Loading...
HomeMy WebLinkAboutOctober 6, 2016C I T Y O F NDOVE 1685 CROSSTOWN BOULEVARD N.W.. ANDOVER, MINNESOTA 55304 . (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV Regular Park & Recreation Commission Meeting October 6, 2016 7:00 P.M. 1. Call to Order 2. Resident Forum 3. Approval of Minutes (9/15/16) 4. Review of Fox Meadows Park Layout/Schedule Public Information Meeting/14-15 5. Discuss Proposed Park Playground Improvements/Draft Neighborhood Letter and Survey/Chesterton Commons Park/17-14 6. Outstanding Items 7. 8. Chair's Report 9. Adjournment 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV To: Park and Recreation Commission CC: David D. Berkowitz, Director of Public Works/City Engineer 301 From: Todd J. Haas, Assistant Public Works Director Subject: 4. Review of Fox Meadows Park Layout/Schedule Public Information Meeting/14-15 Date: October 6, 2016 INTRODUCTION The Park and Recreation Commission is requested to review the draft layout of Fox Meadows Park and schedule the public informational meeting. DISCUSSION Attached is a copy of the draft layout of Fox Meadows Park. Based on direction of the Park and Recreation Commission two soccer/football/lacrosse fields have been identified on plan. One of the fields is a full size field and the other is a medium sized field for the younger age groups which also could be used for practice by the various associations. The full size field has been adjusted further north and west (identified in red) which will provide somewhat a closer access to the parking lot at the north end of the park. There is existing sliding hill closer to the northeast corner of the full size field that was rarely used by the residents that will be permanently removed. The sand from the sliding hill area will be used to grade the site. A sliding hill nearby is at Pine Hills North with other hills within Andover located at Prairie Knoll Park and Andover Station North. It is recommended that a public informational meeting be scheduled for Thursday, November 3, 2016. ACTION REQUESTED The Park and Recreation Commission is requested to review the draft layout of Fox Meadows Park and schedule the public informational meeting for Thursday, November 3, 2017 at 7 pm at Andover City Hall. Respectfully submitted, Todd J. Haas Attachment: Layout (located in side pocket of packet), Cost estimate; Map of area Cost Estimate for: Fox Meadows Park Improvements ITEM DESCRIPTION QUANTITY UNIT UNIT AMOUNT NO. PRICE 1 MOBILIZATION 1 LS $ 8,000.00 $ 8,000.00 2 REMOVE & DISPOSE EX. PARK SHEALTER 1 LS $ 1,500.00 $ 1,500.00 3 CLEAR & GRUB TREES 2.25 AC $ 5,000.00 $ 11,250.00 4 SUBGRADE PREP TRAIL 3 RS $ 200.00 $ 600.00 5 SUBGRADE PREP PARKING LOT 5.5 RS $ 500.00 $ 2,750.00 6 COMMON EXCAVATION (EV) 6200 CY $ 12.00 $ 74,400.00 7 TOPSOIL BORROW (LV) 160 CY $ 24.00 $ 3,840.00 8 AGGREGATE BASE CLASS 5 1100 TN $ 24.00 $ 26,400.00 9 TYPE SP 9.5 WEARING COURSE MIX (2,B) 65 TN $ 150.00 $ 9,750.00 10 6" CONCRETE PEDESTRIAN RAMP 1 LS $ 1,800.00 $ 1,800.00 11 IRRIGATION WELL 1 LS $ 220,000.00 $ 220,000.00 12 IRRIGATION SITE 1 LS $ 25,000.00 $ 25,000.00 13 PRO TURF SEED, FERTILIZER, AND HYDROMULCH 6 AC $ 2,000.00 $ 12,000.00 14 CONSTRUCT PARK SHEALTER 1 EA $ 15,000.00 $ 15,000.00 ESTIMATED CONSTRUCTION COST $ 397,290.00 CONTINGENCY (20%) $ 79,468.00 TOTAL ESTIMATED CONSTRUCTION COST $ 476,748.00 - - --- 4set -- a 7,- --- 4615 --------- 16090 ---- - --- 1608716094 16080 4127 o `a v a 4021 -\ 1697 teaw 1e37 1601-0 16036 160TH LN 7s 16055 16055 414, ' �1?0 0 16002 �1v� v�oo 0 0 vS9 e A 16005 7 607 O 4 730 7 2 co 759 s0 159]57S 15961 QO O 75927 v 7 N 9152 + awz 4517 �o H r ^ya 00 ass° Oo �iS a 4020 15869 4624 ser° O 1921 '4, .,59° tssol 15815 1579D saz, �S� 's°Po ° 5'� � 1y6� ts5pj 75a_ S S8p1 1y 's7a° +, qV A)l INS woo 1 5i Q0 15741 15731 7s 7s° `0�a �q TOA4/ � 4400 111 NIS e 15721 16>10 15721 15710 15710 . 