HomeMy WebLinkAboutWK August 29, 2006
1685 CROSSTOWN BOULEVARD N.W. . ANDOVER, MINNESOTA 55304. (763) 755-5100
FAX (763) 755-8923 . WWW.CI.ANDOVER.MN.US
City Council Workshop
Tuesday, August 29, 2006
Conference Rooms A & B
1. Call to Order - 6:00 p.m.
2. Open Space Referendum Discussion
3. 2007 Proposed Budget & 2007 Tax Levy Review
4. 2007-2011 Capital Improvement Plan Review
5. Other Business
6. Adjournment
(i)
Sl\NDbVE~
1685 CROSSTOWN BOULEVARD N.W. . ANDOVER, MINNESOTA 55304. (763) 755.5100
FAX (763) 755-8923 . WWW.CI.ANDOVER.MN.US
TO:
Mayor and Council Members
FROM:
Jim Dickinson, City Administrator
SUBJECT:
Open Space Referendum Discussion
DATE:
August 29, 2006
INTRODUCTION
An Andover Council 2005-2006 goal is to explore open space preservation. Questions relative to open
space were integrated into the recent community survey conducted by Decision Resources Inc. which
indicated that there was strong support for the City to purchase open space for the purpose of preservation.
The survey also indicated that residents would be supportive of an increase in property taxes to support
open space preservation in the amount $20.60 on an annual basis.
Council discussion over these results has lead to the potential consideration of an open space referendum as
part of the November 2006 general election. In response to that discussion the Council created the "Open
Space Task Force" on July 18, 2006 (refer to attached Council meeting minutes and Open Space Task Force
member listing) to prepare a report for presentation to the Council on September 5, 2006.
DISCUSSION
The Open Space Task Force has meet four times over the month and has covered a lot of ground and at their
last meeting have prepared a ballot question and a "Commonly Asked Questions" sheet for the Council's
review (attached).
The ballot question has been discussed at each meeting of the task force and has undergone review by the
Trust For Public Land and the City's bond counsel. The "Commonly Asked Questions" sheet is a
compilation of reference materials gathered through the task force's research and updated to meet the needs
of the City of Andover.
City Staff, City Administrator and City Planner, have assisted the task force along the way and have
utilized the insight of bond counsel, Biggs & Morgan, and fiscal advisor, Ehlers & Associates, to assure
that legal and fiscal requirements are met. The actual resolution that will be presented to the Council to
approve ordering an open space ballot question is being prepared by Briggs & Morgan.
The City Clerk has indicated that the deadline for a ballot question for the November 2006 general election
would be September 15th. At that time the exact wording for the ballot question is needed. Also since the
last meeting the Council has schedule before September 15th is September 5th, the Council will need to
decide at the September 5th Council meeting whether or not an open space ballot question will be ordered.
Update on Potential Open Space Referendum
July 18, 2006
Page 2 of3
BUDGET AVAILABILITY
The community survey cost was $13,750. The City did budget $20,000 for community survey related
expenses, $6,250 is currently available to assist with incidental expenses if it is the Council's desire to
pursue placing an open space referendum on the November 2006 general election. If additional budget is
necessary, Finance would be able to provide suggested funding sources.
ACTION REOUESTED
The Council is requested to receive a presentation from the Open Space Task Force and City Staff, review
and discuss the progress made, and provide direction on the next steps the Council would like to take.
Respectfully submitted,
Jim Dickinson
Attachments: -City Council meeting minutes
-Open Space Task Force member listing
-Proposed ballot question
-Commonly Asked Questions sheet
Regular Andover City Council Meeting
Minutes - July 18, 2006
Page 19
Motion carried unanimously. (RES.
Minnesota on May 23,2003.
the tax forfeit sale for purch
Mr. Dickinson r . wed the information with the Council.
y Jacobson, Seconded by Orttel, to decline the purchase of the property.
ously.
UPDATE ON POTENTIAL OPEN SPACE REFERENDUM
City Administrator Dickinson stated an Andover Council 2005-06 goal is to explore open space
preservation. Questions relative to open space were integrated into the recent community survey
conducted by Decision Resources, Inc., which indicated that there was strong support for the City
to purchase open space for the purpose of preservation. The survey also indicated that residents
would be supportive of an increase in property taxes to support open space preservation in the
amount of $20.60 on an annual basis.
Mr. Dickinson reviewed the staff report with the Council.
Councilmember Trude thought this has been an important issue to the Mayor. She noted she
drew up a resolution appointing members to a task force committee.
The City Council hereby:
1. Authorizes the creation of an Open Space Task Force consisting of those persons whose
names appear on the list as part of Packet Item 19 in the Council packet of July 18,2006,
with the limitation that only one member per household may serve as a voting member.
2. Appoints Mayor Mike Gamache and Councilmember Mike Knight to represent the
Council on this Task Force authorizing them to work with staff to organize the meetings,
set the agendas and agree on the appointment of a Chair.
3. Directs the Open Space Task Force to prepare a report for presentation to the City
Council on September 5, 2006, to answer the following question: "If Andover residents
voted to increase their taxes in order to purchase $2 million of open space, what are the
characteristics of the land that should be sought to be purchased with these funds?"
4. If the City Council votes to authorize a referendum be placed on the November ballot for
the purchase of Open Space, the Task Force is authorized to prepare an article of
information on the referendum for publication in the City newsletter and other media
Regular Andover City Council Meeting
Minutes - July 18, 2006
Page 20
sources prior to the election.
5. The Open Space Task Force would be dissolved after completion of these tasks.
6. All meetings of the Open Space Task Force shall comply with the Open Meeting law,
with notices posted, and other council members welcomed to attend.
Motion by Trude, Seconded by Ortte!, to approve the proposed resolution.
Councilmember Jacobson stated in general he did not oppose this except for item 3. He thought
they need to defme what they mean and not just the characteristics of the land. They need to
defme what they really mean by open space.
Mr. Dickinson asked Decision Resources this question and when the survey question was asked
it did not mean the development of "Ball fields or park specifics".
The Council thought they need to define open space for the ballot.
Councilmember Knight thought they need to lean heavily on the existing organizations out there.
The Council discussed with staff what the committee should look at regarding open space.
I~ omrioo unanllnow<ly. (RES. R09! ~
PPROVE POLICY FOR NAMING AND RENAMING OF PARKS, PARK FACILITIES
~ S AND CITY CONTROLLED AREAS
)
At the July 5, 2 Council meeting the Council reviewed a proposed City of er "Policy
for Naming and Ren . of Parks, Park Facilities, Trails and Open Space" er the review
staff was directed to incorpo e various details discussed at the meet" and bring back to the
Council for future consideration.
Councilmembe rude stated she has a couple of changes. During their discussion re were a
couple of 0 er things they looked at and most of the time they do not want to go throug s
just for e basic parks. They already have a system. Item A should read "City Park naming .
occ during the preliminary plat review process. Parks shall generally be named after the
cation, subdivision neighborhood adjacent or nearby street or prominent natural feature near
RESIDENTS
Sara Jablonecki
Chip Stratman
Corey & Tanya Weisser
Pam Donato
Lyle Bradley
Douglas Falk
Bruce Cutter
Mary Holmes
Mark & Randi Miskowiec
Gretchen Sabel
Winslow Holasek
Dennis Raab
COUNCILMEMBERS
Mike Gamache
Mike Knight
OPEN SPACE TASK FORCE
Ballot Question
Presenration of Water, Wildlife and Natural Habitat Areas
Shall the City of Andover be authorized to issue general obligation bonds not to exceed
$2,000,000 to finance the acquisition ofland from willing sellers for the preservation of:
natural areas, water and air quality, wildlife habitat and to enhance the trail system?
Spending would be subject to an annual audit.
Yes
No
BY VOTING 'YES' ON THIS BALLOT, YOU ARE VOTING FOR A PROPERTY
TAX INCREASE. THIS PROPOSAL WOULD COST APPROXIMATELY $8 PER
YEAR FOR FIFTEEN YEARS FOR EACH $100,000 IN PROPERTY VALUE ON
MOST PROPERTY TYPES.
Commonly Asked Questions
1. What will the city accomplish with this dedicated funding?
Andover will use the funds to acquire land from willing sellers for protection of water and air quality,
preservation of wildlife habitat and natural amenities.
2. How will the city do this?
The city will acquire land and/or enter into land preservation agreements to permanently protect natural
areas.
3. Where would the lands be located?
Land throughout the city will be eligible for consideration.
4. What can be accomplished with $2,000,000?
An initial investment by Andover residents will open the door to matching funds from public agencies,
nonprofit organizations and corporate sponsors. Preservation can be accomplished in a variety of ways,
including the purchase of property, dedication of conservation easements, purchase or transfer of
development rights and park dedication. By utilizing a combination of funding sources and methods, the
amount of land that can be protected will be multiplied.
5. How long will these properties be protected?
The land will be protected in perpetuity.
6. How much will property taxes increase to fund this program and for how long?
A property owner will pay about $8 per year for each $100,000 of assessed property value for fifteen
years. The annual tax impact is expected to decrease in future years due to growth in the city's tax base.
7. How will the city ensure the program is effective?
A citizen advisory committee appointed by the City Council will review spending and expenditures will
be audited annually. This information will be open to public review. .
8. Does the city have experience with similar projects?
This year the city acquired more than 20 acres of natural habitat area and reached agreement to protect an
additional 10 acres along the same wildlife corridor near Hanson Boulevard and 161 51 Avenue. The
agreement includes a trail connection to the existing system along Hanson Boulevard. A restoration
project in Kelsey Round Lake Park was also completed with funding from with the Department of Natural
Resources and the Natural Resources Conservation Service. The city is currently working with the DNR,
Coon Creek Watershed Management District, Tree Trust and Anoka County Parks to restore native plants
in wetlands along Coon Creek. With dedicated funding a city wide effort to preserve natural areas can be
implemented.
9. What will the effect be on my property?
Local and national research has shown that natural areas positively affect home values and consistently
rank high on lists of home buyer preferences.
10. Are there natural areas remaining in Andover that need to be protected?
Yes. Approximately 40% of the city remains undeveloped. However, The Metropolitan Council
forecasts the city's population will grow to 39,000 people with the addition of as many as 4,000 new
homes by the year 2020. There is presently an opportunity to preserve unique natural areas from
development for the enjoyment of residents now and in the years to come.
11. Will all property owners be required to pay this tax?
No, state law exempts agricultural land and seasonal property from taxes used to repay all referendum
debt.
12. Why would a landowner want to participate in this program?
This would be an option for landowners who don't want to see their land developed but want to protect it
for the enjoyment of future generations.
For Additional Information Contact:
at (763) 755-5100
Q)
1685 CROSSTOWN BOULEVARD N.W. . ANDOVER, MINNESOTA 55304 . (763) 755-5100
FAX (763) 755-8923 . WWW.CI.ANDOVER.MN.US
TO:
Mayor and Councilmembers
FROM:
Jim Dickinson, City Administrator
SUBJECT:
2007 Proposed Budget & 2007 Tax Levy Review
DATE
August 29, 2006
INTRODUCTION
The Council has had a number of reviews of the 2007 Proposed Budget that will be supported by the 2007
Tax Levy. At the last meeting only a few questions remained and those questions will be addressed through
the discussion.
The Council is requested to brim!: their 2007 Bud!!:et information that was discussed at the Au!!:ust 22.
2006 workshop meetin!!: to assist with the discussion.
DISCUSSION
The following items identify sections of the budget the Council wanted more information, updates are in
italics:
Personnel Related Implications:
To date the following are issues facing personnel related expenses:
1. A total salary compensation adjustment package is proposed to provide wages that are competitive
with other government entities. Human Resources indicated that 2007 wage proposals in other
communities for a cost-of-living increase are ranging from 3% to over 4%. Finance/Administration
is currently utilizing a 3.5% cost-of-living increase for the proposed 2007 Budget as a place holder.
Council concurrence relative to this percentage will be sought at the workshop.
Council desired an opportunity to review an updated survey on cost of livin'Z increases, and to include
neighborin'Z communities. Human Resources has updated the survey and those results are attached.
Contractual Departments:
1. The Anoka County Sheriff's contract is currently being negotiated, currently just maintaining the
status quo (72 hour of law enforcement coverage, 12 hours of Community Service Officer coverage,
two School Liaison Officers, additional park patrol through use of CSOs and a part-time Crime
Prevention position) results in an increase of$123,512.
Per Council direction, Administration has requested pricing for additional patrolling, pricing was
received for an additional 8 hours of law enforcement coverage. The following identifies the
additional cost based on a particular start date:
January 2007 $181,758
May 2007 $126,425
June 2007 $112,550
July 2007 $ 98,738
1
The current budget is utilizing a July 2007 start date!
Council provided a number of complements to the Sheriff's Office. those were past alonf!. The Council also
requested that the Sheriff's Office provide Sheriff activity updates in addition to the arrest activity at
Council meetinf!s. The Sheriff's Office welcomed the request!!
Council Memberships and Donations/Contributions:
The following memberships are included as part of the 2007 proposed budget:
League of Minnesota Cities
North Metro Mayor
Association of Metropolitan Cities (AMM)
$17,311
$15,400
$ 6,500
Repeat of2006 Budget item
Repeat of2006 Budget item
Not included in 2006 Budget
The following donations/contributions are included as part of the 2007 proposed budget:
Community Schools
Mediation Services
Youth First
Alexandra House
Senior High Parties
$43,142
$ 3,075
$ 5,000
$10,000
$ 1,500
General Fund
General Fund
Charitable Gambling Fund
Charitable Gambling Fund
Charitable Gambling Fund
Council requested a report on the activities of Community Schools. That has been requested. and if
received by the meeting. it will be presented Council also indicated a desire to see if additional funds could
be souf!ht for Youth First. I am suggestinf! that if savinf!s. from what is currently being bU(if!eted. are
achieved in the employee heath insurance renewal, that be used to assist Youth First.
The other attachments to this staff report (and listed below) are draft staff reports that are anticipated to be
presented to the Council at the September 5, 2006 Council meeting.
Attachments
1. Adopt 2007 Preliminary Tax Levy
2. 2007 Debt Service Levy Changes
3. Set Truth in Taxation Hearing Date
ACTION REOUESTED
The Council is requested to review the staff report, attachments and provide direction to staff as to whether
the Council feels the budget and levy are proceeding in the right direction.
Attachments
2
Proposed COLA 2007
Agency Pop.
Non-Union
Anoka 17,509 3.00%
Andover 30,000 3.50%
Arden Hills 9,426 3.00%
Blaine 41,658 3.50%
Bloomington 86,683 3.00%
Columbia Heights 18,882 3.00%
Coon Rapids 58,991 3.50%
Cottage Grove 28,706 3.50%
Crystal 23,703 3.50%
Eagan 65,000 3.00%
Forest Lake 3.00%
Fridley 28,104 3.00%
Hastings 21,600 3.50%
Maplewood 36,000 4.00%
New Brighton 22,328 3.00%
Prior Lake 16,000 3.00%
Ramsey 20,000 3.00%
Roseville 33,674 3.00%
St. Cloud 50,143 2.50%
Spring Lake Park 6,628 3.00%
Stillwater 16,500 3.50%
Q)
1685 CROSSTOWN BOULEVARD N.W. . ANDOVER, MINNESOTA 55304 . (763) 755-5100
FAX (763) 755-8923. WWW.CI.ANDOVER.MN.US
TO: Mayor and Councilmembers
SUBJECT: Adopt 2007 Preliminary Tax Levy
'~;;/'~ \
FROM: Jim Dickinson, City Administrator
DATE:
September 5, 2006
INTRODUCTION
Each year the City Council is required by state law to approve a preliminary budget and submit a
preliminary levy certification to Anoka County Property Records and Taxation Division by
September 15th. '
DISCUSSION
The 2007 Preliminary Levy certification is the outcome of the numerous budget workshops held
with the Council over the summer. The Preliminary 2007 Budget proposes a total property tax
levy of $9,316,427: $6,115,179 (65.6%) operational levy, $1,833,494 (19.7%) debt service levy,
and $1,367,754 (14.7%) capital levy. The Council has the right to reduce or keep constant this
levy until the final certification date of December 28,2006.
BUDGET IMP ACT
This is the first step in establishing an operating budget for 2007.
ACTION REOUIRED
The Andover City Council is requested to approve the attached resolution that indicates a tatal
preliminary levy of $9,316,427 to be submitted to the Anoka County Property Records and
Taxation Division by September 15th.
Respectfully submitted,
Jim Dickinson
Attachments: Resolution Adopting the Proposed 2007 Property Tax Levy
Attachment A - Proposed 2007 Property Tax Levy
cs
CITY OF ANDOVER
COUNTY OF ANOKA
STATE OF MINNESOTA
RES. NO.
A RESOLUTION ADOPTING THE CITY OF ANDOVER 2007 PROPOSED PROPERTY TAX LEVY TO BE
CERTIFIED TO THE COUNTY AUDITOR.
\)" ~~ +
WHEREAS, the preparation and adoption of operating budgets is recognized as sound financial practice; and
WHEREAS, the City of Andover receives significant financial support from its residents through the payment
of property taxes; and
WHEREAS, the City of Andover has the responsibility to appropriately and efficiently manage the public's
funds; and
WHEREAS, Minnesota State Law requires the City to certify to the County Auditor a proposed tax levy and
budget prior to September 15,2006.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Andover hereby adopts the
proposed 2007 property tax levy totaling $9,316,427 as listed on Attachment A.
Adopted by the City of Andover this 5th day of September 2006.
CITY OF ANDOVER
ATTEST:
Michael R. Gamache - Mayor
Victoria Volk - City Clerk
(5)
----
\),..~~ 1\ ii"(\..-..........,, t ~
City of Andover, Minnesota 612512006
Property Tax Levy
Certified Certified Certified Certlfled r Reque.ted Change
2003 2004 2005 2008 2007 % of Total $ %
General Fund levy $ 4,549,530 $ 4,894,048 $ 4,874,908 $ 5,640,212 6,080,179 65.26% $ 439,967.00 7.80%
Debt Service Funds Levy
1999 G.O. Equipment Certificate 301.980 326,655
2001 C G.O. Equipment Certificate 274,404 276,693 283,210 283,537
2003 G.O. Equipment Certificate 200,000 212,695
2003C G.O. Equipment Certificate 168,000 132,030 132,180
2oo4A G.O. Capilallmprovement Bonds 247,766 364,788 365,051
2004 EDA Public Facility Revenue Bonds 807,000 847,350 889,718
20058 Capital Improvement Bonds 137,922 126,305
20058 G.O. Equipment Certificate 200,000 65,788 63,945
2006B G.O. Equipment Certificate 188,475
2007 G.O. Equipment Certificate 200.000
Total Debt Service* 776,384 984,043 1.670,006 1,831,565 1,833,494 19.68% 1,929.00 0.11%
Other levies
Capital Projects levy
Capital EquipmentIProject 203,200 203,200 203,200 209,296 210,000 2.25% 704.00 0.34%
Parks Projects 50,800 50,800 52,800 54,384 56,000 0.60% 1,616.00 2.97%
Road & Bridge 619,611 619,611 679,899 734,686 1,052,953 11.30% 318,267.00 43.32%
Pedestrtan Trail Maintenance 46,000 47,380 48,801 0.52% 1,421.00 3.00%
Lower Rum River Watershed 24,000 30,000 30,000 33,396 35,000 0.38% 1,604.00 4.80%
GrOSI City Levy 6,223,525 8,781,700 7,558,813 8,550,81g ',318,427 100% 765,508.00 8.95%
Less Fiscal Disparities Distribution 835,118 14',133 128,888 g48,173 520,000 (26,173.00) -2.82%
local Tax Rate Levy $ 5,388,327 $ 5,832,587 $ 8,625,'47 7,604,748 $ 8,386,427 791.681.00 10.41%
Adjusted Tax Capacity Value" $ 18,248,780 $ 18.604,414 $ 21,251,752 $ 24,010,760 $ 26,636,841 $ 2,826,081 11.77%
~ ~
Tax Capacity Rate". 33.161% 31.350% 31.197% 31.672% 31.287% -1.216% -0.385%
Tax Capacity Rate WID lRRWSO 33.037% 31.209% 31.076% 31.547% 0.000%
Tax Capacity Rate With lRRWSD 33.376% 31.603% 31.414% 31.895% 0.000%
.2003 Debt Servics Levy is based on City's Debt Management Study L }
** Adjusted Value determined by adjusting for Fiscal Disparities and Tax Increment estimates. ~
... Blended rate due to the City of Andover levying for Lower Rum River Watershed District V>J'\\ \H \'-\e
Jj l\!~
(1) Adjusted Tax Capacity Value is subject to change.
DY\ ,':) (0' IJW'lV'\
{J'" ~~\I{~"''''1'i
\1 ~',
CD
5'\ND6VE~
1685 CROSSTOWN BOULEVARD N.W. . ANDOVER, MINNESOTA 55304. (763) 755-5100
FAX (763) 755-8923 . WWW.CI.ANDOVER.MN.US
FROM:
Jim Dickinson, City AdministratorlFinance Director
'-~\
~
TO:
Mayor and Councilmembers
SUBJECT: 2007 Debt Service Levy Changes
DATE: September 6, 2006
INTRODUCTION
Anoka County Property Records and Taxation Division requires a City Council resolution
changing bonded indebtedness levies for 2007 that would have been certified to Anoka County as
part of prior years bond sales.
DISCUSSION
When the City issues bonds, a certification of the bonded indebtedness levy is sent to Anoka
County. The County is charged with assuring on an annual basis that local government bonded
indebtedness payments are made. To assist in monitoring, the County is requesting a resolution
that would update all or a portion of previously certified bonded indebtedness levies.
Attached is a resolution to update bonded indebtedness levies along with a brief description as to
why there was a change.
BUDGET IMP ACT
The 2007 City of Andover Debt Service Budgets are current and up-to-date. This resolution is to
inform the County of any changes that have taken place in the past year as well as any new
issuances proposed to be levied for 2007.
ACTION REOUlRED
The Andover City Council is requested to approve the attached resolution that would update
certified bonded indebtedness levies for 2007.
Respectfully submitted,
Jim Dickinson
Attachment: Resolution Updating Certified Bonded Indebtedness for 2007
Attachment A - 2006 Proposed Levy Certification Debt Changes
6)
CITY OF ANDOVER
COUNTY OF ANOKA
STATE OF MINNESOTA
RES. NO.
A RESOLUTION UPDATING CERTIFIED BONDED INDEBTEDNESS FOR 2007.
"0'~\
WHEREAS, the preparation and adoption of budgets is recognized as sound financial practice; and
WHEREAS, the City of Andover has the responsibility to appropriately and efficiently manage the public's
funds; and
WHEREAS, the City of Andover has determined that it is prudent to update certified bonded indebtedness
levies for 2006; and
WHEREAS, the Anoka County Property Records and Taxation Division is requiring a City Council resolution
updating bonded indebtedness levies that would have been certified Anoka County as part of prior year bond sales.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Andover hereby updates all or a
portion of previously certified bonded indebtedness levies for 2007 as listed on Attachment A.
Adopted by the City of Andover this 5th day of September 2006.
CITY OF ANDOVER
ATTEST:
Michael R. Gamache - Mayor
Victoria Volk - City Clerk
~
CITY OF ANDOVER
2007 Proposed Levy Certification Debt Changes
"\)<- ~'\
Attachment A
County Levy City Levy Levy
GENERAL OBLIGATION DEBT Scheduled Scheduled Changes Variance Explanation
56 2004A GO Capital Improvement Bonds 365,051 365,051 Ok
58 2005A GO Improvement Bonds 571,500 571,500 Paid for by assessments
59 2005B GO Equipment Certificate 64,900 63,945 955 City has interest earnings in Debt Service Fund
60 2005B GO Capital Improvement Bonds 128,200 126,305 1,895 City has interest earnings in Debt Service Fund
61 2006A GO PIR Bonds 133,624 133,624 Paid for by assessments
62 2006B GO Equipment Certificate 169,763 188,475 (18,712) City levying for two interest payments
2007 GO Equipment Certificate 200,000 (200,000) Bonds not yet issued
2004 EDA Public Facility Lease Rev 889,718 (889,718) Lease revenue payment per pledge agreement
Total $ 1,433,037 $ 1,833,494 $ (400,457)
@)
CITY OF
NDOVE
1685 CROSSTOWN BOULEVARD N.W. . ANDOVER, MINNESOTA 55304 . (763) 755-5100
FAX (763) 755-8923 . WWW.CI.ANDOVER.MN.US
TO:
Mayor and Councilmembers
'\),~~\
FROM: Jim Dickinson, City AdministratorlFinance Director
SUBJECT: Set Truth in Taxation Hearing Date
DATE: September 5, 2006
INTRODUCTION
This year the Andover City Council is required to hold Truth in Taxation meetings. These
meetings give the public the opportunity to comment on the proposed 2007 budget and tax levy.
DISCUSSION:
The first hearing date selected by the City will be for the initial hearing to present the proposed
levy and budget to the public. If the initial hearing is not sufficient for all public comment and
further discussion is required, a continuation hearing will be necessary, The date and time of
continuation hearing must be announced before the close of the initial hearing. The continuation
hearing must occur at least 5 but no more than 14 business days after the initial hearing. If a
continuation hearing is not necessary, the City must announce the date and time of a subsequent
hearing for the official adoption of the final levy and budget. The announcement must be made
prior to the end of the initial hearing. The Andover City Council is requested to set an initial
Truth in Taxation Public Hearing date from the suggested dates as follows:
Initial hearing date: -Monday December 4,2006 at 7:00 PM
-Tuesday December 5, 2006 at 7:00 PM (Done as
part of a regularly scheduled meeting)
-Monday December 11, 2006 at 7:00 PM
Continuation hearing date: -Tuesday, December 19, 2006 a regular City
Council meeting.
Official adoption date: -Tuesday, December 19, 2006 a regular City
Council meeting.
ACTION REOUIRED
The Andover City Council is requested to select a Truth-in-Taxation hearing date.
Respectfully submitted,
Jim Dickinson
@
COUNTY
OF
ANOKA
PROPERTY RECORDS AND TAXATION DIVISION
GOVERNMENT CENTER. 2100 3RD AVENUE. ANOKA, MN 55303
FAX (763) 323-5421
. Property Assessment
. Property Records and Public Service
. Property Tax Accounting and Research
August 17, 2006
Mr. Jim Dickinson
Finance Director
City of Andover
1685 Crosstown Blvd. NW
Andover, MN 55304
Dear Mr. Dickinson:
The Truth in Taxation law, M.S. 275.065 requires cities to hold a public budget hearing
for property taxes payable in the year 2007. The dates for this hearing cannot conflict
with the initial hearing set by the county, metropolitan agencies or the school districts
located in your city. However, your continuation hearing may conflict with the
continuation hearing of another taxing district. These hearings must be held between
November 29 and December 20, 2006. The continuation hearing must be at least 5 but no
more than 14 business days after your initial hearing. Additionally, Chapter 389, Laws of
1998, requires that the first and second Mondays of December are reserved for use by the
cities until September 15. The following taxing districts within your city have set the
following hearing dates:
TAXING HEARING
DISTRICT DATE
Anoka County................... December 7 ..........
Metropolitan Agencies......._..December 6 ..........
SD #11........................ . November 30 .........
SD #15......................... December 2 ..........
RECONVENING
DATE
December 19
December 13
December 8
December 9
With this information you can now set the initial date for your public hearing and a
date for reconvening the meeting, if necessary. In addition, the time and location of the
initial meeting, the phone number an interested taxpayer may call and your payable 2007
certified proposed property tax levy is due on or before September 15, 2006. A proposed
levy and hearing date certification form is enclosed. Also, a copy of the bond levy
schedule for your taxing jurisdiction is enclosed. If you aren't levying the scheduled
amount, a board resolution to cancel the bonded indebtedness levy is required. According
to M.S. 475.61, the county is required to levy the amount originally certified unless the
taxing authority passes a resolution canceling the levy.
If you have any questions concerning the Truth in Taxation process, please call at
(763) 323-5435.
Sincerely,
CZ (jjJ.
--(Lv\.- ~
Jo n Flavin
Property Tax Accounting
Encl.
Affirmative Action I Equal Opportunity Employer
@
CITY OF
NDOVE
(j)
1685 CROSSTOWN BOULEVARD N.W. . ANDOVER, MINNESOTA 55304 . (763) 755-5100
FAX (763) 755-8923 . WWW.CI.ANDOVER.MN.US
TO: Mayor and Councilmembers
FROM: Jim Dickinson, City Administrator
SUBJECT: 2007-2011 Capital Improvement Plan (CIP) Review
DATE August 22, 2006
INTRODUCTION
City Departments have prepared a proposed 2007-2011 CIP (attached) for the Council's review.
Also attached are various rate analysis and cash flow projections used during the process. The
proposed projects will be review with the Council at the meeting.
Underlined items in the Staff report will be discussed in further detail at the meeting.
DISCUSSION
Bude:et Guidelines:
The following are City Council's 2007 Budget Development guidelines (established by the City
Council on May 2,2006) used by City Staff to prepare the proposed 2007-2011 CIP:
1) A commitment to maintain or reduce the City Tax Capacity Rate, utilizing recent market
value growth to meet the needs of the organization and positioning the City for long-term
competitiveness, staffing and capital requirements through sustainable revenue sources and
operational efficiencies.
2) A commitment to review various revenue streams. including but not limited to tax levy. state
aid. grants and special assessments. to adequately fund necessary City roadway
improvements.
3) A fiscal goal that works toward establishing the General Fund balance for working capital at
no less than 35% of planned 2007 General Fund expenditures.
4) A commitment to limit the 2007 debt levy to no more than 25% of the gross tax levy and a
commitment to a detailed city debt analysis to take advantage of alternative financing
consistent with the City's adopted Debt Policy.
5) A comprehensive review of the condition of capital equipment to ensure that the most cost-
effective replacement schedule is followed. Equipment will be replaced on the basis of a cost
benefit analvsis rather than a vear based replacement schedule.
1
6) A team approach that encourages strategic planning to meet immediate and long-term
operational. staffing, infrastructure and facility needs.
7) A management philosophy that actively supports the implementation of Council policies and
goals. and recognizes the need to be responsive to changing community conditions, concerns
and demands in a cost effective manner.
Current City of Andover Capital Improvement Policy:
The following is the City of Andover adopted Capital Improvement Policy, which is part of the
City of Andover Financial Policies:
CITYOFANDOVERFmANC~Poucrns
C. Capital Improvement Policy
1. A Capital Improvements Program (CIP) will be developed for a period of five years. As
resources are available, the most current year of the CIP will be incorporated into the current
year operating budget as the Capital Improvements Budget (Cm). The CIP will be reviewed
and updated annually. Years two through five are for planning purposes only.
2. The City will maintain its physical assets in a manner, adequate to protect the City's capital
investment and to minimize future maintenance and replacement costs. The City will
provide for maintenance and replacement from current revenues where possible.
3. To be considered in the Capital Improvements Program a project must have an estimated
cost of at least $5,000 in one of the calendar years of the project. Projects may not be
combined to meet the minimum standard unless they are dependent upon each other. Items
that are operating expense (such as maintenance agreements, personal computer software
upgrades, etc.) will not be considered within the CIP.
5. Capital projects, which duplicate other public and/or private service, will not be considered.
6. The City will identitY the estimated costs and potential funding sources for each capital
project prior to inclusion in the CIP. The operating costs to maintain capital projects shall
be considered prior to the decision to undertake the capital projects.
7. Capital projects and/or capital asset purchases will receive a higher priority if they meet a
majority of the following criteria:
A. Mandatory project
B. Maintenance project (approved replacement schedules)
C. Improve efficiency
D. Provide a new service
E. Policy area project
2
F. Broad extent of usage
G. Length of expected useful life
H. Positive effect on operation and maintenance costs
I. Availability of county/state/federal grants
J. Elimination of hazards (improves public safety)
K. Prior commitments
L. Replacement due to disaster or loss
9. The CIP is to be presented by the Finance Director annually to the City Council for approval.
Any substantive change to the CIP after approval must be approved by the City Council.
Proposed 2007 Capital Proiects Levy:
Capital Proiects Levy - The 2007 Budget number for the Capital Projects Levy is part of the
2007-2011 Capital Improvement Plan (CIP) review process.
. Road and Bridge - This levy is proposed for transportation programming related to
maintaining City streets, roadways and pedestrian trails. This would be the fourth year
that a portion of the Road & Bridge Fund is dedicated to pedestrian trail maintenance.
This levy is also used for the City's seal coating and crack sealing programs and to street
overlays and reconstructs. The 2007 Road and Bridge levv was calculated using an
additional 1 % of captured net tax capacity based on Council direction. And while the
policv for road assessments is not fully complete, the budget is designed to achieve the
Council's goal of adequately funding necessary City roadway improvements.
. Park Improvements - This levy is proposed as an annual appropriation to be used to
underwrite a wide range of park improvement projects as recommended by the Park and
Recreation Commission and approved by the City Council. This funding is intended to be
a long-term supplemental source of capital funding for park projects that would be
separately identified in the City's Five-Year Capital Improvement Plan. A 3% levv
increase is proposed.
. Capital EauipmentIProiects - Under the Capital Projects Levy, the levy proposed is
designated to capital improvement/equipment project expenditures. Through this
designation, the City, over time, will be able to build a fund reserve to avoid cash flow
"spikes" and address a wide range of capital improvement needs such as facility
maintenance projects under a more controlled spending environment. No increase will be
proposed for this levy. which is currently approximately $210,000.
Debt Service Levy:
Annually the Finance Department conducts a detailed debt service analysis to monitor
outstanding debt and to look for early debt retirement or refinancing opportunities that will yield
interest expense saving to the City, that process is currently underway.
The Debt Service levy will need to provide for (at a minimum) the following debt service
payments:
3
. 2004A G.O. Capital Imp. Bonds
. 2004 EDA Public Facility Bonds
. 2005 G.O. Capital Imp. Bonds
. 2005B G.O. Equipment Certificate
. 2006B G.O. Equipment Certificate
$365,051
$889,718
$126,305
$ 63,945
$188,475
There will also be an additional $200.000 added to the levY to accommodate a 2007 G.O.
Equipment Certificate to purchase equipment that will be outlined in the 2007-2011 CIP.
ACTION REOUESTED
The Council is requested to review the 2007-2011 CIP and provide direction to staff.
Attachments -Water System Financial Projections
-Sewer System Financial Projections
-Park Improvement Fund Projected Fund Balance
-Trail Fund Projected Fund Balance
-Road and Bridge Funds - Rollup Projected Fund Balance
-MSA Funded Projects Projected Fund Balance
-Tax Levy Funded - Roadway Proj ects
-Tax Levy Funded - Pedestrian Trail Maintenance
-2007-2011 Proposed Capital Improvement Plan
4
Yea
Inf\ationFactor
A....rag. Use (gallons per user pe
A"",, Added
New ComecOOnI
New Customers
Total Customers
~I.'
Base Rate
Use Rata
Connedlon Charge
Area Charge
ConneclO<VAnoa
.........
Use Rate
IOperaUona
Revem....
Use+Base
M......
PermilFees
Penalties
,-
Xferln
01"'"
TolaI
Expens..
O,*""""
DebI Service
CapltalOt<lay
Replacemert Reserve
TolaI
Balance. Un,..lrlcted
Annual Surplu&lDelldl:
Cumulative baIaoce
Ilnfrastructu,.fTrunk
~venue.
Comection Charges
Area Charges
''''''"'"
Special Assessrnert
Replacement Reserve
""""
ToIaI
expeRt..
Debt SeMce
CapilaIOutIay
XferOt.C
T"'"
Balance
Annual SurpluslDeficit
B-.ce
2001
1,041,001
38.356
13,900
16,806
114,336
".
1,224,125
872.653
815,673
1,688,326
2002
,.....
40,983
65
200
300
4,742
7.30
1.14
1,840
1.686
1,058,666
40,343
'4,000
18,977
411,352
196
1,539.534
90<1.962
253.557
363,000
1.526.519
2003
,.....
37,163
65
200
200
'.900
7.67
1.20
1,987
1,821
...
5"
5"
1,337,130
28.392
8,350
25.9215
(93,195)
5OS,170
1,811,773
974,455
458.030
350,000
1.782.485
CfTY OF ANDOVER
Wate' System FilYnc:YI Pro}Ktlona
2004
,.....
39,871
65
200
200
5,100
..05
1.26
2,146
1,967
...
5"
5"
1,329,831
48,818
13,350
1.,606
2,186
739.438
127.986
2.276,813
993,752
749,487
434.000
2,171,219
AduaI
2005
,.....
36.215
65
200
200
5,410
,.....
34,704
50
150
150
5.620
....mat.
....
,.....
34.704
50
150
150
5,770
8.87
1.39
2.503
2.294
...
5"
5"
1,"09,672
"6,316
11,350
21,638
12,"86
168,221
5,892
1,675,355
','....,736
7"8,720
105,000
1,996,"56
2007
9."9
1.49
2,704
2,..n
...
'"
'"
1,547,561
"8,316
11,350
21,638
12,"66
92,645
5,692
1,737,668
1,179,078
7"5,663
65.000
1,979.7'"
2'"
,.....
34,704
50
150
150
5.920
,.....
34,704
35
100
100
6,020
2000
10.67
1.70
3,153
2,890
."
7"
7"
1,831,661
"6,316
11,350
21,638
12,"66
72,883
5.692
2,002,006
1,250,884
7"9,"39
50.000
2,050,323
Fe<caot
2010 2011
,.....
34,704
35
100
100
6,120
,....
34,704
35
100
100
6,220
12.21
1.91
3,678
3.370
...
5"
5"
2,085,"00
"6,316
11,350
21,638
12,"66
85,011
5,692
2,267,873
1,327,063
757,507
65.000
2,139,570
2012
,.....
34,704
'5
100
100
6,320
12.82
2.01
3.972
3,640
...
5"
5"
2,22",316
"6,316
11,350
21,638
12,"66
91,812
5,692
2,"13,590
1,366,875
759,<<0
65.000
2,181,315
2013
201"
("63,601)
1,990,721
1,527,120
"57,348
737,1"9
(124,893)
612,256
I c;"pltal Projects
W...
Rehab W'"
~ofWell"
T.....
New DeYeIopmert Projects
1 Z' water lint down South
PIanl
Pain: waler tower
2 miIIon galon storage tank
Surface Seal Brick Strudlns
Oemo .,...
WTP reclaim tank addition
EQ_
WflAer Securty Syslem lmprovemeru
EIeclricScissorUft
GPS
VanRepIacemer1
T"'"
Funded by 0petati0nI
Funded by Infrastruc:tl.q'ruok
Funded bydebl
Total
IDebt
Rat.
Teon
MOS
CumulaliveDS
Cunonl OS
WTP
8."5
1,32
2,318
2,12"
'"
5"
5"
1,"25,123
"6.316
11.350
21,638
12,"66
5,692
1,522,585
1.098,87"
754.392
68,196
1,919,"62
10.16
1.59
2,920
2,675
."
7"
7"
1,683,861
"6,318
11,350
21,638
12,"66
100,056
5,692
1,881,379
1.21.....50
7"8,228
63.000
2,025,678
11.63
1.62
3."06
3,121
'"
7"
7"
1,954,669
"6.316
11.350
21,638
12,"68
78,71"
5,692
2,130,845
1,288,"10
754,221
50,000
2,092,631
,.....
34,704
35
100
100
6,"20
,.....
34,704
'5
100
100
6,520
,.....
34.704
35
100
100
6,820
13.46
2.11
.,290
3,931
...
5"
5"
1".1"
2.21
",633
",2"6
."
5"
5"
1".84
2.32
5.'"
