Loading...
HomeMy WebLinkAboutCC - October 18, 20161685 CROSSTOWN BOULEVARD N.W.. ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV Regular City Council Meeting — Tuesday, October 18, 2016 Call to Order — 7:00 p.m. Pledge of Allegiance Special Presentation - Minnesota Heart Safe Andover Resident Forum Agenda Approval 1. Approval of Minutes (9/27/16 Workshop; 10/4/16 Regular) Consent Items 2. Approve Payment of Claims — Finance 3. Approve Health Insurance Contract and Employer Contribution —Administration 4. Accept Contribution/North Metro Soccer Association/Andover Community Center - Community Center 5. Approve Amended Personnel Policy to include Christmas Eve as Official City Holiday - Administration Discussion Items 6. Anoka County Sheriff s Office Monthly Report — Sheriff 7. Hold Public Hearing/Adopt Assessment Roll/16-2/2016 Street Reconstruction — Engineering 8. Hold Public Hearing/Adopt Assessment Roll/16-11/173`d Lane NW Reconstruction - Engineering 9. Hold Public Hearing 2017-2021 Capital Improvement Plan —Administration 10. Call for the Sale of Bonds/Ehlers and Associates - Finance Staff Items 11. Administrator'sReport —Administration Mayor/Council Input Adjournment NND: 1685 CROSSTOWN BOULEVARD N.W.. ANDOVER, MINNESOTA 55304 . (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV TO: Mayor and City Council CC: Jim Dickinson, City Administr, FROM: Michelle Harmer, Deputy City SUBJECT: Approval of Minutes DATE: October 18, 2016 INTRODUCTION The following minutes were provided by TimeSaver, reviewed by Administration and submitted for City Council approval: September 27, 2016 Workshop October 4, 2016 Regular DISCUSSION The minutes are attached for your review. ACTION REQUIRED The City Council is requested to approve the above minutes. �Respectfully submitted, Michelle Harmer Deputy City Clerk Attach: Minutes 0 2 0 ANDOVER CITY COUNCIL WORKSHOP MEETING —SEPTEMBER 27, 2016 MINUTES 10 The Bus Tour and Workshop Meeting of the Andover City Council was called to order by Mayor 11 Julie Trude, September 27, 2016, 5:00 p.m., at the Andover City Hall, 1685 Crosstown 12 Boulevard NW, Andover, Minnesota. 13 14 Councilmembers present: Mike Knight, Sheri Bukkila (arrived at 6:45 p.m.), Valerie Holthus 15 (arrived at 6:45 p.m.) and James Goodrich 16 Councilmember absent: None 17 Also present: City Administrator, Jim Dickinson 18 Public Works Director/City Engineer, David Berkowitz 19 City Fire Chief, Jerry Streich 20 Others 21 22 23 COMMUNITYPROJECT BUS TOUR (5:00 p.m, — 6:45 p.m.) 24 25 The City Council toured the City with staff to discuss stop sign placement, road reconstruction, 26 new developments and parks. 27 28 • CIP project areas were pointed out along the tour. 29 • Stop sign placements and removals along Narcissus, Underclift and Xenia streets. 30 • Stopped at Fox Meadows Park to discuss field placement and the importance to work 31 with the neighboring properties. 32 • Toured the 2016 road reconstruction projects. 33 • Toured the planned 2017 road reconstruction projects, pointing out the challenges related 34 to the project. 35 • Toured 167a` Avenue through the Country Oaks North developments. 36 • Toured the Capstone Homes detached townhomes along Unity Street and the Miller's 37 Woods development behind Fire Station #3. 38 • Viewed the railroad tracks along Crosstown Boulevard, discussing the double track and 39 wayside horn. 40 41 Councilmembers Bukkila and Holthus were not on the bus tour 42 43 The City Council arrived back at City Hall at 6:45 p.m. and convened the Workshop Meeting. 44 45 Councilmember Bukkila and Holthus arrived at 6:45 p.m. 46 Andover City Council Workshop Meeting Minutes —September 27, 2016 Page 2 1 2017— 2021 CIP DEVELOPMENT DISCUSSION (6:50 p.m.) 2 3 Mr. Dickinson explained Administration/Finance has been working with Department Heads to 4 prepare a draft 2017-2021 CIP. 5 6 Mr. Dickinson reviewed the draft 2017-2021 CIP with the Council. 7 8 Mayor Trude asked if the $50,000 identified for Community Center expansion is going to be 9 used for the design including the grading for access points, some of the road work. Mr. 10 Dickinson explained it would mainly be design work. 11 12 Mayor Trude asked if there is an opportunity to get something going for the maintenance shop 13 any sooner than two years out. Mr. Dickinson indicated the vehicle maintenance shop is 14 scheduled for 2019 because that follows the timing pattern of when the construction activity to 15 prepare the site could happen. The City does not own all of the land until the end of 2018. 16 17 Councilmember Bukkila thought the cost of the entire Public Works facility was going to be $8.5 18 million and not just Phase I. Mr. Dickinson stated Phase I would include the vehicle 19 maintenance shop, wash bay, cold storage building and fuel island/canopy and grading of the 20 site. Councilmember Bukkila thought the $8.5 million was the cost for both Phases. Mr. 21 Dickinson indicated Phase II would happen further out. Staff addressed immediate needs in 22 Phase I. 23 24 Mr. Berkowitz reviewed the construction costs associated with the site construction. 25 26 Councilmember Bukkila asked if staff was trying to accommodate the Community Center 27 expansion or is it budget constraints. Mr. Dickinson stated that is what they would like to 28 determine at this meeting. He stated if they are trying to keep the tax levy at what it is they can 29 do Public Works Phase 1 and slightly more. The capacity they have on their levy dollars would 30 be around $11 to $12 million in construction costs. He stated once they start talking about 31 getting into the larger Public Works building then they would go beyond the $11 million dollars. 32 He noted they would need an additional $7 to $8 million dollars beyond Phase I for the new 33 Public Works Equipment Building, to include office space and a heated storage garage. 34 35 Discussion between staff and the Council continued regarding the Community Center expansion 36 project. 37 38 Mayor Trude asked if this assumed the City does not have any needs before 2019. Mr. 39 Dickinson stated he has discussed this with the YMCA and they would not be ready to expand 40 until 2019 unless there would be consideration for financing. 41 42 Councilmember Holthus stated her concern is with the Public Works vehicle maintenance shop 43 because she hates to see the workers in unsafe conditions. She asked what kind of growth would 44 they need to have in order to cover the costs. Mr. Dickinson reviewed the long range debt Andover City Council Workshop Meeting Minutes —September 27, 2016 Page 3 1 service and general fund levy projection with the Council. He noted the spreadsheet is based on 2 the debt service levy staying the same in future. 3 4 Councilmember Goodrich stated he gets nervous when they start to plan on building projects 5 with projected growth which might not happen. 6 7 Mr. Dickinson stated they will need to do some planning and get some preliminary design on 8 both facilities to firm up project estimates. 9 10 Discussion continued regarding concerns with being able to accommodate every service in the I I City along with spending money on anew City Campus projects. 12 13 Councilmember Bukkila asked staff to fill in the gaps for her so she can make an educated 14 decision because she indicated she is not comfortable at this point because her priority is the 15 Public Works facility and if they have not done any specs, plans or ideas on that, the budget 16 could potentially expand as needs are identified or costs are evaluated and that may fill the gap 17 and she thought the two projects are too big and huge for the City to take on at one time. 18 19 Mr. Dickinson noted 2017 will be a planning year for both projects and they will basically plan 20 and scope the costs and what the needs are and as a part of that study is to have a confidence 21 level on the access street and mass grading options for the campus. He stated according to the 22 CIP narrative, anything beyond 2017 is planning and not guaranteed. They are looking at 2017 23 to be a commitment to be able to plan and design the city campus projects and then move into 24 the appropriate year. 25 26 Mayor Trude asked a few people in the audience if they wanted to speak on the topic. 27 28 Mr. Tony Peterson from the Andover Youth Hockey Association stated according to the 29 Community Center Advisory Commission they have already maxed out that space in the 30 utilization. The Community Center is busting out at the seams. He stated the hockey association 31 is going elsewhere for half of their ice time. There is a lot of needs and amenities that need to be 32 accounted for and if everything is driven on growth, the majority of people move to Andover for 33 two things; the schools and the Community Center. His fear is if they do not continue to develop 34 and utilize that facility people are going to go elsewhere. 35 36 Councilmember Bukkila understood what is being said but the people she has talked to while 37 campaigning is most of the people do not use the Community Center and have no need for it. 38 There is a balance to it and she knows some people are totally invested in it but it also is how do 39 they appropriately program everything financially for the City all at once without running up the 40 taxes on all. She stated if everything isn't budgeted appropriately for the full build out 41 eventually the revenues will go away and they will still have a large bill to pay. She wondered 42 how they will program that out to make it function and work. 43 44 Mayor Trude believed the community is going to continue to grow. Councilmember Holthus Andover City Council Workshop Meeting Minutes —September 27, 2016 Page 4 1 stated when she goes to the YMCA it is packed. Mr. Peterson stated the YMCA accommodates 2 all ages. Councilmember Holthus thought the vehicle maintenance shop needed to be priority 3 one because of a safety hazard. 4 5 John Pederson, VP of the Hockey Association Board, wondered what the safety factors are for 6 the vehicle maintenance. Mr. Berkowitz explained the Public Works facility to the public and 7 how maintenance is done within the vehicle maintenance facility. 8 9 Councilmember Goodrich indicated he loves the YMCA but wondered how many people live in 10 Andover versus outside of Andover that use the YMCA facility. Councilmember Bukkila stated 11 it was around fifty percent. 12 13 Mayor Trude stated the City is not subsidizing the YMCA and they are helping to bring people 14 into Andover. 15 16 Councilmember Goodrich stated the City does not just collect taxes from the people that use the 17 YMCA, they have to collect taxes from everyone that lives in the City and he did not want to 18 redistribute wealth and take from people to put towards the Community Center. Everyone pays 19 and benefits from Public Works in the City but they do not all benefit from having the 20 Community Center and YMCA. He stated he wanted to keep priority on what the Government's 21 responsibility is. 22 23 Councilmember Bukkila stated she is comfortable with the Public Works Phase I and what is 24 planned but wants to see more information on the City situation regarding the Community Center 25 and she did not want to push the Community Center specs until they see the Public Works specs. 26 27 Mayor Trude reviewed the projects the City has done for different sports associations. 28 29 Mayor Trude acknowledged people in the audience and indicated they would like to speak. 30 31 Councilmember Bukkila stated it is about establishing what the City built and creating a 32 maintenance plan for what is existing and she did not want to end up with a huge balloon 33 payment that they created and cannot sustain in twenty years. She noted they do not have the all 34 answers. 35 36 Mayor Trude did not think that in the sixteen years she has been on the Council did she vote to 37 put the City in the poor house. She thought they had a really good history of working together 38 on building a City fiscally conservatively that meets the needs of the people that want to live 39 here and do live in Andover. She did not think they disagreed on being cautious and being in 40 touch but she would like to allow the Hockey Association to bring up a few points. 41 42 Mr. Jeremy Coe, President Andover Hockey Association, stated as a resident he would like to 43 see growth and improvements on the infrastructures. They understand this is a hot topic. From 44 the Hockey Association they are trying to meet the needs of their members. He stated the facility Andover City Council Workshop Meeting Minutes —September 27, 2016 Page 5 1 they use is dependent on the City. He stated they are trying to find ice all over the metro and 2 there is not any available to purchase. There is a bargaining chip that is in the Super Rink 3 contract of $250,000. If the Association gives the Super Rink a two-year notice of leaving the 4 Super Rink, they will give the City the $250,000 back. He thought that money could be used for 5 the City to help build another rink for the association. He stated the Super Rink only gives them 6 336 hours but the association can purchase more ice time but it is harder to purchase. 7 8 Mr. Coe reviewed the issues the Hockey Association is currently having with ice time. 9 10 The Andover Youth Hockey Association discussed with the City Council options for additional 1 I ice time in the City. 12 13 Mr. Coe stated the Association is willing to make a long term commitment of purchasing hours 14 of ice time in an expansion. He stated they are willing to work with the City on planning and 15 commitment. 16 17 Councilmember Knight stated the Community Center is looking for some type of expansion in 18 2017 and he would be open to doing a study of the expansion. 19 20 Mr. Dickinson summarized that both projects would be identified in the 2017-2021 CIP as 21 having planning and study done in 2017 & 2018 for a future decision of the Council as to 22 whether or not to move forward with construction. 23 24 CIP - TRAILS 25 26 Mr. Aerik Larsen discussed the proposed trails in the City CIP with the Council. He indicated all 27 of the proposed trails have alternate routes that can be used except for the proposed trail along 28 Crosstown Boulevard and Prairie Road. He indicated he lives in the Miller's Woods 29 neighborhood and the residents there really need a trail to get to other parts of the City. Where 30 the children walk to get around the City is on the roadway which is very dangerous. 31 32 Mayor Trude wondered if the trails could be done on a spoke system where they do a section of 33 the trail per year. 34 35 Mr. Larsen asked the Council to reshuffle the trail list, putting the ones with safety issues on the 36 top. He also suggested the City take a different approach to trail construction. If they were to 37 bring in fill and pave a six-foot shoulder it would solve a lot of problems. 38 39 Mr. Berkowitz stated a shoulder on a 55 mile an hour road is a challenge and the City would not 40 promote that as a trail. This would need to be promoted as a shoulder because they could not 41 direct pedestrian traffic to the railroad crossing because it is also not a safe crossing. 42 43 Councilmember Bukkila thought there would be a better chance of getting a trail installed during 44 road reconstruction. Mayor Trude stated staff will review proposed trails during the winter to 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 Andover City Council Workshop Meeting Minutes —September 27, 2016 Page 6 determine the best trails to construct. Mr. Larsen thought there needed to be some continued funding for trails in order to get them done in the City. 2017 SPECIAL REVENUE, DEBT SERVICE, CAPITAL PROJECTS, ENTERPRISE & INTERNAL SERVICE FUNDS BUDGET DISTRIBUTION & DISCUSSION Mr. Dickinson briefly reviewed the budget distribution with the Council. He asked Councilmembers to contact him if they would like to go through the budgets in detail. 2017 BUDGET DEVELOPMENT DISCUSSION Mr. Dickinson reviewed the budget development with the Council, the main update item is the employee health insurance negotiations will yield rates better than previously discussed. OTHER TOPICS Councilmember Bukkila indicated to the Council she would be willing to attend the Four County discussion on the Met Council that will be coming up in November. Mayor Trude said she may be interested also. ADJOURNMENT Motion by Bukkila, Seconded by Goodrich, to adjourn. Motion carried unanimously. The meeting adjourned at 9:07 p.m. Respectfully Submitted, Sue Osbeck, Recording Secretary TimeSaver Off Site Secretarial, Inc. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 REGULAR ANDOVER CITY COUNCIL MEETING — OCTOBER 4, 2016 MINUTES The Regular Bi -Monthly Meeting of the Andover City Council was called to order by Mayor Julie Trude, October 4, 2016, 7:00 p.m., at the Andover City 'Hall, 1685 Crosstown Boulevard NW, Andover, Minnesota. Councilmembers present: Mike Knight, Sheri Bukkila, Valerie Holthus and James Goodrich Councilmember absent: None Also present: City Administrator, Jim Dickinson City Planner, Stephanie Hanson Director of Public Works/CityEngineer, David Berkowitz City Attorney Scott Baumgartner Others PLEDGE OFALLEGL4NCE RESIDENT FORUM No one wished to address the Council. AGENDA' APPROVAL Staff requested the addition of: - Item #5A Approve Appointment/Building Permit Technician; and, - Supplemental Item #6 Discuss/Consider Approval Final Plat/Preserve at Oak View/Metrowide Development, LLC — this item includes comments to replace the engineering comments in the meeting packet. Motion by Bukkila, Seconded by Goodrich, to approve the Agenda as amended above. Motion carried unanimously. APPROVAL OFMINUTES September 20, 2016, Regular Meeting: Correct as written. Regular Andover City Council Meeting Minutes — October 4, 2016 Page 2 1 Motion by Knight, Seconded by Holthus, to approve the minutes as presented above. Motion carried 2 unanimously. 4 CONSENT ITEMS 6 Item 2 Approve Payment of Claims 7 Item 3 Accept Donation from Willy McCoys/14-24/Andover Lions Park (See Resolution R087- 8 16) 9 Item 4 Declare Costs/Order Assessment Roll/Schedule Public Hearing/2016 Delinquent Utility 10 Service Charges, Mowing Fees, Tree Removal, False Alarm Fines and Misc. Abatement 11 Fees Collection (See Resolution R088-16) 12 Item 5 Approve 2017 Anoka County Sheriff Contract 13 Item 5A Approve Appointment/Building Permit Technician 14 15 Motion by Knight, Seconded by Bukkila, approval of the Consent Agenda as read. Motion carried 16 unanimously. 17 18 DISCUSS/CONSIDER APPROVAL FINAL PLATIPRESERVEA T OAK VIE WIMETR 0 WIDE 19 DEVELOPMENT, LLC 20 21 Ms. Hanson explained that the City Council is asked to approve the final plat for Preserve at Oak 22 View. The proposed final plat creates thirteen (13) buildable single family lots. Trail and park 23 fees will be collected prior to the release of the final plat. The developer is working with City 24 staff and the City Attorney on the review and approval of the final legal documents required such 25 as Development Agreement, Covenants, Temporary Street, Drainage and Utility Easements, 26 Public Roadway, Drainage and Utility Easement and Temporary Construction Easement. All 27 legal documents must be approved by the City Attorney prior to the release of the final plat. The 28 City Attorney approved the Operation and Maintenance Agreement for the maintenance of the 29 infiltration basin/rain gardens. All of the approved legal documents will be filed at Anoka County 30 with the final plat. 31 32 Ms. Hanson stated there is a minor change to the plat due to a slight shift in the street alignment 33 near the entrance to the development to protect two significant white pine trees. Ms. Hanson 34 indicated condition #5 of the resolution should be modified to address the maintenance of the 35 two significant white pine trees. The Engineering Department is in the process of reviewing the 36 revised grading plan. The revised grading plan is required to be reviewed and approved by the 37 Engineering Department prior to the filing of the final plat. Ms. Hanson indicated condition #3 38 of the resolution should be modified to include the engineering comments dated October 3, 2016. 39 40 The Anoka County Transportation Department has started a preliminary review of the plat. It has 41 been confirmed that a bypass lane will not need to be constructed with this project; however, 42 there are minor revisions required for the construction of the turn lane. The developer is required 43 to satisfactorily address the County comments prior to the filing of the final plat. Regular Andover City Council Meeting Minutes — October 4, 2016 Page 3 Ms. Hanson reviewed the staff report with the Council. 3 Councilmember Goodrich asked for Mr. Baumgartner's opinion on the matter and if he is in 4 agreement with the changes. Mr. Baumgartner confirmed that he is in agreement. 6 Jason Osberg, developer and land owner, stated the proposed resolution with the changes are 7 "perfectly fine." He confirmed they are in agreement and have met with City staff. He commented 8 the good fall weather has been helpful. Mr. Osberg expressed concern about the amount of the 9 escrow for the future road extension. He stated unfortunately they did not have time to get the actual 10 bid numbers in time for staff to review them. He acknowledged they are a few thousand dollars off 11 in agreement. Furthermore, he asked there not be a definite dollar amount in the resolution that is 12 approved by the Council at this evening's meeting. 13 14 Mayor Trude inquired about condition # 10, stating staff is comfortable with the number that has been 15 recommended with the engineering comments. Mayor Trude noted the amount is not stated in the 16 resolution. Mr. Berkowitz stated staff is saying that they are firm on their recommendation. 17 18 Mayor Trude inquired if the language implies that staff would be determining the escrow amount. 19 Mr. Baumgartner stated the amount is not dependent upon cost estimates. He concluded by saying 20 that Council could refer to the development agreement. 21 22 Councilmember Goodrich asked if the Council could direct staff to continue to work with the 23 developer. Councilmember Holthus inquired about giving staff discretion to negotiate. She asked 24 for clarification as to the difference in the amount that the developer proposed and the amount City 25 staff proposed. 26 27 Mr. Osberg replied they are about $6,000 apart. Staff indicated the estimate was requested in June 28 and received on September 28"'. Staff reviewed the developer's $13,000 estimate and determined it 29 was closer to $32,000. Staff met with the developer on the previous day to discuss and the estimate 30 in the engineering comments was reduced to around $28,000. Mr. Berkowitz confirmed that staff 31 calculated and estimated the shortest route for the extension, so the escrow could have easily been 32 more. 33 34 Mayor Trude indicated the Council does not generally get involved in these matters and it is a matter 35 to be negotiated with staff. Councilmember Knight asked if that was clear. Mr. Baumgartner 36 confirmed the sentence in the resolution talks about the timing, not the amount. 37 38 Mr. Osberg stated they are looking forward to moving forward and appreciated the flexibility in the 39 planning, and the changes that were made to save the two pine trees discussed. Mayor Trude stated 40 she believed it was reasonable to look at the shortest route for the future road extension too. 41 Councilmembers confirmed their support for the project and complimented the developer on the way 42 the trees would be preserved. 43 Regular Andover City Council Meeting Minutes — October 4, 2016 Page 4 1 Motion by Holthus, Seconded by Bukkila, to approve the final plat for Preserve at Oak View 2 with changes recommended by staff on conditions #3 (date) and 45. Motion carried 3 unanimously. (See Resolution R089-16) 4 5 SCHEDULE NOVEMBER WORKSHOPMEETING 6 7 Mr. Dickinson requested the Council schedule a Workshop Meeting to discuss topics as detailed 8 in the staff report. 10 The Council discussed the draft agenda and available dates. 11 12 Motion by Knight, Seconded by Bukkila, to schedule a Workshop Meeting on November 29, 13 2016, at 6:00 p.m. Motion carried unanimously. 14 15 ADMINISTRATOR'S REPORT 16 17 City Staff updated the Council on the administration and city department activities, legislative 18 updates, updates on development/CIP projects, and meeting reminders/community events. 19 20 (Meetings) Mr. Dickinson encouraged the Councilmembers and residents to attend the 21 upcoming Youth First, Taste of Community event at Green Haven. Tickets can be purchased 22 online and at City Hall. 23 24 (Vandalism) Recently there has been a growing issue with vandalism in City parks, including 25 park equipment and portable toilet fires. Mr. Dickinson requested residents keep watch and 26 contact the Sherriff s Department and City staff if they see anything suspicious. He noted the 27 cost of the acts of arson reaches beyond the dollar amount of the physical damage and includes 28 wasted resources, risk to others and increased insurance costs. He noted there has been an 29 significant "uptick" in the incidents within the last month or so and it is very likely the same 30 group or individuals involved. 31 32 (Meetings) Mr. Dickinson noted staff and Councilmembers have been working through budget 33 details and the proposed Capital Improvement Plan. October 18`h will be the public hearing for 34 the CIP. 35 36 (New Homes) The Building Department has granted permits for 77 new single family homes so 37 far this year, plus a 66 unit senior independent living building. Ninety homes are expected to be 38 permitted by year end. Good progress is being made on building projects due to the mild fall 39 weather. An 8 -unit townhome building permit was issued by the Andover Station North 40 development, which will complete the original townhome development. 41 42 (Vandalism) Mr. Berkowitz reiterated his concerns about the uptick in vandalism in the last 2 to 43 3 months, and noted the destruction of garbage cans, playground equipment, and continuous 10 11 12 13 14 15 16 Regular Andover City Council Meeting Minutes — October 4, 2016 Page 5 graffiti near the railroad trestle. He stated the City really needs the resident's help, explaining that it impacts City staff as well as the parks and maintenance staff. Mayor Trude noted there is an arson reward for the playground equipment. (Building/Street Projects) At the Grey Oaks 4h Addition they are moving dirt and several units have been presold. They are planning to do a lot of activity up front so they are able to complete the development more quickly. The street reconstruction this year had really good results. He thanked the staff for putting together a good project. (Community Development) Ms. Hanson stated staff has been busy with code enforcement inspections, but once winter comes around this work slows down. She also stated the City of Andover was awarded a $32,000 grant for the updating of the Comprehensive Plan, specifically the transportation portion. The contract will need to be submitted by the end of the week. The Metropolitan Council is having a Conference in December. The kick-off for Comprehensive Plan work will be in January and February of 2017. 17 MAYORICOUNCIL INPUT 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 (Mayor's Water Challenge) Mayor Trude described the event attended that day by Councilmembers Knight and Holthus who welcomed Governor Dayton in recognition of Andover winning the National Mayors Water Challenge which was a student led initiative and the success of Boys State and Girls State students from Andover High School. Twenty students were recognized and the school received gift certificates totaling $500 from Michaels. The District Superintendent was in attendance. He noted he liked the new trail and how that improves the safety of the students going to and from the school. Channel 9 News covered the event. (Heart Safe Communities) Mayor Trude indicated the Department of Health will be bringing the Heart Safe Community highway signs to a future Council meeting. Training is ongoing with YMCA staff teaching CPR in the hallways, and an upcoming event at St. Patrick's Church is being planned along with training for Girl Scout troops. ADJOURNMENT Motion by Bukkila, Seconded by Knight, to adjourn. Motion carried unanimously. The meeting adjourned at 7:39 p.m. Respectfully submitted, Marlene White, Recording Secretary 1 Regular Andover City Council Meeting Minutes — October 4, 2016 Page 6 REGULAR ANDOVER CITY COUNCIL MEETING MINUTES — OCTOBER 4, 2016 TABLE OF CONTENTS PLEDGE OF ALLEGIANCE......................................................................................................... 1 RESIDENT FORUM...................................................................................................................... 1 AGENDA APPROVAL.................................................................................................................. 1 APPROVAL OF MINUTES........................................................................................................... 1 CONSENTITEMS......................................................................................................................... 2 Item 2 Approve Payment of Claims......................................................................................... 2 Item 3 Accept Donation from Willy McCoys/14-24/Andover Lions Park (R087-16) ............ 2 Item 4 Declare Costs/Order Assessment Roll/Schedule Public Hearing/2016 Delinquent Utility Service Charges, Mowing Fees, Tree Removal, False Alarm Fines and Misc. Abatement Fees Collection (R088-16)............................................................................... 2 Item 5 Approve 2017 Anoka County Sheriff Contract............................................................ 2 Item 5A Approve Appointment/Building Permit Technician ..................................................... 2 DISCUSS/CONSIDER APPROVAL FINAL PLAT/PRESERVE AT OAK VIEW/METROWIDE DEVELOPMENT, LLC(R089-16)....................................................... 2 SCHEDULE NOVEMBER WORKSHOP MEETING.................................................................. 4 ADMINISTRATOR'S REPORT....................................................................................................4 (Meetings)................................................................................................................................... 5 (Vandalism)................................................................................................................................. 5 (Meetings)................................................................................................................................... 5 (New Homes).............................................................................................................................. 5 (Vandalism)................................................................................................................................. 5 (Building/Street Projects)............................................................................................................ 5 (Community Development)........................................................................................................ 5 MAYOR/COUNCIL INPUT.......................................................................................................... 5 (Mayor's Water Challenge)......................................................................................................... 5 (Heart Safe Communities).......................................................................................................... 5 ADJOURNMENT........................................................................................................................... 