HomeMy WebLinkAboutOrd. 425 - 2013 Fee ScheduleCITY OF ANDOVER
COUNTY OF ANOKA
STATE OF MINNESOTA
ORD. NO. 425
AN ORDINANCE AMENDING CITY CODE 1 -7 -3 ESTABLISHING PERMIT FEES, SERVICE CHARGES,
AND VARIOUS OTHER FEES TO BE COLLECTED BY THE CITY OF ANDOVER.
THE CITY COUNCIL OF THE CITY OF ANDOVER HEREBY RESOLVES:
The following permit fees and service charges are hereby established for the year 2013.
Administration:
Administrative Fee: (non project related activity)
15% of total charges for overhead costs
Approval/Recording of Deeds:
Abstract & Torrens Properties
$100.00
Bad Check Fee:
$30.00
Canvasser /Solicitor License:
Investigation Fee $25.00 per individual - 30 day license (Ord 352)
City Publications:
Budget
$25.00
Financial Statements
$25.00
Comp Plan
$25.00
Copies: (per sheet)
Up to 8 %2" x 14"
$0.35
Oversize
$0.50
18 "x24"
$3.00
24 "x36"
$4.00
Larger Sizes
$7.00
Surveys
$3.00
Surveys Requested by Owner
$1.25
City Code - paper copy
$50.00
Dog Licensing:
Yearly License
$6.00 per year
Commercial Kennel (more than 3 dogs)
$380.00 - includes mailing labels
Commercial Kennel Recording Fees
Abstract and Torrens
$100.00
Private Kennel (more than 3 dogs)
$200.00 Includes mailing labels
Annual Kennel Renewals
$25.00
Facility Use Fees:
Sunshine Park Gazebo Rental
$30.00 per 4 hour period
Non- Profit/Service Organizations
N/C weeknights after 4:30 p.m. Monday - Friday
Sunshine Park Conference Room
Non-Profit/Service Organizations
$100.00 refundable key /damage /maintenance deposit
For - Profit Organizations. Businesses
$25.00 + $100.00 refundable key /damage /maintenance deposit
Sunshine Park Building - Athletic Assns
$100.00 refundable key /damage /maintenance deposit
City Hall Front Conference Room
Non- Profit/Service Organizations
$100.00 refundable key /damage /maintenance deposit
For - Profit Orgs/Businesses
$25.00 + $100.00 refundable key /damage /maintenance deposit
Council Chambers
Non- Profit/Service Organizations
$100.00 refundable key /damage /maintenance deposit
For - Profit Orgs/Businesses
$25.00 + $100.00 refundable key /damage /maintenance deposit
City Hall Lunchroom
Non- Profit/Service Organizations
$100.00 refundable key /damage /maintenance deposit
For - Profit OrgsBusinesses
$25.00 + $100.00 refundable key /damage /maintenance deposit
Field Lights
$100.00 refundable key /damage /maintenance deposit
Community Center
Prime Time Ice Rental
Weekdays 3:00 p.m. to 10:00 p.m.
$190.00 per hour
Weekends 7:00 a.m. to 10:00 p.m.
$190.00 per hour
Non -Prime Ice Rental
$140.00 per hour
Open Skate
$5.00 adults
$4.00 students age 18 and under
Prime Time Field House Rental
Weekdays 3:00 p.m. to 10:00 p.m.
$46.00 per hour
Weekends 7:00 a.m. to 10:00 p.m.
$46.00 per hour
Non -Prime Field House Rental
$38.00 per hour
Open Gym
Youth
$3.00 per session
Adult - Resident
$3.00 per session
Adult - Non Resident
$5.00 per session
Helmet Rental
$2.00
Skate Rental
$3.00
Skate Sharpening
$4.00
Meeting Rooms
%: Room
$25.00
Full Room
$50.00
False Alarm Fine: (Police & Fire)
$75.00 fee upon receipt of third false alarm notice at an address in one
calendar year. Each additional false alarm after the third is $75.00.