'.565
'"
5"
5"
2,371,911
"6,316
11,350
21,838
12,"68
99,157
5,692
2,568,530
2,528,705
"6,316
11,350
21,638
12,"66
107,090
5,692
2,733,257
1,407,881
759,964
00.000
1,"50,117
759,034
00.000
2.227,845
2,269,151
13,015
29,288
99,594
(396,877)
(321.101)
(2"2,073)
(1....,299)
("8,317)
36.21"
128,303
232,276
340,685
"64,105
1.540,135
1,569,"23
1,689,017
1.272,1"0
951,039
708,966
564.667
516,349
554,563
682.866
915,1"2
1,255,827
1.719,932
931,718
5.962
90.212
88,219
73,"50
383.000
797,979
"5,328
768,758
350,000
1,960,065
1,335,347
50,119
"5,656
"34,000
12,385
1,877,507
961,261
79.891
130,910
2.210
1,17",272
"05,535
123,864
25.000
50.000
604,399
"37,977
133,77"
25,000
50.000
315,3<<
101.133
25,000
50.000
646,751
"91,"76
340,571
109,223
25.000
50.000
52",795
387,817
117,961
25,000
510,778
397,2"2
127,398
25.000
549,840
"29,022
137.590
25,000
"63,343
1"8,597
25,000
500,"'1
160,485
25,000
228,000
781,540
1,"56,387
591,812
685,896
836,941
12,108
"~63
546.630
213,978
888,235
56....
505,170
1,"50,"03
"63,254
399.166
739,"38
1 ,601,858
978,847
976,&47
170.250
168,221
338,"71
175,500
92,645
268,1"5
978,500
100,056
1.078,556
284.210
299,000
72,683
656.093
284.210
650.000
78,71"
1,012,92"
284.210
150,000
85,011
519,221
284.210
150,000
91,812
526,022
284,210
150,000
99.157
533,367
284,210
150,000
107,090
541,300
.....391
760,808
695.779
1,308,035
509.662
1.617,697
2,093,346
275,649
197,"25
265,928
2,556.699
2.935,305
378,606
(587.080)
(131.298)
2,218,927
(502,1"6)
1,71",781
1,7"5,201
30,"20
1,810,791
65,590
103,57"
1<<,596
1,91",365
2,058,961
2,290,771
170,250
15,000
5.000
5.000
"0,000
275.250
40.000
2,348,225
.5,000 "5.000
10,000
175,500 120,500
750,000
108,000
2,950,000
18,000
230,500 3,991,500
50.000
12",000
150.000
50.000
65.000
150,000
205,000
65.000
00.000
175,000
500.000
349,000
700,000
00.000
150,000
150,000
150,000
205,000
210,000
210,000
275,250
105,000
170,250
55,000 63,000
175,500 978,500
2,950,000
230,500 3,991,500
50.000
299,000
50.000
650.000
700,000
65.000
150,000
205,000
65.000
150,000
00.000
150,000
00.000
150,000
205,000
210,000
210,000
349,000
5.....
10
o
5.....
10
5.....
10
739,"38
5.....
10
7"',393
7"6,720
5....
10
5.....
10
5.....
15
284,210
17,5% of Comectlon I Area Charges is U$ed to suppolt 1he WTP
7"5.683
7"8,228
5.....
15
284,210
284,210
74g,"39
5.....
15
754,221
5.....
15
284,210
757,507
5.()(:l% 5,00%
15 15
5.....
15
284,210 284.210
284.210
75g,....O
759.034
759,964
@
Year
InftatiOn Factor. ell:penses
-.....
New Come<tiono
New c.-~
Total Customers
.....
.... ROO
U.._
Connection Charge
Anoo Chaove
ConnectionIAr..
.... Rale
UseRate
IOoer'llons
R_
.... Uoe
Penalties
.......
Othe,
ToIaI
Ex......
Operations
Oeta _
CapllalOt<lay
Replacement Re.......
TOIaI
8&"nce. Urvestrictlld
........S~
FB 1213112000
BaIanal
2001
,.....
65
200
300
5,578
1,153.225
17,378
95,422
1266023
738,810
825,622
1364232
(98,209)
1783625
'002
7.30
'22
1,180
1,229,730
20,018
46,959
164
1296891
9n,659
".000
228062
1234 721
,.....
65
200
200
5,895
200.
,.....
65
200
200
6,017
2004
,.....
65
200
200
'.21>1
46.00
'"
1,252
,,,
'"
""
1,338.825
18,914
4.016
7527
1369282
988,704
7.000
000 000
1 395 704
(26,422)
......
200'
em Of AHOO'VER
s..... S,.... FNnc:". projKtions
47.84
351
1,302
'"
'"
""
1,523,475
19,646
33,601
7624
1584346
1,139,365
7.000
61,173
1207538
.........
....
,.....
50
150
150
8,435
49.75
361
1,340
'"
."
'"
1,362.832
19,646
33,601
1416079
1,256.859
5.000
'00 000
1561859
378.808
(145,780)
,....
50
150
150
'.565
2007
,.....
50
150
150
..m
2001
,.....
35
100
100
6,635
53.81
387
1,434
."
."
,,,
1,529.946
19,646
33.601
1583193
1,333.402
300,000
'00 000
1933402
(91,6n)
(350,209)
2001
,.....
35
100
100
'.935
55.96
."
1,491
'"
'"
'"
1,814,468
19,846
33,601
1667715
1,373,404
'00 000
1 673 404
........
2010 2011
5820
.,.
1.551
'"
'"
,,,
1,703,31"
19,646
33,601
1 756561
1,"14,606
300 000
1714606
('5,689)
,.....
35
100
100
7.035
60.'53
435
1,813
'"
'"
'"
1,796,593
19,646
33,601
1849840
1,"57,044
350000
1807044
41,955
2012
,.....
35
100
100
7,135
62.95
.52
1,678
'"
'"
'"
1,894,702
19,8411
33,601
1947949
1 ,500,755
350000
1850755
42,796
2013
2014
,.....
35
100
100
7,435
46.00
331
1,215
."
5"
""
1,287,168
22,"18
(1,416)
1308168
988,413
410,873
'90 000
1 787286
&2,170
(479,118)
51.7"
,n
1.379
'"
'"
'"
1,....9,841
19,648
33,601
1 502888
1,294,565
'00 000
1594 565
,.....
'5
100
100
7235
,.....
35
100
100
7,335
65.47
58.09
70.81
."
1,745
'"
'"
'"
,..
1,815
."
'"
'"
509
1....
'"
."
'"
1,997,761
19,646
33,601
2 051 008
2,105,889
19,648
33,601
2159136
1,545,178
1,592,151
350000
1895778
'00 000
1992151
97,194
166.985
155,230
1.362,674
1529,659
11nfr'lJtructur~runk
R_
Connedlon Cha<ge.
Atea Charges
..."'..
ReplacemeliReserw
SpedaI Auessments
~
TOIaI
""-
OebtService
CapIIaIOt<Iay
ToIaI
"Ia~
........S<.<pluaIOef<ll
F81213112000
.......
1,685,416
223,910
44,178
289845
282,024
135584
417606
(127,783)
"0064
1741586
349,952
21,759
228,062
39,~7
25530
643481
(200,633)
1.268,468
248,n3
34,135
390,000
331,~7
1002<115
552,268
291846
84411..
1242048
385,173
39.185
"00,000
18,959
72228
913545
127,951
,..43n
272334
463,254
207904
671158
1618.854
1,473.074
350,155
37,532
94,484
48122
530303
55.600
68.950
37.532
300,000
"0,000
502262
1361391
58,050
71,700
37,532
300.000
"0,000
507262
660 500
680 500
(21,818)
(153,218)
1,031,189
40,200
52,185
37.532
300.000
"0.000
469917
1025500
41.800
sa265
37.532
300.000
"0,000
473617
120 SOO
120500
124000
124000
1.067.455
"3,500
58.465
37,532
300,000
437467
84,178
150000
234178
203,309
1110.251
"5,200
58,730
37,532
350,000
491462
84,178
150 000
234178
257,284
1.207444
"'.000
61,075
37,532
350.000
495607
84,178
150 000
234178
261,429
48,900
63,525
37.532
350.000
50,900
68.000
37,532
400,000
730,081
2"2,387
455011
455017
523900
523900
349,417
349,617
499957
554512
75,286
84,178
150000
23-4178
84,178
150000
23-4178
265,779
320,334
2571.411
2,891745
IC'DiblIProlects
""-
New Developmenl Projects
Croaeown Blvd Trunk
YelklwPineU'l$tation
U'l Station'1 Upgrage
Equlprnenl
GPS
JelVacTI\ldl.
MiscEqulprneri
TOIaI
212291
11658
741739
984126
1059412
1,031794
170,250
353,650
5.000
528,900
884 576
1.233.993
1.583,610
120.500
12",000
650.000
1786,919
150,000
150000
2044,203
150,000
150 000
2305 632
150,000
150 000
150,000
150,000
175,500
400,000
65.000
660 500
300.000
420.500
174.000
150,000
1;0,000
Funded by Operations
Funded by lnIraslruCluf8lTrunk
Funcledbydebt
150,000
150000
1000bI
--
T....
05-'-
Total Annual Debt Service
5.....
10
,.....
I.
5.....
10
5.....
10
5.000
523,900
528900
5.....
10
680.500
660 500
5.....
10
300.000
120,500
420,500
12",000
650 000
mooo
5.....
10
150,000
150 000
5.....
10
&4,1711
150,000
150,000
5.....
10
&4,178
150,000
1;0.000
5.....
10
84,178
150,000
150.000
5.....
I.
5.....
10
5.....
10
&4,178
84,178
&4.118
(D
\,;11 T UI'" ANUUVt:K
Park Improvement Fund
Projected Fund Balance
2006 2007 2008 2009 2010 2011 TOTALS
Projected Sources of Revenue
Park Dedication Fee $2,425 per unit
platted units 100 50 50 50 50 50
Anticipated Park Dedication Fee $ 242,500 $ 121,250 $ 121,250 $ 121,250 $ 121,250 $ 121,250 $ 646.750
Commercial I Residential - Andover Station N 176,420 60,390 76,733 78,733 100,000 514,276
DNR Grant 62,500 62,500
Capital Projects Levy a Park Improvements 52,600 52,600 52,800 52,600 52,600 52,600 316,600
Total Revenues Available 471,720 316,940 252,783 252,783 274,050 174,050 1,742,326
Projected Commitments
Annual Miscellaneous Projects 25,000 25,000 25,000 25,000 25,000 25,000 150,000
Debt Service Payment 52,600 52,600 52,600 52,800 52,800 52,600 316,600
Andover Conununity Center Contribution 50,000 50,000
Andover Station North Ballfields 70,000 385,000 35,000 490,000
Country Oaks West Park 42,166 42,166
Prairie Knoll Park 35,000 150,000 165,000
Woodland Estates 4th 15,000 15,000
Fox Meadows Park 10,000 10,000
Oakview Park 50,000 50,000
Strootman Pari< 40,000 '0,000
Terrace Park 55,000 55,000
Crooked Lake Boat Landing 125,000 125,000
Woodland Crossing Park 57,000 57,000
Sophies South Park 75,000 75,000
Forest Meadows Park 25,000 25,000
Andover Lions Park 65,000 65,000
Hawkridge Park 500,000 500,000
Total Commitments 349,966 882,800 269,800 162,600 727,600 77,800 2,270,988
Revenues Over (Under) Expenditures 121,732 (365,860) (17,017) 89,983 (453,750) 96,250
Fund Balance as of December 31, 2005 248,757
Fund Balance Brought Forward 370,469 4,629 (12,368) 77,595 (376,155)
Ending Fund Balance. $ 370,489 $ 4,629 $ (12,388) $ 77,595 $ (376,155) $ (279,905)
*Target .10% of current years commitments to create a contingency for any project overages.
6)
CITY OF ANDOVER
Trail Fund
Projected Fund Balilnc:e
2006
2007
200B
2009
2010
2011
TOTALS
Projected Sources of Revenue
Trail fee $590 per unit
platted units 150 150 100 100 100 100
Trail Fee 88,500 $ 88,500 $ 59,000 $ 59,000 $ 59,000 $ 59,000 $ 413,000
Total Revenue. Available 88,500 88,500 59,000 59,000 59,000 59,000 413,000
Projected Commitments
East side ofCrosslown Blvd. 139th Aile to t41sllane 30,000 30,000
North side of Bunker lake Blvd. Hanson Blvd to Crane 5t 30,000 30,000
Station Parkway - Thrush 51 10 Jay 5t 60,000 60,000
North Side of Crosstown Blvd. Nightingale 51 to Hanson Blvd 100,000 100,000
157th Ave. Prairie Rd to Kumquat St 230,000 230,000
West side of Crosstown Blvd. South Coon Creek to Andover Blvd 75,000 75,000
Total Commitments 60,000 60,000 100,000 230,000 75,000 $ 525,000
Revenu.. Over (Under) Expenditures 28,500 28,500 (41,000) (171,000) (16,000) 59,000
Fund Balance as of December 31. 2005 107,455
Fund Balance Brought Forward 135,955 164,455 164,455 (6,545) (22,545)
Ending Fund Balance. S 135,955 $ 164,455 123,455 S (6,545) $ (22,545) $ 36,455
-Target .10% of current years commitments to create a contingency for any project overagel.
- It La anticipated that all projects will not be fully expended by the end of the year, and future projects will be contingent on additional revenue..
@
CITY OF ANDOVER
Road & Bridge Funds a Rollup
Projected Fund Balance
2006 2007 2006 2009 2010 2011 TOTALS
Projected Sources of Revenue
Est. Annual MSA Construction Allocation $ 716,152 $ 718,152 $ 718,152 $ 718,152 $ 718,152 $ 718,152 $ 4,308,912
2001 State Aid Road Bond pymt. Principal (140,000) (150,000) (155,000) (160,000) (170,000) (175,000) (950,000)
Available MSA Construction
for Other Commibnents 578,152 568,152 563,152 558,152 548,152 543,152 3,358,912
Est. Annual Maintenance Allocation 307,779 307,779 307,779 307,779 307,779 307,779 1,846,674
2001 State Aid Road Bond Pymt -Interest (96,958) (91,298) (85,120) (78,583) (71,568) (84,063) (487,590)
General Fund Commitment (169,744) (174,836) (180,081) (185,484) (191,048) (196,780) (1,097,974)
Available MSA Maintenance
for Other Commitments 41,077 41,845 42,578 43,712 45,163 46,936 261,110
Total MSA Available for other
Commitments 619,229 609,797 605,730 601,864 593,315 590,088 1,229,026
Federal Funds 270,000 270,000
Assessments- 190,000 389,898 365,701 305,788 473,493 355,518 2,080,396
Tax levy 782,036 1,101,754 1,136,700 1,188.089 1,242,659 1,300.614 6,751,852
Total Revenues Available 1,861,265 2,101,449 2,108,131 2,095,741 2,309,467 2,246,218 10,331,274
Projected Commitments
MSA - New & Reconstruct Routes 1,554,400 383,000 898,800 767,000 714,000 4,317,200
MSA - County Intersection Upgrade. 600,000 175,000 175,000 275,000 1,225.000
MSA. Rail Road Quiet Zones 90,000 400,000 60,000 550,000
MSA - Signal Upgrades 20,000 20,000
Pedesbian Trail Maintenance 47,000 48,000 49,000 50,000 51,000 52,000 297,000
R & B . Pavement Markings 14,000 15,000 16,000 17,000 18,000 19,000 99,000
R & B . Curb Replacement 40,000 41,000 42,000 43,000 44,000 210,000
R & B . Rail Road Qulet Zones 400,000 400,000
R & B - Seal Coating 233,889 245,667 240,236 304,244 594,980 501,614 2,120,630
R & B - Crack Sealing 91,008 80,726 74"70 174,295 151.472 152,187 724,158
R & B - Overlays 1,022,994 791,004 1,019,292 911,645 948,387 4,693,322
Total Convnltments 2,560,297 2,100,387 2,685,510 2,281,831 2,597,097 2,431,188 14,656,310
Revenues Over (Under) Expenditures (699,032) 1,062 (577,379) (186,090) (287,630) (184,970) $ (4,325,036)
Fund Balance as of December 31. 2005 2,798,112
Fund Balance Brought Forward 2,099,080 2.100,142 1,522.762 1,336,672 1,049,042
Ending Fund Balance $ 2,099,080 $ 2,100,142 $ 1,522,762 $ 1,336,672 $ 1,049,042 $ 884,072
. Assuming collected In lame year
@
CITY OF ANOOVER
MSA Funded Projects
Projected Fund Balance
2006 2007 2008 2009 2010 2011 TOTALS
Projected Sources of Revenue
Est. Annual MSA Construction Allocation $ 718,152 $ 718,152 $ 718,152 $ 718,152 $ 718,152 $ 718,152 4,308,912
2001 State Aid Road Bond Pymt - Principal (140,000) (150,000) (155,000) (160,000) (170,000) (175,000) (950,000)
Available MSA Construction
for Other Commitments 578,152 568,152 563.152 558,152 548,152 543,152 3,358,912
Est. Annual Maintenance Allocation 307,779 307,779 307,779 307,779 307,779 307,779 1,846,674
2001 State Aid Road Bond Pymt . Interest (96,958) (91,298) (85,120) (78,683) (71,568) (84,063) (487,590)
General Fund Commitment (169,744) (174,836) (180.081 ) (185,484) (191,048) (196,780) (1,097,974)
Available MSA Maintenance
for Other Commitments 41,077 41,645 42,578 43.712 45,163 46,936 261.110
Total MSA Available for other
Commitments 619.229 609,797 605,730 601,864 593,315 590,088 1,229,026
Federal Funds 270,000 270,000
Assessments- 190,000 83,000 128,400 200,000 71,000 672.400
Total Revenues Available 1,079,229 692,797 734,130 601,864 793,315 661,088 2,171.426
Projected Commitments
MSA - New & Reconstruct Routes 1,554.400 383,000 898,800 767,000 714,000 4,317,200
MSA - County Intersection Upgrades 600,000 175,000 175,000 275,000 1,225,000
MSA . Rail Road Quiet Zones 90,000 400,000 60,000 650,000
MSA . Signal Upgrades 20,000 20,000
Total Commitments 2,174,400 648,000 1,473,800 275,000 827,000 714,000 6,112,200
Revenues Over (Under) Expenditures (1,095,171) 44,797 (739.670) 326,864 (33.685) (52,912) (3,940,774)
Fund Balance as of December 31. 2005 1,500,000
Fund Balance Brought Forward 404,829 449,626 (290,045) 36,819 3,134
Ending Fund Balance $ 404,829 $ 449,626 $ (290,045) $ 36,819 $ 3,134 (49.778)
@
CITY OF ANOQVER
Tax Levy Funded - Roadway Projects
Projected Fund Balance
2006 2007 2008 2009 2010 2011 TOTALS
Projected Sources of Revenue
Tax Levy 734,656 1,052,953 1,086,435 1,136,316 1,189,332 1,245,688 6,445,380
Assessments 306,898 237,301 305,788 273,493 284,516 1,407,996
Total Revenues Available 734,656 1,359,851 1.323,736 1,442,104 1,462,825 1,530,204 7,853,376
Projected Commitments
R & B - Pavement Mar1dngs 14,000 15,000 16,000 17,000 18,000 19,000 99,000
R & B - Curb Replacement 40,000 41,000 42.000 43,000 44,000 210,000
R & B - Rail Road Quiet Zones 400,000 400,000
R & B - Seal Coating 233,889 245,667 240,236 304,244 594,980 501,614 2,120,630
R & B . Crack Sealing 91,008 80,726 74,470 174,295 151.472 152,187 724,158
R & B . Overlays 1,022,994 791,004 1,019,292 911,645 948,387 4,693,322
Total Commitments 338,897 1,404,387 1,162,710 1,956,831 1,719,097 1,665,188 8,247,110
Revenues Over (Under) Expenditures 395,759 (44,536) 161,026 (514,727) (258,272) (134,984) (393,734)
Fund Balance as of December 31,2005 1,267,096
Fund Balance Brought FOlWard 1,662,855 1,618.319 1,779,345 1,264,618 1,008,346
Ending Fund Balance S 1,662,855 1,818,319 $ 1,779,345 $ 1,264,618 $ 1,008,346 873,362
CITY OF ANDOVER
Tax Levy Funded. Pedestrian Trail Maintenance
Projected Fund Balance
2006 2007 2008 2009 2010 2011 TOTALS
Projected Sources of Revenue
Tax Levy 47,380 48,801 50,265 51,773 53,327 54,926 306.472
Projected Commitments
R & B - Pedestrian Trail Maintenance 47,000 48,000 49,000 50,000 51,000 52,000 297,000
Revenues Over (Under) Expenditures 380 801 1,265 1,773 2,327 2,928 9,472
Fund Balance as of December 31, 2005 31,016
Fund Balance Brought FOlWard 31,396 32,197 33,462 35,235 37,562
Ending Fund Balance $ 31,398 $ 32,197 $ 33,462 $ 35,235 $ 37,562 $ 40,488
@
1685 CROSSTOWN BOULEVARD N,W, . ANDOVER, MINNESOTA 55304 . (763) 755-5100
FAX (763) 755-8923 . WWW,CI.ANDOVER,MN,US
2007 - 2011
, Proposed
Capital Improvement Plan
Projects By Department ....................................................................... Pg 1
Projects By Funding Source................................................................. Pg 5
Departments
Central Equipment ...................................................................... Pg 11
Community Center................ ............... ........ ..... ...... ............... ..... Pg 15
Elections...................................................................................... Pg 20
Engineering ......... ........... .......... ...... ............... ........ ..... ..... ........ .... Pg 21
Facility Management ..... ......... ................. ........... ............... ......... Pg 25
Fire ... ......... ........... ..... ...... .......... ................ .......... ........................ Pg 37
Park & Rec - Operations ............................................................ Pg 48
Park & Rec - Projects ................................................................. Pg 59
Planning & Zoning...... ............. ........ ...... ....... ........ ..... ..... ..... ....... Pg 70
Sanitary Sewer.. .......... ...... .......... ........... ..... ..... ........................... Pg 71
Storm Sewer. ........... ..... ........... ..... ..... ...... ....... ........ ..... ..... ..... ...... Pg 75
Street Signs........ ..... ........... .......... ........ ........ ..... .......... ..... ........... Pg 79
Streets / Highways ...................................................................... Pg 81
Water ..... .............. .......... ...... .......... ..... ................ .......... ..... .......... Pg 97
City of Andover, MN
Capital Plan
2007 thru 2011
PROJECTS BY DEPARTMENT
Department Project# Priority 2007 2008 2009 2010 2011 Total
ICentral Equipment I
Canopy for Fuel Island 09-4880~1 3 250,000 250,000
Replacement - Hotsy Pressure Washer 09-4880~2 3 7,000 7,000
Replacement - Floor Sweeper 10-4880~1 1 35,000 35,000
Replacement - Service Truck 10-4880~2 2 28,000 28,000
Central Equipment Total 257,000 35,000 28,000 320,000
ICommunity Center I
Walk Behind Roor Scrubber 07 -4400~1 1 7,500 7,500
Carpet - West Side Entrance 07 -4400~2 2 8,000 8,000
Kitchen Equipment - Fryer/Grill . 08-4400~1 2 7,000 7,000
BatteI)' Pack Replacement - Zamboni 09-44000-Cl 2 7,000 7,000
Storage Buiiding 10-44000-01 2 15,000 15,000
Community Center Total 15,500 7,000 7,000 15,000 44,500
IElections I
Voting Equipment 08-41310-01 100,000 100,000
Elections Total 100,000 100,000
IEngineering ~
New Development Projects 07-4160~1 1 351,000 241,000 248,000 300,000 300,000 1,440,000
Pedestrian Trail Maintenance 07-4160~2 1 48,000 49,000 50,000 51,000 52,000 250,000
Replacement- Blazer #11 09-4160~1 2 30,000 30,000
Replacement - Total Station 09-4160~2 1 21,000 21,000
Engineering Total 399,000 290,000 349,000 351,000 352,000 1,741,000
IFacility Management I
Carpet Replacement 07-41900-01 2 10,000 10,000 10,000 10,000 10,000 50,000
Annual ParKing Lot Maintenance 07-4190~2 1 20,000 21,000 22,000 23,000 24,000 110,000
Communication Radios 07-4190~3 1 10,000 10,000
Surface Seal all Brick Structures OB-4190~1 1 40,000 40,000
Land Purchase OB-41900-02 1 515,217 515,217
Buildin9 A - Seal Floor 08-41900-03 1 7,000 8,000 15,000
Satt Storage Building OB-4190~4 1 350,000 350,000
Recyclin9 Buildin9 & Fence OB-41900-05 1 250,000 250,000
Attached Storage Buildin9 08-4190~6 1 200,000 200,000
Fire St #2 Addition and ParKin9 Lot Improve, 08-4190~7 2 450,000 450,000
Addition to Storage Building & Vehicle Maint Shop 09-41900-01 1 1,850,000 1,850,000
Pedestrian Tunnel Under Crosstown Blvd, 10-4190~1 1 300,000 300,000
Wednesday, August J 6, 2006
1
Departmen Project# Priority 2007 2008 2009 2010 2011 Total
Facility Management Total 40,000 1,843,217 1,882,000 341,000 34,000 4,140,217
Fire
Rescue Truck 07112200-01 1 40,000 40,000
New Mobile Data Terminals in Fire Trucks 0742200-02 2 30,000 30,000
Thermal Imaging Camera 07- 42200-03 1 14,000 14,000
Replacement - Hydraulic Rescue Equipment 07 -42200-04 2 30,000 30,000
Hose Washedfester 0742200-05 2 8,000 8,000
Replacement -Fire Marshall Vehicle 0842200-01 2 30,000 30,000
Replacement - Fire Tanker #31 08- 42200-02 1 295,000 295,000
i Waterllce rescue boat 08- 42200-03 1 20,000 20,000
Replacement - Fire Engine #11 09-42200-01 1 400,000 400,000
Replacement - Ladder Truck #11 10 -42200-01 1 850,000 850,000
Replacement - Fire Chiefs Vehicle 10 42200-02 2 40,000 40,000
Fire Total 122,000 345,000 400,000 890,000 1,757,000
Park & Rec - O perations
Replace /Repair Play Structures - VariousParks 0745000-01 2 40,000 40,000 40,000 40,000 40,000 200,000
Replacement - Self - Propelled 48' Sweeper 07 -45000-02 2 20,000 20,000
Zero Turn Mower 0745000 -03 1 7,500 7,500
Replacement - Toro Groundsmaster328 07- 45000-04 1 32,000 32,000
Truck - 314 Ton Crew Cab 08115000 -01 1 35,000 35,000
Replacement - Mower Trailer 08 -05000-02 1 8,500 8,500
Replacement -Toro Groundmaster 08 -45000-03 1 22,000 22,000
Replacement - Large Cape* lawnmower 09 45000-01 1 112,000 112,000
Replacement - ToroGroundsmaster 0945000-02 1 23,000 23,000
Replacement - Trailer 11- 45000-01 2 9,000 9,000
Replacement - One Ton Pick U wlPlow 11- 45000-02 2 65,000 65,000
P P
Park & Rec - Operations Total 99,500 105,500 175,000 40,000 114,000 534,000
Park &Rec - Proj
Andover Station North Complex 07- 45001 -01 1 385,000 35,000 420,000
Terrace Park 07- 45001 -02 1 55,000 55,000
Crooked Lake Boat Landing 0745001 -03 1 125,000 125,000
Stmotman Park 0745001 -04 1 40,000 40,000
Annual Miscellaneous Projects 0745001 -99 1 25,000 25,000 25,000 25,000 25,000 125,000
Forest Meadows Park 08- 45001 -01 1 25,000 25,000
Sophies South Park 0845001 -02 1 75,000 75,000
Woodland Crossing Park 0845001 -03 1 57,000 57,000
Andover Lions Park 09 -45001 -01 1 85,000 85,000
Hawkridge Park Improvements 10 -45001 -01 1 500,000 500,000
Prairie Knoll Park - Phase III 1045001 -02 1 150,000 150,000
Park & Rec - Projects Total 630,000 217,000 110,000 675,000 25,000 1,657,000
Planning & Zo ning
Replacement - Ford Taurus #15 08- 41500-01 2 20,000 20,000
Planning & Zoning Total 20,000 20,000
Sanitary Sewer
Wednesday, August 16, 2006
2
Department Project# Priority 2007 2008 2009 20]0 2011 Total
Lift Staion #1 Upgrade 07-48200-01 85,000 85,000
Crosstown Blvd Trunk Sewer Une 07-48200-02 400,000 400,000
New JeWac Truck 08-48200-01 300,000 300,000
Yellow Pine Lift Station 09-48200-01 650,000 650,000
Sanitary Sewer Total 485,000 300,000 650,000 1,435,000
iStorm Sewer ,
Storm Sewer Improvemenls 07-48300-01 1 50,000 51,000 52,000 53,000 54,000 260,000
F,E,S, Repair/Meadowood Addition/148th & Makah Sl 07-48300-02 1 60,000 60,000
New Track Backhoe 08-48300-01 2 80,000 80,000
Replacement- Elgin Street Sweeper 10-43100-01 1 150,000 150,000
Storm Sewer Total 110,000 131,000 52,000 203,000 54,000 550,000
:Street Signs I
Replacement- Sign Truck #410 07 -43300-{)1 2 75,000 75,000
Radius Master Machine 07-43300-02 1 8,400 8,400
Street Signs Total 83,400 83,400
iStreets / Highways I
Annual Street Seal Coal Project 07-43100-01 1 287,632 271,328 480,438 660,377 515,760 2,215,535
Annual Street Crack Seal Project 07-43100-02 1 89,840 98,968 183,390 153,439 152,187 677,824
Annual Street Mill and Overlay 07-43100-03 1 1,022,994 791,004 1,019,292 911,645 948,387 4,693,322
Annual Pavement MarKings 07-43100-04 1 15,000 16,000 17,000 18,000 19,000 85,000
Annual Cult Replacement 07-43100-05 1 40,000 41,000 42,000 43,000 44,000 210,000
Mounted Pothoie Spray Palcher 07-43100-06 1 150,000 150,000
Replacement- Dump Truck wi Snow Removal #195 07-43100-07 1 200,000 200,000
Rail Road Quiet Zones 07-43100-08 1 90,000 400,000 400,000 60,000 950,000
Municipal Stale Aid Routes I New & Reconstruct 07-43100-09 1 383,000 898,800 767,000 714,000 2,762,800
Inlersection Upgrades 07-43100-10 1 175,000 175,000 275,000 625,000
Construct Bikewayl Walkway Corridors 07- TRAIL-{)1 1 60,000 100,000 230,000 75,000 465,000
Replacement- Hot Asphall Box 08-43100-02 1 40,000 40,000
Dump Truck wlSnow Equipment 08-43100-04 2 155,000 155,000
Replacement- Dump Truck wi Snow Removal #197 08-43100-05 1 200,000 200,000
Replacement- Water Tanker 09-43100-01 2 100,000 100,000
Asphall Paving Machine 09-43100-02 1 90,000 90,000
Streets / Highways Total 2,513,466 3,187,100 2,837,120 2,688,461 2,393,334 13,619,481
IWater I
Rehabilitation of Wells 07-48100-01 1 45,000 45,000 50,000 50,000 55,000 245,000
Seafing of Well #1 07-48100-02 2 10,000 10,000
Water Main along South Coon Creek Drive 08-48100-01 1 750,000 750,000
Waler Tower Painting 08-48100-02 1 350,000 350,000
Demolish 500,000 Gallon WalerTower 09-48100-01 1 175,000 175,000
Construct Waler Tower 09-48100-02 1 2,950,000 2,950,000
WTP Reclaim Tank Addition 10-48100-01 1 500,000 500,000
Water Total 55,000 1,145,000 3,175,000 550,000 55,000 4,980,000
GRAND TOTAL 4,552,866 7,690,817 9,894,120 5,788,461 3,055,334 30,981,598
Wednesday, August 16, 2006
3
City of Andover, MN
Capital Plan
2007 thru 2011
PROJECTS BY FUNDING SOURCE
Source Project# Priority 2007 2008 2009 2010 2011 Total
IAssessmeuts ~
Annual Street Mill and Overlay 07-43100-03 306,898 237,301 305,788 273,493 284,516 1,407,996
Municipal State Aid Routes / New & Reconstruct 08-43100-01 83,000 128,400 200,000 71,000 482,400
Assessments Total 389,898 365,701 305,788 473,493 355,516 1,890,396
iBuilding Fund I
Land Purdlase 08-41900-02 515,217 515,217
Building Fund Total 515,217 515,217
ICapital Equipment Reserve I
Water Tower Painting 08-48100-02 242,000 242,000
Capital Equipment Reserve Total 242,000 242,000
ICapital Projects Levy .
Annual Parkin9 Lot Maintenance 07-41900-02 1 20,000 21,000 22,000 23,000 24,000 110,000
Communication Radios 07-41900-03 1 10,000 10,000
Radius Master Machine 07-43300-02 1 8,400 8,400
ReplacelRepair Play Structures - Various Parl<s 07-45000-01 2 40,000 40,000
Voting Equipment 08-41310-01 1 100,000 100,000
Surface Seal all Brick Structures 08-41900-01 1 22,000 22,000
Capital Projects Levy Total 78,400 143,000 22,000 23,000 24,000 290,400
iCentral Equipment Fund I
Replacement - Holsy Pressure Washer 09-48800-02 3 7,000 7,000
Replacement - Floor Sweeper 10-48800-01 1 35,000 35,000
Replacement - Service Truck 10-48800-02 2 28,000 28,000
Central Equipment Fund Total 7,000 35,000 28,000 70,000
,
ICommunity Center Operations I
Walk Behind Floor Scrubber 07-44000-01 1 7,500 7,500
Carpet - West Side EntJance 07-44000-02 2 8,000 8,000
Kitchen Equipment- Fryer/Grill 08-44000-01 2 7,000 7,000
Battery Pack Replacement - Zamboni 09-44000-01 2 7,000 7,000
Storage Building 1 0-44000-01 2 15,000 15,000
Community Center Operations Total 15,500 7,000 7,000 15,000 44,500
Wednesday, August 16, 2006
5
Source Project# Priority 2007 2008 2009 2010 2011 Total
IConstruction Seal Coat Fund ~
Annual Street Seal Coat Project 07-43100-01 41,965 31,092 176,194 65,397 14,146 328,794
Annual Street Crack Seal Project 07-43100-02 9,114 24,498 9,095 1,967 0 44,674
Construction Seal Coat Fund Total 51,079 55,590 185,289 67,364 14,146 373,468
IDNR Grant ~
Crooked Lake Boat Landing 07-45001-03 62,500 62,500
DNR Grant Total 62,500 62,500
IEquipment Bond I
Rescue Truck 07-42200-01 1 40,000 40,000
New Mobile Data Tenninals in Fire Trucks 07-42200-02 2 30,000 30,000
Thermal Imaging Camera 07-42200-03 1 14,000 14,000
Replacement- Hydraulic Rescue Equipment 07-42200-04 2 30,000 30,000
Hose Washerrr ester 07-42200-05 2 8,000 8,000
Mounted Pothole Spray Patcher 07-43100-06 1 150,000 150,000
Replacement - Dump Truck wi Snow Removal #195 07-43100-07 1 200,000 200,000
Replacement- Sign Truck #410 07-43300-01 2 75,000 75,000
Replacement- Seff-Propelled 48' Sweeper 07-45000-02 2 20,000 20,000
Zero Tum Mower 07-45000-03 1 7,500 7,500
Replacement - Taro Groundsmaster 328 07-45000-04 1 32,000 32,000
Replacement - Ford Taurus #15 08-41500-01 2 20,000 20,000
Replacement - Fire Marshall Vehicle 08-42200-01 2 30,000 30,000
Replacement- Fire Tanker #31 08-42200-02 1 295,000 295,000
Walernce rescue boat 08-42200-03 1 20,000 20,000
Replacement - Hot Asphall Box 08-43100-02 1 40,000 40,000
Dump Truck wlSnow Equipment 08-43100-04 2 155,000 155,000
Replacement - Dump Truck wi Snow Removal #197 08-43100-05 1 200,000 200,000
Truck - 3/4 Ton Crew Cab 08-45000-01 1 35,000 35,000
Replacement - Mower Trailer 08-45000-02 1 8,500 8,500
Replacement - Taro Groundmasler 08-45000-03 1 22,000 22,000
Replacement - Blazer #1 1 09-41600-01 2 30,000 30,000
Replacement - Total Station 09-41600-02 1 21,000 21,000
Replacement - Fire Engine #11 09-42200-01 1 400,000 400,000
Replacement- WalerTanl<er 09-43100-01 2 100,000 100,000
Asphall Paving Machine 09-43100-02 1 90,000 90,000
Replacement- Large Capacily Lawnmower 09-45000-01 1 112,000 112,000
Replacement - T oro Groundsmaster 09-45000-02 1 23,000 23,000
Replacement - Ladder Truck #1 1 10-42200-01 1 850,000 850,000
Replacement - Fire Chiefs Vehicle 10-42200-02 2 40,000 40,000
Replacement - Trailer 11-45000-01 2 9,000 9,000
Replacement - One Ton Pick Up wlPlow 11-45000-02 2 65,000 65,000
Equipment Bond Total 606,500 825,500 776,000 890,000 74,000 3,172,000
IG.O. Bond I
Sail Storage Building 08-41900-04 1 350,000 350,000
Recycling Building & Fence 08-41900-05 1 250,000 250,000
Attached Storage Building 08-41900-06 1 200,000 200,000
Fire St #2 Addition and ParKing Lot Improve, 08-41900-07 2 450,000 450,000
Addition to Storage Building & Vehicie Maint Shop 09-41900-01 1 1,850,000 1,850,000
Wednesday, August J 6, 2006
6
Source Project# Priority 2007 2008 2009 2010 2011 Total
Canopy for Fuel Island 09-48800-01 3 250,000 250,000
Pedestrian Tunnel Under Crosstown Blvd, 10-41900-01 1 300,000 300,000
G.O, Bond Total 1,250,000 2,100,000 300,000 3,650,000
iGeneral Fund I
Carpet Replacement 07-41900-01 2 10,000 10,000 10,000 10,000 10,000 50,000
ReplacelRepair Play Structures. Various Paries 07-45000-01 2 40,000 40,000 40,000 40,000 160,000
Building A . Seal Floor 08-41900-03 1 7,000 8,000 15,000
General Fund Total 10,000 57,000 SO,OOO 58,000 SO,OOO 225,000
IMunicipal State Aid Funds I
Rail Road Quiet Zones 07-43100-08 90,000 400,000 60,000 550,000
Municipal State Aid Routes I New & Reconstruct 08-43100-01 300,000 770,400 567,000 643,000 2,280,400
intersection Upgrades 08-43100-03 175,000 175,000 275,000 625,000
Municipal State Aid Funds Total 565,000 1,345,400 275,000 627,000 643,000 3,455,400
IPark Improvement Funds I
Andover Station North Complex 07-45001-01 385,000 35,000 420,000
Terrace Park 07-45001-02 55,000 55,000
Crooked Lake Boat Landing 07-45001-03 62,500 62,500
Strootman Park 07-45001-04 40,000 40,000
Annual Miscellaneous Projecls 07-45001-99 25,000 25,000 25,000 25,000 25,000 125,000
Forest Meadows Park 08-45001-01 25,000 25,000
Sophies South Park 08-45001-02 75,000 75,000
Woodland Crossing Park 08-45001-03 57 ,000 57,000
Andover Lions Park 09-45001-01 85,000 85,000
Hawkridge Park Improvements 10-45001-01 500,000 500,000
Prairie KnoB Park. Phase III 10-45001-02 150,000 150,000
Park Improvement Funds Total 567,SOO 217,000 110,000 675,0ll0 25,000 1,594,500
!R & B - Crack Seal & Seal Coat I
Annual Street Seal Coat Project 07-43100-01 245,667 240,236 304,244 594,980 501,614 1,886,741
Annual Street Crack Seal Project 07-43100-02 BO,726 74,470 174,295 151,472 152,187 633,150
R & B - Crack Seal & Seal Coat Total 326,393 314,706 478,539 746,452 653,801 2,519,891
IR & B - Overlays I
Annual Street Mill and Overlay 07-43100-03 716,096 553,703 713,504 638,152 663,871 3,285,326
R & B - Overlays Total 716,096 553,703 713,504 638,152 663,871 3,285,326
IR & B - Pedestrian Trail ~
Pedestrian Trail Maintenance 07-41600-02 48,000 49,000 50,000 51,000 52,000 250,000
R & B - Pedestrian Trail Total 48,000 49,000 SO,OOO 51,000 52,000 250,000
IR & B - Reserve I
Wednesday, August 16, 2006
7
Source Project# Priority 2007 2008 2009 2010 2011 Total
Annual Pavement Mar1<ings 07-43100-04 15,000 16,000 17,000 18,000 19,000 85,000
Annual Curb Replacement 07-43100-05 40,000 41,000 42,000 43,000 44,000 210,000
Rail Road Quiet Zones 07-43100-08 400,000 400,000
R & B - Reserve Total 55,000 57,000 459,000 61,000 63,000 695,000
iSanitary Sewer Fund I
New JeWac Truck 08-48200-01 300,000 300,000
Sanitary Sewer Fund Total 300,000 300,000
ISewer Revenue Bonds I
Yellow Pine Lift Station 09-48200-01 650,000 650,000
Sewer Revenue Bonds Total 650,000 650,000
iSewer Trunk Fund I
New Development Projects 07-41600-01 175,500 120,500 124,000 150,000 150,000 720,000
Lift Staion #1 Upgrade 07-48200-01 85,000 85,000
Crosstown Blvd Trunk Sewer Line 07-48200-02 400,000 400,000
Sewer Trunk Fund Total 660,500 120,500 124,000 150,000 150,000 1,205,000
IStorm Sewer Fund ~
Stonn Sewer Improvements 07-48300-01 1 SO,OOO 51,000 52,000 53,000 54,000 260,000
F,E,S, RepairlMeadowood Addilion/148lh & Makah Sl 07-48300-02 1 60,000 60,000
New Track Backhoe 08-48300-01 2 80,000 80,000
Replacement - Elgin Street Sweeper 10-43100-01 1 1SO,000 150,000
Storm Sewer Fund Total 110,000 131,000 52,000 203,000 54,000 550,000
ITrail Funds I
Construct Bikeway! Walkway Corridors 07-TRAIL-01 60,000 100,000 230,000 75,000 465,000
Trail Funds Total 60,000 100,000 230,000 75,000 465,000
IWater Fund I
Rehabmtation of Wells 07-48100-01 1 45,000 45,000 50,000 50,000 55,000 245,000
Seaflng of Well #1 07-48100-02 2 10,000 10,000
Surtace Seal all Brick Structures 08-41900-01 1 18,000 18,000
Water Fund Total 55,000 63,000 50,000 50,000 55,000 273,000
IWater Revenue Bonds
Construct Water Tower 09-48100-02 2,950,000 2,950,000
Water Revenue Bonds Total 2,950,000 2,950,000
IWater Trunk Fund I
New Development Projects 07-41600-01 175,500 120,500 124,000 150,000 150,000 720,000
Water Main along South Coon Creek Drive 08-48100-01 750,000 750,000
Wednesday, August 16, 2006
8
Source Project# Priority , 2007 2008 2009 2010 2011 Total
Water Tower Painting 08-48100-02 108,000 108,000
Demolish 500,000 Gallon Water Tower 09-48100-01 175,000 175,000
WTP Reclaim Tank Addition 10-48100-01 500,000 500,000
Water Trunk Fund Total 175,500 978,500 299,000 650,000 150,000 2,253,000
GRAND TOTAL 4,552,866 7,690,817 9,894,120 5.788,461 3,055,334 30,981,598
Wednesday, August 16, 2006
9
Capital Plan
City of Andover, MN
2007 thru 2011
Type Improvement
Useful Life 20 Years
Category Equipment
Priority 3 - Low
Contact PW Superintendent
Department Central Equipment
Project # 09-48800-01
Project Name Canopy for Fuel Island
Description
Relocate the fueling station and install two (2) new 10,000 gallon fuel tanks and possibility keep the 2,000 gallon diesel fuel tank for an alternative
fuel like E85. Also, install a canopy to cover the fuel pumps and Gasboy fuel monitoring equipment
Justification
The canopy would keep the fuel pumps, gasboy equipment, operators dry and help keep sun, rain and snow damage to a minimum. It would also
keep the fuel in the tanks from getting contaminated. The larger tanks will allow us to have tanker drops of? ,500 gallons of fuel, saving us money
and the frequency of the drops that we now have, The tanks are approximately 18 years old and are warranted for 30 years. The pumps were
installed in 1999 and are in good shape,
Expenditures
Improvement
2007
2008
2009
250,000
250,000
2010
2011
Total
250,000
250,000
Total
Funding Sources
G,Q, Bond
2007
2008
2009
250,000
250,000
2010
2011
Total
250,000
250,000
Total
Operational Impact/Other I
The larger tanks will allow us to have a tanker drops of 7,500 gallons of fuel, saving us money and the frequency of the drops that we now have,
Wednesday, August J 6. 2006
1 1
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
Useful Life 10 Years
Category Equipment
Priority 3 - Low
Contaet PW Superintendent
Department Central Equipment
Projeet # 09-48800-02
Project Name Replacement - Hotsy Pressure Washer
Description I
The existing Hotsy pressure washer is well used and becoming a high maintenance item. It has been working here for almost 15 years.