5 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV TO: Mayor and Councilmembers CC: Jim Dickinson, City Administrate FROM: Lee Brezinka, Finance Manager SUBJECT: Payment of Claims DATE: October 18, 2016 INTRODUCTION Attached are disbursement edit lists for claims related to the on going business of the City of Andover. DISCUSSION Claims totaling $101,234.25 on disbursement edit lists #1 - 2 from 10/03/16 to 10/12/16 have been issued and released. Claims totaling $796,913.60 on disbursement edit list #3 dated 10/18/16 will be issued and released upon approval. BUDGET RVIPACT The edit lists consist of routine payments with expenses being charged to various department budgets and projects. ACTION REQUESTED The Andover City Council is requested to approve total claims in the amount of $898,147.85. Please note that Council Meeting minutes will be used as documented approval. Respectfully submitted, Lee Brezinka Attachments: Check Proof Lists Accounts Payable Computer Check Proof List by Vendor I User: BrendaF L Printed: 10/03/2016 - 9:57AM Batch: 00403.10.2016 Invoice No Description Amount Payment Date Acct Number Vendor: WellsFar Wells Fargo Bank Check Sequence: 1 Pop 47.46 10/03/2016 7100-00000-24208 Subscription 35.00 10/032016 0101-43200-61325 Computer 614.53 10/03/2016 0101-41420-61225 Sale of Equipment 79.10 10/03/2016 4180-49300-58155 Community Center Ad 175.18 10/032016 2130-44400-63025 Community Center Ad 175.18 10/032016 2130-44300-63025 All Staff Meeting 35.73 10/032016 0101.41200-61310 Council Meeting 123.19 10/032016 0101-41100-61310 Ad for Job Opening 222.75 10/032016 0101-41230-63025 Sunshine Fund 150.30 10/032016 7100-00000-24208 Color Filled Wristbands - Glow 318.24 10/03/2016 0101-42200-61060 Meeting/Comm Ctr Master Plan 19.84 10/03/2016 0101-41200-61310 Attorney General Filing 51.25 10/03/2016 0101-41200-61320 Parts for Units #16-300,4823 & 139 543.80 10/03/2016 6100-48800-61115 Food for APWA 105.17 10/032016 6100-48800-61310 Parking for APWA Conference 10.00 10/03/2016 6100-48800-61410 Misc. Supplies 101.73 10/032016 0101-41930-61120 Labor for Repairs 282:81 10/032016 2130-44300-63105 Misc. Supplies 65.80 10/032016 6100-48800-61020 Parts for Units #134, 173 & 13-4824 270.89 10/03/2016 6100-48800-61115 Fuel 9.45 10/032016 6100-48800-61045 Misc. Supplies 300.92 10/032016 0101-42200-61020 Recycling Meeting 21.40 10/032016 0101-46000-61310 Parking for Conference 10.00 10/032016 5100-48100-61410 Registration for Conference 85.00 10/032016 0101-42400-61315 Registration for Conference 29.00 10/032016 2130-44000-61315 Cube Comer Desk Top 495.00 10/03/2016 2130-44000-61020 Misc. Supplies 133.34 10/032016 2130-44300-61020 Misc. Supplies 83.46 10/032016 2130-44300-61020 Check Total: 4,595.52 +D6'WR Reference ACH Enabled: False AP -Computer Check Proof List by Vendor (10/03/2016 - 9:57 AM) Page 1 Invoice No Description Amount Payment Date Acct Number Reference Total for Check Run: 4,595.52 Total of Number of Checks: AP -Computer Check Proof List by Vendor (10/03/2016 - 9:57 Alva Page 2 Accounts Payable Computer Check Proof List by Vendor User: brendaf Printed: 10/12/2016- 2:57PM Batch: 00410.10.2016 Invoice No Description Amount Payment Date Acct Number Reference Vendor: 3M 3M Check Sequence: I ACH Enabled: False SS31334 Misc. Supplies for Signs 675.00 10/12/2016 0101-43300-61030 Check Total: 675.00 Vendor. AbleHose Able Hose And Rubber Check Sequence:2 ACH Enabled: False 1-877162 Parts for Unit #07-191 13.95 10/12/2016 6100-48800-61115 Check Total: 13.95 Vendor: AceSolid Ace Solid Waste, Inc. Check Sequence: 3 ACH Enabled: False 946792164688 10/16 Commercial Waste & Recycling 355.20 10/12/2016 2130-44100-62020 946792164688 10/16 Commercial Waste & Recycling 355.19 10/12/2016 2130-44000-62020 Check Total: 710.39 Vendor: AFLAC AFLAC Check Sequence: 4 ACH Enabled: False 246798 September 2016 Premium 338.16 10/12/2016 0101-00000-21209 Check Total: 338.16 Vendor: AhMecha Air Mechanical Check Sequence: 5 ACH Enabled: False 2016-02638 Refund Permit Due to Job Cancelled 63.20 10/122016 0101-42300-52190 Check Total: 63.20 Vendor: Aircon Aircon Electric Corporation Check Sequence: 6 ACH Enabled: False 10862-2016-1 Replace Rooftop Cooling Switch 1,324.06 10/12/2016 2130-44000-63105 Check Total: 1,324.06 Vendor: AncorgTec Ancom Technical Center Check Sequence: 7 ACH Enabled: False 63224 Repair Pager 118.00 10/12/2016 0101-42200-61020 AP -Computer Check Proof List by Vendor (10/12/2016 - 2:57 PM) Page 1 Invoice No Description Amount Payment Date Acct Number Reference AP -Computer Check Proof List by Vendor (10/12/2016 - 2:57 PM) Page 2 Check Total: 118.00 Vendor AndWheel Andover Wheel &Frame Alignmen Check Sequence: 8 ACH Enabled: False 9461 Labor for Unit #7 360.00 10/12/2016 6100-48800-63135 9461 Parts for Unit#7 127.72 10/12/2016 6100-48800-61115 Check Total: 487.72 Vendor AnkCity City of Anoka Check Sequence: 9 ACH Enabled: False 201610044326 Traffic Signal - Bunker/7th Ave 25.44 10/12/2016 0101-43400-62005 Check Total: 25.44 Vendor: AnkCol4 Anoka Cc Recorder Check Sequence: 10 ACH Enabled: False 520 Recording Fees 46.00 10/12/2016 0101-41600-63025 Check Total: 46.00 Vendor: AspenMil Aspen Mills Check Sequence: I I ACH Enabled: False 187034 Uniform for D. McNallan 129.95 10/122016 0101-42200-61305 187035 Uniform for J. Streich 64.85 10/122016 0101-42200-61305 187408 Uniform for P. Devaney 64.85 10/12/2016 0101-42200-61305 187409 Uniform for K. Kuhn 54.95 10/122016 0101-42200-61305 Check Total: 314.60 Vendor: BjorkCom Bjorklund Companies LLC Check Sequence: 12 ACH Enabled: False 24597 Timber Trails Park Reconstruction 319.87 10/12/2016 0101-45000-65300 24597 Timber Trails Park Reconstruction 319.86 10/12/2016 4150-49300-61130 Check Total: 639.73 Vendor: Boyerl Boyer Truck Parts Check Sequence: 13 ACH Enabled: False 1094586 Parts for Unit 4201 104.61 10/122016 6100-48800-61115 Check Total: 104.61 Vendor: BrockWhi Brock White Company, LLC Check Sequence: 14 ACH Enabled: False 12721591-00 Tools 206.32 10/122016 0101-43100-61205 Check Total: 206.32 Vendor: Centerpt CenterPoint Energy Check Sequence: 15 ACH Enabled: False 5825952 Equipment Building 22.19 10/12/2016 0101-41950-62015 5825952 AP -Computer Check Proof List by Vendor (10/12/2016 - 2:57 PM) Page 2 Invoice No Description Amount Payment Date Acct Number Reference 5840270 Water Treatment Plant 291.62 10/12/2016 5100-48100-62015 5840270 5840341 Prairie Knoll Park 15.85 10/12/2016 0101-41990-62015 5840341 5841153 Fire Station #1 51.51 10/12/2016 0101-41920-62015 5841153 5841451 Fire Station #2 28.33 10/12/2016 0101-41920-62015 5841451 5852601 Fire Station #3 58.12 10/12/2016 0101141920-62015 5852601 5864630 Pumphouse#4 16.42 10/12/2016 5100-48100-62015 5864630 5883191 Sunshine Park 15.85 10/12/2016 0101-41970-62015 5883191 5893307 well #1 15.85 10/12/2016 5100-48100-62015 5893307 5907226 Pumphouse #6 15.85 10/12/2016 5100-48100-62015 5907226 5927939 Pumphouse#7 15.85 10/12/2016 5100-48100-62015 5927939 5945463 well #3 15.85 10/12/2016 5100-48100-62015 5945463 5950580 City Hall/Senior Center 47.08 10/12/2016 0101-41910-62015 5950580 6122874 Lift Station #4 23.38 10/12/2016 520048200-62015 6122874 7575198 ASN Ballfields 22.19 10/12/2016 0101-41980-62015 7575198 7725077 Lift Station 41 22.24 10/12/2016 5200-48200-62015 7725077 8743371 Warming House 15.85 10/12/2016 0101-45000-62015 8743371 AP -Computer Check Proof List by Vendor (10/122016 - 2:57 PrVn Page 3 Check Total: 694.03 Vendor: ClassC Class C Components Inc. Check Sequence: 16 ACH Enabled: False 209507 Toilet Paper/Paper Towenowl Cleaner 292.56 10/12/2016 2130-44000-61020 Check Total: 292.56 Vendor: Comcast4 Comcast Check Sequence: 17 ACH Enabled: False 900524839/46692085 City Ball - PRI TI Loop (57%) 131.63 10/12/2016 0101-41910-62030 900524839/46692085 Public Works - PRI TI Loop (19 41.57 10/12/2016 010141930-62030 - 900524839/46692085 Water Treatment Plant - PRI Tl 16.17 10/12/2016 5100-48100-62030 900524839/46692085 Community Center - PRI T1 Loop 18.47 10/12/2016 2130-44000-62030 900524839/46692085 Fire Station #1 - PRI TI Loop 23.09 10/12/2016 0101-41920-62030 Check Total: 230.93 Vendor: Comcast5 Comcast Check Sequence: 18 ACH Enabled: False 8772107890001086 Public Works 22-62 10/12/2016 0101-41930-62030 763-755-8118 8772107890001086 Public Works 90.46 10/12/2016 5100-48100-62030 763-755-8118 8772107890001086 Water Treatment Plant 121.75 10/12/2016 5100-48100-62030 763-862-8874 8772107890001086 Fire Station #2 36.92 10/12/2016 010141920-62030 763-421-9426 8772107890001086 Sunshine Park 20.95 10/12/2016 010141970-62030 763-755-9189 8772107890001086 Public Works -Internet 99.98 10/12/2016 0101-41930-62030 8772107890001086 City Hall -Internet 99.98 10/12/2016 0101-41910-62030 8772107890001086 Community Center 220.50 10/12/2016 2130-44000-62030 763-755-2129 8772107890001086 Sunshine Park 20.95 10/12/2016 0101-41975-62030 763-755-9189 AP -Computer Check Proof List by Vendor (10/122016 - 2:57 PrVn Page 3 Invoice No Description Amount Payment Date Acct Number Reference 8772107890001086 Fire Station #1 74.04 10/12/2016 0101-41920-62030 763-755-9825 8772107890001086 Fire Station #3 61.16 10/12/2016 0101-41920-62030 763-434-6173 8772107890001086 City Hall 169.69 10/12/2016 0101-41910-62030 763-755-5100 8772107890001086 Andover Station N Ballfields 46.90 10/12/2016 0101-41980-62030 763-767-2547 Check Total: 1,085.90 Vendor: CommAsp] Commercial Asphalt Co. Check Sequence: 19 ACH Enabled: False 160930 2016 Curb/Sidewalk/Ped Ramps 651.03 10/12/2016 4140-49300-63010 Check Total: 651.03 Vendor: Connexl Connexus Energy Check Sequence: 20 ACH Enabled: False Fox Meadows Park 12.70 10/12/2016 0101-45000-62005 386026-175264 Hanson & 138th Lane 13.50 10/12/2016 5300-48300-62005 386026-202678 Bunker & Hanson -Signal 56.13 10/12/2016 0101-43400-62005 386026-203068 Pumphouse #3 44.78 10/12/2016 5100-48100-62005 386026-203069 Prairie Knoll Park 34.98 10/12/2016 0101-45000-62005 386026-175813 Creekview Crossing Park 12.70 10/12/2016 0101115000-62005 386026-175877 Bunker Lake & Heather St - Signal 52.58 10/12/2016 0101-43400-62005 386026-251490 EDA Reader Board 17.76 10/12/2016 2110-46500-62005 386026-303870 Hills Bunker Lk W Pk Sec Light 8.41 10/12/2016 0101-45000-62005 386026-294591 13711 Crosstown Blvd NW 57.64 10/12/2016 2110-46500-62005 386026-303295 Sports Complex -3535161st Ave 801.97 10/12/2016 0101-45000-62005 386026-304108 Signal 1600 Crosstown 29.56 10/12/2016 0101-43500-62005 386026-269010 Signal -14298 Round Lake 14.78 10/12/2016 0101-43500-62005 386026-279219 Signal 15390 Hanson Blvd 18.40 10/12/2016 0101-43500-62005 386026-287969 Signal 15698 Round Lake Blvd 18.40 10/12/2016 0101-43500-62005 386026-290712 Signal 13976 Hanson BLvd 18.40 10/12/2016 0101-43500-62005 386026-298781 Shady Knoll Pk -Security Light 12.70 10/12/2016 0101-45000-62005 386026-304218 Hidden Creek E Pk -Sec Lightl 12.70 10/12/2016 0101-45000-62005 386026-238967 Pleasant Oaks -Security Light 12.70 10/12/2016 0101-45000-62005 386026-238968 Pumphouse 96 1,239.72 10/12/2016 5100-48100-62005 386026-245409 Bunker & Hanson 18.40 10/12/2016 0101-43500-62005 386026-203068 Round Lake 140th 18.40 10/12/2016 010143500-62005 386026-201777 Bunker Lake & Heather 22.17 10/12/2016 0101-43500-62005 386026-251490 Bunker Lake & Rose St 14.78 10/12/2016 0101-43500-62005 386026-251491 Wash Station -Public Works 28.57 10/12/2016 0101-41930-62005 386026-308646 Crooked Lk Elementary Rink 41.50 10/12/2016 0101-45000-62005 386026-306807 CH Campus Outdoor Hockey Rinks 22.24 10/12/2016 0101-45000-62005 386026-302015 15700 7th St. - Traffic Signal 18.40 10/12/2016 0101-43500-62005 386026-275108 13914 Prairie Rd Traffic Sign 18.40 10/12/2016 0101-43500-62005 386026-282927 Timber Trails Irrigation 56.66 10/12/2016 010145000-62005 386026-248020 AP -Computer Check Proof List by Vendor (10/12/2016 - 2:57 PM) Page 4 Invoice No Description Amount Payment Date Acct Number Reference Altitude Control Vault 17.80 10/12/2016 5100-48100-62005 386026-303716 Siren #9 - 139th & Crosstown Blvd. NW 5.00 10/12/2016 0101-42400-62005 386026-300404 Siren #7 - Andover Blvd. & Prairie Road 5.00 10/12/2016 0101-42400-62005 386026-300405 Siren 91 - 176th & Ward Lake Drive NW 5.00 10/12/2016 0101-42400-62005 386026-300406 Siren #3 - 16860 Roanoke St. NW 5.00 10/12/2016 0101-42400-62005 386026-300407 Siren #4 - 158th & Dakota St. NW 5.00 10/12/2016 0101-42400-62005 386026-300408 Hawkridge Park - Service #2 76.81 10/12/2016 0101-45000-62005 386026-301889 Bus Sign - 1721 Bunker Lk Blvd 19.15 10/12/2016 2110-00000-11310 386026-299532 Round Lake & 138th - Signal 40.85 10/12/2016 0101-43400-62005 386026-201751 Pumphouse #1 51.61 10/12/2016 510048100-62005 386026-201767 Round Lake & 140th - Signal 38.44 10/12/2016 0101-43400-62005 386026-201777 County Rd Intersect Lights 2,570.29 10/12/2016 0101-43500-62005 386026-176059 Subdivision Interior Street Lt 14,702.06 10/12/2016 0101-43600-62005 386026-176201 Tower#1 29.33 10/12/2016 5100-48100-62005 386026-178452 Fire Station #2 482.01 10/12/2016 010141920-62005 386026-178835 Lift Station 41 108.47 10/12/2016 5200-48200-62005 386026-178836 Siren #12- Bunker &Marigold St. NW 5.00 10/12/2016 0101-42400-62005 386026-300398 Siren #10 - 145th & Vintage St. NW 5.00 10/12/2016 0101-42400-62005 386026-300399 Siren #11 - 138th Lane & Drake St. NW 5.00 10/12/2016 0101-42400-62005 386026-300400 Siren #6 - 16050 Constance Blvd. NW 5.00 10/12/2016 0101-42400-62005 386026-300401 Siren #8- 1685 Crosstown Blvd. NW 5.00 10/12/2016 010142400-62005 386026-300402 Andover Station North Ballfld 907.75 10/12/2016 0101-45000-62005 386026-292904 Andover St Ballfield Lights 28.46 10/12/2016 0101-45000-62005 386026-292904 Andover St N Ballfield Lights 42.70 10/12/2016 0101-43500-62005 386026-292034 Kelsey/Rd Lk Pk -Security Light 12.70 10/12/2016 0101-45000-62005 386026-246004 Round Lake &161st -Signal 44.15 10/12/2016 0101-43400-62005 386026-230276 Hawkridge Park -Security Light 44,61 10/12/2016 0101-45000-62005 386026-230286 Bus Sign - 13980 Hanson Blvd 28.07 10/12/2016 2110-00000-11310 386026-299533 ASN Street Lights 226.48 10/12/2016 2110-00000-11310 386026-299989 Nordeens Park 8.01 10/12/2016 0101-45000-62005 386026-175703 Electric Service 18.40 10/12/2016 0101-43500-62005 386026-230276 Wayside Hem - 1000 Crosstown Blvd. 23.33 10/12/2016 0101-43400-62005 386026-299229 13551 Jay Street -Lights 152.91 10/12/2016 2110-00000-11310 386026-255962 Martin & Commercial - Lights 218.37 10/12/2016 2110-00000-11310 386026-255963 Lift Station #6 49.96 10/12/2016 5200-48200-62005 386026-275284 Prairie Knoll Park 637.67 10/12/2016 0101-45000-62005 386026-275569 Lift Station#7 35.91 10/12/2016 5200-48200-62005 386026-276742 Red Oaks W Pk -Security Light 12.70 10/12/2016 0101-45000-62005 386026-246005 Lift Station #2 50.10 10/12/2016 5200-48200-62005 386026-250066 Lift Station #3 61.62 10/12/2016 5200-48200-62005 386026-250421 Northwood EPk-Security Light 8.41 10/12/2016 0101-45000-62005 386026-250587 Bunker Lake & Rose St - Signal 48.19 10/12/2016 0101-43400-62005 386026-251491 Bunker Lake & Jay St - Signal 55.61 10/122016 0101-43400-62005 386026-251653 AP -Computer Check Proof List by Vendor (10/12/2016 - 2:57 PM) Page 5 Invoice No Description Amount Payment Date Acct Number Reference Signal 15390 Hanson Blvd 42.58 10/12/2016 0101-43400-62005 386026-287969 1157 Andover Blvd - Well #9 3,552.90 10/12/2016 5100-48100-62005 386026-286880 Signal 15698 Rd Lk Blvd 35.53 10/12/2016 0101-43400-62005 386026-290712 Lift Station#9 36.55 10/12/2016 5200-48200-62005 386026-287602 Country Oaks Park 5,00 10/12/2016 010145000-62005 386026-289790 Round Lake & 136th - Signal 25.72 10/12/2016 0101-00000-13201 386026-201283 Round Lake & 135th - Signal 20.68 10/12/2016 0101-43400-62005 386026-201284 Round Lake & 135th - Signal 25.28 10/12/2016 0101-00000-13201 386026-201284 Terrace Park -Security Lights 8.41 10/12/2016 0101-45000-62005 386026-270409 Eveland Field -Security Lights 8.41 10/12/2016 0101-45000-62005 386026-270410 Wild Iris Park -Security Lights 8.41 10/12/2016 0101-45000-62005 386026-270411 Strootman Park -Security Lights 8.41 10/12/2016 0101-45000-62005 386026-270412 Water Treatment Plant 10,189.40 10/12/2016 5100-48100-62005 386026-271472 Sunshine Park - Electric 228.44 10/12/2016 0101-45000-62005 386026-273153 Pumphouse #8 1,566.96 10/12/2016 5100-48100-62005 386026-273808 157007th Ave - Signal 43.89 10/12/2016 0101-43400-62005 386026-275108 Fire Station #1 1,007.41 10/12/2016 010141920-62005 386026-68989 Recycling Center 40.75 10/122016 0101-46000-62005 386026-304690 Round Lake & 136th 4.60 10/12/2016 0101-43500-62005 386026-201283 Round Lake & 135th 4.60 10/12/2016 0101-43500-62005 386026-201284 County Road 9 & 116 20.71 10/12/2016 0101-43500-62005 386026-201749 Round Lake & 138th 14.78 10/122016 0101-43500-62005 386026-201751 Pumphouse #2 53.17 10/122016 510048100-62005 386026-201125 Bunker Lake & Jay 29.56 10/12/2016 0101-43500-62005 386026-251653 Signal Bunker & Crosstown 29.56 10/12/2016 0101-43500-62005 386026-251654 Signal Andover & Crosstown 29.56 10/12/2016 0101-43500-62005 386026-266238 County Road 9 & 116 - Signal 41.55 10/12/2016 0101-43400-62005 386026-201749 County Road 9 & 116 - Signal 20.76 10/12/2016 0101-00000-13201 386026-201749 Pumphouse#4 1,196.24 10/12/2016 5100-48100-62005 386026-231280 City Hall Garage 19.83 10/12/2016 0101-41960-62005 386026-231281 Tower#2 27.43 10/12/2016 5100-48100-62005 386026-231282 Pumphouse 45 1,538.50 10/12/2016 510048100-62005 386026-237118 Round Lake & 136th - Signal 21.12 10/12/2016 0101-43400-62005 386026-201283 Lift Station#5 33.88 10/12/2016 5200-48200-62005 386026-273019 Community Center Concession Stand 21,269.86 10/12/2016 2130-44100-62005 386026-281212 Andover Blvd & Hanson - Signal 41.44 10/12/2016 0101-43400-62005 386026-284894 Pine Hills Park 12.70 10/12/2016 0101-45000-62005 386026-256788 Hidden Creek North Park 23.63 10/12/2016 0101-45000-62005 386026-261455 Shadowbrook East Park 34.57 10/12/2016 0101-45000-62005 386026-267140 City Hall Park Lighting 30.33 10/12/2016 0101-45000-62005 386026-268970 1600 Crosstown Blvd - Signal 47.39 10/12/2016 0101-43400-62005 386026-269010 2139 Bunker Lake - Signal 75.60 10/12/2016 0101-00000-11310 386026-269011 TImber Trail Park Security Lights 10.14 10/12/2016 0101-45000-62005 386026-277955 AP -Computer Check Proof List by Vendor (10/12/2016 - 2:57 PM) Page 6 Invoice No Description Amount Payment Date Acct Number Reference Fire Station #3 612.28 10/12/2016 0101-41920-62005 386026-279236 Community Center 657.83 10/12/2016 2130-44000-62005 386026-281212 Lift Station#8 62.63 10/12/2016 5200-48200-62005 386026-281840 13914 Prairie Road - Signal 36.55 10/12/2016 0101-43400-62005 386026-282927 Bunker Lake & Crosstown - Signal 59.79 10/12/2016 0101-43400-62005 386026-251654 Lift Station #4 248.90 10/12/2016 5200-48200-62005 386026-251905 Signal 1594 Andover Blvd 18.40 10/12/2016 0101-43500-62005 386026-284894 Pumphouse #7 88.32 10/12/2016 5100-48100-62005 386026-255064 Public Works 2,323.46 10/12/2016 0101-41930-62005 386026-159276 Lmgseth Park 12.70 10/12/2016 0101-45000-62005 386026-174273 Hidden Creek North Park 25.41 10/12/2016 0101-45000-62005 386026-174280 Control Valve Vault 79.34 10/12/2016 510048100-62005 386026-201816 Signal - Crosstown&Andover Blvd. 45.86 10/12/2016 0101-43400-62005 386026-266238 Andover Station II - Lights 249.75 10/12/2016 2110-00000-11310 386026-295855 1019 Andover Blvd - Wayside Horn 23.25 10/12/2016 0101-43400-62005 386026-297583 Crooked Lake Boat Shelter 14.89 10/12/2016 0101-45000-62005 386026-298796 Signal - 13976 Hanson Blvd. NW 41.74 10/12/2016 0101-43400-62005 386026-298781 Oak BluffPark-SecurityLight 29.29 10/12/2016 0101-45000-62005 386026-299378 Siren #5-2748 161 at Ave NW 5.00 10/12/2016 0101-42400-62005 386026-300397 Sunshine Park 1,930.21 10/12/2016 0101-45000-62005 386026-230685 City Hall - Light 2,001.87 10/12/2016 0101-41910-62005 386026-231135 14298 Round Lake - Signal 36.17 10/12/2016 0101-43400-62005 386026-279219 North Woods West Park 22.36 10/12/2016 0101-45000-62005 386026-201868 Siren #2 - 174th & Round Lake Blvd. NW 5.00 10/12/2016 0101-42400-62005 386026-300403 Chesterton Commons Pk -Security 8.41 10/12/2016 0101-45000-62005 386026-301899 Signal & Lights -16119 Hanson 82.46 10/12/2016 0101-43400-62005 386026-305951 Country Oaks W Pk -Security 8.41 10/12/2016 0101-45000-62005 386026-301901 Check Total: 73,869.48 Vendor: CoonRapi City of Coon Rapids Check Sequence: 21 ACH Enabled: False 11676 Traffice Signal Hanson/133rd 33.28 10/12/2016 0101-43400-62005 11676 Traffice Signal Crosstown/133rd 24.65 10/12/2016 010143400-62005 Check Total: 57.93 Vendor: CountPri Countryside Printing, Inc. Check Sequence: 22 ACH Enabled: False 34289 Print Punch Cards 180.62 10/12/2016 2130-44000-63030 Check Total: 180.62 Vendor: CrowRive Crow River Farm Equipment Check Sequence: 23 ACH Enabled: False 180451 Alum Bar 121.23 10/12/2016 0101-43100-61020 AP -Computer Check Proof List by Vendor (10/12/2016 - 2:57 PNI) page 7 Invoice No Description Amount Payment Date Acct Number Reference AP -Computer Check Proof List by Vendor (10/12/2016 - 2:57 PM) Check Total: Vendor: DehnOil Dehn Oil Company 25091306 Diesel Fuel Additive 48453 Unleaded Fuel 48454 Diesel Fuel AP -Computer Check Proof List by Vendor (10/12/2016 - 2:57 PM) Check Total: Vendor: DeptLabo Department of Labor & Industry 25697003004 September 2016 Surcharge Report 25697003004 September 2016 Surcharge Report 10/12/2016 Check Total: Vendor: Dusty Dustys Body Shop, Inc. 19566 Labor to Repair Unit#205 19566 Parts to Repair Unit #205 Check Total: Vendor: ECM ECM Publishers, Inc. 410052 Ad for Job Openings 410053 Ad for Job Openings 412261 173rd Lane Reconstruction 412262 2016 Street Reconstruction 412374 Sept - Oct 2016 Andover Newsletter Check Total: Vendor: EganSery Egan Service JC10144438 September 2016 Maint Andover/Crosstown 1,982.87 Check Total: Vendor: FacMotor Factory Motor Parts Company 41-Z00410 Battery & Core Credits 6-1454823 Battery 10/12/2016 Check Total: Vendor: Fastenal Fastenal Company MNHAM50612 Misc. Supplies MNTC8144876 Misc. Supplies AP -Computer Check Proof List by Vendor (10/12/2016 - 2:57 PM) Check Sequence: 30 ACH Enabled: False 66.95 10/12/2016 5200-48200-61005 72.00 10/12/2016 6100-48800-61020 Page 8 Check Sequence: 24 ACH Enabled: False 250.00 10/12/2016 6100-48800-61050 899.97 10/12/2016 6100-48800-61045 2,175.00 10/12/2016 6100-48800-61050 3,324.97 Check Sequence: 25 ACH Enabled: False 1,982.87 10/12/2016 0101-00000-23201 -39.66 10/12/2016 0101-42300-54325 1,943.21 Check Sequence: 26 ACH Enabled: False 840.00 10/12/2016 6100-48800-63135 172.50 10/12/2016 6100-48800-61115 1,012.50 Check Sequence: 27 ACH Enabled: False 183.60 10/12/2016 2130-44300-63025 114AS 10/12/2016 2130-44300-63025 64,50 10/12/2016 4140-49300-63025 64.50 10/12/2016 4140-49300-63025 1,826.00 10/12/2016 0101-41210-63030 2,253.08 Check Sequence: 28 ACH Enabled: False 750.75 10/12/2016 0101-43400-62300 750.75 Check Sequence: 29 ACH Enabled: False 361.02 10/12/2016 6100-48800-61115 123.52 10/12/2016 6100-48800-61115 Check Sequence: 30 ACH Enabled: False 66.95 10/12/2016 5200-48200-61005 72.00 10/12/2016 6100-48800-61020 Page 8 Invoice No Description Check Total Vendor: Ferguson Ferguson Waterworks 42516 0213715 Misc. Water Supplies Amount Payment Date Acct Number Reference 138.95 Check Total: Vendor: Fencllg Fenellgas 1093455458 Propane Check Sequence: 31 Check Total: Vendor: FirsImpr First Impressions Building Services LLC 21 Strip/Wm Kitchen Floor- FS #1 1,517.04 Check Total: Vendor: FletPrid FleetPride Track &Trader Parts 79984776 Hose 80199213 Parts for Units #07-191 & #T-13554 49.40 Check Total: Vendor: ForceAm Force America Distributing LLC IN001-1085387 Stock IN001-1085402 Misc. Supplies IN001-1085402 Misc, Stock Check Sequence: 33 Check Total: Vendor: Frattalo Frattallone's Hardware Sto 027602 Misc. Hardware 027619 Tool 027658 Tool 027669 Misc. Supplies 027729 Misc. Supplies 027796 Cement CPVC 4 OZ 027815 Pruning Seal 13 Oz 027818 Mailbox Rural C2 Lock BL 027873 Misc. Supplies 75.99 Check Total: Vendor: G&K G&K Services Inc Amount Payment Date Acct Number Reference 138.95 Check Sequence: 35 ACH Enabled: False 83.49 10/12/2016 Check Sequence: 31 ACH Enabled: False 1,517.04 10/12/2016 5100-48100-61135 1,517.04 10/12/2016 6100-48800-61115 318.14 Check Sequence: 32 ACH Enabled: False 49.40 10/12/2016 6100-48800-61020 ACH Enabled: False 49.40 10/12/2016 0101-42200-61020 0.89 10/12/2016 Check Sequence: 33 ACH Enabled: False 275.00 10/12/2016 0101-41920-63105 275.00 10/12/2016 0101-41930-61120 24.55 10/12/2016 Check Sequence: 34 ACH Enabled: False 66.91 10/12/2016 6100-48800-61115 58.86 10/12/2016 6100-48800-61115 AP -Computer Check Proof List by Vendor (10/12/2016 - 2:57 PM) Page 9 Check Sequence: 35 ACH Enabled: False 83.49 10/12/2016 610048800-61115 53.11 10/12/2016 6100-48800-61020 181.54 10/12/2016 6100-48800-61115 318.14 Check Sequence: 36 ACH Enabled: False 3.89 10/12/2016 0101-42200-61020 0.89 10/12/2016 0101-41600-61205 19.99 10/12/2016 0101-41600-61205 14.98 10/12/2016 0101-41930-61120 24.55 10/12/2016 5100-48100-61005 6.79 10/12/2016 5100-48100-61135 27.96 10/12/2016 0101-43100-61020 75.99 10/12/2016 0101-43100-61020 29.14 10/12/2016 6100-48800-61020 204.18 Check Sequence: 37 ACH Enabled: False AP -Computer Check Proof List by Vendor (10/12/2016 - 2:57 PM) Page 9 Invoice No Description Amount Payment Date Acct Number Reference 1182123894 Uniform Cleaning 162.04 10/12/2016 0101-43100-61020 1182123894 Uniform Cleaning 23.16 10/12/2016 0101-43300-61020 1182123894 Uniform Cleaning 69.44 10/12/2016 0101-45000-61020 1182123894 Uniform Cleaning 23.16 10/12/2016 5100-48100-61005 1182123894 Uniform Cleaning 46.29 10/12/2016 5200-48200-61005 1182123894 Uniform Cleaning 23.12 10/122016 6100-48800-61020 1182135087 Uniform Cleaning 71.32 10/12/2016 0101-45000-61020 1182135087 Uniform Cleaning 23.78 10/12/2016 5100-48100-61005 1182135087 Uniform Cleaning 47.54 10/12/2016 5200-48200-61005 1182135087 Uniform Cleaning 23.75 10/12/2016 6100-48800-61020 1182135087 Uniform Cleaning 166.43 10/12/2016 0101-43100-61020 1182135087 Uniform Cleaning 23.79 10/12/2016 0101-43300-61020 1182135089 Floor Mat Rental 61.25 10/12/2016 0101-41930-62200 1182135090 Floor Mat Rental 39.90 10/12/2016 0101-41910-62200 Check Total: 804.97 Vendor: Goodin Goodin Company Check Sequence: 38 01274929-00 Terrace Park Irrigation & Water Service 585.44 10/12/2016 4150-49300-61020 01294814-00 Terrace Park Irrigation & Water Service 19.40 10/12/2016 4150-49300-61020 Check Total: 604.84 Vendor: GopherSt Gopher State One -Call Inc _ Check Sequence: 39 6090153 Billable Locates 290.25 10/12/2016 5200-48200-63040 6090153 Billable Locates 290.25 10/12/2016 5100-48100-63040 Check Total: 580.50 Total for Check Run: 96,638.73 Total of Number of Checks: 39 ACH Enabled: False ACH Enabled: False AP -Computer Check Proof List by Vendor (10/12/2016 - 2:57 PM) Page 10 Accounts Payable Computer Check Proof List by Vendor User: brendaf Printed: 10/13/2016 - 10:26AM Batch: 00418.102016 Invoice No Description Amount Payment Date Acct Number C IT Y OF DOVER . Reference Vendor: AmPaveSo American Pavement Solutions, Inc. Check Sequence: 1 ACH Enabled: False Final Payment 2016 Crack Sealing 7,447.60 10/18/2016 4140-49300-63010 Final Payment 2016 Parking Lot Maintenance 997.16 10/18/2016 4180-49300-63010 Check Total: 8,444.76 Vendor: AnkCo01 Anoka Cc Treasurer Check Sequence: 2 ACH Enabled: False S161003A 2016 4th Qtr Law Enforcement Contract -133,120.00 10/18/2016 0101-42100-53370 5161003A 20164th Qtr Law Enforcement Contract 734,116.75 10/18/2016 0101-42100-63010 Check Total: 600,996.75 Vendor: BeckerAr Becker Arena Products, Inc Check Sequence: 3 ACH Enabled: False 1002996 New Flooring in Area #1 -2,200.00 10/18/2016 2130-00000-20301 1002996 New Flooring in Area#1 34,839.58 10/18/2016 2130-44300-65300 Check Total: 32,639.58 Vendor: Hawkinsl Hawkins & Baumgartner, P.A. Check Sequence: 4 ACH Enabled: False September 2016 Grey Oaks 4th Addition 485.10 10/18/2016 7200-00000-24202 September 2016 September 2016 Legal Services 15,345.21 10/18/2016 0101-41240-63015 Check Total: 15,830.31 Vendor: MeicounW Metro Council Wastewater Check Sequence: 5 ACH Enabled: False 0001059985 Novennber 2016 Sewer Services 94,380.15 10/18/2016 5200-48200-63230 Check Total: 94,380.15 Vendor: MetCounE Metropolitan Council Environmental Services Check Sequence: 6 ACH Enabled: False September 2016 September 2016 Sac Report -298.20 10/18/2016 0101-41400-58100 September 2016 September 2016 Sac Report 29,820.00 10/18/2016 0101-00000-23201 Check Total: 29,521.80 AP -Computer Check Proof List by Vendor (10/13/2016 - 10:26 AM) Page I Invoice No Description Amount Payment Date Acet Number Reference Vendor: TmutWel Traut Companies Payment#3 Timber Trails Park Reconstruction 15,100.25 Check Total: 15,100.25 Total for Check Run: 796,913.60 Total of Number of Checks: 7 Check Sequence: 7 10/18/2016 4150-49300-63010 ACE Enabled: False AP -Computer Check Proof List by Vendor (10/13/2016 - 10:26 AW Page 2 1685 CROSSTOWN BOULEVARD N.W.. ANDOVER, MINNESOTA 55304 . (763) 755-5100 FAX (763) 755-8923 • WWW.CI.ANDOVER.MN.US TO: Mayor and Councilmembers CC: James Dickinson, City Administrator FROM: Dana Makinen, Human Resources Manager SUBJECT: Approve Health Insurance Contract and Employer Contribution DATE: October 18, 2016 0 The current City sponsored employee health insurance policy contract expires December 31, 2016. Administration, Finance and Human Resources departments have worked with the City's broker Johnson McCann to seek either a contract renewal with the current provider Preferred One or market to other insurance providers to provide a quality, yet affordable employee health insurance plan. The resulting recommendation is provided below. DISCUSSION In 2006 the City of Andover for medical insurance, converted to a High Deductible Health Plan (HDHP) with a Health Savings Account (HSA), which allowed employees to have more control over their own healthcare (Consumer Driven Healthcare), which is consistent with current marketplace trends. Staff is recommending staying with the Health Partners Open Access (deductibles of $2,500 for singles and $5,000 for families) with an HSA for 2017, which will result in the following rates: Health Partners OA HP- OA Current 2017 Rate Rate(3.8% increase) HDHP Single $457.58 $474.75 HDHP Family $1,189.65 $1,234.30 Based on past City practices, Human Resources is recommending that the City Council continue covering 100% of the single health premium and 76% of the family premium, which would be $938.07 per month. The City will continue to partially fund the employee HSA's well within health insurance budget projections at the same amounts as last year (75% of singles and 65% of families). As in the past, if an employee opts out, the City will provide an in lieu payment to the employee of $165.00 per month in taxable income. BUDGETIMPACT Funding for Medical Insurance and HSA would be provided for in the proposed 2017 City Budget. Through the 2017 budget development process a 15% medical insurance increase was originally forecasted, the proposed renewal is well below that forecast with an actual increase of approximately 3.8% (based on current enrollment). The proposed 2017 City Budget will be adjusted accordingly. ACTION REQUIRED The Andover City Council is requested to approve the Health Savings Account contributions. Respectfully submitted, Dana Makinen Health Partners Open Access insurance renewal and the bly N: D6 il , A 6 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.CI.ANDOVER.MN.US TO: Mayor and Council Members CC: Jim Dickinson, City Administrator / Finance FROM: Erick Sutherland, Recreational Facilities Mar SUBJECT: Accept Contribution / North Metro Soccer Association / Andover Community Center DATE: October 18, 2016 INTRODUCTION This item is in regard to approving a resolution accepting a contribution made by North Metro Soccer Association to be used towards the Andover Indoor Youth Soccer Program at the Andover Community Center. DISCUSSION North Metro Soccer Association has made a one-time contribution of $500.00. ACTION REQUIRED The City Council is requested to approve the resolution accepting the contribution. Respectfully Submitted, Eri utherland Attachments: Resolution CITY OF ANDOVER COUNTY OF ANOKA STATE OF MINNESOTA RES. NO. MOTION by Councilmember to adopt the following: A RESOLUTION ACCEPTING A CONTRIBUTION MADE TO THE CITY OF ANDOVER TO BE USED TOWARDS THE INDOOR YOUTH SOCCER PROGRAM AT THE ANDOVER COMMUNITY CENTER. WHEREAS, any contributions that are to be made to the City of Andover must be accepted by the City Council; and WHEREAS, the $500.00 contribution from North Metro Soccer Association is to be used towards the Andover Community Center Indoor Soccer Program. NOW, THEREFORE BE IT RESOLVED by the City Council to hereby accept the contribution, which is to be used towards the Andover Community Center Indoor Youth Soccer Program. MOTION seconded by Councilmember and adopted by the City Council at a regular meeting this 18th day of October 2016, with Councilmembers voting in favor of the resolution, and Councilmembers voting against, whereupon said resolution was declared passed. CITY OF ANDOVER ATTEST: Julie Trude - Mayor Michelle Hartner - Deputy City Clerk 1685 CROSSTOWN BOULEVARD N.W.. ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.CI.ANDOVER.MN.US TO: Mayor and Councilmembers CC: James Dickinson City Administrator FROM: Dana Makinen, Human Resources Manager O SUBJECT: Approve Amended Personnel Policy to include Christmas Eve as Official City Holiday DATE: October 18, 2016 On December 15, 2015 the City Council approved the Union Contract designating Christmas Eve as an official City holiday. As part of the union contract negotiation for the 2016-2017 contract, the City Council approved Christmas Eve as an official City paid holiday. General practice for the City has been to have holidays and leaves consistent for all permanent employees, including non-union. To do so, it must be added to Section 16 of the City of Andover Personnel Policy. Sec. 16. Holidays. (a) A full-time employee shall be provided the following paid holidays except as otherwise provided in this section: New Year's Day Veteran's Day Martin Luther King's Birthday Thanksgiving Day President's Day Day after Thanksgiving Memorial Day Floating Holiday Independence Day Christmas Eve ( new) Labor Day Christmas Day BUDGETIMPACT This has already been included in the budget. ACTION REQUESTED Council is requested to approve amending the Personnel Policy to include Christmas Eve as a City paid holiday. Respectfully submitted, Dana Makinen 1685 C TO: CC: FROM: SUBJECT: DATE: NDO: 5VULCVHKU N.VV. • HNUVVtK, IVIIIVNLJU IH 00. FAX (763) 755-8923 • WWW.ANDOVERMN.GOV Mayor and Councilmembers Jim Dickinson, City Administrator Commander Brian Podany - Anoka Sheriff's Office Anoka County Sheriffs Office Monthly Report - Sheriff October 18, 2016 O Commander Brian Podany from the Anoka County Sheriffs Office will be present to provide the Council and the citizens of Andover with an update on law enforcement activities within the City. DISCUSSION To be verbally presented. ACTION REQUIRED For Council information. Respectfully submitted, Commander Brian Podany Anoka County Sheriff s Office 0 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV TO: Mayor and Council Members CC: Jim Dickinson, City Administrator / FROM: David D. Berkowitz, Director of Pu is W rks/City Engineer SUBJECT: Hold Public Hearing/Adopt Assessment Roll/16-2/2016 Street Reconstruction —Engineering DATE: October 18, 2016 INTRODUCTION The City Council is requested to hold a public hearing and approve the resolution adopting the assessment roll for Project 16-2, 2016 Street Reconstruction. DISCUSSION During the summer of 2016 the streets in the Prairie Meadows development were reconstructed. In accordance with the Roadway Reconstruction Assessment Policy, twenty-five percent (25%) of the total project costs for a standard street section are being assessed to the benefiting properties. There is one property that could be split at a future date. That property will have the assessment amount for the potential lot deferred until a future date if and when it is split. The following table depicts the total project costs, assessable costs, City costs, feasibility assessment rate per unit, and actual assessment rate per unit. Project # Total Project Costs Assessable Costs (25%) City Costs (75%) Feas. Assess. Rate Per Unit Actual Assess. Rate Per Unit 16-2 $423,077.90 1 $105,769.48 $317,308.42 $7,200.00 $7,051.30 The Assessment Roll has been prepared and is on file in the City Clerk's office for review. Attached are the following: • Resolution adopting the assessment roll • Example notice and letter sent to property owners • Location map • Assessment worksheet • Example assessment roll BUDGETIMPACT Seventy-five percent (75%) of the total project costs will be funded from the City's Road & Bridge Fund. The remaining 25% of the total project costs will be assessed to the benefiting properties. Based upon current market conditions, the finance department is recommending these assessments be extended over a 10 -year period at a 4.5% interest rate. Mayor and Council Members October 18, 2016 Page 2 of 2 ACTION REQUIRED The City Council is requested to hold the public hearing and approve the resolution adopting the assessment roll for Project 16-2, 2016 Street Reconstruction. Respectfully submitted, David D. Berkowitz Attachments: Resolution, Letter & Notices Sent to Property Owners, Location Map, Assessment Worksheet & Example Assessment Roll CITY OF ANDOVER COUNTY OF ANOKA STATE OF MINNESOTA RES. NO. MOTION by Councilmember to adopt the following: A RESOLUTION ADOPTING THE ASSESSMENT ROLL FOR THE IMPROVEMENT OF PROJECT NO. 16-2,2016 STREET RECONSTRUCTION. WHEREAS, pursuant to proper notice duly given as required by law, the City Council has met and heard and passed upon all objections to the proposed assessment for the improvements. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF ANDOVER, MINNESOTA: 1. Such proposed assessment, a copy of which is attached hereto and made part hereof, is hereby accepted and shall constitute the special assessment against the lands named therein, and each tract of land therein included is hereby found to be benefited by the proposed improvement in the amount equal to or greater than the assessment levied against it. 2. Such assessment shall be payable in equal annual installments, extending over a period of 10 years, the first of the installments to be payable on or before the first Monday in January, 2017 and shall bear interest at a rate of 4_5 percent per annum from the date of the adoption of this assessment resolution. 3. The owners of any property so assessed may, at any time prior to certification of the assessment to the County Auditor, pay the whole of the assessment on such property with interest accrued to the date of payment to the City Treasurer. MOTION seconded by Councilmember and adopted by the City Council at a regular meeting this 18th day of October , 2016 , with Councilmembers voting in favor of the resolution, and Councilmembers voting against, whereupon said resolution was declared passed. CITY OF ANDOVER ATTEST: Julie Trude - Mayor Michelle Hartner — Deputy City Clerk 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV September 21, 2016 Property Owner 3501 — 170th Lane NW Andover, MN 55304 Re: 2016 Street Reconstruction (Prairie Meadows)/City Project 16-2 Dear Property Owner: Please find enclosed the public hearing notice for the proposed assessment for your street reconstruction. The public hearing is scheduled for Tuesday, October 18, 2016 at 7:00 p.m. at the Andover City Hall. The estimated assessment per lot was $7,200.00 per lot or potential lot and the final assessment amount will be $7,051.30 per lot. The second assessment to your parcel is proposed to be deferred until the parcel is subdivided. Refer to attached assessment roll. Once the public hearing is held and the assessments are approved by the City Council a subsequent letter will be mailed explaining the payment process. If you have any questions, feel free to contact me at (763) 767-5133 or Jason Law at (763) 767-5130. Sincerely, David D. Berkowitz, P.E. Director of Public Works/City Engineer DDB:rja Encl. rall -Mmsm- W�� 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 . (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV September 21, 2016 Re: 2016 Street Reconstruction (Prairie Meadows)/City Project 16-2 Dear Property Owner: Please find enclosed the public hearing notice for the proposed assessment for your street reconstruction. The public hearing is scheduled for Tuesday, October 18, 2016 at 7:00 p.m. at the Andover City Hall. The estimated assessment per lot was $7,200.00 per lot and the final assessment amount will be $7,051.30 per lot. Once the public hearing is held and the assessments are approved by the City Council a subsequent letter will be mailed explaining the payment process. If you have any questions, feel free to contact me at (763) 767-5133 or Jason Law at (763) 767-5130. Sincerely, David D. Berkowitz, P. . Director of Public Works/City Engineer DDB:rja Encl. DOM 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV CITY OF ANDOVER COUNTY OF ANOKA STATE OF MINNESOTA PUBLIC HEARING FOR PROJECT NO. 16-2 NOTICE IS HEREBY GIVEN that the City Council of the City of Andover, Anoka County, Minnesota will meet at the Andover City Hall, 1685 Crosstown Boulevard NW in the City of Andover, on Tuesday October 18 , 2016 at 7:00 PM to pass upon the proposed assessment for street reconstruction in the following described areas: 2016 Street Reconstruction Prairie Meadows The proposed assessment roll is on file for public inspection at the City Clerk's Office. The total amount of the proposed assessment is $7,051.30 per lot. Written or oral objections will be considered at the meeting. No appeal may be taken as to the amount unless a signed, written objection is filed with the Clerk prior to the hearing or presented to the presiding officer at the hearing. The Council may upon such notice consider any objection to the amount of a proposed individual assessment at an adjourned meeting upon such further notice to the affected property owners as it deems advisable. An owner may appeal an assessment to District Court pursuant to Minnesota Statutes Section 429.081 by serving notice of the appeal upon the Mayor or Clerk of the City within 30 days after the adoption of the assessment and filing such notice with the District Court within ten days after service upon the Mayor or Clerk. BY ORDER OF THE CITY COUNCIL Michel -le Hartner - Deputy City Clerk Publication Date: September 30, 2016 (Anoka Union) 170_ Y HL r E G E N D s �c V t Park .. ;� Right of Way City Limits 010 Potential Lot Split r E G E N D s �c V t Park Water Right of Way City Limits L E G E N D 42 Project Location Lots/Parcels Park Water Right of Way City Limits 010 Potential Lot Split Project Location Map EXHIBIT 1 PRAIRIE MEADOWS RECONSTRUCTION ?rr. o -�>J, Lu J C 0 -` 77 of j in �ySs�y V 1I � lei Z) V Ilk 169TH LN ate;, JP 77.9 !n I.Mxd 0 150 300 450 Feet FINAL ANDOVER ASSESSMENT WORKSHEET Project Name: 2016 Street Reconstruction Project No.: Consulting Costs 16-02 - Prairie Meadows Addition $ 3,066.02 Drainage Plan (0.3% of street/storm) Feasibility Report Date: 12/15/15 Const. Amount: $ 343,300.00 Contract Award Date: 4/5/16 Amount: $ 362,746.21 Actual Construction Cost Recording Fees / Legal & Easement Amount: $ 343,202.49 Actual Expenses Engineering (Includes Design, Surveying, Inspection, etc.): $ 49,419.58 Consulting Costs $ - Aerial Mapping (I% of street) $ 3,066.02 Drainage Plan (0.3% of street/storm) $ 1,029.61 Administration (3%) $ 10,296.07 Assessing (1%) $ 3,432.02 Bonding (0.5%) $ - Recording Fees / Legal & Easement $ - Advertising $ 325.19 Permit and Review Fees $ 275.00 Street Signs (Materials and Labor) $ - Material Testing $ 2,863.62 Construction Interest $ 4,676.36 City Costs $ 4,491.94 Total Actual Expenses $ 79,875.41 Expenses Multiplier 23.27355% Total Actual Project Cost Amount: $ 423,077.90 Street & Storm Sewer Construction Costs Indirect Costs Total Project Costs Assessable Costs (25%) City Costs (75%) $ 343,202.49 $ 79,875.41 $ 423,077.90 $ 105,769.48 $ 317,308.42 Road & Bridge Fund Feasibility Assessment Rate Per Unit $ 108,000.00 / 15 Units= $ 7,200.00 Actual Assessment Rate Per Unit $ 105,769.48 / 15 Units= $ 7,051.30 Final Assessment Worksheet CITY OF ANDOVER Special Assessment Roll DATE: September 20, 2016 PROJECT: 1"2 Street Reconstruction PIN: LOT: BLOCK: Address: Total $ 7,051.30 Interest Rate: 4.50% Number of Payments: 10 Annual Payment: $ 891.13 Principal Balance: $ 6,477.48 $ 5,877.84 S 5,251.21 $ 4,596.38 $ 3,912.09 $ 3,197.00 $ 2,449.74 $ 1,668.85 $ 852.82 $ 2017 2018 2019 2020 2021 2022 2023 2024 2026 2026 TOTAL Principal $ 573.82 $ 599.64 $ 626.63 $ 654.83 $ 684.29 $ 715.09 $ 747.26 $ 780.89 $ 816.03 $ 852.82 $ 7,051.30 Interest 317.31 291.49 264.50 236.30 206.84 176.04 143.87 110.24 75.10 38.31 1,860.00 Total $ 891.13 $ 891.13 $ 891.13 $ 891.13 $ 891.13 $ 891.13 $ 891.13 $ 891.13 $ 891.13 $ 891.13 $ 8,911.30 Principal Balance: $ 6,477.48 $ 5,877.84 S 5,251.21 $ 4,596.38 $ 3,912.09 $ 3,197.00 $ 2,449.74 $ 1,668.85 $ 852.82 $ 8 a C I T Y 0 F (D •VN D 06 WVE s� �,.. 1685 CROSSTOWN BOULEVARD N.W.. ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV TO: Mayor and Council Members CC: Jim Dickinson, City Administr� FROM: David D. Berkowitz, Director o Engineer SUBJECT: Hold Public Hearing/Adopt Assessment Roll/16-11/173 Id Lane NW Reconstruction — Engineering DATE: October 18, 2016 INTRODUCTION The City Council is requested to hold a public hearing and approve the resolution adopting the assessment roll for Project 16-11, 173rd Lane NW Reconstruction. DISCUSSION During the summer of 2016, 173`d Lane NW from Round Lake Boulevard NW to Tulip Street was reconstructed. In accordance with the Roadway Reconstruction Assessment Policy, twenty- five percent (25%) of the total project costs for a standard street section are being assessed to the benefiting properties. The following table depicts the total project costs, assessable costs, City costs, feasibility assessment rate per unit, and actual assessment rate per unit. Project # Total Project Costs Assessable I Costs (25%)* City Costs (75%) Feas. Assess. Rate Per Unit Actual Assess. Rate Per Unit 16-11 $187,186.33 1 $41,768.65-1 $145,417.68 $2,200.00 $1,670.75 *minus extra pavement depth costs The Assessment Roll has been prepared and is on file in the City Clerk's office for review. Attached are the following: • Resolution adopting the assessment roll • Example notice and letter sent to property owners • Location map • Assessment worksheet • Example assessment roll BUDGETIMPACT The project will be funded from the City's Road & Bridge Fund, with 25% of the total project costs (minus extra pavement depth cost over 3" standard street section) assessed to the benefiting Mayor and Council Members October 18, 2016 Page 2 of 2 properties fronting along the improvements as identified in the City's Roadway Reconstruction Assessment Policy. The remaining costs will be funded through the City's Road and Bridge Fund, and in turn reimbursed through the City's Municipal State Aid funds. Based upon current market conditions, the finance department is recommending these assessments be extended over an 8 -year period at a 4.5% interest rate. ACTION REQUIRED The City Council is requested to hold the public hearing and approve the resolution adopting the assessment roll for Project 16-11, 173`d Lane NW Reconstruction. Respectfully submitted, rav,O David D. Berkowitz Attachments: Resolution �tter & Notices Sent to Property Owners,Location Map`, Assessment Worksheet & Example Assessment Roll CITY OF ANDOVER COUNTY OF ANOKA STATE OF MINNESOTA RES. NO. MOTION by Councilmember to adopt the following: A RESOLUTION ADOPTING THE ASSESSMENT ROLL FOR THE IMPROVEMENT OF PROJECT NO. 16-11, 173RD LANE NW RECONSTRUCTION, WHEREAS, pursuant to proper notice duly given as required by law, the City Council has met and heard and passed upon all objections to the proposed assessment for the improvements. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF ANDOVER, MINNESOTA: 1. Such proposed assessment, a copy of which is attached hereto and made part hereof, is hereby accepted and shall constitute the special assessment against the lands named therein, and each tract of land therein included is hereby found to be benefited by the proposed improvement in the amount equal to or greater than the assessment levied against it. 2. Such assessment shall be payable in equal annual installments, extending over a period of 8 years, the first of the installments to be payable on or before the first Monday in January, 2017 and shall bear interest at a rate of 4_5 percent per annum from the date of the adoption of this assessment resolution. 3. The owners of any property so assessed may, at any time prior to certification of the assessment to the County Auditor, pay the whole of the assessment on such property with interest accrued to the date of payment to the City Treasurer. MOTION seconded by Councilmember and adopted by the City Council at a regular meeting this 18th day of October 2016 , with Councilmembers voting in favor of the resolution, and Councilmembers voting against, whereupon said resolution was declared passed. CITY OF ANDOVER ATTEST: Julie Trude - Mayor Michelle Hartner— Deputy City Clerk C I T Y O F NDOVE 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV September 21, 2016 Re: 173`d Lane NW Reconstruction/City Project 16-11 Dear Property Owner: Please find enclosed the public hearing notice for the proposed assessment for your street reconstruction. The public hearing is scheduled for Tuesday, October 18, at 7:00 p.m. at the Andover City Hall. The estimated assessment per lot was $2,200.00 per lot and the final assessment amount will be $1,670.75 per lot. Once the public hearing is held and the assessments are approved by the City Council a subsequent letter will be mailed explaining the payment process. If you have any questions, feel free to contact me at (763) 767-5133 or Jason Law at (763) 767-5130. Sincerely, David D. Berkowitz, P.E. Director of Public Works/City Engineer DDB:rja Encl. 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923. WWW.ANDOVERMN.GOV CITY OF ANDOVER COUNTY OF ANOKA STATE OF MINNESOTA PUBLIC HEARING FOR PROJECT NO. 16-11 NOTICE IS HEREBY GIVEN that the City Council of.the City of Andover, Anoka County, Minnesota will meet at the Andover City Hall, 1685 Crosstown Boulevard NW in the City of Andover, on Tuesday October 18 , 2016 at 7:00 PM to pass upon the proposed assessment for street reconstruction in the following described areas: 173rd Lane NW Reconstruction The proposed assessment roll is on file for public inspection at the City Clerk's Office. The total amount of the proposed assessment is $1,670.75 per lot. Written or oral objections will be considered at the meeting. No appeal may be taken as to the amount unless a signed, written objection is filed with the Clerk prior to the hearing or presented to the presiding officer at the hearing. The Council may upon such notice consider any objection to the amount of a proposed individual assessment at an adjourned meeting upon such further notice to the affected property owners as it deems advisable. An owner may appeal an assessment to District Court pursuant to Minnesota Statutes Section 429.081 by serving notice of the appeal upon the Mayor or Clerk of the City within 30 days after the adoption of the assessment and filing such notice with the District Court within ten days after service upon the Mayor or Clerk. BY ORDER OF THE CITY COUNCIL Mic elle Hartner -Deputy City Clerk Publication Date: September 30, 2016 (Anoka Union) Project Location Map EXHIBIT 1 173RD LAND RECONSTRUCTION . t s 9 .1 1- r Langseth a a fi 174 LHLN , S+Cti3': fn+wNi. f-�. PP v O t- 8 ! O a 174TH qV 2E0 s IL �021BRR®q 40 10 1-7 i Al 1�Tiy7}� �7�'; �v W � 4,�1Y ftp `.• iIV I L E G E N D 10 Project Location Lots/Parcels � Park Water Right of Way City Limits 4 Potential Lot Split I�}I}���}II}jj��N_++� /V � Z 6 0 150 300 45-- Feet 56 Feet i w , Y � Z FINAL ANDOVER ASSESSMENT WORKSHEET Project Name: 173rd Lane NW Reconstruction 23,937.88 Consulting Costs Project No.: 16-11 Aerial Mapping (I% of street) $ Feasibility Report Const. Est. Date: 12/15/15 Amount: $ 202,900.00 Contract Award Date: 4/5/16 Amount: $ 155,920.43 Actual Construction Cost 1,460.46 Amount: $ 146,045.74 Actual Expenses Engineering (Includes Design, Surveying, Inspection, etc.): $ 23,937.88 Consulting Costs $ - Aerial Mapping (I% of street) $ 1,423.59 Drainage Plan (0.3% of streettstorm) $ 438.14 Administration (3%) $ 4,381.37 Assessing (1%) $ 1,460.46 Bonding (0.5%) $ - Recording Fees / Legal & Easement $ - Advertising $ 325.19 Permit and Review Fees $ 275.00 Street Signs (Materials and Labor) $ - Material Testing $ 3,994.24 Construction Interest $ 2,073.02 City Costs $ 2,831.70 Total Actual Expenses $ 41,140.59 Expenses Multiplier 28.16966% Total Actual Project Cost Amount: $ 187,186.33 Street & Storm Sewer Construction Costs :ion for Extra Depth (3" standard vs 3.5 paved) Construction Costs (minus deductions) Assessable Construction Costs (25% minus Extra Depth) Assessable Indirect Expenses Total Assessable Costs (25% - Extra Depth) City Costs (75%+ Extra Depth) $ 146,045.74 $ (15,691.50 $ 130,354.24 x.25 $ 32,588.56 $ 9.180.09 $ 41,768.65 $ 145,417.68 Road & Bridge Fund (MSA Funds) Feasibility Assessment Rate Per Unit $ 55,110.00 /25 Units= $ 2,200.00 Actual Assessment Rate Per Unit $ 41,768.65 / 25 Units= $ 1,670.75 Final Assessment Worksheet DATE: September 20, 2016 PROJECT: 16-11 173rd Lane NW Reconstruction PIN: LOT: BLOCK: Address: Total $ 1,670.75 CITY OF ANDOVER Special Assessment Roll Interest Rate: 4.50 Number of Payments: 8 Annual Payment: $ 253.30 2017 2018 2019 2020 2021 2022 2023 2024 TOTAL Principal $ 178.12 $ 186.13 $ 194.51 $ 203.26 $ 212.41 $ 221.97 $ 231.95 $ 242.40 $ 1,670.75 Interest 75.18 67.17 58.79 50.04 40.89 31.33 21.35 10.90 355.65 Total $ 253.30 $ 253.30 $ 253.30 $ 253.30 $ 253.30 $ 253.30 $ 253.30 $ 253.30 $ 2,026.40 Principal Balance: $ 1,492.63 $ 1,306.50 $ 1,111.99 $ 908.73 $ 696.32 $ 474.35 $ 242.40 $ - 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.CI.ANDOVER.MN.US TO: Mayor and Councilmembers CC: Jim Dickinson, City Administrat( FROM: Lee Brezinka, Finance Manager SUBJECT: Public Hearing — 2017 - 2021 Capital Improvement Plan DATE: October 18, 2016 4L INTRODUCTION The City Council is requested to hold a Public Hearing to give the public the opportunity to comment on the proposed 2017 - 2021 Capital Improvement Plan (CIP). DISCUSSION A publication (attached) was in the Anoka Union Herald noticing a public hearing that will be conducted by the City Council of the City of Andover, Minnesota on Tuesday, October 18, 2015 at 7:00 p.m. The proposed 2017 — 2021 CIP is the product of numerous staff meetings and workshops with the City Council. The proposed Capital Improvement Plan is attached for your review and copies are available for public viewing in the Finance Department at City Hall. BUDGETIMPACT Detailed cost analysis is presented in the CIP document. ACTION REQUESTED Receive a brief presentation, hold a public hearing and consider approving the attached resolution adopting the 2017 - 2021 CIP. Respectfully submitted, ?J1, �4 Lee Brezmka Attachments — Publication, Resolution and Proposed 2017 - 2021 CIP CITY OF ANDOVER COUNTY OF ANOKA STATE OF MINNESOTA NOTICE OF PUBLIC HEARING The Andover City Council will hold a public hearing on the 2017 — 2021 Capital Improvements Plan at 7:00 p.m., or soon thereafter as can be heard on Tuesday, October 18, 2016 at Andover City Hall, 1685 Crosstown Blvd NW, Andover, Minnesota. The purpose of the hearing is to receive public testimony on its proposed Capital Improvements Plan for the five-year period from 2017 through 2021. The proposed Capital Improvements Plan is on file and is available for review in the Finance Department at City Hall. Jim Dickinson, City Administrator Publication Dates: October 7, 2016 October 14, 2016 CITY OF ANDOVER COUNTY OF ANOKA STATE OF MINNESOTA laWAMN i] A RESOLUTION ADOPTING THE CITY OF ANDOVER 2017 - 2021 CAPITAL IMPROVEMENT PLAN. WHEREAS, the preparation and adoption of capital improvement plans is recognized as sound financial practice; and WHEREAS, the City of Andover has the responsibility to appropriately and efficiently manage the public's funds; and WHEREAS, the City of Andover has the responsibility to appropriately and efficiently manage the public's infrastructure and equipment; and NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Andover hereby adopts the 2017 - 2021 City of Andover Capital Improvement Plan. Adopted by the City of Andover this 18th day of October 2016. lea 01619.1►11iPh1L7 ATTEST: Julie Trude - Mayor Michelle Harmer — Deputy City Clerk STATE OF MINNESOTA) COUNTY OF ANOKA) CITY OF ANDOVER) I, the undersigned, being the duly qualified and acting City Clerk of the City of Andover, Minnesota, do hereby certify that I have carefully compared the attached Resolution No. adopting the City of Andover 2017 - 2021 Capital Improvement Plan with the original record thereof preserved in my office, and have found the same to be true and correct transcript of the whole thereof. IN TESTIMONY WHEREOF, I have hereunto subscribed my hand this 18th day of October 2016. Michelle Hamner — Deputy City Clerk 2017-2021 Capital improvement Plan :.L000KS FeW, Alb 1 "north 154TH AVE eL W WYY. . CITY CAMPUS MASTER PLAN MASTER PLAN .00M ..x 16s5 Crosstown bIVJ NW, Andover, MN 5530+ r one: 763.755.5100 Fax 763.755.8923 www.andovermn.gov CITY OF ANDOVER 2017 — 2021 Capital Improvement Plan Table of Contents Introduction 2017 — 2021 Capital Improvement Plan Message........................................................................................................1 CIP Project Development & Process Authorization Schedule.....................................................................................4 Graph — 2017 Expenditures By Department................................................................................................................6 Graph — 2017 CIP Expenditures By Year....................................................................................................................6 Five Year Summary of Expenditures By Department..................................................................................................7 Five Year Summary of Revenue By Source.................................................................................................................8 Five Year Summary of Projects By Department & Revenue Source...........................................................................9 Improvements Five Year Summary of Expenditures By Department — Improvements.......................................................................15 Five Year Summary of Revenue By Source — Improvements......................................................................................16 Five Year Summary of Projects By Department & Revenue Source — Improvements................................................17 Improvement Projects By Department CommunityCenter................................................................................................................................................21 EmergencyManagement.......................................................................................................................................35 Engineering...........................................................................................................................................................36 FacilityManagement.............................................................................................................................................47 Parks & Recreation — Operations..........................................................................................................................54 Parks & Recreation — Projects...............................................................................................................................61 SanitarySewer......................................................................................................................................................71 StormSewer..........................................................................................................................................................78 130 Streets/ Highways................................................................................................................................................79 Water.....................................................................................................................................................................102 Equipment Year Summary of Expenditures By Department — Equipment....................................................................................107 Five Year Summary of Revenue By Source — Equipment...........................................................................................108 Five Year Summary of Projects By Department & Revenue Source — Equipment ......................................................109 Equipment By Department Building................................................................................................................................................................113 CentralEquipment................................................................................................................................................114 CommunityCenter................................................................................................................................................115 EmergencyManagement.......................................................................................................................................125 Engineering...........................................................................................................................................................126 FacilityManagement.............................................................................................................................................127 Finance..................................................................................................................................................................129 Fire De artment 130 p.................................................................................................................................................... InformationTechnology.......................................................................................................................................140 Parks & Recreation — Operations..........................................................................................................................141 Planning& Zoning................................................................................................................................................151 SanitarySewer......................................................................................................................................................152 StormSewer..........................................................................................................................................................154 StreetSigns...........................................................................................................................................................156 Streets/ Highways................................................................................................................................................157 Water.....................................................................................................................................................................166 Appendix Road & Bridge Fund Projected Fund Balance.............................................................................................................171 Park Improvement Fund Projected Fund Balance........................................................................................................172 Trail Fund Projected Fund Balance..............................................................................................................................173 Capital Equipment Reserve Projected Fund Balance...................................................................................................174 Water System Financial Projections.............................................................................................................................176 Sewer System Financial Projections............................................................................................................................178 Storm Sewer System Financial Projections..................................................................................................................180 Y 0 F O jV E 1685 CROSSTOWN BOULEVARD N.W.. ANDOVER, MINNESOTA 55304 . (763) 755-5100 FAX (763) 755-8923 • WWW.CI.ANDOVER.MN.US TO: Mayor and Council Members FROM: Jim Dickinson, City Administrator / Finance Director SUBJECT: 2017 — 2021 Capital Improvement Plan DATE: October 18, 2016 INTRODUCTION On behalf of the City's Management Team, I am pleased to present the City of Andover's Capital Improvement Plan for years 2017 through 2021. The City's management team and their respective staff worked diligently to produce a document that was both practical, substantive in addressing needed capital improvements and insightful regarding the underlying factors associated with the City's rapidly changing suburban landscape. CAPITAL IMPROVEMENT PLAN GOALS ACKNOWLEDGE AND COMMUNICATE PUBLIC INFRASTRUCTURE PRIORITIES AND DYNAMICS ENSURE APPROPRIATE RESPONSES TO CHANGING INFRASTRUCTURE NEEDS AND DEMANDS DEVELOP A FINANCIAL ASSESSMENT OF CAPITAL RESOURCES AVAILABLE TO MEET FUTURE CAPITAL PROJECT PLANNING NEEDS INSTITUTE A STRATEGIC VISION PREDICATED ON MAINTAINING A HIGH QUALITY SERVICE INFRASTRUCTURE CAPABLE OF MEETING THE NEEDS OF OUR CITIZENS FOR TODAY AND TOMORROW The purpose of the City's Capital Improvement Plan (CIP) is to identify, prioritize and address community needs through careful long-term capital planning and balanced public investment in supporting physical infrastructure. To ensure that this commitment is both meaningful and achievable, appropriate capital improvement factors were given significant consideration in developing a CIP that addresses community priorities over the next five (5) years. The CIP will also provide a planning foundation for future needs assessments to ensure the City is appropriately responding to the critical infrastructure needs necessary for sustainable future growth. The CIP represents a beginning in terms of producing a comprehensive planning response to address changing capital needs by developing a project schedule that will lead to timely and cost-effective project completions. DISCUSSION The 2017 - 2021 CIP has been prepared as a strategic planning tool to assist the City Council in identifying proposed capital improvement projects over the next five years. With the inclusion of preliminary financing sources, appropriate background information citing needs and projected cost estimates, this document will provide Council with the needed information to begin the process for planning improvements that meet the City's physical infrastructure needs. Consequently, the CIP serves as a flexible guide plan to properly identify the critical components of the City's infrastructure, yet maintain flexibility in determining project timeframes, project scope and possible funding sources. The 2017 - 2021 CIP continues the emphasis of judiciously managing the City's limited resources by prudently planning for known and/or anticipated future capital expenditures. A critical step in the plan adoption process is the collaborative nature of plan review that involves the leadership of the City Council, the input of appointed Commissions and staff, and most importantly, affected residents of the community. Consequently, the strategic value of this plan lies in the acknowledgement of future needs by the governing body and the effective communication of those needs to the general public during project development stages. Likewise, the availability and preliminary designation of fiscal resources to serve both current and future needs is critical to the achievement of plan outcomes that meet with Council approval. Following the approval of the plan, feasibility studies are performed, affected constituencies are notified to formally disseminate and receive public feedback on proposed project plans. This process culminates with the City Council considering all relevant information and making a final decision on whether to proceed with the proposed capital improvement. The public process that supports the advancement of these projects from inception to completion is engendered in the CIP project development and authorization schedule. Formalizing the steps in the CIP project advancement process serves a number of purposes and ensures that the Council and public are kept well informed regarding project purposes and desired outcomes, estimated project costs, funding sources, progress and final status. It should be emphasized that projects will require approval in various stages of project development by the City Council in accordance with approved policies. The objectives of the 2017 - 2021 Capital Improvement Plan are to present a comprehensive capital improvement program that communicates efforts: ➢ to ensure that community priorities are reflected in the capital investment plans of each City department; ➢ to provide a consolidated financial picture of anticipated expenditures and outline recommended funding strategies to underwrite anticipated capital improvements; ➢ to document and communicate capital improvement processes for City projects that will ensure consistency, a full appreciation of both the costs and benefits of proposed capital investments, and raises the level of public understanding regarding the City's public improvement processes; ➢ to provide information on the fiscal impacts of capital investment plans on total City finances; and ➢ to effectively plan for public improvements that support community needs in the areas of private development infrastructure, transportation, public safety, parks and recreation, utilities, and commercial/industrial growth through fiscally responsible economic development initiatives. Accordingly, this document attempts to recognize known or perceived capital improvement needs, but as with any plan recognizes that social, economic and political considerations will by necessity determine final project outcomes. The major categories of expenditures that are identified within the CIP include, but are not limited to: I. New Public Facilities Planning 2. Street Construction, Maintenance and Reconstruction 3. Utility Construction, Maintenance and Reconstruction 4. Construction, Maintenance and Upgrade of Parks, Playgrounds and Trails 5. Capital Improvements to Existing Facilities 6. Private development infrastructure 7. Capital equipment and vehicle planning needs (Equipment purchases to be determined through normal budgetary process) The City Council, consequently, accepts this document with the provision that capital improvement planning is subject to the dynamics of community growth, political leadership and acknowledges that other unanticipated needs may take precedence over planned projects. The 2017 - 2021 Capital Improvement Plan is the product of collaborative planning efforts by City staff, Park and Recreation Commission, Community Center Advisory Commission and the City Council. Projects have been introduced based on 1) anticipated future growth trends articulated in the City's current Comprehensive Plan, 2) the natural cycle of deterioration and decay evident in all physically constructed and engineered improvements in the more established areas of the community and 3) capital deficiencies or infrastructure issues brought to the City's attention through a variety of sources. Capital expenditures identified within the CIP are the best estimates available, and once the CIP is adopted, will be reviewed and confirmed through individual feasibility reports where appropriate. I am appreciative of the commitment, good judgment and expertise that each department has contributed to the capital improvement planning process. Respectfully submitted, Jim Dickinson City Administrator CIP PROJECT DEVELOPMENT AND PROCESS AUTHORIZATION SCHEDULE The following process is a Council/staff guideline for authorizing public improvement projects. As this process is controlled by State Statute and other influencing environmental factors, it is subject to change and should be viewed as a guide to assist the Council and public in understanding the public improvement process used by City staff. A separate Council meeting would facilitate each step in the process, and accomplishment of respective activities. As a result, the process time frame is a significant factor affecting City staffs ability to properly manage and complete approved Council ordered projects within budget and on time. 1. Council Approval of Annual CIP Projects by City Resolution will authorize the following outcomes: a) Staff and/or Consultant preparation of project feasibility studies b) Staff preparation of detailed financial review of project funding sources c) Neighborhood Meeting maybe held prior to Feasibility Study subject to need and type of project. TIME FRAME: October -November of each preceding year. 2. Presentation of Feasibility Study a) Feasibility Study Components: 1) Review of Project Engineering and Construction Estimates 2) Total Project Costs (All related project costs, i.e. land, soft costs) 3) Project Financial Plan/Fiscal Implications (Engineering/Finance) 4) Authorization to develop a Preliminary Assessment Roll, if any, for the Public Hearing. (Engineering) If Council accepts Feasibility Study, A Resolution "Accepting Feasibility Study and Setting Date for Public Hearing on the Project when appropriate (Engineering Department) would initiate the following: 1) Notices mailed to affected Residents per statute requirements no less than 10 days before Public Hearing. (Engineering) 2) Public Hearing Notice is published. Two publications one week apart, with the second publication no less than three days before the hearing. (Engineering/City Clerk) TIME FRAME: February -March -April -May of current year. 3. Neighborhood Meeting — City staff will hold neighborhood project meetings, when appropriate, to review and present Project Feasibility Studies, answer questions and meet with affected property owners. These meetings will include a question and answer component designed specifically to bring awareness to the property owner, obtain citizen input and produce an understanding of the purposes behind the City's attempts to construct public improvements in the affected area. TIME FRAME: Following the presentation of the Feasibility Study to Council, but prior to the holding of a Public Hearing by Council. 