Garbage Hauler License:
$150.00 per year+ $25.00 per truck inspection
$50.00 re- inspections per truck
Horses:
Boarding & Stable Fee of Stray Horses By City
Per contracted rate + administrative fee
Impoundment of Horses (city ordered)
Per contracted rate + administrative fee
Transportation (trailer rental)
Per contracted rate + administrative fee
Interest Charge on Past Due Escrows:
18% annually (if not paid within 30 days of bill date)
Liquor:
3.2 % Malt Liquor
Off Sale
$75.00 per year
On Sale
$200.00 per year
Temporary On Sale
$25.00 - 3 day maximum
2:00 a.m. Closing
$50.00 per year
Intoxicating:
Sunday Liquor
$200.00 per year
On Sale Liquor
$5,250.00 per year
On Sale Wine
$500.00 per year
Off Sale Liquor
$200.00 per year
2 a.m. Closing
$50.00 per year
Liquor Compliance Violations
1" Violation
$750.00
2nd Violation
$1,500.00
3`d Violation
$3,000.00
4 °i Violation
Suspension or revocation
Maps:
City Maps
$3.00
Zoning Maps 11 "x17' colored
$4.00
Topographical Maps
$11.00 per acre
Full Size Color Maps 36 "x36"
$15.00
'/z Section / Address Book
$38.00
Custom GIS Maps
Time and materials
Notary Fee:
$3.00 per document
Outdoor Food & Beverage Sales /Temp.
Retail Food Establishment:
$25.00 — 10 day license
Outdoor Party Permit Fee:
$10.00
Barricades
$50.00 refundable damage deposit
Outdoor Promotional Fee-Temporary:
$100.00 per event
Parking Violations:
Street Obstructions: Golf Carts, Motorized
Vehicles, Snowmobiles, ATVs, Off - Highway
Motorcycles, Abandoned and Disabled Vehicles
$50.00, plus any court imposed fees and/or surcharges
Trailer Parking
$50.00
Peddler License:
$100.00 — 30 day license
Project Recovery Rate Factor:
Engineering Inspection Services
2.9 x hourly rate
City Staff Services
2.0 x hourly rate
(All projects directly related to staff time.
All public & private improvement projects.)
Searches:
City Utility
$20.00 each
Special Assessment
$25.00 each
Therapeutic Massage Establishment * *:
All fees include investigation fee
Single Application Fee
$200.00
Corporate Application Fee
$300.00
Partnership Application Fee
$300.00
Renewal Fee
$150.00
** Residential Application Requires a Conditional
Use Permit
Therapeutic Massage Therapist:
$175.00 annually
Tobacco License: Admin & Enforcement
$250.00
Tobacco Compliance Violations
15t Violation
$75.00
2 "d Violation within 24 months
$200.00
3`d Violation within 24 months
$250.00 in addition to license suspension for not less than 7 days
Individual selling to a minor
$50.00
Transient Merchant License:
$50.00 - 7 day license
Tree Trimmer License:
Commercial License Fee 1
$50.00 per year
Vehicle Sales License: 1
$105.00 per year
Page 3
RESIDENTIAL ELECTRICAL PERMIT FEE SCHEDULE
** Add $5.00 per permit for State Surcharge **
Electrical wiring installed or altered in any new or existing buildings shall have an electrical permit filed on
or before any work has been started. Permits and permit fees shall be filed by the responsible
individual /electrical contractor that is providing the electrical work.
1. Minimum fee (does not include state surcharge) $ 45.00
2. Single family dwelling and multi - family dwelling with individual service $148.50
up to 200 amp service and 30 circuits, max. three trips
3. Swimming pool, spa, fountain $ 45.00
4. Finish basement, rough in and final inspection $ 90.00
5. Electrical panel change out, repair or service upgrade, or new service or power
supplies to separate structures
0 -400 amperes $ 45.00
401- 8001mperes $ 66.00
more than 800 amperes $110.00
6. 0 -200 ampere circuits $ 6.60
7. More than 200 ampere circuits $ 16.50
8. Electrical re- inspection per trip (does not include state surcharge $ 45.00
9. Fee for electrical work started without a permit double the inspection fee
10. Residential Service Change Fuses to breakers $ 75.00
COMMERCIAL ELECTRICAL PERMIT FEE SCHEDULE
** Add $5.00 per permit for State Surcharge **
Electrical wiring installed or altered in any commercial type building shall be performed only by a licensed
electrical contractor. An electrical permit shall be filed with the City by the electrical contractor on or before the
electrical work has been started.
Services
Reference Fee
0 - 400 amp $ 45.00 ea
401 - 800 amp $ 66.00 ea
More than 800 amp $110.00 ea
Additional charges:
Circuits & Feeders
Reference Fee
0 - 200 amp $ 6.60 ea
More than 200 amp $16.50 ea
Multi- family dwelling with common service, each unit
Street, parking and outdoor lighting standards (each standard)
Traffic signals
Transformers for light, heat and power (0 -10 KVA)
Transformers for light, heat and power (more than 10 KVA)
Transformers for electronic power supplies, signs and outline lighting
Alarm communication, remote control and signal circuits less than volts, each
Minimum commercial electrical fee (does not include state surcharge):
Electrical reinspection fee per trip (does not include state surcharge):
Page 4
$77.00
$ 5.50 ea
$ 5.50 ea
$16.50 ea
$33.00 ea
$ 5.50 ea
$ 0.83
$45.00
$45.00
BuildinE Inspections & Permittin¢
Agricultural Building Permit:
$5.00
Air Conditioning Installations:
$75.00 (State Surcharge Add $5.00)
Air to Air Exchange Permit:
$75.00 (State Surcharge Add $5.00)
Basement Refinishing Permit:
$100.00 (State Surcharge Add $5.00)
Building Department Escrows:
As -Built Survey
$500.00
Grading & Erosion Control
$1,500.00
Black Dirt & Sod 15 ft. wide blvd. (Urban lot)
$0.33 per sq. ft.
