain
or need to be replaced, the City should be replacing 3 playground structures a year to keep up
with the industry standard.
As far as the other items identified on the replacement list, the current funding that is available to
help replace some of the bigger ticket items (for example fencing replacements) is $35,000.
There is also another fund of $15,000 that is utilized for smaller ticket items that are need of
repair or replacement. Based on the current funding that is being allocated to the park
replacement fund, the City will not be able to sustain a replacement schedule to keep up with the
need and will continually fall behind. The Park and Recreation Commission has been briefed on
this by staff and they felt that this was important enough to discuss with the City Council.
An option of phasing out certain playground structures in smaller parks located in rural areas
should be considered and will be discussed at the meeting.
ACTION REQUIRED
The City Council is requested to discuss 2018 -2022 Park Playground Equipment Replacement
Plan and provide direction on how to proceed.
Respectfully submitted,
Todd J. Haas
Attachments: Proposed 2018 -2022 CIP Park Playground Equipment Replacement Plan; Article
on Playground Equipment Life Expectancy
• 5 diameter steel posts
Past
• 48" deck grids Projec
$Mentu &� series for limited space and budgets:
-Lw (httpsJ /korkat.com /cart/)
• 3.5" diameter steel posts
• 36" deck grids
• 24" plastic tubes
Recycled plastic product line
• Made from recycled plastic milk jug material
• Similar to Expedition products in dimensions
• 5" square plastic posts
.>
HOW LONG WILL MY PLAYGROUND EQUIPMENT LAST?
Warranties vary by manufacturer, and byproduct type. However, the standard life
expectancy of a commercial playground is 15 years. Although Playland offers the
industries best warranty, you'll want a partner that's committed to maintaining
your equipment for it's lifetime. We will prolong that as well as keep it fully -
functional with our regularly scheduled inspections and service calls available.
DO YOU OFFER FUNDRAISING SUPPORT OR PLAYGROUND
GRANTS?
We have one of the most extensive playground equipment grant lists in the
industry. If you're in the early planning phases, there are a myriad of resources
including fundraising ideas & grants on our KorKat blog page
(http: / /korkat.com /category/playground - planning /): Our goal is to help YOU best
apply the funds within your existing budget, and take full advantage of your
existing resources. If you haven't already done so, you can download your free Big
Book of Playground Grants here (http: / /korkat.com /playground- grantsl)
I. .YII^,* -::<c & f," 6J -1 La 11 53, - -6 z w S"_ePJ 3sit. Z ,v .... O ,.,., ...s..
PLAYGROUND PLANNING- HOW DO YOU MANAGE OUR
PLAYGROUND PROJECT?
T Q Search the Site .
Park Replacement List 2018 -2022
Year
Replacement Items
Estimates costs
Location
2018
Replace Medium Shelter and Concrete Pad
$
30,000.00
Hawkridge
2018
Playground Structure
$
42,000.00
Pine Hills South
2018
Playground Structure
$
11,000.00
138th Ave
2018
Shelter with Concrete Pad - Large
$
25,000.00
Rose
2018
Shelter
$
18,000.00
Strootman
2018
Playground Structure
$
44,100.00
Strootman
2018
Sandboxw /Concrete Walk and Retaining Wall
$
9,000.00
Terrace
2018
ADA Pads to Powerscape Units
$
14,400.00
Terrace
2018
Playground Structure
$
44,100.00
Terrace
2018
Playground Structure - 5 -12
$
41,000.00
Wild Iris
2018
Playground Structure - Playsense - 2 to 5
$
33,000.00
Wild Iris
2018
Wood Chip Fall Zone
$
13,800.00
Wild Iris
2018
Playground Structure - 1 Large`
$
100,000.00
City Campus #1 1Purple
2018
Sandbox w/ Digger
$
5,000.00
City Campus #1 /Purple
2018
Playground Structure
$
64,000.00
Hidden Creek East
2018
Playground Structure (Medium Size Structure)
$
46,300.00
Sunshine
2018
Rock Walls
$
7,800.00
Sunshine
2018 Replacement/Repair Total:
$
548,500.00
Year
Replacement Items
Estimated Costs
Location
2019
Replace Playground Structure w/ Larger One
$
46,300.00
Hawkridge
2019
Border Magic Edging w /Fiber Chip Fall Zone
$
10,900.00
Hawkridge
2019
Playground Structure
$
30,000.00
Rose
2019
150 cu yds Engineered Wood Fiber
$
5,500.00
Rose
2019
Playground Structure
$
52,000.00
Hills of Bunker West
Hidden Creek North
2019 Replacement/Repair Total:
$
144 700.00
45,000.00
Year
Replacement Items
Estimated
Costs
Location
2020
Playground Structure - Medium
$
64,000.00
Country Oaks
2020
Playground Surface Wood Fiber
$
6,250.00
Country Oaks
2020
Concrete Curbing & sidewalk
$
30,000.00
Country Oaks
2020
Playground Structure
$
48,600.00
Hidden Creek North
2020
Wood Chips
$
13,000.00
Hidden Creek North
2020
Playground Structure
$
45,000.00
Prairie Knoll
2020
Concrete Sidewalk Border w /woodchips
$
7,900.00
Prairie Knoll
2020
Playground Structure
$
46,250.00
Shady Knoll
2020 Replacement/Repair Total:
$
261 000.00
Year
Replacement Items
Estimated
Costs
Location
2021
Playground Structure
$
55,000.00
Fox Meadows
2021
Playground Structure
$
56,500.00
Oakview
2021
200 cu yds Engineered Wood Fiber
$
7,500.00
Oakview
2021
Playground Structure
$
44,000.00
Hidden Creek South
2021
Engineered Wood Fiber
$
7,100.00
Hidden Creek South
2021
Playground Structure
$
26,200.00
Woodland Estates
2021 Replacement/Repair Total:
$
196 300.00
Page 1
Park Replacement List 2018 -2022
2022
Walking Path - Asphalt
$ 70,000.00
Timber Rivers
2022
Shelter - Medium with Concrete Pad
$ 30,000.00
Forest Meadows
2022
128'- 6' Fence w/Mow Strip
$ 13,800.00
Hidden Creek North
2022
160'- 4' Sideline Fence w /Mow, Strip
$ 7,000.00
Hidden Creek North
2022
480'- 8' Outfield Fence w /Mow Strip
$ 32,300.00
Hidden Creek North
2022
Soccer Goals - Regulation Set
$ 8,000.00
Hidden Creek North
2022
Six Section Backstop w/ Dugouts Cement
$ 25,800.00
Wild Iris
2022
124' Six foot Fence wl mow strip
$ 8,000.00
Wild Iris
2022
364' Eight foot Outfield Fence w/ Mow Strip
$ 14,600.00
Wild Iris
2022
Playground Structure
$ 49,000.00
Creekview Crossing
2022
180 cu yds Engineered Wood Fiber
$ 7,500.00
Creekview Crossing
2022
380'- 8' Fence along property line
$ 10,200.00
Eveland Fields
2022
900'- 6' Fence along property line
$ 20,000.00
Eveland Fields
2022
300'- 4' ballfield fence w/ mow strips
$ 15,000.00
Eveland Fields
2022
384'- 6' ballfield fence wl mow strips
$ 28,000..00
Eveland Fields
2022
1,146'- 8' ballfield fence w/ mow strips - All Fields
$ 63,000.00
Eveland Fields
2022
Backstop Six Section
$ 32,000.00
Eveland Fields
2022
Batting Cage 2 Place
$ 6,700.00
Eveland Fields
2022
Playground Structure
$ 35,000.00
Red Oaks West
2022
6 Section Backstop w /Overhang
$ 35,000.00
Shadowbrook East
2022
248'- 6' Cyclone Fence Dugout w /Concrete Pad /Mow Strip
$ 15,000.00
Shadowbrook East
2022
208'- 4' Cyclone Sideline Fence w /Mow Strip
$ 9,000.00
Shadowbrook East
2022
802'- 8' Cyclone Outfield Fence w /Mow Strip
$ 30,000.00
Shadowbrook East
2022
Park Name Sign
$ 20,000.00
Sunshine
2022 Replacement/Repair Total:
$ 584 900.00
Page 2
Park Replacement List 2018 -2022
Year Replacement Items
Estimated Costs
Location
Annual Ag Lime Material
$
1,000.00
Lund's North
Annual Ag Lime Material
$
1,000.00
Pine Hills South
Annual Ag Lime Material
$
1,000.00
Timber Trails
Annual Ag Lime Material
$
1,000.00
Hidden Creek North
Annual Ag Lime Material
$
1,000.00
Northwoods East
Annual Ag Lime Material
$
2,000.00
Rose
Annual Ag Lime Material
$
1,000.00
Strootman
Annual Ag Lime Material
$
1,000.00
Terrace
Annual Ag Lime Material
$
1,000.00
Wild Iris
Annual Ag Lime Material
$
1,000.00
Andover Lions
Annual Ag Lime Material
$
3,000.00
ASN
Annual Ag Lime Material
$
1,000.00
City Campus #1 /Purple
Annual Ag Lime Material
$
3,000.00
Eveland Fields
Annual Ag Lime Material
$
1,000.00
Hills of Bunker West
Annual Ag Lime Material
$
2,000.00
Shadowbrook East
Annual Ag Lime Material
$
6,000.00
Sunshine
Annual Ballfeld Maintenance: Regrade & Reseed
$
5,000.00
Northwoods East
Annual Ballfield Maintenance: Regrade & Reseed
$
5,000.00
Strootman
Annual Ballfield Maintenance: Regrade & Reseed
$
5,000.00
Wild Iris
Annual Ballfield Maintenance: Regrade & Reseed
$
5,000.00
Hills of Bunker West
Annual Ballfield Maintenance: Regrade & Reseed
$
5,000.00
Lund's North
Annual Ballfield Maintenance: Regrade, Reseed, Irrigation
$
5,000.00
Pine Hills South
Annual Ballfield Maintenance: Regrade, Reseed, Irrigation
$
10,000.00
Rose
Annual Ballfield Maintenance: Regrade, Reseed, Irrigation
$
5,000.00
Terrace
Annual Ballfield Maintenance: Regrade, Reseed, Irrigation
$
5,000.00
Andover Lions
Annual Ballfield Maintenance: Regrade, Reseed, Irrigation
$
15,000.00
ASN
Annual Ballfield Maintenance: Regrade, Reseed, Irrigation
$
10,000.00
Shadowbrook East
Annual Ballfield Maintenance: Regrade, Reseed, Irrigation
$
45,000.00
Sunshine
Annual Facility Maintenance
$
5,000.00
Prairie Knoll
Annual Facility Maintenance
$
5,000.00
ASN
Annual Facility Maintenance
$
5,000.00
City Campus Hockey
Annual Facility Maintenance
$
5,000.00
Sunshine
Annual Facility Maintenance
$
1,000.00
Crooked Lake Hockey
Annual Field Maintenance: Regrade, Reseed (Non- Irrigated)
$
4,000.00
Northwoods West
Annual Field Maintenance: Regrade, Reseed (Non- Irrigated)
$
4,000.00
Timber Rivers
Annual Field Maintenance: Regrade, Reseed, Irrigation
$
10,000.00
Fox Meadows
Annual Field Maintenance: Regrade, Reseed, Irrigation
$
15,000.00
Hawkridge
Annual Field Maintenance: Regrade, Reseed, Irrigation
$
10,000.00
Timber Trails
Annual Field Maintenance: Regrade, Reseed, Irrigation
$
15,000.00
Pine Hills North
Annual Field Maintenance: Regrade, Reseed, Irrigation
$
10,000.00
Hidden Creek North
Annual Field Maintenance: Regrade, Reseed, Irrigation
$
10,000.00
City Campus #1 /Purple
Annual Field Maintenance: Regrade, Reseed, Irrigation
$
15,000.00
Eveland Fields
Annual Field Maintenance: Regrade, Reseed, Irrigation
$
5,000.00
Oak Bluff
Annual Field Maintenance: Regrade, Reseed, Irrigation
$
15,000.00
Prairie Knoll
Annual Irrigation System Maintenance
$
1,000.00
Woodland Estates
Annual Lighting Maintenance
$
3,000.00
Prairie Knoll
Annual Lighting Maintenance
$
8,000.00
Sunshine
Annual Lighting Maintenance
$
3,000.00
Pine Hills North
Annual Lighting Maintenance
$
2,000.00
City Campus Hockey
Annual Lighting: Maintenance ( 2 Fields and Sliding Hill)
$
3,000.00
ASN
Annual Parking Lot Class V - Add material as needed
$
5,000.00
City Campus Hockey
Annual Parking Lot Repairs (Class V Gravel)
$
1,000.00
Round Lake B.L.
Page 3
Qt
-9kC I T Y O F
NDOVER4171t6
1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755 -5100
FAX (763) 755 -8923 • WWW.ANDOVERMN.GOV
TO: Mayor and Council Members
CC: Jim Dickinson, City Administrator
David D. Berkowitz, City Engine it for of Public Works `1
Park and Recreation Commission M b rs
FROM: Todd J. Haas, Assistant Public Works Director/Parks Coordinator
SUBJECT: 2C. Update of the 2018 -2022 CIP for Parks - Engineering
DATE: October 24, 2017
INTRODUCTION
This an update in regards to the 2018 -2022 CIP for Parks that has been recommended by the Park and
Recreation Commission.
