HomeMy WebLinkAboutFebruary 16, 2017ANL15Y O VEFO
1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100
FAX (763) 755-8923 • WWW.ANDOVERMN.GOV
Regular Park & Recreation Commission Meeting
February 16, 2017
City Hall Conference Room
7:00 P.M.
1. Call to Order
2. Oath of Office/Newly Appointed Commissioner
3. Agenda Approval
4. Meet with YMCA Community Center Advisory Commission to Consider
Questions for Upcoming Community Wide Survey
5. Consider Paving Lund's North Park Parking Lot
6. Adjournment
1685 CROSSTOWN BOULEVARD N.W.. ANDOVER, MINNESOTA 55304 • (763) 755-5100
FAX (763) 755-8923 • WWW.ANDOVERMN.GOV
TO: Park & Recreation Commission
CC: David D. Berkowitz, Director of Public Works/City Engineer—1-15�
FROM: Todd J. Haas, Assistant Public Works Director
SUBJECT: 4. Meet with YMCA Community Center Advisory Commission to Consider
Questions for Upcoming Andover Community Wide Survey
DATE: February 16, 2017
INTRODUCTION
The Park and Recreation Commission is scheduled to meet with the YMCA Community Center
Advisory Commission to consider questions for the upcoming Andover Community Wide
Survey.
DISCUSSION
Jim Dickinson, City Administrator, and Erick Sutherland, Community Center Facilities Manager,
along with the Survey Consultant will be at the meeting to help formulate what type of questions
related to parks and the Community Center should be considered as part of the survey.
Attached is the parks section of the Community survey that was done in late 2013 and early
2014. The Park and Recreation Commission is requested to review the survey to see if any
modifications should be made or if the Commissions would like to include additional questions
in the survey.
ACTION REQUIRED
The Park and Recreation Commission is requested to review the survey from 2013/2014 to
determine if any modifications should be made or if the Commission would like to include
additional questions in the survey.
Respectfully submitted,
1-10011 166e�
Todd J. Haas
Cc: Jim Dickinson, City Administrator
Erick Sutherland, Andover Community Center Facilities Manager
Attachments: 2013/2014 Community Survey x
67. How often do you or members of FREQUENTLY.............25%
your household use city trails - OCCASIONALLY ........... 40%
frequently, occasionally,• rarely RARELY.................17%
or never? NEVER... . .............18%
DON'T KNOW/REFUSED...... 0%
IF "FREQUENTLY" "OCCASIONALLY" OR "RARELY," ASK:'•(n=327)
6B. What do you use them for most DON'T KNOW/REFUSED...... 0%
often? WALKING.................. 58%
8%BICRUNNING/JOGGING ........ 18% -
BICYCLING......... ....... 244%
YCLING................24%
69. Do you support or oppose the use. STRONGLY SUPPORT....... 12%
------• of -city- funding for additional •-- SUPPORT:....:: , ..59 -
trails in the City? (WAIT FOR RE- OPPOSE.................23%
SPONSE) Do you feel strongly that STRONGLY OPPOSE '......... 6%
way? DON'T KNOW/REFUSED ..... .I%
Turning to parks and.recreation....
70. Overall, how would you rate the EXCELLENT..............17-W
city parks and recreation facile- GOOD........ . ..76%
ties in Andover - excellent, good, ONLY FAIR... .5%
only fair or poor? POOR....................1%
DON'T KNOW/REFUSED:..... 2%
71. How often do you of members of FREQUENTLY.............24%
�S your household use city parks and OCCASIONALLY ............ 41%
�- recreation.facilities --frequent- RARELY............ ..14%
ly, occasionally, rarely or never? NEVER.. •,20%
DON`T KNOW/REFUSED...... 0%
IF "FREQUENTLY" "OCCASIONALLY" OR "RARELY," ASK: (n=319)
72. What.do you use them for most DON'T KNOW/REFUSED...... 0%
often? EXERCISE ................ 41%
PLAYGROUND EQUIPMENT... 28%
COMMUNITY CENTER 12%
BALLFIELDS.............18%
'FAMILY GATHERINGS ....... 2%
For each of the following, please tell me if you think Andover's
facilities are much better in comparison to other cities, somewhat
better, about the same, somewhat worse or much worse in comparison
to other cities.