Topsoil, Seed & Mulch 18 ft. wide (Rural lot)
$0.09 per sq. ft
Front Yard Sod or Seed (Urban Lot)
$2,500.00
Hydro - seeding - (in addition to sod escrow)
$160.00
Retaining Wall
$25.00 per sq. ft.
Driveway (Urban lot)
$1,181.00
Driveway Apron (Rural lot)
$400.00
Steps
$100.00 per riser
Sidewalk
$3.00 per sq. ft.
Garage Floor
$3.00 per sq. ft.
Trees
$750.00
Building Re-inspection Fee (after 2"" inspect):
$50.00 established under state bldg code
Certificate of Occupancy:
$10.00
Commercial Building Permit Fee Schedule:
1. State of Minnesota Building Valuation Data, Dated 05/98.
2. Fees for Commercial Buildings Computed on Contract Bid Price.
3. Plan Check Fee shall be 65% of Permit Fee.
4. Fees shall be based on the 1997 Uniform Building Code Schedule IA.
5. The above fees apply to all new construction, alterations & repairs.
Commercial Plumbing Plan Review:
25% of the plan review fee (from the 1997 UBC fee schedule) when plan
reviews are completed by the State Plumbing Division or State Building
Division and the city does the inspections (Minnesota rule part 1302.0600,
subparts 1, 2, and 4)
Contractor Licenses:
Contractor Verification Fee
$5.00
Contractor License
$50.00
Demolition Permits:
Single Family Structures
$100.00
Two Family Structures
$150.00
Single/Double Garages
$75.00
Barns
$75.00
Multiple Family Structure
First Two Units
$150.00
Each Additional Unit
$50.00
Commercial Units
$10.00 per $100.00 Demolition Costs ($200.00 minimum)
Escrow Inspection Fee:
$50.00 per inspection
Footing to Grade:
$50.00 per inspection
Garage Furnace Permit:
$75.00 per unit (State Surcharge Add $5.00)
Gas Fireplace Permit:
$75.00 per it (State Surcharge Add $5.00)
Geo- thermal Heating Permit:
$75.00 (State Surcharge Add $5.00)
Grading Inspection Fees (engineering):
First Inspection
No charge (included in bldg permit fees)
Second Inspection
No charge (included in bldg permit fees)
Third Inspection
$75.00
Fourth Inspection
$125.00
Fifth and any subsequent Inspections
$150.00 each
Heating Installations:
Furnace / Air Combo
$85.00 (State Surcharge Add $5.00)
Boiler
$75.00 (State Surcharge Add $5.00)
In Floor Heating
$50.00 (State Surcharge Add $5.00)
Furnace
$75.00 (State Surcharge Add $5.00)
Water Heaters
$50.00 (State Surcharge Add $5.00)
House Moving Permit:
$75.00
Lawn Sprinkler Permit:
$50.00 (State Surcharge Add $5.00)
Page 5
Plan Check Trees Protection/Inspection:
$65.00
Plan Check Fees:
Residential
65% of permit fee
Plumbing: (per opening)
$10.00 (Minimum fee $70.00) (State Surcharge Add $5.00)
Re-roofing Permit:
$75.00 (State Surcharge Add $5.00)
Multi - Family Rental Housing License (see ord.):
Structures without fire suppression systems
$75.00 per unit inspected every two years (except owner occupied) Bldg code
& fire code inspections.
Structures with fire suppression systems
$52.00 per unit inspected every two years (except owner occupied) Bldg.
Code & fire code inspections. This includes common areas in the building.
Re- inspection Fee per Call (2 °a)
$50.00
Single - Family Rental Housing License (see ord.):
$50.00 per unit inspected every two years.
Re- inspection Fee per valid complaint
$50.00
Septic System:
Pumping
$15.00
New Installation or Repair:
At Grade
$75.00
Mound or Bed
$100.00
Siding Permit:
$75.00 (State Surcharge Add $5.00)
Page 6
Engineering
Curb Cut Permit:
$50.00 permit issuance
Driveway - Secondary: Request / Construction
$500.00 refundable deposit. Note: will be refunded once driveway
requirements are inspected and approved.