DISCUSSION
Listed below are the projects that have been identified by the Park and Recreation Commission over
the next 5 years:
2018
• Small irrigation project - $25,000 (this fund will be used to install the irrigation systems for Wild Iris
Park and Hills of Bunker Lake West Park).
• Annual Misc. Projects - $15,000
2019
• Small irri-ap tion project -$20,000
• Annual Misc. Projects - $15,000
2020
• Pine Hills North/Parking lot with curb - $120,000 Note: The estimated cost to pave and curb the is
$400,000. The remaining cost of $280,000 would be funded from the Capital Equipment Reserve.
• Annual Misc. Projects - $15,000
2021
• Annual Misc. Projects - $15,000
2022
• Annual Misc. Projects - $15,000
Attached is the Park Improvement Projected Fund Balance spreadsheet for your review identifying
projects listed above. The Park and Recreation Commission would begin preparing the 2019 -2023 CIP
in the spring of 2018. Some of the projects listed above may change which may also include new
projects once the Commission has a better idea of funds available once the projects (for example Fox
Meadows Park) that were done in 2017 are completed and the bills have been paid.
ACTION REQUIRED
This is for informational only and no action is required.
Respectfully submitted,
Todd J. Haas
Attachment: Proposed 2018 -2022 CIP Park Improvements
Projected Sources of Revenue
Park Dedication Fee - Residential Units
Park Dedication Fee - Residential ($3,038 /unit)
Park Dedication Fee - Commercial
Interest
Miscellaneous
Donation / Contribution
Capital Projects Levy - Park Improvements
Total Revenues Available
Projected Commitments
Rose Park - tower rental fee
Lions Park - Irrigation
Kelsey Round Lake Park - Master Plan
Timber Trails Park - Renovation
Terrace Park - Irrigation & Water Service
Sunshine Park - Scoreboard Wiring & Design
Maple View Park
Irrigation Project - Small
Nordeen's Park - Basketball court
Fox Meadows- Reconstruction
Pine Hills North - Phase II
Storage Building (Donations)
Parking Lot w/ Curb (30% Park Dedication)
Annual Miscellaneous Projects
Total Commitments
Revenues Over (Under) Expenditures
CITY OF ANDOVER
Park Improvement Fund
Projected Fund Balance
2016
2017
2018
2019
2020
2021
2022
TOTALS
50
25
25
25
25
25
$ 431,784
$ 151,900
$ 75,950
$ 75,950
$ 75,950
$ 75,950
$ 75,950
$ 963,434
3,039
3,039
11,319
-
11,319
8,490
100,000
-
_
_
_
_
108,490
15,253
15,000
15,000
15,000
15,000
15,000
15,000
105,253
469,885
266,900
90,950
90,950
90,950
90,950
90,950
1,191,535
13,173
13,173
17,042
17,042
7,434
7,434
274,457
274,457
22,761
22,761
25,092
25,092
95,946
95,946
20,000
25,000
20,000
65,000
7,500
7,500
457,300
457,300
100,000
1 D0,000
120,000
120,000
8,169
15,000
15,000
15,000
15,000
15,000
15,000
98,169
433,859
630,015
40,000
35,000
135,000
15,000
15,000
1,303,874
36,026
(363,115)
50,950
55,950
(44,050)
75,950
75,960
Fund Balance as of December 31, 2015 376,632
Fund Balance Brought Forward 412,658 49,543 100,493 156,443 112,393 188,343
Ending Fund Balance *' $ 412,658 $ 49,643 $ 100,493 $ 156,443 $ 112,393 $ 188,343 $ 264,293
"*Target - $50,000 to create a contingency for any project overages.
WA ^16W 10
i F
NDOVER
1685 CROSSTOWN BOULEVARD N.W. , ANDOVER, MINNESOTA 55304 , (763) 755 -5100
FAX (763) 755 -8923 • WWW.ANDOVERMN.GOV
TO: Mayor and City Council
CC: Jim Dickinson, City Administrat
David D. Berkowitz, Director of is Works /City EngineerM5
Park and Recreation Commission mbers
FROM: Todd J. Haas, Assistant Public Works Director
SUBJECT: 2D. Update on the 2018 -2022 Park Playground Equipment Replacement Plan
DATE: October 24, 2017
INTRODUCTION
This an update in regard to the 2018 -2022 CIP for Parks that has been recommended by the Park
and Recreation Commission.
DISCUSSION
Below are the proposed structures that are being recommended to be replaced as part of the CIP.
• 2018 — Pine Hills South Park and Terrace Park or Strootman Park
• 2019 — Purple Park (City Hall) and Terrace Park or Strootman Park
• 2020 — Hawkridge Park and Sunshine Park
• 2021 — Hidden Creek North Park and Prairie Knoll Park
• 2022 — Wild Iris Park and Tot Lot Park (1381h Avenue NW)
Based on the life expectancy of 15 years for playground equipment the 5 -year replacement plan
for 2019 -2023 is recommended to be adjusted to increase the number of structures from 2 a year
to 3 a year to keep up based on industry standard life expectancy of a commercial playground.
This will require additional funding to keep up on the replacement of the playground equipment.
As mentioned previously Purple Park is a top priority for replacement but a decision has been
made to hold off on replacing the equipment until after the Community Center Exploration
Report has been completed and direction from the City Council has been provided.
The Park and Recreation Commission is recommending the playground equipment at Pine Hills
South Park be refurbished. The steel posts and components will be repainted and the plastic parts
will be replaced with new plastic. The estimated cost to refurbish this playground equipment is
$17,000. The Parks Maintenance Department may be able to replace the plastic parts. If not, there
would be an additional cost to hire a contractor to replace the plastic parts. Refurbishing the
playground equipment would save about $5000 to $7000.
Parks Maintenance Department will continue to review the playground structures from year to
year so the list may be modified as the condition of the structures change.
BUDGETIMPACT
As indicated on the attached sheet $50,000 is proposed to be allocated each year for the next 5
years. For quite a few years Public Works Parks Maintenance Department was making every
effort to replace 2 structures a year but with the rising cost of equipment and supplies (concrete
borders, wood chips, etc.) the number of playground rebuilds over the last few years was reduced
to 1 a year. To keep up with replacing of older /outdated equipment, additional funds are needed
if the City would like to replace 3 structures a year. The current budget of $50,000 a year will not
be enough to meet the replacement schedule.
An option of phasing out certain playground structures in smaller parks located in the rural areas
should be considered and will be discussed at the meeting.
ACTION REQUIRED
The City Council is requested to direct staff on how to proceed with (2019 -2023) playground
replacement schedule.
Respectfully submitted,
Todd J. Haas
Attachments: Article on Playground Equipment Life Expectancy; 2018 -2022 CIP Park
Playground Equipment Replacement Plan; Play Structures and Playgrounds Installed
• 5" diameter steel posts
48" deck grids Projects Wishlists
ie Products Contact Financin%�(https: / /kdHti0s:6&
$RkNentuE &series for limited space and budgets:
MS
I-= (https: / /korkat.com /cart/)
• 3.5" diameter steel posts
• 36" deck grids
• 24" plastic tubes
Recycled plastic product line
• Made from recycled plastic milkjug material
• Similar to Expedition products in dimensions
• 5" square plastic posts
HOW LONG WILL MY PLAYGROUND EQUIPMENT LAST?
Warranties vary by manufacturer, and by product type. However, the standard life
expectancy of o commercial playground is 95years. Although Playland offers the
industries best warranty, you'll want a partner thats committed to maintaining
your equipment for its lifetime. We will prolong that as well as keep it fully -
functional with our regularly scheduled inspections and service calls available.
.. . 1.s _ ( 4 J E -- .I I, r" t 'y 13 . P.eAI -? s V 3s'44OAI I u II1 *v^ g "9 -It- v ? "9,x r
DO YOU OFFER FUNDRAISING SUPPORT OR PLAYGROUND
GRANTS?
We have one of the most extensive playground equipment grant lists in the
industry. If you're in the early planning phases, there are a myriad of resources
including fundraising ideas &grants on our KorKat blog page
(http: / /korkat.com /category/playground_planning/): Our goal is to help YOU best
apply the funds within your existing budget, and take full advantage of your
existing resources. If you haven't already done so, you can download your free Big
Book of Playground Grants here (http: / /korkat.com /playground - grants/)
PLAYGROUND PLANNING- HOW DO YOU MANAGE OUR
PLAYGROUND PROJECT?
�Ct Search the Site
Capital Plan 2018 thru 2022 Department Park & Rec -Operations
City of Andover, MN Contact DPW / City Engineer
Project# 18- 45000 -01
Project Name Replace/Repair Play Structures -Various Parks
Type Improvement
Useful Life 15 -20 Years
Category Park Improvements
Priority 1 -High
Description
Ilse parks listed are in need of replacing the existing playground equipment and repairing the fall zones to achieve ADA accessibility. The
)roposed playground equipment improvements /rebuilds are as follows:
8 - Pine Hills South Park and Purple Park (City Hall)
9 - Terrace Park and Strootman Park
0 - Hawkridge Park and Sunshine Park
1 - Hidden Creek North Park and Prairie Knoll Park
2 - Wild Tris Park and Tot Lot Park (138th Avenue N
Justification
0ld equipment no longer meets ADA requirements, such as entrapments, fall zones and handicap accessibility. Working to bring the parks up to
meet all safety requirements.
Expenditures
Funding Sources
2018
2019
2020
2021
2022
Total
50,000
50,000
50,000
50,000
50,000
250,000
Total 50,000
50,000
50,000
50,000
50,000
250,000
2018 2019 2020 2021 2022 Total
General Fund 50,000 50,000 50,000 50,000 50,000 250,000
Total 50,000 50,000 50,000 50,000 50,000 250,000
Budget Impact/Other I
.ess maintenance and will meet all safety requirements.
Play Structures and Playgrounds Installed
Park Name
Years Replaced. Refurbished or Removed
Notes
1
Andover Lions
1998
21
2
Andover Station North
2008: New Park
Bunker Hills West
1988
r
2C a
4
City Hall (Purple Park) **
1984
1985
1996
2001
5
Chesterton
2000
6
Country Oaks
2104 _ �',
2005: New Park
7
Creekview Crossing
1992
1993
MIR
8
Forest Meadows
1987
Removed 2001
9
Fox Meadows
1991
. '10%D
10
Green Acres
1983
1998
3, IN
11
Hawkridge
1988
_ °20b3 AM
12
Hickory Meadows
=2
2012: New Park
13
Hidden Creek East
1992
ANN � 1
2015 (Partial)
2015: New border & wood chips
14
Hidden Creek North
'Iffira8 �
1991, '95(Partial)
2000 (Partial)
2005 (Partial)
1s
Hidden Creek South
1988
UNN- ) _
16
Langseth
1979
1994
17
Maple View
�,LQi�+.6��`�
2016: New Park
18
Meadowood North
A- ' g
! j'?W99
19
Meadows of Round Lake
1995
1997
gg-
Fr��,2Q08r��?
20
Nordeen's
1997
b n
21
Northwoods East
1983
1998��
22
Oak Bluff
1991
1998
4 i4
Oak View
tiil,
2006: New Park
241
Pine Hills North
201u
2015: New Park
25
Pine Hills South
1979
26
Pleasant Oaks
1984
1996
M
27
Prairie Knoll
1988
NO-
28
Red Oaks West
1993
,h .._
Q(!
29
Rose
1.987
1 —2QQ ;'�S ;
30
Shadowbrook East
2002
311
Shady Knoll
1989_
(i
32
Sophie's
I
2010: New Park
33
Strootman
1987_
'
34
Sunshine
ZOQ
•r T
2009 (Partial)
2009: Swings, Digger, Spring Toys
2000: Kidtime unit installed
35
Terrace
1979
1993
361
Timber Rivers
1999
2000
,
37
Timber Trails
1996
Rd
38
Tot Lot 138th
1985
2009 (Partial)
39
Woodland Crossing
2008: New Park
40
Woodland Estates
-
2006: New Park
41
Woodland Meadows
2011 (Partial)
2011: New Border & Wood Chips
42
Wild Iris
1987
'Alm am
= Complete Rebuild
REMOVALS
1
Crooked Lake Boat Landing
1982
Removed 1999
2
Creekridge
1990
Removed 2001
3
Northwoods West
1979
Removed 2004
LNDOVEA,
1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755 -5100
FAX (763) 755 -8923 • WWW.ANDOVERMN.GOV
TO:
FROM:
SUBJECT
DATE:
Mayor and Councilmembers
Jim Dickinson, City Administrator
2018 Budget Development Discussion
October 24, 2017
INTRODUCTION
City Administration/Finance along with the Department Heads continue to work on the 2018
Annual Operating Budget Development process and are looking to update the City Council on
progress and seek direction as the preparation of the 2018 Annual Operating Budget proceeds.
On September 19th the City Council approved the 2018 Preliminary Levy certification. This
approval was the outcome of the numerous budget workshops held by the Council over the
summer. The Preliminary 2018 Budget proposes a total property tax levy of $12,416,357:
$8,643,256 (69.61 %) operational levy, $1,599,087 (12.88°/x) debt service levy, and $2,174,014
(17.51 %) capital /watershed levy. (see attached Property Tax Levy spreadsheet)
The 2018 Proposed Property Tax Levy is estimated to reduce the current City tax rate by close to
6% but will generate additional tax revenue to preserve the City's current operations and
infrastructure assets. This is a 4.00% increase in the gross tax levy. The Council has the right to
reduce or keep constant this levy until the final certification date of December 28, 2017.