Justification I
A new one would operate more efficiently, saving time and money by having less break downs, The new one should run on natural gas rather than
on kerosene, wouldn't have to run out and buy fuel for it all the time,
Expenditures
Equipment
2007
2008
2009
7,000
7,000
2010
2011
Total
7,000
7,000
Total
Funding Sources
Central Equipment Fund
2007
2008
2009
7,000
7,000
2010
2011
Total
7,000
7,000
Total
Operntional Impact/Other I
Less break downs, saving time and money, Not having to send people out to buy fuel for it would also save money. Harder to get parts for.
Wednesday, August J 6, 2006
12
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
Useful Life IS Years
Category Equipment
Priority I - High
Contact PW Superintendent
Department Central Equipment
Project #
10-48800-01
Project Name Replacement - Floor Sweeper
Description
Replace Unit #324, a 1991 Floor Sweeper/Scrubber, With the addition of new buildings, it will be more economical to purchase a new unit that is
faster and more efficient 1 don't believe that a bigger machine is what we need but one that is just more efficient
Justification
The floors are not cleaned as often as they should be because the current sweeper's washing and vacuum portion is worn out and parts are getting
harder to find. The sweeper works well outside because we only use the broom portion of the machine, The present machine works well for the
area that we now have but ifwe double the area, we will need to be able to clean the area faster and do it more efficiently,
Expenditures
Equipment,
2007
2008
2009
2010
35,000
35,000
2011
Total
35,000
35,000
Total
Funding Sources
Central Equipment Fund
2007
2008
2009
2010
35,000
35,000
2011
Total
35,000
35,000
Total
Operational Impact/Other I
A new machine would have less maintenance issues even with using it more often.
Wednesday, August J 6, 2006
13
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
Useful Life 10 Years
Category Equipment
Priority 2 - Medium
Contact PW Superintendent
Department Central Equipment
Project #
10-48800-02
Project Name Replacement - Senice Truck
Description
Replace Unit #371, a 2001 510 Ex! Cab 4x4 truck with 34,000 miles, This truck averages about 7,000 miles a year and by 2010 it will have
approximately 62,000 miles, The new truck should be able to carry 3 or 4 people and also have a tailgate lift. A crew cab truck set up with some
of the same options that are on the #371 would be good.
Justification
I
To assist mechanics with jobs outside the shop such as parts runs, schooling, vehicle repair and moving equipment around. Many times this
vehicle is not big enough to handle the job, A newer truck would be more efficient and help us work more efficiently. The current vehicle would
make a good intern or spare vehicle or kept as a runner/drop truck.
Expenditures
Vehicles
2007
2008
2009
2010
2011
28,000
28,000
Total
28,000
28,000
Total
Funding Sources
Central Equipment Fund
2007
2008
2009
2010
2011
28,000
28,000
Total
28,000
28,000
Total
Operntional Impact/Other I
A bigger vehicle would increase operating costs - fuel and maintenance.
Wednesday. August 16, 2006
14
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
Useful Life 5 years
Category Equipment
Priority 1 - High
Contaet Comm Ctr Manager
Department Community Center
Project # 07-44000-01
Project Name Walk Behind Floor Scrubber
Description I
A new walk behirid floor scrubber for operations at the Conununity Center.
Justification I
The floor scrubber would be used throughout the Conununity Center. The field house alone needs to be scrubbed every week, and at 16,000 +
square feet a new floor scrubber would help, In addition to the field house, we would use the scrubber in the ice arena locker rooms and hallway,
main street, and concessions lobby area.
Expenditures
Equipment
2007
7,500
7,500
2008
2009
2010
2011
Total
7,500
7,500
Total
Funding Sources
Community Center Operations
2007
7,500
7,500
2008
2009
2010
2011
Total
7,500
7,500
Total
Operntional Impact/Other I
The floor scrubber would allow us to continue to maintain the facility at a high level.
Wednesday, August 16, 2006
15
Capital Plan
City of Andover, MN
2007 thru 2011
Type Improvement
Useful Life 10 Years
Category Improvements
Priority 2 - Medium
Contaet Comm Ctr Manager
Department Community Center
Prnject # 07-44000-02
PrnjectName Carpet - West Side Entrance
Description
Install carpet tiles inside the west end doors.
Justification
I
The carpet tiles would give the entrance a more finished look. In addition to keeping snow / salt / sand from making it's way down the hall during
the winter months, the tiles can be replaced as they go bad without having to change the entire carpet area.
Expenditures
Improvement
2007
8,000
8,000
2008
2009
2010
2011
Total
8,000
8,000
Total
Funding Sources
Community Center Operations
2007
8,000
8,000
2008
2009
2010
2011
Total
8,000
8,000
Total
Operational Impact/Other I
It would save staff from having to mop or scrub the entrance area as much. It also would be safer in the winter months due to the concrete floor
getting slippery. We currently have a contract to rent carpet runners in the winter and spring that would no longer be needed,
Wednesday, Augusl16, 2006
16
Capital Plan
City of Andover, MN
2007 thru 2011
Project # 08-44000-01
Project Name Kitchen Equipment - Fryer/Grill
Type Equipment
Useful Life 15-20 Years
Category Equipment
Priority 2 - Medium
Contact Comm Ctr Manager
Department Community Center
Description I
A grill and flyer for expanding the menu at the Community Center concessions,
Justification I
When the concessions was built, the hood and steel wall guards were installed. This would be the next step in finishing off that area The YMCA
would in the end share in the cost to purchase.
Expenditures
Equipment
2007
2008
7,000
7,000
2009
2010
2011
Total
7,000
7,000
Total
Funding Sources
Community Center Operations
Total
2007
2008
7,000
7,000
2009
2010
2011
Total
7,000
7,000
Operational Impact/Other I
The additional revenues from the sales of "hot" food items would help pay the equipment off over the years. There would be some additional costs
when it comes to hiring a cook to prepare the food. According to the Anoka County Health Department we are already licensed to operate a grill
and fryer.
Wednesday, August 16, 2006
17
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
Useful Life 7 Years
Category Unassigned
Priority 2 - Medium
Contact
Department Community Center
Project # 09-44000-01
Project Name Battery Pack Replacement - Zamboni
Description I
Battery Pack for the Electric Zamboni.
Justification l
The battery pack that drives the Zamboni has to be replaced every 5-7 years, Over time, the batteries will hold less and less of a charge and
eventually have to be replaced,
Expenditures
Vehicles
2007
2008
2009
7,000
7,000
2010
2011
Total
7,000
7,000
Total
Funding Sources
Community Center Operations
2007
2008
2009
7,000
7,000
2010
2011
Total
7,000
7,000
Total
Operational Impact/Other l
The Zamboni is a necessary part of the operation of the ice arena, and without it we would not be able to keep the facility open. The hope is that
with the preventative maintenance program that is in place, we can achieve the maximum amount of time available on the battery pack before it has
to be renlaced,
Wednesday, August 16, 2006
18
Capital Plan
City of Andover, MN
2007 thru 2011
Type Improvement
Useful Life 25 Years
Category Building Construction
Priority 2 - Medium
Contact Comm Ctr Manager
Department Community Center
Project #
10-44000-01
Project Name Storage Building
Description I
Storage Building / Garage for future equipment purchases, The building would be added to the north end of the field house using the existing wall
as part of the new structure.
Justification I
As the Community Center continues to grow and acquire more recreational equipment, tables, chairs etc., there will be a lack of storage space, We
would only buy equipment if there was a need for it in the field house and if it would help increase rental hours, Some of the equipment would be
rented out to users and create additional revenues.
Expenditures
Construction
2007
2008
2009
2010
15,000
15,000
2011
Total
15,000
15,000
Total
Funding Sources
Community Center Operations
2007
2008
2009
2010
15,000
15,000
2011
Total
15,000
15,000
Total
Operational Impact/Other I
The additional space would provide storage for equipment and would need to have electricity and heat. This space would free up some space in
what has already become a crowded field house storage room.
Wednesday, August J 6, 2006
19
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
Useful Life 15 Years
Category Equipment
Priority I - High
Contaet City Clerk
Department Elections
Project # 08-41310-01
Project Name Voting Equipment
Description I
New electronic voting equipment for 10 precincts,
Justification I
A Federal mandate to comply with HA VA - Help America Vote Act The current equipment is non-compliant.
Total
2008
100,000
100,000
2009
2010
2011
Total
100,000
100,000 .
Expenditures 2007
Equipment
Total
2008
100,000
100,000
2009
2010
2011
Total
100,000
100,000
Funding Sources 2007
Capital Projects Levy
Operational Impact/Other I
Continued storage and maintenance of all the equipment.
Wednesday, August J 6, 2006
20
Capital Plan
City of Andover, MN
2007 thru 2011
Type Improvement
Useful Life 50 YeaIS
Category New Development Projects
Priority I - High
Contact City Engineer
Department Engineering
Project #
07-41600-01
Project Name New Development Projects
Description
New developments include the construction of sanitary sewer, water main, storm sewers and streets, Since the majority of the improvement
projects are being privately installed by the developer, the following expenditures are the city's share for trunk water and sewer improvements,
Note: All private development construction is dependent upon market conditions, plat approval and normal City development procedures.
Justification
The develoment phasing is identified in the City's Comprehensive Plan.
Expenditures
Construction
2007
351,000
351,000
2008
241,000
241,000
2009
248,000
248,000
2010
300,000
JOO,Ooo
2011
300,000
JOO,OOO
Total
1,440,000
1,440,000
Total
Funding Sources 2007 2008 2009 2010 2011 Total
Sewer Trunk Fund 175,500 120,500 124,000 150,000 150,000 720,000
Water Trunk Fund 175,500 120,500 124,000 150,000 150,000 720,000
Total 351,000 241,000 248,000 300,000 JOO,Ooo 1,440,000
Operational Impact/Other I
Additional maintenance of streets, storm sewer, water main and sanitary sewer will result Additional streets will be added for snowplowing.
Wednesday, August 16, 2006
21
Capital Plan
City of Andover, MN
Project # 07-41600-02
Project Name Pedestrian Trail Maintenance
2007 thru 2011
Type Improvement
Useful Life 20 years
Category Improvements
Priority 1 - High
Cootact City Eogineer
Department Engineering
Description
This project provides maintenance such as patching, crack filling and restoration for the city's pedestrian and park trail system.
Justification -I
City trails are in need of general maintenance including bituminous patching, crack filling and restoration to maintain the high level of service to
pedestrian walkers, bikers and roller bladers. A 5-year capital improvement plan was prepared for the City to identifY and prioritize the necessary
repairs,
Expenditures
Improvement
2007
48,000
48,000
2008
49,000
49,000
2009
50,000
SO,OOO
2010
51,000
51,000
2011
52,000
52,000
Total
250,000
250,000
Total
Funding Sources
R & B - Pedestrian Trail
2007
48,000
48,000
2008
49,000
49,000
2009
50,000
SO,OOO
2010
51,000
51,000
2011
52,000
52,000
Total
250,000
250,000
Total
Operational Impact/Other I
As the city trail system begins to age, general maintenance such as bituminous patching, crack filling and restoration becomes a necessity. The
maintenance will allow for a longer service life for the trail system throughout the city.
Wednesday, August J 6, 2006
22
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
Useful Life 10 Years
Category Equipment
Priority 2 - Medium
Contact City Eogineer
Department Engineering
Project # 09-41600-01
Project Name Replacement - Blazer #11
Description I
Replace Unit #11, a 1995 SIO Blazer with 57,700 miles. The Engineering Department puts about 5,000 miles per year on this vehicle. After 14
years, it will have approximately 77,000 miles on it This unit could make a good intern vehicle or spare vehicle if needed.
Justification I
This vehicle is an Engineering Tech inspection vehicle and needs to be available for inspections and surveying,
Expenditures
Equipment
2007
2008
2009
30,000
30,000
2010
2011
Total
30,000
30,000
Total
Funding Sources
Equipment Bond
2007
2008
2009
30,000
30,000
2010
2011
Total
30,000
30,000
Total
Operational Impact/Other I
Lower maintenance costs and downtime,
.
Wednesday, August 16, 2006
23
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
Useful Life 10 years
Category Equipment
Priority I - High
Contact City Engineer
Department Engineering
Project # 09-41600-02
Project Name Replacement - Total Station
Description
Replace the existing Total Station, which is approximately 8 years old and utilizes outdated software, The Engineering Department utilizes the
Total Station to stake construction projects (curb and gutter, sewer, water main, etc) and to complete topographic surveys for design purposes, The
Total Station is used almost on a daily basis during the construction season by the Engineering Department Replacement of the Total Station
would be approximately every 10 years upon purchase of a new unit
Justification
The hardware and software associated with the Total Station becomes more obsolete every year. It would be beneficial to replace this unit while it
still has some trade value towards purchase of a new unit
Expenditures
Equipment
2007
2008
2009
21,000
21,000
2010
2011
Total
21,000
21,000
Total
Funding Sources
Equipment Bond
2007
2008
2009
21,000
21,000
2010
2011
Total
21,000
21,000
Total
OperationallmpactJOther l
Upgrading the unit will allow for increased efficiency by the Engineering Department as new hardware and software technologies are incorporated
into the surveying discipline,
Wednesday, August J 6, 2006
24
Capital Plan
City of Andover, MN
2007 thru 2011
Type Improvement
Useful Life 10 Vears
Category Equipment
Priority 2 - Medium
Contact PW Superintendent
Department Facility Management
Project # 07-41900-01
Project Name Carpet Replacement
Description
The replacement of carpet in appropriate areas of all City buildings where deemed necessary. An annual review of all carpeted areas will be done
to determine the order of replacement
Justification
The buildings get a lot of use and, despite the appropriate cleaning and maintenance, the carpeted areas will need to be replaced.
Expenditures
Facility Maintenance
2007
10,000
10,000
2008
10,000
10,000
2009
10,000
10,000
2010
10,000
10,000
2011
10,000
10,000
Total
50,000
SO,OOO
Total
Funding Sources
General Fund
2007
10,000
10,000
2008
10,000
10,000
2009
10,000
10,000
2010
10,000
10,000
2011
10,000
10,000
Total
50,000
SO,OOO
Total
OperntionaI Impact/Other I
The carpet replacement will be needed in order to keep the buildings in good repair, Due to heavy use, it is anticipated that all carpeted areas will
need to be replaced.
Wednesday, August 16, 2006
25
Capital Plan
City of Andover, MN
2007 thru 2011
Type Improvement
Useful Life 10 Years
Categury Improvemeuts
Priority 1 - High
Contact City Engineer
Department Facility Management
Project # 07-41900-02
Project Name Annual Parking Lot Maintenance
Description
Yearly maintenance of the City parking lots is n=ssary to extend their useful lives. Parking lots that need maintaining include those at the City
Hall complex, Public Works, Community Center, at City parks, and at the Fire Stations. Yearly maintenance may include crack sealing, seal
coating, and mill and overlays. Maintenance will generally be completed with the street zones, or on an as needed basis.
Justification
Completing periodic maintenance on the City parking lots, similar to City streets, will extend the overall design life of the pavement and reduce
and/or prolong costly repairs.
Expenditures
Improvement
2007
20,000
20,000
2008
21,000
21,000
2009
22,000
22,000
2010
23,000
23,000
2011
24,000
24,000
Total
110,000
110,000
Total
Funding Sources
Capital Projects Levy
2007
20,000
20,000
2008
21,000
21,000
2009
22,000
22,000
2010
23,000
23,000
2011
24,000
24,000
Total
110,000
110,000
Total
Operational Impact/Other I
Maintaining the parking lots will result in less annual maintenance for public works and prolong the life of the pavements,
Wednesday, August 16, 2006
26
Capital Plan
City of Andover, MN
2007 thru 2011
Projeet #
07-41900-03
ProjeetName Communication Radios
Type Equipment
Useful Life ] 0 Years
Category Equipment
Priority ] - High
Contaet PW Superintendent
Department Facility Management
Description l
The city has a need for three 800 mhz communication radios to be used in emergency situations between the Civil Defense person, Public W orles
Superintendent, Fire Chief and the Sherifl's Department
Justification I
Central Communications changed to the new frequency a few years back and the old system will be discontinued..
Expenditures
Equipment
2007
10,000
10,000
2008
2009
2010
2011
Total
10,000
10,000
Total
Funding Sources
Capital Projects Levy
2007
10,000
10,000
2008
2009
2010
2011
Total
10,000
10,000
Total
Operational Impact/Other I
Without the ability to communicate between departments, we slow down the response time that is so critical when dealing with emergencies.
Wednesday, August J 6, 2006
27
Capital Plan
City of Andover, MN
2007 thru 2011
Type Improvement
Useful Life 5 years
Category Facility Management
Priority 1 - High
Contact PW Superintendent
Department Facility Management
Project # 08-41900-01
Project Name Surface Seal all Brick Structures
Description
A surface sealing application would be initiated for all brick and/or block municipal buildings. The buildings include: City Hall, Public Works,
Fire Station #1 & #2, Sunshine Park Building, Prairie Knoll Park Building, and all utility department buildings such as the pump houses and
treatment facility.
Justification
This is a necessary maintenance item to ensure the long term integrity of the municipal buildings,
Expenditures
Facility Maintenance
2007
2008
40,000
40,000
2009
2010
2011
Total
40,000
40,000
Total
Funding Sources
Capital Projects Levy
Water Fund
2007
2008
22,000
18,000
40,000
2009
2010
2011
Total
22,000
18,000
40,000
Total
Operational Impact/Other]
This will reduce the amount of long term maintenance and repair to the municipal buildings,
Wednesday, August 16, 2006
28
Capital Plan
City of Andover, MN
2007 thru 2011
Type Improvement
Useful Life Unassigned
Category Improvements
Priority 1 - High
Contact PW Superintendent
Department Facility Management
Project # 08-41900-02
Project Name Land Purchase
Description
Purchase land west of the Public Works building to be used for a salt storage building, material storage, recycling center and future facility
expansion. The City's is currently under contract to purchase this property, The City management team will be evaluating and assisting with the
planning and future expansion for the Public Works Facility. Adequate property is necessary to insure that future needs of the community can be
met.
Justification
This is the last opportunity to purchase this property and keep city facilities together in one complex. Future site expansion opportunities are
limited without additional property.
Expenditures
Land Acquisition
2007
2008
515,217
515.217
2009
2010
2011
Total
515,217
515.217
Total
Funding Sources
Building Fund
2007
2008
515.217
515.217
2009
2010
2011
Total
515,217
515.217
Total
Operational Impact/Other
Large cost savings in keeping facilities together. Another large savings is having a salt storage area on the property, The recycling center would be
moved away from the parks and this would help maintain cleaner parks on the complex. It would also provide a large storage area for the seal coat
rock, swe in etc. en land areas in Andover will soon be a thin of the ast
Wednesday, August J 6, 2006
29
Capital Plan
City of Andover, MN
2007 thru 2011
Type Improvement
Useful Life 2 Years
Category Facility Management
Priority I - High
Contact PW Superintendent
Department Facility Management
Project # 08-41900-03
Project Name Building A - Seal Floor
Description
Apply a sealant to the cement floor in Building A (large garage),
Justification
The cement floor in Building A spalds due to salt and traffic from daily vehicles use, Sealing of the floors should be repeated every 2 years to
retain the integrity of the floor surface. Without this process, the cement floor would deteriorate and would have to be replaced. It is much more
cost effective to perform the maintenance than to replace the entire floor.
Expenditures
Facility Maintenance
2007
2008
7,000
7,000
2009
2010
8.000
8,000
2011
Total
15,000
15,000
Total
Funding Sources
General Fund
2007
2008
7,000
7,000
2009
2010
8,000
8,000
2011
Total
15,000
15,000
Total
Operational Impact/OtlJer I
Gives use a much longer life of the cement floor, than having to replace it before its life expectancy is up,
Wednesday, August 16, 2006
30
Capital Plan
City of Andover, MN
Project # 08-41900-04
Project Name Salt Storage Building
2007 thru 2011
Type Improvement
Useful Life 30 Years +
Category Facility Management
Priority 1 - High
Contact PW Superintendent
Department Facility Management
Description I
Ibis salt storage building would be 40' x 50' x 25' high. The City would be able to purchase a season's worth of salt and keep it stored inside this
structure out of the elements, We would meet all environmental specifications needed for this type of storage, with no damage to the product being
stored. This facility would be built to blend in with the rest of the City complex and not a sight distraction within the campus.
Justification I
At the present time the City purchases salt from Anoka County, which has been done since the City was first adopted. This puts us at the mercy of
the county operations, causing situations such as what time someone will be there to load our trucks, do they have an adequate supply of salt
needed at all times, We have had good working relations with the county, but they also would like to see us be able to store our own winter supply
so they would be able to keep a larger supply of salt for county use, Cost savings is also a large part of having our own storage, We can purchase
product at $10.00 to 15.00 per ton less, plus we wouldn't be paying a 15% administration fee for county personnel services. This building will pay
for itself over a short oeriod of time.
Expenditures
Construction
2007
2008
350,000
350,000
2009
2010
2011
Total
350,000
350,000
Total
Funding Sources
G,O, Bond
2007
2008
350,000
350,000
2009
2010
2011
Total
350,000
350,000
Total
Operational Impact/Other I
Having this building right here on campus will save a great deal of personnel time, )nicking, and fuel costs, The salt not used could be returned to
the storage building and not dumped outside where it gets wet and damaged, or becomes an environmental problem.
Wednesday, August J 6, 2006
31
Capital Plan
City of Andover, MN
Project # 08-41900-05
Project Name Recycling Building & Fence
2007 thru 2011
Type Improvement,
Useful Life 15-20 Years
Category Facility Management
Priority 1 - High
Contact PW Superintendent
Department Facility Management
Description I
Move Recycling Center from location on Tower Drive to new location located north of the water treatment facility, A new building that will be
constructed of materials that will best blend in with the rest of the public works campus, This structure will have to be larger than the present one
so more recycled materials can be stored inside and with less chance of the lighter materials blowing out Also need more room for outside storage,
a paved drive surface, completely fenced, better security lighting, and updated security camera's.
Justification I
At the present location we have just plain run out of room! And the recycling center will have to be moved do to it now sits in the foot print of the
new addition of the vehicle storage building. Also as clean as we try to keep this area, it is probably not the best neighbor to the Community Center
and YMCA do to items that blowout of the recycling storage yard Also it would be best to keep the large trucks off of Tower Drive for safety
reason, due to narrow streets and a lot of pedestrian traffic,
Expenditures
Construction
2007
2008
250,000
250,000
2009
2010
2011
Total
250,000
250,000
Total
Funding Sources
G,Q, Bond
2007
2008
250,000
250,000
2009
2010
2011
Total
250,000
. 250,000
Total
Operational Impact/Other I
In the new location we will most likely be able to keep a closer watch on the area. It will still be within the area of the public works so there would
be no extra cost in maintenance of the grounds and with a larger area it will be more customer friendly.
Wednesday, August 16, 2006
32
Capital Plan
City of Andover, MN
2007 thru 2011
Project #
08-41900-06
Project Name Attacbed Storage Building
Type Improvement
Useful Life 25 Years
Category Facility Management
Priority 1 - High
Contact PW Superintendent
Department Facility Management
Description I
Three sided attachment building 25' x 50'. This building will be used for small equipment that can be stored in all types of temperature but under a
roofto protect it from the elements. It will also work as screening the facility.
Justification
Expenditures
Construction
2007
2008
200,000
200,000
2009
2010
2011
Total
200,000
200,000
Total
Funding Sources
G,Q, Bond
2007
2008
200,000
200,000
2009
2010
2011
Total
200,000
200,000
Total
I ""........ 1m..."",."
Wednesday, August 16, 2006
33
Capital Plan
City of Andover, MN
Project # 08-41900-07
Project Name Fire St. #2 Addition and Parking Lot Improve.
2007 thru 2011
Type bnprovement
Useful Life 30 Years
Category bnprovements
Priority 2 - Medium
Contact Fire Chief
Department Facility Management
Description
The addition of one bay to the apparatus area, the purchase and storage of an auxiliary power generator, and expanding the existing parking lot to
allow for more room and parking space, The project also includes a mill and overlay of the existing parking lots at Station #1 and #2.
Justification
The additional space to the building will allow for all vehicles to be parked in front of an exit door. The firefighters will not have to move a
vehicle in order to get another one out of the building. The additional bay will also make clean up operations after an event much easier, The
frrefighters will not have to 1I!0ve vehicles out of the building in order to clean hose and equipment The additional parking space will provide for
much needed hard surface training area and more vehicle parking, Replacement of the existing parking lots is necessary due to the heavy frre
vehicle traffic,
Expenditures 2007 2008 2009 2010 2011 Total
Equipment 35,000 35,000
Improvement 415,000 415,000
Total 450,000 450,000
Funding Sources
G,Q, Bond
2007
2008
450,000
450,000
2009
2010
'2011
Total
450,000
450,000
Total
Opemtional Impact/Other I
The additional space will make all fire operations more efficient at this building, Vehicles will not have to be moved in order to get others out and
clean-up will be much easier and faster,
Wednesday, August J 6, 2006
34
Capital Plan
City of Andover, MN
2007 thru 2011
Project # 09-41900-01
Project Name Addition to Storage Building & Vehicle Maint. Shop
Type Improvement
Useful Life 30 Yean; +
Category Facility Management
Priority 1 - High
Contact PW Superintendent
Department Facility Management
Description I
This is an addition to the present vehicle storage building. It will be added to the north end of the present building and be the same in size, 100' x
250' with a 75' x 140' addition to the northwest side of the new vehicle storage garage for the vehicle maintenance shop. This building will be built
with cement panels to match the present vehicle garage and would screen Public Works operations from the Community Center/YMCA as
proposed in ajoint meeting with the Mayor and City Council.
Justification 1
Due to the increase of vehicles, equipment and supplies now used by the City of Andover, this vehicle storage building and vehicle maintenance
repair shop is badly needed. It is not cost effective to have vehicles or other equipment stored outside. Minnesota's four seasons are way too hard
on them and it makes for a much cleaner operation. The vehicle maintenance repair shop has been needed for a long time. The area now used has
doors that are not wide enough and work areas for the hydraulic hoist are way too small. Also with the amount of equipment now maintained by
our staff in the area is much too small to run a completely safe operation.
Expenditures
Improvement
2007
2008
2009
1,850,000
1,850,000
2010
2011
Total
1,850,000
1,850,000
Total
Funding Sources
G,Q, Bond
2007
2008
2009
1,850,000
1,850,000
2010
2011
Total
1,850,000
1,850,000
Total
Operational Impact/Other
This will impact the life of the vehicles and other equipment by being stored inside and to house our vehicle maintenance mechanics. Over the
years, the cost savings have been shown when the proper maintenance of our equipment can be implemented. This building will provide a safe,
roductive, and health 0 erational area for Ci em 10 ees that will benefit the Ci of Andover for man ears,
Wednesday, August J 6, 2006
35
Capital Plan
City of Andover, MN
2007 thru 2011
Project #
10-41900-01
Project Name Pedestrian Tunnel Under Crosstown Blvd.
Type Improvement
Useful Life 30 Years +
Category Facility Management
Priority 1 - High
Contact PW Superintendent
Department Facility Management
Description I
This would be a pedestrian underpass walkway under Crosstown to accommodate pedestrian traffic from a possible development of a parking lot or
other sports fields on the north side of Crosstown Boulevard that could crossunder Crosstown Boulevard to Sunshine Park Facilities or just
connect to the cities trail system.
Justification 1
This item was discussed at a Council Workshop with the Public Works Department Managers February 16th 2006, For safety and for easy access
for crossing Crosstown Boulevard from a future park and/or future parking lot on the north side of Crosstown Boulevard to Sunshine Park on the
South side, or just getting to the city trail system the quickest and safest way will be a pedestrian underpass under Crosstown Boulevard.
.
Expenditures
Improvement
2007
2008
2009
2010
300,000
300,000
2011
Total
300,000
300,000
Tolal
Funding Sources
G,Q, Bond
2007
2008
2009
2010
300,000
300,000
2011
Total
300,000
300,000
Tolal
Operational Impact/Other 1
Connecting of these area's though a trail system, or underpass will only benefit our operational impact This underpass will also add to the safety
of our personnel and equipment. That is the smaller equipment that now has to cross a very busy street, could also use the underpass. Keeping the
campuses formate works well in holdinQ down operational cost.
Wednesday, August 16, 2006
36
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
Useful Life 10 Years
Category Equipment
Priority I . High
Contact Fire Chief
Department Fire
Project #
07-42200-01
Project Name Rescue Truck
Description
Purchase a rescue truck for responding to emergency medical calls. These would be an addition to the fleet
Justification
Currently the grass truck at St #2 is responding to all medical calls but is not equipped to handle all emergencies. Another smaller truck
designated and equipped strictly for medical calls would be more efficient and economical, thus preserving the bigger grass rig and extending its
useful life, Of the fire department responses, approximately 60% of the calls are now medical related, With the medical gear currently stored on the
grass truck, the equipment is always getting wet or damaged by fire type responses, The goal of having one specific vehicle at each station designed
for medical responses will help to keep the appropriate equipment in the right locations always available for medical calls, The proposed truck will
have a fiberglass body with plenty of storage space so that we will also be able to store and transport hydraulic rescue equipment on the vehicle as
needed. The grass trucks will last us longer as they will be used strictly for wildfires and transportation of hose and equipment from fire scenes.
The medical gear and equipment will also be less likely to become contaminated by fire and have to be thrown away or cleaned before we have a
chance to use it All three stations have a higher percentage of medical responses and it is important that we have the appropriate vehicles to
erform the 'ob,
Expenditures
Vehicles
2007
40,000
40,000
2008
2009
2010
2011
Total
40,000
40,000
Total
Funding Sources
Equipment Bond
2007
40,000
40,000
2008
2009
2010
2011
Total
40,000
40,000
Total
Operational Impact/Other I
A smaller truck would be more efficient and economical and would also extend the useful life of the grass rig, By having a designated vehicle for
medical responses, the fire department will be able to cany more of the appropriate medical equipment and not have to be concerned about
contamination from grass fires or other types offrre incidents that we may respond to, The "medical" vehicles will also be kept in town and not in
other cities as they may be now when called for mutual aid assistance for wildfires.
Wednesday, August J 6, 2006
37
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
Useful Life 5 years
Category Equipment
Priority 2 - Medium
Contact Fire Chief
Department Fire
Project # 07-42200-02
Project Name New Mobile Data Terminals in Fire Trucks
Description
Installation of mobile data terminals (MDT's) in fire trucks,
Justification
By including MDTs in fIre vehicles, firefIghters will be able to access important data and information from the Anoka County Communications
Center and fire stations, As an example, known bazardous conditions will be identified while responding to the incident
Expenditures
Equipment
2007
30,000
30,000
2008
2009
2010
2011
Total
30,000
30,000
Total
Funding Sources
Equipment Bond
2007
30,000
30,000
2008
2009
2010
2011
Total
30,000
30,000
Total
OperntionailmpactlOther I
The installation ofMDTs will improve communications and data capabilities. The opportunity to view important information prior to arriving at
the scene will make the firefIghters jobs much safer.
Wednesday, August J 6, 2006
38
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
Useful Life 5 years
Category Equipment
Priority 1 - High
Contact Fire Chief
Department Fire
Project #
07-42200-03
Project Name Thermal Imaging Camera
Description I
The thermal imaging camera is new technology that will greatly increase firefighters ability to locate beat sources in a structure. The camera is
designed to be used to find human bodies in fire situations where it is near impossible to see because of the smoke and fire encountered during a
structure fire, The camera will also be used to fmd hot spots in walls and lor floors during the extinguishment process.
Justification I
Firefighters will be much more effective in performing search and rescue of victims who could not get out of the structure for some reason. The
camera will also be very helpful in identifYing internal hot spots that may not be visible.
Expenditures
Equipment
2007
14,000
14,000
2008
2009
2010
2011
Total
14,000
14,000
Total
Funding Sources
Equipment Bond
2007
14,000
14,000
2008
2009
2010
2011
Total
14,000
14,000
Total
Operational Impact/Other I
The camera will potentially save lives of victims who may not be visible by conventional methods or means, Firefighters can scan a room from one
location looking for a victim and move to the next room much faster.
Wednesday, August} 6. 2006
39
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
Useful Life 10 yean;
Category Equipment
Priority 2 - Medium
Contact Fire Chief
Department Fire
Project # 07-42200-04
Project Name Replacement - Hydraulic Rescue Equipment
Description
Replace one (and possibly two) hydraulic rescue tools used for extrication and heavy rescue work.
Justification
The current equipment is approximately 13 years old and is somewhat heavier than the new types of equipment. The new hydraulic tools also have
more capacity for pushing, pulling, and cutting activities,
Expenditures
Equipment
2007
30,000
30,000
2008
2009
2010
2011
Total
30,000
30.000
Total
Funding Sources
Equipment Bond
2007
30,000
30,000
2008
2009
2010
2011
Total
30,000
30,000
Total
Operntional Impact/Other I
The hydraulic rescue equipment is necessary to provide the fastest and most efficient means to extricate trapped parties, The lighter weight and
stronger tools will make the rescue work much less stressful for the firefighters to perform.
Wednesday, August J 6, 2006
40
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
Useful Life 20 Years
Category Equipment
Priority 2 - Medium
Contact Fire Chief
Department Fire
Project #
07-42200-05
Project Name Hose Washerffester
Description
The hose washer !tester can be used to wash hose as necessary and also to conduct the annual required hose tests.
Justification
The hose washer will save time after the incident has ended in that the firefighters will be able to wash hose much faster after each incident The
tester will be use to conduct the annual hose testing where each section of hose is required to be tested to a certain pressure for a certain period of
time. The tester will allow the fire department to keep the pumpers in service instead of committing them for the testing process,
Expenditures
Equipment
2007
8,000
8,000
2008
2009
2010
2011
Total
8,000
8,000
Total
Fnnding Sources
Equipment Bond
2007
8,000
8,000
2008
2009
2010
2011
Total
8,000
8,000
Total
Operational ImpactJOtlJer I
The new washer /tester will aid in making our jobs of getting the trucks back into service much easier after the fire events. The washer can clean
hose much faster than firefighters scrubbing hose with a brush or broom, The hose is required to be tested annually, and with the proposed tester at
least five sections can be tested at a time instead of doing each section individuallv,
Wednesday, August 16, 2006
41
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
Useful Life 1 0 Years
Category Equipment
Priority 2 - Medium
Contact Fire Chief
Department Fire
Project #
08-42200-01
Project Name Replacement - Fire Marshall Vehicle
Description
Replace Unit # 4801 _ 1997 SlO Blazer with 53,000 miles. We may want to evaluate what type of vehicle we will need for this position at the time
of replacement
Justification
The Fire Marshal's vehicle is anticipated to have approximately 65,000 miles on it by the year 2008, and the ability to respond to an emergency
with a dependable vehicle needs to be considered. There have been more maintenance issues with this vehicle, and although most have been minor,
the occurrences are increasing and the costs will also start to increase as the vehicle gets older.