Hold Harmless / Encroachment Agreement Fee:
$100.00
Fence (Plan Check):
$30.00
Flood Zone Search/Map:
$15.00
Retaining Wall (Plan Check):
$30.00
Rights -of -Way Permit Fee Structure:
Annual Registration Fee
$50.00
Excavation Permit Fee
$200.00
Per Add'1 Excavation (paved area)
$30.00
Per Add'1 Excavation (unpaved area)
$15.00
Trench Fee
Underground Utility /Telecom Installation
$40.00 per 100 L.F.
Directional Boring or Tunneling (in addition to
excavation permit fee)
Underground Utility /Telecom Installation Open
$55.00 per 100 L.F.
Trenching (in addition to excavation permit fee)
Overhead Utility /Telecom Installation (in addition
$5.00 per 100 L.F.
to excavation permit fee)
Obstruction Permit Fee
$50.00
Permit Extension Fee
$55.00
Annual Mapping Fee
$10.00 per Permit ($0.00 if in the City fonnat)
Delay Penalty (up to 3 days late)
$60.00
(each day late over 3 days)
Plus $10.00 per Day
Individual Service Work in the Right -of -Way
$500.00 annual fee or $10.00 per service
Per Lot Fee (Can be used as an alternative for new
developments)
Urban Rural
Connexus Energy
$31.00 per lot $35.00 per lot
Reliant Energy
$39.00 per lot $60.00 per lot
Qwest
$24.00 per lot $40.00 per lot
AT & T
$34.00 per lot $47.00 per lot
Special Assessment Costs (Estimated):
See Development Contract Escrows
Street Opening Permit Sewer & Water):
$350.00 - Permit & Engineering Inspection
Trail Fee (Bikeway/Pathway):
Residential
$725.00 per unit
Internal Trails (New Plats)
Developer's Responsibility
Commercial/Industrial
Developer's Responsibility
Collected pursuant to development contract or
Council resolution
Vacation of Easement
$125.00 - Includes mailing labels
Recording Fee:
Abstract and Torrens
$100.00
Page 7
CITY INSTALLED IMPROVEMENTS
Part A of Development Contract
1. Developer's Improvements Costs
• Erosion Control ................................................................................................. ............................... $750.00
• Tree Protection .................................................................................................. ............................... $750.00
• Street Sweeping .............................................................................................. ............................... $1,000.00
• Iron Monuments ................................................................................... ............................... $100.00 per Lot
• Grading, Clearing & Grubbing Certification, As- Builts .............................. Value of Work Not Completed
• Tree Removal ................................................................................................ ............................... $1,000.00
• Installation of Street Lights .......................................... ............................... Value of Work Not Completed
• Grading Certification & As- Builts ................................................................. ............................... $2,500.00
• Landscaping Improvements (if required) ..................... ............................... Value of Work Not Completed
• Sodding of Boulevard (if required in common areas) .. ............................... Value of Work Not Completed
• The estimated engineering, legal, and administrative fees are 15% of the total estimated cost for the developer's
improvements.
• The total Developer's Improvement costs (including engineering, legal, and administrative) are then multiplied by 150%
to establish the Developer's Security for the project.
Part B of Development Contract
1. Developer's Improvements Costs
• Streets & Utilities (Based on Developer's estimated construction cost ) .............................. Value of Work
• Trails / Sidewalks .................................. ............................... ..........................Value of Work
• The estimated engineering, legal, and administrative fees are 15% of the total estimated cost for the developer's
improvements.
• The total Developer's Improvement costs (including engineering, legal, and administrative) are then multiplied by 105%
to establish the Developer's Security for the project.
2. Project Security Requirements Prior to Final Street & Utility Plans & Specifications are as follows:
a. Developer to escrow 6% of estimated construction cost to complete street and utility construction plan, if plans are requested
prior to the execution of the development contract. This will be returned to the developer when the development contract is
executed. This only applies to urban developments.
Special Assessment Costs (estimated)
1. Estimated Construction Costs (costs vary according to project requirements):
✓ Lateral Sanitary Sewer ✓ Storm Sewer
✓ Trunk Sanitary Sewer ✓ Streets
✓ Lateral Water Main ✓ Sidewalks
✓ Trunk Water Main ✓ Other
All project cost estimates are identified within the project feasibility report. The construction cost estimates are based on current
industry construction cost standards. The final construction costs are based on competitive bids and final construction quantities.