City Administration will review with the Council the bold italics items at the meeting.
DISCUSSION
The following are the 2018 Budget Development guidelines adopted at the April 18th City Council
meeting along with progress updates:
1) A commitment to a City Tax Capacity Rate to meet the needs of the organization and
positioning the City for long -term competitiveness using sustainable revenue sources and
operational efficiencies.
Note: Preliminary Anoka County Assessor taxable market value figures for the City of
Andover are reflecting close to a 12.36% increase in total taxable market value. See
attached City ofAndover Pay 2018 Valuation Estimates.)
2) A fiscal goal that works toward establishing the General Fund balance for working capital at
no less than 45% of planned 2018 General Fund expenditures and the preservation of
emergency fund balances (snow emergency, public safety, facility management & information
technology) through targeting revenue enhancements or expenditure limitations in the 2017
adopted General Fund budget.
Note: With property tax revenues making up close to 80% of the total General Fund
revenues, cash flow designations approaching 50% would be appropriate and are
recommended by the City's auditor. The 2018 proposed budget exceeds this guideline, also
Emergency Fund Balances (approximately 3% of planned General Fund expenditures) are
in place to stabilize a situation, not be a complete solution. Administration will review with
the Council the attached General Fund Fund Balance Analysis and General Fund Revenue
and Expense Summary.
3) A commitment to limit the 2018 debt levy to no more than 25% of the gross tax levy and a
commitment to a detailed city debt analysis to take advantage of alternative financing
consistent with the City's adopted Debt Policy.
Note: The proposed 2018 debt levy is at 12.88% of the gross tax levy, the 25% guideline
provides reasonable margin to accommodate a 2018 Equipment andlor an Improvement
Bond if necessary.
Please keep in mind that for the 2017 & 2018 budgets, $500,000 of existing debt levy is
temporarily moved to a Capital Levy to fund planned equipment purchases (rather than
issuing debt), that change decreases the debt levy percentage of the gross tax levy
significantly.
4) A comprehensive review of the condition of capital equipment to ensure that the most cost -
effective replacement schedule is followed. Equipment will be replaced based on a cost benefit
analysis rather than a year based replacement schedule.
Note: The City Vehicle Purchasing Committee has completed this analysis, and has made
recommendations to the City Council as part of the 2018 -2022 Capital Improvement
Plan(CIP) development process. A public hearing was held October 17t1 on the 2018 -2022
CIP and the CIP was adopted at that meeting.
5) The use of long -term financial models that identify anticipated trends in community growth
and financial resources that will help designate appropriate capital resources for future City
needs. The financial models will be used in the budget planning process to ensure that key
short-term fiscal targets are in line with long -term fiscal projections.
Note: The City continually maintains various financial models to determine the long -term
impacts of present day expenditures and financing decisions. Fiscal assumptions are based
upon a complex set of financial data including growth factors, tax capacity valuations, per
capita spending and debt ratios. A long range financial model (attached) will be reviewed
with the Council during budget deliberation discussions.
6) Continued commitment to strategic planning targeted toward meeting immediate and long-
term operational, staffing, infrastructure and facility needs.
Note: A strategic planning session was held with the City Council in 2015, with a final
Council Community Vision and Organizational Goals and Values document approved by
the City Council. Administration is to assure that direction provided in that document is
integrated into various department work plans and budgets.
7) A management philosophy that actively supports the funding and implementation of Council
policies and goals, and a commitment to being responsive to changing community conditions,
concerns, and demands, and to do so in a cost - effective manner.
Note: Management pays special attention to fiscal values, commercial & residential
development or redevelopment, collaboration opportunities, service delivery and the
livability /image of the community.
Staffing:
Administration did receive new staffing requests from the Fire Department for the 2018 budget.
One request was to expand the Duty -Crew model to cover weekends and the other was for an
administrative support position to focus on reporting needs and community based education.
After evaluation, Administration is recommending the expansion of the Duty -Crew model to
cover weekends, but is still evaluating other options with existing staffing and other options
available to address the administrative support and community based education proposaG
There are some anticipated retirements and staff vacancies within the next few years; in response
Administration has made a concerted effort to focus on appropriate succession planning, effective
utilization of internship opportunities in various departments, continued cross - training of staff,
part-time staffing or realignment of existing resources.
Personnel Related Implications:
To date the following are projected issues facing personnel related expenses:
1. Human Resources will again review position -based salaries and our benefit package in
detail to determine if the total package is competitive with other government entities.
As part of the budget process, pay steps for eligible employees will be included in a 2018
budget proposal. A cost of living adjustment (COLA) for non - bargaining employees is
being evaluated. A Public Works Union contract was approved by the Council on
September 10, the new contract is set to expire on December 31, 2019. As part of that
new contract, a 3% COLA was provided for 2018.
2. A review ofthe health plan was conducted with our broker in July. The current employee
health & dental plan provider is with HealthPartners. Administration authorized a
marketing of the health plan to keep the rates inline as a rate increase under
HealthPartners was proposed. Marketing was successful as Health Partners is now
proposing a 0.00% increase in the premiums for 2018.
The City currently offers employees an open access high deductible plan ($5,000 family
plan deductible and $2,500 single plan deductible) with a health spending account (HSA),
this was implemented in 2006. As part of the program, the City pays for 100% of the single
health insurance premium and 76% for a family health insurance premium. The City does
contribute annually to the employee's HSA.
Contractual Departments:
1. The City Attorney has agreed to a fee neutral status -quo service level contract for 2018.
2. The 2017 City of Andover Law Enforcement expenditure budget is $2,962,551 which is
offset by a Police State Aid revenue budget of $131,511 and School Liaison revenue budget
of $93,656 reflecting a net tax levy impact of $2,737,384.
The 2017 Sheriff's contract provides for:
a. 80 hours per day of patrol service
b. 6 hours per day of service provided by a Community Service Officer
c. School Liaison Officers in the middle school and high school
d. 2 Patrol Investigators
e. 50% of the Crime Watch Program's coordinator position.
It should be noted that the Sheriff's Department always provides the required number of
deputies for all hours contracted by the City. If the Sheriff's Department has a vacancy or
a deputy is injured etc.., they still provide the City with a deputy at straight time even
though they may have to fill those hours with overtime which at times may cost the
Sheriff's Department additional, but is not billable per the contract
City Council direction was for Staff to secure a Status Quo Contract with the Anoka
County Sheriff for 2018. Negotiations for a Status Quo Contract for 2018 reflect a 3.07%
increase ($90,975) over the 2017 contract. The 2018 Law Enforcement Contract was
approved at the October 3rd City Council meeting.
Council Memberships and Donations /Contributions:
The following memberships /contributions are included in the 2018 Budget:
• North Metro Mayors Association
• Metro Cities
• Mediation Services
• YMCA — Water Safety Program
• Alexandra House
• Youth First (Program Funding)
• NW Anoka Co. Community Consortium - JPA
• Teen Center Funding (YMCA)
• Family of Promise
• Lee Carlson Central Center for Family Resources
• Senior High Parties
• Stepping Stone
$15,010
(GF)
$ 9,518
(GF)
$ 3,366
(GF)
$ 8,500
(GF)
$18,328
($15,328 GF & $3,000 CG)
$14,000
($12,000 GF & $2,000 CG)
$10,000
(GF)
$24,500
($8,100 GF & $16,400 CG)
$ 3,000
(CG)
$ 1,500
(GF)
$ 1,000
(CG)
$ 900
(CG)
Some are funded via the General Fund(GF), and those that qualify for charitable gambli
funding are done through the Charitable Gambling (CG) Special Revenue Fund.
Capital Projects Levy:
Capital Projects Levy — The proposed 2018 Capital Projects Levy Budget specifically designates
$2,134,014 of the general tax levy to capital projects and equipment needs relating to Capital
Project Outlay ($275,000), Capital Equipment Purchases ($525,000) Road and Bridge
($1,169,014), Pedestrian Trail Maintenance ($100,000), Park Projects ($15,000) and Facility
Maintenance Reserve ($50,000). Specific designation of the tax levy to anticipated City needs and
priorities for transportation and trail maintenance, park projects and equipment outlays allows the
City to strategically allocate its resources and raise the public's awareness of City spending
priorities. The Road and Bridge levy is evaluated annually and along with Capital Outlay,
Pedestrian Trail Maintenance and Park Levies increased /decreased according to the City Council
budget guidelines.
• Road and Bridge
An adjustment was made to the Road & Bridge funding formula in 2014, primarily to stop
the continual decrease in the levy that has been happening over the past few years due to
decreases in the Anoka County Assessor taxable market value figures for the City of
Andover. Based on Council discussion, consensus was to stop the decline in road funding
and evaluate annually through the adopted City Council Budget Development Guidelines.
It should be noted that in 2014, Local Government Aid (LGA) in the amount of $74,655
was used to help fund the Road & Bridge Fund. That State of Minnesota funding has
largely gone away, down to $2,706 for 2016 and nothing budgeted for 2017 and 2018.
Future increases in LGA or even the presence of LGA for the City of Andover based on
the current Slate formula are remote.
The City of Andover Road & Bridge proposed levy of $1,169,014 for 2018 would be a
4.74% increase over 2017.
The City ofAndover provided a 2.0% increase in the Pedestrian Trail Maintenance levy
to $63,075 for 2017, Administration is recommending another Pedestrian Trail
Maintenance levy increase to $100,000 for 2018, a 58.54% increase in funding.
• Park Improvements
This levy is an annual appropriation to be used to underwrite park improvement projects
as recommended by the Park and Recreation Commission and approved by the City
Council. This funding is intended to be a supplemental source of capital funding for park
projects that is separately identified in the City's Five -Year Capital Improvement Plan.
The 2015 levy was $61,500, but only $15,000 was levied for 2016. $46,500 ofthe previous
levy was re- assigned to the General Fund to focus on Park's maintenance/replacement
items. In addition to the re- assigned funds an additional $43,500 of General Fund levy
was assigned to Parks Repair/Replacement items for a total levy of $90,000 in 2016, and
that continued for 2017. The 2018 General Fund levy assigned to Parks
Repair/Replacement items levy is proposed to be $100,000.
Again for 2018 Administration is recommending a Parks Project levy be set at $15,000.
• Capital Equipment/Project
Under the Capital Projects Levy, a levy is proposed to be designated to Capital
Equipment/Project expenditures identified through the CIP process. Through this
designation, the City, over time, will build a fund reserve to avoid cash flow "spikes" and
address a wide range of capital improvement needs such as facility maintenance projects
under a more controlled spending environment. The 2017 levy is $250,000,
.Administration is recommending a $25,000 increase to $275,000 for 2018.
• Capital Equipment Purchases
New, for the 2017 equipment purchases Administration/Finance proposed a straight
$500,000 Capital Equipment Purchases Levy for the 2017 equipment purchases rather
than through debt service levy and an equipment bond. This process was anticipated to
continue through 2018, Administration will be recommending that same process again
for 2018, but increasing the levy by $25,000 to $525,000.
• Facility Maintenance
This is a new proposed $50,000 levy for 2018. The recent facility condition assessment
study has identi/ed many maintenance related repairs for City facilities such as roofs,
HYAC, electrical panels, fire alarm systems, windows and air quality related items.
Debt Service Levy:
Annually the Finance Department conducts a detailed debt service analysis to monitor outstanding
debt and to look for early debt retirement or refinancing opportunities that will yield interest
expense savings to the City. (Staff along with Ehlers & Associates have completed a review to see
if any efinancing opportunities are available now, of which there are none,, we will continue to
monitor refunding opportunities as markets can move quickly, and calculate potential savings fo
each issue that may meet parameters which may generate savings.)
The proposed 2018 Debt Service levy is as follows:
• 2010A G.O. Open Space Referendum $ 188,777
• 2012C Taxable G.O. Abatement Bonds $ 972,055
• 2014A G.O. Equipment Certificates $ 294,945
• 2016A G.O. Equipment Certificates $ 143,310
Total $19599,087
It should be noted that the levy is offset significantly by a $635,000 YMCA annual rental
payment for the Community Center bonds (2012C Taxable G.O. Abatement Bonds).
The proposed 2018 Debt Service lew reflects a .68% decrease (S 10,960). (See attached Debt
Service Levy Sumary)
ACTION REQUESTED
The Council is requested to receive a presentation and provide direction to staff.
