HomeMy WebLinkAboutWK August 29, 2006 1685 CROSSTOWN BOULEVARD N.W. . ANDOVER, MINNESOTA 55304. (763) 755-5100 FAX (763) 755-8923 . WWW.CI.ANDOVER.MN.US City Council Workshop Tuesday, August 29, 2006 Conference Rooms A & B 1. Call to Order - 6:00 p.m. 2. Open Space Referendum Discussion 3. 2007 Proposed Budget & 2007 Tax Levy Review 4. 2007-2011 Capital Improvement Plan Review 5. Other Business 6. Adjournment (i) Sl\NDbVE~ 1685 CROSSTOWN BOULEVARD N.W. . ANDOVER, MINNESOTA 55304. (763) 755.5100 FAX (763) 755-8923 . WWW.CI.ANDOVER.MN.US TO: Mayor and Council Members FROM: Jim Dickinson, City Administrator SUBJECT: Open Space Referendum Discussion DATE: August 29, 2006 INTRODUCTION An Andover Council 2005-2006 goal is to explore open space preservation. Questions relative to open space were integrated into the recent community survey conducted by Decision Resources Inc. which indicated that there was strong support for the City to purchase open space for the purpose of preservation. The survey also indicated that residents would be supportive of an increase in property taxes to support open space preservation in the amount $20.60 on an annual basis. Council discussion over these results has lead to the potential consideration of an open space referendum as part of the November 2006 general election. In response to that discussion the Council created the "Open Space Task Force" on July 18, 2006 (refer to attached Council meeting minutes and Open Space Task Force member listing) to prepare a report for presentation to the Council on September 5, 2006. DISCUSSION The Open Space Task Force has meet four times over the month and has covered a lot of ground and at their last meeting have prepared a ballot question and a "Commonly Asked Questions" sheet for the Council's review (attached). The ballot question has been discussed at each meeting of the task force and has undergone review by the Trust For Public Land and the City's bond counsel. The "Commonly Asked Questions" sheet is a compilation of reference materials gathered through the task force's research and updated to meet the needs of the City of Andover. City Staff, City Administrator and City Planner, have assisted the task force along the way and have utilized the insight of bond counsel, Biggs & Morgan, and fiscal advisor, Ehlers & Associates, to assure that legal and fiscal requirements are met. The actual resolution that will be presented to the Council to approve ordering an open space ballot question is being prepared by Briggs & Morgan. The City Clerk has indicated that the deadline for a ballot question for the November 2006 general election would be September 15th. At that time the exact wording for the ballot question is needed. Also since the last meeting the Council has schedule before September 15th is September 5th, the Council will need to decide at the September 5th Council meeting whether or not an open space ballot question will be ordered. Update on Potential Open Space Referendum July 18, 2006 Page 2 of3 BUDGET AVAILABILITY The community survey cost was $13,750. The City did budget $20,000 for community survey related expenses, $6,250 is currently available to assist with incidental expenses if it is the Council's desire to pursue placing an open space referendum on the November 2006 general election. If additional budget is necessary, Finance would be able to provide suggested funding sources. ACTION REOUESTED The Council is requested to receive a presentation from the Open Space Task Force and City Staff, review and discuss the progress made, and provide direction on the next steps the Council would like to take. Respectfully submitted, Jim Dickinson Attachments: -City Council meeting minutes -Open Space Task Force member listing -Proposed ballot question -Commonly Asked Questions sheet Regular Andover City Council Meeting Minutes - July 18, 2006 Page 19 Motion carried unanimously. (RES. Minnesota on May 23,2003. the tax forfeit sale for purch Mr. Dickinson r . wed the information with the Council. y Jacobson, Seconded by Orttel, to decline the purchase of the property. ously. UPDATE ON POTENTIAL OPEN SPACE REFERENDUM City Administrator Dickinson stated an Andover Council 2005-06 goal is to explore open space preservation. Questions relative to open space were integrated into the recent community survey conducted by Decision Resources, Inc., which indicated that there was strong support for the City to purchase open space for the purpose of preservation. The survey also indicated that residents would be supportive of an increase in property taxes to support open space preservation in the amount of $20.60 on an annual basis. Mr. Dickinson reviewed the staff report with the Council. Councilmember Trude thought this has been an important issue to the Mayor. She noted she drew up a resolution appointing members to a task force committee. The City Council hereby: 1. Authorizes the creation of an Open Space Task Force consisting of those persons whose names appear on the list as part of Packet Item 19 in the Council packet of July 18,2006, with the limitation that only one member per household may serve as a voting member. 