Development of Street & Utility Feasibility Report ........................ ......................$7,500.00
2. Estimated Project Expenses:
✓ Engineering - The estimate is based upon project size, scope and complexity. The amount assessed is based upon
billable hourly rates times project recovery rate factor.
✓ Aerial Mapping - I% of Street. The estimate is based upon I% of the value of the street construction. The final value
is based upon 1% of the final street costs.
✓ Administration - 3 %. The estimate is based upon 3% of the estimated construction cost. The final value is based upon
3% of the final construction cost.
✓ Assessing - 1 %. The estimate is based upon 1% of the estimated construction cost. The final value is based upon 1% of
the final construction cost.
✓ Legal - Legal costs will be actual billing.
Page 8
✓ Easement - Estimates are project - specific.
✓ Advertising — Project specific.
✓ City Costs - Includes inspection and city related project costs.
✓ Street Signs - The cost is based upon the size of the project. See Signs under the Public Works section for cost
determination.
✓ Construction Interest — Rate is determined at time of project estimate.
✓ Bonding - 0.5% of total project cost.
✓ Drainage Plan - 0.3% of street & storm sewer costs.
✓ County Road Improvement Fee (if applicable) — Project - specific, determined at Preliminary or Final Plat
3. Crack Seal and Seal Coating: $2.00 x sq. yd. of paved street surface.
DEVELOPER INSTALLED IMPROVEMENTS
Part A of Development Contract
1. Developer's Improvements Costs
• Erosion Control ................................................................................................. ............................... $750.00
• Tree Protection .................................................................................................. ............................... $750.00
• Street Sweeping .............................................................................................. ............................... $1,000.00
• Iron Monuments ................................................................................... ............................... $100.00 per Lot
• Grading, Clearing & Grubbing Certification, As- Builts .............................. Value of Work Not Completed
• Tree Removal ................................................................................................ ............................... $1,000.00
• Installation of Street Lights .......................................... ............................... Value of Work Not Completed
• Grading Certification & As- Builts ................................................................. ............................... $2,500.00
• Landscaping Improvements (if required) ..................... ............................... Value of Work Not Completed
• Sodding of Boulevard (if required in common areas) .. ............................... Value of Work Not Completed
• The estimated engineering, legal, and administrative fees are 15% of the total estimated cost for the developer's
improvements.
• The total Developer's Improvement costs (including engineering, legal, and administrative) are then multiplied by 150%
to establish the Developer's Security for the project.
Part B of Development Contract
1. Developer's Improvements Costs
• Streets & Utilities (Based on Developer's estimated construction cost) ................... Value of Work
• Trails / Sidewalks ....................... ............................... ..........................Value of Work
• The estimated engineering, legal, and administrative fees are 15% of the total estimated cost for the developer's
improvements.
• The total Developer's Improvement costs (including engineering, legal, and administrative) are then multiplied by 105%
to establish the Developer's Security for the project.
Proiect Expenses
1. Proiect Expenses — collection of expenses will be outlined in the development contract aereed to before street and utility
construction can begin:
✓ Aerial Mapping - 1% of Street. The estimate is based upon 1% of the value of the street construction. The final value
is based upon 1% of the final street costs.
✓ Administration - 2 %. The estimate is based upon 2% of the estimated construction cost. The final value is based upon
2% of the final construction cost.
✓ Crack Seal and Seal Coating - $2.00 x sq. yd. of paved street surface.
✓ * Water Area Charge — Refer to Water Fees, Page 14
✓ * Water Connection Fee - Refer to Water Fees, Page 14
✓ * Sanitary Sewer Area Charge — Refer to Sanitary Sewer Fees, Page 13
✓ * Sanitary Sewer Connection Fee - Refer to Sanitary Sewer Fees, Page 13
✓ * Sanitary Sewer Lift Station Connection Fee (if applicable) — Refer to Sanitary Sewer Fees, Page 13
✓ * Sanitary Sewer 2 "d Lift Station Connection Fee (if applicable) — Refer to Sanitary Sewer Fees, Page 13
✓ * Sanitary Sewer & Water Main Railroad Crossing Fee — Refer to Sanitary Sewer Fees, Page 13
✓ County Road Improvement Fee (if applicable) — Project specific, determined at Preliminary or Final Plat
Page 9
2. Project Security Requirements Prior to Final Street & Utility Plans & Specifications are as follows:
a. Developer to escrow 6% of estimated construction cost to complete street and utility construction plan, if plans are requested
prior to the execution of the development contract. This will be returned to the developer when the development contract is
executed. This only applies to urban developments.
3. City Costs including engineering (design), inspection and City related project costs The amount of expenses shall be invoiced to
the developer as work is completed.