73. City park system?
74. Youth athletic facilities?
75. Adult recreation facilities?
MBT SBT SAM SWR MWR DKR
8% 30% 58% 2% 0% 3%.
4% 23% 59% 5% 0% 10%'
3% •19% 65% 6%' 0% 8-o.-
76.
%
76. Have you or members of your house= YES....................49%
hold used the 'Andover -Community NO ......... ...........51%
Center during the past year? DON'T KNOW/REFUSED...... 0•%
IF "YES," ASK: (n=197)
-- - -- ;77-. -Overall; how -would you rate- EXCELLENT:.: -.:.;-
the.Community Center -- ex- GOOD.. .....57%
cellent, good, only fair, or ONLY FAIR.• ............ .2%
Q�....
poor? POOR..............0%
DON'T KNOW/REFUSED...... 0%
•IF "ONLY FAIR" OR "POOR," ASK: (n=4)
78. Why did you rate it as (only fair/poor)?
..NOT OPEN ENOUGH HOURS, -50%; COSTS_T00 MUCH,'50%.
79. How satisfied are you with VERY SATISFIED ......... 52% -
the 'current offerings at the SOMEWHAT SATISFIED..... 46%
Community Center - very sat- NOT T00 SATISFIED ....... 2'
isfied, somewhat satisfied, NOT AT ALL SATISFIED....0%
not too satisfied,.or not at DON'T KNOW/REFUSED...... 1%
all satisfied?
IF "NOT TO0 SATISFIED" OR "NOT AT ALL SATISVIED," ASK:
(n=3)
60. Why do you feel that way?
NOT ENOUGH PROGRAMS, 33%; NOT -ENOUGH FOR YOUNG
CHILDREN, 67%.
81. Would you favor or oppose' -the City STRONGLY SUPPORT....... 12%
offering a teen center in Andover? SUPPORT................57%
(WAIT FOR RESPONSE) Do you feel OPPOSE .................. 22%
strongly that way? STRONGLY OPPOSE ......... 2%
DON'T KNOW/REFUSED...... 7%
The City of Andover is considering a voter referendum to fund the
enhancement of the park and recreation system in the community.
82. Would you support or oppose the STRONGLY SUPPORT ........ 6%
enhancements•of the parks and SUPPORT..;.............61%
recreation system? (WAIT FOR' - OPPOSE.................26%
RESPONSE) Do you feel strongly STRONGLY OPPOSE ......... 4%
that way? DON'T KNOW/REFUSED ...... 4
83. How much would you be willing to.
see your property taxes increase
in order to fund these enhance-
ments? Would you be willing to
pay $_ per year?
-----(CHOOSE RANDOM.STARTING POINT;
MOVE UP OA DOWN DEPENDING ON
ANSWER) How about $_ per year?
(REPEAT PROCESS)
Moving on.....
NOTHING................41%
$10.00........... ....27%
$20.00 .................13%
$30.00 ..................3%
$40.00 ..................2%
$50:00-: r ....:..:.:...::.2%
. -...-
$60:00 ...................
2%
$70.00 ..................1%
$80.00..... ...... ...0%
$90.00 ..................1%
$100.00 .................1%
DON'T KNOW/REFUSED......
8%
84. What is your primary source of in- DON'T KNOW/REFUSED...... 0%
formation about Andover City Gov- NONE.....................1%
.ernment and its activities? CITY NEWSLETTER ........ 71%
LOCAL NEWSPAPER ........ 12%
CABLE TELEVISION ........ 2%
CITY WEBSITE ............ 10%
WORD OF MOUTH ............ 3t
SCATTERED: .............. 2a
85: How would you prefer to receive
information about City Government
and its activities?
