Loading...
HomeMy WebLinkAboutNovember 29, 2012r C I T Y 0 F �...,. NLID5 06 AVYE 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 . (763) 755 -5100 FAX (763) 755 -8923 • WWW.CI.ANDOVER.MN.US Regular Park & Recreation Commission Workshop Meeting November 29, 2012 7:00 P.M. 1. Call to Order 2. Discuss Vision of Sports Complex/Project 12- 31/3535 -161St Avenue NW 3. Other Business 4. Chair's Report 5. Adjournment ANLb �6V 9 1 1685 CROSSTOWN BOULEVARD N.W. • ANDOVER, MINNESOTA 55304 • (763) 755 -5100 FAX (763) 755 -8923 • WWW.CI.ANDOVER.MN.US TO: Park & Recreation Commission CC: David D. Berkowitz, Director of Public Works /City Engineer FROM: Todd J. Haas, Assistant Public Works Director SUBJECT: 2. Discuss Vision of Sports Complex/12 -31 /3535 -161" Avenue NW DATE: November 29, 2012 INTRODUCTION The Park and Recreation Commission is requested to discuss the vision of the Sports Complex, Project 12 -31 and recommend the three (3) consultants for staff to interview. DISCUSSION The meeting is an opportunity to discuss the vision the Park and Recreation Commission has for the property and the amenities the Commission and associations would like to see at the facility. The main focus is the big picture of the site. There may be other opportunities for trails, shelters and possibly a sliding hill or a playground area. There may also be some opportunity in the floodplain and wetland areas to create open water features that could provide excellent habitat for the wildlife. A total of seven (7) proposals were received. Staff has reviewed the proposals and is recommending three (3) consultants (Anderson - Johnson Associates, WSB and SRF) be interviewed. Copies of the 3 consultant proposals are included in the side pocket of the packet. The proposals received were from the following consultants including the proposed fee: • Anderson- Johnson Associates, Inc. $65,900 Note: Construction staking included in the above fee was proposed at approximately $4000. This cost was to be included as a not to exceed fee. Staff will clarify this with the consultant. The fee for the artificial turf design was included in the total not to exceed $18,500. • WSB and Associates, Inc. $67,226 Note: The construction staking was included in the not to exceed fee of $6480. The fee for the artificial turf design was included in the total not to exceed $4850. • SRF Consultants $88,744 Note: The fee indicated in the proposal was an estimated fee and was to be indicated as a not to exceed fee. Staff will clarify this with consultant. The construction staking was included in the total at $5555. The fee for the artificial turf design was indicated in the total at $7048. • Larson Engineering, Inc. $94,084 Note: The fee for the artificial turf design was included in the total not to exceed $13,205. • SandersWackerBergly, Inc. $105,150 Note: The fee for the artificial turf design was included in the total not to exceed $5040. • Carlson- McCain $114,580 • Westwood $130,595 Note: Each of the proposals does include an alternate fee for design for 1 artificial turf field. Staff will interview the three (3) consultants and make a recommendation of the consultant to be selected to the City Council. The consultant selected will be attending the Park Commission workshop meeting on Thursday, December 20, 2012 to discuss the master plan and answer any questions the Commission may have. Based on input from the Commission, the consultant will prepare a draft master plan which will be presented to the Commission and associations on Thursday, January 17, 2013. ACTION REQUIRED The Park and Recreation Commission is requested to discuss the vision of the Sports Complex, Project 12 -31 and recommend the three (3) consultants for staff to interview. Respectfully submitted, ;001 Todd J. Haas Cc: Mike Johnson/Twila Hauck, Andover Football Association (copy sent by e -mail) Barb Anderson, North Metro Soccer Association (copy sent by e -mail) Glen Schneider, Andover Area Lacrosse Association (copy sent by e -mail)