Page 10
Fire
Accident Response Fees * *:
Each Fire Engine/Pumper $250.00 per hour
Each Utility Vehicle or Pickup, Command Van $125.00 per hour
Ladder / Aerial Truck $ 500.00 per hour
6 -wheel ATV $75.00 per hour
Each Firefighter $18.00 each, per hour
Chief(s) response $100.00 per hour
Fire Marshal response $70.00 per hour
** Fees would be charged to the insurance companies of the parties involved. Fire officer would collect information needed to
charge on the scene. The resident, should the insurance company not pay, will not be responsible for the charges.
Copies of Fire Reports:
$20.00
Building and Fire Re-inspection Fees:
$50.00 per hour
Burning Permits:
$20.00
Fire & Pyrotechnics Special Effects:
$250.00
Gas Pipeline Response Fees * *:
Each Fire Engine/Pumper $250.00 per hour
Each Utility Vehicle or Pickup, Command Van $125.00 per hour
Ladder / Aerial Truck $500.00 per hour
6 -wheel ATV $75.00 per hour
Each Firefighter $15.00 each, per hour
Chief(s) response $100.00 per hour
Fire Marshal response $70.00 per hour
** This fee would be charged to contractors or sub - contractors who hit properly marked gas lines. Charges would not apply to
residents who hit a gas line.
Home Occupation Inspections:
$50.00 per hour
Inspection Fees:
Aboveground Storage Tanks
Permit Fee — 1.25% of total project value (minimum $25.00).
Plan Review Fee — 65% of permit fee (minimum $25.00).
Commercial Hood Extinguishing Systems
Permit Fee — 1.25% of total project value (minimum $25.00).
(plan review, permit, inspection, modification)
Plan Review Fee — 65% of permit fee (minimum $25.00).
Day Care Licensing Inspections
$50.00 per inspection (includes 1 re- inspection)
Fire Alarm Systems (plan review, permit,
Permit Fee — 1.25% of total project value (minimum $25.00).
inspection, modification)
Plan Review Fee — 65% of permit fee (minimum $25.00).
Fire Sprinkler Monitoring Systems (plan
Permit Fee — 1.25% of total project value (minimum $25.00).
review, permit, inspection, modification)
Plan Review Fee — 65% of permit fee (minimum $25.00).
Fire Sprinkler Systems (plan review,
Permit Fee — 1.25% of total project value (minimum $25.00).
permit, inspection, modifications)
Plan Review Fee — 65% of permit fee (minimum $25.00).
Underground Storage tanks (plan review,
Permit Fee — 1.25% of total project value (minimum $25.00).
install and removal)
Plan Review Fee — 65% of permit fee (minimum $25.00).
Other Inspections as Requested:
$50.00 per hour
Special Investigation as Requested:
$50.00 per hour
Page 11
Parks
Ball Field Usage:
Adult Rec Play
$75.00 per team, per season
$10.00 additional, per player, non - resident fee
Youth Rec Play
$0.00 per team, per person
$0.00 additional, per player, non - resident fee
Note: Includes the use of fields for both lighted and non - lighted
Field without Lights (Private Use)
$15.00 per hour or
$75.00 per day
Field with Lights (Private Use)
$20.00 per hour or
$100.00 per day
Rental Equipment for Tournament
Limer
$6.00 per tournament
Lime
$7.00 per bag
Drag
$3.00 per tournament
Hose and Nozzle
$3.00 per tournament
Batter's Box
$3.00 per tournament
Weekend Tournaments
No Field Maintenance /Adult
$275.00 tournament fee for the park plus
$200.00 field usage fee per field
No Field Maintenance /Youth
$275.00 tournament fee for the park plus
$100.00 field usage fee per field, youth organizations not affiliated with
Andover Youth
With Field Maintenance /Adult
$650.00 tournament fee for the park plus
$200.00 field usage fee per field
With Field Maintenance/Youth
$650.00 tournament fee for the park plus
$100.00 field usage fee per field, youth organizations not affiliated with
Andover Youth
Note: 1 day tournaments will be charged 75% of the tournament and field
usage fee.
Hockey Rinks:
Rink with lights (Adults)
$18.00 per hour
Park Dedication Fees:
Single Family Residences
$2,732.00 per unit
Town Home and Twin Home
$2,732.00 per unit
Apartment (Multi - Family)
$2,732.00 per unit
Lot Splits
$2,732.00 per unit
Commercial/Industrial
$8,192.00 per acre or 10% of market value of land, which ever is less (per
Ord. 10 Sec.9.07.5)
Collected pursuant to development contract or
Council resolution
Vehicle Rental — Truckster:
$50.00 per day and $350.00 refundable damage deposit
Page 12
Plannin¢
Adult Use Business License:
$8,000.00 per year
(see ordinance)
Commercial Site Plan Review:
Escrow for services & agree to reimburse city for
$1,500.00 for small projects less than 5,000 sq. ft.
services provided.