)ectfully submitted,
S-�-
Dickinson
City of Andover, Minnesota
Property Tax Levy
Other Levies
Capital Projects Levy
Capital Equipment/Project
Certified
Certified
Certified
Certified
Requested
2.21%
Change
25,000
10.00%
2.75%
2014
2015
2016
2017
2018
%of Total
$
%
25,000
General Fund Lew
34.879%
Facility Maintenance Reserve
-
-
-
-
50,000
0.40%
$
General Operations
$ 7,435,891
$ 7,630,892
$ 7,947,528
$ 8,254,354
$ 8,543,256
68.81%
$ 288,902
3.50%
0.12%
Parks Repair /Replacement Items
-
0.00%
90 ,000
90,000
100,000
0.81%
$ 10,000
11.11%
1,169,014
9.42%
$
52,935
4.74%
8,344,354
8,643,256
69.61%
$ 298,902
3.58%
O
Total General Fund
7,435,891
7,630,892
8,037,528
58.54%
Lower Rum River Watershed
40,000
40,000
40,000
Debt Service Funds Lew
40,000
032%
$
0.00%
Total Other
1,336,968
1,376,968
2004 EDA Public Facility Revenue Bonds
181,803
-
-
-
-
9.57%
Gross City Levy
10,843,925
2010A G.O. Open Space Referendum Bonds
187,283
184,238
186,291
187,840
188,777
477,802
4.00%
2012A G.O. Equipment Certificate
140,000
140,000
142,885
-
-
2012B G.O. Cap Improv Refunding Bonds
561,015
540,120
498,435
-
-
2012C Taxable G.O. Abatement Bonds
740,965
975,652
977,332
974,418
972,055
$ 10,731,907
2014A G.O. Equipment Certificate
260,000
296,055
295,470
295,260
294,945
$ (187,840)
$ (188,777)
2016A G.O. Equipment Certificate
Net Local Tax Rate Levy
152,529
143,310
$ 9,820,887
$ 10,014,168
$ 10,543,130
Total Debt Service
2,071,066
2,136,065
2,100,413
1,610,047
1,599,087
12.88%
$ (10,960)
-0.68%
30,055,299
Other Levies
Capital Projects Levy
Capital Equipment/Project
210,000
250,000
250,000
250,000
275,000
2.21%
$
25,000
10.00%
2.75%
Capital Equipment Purchases
-
-
-
500,000
525,000
4.23%
$
25,000
5.00%
34.879%
Facility Maintenance Reserve
-
-
-
-
50,000
0.40%
$
50,000
Na
-6.458%
Parks Projects
61,500
61,500
15,000
15,000
15,000
0.12%
$
-
0.00%
Road &Bridge
967,197
967,197
1,089,146
1,116,079
1,169,014
9.42%
$
52,935
4.74%
Pedestrian Trail Maintenance
58,271
58,271
61,838
63,075
100,000
0.811%
$
36,925
58.54%
Lower Rum River Watershed
40,000
40,000
40,000
40,000
40,000
032%
$
0.00%
Total Other
1,336,968
1,376,968
1,455,984
1,984,154
2,174,014
17.51%
$
189,860
9.57%
Gross City Levy
10,843,925
11,143,925
11,593,925
11,938,555
12,416,357
100%
$
477,802
4.00%
Less Fiscal Disparities Distribution
1,718,153
1,846,295
1,586,747
1,736,547
1,684,451
Local Tax Rate Levy
$ 9,125,772
$ 9,297,630
$ 10,007,178
$ 10,202,008
$ 10,731,907
Less Levy Based on Market Value
$ (187,283)
$ (184,238)
$ (186,291)
$ (187,840)
$ (188,777)
Net Local Tax Rate Levy
$ 8,938,489
$ 9,113,392
$ 9,820,887
$ 10,014,168
$ 10,543,130
Adjusted Tax Capacity Value -(1)
20,615,782
24,496,024
25,543,662
26,703,971
30,055,299
18.82%
4.28%
4.54%
12.55%
Chance
% Chana
Tax Capacity Rate-
43.358%
37.204%
38,447%
37.501%
35.079%
- 2.422%
- 6.457%
Tax Capacity Rate W/O LRRWSD
43.197%
37.070%
38,314%
37.374%
Tax Capacity Rate With LRRWSD
43.657%
37.461%
38702%
37.738%
Voter Approved Ref - MV
0.00841%
0.00719%
0.00699%
0.00681%
"Adjusted Value determined by adjusting for Fiscal Disparities and Tax Increment estimates
- Blended rate due to the City of Andover levying for Lower Rum River Watershed District
(1) Adjusted Tax Capacity Value is subject to change.
2018 Levy Calculation Options
Rate
Ch in Rate
Levy
Ch in Levy
34.580%
- 7.788%
$
327,802
2.75%
34.680%
- 7.522%
$
357,802
3.00 °.6
34.780%
- 7.255%
$
387,802
3.25°•6
34.879%
-6.991%
S
417,802
3.50%
34.979%
-6.724%
$
447,802
3.75%
35.079%
-6.458%
$
477,802
4.00%
35.179%
-6.191%
$
507,802
4.25%
no rate change 1 37.500% -0.002% $ 1,205,502 10.1046
O
CITY OF ANDOVER
Pay 2018 Valuation Estimates
$1,500,000,000
$1,000,000,000
$500,000,000
$0
Taxable Market Value
% Change
Pay 2015 $ 2,435,770,612
Pay 2016 $ 2,539,686,867 4.27%
Pay 2017 $ 2,636,599,713 3.82%
Pay 2018 $ 2,962,402,062 12.36%
Taxable Market Values
D
Pay 2015 Pay 2016 Pay 2017 Pay 2018
$35,000,000
$30,000,000
$25,000,000
$20,000,000
$15,000,000
$10,000,000
$5,000,000
$0
Tax Capacity Value
% Change
Pay 2015 $ 25,705,350
Pay 2016 $ 26,847,273
Pay 2017 $ 27,920,178
Pay 2018 $ 31,332,022
Tax Capacity Values
Pay 2015 Pay 2016
4.44%
4.%
12.2222% 90
Pay 2015
Pay 2016
Pay 2017
Pay 2018
Taxable
Tax
Taxable
Tax
Taxable
Tax
Taxable
Tax
Market
Capacity
Market
Capacity
Market
Capacity
Market
Capacity
Value
Value
Value
Value
Value
Value
Value
Value
Andover Valuation Totals
$ 2,435,770,612 $
25,705,350
$ 2,539,686,867 $
26,847,273
$ 2,636,599,713 $
27,920,178
$ 2,962,402,062 $
31,332,022
Captured Tax Increment
(210,936)
(248,327)
(91,996)
(91,996)
Fiscal Disparity Contribution
(998,390)
(1,055,284)
(1,124,211)
(1,184,727)
Local Tax Rate Value
24,496,024
25,543,662
26,703,971
30,055,299
Fiscal Disparity Distribution
4,257,801
4,264,789
4,516,466
4,516,466
Total Adjusted Values
$
28,753,825
$
29,808,451
$
31,220,437
$
34,571,765
3.67%
4.74%
10.73%
$1,500,000,000
$1,000,000,000
$500,000,000
$0
Taxable Market Value
% Change
Pay 2015 $ 2,435,770,612
Pay 2016 $ 2,539,686,867 4.27%
Pay 2017 $ 2,636,599,713 3.82%
Pay 2018 $ 2,962,402,062 12.36%
Taxable Market Values
D
Pay 2015 Pay 2016 Pay 2017 Pay 2018
$35,000,000
$30,000,000
$25,000,000
$20,000,000
$15,000,000
$10,000,000
$5,000,000
$0
Tax Capacity Value
% Change
Pay 2015 $ 25,705,350
Pay 2016 $ 26,847,273
Pay 2017 $ 27,920,178
Pay 2018 $ 31,332,022
Tax Capacity Values
Pay 2015 Pay 2016
4.44%
4.%
12.2222% 90
City of Andover
General Fund
2017 Fund Balance Analysis
10/18/2017
Actual
December 31, 2016 $ 7,796,745
2017 Estimated Fund Balance Increase (Decrease) (730,999)
Projected December 31, 2017
7,065,746
Less: Snow Emergency
(85,000)
Public Safety
(85,000)
Facility Management
(85,000)
Information Technology
(85,000)
2018 Budgeted Use of Fund Balance
(181,288) ?;
Economic Development Transfer
(300,000)
Prepaids / Inventories
(146,417)
Working Cash Flow
(5,633,263)
Estimated Balance Available for Adjustments
$ 464,778
2017 Working Cash Flow Designation Calculation:
2018 Requested Expenditure - Preliminary Estimate
$11,266,526
% of 2018 General Fund Expenditures 50.000%
$ 5,633,263
CITY OF ANDOVER
General Fund
Revenue & Expense Summary
Actual Actual Actual Actual Actual Budget' Estimate Requested Budget Change ( *)
2012 2013 2014 2015 2016 2017 2017 2018 $ %
REVENUES
Property Taxes
$ 7,340,532
$ 7,376,284
$ 7,476,295
$ 7,634,715
$ 8,217,768
$ 8,420,354
$ 8,422,354
$ 8,721,256
300,902
3.57%
License and Permits
449,826
536,707
364,430
452,616
625,906
367,705
465,375
377,900
10,195
2.77%
Intergovernmental Revenues
653,720
710,071
697,491
749,570
733,953
766,150
827,706
766,274
124
0.02%
Charges for Current Services
973,604
1,122,460
998,150
804,684
912,220
773,950
770,050
746,700
(27,250)
-3.52%
Fines and Forfeits
97,571
96,130
94,375
99,304
88,600
100,750
90,150
90,250
(10,500)
- 10.42%
Interest Income
95,365
(17,096)
144,876
63,709
68,380
75,000
75,000
75,000
0
0.00%
Miscellaneous Revenue
149,857
140,983
150,759
154,239
194,812
124,300
150,907
129,300
5,000
4.02%
Transfers
196,930
196,930
196,930
196,930
196,930
196,930
196,930
178,558
(18,372)
-9.33%
TOTAL REVENUES
9,957,405
10 162 469
10,123,306
10,155,767
11,038,569
10,825,139
10,998,472
11,085,238
260,099
EXPENDITURES
General Government
2,223,773
2,308,882
2,481,927
2,511,970
2,592,649
2,878,311
2,928,098
3,007,562
129,251
4.49%
Public Safety
4,087,065
4,311,340
4,498,920
4,503,332
4,667,326
4,862,558
4,863,008
4,974,321
111,763
2.30%
Public Works
2,482,490
2,759,342
2,819,372
2,817,981
2,966,674
3,175,822
3,118,037
3,214,215
38,393
1.21%
Other
663,372
210,510
81,185
256,720
283,077
70,328
820,328
70,428
100
0.14%
2.54 %0
TOTAL EXPENDITURES
9,456,700
9,590,074
9,881,404
10,090 003
10,509,726
10,987,019
11,729,471
11,266,526
279,507
E
10/18/2017
CITY OF ANDOVER
General Fund - Expenditure Budget Summary Totals - By Department
Budget Year 2018
Actual Actual Actual Actual Actual Budget* Estimate Requested° Change ( *)
2012 2013 2014 2015 2016 2017 2017 2018 $ %
GENERAL GOVERNMENT
Mayor and Council $
83,622
$ 83,595
$ 84,650
$ 85,060
$ 86,989
$ 89,991
$ 89,991
$ 91,298
1,307
1.45%
Administration
140,048
147,503
169,218
172,296
187,876
199,541
199,541
204,586
5,045
153%
Newsletter
22,336
17,677
20,974
21,042
22,731
26,000
24,500
26,000
0
0.00%
Human Resources
12,485
17,907
18,038
15,908
13,404
27,913
20,913
28,459
546
1.96%
Attorney
170,930
173,244
177,427
180,313
184,990
191,360
190,000
191,360
0
0.00%
City Clerk
101,377
108,312
128,861
134,775
148,338
148,599
148,599
156,365
7,766
5.23%
Elections
39,614
11,352
41,508
14,497
64,433
63,881
19,100
59,904
(3,977)
-6.23%
Finance
207,337
215,215
230,639
240,319
252,563
268,129
268,129
280,004
11,875
4.43%
Assessing
143,338
144,561
145,051
146,315
146,473
150,000
149,000
154,000
4,000
2.67%
Information Services
136,025
135,982
146,984
131,744
151,387
170,522
174,022
181,043
10,521
6.17%
Planning & Zoning
318,523
349,489
387,308
406,045
414,141
462,212
461,912
433,658
(28,554)
-6.18%
Engineering
427,339
452,788
460,872
464,843
511,074
535,715
535,415
551,508
15,793
2.95%
Facili Management
420,799
451,257
470,397
498,813
408,250
544,448
646,976
649,377
104,929
19.27%
Total General Gov
2,223,773
2,308,882
2,481,927
2,511,970
2,592,649
2,878,311
2,928,098
3,007,562
129,251
PUBLIC SAFETY
Police Protection
2,693,896
2,740,899
2,818,132
2,918,308
2,936,467
2,962,551
2,962,551
3,053,526
90,975
3.07%
Fire Protection
1,015,825
1,126,979
1,264,018
1,165,223
1,285,417
1,422,522
1,423,222
1,417,991
(4,531)
-0.32%
Protective Inspection
354,753
423,495
390,908
391,951
424,247
446,688
446,438
464,310
17,622
3.95%
Emergency Management
14,088
13,930
21,836
24,352
17,495
24,847
24,847
32,544
7,697
30.98%
Animal Control
8,503
6,037
4,026
3,498
3,700
5,950
5,950
5,950
0
0.00%
Total Public Safety
4,087,065
4,311,340
4,498,920
4,503,332
4,667,326
4,862,558
4,863,008
4,974,321
111,763
2.30%
PUBLIC WORKS
Streets and Highways
570,630
572,753
600,313
629,724
686,086
691,473
614,668
662,170
(29,303)
- 4.24%
Snow and Ice Removal
420,175
630,799
637,154
442,078
468,173
568,257
547,777
563,623
(4,634)
- 0.82%
Street Signs
170,200
162,861
187,935
204,495
167,282
215,244
215,244
219,485
4,241
1.97%
Traffic Signals