Expenditures
Vehicles
2007
2008
30,000
30,000
2009
2010
2011
Total
30,000
30,000
Total
Funding Sources
Equipment Bond
2007
2008
30,000
30,000
2009
2010
2011
Total
30,000
30,000
Total
Operational Impact/Other I
The new vehicle will be used for day to day inspections and also emergency responses when the Fire Marshal is available to assist at the incident
including medical calls, It is crucial that the Fire Marshals vehicle be in good operating order to perform all of the functions needed. This vehicle is
also used to help conduct all of the fire investigations and the appropriate equipment needs to be stored in the vehicle. The fire department needs
to have a verY denendable vehicle to perform all of the functions listed,
Wednesday, August 16, 2006
42
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
UseCul LiCe 20 Years
Category Equipment
Priority 1 - High
Contact Fire ChieC
Department Fire
Project # 08-42200-02
Project Name Replacement - Fire Tanker #31
Description
Replace fire tanker #31, a 19911ntemational! Alexis tanker with 7,700 miles,
Justification
l
lbis vehicle will be seventeen years old in 2008 and will most certainly need a major refurbishment or replacement It would be recommended to
replace and sell the existing vehicle as is so that our fire department will benefit from new vehicle technology that should last us for the next twenty
years. The maintenance costs are starting to increase and the body work needed should be evaluated. The new tanker will have high technology
flow meters, automated pump controls, a more efficient engine that creates less pollution in the station and on the road.
Expenditures
Equipment
2007
2008
295,000
295,000
2009
2010
2011
Total
295,000
295,000
Total
Funding Sources
Equipment Bond
2007
2008
295,000
295,000
2009
2010
2011
Total
295,000
295,000
Total
Operational Impact/Other
The new technology will allow firefighters to perform their jobs in a more efficient and safe manner. The newer technology will allow for just one
operator to staff the vehicle for water shuttles to and from the fire scenes, Currently, we need at least two firefighters to operate the tanker properly,
The newer controls and gauges will also help to make the vehicle much easier to pump and dump water as needed. Other items that will be
improved include; electronic dump chutes for water control, inside cab controls for operator ease, larger pump that can he 1.5.0, certified, better
emergency lighting for responding to the scene, more storage room, roll up doors for safer access on the scene, pre plumbed suppressant foam
su I, electroniclh draulic dum tank lowerin device, and the room needed for a second ortable tank.
Wednesday, August J 6, 2006
43
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
Useful Life 15 Years
Category Equipment
Priority I - High
Cootact Fife Chief
Department Fire
Project #
08-42200-03
Project Name WaterlIce rescue boat
Description
A small boat designed and built to perform water and ice rescues,
Justification
Andover does not currently have a rescue boat. The boat would be used to perform ice and water rescues, The boat will make these specific types
of rescues safer for all responders, The boat will allow firefighters to perform rescue work rather than waiting for a boat to arrive and perform
recovery work.
Expenditures
Equipment
2007
2008
20,000
20,000
2009
2010
2011
Total
20,000
20,000
Total
Funding Sources
Equipment Bond
2007
2008
20,000
20,000
2009
2010
2011
Total
20,000
20,000
Total
Operational Impact/Other I
Boat will make an easier and safer rescue for all responders and parties being rescued, The boat will save lives and make it safer for firefighters
who have to enter the water or crawl on the ice, The current method of having firefighters wear wet suits and try to swim or crawl on the ice to the
victim is not Very safe or recommended if we can avoid it The boat will helD !tet the rescuer and victim out of the situation faster and safer,
Wednesday, August 16, 2006
44
Capital Plan
City of Andover, MN
Project # 09-42200-01
Project Name Replacement - Fire Engine #11
2007 thru 2011
Type Equipment
Useful Life 20 Years
Category Equipment
Priority 1 - High
Contact Fire Chief
Department Fire
Description
Replace fire engine #11, a 1991 Pierce Lance pumper truck with 23,100 miles,
Justification
Engine # II and three other major pieces of equipment are scheduled to be replaced in the next few years. The current engine is working fme but is
starting to have more day to day repairs. As with any vehicle that is 16 years old, some parts can be harder to fmd and take longer to receive for
needed repairs. The fire department can not afford to have vehicles down for extended periods of time.
Expenditures
Vehicles
2007,
2008
2009
400,000
400,000
2010
2011
Total
400,000
400,000
Total
Funding Sources
Equipment Bond
2007
2008
2009
400,000
400,000
2010
2011
Total
400,000
400,000
Total
Operational Impact/Other I
The new technology will allow firefighters to respond and conduct fire suppression activities, rescue operations, and other required activities in a
safer and more efficient manner, The maintenance costs can be lowered as well, Some of the new technology items include increasing the
capability to transport more firefighters to the scene, internal plumbed foam suppressant system, climate control1ed cab can be used for firefighter
rehabilitation, much better visibility when driving to emergencies, better maneuverability, and new designs make it much easier to enter and exit
the cab area In addition the new emergency lighting standards will make it easier to see the truck while responding and also while parked at the
scene,
Wednesday, Augusl16, 2006
45
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
Useful Life 20 Years
Category Equipment
Priority I - High
Contact Fire Chief
Department Fire
Prnject# 10-42200-01
Project Name Replacement - Ladder Truck #11
Description
Replace ladder truck #11, a 1991 Pierce 75' ladder truck with 15,800 miles. The new ladder truck would be a 100 foot aerial platform, which
includes a bucket at the end of the ladder for firefighter safety. The 100 foot reach will allow for the fire departrnentto perform rescue and
suppression activities in buildings that we can not currently reach,
Justification I
The city is required by the 1.8,0, to have this type of vehicle available for use because of the building heights allowed in Andover, The new
platform style truck versus the current straight ladder will be much safer for firefighter activities and fire suppression activities. It should be noted
that the newest aerial truck equipment and technologies are better than what we are now using, The new vehicles have safety sensors and weight
distribution gauges that will keep the operators from making mistakes while operating the truck that could be very costly or dangerous, The newer
buildings in Andover are getting taller with more green space between the building and a hard surface making it much more difficult to reach some
of them because of the height restrictions of the current ladder truck.
Expenditures
Equipment
2007
2008
2009
2010
850,000
850,000
2011
Total
850,000
850,000
Total
Funding Sources
Equipment Bond
2007
2008
2009
2010
850,000
850,000
2011
Total
850,000
850,000
Total
Operational Impact/Other I
The use of an aerial device can be very dangerous if not performed properly, A new platform truck will allow firefighters to perform the most
dangerous of activities as required from time to time, and know that they have the right piece of equipment to do the job, The larger and taller
buildings now being built in Andover will require this type of equipment The current ladder truck has been fairly dependable with not many major
repairs needed. The maintenance costs are going up for this vehicle and the trade in value may be going down as the truck gets older, The new
bucket style of truck will also much safer conditions for firefighters performing suppression activities. The new ladder truck can be equipped to
have pre-plumbed breathing air in the bucket for extended use and also high intensity lighting mounted on the bucket wiIl greatly increase site
visibility, Firefighters will no longer have to cany heavy equipment up the ladder but rather can swing the bucket down to the ground to pick it up,
The larger cab design wiIl allow for transporting more firefighters and also can be used for rehabilitation of staff when needed, The bucket design
will also allow for two master stream devices mounted near the top of the bucket to be used for extinguishment for very large types of fires, The
over head visibilitv at the scene will also heln the incident commander make vital decisions regarding the tactics and strategies to be used,
Wednesday, August 16, 2006
46
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
Useful Life ) 0 Vears
Category Equipment
Priority 2 - Medium
Contact Fire Chief
Department Fire
Project # 10-42200-02
Project Name Replacement - Fire Chiefs Vehicle
Description
Replacement of Fire Chiefs vehicle, a 2002 Tahoe with approximately 34,000,
Justification
In order to keep the first line emergency responding vehicles in the proper operating conditions, it is important to replace equipment when needed.
The current vehicle has worked vel)' well and should be evaluated for repair histol)' and maintenance costs as the replacement date gets closer.
Expenditures
Equipment
2007
2008
2009
2010
40,000
40,000
2011
Total
40,000
40,000
Total
Funding Sources
Equipment Bond
2007
2008
2009
2010
40,000
40,000
2011
Total
40,000
40,000
Total
Operational Impact/Other I
The Chiefs vehicle is used by the Chief to respond to emergency incidents. The vehicle has to be in good shape and able to provide safe and
protective transportation when responding to all types of incidents. The vehicle also carries all of the Chiefs protective gear and equipment needed
to help conduct fire investigations. The Chief regularly uses the vehicle to conduct interviews while on the scene with property owners and also
uses the truck to provide a place for fire victims to sit out of the elements while they are waiting for relatives or the Red Cross to respond to the
scene,
Wednesday, August 16, 2006
47
Capital Plan
City of Andover, MN
2007 thru 2011
Project # 07-45000-01
Project Name ReplacelRepair Play Structures - Various Parks
Type Improvement
Useful Life 10 Years
Category Park Improvements
Priority 2 - Medium
Contact PW Superintendent
Department Park & Rec - Operations
Description I
Repair to fall zones and achieve ADA accessibility. Replacement of playgrmmd equipment and other major replacements, such as short fences on
ball fields, soccer goals, or any area of play that does not meet safety specifications.
Justification I
Old equipment no longer meets ADA requirements, such as entrapments, fall zones or handicap accessibility, Working to bring the parks up to
meet all safety requirements,
Expenditures
Equipment
2007
40,000
40,000
2008
40,000
40,000
2009
40,000
40,000
2010
40,000
40,000
2011
40,000
40,000
Total
200,000
200,000
Total
Funding Sources 2007 2008 2009 2010 2011 Total
Capttal Projects Levy 40,000 40,000
General Fund 40,000 40,000 40,000 40,000 160,000
Total 40,000 40,000 40,000 40,000 40,000 200,000
Operational Impact/Other I
Less maintenance and will meet all safety requirements,
Wednesday, August 16, 2006
48
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
Useful Life 15 Years
Category Equipment
Priority 2 - Medium
Contact PW Superintendeot
Department Park & Rec - Operations
Project #
07-45000-02
Project Name Replacement - Self-Propelled 48" Sweeper
Description
Replace Unit #542, a 1988 Olathe sweeper, This machine is smaller than the pull type and can get into tighter places,
Justification
The current machine has a lot of hours on it and is costing us more each year to repair and maintain as a front line unit
Expenditures
Equipment
2007
20,000
20,000
2008
2009
2010
2011
Total
20,000
20,000
Total
Funding Sources
Equipment Bond
2007
20,000
Total 20,000
2008
2009
2010
2011
Total
20,000
20,000
Operntional Impact/Other I
A more cost efficient machine with less breakdowns.
.
Wednesday, August 16, 2006
49
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
Useful Life 10 Years
Category Equipment
Priority I - High
Contact PW Superintendent
Department Park & Rec - Operations
Project #
07-45000-03
Project Name Zero Turn Mower
Description
A zero turn mower to be used by the Parks Department for mowing operations at the Community Center, City Hall and Public Works facilities.
Justification
I
This mower is smaller than the normal six foot mowers and has a zero turn operation allowing it to trim and turn in smaller areas.
Expenditures
Equipment
2007
7,500
7,500
2008
2009
2010
2011
Total
7,500
7,500
Tola)
Funding Sources
Equipment Bond
2007
7,500
7,500
2008
2009
2010
2011
Total
7,500
7,500
Tola)
Operational Impact/Other 1
This machine can be used in more isolated areas and eliminate trimming with a hand mower and less clean up. Saving time, personnel and money.
Wednesday. AuguS116. 2006
50
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
Useful Life I 0 Years
Category Equipment
Priority I - High
Contact PW Superintendent
Department Park & Roc - Operations
Project # 07-45000-04
Project Name Replacement - Toro Groundsmaster 328
Description
Replace Unit #560, a 1992 Toro Groundmaster 328 with cab, a 72" discharge deck and snow blower and has approximately 1,600 hours, The
Parks Department would like to replace it with a 4-wheel drive model, which is helpful in moving snow and mowing on hilly and wet terrain, The
current machine would replace one of the older units in another department
Justification
This unit is used year round and maintenance costs are rising, The cost to operate this unit increased $,58 per hour this last year, This unit used
around the Community Center, City Hall and Public Works facilities.
Expenditures
Equipment
2007
32,000
32,000
2008
2009
2010
2011
Total
32,000
32,000
Total
Funding Sources
Equipment Bond
2007
32,000
32,000
2008
2009
2010
2011
Total
32,000
32,000
Total
Operational Impact/Other I
An additional unit with a cab will help during winter operations. The 4-wheel drive unit will be more efficient with its time ra!her than spinning its
tires and getting stuck.
Wednesday, August J 6, 2006
51
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
Useful Life 10 Years
Category Equipment
Priority I - High
Conlaet PW Superintendent
Department Park & Rec - Operations
Projeet # 08-45000-01
Project Name Truck - 3/4 Ton Crew Cab
Description
Large pick up truck to haul mowers, equipment and personnel to job sites around the city, It would be similar to Unit 502 which has worked great.
This would be an addition to the fleet
Justification
I
To haul more equipment and personnel to various job sites saving time,
Expenditures
Vehicles
2007
2008
35,000
35,000
2009
2010
2011
Total
35,000
35,000
Total
Funding Sources
Equipment Bond
2007
2008
35,000
35,000
2009
2010
2011
Total
35,000
35,000
Total
Operationallmpact/Other I
Save time and money by hauling a number of people out to the job site in one vehicle rather than two or more, A second rig would be extremly
helpful during the spring, summer and fall months when all of the part-time help is here.
Wednesday, August 16, 2006
52
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
Useful Life 10 Years
Category Equipment
Priority I - High
Contact PW Superintendent
Department Park & Rec - Operations
Project #
08-45000-02
Project Name Replacement - Mower Trailer
Description
Replace Unit# T-555, a tandem axle trailer with GVW rating of 10,000 to 12,000 lbs with a trailer similar to Unit #T-554.,
Justification
This trailer has already been sandblasted and painted once before because of rust and is now starting to sbow its age, In addition, this trailer bas
higher siderails making it diffucult to load and unload equipment
Expenditures
Equipment
2007
2008
8,500
8,500
2009
2010
2011
Total
8,500
8,500
Total
Funding Sources
Equipment Bond
2007
2008
8,500
8,500
2009
2010
2011 '
Total
8,500
8,500
Total
Operntional Impact/Other I
Save time and money in bauling equipment around the city on a proven multi use trailer,
Wednesday, August J 6, 2006
53
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
Useful Life 10 Years
Category Equipment
Priority 1 - High
Contact PW Superintendent
Department Park & Rec - Operntions
Project #
08-45000-03
Project Name Replacement - Toro Groundmaster
Description
Replace Unit #550, a 1998 Taro Groundmaster mower with 2,700 hours,
Justification
The maintenance cost are substantially higher than any of the other mowers. This machine is spending more and more time in the shop being
repaired rather than mowing and being productive,
Expenditures
Equipment
2007
2008
22,000
22,000
2009
2010
2011
Total
22,000
22,000
Total
Funding Sources
Equipment Bond
2007
2008
22,000
22,000
2009
2010
2011
Total
22,000
22,000
Total
OpemtionaI Impact/Other]
More time being productive, saving time and money,
.
Wednesday, August 16, 2006
54
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
Useful Life 10 Years
Category Equipment
Priority 1 - High
Contact PW Superintendent
Department Park & Rec - Operations
Projeet #
09-45000-01
Project Name Replacement - Large Capacity Lawnmower
Description
Replace Unit #580, a 1999 Toro 580 large capacity mower with 2,000 hours. This machine is averaging 200 - 300 hours per year and by 2009 it
will have approximately 2,500 hours,
Justification
Maintenance costs are starting to accumulate and it should be traded in while it still has some value. Maintenance costs rose $1.37 per hour over
the previous year.
Expenditures
Equipment
2007
2008
2009
112,000
112,000
2010
2011
Total
112,000
112,000
Total
Funding Sources
Equipment Bond
2007
2008
2009
112,000
112,000
2010
2011
Total
112,000
112,000
Total
Operational Impact/Other I
Higher maintenance cost, possibly more break downs and lower trade-in value,
Wednesday, August J 6, 2006
55
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
Useful Life 10 Years
Category Equipment
Priority 1 - High
Coo tact PW Superintendent
Department Park & Rec - Operations
Project #
09-45000-02
Project Name Replacement - Toro Groundsmaster
Description
Replace Unit #559, a 1999 Toro Groundsmaster 328 with 1,600 hours,
Justification
These units are run year round and average about 300 hours a year!! With the additional parks that are added each year, the average hour that each
machine puts on will increase,
Expenditures
Equipment
2007
2008
2009
23,000
23,000
2010
2011
Total
23,000
23,000
Total
Funding Sources
Equipment Bond
2007
2008
2009
23,000
23,000
2010
2011
Total
23,000
23,000
Total
Operational Impact/Other I
Possibility of more costly breakdowns in the future along with higher everyday maintenance issues,
Wednesday, Augus116, 2006
56
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
Useful Life 10 Years
Category Equipment
Priority 2 - Medium
Contact PW Superintendent
Department Park & Rec - Operations
Project #
11-45000-01
Project Name Replacement - Trailer
Description
Replace Unit #T-554, a tandem axle trailer with GVW rating of 10,000 - 12,000 lbs. We just had it sand blasted and repainted top to bottom
extending it useful life a few more years,
Justification
This is the main trailer for the Parks Department. It was the first and only trailer that was designed for hauling mowers and it has worked out
great. We would like to purchase another one just like it.
Expenditures
Equipment
2007
2008
2009
2010
2011
9,000
9,000
Total
9,000
9,000
Total
Funding Sources
Equipment Bond
2007
2008
2009
2010
2011
9,000
9,000
Total
9,000
9,000
Total
Operntional Impact/Other 1
More parks can only mean moving more equipment to them.
Wednesday, August 16, 2006
57
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
Useful Life ] 0 Years
Category Equipment
Priority 2 - Medium
Contact PW Superintendent
Department Park & Rec - Operations
Project # 11-45000-02
Project Name Replacement - One Ton Pick Up wlPlow
Description
Replace Unit # 599, a 2000 F450 I-ton with 37,000 miles, These trucks are on the move all year and average about 6,000 miles per year,
Justification
This truck is used everyday; hauling material, equipment, people and also plowing snow in the winter, The plowing of snow puts a lot of wear and
tear on the engine, transmission and other drive line components,
Expenditures
Vehicles
2007
2008
2009
2010
2011
65,000
65,000
Total
65,000
65,000
Total
Funding Sources
Equipment Bond
2007
2008
2009
2010
2011
65,000
65,000
Total
65,000
65,000
Total
Operationallmpact/Otber I
Being that this is a front line unit, we need to know that we can count on it everyday. Cost to operate it have only gone up $.22 per mile last year
put those costs will continue to rise in the coming years, With preventative maintenance, we might be able to extend its useful life,
Wednesday, Augusl16, 2006
58
Capital Plan
City of Andover, MN
2007 thru 2011
Type Improvement
Useful Life 30 Years +
Category Park Improvements
Priority I - High
Contact City Engineer
Department Park & Rec - Projects
Project # 07-45001-01
Project Name Andover Station North Complex
Description
Continued development and construction of an AthleticlPark Complex south of the WDE site. With the fields due to be completed in the fall of
2006; bleachers and playground equipment will be necessary. In order to maximize the usage of the fields, lighting of the two larger fields is
necessary with the possibility of lighting the third and smaller field.
2007 - $20,000 for 3 sets of bleachers, $65,000 for playground equipment and $300,000 to light the 2 larger fields and possibly the smaller field.
2008 - $35,000 for playground equipment
Note: Parkin would be shared with the businesses.
Justification
The bleachers are necessary to allow the spectators to enjoy watching the games without having to stand for long periods of time; The playground
equipment will allow families with children not playing baseball the opportunity to enjoy another activity. The lighting of the fields allows
additional games and practices to be played during the evenings.
Expenditures
Improvement
2007
385,000
385,000
2008
35,000
35,000
2009
2010
2011
Total
420,000
420,000
Total
Funding Sources
Park Improvement Funds
2007
385,000
385,000
2008
35,000
35,000
2009
2010
2011
Total
420,000
420,000
Total
Operational Impact/Other I
Routine maintenance will be required to upkeep the field and park.
Wednesday, August J 6, 2006
59
Capital Plan
City of Andover, MN
2007 thru 2011
Type bnprovement
Useful Lire 25 Years
Category Park bnprovements
Priority 1 - High
Cootact City Engineer
Department Park & Rec - Projects
Project #
07-45001-02
Project Name Terrace Park
Description
Install new basketball court and parking lot with concrete curb and gutter along with completing a small section of trail to provide access to the
playground equipment and the other portions of the park.
Justification
I
The existing parking lot is currently gravel. Since this is located in an urban area, the parking lot should be paved and the neighborhood residents
have requested a baskethall court. Also, the trail to the playground area needs to be paved.
This project has been recommended by the Park & Recreation Commission.
Expenditures
Improvement
2007
55,000
55,000
2008
2009
2010
2011
Total
55,000
55,000
Total
Funding Sources
Pari< Improvement Funds
2007
55,000
55,000
2008
2009
2010
2011
Total
55,000
55,000
Total
Operational Impact/Other I
Additional long-term maintenance and ultimately replacement will be necessary,
Wednesday, Augusr 16, 2006
60
Capital Plan
City of Andover, MN
2007 thru 2011
Type Improvement
Useful Life 25 Y <:an;
Category Park Improvements
Priority 1 - High
Cootaet City Engineer
Departmeot Park & Rec - Projects
Project # 07-45001-03
Project Name Crooked Lake Boat Landing
Description I
Construct new parking lot, install new dock and dredge boat landing area. This project will go forward with the assistance of a MN DNR Matching
Grant
Justification I
The existing parking lot is beyond its normal maintenance requirements. Surface has deteriorated and a number of pot holes have been filled up to
this point A boat dock is necessary for individuals launching their boat, Also, the boat landing has silted in and needs to be removed to allow
boats to maneuver.
This project has been recommended by the Park & Recreation Commission.
Expenditures
Improvement
2007
125,000
125,000
2008
2009
2010
2011
Total
125,000
125,000
Total
Funding Sources
DNR Grant
Parle Improvement Funds
2007
62,SOO
62,500
125,000
2008
2009
2010
2011
Total
62,500
62,500
125,000
Total
Operational Impact/Other 'I
Normal maintenance (sealcoating. sniping. etc.) will be necessary.
Wednesday, August J 6, 2006
61
Capital Plan
City of Andover, MN
2007 thru 2011
Project #
07-45001-04
Type Improvement
Useful Life 25 Years
Category Park Improvements
Priority 1 - High
Contact City Engineer
Department Park & Rec - Projects
Project Name Strootman Park
Description I
Reconstruct existing ballfield and replace fencing, The ballfield will be reduced in size for players generally under the age of 12. In addition, there
will not be an outfield fence so the field can be used for other sports as welL
Justification I
Current ballfield fencing does not meet League ofMN Cities guidelines and needs to be replaced.
This project has been recommended by the Park & Recreation Commission,
Expenditures
Improvement
2007
40,000
40,000
2008
2009
2010
2011
Total
40,000
40,000
Total
Funding Sources
Park Improvement Funds
2007
40,000
40,000
2008
2009
2010
2011
Total
40,000
40,000
Total
Operational Impact/Other I
Normal maintenance will be necessary,
Wednesday, August} 6, 2006
62
Capital Plan
City of Andover, MN
2007 thru 2011
Project #
07-45001-99
Project Name Annual Miscellaneous Projects
Type Improvement
Useful Life Unassigoed
Category Park Improvements
Priority I - High
Contact City Engineer
Department Park & Rec - Projects
Description I
This is for unforeseen or requested miscellaneous projects that may arise during the year, requested by the public, staff, City Council or the Parks
and Recreation Commission for each year.
Justification
I
This gives flexibility to the City to do certain small-sized projects that may be warranted; for example, purchase of soccer goals.
This funding has been recommended by the Park & Recreation Commission.
Expenditures
Improvement
2007
25,000
25,000
2008
25,000
25,000
2009
25,000
25,000
2010
25,000
25,000
2011
25,000
25,000
Total
125,000
125,000
Total
Funding Sources
Park Improvement Funds
2007
25,000
25,000
2008
25,000
25,000
2009
25,000
25,000
2010
25,000
25,000
2011
25,000
25,000
Total
125,000
125,000
Total
OperntionaI Impact/Other I
Allows the Park and Recreation Commission to address a variety of different needs throughout the year,
Wednesday, August 16, 2006
63
Capital Plan
City of Andover, MN
2007 thru 2011
Project #
08-45001-01
Project Name Forest Meadows Park
Type Improvement
Useful Life 15 Years
Category Park Improvements
Priority 1 - High
Contact City Engin=
Department Park & Ree - Projects
Description
Install additional playground equipment for 2-5 year old users.
Justification
I
This funding has been recommended by the Park & Recreation Commission.
Total
2008
25,000
25,000
2009
2010
2011
Total
25,000
25,000
Expenditures 2007
Improvement
Total
2008
25,000
25,000
2009
2010
2011
Total
25,000
25,000
Funding Sources 2007
Pari< Improvement Funds
Operational Impact/Other I
Additional long-term maintenance and ultimately replacement will be necessary.
Wednesday, August 16, 2006
64
Capital Plan
City of Andover, MN
2007 thru 2011
Type Improvement
Useful Life 15 Years
Category Park Improvements
Priority 1 - High
Contact City Engineer
Department Park & Rec - Projects
Project # 08-45001-02
Project Name Sophies South Park
Description
Install new playground equipment and basketball court. The park was dedicated as part of the development of Sophies South. Since no park exists
within the general area, it was recommended to begin developing the park.
Justification
This funding has been recommended by the Park & Recreation Commission.
Expenditures
Improvement
2007
2008
75,000
75,000
2009
2010
2011
Total
75,000
75,000
Total
Funding Sources
Park Improvement Funds
2007
2008
75,000
15,000
2009
2010
2011
Total
15,000
15,000
Total
OpemtionaI Impact/Other I
Additional long-term maintenance and ultimately replacement will be necessary,
Wednesday, August 16, 2006
65
Capital Plan
City of Andover, MN
2007 thru 2011
Type hnprovement
Useful Life 15 Years
Category Park hnproyements
Priority 1 - High
Contact City Engineer
Department Park & Roc - Projects
Project #
08-45001-03
Project Name Woodland Crossing Park
Description
Install new playground equipment
Justification
The park will have a new basketball court and shelter built in 2006. To complete the park, new playground equipment is necessary for all ages
from 2 - 12 years old.
Expenditures
Improvement
2007
2008
57,000
57,000
2009
2010
2011
Total
57,000
57,000
Total
Funding Sources
Parlt Improvement Funds
2007
2008
57,000
57,000
2009
2010
2011
Total
57,000
57,000
Total
Operational Impact/Other I
Additional long-term maintenance and ultimately replacement will be necessary.
Wednesday, August 16, 2006
66
Capital Plan
City of Andover, MN
2007 thru 2011
Project # 09-45001-01
Project Name Andover Lions Park
Type Improvement
Useful Life 25 Years
Category Park Improvements
Priority 1 - High
Contact City Engineer
Department Park & Rec - Projects
Description l
Install outfield fencing with mow strips for ballfield and install new irrigation system.
8 foot high fencing with mow strips - $35,000 and irrigate existing ballfield - $50,000.
Justification I
The installation of an outfield fence will allow the ball to stay in play and also give the awesome feeling when a ball is hit for a home run, Also
give the players a safer playing surface by installing a irrigation system.
This project has been recommended by the Park & Recreation Commission.
Expenditures
Improvement
2007
2008
2009
85,000
85,000
2010
2011
Total
85,000
85,000
Total
Funding Sources
Park. Improvement Funds
2007
2008
2009
85,000
85,000
2010
2011
Total
85,000
85,000
Total
OperationallmpactlOther I
Additionallong-tenn maintenance and ultimately replacement will be necessary,
Wednesday, August 16, 2006
67
Capital Plan
City of Andover, MN
2007 thru 2011
Type Improvement
Useful Life 30 Years
Category Park Improvements
Priority 1 - High
Contact City Engineer
Department Park & Rec - Projects
Project # 10-45001-01
Project Name Hawkridge Park Improvements
Description
The project includes the construction of a warming house, construction of a well w/pump and controls, installation of irrigation for the soccer and
ball fields, playground equipment for children 2-5 years of age and bleachers for sporting spectators.
Storage building/bathroomslconcessions - $209,000; drill well with pump & controls - $100,000; septic system - $7,500; pave existing parking
lot - $90,000; irrigation for 2 fields - $50,000; playground Equipment (2-5 year olds) - $25,000; bleachers with concrete pads(soccer &
ballfield - $15,000; securi light - $2,500; ark si e and landsca in - $1,000.
Justification
By continuing to improve the park system in Andover, the City provides a high quality parks and recreation complex to meet the growing needs of
an active community. These improvements will provide high quality athletic and recreational opportunities to the residents, A warming house
provides shelter and a restroom facility that can be used year around. The well and irrigation provide for a high quality athletic surface for soccer,
baseball/softball activities and water for the restroom. Playground equipment provides activities for younger children and bleachers provide a safe
and comfortable place for spectators.
This roO ect has been recommended b the Park & Recreation Commission.
Expenditures
Improvement
2007
2008
2009
2010
500,000
500,000
2011
Total
500,000
500,000
Total
Funding Sources
Park Improvement Funds
2007
2008
2009
2010
500,000
500,000
2011
Total
500,000
500,000
Total
Operational Impact/Other
The construction of a warming house and restroom facility will increase the use and enjoyment of the park. Also, the construction of the
storage/warming house/restroom facility will eliminate the need to rent a portable warming house and portable bathroom, The well construction
will give the ability to ice the rinks from the on-site well and will eliminate the need to "tanker" water to the site from the Public Works facility on
Crosstown Blvd. The la ound e ui ment will re uire additionallong-tenn maintenance and ultimate re lacement will be necess
Wednesday, Augusrl6, 2006
68
Capital Plan
City of Andover, MN
2007 thru 2011
Project # 10-45001-02
Projcct N'ame Prairie Knoll Park - Phase ill
Type Improvement
Useful Life 25 Years
Category Park Improvements
Priority 1 . High
Contact City Engineer
Department Park & Rec - Projects
Description
2010 - The parking lot would be paved including concrete curb and gutter ($150,000).
Justification
I
Prairie Knoll Park is considered a regional city park and completion would bring it into compliance with City standards due to the increased use by
the associations for both soccer and football.
This project has been recommended by the Park & Recreation Commission.
Expenditures
Improvement
2007
2008
2009
2011
Total
150,000
150,000
Total
2010
.150,000
150,000
Funding Sources
Park Improvement Funds
2007
2008
2010
150,000
150,000
2009
Total
2011
Total
150,000
150,000
Operational ImpactlOfuer I
Additionallong-tenn maintenance and ultimately replacement will be necessary,
.
69
Wednesday, August J 6, 2006
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
UseCul LiCe I 0 Years
Category Equipment
Priority 2 - Medium
Contact Comrn, Dev, Director
Department Planning & Zoning
Project #
08-41500-01
Project Name Replacement - Ford Taurus #15
Description
Replace Unit #15, a 1995 Taurus with 64,000 miles. 1bis unit averages 4,000 to 6,000 miles a year,
Justification
By year 2008, this vehicle will have 75,000 miles on it This vehicle could be used as an intern vehicle or for city employees attending
seminars/training,
Expenditures
Equipment
2007
2008
20,000
20,000
2009
2010
2011
Total
20,000
20,000
Total
Funding Sources
Equipment Bond
2007
2008
20,000
20,000
2009
2010
2011
Total
20,000
20,000
Total
Operationallmpact/Other I
Will decrease maintenance costs and improve productivity. 1bis car could be kept and used for interns and possibly replace an older unit
Wednesday, August J 6, 2006
70
Capital Plan
City of Andover, MN
2007 thru 2011
Type Improvement
Useful Life 15-20 Years
Category Improvements
Priority 1 - High
Contact PW Superintendent
Department Sanitary Sewer
Project # 07-48200-01
Project Name Lift Staion #1 Upgrade
Description
Replacement of the control cabinet at this lift station along with replacement of the pumps. Adding a permanent natural gas generator to this site is
also included,
Justification
This lift station was originally set up as a temporary lift station. When future development to the west was to take place and a new trunk line was
installed from the Anoka area, this station was then to be eliminated and the flows would be to a gravity system. We have been told this probably
will not happen any time soon and we should consider the lift station as a permanent structure, This is the oldest lift station of the 9 currently in
use, The controls and components to operate this unit are out dated and in need of replacement The controls would be upgraded to the same
controls used at all the other stations. This particular station has the highest usage on a day to day basis along with the longest force main to reach
the gravity system. There have been numerous power outages at this location and it is recommended to install a p=anent generator on this site as
well.
Expenditures
Improvement
2007
85,000
85,000
2008
2009
2010
2011
Total
85,000
85,000
Total
Funding Sources
Sewer Trunk Fund
2007
85,000
85,000
2008
2009
2010
2011
Total
85,000
85,000
Total
Operational Impact/Other I
By upgrading this site, the number and types of problems would be significantly reduced. This lift station would be patterned after lift station #4,
which was upgraded in 2006, It has seen a dramatic decrease in the number of alarms and call outs, which is saving many hours of overtime to
respond to anv calls,
Wednesday, August 16, 2006
71
Capital Plan
City of Andover, MN
2007 thru 2011
Type bnprovement
Useful Life 50 Vears
Category Improvements
Priority I - High
Contact City Engineer
Department Sanitary Sewer
Project # 07-48200-02
Project Name Crosstown Blvd Trunk Sewer Line
Description
Extend sanitary sewer trunk along Crosstown Boulevard from the railroad tracks east to Prairie Road. It will be necessary to jack the sanitary
sewer underneath the railroad,
Justification I
The trunk sanitary sewer will be extended to serve properties adjacent to Crosstown Boulevard and east of Prairie Road. The extension has been
recommended through the sanitary sewer report (2004 Sanitary Sewer Report).
Expenditures
Improvement
2007
400,000
400,000
2008
2009
2010
2011
Total
400,000
400,000
Total
Funding Sources
Sewer Trunk Fund
2007
400,000
400,000
2008
2009
2010
2011
Total
400,000
400,000
Total
Operational Impact/Other I
Additional routine maintenance including televising and cleaning will be required.
Wednesday, August J 6, 2006
72
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
Useful Life 15-20 Years
Category Equipment
Priority 1 - High
Contaet PW Superintendent
Department Sanitary Sewer
Project #
08-48200-01
PrnjectName New JetIVac Truck
Description
This is a combinationjet/vac unit, Model 2115 Positive Displacement Unit (PD Unit) used for cleaning sanitary and storm sewers, This unit will
carry up to 2000 gallons of water and 600 feet of jetting hose,
Justification
I
Approximately 13 miles or 15% of the sanitary sewer system is trunk mains with diameters of 12" - 36". These trunk mains are flowing near
capacity in some areas at the present time. By removing the sedimentation in these pipes the flow line will drop giving more room for additional
flows, In turn this could put on hold the addition of the designated lift station to by pass certain areas for a year or more. Without the addition of
this new PD Unit, the trunk lines could still be cleaned by blocking the flow in the main which will cause a backup in the system until the pipes are
cleaned. This would be done in sections at a time to try and avoid a major backup into basements, This is not the best way to do the maintenance
but would work with some risk. This type of unit can also clean flared end sections in back yards and sedimentation ponds within a reasonable
distance, This would allow some areas to be cleaned without having to enter properties with equipment that will do some type of damage to yards
saving money in yard restoration,
Expenditures
Equipment
2007
2008
300,000
300,000
2009
2010
2011
Total
300,000
300,000
Total
Funding Sources
Sanitary Sewer Fund
2007
2008
300,000
300,000
2009
2010
2011
Total
300,000
300,000
Total
Operational Impact/Other I
This truck will help save time with cleaning of the system. It will also allow the system to be cleaned under heavy flows which cannot be done
with the machine currently being used. This type of V AC truck will allow the operators to clean more of the system without having to stop
because the truck cannot handle the flows, It would save time by not having to plug mains and risk backups into basements because of some
unforeseen difficulty,
The older machine would be used in the storm sewer department which would enable the maintenance department to clean both sanitary and storm
sewers at the same time which will help satisfy some of the rQuirements for the NPDES,
Wednesday, August J 6, 2006
73
Capital Plan
City of Andover, MN
2007 thru 2011
Type Improvement
Useful Life 50 Years
Category Improvements
Priority I - High
Contact PW Superintendent
Department Sanitary Sewer
Project # 09-48200-01
Project Name YeHow Pine Lift Station
Description
Install a lift station at Yellow Pine Street to divert flow from the Bluebird Street trunk line to the Pinewood trunk line, The wet well for this lift
station was constructed in 2005 as a part of the Crosstown Boulevard Improvements Project.
Justification
This lift station will allow additional capacity in the Bluebird Street trunk line to serve adjacent properties until the year 2020,
Expenditures
Improvement
2007
2008
2009
650,000
650,000
2010
2011
Total
650,000
650,000
Total
Funding Sources
Sewer Revenue Bonds
2007
2008
2009
650,000
650,000
2010
2011
Total
650,000
650,000
Total
Operational ImpactJOlher I
Routine monitoring and maintenance of the lift station will be required.
Wednesday, August J 6, 2006
74
Capital Plan
City of Andover, MN
2007 thru 2011
Type Improvement
Useful Life 30 Years +
Category Utilities
Priority 1 - High
Contact City Engineer
Department Storm Sewer
Project #
07-48300-01
Project Name Stonn Sewer Improvements
Description
Each year, areas of the City are identified where improvements are required to maintain our storm sewer system. Maintenance items include
replacement of failing culverts, catch basins, and storm sewer pipes, erosion issues at storm sewer outfalls, and dredging of ponds and ditches,
2007 - Repair failing culvert and patch street on 141 st Ave in Smith's Green Acres
Justification I
Maintaining the City's storm sewer system improves water quality, improves public safety, and reduces the need for costly repairs in the future.
Repairing and maintaining these systems also allows public works to focus on and comply with requirements of the NPDES program, such as pipe
cleaning, inspections, and sweeping.
Expenditures
Construction
2007
50,000
SO,OOO
2008
51,000
51,000
2009
52,000
52,000
2010
53,000
53,000
2011
54,000
54,000
Total
260,000
260,000
Total
Funding Sources
Storm Sewer Fund
2007
50,000
SO,OOO
2008
51,000
51,000
2009
52,000
52,000
2010
53,000
53,000
2011
54,000
54,000
Total
260,000
260,000
Total
OperntionaI Impact/Other I
Repairing problem areas in the storm sewer system will reduce the yearly maintenance needs placed on the public works personneL
Wednesday, August 16, 2006
75
Capital Plan
City of Andover, MN
2007 thru 2011
Project # 07-48300-02
Project Name F.E.S. RepairlMeadowood Addition/148th & Makah St.
Type Improvement
Useful Life 20 years
Category Improvements
Priority 1 - High
Contact PW Superintendent
Department Storm Sewer
Description I
The flared end section of the storm system located in the park west ofMakah St. is deteriorating and in need of repair. This was built over 20 years
ago out of railroad ties and should be replaced with our standard rip-rap (rock).
.
Justification I
The outflow of the system after the flared end section is made up of railroad tie and is rotting away, It is located on an embankment that will start
to wash away ifnot corrected, This is in the area of the back waters of the Rum River and could be a serious repair ifnot taken care of in the near
future, This could potentially washout the bank creating a bigger problem by having to retrieve the dirt from the bottom of the slope thus adding
costs to the project.
Expenditures
Improvement
2007
60,000
60,000
2008
2009
2010
2011
Total
60,000
60,000
Total
Funding Sources
Storm Sewer Fund
2007
60,000
60,000
2008
2009
2010
2011
Total
60,000
60,000
Total
OperationallmpactJOtber I
lfthis repair is done soon it will save more expense if done later after a more serious problem is created. If the repair is done in the near future it
could save close to $20,000.00 by not having such an extensive repair.
Wednesday, August 16, 2006
76
Capital Plan
City of Andover, MN
2007 thru 2011
Project #
08-48300-01
Type Equipment
Useful Life 15-20 Years
Category Equipment
Priority 2 - Medium
Contact PW Superintendent
Department Stonn Sewer
Project Name New Track Backhoe
Description
New larger backhoe to be used to clean out ditches and storm ponds,
Justification
Present equipment is not large enough and cannot reach far enough for cleaning out storm water ponds and ditches,
Expenditures
Equipment
2007
2008
80,000
80,000
2009
2010
2011
Total
80,000
80,000
Total
Funding Sources
Storm Sewer Fund
2007
2008
80,000
80,000
2009
2010
2011
Total
80,000
80,000
Total
OperntionaI Impact/Other
This new machine will allow the department to clean areas that require a larger unit The machine presently being used is to small and cannot get
to some areas of the system, More of the system could be cleaned without hiring a contractor, This could also be used in other departments sucb
as for water main airs, ark eo' ects, etc,
Wednesday, Augusr 16, 2006
77
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
Useful Life 15 Years
Category Equipment
Priority 1 - High
Contact PW Superintendent
Department Storm Sewer
Project #
10-43100-01
Project Name Replacement - Elgin Street Sweeper
Description
Replace Unit #169, a 2000 Elgin sweeper.
