Park & Recreation Commission Work Session Meeting
February 20, 2014
6:00 P. M. Fox Meadows Park Redevelopment Committee
A. Approval of Minutes (January 16, 2014)
B. Continue Discussion of Park Redevelopment
7:00 P.M.
1. Call to Order
2. Resident Forum
3. Approval of Minutes (1/16/14)
4. Consider Winslow Woods Sketch Plan
5. Discuss Langseth Park Budget and Improvements
6. Consider Locations of Way Finding Signs, Project 14 -16
7. Consider 2014 Events in City Parks or Facilities
8. Outstanding Items
9.
10. Chair's Report
11. Adjournment
ANLf) •
1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755 -5100
FAX (763) 755 -8923 • WWW.CI.ANDOVER.MN.US
TO: Park & Recreation Commission
CC: David D. Berkowitz, Director of Public Works /City Engineer 3rs1'
FROM: Todd J. Haas, Assistant Public Works Director
SUBJECT: 4. Review Winslow Woods Sketch Plan
DATE: February 20, 2014
INTRODUCTION
The Park and Recreation Commission is requested to review and consider the park dedication
requirements for the proposed Winslow Woods Sketch Plan which is located south of Sophie's
South development.
DISCUSSION
A copy of the sketch plan is in the side pocket of your packet for review. The sketch plan does
include an area of park adjacent to Sophie's Park. Sophie's Park is identified on the attached map.
Public Works Staff have reviewed the sketch plan and recommends that no additional park land be
dedicated in addition to the Sophie's Park due to the existing wetlands that has been identified on
the sketch plan. Staff is recommending a 20 foot wide trail easement or park land access from
Winslow Woods for access to Sophie's Park (see attached drawing).
If any of the property in this general area is dedicated as park, the cash portion that is due for the
remainder of the park dedication will be calculated based on the formula per City Code 11 -3 -7 (C).
The more land required to be dedicated the lesser the park dedication fee portion will be.
ACTION REQUIRED
The Park and Recreation Commission is to review and consider the park dedication requirements
for the proposed Winslow Woods Sketch Plan.
Respectfully submitted,
Todd J. Haas
Cc: Larry Olson (copy sent be e -mail)
Attachments: Sketch Plan (side pocket of packet), Map of the area identifying Sophie's Park
\A1 I K5Lo%&1 woo1Ps
jl'
Z-A
OT
Vi
CIVT�. A-Y, 0 q T�AAVjJr1R(_Yl1
k if T A
11W,
_I
5
X�lk
f I -
�,Z, /
f
I JI
r s �
y
w
aas
o "
f a
�m
s
SKETCH PLAN WITH
`
Carlson
Nm
"g
m
°
PAUL EMMERICH
CONSTRUCTION
GHOST SKETCH
McCain
H.
a
n ` ^ss
1875 Station Parkway Nw
A
\
"- -3
g-o;
ae
Andover, MN 55304
WINSLOW WOODS
Andover, Minnesota
ENVIRONMENTAL • ENGINEERING •SURVEYING
248 Apollo Dr, Suite 100, Lino Lakes, MN 55014
IP t d ay
Phone: 763- 489 -7900 Fax: 763 -489 -7959
1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755 -5100
FAX (763) 755 -8923 • WWW.ANDOVERMN.GOV
To: Park and Recreation Commission
CC: David D. Berkowitz, Director of Public Works /City Engineer'o 3
From: Todd J. Haas, Assistant Public Works Director
Subject: 5. Discuss Langseth Park Budget and Improvements /13 -43
Date: February 20, 2014
INTRODUCTION
The Park and Recreation Commission is requested to discuss budget and improvements
to Langseth Park.
DISCUSSION
Attached are the proposed improvements that are being recommended by the Public
Works Parks Department along with recommended allocation for parks (Langseth and
Andover Lions). If there are no questions from the Commission, staff will contact the
neighborhood representatives to schedule a meeting to discuss the funds available and
playground structures that may want to consider for purchase.
BUDGETIMPACT
The Capital Improvement Plan (CIP) identifies $48,000 to be utilized on
replacement/repairs of playground structures.