15711 b 1sm1 u7a0 5701 15706 4345 - '` --- -- 157TH AVE - 15651 X56 rn 15640 15643 15658 15654 N 15629 15601 ✓/ Q 15598 Q 15593 15604 15597 15600 15628 15621 15620 f vvJ /� 15570 15577 4359 r 15535 w 15543 15571 15566 1 o N T 0_ 15523°t 15490 15481 v 4260 4096 y 7SQlB v T ROOTNIAN 4221 PARK a ° 15459 4310 A A O 15440 ry v D 1yA53 NCV A W y v] „ O m 4051 15364 15349 n � V U Z � w 1966 15]66 Q----- ----- - -- �n�t N1e,�ewj Piurl�. 9/2312016 4615 16090 160' 16037 16070 15 mapFeeder 6107 4,304 1 4228 1 4208 ±1605516056 a 16080 z � 16038 4 16019 16002 16005 16011 15 960 1` 15825 16000 I 4517 t 1593 4624 15841/15840' 158 15 869 15 830 15831 15820 � 15810 158: 15815 15790 158 1 15810 5 8 0 15801 15 800 44 15774 1574 15740 15731 15730 4420 44c 15719 15721 15710 15721 15748 15724 15700 •.1570 15701 1570 ' 15671 15673 15684 15672 15629_ 15628 15671 • 15620 • r 15570 15577 15571 15566 https:/Mww.m apfeeder.net(andaver/v2g �Cvvu wvc mi. 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 . (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV To: Park and Recreation Commission CC: David D. Berkowitz, Director of Public Works/City EngineerAD From: Todd J. Haas, Assistant Public Works Director Subject: 5. Discuss Proposed Park Improvements/Draft Neighborhood Letter and Survey/Chesterton Commons Park/17-14 Date: October 6, 2016 INTRODUCTION This item is in regards to proposed park improvements, draft neighborhood letter, and resident survey for Chesterton Commons Park, Project 17-14. DISCUSSION As previously mentioned to the Commission at the August 18, 2016 meeting, staff had indicated that the existing playground equipment at the park is due for replacement and is the next piece of playground equipment that is recommended to be replaced in 2017. The Parks Maintenance Department has determined the entire structure will need to be replaced. Also new concrete boarders and falls zones will be included in the replacement of the structure. Please review the attached draft letter, map, and survey and provide comments at the meeting for discussion. BUDGETIMPACT Improvements will be funded from the annual playground replacement fund that is allocated each year for these types of projects. ACTION REQUESTED The Park and Recreation Commission is requested to review the draft letter and survey and provide comments at the meeting before the letter is sent to residents near Chesterton Commons Park. Respectfully submitted, Todd J. Haas Attachment: Draft letter to residents�Map/Layout of are and Survey 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOv October 7, 2016 Resident Andover, MN Re: Park/Public Information Meeting and Resident Survey Dear Resident: The Andover Park and Recreation Commission has scheduled a public information meeting for Thursday, December 1, 2016 at 7:00 p.m. or shortly thereafter at Andover City Hall Council Chambers regarding the possible improvements to Chesterton Commons Park. The existing playground equipment is proposed to be replaced along with the installation of new concrete edging. The fall zones around the new equipment will have woodchips installed which is being done at many of the parks throughout Andover. Also a new sand box will be included in the park layout. The park location map is on the back side of this letter. For the Park Commission to consider what other improvements could be made to the park, the City would like to receive input from the neighborhood. The