27,457
26,241
34,901
30,170
27,919
37,000
37,000
37,000
0
0.00%
Street Lighting
33,439
31,702
32,646
30,664
37,089
38,400
38,400
40,400
2,000
5.21%
Street Lights - Billed
195,197
210,331
203,148
201,500
200,509
217,500
217,500
220,500
3,000
1.38%
Park & Recreation
912,750
946,545
1,009,373
1,151,314
1,247,501
1,275,530
1,273,530
1,301,968
26,438
2.07%
Natural Resource Preservatim
-
-
-
-
7,255
10,197
12,697
11,580
1,383
1156%
Rec cling
152,642
178,110
113,902
128,036
124,860
122,221
161,221
157,489
35,268
28.86%
Total Public Works
2,482,490
2,759,342
2,819,372
2,817,981
2,966,674
3,175,822
3,118,037
3,214,215
38,393
OTHER 663,372 210,510 81,185 256,720 283,077 70,328 820,328 70,428 100 0.14%
Total Other 663,372 210,510 81,185 256,720 283,077 70,328 820,328 70,428 100
GRAND TOTAL S 9,456,700 $ 9,590,074 $ 9,881,404 S 10,090,003 $ 10,509,726 $ 10,987,019 $ 11,729,471 $ 11,266,526 279,507 2.54%
CITY OF ANDOVER
Debt Service Levy Summary
2017
2018
2019
2020
2021
2022
2023
General Obligation Abatement Bonds
142,837.00
143,37100
447,789.00
438,255.00
437,362.00
2012C G.O. Abatement Bonds 1,274,418.00
1,272,055.00
1,269,378.00
1,276,780.00
1,273,263.00
1,274,628.00
1,269,745.00
Transfer from Operations (300,000.00)
(300,000.00)
(300,000.00)
(300,000.00)
(300,000.00)
(300,000.00)
(300,000.00)
974,418.00
972,055.00
969,378.00
976,780.00
973,263.00
974,628.00
969,745.00
Certificates of Indebtedness
2014A G.O. Equipment Certificates
295,260.00
294,945.00
294,525.00
2016A G.O. Equipment Certificates
152,529.00
143,310.00
142,837.00
143,37100
447,789.00
438,255.00
437,362.00
143,373.00
Referendum Bonds
2010A G.O. Open Space Referendum Bonds
187,840.00
188,777.00
183,989.00
184,199.00 184,078.00
1,610,047.00
1,599,087.00
1,590,729.00
1,304,352.00 1,157,341.00 974,628.00 969,745.00
(10,960.00) -
(8,358.00)
(286,377.00) (147,011.00) (182,713.00), (4,883.00)
Certificates of Indebtedness
2011A G.O. Equipment Certificates
2012A G.O. Equipment Certificates
2014A G.O. Equipment Certificates
2016A G.O. Equipment Certificates
Equipment Purchases Levy
2020 Equipment Certificate -
2022 Equipment Certificate -
2024 Equipment Certificate -
Capital Improvement Bonds
2004A G.O. Cap Improvement Bonds
20128 G.O. Cap Improvement Ref Bonds
Facility Expansion
Referendum Bonds
Open Space Referendum Bonds
Subtotal
Community Center Bonds
2004 EDA Public Facility Revenue Bonds
2012C G.O. Abatement Bonds
*Transfer from Operations
Subtotal
CITY OF ANDOVER
Long Range Debt Service & General Fund Levy Projections
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2024
Tax Capacity Value
22,569,018
21,978,322
25,705,350
26,847,273
101,745
31,332,022
31,958,662
32,597,836
33,249,792
33,914,788
34,593,084
35,284,946
(590,696)
3,727,028
125,000
140,000
140,000
142,885
639,173
651,957
664,996
678,296
691,862
-2.62%
16.96%
260,000
296,055
295,470
295,260
294,945
294,525
2.00%
2.00%
2.00%
Gross Tax Levy
10,631,299
10,843,925
11,143,925
11,593,925
11,938,555
152,529
143,310
142,837
143,373
13,439,864
13,708,661
13,982,835
212,626
300,000
450,000
500,000
525,000
248,327
253,294
150,000
263,527
268,797
274,173
2.00%
2.77%
4.04%
2.97%
4.00%
300,000
300,000
300,000
300,000
2.00%
2.00%
General Fund
150,000
150,000
150,000
Revenues
10,162,468
10,123,306
10,155,767
11,038,569
10,998,472
11,085,238
11,306,943
11,533,082
300,000
226,745
400,000
436,055
438,355
947,789
963,255
437,362
443,373
450,000
450,000
450,000
450,000
2.00%
2.00%
2.00%
2.00%
Expenditures
9,590,074
9,881,404
381,290
10,509,726
11,729,471
11,266,526
11,491,857
11,721,694
11,956,128
12,195,251
12,439,156
12,687,939
138,339
561,015
540,120
498,435
-3.95%
2.00%
2.00%
2.00%
2.00%
2.00%
2.00%
Fund Balance
6,960,236
7,202,138
7,267,902
7,796,745
7,065,746
6,884,458
500,000
500,000
500,000
685,000
685,000
685,000
519,629
561,015
540,120
498,435
74.19%
60.24%
500,000
500,000
500,000
685,000
685,000
685,000
45.07%
184,973
187,283
184,238
186,291
187,840
188,777
183,989
184,199
184,078
931,347
1,135,629
1,152,032
1,121,351
1,127,572
1,134,078
1,135,000
1,135,000
1,135,000
1,148,298
1,160,413
1,123,081
752,082
481,803
578,045
740,965
1,275,652
1,277,332
1,274,418
1,272,055
1,269,378
1,276,780
1,273,263
1,274,628
1,269,745
1,273,650
(300,000)
(300,000)
(300,000)
(300,000)
(300,000)
(300,000)
(300,000)
(300,000)
(300,000)
(300,000)
(300,000)
(300,000)
1,030,127
922,768
975,652
977,332
974,418
972,055
969,378
976,780
973,263
974,628
969,745
973,650
1,961,474
2,071,066
2,136,065
2,100,413
2,110,047
2,124,087
2,090,729
2,104,352
2,107,341
2,109,628
2,104,745
2,108,650
109,592
64,999
(35,652)
9,634
14,040
(33,358)
13,623
2,989
2,287
(4,883)
3,905
5.59%
3.14%
-1.67%
0.46%
0.67%
-1.57%
0.65%
0.14%
0.11%
-0.23%
0.19%
* Dependent upon operational revenues exceeding operational expenditures
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Tax Capacity Value
22,569,018
21,978,322
25,705,350
26,847,273
27,920,178
31,332,022
31,958,662
32,597,836
33,249,792
33,914,788
34,593,084
35,284,946
(590,696)
3,727,028
1,141,923
1,072,905
3,411,844
626,640
639,173
651,957
664,996
678,296
691,862
-2.62%
16.96%
4.44%
4.00%
12.22%
2.00%
2.00%
2.00%
2.00%
2.00%
2.00%
Gross Tax Levy
10,631,299
10,843,925
11,143,925
11,593,925
11,938,555
12,416,357
12,664,684
12,917,978
13,176,337
13,439,864
13,708,661
13,982,835
212,626
300,000
450,000
344,630
477,802
248,327
253,294
258,360
263,527
268,797
274,173
2.00%
2.77%
4.04%
2.97%
4.00%
2.00%
2.00%
2.00%
2.00%
2.00%
2.00%
General Fund
Revenues
10,162,468
10,123,306
10,155,767
11,038,569
10,998,472
11,085,238
11,306,943
11,533,082
11,763,744
11,999,019
12,238,999
12,483,779
-0.39%
0.32%
8.69%
-0.36%
0.79%
2.00%
2.00%
2.00%
2.00%
2.00%
2.00%
Expenditures
9,590,074
9,881,404
10,090,003
10,509,726
11,729,471
11,266,526
11,491,857
11,721,694
11,956,128
12,195,251
12,439,156
12,687,939
3.04%
2.11%
4.16%
11.61%
-3.95%
2.00%
2.00%
2.00%
2.00%
2.00%
2.00%
Fund Balance
6,960,236
7,202,138
7,267,902
7,796,745
7,065,746
6,884,458
6,699,544
6,510,932
6,318,548
6,122,316
5,922,159
5,717,999
Fund Balance% of Expenditures
72.58%
72.89%
72.03%
74.19%
60.24%
61.11%
58.30%
55.55%
52.85%
5020%
47.61%
45.07%
A
1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755 -5100
FAX (763) 755 -8923 • WWW.ANDOVERMN.GOV
TO:
FROM:
SUBJECT:
DATE:
Mayor and Councilmembers
Jim Dickinson, City Administrator
September 2017 General Fund Budget Progress Report
October 24, 2017
INTRODUCTION
The City of Andover 2017 General Fund Budget contains total revenues of $10,825,139 and total
expenditures of $11,039,719; a decrease in fund balance is planned.
Monthly reporting of the City Budget progress to the Governing body is a recommended financial
practice and often viewed positively by rating agencies.
DISCUSSION
Attached is the General Fund Revenue & Expenditure Budget Summary - Budget Year 2017,
reflecting year to date actual through September 2017. The attachments are provided to assist
discussion in reviewing 2017 progress; other documents may be distributed at the meeting.
The following represents Administration's directives and departmental expectations that are in place
for 2017:
1. Expenditure budgets while approved, expenses are to meet with the spirit that needs are
fulfilled first, expansions of service and special requests are to be reviewed with City
Administration before proceeding.
2. Departments are to be committed to search for the best possible prices when purchasing goods
and services.
3. Departments are to be committed to continually searching out new efficiencies and to
challenge the status quo of-how the City provides services.
4. Departments are to be committed to searching out collaborative opportunities to facilitate
efficient and cost - effective utilization of governmental assets and personnel.
5. Departments are to be committed to developing effective, consistent and ongoing
communications with City residents, businesses and other stakeholders.
6. Departments are to be cognizant that services provided are subject to available revenues and
should not commit to services that are not sustainable.
ACTION REQUESTED
The Council is requested to receive a presentation from staff.
ctfully submitted,
Dickinson
achment
CITY OF ANDOVER
General Fund Budget Summary Totals
Budget Year 2017
2016 2017
REVENUES Budget Sep YTD % Bud Final Budget Sep YTD % Bud
General Property Tax
$ 8,113,528
$ 4,226,438
52%
$ 8,217,768
$ 8,420,354
$ 4,364,254
52%
Licenses and Permits
346,205
439,188
127%
625,907
367,705
406,007
110%
Intergovernmental
673,248
530,633
79%
733,951
766,150
581,893
76%
Charges for Services
767,950
659,234
86%
857,163
773,950
620,403
80%
Fines
100,750
66,940
66%
88,600
100,750
52,122
52%
Investment Income
75,000
7,922
11%
43,747
75,000
19,980
2701.
Miscellaneous
116,800
141,710
121%
194,802
124,300
151,391
122%
Transfers In
196,930
196,930
100%
196,930
196,930
196,930
100%
Total Revenues
$ 10,390,411
$ 6,268 995
60%
$ 10,958,868
$ 10,825,139
$ 6,392,980
59%
2016 1 2017
EXPENDITURES Budget Sep YTD % Bud Final Budget Sep YTD % Bud
GENERAL GOVERNMENT
Mayor and Council
$ 88,780
$ 70,759
80%
$ 86,990
$ 89,991
$ 68,761
76%
Administration
192,778
136,465
71%
187,876
199,541
137,527
69%
Newsletter
26,000
17,429
67%
22,731
26,000
17,605
68%
Human Resources
35,260
13,342
38%
13,403
27,913
15,626
56%
Attorney
187,640
123,372
66%
184,990
191,360
125,989
66%
City Clerk
157,075
108,134
69%
148,338
148,599
107,030
72%
Elections
82,919
43,762
53%
64,433
63,881
14,909
23%
Finance
261,016
195,011
75%
252,563
268,129
202,970
76%
Assessing
150,000
143,883
96%
146,472
150,000
145,367
97%
Information Services
173,483
114,528
66%
151,386
180,722
108,591
60%
Planning & Zoning
435,606
322,101
74%
414,141
462,212
287,493
62%
Engineering
509,514
378,033
74%
511,074
535,715
377,655
70%
Facility Management
568,201
308,163
54%
408,250
681,733
351,977
52%
Total General Gov
2,868,272
1,974,982
69%
2,592,647
3,025,796
1,961,500
65 °/
PUBLIC SAFETY
Police Protection
2,936,467
2,202,350
75%
2,936,467
2,962,551
2,221,913
75%
Fire Protection
1,294,795
795,668
61%
1,285,416
1,422,522
854,102
60%
Protective Inspection
441,807
302,516
68%
424,247
446,688
330,875
740/.