4. Council holds a Public Hearing when appropriate for following purposes: a) Presentation of Project (Engineering Department) b) Presentation of Preliminary Special Assessment Rolls and Financing Implications (Engineering/Finance Department) c) Council to hear Affected Resident Input d) Council determines whether to "order" the public improvement A Council Resolution is drafted "Ordering the Project and Authorizing Preparation of Plans and Specifications" (Engineering Department). Council may ORDER THE IMPROVEMENT after the public hearing is closed or at a subsequent Council Meeting within 6 months of the public hearing date. (Statutory Requirement - Council Resolution ordering project must be approved on 4/5 Council vote if it is Council initiated project with assessments). If Council decides to reject the project as presented, a Council vote should be taken to officially determine the final status of the project. TIME FRAME: April -May -June of current year 5. Plans and Specifications are presented to Council for approval. (Engineering Department) a) A Council Resolution is drafted authorizing the following: 1) Accepting and Approving Project Plans and Specifications 2) Authorizing the Advertisement for Project Bids. Bids are developed and invitation to Bid is processed. Bid opening date is no less than 3 weeks after publication. (Engineering) 3) Authorize staff to pursue an appropriate funding mechanism to underwrite project costs TIME FRAME: May -June of each year 6. Council Acceptance of Project Bids and Awarding of Contracts would authorize the following outcomes: a) A Council Resolution is drafted "Accepting Project Bids and Awarding Contracts" (Engineering) b) Initiation of Project Construction and work (Engineering) TIME FRAME: April -May -June -July of current year. 7. Project Completion a) Council Acceptance of Project b) Final Presentation and Review of Project Costs versus Project Budget by Finance Department. c) If Special Assessments are financing a portion of the Project, A Council Resolution "Setting the Special Assessment Hearing for Project #" is adopted at this same meeting. (Engineering/Finance) TIME FRAME: Upon completion of project. 8. If Special Assessments would finance a portion of the projects costs, Council Holds a Special Assessment Hearing to review the following: a) Affected Property owners would be officially notified per statute no less than two weeks prior to Special Assessment Hearing. (Clerk/Engineering) b) Public Notice is published no less than two weeks prior to Special Hearing per statute (Clerk/Engineering) c) Staff prepares a proposed roll and Council Approves Final Assessment Roll (Engineering/Finance) d) Council consideration of Assessment Appeals and Requested Deferrals filed prior to hearing or during the hearing. e) Meets M.S. Chapter 429 statutory requirements • A Council Resolution is drafted "Adopting Final Special Assessment Roll"(Engineering), and is adopted at this meeting. TIME FRAME: October/November of current year depending on finalization of project and status of completion. CITY OF ANDOVER 2017 CIP Expenditures By Department Parks - Prot. Parks - Oper. Water Fire 8.83% 4.05/° 1.18% 1.47/° Emergency Mgmt Planning & Zoning 1.25% 0.44% Engineering 12.82% Street Signs 0.15% Sanitary Sewer 9.05% Streets/Highways Comm Ctr 54.20% 1.19% Storm Sewer Facility Mgmt. 0.81% 4.56% City of Andover, MN Capital Plan 2017 thru 2021 DEPARTMENT SUMMARY Department 2017 2018 2019 2020 2021 Building 35,000 35,000 Central Equipment 40,000 40,000 Community Center 81,000 248,000 7,879,000 589,000 268,000 9,065,000 Emergency Management 85,000 63,000 52,500 45,000 245,500 Engineering 871,000 569,500 607,000 1,088,000 809,000 3,944,500 Facility Management 310,000 580,000 9,025,000 115,000 40,000 10,070,000 Finance 150,000 150,000 Fire 100,000 190,000 510,000 635,000 55,000 1,490,000 Information Technology 12,000 12,000 Park & Rec- Operators 275,000 300,000 241,000 102,000 75,000 993,000 Park & Rec- Projects 599,800 35,000 35,000 457,500 15,000 1,142,300 Planning & Zoning 30,000 30,000 Sanitary Sewer 615,000 1,250,000 1,865,000 Storm Sewer 55,000 280,000 260,000 62,000 65,000 722,000 Street Signs 10,000 10,000 Streets l Highways 3,683,000 2,857,000 3,673,000 2,986,000 4,636,000 17,835,000 Water 80,000 798,000 1,660,000 50,000 50,000 2,638,000 TOTAL 6,794,800 7,222,500 24,127,500 6,129,500 6,013,000 50,281,300 ii City of Andover, MN Capital Plan 2017 thru 2021 FUNDING SOURCE SUMMARY Source 2017 2018 2019 2020 2021 Total Assessments 657,000 880,500 1,140,000 388,000 332,000 3,397,500 Capital Equipment Reserve 885,000 205,000 277,500 438,000 75,000 1,880,500 Comm Ctr OperaSons 66,000 48,000 79,000 49,000 268,000 510,000 Construction Seal Coat Fund 17,000 8,000 10,000 10,000 10,000 55,000 Donations 100,000 100,000 Equipment Bond 688,500 1,111,000 1,082,000 220,000 3,101,500 G.O. Bond 650,000 16,750,000 537,000 17,937,000 General Fund 95,000 95,000 95,000 95,000 95,000 475,000 Grant 265,000 1,600,000 1,865,000 Municipal State Aid Funds 1,057,000 1,029,500 1,546,000 335,000 750,000 4,717,500 Park Dedication Funds 499,800 35,000 35,000 177,500 15,000 762,300 Road & Bridge Funds 2,048,000 1,590,000 1,644,000 1,996,000 1,953,000 9,231,000 Sanitary Sewer Fund 245,000 116,000 361,000 Sewer Trunk Fund 397,000 1,267,000 120,000 125,000 125,000 2,034,000 Storm Sewer Fund 55,000 76,000 60,000 62,000 65,000 318,000 Trail Funds 565,000 225,000 710,000 400,000 1,900,000 Water Fund 65,000 126,000 950,000 75,000 50,000 1,266,000 Water Trunk Fund 43,000 183,000 45,000 50,000 55,000 376,000 GRAND TOTAL 6,794,800 7,222,500 24,127,500 6,129,500 6,013,000 50,287,300 L: City of Andover, MN Capital Plan 2017 thm 2021 PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project# Priority 2017 2018 2019 2020 2021 Total (Building - - Replacement - Small Extended Cab Pick Up #8 19-02300-01 1 35,000 35,000 Equipment Bond 35,000 35,000 Building Total 35,000 35,000 (Central Equipment Replacement- Service Truck #371 18-48800-01 2 40,000 40,000 Equipment Bond 40,000 40,000 Central Equipment Total 40,000 40,000 Community Center Exterior Painting 17-44000-01 1 6,000 6,000 Comm Cor Operations 6,000 6,000 ACCNMCA Expansion 17-04000-02 2 75,000 200,000 6,725,000 7,000,000 Capital Equipment Reserve 75,000 75,000 G.O. Bond 200,000 6,725,000 6,925,000 Replacement -Carpeting 18-44000-01 1 18,000 12,000 30,000 Comm Ctr Operations 18,000 17,000 30,000 Replacement - Skate Sharpener 18-44200-01 1 10,000 10.000 Comm 00 Operations 10,000 10,000 Replacement- Pickleball Inserts/Net System 1844400-01 1 10,000 10,000 Comm Ctr Operations 10,000 10,000 New - Inflatables 18-04400-03 1 10,000 10,000 Comm CH Operations 10,000 10,000 Replacement- All Community Center Doors 19-44000-02 1 75,000 75,000 G.O. Bond 75,000 75,000 Refacing Rink Boards 19-44300-01 1 25,000 25,000 Comm Cor Operattons 25,000 25,000 Repaint Ice Arena ceiling 19-04300-02 1 25,000 25,000 Comm Ctr Operations 25,000 25,000 Replacement- Ice Arena Refrigeration Replacement 19-04300-03 1 1,000,000 1,000,000 G.O. Bond 1,000,000 1,000,000 Replacement - Heat Exchangers-Munters Unit 19-44300-04 1 15,000 15,000 Comm Cb Operations 15,000 15,000 Replacement- Zambont Battery Pack 19-44300-06 1 14,000 14,000 Comm Cor Operations 14000 14,000 Replacement - Scissor Lift 20-04000-01 1 15,000 15,000 Equipment Bond 15,000 14000 Replacement - Lobby Furniture 20-44000-02 1 15,000 15,000 Comm Ctr Operations 15,000 15000 Replacement - Roof 20-44000-03 1 500,000 500,000 G.O. Bond 500,000 500,000 4] Department Project# Priority 2017 2018 2019 2020 2021 Total Replacement- Kaivac Cleaning System 20-44000-05 1 60,000 10,000 1741900-02 2 10,000 10,000 Comm Ctr Operations 30,000 Capital Equipment Reserve 10,000 10,000 10,000 10,000 101000 Replacement- Camera/Secunty System 20-04000-06 1 12,000 12,000 G.O. Bond 12,000 12000 Replacement- Zamboni Room Water Healer 2044300-02 1 25,000 25,000 G.O. Bond 25,000 24000 Replacement - Floor Scrubber 21-44000-01 1 15,000 15,000 Comm Ctr Operations 15,000 15,000 Repaint Field House Ceiling 21-44200-01 1 25,000 25,000 Comm Ctr Operations 25,000 25,000 Replacement - Munters Desiccant Wheel 21-44300-01 1 10,000 10,000 Comm Ctr Operations 10,000 10,000 Replacement-Electric Edger 21-44300-02 1 8,000 8,000 Comm CV Operations 8,000 0,000 Replacement- Evaporative Condenser 21-44300-03 1 60,000 60,000 Comm Ctr Operations 60,000 60,000 Replacement- Field House Floor 21-04400-02 1 150,000 150,000 Comm Ctr Operations 150,000 150,000 Community Center Total 81,000 248,000 7,879,000 589,000 268,000 9,065,000 Emergency Management Emergency Operations Center Improvement 17-02400-01 1 40,000 18,000 7,500 65,500 Capital Equipment Reserve 40,000 18,000 7,500 65,500 Replacement- Emergency Sirens 17-02400-02 1 45,000 45,000 45,000 45,000 180,000 Capital Equipment Reserve 45,000 45,000 45,000 45,000 180,000 Emergency Management Total 85,000 63,000 52,500 45,000 245,500 Engineering New Development Projects 17-01600-01 1 160,000 160,000 165,000 175,000 180,000 840,000 Sewer Trunk Fund 117,000 117,000 120,000 125,000 125,000 604,000 Water Trunk Fund 43,000 43,000 45,000 50,000 55,000 236,000 Pedestrian Trail Maintenance 17-01600-02 1 50,000 55,000 60,000 65,000 70,000 300,000 Road B Bridge Funds 50,000 55,000 60,000 65,000 70,000 300,000 New Pedestrian Trail and Sidewalk Segments 17-41600-03 1 565,000 225,000 265,000 710,000 400,000 2,165,000 Grant 265,000 265,000 Trail Funds 565,000 225,000 710,000 400,000 1,900,000 Pedeshian Trail Recenstruction 1741600-04 1 60,000 80,000 100,000 120,000 140,000 500,000 Road B Bridge Funds 60,000 80,000 100,000 120,000 140,000 500,000 Pedestrian Curb Ramp Replacements 1741600-05 1 15,000 16,000 17,000 18,000 19,000 85,000 Road B Bridge Funds 15,000 16,000 17,000 18,000 19,000 85,000 LED Crosswalk Warning System 1741600-06 1 21,000 21,000 Road 8 Bridge Funds 21,000 21,000 Replacement- Data Collector/Total Station 18-01600-01 1 33,500 33,500 Equipment Bond 33,500 33,500 Engineering Total 871,000 569,500 607,000 1,088,000 809,000 3,944,500 Facilitv Manaeement Annual Parking Lot Maintenance 1741900-01 1 90,000 130,000 30,000 30,000 30,000 310,000 Capital Equipment Reserve 30,000 130,000 30,000 30,000 30,000 250,000 Comm Cir Operations 60,000 60,000 Replacement - Carpet/Tile 1741900-02 2 10,000 10,000 10,000 30,000 Capital Equipment Reserve 10,000 10,000 10,000 30,000 10 Department Project# Priority 2017 2018 2019 2020 2021 Total Replacement- Security Management System 1741900-03 1 100,000 115,000 Replacement- Turnout Gear 100,000 Capital Equipment Reserve 100,000 17-02200-02 Capital Equipment Reserve 100,000 Public Works Relocation/Expansion 17-01900-04 1 50,000 450,000 8,500,000 Replacement - Grass #21 9,000,000 Capital Equipment Reserve, $0,000 1942200-01 Equipment Bond 50,000 G.O. Bond 1942200-03 Equipment Bond 450,000 81500,000 Replacement -1999 GMC Sonoma Truck (U-10) #4810 8,950,000 HD Upgrade - City Hall Council Chambers 1741900-05 1 60,000 2042200-01 Equipment Bond 60,000 Capital Equipment Reserve 20-02200-02 60,000 Replacement- Engine 21 #4884 60,000 Building A - Seal Floor 19-01900-01 1 25,000 25,000 Capital Equipment Reserve 85,000 25,000 25,000 Pedestrian Tunnel Under Crosstown Blvd. 19-41900-05 1 450,000 450,000 G.O. Bond 85,000 450,000 450,000 Memorial - Veterans Memorial 19-01900-06 1 10,000 10,000 Capital Equipment Reserve 400,000 10,000 10,000 Surface Seal all Brick Structures 20-01900-01 1 85,000 85,000 Capita/Equipment Reserve 45,000 4000 48,000 Comm Ctr Operations 45,00 1;000 14000 Water Fund 45,000 25.000 2500 Facility Management Total Finance Financial / Payroll System Upgrade / Replacement 19-41400-01 Capital Equipment Reserve Finance Total 580,000 [Fire 115,000 Replacement- Turnout Gear 17-42200-01 General Fund Replacement- E%Iricatlon(Rescue) Equipment 17-02200-02 Capital Equipment Reserve 150,000 Replacement - Grass #31 18-02200-01 Equipment Bond Replacement - Grass #21 1842200-02 Equipment Bond Replacement - Tanker #11 1942200-01 Equipment Bond 150,000 Replacement - Grass Utility Vehicle (UTV) #4813 1942200-03 Equipment Bond 20,000 Replacement -1999 GMC Sonoma Truck (U-10) #4810 1942200-05 Equipment Bond 20,000 Replacement- SCBA Compressors 2042200-01 Equipment Bond 100,000 Replacement -800 MHz radios 20-02200-02 Capital Equipment Reserve Replacement- Engine 21 #4884 2042200-03 Equipment Bond 310,000 580,000 9,025,000 115,000 40,000 10,070,000 1 150,000 150,000 150,000 150,00 150,000 150,000 1 20,000 20,000 20,000 20,000 20,000 100,000 20,000 20,000 20,000 20,000 20,000 100,000 1 80,000 80,000 80,00 80,000 1 85,000 85,000 85,00 85,00 1 85,000 85,000 85,00 85,00 1 400,000 400,000 40,00 400,00 1 45,000 45,000 45,00 45,00 2 45,000 45,000 45,000 45,00 1 130,000 130.000 130,00 130,000 1 35,000 35,000 70,000 35,00 35,000 70,000 1 450,000 450,000 450,00 450,00 Fire Total Information Technology Smartboard Addition 1841420-01 1 Capital Equipment Reserve 11 100,000 190,000 510,000 635,000 55,000 1,490,000 12,000 14000 12,000 12,000 Department Project# Priority 2017 2018 2019 2020 2021 Total Information Technology Total 12,000 12,000 Park & Rec - Operations ReplaoelRepair Play Structures - Various Parks 17-45000-01 1 50,000 50,000 50,000 50,000 50,000 250,000 General Fund 50,000 50,000 50,000 50,000 50,000 250,000 ReplacelRepair Major Park Projects - Various Parks 17-45000-02 1 25,000 25,000 25,000 25,000 25,000 125,000 General Fund 25,000 25,000 25,000 25,000 25,000 125,000 Replacement - One Ton Crew Cab Pickup #502 17-45000-03 1 50,000 50,000 Capital Equipment Reserve 50,000 50,000 New -Trail Machine 17-45000-04 1 150,000 150,000 Capital Equipment Reserve 150,000 150,000 Replacement- One Ton Truck wl Pt= #599 18-05000-01 1 80,000 80,000 Equipment Bond 80,000 80,000 New- Wood Chipper Tow -Behind 18-45000-02 1 20,000 20,000 Equipment Bond 20,000 20,000 Replacement -Bobcat Track Loader #610 18-45000-03 1 55,000 55,000 Equipment Bond 55,000 55,000 Replacement - Small Extended Cab Truck #76 18-05000-04 1 55,000 55,000 Equipment Bond 55,000 55,000 New -"V" Snow Plow for #09-589 18-45000-05 1 15,000 15,000 Equipment Bond 15,000 14000 Replacement - Water Tanker #161 1945000-01 1 150,000 150,000 Equipment Bond 150,000 150,000 Replacement -Trailer #T-555 1945000-02 1 16,000 16,000 Equipment Bond 1koint 14000 Replacement- Cushman Field Dresser#547 2045000-01 1 27,000 27,000 Equipment Bond 27,000 27,000 Park & Rao - Operations Total 275,000 300,000 241,000 102,000 75,000 993,000 Park & Rec - Projects Annual Miscellaneous Park Projects 17-45001-01 1 15,000 15,000 15,000 15,000 15,000 75,000 Park Dedication Funds 15,000 15,000 VOW 14000 151000 75,000 Fox Meadows Park - Renovation 1745001-02 1 457,300 457,300 Park Dedication Funds 457,300 457,300 Pine Hills North - Phase It 1745001-03 1 100,000 400,000 500,000 Capital Equipment Reserve 280,000 280,000 Donations 100,000 100,000 Park Dedication Funds 120,000 120,000 Irrigation Projects - Small Parks 1745001-04 1 20,000 20,000 20,000 60,000 Park Dedication Funds 24000 20,000 20,000 60,000 Nordeen's Park Basketball Court 17-45001-05 1 7,500 7,500 Park Dedication Funds 7,500 7,500 Wild Iris Park Irrigation and Water Service 19-45001-02 1 42,500 42,500 Park Dedication Funds 42,500 42,500 Park&Rec - Projects Total 599,800 35,000 35,000 457,500 15,000 1,142,300 Planning & Zoning Replacement - Planning Vehicle #7 17-41500-01 1 30,000 30,000 Capital Equipment Reserve 30,000 30,000 Planning & Zoning Total 30,000 30,000 12 Department Project# Priority 2017 2018 2019 2020 2021 Total Sanitary Sewer 1 Sanitary Sewer Extensions 17-08200.01 1 105,000 500,000 605,000 Assessments 17-43100-01 105,000 55,000 105,000 Sewer Trunk Fund Construction Sul Coat Fund 1 500,000 500,000 Replacement - Jet/Vac Truck #99 17-48200-02 1 460,000 17,000 460,000 SanitarySewer Fund Road 8 Bridge Funds 230,000 Municipal State Aid Routes / New 8 Reconstruct 230,000 Sewer Trunk Fund 200,000 230,000 55,000 230,000 Lift Station #4 Upgrade 17-48200-03 1 50,000 Road 6 Bridge Funds 50,000 Sewer Trunk Fund 17-03100-07 50,000 46,000 50,000 Yellow Pine Lift Station 1848200-01 1 17-03100-08 650,000 650,000 Sewer Trunk Fund 17-43100-11 Capital Equipment Reserve 650,000 650,000 Replacement - One Ton Utility Truck #69 1848200-02 1 58,000 100,000 100,000 Sanitary Sewer Fund 1,690,000 350,000 100,000 100,000 Sanitary Sewer Total Storm Sewer Storm Sewer Improvements 1748300-01 Storm Sewer Fund Replacement - Tymcc Street Sweeper #172 18-08300-01 Equipment Band Replacement - Elgin Street Sweeper #169 1948300-01 Equipment Band Storm Sewer Total Street Signs Sign Design Software and Plotter 17-43300-01 Capital Equipment Reserve Street Signs Total 1,250,000 260,000 1,865,000 Streets / Highways Annual Street Seal Coat Project 17-43100-01 Road 8 Bridge Funds 55,000 Annual Street Crack Seal Project 1743100-02 Construction Sul Coat Fund 1 Road 8 Bridge Funds 245,000 Annual Pavement Markings 17-43100-03 Road 8 Bridge Funds 17,000 Annual Curb Replacement 17-43100-04 Road 8 Bridge Funds 200,000 Municipal State Aid Routes / New 8 Reconstruct 17.43100-05 Assessments 200,000 Municipal State Aid Funds 55,000 Annual Street Reconstruction 17-43100-06 Assessments 2 10,000 Road 6 Bridge Funds 50,000 Intersecton Upgrades 17-03100-07 Grant 46,000 Municipal State Aid Funds 10,000 Gravel Road Improvements 17-03100-08 Road 6 Bridge Funds 54,000 Replacement - One Ton Truck w/ Plow #134 17-43100-11 Capital Equipment Reserve 50,000 615,000 1,250,000 260,000 1,865,000 1 55,000 60,000 60,000 62,000 65,000 302,000 55,000 60,000 60,000 61,000 65,000 30$000 1 220,000 245,000 220,000 375,000 220,000 17,000 220,000 1 10,000 200,000 200,000 143,000 16$000 200,000 200,000 55,000 280,000 260,000 62,000 65,000 722,000 2 10,000 48,000 50,000 10,000 10,000 44,000 46,000 10,000 10,000 230,000 1 50,000 10,000 1 725,000 250.000 260,000 275,000 285,000 1,795,000 725,000 250,000 260,000 275,000 284000 1,795,000 1 160,000 170,000 245,000 290,000 375,000 1,240,000 17,000 8,000 10,000 10,000 10,000 55,000 143,000 16$000 235,000 280,000 365,000 1,185,000 1 42,000 44,000 46,000 48,000 50,000 230,000 4000 44,000 46,000 48,000 50,000 230,000 1 50,000 52,000 54,000 56,000 58,000 270,000 50,000 51,000 5000 56,000 58,000 270,000 1 1,300,000 820,000 1,690,000 350,000 290,000 4,450,000 243,000 75,500 144,000 15,000 15,000 492,500 1,057,000 744,500 1,546,000 335,000 275,000 3,957,500 1 1,236,000 821,000 1,143,000 1,092,000 1,268,000 5,560,000 309000 205,000 286,000 273,000 317,000 1,390,000 927,000 616,000 857,000 819,000 951,000 4,170,000 1 285,000 2,075,000 2,360,000 1,600,000 1,600,000 285,000 475,000 760,000 1 15.000 15,000 15,000 15,000 15,000 75,000 15,000 15,000 14000 14000 15,000 75,000 1 80,000 80,000 80,000 80,000 13 Department Project# Priority 2017 2018 2019 2020 2021 Total New - One Ton Truck w/ Regular Box wl Lift & Plow 17-43100-12 1 55,000 3,673,000 55,000 Capital Equipment Reserve 17,835,000 Water 55,000 54000 New -Bobcat paver 1743100-13 1 20,000 Rehabilitation of Wells 20,000 Capital Equipment Reserve 50,000 50,000 20,000 50,000 20,000 Street Overlays 1843100-01 1 50,000 400,000 400,000 800,000 Assessments 250,000 Replacement - Dodge Dakota #95 1748100-02 100,000 100,000 200,000 Road &Bridge Funds 30,000 300,000 300,000 600,000 New - Dump Truck w/ snow removal 19-03100-01 1 220,000 220,000 Equipment Bond 15,000 220,000 220,000 Replacement - Dump Truck w/ Snow removal#198 2043100.01 1 18-08100-02 220,000 220,000 Equipment Bond 60,000 220,000 220,000 Replacement -Bobcat S185#120 20-43100-02 1 50,000 50,000 Equipment Bond 1848100-03 1 48,000 50,000 50,000 Replacement - One Ton Truck w/Plow #133 20-43100-03 1 80,000 80,000 Equipment Bond 16,000 80,000 80,000 Replacement- Backhoe Loader #80 2043100-04 2 110,000 110,000 Equipment Bond 16,000 110,000 110,000 Replacement- Dump Truck wl Snow removal#200 21-03100-01 1 18-08100-04 220,000 220,000 Equipment Bond 1,350,000 220,000 220,000 Streets / Highways Total 3,683,000 2,857,000 3,673,000 2,986,000 4,636,000 17,835,000 Water Rehabilitation of Wells 1748100-01 1 50,000 50,000 50,000 50,000 50,000 250,000 Water Fund 50,000 50,000 50,000 50,000 50,000 250,000 Replacement - Dodge Dakota #95 1748100-02 1 30,000 30,000 Sanitary Sewer Fund 15,000 15,000 Water Fund 15,000 15,000 Replacement - 3/4 Ton Utility Truck #66 18-08100-02 1 60,000 60,000 Water Fund 60,000 60,000 Replacement - Side by Side UN 970 1848100-03 1 48,000 48,000 SanifarySewerFund 16,000 16,000 Storm Sewer Fund 16,000 16,000 Water Fund 16,000 16,000 Water Main Improvements 18-08100-04 1 640,000 710,000 1,350,000 Assessments 500,000 710,000 1,210,000 Water Trunk Fund 140,000 140,000 Water Meter Reading System AMI/AMR 1948100-01 2 900,000 900,000 Water Fund 900,000 900,000 Water Total 80,000 798,000 1,660,000 50,000 50,000 2,638,000 GRAND TOTAL 6,794,800 7,222,500 24,127,500 6,129,500 6,013,000 50,287,300 14 City of Andover, MN Capital Plan 2017 thm 2021 DEPARTMENT SUMMARY Department 2017 2018 2019 2020 2021 Total Community Center 81,000 218,000 7,865,000 552,000 185,000 8,901,000 Emergency Management 40,000 18,000 7,500 65,500 Engineering 871,000 536,000 607,000 1,088,000 809,000 3,911,000 Facility Management 150,000 580,000 9,025,000 115,000 40,000 9,910,000 Park & Rec- Operations 75,000 75,000 75,000 75,000 75,000 375,000 Park & Rec-Projects 599,800 35,000 35,000 457.500 15,000 1,142,300 Sanitary Sewer 155,000 1,150,000 1,305,000 Storm Sewer 55,000 60,000 60,000 62,000 65,000 302,000 Streets/Highways 3,528,000 2,857,000 3,453,000 2,526,000 4,416,000 16,780,000 Water 50,000 690,000 760,000 50,000 50,000 1,600,000 TOTAL 5,604,800 6,219,000 21,887,500 4,925,500 5,655,000 44,291,800 15 City of Andover, MN Capital Plan 2017 thru 2021 FUNDING SOURCE SUMMARY Source 2017 2018 2019 2020 2021 Total Assessments 657,000 880,500 1,140,000 388,000 332,000 3,397,500 Capital Equipment Reserve 205,000 148,000 82,500 358,000 40,000 833,500 Comm Ctr Operations 66,000 18,000 65,000 39,000 185,000 373,000 Construction Seal Coat Fund 17,000 8,000 10,000 10,000 10,000 55,000 Donations 100,000 100,000 G.O. Bond 650,000 16,750,000 525,000 17,925,000 General Fund 75,000 75,000 75,000 75,000 75,000 375,000 Grant 265,000 1,600,000 1,865,000 Municipal State Aid Funds 1,057,000 1,029,500 1,546,000 335,000 750,000 4,717,500 Park Dedication Funds 499,800 35,000 35,000 177,500 15,000 762,300 Road 8 Bridge Funds 2,048,000 1,590,000 1,644,000 1,996,000 1,953,000 9,231,000 Sewer Trunk Fund 167,000 1,267,000 120,000 125,000 125,000 1,804,000 Ston Sewer Fund 55,000 60,000 60,000 62,000 65,000 302,000 Trail Funds 565,000 225,000 710,000 400,000 1,900,000 Water Fund 50,000 50,000 50,000 75,000 50,000 275,000 Water Trunk Fund 43,000 183,000 45,000 50,000 55,000 376,000 GRAND TOTAL 5,604,800 6,219,000 21,887,500 4,925,500 5,655,000 44,291,800 TI City of Andover, MN Capital Plan 2017 thm 2021 PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project# Priority 2017 2018 2019 2020 2021 Total Communitv Center 1 Exterior Painting 17-44000-01 1 6,000 552,000 185,000 8,901,000 (Emergency Management 6,000 Comm Ctr Operations Q000 Emergency Operations Center Improvement 1742400-01 1 40,000 18,000 6,000 ACCNMCA Expansion 17-04000-02 2 75,000 200,000 6,725,000 7,500 7,000,000 Capital Equipment Reserve Emergency Management Total 40,000 75,000 7,500 65,500 75,000 G.O. Bond 200,000 6,725,000 New Development Projects 1741600-01 1 160,000 6,925,000 Replacement -Carpeting 18-44000-01 1 840,000 18,000 117,000 12,000 120,000 30,000 Comm Ctr Operations 64000 Water Trunk Fund 43,000 18,000 45,000 12,000 55,000 30,000 Replacement- Al Community Center Doors 19-04000-02 1 60,000 65,000 75,000 300,000 Road& Bridge Funds 75,000 G.O. Bond 60,000 65,000 70,000 300,000 75,000 75,000 Refacing Rink Boards 19-44300-01 1 25,000 25,000 Comm Ctr Operations 25,000 25,000 Repaint Ice Arena ceiling 19-44300-02 1 25,000 25,000 Comm Cfr Operations 25,000 25,000 Replacement- Ice Arena Refrigeration Replacement 19-04300-03 1 1,000,000 1,000,000 G.O. Bond 1,000,000 1,000,000 Replacement- Heat Exchangers - Munters Unit 19-04300-04 1 15,000 15,000 Comm Ctr Operations 15,000 15,000 Replacement - Lobby Furniture 2044000-02 1 15,000 15,000 Comm Ctr Operations 15,000 14000 Replacement - Roof 20-44000-03 1 500,000 500,000 G.O. Bond 500,000 500,000 Replacement- Zamboni Room Water Heater 20-44300-02 1 25,000 25,000 G.O. Bond 25,000 25,000 Repaint field House Ceiling 21-04200-01 1 25,000 25,000 Comm Ctr Operations 24000 25,000 Replacement - Munters Desiccant Wheel 21-04300-01 1 10,000 10,000 Comm Ctr Operations 10,000 10,000 Replacement- Field House Floor 21-04400-02 1 150,000 150,000 Comm Ctr Operations 150,000 150,000 Community Center Total 81,000 218,000 7,865,000 552,000 185,000 8,901,000 (Emergency Management Emergency Operations Center Improvement 1742400-01 1 40,000 18,000 7,500 65,500 Capitat Equipment Reserve 40,000 18,000 7,500 65,500 Emergency Management Total 40,000 18,000 7,500 65,500 Engineering New Development Projects 1741600-01 1 160,000 160,000 165,000 175,000 180,000 840,000 Sewer Trunk Fund 117,000 117,000 120,000 125,000 125,000 64000 Water Trunk Fund 43,000 43,000 45,000 50,000 55,000 236,000 Pedestrian Trail Maintenance 1741600-02 1 50,000 55,000 60,000 65,000 702000 300,000 Road& Bridge Funds 50,000 55,000 60,000 65,000 70,000 300,000 17 Department Project# Priority 2017 2018 2019 2020 2021 Total New Pedestrian Trail and Sidewalk Segments 17-41600-03 1 565,000 225,000 265,000 710,000 400,000 2,165,000 Grant 17415000-02 Public Works Relocation I Expansion 17-41900-04 265,000 130,000 G.O. Band 265,000 Trail Funds 19-01900-01 565,000 225,000 Pedestrian Tunnel Under Crosstown Blvd. 710,000 400,000 1,900,000 Pedestrian Trail Reconstruction 17-41600-04 1 60,000 80,000 100,000 120,000 140,000 500,000 Road &Bridge Funds 17-45001-04 60,000 80,000 100,000 120,000 140,000 500,000 Pedestrian Curb Ramp Replacements 17-41600-05 1 15,000 16,000 17,000 18,000 19,000 65,000 Road& Bridge Funds 450,000 15,000 16,000 17,000 18,000 19,000 85,000 LED Crosswalk Waming System 1741600-06 1 21,000 25,000 25,000 21,000 Road & Bridge Funds 25,000 21,000 450,000 21,000 Engineering Total Facilitv Management Annual Parking Lot Maintenance 17-41900-01 Capital Equipment Reserve 1,088,000 Comm Car Operations 1745000-01 Replacement - Carpet I Tile 17-41900-02 Capital Equipment Reserve 17415000-02 Public Works Relocation I Expansion 17-41900-04 Capital Equipment Reserve 130,000 G.O. Band 30,000 Building A - Seal Floor 19-01900-01 Capital Equipment Reserve Pedestrian Tunnel Under Crosstown Blvd. 19-41900-05 G.O. Bond 60,000 Memorial - Veterans Memorial 19-41900-06 Capital Equipment Reserve Surface Seal all Brick Structures 2041900-01 Capital Equipment Reserve Comm Ctr Operations 17-45001-04 Water Fund 30,000 Facility Management Total 536,000 Park & Rec - Operations 1,088,000 Replaoe/Repair Play SWctures- Various Parks 1745000-01 General Fund 130,000 ReplacelRepair Major Park Projects - Various Parks 17415000-02 General Fund 310,000 Park & Rec - Operations Total 130,000 (Park & Rec - Projects 30,000 Annual Miscellaneous Park Projects 17-45001-01 ParkDedicao'on Funds Fox Meadows Park - Renovation 1745001-02 Park Dedication Funds 60,000 Pine Hills North - Phase II 17-45001-03 Capital Equipment Reserve Donations 30,000 Park Dedication Funds Irrigation Projects - Small Parks 17-45001-04 Park Dedication Funds 30,000 Nordeen's Park Basketball Court 17-45001-05 Park Dedication Funds 871,000 536,000 607,000 1,088,000 809,000 3,911,000 1 90,000 130,000 30,000 30,000 30,000 310,000 30,000 130,000 30,000 30,000 30,000 250,000 60,000 60,000 2 10,000 10,000 10,000 30,000 10,000 10,000 10,000 30,000 1 50,000 450,000 8,500,000 9,000,000 50,000 50,000 450,000 8,500,000 8,950,000 1 25,000 25,000 25,000 25,000 1 450,000 450,000 450,000 450,000 1 10,000 10,000 10,000 10,000 1 85,000 85,000 48,000 4&000 12,000 12,000 25,000 24000 150,000 580,000 9,025,000 115,000 40,000 9,910,000 1 50,000 50,000 50,000 50,000 50,000 250,000 50,000 50,000 50,000 50,000 50,000 250,000 1 25,000 25,000 25,000 25,000 25,000 125,000 25,000 25,000 25,000 25,000 25,000 125,000 75,000 75,000 75,000 75,000 75,000 375,000 1 15,000 15,000 15,000 15,000 15,000 75,000 15,000 15,000 15,000 15,000 15,000 75,000 1 457,300 457,300 457,300 457,300 1 100,000 400,000 500,000 280,000 280,000 100,000 100,000 120,000 120,000 1 20,000 20,000 20,000 60,000 20,000 20,000 20,000 60,000 1 7,500 7,500 7.500 7,500 18 Department Project# Priority 2017 2018 2019 2020 2021 Total Wild Ins Park Irrigation and Water Service 19-45001-02 1 Assessments 5WOoo 710,000 42,500 Water Trunk Fund 42,500 Park Dedication Funds 140,000 42,500 42,500 Park & Rec - Projects Total 599,800 35,000 35,000 457,500 15,000 1,142,300 Sanitary Sewer Sanitary Sewer Extensions 1748200-01 1 105,000 500,000 605,000 Assessments 105,000 105,000 Sewer Trunk Fund 500,000 500,000 Lift Station lW Upgrade 17-48200.03 1 50,000 50,000 Sewer Trunk Fund 50,000 50,000 Yellow Pine lift Station 18-48200-01 1 650,000 650,000 Sewer Trunk Fund 650,000 650,000 Sanitary Sewer Total 155,000 1,150,000 1,305,000 Storm Sewer Storm Sewer Improvements 1748300-01 1 55,000 60,000 60,000 62,000 65,000 302,000 Storm Sewer Fund 55,000 60,000 60,000 61,000 65,000 301,000 Storm Sewer Total 55,000 60,000 60,000 62,000 65,000 302,000 LStreets / Highways Annual Street Seal Coat Project 17-03100-01 1 725,000 250,000 260,000 275,000 285,000 1,795,000 Road&Bridge Funds 725,000 250,000 260,000 275,000 285,000 1,795,000 Annual Street Crack Seal Project 1743100.02 1 160,000 170,000 245,000 290,000 375,000 1,240,000 Construction Seal Coat Fund 17,000 8,000 10,000 10,000 10,000 55,000 Road&Bridge Funds 143,000 16;000 235,000 280,000 365,000 1,185,000 Annual Pavement Markings 17-03100-03 1 42,000 44,000 46,000 48,000 50,000 230,000 Road &Bridge Funds 42000 44,000 46,000 48,000 50,000 230,000 Annual Curb Replacement 17-03100-04 1 50,000 52,000 54,000 56,000 58,000 270,000 Road Bridge Funds 50,000 52,000 54,000 56,000 58,000 270,000 Municipal Stale Aid Routes / New, &Reconstruct 17.43100-05 1 1,300,000 820,000 1,690,000 350,000 290,000 4,450,000 Assessments 243,000 74500 144,000 15,000 15,000 491,500 Municipal State Aid Funds 1,057,000 79500 1,546,000 335,000 275,000 3,957,500 Annual Street Reconstruction 1743100-06 1 1,236,000 821,000 1,143,000 1,092,000 1,268,000 5,560,000 Assessments 309,000 205,000 286,000 273,000 317,000 11390,000 Road &Bridge Funds 927,000 616,000 857,000 819,000 951,000 4,170,000 Intersection Upgrades 1743100-07 1 285,000 2,075,000 2,360,000 Grant 1,600,000 1,600,000 Municipal State Aid Funds 285,000 475,000 760,000 Gravel Road Improvements 1743100-08 1 15,000 15,000 15,000 15,000 15,000 75,000 Road &Bridge Funds 15000 15,000 15,000 15,000 15,000 75,000 Street Ovedays 1843100-01 1 400,000 400,000 800,000 Assessments 100,000 100,000 200,000 Road Bridge Funds 300,000 300,000 600,000 Streets / Highways Total 3,528,000 2,857,000 3,453,000 2,526,000 4,416,000 16,780,000 Water Rehabilitation of Wells 1748100-01 1 50,000 50.000 50,000 50,000 50,000 250,000 Water Fund 50,000 $0,000 50,000 50,000 50,000 250,000 Water Main Improvements 18-08100-04 1 640,000 710,000 1,350,000 Assessments 5WOoo 710,000 1,210,000 Water Trunk Fund 140,000 140,000 19 Department Project# Priority 2017 2018 2019 2020 2021 Total Water Total 50,000 690,000 760,000 50,000 50,000 1,600,000 GRAND TOTAL 5,604,800 6,219,000 21,867,500 4,925,500 5,655,000 44,291,800 20 Capital Plan 2017 1hru 2021 City of Andover, MN Justification I After 12 years, the paint has begun to chip and Flake away. A new paint job will insure a quality look as our customers make their way into the Expenditures 2017 2018 2019 2020 2021 Total Facility Maintenance 6,000 6,o00 Total 6,000 6,000 Sources 2017 2018 2019 2020 2021 Total spent in the entrance areas. Total 6,000 6,000 21 Capital Plan 2017 rh,z, 2021 City of Andover, MN Project # 17-44000-02 Project Name ACC/YMCA Expansion Type Improvement Department Community Center Useful Life 30 Years + Contact Comm Ctr Manager Category Equipment Priorim 2 -Medium i Expansion of the Community Center which may include a youth center, additional meeting rooms, office space, library services space, practice is rink, storage, hockey training and multi-purpose space. The YMCA may look into additional studio space as well as "flex space" and offices. 