ACTION REQUESTED
The Park and Recreation Commission is requested to discuss budget and improvements
to Langseth Park.
Respectfully submitted,
Todd J. Haas
Attachment: Proposed budget for Langseth Park
s
Langseth and Lions playground /structures rebuilds
Langseth play structure $ 17,000
Two seat swing $ 1,100 or four seat swing $ 1,700
Wood chips for fall zones $ 3,200
Concrete $ 1,600 to $ 1,900
New benches $ 300
New table $ 425
New park sign $ 525
Basket ball or volleyball area?
Spring rides $ 900 each
Full tear out and tree cutting
Black dirt and seeding; our budget
New trees: use our budget
Fill and grading: our budget
Shelter or grill?
Back hoe digger $ 900
Total we are spending on Langseth $ 27,500 out of our CIP Budget
Lions swingset $ 1,700
New benches $ 300
New table $ 425
New /replacement plastic items on structure $ 5,800 to $ 7,300
Change out climbing feature $ 2,800
Concrete $ 2,300 to 2,800
Wood chips for fall zones $ 4,800
Spring rides $ 1,800
Back hoe digger $ 900
Paint $ 165
Fill and grade; our budget
New trees; our budget
Black dirt and seeding; our budget
Concrete under and behind backstop $ 1,600
Sideline fencing for ball field? Shelter or grills?
Fitness and exercise items; other funding source
Total we spending on Lions rebuild $ 20,500 out of our CIP Budget
r�
1685 CROSSTOWN BOULEVARD N.W. *ANDOVER, MINNESOTA 55304 J (763) 755 -5100
FAX (763) 755 -8923 • WWW.AN DOVE RMN.GOV
TO: Park & Recreation Commission
CC: David D. Berkowitz, Director of Public Works /City Engineer DDES
FROM: Todd J. Haas, Assistant Public Works Director
SUBJECT: 6. Consider Locations of Way Finding Signs, Project 14 -16
DATE: February 20, 2014
INTRODUCTION
The Park and Recreation Commission is requested to consider locations of way finding signs.
DISCUSSION
As mentioned at the January 16, 2014 Park Commission meeting, scheduled for 2014 is the
installation of way finding signs along city corridor trails. Located in the side pocket of the
packet are the proposed locations that are being recommended by staff for the way finding signs.
The area that staff is concentrating on is the central corridor of the City from the Community
Center south to the commercial district (Andover Station) and east to Bunker Hills Regional
Park. The locations of the signs will go to the City Council for review before the final plan will
be completed.
BUDGET
The CIP identifies $30,000 for the installation of way finding signs and exercise equipment along
trial segments. It is identified that $10,000 would be funded from Park dedication Funds and the
remaining $20,000 from Trails Funds.
ACTION REQUIRED
The Park and Recreation Commission is requested to consider locations of way finding signs.
Respectfully submitted,
, O�AA4
Todd J. Haas
Attachments: Location map of way finding signs (side pocket of packet)
155TH LN
C
w
Q. 169TH LN
.j.P
" i
z
9�S
g
y
M ._.
154TH AVE
y OSAG';�
P2
Y
�
a
m
A
w
5
0
z
v
Z 153RD W
�
a
0
149TH LN
- 1wfiLN....
z
�I
m
O
i
�V
N
CI
z �
m
w
rc
156TH AVE O
154TH LN
H
» w
� p
O
-145TH AVE
Z Sf
b
z
1�
r 844 ST 142ND LN
eP� 3
J
<01 `ry? 142ND AVE
¢ 95
S
/
941 ST LN p5P C
D
O
i
4� 138THLf�-
N
a
N X 135TH IN
,,pry
_ qLP
141ST AVE
1ApfH LN
438TH LN
y - 138THAVE -
? w
O >
A
w D
137THtN
a
2 ¢ 15 t N
ti158TH AVE
h w
a
rc
ST
y
w
u�
t50T11tN � �� VJp
w � �
S
t� O
7LN
6 lftz
F is
r m' 75y 454TH LN
- � w
i 154TH AVE q9 OA
- as2NPt49 --
rF�
zoo,;
La
J 4iS
4/ata�� O
or
w
4 w
" i
13y
r
g
S
M ._.
