Loading...
HomeMy WebLinkAboutOrd. 462 - Amended Fee ScheduleCITY OF ANDOVER COUNTY OF ANOKA STATE OF MINNESOTA ORD. NO. 462 AN ORDINACE AMENDING THE CITY CODE TITLE 1 -7 -3 ESTABLISHING PERMIT FEES, SERVICE CHARGES, AND VARIOUS OTHER FEES TO BE COLLECTED BY THE CITY OF ANDOVER. THE CITY COUNCIL OF THE CITY OF ANDOVER HEREBY RESOLVES: City code 1 -7 -3 is hereby amended as follows: Electrical Permit Fee Schedule: Solar PV Installation Electrical Inspection Fees The following electrical inspection fees are applicable to solar PV systems and installations: (a) The inspection fee for the installation of solar PV systems, is (1) 0 watts to and including 5,000 watts $60 (2) 5,001 watts to and including 10,000 watts $100 (3) 10,001 watts to and including 20,000 watts $150 (4) 20,001 watts to and including 30,000 watts $200 (5) 30,001 watts to and including 40,000 watts $250 (6) 40,001 watts to and including 1,000,000 watts $250 and $25 for each additional 10,000 watts over 40,000 watts (7) 1,000,000 watts to 5,000,000 watts $2,650 and $15 for each additional 10,000 watts over 1,000,000 watts (8) 5,000,000 watts and larger $8,650 and $10 for each additional 10,000 watts over 5,000,000 watts. (b) For the purpose of paragraph (a), the watt rating is the total estimated alternating current (ac) energy output of the solar system. The total do energy output is not used. (c) The solar PV inspection fees shall include inverters, modules, panels, combiners, converters, charge controllers, disconnecting means and electrical conductors between the inverter and the ac panelboard for stand -alone solar PV systems, or the conductors between the inverter and the service equipment or other power production, distribution and utilization system, such as a utility system and its connected loads, that is external to and not controlled by the solar PV power system. (d) In addition to the inspection fees in (a), additional inspection fees may be applicable on large -scale projects for the inspection of additional electrical infrastructure between the inverter output circuit and the electrical production and distribution network. The inspection fees shall be calculated according to Minnesota Statutes 326B.37,subdivisions 2, 3, 4, and 6, oaraeranhs (d), (fl, (i), and (k). (e) When a plan review is required or performed the plan review fee is $80 per hour. Adopted by the City Council of the City of Andover on this 17" day of May 2016. Attest: - CITY OF fA%NDOVEER / n �t�Llk/ti. ,i,VCIei v ich Ile Harmer- Deputy City Clerk Ju 'e T ude -Mayor