Justification
The maintenance cost of this machine has risen $.58 per hour in the last year alone. The Spring of2006, we have put a lot ofmoncy into it
Expenditures
Vehicles
2007
2008
2009
2010
150,000
150,000
2011
Total
150,000
150,000
Total
Funding Sources
Storm Sewer Fund
2007
2008
2009
2010
150,000
150,000
2011
Total
150,000
150,000
Total
Operational Impact/Other I
We will need to monitor the costs closely over the next few years and make a decision at that time, This machine only runs about a month and a
halfa year,
Wednesday, August 16, 2006
78
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
Useful Life 10 Years
Category Equipmeot
Priority 2 - Medium
Cootact PW Superintendent
Department Street Signs
Project # 07-43300-01
Project Name Replacement - Sign Truck #410
Description
Replace Unit #410, a 1995 F350 sign truck chassis with an enclosed box and 71,000 miles, This unit spends a fair amount of time idling at the job
site while the hydraulics are being used to install or remove sign posts. This truck was set up and is not very user friendly, We are looking to at
some new designed sign trucks that are out there.
Justification
A beller designed vehicle would provide safer and improved production while transporting and installing/removing equipment (signs),
Expenditures
Equipment
2007
75,000
75,000
2008
2009
2010
2011
Total
75,000
75,000
Total
Funding Sources
Equipment Bond
2007
75,000
75,000
2008
2009
2010
2011
Total
75,000
75,000
Total
OperntionaI Impact/Other I
Better use of equipment, saving time and money,
Wednesday, August J 6, 2006
79
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
Useful Life
Category Equipment
Priority I - High
Contact PW Superintendent
Department Street Signs
Project #
07-43300-02
Project Name Radius Master Machine
Description I
The Roper Whitney Radius Master is a metal fabrication notcher used to cut the precise comer radius specified by MUTCD for sheet sign
fabrication, It is a hydraulically operated, self-contained unit designed to cut comer radii on sign blanks and other sheet material without having to
make blade adjustments. It requires no set-up, The Radius Master comes with the 4 radii used by Minnesota Department of Transportation,
Justification I
When using our metal shear to cut sign blanks to size and reuse old blanks, the sharp comers must be cut to a specific radius, Currently, the
comers are marked with the proper radius, put in a vise in the maintenance shop and grind the comers down with a hand held 4- I12n grinder. 1his
process is time consuming, extremely' noisy and very hot particles are exposed to the skin, A full face shield is required, as well as ear protection.
To special order sign blanks costs the city 2-3 times as much as our annual bid order that takes 6-10 weeks to receive. The cost of aluminum sign
blanks has increased 100% in the last II months. The Radius Master is safe, clean, quiet and easy to use. There is no setup and clean up is
minimal. The machine uses 8 sq it of floor space & operates on standard 110 electricity. The entire process to cut a comer to the exact radius
reouires iust seconds from'start to finish,
Expenditures
Equipment
2007
8,400
8,400
2008
2009
2010
2011
Total
8,400
8,400
Total
Funding Sources
Capital Projects Levy
2007
8,400
8,400
2008
2009
2010
2011
Total
8,400
8,400
Total
Operational Impact/Other I
It is quiet, inexpensive to operate, easy to use, safe and requires very little room. Maintenance is minimal due to the simplicity and few moving
parts,
Wednesday, August 16, 2006
80
Capital Plan
City of Andover, MN
2007 thru 2011
Type Improvement
Useful Life 7 Yeais
Category StreetslHighways
Priority I - High
Cootact City Engin=
Departmeot Str= I Highways
Project # 07-43100-01
Project Name Annual Street Seal Coat Project
Description
This project provides for a seal coat of the streets in the following maintenance zones:
2007 - Zone 5
2008 - Zone 6
2009 - Zone 7
2010 - Zone 8 and 9
2011-Zone 1
uired.
Justification
Seal coating will extend the useful life of roads by protecting the bituminous from oxidation due to adverse weather conditions (sun, rain, wind,
snow, etc,), The prevention of oxidation will prolong the useful life of the pavement and defer the need for a costly reconstruction, Seal coating
also improves the skid resistance of the roadway surface by increasing the friction between vehicle tires and the roadway.
New developments requiring seal coating are not shown on the attached maps.
Expenditures
Construction
2007
287,632
287,632
2008
271,328
271,328
2009
480,438
480,438
2010
660,377
660,317
2011
515,760
515,760
Total
2,215,535
2,215,535
Total
Funding Sources 2007 2008 2009 2010 2011 Total
Construction Seal Coat Fund 41,965 31,092 176,194 65,397 14,146 328,794
R & B - Crack Seal & Seal Coa 245,667 240,236 304,244 594,980 501,614 1,886.741
Total 287,632 271,328 480,438 660,317 515,760 2,215,535
Operational Impact/Other I
Extending the life of the street will reduce routine maintenance (Crack sealing, pot hole patching, overlays, etc,) and extend the overall design life
of the pavement.
Wednesday, August 16, 2006
81
Capital Plan
City of Andover, MN
2007 thru 2011
Type Improvement
Useful Life 7 Years
Category StreetsIHighways
Priority I - High
Contact City Engineer
Department Streets I Highways
Project # 07-43100-02
Project Name Annual Street Crack Seal Project
Description
The project provides for sealing of the street cracks in the following maintenance zones:
2007 - Zone 6
2008 - Zone 7
2009 - Zone 8 and 9
2010 - Zone I
2011 - Zone 2
Justification
The sealing of street cracks will significantly extend the useful life of the streets. This will extend the time frame when a costly street
reconstruction project will be necessary. The sealing of cracks in the street surface reduces/eliminates water from entering the road base and
subgrade, This process reduces the freeze/thaw cycles of the subgrade, maintaining the integrity of the road, Crack sealing is completed in a
particular zone one year prior to seal coating, This allows the crack sealing material to cure and minimize bleed through once seal coated.
Expenditures
Construction
2007
89,840
89,840
2008
98,968
98,968
2009
183,390
183,390
2010
153,439
153,439
2011
152,187
152,187
Total
677,824
677,824
Total
Funding Sources 2007 2008 2009 2010 2011 Total
Construction Seal Coat Fund 9,114 24,498 9,095 1,967 0 44,674
R & B - Crack Seal & Seal Coa 80,726 74,470 174,295 151,472 152,187 633,150
Total 89,840 98,968 183,390 153,439 152,187 677,824
Operational Impact/Other I
Sealing the street cracks will reduce routine maintenance by eliminating the source of degradation resulting from moisture in the road subgrade,
Wednesday, August 16, 2006
82
Capital Plan
City of Andover, MN
2007 thru 2011
Type Improvement
Useful Life 20 Years
Category StreetslHighways
Priority I - High
Contact City Engineer
Department Streets I Highways
Project # 07-43100-03
Project Name Annual Street Mill and Overlay
Description
The Street Mill and Overlay projects will consist of milling the existing street surface and constructing a new asphalt surface. Minor shouldering
and restoration work will be included with the project In developments that have existing bituminous curb or no curb or ditch, concrete curb and
gutter will be constructed. 30% of the total project costs are assessed to the benefiting properties in each development This program helps to
maintain the integrity and value of the communities street infrastructure.
Areas to be reconstructed are shown on the attached maps and are listed below:
2007 - Lund's Evergreen Estates 2nd, 3rd, 4th & 5th Additions
2008 - Northglen, Grow Oakview Estates
2009 - Woodland Ridge, Indian Meadows 3rd Addition, Kelsey Estates
2010 - Stenquist Addition, Johnson's Oakmount Terrace, Ivywood Estates
20 II - Prairie Meadows, Enchanted Drive Area, A1ladin Acres
Justification
The streets in these neighborhoods are in excess of20 years old and are in need of rehabilitation, The intent of this Street Mill and Overlay is to
provide the community with a high quality transportation system and maintain a constant upkeep of the City's street infrastructure.
Expenditures
Construction
2007
1,022,994
1,022,994
2008
791,004
791,004
2009
1,019,292
1,019,292
2010
911,645
911,645
2011
948,387
948,387
Total
4,693,322
4,693,322
Total
Funding Sources 2007 2008 2009 2010 2011 Total
Assessments 306,898 237,301 305,788 273,493 284,516 1,407,996
R & B - Overlays 716,096 553,703 713,504 638,152 663,871 3,285,326
Total 1,022,994 791,004 1,019,292 911,645 948,387 4,693,322
Operational Impact/Other I
The rehabilitation of the streets will reduce the routine maintenance (Crack sealing, pot hole patching, etc..) in the area. Long term, this
reconditioning will prolong the structural stability of the roadway making for a longer serviceable life.
Wednesday, August 16, 2006
83
Capital Plan
City of Andover, .MN
2007 thru 2011
Type Improvement
Useful Life 1-2 Years
Category Improvements
Priority I - High
Cootaet City Engineer
Department Streets I Highways
Project #
07-43100-04
ProjcctName Annual Pavement Markings
Description
The pavement striping for City streets is conducted one time per year. This includes centerline striping and sboulder striping. Striping enhances
the safety of the roadway by directing traffic to the correct lane movement
Justification
Striping is required through the local and state agencies. A reflective standard is required. Restriping annually maintains the pavement markings
to the required standards.
Expenditures
Improvement
2007
15,000
15,000
2008
16,000
16,000
2009
17,000
17,000
2010
18,000
18,000
2011
19,000
19,000
Total
85,000
85,000
Total
Funding Sources
R & B - Reserve
2007 .
15,000
15,000
2008
16,000
16,000
2009
17 ,000
17,000
2010
18,000
18,000
2011
19,000
19,000
Total
85,000
85,000
Total
OperntionaI Impact/Other I
The pavement markings are contracted out each year adding virtually no operational impact
Wednesday, August 16, 2006
84
Capital Plan
City of Andover, MN
2007 thru 2011
Type Improvement
Useful Life 30 Years
Category StreetslHighways
Priority I - High
Contact City Engineer
Department Streets I Highways
Project # 07-43100-05
ProjcctNamc Annual Curb Replacement
Description
Damaged and failing concrete curb and gutter throughout the City needs to be repaired or replaced to help maintain the integrity of the roadway
system. Replacing damaged or failing sections of curb and gutter helps with drainage of the roadway and prolongs the life of the street system.
Justification
The majority of the concrete curb and gutter throughout the City is in relatively good condition. However, there are isolated areas that need
rehabilititation every year. Failing or damaged sections of concrete curb and gutter are removed and replaced. Replacing damaged sections of
concrete curb and gutter maintains the integrity of and prolongs the life of the City's street infrastructure.
Expenditures
Construction
2007
40,000
40,000
2008
41,000
41,000
2009
42,000
42,000
2010
43,000
43,000
2011
44,000
44,000
Total
210,000
210,000
Total
Funding Sources
R & B - Reserve
2007
40,000
40,000
2008
41,000
41,000
2009
42,000
42,000
2010
43,000
43,000
2011
44,000
44,000
Total
210,000
210,000
Total
Operational Impact/Other 1
Repairing failing or damaged sections of curb and gutter reduces the routine maintenance required by the public works department
Wednesday, August 16, 2006
85
Capital Plan
City of Andover, MN
2007 thru 2011
Project # 07-43100-06
Project Name Mounted Pothole Spray Patcher
Type Equipment
Useful Life 10 Years
Category Equipment
Priority I - High
Contact PW Superintendent
Department Streets I Highways
Description I
This unit is a truck mounted spay patcher, used for street repairs such as Potholes, Alligator Cracks, Utility Cuts, Shoulder Work, Depressions,
Edge Raveling, and Tire Depressions, This unit carries its own emulsion and aggregate. Spray injector patching is easy and effective, Spray
injection patching is most economical and longest lasting method of pothole repair. The pothole is cleaned with a high-volume blower, a tack coat
of emulsion is applied to the area, a mixture of aggregate and hot emulsion fill the pothole, and a fmish coat of dJy aggregate is sprayed over the
top and again the street is ready for traffic. All of this in just a matter of minutes and the patch will usually out last the rest ofthe road surface.
Justification I
The current trailer has reached its life expectancy and with the increase in city streets does not have the capacity to keep up with needs of the city.
This unit also needs a three person crew with two of the three standing out in traffic. There have had some very close calls with traffic that don't
follow work crew warning signs, With the new truck mounted unit, only one person is needed to control all the patching functions from the safety
and comfort of the cab. The driver operates ajoystick from the driver's seat and performs the four-step process, typically in less than a minute and
can be used nine months of the year,
Expenditures
Equipment
2007
150,000
150,000
2008
2009
2010
2011
Total
150,000
150,000
Total
Funding Sources
Equipment Bond
2007
150,000
150,000
2008
2009
2010
2011
Total
150,000
150,000
Total
Operational Impact/Other I
The spray patcher once filled with product can operate two to three days without having to be refilled, With the present machine, it becomes a daily
procedure to have to leave town to refill with emulsion, The aggregate we will keep in stock so that is Dot a problem. So we will be able to reduce
cost, increase production, and limit our liability!
Wednesday, August 16, 2006
86
Capital Plan
City of Andover, M.N
2007 thru 2011
Type Equipment
Useful Life laY ears
Category Equipment
Priority I - High
Contact PW Superintendent
Department Streets I Highways
Project #
07-43100-07
Project Name Replacement - Dump Truck wI Snow Removal #195
Description
Replace Unit # 195, a 1995 L 1'9000 tandem axle dump truck with snow removal equipment and approximately 60,000 miles, This truck is used for
plowing snow and for hauling materials like sand, asphalt, gravel and debris,
Justification
This vehicle has been used by the city since 1994 and has performed very well. Ibis is one of the remaining few units with a manual transmission
in it It's difficult and tiring to operate the snow removal equipment and change gears at the same time, Less operations in the cab will keep the
driver alert for longer periods of time during those long snow removal days and nights.
Expenditures
Equipment
2007
200,000
200,000
2008
2009
2010
2011
Total
200,000
200,000
Total
Funding Sources
Equipment Bond
2007
200,000
200,000
2008
2009
2010
2011
Total
200,000
200,000
Total
Operntional Impact/Other I
Decreased maintenance cost and down time,
Wednesday, August J 6, 2006
87
Capital Plan
City of Andover, MN
2007 thru 2011
Type Improvement
Useful Life 50 Years
Category Improvements
Priority 1 - High
Contact City Engineer
Department Streets I Highways
Project # 07-43100-08
Project Name Rail Road Quiet Zones
Description
Improvements at rail road crossings are necessary to comply with rail road requirements to allow for "quiet zones," or crossings wbere the trains do
not need to blow their borns. Necessary improvements include construction of divided roadway sections with concrete medians, sign installation,
and installation of new rail road crossing signals.
Justification
Improvements are planned at the following crossings:
2007 - Bunker Lake Blvd ($90,000)
2008 - Andover Blvd ($400,000)
2009 - Crosstown Blvd ($400,000)
2010 - l6lst Avenue ($60,000
Expenditures
Construction
2007
90,000
90,000
2008
400,000
400,000
2009
400,000
400,000
2010
60,000
60,000
2011
Total
950,000
950,000
Total
Funding Sources 2007 2008 2009 2010 2011 Total
Municipal State Aid Funds 90,000 400,000 60,000 550,000
R & B - Reserve 400,000 400,000
Total 90,000 400,000 400,000 60,000 950,000
Operational Impact/Other 'J
Improvements will enhance the quality oflife for residents living adjacent to the crossings, resulting in less disruptions from the trains while
providing safe crossings for vebicular and pedestrian traffic.
fVednesday,August16,2006
88
Capital Plan
City of Andover, MN
2007 thru 2011
Type Improvement
Useful Life 20 Years
Category Streets/Highways
Priority 1 - High
COD tact City Engineer
Department Streets I Highways
Project # 07-43100-09
Project Name Municipal State Aid Routes / New & Reconstruct
Description
The following projects are proposed to be constructed and/or rehabilitated to meet State Aid Standards, The rehabilitation projects will consist of
milling the existing street surface, constructing concrete curb and gutter where it does not exist, and improving stonn drainage,
2007: I 68th Lane (Verdin St - Crocus St) $383,000
2008: South Coon Creek Drive (Round Lake Blvd - Crosstown) $844,200
2010: Nightingale Street (Crosstown Blvd - 161st Ave) $767,000
20 II: Prairie Road (Andover Blvd - Crosstown Blvd) $714,000
Justification
2007: I 68th Lane NW (Verdin St - Crocus St) - Upgrade needed to maintain roadway and meet State Aid Standards, Part of 2007 Overlay Project
2008: South Coon Creek Drive (Round Lake Blvd - Crosstown) - Upgrade needed to maintain roadway and meet State Aid Standards.
Constructed concurrently with trunk water main extension,
2010: Nightingale Street (Crosstown Blvd - 161st Ave) - Upgrade needed to maintain integrity of State Aid roadway infrastructure,
20 II: Prairie Road (Andover Blvd - Crosstown Blvd) - Upgrade needed to maintain integrity of State Aid roadway infrastructure.
Expenditures
Construction
2007
383,000
383,000
2008
898,800
898,800
2009
2010
767,000
767,000
2011
714,000
714,000
Total
2,762,800
2,762,800
Total
Funding Sources 2007 2008 2009 2010 2011 Total
Assessments 83,000 t28,400 200,000 71,000 482,400
Municipal State Aid Funds 300,000 770,400 567,000 643,000 2,280,400
Total 383,000 898,800 767,000 714,000 2,762,800
OperationallmpactlOtber I
Rehabilitating the roads will reduce the amount of routine maintenance along these sections of roadway and provide a safer and higher quality
transportation system.
Wednesday, August 16, 2006
89
Capital Plan
City of Andover, MN
2007 thru 2011
Type Improvement
Useful Life 25 Years
Category Improvements
Priority 1 - High
Contact City Engineer
Department Streets I Highways
Project #
07-43100-10
Project Name Intersection Upgrades
Description
2007 - Construction of turn lanes at the intersection of Crosstown Blvd and Nightingale Street ($175,000)
2008 - Intersection upgrades, including construction of a traffic signal, at Hanson Blvd and 133rd Ave. This signal will include a cost share with
the City of Coon Rapids. ($175,000)
2009 - Construction of a traffic signal at the intersection of South Coon Creek Dr and Round Lake Blvd. Minor lane widening may be needed but
turn lane construction would not be included in this project ($275,000)
Justification
I
Intersection upgrades are necessary due to the increased development and demands On the transportation system, the need for safety improvements,
and to comply with Anoka County Highway Department requirements.
Expenditures
Construction
2007
175,000
175,000
2008
175,000
175,000
2009
275,000
275,000
2010
2011
Total
625,000
625,000
Total
Funding Sources
Municipal State Aid Funds
2007
175,000
175,000
2008
175,000
175,000
2009
275,000
275,000
2010
2011
Total
625,000
625,000
Total
Operational Impact/Other I
Improvements will improve the flow of traffic and will improve the safety of vehicles, pedestrians and bicyclists,
Wednesday, August J 6, 2006
90
Capital Plan
City of Andover, MN
2007 thru 2011
Type Improvement
UseCul LiCe 25 Years
Category Trail Construction
Priority 1 - High
Contact City Engineer
Department Streets I Highways
Project #
07-TRAIL-Ol
Project Name Construct Bikeway/Walkway Corridors
Description
2007 - Station Parkway from Thrush St to Jay St ($60,000).
2008 - North side of Crosstown Blvd from Nightingale St to Hanson Blvd ($100,000).
2009 - Construct a trail along 157th Avenue from Prairie Road to Kumquat St ($230,000),
2010 - West side of Crosstown Blvd from South Coon Creek to Andover Blvd ($75,000).
Justification
Improve pedestrian and multi-modal access to various destinations within and externally to the city.
The trails have reviewed by the Park and Recreation Commission. These trails that are proposed are a combination of interest by the Park
Commission and City Council.
Expenditures
Construction
2007
60,000
60,000
2008
100,000
100,000
2009
230,000
230,000
2010
75,000
75,000
2011
Total
465,000
465,000
Total
Funding Sources
Trail Funds
2007
60,000
60,000
2008
100,000
100,000
2009
230,000
230,000
2010
75,000
75,000
2011
Total
465,000
465,000
Total
Operntional Impact/Other I
Additional long-term maintenance and snowplowing will be necessary.
Wednesday, August J 6, 2006
91
Capital Plan
City of Andover, :M.N
2007 thru 2011
Type Equipment
Useful Life 10 Years
Category Equipment
Priority I - High
Contaet PW Superintendent
Department Streets I Highways
Project # 08-43100-02
Project Name Replacement - Hot Asphalt Box
Description
Replace a 1998 hot asphalt box donated by the Andover Lions Club, The new unit will be mounted to a flat bed roll off attachment for the new
hook truck that arrives in the fall of 2006,
Justification
The current hot asphalt box is starting to experience maintenance issues and is wasting a lot of asphalt material by not keeping it WanD.
Expenditures
Equipment
2007
2008
40,000
40,000
2009
2010
2011
Total
40,000
40,000
Total
Funding Sources
Equipment Bond
2007
2008
40,000
40,000
2009
2010
2011
Total
40,000
40,000
Total
Operational Impact/Other 1
By attaching it to a flat bed roll of!; it can be loaded and unloaded in a matter of minutes and be used year round.
Wednesday, August 16, 2006
92
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
Useful Life
Category Equipment
Priority 2 - Medium
Contaet PW Superintendent
Department Streets / Highways
Project #
08-43100-04
Project Name Dump Truck w/Snow Equipment
Description
Purchase a dump truck with snow removal equipment that would remove Unit # 196 from the snow removal cycle. This would be an addition to
the fleet Unit # 196 is a 1996 with 40,000 miles, it would be kept for a backup snow plow truck and used for moving trailers and equipment year
round.
Justification
Unit 196 has a 9 foot long box which is on the short side for carrying material, It is also very difficult to load because the loader bucket is almost 9
1/2 feet wide. Performing snow plowing and salting operation makes this truck less desirable then any others in the fleet We wouldn't have to
remove plow equipment ifwe had to haul out material or equipment because of an emergency.
Expenditures
Vehicles
2007
2008
155,000
155,000
2009
2010
2011
Total
155,000
155,000
Total
Funding Sources
Equipment Bond
2007
2008
155,000
155,000
2009
2010
2011
Total
155,000
155,000
Total
Operational Impact/Other I
Unit # 196 would be used as a backup snowplow truck and for moving equipment and materials year round.
Wednesday, AuguS116, 2006
93
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
Useful Life 10 Years
Category Equipment
Priority I. High
Contact PW Superintendent
Department Streets / Highways
Project #
08-43100-05
Project Name Replacement - Dump Truck wI Snow Removal #197
Description I
Unit #197, a 1996 LT9000 tandem axle dump truck and snow removal equipment with 55,000 miles on it
Justification I
This is one of the remaining few units with a manual transmission in it It's difficult and tiring to operate the snow removal equipment and change
gears at the same time. Less operations in the cab will keep the driver alert for longer periods oftime during those long snow removal days and
nights.
Expenditures
Equipment
2007
2008
200,000
200,000
2009
2010
2011
Total
200,000
200,000
Total
Funding Sources
Equipment Bond
2007
2008
200,000
200,000
2009
2010
2011
Total
200,000
200,000
Total
Operntionallmpact/Otber I
Changing to an automatic transmission and newer snowplow controls will give us more attentive drivers and less fatigued driver after many hours
of service.
Wednesday, August 16, 2006
94
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
Useful Life 15 Years
Category Equipment
Priority 2 - Medium
Contact PW Superintendent
Department Streets / Highways
Project #
09-43100-01
Project Name Replacement - Water Tanker
Description
Replace Unit #163, a 1986 water tanker with 63,000 miles.
Justification.. I
The old tanker was partially refurbished a few years ago because the floor and tank had rusted out. A new water truck would handle the job tasks
better and more efficiently. The Parks Dept water tanker with its cab over design and short turning radius has been a great asset to the public
works staff.
Expenditures
Vehicles
2007
2008
2009
100,000
100,000
2010
2011
Total
100,000
100,000
Total
Funding Sources
Equipment Bond
2007
2008
2009
100,000
100,000
2010
2011
Total
100,000
100,000
Total
OperntionaI Impact/Other I
The design of the new water tanker make it very efficient to operate and pleasure to use. The front adjustable nozzle is particularly liked by the
public works staff.
Wednesday, August 16, 2006
95
Capital Plan
City of Andover, MN
2007 thru 2011
Type Equipment
Useful Life 20 Years
Category Equipment
Priority I - High
Contact PW Superintendent
Department Streets / Highways
Project # 09-43100-02
Project Name Asphalt Paving Machine
Description
Asphalt paving machine used for overlay and trails. The City currently does not own a paver which we have an increasing need for due to the
deterioration of city streets.
Justification
I
Due to increasing repairs to city streets, the city has a need to own a paver. It could also be used for trails.
Expenditures
Equipment
2007
2008
2009
90,000
90,000
2010
2011
Total
90,000
90,000
Total
Funding Sources
Equipment Bond
2007
2008
2009
90,000
90,000
2010
2011
Total
90,000
90,000
Total
OperntionaI Impact/Other I
Not having to rent one, being able to use it when it fits in to our time scbedule rather than having to see when one is available to rent Share cost
with another city is an option.
Wednesday, August 16, 2006
96
Capital Plan
City of Andover, MN
2007 thru 2011
Type Improvement
Useful Life 7 Years
Category Improvements
Priority I . High
Contact PW Superintendent
Department Water
Project # 07-48100-01
Projcct Name Rehabilitation of Wells
Description
The motor, pump and column pipe are taken out for inspection and worn parts are replaced. The well is televised to determine the depth and
condition, lfthe well is at or close to the original drill depth everything is put back in place. The well may need to be cleaned out to the original
depth if there is a substantial decrease in the depth.
Justification
To make sure the well is operational to what it is designed for and to correct any problems that may affect our ability to produce the amount of
water needed to meet the demand. A complete inspection and maintenance overhall is performed on each well a minimum of once every seven (7)
years.
Expenditures
Improvement
2007
45,000
45,000
2008
45,000
45,000
2009
50,000
50,000
2010
50,000
50,000
2011
55,000
55,000
Total
245,000
245,000
Total
Funding Sources
Water Fund
2007
45,000
45,000
2008
45,000
45,000
2009
50,000
50,000
2010
50,000
50,000
2011
55,000
55,000
Total
245,000
245,000
Total
OperntionaI Impact/Other I
This would be done at such a time that it would not affect the demand needs of the system. Typically done late fall.
Wednesday, August 16, 2006
97
Capital Plan
City of Andover, MN
2007 thru 2011
Type Improvement
Useful Life Unassigned
Category Improvements
Priority 2. Medium
Contact PW Superintendent
Department Water
Project # 07-48100-02
Project Name Sealing of Well #1
Description
Well #1 would be sealed off from use by a licensed well contractor.
Justification
This well has not been used for sometime now. This particular well is 600 feet deep and is pumping a high volumne of sand when it was in
operation, The well was designated as an emergency well about four years ago and was not used in this time frame. The formation of this well is
very soft and would take a considerable amount of money to try and make it produce the water needed. There is no other aquifer in this area above
the existing aquifer. It is also a well that is high in radium which is another reason not to use it It would be in the best interest of the city to seal it
and use the water from the treatment facility to feed this area. Money would be best spent on making the water system one system rather than the
two we are current! usin .
Expenditures
Improvement
2007
10,000
10,000
2008
2009
2010
2011
Total
10,000
10,000
Total
Funding Sources
Water Fund
2007
10,000
10,000
2008
2009
2010
2011
Total
10,000
10,000
Total
OperntionaI Impact/Other I
Money usually used to treat the water at the well head is no longer needed. There would be a power savings also as the well would be pulled and
all the controlls would be eliminated from the well house.
Wednesday, August 16, 2006
98
Capital Plan
City of Andover, MN
2007 thru 2011
Type Improvement
Useful Life 50 Years
Category Improvements
Priority 1 - High
Contact City Engineer
Dcpartment Water
Project # 08-48100-01
Project Name Water Main along South Coon Creek Drive
Description
Install a 12" water main along South Coon Creek Drive from 1 45th Avenue to Jonquil Street.
Justification I
Construction of a water main along South Coon Creek Drive will allow the existing water distribution system between the east and west sides of
town to be looped. The only existing connection between the two parts of town is along Bunker Lake Boulevard. Looping of the system will
allow treated water to be continuously supplied to all residents in town on the water system. It will also help alleviate the pressure variance that is
experienced between the east and west sides of town. Coon Creek Boulevard is scheduled for reconstruction in 2008. It would be advantageous to
construct the water main concurrently with the roadway reconstruction.
Expenditures
Improvement
2007
2008
750,000
750,000
2009
2010
2011
Total
750,000
750,000
Total
Funding Sources
Water Trunk Fund
2007
2008
750,000
750,000
2009
2010
2011
Total
750,000
750,000
Total
OperntionaI Impact/Other I
Additional maintenance and flushing requirements for the water main system will result
Wednesday, August 16, 2006
99
Capital Plan
City of Andover, MN
2007 thru 2011
Type Improvement
Useful Life 15-20 Years
Category Utilities
Priority I - High
Contact PW Superintendent
Department Water
Project #
08-48100-02
Project Name Water Tower Painting
Description
Painting of the water tower closest to City Hall, including the new City logo.
Justification
I
The tower is going to be in need of painting to maintain its appearance and to protect it from wear and tear. A new City logo should also be put on
the tower that show's what the City of Andover is about
Expenditures
Improvement
2007
2008
350,000
350,000
2009
2010
2011
Total
350,000
350,000
Total
Funding Sources 2007 2008 2009 2010 2011 Total
Capital Equipment Reserve 242,000 242,000
Water Trunk Fund 108,000 108,000
Total 350,000 350,000
OperntionaI Impact/Other I
This is a scheduled maintenance that should be budgeted for.
Wednesday, August 16, 2006
100
Capital Plan
City of Andover, MN
2007 thru 2011
Type Improvement
Useful Life Unassigned
Category Improvements
Priority I - High
Contact City Engineer
Department Water
Project #
09-48100-01
Project Name Demolish 500,000 Gallon Water Tower
Description
Demolish the existing 500,000 gallon water tower located on the west side oftown.
Justification
I
The existing 500,000 gallon water tower will be demolished and replaced by a new two million gallon water tower so the City's water distribution
system can be managed under one pressure zone, providing treated water to all residents on the system.
Expenditures
Improvement
2007
2008
2009
175,000
175,000
2010
2011
Total
175,000
175,000
Total
Funding Sources
Water Trunk Fund
2007
2008
2009
175,000
175,000
2010
2011
Total
175,000
175,000
Total
OperntionaI Impact/Other I
Maintenance of the existing water tower will no longer be required.
Wednesday, August 16, 2006
101
Capital Plan
City of Andover, MN
Project # 09-48100-02
Project Name Construct Water Tower
2007 thru 2011
Type Improvement
Useful Life 50 Years
Category Improvements
Priority 1 - High
Contact City Engineer
Department Water
Description
Construct a 2 million gallon elevated storage tank adjacent to the water treatment plant
Justification
In order to adequately supply treated water at an acceptable pressure to the entire distribution system in Andover, a two million gallon water tower
must be constructed near the water treatment plant The existing 500,000 water tower in the southwest part of town would be demolished as part of
this process. Construction of this tower and demolition of the existing 500,000 gallon tower would eliminate the low pressure zone currently in the
southwest part of town.
Expenditures
Construction
2007
2008
2009
2,950,000
2,950,000
2010
2011
Total
2,950,000
2,950,000
Total
Funding Sources
Water Revenue Bonds
2007
2008
2009
2,950,000
2,950,000
2010
2011
Total
2,950,000
2,950,000
Total
OperntionaI Impact/Other I
Additional maintenance and monitoring would be required of the Sewer and Water department
Wednesday, August 16, 2006
102
Capital Plan
City of Andover, MN
2007 thru 2011
Project # 10-48100-01
Projcct Name WTP Reclaim Tank Addition
Type Improvement
Useful Life 30 Years
Category Improvements
Priority I - High
Contact PW Superintendent
Department Water
Description I
Add an additional 200,000 gallon reclaim tank and process piping to the water plant
Justification I
In order to maintain a certain level of operations and meet the demands of the water population, this tank would help in meeting this objective.
Staffhas noticed that during the high peaking months of May through September the water plant needs to backwash the filters on a daily basis.
With the single reclaim tank now in operation the daily operations will run into a difficulty with backwashing filters as there is not enough room to
handle the flows required to meet the needs. As the population continues to increase more of a demand is put on the system to function at a high
rate of production. With an increase in tank size the operations can continue without much interuption when more room is required for
backwashing of the filters.
Expenditures
Improvement
2007
2008
2009
2010
500,000
500,000
2011
Total
500,000
500,000
Total
Funding Sources
Water Trunk Fund
2007
2008
2009
2010
500,000
500,000
2011
Total
500,000
500,000
Total
OperntionaI Impact/Other
With additional storage for backwashing the filtering process would not need to be interupted by shutting down certain wells in order to keep the
filters from over loading. With an increase in capacity the water plant filters would be able to operate fully keeping the amount of water filtered at
it's hi est ca aci .
Wednesday, August 16, 2006
103
t-;< C/-ot
w.~
CITY G.O. OPEN SPACE BONDS (Ch 475) Election
Amount Financed $2,000,000
Number of Years 15
Structure Equal P & I
Interest Rate 4.50%
Referendum Mid. Val. . Pavable 2006 2,522,273,800
Debt Levy ReQuired l1il105% 195,539
Tax Rate 0.0078%
Taxable Tax Increase
Tvne of Propertv Market Value Debt Service Only'
$200,000 $16
250,000 19
300,000 23
350,000 27
Residential 400,000 31
Homestead 450,000 35
500,000 39
550,000 43
600,000 47
650,000 50
700,000 54
750,000 58
$500,000 $39
CommerciaV 750,000 58
Industrial 1,000,000 78
1,500,000 116
2,000,000 155
$300,000 $23
Agricultural 325,000 25
Homestead ** 350,000 27
400,000 31
500,000 39
600,000 47
Agricultural $5,000 $0.00
Non-Homestead 6,000 0.00
(dollars per acre) 7,000 0.00
8,000 0.00
$100,000 $0.00
SeasonaVRecreation 200,000 0.00
300,000 0.00
400,000 0.00
500,000 0.00
City of Andover, Minnesota e
Estimated Tax Impact
August 29, 2006
EHLERS
. .....e'.'" "<0
*The figures in the table are based on county taxes for new bonded
debt only, and do not include tax levies for other purposes. Tax
increases shown above are gross increases, not including the impact
of the state Property Tax Refund ("Circuit Breaker") program. Many
owners of homestead property will qualify for a refund, based on their
income and total property taxes. This will decrease the net tax effect of
the bond issue for many property owners.
"For agricultural homestead property, land and buildings beyond the
house, garage, and one acre are exempt from referendum market value
tax.
Prepared by Ehlers & Associates, Inc.
Preliminary: For Discussion Purposes ONLY
8/29/2006
~NDbVE~
\
1685 CROSSTOWN BOULEVARD N,W. . ANDOVER, MINNESOTA 55304 . (763) 755-5100
FAX (763) 755-8923 . WWW,CI.ANDOVER.MN.US
TO: Mayor and Councilmembers
FROM: Jim Dickinson, City Administrator
SUBJECT: Additional Information - Open Space Referendwn Discussion
DATE: August 29, 2006
The attached docwnents are provided by the City's bond counsel and updated with information
by the City's fiscal advisor. The docwnents are what will need to be approved at future meetings
to comply with State of Minnesota statute requirements for a referendwn ballot question.
The attachments are as listed:
Pgs 1 - 7
Pgs 8 - 9
Pg 10
Pgs 11 - 12
Pgs 13 - 15
Resolution Calling For An Election On $2,000,000 General Obligation Bonds
Anoka County Auditor Notification Letter
Affidavit Of Posting Notice Of Election And Of Posting Sample Ballot
Official Returns of Judges Of City Election
Resolution Canvassing Returns of Election
I will review each of the docwnents briefly with the Council at the meeting.
Attachments
,
EXTRACT OF MINUTES OF MEETING OF
THE CITY COUNCIL OF THE
CITY OF ANDOVER, MINNESOTA
HELD: September 5, 2006
Pursuant to due call and notice thereof, a regular or special meeting of the City Council
:>fthe City of Andover, Minnesota, was duly called and held at the City Hall on September 5,
2006, at _ o'clock p.m.
The following members were present:
md the following were absent:
Member
introduced the following resolution and moved its adoption:
RESOLUTION CALLING FOR AN ELECTION ON
$2,000,000 GENERAL OBLIGATION BONDS
BE IT RESOLVED by the City Council (the "Council") of the City of Andover,
Minnesota (the "City"), as follows:
1_ Project. This Council has investigated the facts and does hereby fmd, determine
md declare that it is necessary and expedient to issue general obligation bonds to finance the
acquisition of land from willing sellers for the preservation of natural areas, water and air
quality, wildlife habitat and to enhance the trail system, for which spending would be subject to
an annual audit.
2. Election. The proposition of authorizing the issuance of not to exceed $2,000,000
general obligation bonds for said purpose shall be submitted to the qualified electors of the City
at the general election to be held on November 7, 2006. The election shall be held between the
hours of7:00 a.m. and 8:00 p.m. The polling places for the election shall be:
Precinct
Polling Place
1
Hope Lutheran Church
16180 Round Lake Boulevard NW
2
Grace Lutheran Church
13655 Round Lake Boulevard NW
3
Riverdale Assembly of God Church
3210 Bunker Lake Boulevard NW
4
Crooked Lake Elementary School
2939 Bunker Lake Boulevard NW
I 93&S24vl
5
Meadow Creek Church
3037 Bunker Lake Boulevard NW
6
Bunker Hills Activity Center
550 Bunker Lake Boulevard NW
7
Constance Evangelical Free Church
16150 Crosstown Boulevard NW
8
Andover Christian Church
16045 Nightingale Street NW
9
Prairie Oak Community Church
1657 l6lst Avenue NW
10
Andover Elementary School
14950 Hanson Boulevard NW
3. Notice and Ballot. The Clerk is hereby authorized and directed to post and
publish according to law a Notice of Election and Ballot, and to prepare ballots for the question
for use at the election, which notice and ballot shall be in substantially the following forms:
193&&24vl
2
NOTICE OF ELECTION
NOTICE IS HEREBY GIVEN that an election on a question will be held in and for the
City of Andover, Anoka County, Minnesota, on November 7, 2006, between the hours of7:00
a.m. and 8:00 p.m., at which time the following question will be submitted:
"Shall the City of Andover, Minnesota, be authorized to issue its general
obligation bonds in an amount not to exceed $2,000,000 to fmance the acquisition
ofland from willing sellers for the preservation of: natural areas, water and air
quality, wildlife habitat and to enhance the trail system? Spending would be
subject to an annual audit."
The polling places for the election shall be
Precinct
Polling Place
1
Hope Lutheran Church
16180 Round Lake Boulevard NW
2
Grace Lutheran Church
13655 Round Lake Boulevard NW
3
Riverdale Assembly of God Church
3210 Bunker Lake Boulevard NW
4
Crooked Lake Elementary School
2939 Bunker Lake Boulevard NW
5
Meadow Creek Church
3037 Bunker Lake Boulevard NW
6
Bunker Hills Activity Center
550 Bunker Lake Boulevard NW
7
Constance Evangelical Free Church
16150 Crosstown Boulevard NW
8
Andover Christian Church
16045 Nightingale Street NW
9
Prairie Oak Community Church
1657 161st Avenue NW
10
Andover Elementary School
14950 Hanson Boulevard NW
10"UHZ"4vl
3
in the City, at which places all of the qualified electors of the City residing within the precinc1
with respect to which the polling place has been established may cast their ballots.