Civil Defense
22,982
15,262
66%
17,495
24,847
14,085
57%
Animal Control
7,950
2,184
27%
3,700
5,950
1,600
27%
Total Public Safety
4,704,001
3,317,980
71%
4,667,325
4,862,558
3,422,575
70%
PUBLIC WORKS
Streets and Highways
656,237
- 542,372
83%
686,087
614,668
457,131
74%
Snow and Ice Removal
563,587
338,890
60%
468,174
547,777
301,297
55%
Street Signs
204,193
118,023
58%
167,283
215,244
149,783
70%
Traffic Signals
35,000
17,099
49%
27,919
37,000
20,301
55%
Street Lighting
36,400
25,260
69%
37,089
38,400
18,066
47%
Street Lights - Billed
217,500
132,094
61%
200,509
217,500
91,005
42%
Park & Recreation
1,257,247
900,174
72%
1,247,501
1,275,530
874,015
69%
Natural Resource Preservation
10,096
50
0%
7,255
12,697
4,001
32%
Recycling
130,927
87,278
69%
124,860
122,221
116,265
95%
Total Public Works
3,111,187
2,161,240
69%
2,966,677
3,081,037
2,031,864
66
OTHER
Miscellaneous 281,728 258,107 92% 258,577 781,728 764,850 98%
Youth Services 38,600 24,500 63% 24,500 38,600 - 0%
Total Other 320,328 282,607 88% 283,077 820,328 764,850 93
Total Expenditures S 11,003,788 $ 7,736,809 70% $ 10,509,726 $ 11,789,719 $ 8,180,789 699
NET INCREASE (DECREASE) $ (613,377) $ (1,467,814) $ 449,142 $ (964,580) $ (1,787,809)
1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755 -5100
FAX (763) 755 -8923 • WWW.ANDOVERMN.GOV
TO:
FROM:
SUBJECT:
DATE:
Mayor and Councilmembers
Jim Dickinson, City Administrator
September 2017 City Investments Review
October 24, 2017
INTRODUCTION
0
Summary reporting of the City Investment portfolio to the Governing body is a recommended
financial practice and often viewed positively by rating agencies.
Furthermore, the City of Andover Investment Policy recommends the Finance Director presents
to the City Council at least quarterly the type of investments held by the City.
DISCUSSION
Attached is the Investment Maturities Summary for September 2017, the September 2017
Investment Detail Report, and the September 2017 Money Market Funds Report. These
attachments are intended to assist with discussion when reviewing the September 2017
investments.
ACTION REQUESTED
Informational. The Council is requested to review and provide feedback to staff.
fitted,
Investment Maturities - September 2017
i
Investment Maturities (in Years)
Credit Fair Less Than More Than
Investment Tye Rating Value 1 1 - 5 6 - 10 10
Money market funds
N/A
$ 1,407,179
$ 1,407,179
$
$
$
MN Municipal Money
1,009,386
1,009,386
Market Fund (4M)
N/A
Premier Banks Money
N/A
Market Fund
261,301
261,301
Certificates of deposit
3,843,285
FDIC
12,824,432
8,981,147
A /Al /A2
555,915
Local governments
183,821
1,673,514
209,210
!
60,136
102,748
AA1 /AA2 /AA3
_
7,140,574
3,709,0691
1,342,499
415,492
AAA
3,586,924
614,366
2,592,199
380,360
-
205, 328.
State governments
A /A1 /A2
205,328
AA1 /AA2 /AA3
1,491,055
495,613
995,442
AAA
660,884
60,181
396,416
204,286
4,738,536
37,744
121,545
U.S. agencies
AAA
6,348,928
1,451,104
N/A
1,117
FNMA REMIC
1,117
---
U.S.agencies
N/A
1,465,408
1,269,643
195,765
$ 36,958,432
$ 17,408,372
Total investments
j
$ 16,885,249
$ 2,025,026
1 $ 639,785
Deposits
1,461,366:
Total cash and investments
$ 381419,798
September 2017 Investment Detail
Description
Cusip
Number
Credit
RatinglF
DIC#
Type
Purchase Price
Carrying Cost
Maturity
Amount
Interest
Rate
Current Market
Valuetesf
paid
Date
Acquired
Coupon
Date
Maturity 1
Due Date
Bank of India NY
06279HR62
30856PAG1
33648
9298
CD
245,000.00
245,000.00
245,000.00
1.250%
245,029.40
maturity
07/20/17
none
10/18/17
Farmers & Merchants Svgs Bk
CD
249,000.00
245,000.00
249,000.00
245,000.00
249,000.00
245,000.00
1.050%
1.200%
249,047.31
245,031.85
monthly
maturity
01/22/16
07125/17
02/22/16
10/23/17
Whitney Bk New Orleans LA
966594BAO
12441
CD
none
10/25/17
Luther Burbank- CA
550551CB9
32178
CD
245,000.00
245,000.00
245,000.00
1.150%
245,026.95
maturity
07/27/17
none
10/27/17
First Federal Svgs Bk of Florida
32022WAS5
31313
23623
CD
CD
245,000.00
245,000.00
245,000.00
245,000.00
1.150%
245,029.40
maturity
07/28/17
12/05/16
none
none
10/30/17
11/17/17
Washington Trust Company
940637HU8
245,000.00
245,000.00
0.750%
244,909.35
maturity
PeoplesBank
710465EE1
90213
CD
245,000.00
245,000.00
245,000.00
1.150%
245,046.55
maturity
07/21117
none
11/21/17
1 Year CD- Premier Bank
1091003210
2055214401
21714
33202
CD
251,504.10
251,504.10
251,504.10
0.700%
251,504.10
maturity
12/16/16
none
12/16/17
1 Year CD - Premier Bank Rochester
CD
246,474.02
246,474.02
246,474.02
0.600%
246,474.02
maturity
12/16/16
none
12/16/17
1 Year CD - Premier Bank MN
3041574901
33204
CD
246,474.02
246,474.02
246,474.02
0.600%
246,474.02
maturity
12/16/16
none
12/16/17
Valley Cent Svgs Bk Reading OH
Safra National Bk
91944RAE8
28555
CD
150,000.00
150,000.00
150,000.00
1.250%
150,051.00
monthly
12/22/14
01122/15
12/22/17
78658QD59
26876
CD
245,000.00
245,000.00
245,000.00
245,000.00
245,000.00
245,000.00
1.000%
1.100%
244,919.15
244,980.40
maturity
maturity
12/29/16
none
12/28/17
BankUnited NA
066519CT4
58979
CD
12/29/16
none
12129/17
Bank Baroda New York
06062QY99
33681
CD
245,000.00
245,000.00
245,000.00
1.000%
244,911.80
maturity
03/31/17
none
01/02/18
State Bk India NY
856285DA6
07370T6R9
33682
32574
CD
CD
245,000.00
245,000.00
245,000.00
1.300%
245,110.25
maturity
maturity
07/18/17
06/21/17
none
none
01/18/18
01/24/18
Beal Bank SSB Plano Tex
245,000.00
245,000.00
245,000.00
1.100%
244,951.00
First Bank of Highland
319141EL7
17470
CD
245,000.00
245,000.00
245,000.00
0.850%
244,649.65
maturity
02122/17
none
02/22118
TCF National Bank
Plains Commerce Bank
872278YZ3
28330
CD
245,000.00
245,000.00
245,000.00
0.850%
244,649.65
maturity
02/22/17
none
02/22/18
02128/18
72651LBM5
1678
CD
245,000.00
245,000.00
245,000.00
245,000.00
0.850%
0.900%
244,627.60
244,647.20
maturity
02/28/17
none
Home Savings & Loan Co
43731 LCF4
28114
CD
245,000.00
245,000.00
maturity
03/10117
none
03/09118
Mabrey Bk Bixby OK
554133BP2
10667
CD
245,000.00
245,000.00
245,000.00
1.200%
244,968.15
maturity
07114/17
none
03/14/18
Old National Bank
680061GY8
3832
CD
CD
245,000.00
245,000.00
245,000.00
245,000.00
245,000.00
245,000.00
0.950%
1.000%
244,681.50
244,737.85
maturity
maturity
03/15/17
none
03/15/18
S & T Bank
783861CJ4
11124
03/15/17
none
03/15/18
Synovus Bank
87164DHW3
873
CD
244,999.78
244,999.78
245,000.00
1.000%
244,838.30
semi - annual
12/05116
none
04/13/18
IberiaBank
45083AGW6
32021SDTO
28100
6600
CD
CD
245,000.00
245,000.00
245,000.00
245,000.00
1.350%
245,102.90
245,169.05
maturity
maturity
07/19/17
07/21/17
none
none
04/19/18
First Financial Bank
245,000.00
245,000.00
1.400%
04/23/18
Morgan Stanley Bank NA
61747MXH9
32992
CD
245,000.00
245,000.00
245,000.00
1.450%
245,235.20
maturity
07/27117
none
04/27/18
Morgan Stanley PvtBank
Community Bk Chesapeake MD
61760ACHO
34221
CD
245,000.00
245,000.00
245,000.00
1.450%
245,235.20
maturity
07/27/17
none
none
04/27/18
05/11/18
20350ACU3
30903
CD
245,000.00
245,000.00
245,000.00
245,000.00
245,000.00
1.350%
1.400%
245,073.50
245,149.45
maturity
08/18/17
Compass Bk Birmingham AL
20451PSG2
19048
CD
245,000.00
maturity
08111117
none
05/11/18
PlainsCapital Bank
72663QC98
17491
CD
245,000.00
245,000.00
245,000.00
1.350%
244,990.20
maturity
06/21/17
none
06/21118
Capital One Bank (USA)
140420ZQ6
33954
17534
CD
CD
245,000.00
245,000.00
245,000.00
245,000.00
245,000.00
245,000.00
0.900%
0.850%
244,218.45
244,314.00
semi - annual
semi - annual
07/13/16
07/13/16
01/13/17
07113/18
Key Bank National Association
49306SWQ5
01/13117
07113/18
Bank of China NY
06426WNJ7
33653
CD
245,000.00
245,000.00
245,000.00
1.500%
245,198.45
maturity
07/20/17
none
07/20/18
First National Bank of Omaha
Israel Discount Bank of NY
332135HA3
465076JU2
5452
19977
CD
245,000.00
245,000.00
245,000.00
1.450%
245,080.85
maturity
maturity
07/28/17
08/09/17
none
none
07/27/18
08/09/18
CD
245,000.00
245,000.00
245,000.00
1.450%
245,041.65
Pacific Western Bank
69506YFT1
24045
CD
245,000.00
245,000.00
245,000.00
1.450%
245,041.65
maturity
08/09117
none
08/09/18
Junction City Kansas
Augusta ME
481502F72
A2
local
101,558.00
101,558.00
100,000.00
5.500%
103,286.00
semi - annual
05/28108
03/07/12
03/01/09
none
09/01/18
10101/17
051411ND4
A3
local
11,250.00
11,250.00
10,000.00
5.250%
10,001.90
semi- annual
Kaufman TX
486206KLB
A3
local
72,922.50
72,922.50
70,000.00
4.000%
70,533.40
semi - annual
06/28/16
02/15117
02/15118
Racine WI
7500216D4
AA-
local
101,792.00
101,792.00
100,000.00
2.100%
100,305.00
semi- annual
01/24/12
06/01/12
06101/18
Indiana St Bond Bank
454624S40
AA+
local
146,123.60
146,123.60
140,000.00
4.302%
142,735.60
semi - annual
12/30/16
none
08/01/18
8,981,147.00 CD
Description
Cusip
Number
Credit
RatinglF
DIC#
Type
Purchase Price
Carrying Cost
Maturity
Amount
Interest
Rate
Current Market
Value
Date
Acquired
Coupon
Date
Maturity /
Due Date
Regl Transprtn Dist, Denver
759136RR7
AA1
local
254,312.50
254,312.50
250,000.00
2.000%
250,157.50
semi - annual
07/12/16
11/01113
11/01/17
Dane County WI
236091M92
AA1
local
106,487.00
106,487.00
100,000.00
2.450%
100,171.00
semi- annual
07/16/12
none
12/01/17
Minneapolis MN
60374YF93
AA1
local
220,938.00
220,938.00
200,000.00
4.000%
202,068.00
semi - annual
03/04/14
none
03/01/18
New York City NY Transitional
Scott County IA
64971 QTU7
809486EZ2
AA1
local
100,440.00
100,440.00
112,617.00
100,000.00
100,000.00
1.600%
4.400%
100,057.00
101,282.00
semi- annual
01/27/17
none
05/01/18
AA1
local
112,617.00
semi- annual
10/31/12
12101/12
06/01/18
Prior Lake MN
742617CB7
AA2
local
230,000.00
230,000.00
230,000.00
1.000%
229,760.80
semi - annual
05/14/15
12/15/15
12/15/17
Hopkins Minn lSD #270
439881HCO
AA2
local
95,278.40
95,278.40
80,000.00
5.250%
80,951.20
111,135.20
semi - annual
04/30/12
08/01/09
02/01/18
Orono MN ISD #278
687136LA7
AA2
local
115,511.00
115,511.00
110,000.00
4.000 %
semi - annual