2017 and 2018 includes a study to determine what type of space is needed, a preliminary design, a high-level cost estimation and other necessary information needed to make a decision on whether to move forward with construction. er 12 years in operation, the city is exploring an expansion to the Community Center to issues that staff currently face. users and address some of Expenditures 2017 2018 2019 2020 2021 Total Planning/Design 75,000 200,000 275,000 Construction 6,725,000 6,725,000 Total 75,000 200,000 6,725,000 7,000,000 Funding Sources 2017 2018 2019 2020 2021 Total Capital Equipment Reserve 75,000 75,000 G.O. Bond 200,000 6,725,000 6,925,000 Total 75,000 200,000 6,725,000 7,000,000 Additional $7,000,000 in debt service; additional lease revenue 22 Capital Plan 2017 thrrr 2021 City of Andover, MN carpet begins to wear and needs replacement. Expenditures 2017 2018 2019 2020 2021 Total Facility Maintenance 18,000 12,000 30,000 Total 18,000 12,000 30,000 Funding Sources 2017 2018 2019 2020 2021 Total Comm Ctr Operations 18,000 12,000 30,000 Total 18,000 12,000 30,000 cost of new carpet will insure a our customers for another 5 years. 1141 Capital Plan 2017 thru 2021 C itv of AnAnyPr TAN years, all the doors are showing wear and tear and in need of replacement. 2017 2018 2019 2020 2021 Total 75,000 Total 75,000 75,000 Funding Sources 2017 2018 2019 2020 2021 Total G.O. Bond 75,000 75,000 Total 75,000 75,000 24 Capital Plan City of Andover, MN Project p 19-44300-01 Project Name Refacing Rink Boards Type Improvement Useful Life 15-20 Years Category Improvements 2017 111111 2021 Department Community Center Contact Comm Ctr Manager Priority 1 -High Replace the white poly and yellow kick plates on the rink boards along with new on the ends. ensure a safe and proper playing area- the rink boards, kick plates and nets need to be replaced after 15 years of wear and tear. It also gives opportunity to inspect all of the frames and fix alignment issues from the expansion and contraction of the sand floor. Expenditures 2017 2018 2019 2020 2021 Total Facility Maintenance 25,000 25,000 Total Funding Sources 2017 25,000 2018 2019 2020 25,000 2021 Total Comm Ctr Operations 25,000 25,000 Total 25,000 25,000 will be less maintenance initially; but as they age, the maintenance will increase as well. 25 Capital Plan 2017 thru 2021 City of Andover, MN Justification After 15 years, the ice arena ceiling is showing signs of flaking and pealing. Painting the ceiling will provide a clean, restored look to the space. Expenditures 2017 2018 2019 2020 2021 Total Facility Maintenance 25,000 25,000 Total 25,000 25,000 Funding Sources 2017 2018 2019 2020 2021 Total Comm Ctr Operations 25,000 25,000 Total 25,000 25,000 26 Capital Plan City of Andover, MN 2017 1h,ly 2021 Project 4 19-44300-03 Project Name Replacement - Ice Arena Refrigeration Replacement Type Improvement Useful Life 15 Years Category Improvements Department Community Center Contact Comm Cu Manager Priority I -High Description ried to Building Expansion - As R22 is phased out we will need to look at a new compressor system for the rink floor. `-- Justification f a second sheet were built, we would have the options to tie the two systems together with the best option at the time. Either way, as R-22 is )based out, we will need to look at a new compressor system to handle the refrigerant we decide to go with. Expenditures 2017 2018 2019 2020 2021 Total Equipment 1,000,000 1,000,000 Total 1,000,000 1,000,000 Funding Sources 2017 2018 2019 2020 2021 Total G.O. Bond 1,000,000 1,000,000 Total 1,000,000 1,000,000 get Impact/Other will get us a new system that will be in compliance with new laws and regulations when it comes to R-22 freon, which is being phased out efficiencies and less maintenance on a new system will help offset the costs. 27 Capital Plan 2017 thril 2021 City of Andover, MN years, the heating to the ice arena will need to be replaced. Expenditures 2017 2018 2019 2020 2021 Total Equipment 15,000 15,000 Total 15,000 15,000 Sources 2017 2018 2019 2020 2021 Total Comm Ctr Operations 15,0uu 15,Uu8 Total 15,000 15,000 cost of the heat exchangers will be offset by better technologies and efficiencies with less maintenance costs 28 Capital Plan 2017 /Mrtr 2021 City of Andover, NIN Justification After 15 years, the lobby furniture is in need of replacement. Expenditures 2017 2018 2019 2020 2021 Total Office Equipment/Fumiture 15,000 15,000 Total 15,000 15,000 Funding Sources 2017 2018 2019 2020 2021 Total Comm Ctr Operations 15,000 15,000 Total 15,000 15,000 0 Capital Plan 2017 thi ll 2021 City of Andover, MN 15+ years, the rubber roof membrane will need to be replaced. Expenditures 2017 2018 2019 2020 2021 Total Facility Maintenance 500,000 500,000 Total 500,000 500,000 Funding Sources 2017 2018 2019 2020 2021 Total G.O. Bond 500,000 500,000 Tom 500,000 500,000 30 Capital Plan 2017 Ihru 2021 City of Andover, MN years, the water heater within the Zamboni room will need to be replaced. Expenditures 2017 2018 2019 2020 2021 Total Equipment 25,000 25,000 Total 25,000 25,000 Funding Sources 2017 2018 2019 2020 2021 Total G.O. Bond 25,000 25,000 Total 25,Oo0 25,000 cost of the new hot water heater will keep maintenance costs down and provide better 31 Capital Plan City of Andover, MN Project a 21_44200_01 Project Name Repaint Field House Ceiling Type Improvement useful Life 15 Years Category Improvements 2017 1/111, 2021 Department Community Center Contact Comm Ctr Manager Priority I -High years, the field house arena ceiling is showing signs of flaking and pealing. Painting the ceiling will provide a clean, restore look to the Expenditures 2017 2018 2019 2020 2021 Total Facility Maintenance 25,000 25,000 Total 25,000 25,000 Funding Sources 2017 2018 2019 2020 2021 Total Comm Ctr Operations 25,000 25,000 Total 25,000 25,000 32 Capital Plan 2017 ih ,t 2021 City of Andover, MN years, the desiccant wheel that provides the dehumidification to the ice arena will need to be replaced. 2017 2018 2019 2020 2021 Total Total 10,000 10,000 Sources 2017 2018 2019 2020 2021 Total Total 10,000 10,000 33 Capital Plan 2017 rh rr 2021 City of Andover, MN r the last 15+ years, the floor has hosted many different types of events. The overall finish of the floor is wearing off along with the cracking chipping that warrants a replacement. Expenditures 2017 2018 2019 2020 2021 Total Facility Maintenance 150,000 150,000 Total 150,000 150,000 Funding Sources 2017 2018 2019 2020 2021 Total Comm Ctr Operations 150,000 150,000 Total 150,000 150,000 new floor will insure a safe place for all our users and events. It will give us an opportunity to our user base. There will also be some upfront savings on maintenance costs with a new floor. 34 given Capital Plan City of Andover, MN Project# 17-42400-01 Project Name Emergency Operations Center Improvement 2017 fhrn 2021 Type Improvement Department Emergency Management Useful Life 15 Years Contact Fire Chief Category Improvements Priority I -High Description "onstruct a functional Emergency Operational Center (EOC) by improving workable space at fire station #1 located at 13578 Crosstown Blvd. rhe improvements include light station modifications, technology improvements, lockable cabinets/storage, hand-held and stationary radios. funds will be used to resurface the Flooring on the upper level of the fire station, cut a new door into a wall, add new technology such as :ns. Dhones. WiFi. Mao Boards. and change locks so the EOC can he secured. it and State law requires local governments to develop and maintain an Emergency All -Hazard Operations Plan. In that plan we are ed to identify a primary and alternate EOC location. Fire station #I has a lot of unused space that would convert well into an EOC with less cost than starting new. The improvements would also allow a dual purpose for emergency personnel to train and meet using the same Expenditures 2017 2018 2019 2020 2021 Total Construction 25,000 25,000 Office Equipment/Fumiture 10,000 7,500 17,500 Technology Improvements 15,000 8,000 23,000 Total 40,000 18,000 7,500 65,506 Sources 2017 2018 2019 2020 2021 Total Capital Equipment Reserve 40,000 18,000 7,500 65,500 Total 40,000 18,000 7,500 65,500 igh we have had a workable emergency plan for several years, Andover has relied upon the County to assist us during emergencies. In the Fire Chief was tasked with improving the emergency operations plan so that it could be implemented and operational in a very short This effort will require funds to improve the Emergency Operations Center so effective coordination can occur should the city suffer an 35 Capital Plan 2017 rhru 2021 ritzy of AnAnirPr MN All private development construction is dependent upon market conditions, plat approval and normal City development procedures. Expenditures 2017 2018 2019 2020 2021 Total Construction 160,000 160,000 165,000 175,000 180,000 840,000 Total 160,000 160,000 165,000 175,000 180,000 840,000 Funding Sources 2017 2018 2019 2020 2021 Total Sewer Trunk Fund 117,000 117,000 120,000 125,000 125,000 604,000 Water Trunk Fund 43,000 43,000 45,000 50,000 55,000 236,000 Total 160,000 160,000 165,000 175,000 180,000 840,000 maintenance of streets, storm sewer, water main and sanitary sewer will result. Additional streets will be added for snowplowing. 36 Capital Plan 2017 thti, 2021 Citv of Andover. MN Justification City trails are in need of general maintenance including crack filling and fog sealing to maintain the high level of service to pedestrian walkers, bikers and roller binders. A 5 -year capital improvement plan was prepared for the City to identify and prioritize the necessary repairs. Expenditures 2017 2018 2019 2020 2021 Total Improvement 50,000 55,000 60,000 65,000 70,000 300,000 Total 50,000 55,000 60,000 65,000 70,000 300,000 Funding Sources 2017 2018 2019 2020 2021 Total Road & Bridge Funds 50,000 55,000 60,000 65,000 70,000 300,000 Total 50,000 55,000 60,000 65,000 70,000 300,000 the City trail system begins to age, routine preventative maintenance such as crack filling and fog sealing becomes a necessity. The intenance will allow for a longer service life for the trail system throughout the city. 37 Capital Plan 2017 thn, 2021 city of AnrinvPr MN Justification Expansion of the City's trail and sidewalk system provides more recreational and exercise opportunities along with an alternative mode of transportation. These segments provide key connections to other existing trail and sidewalk routes. Expenditures 2017 2018 2019 2020 2021 Total Improvement 565,000 225,000 265,000 710,000 400,000 2,165,000 Total 565,000 225,000 265,000 710,000 460,000 2,165,000 Funding Sources 2017 2018 2019 2020 2021 Total Grant 265,000 265,000 Trail Funds 565,000 225,000 710,000 400,000 1,900,000 service to pedestrians. Total 565,000 225,000 265,000 710,000 400,000 2,165,000 38 to 11111111111 ♦ � � �� _ ,. _, IIIII�I•11. ■� ��■ .■ MM ■■■■■■ 1 Project Location Park sWater Right of Way 1 ■ h.. •wY. City Limits i1Lelz inl/ril�i�� ,, MM ��• .- == M • ee 1 -, - 1 IN Project Location LotslParcels F7 Park f Water Right of Way City Limits 'al1L`e�Y�7ln 1 _iu� �� ANDOVEA Capital Improvement Name: TRAILProject -• KENSINGTON ESTATES 7TH ADD TOANDOVER STATION NORTH NUNN �CO41/ ISI It\ Oaks 1East Park ■■� : , . _ Jeld ComLU►�� ■ ���r. ■� 11_1 ��_�.. , 10 Project Location GLots/Parcels f] Park water Right of WayCity Limits _�_ _ c_ n• `-a�`yp •II � � 111 �■ : I � I i 00 OF •:. �r • .,z�ii 1•ti � '�L..w u t�'I e .. . til r �� ANDOVER Capital Improvement Plan (2021) Project Name: TRAIL IMPROVEMENTS VERDIN ST 161 STAVE TO 163RD LANE F- N w4SN AV.E �6 3 1fi3RD LN y 2 D i y W i 161 ST AVE � to r rn W G F O Z a -JJ aJ In fn Location Map L E G E N Project Location D N LU Lots/Parcels w E c F'] Park Water S Right of Way 0 150 300 450 City Limits Feet o=men Patrt H:MGismtalEnonaeanglProoctslCIP ml6.mntl 43 Capital Plan City of Andover, MN Project tt 17-41600-04 Project Name Pedestrian Trail Reconstruction Type Improvement Useful Life 25 Years Category Improvements the City's trail system ages ght after in Andover. Justification 2017 thru 2021 Department Engineering Contact DPW / City Engineer Priority 1 -High necessary to maintain the high quality trail system that is so rail segments in the City are reaching 25+ years in age. There are segments that are in need of reconstruction to help maintain the level expected in the trail system by residents. Expenditures 2017 2018 2019 2020 2021 Total Construction 60,000 80,000 100,000 120,000 140,000 500,000 Total 60,000 80,000 100,000 120,000 140,000 500,000 Funding Sources 2017 2018 2019 2020 2021 Total Road & Bridge Funds 60,000 80,000 100,000 120,000 140,000 500,000 Total 60,000 80,000 100,000 120,000 140,000 500,000 uction of trail segments in need will help reduce short and long term maintenance costs necessary to keep them serviceable. It will also the safety of the trail system. 44 Capital Plan 2017 thrn 2021 City of Andover, MN Projects 17-41600-05 Project Name Pedestrian Curb Ramp Replacements Type Improvement Department Engineering Useful Life 25 Years Contact DPW / City Engineer r Category Improvements Priority I -High Description Chis project will result in the City trails and sidewalks being in compliance with the Americans with Disabilities Act by replacing existing ledestrim curb ramps to meet standards. Justification rhe Americans with Disability Act requires that all public facilities be accessible to those with disabilities. As a part of the ADA, pedestrian curt amps are required to follow strict standards to ensure they are accessible. Numerous pedestrian ramps in the City are not in compliance with the \DA. This project works towards bring our trail and sidewalk system into compliance by replacing multiple ramps each year. Expenditures 2017 2018 2019 2020 2021 Total Improvement 15,000 16,000 17,000 18,000 19,000 85,000 TOW 15,000 16,000 17,000 18,000 19,000 85,000 Funding Sources 2017 2018 2019 2020 2021 Total Road & Bridge Funds 15,000 16,000 17,000 18,000 19,000 85,000 Total 15,000 16,000 17,000 18,000 191000 85,000 the Americans with Disabilities Act. C1.7 Capital Plan City of Andover, MN Project# 17-41600-06 Project Name LED Crosswalk Warning System 2017 dint 2021 Type Improvement Department Engineering Useful Life 15 Years Contact DPW / City Engineer Category Improvements Priority I -High Description A solar powered Rectangular Rapid Flash Beacon LED Crosswalk Warning System will be constructed on Crosstown Blvd at 149th Ave to enhance the awareness of the pedestrian crossing that currently exists. Justification I (here has been concern at this intersection that a pedestrian crossing exists but motorist frequently do not stop for pedestrians. system will enhance the visibility of the crossing when the push button is activated. 2017 2018 2019 2020 2021 Total 21,000 21,000 Total 21,000 21,000 Funding Sources 2017 2018 2019 2020 2021 Total Road & Bridge Funds 21,000 21,000 Total 21,000 21,000 E111 Capital Plan 2017 rhvu 2021 City of Andover, AN Expenditures 2017 2018 2019 2020 2021 Total Improvement 90,000 130,000 30,000 30,000 30,000 310,000 Total 90,000 130,000 30,000 30,000 30,000 310,000 Funding Sources 2017 2018 2019 2020 2021 Total Capital Equipment Reserve 30,000 130,000 30,000 30,000 30,000 250,000 Comm Ctr Operations 60,000 60,000 Total 90,000 130,000 30,000 30,000 30,000 310,000 the parking lots will result in less annual maintenance for public works and prolong the life of the pavements. 47 Capital Plan City of Andover, MN Project# 17-41900-02 Project Name eplacemen t -Carpet / Tile type improvement Useful Life 10 Years Category Improvements 2017 thrat 2021 Department Facility Management Contact DPW / City Engineer Priority 2 -Medium to replacement of carpet and tile in appropriate areas of all City buildings where determine the order of replacement. E'a" 'ir7� tY fop— AV necessary. An annual review of all areas will be done get a lot of use and, despite the appropriate cleaning and maintenance, the carpeting and tile will need to be Sources 2017 2018 2019 2020 2021 Total 10,000 10,000 10,000 30,000 Total 10,000 10,000 10,000 30,000 2017 2018 2019 2020 2021 Total ve 10,000 10,000 10,000 30,000 Total 10,000 10,000 10,000 30,000 carpet and tile replacement will be needed in order to keep the buildings in good repair. Due to heavy use, it is tile areas will need to be replaced. 48 that all Capital Plan City of Andover, MN Project q 17-41900-04 Project Name Public Works Relocation/ Expansion 2017 rhru 2021 type improvement Department Facility Management Useful Life 30 Years+ Contact DPW / City Engineer Category Facility Management Priority I -High of a new Public Works facility as identified in the approved City Campus Expansion Master Plan. 1 - Construct a new Vehicle Maintenance Shop, including a wash bay, cold storage building and fuel island/canopy. 2017 and 2018 es a study to determine what type of space is needed, a preliminary design, a high-level cost estimation and other necessary information I to make a decision on whether to move forward with construction. - "nstruct a new and The Due to the increase of vehicles, equipment and supplies now used by the City of Andover, this vehicle storage building and vehicle maintenance repair shop is badly needed. It is not cost effective to have vehicles or other equipment stored outside. Minnesota's four seasons are way too hard on them and it makes for a much cleaner operation. The vehicle maintenance repair shop has been needed for a long time. The area now used has doors that are not wide enough and the work areas for the hydraulic hoist are way too small. Also with the amount of equipment now maintained by our staff, the area is much too small to run a comnletely safe nnerntfne tenditures 2017 2018 2019 50,000 2020 2021 Total 8,500,000 8,500,000 Total 50,000 450,000 8,500,000 9,000,000 Funding Sources 2017 2018 2019 2020 2021 Total Capital Equipment Reserve 50,000 50,000 G.O. Bond 450,000 8,500,000 8,950,000 Total 50,000 450,000 8,500,000 9,000,000 1 his will impact the life of the vehicles and other equipment by being stored inside and to house our vehicle maintenance mechanics. Over the years, the cost savings have been shown when the proper maintenance of our equipment can be implemented. This building will provide a safe, productive, and healthy operational area for City employees that will benefit the Citv of Andover for mnnv vear< 49 Capital Plan 2017 thru 2021 City of Andover, MN Expenditures 2017 2018 2019 2020 2021 Total ten, y rv,mmcumice 25,000 25,000 Total 25,000 25,000 Funding Sources 2017 2018 2019 2020 2021 Total Capital Equipment Reserve 25,000 25,000 Total 25,000 25,000 maintenance extends the life of the cement Floor, thus not having to replace it before its life expectancy is up. Capital Plan City of Andover, MN Project# 19-41900-05 Project Name Pedestrian Tunnel Under Crosstown Blvd. 2017 thru 2021 Type Improvement Department Facility Management Useful Life 30 Years+ Contact DPW / City Engineer Category Facility Management Priority I -High Description Phis would be a pedestrian underpass walkway under Crosstown to accommodate pedestrian traffic from a possible development of a parking lot x other sports fields on the north side of Crosstown Boulevard that could cross under Crosstown Boulevard to Sunshine Park Facilities or just ;onnect to the city's trail system. Justification This item was discussed at a Council Workshop with the Public Works Department Managers February 16th, 2006. For safety and easy access for crossing Crosstown Boulevard from a future park and/or parking lot on the north side of Crosstown Boulevard to Sunshine Park on the south side; orjust getting to the city trail system the quickest and safest way will be a pedestrian underpass under Crosstown Boulevard. Expenditures 2017 2018 2019 2020 2021 Total Improvement 450,000 450,000 Total 450,000 450,000 Funding Sources 2017 2018 2019 2020 2021 Total G.O. Bond 450,000 450,000 Total 450,000 450,000 Impact/Other ig of these area's through an underpass will not only benefit pedestrians crossing the roadway, but will also provide a safe passage and smaller equipment. 51 Capital Plan 2017 th, t/ 2021 City of Andover, MN Project x 19-41900-06 Project Name Memorial - Veterans Memorial Type Improvement Department Facility Management Useful Life 20 Years Contact DPW / City Engineer Category Improvements Priority I -High to honor Andover veterans. would like to construct a memorial to honor Andover veterans. 2017 2018 2019 2020 2021 Total 10,000 10,000 Total 10,000 10,000 Funding Sources 2017 2018 2019 2020 2021 Total Capital Equipment Reserve 10,000 10.000 An increase in Total 10,000 10,000 52 Capital Plan City of Andover, MN 'roject# 20-41900-01 2017 thru 2021 Expenditures 2017 2018 2019 2020 2021 Total Total 85,000 85,000 Funding Sources 2017 2018 2019 2020 2021 Total Capital Equipment Reserve 48,000 48,000 Comm Ctr Operations 12,000 12,000 Water Fund 25,000 25,000 Total 85,000 85,000 will reduce the amount of long term maintenance and repair to the 53 Capital Plan City of Andover, MN Projects 17-45000-01 Project Name Replace/Repair Play Structures - Various Parks 2017 thin 2021 Type Improvement Department Park @ Rm - Operations Useful Life 10 Years Contact DPW / City Engineer Category Park Improvements Priority 1 - High Description 2epair to fall zones and achieve ADA accessibility. Replacement of playground equipment and other major replacements, such as short fences on tall fields, soccer goals, and any area of play that does not meet safety specifications. The proposed rebuilds are as follows: 7 - Chesterton Commons S - Shadowbrook East 9 - Pine Hills South 0 - Terrace Park Justification equipment no longer meets ADA requirements, t all safety requirements. as entrapments, fall zones accessibility. Working to bring the parks up to Expenditures 2017 2018 2019 2020 2021 Total Equipment 50,000 50,000 50,000 50,000 50,000 250,000 Total 50,000 50,000 50,000 50,000 50,000 250,000 Funding Sources 2017 2018 2019 2020 2021 Total General Fund 50,000 50,000 50,000 50,000 50,000 250,000 Total 50,000 50,000 50,000 50,000 50,000 250,000 maintenance and will meet all safety 54 F- rn W J Un Q W Capital Improvement Plan Project Name: REPLACE/REPAIR PLAY STRUCTURES CHESTERTON COMMONS (2017) L E G E N D Project Location Lots/Parcels (3 Park Water Right of Way go City Limits Da nt Path- PM1B.mxd 0 0 100 zoo soo Feet55 'O 55 _ G LShado wbrook t Park • ' / , Capital Improvement , • ' • SOUTHProject Name: PINE HILLS Tp�=�e 161 ST AVE t Pine Hills ills 0 Location .• Project Location +: F7 Park RightWater of _-ry%rte aC City Limits 0 50 100 150 n C l _ 1 6W^ Capital Improvement , I / / Project Name: TERFLACE PARK ■ ■ 135TH LN • ■ a. ox ' • ' ORCHID ST • ■ AVE Terrace135TH Park SUS CT • • -_ Project Location �' J� WLiC3 . _�EI_-�`: 1 --fie ry• l I 1 II 1 •, yri�y✓„��' AND , Capital /• Plan (2021) Project'•• CO • • • Strootman Park RUM RIV Location Map 92 Project Location Lots/Parcels /I\ iPark Water �,•- ;r ,. .• L�jJ Right of Way �@_ City Limits 0 100 200 300 Capital Plan City of Andover, MN 2017 rhru 2021 Project # 17-45000-02 Project Name Replace/Repair Major Park Projects -Various Parks As the Andover park system continues to age there is a need for mayor replacement projects that cost in excess of $10,000 per project. These items can not be replaced through the Parks maintenace budget because of the high cost of the replacement. Current projects that are in need include the replacement of the outfield fencing and parking lot reconstruction within City Parks. Each year a specific project will be identified. Sources Fund 2017 2018 2019 2020 2021 Total 25,000 25,000 25,000 25,000 25,000 125,000 Total 25,000 25,000 25,000 25,000 25,000 125,000 2017 2018 2019 2020 2021 Total 25,000 25,000 25,000 25,000 25,000 125,000 Total 25,000 25,000 25,000 25,000 25,000 125,000 and rebuilds will reduce the ongoing maintenance that is needed to keep park facilities useable and safe. Rol Capital Plan City of Andover, MN Project# 17-45001-01 Project name Annual Miscellaneous Park Projects 2017 thru 2021 Type Improvement Department Park&Rm- Projects Useful Life Unassigned Contact Asst Public Works Director Category Park Improvements Priority I -High Description Phis is for unforeseen or requested miscellaneous projects that may arise during the year, requested by the public, staff, City Council or the and Recreation Commission each year. Justification This gives Flexibility to the City to do certain small -sized projects that may be warranted; for example, purchase soccer goals. This funding has been recommended by the Park and Recreation Commission. Expenditures 2017 2018 2019 2020 2021 Total Improvement 15,000 15,000 15,000 15,000 15,000 75,000 Total 15,000 15,000 15,000 15,000 15,000 75,000 Funding Sources 2017 2018 2019 2020 2021 Total Park Dedication Funds 15,000 15,000 15,000 15,000 15,000 75,000 Tota] 15,000 15,000 15,000 15,000 15,000 75,000 61 Capital Plan 2017 rhru 2021 City of Andover, MN Justification For the size of this park, it is under utilized. Due to the condition of the existing field and the lack of a good playing surface, the field needs to be upgraded with irrigation. An additional smaller field adjacent to the full size field will give the associations another place to practice and/or play 2017 2018 2019 2020 2021 Total unPruvement x54300 457,300 Total 457,300 457,300 Funding Sources 2017 2018 2019 2020 2021 Total Park Dedication Funds 457,300 457,300 Total 457,300 457,300 :Ya Capital Improvement Plan Project Name: FOX MEADOWS L E G E N D Project Location r Lots/Parcels Park Water Right of Way City Limits D=rnent Path: 7 U. 0 150 300 450 Feet63 (2017) Capital Plan City of Andover, MN Project# 17-45001-03 Project Name Pine Hills North - Phase II 2017 thru 2021 Type Improvement Department Park d Rec - Projects Useful Lite 20 Years Contact.lssr. Public Works Director Category Improvements Priority 1 -High Description 'hese II of the new sporting complex will include the construction of a storage building (identified for 2017) funded by donations from the tthletic associations as recommended by the Park and Recreation Commission. 2020 includes the paving of existing and/or newly created Ind was purchased in 2012. The fields were graded, irrigated and seeded in 2013. There will be other improvements down the road tding concession/storage buildings, large playground structure, ect. Justification I Due to the growth of soccer, football, and lacrosse, an additional sports complex was necessary to keep up with demand so that the existing fields u -e not over -used which allows those fields additional time to recover between games and practices. Paving is necessary to reduce the dust during Iry times of the year. Paving will also allow vehicles to park in designated parking stalls once the parking lot is striped. Drivers at times create more distance between vehicles when parking their vehicle on a gravel lot. the Park Commission Expenditures 2017 2018 2019 2020 2021 Total Improvement 100,000 400,000 500,000 Total Funding Sources 100,000 2017 2018 400,000 2019 2020 2021 500,000 Total Capital Equipment Reserve Donations Park Dedication Funds 100,000 280,000 120,000 280,000 100,000 120,000 Total 100,000 400,000 500,000 new items to the facility will put additional burdens on existing park stats and budgets. 0 Capital Improvement Plan (2020) Project Name: PINE HILLS NORTH —16 RD-LN 162ND LN . ine Hills E-160TH Location.. Project Location r= Park s Water L�� Right of Way 42 City Limits 1 250 500 750, z _ Capital Plan 2017 thru 2021 City of AnrinvPr MN Justification Since most of the City parks have sandy soils, irrigation is pretty much the only way to keep the grass green and the area looking good otherwise the area will tum to dirt and will be unsightly. 2017 2018 2019 2020 2021 Total Improvement 20,000 20,000 20,000 60,000 Total 20,000 20,000 20,000 60,000 Funding Sources 2017 2018 2019 2020 2021 Total Park Dedication Funds 20,000 20,000 20,000 60,000 Total 20,000 20,000 20,000 60,000 56 Capital Plan City of Andover, MN Project # 17-45001-05 Project name Nordeen's Park Basketball Court Type Improvement Useful Life 15 Years Category Improvements 2017 rhrtr 2021 Department Park & Rec - Projects Contact Asst Public Works Director Priority 1 -High a new basketball court at the request of neighborhood petition that was submitted in 2016. i on interest nom me are visiting the park. Improvement it has been determined that a basketball court would provide another option for residents to 2017 2018 2019 2020 2021 Total 7,500 7,500 Total 7,500 7,500 Funding Sources 2017 2018 2019 2020 2021 Total Park Dedication Funds 7,500 7,500 annual maintenance. Total 7,500 7,500 67 Capital Improvement Plan (2017) Project Name: NORDEEN'S PARK Location Map I_ E G E N D Capital Plan City of Andover, MN 2017 (/1111 2021 Funding Sources Park Dedication Funds ract/Other nual maintenance. `V�42,500 42,500 2017 2018 2019 2020 2021 Total Total 42,500 42,500 CE Capital Improvement Plan Project Name: WILD IRIS PARK (2020) L E GEND oject Location cePr ls LoPa rk Water Right of Way City Limits Do ent Path H:1GisE Mt nglneenngTmje tMcp 0 150 300 450 Feet7o Capital Plan 2017 11717, 2021 ON of AndnVElr MAT r.xpenmtures 2017 2018 2019 2020 2021 Total Improvement 105,000 500,000 Total 105,000 500,000 605,000 Funding Sources 2017 2018 2019 2020 2021 Total Assessments 105.000 Sewer Trunk Fund105,000 500,000 500,000 Total 105,000 500,000 605,000 routine maintenance including televising and cleaning will be required. 71 C I T Y O F ND WR Capital Improvement Plan Project Name: SANITARY SEWER IMPROVEMENTS AZTEC ESTATES LIFT STATION UPGRADES (2017) L E G E N D Project Location Lots/Parcels E3 Park Water Right of Way City Limits M .ment Paft 0 350 700 7,050 Feet72 Location Mar) 7��ivvovEx Capital Improvement Plan (201 8) Project Name: SANITARY SEWER IMPROVEMENTS CROSSTOWN BLVD SANITARY SEWER EXTENSION L E G E N D 0 Project Location Lots/Parcels ca Park Water [ Right of Way City Limits Document Path H:1Gis0etOTngineenng mjfttslCIP 2016.mxd Locauon neap Capital Plan 2017 thrt, 2021 City of Andover, MN Expenditures 2017 2018 2019 2020 2021 Total improvement 50,000 50,000 Total 50,000 50,000 Funding Sources 2017 2018 2019 2020 2021 Total Sewer Trunk Fund 50,000 50,000 Total 50,000 50,000 74 Capital Improvement Plan Project Name: SANITARY SEWER IMPROVEMENTS LIFT STATION #4 UPGRADES (2017) L E G E N D 43 Project Location 0 Lots/Parcels Park Water Right of Way City Limits b rnent Path: 0 100 200 300 Feet75 Capital Plan 2017 tht t1 2021 City of Andover, MN Expenditures 2017 2018 2019 2020 2021 Total Improvement 650,000 650,000 Total 650,000 650,000 Funding Sources 2017 2018 2019 2020 2021 Total Sewer Trunk Fund 650,000 Asn nnn Total 650,000 650,000 monitoring and maintenance of the lift station will be 76 Capital Plan 2017 th,r 2021 City of Andover, MN Expenditures 2017 2018 2019 2020 2021 Total Improvement 55,000 60,000 60,000 62,000 65,000 302,000 Total 55,000 60,000 60,000 62,000 65,000 302,000 Storm Sources runa 2017 2018 2019 2020 2021 Total 55,000 60,000 60,000 62,000 65,000 302000 Total 55,000 60,000 60,000 62,000 65,000 302,000 problem areas in the storm sewer system will reduce the yearly maintenance needs placed on the public works personnel. 78 Capital Plan 2017 'hi'll 2021 City of Andover, MN Expenditures 2017 2018 2019 2020 2021 Total Construction 725,000 250,000 260,000 275,000 285,000 1,795,000 Total 725,000 250,000 260,000 275,000 285,000 1,795,000 Funding Sources 2017 2018 2019 2020 2021 Total Road &Bridge Funds 725,000 250,000 260,000 275,000 285,000 1,795,000 Total 725,000 250,000 260,000 275,000 285,000 1,795,000 snding the life of the street will reduce routine maintenance (Crack sealing, pot hole patching, overlays, etc.) and extend the overall design of the pavement. Seal coating will also help to hold deteriorating streets together until they can be scheduled for reconstruction. 79 Capital Plan 2017 that, 2021 City of Andover, MN r.xpenaitures 2017 2018 2019 2020 2021 Total Construction 160,000 170,000 245,000 290,000 375,000 1,240,000 Total 160,000 170,000 245,000 290,000 375,000 1,240,000 Funding Sources 2017 2018 2019 2020 2021 Total Construction Seal Coat Fund 17,000 8,000 10,000 10,000 10,000 55,000 Road & Bridge Funds 143,000 162,000 235,000 280,000 365,000 1,185,000 Total 160,006 170,000 245,060 290,000 375,000 1,240,000 t &pact/Other the street cracks will reduce routine maintenance by eliminating a major source of street degradation resulting from moisture in FPl Capital Plan City of Andover, MN Project# 17-43100-03 Project Name Annual Pavement Markings type improvement 2017 1/7t1/ 2021 Department Streets/ Highways cxpenattures 2017 2018 2019 2020 2021 Total Improvement 42,000 44,000 46,000 48,000 50,000 230,000 Total 42,000 44,000 46,000 48,000 50,000 230,000 Sources rm,us 2017 2018 2019 2020 2021 Total 42,000 44,000 46,000 48,000 50,000 230,000 Total 42,000 44,000 46,000 48,000 50,000 230,000 pavement markings are contracted out each year freeing staff for other duties. 81 Capital Plan 2017 ih," 2021 City of Andover, MN Expenditures 2017 2018 2019 2020 2021 Total Improvement 50,000 52,000 54,000 56,000 58,000 270,000 Total 50,000 52,000 54,000 56,000 58,000 270,000 Funding Sources 2017 2018 2019 2020 2021 Total Road & Bridge Funds 50,000 52,000 54,000 56,000 58,000 270,000 Total 50,000 52,000 54,000 56,000 58,000 270,000 failing or damaged sections of curb and gutter reduces the routine maintenance required by the public works 82 Capital Plan City of Andover, MN 2017 th/zr 2021 IProject# 17-43100-05 Project Name Municipal State Aid Routes / New & Reconstruct Type Improvement Department Streets/ Highways Useful Life 20 Years Contact DPW / City Engineer Category Improvements Priority I -High 7 he tol[Owing projects are proposed to be constructed and/or rehabilitated to meet State Aid Standards. 2017: University Ave Overlay (157th to 161st) $130,000' 168th Lane (Round Lake Blvd to Verdin) $1,170,000 2018: 143rd Avenue Reconstruction (Xenia St to Round Lake Blvd) $370,000 Crosstown Blvd Overlay (Hanson Blvd to 161st Ave) $450,000 2019: University Ave Recon (Andover Blvd to 157th) $690,000* Hanson Blvd (Jay Street to Crosstown Blvd) $1,000,000 2020: Prairie Road Overlay (Andover Blvd to Bunker Lake Blvd) $350,000 2021: Jay Street Overlay (Bunker Lake Blvd to Hanson Blvd) $290,000 *This is Andover's portion of these 2120ject costs. The City of Ham Lake would fund the remaining 50% of these pLoject costs. lustlfication Upgrades to existing roadways are needed to maintain the integrity of the City's State Aid roadway infrastructure. New Municipal State Aid routes are necessary to provide access to current and future developments. 2017 2018 2019 2020 2021 Total 1,300,000 820,000 1,690,000 350,000 290,000 4,450,000 Total 1,300,000 820,000 1,690,000 350,000 290,000 4,450,000 funding Sources 2017 2018 2019 2020 2021 Total Assessments 243,000 75,500 144,000 15,000 15,000 492,500 Municipal State Aid Funds 1,057,000 744,500 1,546,000 335,000 275,000 3,957,500 Total 1,300,000 820,000 1,690,000 350,000 290,000 4,450,000 the roads will reduce the amount of routine maintenance along these sections system. 