way you can participate in this is by completing the on-line survey that is available on the City of Andover's Website at http://www.andovennn.gov/and click on City Services. Once you get to this part of the website, click on Andover Park Survey's, then click on Chesterton Commons Park Neighborhood Park Survey. For the Park Commission to consider your comments, the survey must be completed by 4:30 p.m. on Friday, November 18, 2016. If you have questions about the survey or about the park in general or you do not have access to the internet, feel free to contact me at 763-767-5131 or just stop by Andover City Hall. You can also contact me by e-mail at t.haas(ci)-andovermn.gov Sincerely, Todd J. Haas Assistant Public Works Director/Parks Coordinator TJH:tjh ANDOVER Chesterton Commons Park ,SS'"qy 15512 15536 m 15533 15521 1486 r3 "qyE 15522 c�P 15 513 1476 "` 15511 1466 ssf"4yE 1431°� 1377 pa SSS 1505 1456 ifrr "q E" 1411 1397 s� s4 1446 1495 ,5 1436 1372 1485 'ssr„ AYL N v 1426 1382 1475 1392 ry 1465 CHESTERTON COMMONS PARK2 1355 �`'N, 1455 1480 1365 1470 1441 1375 1460 1431 1385 1493 1421 1387 'JE �'rV 154TH AVE NW ,Setif 1438 ro" °� 101 k 1370 1428 �syry 1380 1490 1478 1466 ,ys 1418 3�� 1394 QO h' 1425 1404 1296 1487 1473 1459 1445 1414 ria P° 1 Date Created: September 21, 2016 Disclaimer- The provider makes no representation or warranties with respect to the reuse of this data. 1574 1573 v �q's y ---EAST 1559 245 tsgp 1536 1534 15,11 I 1542 7S 7 Sqs 1558 I 1526 1524 Is,73 1530 u w 1535 73.2 Sq3, u 1531 33 4 ti 1 1518 N v 1523 757 p 7535 7578 75?7 1514 y 1523 15596 I 1506 1515 1514 P 1511 16pp p 73.7525 748 506 757j 1504 y 1613 7560s 1501 1502 74gO 73. 6 7q 6 lspt 1494 1503 7 1494 219 1482 1487 1490 u 7qs p %� 7q 1483 9 74j6 66 7,197 1484 1493 562° y S 1470 1473 _ 1478 7 1y)p ^� 7g6S 1gs6 7,167 74T9 m 73,63 1466 qsp 7q) 7qS y� v > 1473 ? 1S7 1458 69VL 6 7 6 •L"`' qsq 7 7467 6176 91' 2B 71r. ,p 1q7 1 1rf - 143 ' W, 1424 6 4 1 j t � 141 1 v w Tr , Ssss 1 WP - AN S> 1421 �zT 9L95L 92 b°p�oa� 1397 7,7lL L6� iv ow rn m m ,19591 7 7386 8 IV ti$E°�� Z6£L LLE LUEBI DST 7 15643j4 13 65 9 tss3 ° 9 7S 2 n r„V 9g yy,V y 'ri w � m v 68p 624 O I ` 137 tib- ti� 9y p,5.�' % w� 766�6 ✓ , �rn 134 9�y 1,� rn a r� 0� ti 15608 y 7S6,73`n / 133 ti�� tin T �` 1560, — 5 13 � � ��wyo � 4,4w �� �56 � � 1316 1317 $ 7 S 1 30 2 O� 9� w m 3 Vg 7`ru', .6`+ q0£L 1303 1559G 9'~ l S ti� N L 1297 vS29 oS� O�w y �wti �" N a rn 06ZLUl 1289 1285 7 Sp 'sem y5y y9ti� lqo ZILLA -i 1277 tiV A = " -� 91.V 65 1V 4,w4'" a"' a r; N N 59ZL % L9ZL O yti� 6btiy v w ' cn f £9Z L 6a219y� tiyv LFR q.LV 1'L w m oma, a N m m N LYZL '' amu' 7 1220 �9 °' 15537 ��oi �m w m m N (D —I z 0 0 (%) 11) 0 (b Iv U) > C j dr1.�y O 0 1J) lJ ' n t� c,) 1574 1573 v �q's y ---EAST 1559 245 tsgp 1536 1534 15,11 I 1542 7S 7 Sqs 1558 I 1526 1524 Is,73 1530 u w 1535 73.2 Sq3, u 1531 33 4 ti 1 1518 N v 1523 757 p 7535 7578 75?7 1514 y 1523 15596 I 1506 1515 1514 P 1511 16pp p 73.7525 748 506 757j 1504 y 1613 7560s 1501 1502 74gO 73. 6 7q 6 lspt 1494 1503 7 1494 219 1482 1487 1490 u 7qs p %� 7q 1483 9 74j6 66 7,197 1484 1493 562° y S 1470 1473 _ 1478 7 1y)p ^� 7g6S 1gs6 7,167 74T9 m 73,63 1466 qsp 7q) 7qS y� v > 1473 ? 1S7 1458 69VL 6 7 6 •L"`' qsq 7 7467 6176 91' 2B 71r. ,p 1q7 1 1rf - 143 ' W, 1424 6 4 1 j t � 141 1 v w Tr , Ssss 1 WP - AN S> 1421 �zT 9L95L 92 b°p�oa� 1397 7,7lL L6� iv ow rn m m ,19591 7 7386 8 IV ti$E°�� Z6£L LLE LUEBI DST 7 15643j4 13 65 9 tss3 ° 9 7S 2 n r„V 9g yy,V y 'ri w � m v 68p 624 O I ` 137 tib- ti� 9y p,5.