Dated:
,2006.
BY ORDER OF THE CITY COUNCIL
Isl
City Clerk
193&&24vl
4
CITY QUESTION BALLOT
CITY OF ANDOVER
November 7, 2006
INSTRUCTION TO VOTERS: To vote for a question, put an (X) in the square next to the word
"YES" for that question. To vote against a question, put an (X) in the square next to the word
"NO" for that question.
CITY QUESTION NO.1
PRESERVATION OF WATER, WILDLIFE AND NATURAL HABITAT AREAS
o YES
"Shall the City of Andover, Minnesota, be authorized to issue its
general obligation bonds in an amount not to exceed $2,000,000 to
fmance the acquisition ofland from willing sellers for the preservation
of: natural areas, water and air quality, wildlife habitat and to enhance
the trail system? Spending would be subject to an annual audit."
o NO
BY VOTING "YES" ON TIllS BALLOT QUESTION, YOU ARE VOTING FOR A
PROPERTY TAX INCREASE.
The maximum amount of increased levy as a percentage of market value is .0078%.
The maximum amount that would be raised by the new referendum tax rate in the
fIrst year if it were to be levied is $195,539.
1938824vl
5
4. Election Judges. Election judges will be appointed at least twenty five days prior
to the election.
5. Manner: Canvass. The election shall be held and conducted in accordance with
the statutes of the State of Minnesota applicable, and the Council shall meet as required by law
for the purpose of canvassing the election and declaring the results thereof.
The motion for the adoption of the foregoing resolution was duly seconded by member
and, after full discus!lion thereof and upon a vote being taken thereon, the
following voted in favor thereof:
and the following voted against the same:
Whereupon the resolution was declared duly passed and adopted.
193&&24vl
6
STATE OF MINNESOTA
COUNTY OF ANOKA
CITY OF ANDOVER
I, the undersigned, being the duly qualified and acting Clerk of the City of Andover,
Minnesota., DO HEREBY CERTIFY that I have carefully compared the attached and foregoing
extract of minutes with the original minutes of a meeting of the City Council duly called and
held on the date therein indicated, which are on fIle and of record in my office, and the same is a
full, true and correct transcript therefrom insofar as the same relate to an election on the
proposed issuance of general obligation bonds to finance the acquisition ofland from willing
sellers for the preservation of natural areas, water and air quality, wildlife habitat and to enhance
the trail system, for which spending would be subject to an annual audit.
WITNESS my hand as such Clerk on September 5, 2006.
City Clerk
lQ,RR?4vl
7
1685 CROSSTOWN BOULEVARD N.W. . ANDOVER, MINNESOTA 55304. (763) 755-5100
FAX (763) 755-8923 . WWW,CI.ANDOVER.MN.US
,2006
Anoka County Auditor
2100 Third Avenue
Anoka., Minnesota 55303-2265
Dear County Auditor:
Pursuant to Minnesota Statutes, Section 205.16, Subdivision 4, this letter is to formally
advise you that the City of Andover, Minnesota, will be holding an election on a question on the
date of the general election, November 7, 2006, between the hours of7:00 a.m. and 8:00 p.m. at
the following polling places in the City:
Precinct
Polling Place
1
Hope Lutheran Church
16180 Round Lake Boulevard NW
2
Grace Lutheran Church
13655 Round Lake Boulevard NW
3
Riverdale Assembly of God Church
3210 Bunker Lake Boulevard NW
4
Crooked Lake Elementary School
2939 Bunker Lake Boulevard NW
5
Meadow Creek Church
3037 Bunker Lake Boulevard NW
6
Bunker Hills Activity Center
550 Bunker Lake Boulevard NW
7
Constance Evangelical Free Church
16150 Crosstown Boulevard NW
8
Andover Christian Church
16045 Nightingale Street NW
9
Prairie Oak Community Church
1657 161st Avenue NW
10
Andover Elementary School
14950 Hanson Boulevard NW
1938824vl
cv
The following question will be submitted to the voters at that election:
"Shall the City of Andover, Minnesota, be authorized to issue its general
obligation bonds in an amount not to exceed $2,000,0000 to finance the
acquisition of land from willing sellers for the preservation of: natural areas,
water and air quality, wildlife habitat and to enhance the trail system? Spending
would be subject to an annual audit."
Very truly yours,
CITY OF ANDOVER,
MINNESOTA
By
Its City Clerk
1938824vl
2
6)
STATE OF MINNESOTA
COUNTYOFANOKA
CITY OF ANDOVER
AFFIDAVIT OF POSTING
NOTICE OF ELECTION AND
OF POSTING SAMPLE BALLOT
The undersigned, City Clerk for the City of Andover, Minnesota, being first duly sworn
on oath, deposes and says that on ,2006 (at least ten days before the
election) she posted the Notice of Election, a true and correct copy of which is hereto attached,
at the office of the City Clerk in said City, and at each of the following public and conspicuous
places within said City:
One at
One at
One at
She further says that on , 2006, at least four days before the election,
she posted a sample ballot, a true and correct copy of which is attached hereto, at the office of
the City Clerk. On the election day, she posted a sample ballot at each polling place for the
election.
She further certifies that two weeks published notice of the election appeared in a
newspaper published in the City, as evidenced by the affidavit of publication attached hereto, and
that one week published notice of said sample ballot appeared in the official newspaper of the
City as evidenced by the affidavit of publication attached hereto.
City Clerk
Subscribed and sworn to before me
on , 2006.
Notary Public
(Attach Notice of Election, Sample Ballot and Publisher's Affidavits)
c@
10'lS!:S!:,).d,,1
STATE OF MINNESOTA
COUNTY OF ANOKA
CITY OF ANDOVER
OFFICIAL RETURNS OF JUDGES
OF CITY ELECTION
VVe, ,
Judges of the election held in the City of Andover, Anoka County, Minnesota, on November 7,
2006, DO HEREBY CERTIFY as follows:
1. On the date of the election we attended at the polling place for the election, to-wit:
2. The polls for the election were duly opened at 7:00 a.m. and remained open
continuously thereafter until 8:00 p.m. on said day, and no longer.
3. The election was in all respects conducted according to law, and all qualified
voters resident in the City who desired to vote thereat were permitted to do so.
4. Each person who voted thereat was furnished by us with an official ballot in form
identical with the one hereto attached.
5. Forthwith upon the closing of the polls for the election, we proceeded to count
and canvass the votes cast at the election upon the question set forth below, and thereupon found
and determined and do hereby certify and declare, that the vote was as follows:
"Shall the City of Andover, Minnesota, be authorized to issue its
general obligation bonds in an amount not to exceed $2,000,000 to
finance the acquisition of land from willing sellers for the
preservation of: natural areas, water and air quality, wildlife
habitat and to enhance the trail system? Spending would be
subject to an annual audit."
Votes YES
Votes NO
Spoiled or Blank Ballots
Total Ballots
VVITNESS our hands officially as such election officers on November _, 2006.
(Attach Ballot)
@
101.R:SZ?4vl
STATE OF MINNESOTA
COUNTY OF ANOKA
CITY OF ANDOVER
I, the undersigned, being the duly qualified and acting City Clerk of the City of Andover,
Minnesota, DO HEREBY CERTIFY that attached hereto is a full, true and correct copy of the
official returns of the judges of the election held in said City on November 7, 2006, as shown in
the files and records in my office.
WI1NESS my hand on
,2006.
City Clerk
1938824vl
2
@
EX1RACT OF MINUTES OF A MEETING OF
THE CITY COUNCIL OF THE
CITY OF ANDOVER. MINNESOTA
HELD: November _, 2006
Pursuant to due call and notice thereof, a special or regular meeting of the City Council
of the City of Andover, Minnesota, was called and held at the City Hall on November 2006,
at o'clock .M.
The following members were present:
and the following were absent:
The City Clerk presented affidavits of posting and publication of a Notice of Election
held in accordance with the resolution adopted on September 5, 2006, authorizing the election to
vote on the question of the City of Andover issuing bonds in an amount not to exceed
$2,000,000, to finance the acquisition of land from willing sellers for the preservation of natural
areas, water and air quality, wildlife habitat and to enhance the trail system, for which spending
would be subject to an annual audit, and also presented the official returns of the judges of
election. Said affidavits and returns were duly examined, approved and ordered placed on file in
the office of the City Clerk.
Member
adoption:
introduced the following resolution and moved its
RESOLUTION CANVASSING RETURNS OF ELECTION
BE IT RESOLVED by the City Council of the City of Andover, Anoka County,
Minnesota (the "City"), that it is hereby found, determined and declared that the election held in
and for the City on November 7, 2006, was in all respects duly and legally called and held and
the returns thereof have been duly canvassed, and the votes cast at the election for and against
the following question were as follows:
"Shall the City of Andover, Minnesota, be authorized to issue its
general obligation bonds in an amount not to exceed $2,000,000 to
finance the acquisition of land from willing sellers for the
preservation of: natural areas, water and air quality, wildlife
habitat and to enhance the trail system? Spending would be
subject to an annual audit."
Votes YES
Votes NO
Spoiled or Blank Ballots
Total Votes
1938824vl
@
and said proposition, having received the approval of a majority of the votes cast thereon, is
hereby declared to have carried.
The motion for the adoption of the foregoing resolution was duly seconded by member
and, after full discussion thereof and upon a vote being taken thereon,
the following voted in favor thereof:
and the following voted against the same:
Whereupon the resolution was declared duly passed and adopted.
1938824vl
2
@
STATE OF MINNESOTA
COUNTY OF ANOKA
CITY OF ANDOVER
I, the undersigned, being the duly qualified and acting City Clerk of the City of Andover,
Minnesota, DO HEREBY CERTIFY that I have compared the attached and foregoing extract of
minutes with the original minutes on file and of record in my office and that the same is a full,
true and correct transcript of minutes of a meeting of the City Council duly held on the date
therein indicated, insofar as the same relates to canvassing the results of an election held in and
for the City.
WITNESS my hand as such City Clerk on November _, 2006.
City Clerk
lO1.RR?4vl
3
@)
2006 FTE's by Population
Minneapolis 382,295 4500 25 225 11.77
Wayzata 4,122 41 45 3 9.95
Sl Paul 287,604 2850 400 800 9.91
Hennepin County 1,144,037 11000 476 9.62
Carver* 1,801 13 0 2 7.22
New Prague 5,016 35 45 6.98
Sl Anthony Village 8,012 54 45 12 6.74
Carver County 81,618 540 74 25 6.62
Anoka 18,275 116 94 115 6.35
Minnetrista 4,890 31 0 0 6.34
Ramsey County 515,411 3200 786 230 6.21
Bloomington 85,301 529 140 300 6.20
Richfield 34,502 209 29 100 6.06
Hopkins 17,643 106 6 65 6.01
Newport 3,694 22 1 5 5.96
Golden Valley 20,736 122 7 202 5.88
Columbia Heights 18,698 110 42 56 5.88
Orono 7,687 45 4 12 5.85
Chaska 20,260 115 235 100 5.68
Jordan 4,413 25 4 6 5.67
Farmington 15,549 88 18 44 5.66
Edina 48,156 265 70 300 5.50
St. Louis Park 44,896 242 8 90 5.39
Robbinsdale 14,068 74 27 8 5.26
Hastings 19,782 103 8 5.21
Anoka County 316,830 1609 110 472 5.08
Fridley 27,480 139 65 185 5.06
Scott County 112,623 552 128 53 4.90
Maplewood 35,763 174 35 376 4.87
Spring Lake Park 6,833 33 16 4.83
Osseo 2,485 12 9 3 4.83
Rosemount 16,794 81 14 26 4.82
Oak Park Heights 4,379 21 0 10 4.80
Mound 9,630 46 7 4 4.78
Shako pee 24,967 118 122 33 4.73
North St. Paul 12,273 58 19 4.73
Savage 23,570 111 65 12 4.71
Medina 4,276 20 2 1 4.68
Burnsville 61,355 286 13 128 4.66
Rogers 5,580 26 21 4 4.66
Marine On Saint Croix 644 3 1 4.66
Deephaven 3,885 18 1 10 4.63
*Contracts with another aaencv for police protection
Paae 1 of 3
2006 FTE's by Population
South St. Paul 20,304 94 18 50 4.63
Roseville 34,080 154 14 200 4.52
Crystal 23,012 101 10 0 4.39
Washington County 217,435 947 171 110 4.36
Maple Grove 55,278 240 12 591 4.34
Minnetonka 51,658 224 17 196 4.34
West St. Paul 19,655 84 5 20 4.27
Dakota County 383,076 1598 231 159 4.17
Excelsior 2,400 10 3 4.17
Brooklyn Park 68,715 285 47 330 4.15
Waconia* 8,018 33 75 6 4.12
Lexington 2,220 9 12 5 4.05
Lakeville 47,523 191 38 163 4.02
Ramsey 19,208 77 5 20 4.01
Prior Lake 19,662 78 7 94 3.97
New Brighton 22,332 88 12 200 3.94
Cottage Grove 31,437 122 8 100 3.88
New Hope 20,908 81 16 150 3.87
Watertown* 3,620 14 6 3.87
Woodbury 49,329 190 7 200 3.85
Victoria 5,198 20 20 20 3.85
Coon Rapids 62,295 238 96 100 3.82
St. Paul Park 5,052 19 29 4 3.76
Lino Lakes 18,368 69 5 54 3.76
Apple Valley 48,418 180 57 112 3.72
Plymouth 70,238 260 8 500 3.70
Hamburg 545 2 1 0 3.67
Norwood Young America* 3,272 12 0 25 3.67,
White Bear Lake 24,909 91 11 3.65
Eden Prairie 59,325 215 7 300 3.62
Mendota Heights 11,635 42 14 5 3.61
Mounds View 12,865 46 3 10 3.58
Forest Lake 15,692 56 14 19 3.57
Blaine 49,962 173 17 69 3.46
Champlin 22,925 79 13 25 3.45
Circle Pines 4,742 16 0 10 3.37
Foley* 2,154 7 0 12 3.25
Chanhassen* 21,600 65 4 50 3.01
Shoreview* 26,475 77 10 10 2.91
New Germany 346 1 4 2.89
Shorewood* 7,595 21 10 10 2.76
Andover added 20 for Police 28,939 79 2 25 2.73
*Contracts with another agency for police protection
-'
Page 2 of 3
2006 FTE's by Population
Greenfield* 2,744 7 5 0 2.55
Arden Hills* 9,457 24 0 50 2.54
Centerville 3,557 9 2 3 2.53
Hugo 8,375 21 1 4 2.51
Hanover* 2,048 5 1 0 2.44
Rockford 3,738 9 1 2 2.41
Spring Park* 1,720 4 0 0 2.33
Corcoran 5,850 13 7 4 2.22
Lauderdale 2,364 5 0 4 2.12
Andover* 28,939 59 2 25 2.04
Independence* 3,529 7 0 0 1.98
Falcon Heights* 5,579 11 1 25 1.97
Vadnais Heights* 13,270 26 1 14 1.96
Maple Plain 2,096 4 0 0 1.91
Lake Elmo* 7,666 14 28 3 1.83
Mahtomedi* 8,050 14 2 4 1.74
East Bethel* 11,230 19 0 2 1.69
Oak Grove* 7,290 11 2 5 1.51
Ham Lake* 14,034 20 2 5 1.43
Dept 12,000 16 2 5 1.33
Little Canada 9,890 13 8 18 1.31
New Market 1,028 1 4 0.97
Dellwood 1,070 1 0.93
Brooklyn Center 29,174 0.00
Gem Lake* 442 0 2 0 0.00
Hampton 598 0 6 1 0.00
Inver Grove Heights 31,053 0.00
Pine Springs 421 0 0 0 0.00
St Francis 6,177 0.00
*Contracts with another agency for police protection
Page 3 of 3
.A.noka-Hennepin School District
COMMUNITY EDUCATION
Memo
Date:
To:
From:
Re:
June 6, 2006
Jim Dickinson, City Administrator
Reid Mortensen, Community Education Supervisor ~
Community School Budget 2007
~
I am requesting the support of the City of Andover for the Community School program
during the 2007 budget year. The proposal is based on the maintenance of existing levels
of service. Anoka-Hennepin School District provides the supervisory position, most of
the clerical support and ten hours of staff time at each building. The joint funding
provided by the City of Andover and Community Education provides the necessary staff
time to create the services listed below.
Services Provided With Joint School District/City Funding
1. Youth Programs and Activities- Andover: 30-36 per quarter
Crooked Lake: 20-24 per quarter
Rum River 20-24 per quarter
2. School Buildings Open to Community Groups-4 nights a week
3. Summer Program
Cost of Services-City of Andover Share
1. Youth Program
2. Summer Program
3. Total
$35,542
$7,600
$43,142
City of Andover-Allocation by Building
Andover $17,770
Crooked Lake $8,886
Rum River $8,886
Summer $7,600
T ota! $43,142
If you have additional questions please give me a call at 506-1263.
discover 'VI
ig~W ",
Anoka-Hennepin School District ,;>
2727 Ferry Street North. Anoka, MN 55303 . Tel: 763.506.1260 . Fax: 763.506.1299 . TIY: 763.506.1292
unu''U' t:lTln'lcs:> \:-1 ?_Tnn_llc:,/~e 66
Memo
Date:
To:
From:
Re:
August 29, 2006
Lee Brezinka, Assistant Finance Director City of Andover
Reid Mortensen, Community Education Program Supervisor
City of Andover/Community Education Program
The purpose of this memo is to clarify the services that the funding from the City of
Andover and Anoka Hennepin Community Education provide for Andover residents.
At Andover Elementary, Crooked Lake Elementary and Rum River Elementary we have
the following staff and school year positions:
Andover: Community School Programmer; 175 days at 30 hours per week;
Andover funds 20 hours/week and Community Education funds 10
hours/week
Crooked Lake: Community School Programmer; 175 days at 20 hours per week;
Andover funds 10 hours/week and Community Education funds 10
hours/week
Rum River: Community School Programmer; 175 days at 20 hours per
week; Andover funds 10 hours/week and Community
Education funds 10 hours/week
Summer: Community School Programmer for 6 week summer program
These staff provide a variety of programs that include arts, skills, enrichment, recreational
and general interest classes and activities for preschoolers through teens with some special
events and activities. Included with this memo are brochures that are representative of the
type of programming that is offered after school and some evenings.
In addition these staff coordinate facility use at the schools for community groups after
school, evenings and weekends. Besides community groups, facility use includes
tournaments, community athletic practices, civic groups, trainings and special school and
community events.
Data is not complete for the 05/06 school year, but over 5800 youth participated in
programming for the 04/05 school year. If you need additional information or have
questions, please do not hesitate to contact me at 763-506-1263 or email me at
Reid.Mortensen@anoka.k12.mn.us.
Community School Youth Programmer
Carolynn Meints 506-1712
Community School Secretary
Carolyn Ballstaat 506-5642
Community School Programs are brought to you by the City of Anaover ana Anoka-Hennepin School District 11
Andover Community School
FALL 2005
Back To School Scrapbook
Start saving your school memories now! Come and assemble a 3-ring
photo album. Personalize your pages and add your favorite photos.
Bring "Back to School" pictures to start with. Extra inserts will be pro-
vided so you can continue to add throughout the year!
Course# Location Gr. Date/Day Time Wks Fee
1273CF1-00 Andover K-5 Oct 12 W 3:50-6:00 1 $18,00
Fall Canvas Bag
You'll design and decorate your own special canvas bag with puff
paints, fabric and buttons. When completed, you'll be able to use your
bag for school or anything you may want to put in it.
Course# Location Gr. Date/Day Time Wks Fee
1273CF3-00 Andover K-5 Oct 26 W 6:30-7:30 1 $8,00
Fancy Notebook
You'll embellish a spiral notebook using different fabrics, buttons and
sequins.
Course# Location Gr. Date/Day Time Wks Fee
1273CF2-00 Andover K-5 Oct 5 W 6:30-7:30 $12.00
Tie Dye T-Shirt
Be the talk of the class as your wear your tie dyed t-shirt that you
made! (Size 18-20 T-shirt supplied. If a larger size is needed, please
note on the registration,)
Course# Location Gr. Date/Day Time Wks Fee
1273CF4-00 Andover K-5 Nov 16 W 3:50-5:00 1 $12.00
Treasure Box
Store all your treasures in this wooden box that you decoupage. The
box will already be base coated so you get to do the fun part!
Course# Location Gr. Date/Day Time Wks Fee
1273CF5-00 Andover K-5 Oct 26 W 3:50-6:00 1 $12.00
Archery (Tuesday/Thursday Class)
This popular two-session class will introduce you to the basic skills
used in archery: safety rules, stance, aiming and correct shooting tech-
niques. We will provide the targets, bows, arrows, equipment and pro-
fessional instructor. Register early as class size is limited!
Course# Location Gr. Date/Day Time Wks Fee
1273HF1-00 Andover 2-5 Nov 1 & 3 3:50-4:50 1 $14,00
Archery Partners (Tuesday/Thursday Class)
This class is designed to give instruction in pairs with one adult for each
student. Basic archery skills will be stressed: safety rules, stance, aim-
ing and correct shooting techniques. We provide the targets, bows,
arrows, equipment and professional instruction. Register early as class
size is limited..
Course# Location Gr. Date/Day Time Wks Fee
1272BF1-00 Andover K-5 Nov 1 & 3 4:55-5:55 $16.00
Basketball Warm Up
Students who enjoy the game of basketball and would like to sharpen
up their skills are invited to join this fun group. We'll practice the basic
skills including dribbling, ball control, lay-ups, shooting, and defense.
Inter-squad games will be played each week. Great tune-up for the
Andover Athletic leagues. Boys and girls welcome.
Course# Location Gr. Date/Day Time Wks Fee
1273HF4-00 Andover 3-5 Nov 30 W 3:50-4:50 4 $12.00
New this year...Register on line at
www.discovercommunityed.com
Flag Football
Have fun playing the popular game of flag football, Students will learn
and practice catching, passing, kicking, and running with the ball as
well as offense and defense formations, play calling, rules, and sports-
manship. Inter-squad games will be played each week, Join the team
and make new friends!! Dress for the outdoors.
Course# Location Gr. Date/Day Time Wks Fee
1273HF4-00 Andoverr 3-5 Oct 6 Th 3:50-4:50 4 $12.00
Little Ninjas
Our specialized Little Ninja's program is an age-specific curriculum that
is professionally designed to teach children important life skills in a fun,
exciting and enriching manner. In this program your child will learn
more than just how to kick and punch, They will learn valuable life
skills such as focus, memory, teamwork, discipline, self-control, fitness,
balance and coordination. Many of the same concepts you are teachi-
ing your child at home will be consistently reinforced through classroom
discussions in your child's program.
Course# Location Gr. Date/Day Time Wks Fee
1273FF2-01 Andover K-2 Sep 27 T 3:50-4:20 6 $39.00
1273FF2-02 Andover K-2 Nov 8 T 3:50-4:20 6 $39.00
Soccer Fun
Students will receive instruction on the basic rules and skills of soccer,
including teamwork and good sportsmanship. Join the team and have
fun playing this great game!!
Course# Location Gr. Date/Day Time Wks Fee
1273HF5-00 Andover K-2 Oct 4 T 3:50-4:50 4 $12.00
Sports of All Sorts
In this class students will be playing a variety of fun sports and exciting
gym games including floor hockey, T-ball, kickball and much more! A
different activity each week. This class is designed to give the younger
students a "taste" of many fun activities. Girls and Boys are welcome.
Meet new friends and have some fun!!
Course# Location Gr. Date/Day Time Wks Fee
1273HF6-00 Andover K-2 Nov 8 T 3:50-4:50 4 $12.00
Volleyball Warm Up
Join us after school for an afternoon of Volleyball. You'll have fun learn-
ing skills and playing inter-squad matches, Great warm up to join the
Winter Volleyball team!
Course# Location Gr. Date/Day Time Wks Fee
1273HF7-00 Andover 3-5 Oct 6 Th 3:50-5:20 5 $20,00
YMCA Danceline
This energetic class will teach basic dance team techniques! Get in
line and join the fun! Please wear comfortable clothing and tennis
shoes.. This class is cooperative with the YMCA,
Course# Location Gr. Date/Day Time Wks Fee
1273HF8-00 Andover K-5 Nov14 M 3:50-4:50 6 $36,00
YMCA Youth Fitness
Fitness is fun! Join others to learn how you can be fit and healthy in
spirit, mind and body, We'll excercise your muscles, play some fun
games and meet new friends, We'd love to have you join us, This
class is cooperative with the YMCA.
Course# Location Gr. Date/Day Time Wks Fee
12731F1-D0 Andover K-5 Oct 4 T 3:50-4:50 6 $36,00
YMCA Youth Yoga
A wonderful way to introduce the benefits of fitness yoga (strength,
stretching, breathing & relaxation) to children through games and activi-
ties in a safe, enjoyable, inclusive format. This class is cooperative with
the YMCA.
Course# Location Gr. Date/Day Time Wks Fee
12731F2-00 Andover K-5 Oct 5 W 3:50-4:50 6 $36.00
~
y
~
Emma B Howe
Northtown Family YMCA
8950 Springbrook Drive
Coon Rapids, MN 55433
763-785-7882
Andover Dragons Choir
Be a part of our Andover Dragons Choir! You will be performing for our
school. Look for an announcement for the upcoming date. The choir
will be directed by our music teacher, Yvonne Ostien. Class size is lim-
ited.
Course# Location Gr. DatelDay Time Wks Fee
1273DF1-00 Andover 4-5 Oct 11 T 3:50-5:00 10 $38,00
Babysitting Preparation (Man, Tues, Wed Class)
Students will/earn about common babysitting situations, safety proce-
dures, first aid, and child development stages. This is a must for all
beginning sitters. Snack Included. (Certification cards will be awarded
upon completion.)
Course# Location Gr. DatelDay Time Wks Fee
1273FF1-00 Andover 4-5 Nov 14-16 3:50-6:00 $30,00
r
r
~
New this year...Register on line at
www.discovercommunityed.com
~~
.Ai
~
Girls Club
Girls, you wanna have some fun? We are calling all girls! Come and
learn some fun things, play some fun games and do some fun crafts
(including lip gloss and body glitter!) and make a cool journal to keep.
Course# Location Gr. DatelDay Time Wks Fee
1273CF6-01 Andover K-2 Oct 12 W 3:50-4:50 5 $20.00
1273CF6-02 Andover 3-5 Oct 13 Th 3:50-4:50 5 $20.00
A
Study Club
Learn good study habits! Receive extra help with homework, reading
and special projects.
Course# Location
1273FF4-01 Andover
1273FF4-02 Andover
Gr.
4-5
4-5
Date/Day Time Wks Fee
Oct 4 T 3:50-5:00 6 $25.00
Nov 15 T 3:50-5:00 5 $21.00
Back to School Bash
Join Andover, Crooked Lake, McKinley and Rum River Elementary
Schools for a night of excitement! Meet new friends, participate in open
gym activities, win prizes, do a fun craft, enjoy a slice of pizza and a
beverage, sing karaoke, listen to music and more! "Back To School
Bash' will be held at Andover Elementary School.
Course# Location Gr. DatelDay Time Wks Fee
1273HF2-01 Andover 1-3 Sep 28 W 6:30-8:00 1 $9.00
1273HF2-02 Andover 4-5 Sep 20 T 6:30-8:00 1 $9.00
Family Rollerskating Night
Mark your calendars for a fun family night at Cheap Skate in Coon
Rapids, Watch for flyers or pick one up in the Community School office.
You must provide your own transportation. Pay at the door
Course# Location Gr. DatelDay Time Wks Fee
1273HF3-01Cheapskate K-5 Oct 25 T 6:00-9:00 1 $4.00
1273HF3-02Cheapskate K-5 Nov 15 T 6:00-9:00 1 $4.00
Community Education funds, including participant fees and municipal funding paid for the printing and distribution of this publication.
Regular K-12 instruction funding was not used.
r-----------------------------___.___._____.___.,
All classes require pre-registration and are filled on a first-come, first- emergency causes cancellation of classes.
served basis, We reserve the right to cancel classes due to insufficient regis- Cancellation will be announced on the school intercom. Parents should be
tration. No refunds will be made after the first class. sure children have instruction of where to go if class is canceled and both
1. Please complete one registration form for each class, parents ~re working, ~Ie~se include this inf?rmation on the regist~ation form.
2, All fees must accompany registration. Make checks payable to Fee ASSistance applications are available In your local Community Education
"Anoka-Hennepin District #11." Offices, F~r further Information please ca!1 !i06-1260. . ". . .
3. There is no confirmation on registrations, Assume you are enrolled CO":lmu~lty Education Welcomes Participants of All Abilities. All actlv/-
. , . ties In thiS flyer are open to persons With disabilities. We encourage people to
If you are not not,lfied otherwise, " actively engage and participate in age-appropriate community education inte-
4. Enclose registration form, al?ng v.:lth p~yment, In a seal:d envelop.e. grate activities, The Community Education Department will provide accessibil-
Students may drop off registrations In the Community Education ity assistance if needed, to make physical and social integration successful. If
Office. Registrations MUST be received two business days prior to you need assistance to participate, inform the Community Education office at
start of class. least two weeks prior to class. This document will be provided in alternate for-
PARENTS PLEASE NOTE: Due to unpredictable weather or other emergen- mats upon a 72 hour request to accommodate people with disabilities. Please
cies, please plan with your child where they should go after school if an contact Carolynn Meints at 506-1712 to make a request.
TIIIE
COURSE #
lAST NAME
ADDRESS
PARENTNAME
SCHOOL YOUmEND
ClASS DJilll
Accornnxxlatioo<i A=ibility Needs
Office Use: Date
I
TIIIE
COURSE #
lAST NAME
ADDRESS
PARENTNAME
SCHOOL YOU mEND
ClASS DJilll
AccomrrxxIatioo<i A=ibility Needs
Office Use: Date
Rum River Community School
WINTER 2005
Community School Youth Programmer
Kim Munson 506-8212
~-,' y ~ "
-.. Community School Secretary
.' Carolyn Bal/staat 506-5642
Community School Programs are brought to you by the City of Antlover anti Anoka-Hennepin School DIstrict 11
~'. ,';: ;:'
Arts & Crafts
(Paint Shirts Recommended For All Arts and Craft Classes)
Candy Cane Holder
You'll start by painting a 4' ceramic candy holder. You'll complete your
candy cane holder by adding candy canes. Great as an ornament or
for gift giving.
Course# Location Gr. Date/Day Time Wks Fee
1323CW4-QORum River K-5 Dee 19 M 4:15-5:15 1 $8.00
Christmas Tree Pillow
Deeorate your home and get into the spirn of the holidays by making
this adorable no sew pillow. Christmas colors and a gold jingle bell,
will remind everyone of the holiday season.
Course# Location Gr. Date/Day Time Wks Fee
1323CW5-ooRum River 3-5 Dee 12 M 4:15-5:45 1 $16.00
Enchanted Forest
Come paint these two 3' and one 4' ceramic trees nestled on a mirror
base glistening wnh snow. Makes a great winter scene!
Course# Location Gr. Date/Day Time Wks Fee
1323CW6-o0Rum River K-5 Jan 9 M 4:15-5:30 1 $15.00
Frosty Fun
Come join us for this hour while we watch "Frosty The Snowman', paint
a 3' ceramic snowman and have chocolate "Frosty's' from Wendy's.
Course# Location Gr. Date/Day Time Wks Fee
1323CW7-OORum River K-2 Jan 23 M 4:15-5:15 1 $11.00
Gingerbread Boy Door Stop
Come and turn this outside edging stone into the most adorable ginger-
bread boy everl He can be used as a doorstop or as a decorative
piece for your front step, porch or deck.
Course# Location Gr. Date/Day Time Wks Fee
1323CW8-ooRum River K-5 Dee 5 M 4:15-5:30 1 $9.00
"Let It Snow" Lighted Snowman
Bring this snowman to life by painting him and his "Let It Snow' sign
then adding a light to make him bright!
Course# Location Gr. Date/Day Time Wks Fee
1323CW1-OORum River K-5 Jan 18 M 4:15-5:15 1 $13,00
"No Sew" Heart Pillow
Need something to cuddle this Valentine's Day? Come and make your
own heart shaped, "no sew', fleece pillow. Looks great and is very
"huggable' I
Course# Location Gr. Date/Day Time Wks Fee
1323CW2-00Rum River 3-5 Feb 13 M 4:15-5:45 1 $16,00
"No Sew" Poncho & Hat
Make your own poncho and hat out of fleece material, No sewing
required. A supply list will be sent to you after you register.
Course# Location Gr. Date/Day Time Wks Fee
1323CW3-ooRum River 4-5 Jan 19 Th 4:15-6:15 1 $12.00
Valentine Votive Candle Holder
Just in time for Valentines Dayl Come paint enher a ceramic heart bear
or ceramic heart bunny sitting next to the votive holder. A great gift idea
for that someone special!
Course# Location Gr. Date/Day Time Wks Fee
1323CW9-OORum River K-2 Jan 30 M 4:15-5:15 1 $10.00
v Broadway On Site Presents ~
"The Hobbit" at Rum River
&". Watch for flyers coming home soon! A
Recreation/Sports
Archery (Tuesday/Thursday Class)
This popular two session class will introduce you to the basic skills
used in archery: safety rules, stance, aiming and correct shooting tech-
niques, We will provide the targets, bows, arrows, equipment and pro-
fessional instructor. Register early, class size is limned!
Course# Location Gr. Date/Day Time Wks Fee
1323HW5-ooRum River 2-5 Dee 13 &15 4:15-5:15 1 $14,00
Archery Partners (Tuesday/Thursday Class)
This class is designed to give instruction in pairs with one adull for each
student. Basic archery skills will be stressed: safety rules, stance, aim-
ing and correct shooting techniques. We provide the targets, bows,
arrows, equipment and professional instruction. Register early as class
size is limned.
Course# Location Gr. Date/Day Time Wks Fee
1322BW1-o0Rum River K-5 Dee 13 & 15 5:30-6:30 1 $16,00
Floor Hockey Tournament
Join us in playing floor hockey. On March 18th, we will be in a tourna-
ment held in Blaine at Roosevell Middle School. T.Shirt included!
Course# Location . Gr. Date/Day Time Wks Fee
1323GW1-OORum River 3-5 Feb 7 T 4:15-5:15 5 $33.00
Sports For Fun
In this class, students will be playing a variety of fun sports and excning
gym games including floor hockey, T-Ball, kickball and much more! A
different activity each week. This class is designed to give the younger
students a "taste' of many fun activnies. Girls and boys are welcome.
Meet new friends and have some funl
Course# Location Gr. Date/Day Time Wks Fee
1323HW3-o1Rum River K-2 Jan 3 T 4:15-5:15 5 $21.00
I 1323HW3-02Rum River 3-5 Jan 5 Th 4:15-5:15 3 $13.00
YMCA Youth Fitness
Fitness is fun! Join others to learn how you can be frt and heallhy in
spirn, mind and body. We'll excercise your muscles, play some fun
games and meet new friends. We'd love to have you join us. This
class is cooperative wnh the YMCA.
Course# Location Gr. Date/Day Time Wks Fee
1323IW1-o0Rum River 4-5 Dee 1 Th 4:15-5:15 4 $24.00
Volleyball Tournament
Join the Volleyball team as we practice up for the annual tournament to
be held on Saturday, March 4th at Northdale Middle School. Open to
all 3rd, 4th and 5th graders who enjoy playing this great game, We'll
have fun practicing our skills and playing inter-squad matches in prepa-
ration for the big tourney! Bump, Set, Spike! Tournament T-Shirt is
included in fee.
Course# Location Gr. Date/Day Time Wks Fee
1323GW2-OORum River 3-5 Feb 2 Th 4:15-5:15 5 $33,00
r
-,
y
Andover YMCA
15200 Hanson Boulevard
Andover, MN 55304
(763) 230-9622
~
A;
Special Events
After School Rollerskating Party
Join us for a fun afternoon of skating at Cheapskate! We'll leave by
bus right after school and return to the school at approximately 7:00pm.
Fee includes skate rental, hot dog, chips and pop, Watch for an addi-
lionalflyer wfth more information I
Course# Location Gr. Date/Day TIme Wks Fee
1323EW1-00cheapskate 1-5 Jan 17 T 4:15-7:00 1 $12.00
Family Rollerskating
Mark your calendars for a fun family night at Cheapskate in Coon
Rapids. Pick up a flyer in the Community School office. You must pro-
vide your own transportation, Pay at the door,
Course# Location Gr. Date/Day TIme Wks Fee
1323HW1-D1Cheapskate K-5 Dec 13 T 6:00-9:00 1 $4.00
1323HW1-02Cheapskate K-5 Jan 24 T 6:00-9:00 1 $4.00
1323HW1-03Cheapskate K-5 Feb 21 T 6:00-9:00 1 $4.00
Family Swim Night
Please join us at the Roosevelt Middle School Pool for an evening of
fun in the water for the entire familyl An adutt must accompany children
under 7. For more information, pick up a flyer in the Community School
office. You must provide your own transportation.
Pay at the door, $2.00 per person or $8.00 per family.
Course# Location Gr. Date/Day TIme Wks Fee
1323HW2-01 RMS K-5 Jan 13 F 6:30-8:30 1 $21$8
1323HW2-02 RMS K-5 Feb 10 F 6:30-8:30 1 $21$8
Sweetheart Dance
Celebrate the holiday with your sweetheart! Students (Grades K-3) and
a special adutt in their lives are invfted to this holiday special event.
You will be able to dance to music, make a special craft, enjoy refresh-
ments and have your picture taken (fee includes one photo).
$7.00 per person or $20.00 per family. Held at Rum River
Elementary.
Course# Location Gr. Date/Day TIme Wks Fee
1323HW4-DORum River K-3 Feb 10 F 6:30-8:30 1 $7/$20
Community EdMcationfunds. including participtmtfees andnumicipalfunding paidfo,. the printing and distribution of this publication.
Regular K-12 instruction funding was not used.
rAil;~:;-ec;u;;p;~isi;;;n-;d~;ruI;d-;a'fl;-~;ii~st-:-' -e~;e~;;~;-dn;jjatjo~~la-;s~ -. -. -. -. -.,
served basis, A $5.00 processing lee will be charged lor all refunds. Cancellation will be announced on the school Intercom, Parents should be
We reserve the right to cancel dasses due to insufficient registration, sure children ha~e instructio~ of wher~ t~ go if c1~ss is cancela? an~ both
1. Please complete one registration form for each dass, parents ~re working, ~e~se Indude t~IS Inf?rmation on the registration fom:'
2 All fees must accompany registration, Make checks payable to Fee ASSistance applical10ns are available In your local Community Education
, 'Anoka-Hennepin District #11.' Offices, F~r further i~formation please ca!1 ?O6-1260, .... ' ,
3 There Is no confirmation on registrations Assume you are enrolled Coll)mumty Education Welcomes PartiCipants 01 All Abilities. All acllVl-
, , , , " ties In thiS flyer are open to persons with disabilities. We encourage people to
If you are n~t not,llled Otherwise, " actively engage and participate in age-appropriate community education inte-
4. Enclose registration lorm, al?ng WIth p~yment, In a sealed enveioP:e' grate activities, The Community Education Department will provide accessibil-
Students may drop 011 registrations In the Community EducatIon ity assistance il needed, to make physical and social integration successful, If
Ollice. Registrations MUST be received two business days prior to you need assistance to participate, inform the Community Education office at
start 01 class. least two weeks prior to class. This document will be provided in alternate for-
PARENTS PLEASE NOTE: Due to unpredictable weather or other emergen- mats upo~ a 72 hour request to accommodate people with disabilities. Please
cies, please plan with your child where they should go after school if an contact Kim Munson at 506-8212 to make a request.
~._._._._._._._._._._._._._._._._._._._._._._._.~
11'
~
New this year...Register on line at
www.discovercommunityed.com
&...