08/04/16
02/01/17
02/01/18
Chippewa Falls WI
169772VS6
AA3
local
255,321.30
255,321.30
255,000.00
1.550%
254,890.35
semi - annual
07/31/17
none
04/01/18
Washington County MN
937791KL4
AAA
local
115,000.00
115,000.00
115,000.00
3.750%
115,468.05
100,752.00
semi - annual
semi- annual
07/01/10
01/01/11
01/01/18
Saint Louis Park MN
BanderaTXISD
79174OWC3
059851HR9
AAA
AAA
local
local
112,114.00
154,890.00
112,114.00
154,890.00
100,000.00
3.850%
12/22/11
none
02/01/18
150,000.00
4.000%
151,735.50
semi- annual
12/22/16
none
02/15/18
Brownsville TX ISD Zero Coupon
116421E46
AAA
local
229,640.00
229,640.00
250,000.00
246,410.00
maturity
semi - annual
06/26/13
12/09/15
none
08/15/18
New Hampshire St Hsg
New Hampshire St Hsg
64469DWUl
64469DWV9
AA2
AA2
state
state
200,762.00
115,685.40
200,762.00
115,685.40
200,000.00
115,000.00
1.789%
200,078.00
07/01/16
01/01/18
1.939%
115,187.45
semi - annual
12/09/15
07/01/16
07101/18
Kansas St Dev Fin Auth
485429X90
AA3
state
182,743.20
182,743.20
180,000.00
1.877%
180,347.40
semi- annual
semi- annual
07/12/16
02/09/17
none
04/15/18
Virginia St Res Auth Infrastructure
92817QKSO
AAA
state
61,500.00
61,500.00
60,000.00
4.710%
0.930%
60,181.20
249,462.50
11/01109
11/01/17
Fed Farm Credit Bank
3133EFJMO
AAA
US
249,750.00
249,750.00
250,000.00
semi- annual
05/25/16
04/13/16
04/13/18
Fed Home LnBank
313379DT3
AAA
US
250,010.74
250,010.74
250,000.00
1.250%
249,937.50
semi - annual
07/07/17
12/08/12
06108/18
Fed Farm Credit Bank
3133EHDQ3
AAA
US
200,042.00
200,042.00
200,000.00
1.180%
199,942.00
249,517.50
semi- annual
semi- annual
03/30/17
06/27/17
06/27/18
Fed Natl Mtg Assn
3135GOE33
AAA
US
249,677.50
200,000.00
249,677.50
200,000.00
250,000.00
200,000.00
1.125%
07/07/17
07/20/15
07/20/18
Fed Home Ln Mtg Corp Mad Term Note
3134G3ZK9
AAA
US
1.200%
199,834.00
semi- annual
07/30/12
01/30/13
07/30/18
Fed Farm Credit Bank
31331Y4S6
AAA
US
114,000.00
114,000.00
100,000.00
5.050%
103,086.00
semi - annual
semi- annual
09/11/13
03/30/17
none
08/01118
Fed Farm Credit Bank
3133EGK87
AAA
US
199,462.00
199,462.00
1,133.05
200,000.00
1,109.82
1.020%
199,324.00
'none
09/24/18
Fed Nat] Mtg Assn Remic
31393EAL3
US
204,187.50
4.500%
1,117.39
monthly
07/30/03
none
08/25/18
FICO Strip Prin Zero Coupon
31771 KAC1
US
295,932.00
295,932.00
300,000.00
299,961.00
maturity
10/23/15
none
10/06/17
FICO Strip Prn-4 Zero Coupon
31771EAD3
US
194,572.00
194,572.00
200,000.00
224,000.00
199,974.00
maturity
03/16/15
none
10/06/17
FICO Strip Cpn -E Zero Coupon
31771JXM7
US
215,452.16
215,452.16
223,776.00
maturity
12/11/14
none
11/02117
FICO Strip Cpn Zero Coupon
31771EAA9
US
529,947.00
529,947.00
550,000.00
545,182.00
maturity
06/09/14
none
05/11/18
Fed Home Ln Mtg Corp
31393VMQ1
US
153,656.25
765.06
746.86
4.500%
750.30
14,730,505.74
monthly
06/30/03
06/15/18
Amex Centurion Bk
02587DU63
27471
CD
245,000.00
245,000.00
245,000.00
1.550%
245,009.80
maturity
semi - annual
08/03/17
02/08/18
11/08/18
BMW Bank of North America
0558OADR2
35141
CD
245,000.00
245,000.00
245,000.00
245,000.00
245,000.00
245,000.00
1.600%
245,095.55
01/22116
07/22/16
01/22/19
Ally Bank Midvale Utah
02006LF32
57803
CD
1.200%
242,998.35
semi- annual
06/30/16
12/30/16
07/01/19
Barclays Bank
06740KHB6
57203
CD
247,000.00
247,000.00
247,000.00
2.050%
248,479.53
semi - annual
07/03/14
01/02/15
07/02/19
Synchrony Bank
87164WBT4
27314
CD
247,000.00
247,000.00
247,000.00
2.050%
1.100%
248,435.07
242,750.90
semi - annual
07/11/14
01/11/15
07/11/19
JP Morgan Chase Bank NA
48125Y5L4
628
CD
245,000.00
245,000.00
245,000.00
quarterly
07/15/16
10/15/16
07/15/19
PrivateBank & Trust Co
74267GUQ8
33306
CD
247,000.00
247,000.00
247,000.00
2.000%
248,435.07
semi - annual
07/21114
01/21/15
07122/19
Goldman Sachs Bank USA
38147JU59
33124
CD
247,000.00
247,000.00
247,000.00
2.050%
1.700%
248,257.23
245,117.60
semi - annual
07/23114
01/23/15
07/23/19
Sallie Mae Bank
First Federal Svgs Bk
795450895
32021YCH4
58177
29690
CD
CD
245,000.00
245,000.00
245,000.00
semi- annual
08/09/17
02/09/18
08/09/19
249,000.00
249,000.00
249,000.00
1.500%
250,541.31
monthly
01/21/16
02121/16
08/21/19
Victory Bank
92644LAB8
58615
CD
247,000.00
247,000.00
247,000.00
2.000%
248,407.90
semi - annual
09/24/14
03/24/15
09/24/19
2,471,700.50 local
555,794.05 state
2,721,864.19 US
-ess Than 1 Year
Description
Cusip
Number
Credit
Rating /F
DIC #
Type
PurchasePrice
Carrying Cost
Maturity
Amount
rrent Market
Value
re at
Date
Acquired
Coupon
Date
Maturity l'
Due Date
Third Federal Sav & Loan
884130AW8
30012
CD
128,000.00
128,000.00
128,000.00
J1.000%
128,966.40
249,655.25
semi- annual
11/24/14
05124115
11/25/19
Celtic Bank
15118RJMO
57056
CD
247,000.00
247,000.00
247,000.00
247,000.00
247,000.00
semi- annual
12/20/13
06/20/14
12120119
12/26/19
Stearns Bank NA
857894PB9
17318LAP9
10988
1402
CD
CD
247,000.00
249,000.00
248,896.96
semi- annual
12/26/14
06/27/14
06/26115
Citizens Alliance Bank
249,000.00
249,000.00
2.000%
251,651.85
250,586.13
monthly
07/27/14
06/26/20
Enerbank USA
29266NA31
57293
CD
249,000.00
249,000.00
249,000.00
165,000.00
2.100%
2.750%
monthly
07118/14
08118114
07/20/20
Elbow Lake MN
284281KC5
A
local
170,045.70
45,755.20
170,045.70
167,432.10
semi- annual
12/08/14
none
none
12/01/19
Oneida County NY
Farmington MN
6824543R2
Al
local
45,755.20
40,000.00
6.250%
41,777.60
semi - annual
semi - annual
08/16/10
04/15119
311297W84
AA
local
102,787.00
102,787.00
100,000.00
2.000%
4.400%
101,252.00
41,473.20
07/06116
none
02/01119
Rice Cnty MN
762698GK8
AA
local
45,466.80
45,466.80
10,000.00
40,000.00
semi - annual
03/07/12
none
08/01/14
02/01/19
02101/19
Minnetrista MN
604229KE3
751813PB6
AA+
AA+
local
10,000.00
10,000.00
2.450%
10,010.90
semi- annual
semi - annual
10/10/13
02/16/12
Ramsey MN
local
158,677.85
158,677.85
145,000.00
4.500%
145,346.55
04101116
04/01119
Rothsay MN ISD #850
778731AZ2
AA+
local
208,640.25
208,640.25
195,000.00
80,000.00
3.000%
203,767.20
semi - annual
07/06/16
none
02/01120
03/01/20
Saint Paul MN Port Auth
793067CC1
AA+
AA+
local
local
79,756.80
276,875.00
79,756.80
2.000%
79,905.60
semi- annual
01/10/17
04/17/13
09/01/17
Stearns Co MN
Minnetrista MN
857896MH4
276,875.00
250,000.00
4.500%
250,477.50
160,264.00
semi- annual
none
06/01/20
604229KG8
AA+
local
161,038.40
161,038.40
160,000.00
25,000.00
3.100%
semi - annual
10/10/13
08/01/14
02/01/21
03/15/21
12/01/18
Greenway MN ISD #31
39678LDF6
AA+
AA1
local
local
27,593.50
111,898.00
27,593.50
5.000%
26,070.75
semi- annual
07/09/13
06/05/12
none
Minneapolis MN
Cedar Rapids IA
60374YS73
111,898.00
100,000.00
3.250%
101,981.00
204,354.00
semi - annual
semi- annual
12/01111
150528RM1
AA1
local
217,672.00
217,672.00
200,000.00
3.000%
1.450%
06111/13
12/01/13
06/01/19
Multnomah Cnty OR Sch Dist 1J
625517JMO
AA1
local
250,000.00
250,000.00
278,632.50
250,000.00
249,185.00
semi- annual
08/10117
12/15/17
none
06115119
Minneapolis MN
60374YS81
4095582,11
AA1
AA1
local
278,632.50
250,000.00
3.500%
259,052.50
semi - annual
semi- annual
02/26/13
12/01/19
Hampton VA
Middleton WI
local
100,836.00
100,836.00
100,000.00
2.209%
100,747.00
101,907.00
01/20/16
none
04/01/20
596782RX2
AA1
local
106,979.00
106,979.00
100,000.00
50,000.00
3.750%
semi- annual
02/24/15
none
09101/20
06/01/21
Des Moines IA Area Cmnty Col
250097H21
AA1
AA2
local
local
50,606.00
241,689.60
50,606.00
2.450%
50,774.50
semi - annual
11/10/14
08/05110
12/01/14
Orange Beach ALA
Sioux City IA
68406PHF1
241,689.60
240,000.00
4.400%
245,224.80
155,829.25
semi- annual
02/01/11
02/01/19
829458FC7
AA2
local
156,100.50
156,100.50
155,000.00
50,000.00
2.000%
semi- annual
12/22/16
none
06/01/19
06/01119
Waterloo IA
941647PAI
AA2
local
50,559.50
100,000.00
50,559.50
100,000.00
2.000%
50,218.50
semi - annual
06/27/13
08/16/11
12/01/13
04/01/12
Westem Lake Superior MN
Portsmouth VA
958522WU4
73723RSL8
AA2
local
100,000.00
3.150%
102,219.00
semi - annual
semi - annual
10/01/19
AA2
local
286,268.00
286,268.00
295,000.00
110,000.00
2.400%
1.740%
300,165.45
07117/13
02/01/14
02/01/20
05/01/20
Brunswick Cnty
117061VH1
AA2
local
108,967.10
259,715.00
108,967.10
259,715.00
109,536.90
semi- annual
08/21/15
03/10117
none
none
Fon Du Lac Cnty WI
344442KK3
AA2
AA3
local
local
250,000.00
3.250%
256,287.50
semi - annual
maturity
03/01121
Kane McHenry Cook & De Kalb Zero Cpn
Moorhead MN
484080MB9
157,328.00
157,328.00
200,000.00
194,630.00
101,063.00
07/16112
none
12/01118
6161412R7
AA3
local
108,820.00
108,820.00
100,000.00
100,000.00
3.800%
semi- annual
11/14/11
none
none
02/01/20
12/01/20
WhitewaterWis
966204KA6
AA3
local
local
109,541.00
224,634.00
109,541.00
4.850%
107,326.00
semi - annual
06/09/11
03/27/12
King Cnty WA
Minnetonka MN ISD #276
49474E31-5
AAA
224,634.00
200,000.00
3.980%
205,098.00
35,435.75
semi - annual
none
12/01/18
604195RA7
AAA
local
37,433.20
37,433.20
35,000.00
3.100%
5.898 %
semi- annual
12/22/11
none
02/01/19
Palm Beach Cnty FIA
696497TR7
AAA
local
174,889.50
262,890.00
174,889.50
262,890.00
150,000.00
156,580.50
semi - annual
07/06/11
12/27/13
none
none
06/01/19
Tenn Val Auth Cpn Strip Zero Cpn
88059EWZ3
668844DS9
AAA
local
300,000.00
290,280.00
maturity
semi- annual
06/15/19
Norwalk Conn
AAA
local
122,464.80
122,464.80
120,000.00
4.050%
3.263%
122,380.80
08/04110
08/01/11
08/01/19
Greensboro NC
39546OV21
AAA
local
366,832.80
366,832.80
360,000.00
367,603.20
semi - annual
07/15111
none
10/01/19
Saint Paul MN Port Auth
793028WS6
97913PCO7
AAA
AAA
local
201,806.00
201,806.00
200,000.00
2.000%
201,674.00
semi- annual
12/22/16
12/22/11
08/01/17
none
02/01/20
02/01/20
Woodbury MN
local
123,037.35
123,037.35
115,000.00
3.250%
116,401.85
semi- annual
Dallas TX Indpt Sch Dist
2353080K2
AAA
local
116,900.00
116,900.00
263,970.00
100,000.00
4.450%
105,908.00
semi- annual
04/16/12
08/15!11
none
02/15/20
Tenn Valley Auth Zero Cpn
88059EHD9
AAA
local
263,970.00
300,000.00