Z
y OSAG';�
438TH LN
y - 138THAVE -
? w
O >
A
w D
137THtN
a
2 ¢ 15 t N
ti158TH AVE
h w
a
rc
ST
y
w
u�
t50T11tN � �� VJp
w � �
S
t� O
7LN
6 lftz
F is
r m' 75y 454TH LN
- � w
i 154TH AVE q9 OA
- as2NPt49 --
rF�
zoo,;
La
J 4iS
4/ata�� O
or
,'_'881HW.
�..
150TH61,
M ._.
Y
IL
m
Z
149TH LN
- 1wfiLN....
�I
148TH Lp_
2
i
148TH LN
...... ;.
TNAVE
Hy
148TH LN
� 54BTNAVE..
r
147TH LN
aS
147TH CT
y3r3�37rrr
t
i
¢ yt
Mn AVE
�T
_
g
t4BTNt?OF
wTHtµ..
146TH
x
140TH
"hP
ST
'C'
Hy 1 - -48TH
yTdE
AVE...
AVE
<
L
W ..1.
r
846TH LN
135TH LN
- 146TH. LN..
Y N
~146TMAVE -�
..ANDOVER9VO
g�� �gSMAVE �G WTH LN'
r
2
w
u � 183RD AVE w
O W
m ZZZ � x 149'pO (41 W
2 u 1H h 2O W y 143�jO
W 1Sy 1 A
+A=
T 9
7r �.J y rµBN@iN_q 14 2ND LN
1421q AVE
E. 141STLN
1 141ST AVE
14UTNtN
140THW
^yO,AfE n
(T, 6
h
13eiMW. rs w � q�CT
139THAV Oo 3�r
6
79 _,7 F f39THAVE.. pbp
6dY
3"
LA
A
w
. 138TH A
138TH AVE VE
- y^
$$� ... 436TH AVE
13Y1NtN
IVTHLN._
I
I 0
J
135TH AVE �..
G (�
134TH LN N ^Y
J y9TH AVE
m
NDOVE Proposed N
MAP DATE: Guide Signs for Trails
February 05, 2014
LEGEND
Paved - City Unpaved - City •
'.. Paved - County Sidewalk - City
'\.. Paved - Private '\. Sidewalk - Private
0 500 1,000 2,000 3,000 4,000
Feet
Proposed Sign Locations
Road Centerline
Parcels
water
park
Pmie Paft H:iGisdaWe Paiks\Pmiects\Pmwo Guide$i nLoc tione.msd
AN66V9 j
1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755 -5100
FAX (763) 755 -8923 • WWW.ANDOVERMN.GOV
TO: Park & Recreation Commission
CC: David D. Berkowitz, Director of Public Works /City EngineerT
FROM: Todd J. Haas, Assistant Public Works Director
SUBJECT: 7. Discuss 2014 Events in City Parks or Facilities
DATE: February 20, 2014
INTRODUCTION
The Park and Recreation Commission is requested to discuss potential 2014 events in City parks
or facilities.
DISCUSSION
The Commission members will need to determine what the activity responsibilities will be for
2014. Keep in mind that the Commission members can team up on an activity if they would like.
• Marinello — 2014 ?
• Elstrom — 2014 ?
• Stenzel — 2014 ?
• Organized Trail Bike Ride/Lindahl — Commissioner Lindahl will need to
submit information by March 41h, 2014 in time for the May -June newsletter.
• Butler — 2014 ?
• Lewnau — 2014 ?
• Miskowiec — 2014 ?
ACTION REQUIRED
The Park and Recreation Commission is requested to discuss potential 2014 events in City parks
or facilities.
Respectfully submitted,
Todd J. Haas
1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755 -5100
FAX (763) 755 -8923 • WWW.ANDOVERMN.GOV
TO: Park & Recreation Commission
CC: David D. Berkowitz, Director of Public Works /City EngineerL —D�
FROM: Todd J. Haas, Asst. Public Works Director VW
SUBJECT: 8. Review Outstanding Items
DATE: February 20, 2014
Issues list as of 2/18/14
COMPLETED PROJECTS —
ON -GOING PROJECTS -
• Update of Park Dedication Improvement Fund Ouarterly Report — Next quarterly report is due in
April.