A
CDURSE# 1ITlE LCX:1ffiON OF C1.ASS
LAST NAME FIRST NAME
ADDRE::S 01Y ZlP
ffiRENT NAME PffiNE (H) WKiSmER
SCHXlL YOUATIEND GRADE C1.ASSR:'OM1EAQffiR
C1.ASS DATE DNY TIME C1.ASS FEE
Aaxxrrmdalim;/1\o::e<Nlility Needs
Offire Use: Date Ca<;h Cln:k # FA
COURSE # 1ITlE LCX:ATION OFC1.ASS
LAST NAME FlRSTNAME
ADDRE::S 01Y ZlP
ffiRENTNAME PffiNE (H) WKiSmER
SCHX)L YOUATIEND GRADE C1.ASSK:OM1FACHER
CLASS DATE DNY TIME CLASS FEE
Aaxxrrmdaliorl'f1\o::e<Nlili1y Needs
Offire Use: Thte Ca<;h Cln:k # FA
CDURSE # 1ITlE LCX:ATION OF C1.ASS
LAST NAME FIRST NAME
ADDRE::S 01Y ZlP
ffiRENT NAME PHJNE (H) WKiSmER
SCHX)L YOUATIEND GRADE C1.ASSR:'OM1FACHER
CLASS DATE DNY TIME C1.ASS FEE
Au.uIlIlulalim;/A~lilily Needs
Offire Use: Dale Ca<;h Cln:k # FA
Crooked Lake
Community School
SPRING 2006
Community School Youth Programmer
Kim Munson 506-2112
Community School Secretary
Carolyn Ballstactt 506-56LJ2
Community ScllOol Programs are brOught to you by the City of Anaover ana Anoka-Hennepin School District 11- .
. -- I Sports For Fun
! In this class students will be playing a variety of fun sports and exciting
r gym games including floor hockey, T-ball, kickball and much more! A
! different activity each week. This class is designed to give the younger
Bunny Candy Dish I students a 'taste" of many fun activities, Girls and Boys are welcome.
Paint an adorable ceramic Bunny Candy Dish. The bunny stands 9" tall -f Meet new friends and have some fun!! (No class 4/10)
and is holding a candy dish with a lid. Take him home andfiil the dish ! Course# Location Gr. Date/Day Time Wks Fee
with your favorite sweet treats. Very cute project! : 1213HS4-00 Crkd Lk 3-5 Mar 20 M 4:05-5:05 4, $17.00
. Course# . Location Gr. DatelDay Time - Wks Fee !
1213CS1,00 Crkd Lk K-5 Mar 29 W 4:05-5:20 _ 1 . $14.00 j Spring Softball - .
. I Softball fever is in the air! Grab your glove and join the team! We'll
: work on the skills of the game: throwing, catching, fielding, hitting and
! base running, Good sportsmanship and teamwork will be stressed. All
: boys and girls are welcome!
I Course# Location Gr.. Date/Day Time Wks Fee
1213HS5-00CrkdLk 3-5 May 1 M 4:05-5:05 4 $17.00
Clean The Cupboard _
Mother Hubbard's cupboard is full! We have lots of leftover kits for
boys and girls to choose from, maybe even two! You may choose from
wood, ceramics, magnets and more!
Course# Location Gr. - DatelDay Time Wks Fee
1213CS5-00 Crkd Lk K-5 Apr 19 W 4:05-5:0~ 1 $12.00
Father's Day Surprise!
Students will be making a surprise gift for Dad or that someone special
in their life. This is a great project that he will cherish forever. Students
may peek in the Community School office to see the sample, but
remember ~it's a secretl
Course# Location Gr. _ DatelDay Time Wks Fee
. 1213CS2-00 Crkd Lk K-5 May 17 W 4:05-5:20 1 $12.00
Mother's Day Surprise!-
Mom listen, but don't peek - a special gift just for you! Your child will
paint a very special project to make this gift one you will always treas-
ure. Stop and see the sample in the Community School office...but
keep it a secret! .
Course# Location Gr. Date/Day Time . Wks Fee
1213CS3-00 Crkd Lk K-5 May 8 M 4:05-5:20. 1 $12.00
Welcome Frog Garden Ornament
This ceramic garden ornament will brighten any garden. This cute frog
is perched on top of a rock that says "Welcome". You will paint with
special outdoor paints so your piece will weather any kind of weather.
Course# Location Gr. Date/Day Time Wks Fee
1213CS4-00 Crkd Lk K-5 May 15 M 4:05-5:05 1 $11.00
Soccer Fun
Students will receive instruction on the basic rules and skills of soccer,
including teamwork and good sportsmanship. Join the team and have
fun playing this great game!!
Course# Location Gr, DateIDay Time Wks Fee
1213HS3-00 Crkd Lk K-2 Mar 8 W 4:05-5:05 4 $17.00
Spring T-Ball .
This fun introduction to baseball gives students the chance to learn the
game at their own pace. Using 'soft" baseballs, students will work on
catching and throwing the ball, fielding ground balls and pop-ups, run-
ning the bases and hitting. We will start off using the T-ball stands,
then progress into hitting slow pitches. This is a non-competitive class
that will stress saf(jty, teamwork and good sportsmanship. All boys and
I girls are welcome! .
I Course# Location Gr. Date/Day Time Wks Fee
! 1213HS6-00 Crkd Lk .K-2 May 3 W 4:05,5:05 4$17.00
I
I
I -
: Horseback Riding Lessons-Beginner
: Enjoy a 3 week horseback riding course that will teach you the funda-
l mentals of riding as well as basic horse care. Lessons will create a
I sense of "belonging' and self confidence. Each lesson is 1 1/2 hours in
length, with one half of the time in class and the other hal! of the time
riding, Students must provide their own transportation. Parents are
invited to stay and watch. Classes are held rain or shine, Students
should wear long pants and boots (if they have them). Helmets are
provided. Located at Roselawn Stabies, 24069 Rum River Blvd., SI.
Francis (753-5517) 10 minutes north of Anoka, Please do not mail reg-
istration directly to Roselawn Stables,
Course# Location Gr. Date/Day' Time Wks Fee
1213FS3-01 Roselawn 4-5 Apr 3 M 7:00-8:30 3 $75.00
1213FS3-02 Roselawn 4-5 Apr 5 W 7:00-8:30 3 $75.00
1213FS3-03 Roselawn 4-5 May 8 M 7:00-8:30 3 $75.00-
1213FS3-04 Roselawn 4.5 May 10 W 7:00-8:30 3 $75.00
I-
I-
I
I
I
I '
i~
New this year...Register on line at
www.discovercommunityed.com
Babysitting Preparation (Tues, Wed, Thurs Class)
Students willleam about common babysitting situations, safety proce-
dures, first aid and child development stages. This is a must for ail
beginning sitters, Snack Included. (Certification cards will be awarded
upon completion.)
Course# Location. Gr. Date/Day Time Wks Fee
12131S1-00 Crkd Lk 4-5 May 2-4 '4:05-6:05 1 $30,00
Computer Lab
This class is for all you computer wizards who want to experiment'with
a new program or just have fun playing your favorite games, You can
play, practice and explore the world of computers. . This is your chance
to use a variety of your favorite software in the computer lab. Come
and have fun!
Course# Location Gr.
1213FS1-00 Crkd Lk K-5
,
Date/Day Time Wks Fee
Apr 17 M 4:05-5:05 4 $21.00
Family Rollerskating
Mark your caiendars for a fun family night at Cheapskate in Coon
I Rapids. Pick up a flyer in the Community School office, You must pro-
vide your own transportation. Pay at the door.
Course# Location Gr. Date/Day Time Wks Fee
1213HS1-01 Cheapskate K-5 Mar 21 T 6:00-8:00.1 $4,00
1213HS1-02 Cheapskate K-5 Apr 18 T 6:00-8:00. 1 $4.00
1213HS1-03 Cheapskate K-5 May 16 T 6:0Q-8:00 1 $4.00
Family Swim Night
Please join us at the Roosevelt Middle School Pool for an evening of
I fun in the water for the entire family! An adult must accompany children
under 7. For more information, pick up a flyer in the Community School
office. You must provide your own transportation.
Pay at the door, $2;00 per person or $8.00 per family. ..
Course# Location Gr. Date/Day Time Wks Fee
1213HS2-00 RMS K-5 Mar 24 F 6:30-8:30 1 $21$8
I
,
Community Education funds, including participant fees and municipal funding paid for the printing and distribution of this publication.
. Regular K-12 ins,tructionfunding was not used. .
r._._._._._.~._._._._.~._._._._._~_._._._._._._.'
. All classes require pre'reglstralion and are filled on a first-come, first1 emergency causes cancellation of classes.. . .
1 seNed basis. A $5.00 processing fee will be charged for all refunds~ . Cancell~tion will be, annou~ced on the school. interco~. Parents should be 1
. We reseNe the 6ght to cancel classes due to insufficient registration. ~ sure children ha~e Instructlo~ of wher~ t~ go If class IS cancele? an~ both .
11. Please complete one registration form for each class. parents ~re working, ~Ie~se mclude ~IS mf?rmatlon on the reglS.l~alion for"!. 1
. 2. All fees must accompany registration, Make checks payable to Fee ASSistance applications are available In your local Community Education .
.1 'Anoka-Hennepin District #11.' Offices. F?r further i~formatlon please call 506-1260. . . ..:, 1
,3, There is no confirmation on registrations. Assume you are enrolled ! l?o":lmu~lty Education Welcomes P~rtlclpan~~ of All Abilities: All actlV!-
I if you are not notified othe . ' tle~ In thiS fiyer are open. t~ per~ons With dlsab!htles. We en~ourage ~eoRle to .
. ,. rwlse, , . actively engage and partiCipate In age-appropnate community education Inte. 1
. 4. Enclose registration form, ,alon~ With payment, In a .sealed en.velope. grate activities. The Community Education Department will provide accessibil- .
1 St~dents may drop off registrations In the Community Education, ity assistance If needed, 10 make physical and social integration successful. If 1
Office. REGISTRATIONS MUST BE RECEIVED TWO BUSINESS you need assistance to participate, inform the Community Education office at
I. DAYS PRIOR TO START OF CLASS. i least two weeks prior to class. This document will be provided In alternate for- .
PARENTS PLEASE NOTE: Due to unpredictable weather or other emergen- mats upon a 72 hour request 10 accommodate people with disabilities. Please 1
. cies, please pian with your child where they should go after school if an contact Kim Munson at 506.2112 to make a request. . ,
.
TIIlE
LOCiIDON OF CLASS
.
PARENTNAME
SOIOOL YOUtUIEND
CLASS DAlE
Accomm:datioosl AcceSsibility Needs
Office Use: Date
PHONE (H)
GRADE
DAY
Cash
FlRSfNAME
CITY
.
. ZIP
.
. WKiSII1ER
C1ASSROOMlEACBER
CLASS FEE
TIME
Check #
FA
COURSE #
lASf NAME
ADDRESS
PARENTNAME
SOIOOL YOU mEND
CLASS DAlE
AccommOOationslAc:c:esSJbility Needs
Office Use: Date
TIIlE
PHONE(H)
. ,
GRADE
,
DAY
Olsh
LOCiIDON OF CLASS
FlRSf NAME
CITY
ZIP
WI</SITIER,
CLASSROOM1EAOffiR
CLASS FEE
TIME
Check #
FA
\
~ ..)>-
N ~ 3 ~
25 !!!. g ~
.~ ffi a g
~ en en Ql
:::I cnoa.
'S ~ ~ c'
-<" 0 0 cn
9- ""C C -
ro CD iil 3
:::I ~ [a
-
OleO'
>< en Ql
CD -. (f)
cn~CD
_. a.
~ :5" 0
co::J
g- 3 3'
~~-g
~ o' Q.
~::.;
~ a ~.
~ 3 CD
Ol-a.
::::!. ~ m
.:<o~
a. -
_. CD 0
en'C~
-Ol.....
~;:1Q
c: 3 C/I
g. ~ ?I
:l-CD
m9.20
~;Ui5
O'CD(')
c:C%~
~::J(Q
o c: 0
CD ~ ct;
en ~
:l :l
o 3
- CD
~. .;
c c:
~ n
:r
Ol
en
CD
en
~
CD
<
CD
:l
e
CD
=l'
o
3
(')
Ol
'C
2'
~
CD
a.
iii
><
:l
(')
~
CD
3
CD
::l.
iii
><
(')
Ol
'C
Ol
(')
~
I
CO
o
:::R
o
I
--J
o
:::R
o
I
.t>-
O
:::R
o
I
......
o
:::R
o
o
:::R
o
......
o
"*"
N
o
:::R
o
I
W
o
:::R
o
I
N
o
:::R
o
I
(j)
o
:::R
o
I
(J1
o
:::R
o
"'U
w
'<
'"
o
o
'"
~)
/
/
/
r/ . -
II
.
I _I
* + + .1. t .
. J
I
(/)(')(')-1(')
m~;::::;.:a;::;.:
-'<'< ll)'<
CO "'U:::o-"'U :1 ~
)>-. CO (')-.
-. 0 < -. 0
g.::, CO -< ::'
Qoo;l~a~
(')x -OX
(ilOg'COO .
c.. :J Ul ;:!. :J
;:+: CD CO '< I
Ulc: -10
~. ~ 3
:J CO CO
II CO Ul Ul ~ ~ ~
Ul -
Ul CO
CO ll)
Ul c..
* Ul
"'U
w
'<
'"
o
o
w
"'U
w
'<
'"
o
o
~
"'U
w
'<
'"
o
o
CJ'1
"'U
W
'<
'"
o
o
0'>
w
o
"*"
-
)>CDm
_.~ tn
!!!. ~ + ~
~QoSUSU
(') -. .....
CD (") 0. CD
"'C.,tnQ.
SU ~~"'C
'< -. (") CD
.... -. ..,
Ntn~(')
o -. CD
O~:I:~
N:;oO.....
~CD3(")
., SU CD ::r
-tnSU
~-=:~~
-. ,... (Q
Z~SUCD
3: S' ~ :i'
3::::!:lOJ"'C
)>~s:::a
(") -. tn "C
-. 0 -. CD
~=t~~
CDSUCDL.ooo"
tn Q.tn~
CD '-. tn -I
>< s::: "'C SU
(') tn ., ><
-~OCD
s:::w"Ctn
0.0._,"
-.......... ,.,
~C:l:;O
o '< CD
3:=-Ic;
_. SU SU ~
~ ., >< s:::
~ tn CD
CD"'CtnCD
SU CD '" OJ
., SU SU
~ tn
0. CD
2,(")
-. SU
tn"C
-.
.....
SU
en-=:
..... .
SU CD
..... .
CD '"
~ .)>5"
- OJ 3 :!l
...a. c: 0 OJ
0: en c: :::!':
.~ :;":30
< CD_:3
Q) UI CIJ OJ
::J cnoQ.
""C Q) "",-,
s ..., 0" 5i
-<" 0 c .-
~ -g or ~
::J :1 cD ::J
'<0._
S'cC"
~ ~. ~
.. " (I)
_. (C C.
~ :5" 0
-0':]
a. 3 3'
(I)",."
::h_=
(() o' Q,
bl"-
- =r~
a. 0 -.
(jj' 3 ~
." - a.
'" ::r (I)
::!. CD ~
.;;:o~
~mQ
!eo -g _
5=;:1Q
c: 3 ..
g:~i
" - (I)
oraQO
.:i:;o 0'
C"~g
c: (I) -
-"<0
o.C:o
0(1)<
(I). (I)
.. ~
" "
o 3
- (I)
"
-
j
~
~
i
.
.-
"
!2.
c:
a.
(I)
iil
(ii
"
c:
(I)
=l'
o
3
bl
"E.
c:
~
(I)
a.
W
x
:i'
(')
~
(I)
3
(I)
a
-
'"
x
bl
."
'"
(')
-?
."
c:
o
::r
'"
..
(I)
..
I N .j:>.
I I I N 0 0
I -" I 0) .j:>. 0 :oR
-" ()) 0 :oR
0 0 0 :oR *- 0
N 0 :oR 0
0 0 :oR :oR 0 0
:oR :oR 0 0
0 0
lJ
Q)
'<
N
o
o
N
lJ
Q)
'<
N
o
o
v.>
lJ
Q)
'<
N
o
~
* + + .:l +
~Q2dg
w -< '< or '<
ro-o:::o(")~
)> "'0 (1) _. 0
-. < ,<-"0
c.. "C (1) .
CII' :J-o-l
Qo-ie..,W
W (1) 0 x
(') X "C
.., 0 OJ (1) 0
(1):JQ)::4.:J
c.. CII '<
-. OJ (1) I
ene -io
CII W 3
-. x (1)
:J (1) CII
(1) CII_
CII (1)
CII W
(1) c..
ClIo. CII
lJ
Q)
'<
N
o
o
(J'1
lJ
Q)
'<
N
o
o
()')
I
"'C"'I'Im
.., f'V en
o CD .....
"C < -.
CD CD 3
:1.~1>>
'<:cS-
I>>-ICDo.
o.I>>OJ"'C
_. >< I>> CD
C CD en ..,
en en CD (')
.....'" CD
CDI>>-=:~
B~CI>"'"
co..: 0
o(f)Ci)~
-.....<1>>
~~'<cE
Ul CD + CD
"'C ~ I>> -.
CD 0. -. ~
"'en~O
o Qo ~ -.
I>> O~
"C 0 _. 0
s:~~;
en::;::I:~
:;. en 0 0.
(') -. 3 0
CD ~ CD <
"'C:::a~~
I>> CD CD "'C
'< I>> I>> ..,
N= 0. 0
o :-. Qo"C
o CD CD
N.: OJ:1.
:;. c '<:
""" ~. -I
-~I>>
~CD><
-. en CD
o en en
~ '"
I
Community
Resource
Partnerships, Inc.
1000 Westgate Drive, Suite 252
St. Paul, MN 55114
DATE: August 29,2006
TO: NMMA BOARD MEMBERS
FROM: Bob Benke
RE: REVENUE TRENDS
Attached for your information and use are copies of graphs depicting changes in
revenue streams using Pay 2002 as the base. The base was chosen to coincide
with Legislative action to change property class rates at the same time that there
were major cuts in LGA.
The first chart shows the composite trend data for all NMMA cities without the
City of Minneapolis included due to the significant difference in budget levels.
When Minneapolis is included, the pattern is very similar but the degree of
change is different. We will package this chart for discussions with legislative
candidates and other appropriate outlets.
The second chart is for your select city. Board Members are the only ones to get
copies of this information and we will not share it with others without your
consent. Use of this information is your choice. We recognize that each city has its
own tax base make up, local culture and political discussion to deal with. We felt that
there are so many possible ways to interpret the data that it should be done by those
responsible for the decisions being reflected.
In general, the charts show that LGA has been reduced significantly, property tax levies
and homestead tax levies have risen noticeably and local business taxes have declined.
We did not separate out the multi-family property tax data The composite data show that
when adjusted for inflated costs of public services, as opposed to the Cost of Living
Index, city revenue base is about 10% below the Pay 2002 level.
The homestead tax trend is fueled both by the class rate changes as well as escalating
home values. The business class tax drop reflects the rate change but does not include the
statewide business tax currently levied by the State.
For your information, we also generated a data base based on State Auditor's data that
covers the 2000 -2004 budget years. CY 2005 data won't be available until later this year.
In reviewing the results, it is clear that there are too many discrepancies and
unexplainable changes to draw detailed conclusions. Examples include how capital
expenditures are recorded, how debt service is set up (GO Levy vs. EDA Revenue
Bonds), etc. Consequently, we will not be releasing that information to anyone.
Please review the two charts and let me know if you have any questions. We'll get the
best answers possible. If you share this information during your budget process or other
public forums we would welcome your assessment as to the value added to your city.
CC: Joseph Strauss
Bill Barnhart
Becca Pryse
U:\NMMA\2007 Session\Finance Docs\City Revenue Charts\Dist.Cover Memo.doc
't
CITY OF
NDOVE
1685 CROSSTOWN BOULEVARD N.W. . ANDOVER, MINNESOTA 55304 . (763) 755.5100
FAX (763) 755-8923 . WWW.CI.ANDOVER.MN.US
TO: Mayor and Councilmembers
FROM: Jim Dickinson, City Administrator
SUBJECT: Follow Up Information
DATE: August 29,2006
At the August 22nd Council workshop, there was a request by the Council to have more
information distributed on the Motor Vehicle Sales Tax (MVST) Constitutional Amendment that
will be on the November 7th ballot. I have attached a North Metro Mayors Association document
that should assist each Councilmember.
If you would like additional information, do not hesitate in contacting me.
NMMA Transportation Policy Position: TRANSPORTATION
BACKGROUND; The 2005 Legislature adopted a transportation funding bill that
would have provided significant increases in funding for roads, highways and
transit services in Minnesota. The 2006 Legislature again considered funding
increases but failed to reach consensus in the Conference Committee.
Consequently, the only immediate opportunity to increase funds for roads,
highways and transit services is support for the adoption of the Motor Vehicle
Sales Tax (MVST) Constitutional Amendment that will be on the November 7
ballot. The NMMA Board Members are hopeful that candidates for Governor and
the Legislature will address the escalating transportation funding gap during the
General Election campaign process and then follow through during the 2007
Session.
The gas tax, or, "fuel user fee", has not changed from the current rate of 20 cents
per gallon since fall of 1988 when gas sold at an average of about $1.00 per
gallon. If the same rate of tax as a percent of purchase price. 20.0%, prevailed at
today's price of about $3.00 per gallon, the fuel user fee would be 60 cents, or a
200% increase that would generate an additional $1.3 Billion per year to repair
and improve Minnesota's deteriorating transportation infrastructure and level of
service.
CURRENT POLICY POSITION: The NMMA Board of Directors recommends that
the Governor and Legislature collaborate in the development and passage of a
transportation funding package early in the 2007 Session so as to avoid late
session failure to reach agreement. Agreement is urgently needed to address
needs of city and county roads as well as the state roads that they supplement.
Further, a long term financing strategy for transit infrastructure and services is
needed to meet mobility needs of our work force, handicapped travelers and
increasing numbers of senior citizens. Towards this end, the NMMA offers the
following documents as resources and a framework for debate:
· "Transportation Principles" that should guide decision making, including,
o Reliance on increased user fees
o Provide certainty of funding
o Prudent Fiscal Management
· "Principles Commentary" that provides additional ideas for consideration
and rationale for recommended actions,
· "Transportation Fact Sheet" documenting the severity of the trunk highway
system funding gap based on 2005 estimates that predate recent annual
increases in highway construction costs due to inflation,
· A "Conceptual Funding Plan" offering a mix of fund sources for
consideration that can serve as a menu of choices and framework for
analysis and debate on the options available.
U:\NMMA\2007 Session\Transportation Docs\NMMA Transportation Policy Position 8.10.06.doc
&.
NORTH METRO MAYORS
ASSOCIATION
TRANSPORTATION PRINCIPLES
FOR CONSIDERATION BY CANDIDATES FOR GOVERNOR AND
LEGISLATURE--2006 ELECTION CAMPAIGNS
OVERVIEW
The North Metro Mayors Association members believe that significant new revenues are needed
for Minnesota's transportation system. We have fallen behind prudent investment schedules and
are suffering safety, congestion, economic and quality of life impacts as a result. Our future well
being demands that we invest now to enhance our future ability to sustain our growing population
and our economic base that provides jobs and wealth to us all.
The problems created by chronic underinvestment in transportation are well known and have
been well documented in reports and media coverage. There were serious proposals under
consideration in the 2005 Legislature from the Governor, the Association of Minnesota Counties,
the Minnesota Chamber of Commerce, the Minnesota Transportation Alliance and individual
Legislators. These organizations and leaders should be congratulated for their efforts that raised
awareness of the need for significant new funding and for providing specific solutions to the
funding dilemma. Unfortunately, the funding bill agreed to by the Legislature did not meet with
the Governor's approval. .
In the end, the 2006 Legislature failed to. reach agreement on transportation funding. Our
challenge now is to craft a plan that can receive bipartisan support in the Legislature as well as
the concurrence of the Governor in the 2007 Session. Toward that end, the NMMA puts forth for
consideration the attached PRINCIPLES that should guide the crafting of the increased
transportation funding legislation.
NMMA MEMBER CITIES
Andover
Anoka
Blaine
Brooklyn Center
Brooklyn Park
O1amplin
Circle Pines
Coon Rapids
Crystal
Dayton
Lexington
Maple Grove
MinneapolIs
Mounds View
I
New Brighton
New Hope
Oak Grove
Osseo
Ramsey
Spring Lake Park
CONTACTS: 651-203-7259
Steve Larson, Mayor, City of New Brighton, NMMA President
Mark Steffenson, Mayor, City of Maple Grove, NMMA Vice President
Joseph Strauss, NMMA Executive Vice President
Bob Benke, Director, Research and Advocacy Services
NMMA KEY PRINCIPLES
· RELIANCE ON INCREASED USER FEES TO FUND
HIGHWAY IMPROVEMENTS
o USER CONTRIBUTION PROPORTIONAL TO BURDEN IMPOSED
o TRANSPARENCY OF RELATIONSHIP
o GENERATIONAL EQUITY
· CERTAINTY OF FUNDING FOR TRANSIT & HIGHWAYS
o LEGISLATIVE ACTION FOR IMMEDIATE IMPACT WITHOUT
REFERENDA REQUIREMENTS
o 100% MVST TRANSFER
o MINIMAL RELIANCE ON UNCERTAIN SOURCES:
· FEDERAL FUNDING INCREASES
· TOLL FACILITIES
· EFFICIENCIES
· PRUDENT FISCAL MANAGEMENT
o PHASE IN OF REVENUE INCREASES:
· AVOID HIGHWAY PROGRAM SURGE/DELIVERY PROBLEMS
· LEAD TIME NEEDED FOR MAJOR TRANSIT CORRIDOR
PROJECTS
o PROVIDE RESOURCES TO ADVANCE HIGH PRIORITY CRITICAL
BRIDGE, INTER REGIONAL CORRIDOR AND BEL lWA Y
BOTTLENECK PROJECTS
· BONDING PAID FROM NEW REVENUE SOURCE
· ESTABLISH DEBT BURDEN LIMITS FOR HUTDF
o PROVIDE EARLY NEW FUNDING FOR SYSTEM PARTNERS THAT
ALSO NEED HELP:
· CITY AND COUNTY STATE AID ACCOUNTS NOT BENEFITED
FROM USER FEE INCREASES SINCE 1988
· TRANSIT SERVICE CUTS MUST BE REVERSED
U:INMMA\2007 SessionlTransportation DocsINMMA Principles 2007.doc
A
NMMA TRANSPORTATION PRINCIPLES COMMENTARY
AUGUST 2006
We concur with the findings of the Minnesota Chamber of Commerce, the Minnesota
Transportation Alliance, the Association of Minnesota Counties and other transportation
advocates that significant new, additional funding is needed for transportation. We
believe that the best source of that new revenue should be the users of the system.
Resolving all of the policy issues that complicate this debate at one time is a daunting
task. Purity in purpose may not be achievable in the immediate future, but we should
debate the options with fundamental Principles as a basis for conversation. We suggest
that three Principles should fonn the basis of beginning that conversation:
1. RELIANCE ON INCREASED USER FEES
2. CERTAINTY OF FUNDING
3. PRUDENT FISCAL MANAGEMENT
I
RELIANCE ON INCREASED USER FEES TO FUND HIGHWAY
IMPROVEMENTS: I
. CONTRIBUTION PROPORTIONAL TO BURDEN IMPOSED
We believe that it is fair and appropriate that users of the transportation system
pay for the burdens that they impose on society and other users. To suggest
otherwise is to argue for cross subsidization of one user to another. It is not
always clear what constitutes a 'fair' fee contribution, and society as a whole
benefits from an efficient transportation system. For example, each citizen
benefits from lower priced, higher quality foods derived from use of an efficient
road system whether they use the road personally or not. Likewise, there is
societal value in providing effective transit services for people without auto
availability.
In considering how to balance costs and burdens imposed, it is convenient to
think in tenns of other 'utility' systems. In public water supply utility tenns, there
are two basic cost factors: 1) Water Opportunity Costs, and, 2) Water Use Costs
The Opportunity Cost is a fixed cost that ensures that the pumps and pipes are
in place and water is available when a user needs it. The Use Cost is a variable
cost that is detennined by how much water is used.
One option to consider for highway user fees would suggest that vehicle
registration and MVST revenues should cover the availability cost while fuel user
fees should cover the variable operating costs. Given the difficulty in calculating
costs and burdens, immediate action is recommended to gradually increase
vehicle registration fees, fuel user fees as well as 100% dedication of MVST
revenues. Further, the Legislature should review the costs of transportation
system construction and operation to detennine if a different mix of revenue
sources is appropriate.
· TRANSPARENCY OF RELATIONSHIP
We believe that the majority of consumers are willing to pay a fair fee for their
use of a service as long as there is a clear relationship between use cost paid.
The use of "Opt-In Tolling" on 1-394 is a clear example of direct linkage of
payment to user choices made. However, for most motorists, use of credit cards
for payments for fuel at the pump insulates the user from direct cost impact of
driving both by delaying the cash transfer and by mixing the fuel cost with other
card based purchases.
Most road users understand that fuel use is a measure actual miles driven.
Perhaps not surprisingly, many do not know that fuel user fee revenues are
constitutionally dedicated to "highway purposes". Further, there is some
qualification as to what is deemed a highway purpose. The Govemor and
MnlDOT should lead efforts to clarify fund source and use information. Future
transportation user fee increases should be accompanied by a clear statement of
what the funds will be used for and how and why the choice of rates and sources
was made.
· GENERATIONAL EQUITY
We believe that the transportation system should be funded on a "Pay as You
Go" basis with restrained use of borrowing. An entire generation of new drivers in
Minnesota has not experienced a user fee rate increase. In real dollar terms they
are paying only about 60% of the fuel user fee set in 1988. Real reductions were
made in vehicle registration fees in 2000. In other words, current users are not
paying at a rate that should have been adjusted incrementally over the past 18
years just to keep the buying power constant.
To a degree, borrowing funds via bonding to pay for current investments is a
wise choice if the benefits gained and costs avoided by advancing projects out
weigh the costs of the loan. To the extent that bonding is used to catch up to
deferred costs, future users are being asked to pay for costs that were passed on
from one generation of users to another. We also need to consider policy options
such as: 'What is an appropriate level of debt service that we can justify for
bonding without losing future generations' choice flexibility"?
Given the amount of past use of bonding for highway improvements, we suggest
that future borrowing costs should be paid by directly increasing current user fees
to cover the debt payment Further, the Legislature should establish a highway
bonding limit policy, comparable to limits on General Fund bonding, so that future
bonding program decisions can be made more rationally and without the political
rancor that has been evident in recent debates.
CERTAINTY OF FUNDING FOR TRANSIT & HIGHWAYS:
The current shortage of funds for highways and transit investments has created
an unsustainable program delivery challenge. Use of available funds to preserve
what has been built is a necessary choice but it leaves little hope for those
looking at unmet needs to improve the system. Consequently, there are
increasing efforts to go "around the system" to influence priorities and schedules.
Expanding project scope and cost inflation is a frequent issue but should be
anticipated. Frequently problems are not identified until more intensive design
2
work or site exploration has occurred just due to the nature of the planning and
design process. Delays and changed conditions mean that anticipated
improvements may not arrive when planned. As our funding gap. has deepened,
costs of steel and concrete have escalated, further exacerbating the problem.
Communities and businesses follow a tortured path without certainty that funds
will be available for implementation, further complicating the best public
involvement process and creating lack of trust needed to succeed.
A more dependable funding stream must be assured to provide credibility in the
project development process. In order for streamlining efforts to effectively
reduce the overburden of unnecessary tasks and processes, more work is
needed eartier in the project definition stage. In order for that eartier work to
occur, adequate resources and staff expertise must be maintained to drive the
process. The result will be fewer, surprises found later in the process. In short,
our programming process should maximize the match of expectations for
improvements with the certainty of delivery.
. LEGISLATIVE ACTION YS. REFERENDA REQUIREMENTS
In our representative form of government we elect office holders to make
decisions on our behalf. We elect people that we trust will make good decisions.
We are obligated to share opinions and information on choices to be made with
those representatives, recognizing the complexity of the decision. If trust is not
sustained, we have opportunities in future elections to change our choice of
representative.
In addition to this consideration, submitting needed funding increases to a
referendum adds uncertainty and delay to the delivery of improvements.
Deferring increases in funding until after a November ballot risks:
a. Rejection of needed revenue increases and lost investment
opportunities '
b. More years of inflation costs added to projects ready to go.
c. More years delay in the receipt of benefits in safety, congestion and
environmental impact gained from improvements.
. TRANSFER OF MOTOR VEHICLE SALES TAX REVENUE
FROM THE GENERAL FUND
Legislative action to transfer 100% of the share of MVST funds currently retained
in the General Fund is recommended for approval on November 7,2006. This
transfer is appropriate in that: , .
a. The action would provide some certain funds immediately on a secure
schedule.
b. The MVST revenues can be considered transportation user fees that
most payers assume are for that purpose
c. If the Legislature and Governor believe that a Constitutional
Amendment is needed to avoid 'raiding' by a future Legislature, the
issue can be left on the 2006 ballot for ratification of the 2006 Session
decision.
I
It is appropriate to note that if the MVST transfer is approved, the transportation
funding problem will not be solved. The new revenue available to MnlDOT will
3
only fill about 5% of the funding gap in the Metro area trunk highway system.
More steps must follow in the 2007 Session.
· RELIANCE ON UNCERTAIN FEDERAL FUNDING
Congress was many months late in passing SAFETEA-LU, the latest federal
funding reauthorization bill for transportation. Minnesota lost over $150 Million in
federal revenues due to the lateness of the new bill. Appropriations will
apparently be only 85% of the authorized funding levels and earmarking has
complicated the matching with state funds. It is apparent that there will not be
significant increases in future federal user fees to help fill our funding gap.
Consequently, future programming should be supported by a strong state fund
commitment sufficient to meet basic operating and construction program needs.
Federal funds should be used to accelerate critical projects in the base program.
· MINIMAL RELIANCE ON UNCERTAIN PRIVATE FUNDING
Mn!DOTs MnPASS Study results indicate that there are no potential tolling
projects in the Twin Cities area that will generate sufficient revenues to justify
100% private sector financing. Indications are that the most encouraging project
would generate only 25% of the revenues needed to cash flow. The remaining
funds would have to come from the public sector. How those funds would be
sourced is uncertain. How many and when funds would be needed is unknown at
this time. We suggest that we not rely on those funds to influence our choices
today. Rather, we should continue to seek opportunities in the future and
consider those projects when they are found viable.
· ANALYSIS TO DETERMINE 'EFFICIENCIES' THAT CAN
YIELD FUNDS FOR NEW PROJECTS
The Pawlenty Administration has made significant reductions in the Mn!DOT
administrative and management ranks over the past biennium. Additional cuts
are anticipated in the 2007-2008 Budget to be submitted to the Legislature in
January. Streamlining actions have been taken along with design! build and other
management strategies to reduce overhead costs. The results of these actions
are positive. These savings are not reflected in national statistics that were used
in 2005 to suggest greater efficiencies can result in transfer of revenues to
construction projects.
However, we need to be certain that we maintain the level of professional
expertise needed to develop and deliver the program that we ask for. We must
maintain the infrastructure already in place. We suggest that the Legislature ask
that a "Peer Review" of Mn/DOT operations, budgets and policies by respected
transportation professionals be conducted to ensure that organizational capacity
is maintained at the appropriate level for future program delivery.
It might also be of value to review the structural organization of highway and
transit service planning and delivery in the Twin Cities metropolitan area. Do we
need seven Regional Rail Authorities in addition to the Metropolitan Council?
Should the 'Twin Cities' transportation planning area be extended beyond the 8
County Mn/DOT Metro District boundaries? Are the highest priority projects being
scheduled for funding on a statewide basis?
4
We suggest that these questions deserve consideration. In the mean time, we
should not bank our future on additional savings until we conduct an audit of
costs and benefits that could be achieved and the legislative and administrative
actions that must be made to enable those changes to occur.
PRUDENT FISCAL MANAGEMENT: "PAY AS YOU GO"
MnlDOT has estimated that the i gap in funding needed to meet established
performance standards through the year 2030 is $24 Billion statewide, with a
shortage of $21 Billion in the Metro Area. We should not respond to this
challenge simply and by only raising new revenues immediately. We need to take
a more thoughtful view of how much of the gap needs to be filled and how quickly
to generate the most effective retum on our increased investment
,
. PHASE IN REVENUE INCREASES
The delivery of highway and transitway projects is a long and complicated
process. Public involvement and environmental analyses are crucial parts of the
process. Greatly accelerating implementation of critical projects must not come at
the full cost of abandoning these commitments. While there are several MnlDOT
projects in "Advanced Design" stages almost ready to go, is it is possible to ramp
up to a full flow of recommended new funding immediately? Is our construction
industry able to gear up quickly after recent hard times? How soon can priority
projects be brought on line and what investments in planning and project
development are needed to get there.
We also are concemed that key transit system additions to the Hiawatha Line are
controversial and not fully designed. These concems suggest we need to more
accurately determine how much new funding is needed in the next few years
while accounting for likely cost inflation and scope adjustment that are inevitable
to accommodate community needs and to avoid unwise 'comer cutting'.
. PROVIDE RESOURCES FOR HIGH PRIORITY MEGA PROJECTS
The lack of adequate funds for highways and capital investments in transit has
not been fully met by recent bonding and advanced federal fund use. There are
several critical bottleneck, beltway and Inter Regional Corridor projects remaining
in the near term 'mega project' category. These projects require large amounts of
money over short periods of time. Funding these projects from the regular
program would leave very few smaller projects funded for the foreseeable future.
Judicious use of bonding, as suggested above, removes these projects from the
programming process and removes major headaches from the system operation.
,
. PROVIDE EARLY NEW FUNDING FOR TRANSIT, CITIES AND
COUNTIES
The Metro Council has identified a system of transit ways that should be built by
2030 to meet future mobility needs. MnlDOT has assumed that these transit
services would be available when making their need forecasts. Reliance on
bonding for the state program has not providing increased funding for city and
county roads needed to supplement the state arterials. In fact, funding problems
at Mn/DOT have led to increased demands for city and county contributions to
project costs. As new funding is brought online, emphasis should be placed on
addressing the funding needs of transit providers, cities and counties.
U:\NMMA\2006 Session\Transportation\NMMA PRINCIPLES Commentary 2007.doc
5
NMMA TRANSPORTATION FACT SHEET
UNMET NEEDS - 2008-2030
MnlDOT developed performance standards for the Minnesota Trunk Highway System and analyzed
the current status of each route. Based on their review, the current funding stream was found to be
significantly deficient in meeting needs for improvements. Moreover, a significant portion of the
anticipated unmet funding needs, based on current fund distribution policies, was derived from
Metropolitan Area roadways. The following table summarizes MnlDOT's findings. The 'Funding Gap'
equals $1.048 per year on average ($23.9B I 23 years). This estimate does not include funding
shortfalls for transit or for City, Township and County roads needed to complement
M' ta' h' h t
mneso s Ig way sys em.
STATEWIDE METRO METRO SHARE
FUND NEEDS 2008-2030 $38.1 B $27B 70.9%
CURRENT REVENUE STREAM $14.5 B $6.5B 44.8%
FUNDING GAP $23.9 B $20.6 B 86.2%
MVST CONSTITUTIONAL AMENDMENT
The Constitutional Amendment on the November 2006 General Election ballot proposes to dedicate
100% of the Motor Vehicle Sales Tax revenues to transportation purposes compared to the current
54% dedication in state law. If approved in November, the transfer will be phased in over a five year
period, giving the Legislature time to adjust the General Fund Budget. MnlDOT estimates that the
new revenue to the Highway User Tax Distribution Fund (HUTDF) would grow from $37.5 M in 2008
to $187.3 M in 2012 and each year there after. The portion going to the state trunk highway system
would increase from $22.1 M to $110.3 M in 2012. This represents 10.6% of the estimated annual
statewide funding gap for trunk highways and 5.5% of the Metro gap at current distribution rates.
The Amendment provides that at least 40% of the transferred funds would be dedicated to public
transit uses, mostly in the Metropolitan Area. At this rate transit funding would increase from $22.5 M
in 2008 to $122.1 M in 2012 and each year beyond. For comparison, the Metropolitan Council has
estimated that the capital costs to add transit ways and increase bus use for just the Tier I routes in
their 2030 Transportation Policy Plan by 2020 are $665M - $1.2458 plus an additional $22 M for
operating costs each year. In summary, the MVST transfer would provide approximately $1.33 8 in
new transit revenues through 2020, about enough to implement the proposed Tier I transit services.