284,658.00
maturity
03/11/13
05/01/20
3,843,284.90 CD
Description
Cusip
Number
Credit
RatinglF
DIC #
Type
Purchase Price
Carrying Cost
Maturity
Amount
Interest
Rate
Current Market
Value
7
Date
Acquired
Coupon
Date
Maturity
Due Date
Tenn Val Auth Cpn Strip Zero Cpn
McAllen TX Dev Corp
88059EMX9
579086AW9
AAA
local
88,133.00
88,133.00
100,000.00
94,472.00
maturity
semi - annual
03/18/13
none
07/15/20
AAA
local
175,000.00
175,000.00
175,000.00
1.400%
2.219%
172,186.00
07/26/16
02/15/17
08/15/20
01/15/21
Indianapolis Ind
45528UGF2
AAA
local
251,507.50
251,507.50
51,290.00
250,000.00
50,000.00
250,430.00
semi - annual
07/11117
07/15/13
none
04/01/16
Baltimore Cnty MD
05914FME7
64988RHGO
AAA
AAA
local
local
51,290.00
2.097%
49,826.50
semi- annual
08/31/16
10/27/15
08/01/21
10/01/21
12/01/21
New York St Mtge Agy
Columbus OH
100,000.00
100,000.00
100,000.00
2.375%
2.133%
99,309.00
39,955.20
semi- annual
AA
local
39,956.40
39,956.40
214,954.00
40,000.00
200,000.00
semi - annual
02/20/15
none
02/15/14
Connecticut State
Al
state
state
214,954.00
205,804.00
3.517%
205,328.00
semi - annual
05/27/16
01/24/12
08/15/21
Washington State
W60414rPJ3
AA
205,804.00
200,000.00
4.500%
205,034.00
200,920.00
semi - annual
04/01/12
10/01/18
Massachusetts State
Florida St Hurricane
A1
state
199,744.00
199,744.00
200,000.00
2.090%
2.995%
semi - annual
12/17/14
11/01/14
05/01/20
07/01/20
A3
state
279,439.80
279,439.80
100,000.00
270,000.00
275,194.80
semi- annual
11/10/15
02/26/15
07/01113
Minnesota St Colleges & Univ
3416OWUAO
A3
AA3
state
100,000.00
100,000.00
2.000%
99,7 53.00
semi - annual
semi- annual
10/01/15
10/01/20
Florida St Dept Environmental
Georgia State
state
217,800.00
217,800.00
200,000.00
6.206%
2.970%
214,540.00
25,355.75
08/30/10
07101/10
07/01/22
10/01/18
373384RQ1
AAA
state
26,742.50
26,742.50
103,089.00
25,000.00
100,000.00
semi - annual
02/08/12
none
04/01/12
02/01/12
Texas State
882722,151
AAA
state
state
103,089.00
48,218.85
2.894%
101,356.00
semi - annual
08/10/11
08/30/16
10/01/18
08101/20
06/01/21
Tennessee State
Virginia State
880541QQ3
AAA
48,218.85
45,000.00
3.178%
4.100%
46,633.05
20,683.60
semi - annual
928109XD4
AAA
state
22,126.00
22,126.00
203,458.00
20,000.00
200,000.00
semi- annual
02/07/12
03/29/17
none
none
Kentucky St Hsg Corp
49130TSHO
AAA
state
203,458.00
448,245.00
2.780%
202,388.00
semi- annual
semi- annual
semi- annual
07/01/21
Govt Nall Mtg Assn
3136GILU1
3133EHQF3
AAA
US
448,245.00
450,000.00
1.060%
446,584.50
08/21117
07/07117
none
01/07/18
11/14/18
01/07119
Fed Farm Credit Bank
Fed Farm Credit Bank
AAA
US
249,870.00
249,870.00
250,000.00
200,000.00
1.350%
1.250%
249,565.00
3133EG3X1
AAA
US
199,711.60
199,300.00
99,587.00
199,711.60
199,300.00
199,450.00
semi- annual
06/16/17
10/30/12
07/17117
01/17/19
Fed Natl Mtg Assn
3136GOY70
AAA
AAA
US
US
200,000.00
1.080%
198,986.00
semi- annual
semi- annual
01130113
01/30/19
Fed Farm Credit Bank
Fed Farm Credit Bank
3133EC5NO
99,587.00
100,000.00
1.250%
99,497.00
250,850.00
01/07/13
03104/13
03/04/19
03/04/19
3133EDTU6
AAA
US
251,285.00
251,285.00
250,000.00
200,000.00
1.700%
semi - annual
07/07/17
03/04/15
09/06/17
09108/12
Fed Farm Credit Bank
3133EHLZ4
AAA
US
US
199,654.80
250,470.00
199,654.80
1.270%
199,310.00
semi - annual
06/16/17
07/07/17
03/06/19
03/08/19
03/13/19
Fed Home Ln Bank
Fed Nat] Mtg Assn
Fed Natl Mtg Assn
3133782M2
AAA
250,470.00
250,000.00
1.500%
250,107.50
199,542.00
semi- annual
3136G1FYO
AAA
US
200,000.00
200,000.00
200,000.00
1.375%
semi- annual
06/22/17
none
10/26/16
3135GOK28
AAA
US
299,700.00
249,035.00
299,700.00
249,035.00
300,000.00
1.250%
298,449.00
semi- annual
semi - annual
quarterly
07/19/17
04/26/19
Fed Home Ln Mtg Corp
3137EADK2
3134G96U6
AAA
AAA
US
250,000.00
1.250%
248,812.50
07/07/17
08123/16
02101/13
11/23116
08/01/19
08/23/19
Fed Home Ln Mtg Corp Med Term Note
Fed Home Ln Mtg Corp Med Term Note
US
200,000.00
200,000.00
200,000.00
250,000.00
1.050%
197,958.00
3134GALU6
AAA
US
249,835.00
249,835.00
185,568.00
0.800%
250,000.00
semi- annual
03/29/17
03/30/17
09/30/19
RFCSP Strip Principal Zero Coupon
76116FAA5
AAA
US
US
185,568.00
199,600.00
200,000.00
193,272.00
maturity
semi- annual
07/22/15
none
10/15/19
Fed Farm Credit Bank
Fed Home Ln Mtg Corp Zero Cpn
3133EGBKO
AAA
199,600.00
200,000.00
1.300%
198,316.00
05/25/16
11/25/16
11125/19
11/29/19
31340OBV4
AAA
US
950,527.00
950,527.00
99,500.00
1,000,000.00
100,000.00
959,610.00
maturity
11102/15
07/22/15
12/28/16
none
Fed Home Ln Bank
313OA3XL3
AAA
US
US
99,500.00
200,000.00
1.500%
99,632.00
semi- annual
08/10/15
06/28/17
02/10/20
12/28/20
Fed Natl Mtg Assn
3136G4JM6
31771C2G9
AAA
200,000.00
200,000.00
1.850%
198,594.00
semi- annual
FICO Strip Cpn13 Zero Coupon
FICO Strip Cpn Zero Coupon
US
93,140.00
93,140.00
100,000.00
100,000.00
98,037.00
maturity
12/29/14
none
12127/18
31358BAA6
US
94,480.00
94,480.00
97,728.00
maturity
04/17/15
none
02/01119
486206KR5
A3
16,885,249.20
local
61,821.00
61,821.00
60,000.00
3.000%
Kaufman TX
60,136.20
semi- annual
06/28/16
02115117
02/15/23
Chaska MN
1616636S3
AA
AA
local
104,657.00
104,657.00
100,000.00
4.000%
102,722.00
semi - annual
09/08/14
none
02/01/24
Mitchell SD Sch Dist #17 -2
606687EHO
local
116,702.00
116,702.00
100,000.00
6.000%
105,742.00
semi - annual
12/20/11
06/15/19
06/15/24
MinnetristaMN
604229KJ2
AA+
local
40,000.00
40,000.00
40,000.00
3.850%
40,092.40
semi- annual
10/10/13
08/01/14
02/01/23
6,510,477.60 local
1,597,186.20 state
4,934,300.50 US
- 5 Years
Description
Cusip
Number
Credit
RatinglF
DIC #
Type
Purchase Price
Carrying Cosy
Maturity
Amount
Interest
Rate
Current Market
Value
N.' c f
Date
Acquired
Q
Coupon
Date
Maturity)
Due Date
Savage Minn
80465PAN4
AA+
local
198,018.00
103,933.00
198,018.00
103,933.00
200,000.00
4.800%
205,374.00
semi- annual
06/17/10
05/11/11
02/01111
none
02/01124
Lake City Minn ISD #813
Milaca Minn ISD #912
508084DW7
AA+
local
100,000.00
5.000%
103,444.00
semi - annual
semi- annual
02/01/25
598699NT9
AA+
local
106,941.00
106,941.00
100,000.00
5.650%
4.700%
104,768.00
103,806.00
07122/11
none
02/01/27
03/01/23
Minneapolis MN
60374YG68
AA1
local
110,419.00
72,201.35
110,419.00
72,201.35
100,000.00
semi - annual
10/31111
12/09/14
none
none
_
Minneapolis MN
Alexandria MN ISD #206
60374YG76
015131L06
AA1
local
65,000.00
4.800%
67,558.40
semi - annual
03/01/24
AA2
local
279,760.50
279,760.50
270,000.00
3.000%
2.625%
278,831.70
29,613.60
semi - annual
01/21/15
none
02/01123
02/01/25
Duluth MN
264438ZL9
AA2
local
29,767.20
29,767.20
101,245.00
30,000.00
100,000.00
semi - annual
12/05/12
08/01/13
10/01/16
W Palm Beach FL
955116BE7
AA3
AA3
local
local
101,245.00
111,480.00
1264%
98,075.00
semi- annual
semi - annual
07/05/16
03113/12
10/01/22
Hawkins Cnty TN
420218PL7
111,480.00
100,000.00
4.800%
102,472.00
none
05/01/24
Tennessee Valley Auth Ser E
880591CJ9
AAA
local
121,500.00
121,500.00
100,000.00
250,000.00
6.750%
130,360.00
semi- annual
03/19/09
none
11/01/25
01101/26
Ice Deposit - National Sports Center
none
local
250,000.00
204,444.00
250,000.00
204,444.00
250,000.00
maturity
02/06/08
12/13/16
07/27117
none
none
08/22/17
Georgia State
373384208
3130A8W33
AAA
AAA
state
200,000.00
2.780%
204,286.00
semi - annual
02/01/23
08122/25
Fed Home Ln Bank
US
39,000.00
39,000.00
40,000.00
2.100%
37,744.40
2,025,025.70
semi- annual
465452GP9
A
07/12/11
none
02/01/28
Itasca County Minn
Van Buren Mich Public Schools
local
105,024.00
105,024.00
100,000.00
5.550%
6.430%
102,748.00
106,462.00
semi- annual
920729HD5
AA1
local
102,750.00
102,750.00
100,000.00
500,000.00
semi- annual
07/17/09
11/01/09
none
05/01/29
Will County IL Cmnty Zero Coupon
969078QM9
AA2
AAA
local
US
159,000.00
106,030.45
159,000.00
309,030.00
maturity
semi- annual
08125/09
11/01/27
Fed Farm Credit Bank
31331VLC8
106,030.45
100,000.00
5.250%
121,545.00
02/26/10
none
04/21/28
639,785.00
34,280,565.64
1,782,995.30 local
204,286.00 state
37,744.40 US
5 -10 Years
518,240.00 local
121,545.00 US
10+ Years
INVESTMENT SCHEDULE - Money Market Funds
September 30, 2017
Description
Current Market
Value
YTD Interest
Wells Far o
Wells Fargo Government Money Market Fund
1 $1,407,179.451
$5,519.10
4M
1 14M
1 1,002,467.82
573.08
4M PLUS
1 14M Plus
1 6,918.121
3,810.57
Premier Bank
1 Premier Bank Money Market
261,301.32
488.09
Grand Total Money Market Funds 1 $2,677,866.71 1 $10,390.84
Updated: 10/10/2017
A C I T Y 0 F
I :.`. �.
' , r1
1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755 -5100
FAX (763) 755 -8923 • WWW.ANDOVERMN.GOV
TO: Mayor and City Council '
CC: Jim Dickinson, City Administrat
FROM: Michelle Hartner, Deputy City Clerk
SUBJECT: Discuss 2018 Council Meeting Dates
DATE: October 24, 2017
INTRODUCTION
Discuss 2018 Council meeting dates because of elections and other conflicts.
DISCUSSION
As staff is preparing calendars for the upcoming year, Council is requested to discuss
meeting date options. The following are dates that fall on Council meeting dates:
Tuesday, February 6, 2018 — Precinct Caucus
Tuesday, July 3, 2018 — falls the day before a holiday
Tuesday, August 7, 2018 — Night to Unite
Tuesday, November 6, 2018 — General Election
ACTION REQUESTED
The City Council is requested to discuss meeting date options that will be brought to a
future Council meeting for approval.
Respectfully submitted,
Michelle Harmer
Deputy City Clerk
O
February 2018
Sun Mon Tue Wed Thu Fri Sat
1
2
3
4
5
6
PRECINCT CAUCUS
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
July 2018
Sun Mon Tue Wed Thu Fri Sat
1
2
3
COUNCIL MEETING
4
4THOFJULY
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
August 2018
Sun Mon Tue Wed Thu Fri Sat
1
2
3
4
5
6
7
NIGHT TO UNITE
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
November 2018
Sun Mon Tue Wed Thu Fri Sat
1
2
3
4
5
6
ELECTION DAY
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30