83 and provide a safer and NDWR Capital Improvement Plan (2017) Project Name: STATE AID ROUTES OVERLAY UNIVERSITY AVE- 157TH TO 161ST C0NSTANCE BLVD F i ;O Z W O 'J l7 W Q 'u H y W '2 Location Map L E G E N D N Project Location Lots/Parcels w E Park S Water {� Right of Way 9 City Limits 0 250 500 7E Feet84 Document Patt[ H: GIs=atEnpneeMgTrgeds C[P_X16.mW v ■- 1 1 ■ 1 "� ■ ■■ ■■�■■■ ■- ■■ • uJ 63 Project'Park Irl fWater i�2J Right of Way 1City Limits1 •11 :11 11 I , Project... . I�,Y,� � ELots/Parcels,►, Park Water Right of Way l �CityLimits 1 1 11 tic 11 i4 1. �S=i ' pp �� Capital Improvement Plan Project Name: STATE AID ROUTES RECONSTRUCTION III UNIVERSITY AVE -ANDOVER BLVD TO 157TH AVE (2019) L E G E N D 4: Project Location Lots/Parcels C3 Park Water f` Right of Way City Limits mu"nt Path ! E016mx4 1,300 1,950 Feet88 Location jor 0 Capital Improvement Plan Project Name: STATE AID ROUTES OVERLAY JAY STREET (HANSON BLVD TO BUNKER LAKE BLVD) (2021) L E G E N D Project Location Lots/Parcels Park Water Right of Way City Limits ixument Paft 0 0 250 500 Feet91 Location Map Capital Plan City of Andover, MN Project# 17-43100-06 Project Name Annual Street Reconstruction .ype improvement Useful Life 20 Years Category Improvements Description 2017 thru 2021 Department Streets / Highways Contact DPW / City Engineer Priority 1 -High Street Reconstruction projects will consist of milling the existing street surface and constructing a new asphalt surface. Minor shouldering restoration work will be included with the project. In developments that have existing bituminous curb or no curb or ditch, concrete curb and .r will be constructed. 25% of the total project costs are assessed to the benefiting properties in each development. This program helps to vain the integrity and value of the community's street infrastructure. to be reconstructed are listed below. The timing of reconstruction of developments more than two years out may be revised as street ions and ratings are reviewed on an annual basis. Additional developments may be added to the schedule or projects moved up if it is :ageous to reconstruct them in conjunction with other nearby projects. 17 - Lund's Evergreen Estates 2nd - 5th Additions 18 - Andover Bdy Commission Plat 1 / Shirley's Estates 19 - Area east of Crooked Lake 20 - Alladin Acres, Enchanted Drive Area 21- Andover West. Indian Meadows Tod A Wit; t streets in these neighborhoods are generally in excess of 25 years old and are in need of rehabilitation. The intent of this program is to ide the community with a high quality transportation system and maintain a constant upkeep of the City's street infrastructure. cxpenunures 2017 2018 2019 2020 2021 Total Construction 1,236,000 821,000 1,143,000 1,092,000 1,268,000 5,560.000 Total 1,236,000 821,000 1,143,000 1,092,000 1,268,000 5,560,000 Sources 2017 2018 Assessments 309,000 2019 2020 2021 Total 286,000 273,000 317,000 1,390,- Road & Bridge Funds 927,000 616,000 857,000 819,000 951,000 4,170,000 Total 1,236,000 821,000 1,143,000 1,092,000 1,268,000 5,560,000 on of the streets will reduce the routine maintenance (crack sealing, pot hole patch will prolong the structural stability of the roadway making for a longer serviceable hE etc..) in the area. Long term, Capital Improvement Plan Project Name: ANNUAL STREET RECONSTRUCTION LUND'S EVERGREEN ESTATES 2ND -5TH ADDITIONS (2017) L E G E N D 92 Project Location 0 Lots/Parcels 93 Park 0 Water 0 Right of Way 0 City Limits Document N k E S 300 600 90C Feet93 LM Capital Improvement Plan Project Name: ANNUAL STREET RECONSTRUCTION ANDOVER BOUNDARY COM. PLAT 1 & SHIRLEYS ESTATES (2018) L E G E N D Project Location Lots/Parcels Park Water Right of Way City Limits Doman Patt[ 0 0 150 300 450 Feet94 Map • •� • ��. ca ♦ �..- r \ ' • 1 ■ ' . 0 ON CREEK: IR 111 ■ 10 .1 AVELU .i_ m. ■■ '1 ' - Location.. Project Location Park • lli� Water �f zYi9 �:►yj�7w Right of Way ' 200400 600 Capital Improvement Plan Project Name: ANNUAL STREET RECONSTRUCTION ALLADIN ACRES & ENCHANTED DRIVE AREA (2020) L E G E N D Project Location Lots/Parcels Park Water t Right of Way (� City Limits Ja .0 t Pack 0 0 250 500 Feet96 Location MaD Capital Improvement Plan (2021) Project Name: ANNUAL STREET RECONSTRUCTION NDOVER WEST, INDIAN MEADOWS 2ND ADDITION & LUNDS ROUND LAKE ESTATES L E G E N D Project Location Lots/Parcels Park Water Right of Way City Limits btu m Pat, 400 800 1,200 Feet97 Location Map Capital Plan City of Andover, MN Project# 17-43100-07 Project Name Intersection Upgrades Type Improvement Useful Life 25 Years Category Improvements Description rhe following are projects 2017 thri, 2021 Department Streets / Highways Contact DPW / City Engineer Priority I -High are tentatively identified for improvements. Exact timing is subject to change. 18 - Construction of a traffic signal at South Coon Creek Drive and Round Lake Blvd ($285,000) if warrants are met. 1 - Crosstown Blvd / Crosstown Drive Intersection. Improvements could include separating the southbound right turning movement onto :stown Drive to improve safety ($275,000). - Nightingale Street / Crosstown Blvd Intersection. A round about with two pedestrian underpasses is being submitted for HSIP grant ng. Timing of this project would be dependant upon award of grant ($1,800,000). Grants typically require a minimum 10/ City match ification vection upgrades are necessary due to the increased development and demands on the transportation system, the need for safety wements, and to comply with Anoka County Highway Department requirements. Expenditures 2017 2018 2019 2020 2021 Total Construction 285,000 2,075,000 2,360,000 Total 285,000 2,075,000 2,360,000 ;Sources 2017 2018 2019 2020 2021 Total t,ouu,uuu 1,tiuu,ouo Municipal State Aid Funds 285,000 475.000 760 Ono Total 285,000 2,075,000 2,360,000 will improve the flow of traffic and will improve the safety of vehicles, pedestrians and bicyclists. 98 t ��r, .. ::plln• �� - ••/lllnoq-n111111- _ •. '■■■i1 ,■■%4�1\P V-IP\11111. /i.r�\��11-a\1111bu 0 0 Capital Plan 2017 thru 2021 City of Andover, MN Expenditures 2017 2018 2019 2020 2021 Total Improvement 15,000 15,000 15,000 15,000 15,000 75,000 Total 15,000 15,000 15,000 15,000 15,000 75,000 Funding Sources 2017 2018 2019 2020 2021 Total Road &Bridge Funds 15,000 15,000 15,000 15,000 15,000 75,000 Total 15,000 15,000 15,000 15,000 15,000 75,000 100 Capital Plan 2017 thru 2021 City of Andover, MN Expenditures 2017 2018 2019 2020 2021 Total Construction 400,000 400,000 800500 Total 400,000 400,000 800,000 Funding Sources 2017 2018 2019 2020 2021 Total Assessments 100,000 100,000 200,000 Road & Bridge Funds 300,000 300,000 600,000 Total 400,000 400,000 800,000 a structurally sound road will prolong it's useful life a minimum of 15 years, and also reduce routine annual maintenance to an older roadway surface (pothole patching, crack sealing, etc.) 101 Capital Plan City of Andover, MN Project k 17-48100-01 Project Name Rehabilitation of Wells 2017 thtu 2021 ,ype improvement Department Water Useful Life 7 Years Contact DPW I City Engineer Category Improvements Priority I -High motor, pump and column pipe are taken out for inspection and worn parts are replaced. The well is televised to determine the depth and lition. If the well is at or close to the original drill depth everything is put back in place. The well may need to be cleaned out to the original It if there is a substantial decrease in the depth. Justification ro make sure the well is operational to what it is designed for and to correct any problems that may affect our ability to produce the amount of nater needed to meet the demand, a complete inspection and maintenance overhall is performed on each well a minimum of once every seven (7) ears. This maintenance will also maximize the pumping rate of the well. Funding Sources Water Fund apaet/Other be done at such a tim, 2017 2018 2019 2020 2021 Total 50,000 50,000 50,000 50,000 50,000 250,000 Total 50,000 50,000 50,000 50,000 50,000 250,000 2017 2018 2019 2020 2021 Total 50,000 50,000 50,000 50,000 50,000 250,000 Total 50,000 50,000 50,000 so,onn ;n Ann 250,000 that it would not affect the demand needs of the system. Typically done late fall. 102 Capital Plan City of Andover, MN Project p 18-48100-04 Project Name Water Main Improvements 2017 1/I1'1r 2021 vp= uuy, ovcurcm Department Water Useful Life 50 Years Contact DPW I City Engineer Category Improvements Priority I -High III water main, hydrants, and service lines to provide water service to existing areas in the City that are not currently served with City water. following projects are proposed to be constructed along with the planned reconstruction of the streets in these areas: 18: 143rd Avenue (Round Lake Blvd to Woodbine St) ($140,000) Andover Boundary Commission Plat I & Shirleys Estates ($500,000) 19: Area eaet of ('rnn4Pd 1 Abe remit n nnm roadways in the Andover Boundary Commission Plat I and along 143rd Avenue between Round Lake Blvd and Woodbine Street are osed to be reconstructed in 2018. The connection along 143rd Avenue would be considered a trunk improvement as it would provide a ed connection for over 170 parcels west of this connection. roadways in the Lakeview Terrace areas east of Crooked Lake are proposed to be reconstructed in 2019. the water main in these areas while the 2017 2018 2019 2020 2021 Total Total 540,000 710,000 1,350,000 Funding Sources 2017 2018 2019 2020 2021 Total Assessments 500,000 710,000 1,210,000 Water Trunk Fund 140,000 Total 540,000 710,000 1,350,000 and flushing requirements for the water main system will 103 Capital Improvement Plan (201 8) Project Name: WATER MAIN IMPROVEMENTS 143RDAVE,ANDOVER BOUNDARY COM. PLAT 1 & SHIRLEYS ESTATES 1VDOVER� Capital Improvement Plan (2019) Project Name: WATER MAIN IMPROVEMENTS AREA EAST OF CROOKED LAKE H V! J O F a y J y N W W 135TH LN W � COON CREEK S W ,�g5TH CIR 135TH AVE CROOKEDLAKE 134TH LN 134TH AVE to fn W 3 133RD LN w 0 w Location Map L E G E N D Project Location Lots/Parcels N W E ELI Park s Water i Right of Way City Limits 0 150 300 450 Feel 05 'Ww nt Patk H:\GisO Wl EngineannglPm�ects\CIP 2016.mxd This page left blank intentionally. 106 City of Andover, MN Capital Plan 2017 thru 2021 DEPARTMENT SUMMARY Department 2017 2018 2019 7020 2021 Tot Building 35,000 35,000 Central Equipment 40,000 40,000 Community Center 30,000 14,000 37,000 83,000 164,000 Emergency Management 45,000 45,000 45,000 45,000 180,000 Engineering 33,500 33,500 Facility Management 160,000 160,000 Finance 150,000 150,000 Fire 100,000 190,000 510,000 635,000 55,000 1,490,000 Information Technology 12,000 12,000 Park & Rec- Operations 200,000 225,000 166,000 27,000 618,000 Planning & Zoning 30,000 30,000 Sanitary Sewer 460,000 100,000 560,000 Storm Sewer 220,000 200,000 420,000 Street Signs 10,000 10,000 Streets l Highways 155,000 220,000 460,000 220,000 1,055,000 Water 30,000 108,000 900,000 1,038,000 TOTAL 1,190,000 1,003,500 2,240,000 1,204,000 358,000 5,995500 107 108 City of Andover, MN Capital Plan 2017 thru 2021 FUNDING SOURCE SUMMARY Source 2017 2018 2019 2020 2021 Total Capital Equipment Reserve 680,000 57,000 195,000 80,000 35,000 1,047,000 Comm Ctr Operalions 30,000 14,000 10,000 83,000 137,000 Equipment Band 688,500 1,111,000 1,082,000 220,000 3,101,500 G.O. Bond 12,000 12,000 General Fund 20,000 20,000 20,000 20,000 20,000 100,000 Sanitary Sewer Fund 245,000 116,000 361,000 Sewer Trunk Fund 230,000 230,000 Storm Sewer Fund 16,000 16,000 Water Fund 15,000 76,000 900,000 991,000 GRAND TOTAL 1,190,000 1,003,500 2,240,000 1,204,000 358,000 5,995,500 108 City of Andover, MN Capital Plan 2017 thru 2021 PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project# Priority 2017 2018 2019 2020 2021 Total Building Replacement - Small Extended Cab Pick Up #8 19-42300-01 1 35,000 35,000 Equipment Bond 75,000 35,000 Building Total (Central Equipment Replacement - Service Truck #371 1848800-01 Equipment Bond Central Equipment Total 40,000 Community Center Replacement - Skate Sharpener 18-44200-01 Comm Ctr Operations Replacement- Pickleball lnsedslNet System 1844400-01 Comm Ctr Operations 1 10,000 New - Inflatables 18-04400-03 Comm Ctr Operations 10,000 Replacement- Zamboni Battery Pack 19-44300-06 Comm Gtr Operations Replacement- Scissor Lift 20-44000-01 Equipment Bond Replacement- Kaivac Cleaning System 2044000-05 Comm Cor Operations Replacement- CameralSecurty System 20-44000-06 G.O. Bond 1 10,000 Replacement - Floor Scrubber 21-44000-01 Comm Chr Operations 10,000 Replacement -Electric Edger 21-44300-02 Comm Ctr Operations Replacement- Evaporative Condenser 21-04300-03 Comm Ctr Operations Community Center Total 14,000 14,000 Emergency Management Replacement- Emergency Sirens 17-42400-02 Capital Equipment Reserve Emergency Management Total 15,000 Engineering Replacement- Data CollectorlTotal Station 18-01600-01 35,000 35,000 2 40,000 40,000 40,000 40,000 40,000 40,000 1 10,000 10,000 10,000 10,000 1 10,000 10,000 10,000 10,000 1 10,000 10,000 10,000 10,000 1 14,000 14,000 14,000 14,000 1 15,000 15,000 16,000 14000 1 10,000 10,000 10,000 14000 1 12,000 12,000 lz000 Iz000 1 15,000 15,000 15,000 15,000 1 8,000 8,000 6,000 8,000 1 60,000 60,000 60,000 60,000 30,000 14,000 37,000 83,000 164,000 1 45,000 45,000 45,000 45,000 180.000 4%000 45,000 45,000 45,000 160,000 45,000 45,000 45,000 45,000 180,000 1 33,500 109 33,500 Department Project# Priority 2017 2018 2019 2020 2021 Total Equipment Bond 33,500 33,500 Engineering Total 33,500 33,500 (Facility Management Replacement- Security Management System 17-41900-03 1 100.000 100,000 Capital Equipment Reserve 100,000 100,000 HD Cabling - City Hall 17-01900-05 1 60,000 60,000 Capital Equipment Reserve 60,000 60,000 Facility Management Total 160,000 160,000 LFinance Financial l Payroll System Upgrade/Replacement 1941400-01 1 150,000 150,000 Cap Bal Equipment Reserve 150,000 150,000 Finance Total 150,000 150,000 Fire Replacement-Turnout Gear 1742200-01 1 20,000 20,000 20,000 20,000 20,000 100,000 General Fund 25000 20,000 20,000 20,000 20,000 100,000 Replacement- Extrication (Rescue) Equipment 1742200.02 1 80,000 80,000 Capial Equipment Reserve 84000 80,000 Replacement - Grass #31 1842200-01 1 85,000 85,000 Equipment Bond 85,000 85,000 Replacement - Grass #21 1842200-02 1 85,000 85,000 Equipment Bond 85,000 85,000 Replacement - Tanker #11 19-42200-01 1 400,000 400,000 Equipment Bond 400,000 400,000 Replacement - Grass Utility Vehicle (UTV) #4813 19-02200-03 1 45,000 45,000 Equipment Bond 45,000 45,000 Replacement- 1999 GMC Sonoma Truck (U-1 0) #48 10 19-42200-05 2 45,000 45,000 Equipment Bond 45,000 45,000 Replacement- SCBA Compressors 20-42200-01 1 130,000 130,000 Equipment Bond 130,000 130,000 Replacement-800 MHz radios 2042200-02 1 35,000 35,000 70,000 Capital Equipment Reserve 35,000 35000 70,000 Replacement-Engine 21#4884 2042200-03 1 450,000 450,000 Equipment Bond 450,000 450,000 Fire Total 100,000 190,000 510,000 635,000 55,000 1,490,000 Information Technology Smartboard Addition 18-0142MI 1 12,000 12,000 Capital Equipment Reserve 11,000 12,000 Information Technology Total 12,000 12,000 (Park&Ree- Operations Replacement - One Ton Crew Cab Pickup #502 17-45000-03 1 50.000 50,000 Capital Equipment Reserve 50,00 50,000 New-Trail Machine 17-45000-04 1 150,000 150,000 Capital Equipment Reserve 150,000 150,000 Replacement - One Tan Truck wl Plow #599 1845000-01 1 80,000 80,000 110 Department Project# Priority 2017 2018 2019 2020 2021 Total Equipment Bond Replacement - One Ton Truck w/ Plow 4134 17-03100-11 1 80,000 80,000 80,000 New - Wood Chipper Tow -Behind 18-05000-02 1 55.000 20,000 Caplial Equipment Reserve 20,000 Equipment Bond New - Bobcat paver 17-43100-13 1 20,000 20,000 20,000 20,000 20,000 Replacement - Bobcat Track Loader #610 18-45000-03 1 55,000 55,000 Equipment Bond 54000 55,000 Replacement - Small Extended Cab Truck #76 18-45000-04 1 55,000 55,000 Equipment Bond 55,000 55,000 New - "V" Snow Plow for 09-589 18-05000-05 1 15,000 15,000 Equipment Band 15,000 14000 Replacement - Water Tanker #161 1945000-01 1 150,000 150,000 Equipment Bond 150,000 150,000 Replacement -Trailer #T-555 1945000-02 1 16,000 16,000 Equipment Bond 14000 16,000 Replacement- Cushman Field Dresser#547 2045000-01 1 27,000 27,000 Equipment Bond 27,000 27,000 Park & Ree - Operations Total 200,000 225,000 166,000 27,000 618,000 (Planning & Zoning Replacement - Planning Vehicle #7 1741500-01 1 30,000 30,000 Capital Equipment Reserve 30,000 30,000 Planning & Zoning Total 30,000 30,000 unitary Sewer Replacement - JetfVac Truck #99 1748200-02 1 460,000 460,000 Sanitary Sewer Fund 230,000 230,000 Sewer Trunk Fund 230,000 230,000 Replacement - One Ton Utility Truck #69 1848200-02 1 100,000 100,000 Sanitary Sewer Fund 100,000 100,000 Sanitary Sewer Total 460,000 100,000 560,000 (Storm Sewer Replacement - Tymoo Street Sweeper #172 18-48300-01 1 220,000 220,000 Equipment Bond 220,000 220,000 Replacement - Elgin Street Sweeper #169 1948300-01 1 200,000 200,000 Equipment Bond 200,000 200,000 Storm Sewer Total 220,000 200,000 420,000 Street Signs Sign Design Software and Platter 17-03300-01 2 10,000 10,000 Capital Equipment Reserve 10,000 10,000 Street Signs Total 10,000 10,000 (Streets / Highways Replacement - One Ton Truck w/ Plow 4134 17-03100-11 1 80,000 80,000 Capital Equipment Reserve Salim 80,000 New - One Ton Truck w/ Regular Box w/ Lift & Plow 17-43100-12 1 55.000 55,000 Caplial Equipment Reserve 55,000 55,000 New - Bobcat paver 17-43100-13 1 20,000 20,000 Capital Equipment Reserve 20,000 20,000 111 Department Project# Priority 2017 2018 2019 2020 2021 Total New - Dump Truck wl snow removal 19-03100-01 1 220,000 220,000 Equipment Bond SanifaryS werFund 220,000 220,000 Replacement- Dump Truck wl Snow removal #198 2043100-01 1 220,000 220,000 Equipment Bond 15,000 220,000 220,000 Replacement -Bobcat S185#120 20-03100-02 1 50,000 50,000 Equipment Bond 60,000 50,000 50,000 Replacement- One Ton Truck wl Plow#133 2043100-03 1 80,000 80,000 Equipmentaond Sanitary Sewer Fund 80,000 84000 Replacement- Backhoe Loader #80 20-43100-04 2 110,000 110,000 Equipment Bond 16,000 110,000 110,000 Replacement- Dump Truck wl Snow removal #200 21-03100-01 1 220,000 220,000 Equipment Bond 2 220,000 220,000 Streets / Highways Total 155,000 220,000 460,000 220,000 1,055,000 Water Replacement - Dodge Dakota #95 17-08100-02 1 30,000 30,000 SanifaryS werFund 14000 15,000 Water Fund 14000 15,000 Replacement - 3l4 Ton Wily Truck #66 18-48100-02 1 60,000 60,000 Water Fund 60,000 60,000 Replacement - Side by Side UTV #70 18-08100-03 1 48,000 48,000 Sanitary Sewer Fund 16,000 16,000 Storm Sewer Fund 14000 16,000 Water Fund 16,000 16,000 Water Meter Reading System AMUAMR 19-08100-01 2 900,000 900,000 Water Fund 900,000 900,000 Water Total 30,000 108,000 900,000 1,038,000 GRAND TOTAL 1,190,000 1,003,500 2,240,000 1,204,000 358,000 5,995,500 112 Capital Plan City of Andover, MN Project# 19-42300-01 Project Name Replacement- Small Extended Cab Pick Up #8 2017 thru 2021 Type Equipment Department Building Useful Life 10 Years Contact Building Official Category Equipment Priority I -High (Replace unit #8, a 2004 Chevrolet Colorado pickup truck with 101,131 miles. 111I Justification This truck is out daily with inspections and maintenance costs are going up. 2017 2018 2019 2020 2021 Total 35,000 35,000 Total 35,000 35,000 Funding Sources 2017 2018 2019 2020 2021 Total Equipment Bond 35,000 35,000 Total 35,000 35,000 break downs saving the City time and money. 113 Capital Plan City of Andover, MN Project q 18-48800-01 2017 thri, 2021 Justification This truck averages about 7,000 miles a year and by 2018 it will have approximately 125,000 miles. To assist mechanics with jobs outside the shop such as parts runs, vehicle repair and moving equipment around; a larger and roomier vehicle is needed. Expenditures 2017 2018 2019 2020 2021 Total Vehicles 40,000 40,000 Total 40,000 40,000 Funding Sources 2017 2018 2019 2020 2021 Total Equipment Bond 40,000 40,000 Total 40,000 40,000 costs - fuel and maintenance, but would have many more uses. 114 Capital Plan 2017 thm 2021 City of Andover, MN Expenditures 2017 2018 2019 2020 2021 Total Equipment 10,000 10,000 Total 10,000 10,000 Funding Sources 2017 2018 2019 2020 2021 Total Comm Ctr Operations 10,000 10,000 Total 10,000 10,000 Shop rentals and sharpening services have always been very positive. 115 Capital Plan 2017 thru 2021 City of Andover, MN Justification Pickleball has become a huge use for the Community Center. Staff spends 45 minutes a day setting up and taking down portable nets. A net system with poles that slide into a drilled sleeve in the ground will provide a better playing experience and save on staff time. Expenditures 2017 2018 2019 2020 2021 Total Improvement 10,000 10,000 Total 10,000 10,000 Funding Sources 2017 2018 2019 2020 2021 Total Comm Ctr Operations 10,000 10,000 Total 10,000 10,000 ]get JmpacN08ter rall cost of the new posts/nets will provide a better playing experience along with savings on the amount of time it takes staff to set up down the nets. 116 Capital Plan City of Andover, MN Projects 18-44400-03 Project Name New - Inflatables 2017 thru 2021 Type Equipment Department Community Center Useful Life 10 Years Contact Comm Cur Manager Category Equipment Priority 1 -High Qumpers) are used in the field house and area big part of our tot programs and birthday parties. Jutif cation Currently renting inflatables as needed. The purchase would be offset by the rental fees, in addition to, having them available at all times. Expenditures 2017 2018 2019 2020 2021 Total Equipment 10,000 10,000 Total 10,000 10,000 Funding Sources 2017 2018 2019 2020 2021 Total Comm Ctr Operations 10.000 10.000 costs are Total 10,000 10,000 to 117 events. Capital Plan City of Andover, MN Project p 19-44300-06 Project Name Replacement - Zamboni Battery Pack Type Equipment Useful Life 7 Years Category Equipment to be replaced. 2017 lhru 2021 Department Community Center Contact Comm Cm Manager Priority I -High should be replaced every 5-7 years. Over time, the batteries will hold less of a charge and eventually 2017 2018 2019 2020 2021 Total Total 14,000 14,000 Funding Sources 2017 2018 2019 2020 2021 Total Comm Ctr Operations 14.000 14,000 Total 14,000 14,000 Zamboni is a necessary part of the operations of the ice arena; and without it, we would not be able to keep the facility open. With the entative maintenance program that is in place, we have achieved the maximum amount of time available on the battery pack before it has to 118 Capital Plan 2017 rhru 2021 City of Andover, MN Justification The scissor lift will be 15 years old and operating costs continue to rise. 2017 2018 2019 2020 2021 Total Total 15,000 15,000 Funding Sources 2017 2018 2019 2020 2021 Total Equipment Bond 15,000 15,000 Total 15,000 15,000 119 Capital Plan 2017 rhru 2021 City of Andover, MN Justification After 12 plus years, the current Kaivac system will be in need of replacement. Expenditures 2017 2018 2019 2020 2021 Total Equipment 10,000 10,000 Total 10,000 10,000 Funding Sources 2017 2018 2019 2020 2021 Total Comm Ctr Operations 10,000 10,000 Total 10,000 10,000 cost of the new cleaning system 120 Capital Plan 2017 thrz, 2021 Citv of Andover. MN j The current in-house analoe cameras are outdated and in need of replacement Safetv and security of our users and facility is always important. Expenditures 2017 2018 2019 2020 2021 Total quipment 12,000 12,000 Total 12,000 12,000 Funding Sources 2017 2018 2019 2020 2021 Total G.O. Bond 12,000 12,000 Total 12,000 12,000 BudgetImpact/Other Capital plan 2017 thru 2021 City of Andover, MN Justification After 6 years, it will be time to replace the floor scrubber that is used as part of facility maintenance. Expenditures 2017 2015 2019 2020 2021 Total Equipment 15,000 15,000 Total 15,000 15,000 Funding Sources 2017 2015 2019 2020 2021 Total Comm Cir Operations 15,000 15,000 Total 15,000 15,000 A new machine should orovide some 122 Capital Plan 2017 thru 2021 City of Andover, MN years, Expenditures to replace the edger that is used as part of ice rink maintenance. 2017 2018 2019 2020 2021 Total Equipment 8,000 8,000 Total 8,000 8,000 Funding Sources 2017 2018 2019 2020 2021 Total Comm Ctr Operations 8,000 8,000 Total 8,000 8,000 123 Capital Plan City of Andover, MN 2017 Ihru 2021 Projects 21-44300-03 Project Name Replacement -Evaporative Condenser Type Equipment Useful Life 25 Years Category Equipment in the cooling process. Expenditures Department Community Center Contact Comm Cur Manager Priority I -High one we would not be able to components of the refrigeration system that cool or make ice. the heat absorbed from the rink 2017 2018 2019 2020 2021 Total Equipment 60,000 60,000 Total 60,000 60,000 Funding Sources 2017 2018 2019 2020 2021 Total Comm Ctr Operations 60,000 60,000 Total 60,600 66,000 124 Capital Plan City of Andover, MN 2017 (hru 2021 Project # 17-42400_02 Project Name Replacement- Emergency Sirens Type Equipment Department Emergency Management Useful Life 15 Years Contact Building Official Category Equipment Priority I -High emergency sirens, truce per year. fhe sirens were variously installed between the years of 2001 and 2003. Various upgrades have been made to existing installations and the system has grown and evolved to what it is today. There are presently twelve (12) siren installations throughout the City. Substantial maintenance concerns have come to light in several of the siren installations. Water has entered main electrical cabinets, panels and control cabinets and corrosion has been observed on the control boards. Expenditures 2017 2018 2019 2020 2021 Total Equipment 45,000 45,000 45,000 45,000 180,000 Total Funding Sources 45,000 2017 45,000 2018 45,000 2019 45,000 2020 2021 180,000 Total Capital Equipment Reserve 45,000 45,000 45,000 45,000 180,000 Total 45,000 45,000 45,000 45,000 180,000 125 Capital Plan City of Andover, MN Project# 18-41600-01 Project Name Replacement - Data COQeCtOr/Total Station 2017 rhru 2021 Type Equipment Department Engineering Useful Life 10 Years Contact DPW / City Engineer Category Equipment Priority I -High completed each year. survey equipment ages, it is important to to the mutilple projects that 2017 2018 2019 2020 2021 Total 33,500 33,500 TOW 33,500 33,500 Funding Sources 2017 2018 2019 2020 2021 Total Equipment Bond 33,500 33,500 Total 33,500 33,500 Capital Plan 2017 that 2021 City of Andover, MN Is currently no way to tell who has come into the buildings and when equipment is taken out of the building. With the growing threat of groups looking to disable our critical infrastructure, it is imparitive that we secure our buildings and manage who is coming and going them. current hiring model of the fire department has shown to have a turnover rate of at least two people leaving per year. That requires us to ige all of the door codes once that person leaves. New technology would allow us to change codes immediately and/or lock out a specific on so they could not enter the station. request is to install a new security system with cameras to better secure our assets so we are prepared at all times to respond to calls. The ice of securing our fire sWtons is recommended by FEMA and Homeland Securtv as oart of a sound emereencv oreoareciness clan. res 2017 2018 2019 2020 2021 Total Total 100,000 100,000 Funding Sources 2017 2018 2019 2020 2021 Total Capital Equipment Reserve 100,000 100,000 Total 100,000 100,000 127 Capital Plan City of Andover, MN Project# 17_41900_05 Project Name HD Upgrade -City Hall Council Chambers 2017 thrtr 2021 Type Equipment Department Facility Management Useful Life 5 years Contact Finance Manager Category Equipment Priority I -High Description Jpgrade the monitors on the dais and the video switching equipment, and provide the necessary equipment to allow individuals to :rum their laptops. This would upgrade the video in the council chambers to HD along with a couple of necessary audio upgrades. Justification Chis project would give the council chambers HD capabilities in addition to allowing the use of tablets to present Expenditures 2017 2018 2019 2020 2021 Total Technology Improvements 60,000 60,000 Total 60,000 60,000 Funding Sources 2017 2018 2019 2020 2021 Total Capital Equipment Reserve 60,000 60,000 Total 60,000 60,000 128 content Capital Plan City of Andover, MN Project u 19-41400-01 Project Name Financial / Payroll System Upgrade / Replacement 2017 thrit 2021 Type Equipment Department Finance Useful Life 10 Years Contact Finance Manager Category Equipment Priority I -High Description Jpgrade or replace the current financial/payroll software program. Justification rhe financial and payroll systems are the primary tools utilized by the Finance Department to provide financial and payroll services to the City. rhe current system is due for an upgrade so it's time to explore moving to the "cloud" with our current vendor or exploring other options. 2017 2018 2019 2020 2021 Total Technology Improvements 150,000 150,000 Total 150,000 150,000 Funding Sources 2017 2018 2019 2020 2021 Total Capital Equipment Reserve 150,000 150,000 Total 150,000 150,000 12�� Capital Plan City of Andover, MN Project# 17-42200-01 Project Same Replacement- Turnout Gear Type Equipment Useful Life 5 years Category Equipment Department Fire Contact Fire Chief Priority I -Ilieh 2017 thrrr 2021 :e worn turnout gear. The turnout gear consists of a coat and bunker pants with suspenders. Other personal protective gear includes helmets, nomex hood, goggles and appropriate protective gloves. turnout gear is wont by firefighters for fire suppression activities and does need to be replaced on a regular basis. The life span of the gear rids on how active the firefighter is and what condition(s) the gear may have been exposed to during normal use. The current firefighter mt gear is seven years old and is beginning to show wear and tear. Expenditures 2017 2018 2019 2020 2021 Total 20,000 20,000 20,000 20,000 20,000 100,000 Total 20,000 20,000 20,000 20,000 20,000 100,000 Funding Sources 2017 2018 2019 2020 2021 Total General Fund 20,000 20,000 20,000 20,000 20,000 100,000 Total 20,000 20,000 20,000 20,000 20,000 100,000 years is considered to be the average life span of firefighter turnout gear. 130 Capital Plan City of Andover, MN Project tt 17_42200-02 Project Name Replacement- Extrication (Rescue) Equipment Type Equipment Useful Life 15 Years Category Equipment Description Department Fire Contact Fire Chief Priority I -High 2017 thru 2021 Replace three (3) sets of hydraulic power equipment used to extricate people from vehicles and machinery. Each set goes on a lire engine at each station. Due to technological advancements we will be changing to battery operated power tools. This will reduce the overall cost of the equipment compared to the current style we have which requires a hydralic pump, lines, and the tools. Maintenance costs will be reduced and thi will also free up area in the fire engine compartments which is always an issue. Justification This request is to replace three sets of hydraulic power equipment used to cut people from vehicles and machinery. Technology to improve the strength and weight of vehicles has changed the metals they use to build them. One such metal is Boron. This super strong metal is now being placed inside many vehicles to support the roof and windshild from crushing the driver should a rollover occur. Because the metal is so strong, our current tools cannot cut through it leaving us unable to properly extricate the patient as quickly as we could. Technology has also improved the size and weight of the eauinment reducing snare needs and nhvsical exertion on the firefighters. Expenditures 2017 2018 2019 2020 2021 Total Equipment 80,000 80,000 Total 80,000 80,000 Sources 2017 2018 2019 2020 2021 Total 80,000 Total 80,000 80,000 131 Capital Plan 2017 d„il 2021 City of Andover, MN Justification [he fire department has now purchased new vehicles for rescue calls only and this will allow for the new grass trucks to have an extended life mpectancy. The current grass vehicles have worked very hard responding to both wildfire and medical types of calls during most of the life of d rucks. The grass trucks also have many engine hours on them due to idling conditions while at grass fires and medical calls. By using separate iehicles for each function, both the grass fire vehicle and assigned medical vehicle will last for at least 15 years or more. This vehicle also pulls he trailer that holds the Polaris 6X6(G-32). We will also need to replace the slide in pump which is as old as the truck. The price includes the rucks. oumo. liehtine oackaee and decals. 2017 2018 2019 2020 2021 Total 85,000 Tom 85,000 85,000 Funding Sources 2017 2018 2019 2020 2021 Total Equipment Bond 85,000 85,000 Total 85,000 85,000 fire department will be looking to purchase a smaller and more maneuverable vehicle when it is time to replace the grass trucks. The current size pick up trucks, while capable of handling larger tanks and more weight, can be difficult to use when the need to negotiate around tacles during wildfires arises. The grass vehicles will be a four wheel drive type and should probably have winches mounted on the front of vehicle. The smaller and more maneuverable vehicles should be less expensive but yet perform much better when using the off road function 132 Capital Plan 2017 rhru 2021 City of Andover, MN Justification The fire department has now purchased new vehicles for rescue calls only and this will allow for the new grass trucks to have an extended life expectancy. The current grass vehicles have worked very hard responding to both wildfire and medical types of calls during most of the life of the trucks. The grass trucks also have many engine hours on them due to idling conditions while at grass fires and medical calls. By using separate vehicles for each function, both the grass fire vehicle and assigned medical vehicle will last for at least 15 years or more. Expenditures 2017 2018 2019 2020 2021 Total Vehicles 85,000 85,000 Total 85,000 85,000 Sources 2017 2018 2019 2020 2021 Total 85,000 Total 85,000 85,000 fire department will be looking to purchase a smaller and more maneuverable vehicle when it is time to replace the grass trucks. The current size pick up trucks, while capable of handling larger tanks and more weight, can be difficult to use when the need to negotiate around tacles during wildfires arises. The grass vehicles will be a four wheel drive type and should probably have winches mounted on the front of vehicle. The smaller and more maneuverable vehicles should be less expensive but yet perform much better when using the off road function: 133 Capital pian 2017 rhru 2021 City of Andover, MN Justification This vehicle will be 28 years old in 2019. The all wheel drive vehicle has worked extremely well as a tanker that can be used at all Types of fires including wildfires, where the off road capabilities have proven to be very valuable. There have been no significant problems with this vehicle and the replacement need has to be re-evaluated in 2019 but it is very important that we keep this vehicle current and up to date with the latest firefighting technologies. The current vehicle has a rear mounted pumping system that requires constant maintenance and usually more than one person to operate the truck and pump at a fire scenario. The proposed new tanker will have remote operational capabilities that will make operating the truck with only one person a reality. The current manually -operated pump has many drawbacks and limitations due to the need for Expenditures 2017 2018 2019 2020 2021 Total Vehicles 400,000 400,000 Sources Bond Total 400,000 400,000 2017 2018 2019 2020 2021 Total 400,000 400,000 Total 400,000 400,000 The new vehicle will probably have a larger tank and also the capability for only one person to operate during a fire situation. The maintenance costs for a newer vehicle will also have a budget impact in that there should be much less maintenance costs for the first half of the lifespan of the vehicle. The newer vehicle will also be expected to last longer because of the updates in the manufacturing process. The newer styles and metal fabrication help to reduce rusting and deterioration of the vehicle. The new vehicle should be produced so that the driver can dump water from chutes installed on both sides and from the rear of the truck. Currently, water can be discharged only from a large rear outlet or with the manual oumo system installed at the back of the truck. 