DON'T KNOW/REFUSED...... 0%
NONE. ................... 1%
CITY NEWSLETTER ........ 70%.
LOCAL NEWSPAPER ........ 11%
CABLE TELEVISION ........ 2%
CITY WEBSITE ............ 11-W
WORD OF MOUTH .......... :3%
MEETINGS.................2%
SCATTERED...............1%
The City publishes a bi-monthly newsletter, called "Andover
Today."
• •-~ •t. -.y.
LNDO WE
1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100
FAX (763) 755-8923 • WWW. ANDOVERMN.GOV
TO: Park & Recreation Commission
CC: David D. Berkowitz, Director of Public Works/City Engineer
FROM: Todd J. Haas, Asst. Public Works Director
SUBJECT: 5. Consider Paving Lund's North Park Parking Lot
DATE: February 16, 2017
INTRODUCTION
This item is in regard to considering paving the parking lot at Lund's North Park.
DISCUSSION
Attached is drawing identifying the area where City streets will be reconstructed for the
upcoming construction season. The streets are in poor condition and need to be replaced. As part
of the reconstruction of the street, there is a possibility of including the paving of the existing
parking lot at Lund's North Park. The existing parking lot already has some gravel but additional
gravel will be necessary. The Commission has the option to include improvements as part of the
base bid, bid as an alternate to the base bid, or not pave the lot at this time. Concrete curb is not
included in the estimate and not necessary at this time.
The estimate to pave the parking lot is $50,446.19. This improvement is not included in the
current Capital Improvement Plan (CIP). There is an existing ball field that is used by the
Andover Baseball Association for younger age players. The field is not irrigated and generally is
used Monday through Thursday during the spring summer season.
BUDGETIMPACT
This proposed improvement to pave the parking lot is not included in the current CIP and if
constructed would be funded by Park Dedication Funds.
ACTION REQUIRED
The Park and Recreation Commission is requested to consider paving the existing parking lot at
Lund's North Park as requested by the City Council.
Respectfully submitted,
Todd J. Haas
Attachment: Street project location map; Aerial view of park; Reconstruction estimate
AN,P,.OVERPROJECT LOCATION MAP
Project Limits
Date Created: November 09, 2016 EXHIBIT 1
Disclaimer. The provider makes no representation or warranties with respect to the reuse of this data.
MEN
EMEEMEW
NOMMOMM
NEENEEN
i Rim
NONE
OMEN
MOEN
and
Project Limits
Date Created: November 09, 2016 EXHIBIT 1
Disclaimer. The provider makes no representation or warranties with respect to the reuse of this data.
AN ov Lund's North Park
Date Created: February 08, 2017
Disclaimer. The provider makes no representation or warranties with respect to the reuse of this data.
LUNDS NORTH PARKING LOT RECONSTRUCTION ESTIMATE
ITEM
IreNO.
14,
PTION
UNIT
:AWCE
QUAN.
COST .
1
Sub rade Preparation
SY
$1.25
1815
$2,268.75
2
Aggregate Base Class 5
TN
$25.00
330
$8,250.00
3
Type LV3 C Non -Wearing Course Mixture
TN
$82.00
180
$14,760.00
4
Type LV3 C Wearing Course Mixture
TN
$78.00
180
$14,040.00
5
Bituminous Tack Coat
Gal
$3.50
90
$315.00
6
Select Topsoil Borrow
CY
$28.00
65
$1,820.00
7
Erosion Control Blanket Cat. 1, with Seed
SY
$2.75
750
$2,062.50
8
4" Solid Line White - Paint
LF
$0.25
960
$240.00
8
Pavmt. Message Handicap
EA
$110.00
1
$110.00
15% Contingency
$6,579.94
Estimated Cost 1
$50,446.19