$2,000.00 for projects between 5,000 and 10,000 sq. ft.
$2,500.00 for projects 10,000 sq. ft. and greater
Billable Staff Time x Project Recovery Rate Factor (2.0)
Comprehensive Plan Amendment:
$500.00 - Includes mailing labels
Public Notification Sign
$30.00
Conditional Use Permit:
Commercial
$1,000.00 escrow - to facilitate ARC review
Residential
$350.00 - Includes mailing labels
Amended Special Use Permit
$200.00 - Includes mailing labels
Public Notification Sign
$30.00
Recording Fee
$100.00
Lot Split Fee:
Lot Split
$300.00 - Includes mailing labels
Public Notification Sign
$30.00
Administrative Lot Split
$30.00 — 5 acres or more
Pawnbroker, secondhand goods dealer, precious
metal License:
New
$5,500.00 per year
Renewal
$5,000.00 per year
Plat Fees:
Sketch Plan Fee
$1,000 escrow for services & agree to reimburse city for all services
provided. Billable Staff time x Project Recovery Rate Factor (2.0)
Preliminary Plat Filing Fee
$350.00
Final Plat Fee
$150.00
Plat Escrow Deposit
Urban Lot
$350.00 per lot
Rural Lot
$700.00 per lot
Public Notification Sign
$30.00
Re- zoning:
$325.00 - Includes mailing labels
Public Notification Sign
$30.00
Sign Permit:
$2.00 per square foot/side
$4.00 per square foot per side erected without permit if approved
Towers & Antennas:
Application Fee Special Use
$2,000.00 - Includes mailing labels
Lease Rates
Negotiated
Variances:
Zoning Ordinance Variance Requests
$150.00 for single family
$125.00 for other requests
Zoning Letter:
$50.00
Page 13
Public Works
Street Sweeping:
$40.00 (State Surcharge Add $5.00)
Equipment Fee
$110.00 per hour (minimum charge %2 hour)
Labor
Billable hourly rate times project recovery rate factor
Signs:
Materials
Cost plus administrative fee
Labor
Billable hourly rate times project recovery rate factor
Sanitary Sewer
Hook-up Permit Fee:
$40.00 (State Surcharge Add $5.00)
Laterals:
$43.00 per front foot
Plumbing:
Homeowner contracts for
Sanitary Sewer Rates:
Sewer Area Charge
$1,613.00 per acre
Sewer Connection Fee
$435.00 per unit
Commercial Connection Fee
Rate = 1 connection fee for each SAC unit
Sanitary Sewer Extra Depth Lateral Fee:
Connection to lateral sanitary sewer at Xeon
$15,000.00 plus cost index percentage (Engineers New Record) dated back to
Street NW located within the Sophie's South
September of 2004. (This connection will only be allowed by City
Development
Council approval.) (Ord.367, 4- 15 -08)
South Coon Creek Drive Sewer Connection
$59,138.00 plus cost index percentage (Engineers News Record) dated back
to December 2012. Constructed with City Project #11 -10.
Sanitary Sewer Lift Station Connection Fee:
Fox Hollow Lift Station
$225.00 per unit
Shadowbrook Lift Station
$976.00 per unit
Chesterton Commons Lift Station (Lift Station #4)
$952.00 per unit
Constance Comers Lift Station (Lift Station #7)
$967.00 per unit
Aztec Estates Lift Station (Lift Station #5)
$57,345.00 plus construction cost index percentage dated back to Jan. 2004
(Amount to be charged to remaining benefiting properties when developed.)