134 Capital Plan 2017 rhru 2021 City of Andover, MN Justification This vehicle is used to fight wildland fires over heavy terrain. It carries a water pump to firefighters so they can fight fire deep in the woods. It lighter than a truck and can reach areas a truck cannot go. The equipment has limitations as it was not designed to carry water and personnel as we use it. It was designed for `recreational use" and we turned it into industrial use. That brings challenges and limitations as other vehicle could carry more water and be built to support more personnel. would like to retire this vehicle as a grass vehicle and use it as a rescue and medical responder on our park trails and city events. We would to purchase a more industrialized vehicle to hold more water for fighting fires and more personnel to assist on the scene while deep in the Expenditures 2017 2018 2019 2020 2021 Total Equipment 45,000 45,000 Total 45,000 45,000 Funding Sources 2017 2018 2019 2020 2021 Total Equipment Bond 45,000 45,000 Total 45,000 45,000 135 Capital Plan 2017 thru 2021 City of Andover, MIN The use of smaller quick response vehicles provides great efficiency over our larger trucks. This truck is equipped with tools to handle incidt like smoke alarm checks, carbon monoxide alarms, medicals and the like. Typically staffed with one person, the duty officer using this truck responds to lower priority calls as a single unit rather than paging the entire station or stations out. This saves cost. current truck is rusting and over 15 years old. These trucks are not designed to last this long but our service department has kept them up Expenditures 2017 2018 2019 2020 2021 Total Vehicles 45,000 45,000 Total 45,000 45,000 Funding Sources 2017 2018 2019 2020 2021 Total Equipment Bond 45,000 45,000 Total 45,000 45,000 efficient and less maintenance costs. 136 Capital plan 2017 thru 2021 City of Andover, MN These compressors are used to till the air bottles firefighters use to breath in areas that are dangerous to our health. The compressor takes air from the atmosphere and cleans it using high level filters to assure the firefighter is breathing fresh air to do theirjob. compressor then forces air into a small cylinder under high pressure so each firefighter has approximately 30 minutes of breathing time tre they run out of air. These are specialized pieces of equipment, expensive, and require frequent maintenance to assure the air is clean and contaminated. current compressors have been with us for many years and currently requiring a lot of maintenance costs. Newer technology also allows us tve energy and fill our bottles in less time with less overall maintenance costs. Expenditures 2017 2018 2019 2020 2021 Total Equipment 130,000 130,000 Total 130,000 130,000 Funding Sources 2017 2018 2019 2020 2021 Total Equipment Bond 130,000 130,000 Total 130,000 130,000 Capital Plan City of Andover, MN Project q 20-42200-02 Project Name Replacement- 800 MHz radios Type Equipment Useful Life 10 Years Category Equipment Department Fire Contact Fire Chief Priority I -High 2017 thru 2021 The current 800 MHz. handheld and mobile radios used by the fire department and Public Works are no longer manufacturered. In addition, the service support for maintenance and repair for the same radios will not be available after 2019. The fire department currently has 37 hand held radios and has a need to increase to 40. The fire department also has 16 mobile radios mounted in vehicles or used as a base station at all three stations. The Public Works Department has 6 hand held radios that can be used to contact agencies on the 800 MHz. frequency. current radios are no longer be manufacturered and service to repair the current radios will end in December of 2019. There will not be a cpile of radios available to replace a radio that fails for any reason after 2019. In order to replace a radio that does not work and cannot be iced the delivery time could take weeks for some new models. The proposal would be to gradually replace radios during the five year period n they can still be serviced and/or repaired. Keep in mind that the warranty period starts when the radio is purchased so as they are replaced Expenditures 2017 2018 2019 2020 2021 Total Equipment 35,000 35,000 70,000 Total 35,000 35,000 70,000 Sources 2017 2018 2019 2020 2021 Total Capital Equipment Reserve 35,000 35,000 70,000 Total 35,000 35,000 70,000 current pricing for the hand held radios is $3,300 each and $3,400 for each mobile. The total cost to replace every radio at one time would be it $207.000 if the radios are not encrypted. An additional cost of $500 for each radio would be needed if the agencies in Anoka County ie that all radios should have encryption programming to block out others from hearing the conversations. The encrypted radio costs would 138 Capital Plan City of Andover, MN Project At 20-42200-03 Project Name Replacement- Engine 21 #4884 Type Equipment Useful Life 20 Years Category Equipment unit #4884, a 1997 Pierce Department Fire Contact Fire Chief Priority I -High 2017 ahru 2021 Justification Fhis truck is schedule to hit 20 years in 2017. The truck is showing signs of internal rusting of the tank and supports. his will be expensive and it is recommended that we sell the truck for the highest value prior to major repairs. Expenditures 2017 2018 2019 2020 2021 Total Equipment 450,000 450,000 Total 450,000 450,000 Funding Sources 2017 2018 2019 2020 2021 Total Equipment Bond 450,000 450,000 Total 450,000 450,000 139 Capital Plan 2017 rhru 2021 City of Andover, MN Justification current projector system Expenditures 2017 2018 2019 2020 2021 Total Technology Improvements 12,000 12,000 Total 12,000 12,000 Sources 2017 2018 2019 2020 2021 Total Budget Impact/Other 12,000 Total 12,000 12,000 140 Capital Plan City of Andover, MN Project# 17-45000-03 Project Name Replacement -One Ton Crew Cab Pickup #502 Type Equipment Useful Life 10 Years Category Equipment Description Replace unit #502, a 2002 17350 crew 2017 thru 2021 Department Park d Rec - Operations Contact DPW / City Engineer Priority I -High truck is used for pulling a large trailer around the city with mowing equipment in the spring, summer and fall along with the summer part - help. In the winter months, it is pulling equipment that is used to clear the ice skating rinks. A crew cab that can transport a mowing crew all their equipment is an ideal situation. 2017 2018 2019 2020 2021 Total 50,000 Total 50,000 50,000 Funding Sources 2017 2018 2019 2020 2021 Total Capital Equipment Reserve 50,000 50,000 Total 50,000 50,000 cost per mile to operate and fewer break downs. The cost to operate this vehicle has increased to $.50 per mile. 141 Capital Plan City of Andover, MN Project M 17-45000-04 Project Name New - Trail Machine 2017 Ihru 2021 Type Equipment Department Park&Rec - Operations Useful Life IO Years Contact DPW I City Engineer Category Equipment Priority I -High (This would be a new trail machine to assist in the clearing of snow in the winter and keeping them clean throught out the rest of the year. Justification This unit is used all year on the trail system. In the winter months its used to clear snow and the rest of the year its used to sweep the traits. It must be readily available at all times during the winter to clear the pedestrian trails around the city. Expenditures 2017 2018 2019 2020 2021 Total Equipment 150,000 150,000 Total 150,000 150,000 Funding Sources 2017 2018 2019 2020 2021 Total Capital Equipment Reserve 150,000 150,000 Total 150,000 150,000 maintenance costs with the addition of another trail machine. 142 Capital Plan 2017 Ihrer 2021 City of Andover, MN Justification cost are going up and this truck will be 18 years Expenditures 2017 2018 2019 2020 2021 Total Vehicles 80,000 80,000 Total 80,000 80,000 Sources 2017 2018 2019 2020 2021 Total 80,000 Total 80,000 80,000 143 Capital Plan 2017 rhru 2021 r..ity of Anrinvrr MN Justification Sharing the current machine, it is too big and and heavy to get down the trail system and into the open space areas are all concerns. 1 :penditures 2017 2018 2019 2020 2021 Total uipment 20,000 20,000 Total anding Sources 2017 20,000 2018 2019 2020 20,000 2021 Total fuipment Bond 20,000 20,000 Total 20,000 20,000 use Of time, would not have to haul evenhing out with smaller equipment, trees and branches could be chipped up on the spot. 144 Capital Plan City of Andover, MN (Project# 18-45000-03 Project Name Replacement -Bobcat Track Loader #610 Type Equipment Useful Life 10 Years Category Equipment 2017 thru 2021 Department Park & Rec - Operations Contact DPW / City Engineer Priority I -High unit #610, a 2014 Bobcat T590 track loader with 642 hours. Justification ace machine before the tracks and the idlers need to be replaced. We replaced the drive sprockets in the spring of 2016. good resale at this time. Expenditures 2017 2018 2019 2020 2021 Total Equipment 55,000 55,000 Total 55,000 55,000 Funding Sources 2017 2018 2019 2020 2021 Total Equipment Bond 55,000 55,000 are starting to go up. Total 55,000 55,000 145 4 Capital Plan 2017 tnru 2021 City of Andover, MN I his small truck would be replaced with a 3/4 ton truck and a snowplow. When all the one tons are out plowing, this vehicle would allow other staff to open up rinks and parking lots at the various parks. Expenditures 2017 2018 2019 2020 2021 Total Vehicles 55,000 55,000 Total 55,000 55,000 Funding Sources 2017 2018 2019 2020 2021 Total Equipment Bond 55,000 55,000 Total 55,000 55,000 to operate than a one -ton 4 -wheel drive truck. 146 Capital Plan 2017 rhru 2021 rite nf AnAnupr XAM enough to scape the trails clean but leaves a trail down the center. The trip edges have been a number of times. Expenditures 2017 2018 2019 2020 2021 Total Equipment 15,000 15,000 Total 15,000 15,000 Funding Sources 2017 2018 2019 2020 2021 Total Equipment Bond 15,000 15,000 Total 15,000 15,000 to go over the trail less times saves time and money. 147 Capital Plan City of Andover, MN Project# 19-45000-01 Project Nnme Replacement -Water Tanker #161 type equtpmem Useful Life 10 Years Category Equipment 2017 thru 2021 uepartmem rasa a ncc - upaauuns Contact DPW / City Engineer Priority I -High is used year round and in all types of weather. The frame and the truck components, ie. air tanks and crossmembers, were in 2013 but are showing their age. Expenditures 2017 2018 2019 2020 2021 Total Equipment 150,000 150,000 Total 150,000 150,000 Funding Sources 2017 2018 2019 2020 2021 Total Equipment Bond 150,000 150,000 Total 150,000 150,000 igot hnpact/Other truck frame was and blasted and repainted once to try to slow down the rusting process. Being that the tank is stainless steel, we might be to install it on to a new truck chassis saving some money. 148 Capital Plan 2017 thru 2021 City of Andover, MN cost are going up and the steel on it is showing its 23 years of service. Expenditures 2017 2018 2019 2020 2021 Total Equipment 16,000 16,000 Total 16,000 16,000 Funding Sources 2017 2018 2019 2020 2021 Total Equipment Bond 16,000 16,000 maintenace and down time. Total 16,000 16,000 149 Capital Plan 2017 thru 2021 City of Andover, MN years becoming a maintenance problem. It would be replaced with a Expenditures 2017 2018 2019 2020 2021 Total Equipment 27,000 27,000 Total 27,000 27,000 Funding Sources 2017 2018 2019 2020 2021 Total Equipment Bond 27,000 27,000 Total 27,000 27,000 machine and newer equipment, 150 the infield work. Capital Plan 2017 rhru 2021 City of Andover, MN Project ft 17-41500-01 Project Name Replacement -Planning Vehicle #7 Type Equipment Department Planning&Zoning Usefut Life 10 Years Contact Comm Dev Dir Category Equipment Priority I -High unit 47, a 1999 S10 Blazer with over 102,929 miles. years the cost per mile is still low, these numbers are expected to go up do to its age Expenditures 2017 2018 2019 2020 2021 Total Equipment 30,000 30,000 Total 30,000 30,000 Funding Sources 2017 2018 2019 2020 2021 Total Capital Equipment Reserve 30,000 30,000 Total 30,000 30,000 break downs saving the City time and money. 151 Capital Plan 2017 rhrt, 2021 City of Andover, MN Justification Approximately 13 miles or 15% of the sanitary sewer system is trunk mains with diameters of 12" - 36". These trunk mains are flowing near capacity in some areas at the present time. By removing the sedimentation in these pipes, the flow line will drop giving more room for additional flows. In tum, this could put a hold on the addition of the designated lift station to by-pass certain areas for a year or more. This type of unit can also clean flared end sections in back yards and sedimentation ponds within a reasonable distance without having to leave the pavement. At the present time, most of the department's efforts are geared towards the stomt sewer system because of the many failures and neglect that has taken place in the past. There are thirty six square miles of storm sewer systems and ninety miles of sanitary systems. The storm sewers are maintainer from the spring of the year and ending in the fall. The sanitary system is then maintained during the winter months when conditions are less than 2017 2018 2019 2020 2021 Total Equipment 460,000 460,000 Total 460,000 460,000 Funding Sources 2017 2018 2019 2020 2021 Total Sanitary Sewer Fund 230,000 230,000 Sewer Trunk Fund 230,000 230,000 Total 460,600 460,000 [get Impawother truck will help save time with cleaning of the system. It will also allow the system to be cleaned under heavy flows which cannot be do the machine currently being used. This type of VAC truck will allow the operators to clean more of the system without having to stop ase the truck cannot handle the flows. It would save time by not having to plug mains and risk backups into basements because of some 152 Capital Plan City of Andover, MN Project # 18-48200-02 Project Name Replacement - One Ton Utility Truck #69 2017 thru 2021 Type Equipment Department Sanitary Sewer Useful Life Contact DPW / City Engineer Category Utilities Priority I -High )lace unit #69, a 2006 Ford F450 utility truck with a box and a crane that has 117,673 miles on it. It is proposed to truck to allow for a bigger crane, power inverter and air compressor. truck will be 12 years old in 2018 and is starting to have mechanical issues. It is used daily in checking and through out the City in our sanitary sewers. We have rebuilt the crane twice since we have owned the truck. with a 2 1/2 pumps tnat are Expenditures 2017 2018 2019 2020 2021 Total Vehicles 100,000 100,000 Total 100,000 100,000 Funding Sources 2017 2018 2019 2020 2021 Total Sanitary Sewer Fund 100,000 100,000 Total 100,000 100,000 new vehicle will be more dependable to operate. 153 Capital Plan 2017 thrzt 2021 Citv of Andover_ MN Justification The maintenace cost are starting to increase because of its age and the box is wearing thin. A number of patches have been welded on it already. Expenditures 2017 2018 2019 2020 2021 Total Equipment 220,000 220,000 Total 220,000 220,000 Funding Sources 2017 2018 2019 2020 2021 Total Equipment Bond 220,000 220,000 Total 220,000 220,000 to purchase a new, complete street sweeper with a stainless steel box to cut down on the maintenance cost. 154 Capital Plan 2017 Ihru 2021 City of Andover, MN costs continue to rise and it will need to be monitored as to the timing of replacement. Expenditures 2017 2018 2019 2020 2021 Total Vehicles 200,000 200,000 Total 200,000 200,000 Sources 2017 2018 2019 2020 2021 Total 2UU,UUo Total 200,000 200,000 dget ImpwYOther will need to monitor the costs closely over the next few years and make a decision at that time. This machine only runs about a month and a a year. 155 Capital Plan City of Andover, MN Project k 17-43300-01 Project Name Sign Design Software and Plotter 2017 that 2021 Type Equipment Department Street Signs Useful Life 5 years Contact DPW / City Engineer Category Equipment Priority 2 -Medium (Replace old sign design software and plotter with updated software and plotter to design and make warning and regulatory signs. Justification As the sign design software and plotter become outdated there is a need to keep up with new software to provide efficiencies to the sign making process. Expenditures 2017 2018 2019 2020 2021 Total Equipment 10,000 10,000 Total 10,000 10,000 Funding Sources 2017 2018 2019 2020 2021 Total Capital Equipment Reserve 10,000 10,000 Total 10,000 10,000 new software and plotter MA within the department. Capital Plan City of Andover, MN Project 17-43100-11 Project Name Replacement - One Ton Truck w/ Plow #134 2017 rhru 2021 Type Equipment Department Streets/ Highways Useful Life 10 Years Contact DPW / City Engineer Category Equipment Priority 1 -High Description Replace unit #134, a 2004 Ford F-450 dump truck and 9' snow plow with 83,128 miles. Justification IThis unit will be 13 years old and maintenance costs are on the rise. Expenditures 2017 2018 2019 2020 2021 Total Total 80,000 80,000 Funding Sources 2017 2018 2019 2020 2021 Total Capital Equipment Reserve 80,000 80,000 Total 80,000 80,000 157 Capital Plan 2017 thru 2021 City of Andover, MN Project 17-43100-12 Project Name New - One Ton Truck w/ Regular Box w/ Lift & Plow Type Equipment Department Streets/ Highways Useful Lite 10 Years Contact DPW / City Engineer Category Equipment Priority I -High Description Vew, one ton 4x4 truck with a Justification Chis pick-up will be u: :quipment to job sites. gate lift and a snow plow. snow in the winter and the lift gate will used for removing large 2017 2018 2019 2020 2021 Total cgmpment 5a,uuu 55,000 Total 55,000 55,000 Funding Sources 2017 2018 2019 2020 2021 Total Capital Equipment Reserve 55,000 55,000 Total 55,000 55,000 use of personnel and equipment. 158 Capital Plan 2017 thru 2021 City of Andover, MN way to repair the trail system and patching of the larger area's of the street. Expenditures 2017 2018 2019 2020 2021 Total Equipment 20,000 20,000 Total Funding Sources 20,000 2017 2018 20,000 2019 2020 2021 Total Capital Equipment Reserve 20,000 20,000 Total 20,000 20,000 use of people and equipment. 159 Capital Plan 2017 lhru 2021 City of Andover, MN ntly there is no backup truck to use during a snow emergency as a replacement when a plow truck breaks down. would allow the oldest truck to be set Expenditures 2017 2018 2019 2020 2021 Total Equipment 220,000 220,000 Total 220,000 220,000 Sources 2017 2018 2019 2020 2021 Total in operational costs. Total 220,000 220,000 160 Capital Plan 2017 thru 2021 Justification Maintenance costs are starting to go up and getting parts for a 17 year old truck are getting harder to find and are more costly once they are found .nditures 2017 2018 2019 2020 2021 Total ment 220,000 220,000 Total ding Sources 2017 2018 220,000 2019 2020 2021 220,000 Total tment Bond 220,000 220,000 Total 220,000 220,000 udget Impact/Other new truck will be more efficient to operate, repair costs should be lower making it cheaper to operate. 161 Capital Plan 2017 thru 2021 City of Andover, MN Justification This unit is primarily used by the Streets Department to run the mill machine to grind asphalt when patching. It is also used by other departments for loading trucks, stump grinding, moving material and snow blowing the Recycling Center. A bigger machine with high-flow hydraulics is 2017 2018 2019 2020 2021 Total 50,000 50,000 Total 50,000 50,000 Sources 2017 2018 2019 2020 2021 Total Total 50,000 50,000 this unit accumulates more hours, maintenance cost will continue to increase as 162 Capital Plan 2017 thru 2021 City of Andover, MN years to each year to determine the proper time for Expenditures 2017 2018 2019 2020 2021 Total Equipment 80,000 80,000 Total 80,000 80,000 Funding Sources 2017 2018 2019 2020 2021 Total Equipment Bond 80,000 80,000 Total 80,000 80,000 breakdowns and maintenance costs. 163 Capital Plan 2017 thin 2021 City of Andover, MN tractor and snow blade/bucket for better use of equipment and cheaper than purchasing another Expenditures 2017 2018 2019 2020 2021 Total Equipment 110,000 110,000 Total 110,000 110,000 Funding Sources 2017 2018 2019 2020 2021 Total Equipment Bond 110,000 110,000 Total 110,000 110,000 use and cheaper to operate. 164 Capital Plan 2017 that 2021 Justification Maintenance cost are starting to go up and getting parts for a 17 year old truck are getting harder to find and are more costly once they are found. enditures 2017 2018 2019 2020 2021 Total >ment 220,000 220,000 Total tding Sources 2017 2018 220,000 2019 2020 2021 220,000 Total ipment Bond 220,000 220,000 Total 220,000 220,000 udgetImpact/Other new truck will be more efficient to operate, repair costs should be lower making it cheaper to operate. 165 Capital Plan City of Andover, MN Project# 17-48100-02 Project Name Replacement - Dodge Dakota #95 Type Equipment Useful Life 10 Years Category Utilities a years 2017 thru 2021 Department Water Contact DPW / City Engineer Priority I -High up with 125,000 miles on it. cost are starting to go up. It is at the end of its life cycle. Expenditures 2017 2018 2019 2020 2021 Total Vehicles 30,000 30,000 Total 30,000 30,000 Funding Sources 2017 2018 2019 2020 2021 Total Sanitary Sewer Fund 15,000 15,000 Water Fund 15,000 15,000 break downs, less cost. Total 30,000 30,000 166 Capital Plan City of Andover, MN Project # 18_48100_02 Project Name Replacement - 3/4 Ton Utility Truck #66 Type Equipment Useful Life 10Years Category Utilities Description leplace unit #66, a 2017 thru 2021 Department Water Contact DPW / City Engineer Priority I -High a utility box that has 114.000 miles. Justification Vlaintenance cost are going up and it is at the end of it's life cycle. Expenditures 2017 2018 2019 2020 2021 Total Vehicles 60,000 60,000 Total 60,000 60,000 Funding Sources 2017 2018 2019 2020 2021 Total Water Fund 60,000 60,000 Total 66,000 60,600 167 Capital Plan City of Andover, MN Project # 18-48100-03 Project Name Replacement -Side by Side UTV #70 Type Equipment Useful Life 10 Years Category Utilities 2017 thru 2021 Department Water Contact DPW / City Engineer Priority I -High Replace unit 470, a 2004 IR 5600 Toolcat with 1,214 miles on it. A replacement for this unit should be capable of doing the same type of work as unit #70 but needs to have more power to do the job efficiently. The new unit shall be able to haul materials into and out of ajob with ease. It shall also be equiped with hydraulics to use many different type of attachments such as a plow, snowblower, auger and any other attachment suited for this machine. current unit is under powered to do a lot of the backyard hauling where any type of grade change is present. The unit cannot climb up a imum grade of a 10:1 slope while carrying a load and even has a hard time on level ground. Although the machine is used for a variety of like plowing snow or moving other equipment around, it still needs to be a more complete piece of equipment to use on a daily basis. This unit will replace both the present John Deere Gator #93 and the Bobcat Toolcat #70. Expenditures 2017 2018 2019 2020 2021 Total Equipment 48,000 48,000 Total 48,000 48,000 Funding Sources 2017 2018 2019 2020 2021 Total Sanitary Sewer Fund 16,000 16,000 Storm Sewer Fund 16,000 16,000 Water Fund 16,000 16,000 Total 48,000 48,000 168 Capital Plan City of Andover, MN Project 19-48100-01 Project Name Water Meter Reading System AM1/AMR 2017 Ihru 2021 Type Equipment Department Water Useful Life 20 Years Contact DPW I CityEngineer Category Improvements Priority 2 -Medium A meter reading system that will read all water meters by either a Fixed Base Reading System or a Drive By Radio Read System. The Fixed Base System is a system that is stationary with the means of reading all eater meters from one or multiple points throughout the system. The Drive By System is a system where an employee drives through the water service area and gathers all the meter readings by way of a vehicle mounted computer and receiver. It will allow the water utility to read meters with more efficiency and to provide customer's with more reliable readings. It will also increase revenues because the non reading or zero usage meters will be found earlier and repaired. With the present system, the utility waits for a minimum of a quarter before some meters are found to be faulty. Staff will have the ability to respond to customer concerns immediately and with documentation of customer usage. Expenditures 2017 2018 2019 2020 2021 Total Improvement 900,000 900,000 Total 900,000 900,000 Funding Sources 2017 2018 2019 2020 2021 Total Water Fund 900,000 900,000 Total 900,000 900,000 The initial costs will be substantial but revenues will increase with the systems accuracy. Billing could be done for all customers on a monthly basis. 169 CIN OF ANDOVER Road & Bridge Funds - Rollup Projected Fund Balance . Assuming collected in same year 171 2016 2017 2018 2019 2020 2021 TOTALS Projected Sources of Revenue Est. Annual MSA Construction Allocation $ 630,121 $ 1,161,947 $ 1,161,947 $ 1,161,947 $ 1,161,947 $ 1,161,947 $ 6,439,856 Est. Annual Maintenance Allocation 387,316 387,316 387,316 387,316 387,316 387,316 2,323,896 General Fund Commitment (227,535) (234,361) (241,392) (248,634) (256,093) (263,775) (1,471,790) Available MSA Maintenance 159,781 152,955 145,924 138,682 131,223 123,541 852,106 Total MSA Available for other Commitments 789,902 1,314,902 1,307,871 1,300,629 1,293,170 1,285,488 789,902 Federal / State Funds - - - - - 1,600,000 1,600,000 Assessments' 1,053,000 552,000 380,500 430,000 388,000 332,000 3,135,500 LGA- Local Government Aid 2,706 - - - - - 2,706 Tax Levy 1,150,984 1,179,154 1,204,119 1,231,405 1,259,523 1,288,503 7,313,688 Total Revenues Available 2,996,592 3,046,056 2,892,490 2,962,034 2,940,693 4,505,991 12,841,796 Projected Commitments MSA- New & Reconstruct Routes 2,600,000 1,300,000 820,000 1,690,000 350,000 290,000 7,050,000 MSA- Intersection Upgrades - - 285,000 - - 2,075,000 2,360,000 R & B - Pavement Markings 40,000 42,000 44,000 46,000 48,000 50,000 270,000 R & B- Curb Replacement 50,000 50,000 52,000 54,000 56,000 58,000 320,000 R & B - New & Reconstruct Routes 693,000 1,236,000 821,000 1,143,000 1,092,000 1,268,000 6,253,000 R & B - Seal Coaling 460,000 725,000 250,000 260,000 275,000 285,000 2,255,000 R&B - Crack Sealing 225,000 143,000 162,000 235,000 280,000 365,000 1,410,000 R & B - Gravel Road Improvements 15,000 15,000 15,000 15,000 15,000 15,000 90,000 R & B - Overlays - - 400,000 - 400,000 - 800,000 Pedestrian Trail Reconstruction 50,000 60,000 80,000 100,000 120,000 140,000 550,000 Pedestrian Trail Curb Ramp Replacements - 15,000 16,000 17,000 18,000 19,000 85,000 Pedestrian LED Crosswalk Warning System - 21,000 - - - - 21,000 Pedestrian Trail Maintenance 45,000 50,000 55,000 60,000 65,000 70,000 345,000 Total Commitments 4,178,000 3,657,000 3,000,000 3,620,000 2,719,000 4,635,000 21,809,000 Revenues Over (Under) Expenditures (1,181,408) (610,944) (107,510) (657,966) 221,693 (129,009) Fund Balance as of December 31, 2015 5,511,747 Fund Balance Brought Forward 4,330,339 3,719,395 3,611,885 2,953,919 3,175,613 Ending Fund Balance $ 4,330,339 $ 3,719,395 $ 3,611,885 $ 2,953,919 $ 3,175,613 $ 3,046,603 . Assuming collected in same year 171 Projected Sources of Revenue Park Dedication Fee - Residential Units Park Dedication Fee - Residential ($2,952/unit) Park Dedication Fee - Commercial Donation / Contribution Capital Projects Levy - Park Improvements Total Revenues Available Projected Commitments Rose Park - tower rental fee Lions Park - irrigation Kelsey Round Lake Park - Master Plan Timber Trails Park - Renovation Terrace Park - Irrigation & Water Service Sunshine Park - Scoreboard Wiring & Design Irrigation Project - Small Nordeen's Park - Basketball court Fox Meadows - Reconstruction Pine Hills North - Phase II Storage Building (Donations) Parking Lot w/ Curb (30% Park Dedication) Wild Iris Park - Irrigation & Water Service Annual Miscellaneous Projects CITY OF ANDOVER Park Improvement Fund Projected Fund Balance 2016 2017 2018 2019 2020 2021 TOTALS Revenues Over (Under) Expenditures (11,512) (337,200) 53,800 53,800 (88,700) 73,800 Fund Balance as of December 31, 2015 50 25 25 25 25 $ 365,830 $ 147,600 $ 73,800 $ 73,800 $ 73,800 $ 73,800 $ 808,630 - 100,000 - - - - 100,000 15,000 15,000 15,000 15,000 15,000 15,000 90,000 380,830 262,600 88,800 88,800 88,800 88,800 998,630 4,635 4,635 17,042 17,042 9,665 9,665 284,000 284,000 35,000 35,000 27,000 27,000 20,000 20,000 20,000 60,000 7,500 7,500 457,300 457,300 100,000 100,000 120,000 120,000 42,500 42,500 15,000 15,000 15,000 15,000 15,000 15,000 90,000 Total Commitments 392,342 599,800 35,000 35,000 177,500 15,000 1,254,642 Revenues Over (Under) Expenditures (11,512) (337,200) 53,800 53,800 (88,700) 73,800 Fund Balance as of December 31, 2015 376,632 Fund Balance Brought Forward 365,120 27,920 81,720 135,520 46,820 Ending Fund Balance *' $ 365,120 $ 27,920 $ 81,720 $ 135,520 $ 46,820 $ 120,620 "Target - $50,000 to create a contingency for any project overages 172 CIN OF ANDOVER Trail Fund Projected Fund Balance Projected Commitments 8' Bituminous Trail along Crosstown Blvd - Coon Creek Bridge to S. Coon Creek Or 5' Concrete Sidewalk along Bunker Lk Blvd - Yukon St to Hidden Creek North Park 8' Bituminous Trail and Boardwalk along Crosstown Blvd - Bunker Lk Blvd to 140th Ave 8' Bituminous Trail along Andover Blvd - Bluebird St to Vale Sl 10' Bituminous Trail along WIDE site - Kennsington Estates 71h Add. to Andover Station North 8' Bituminous Trail along Crosstown Blvd - Xeon St to railroad tracks Railroad tracks to 157th Ave 157th Ave to 159th Ave 8' Bituminous Trail along Verdin St - 161st Ave to 163rd Lane Total Commitments Revenues Over (Under) Expenditures Fund Balance as of December 31, 2015 Fund Balance Brought Forward Ending Fund Balance" 220,000 220,000 55,000 55,000 565,000 565,000 225,000 225,000 265,000 265,000 165,000 165,000 300,000 300,000 245,000 245,000 400,000 400,000 275,000 565,000 225,000 265,000 710,000 400,000 $ 2,440,000 74,474 (525,800) (205,400) 19,600 (690,400) (380,400) 347,400 421,874 (103,926) (309,326) (289,726) (980,126) $ 421,874 $ (103,926) $ (309,326)$ (289,726) $ (980,126) $ (1,360,526) "Target -10% of current years commitments to create a contingency for any project overages. It is anticipated that all projects will not be fully expended by the end of the year, and future projects will be contingent on additional revenues. 173 2016 2017 2018 2019 2020 2021 TOTALS Projected Sources of Revenue Trail Fee $784 per unit platted units 50 25 25 25 25 Trail Fee $ 99,474 $ 39,200 $ 19,600 $ 19,600 $ 19,600 $ 19,600 $ 217,074 Grant - - - 265,000 - - 265,000 Operating Transfer In 250,000 250,000 Total Revenues Available 349,474 39,200 19,600 284,600 19,600 19,600 732,074 Projected Commitments 8' Bituminous Trail along Crosstown Blvd - Coon Creek Bridge to S. Coon Creek Or 5' Concrete Sidewalk along Bunker Lk Blvd - Yukon St to Hidden Creek North Park 8' Bituminous Trail and Boardwalk along Crosstown Blvd - Bunker Lk Blvd to 140th Ave 8' Bituminous Trail along Andover Blvd - Bluebird St to Vale Sl 10' Bituminous Trail along WIDE site - Kennsington Estates 71h Add. to Andover Station North 8' Bituminous Trail along Crosstown Blvd - Xeon St to railroad tracks Railroad tracks to 157th Ave 157th Ave to 159th Ave 8' Bituminous Trail along Verdin St - 161st Ave to 163rd Lane Total Commitments Revenues Over (Under) Expenditures Fund Balance as of December 31, 2015 Fund Balance Brought Forward Ending Fund Balance" 220,000 220,000 55,000 55,000 565,000 565,000 225,000 225,000 265,000 265,000 165,000 165,000 300,000 300,000 245,000 245,000 400,000 400,000 275,000 565,000 225,000 265,000 710,000 400,000 $ 2,440,000 74,474 (525,800) (205,400) 19,600 (690,400) (380,400) 347,400 421,874 (103,926) (309,326) (289,726) (980,126) $ 421,874 $ (103,926) $ (309,326)$ (289,726) $ (980,126) $ (1,360,526) "Target -10% of current years commitments to create a contingency for any project overages. It is anticipated that all projects will not be fully expended by the end of the year, and future projects will be contingent on additional revenues. 