• Update of Ouarterly Sheriffs Department Report on Park Patrol & Vandalism — Next quarterly
report is due April.
• 40 Acre Sports Complex — The site is 95% complete including the irrigation system for the fields.
There will be additional irrigation being installed next spring around the parking lots. The grass for
the fields is coming in very nicely. Staff is working on expenses made to date. Naming of the park is
still undecided and will be presented again to the City Council on February 25, 2014 for
consideration.
• Langseth Park — Item is on the agenda to determine the budget for the park.
• Hidden Creek North Park — Neighborhood letter has been sent out. To date staff has received 5
surveys back. 4 in favor of the rinks and 1 against so far.
• Prairie Knoll Park — Plans are currently being worked on by engineering. At the direction of the City
Council, concrete curb will be installed along the north side of the south parking lot and concrete curb
will be installed along the south side of the north parking (north parking lot is being included as an
alternate to the south parking lot bid).
• Oak Bluff Park — Public Works Parks Maintenance staff are gearing up to have the irrigation system
installed early this spring. We have notified North Metro Soccer Association that they may need to
stay off the field for a short period possibly till the end of May.
• Way Finding Signs — Item is on the agenda.
ON -HOLD PROJECTS — None at the time.
OTHER ITEMS OF INTEREST —
• Prairie Knoll Park Cell Tower — Nothing new to report. Still waiting for them to indicate when they
are planning on starting on the construction.
Cell Phone Companies Update (Rose and Fox Meadows Park)
Rose Park
The City Council has approved the Conditional Use Permit (CUP) for Verizon Wireless to the City
Council. The City Administrator is currently working on a lease agreement (sounds like they are very
close to an agreement). A portion of the funds received from lease agreement will be deposited into a
fund that can only be utilized at Rose Park for improvements. Looks like 50% of the annual lease fees
collected will remain with the park.
Fox Meadows Park
Plans for the building and pole have been submitted by Verizon Wireless but the application and fees
required have not been submitted. Verizon is still considering other locations. If the application and
fees are submitted, staff will schedule the request on a future agenda.
2014 Events in City Parks or Facilities — The Park and Recreation Commission will need to determine
what each of the Commissioners will be responsible for during 2014.
• Marinello — ?
• Elstrom — ?
• Stenzel — ?
• Oreanized Trail Bike Ride/Lindahl — Need to prepare an article which is due by
March 4, 2014 for the May /June 2014 Newsletter.
• Butler — ?
• Lewnau — ?
• Miskowiec —
Update of Pedestrian Trails — At this point this is what has been going on with trails:
• The City Council has preliminary approved the 5 year (2014 -2018) Capital Improvement
Plan (CIP) for trails for the following locations:
o A trail is identified in 2016 along the south side of Andover Blvd NW
between Bluebird Street NW and Vale Street NW.
• Reconstruction of Bunker Lake Boulevard from Crane Street NW to Jefferson Street NE
in Ham Lake is scheduled for 2015 -2016. As part of this project trail segments along the
north side of Bunker Lake Boulevard will either be left in place or portions
reconstructed. A pedestrian underpass is being evaluated near the Bunker Hills Activity
Center. Also the trail will continue on the north side to Jefferson Street. A new trail will
be constructed from Crane Street NW, crossing the railroad tracks to Andover Lions
Park. Also a new trail segment will be constructed on the south side from the Anoka
County Highway Department, crossing the railroad tracks, tying into Bunker Hills
Regional Park.
• Update of Schedulina Park and Recreation Commission meeting at a City Park or Facility —
The locations and dates of these meeting will be determined in late winter or early spring.
If you have any questions or comments regarding any of the items mentioned above or any items
relating to parks or projects, feel free to contact Todd Haas or Dave Berkowitz at the City. Staff
recommends the Commission continue reviewing the City Council meeting minutes that you receive
by e -mail as to discussions of various projects the City Council has been working on or is
considering.
Note: If you have any items that you would like to add to the list, let me know at the meeting.