Sanitary Sewer & Water Main Railroad
Crossin Fee 1615f Avenue:
$208.00 per unit
Sewer Availability Charge — Met Council Fee:
$2,435.00
Sewer Contracting:
Equipment Fee
$110.00 per hour
Labor Fee
Billable hourly rate times project recovery rate factor
Sewer Usage Rates:
Penalty/Late Payment
18% annually
Quarterly Rate
$59.37 per quarter
Monthly Rate
$19.79 per month
Quarterly Rate (Senior Citizen Reduced Rate)*
$29.69 per quarter
Monthly Rate (Senior Citizen Reduced Rate)*
$9.90 per month
Quarterly Rate (Disabled Persons Reduced Rate)*
$29.69 per quarter
Monthly Rate (Disabled Persons Reduced Rate)*
$9.90 per month
*must meet income eligibility
Storm Water
Storm Water Utility Fee:
Zoning Category
Single Family Urban
Single Family Rural, Estates, Suburban
&Farmstead
Manufactured Housing
Multiple Dwelling
Business, Commercial Industrial & Public
Developed Parks
Elementary & Middle Schools
High Schools
Churches
Quarterly Rate Per Unit:
$8.09 per unit
$8.09 per unit
N/A
$17.80 per acre
$34.35 per acre
$8.09 per unit
$16.16 per acre
$16.16 per acre
$16.16 per acre
N/A
Page 14
Water
Hydrant Meter Deposit &Rental Rates:
Deposit Rental Rate
5/8" hydrant meter setup
$250.00 $4.00 per day for the first 7 days
$2.00 per day thereafter for full rental period
3" hydrant meter setup
$600.00 $5.00 per day for the first 30 days
$3.00 per day thereafter for full rental period
3" hydrant meter w/backflow preventer
$1,000.00 $6.00 per day for the first 30 days
$4.00 per day thereafter for full rental period
Hydrant Use:
Deposit (as stated above) plus standard water rates
Laterals:
$43.00 per front foot
Service Charges:
Labor
Billable hourly rate times project recovery rate factor
Testing 0 to 6" Meters
Cost plus administrative fee
Violation Penalties:
May 15` through August 315`
I" Penalty
Warning
2 °d Penalty
$100.00
3`d Penalty
$200.00
4'h Penalty
$200.00 & Turned over to the City Attorney for criminal prosecution.
Unit Connection Charges:
Residential
$4,131.00 per unit
Non - residential and Institutional (Land owned
$12,393.00 per acre
or operated by municipal, school district, county,
state or other governmental agencies)
Water Area Charges:
Residential and Commercial
$3,786.00 per acre
Water Meter Charges:
"Meter
$154.03
#2 Horn (for 3/4" meter)
$48.18
'' /a" Meter with #2 Horn
$202.21
Special Sizes
Cost plus administrative fee
Water Permit Fees:
Service /Connection
$50.00 (State Surcharge Add $5.00)
Tapping Main
$30.00
Disconnection/Reconnection Requests
$50.00
HVAC
$15.00
Re- Inspection (all)
$50.00 per hour
Water Usage Rates:
Monthly Rate Structure
$5.26 Base Rate
$1.91 per 1,000 for 1516,000 Gallons
$2.07 per 1,000 for 6,001 - 16,000
$2.43 per 1,000 for 16,001 - 33,000
$3.11 per 1,000 for 33,001 and above
Monthly Minimum
$7.33
Penalty /Late Payment
18% Annually
Quarterly Rate Structure
$12.19 Base Rate
$1.91 per 1,000 for 15118,000 Gallons
$2.07 per 1,000 for 18,001 - 48,000
$2.43 per 1,000 for 48,001 - 99,000
$3.11 per 1,000 for 99,001 and above
Minimum per quarter
$14.57
Penalty /Late Payment
18% Annually
Page 15
Street Liahtin
Quarterly Charges:
Urban Residential Areas $8.00 per quarter
Rural Residential Areas $13.60 per quarter
Commercial Property $8.00 per quarter
Adopted by the City Council of the City of Andover this 181h day of December 2012.
Attest:
,,"
Midhe e Harmer — Deputy City Clerk
Page 16
CITY OF ANDOVER
Mi ael R. Gamache — Mayor
CITY OF ANDOVER
COUNTY OF ANOKA
STATE OF MINNESOTA
ORD. NO. 425 SUMMARY
AN ORDINANCE ESTABLISHING PERMIT FEES, SERVICE CHARGES AND VARIOUS
OTHER FEES TO BE COLLECTED BY THE CITY OF ANDOVER.
The City Council of the City of Andover ordains:
Section 1. Pursuant to Minnesota Law, the Andover City Code and upon a review by city staff, a
fee schedule for city services, permit fees and various other fees is hereby adopted.
2013 Fee Schedule
a) The city code of the City of Andover establishes that certain fees be set from time
to time by the City Council.
b) City staff has reviewed the current Fee Schedule for the City of Andover and is
hereby recommending that the 2013 Fee Schedule, which is available for
inspection in the office of the City Clerk, be adopted.
C) Upon consideration and review by the City Council, the 2013 Fee Schedule is
hereby adopted and becomes effective January 1, 2013.
Section 2. This ordinance shall be in full force and effect January 1, 2013.
Adopted by the City Council of the City of Andover this 1 Sth day of December, 2012.
Attest:
L,
t ' l'L' P b
Mi helle Hartner — Deputy City Clerk
CITY OF ANDOVER
`;, :
M' hael R. Gamac e — Mayor