�' % w� 766�6 ✓ , �rn 134 9�y 1,� rn a r� 0� ti 15608 y 7S6,73`n / 133 ti�� tin T �` 1560, — 5 13 � � ��wyo � 4,4w �� �56 � � 1316 1317 $ 7 S 1 30 2 O� 9� w m 3 Vg 7`ru', .6`+ q0£L 1303 1559G 9'~ l S ti� N L 1297 vS29 oS� O�w y �wti �" N a rn 06ZLUl 1289 1285 7 Sp 'sem y5y y9ti� lqo ZILLA -i 1277 tiV A = " -� 91.V 65 1V 4,w4'" a"' a r; N N 59ZL % L9ZL O yti� 6btiy v w ' cn f £9Z L 6a219y� tiyv LFR q.LV 1'L w m oma, a N m m N LYZL '' amu' 7 1220 �9 °' 15537 ��oi �m w m m N (D CHESTERTON COMMONS PARK NEIGHBORHOOD PARK SURVEY The Andover Park and Recreation Commission is considering new park improvements be provided at Chesterton Commons Park in 2017. In order to determine the best playground plan and/or other improvements to the park, your help is needed. Please take a few minutes to complete the following survey. Park improvement plans being considered by the Park Commission will be discussed at their meeting on Thursday, December 1, 2016 at 7 P.M. or shortly thereafter for resident input at Andover City Hall. 1. Currently the site contains a few trees. Would you prefer to see: (check only one) a. More trees preserved and less active spaces: b. More of a balance between preserving trees and providing active spaces: c. Provide more active spaces and preserve less trees: d. Other suggestions: 2. Would you like to see a park that provides: (check all that apply) a. Lots of active facilities and spaces for children b. More quiet, landscaped areas and natural setting/open spaces: c. Some open space for free play: d. Mixture of active spaces and passive landscape areas: e. Other ideas: 3. Please list the number of children in your family in each age group: a. 2 to 5 years b. 6 to 12 years c. 13 to 18 years 4. What type of park facilities would you like to see provided in this park: (check all that apply) a. Playground equipment for children ages 2 to 5: b. Playground equipment for children ages 6 to 12: c. Half court basketball court: d. Other suggestions: 5. Please prioritize the park facilities you have chosen above: 1. 2. 3. 4. 6. Other ideas and/or suggestions for the park: 7. If necessary would you be willing to serve on a Neighborhood Park Committee to develop a playground plan and/or other improvements, evaluate proposals received and make a recommendation to the Park and Recreation Commission? This may involve approximately 2 or 3 evening meetings. Yes Name Phone E-mail No We would appreciate the survey be completed by 4: 30 pm on Friday, November 18, 2016 Nlnl�wr o -" 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755-5100 FAX (763) 755-8923 • WWW.ANDOVERMN.GOV TO: Park & Recreation Commission CC: David D. Berkowitz, Director of Public Works/City Engineer FROM: Todd J. Haas, Asst. Public Works Director SUBJECT: 6. Review Outstanding Items/Maintenance Update DATE: October 6, 2016 Issues list as of 10/3/16 COMPLETED PROJECTS — ON-GOING PROJECTS - • Update of Park Dedication Improvement Fund Quarterly Report — Next quarterly report will be on November 3`d agenda. • Update of Quarterly Sheriffs Department Report on Park Patrol & Vandalism — Next quarterly report will be on November 3`d agenda. • Andover Lions Park — The grant has been approved by the City Council and the playground equipment has been ordered. The City Council also approved the donation that was made by Willy McCoy's of Andover. The Parks Maintenance Department will be installing the equipment as time permits later this fall or next spring. The ball field fencing posts and concrete mow strips has been completed. The remainder of the fencing will be completed shortly. • Timber Trails Park — The project is substantially complete. Only minor grading remains. Stop by and check it out when you get a chance. • Maple View Park — The playground equipment and swing