173 Projected Sources of Revenue Capital Projects Levy Capital Equipment Purchases Levy Donations Miscellaneous Revenues Total Revenues Available Projected Commitments Annual Parking Lot Maintenance Andover Lions Park Pine Hills North Parking Lot Replacement- Crooked Lake School Hockey Rink Microsoft Upgrade Public Works / Community Center Master Planning Replacement- SCSA's Add/Replace - Server Replacement -800 MHz Radios Sign Design Software & Plotter Replacement- Security Management System Replacement- Planning Vehicle 47 Public Worts Relocation / Expansion ACC I YMCA Expansion Replacement- Extrice8on (Rescue) Equipment Replacement - One Ton Truck w/ Plow #134 Now- Ono Ton Truck wl Regular Box w/ Lift & Plow Now- Bobcat Paver Replacement - One Ton Crew Cab Pickup #502 Now- Tall Machine Replacement - CagatTile Replacement - Emergency Sirens Emergency Operations Center Improvements HD Cabling - City Hall Smadboard Addition Financial / Payroll System Upgrade I Replacement Building A- Seal Floor Memorial- Veterans Memorial Brat.. Seal all Brick Structures Natural Disaster Reserve QCTV - Council Chambers Total Commitments Revenues Over (Under) Expenditures Fund Balance as of December 31, 2015 Fund Balance Brought Forward Ending Fund Balance CITY OF ANDOVER Capital Equipment Reserve Fund Projected Fund Balance 2016 2017 2018 2019 2020 2021 TOTALS 250,000 250,000 250,000 250,000 250,000 250,000 1,500,000 - 500,000 - - - - 500,000 2,000 2,000 - - - - 4,000 6,000 6,D00 258,000 752,000 250,000 250,000 250,000 250,000 2,010,000 30,000 30,000 130,000 30,000 30,000 30,000 280,000 19,980 19,980 280,000 280,000 7,490 7,490 15,000 15,000 11,484 11,484 250,000 250,000 20,000 20,000 35,000 35,000 35,000 105,000 1Q000 10,D00 100,000 100,000 30,000 30,000 50,000 50,000 75,000 75,000 80,000 80,000 80,000 60,000 55,00D 55,000 20,000 20,000 50,000 50,000 150,000 150,000 10,000 10,000 10,000 31 45,000 45,000 45,000 45,000 180,000 40,000 18,000 7,500 65,500 60,000 60,000 12,000 12,000 150,000 150,000 25,000 25,000 10,000 10,000 48,000 48,000 350,000 350,000 93,683 93.663 832,617 885,000 205,000 277,500 438,000 75,000 2,713,117 (574,617) (133,000) 45,000 (27,500) (188,000) 175,000 1,051,687 477,070 344,070 389,070 361,570 173,570 $ 4T7,070 $ 344,070 $ 389,070 $ 361,57D $ 173,570 $ 348,570 174 CITY OFANDOVER Water System Financial Projections Estimate Forecast Year 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Inflation Factor 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% Ave. Use (gal per user per qtr) 41,662 37,400 32,000 34,000 35,000 35,000 35,000 35,000 35,000 35,000 Acres Added 5 5 5 5 5 New Connections 10 10 10 10 10 New Customers 35 35 35 35 35 Residential Accounts 6,161 6,218 6,276 6,325 6,325 CommerciaUlnsfitutional Accts 142 149 153 155 155 Total Accounts 6,303 6,367 6,429 6,480 6,480 6,515 6,550 6,585 6,620 6,655 1.02% 0.97% 0.79% 0.79% Rates Base Rate $11.89 $12.19 $12.50 $12.81 $13.13 $13.46 $13.79 $14.14 $14.49 $14.86 Use Rate $1.89 $1.96 $1.98 $1.98 $2.12 $2.19 $2.27 $2.35 $2.43 $2.52 Connection Charge $3,972 $4,131 $4,296 $4,296 $4,647 $4,833 $5,026 $5,227 $5,436 $5,654 Area Charge $3,640 $3,786 $3,937 $3,934 $4,258 $4,428 $4,605 $4,790 $4,981 $5,181 Base Rate 0.0% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% Use Rate 0.0% 3.7% 1.0% 0.0% 7.1% 3.5% 3.5% 3.5% 3.5% 3.5% Connection Charge 0.0% 4.0% 4.0% 0.0% 8.2% 4.0% 4.0% 4.0% 4.0% 4.0% Area Charge 0.0% 4.0% 4.0% -0.1% 8.2% 4.0% 4.0% 4.0% 4.0% 4.0% Estimate Forecast Enterprise Fund - Water Operations 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Cash flows from operating Activities: Receipts from customers and users $ 2,551,954 $ 2,305,675 $ 2,178,391 $ 2,741,777 $ 2,470,186 $ 2,452,052 $ 2,543,926 S 2,639,346 $ 2,738,448 $ 2,841,373 Payment to suppliers (1,015,656) (742,008) (745,176) (825,038) (933,500) (985,315) (1,014,874) (1,045,321 1,076,680 ( ) (1,108,981) Payment to employees (405,159) (382,518) (408,441) (408,276) (446,234) (460,299) (474,108) (488,331) (502,981) (518,071 Net from operating activities 1,131,139 1,181,149 1,024,774 1,508,463 1,090,452 1,006,438 7,054,943 1,105,694 1,158,786 1,214,322 Cash flows from noncapital financing activities: Transfers in 7,134 4,242 20,737 58,249 85,096 54,228 40,530 12,332 12,826 13,339 Transfers out (150250) (150250) (150250) (150,250) (150250) (150250 (150,250) (150,250) (150,250) (150,250) Net from noncapital financing activities (143,116) (146008) (129,513) (92001) (65154) (96022 109720 ( ) (137,918) (137,424) (136,911) Cash flows from capital and related financing activities: Acquisition ofcapital assets - - - (2,863) - (15,000) (76,000) (900,000) - Payment on debt (7,600,675) (830,166) (828,807) (831,486) (833,101) (828,751) (833,338 826,776 ( ) (829,045) (824,706) Proceeds from tlse sale ofcapital assets 4,000 Net from capital and related financing activities (7,600,675) (826,166) (828,807) (834,349) (833,101) (843,751) (909,338) (1,726,776 (829,045) (824,706) Cash flows from investing activities: Investment income 286,720 (7,318) 44,576 23,913 15,000 15,000 15,000 15,000 15,000 15,000 Net increase in cash and cash equivalents (6,325,932) 201,657 111,030 606,026 207,197 81,665 50,885 (744,000) 207,317 267,705 Cash and cash equivalents - )annary 1 8,267,714 1,941,782 2,143,439 2,254,469 2,860,495 3,067,692 3,149,357 3,200,242 2,456,241 2,663,559 Cash and cash equivalents -December 31 $ 1,941,782 $ 2,143,439 $ 2,254,469 $ 2,860,495 $ 3,067,692 $ 3,149,357 $ 3,200,242 $ 2,456,241 $ 2,663,559 $ 2,931,264 176 CITY OF ANDOVER Water System Financial Projections 0 177 Estimate Forecast Capital Projects Fund - Water Trunk 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Revenues Connection Charges $ 118,495 $ 332,853 $ 487,928 $ 309,873 $ 231,598 $ 48,329 $ 50,262 $ 52,272 $ 54,363 $ 56,538 Area Charges - - - - - 22,142 23,027 23,948 24,906 25,903 Interest 54,177 (19,830) 71,236 35,034 25,000 25,000 25,000 25,000 25,000 25,000 Special Assessment 59,440 34,216 37,274 42,342 286,072 30,000 30,000 30,000 30,000 30,000 Replacement Reserve - - - - - - - - - _ XFer In Total 232,112 347,239 596,438 387,249 542,670 125,470 128,289 131,221 134,270 137,440 Expenses Debt Service - - - - - - - - _ Capital Outlay 784 973,950 183,920 112,150 470,792 43,000 683,000 755,000 50,000 55,000 Xter Out 7,134 4,242 20,737 58,249 85,096 54,228 40,530 12,332 12,826 13,339 Total 7,918 978,192 204,657 170,399 555,888 97,228 723,530 767,332 62,826 68,339 Net Increase(Decresse) in Fund Balance 224,194 (630,953) 391,781 216,850 (13,218) 28,242 (595,241) (636,111) 71,444 69,101 Fund Balance - January 1 2,652,691 2,876,885 2,245,932 2,637,713 2,854,563 2,841,345 2,869,587 2,274,347 1,638,235 1,709,679 Fund Balance -December 31 $ 2,876,885 $ 2,245,932 $ 2,637,713 $ 2,854,563 $ 2,841,345 $ 2,869,587 $ 2,274,347 $ 1,638,235 $ 1,709,679 $ 1,778,780 Capital Projects Wells Rebab Wells Trunk 50,000 50,000 50,000 50,000 50,000 New Development Projects 43,000 43,000 45,000 50,000 55,000 Water Main Improvements 640,000 710,000 Plant 25,000 Equipment 15,000 76,000 Automated Meter Reading System 900,000 Total $ - $ $ - $ $ $ 108,000 $ 809,000 $ 1,705,000 $ 125,000 $ 105,000 Funded by Operations $ - $ - $ - $ - $ - $ 65,000 $ 126,000 $ 950,000 $ 75,000 $ 50,000 Funded by Infrastructure/Trunk - - - - - 43,000 683,000 755,000 50,000 55,000 Funded by debt Total $ - $ - $ $ $ $ 108,000 $ 809,000 $ 1,705,000 $ 125,000 $ 105,000 Debt Rate 5.50% 5.50% 5.50% 5.50% 5.50% 5.50% 5.50% 5.50% Tenn 10 10 10 10 15 15 15 15 15 15 AADS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ Cumulative DS $ - $ _ $ _ $ - $ - $ - $ _ $ _ $ _ $ - Current DS $ 7,600,675 $ 830,166 $ 828,806 $ 831,487 $ 833,101 $ 828,751 $ 833,338 $ 826,776 $ 829,045 $ 824,706 0 177 178 CITY OF ANDOVER Sanitary Sewer System Financial Projections Actual Estimate Forecast Year 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Inflation Factor 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% Acres Added 5 5 5 5 5 5 New Connections 10 10 10 10 10 10 New Customers 35 35 35 35 35 35 Residential Accounts 7,093 7,130 7,177 7,238 7,511 Commercial SACS 1,411 1,479 1,499 1,691 1,517 Total Accounts 8,504 8,609 8,676 8,929 9,063 9,098 9,133 9,168 9,203 9,238 1.23% 0.78% 2.92% 1.50% Rates Base Rate $59.37 $59.37 $59.37 $59.37 $59.37 $61.15 $62.99 $64.88 $66.82 $68.83 Connection Charge $435 $435 $435 $435 $435 $452 $470 $489 $509 $529 Area Charge $1,613 $1,613 $1,613 $1,613 $1,613 $1,678 $1,745 $1,814 $1,887 $1,962 Base Rate 0.0% 0.0% 0.0% 0.0% 3.0% 3.0% 3.0% 3.0% 3.0% Connection/Area 0.0% 0.0% 0.0% 0.0% 4.0% 4.0% 4.0% 4.0% 4.0% Area Charge 0.0% 0.0% 0.0% 0.0% 4.0% 4.0% 4.0% 4.0% 4.0% Actual Estimate Forecast Enterprise Fund - Sanitary Sewer Operations 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Cash flows from operating activities: Receipts from customers and users $ 2,035,033 $ 1,964,283 $ 1,938,680 $ 2,244,730 $ 2,152,281 $ 2,225,411 S 2,300,991 $ 2,379,103 $ 2,459,832 $ 2,543,262 Payment to suppliers (1,051,249) (1,182,075) (1,156,406) (1,185,024) (1,347,613) (1,385,412) (1,426,974) (1,469,784) (1,513,877) (1,559,293) Payment to employees (294,583) (287,648) (295,075) (320,710) (337,491) (349,622) (360,111) (370,914) (382,041) (393,503) Net from operating activities 689,201 494,560 487,199 738,996 467,177 490,377 513,906 538,406 563,913 590,466 Cash flows from noncapital financing activities: Transfers out- Replacement Reserve (400,000) (400,000) (400,000) (400,000) (400,000) (400,000) (400,000) (400,000) (400,000) (400,000) Transfers out (46,680) (46,680) (46,680) (46,680) (46,680) (46,680) (48,080) (49,523) (51,008) (52,539) Net from noncapital financing activities (446,680) (446,680) (446,680) (446,680) (446,680) (446,680) (448,080) (449,523) (451,008) (452,539) Cash flows from capital and related financing activities: Acquisition of capital assets (4,482) (54,573) - (81,749) - (245,000) (116,000) - - - Proceeds from the sale of capital assets 4,000 Net from capital and related financing activities (4,482) (50,573) (81,749) (245,000) (116,000) Cash flows from investing activities: Investment income 45,390 (15,205) 68,423 31,306 30,000 30,000 30,000 30,000 30,000 30,000 Net increase in cash and cash equivalents 283,429 (17,898) 108,942 241,873 50,497 (171,303) (20,174) 118,883 142,905 167,927 Cash and cash equivalents - January 1 2,408,924 2,692,353 2,674,455 2,783,397 3,025,270 3,075,767 2,904,464 2,884,290 3,003,173 3,146,077 Cash and cash equivalents - December 31 $ 2,692,353 $ 2,674,455 $ 2,783,397 $ 3,025,270 $ 3,075,767 $ 2,904,464 $ 2,884,290 $ 3,003,173 $ 3,146,077 $ 3,314,005 178 CITY OF ANDOVER Sanitary Sewer System Financial Projections Actual Estimate Forecast Ca ital Pro'ects Fund - Sewer Trunk 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Revenues Connection Charges Area Charges Interest Special Assessment Replacement Reserve Other Total Expenses Debt Service Capital Outlay Total Net Increase (Decrease) in Fund Balance Fund Balance - January 1 Fund Balance - December 31 $ 51,707 $ 103,775 $ 188,898 $ 96,094 $ 147,780 $ 4,524 $ 4,705 $ 4,893 $ 5,089 $ 5,292 - - - - - 8,388 8,723 9,072 9,435 9,812 98,205 (19,019) 156,454 75,978 50,000 50,000 50,000 50,000 50,000 50,000 23,659 23,110 13,219 27,195 20,000 105,000 20,000 20,000 20,000 20,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 573,571 507,866 758,571 599,267 617,780 567,912 483,428 483,965 484,524 485,105 3,296 211,190 134,943 59,130 110,000 502,000 1,267,000 120,000 125,000 125,000 3,296 211,190 134,943 59,130 110,000 502,000 1,267,000 120,000 125,000 125,000 570,275 296,676 623,628 540,137 507,780 65,912 (783,572) 363,965 359,524 360,105 4,051,214 4,621,489 4,918,165 5,541,793 6,081,930 6,589,710 6,655,622 5,872,050 6,236,015 6,595,539 $ 4,621,489 $ 4,918,165 $ 5,541,793 $ 6,081,930 $ 6,589,710 S 6,655,622 $ 5,872,050 $ 6,236,015 $ 6,595,539 $ 6,955,643 Capital Projects Infrastructure New Development Projects $ 117,000 $ 117,000 $ 120,000 S 125,000 125,000 Sanitary Sewer Ext - Crosstown Blvd 500,000 Aztec Estates IJA Station Upgrade 105,000 Lill Station 04 Upgrade 50,000 Yellow Pine Lift Station 650,000 Fquipment 475,000 116,000 Total $ - $ $ $ $ $ 747,000 $ 1,383,000 $ 120,000 $ 125,000 $ 125,000 Funded by Operations $ - $ - $ $ _ $ $ 245,000 $ 116,000 $ - $ - $ - Funded by lnfrastnrcture/rank - - - - - 502,000 1,267,000 120,000 125,000 125,000 Funded by debt Total $ - $ - $ - $ $ $ 747,000 $ 1,383,000 $ 120,000 $ 125,000 $ 125,000 Debt Rate 550% 5.50% 550% 5.50% 5.50% 5.50%� 5.50% 5.50%� 5.50% 5.50% Term 10 10 10 10 10 10 10 10 10 10 AADS $ - $ - $ - $ - $ - $ - $ - $ - $ - $ Cumulative DS $ $ _ $ $ _ $ $ _ $ _ $ _ $ - $ - Current DS $ - $ - $ - $ - $ - $ _ $ _ $ - $ _ $ _ 179 Cash Maui from noncapiml Gnanciagamlvitim: CITY OF ANDOVER Tmmfers out Storm Sewer System Financial Projections (14,600) (28,000) (28,000) Actual Estimate Forecast Year 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Inflation Factor - - Proceeds from the sale of capital assets 30% 3.0% 3.0% 3.0% 3.0% 3.0% New Customers Net from capital and related financing activities (25,152) 35 35 35 35 35 Residential - Urban/Ruml (units) 9,668 9,668 9,697 9,749 9,750 9,785 9,820 9,855 9,890 9,925 Multiple Dwelling (acres) 223 228 232 235 235 235 235 235 235 235 Comm/Industrial (acres) 1,000 349 401 412 409 412 412 412 412 412 412 Schools/Churches (acres) 49,313 282 282 282 282 282 282 282 282 282 282 Rates (Qtrly) 280,510 329,823 Cash and tach equivalents - December 31 S 228,305 $ 251,681 $ 25,713 $ 118,033 S 158,305 S 197,005 $ 231,632 $ Residential - Urban/Rural -per unit $ 7.70 S 8.09 S 8.49 S 891 $ 9.36 S 9.83 $ 1032 S 1084 S 11.38 $ 11.95 Multiple Dwelling- per acre $ 16.95 S 17.80 $ 1869 S 1962 S 20.60 S 21.63 $ 2271 S 23.85 $ 2504 $ 2629 Comm/Industrial - per acre $ 3271 S 34.35 S 36.07 $ 37.87 $ 3976 S 41.75 S 43.84 $ 46.03 S 48.33 S 5074 Schools/Churches-per acre $ 15.39 S 16.16 S 16.97 $ 17.82 $ 1871 S 19.65 S 20.63 $ 21.66 $ 22.74 S 23.88 Residential - Urban/Rural - per unit 5.0% 5.0% 5.0% 4.9% 5.1% 5,0% 5.0% 50°/ 5.0% 5.0% Multiple Dwelling- per acre 62,000 $ 5.0% 5.0% 5.0% 500/o 5.0% 5.0% 50% S0a/a 5.0% 5.0% Cam./Industrial -per acre 62,000 $ 5.0% 5.0% 5.0% 5.0°/a 5.0% 50% 5.0% 50% 5.0% 5.0% Schools/Churches - per acre 5.0% 5.0% 5.0% SO°/ 50% 5.0% 5.0% 50A 5.0% 5.0% Actual $ Estimate S $ Foreast S 55,000 S 60,000 $ Enterprise Fund- Storm Sewer Operations 62,000 $ 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Cash flows from operating activities: Receipts from customers and users $ 371,816 $ 367,958 S 376,260 S 462,208 $ 456,902 S 471,163 S 496,094 S 522,339 $ 549.969 $ 579,057 Payment to suppliers (94,942) (134,050) (412,210) (155,178) (200,535) (210,096) (216,399) (222,891) (229.578) (236,465) Payment to employees (195,321) (185,072) (192,958) (212,555) (217,095) (223,367) (230,068) (236,970) (244.079) (251402) Net from operating activities 81,553 48,836 (228,938) 94,475 39,272 37,700 49,627 62,478 76,313 91,190 Cash Maui from noncapiml Gnanciagamlvitim: Tmmfers out (14,600) (28,000) (28,000) Cash news from capital and related financing activities: Acquisition ofespiml assats - (25,152) (2,863) - - (16,000) - - - Proceeds from the sale of capital assets Net from capital and related financing activities (25,152) (2,863) (16,000) Cash Flows from investing activities: Investment income 4,481 (308) 2,970 708 1,000 1,000 1,000 1,000 1,000 1,000 Net increase in cash and cash equivalents 86,034 23,376 (225,968) 92,320 40,272 38,700 34,627 48,878 49,313 64,190 Cash and cash equivalents; -3anuary1 142,271 228,305 251,681 25,713 118,033 158,305 197,005 231,632 280,510 329,823 Cash and tach equivalents - December 31 S 228,305 $ 251,681 $ 25,713 $ 118,033 S 158,305 S 197,005 $ 231,632 $ 280,510 $ 329,823 S 394,013 Capital Projects Infrastructure Storm Sewer Improvements $ 55,000 $ 60,000 S 60,000 $ 62,000 $ 65,000 Equipment 16,000 Tom[ $ S S S S $ 55,000 S 76,000 S 60,000 $ 62,000 $ 65,000 Funded by Operations $ - $ - $ - S - $ - S 55,000 S 60,000 S 60,000 $ 62,000 $ 65,000 Funded by lnfinstmemre/Trunk _ _ _ _ _ _ _ _ _ Funded by debt Tom] $ $ S S $ S 55,000 S 60,000 $ 60,000 S 62,000 $ 65,000 180 Y O F OVE. 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 . (763) 755-5100 FAX (763) 755-8923 • WWW.CLANDOVER.MN.US TO: Mayor and Council Members CC: Jim Dickinson, City Administrator FROM: Lee Brezinka, Finance Manager SUBJECT: Call for the Sale of Bonds — Ehlers and Associates DATE: October 18, 2016 @1b INTRODUCTION During the review of past debt issuances for potential long term debt service savings, the General Obligation Water Revenue Refunding Bonds, Series 2007B may meet the state minimum requirement for present value savings of 3%. Ehlers and Associates, the City's fiscal advisor, will be present at the meeting to discuss pre -sale reports for the refunding of the 2007B GO Water Revenue Refunding Bonds. BUDGETIMPACT The refunding issuance is an opportunity to save long term debt service expense. ACTION REQUESTED The City Council will be asked to approve the resolution for the sale of refunding revenue bonds. Respectfully submitted, Lee Brezinka Attachments: Pre -Sale Report, Resolution Providing for the sale of $4,030,000 GO Water Revenue Refunding Bonds, Series 2016B 4M EHLERS LEADERS IN PUBLIC FINANCE October 18, 2016 Pre -Sale Report for City of Andover, Minnesota $4,030,000 General Obligation Water Revenue Refunding Bonds, Series 2016B Prepared by: Todd Hagen, CIPMA VP/Senior Municipal Advisor And Shelly Eldridge, CIPMA VP/Senior Municipal Advisor � � ®' � 1-800-552-1171 1 www.ehlers-inc.com Executive Summary of Proposed Debt Proposed Issue: $4,030,000 General Obligation Water Revenue Refunding Bonds, Series 2016B Purpose: The proposed issue includes financing to current refund the City's outstanding GO Water Revenue Refunding Bonds, Series 2007B for an interest cost savings. The Series 2007B Bonds were issued to advance refund the City's outstanding GO Water Revenue Bonds, Series 2002 for an interest cost savings. The Series 2002 Bonds were issued to finance the construction of a water treatment plant and related improvements to the municipal water system. Debt service will continue to be paid from water revenues. Interest rates on the obligations proposed to be refunded are 4.00% to 4.25%. It is estimated that the new rates will average less than 1.10%. The refunding is expected to reduce interest expense by approximately $336,091 over the next 6 years. The Net Present Value Benefit of the refunding is estimated to be $324,639, equal to 8.250% of the refunded principal. This refunding is considered to be a "current refunding" as the obligations being refunded are either callable (pre -payable) now, or will be within 90 days of the date of issue of the new Bonds. Authority: The Bonds are being issued pursuant to Minnesota Statutes, Chapters: • 475 (general bonding authority) 444 (utility revenue pledge) Chapter 444 allows cities to issue debt without limitation as long as debt service is expected to be paid from water and sewer revenues. The Bonds will be general obligations of the City for which its full faith, credit and taxing powers are pledged. Term/Call Feature: The Bonds are being issued for a 6 -year term. Principal on the Bonds will be due on February 1 in the years 2018 through 2023. Interest is payable every six months beginning August 1, 2017. The Bonds will not be subject to prepayment prior to their maturity. Bank Qualification: Because the City is expecting to issue no more than $10,000,000 in tax exempt debt during the calendar year, the City will be able to designate the Bonds as "bank qualified" obligations. Bank qualified status broadens the market for the Bonds, which can result in lower interest rates. Rating: The City's most recent bond issues were rated AA+ by Standard & Poor's. Presale Report October 18, 2016 City of Andover, Minnesota Page 1 Presale Report October 18, 2016 City of Andover, Minnesota Page 2 The City will request a new rating for the Bonds. If the winning bidder on the Bonds elects to purchase bond insurance, the rating for the issue may be higher than the City's bond rating in the event that the bond rating of the insurer is higher than that of the City. Basis for Recommendation: Based on our knowledge of your situation, your objectives communicated to us, our advisory relationship as well as characteristics of various municipal financing options, we are recommending the issuance of general obligation bonds as a suitable financing option for the following reasons: • The City's policy and past practice has been to refinance outstanding bonds like this with this type of debt issue. • This is a cost-effective option among the limited other options available to finance this type of project. • General obligation bonds provide the lowest possible interest cost. Method of Sale/Placement: In order to obtain the lowest interest cost to the City, we will competitively bid the purchase of the Bonds from local and national underwriters/banks. We have included an allowance for discount bidding equal to 1.20% of the principal amount of the issue. The discount is treated as an interest item and provides the underwriter with all or a portion of their compensation in the transaction. If the Bonds are purchased at a price greater than the minimum bid amount (maximum discount), the unused allowance may be used to lower your borrowing amount. Premium Bids: Under current market conditions, most investors in municipal bonds prefer "premium" pricing structures. A premium is achieved when the coupon for any maturity (the interest rate paid by the issuer) exceeds the yield to the investor, resulting in a price paid that is greater than the face value of the bonds. The sum of the amounts paid in excess of face value is considered "reoffering premium." For this issue of Bonds we have been directed to use the premium to reduce the size of the issue. The adjustments may slightly change the true interest cost of the original bid, either up or down. Review of Existing Debt: We have reviewed all outstanding indebtedness for the City and find that, other than the obligations proposed to be refunded by the Bonds; there are no other refunding opportunities at this time. We will continue to monitor the market and the call dates for the City's outstanding debt and will alert you to any future refunding opportunities. Continuing Disclosure: Because the City has more than $10,000,000 in outstanding debt (including this issue) and this issue is over $1,000,000, the City will be agreeing to provide certain updated Annual Financial Information and its Audited Financial Statement annually as well as providing notices of the occurrence of Presale Report October 18, 2016 City of Andover, Minnesota Page 2 Presale Report October 18, 2016 City of Andover, Minnesota Page 3 certain reportable events to the Municipal Securities Rulemaking Board (the "MSRB"), as required by rules of the Securities and Exchange Commission (SEC). The City is already obligated to provide such reports for its existing bonds, and has contracted with Ehlers to prepare and file the reports. Arbitrage Monitoring: Because the Bonds are tax-exempt obligations/tax credit obligations, the City must ensure compliance with certain Internal Revenue Service (IRS) rules throughout the life of the issue. These rules apply to all gross proceeds of the issue, including initial bond proceeds and investment earnings in construction, escrow, debt service, and any reserve funds. How issuers spend bond proceeds and how they track interest earnings on funds (arbitrage/yield restriction compliance) are common subjects of IRS inquiries. Your specific responsibilities will be detailed in the Non -arbitrage Certificate prepared by your Bond Attorney and provided at closing. We recommend that you regularly monitor compliance with these rules and/or retain the services of a qualified firm to assist you. Risk Factors: Utility Revenue: The City expects to pay the Bond debt service with utility funds. If utility revenue is inadequate, the City may have to levy taxes to pay debt service on the Bonds. Current Refunding: The Bonds are being issued for the purpose of current refunding prior City debt obligations. Those prior debt obligations are "callable" now and can therefore be paid off within 90 days or less. The new Bonds will not be pre -payable. This refunding is being undertaken based in part on an assumption that the City does not expect to have future revenues to pay off this debt and that market conditions warrant the refinancing at this time. Other Service Providers: This debt issuance will require the engagement of other public finance service providers. This section identifies those other service providers, so Ehlers can coordinate their engagement on your behalf. Where you have previously used a particular firm to provide a service, we have assumed that you will continue that relationship. For services you have not previously required, we have identified a service provider. Fees charged by these service providers will be paid from proceeds of the obligation, unless you notify us that you wish to pay them from other sources. Our pre -sale bond sizing includes a good faith estimate of these fees, so their final fees may vary. If you have any questions pertaining to the identified service providers or their role or if you would like to use a different service provider for any of the listed services please contact US. Bond Attorney: Briggs and Morgan Paying Agent: US Bank Rating Agency: Standard & Poor's Presale Report October 18, 2016 City of Andover, Minnesota Page 3 Summary: The decisions to be made by the Council are as follows: • Accept or modify the finance assumptions described in this report. • Adopt the resolution attached to this report. This presale report summarizes our understanding of the City's objectives for the structure and terms of this financing as of this date. As additional facts become known or capital markets conditions change, we may need to modify the structure and/or terms of this financing to achieve results consistent with the City's objectives. Presale Report October 18, 2016 City of Andover, Minnesota Page 4 Proposed Debt Issuance Schedule Pre -Sale Review by City Council: October 18, 2016 Distribute Official Statement: Week of October 24, 2016 Conference with Rating Agency: Week of October 31, 2016 City Council Meeting to Award Sale of the Bonds: November 15, 2016 Estimated Closing Date: December 1, 2016 Redemption Date for Prior Bonds February 1, 2017 Attachments Sources and Uses of Funds Proposed Debt Service Schedule Bond Buyer Index Refunding Savings Analysis Resolution Authorizing Ehlers to Proceed with Bond Sale Ehlers Contacts Municipal Advisors: Disclosure Coordinator: Financial Analyst: Todd Hagen Shelly Eldridge Meghan Lindblom Alicia Gage (651)697-8508 (651)697-8504 (651)697-8549 (651)697-8551 The Official Statement for this financing will be mailed to the City Council at their home or e-mail address for review prior to the sale date. Presale Report October 18, 2016 City of Andover, Minnesota Page 5 City of Andover, Minnesota $4,030,000 G.O. Water Revenue Refunding Bonds, Series 2016B Proposed Current Refunding of Series 2007B Assuming Current GO BQ "AA+" Market Rates Sources & Uses Dated 12/15/2016 i Delivered 12/15/2016 Sources Of Funds Par Amount of Bonds _ $4,030,000.00 Total Uses 2016AGOWtrRev Ref Bond I SINGLEPURPOSE 110/12/201611:08PM EHLERS LEADERS IN PUBLIC FINANCE City of Andover, Minnesota $4,030,000 G.O. Water Revenue Refunding Bonds, Series 2016B Proposed Current Refunding of Series 2007B Assuming Current GO BQ "AA+" Market Rates Debt Service Schedule Date 12/15/2016 Interest Total P+I Fiscal Total 08/01/2017 - - 24,759.56 24,759.56 - 02/01/2018 655,000.00 0.700% 19,720.00 674,720.00 699,479.56 08/01/2018 - - 17,427.50 17,427.50 - 02/01/2019 660,000.00 0.800°% 17,427.50 677,427.50 694,855.00 08/01/2019 - - 14,787.50 14,787.50 - 02/01/2020 665,000.00 0.900% 14,787.50 679,787.50 694,575.00 08/01/2020 - - 11,795.00 11,795.00 - 02/01/2021 675,000.00 1.050% 11,795.00 686,795.00 698,590.00 08/01/2021 8,251.25 8,251.25 02/01/2022 685,000.00 1.150% 8,251.25 693,251.25 701,502.50 08/01/2022 - - 4,312.50 4,312.50 - 02/01/2023 690,000.00 1.250°% 4,312.50 694,312.50 698,625.00 Total $4,030,000.00 - $157,627.06 $4,187,627.06 - Yield Statistics Year Dollars IRS Form 8038 Net Interest Cost 1.0686621% ears. Weighted Average Mamnty m60 Years 2016AG0Wlr Rev Ref Bond I SINGLEPURPOSE 1 10/1212016 1 1:08PIA EHLERS LEADERS IN PUBLIC FINANCE of Andover, Minnesota $4,030,000 G.O. Water Revenue Refunding Bonds, Series 2016B Proposed Current Refunding of Series 2007B Assuming Current GO BQ "AA+" Market Rates Debt Service Comparison Date Total P+I Net New DIS Old Net D/S Savings 02/01/2017 $4,522,078.80 $336,091.74 - (1,640.00) - 1,640.00 Net Present Value Benefit Net PV Benefit / $4,352,999.05 PV Refunded Debt Service 02/01/2018 699,479.56 699,479.56 755,746.26 56,266.70 02/01/2019 694,855.00 Refunding Deliver Date _ 2016A GO Wtr Rev Ref Bond I SINGLE PURPOSE 1 101122016 1 1:08 PM 694,855.00 751,946.26 57,091.26 02/01/2020 694,575.00 694,575.00 752,346.26 57,771.26 02/01/2021 698,590.00 698,590.00 751,746.26 53,156.26 02/01/2022 701,502.50 701,502.50 754,481.26 52,978.76 02/01/2023 698,625.00 698,625.00 755,812.50 57,187.50 Total $4,187,627.06 $4,185,987.06 $4,522,078.80 $336,091.74 PV Analysis Summary (Net to Net) Gross PV DebtServwe Savings„ .... Net PV Cashflow Savings @ _l 067%(Bond Yield) Contingency or Rounding Amount .................... 322,999.05 322,999.05 1,640.00 Net Present Value Benefit Net PV Benefit / $4,352,999.05 PV Refunded Debt Service _ $324,639.05 7.458°/ Net PV Benefit / $3,935,000 Refunded Principal. Net PV Benefit / $4,030,000 Refunding Principal._ _ 8.056% Refunding Bond Information Refunding Dated Date 12/15/2016 Refunding Deliver Date _ 2016A GO Wtr Rev Ref Bond I SINGLE PURPOSE 1 101122016 1 1:08 PM 12/15/2016 EHLERS LEADERS IN PUBLIC FINANCE of Andover, Minnesota $6,570,000 G.O. Water Revenue Refunding Bonds, Series 2007 Crossover Refunding of Series 2002 Debt Service To Maturity And To Call Total $3,935,000.00 $3,935,000.00 $3,935,000.00 - $587,078.80 $4,522,078.80 Yield Statistics Life & Ave. Conoco Calculation Refunding Bond Information Refunding Dated Date _ 12/15/2016 Refunding Delivery Date . _ 12/15/2016 32534:And.,2007BGOW I SINGLEPURPOSE 110/121201611:08PM EHLERS LEADERS IN PUBLIC FINANCE Refunded Refunded Date Bonds DIS To Call Principal Coupon Interest DIS 12/15/2016 - - - - - - 02/01/2017 3,935,000.00 3,935,000.00 - - - - 08/0l/2017 - - - - 80,373.13 80,373.13 02/01/2018 - - 595,000.00 4.000% 80,373.13 675,373.13 08/01/2018 - - - - 68,473.13 68,473.13 02/01/2019 - - 615,000.00 4.000% 68,473.13 683,473.13 08/01/2019 - - - - 56,173.13 56,173.13 02/01/2020 - - 640,000.00 4.000% 56,173.13 696,173.13 08/01/2020 - - - - 43,373.13 43,373.13 02/01/2021 - - 665,000.00 4.100%__ _.43,373.13 _ _ _708,373_13 08/01/2021 - - - 29,740.63 29,740.63 02/01/2022 - - 695,000.00 4.125% 29,740.63 724,740.63 08/01/2022 - - - - 15,406.25 15,406.25 02/01/2023 - - 725,000.00 4.250% 15,406.25 740,406.25 Total $3,935,000.00 $3,935,000.00 $3,935,000.00 - $587,078.80 $4,522,078.80 Yield Statistics Life & Ave. Conoco Calculation Refunding Bond Information Refunding Dated Date _ 12/15/2016 Refunding Delivery Date . _ 12/15/2016 32534:And.,2007BGOW I SINGLEPURPOSE 110/121201611:08PM EHLERS LEADERS IN PUBLIC FINANCE 30 YEAR TREND IN MUNICIPAL BOND INDICES Weekly Rates October, 1986 - October, 2016 In nno% Jan oo Jan au Jan y2 Jan y4 Jan yti Jan 98 Jan 00 Jan 02 Jan 04 Jan 06 Jan 08 Jan 10 Jan 12 Jan 14 Jan 16 — BBI (Current:7iT/0) The Bond Buyer "20 Bond Index" (BBI) shows average yields on a group of municipal bonds that mature in 20 years and have an average rating equivalent to Moody's Aa2 and S&P's AA. Source: The Bond Buyer EHLERS LEADERS IN PUBLIC FINANCE Council Member Resolution No. introduced the following resolution and moved its adoption: Resolution Providing for the Sale of $4,030,000 General Obligation Water Revenue Refunding Bonds, Series 2016B A. WHEREAS, the City Council of the City of Andover, Minnesota has heretofore determined that it is necessary and expedient to issue the City's $4,030,000 General Obligation Water Revenue Refunding Bonds, Series 2016B (the "Bonds"), to current refund the City's outstanding GO Water Revenue Refunding Bonds, Series 2007B for an interest cost savings; and B. WHEREAS, the City has retained Ehlers & Associates, Inc., in Roseville, Minnesota ("Ehlers"), as its independent municipal advisor for the Bonds in accordance with Minnesota Statutes, Section 475.60, Subdivision 2(9); NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Andover, Minnesota, as follows: 1. Authorization; Findings. The City Council hereby authorizes Ehlers to assist the City for the sale of the Bonds. 2. Meeting; Proposal Openin . The City Council shall meet at 7:00 p.m. on November 15, 2016, for the purpose of considering proposals for and awarding the sale of the Bonds. 3. Official Statement. In connection with said sale, the officers or employees of the City are hereby authorized to cooperate with Ehlers and participate in the preparation of an official statement for the Bonds and to execute and deliver it on behalf of the City upon its completion. The motion for the adoption of the foregoing resolution was duly seconded by City Council Member and, after full discussion thereof and upon a vote being taken thereon, the following City Council Members voted in favor thereof: and the following voted against the same: Whereupon said resolution was declared duly passed and adopted. Dated this 18`s day of October, 2016. City Clerk LIY OF 0VE 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 . WWW.ANDOVERMN.GOV TO: Mayor and Councilmembers FROM: Jim Dickinson, City Administrator SUBJECT: Administrator's Report DATE: October 18, 2016 The City Administrator and Department Heads present will provide a brief verbal update on various items of interest to the City Council and to the residents at the meeting. Listed below are a few areas of interest: 1. Administration & City Department Activities 2. Update on DevelopmentiCIP Projects 3. Meeting reminders Upon receipt of the meeting packet, if a member of the Council would like an update on a particular item, please notify me so an adequate update can be made. mitted, Andover City Council Workshop Meeting Minutes -September 27, 2016 Page 5 - - ._... _ - --.•.- _. -- 1��p (til_ 1 336 hours but the association can purchase more ice time but it is harder to purchase. 2 3 Mr. Coe reviewed the issues the Hockey Association is currently having with ice time. 4 5 The Andover Youth Hockey Association discussed with the City Council options for additional 6 ice time in the City. 7 8 Mr. Coe stated the Association is willing to make a long term commitment of purchasing hours 9 of ice time in an expansion. He stated they are willing to work with the City on planning and 10 commitment. 11 12 Councilmember Knight stated the Community Center is looking for some type of expansion in 13 2017 and he would be open to doing a study of the expansion. 14 15 Mr. Dickinson summarized that both projects would be identified in the 2017-2021 CIP as 16 having planning and study done in 2017 & 2018 for a future decision of the Council as to 17 whether or not to move forward with construction. 18 - 19 CIP - TRAILS 20 / 21 Mr. Aerik La sen discussed the proposed trails in the City CIP with the Council. He indicated all l(\ 22 of the proposed trails have alternate routes that can be used except for the proposed trail along 23 Crosstown Boulevard and Prairie Road. He indicated he lives in the Miller's Woods 24 neighborhood and the residents there really need a trail to get to other parts of the City. Where 25 the children walk to get around the City is on the roadway which is very dangerous. 26 27 Mayor Trude wondered if the trails could be done on a spoke system where they do a section of 28 the trail per year. 29 30 Mr. Larsen asked the Council to reshuffle the trail list, putting the ones with safety issues on the 31 top. He also suggested the City take a different approach to trail construction. If they were to 32 bring in fill and pave a six-foot shoulder it would solve a lot of problems. 33 i34 Mr. Berkowitz stated a shoulder on a 55 mile an hour road is a challenge and the City would not �35 promote that as a trail. This would need to be promoted as a shoulder because they could not 36 direct pedestrian traffic to the railroad crossing because it is also not a safe crossing. 37 38 Councilmember Bukkila thought there would be a better chance of getting a trail installed during 39 road reconstruction. Mayor Trude stated staff will review proposed trails during the winter to 40 determine the best trails to construct. 41 42 Mr. Larsen thought there needed to be some continued funding for trails in order to get them 43 done in the City. 44�r - 45 2017 SPECIAL REVENUE, DEBT SERVICE, CAPITAL PROJECTS, ENTERPRISE &