MnlDOT assumed that the Tier I and Tier II services will be in place when they prepared their 2030
forecasts noted above.
OTHER MVST FACTOIDS
· Minnesota cities would share $3.2 M in additional MVST funds in 2008 for MSA streets
· Minnesota cities would share $16.1 M in additional MVST funds in 2012 and beyond.
· NMMA area cities would share about $4.5 M in MVST funds in 2012 for MSA streets
· Minneapolis would receive about $1.9 M in additional MVST funds in 2012.
· Minnesota cities are responsible for more lane miles of city streets (31.608 miles) not eligible
for MSA funding than MnlDOT has on the state freeway and highway system (29,024 miles).
NMMA CONTACTS
Bob Benke, Director
Research & Advocacy Services
Office: 651-203-7259
Cell: 612-669-0274
bob@straussmomt.com
Becca Pryse
Ewald Consulting
Office: 651-265-7858
Cell: 612-490-2651
beccap@ewald.com
Bill Barnhart
Barnhart & Associates
Cell: 612-702-4931
bbarnha@cpintemet.com
U:\NMMA\2007 Session\Transportation DocsWMMA 2007 TRANSPORTATION FACT SHEET-doc
~z
z<t
o~
ZC>
O~
-0
~z
~~
I-z
00
:J-
...J!;(
...J....
-tt:
1-0
D.a..
Wen
OZ
z~
0....
o
jijM
:>....
CO
cN
oct^
0::'"
oct'"
ws:
>-w
CDZ
0::
oct
W
>-
-l
oct
u
m
u:
W
~
1Il
om
1-0
ZZ
0:;)
_u.
I-
is
o
oct
ZI-
Sz
Q.W
C)Z
zO
-Q.
O:E
ZO
:;)u
u.
M
....
o
N
N
....
o
N
....
....
o
N
o
....
o
N
a>
o
o
N
CD
o
o
N
W
m
:;)
o
Z
:;)
u.
W
Z
::::i
It>
N
N
It>
0>
~
~
CXl
....
o
....
N
..q
l")
~
~
It>
0>
....
<0
...
~
~
...
<0
...
It>
0>
~
~
<0
t'-
o
CXl
...
~
~
t'-
<0
...
t'-
It>
~
~
0>
...
It>
o
N
~
..q
..q
...
~
~
~
u.
o
l-
=>
:c
a:i
o
o
N
~
It> 0
0'"
~~
~O/l
octo>
Olo
lDo
:gN
g~
U. .5
E ....J--
Ol 0:: CI
o I- ~
-
C
Ol
E
>-
III
a..
....
N
~
o
CXl
~
~
~
~
N
l")
~
N
l")
~
<0
...
~
CXlO>
00
00
NN
~~
JIlJll
c <=
Ol Ol
UU
It> l")
>-
u.
.!:
It>
o
o
Eli
.f: 0
Ol...
Olo
CDN
m "1ii
W W ::l
W W U.
u.u. ~
0:: 0::
W We> Z
~ ~~
...J ...J ><
W WW
=> =>0
u. u.Z
M
o
CXl
~
o
<0
...
~
..q
<0
~
CXl
..q
~
N
l")
~
<0
..-
~
~
~
u.
o
l-
=>
:c
19m
o Ol
1--
.0 l;;
::l lD
en=>
..q
o
o
..q
~
o
o
<0_
...
~
o
N
l")
~
..q
o
l")
~
CXl
CXl
N
~
N
t'-
N
~
<0
It>
N
~
o
<0
...
~
o
~o
OlO
C.N
:Eo
g~
~~:!!
.!: I ,g
3l@g
~m-g
a.. ~o::
m
W
W
u.
CD
~
W
en
Z
W
o
:J
It)
10
o
N
~
o
It>
t'-
,~
:8
N
~
It>
t'-
...
~
o
I ~
,
I~
o
o
...
~
It>
't'-
!~
o
It>
~
U.
10
l-
=>
:c
c5:c
Q;I-
.2:-"0
'C c
o III
'C
a..~
.r::"O
.~~
:c_
_lll
00
c;g
,g0
III -
G>~
~~o
OOl...
oct CD <0
~:!;!
III III Ol
Ol C. Ol
~~u.
-'~ CD
Ol Ol lD
l;lD=>
c:03:
o Ol Ol
=o<=Ol
iii.r::E>
_~o.8
~~-=CG
CD
~
o
o
0_
...
~
~
~
o
o
N
~
o
o
l")
~
o
o
l")
~
o
o
N
~
:c
1-",
~ g:
en Z ~
o S ij;
zoo::
o 1-"0
CD .oc
:c .::l ::l
I- en u.
t'- co
o
o
<0
~
o
It>
l")
l")-
~
o
N
It>
~
0>
t'-
..q
~
CXl
l")
<0
~
N
t'-
<0
~
...
l")
<0
~
o
...
..q
~
..q
o
...
~
It>
l")
t'-
~
t'-
CXl
...
~
t'-
CXl
...
~
t'-
..q
...
~
CXl
o
...
~
...
t'-
~
It>
l")
~
u.
o
l-
=>
:c
'<;e
o
<0
~
o
o
o
...
.!:
Ol
lD
III
.r::
a..
0::
W
u.
en
Z
oct
0::
l-
I-
en
>
:E
a>
..q
o
t'-
~
It>
CXl
o
~
~
t'-
o
t'-
~
<0
<0
<0
~
It>
CXl
t'-
~
o
CXl
t'-
~
N
o
t'-
~
It>
..q
..q
~
:c
I-
3: '"
Ol Ol
ZE
m Q)
- iil
~o::
o
....
o
It>
...
~
N
0>
..q
~
It>
l")
...
~
It>
...
...
~
CXl
0>
~
N
t'-
~
CXl
..q
~
..q
N
~
:?
e>
'<;e
N
':f
'<;e
CXl
!:1
I-
Cii
Z
oct
0::
I-
'<;e
o
..q
-
o
C
Q)
E
Ol
o
III
a.
Q)
0::
O/l
'" ~
Q) III
O.r::
'i:: en
Oll-
en en
~>
:!!:E
!!!:c
1-1-
'<;e
o
o
...
.!:
Ol
lD
III
.r::
a..
~
.!:
It>
o
o
Eli
.50>
010
Olo
CDN
0::
W
U.
en
Z
oct
0::
l-
I-
m
>
:E
1;j
I-
~ lD
o Ol
=am
<=m
III III
Ol Q)
"O~
.~ oct
Ol 0
aii
1i)~
....
....
..q
It>
CXl
8
N
a
iii
~
'---
t'-
t'-
It>
~
~
I--
N
..q
CXl
lD
<=
o
'i':
o
~
...
CXl
t'-
o
-
~
III
.r:: ~
o
"0 l")
Ol CXl
.r:: CXl
o
III
~~
Ol N
Ol It>
en CXl
~
o
It>
t'-
~
I--
0>
<0
..q
~
~
~
~
W
Z
...J
~
o
I-
'"
..,
0::
>-
.c
."
"
to
c.
!
a.
N
....
l")
....
:E 10 '<t 0 0 0 10
<(-, '<t 10 ...... '<t r- CO
0::<( 0 C') '<t_ O C') ......
(')1- N ...... C') C\r ...... N
00
0::1- Ell Ell Ell Ell Ell Ell
c..
0 0 0 0 0 V
N CO 0 10 V CO
C') ~ C') ~ CO N. C') CO C')
...... 0 0
0 ll') ...... ll') N ...... ......
C') N N
^ 0 0
Ell Ell Ell Ell Ell Ell
-' 10 V 0 0 0 N
<( N CO ...... CO C") 0
ZI- t- V N_ 10 ll') CO
<(0 ......
-'I-
c..m
~
(/) Ell Ell Ell Ell Ell Ell
ll') 0 ll') 0 ll') C')
10 ...... t- t- O t-
C') eje ...... ~ ...... N ...... ...... ......
0
...... ll') ll')
0 N N
N 0 0
Ell Ell Ell Ell Ell Ell
ll') 0 ll') 0 ll') C')
10 ...... t- t- O t-
...... ...... N ...... ...... ......
N eje ~
0
...... ll') ll')
0 N N
N 0 0
Ell Ell Ell Ell Ell Ell
N N V 0 V CO
C') C') 10 ...... ll') (J)
...... ...... N ...... ...... ......
...... ~ eje
0
...... 0 0
0 N C')
(/) N 0 0
0::
<(
W Ell Ell Ell Ell Ell Ell
>-
-' N N V 0 V CO
<( C') C') 10 ...... ll') (J)
() ...... ...... N ...... ...... ......
(/) 0 eje ~
u:: 0
...... 0 0
0 N C')
N 0 0
Ell Ell Ell Ell Ell Ell
<D <D 0 <D 0
<D <D <D C')
,
(J) eje
0 0 0
0 ......
N 0
Ell Ell Ell Ell Ell Ell
<D <D 0 10 0
<D <D <D C')
,
CO ~
0
0 0 0
0 ......
N 0
Ell Ell Ell Ell Ell Ell
W W 0 W~W
WwfiJ <( <( 0 ~O W O::O~
() ~~ W~W WWW Zw () :i:ffi <(Vz
0:: 9~1- O::~I- WI- :s J: @w
~ O::I-(/)
-I- :i:z<( <( <( <(z<( ><( W~ (/) >
0 :i:(/) c..
Wwo:: o(/)W OW 0:: Wo:: W ZZ I-I-w
(/) Ww O::w I-W
~-' I->W o::wo:: o::>W 0:: -(/)0::
0 <(wz I-..J() I-WZ -'z w> ~>z
Z 1-<( 1-000W w<(z WO::W ;5w I- ZW <(:Ez
~ (/)(/) (/) (') (/)- :E (') (/) 0::
u.. :E 0(') > o::u..+
I- :E 1-0
CITY OF
NDOVE
1685 CROSSTOWN BOULEVARD N.W. . ANDOVER, MINNESOTA 55304 . (763) 755-5100
FAX (763) 755-8923 . WWW.CI.ANDOVER.MN.US
TO: Mayor and Councilmembers
FROM: Jim Dickinson, City Administrator
SUBJECT: Follow Up Information
DATE: August 29, 2006
At the August 22nd Council workshop, there was a request by the Council to have more
information distributed on the Motor Vehicle Sales Tax (MVST) Constitutional Amendment that
will be on the November ih ballot. I have attached a North Metro Mayors Association document
that should assist each Councilmember.
If you would like additional information, do not hesitate in contacting me.
NMMA Transportation Policy Position: TRANSPORTATION
BACKGROUND: The 2005 Legislature adopted a transportation funding bill that
would have provided significant increases in funding for roads, highways and
transit services in Minnesota. The 2006 Legislature again considered funding
increases but failed to reach consensus in the Conference Committee.
Consequently, the only immediate opportunity to increase funds for roads,
highways and transit services is support for the adoption of the Motor Vehicle
Sales Tax (MVST) Constitutional Amendment that will be on the November 7
ballot. The NMMA Board Members are hopeful that candidates for Governor and
the Legislature will address the escalating transportation funding gap during the
General Election campaign process and then follow through during the 2007
Session.
The gas tax, or, "fuel user fee", has not changed from the current rate of 20 cents
per gallon since fall of 1988 when gas sold at an average of about $1.00 per
gallon. If the same rate of tax as a percent of purchase price, 20.0%, prevailed at
today's price of about $3.00 per gallon, the fuel user fee would be 60 cents, or a
200% increase that would generate an additional $1.3 Billion per year to repair
and improve Minnesota's deteriorating transportation infrastructure and level of
service.
CURRENT POLICY POSITION: The NMMA Board of Directors recommends that
the Governor and Legislature collaborate in the development and passage of a
transportation funding package early in the 2007 Session so as to avoid late
session failure to reach agreement. Agreement is urgently needed to address
needs of city and county roads as well as the state roads that they supplement.
Further, a long term financing strategy for transit infrastructure and services is
needed to meet mobility needs of our work force, handicapped travelers and
increasing numbers of senior citizens. Towards this end, the NMMA offers the
fOllowing documents as resources and a framework for debate:
· "Transportation Principles" that should guide decision making, including,
o Reliance on increased user fees
o Provide certainty of funding
o Prudent Fiscal Management
· "Principles Commentary" that provides additional ideas for consideration
and rationale for recommended actions,
· "Transportation Fact Sheet" documenting the severity of the trunk highway
system funding gap based on 2005 estimates that predate recent annual
increases in highway construction costs due to inflation,
· A "Conceptual Funding Plan" offering a mix of fund sources for
consideration that can serve as a menu of choices and framework for
analysis and debate on the options available.
U:\NMMA\2007 Session\Transportation Docs\NMMA Transportation Policy Position 8.10.06.doc
...
NORTH METRO MAYORS
ASSOCIATION
TRANSPORTATION PRINCIPLES
FOR CONSIDERATION BY CANDIDATES FOR GOVERNOR AND
LEGISLATURE-2006 ELECTION CAMPAIGNS
OVERVIEW
The North Metro Mayors Association members believe that significant new revenues are needed
for Minnesota's transportation system. We have fallen behind prudent investment schedules and
are suffering safety, congestion, economic and quality of life impacts as a result. Our future well
being demands that we invest now to enhance our future ability to sustain our growing population
and our economic base that provides jobs and wealth to us all.
The problems created by chronic underinvestment in transportation are well known and have
been well documented in reports and media coverage. There were serious proposals under
consideration in the 2005 Legislature from the Governor, the Association of Minnesota Counties,
the Minnesota Chamber of Commerce, the Minnesota Transportation Alliance and individual
Legislators. These organizations and leaders should be congratulated for their efforts that raised
awareness of the need for significant new funding and for providing specific solutions to the
funding dilemma. Unfortunately, the funding bill agreed to by the Legislature did not meet with
the Governor's approval.
In the end, the 2006 Legislature failed to. reach agreement on transportation funding. Our
challenge now is to craft a plan that can receive bipartisan support in the Legislature as well as
the concurrence of the Governor in the 2007 Session. Toward that end, the NMMA puts forth for
consideration the attached PRINCIPLES that should guide the crafting of the increased
transportation funding legislation.
NMMA MEMBER CITIES
Andover
Anoka
Blaine
Brooklyn Center
Brooklyn Park
Champlin
Circle Pines
Coon Rapids
Crystal
Dayton
Lexington
Maple Grove
Minneapolis
Mounds View
New Brighton
New Hope
Oak Grove
Osseo
Ramsey
Spring Lake Park
CONTACTS: 651-203-7259
Steve Larson, Mayor, City of New Brighton, NMMA President
Mark Steffenson, Mayor, City of Maple Grove, NMMA Vice President
Joseph Strauss, NMMA Executive Vice President
Bob Benke, Director, Research and Advocacy Services
NMMA KEY PRINCIPLES
· RELIANCE ON INCREASED USER FEES TO FUND
HIGHWAY IMPROVEMENTS
o USER CONTRIBUTION PROPORTIONAL TO BURDEN IMPOSED
o TRANSPARENCY OF RELATIONSHIP
o GENERATIONAL EQUITY
· CERTAINTY OF FUNDING FOR TRANSIT & HIGHWAYS
o LEGISLATIVE ACTION FOR IMMEDIATE IMPACT WITHOUT
REFERENDA REQUIREMENTS
o 100% MVST TRANSFER
o MINIMAL RELIANCE ON UNCERTAIN SOURCES:
· FEDERAL FUNDING INCREASES
· TOLL FACILITIES
· EFFICIENCIES
· PRUDENTF~CAlMANAGEMENT
o PHASE IN OF REVENUE INCREASES:
· AVOID HIGHWAY PROGRAM SURGE/DELIVERY PROBLEMS
· LEAD TIME NEEDED FOR MAJOR TRANSIT CORRIDOR
PROJECTS
o PROVIDE RESOURCES TO ADVANCE HIGH PRIORITY CRITICAL
BRIDGE, INTER REGIONAL CORRIDOR AND BELTWAY
BOTTLENECK PROJECTS
· BONDING PAID FROM NEW REVENUE SOURCE
· ESTABLISH DEBT BURDEN LIMITS FOR HUTDF
o PROVIDE EARLY NEW FUNDING FOR SYSTEM PARTNERS THAT
ALSO NEED HELP:
· CITY AND COUNTY STATE AID ACCOUNTS NOT BENEFITED
FROM USER FEE INCREASES SINCE 1988
· TRANSIT SERVICE CUTS MUST BE REVERSED
U:INMMA\2007 Sesslon\Transportatlon DocsINMMA Principles 2007.doc
~
NMMA TRANSPORTATION PRINCIPLES COMMENTARY
AUGUST 2006
We concur with the findings of the Minnesota Chamber of Commerce, the Minnesota
Transportation Alliance, the Association of Minnesota Counties and other transportation
advocates that significant new, additional funding is needed for transportation. We
believe that the best source of that new revenue should be the users of the system.
Resolving all of the policy issues that complicate this debate at one time is a daunting
task. Purity in purpose may not be achievable in the immediate future, but we should
debate the options with fundamental Principles as a basis for conversation. We suggest
that three Principles should form the basis of beginning that conversation:
1. RELIANCE ON INCREASED USER FEES
2. CERTAINTY OF FUNDING
3. PRUDENT FISCAL MANAGEMENT
RELIANCE ON INCREASED USER FEES TO FUND HIGHWAY
IMPROVEMENTS:
· CONTRIBUTION PROPORTIONAL TO BURDEN IMPOSED
We believe that it is fair and appropriate that users of the transportation system
pay for the burdens that they impose on society and other users. To suggest
otherwise is to argue for cross subsidization of one user to another. It is not
always clear what constitutes a 'fair' fee contribution, and society as a whole
benefits from an efficient transportation system. For example, each citizen
benefits from lower priced, higher quality foods derived from use of an efficient
road system whether they use the road personally or not. Likewise, there is
societal value in providing effective transit services for people without auto
availability .
In considering how to balance costs and burdens imposed, it is convenient to
think in terms of other 'utility' systems. In public water supply utility terms, there
are two basic cost factors: 1) Water Opportunity Costs, and, 2) Water Use Costs
The Opportunity Cost is a fixed cost that ensures that the pumps and pipes are
in place and water is available when a user needs it. The Use Cost is a variable
cost that is determined by how much water is used.
One option to consider for highway user fees would suggest that vehicle
registration and MVST revenues should cover the availability cost while fuel user
fees should cover the variable operating costs. Given the difficulty in calculating
costs and burdens, immediate action is recommended to gradually increase
vehicle registration fees, fuel user fees as well as 100% dedication of MVST
revenues. Further, the Legislature should review the costs of transportation
system construction and operation to determine if a different mix of revenue
sources is appropriate.
· TRANSPARENCY OF RELATIONSHIP
We believe that the majority of consumers are willing to pay a fair fee for their
use of a service as long as there is a clear relationship between use cost paid.
The use of "Opt-In Tolling" on 1-394 is a clear example of direct linkage of
payment to user choices made. However, for most motorists, use of credit cards
for payments for fuel at the pump insulates the user from direct cost impact of
driving both by delaying the cash transfer and by mixing the fuel cost with other
card based purchases.
Most road users understand that fuel use is a measure actual miles driven.
Perhaps not surprisingly, many do not know that fuel user fee revenues are
constitutionally dedicated to "highway purposes". Further, there is some
qualification as to what is deemed a highway purpose. The Governor and
MnlDOT should lead efforts to clarify fund source and use information. Future
transportation user fee increases should be accompanied by a clear statement of
what the funds will be used for and how and why the choice of rates and sources
was made.
· GENERATIONAL EQUITY
We believe that the transportation system should be funded on a "Pay as You
Go" basis with restrained use of borrowing. An entire generation of new drivers in
Minnesota has not experienced a user fee rate increase. In real dollar terms they
are paying only about 60% of the fuel user fee set in 1988. Real reductions were
made in vehicle registration fees in 2000. In other words, current users are not
paying at a rate that should have been adjusted incrementally over the past 18
years just to keep the buying power constant.
To a degree, borrowing funds via bonding to pay for current investments is a
wise choice if the benefits gained and costs avoided by advancing projects out
weigh the costs of the loan. To the extent that bonding is used to catch up to
deferred costs, future users are being asked to pay for costs that were passed on
from one generation of users to another. We also need to consider policy options
such as: 'What is an appropriate level of debt service that we can justify for
bonding without losing future generations' choice flexibility"?
Given the amount of past use of bonding for highway improvements, we suggest
that future borrowing costs should be paid by directly increasing current user fees
to cover the debt payment. Further, the Legislature should establish a highway
bonding limit policy, comparable to limits on General Fund bonding, so that future
bonding program decisions can be made more rationally and without the political
rancor that has been evident in recent debates.
CERTAINTY OF FUNDING FOR TRANSIT & HIGHWAYS:
The current shortage of funds for highways and transit investments has created
an unsustainable program delivery challenge. Use of available funds to preserve
what has been built is a necessary choice but it leaves little hope for those
looking at unmet needs to improve the system. Consequently, there are
increasing efforts to go "around the system" to influence priorities and schedules.
Expanding project scope and cost inflation is a frequent issue but should be
anticipated. Frequently problems are not identified until more intensive design
2
work or site exploration has occurred just due to the nature of the planning and
design process. Delays and changed conditions mean that anticipated
improvements may not arrive when planned. As our funding gap has deepened,
costs of steel and concrete have escalated, further exacerbating the problem.
Communities and businesses follow a tortured path without certainty that funds
will be available for implementation, further complicating the best public
involvement process and creating lack of trust needed to succeed.
A more dependable funding stream must be assured to provide credibility in the
project development process. In order for streamlining efforts to effectively
reduce the overburden of unnecessary tasks and processes, more work is
needed earlier in the project definition stage. In order for that earlier work to
occur, adequate resources and staff expertise must be maintained to drive the
process. The result will be fewer. surprises found later in the process. In short,
our programming process should maximize the match of expectations for
improvements with the certainty of delivery.
· LEGISLATIVE ACTION V5. REFERENDA REQUIREMENTS
In our representative form of government we elect office holders to make
decisions on our behalf. We elect people that we trust will make good decisions.
We are obligated to share opinions and information on choices to be made with
those representatives, recognizing the complexity of the decision. If trust is not
sustained, we have opportunities in future elections to change our choice of
representative.
In addition to this consideration, submitting needed funding increases to a
referendum adds uncertainty and delay to the delivery of improvements.
Deferring increases in funding until after a November ballot risks:
a. Rejection of needed revenue increases and lost investment
opportunities
b. More years of inflation costs added to projects ready to go.
c. More years delay in the receipt of benefits in safety, congestion and
environmental impact gained from improvements.
· TRANSFER OF MOTOR VEHICLE SALES TAX REVENUE
FROM THE GENERAL FUND
Legislative action to transfer 100% of the share of MVST funds currently retained
in the General Fund is recommended for approval on November 7,2006. This
transfer is appropriate in that:
a. The action would provide some certain funds immediately on a secure
schedule.
b. The MVST revenues can be considered transportation user fees that
most payers assume are for that purpose
c. If the Legislature and Governor believe that a Constitutional
Amendment is needed to avoid 'raiding' by a future Legislature, the
issue can be left on the 2006 ballot for ratification of the 2006 Session
decision.
It is appropriate to note that if the MVST transfer is approved, the transportation
funding problem will not be solved. The new revenue available to Mn/DOT will
3
only fill about 5% of the funding gap in the Metro area trunk highway system.
More steps must follow in the 2007 Session.
· RELIANCE ON UNCERTAIN FEDERAL FUNDING
Congress was many months late in passing SAFETEA-LU, the latest federal
funding reauthorization bill for transportation. Minnesota lost over $150 Million in
federal revenues due to the lateness of the new bill. Appropriations will
apparently be only 85% of the authorized funding levels and earmarking has
complicated the matching with state funds. It is apparent that there will not be
significant increases in future federal user fees to help fill our funding gap.
Consequently, future programming should be supported by a strong state fund
commitment sufficient to meet basic operating and construction program needs.
Federal funds should be used to accelerate critical projects in the base program.
· MINIMAL RELIANCE ON UNCERTAIN PRIVATE FUNDING
Mn!DOT's MnPASS Study results indicate that there are no potential tolling
projects in the Twin Cities area that will generate sufficient revenues to justify
100% private sector financing. Indications are that the most encouraging project
would generate only 25% of the revenues needed to cash flow. The remaining
funds would have to come from the public sector. How those funds would be
sourced is uncertain. How many and when funds would be needed is unknown at
this time. We suggest that we not rely on those funds to influence our choices
today. Rather, we should continue to seek opportunities in the future and
consider those projects when they are found viable.
· ANALYSIS TO DETERMINE 'EFFICIENCIES' THAT CAN
YIELD FUNDS FOR NEW PROJECTS
The Pawlenty Administration has made significant reductions in the Mn/DOT
administrative and management ranks over the past biennium. Additional cuts
are anticipated in the 2007-2008 Budget to be submitted to the Legislature in
January. Streamlining actions have been taken along with design! build and other
management strategies to reduce overhead costs. The results of these actions
are positive. These savings are not reflected in national statistics that were used
in 2005 to suggest greater efficiencies can result in transfer of revenues to
construction projects.
However, we need to be certain that we maintain the level of professional
expertise needed to develop and deliver the program that we ask for. We must
maintain the infrastructure already in place. We suggest that the Legislature ask
that a 'Peer Review" of Mn!DOT operations, budgets and policies by respected
transportation professionals be conducted to ensure that organizational capacity
is maintained at the appropriate level for future program delivery.
It might also be of value to review the structural organization of highway and
transit service planning and delivery in the Twin Cities metropolitan area. Do we
need seven Regional Rail Authorities in addition to the Metropolitan Council?
Should the 'Twin Cities' transportation planning area be extended beyond the 8
County Mn/DOT Metro District boundaries? Are the highest priority projects being
scheduled for funding on a statewide basis?
4
We suggest that these questions. deserve consideration. In the mean time, we
should not bank our future on additional savings until we conduct an audit of
costs and benefits that could be achieved and the legislative and administrative
actions that must be made to enable those changes to occur.
PRUDENT FISCAL MANAGEMENT: "PAY AS YOU GO"
Mn/DOT has estimated that the gap in funding needed to meet established
performance standards through the year 2030 is $24 Billion statewide, with a
shortage of $21 Billion in the Metro Area. We should not respond to this
challenge simply and by only raising new revenues immediately. We need to take
a more thoughtful view of how much of the gap needs to be filled and how quickly
to generate the most effective return on our increased investment
· PHASE IN REVENUE INCREASES
The delivery of highway and transitway projects is a long and complicated
process. Public involvement and environmental analyses are crucial parts of the
process. Greatly accelerating implementation of critical projects must not come at
the full cost of abandoning these commitments. While there are several Mn/DOT
projects in "Advanced Design" stages almost ready to go, is it is possible to ramp
up to a full flow of recommended new funding immediately? Is our construction
industry able to gear up quickly after recent hard times? How soon can priority
projects be brought on line and what investments in planning and project
development are needed to get there.
We also are concerned that key transit system additions to the Hiawatha Line are
controversial and not fully designed. These concerns suggest we need to more
accurately determine how much new funding is needed in the next few years
while accounting for likely cost inflation and scope adjustment that are inevitable
to accommodate community needs and to avoid unwise 'corner cutting'.
. PROVIDE RESOURCES FOR HIGH PRIORITY MEGA PROJECTS
The lack. of adequate funds for highways and capital investments in transit has
not been fully met by recent bonding and advanced federal fund use. There are
several critical bottleneck, beltway and Inter Regional Corridor projects remaining
in the near term 'mega project' category. These projects require large amounts of
money over short periods of time. Funding these projects from the regular
program would leave very few smaller projects funded for the foreseeable future.
Judicious use of bonding, as suggested above, removes these projects from the
programming process and removes major headaches from the system operation.
. PROVIDE EARLY NEW FUNDING FOR TRANSIT, CITIES AND
COUNTIES
The Metro Council has identified a system of transit ways that should be built by
2030 to meet future mobility needs. Mn/DOT has assumed that these transit
services would be available when making their need forecasts. Reliance on
bonding for the state program has not providing increased funding for city and
county roads needed to supplement the state arterials. In fact, funding problems
at Mn/DOT have led to increased demands for city and county contributions to
project costs. As new funding is brought online, emphasis should be placed on
addressing the funding needs of transit providers, cities and counties.
U:INMMA\2006 Session\TransportationlNMMA PRINCIPLES Commentary 2007.doc
5
NMMA TRANSPORTATION FACT SHEET
UNMET NEEDS - 2008-2030
MnlDOT developed performance standards for the Minnesota Trunk Highway System and analyzed
the current status of each route. Based on their review, the current funding stream was found to be
significantly deficient in meeting needs for improvements. Moreover, a significant portion' of the
anticipated unmet funding needs, based on current fund distribution policies, was derived from
Metropolitan Area roadways. The following table summarizes Mn/DOT's findings. The 'Funding Gap'
equals $1.048 per year on average ($23.9B 123 years). This estimate does not include funding
shortfalls for transit or for City, Township and County roads needed to complement
Mi t I h. h t
nneso a s Ilgl way sys em.
STATEWIDE METRO METRO SHARE
FUND NEEDS 2008-2030 $38.1 B $27 B 70.9%
CURRENT REVENUE STREAM $14.5 B $6.5 B 44.8%
FUNDING GAP $23.9 B $20.6 B 86.2%
MVST CONSTITUTIONAL AMENDMENT
The Constitutional Amendment on the November 2006 General Election ballot proposes to dedicate
100% of the Motor Vehicle Sales Tax revenues to transportation purposes compared to the current
54% dedication in state law. If approved in November, the transfer will be phased in over a five year
period, giving the Legislature time to adjust the General Fund Budget. Mn/DOT estimates that the
new revenue to the Highway User Tax Distribution Fund (HUTDF) would grow from $37.5 M in 2008
to $187.3 M in 2012 and each year there after. The portion going to the state trunk highway system
would increase from $22.1 M to $110.3 M in 2012. This represents 10.6% of the estimated annual
statewide funding gap for trunk highways and 5.5% of the Metro gap at current distribution rates.
The Amendment provides that at least 40% of the transferred funds would be dedicated to public
transit uses, mostly in the Metropolitan Area. At this rate transit funding would increase from $22.5 M
in 2008 to $122.1 M in 2012 and each year beyond. For comparison, the Metropolitan Council has
estimated that the capital costs to add transit ways and increase bus use for just the Tier I routes in
their 2030 Transportation Policy Plan by 2020 are $665M - $1.2458 plus an additional $22 M for
operating costs each year. In summary, the MVST transfer would provide approximately $1.33 8 in
new transit revenues through 2020, about enough to implement the proposed Tier I transit services.
Mn/DOT assumed that the Tier I and Tier II services will be in place when they prepared their 2030
forecasts noted above.
OTHER MVST FACTOIDS
· Minnesota cities would share $3.2 M in additional MVST funds in 2008 for MSA streets
· Minnesota cities would share $16.1 M in additional MVST funds in 2012 and beyond.
· NMMA area cities would share about $4.5 M in MVST funds in 2012 for MSA streets
· Minneapolis would receive about $1.9 M in additional MVST funds in 2012.
· Minnesota cities are responsible for more lane miles of city streets (31.608 miles) not eligible
for MSA funding than MnlDOT has on the state freeway and highway system (29,024 miles).
NMMA CONTACTS
Bob Benke, Director
Research & Advocacy Services
Office: 651-203-7259
Cell: 612-669-0274
bob@straussmomt.com
Becca pryse
Ewald Consulting
Office: 651-265-7858
Cell: 612-490-2651
beccap@ewald.com
Bill Bamhart
Bamhart & Associates
Cell: 612-702-4931
bbarnha@cpintemet.com
U:\NMMA\2007 Session\Transportation Docs\NMMA 2007 TRANSPORTATION FACT SHEET. doc
>-
...JZ
z<l:
O~
zc)
02!:
-0
....Z
~~
....z
00
:J-
...JI-
...J~
-0::
....0
a.a..
Wen
UZ
z~
01-
U
OiM
:I'"
cO
cN
oct^
0:: tit
oct tit
w::
>-w
coz
0::
oct
W
>-
-I
oct
u
en
ii:
W
~
al
oen
1-0
ZZ
0::J
_u.
l-
e
o
oct
ZI-
5z
Q.W
C)Z
zO
-Q.
0:::;:
zo
~u
M
...
o
N
N
...
o
N
...
...
o
N
o
...
o
N
Cl>
o
o
N
co
o
o
N
W
en
::J
o
Z
::J
u.
W
Z
:J
LO
N
N
~
<Xl
...
o
~
...
(0
...
~
...
(0
...
~
o
<Xl
...
~
r--
(0
...
~
LO
o
N
~
"It
"It
...
....
u.
o
l-
=>
::c
...
LO
Cl>
~
N
"It
<')
~
LO
0)
~
LO
0)
<I)
(0
r--
~
r--
LO
~
0)
...
<I)
~
-
c
'"
E
~
Q.
:E
'"
o
cO
o
o
N
(;:
LOO
0'"
00
.N
~O/l
octo)
"'0
"'0
"'N
~>-
gu.
C
u. ,-
-' ...
0::0
I-~
N
~
o
<Xl
<I)
~
<I)
~
N
<')
~
N
<')
~
(0
...
....
<Xl 0)
00
00
NN
(;:(;:
2l2l
c c
'" '"
00
LO <')
>-
u.
.!;
LO
o
o
~
.f; 0
01...
"'0
lllN
en c;;
W W :I
W W u..
~ ~ ~
W We> Z
~ ~~
-' -' ><
W WW
=> =>0
u.. u. Z
M
o
<Xl
~
o
(0
...
~
"It
(0
<I)
<Xl
"It
<I)
N
<')
<I)
(0
...
~
<I)
<I)
u..
o
l-
=>
::c
m '"
15 m
1-::
.a",
:I '"
en=>
"It
o
o
"It
~
o
o
(0_
...
~
o
N
<')
~
"It
o
<')
<I)
<Xl
<Xl
N
<I)
N
r--
N
<I)
(0
LO
N
~
o
(0
...
....
o
~o
"'0
a.N
:::;:'0
g~
NLO",
<l)r--c
c 1 0
'CD @U
0.....-6
~(OQ)
0.. ~o::
en
W
W
u..
III
~
W
en
Z
W
o
:J
It)
o
o
N
~
o
LO
r--
~
o
o
N
<I)
LO
r--
...
~
o
LO
...
<I)
o
o
...
<I)
LO
r--
, ~
o
LO
....
u..
o
l-
=>
::c
co
6::c
!fl-
~-g
0'"
.'"
0..8,
.r:.'O
O)"i::
I~
-'"
o 0
c'E
~t)
~ >
'" '"
~~O
0"'...
<(Ill (0
I!!~
'" '" '"
'" a. '"
>-",u..
"I:t.2.....
~ ~ '"
'" '" '"
1>"'=>
c:Eo;:
o '" '"
gOc",
Ill.r:.E1>
......:t!o..a
69$~m
~
o
o
o
~
~
~
o
o
N
....
o
o
<')
~
o
o
<')
~
o
o
N
<I)
(/)
o
Z
o
III
::c
I-
::c
I- '"
0;: '"
'" :I
Z lii
10 ij;
00::
1-'0
.a '"
:I :I
(/)u..
....
o
o
(0
<I)
o
LO
<')
M
~
o
N
LO
<I)
0)
r--
"It
<I)
<Xl
<')
(0
~
N
r--
(0
~
...
<')
(0
~
o
...
"It
....
co
"It
o
...
~
LO
<')
r--
~
r--
<Xl
...
<I)
r--
<Xl
...
~
r--
"It
...
<I)
<Xl
o
...
~
...
r--
<I)
LO
<')
....
u..
o
l-
=>
::c
'0'<
o
(0
~
o
o
o
...
,!;
'"
'"
'"
.r:.
0..
0::
W
u..
(/)
Z
<(
0::
l-
I-
(/)
>
:::;:
::c
I-
~ [{l
Z ~
m '"
- ij;
~o::
01
"It
o
r--
~
LO
<Xl
o
"It
~
r--
o
r--
<I)
(0
(0
(0
~
LO
<Xl
r--
<I)
o
<Xl
r--
~
N
o
r--
~
LO
"It
"It
~
o
...
o
LO
...
~
N
0)
"It
<I)
LO
<')
...
~
LO
...
...
~
<Xl
0)
~
N
r--
<I)
<Xl
"It
~
"It
N
~
:::;:
e>
'0'<
N
:::;:
'0'<
<Xl
~
I-
1ii
Z
<(
0::
I-
'0'<
o
"It
~
o
o
o
...
.!;
II>
'"
to
.r:.
0..
0::
W
u.
(/)
Z
<(
0::
l-
I-
(/)
>
:::;:
...
...
"It
LO
<Xl
~
N
(5
;a
<I)
f---
r--
r--
LO
..,f
<I)
f---
N
"It
<Xl
'"
'"
o
"" <I)
gf---
...
<Xl
r--
(;
-
~
'"
.r:. ~
0-
'0 <')
II> <Xl
.r:. <Xl
o
'"
~~
II> N
'" LO
(/) <Xl
<I)
-
o
LO
r--
~
-
0)
(0
"It
....
-
o
'E
II>
E
'"
o
'"
C.
'"
0::
O/l",
'" ~
II> '"
O.r:.
.~ (/)
"'I-
(/)(/)
~>
~:::;:
~::c
1-1-
(;:
.!;
LO
o
o
~
.~ en
010
11>0
lllN
1;j
I-
~ '"
o II>
=Om
",(/)
'" to
II> Q)
'0 ~
.~ <(
.! ~
.l9iii
(/):::;:
<I)
~
:::
W
Z
-'
~
o
I-
m
..,
'"
~
"0
Gl
l;;
a.
Gl
It
N
...
M
...
.'
:E <D '<t a a a <D
<(-I '<t <D .... '<t ..... 00
0::<( a M '<t a M ....
"l- N .... M N .... N
00
0::1- ~ ~ ~ ~ ~ ~
a..
a a a a a '<t
N 00 a <D '<t 00
M ~ M ~ 00 N M 00 M
.... 0 .... 0 N .... ....
a It) It)
M N N
^ ci ci
~ ~ ~ ~ ~ ~
-I <D '<t a a a N
<( N 00 .... 00 M a
zl- ..... '<t N <D It) 00
<(0 ....
-II-
a.. CD
::l
(/) ~ ~ ~ ~ ~ ~
It) a It) a It) M
<D .... ..... ..... a .....
M ~ .... ~ .... N .... .... ....
0 0
.... It) It)
a N N
N ci ci
~ ~ ~ ~ ~ ~
It) a It) a It) M
<D .... ..... ..... a .....
~ .... ~ .... N .... .... ....
N 0 0
.... It) It)
a N N
N ci ci
~ ~ ~ ~ ~ ~
N N '<t a '<t 00
M M <D .... It) Ol
.... .... N .... .... ....
.... ~ ~
0 0
.... a a
a N M
(/) N ci ci
0::
<(
W ~ ~ ~ ~ ~ ~
>-
-I N N '<t a '<t 00
<( M M <D .... It) Ol
0 .... .... N .... .... ....
(/) a ~ ~
u:: 0 0
.... a 0
a N M
N ci ci
~ ~ ~ ~ ~ ~
<D <D a <D a
<D , <D <D M
Ol ~
a a a
a ....
N ci
~ ~ ~ ~ ~ ~
<D <D a <D a
<D , <D <D M
00 ~
a a a
a ....
N ci
~ ~ ~ ~ ~ ~
W W 0 w~w
~wfil <( <( 0 ::l0 W O::a::l
0 ~~ 0 3:[fl
a:: w~w www Zw ::s <('<tZ
::l ~~~ O::I-(/) O::::ll- wI- I@w
-I- <( <( <(z<( ><( W::l
0 3:(/) a.. zz (/) >
wwa:: O(/)W owo:: wa:: w I-I-w
(/) Ww a::w I-w
~-I I->W a::wa:: a::>w 0:: -(/)a::
0 <(wz 1--10 I-WZ -IZ w> ~>z
Z 1-<( I-a::w w<(Z wo::w ~w I- ZW <(:EZ
::l (/)(/) (/) " :E(/)- :E " (/) 0::
u.. 0" > o::u..+
I- :E 1-0