set has been installed along with the wood chips. The footings for the shelter have already been installed. The shelter is anticipated to be delivered and installed very soon. The park has been seeded and trees have been planted. • Fox Meadows Park -- Item is on the agenda to discuss the proposed layout and schedule public information meeting. • Chesterton Commons Park — Item is on the agenda to discuss the neighborhood letter and draft survey that will be sent out to area residents near the park. ON -HOLD PROJECTS — None at the time. UPDATE OFANDOVER COMMUNITY CENTER ADVISORYBOARD — Commissioner Butler OTHER ITEMS OF INTEREST — • Update of Park Signage Along County Roads/City Streets — Nothing new to report. The County has indicated that it is possible on larger sized parks (for example Kelsey Round Lake Park or Pine Hills North) but not for neighberhood or smaller type of parks. Staff will prepare a plan over the winter months. Once a plan has been drafted, staff will meet the Anoka County Highway Department for their review and approval. If the sign locations are approved they would be installed sometime in the spring or summer of 2017. • Update of Pedestrian Trails — The trails that are planned for the next 3 years are as follows: ❖ 2017- Crosstown Blvd NW between Bunker Lake Blvd NW and 1401h Avenue NW. ❖ 2018- Andover Blvd NW between Bluebird Street NW and Vale Street NW. ❖ 2019- ASN Trail from Kensington Estates to ASN Ball Field Facility. • Update of the Reconstruction of Bunker Lake Boulevard from Crane Street NW to Jefferson Street NE in Ham Lake —The contractor was not able to comply with a few items of the contract. The project will be rebid sometime this fall or winter with construction starting in the spring of 2017. • Update of Scheduling Park and Recreation Commission meeting at a City Park or Facility — The Commission will need to determine if you would like to have a meeting at one of the City parks in 2017. If you have any questions or comments regarding any of the items mentioned above or any items relating to parks or projects, feel free to contact Todd Haas or Dave Berkowitz at the City. Staff recommends the Commission continue reviewing the City Council meeting minutes that you receive by e-mail as to discussions of various projects the City Council has been working on or is considering. Note: If you have any items that you would like to add to the list, let me know at the meeting. Weekly Parks Maintenance Uvdate 9/17/16 • Supervisor attended the Park and Recreation Commission meeting, September 15"' at Rose Park. • Completed full mow cycle and trash service of all parks and trails. Replenished dog pot bags in the parks. • Groomed all ball fields. • Cleaned up vandalism, graffiti and trash, at the Skate Park. • Repaired playground set at Sophie's Park. • Painted hockey rink at Prairie Knoll Park. • Delivered wood chips to Fire Station 3. • Delivered one pallet of field chalk to Sunshine Park for Andover fast pitch (AAA). • Installed irrigation and seeded Timber Trails Park ball field infield. 9/24/16 • Completed a full mow cycle of all parks and trash service in all parks. • Groomed all ball fields. Cleaned park buildings at ASN and Sunshine Parks. • Cleaned up vandalism (graffiti and trash) at the Skate Park. • Seeded and fertilized Timber Trails Park ball field perimeter areas. • Over seeded Forest Meadows Park and Timber Rivers Park. • Aerated, seeded and fertilized Prairie Knoll Park west football field. • Removed vines and cut down shrubs on north side of City Hall building. • Cleaned up and removed the portable restroom at Terrace Park that was vandalized Friday, 9/16.