2. Appoints Mayor Mike Gamache and Councilmember Mike Knight to represent the Council on this Task Force authorizing them to work with staff to organize the meetings, set the agendas and agree on the appointment of a Chair. 3. Directs the Open Space Task Force to prepare a report for presentation to the City Council on September 5, 2006, to answer the following question: "If Andover residents voted to increase their taxes in order to purchase $2 million of open space, what are the characteristics of the land that should be sought to be purchased with these funds?" 4. If the City Council votes to authorize a referendum be placed on the November ballot for the purchase of Open Space, the Task Force is authorized to prepare an article of information on the referendum for publication in the City newsletter and other media Regular Andover City Council Meeting Minutes - July 18, 2006 Page 20 sources prior to the election. 5. The Open Space Task Force would be dissolved after completion of these tasks. 6. All meetings of the Open Space Task Force shall comply with the Open Meeting law, with notices posted, and other council members welcomed to attend. Motion by Trude, Seconded by Ortte!, to approve the proposed resolution. Councilmember Jacobson stated in general he did not oppose this except for item 3. He thought they need to defme what they mean and not just the characteristics of the land. They need to defme what they really mean by open space. Mr. Dickinson asked Decision Resources this question and when the survey question was asked it did not mean the development of "Ball fields or park specifics". The Council thought they need to define open space for the ballot. Councilmember Knight thought they need to lean heavily on the existing organizations out there. The Council discussed with staff what the committee should look at regarding open space. I~ omrioo unanllnow<ly. (RES. R09! ~ PPROVE POLICY FOR NAMING AND RENAMING OF PARKS, PARK FACILITIES ~ S AND CITY CONTROLLED AREAS ) At the July 5, 2 Council meeting the Council reviewed a proposed City of er "Policy for Naming and Ren . of Parks, Park Facilities, Trails and Open Space" er the review staff was directed to incorpo e various details discussed at the meet" and bring back to the Council for future consideration. Councilmembe rude stated she has a couple of changes. During their discussion re were a couple of 0 er things they looked at and most of the time they do not want to go throug s just for e basic parks. They already have a system. Item A should read "City Park naming . occ during the preliminary plat review process. Parks shall generally be named after the cation, subdivision neighborhood adjacent or nearby street or prominent natural feature near RESIDENTS Sara Jablonecki Chip Stratman Corey & Tanya Weisser Pam Donato Lyle Bradley Douglas Falk Bruce Cutter Mary Holmes Mark & Randi Miskowiec Gretchen Sabel Winslow Holasek Dennis Raab COUNCILMEMBERS Mike Gamache Mike Knight OPEN SPACE TASK FORCE Ballot Question Presenration of Water, Wildlife and Natural Habitat Areas Shall the City of Andover be authorized to issue general obligation bonds not to exceed $2,000,000 to finance the acquisition ofland from willing sellers for the preservation of: natural areas, water and air quality, wildlife habitat and to enhance the trail system? Spending would be subject to an annual audit. Yes No BY VOTING 'YES' ON THIS BALLOT, YOU ARE VOTING FOR A PROPERTY TAX INCREASE. THIS PROPOSAL WOULD COST APPROXIMATELY $8 PER YEAR FOR FIFTEEN YEARS FOR EACH $100,000 IN PROPERTY VALUE ON MOST PROPERTY TYPES. Commonly Asked Questions 1. What will the city accomplish with this dedicated funding? Andover will use the funds to acquire land from willing sellers for protection of water and air quality, preservation of wildlife habitat and natural amenities. 2. How will the city do this? The city will acquire land and/or enter into land preservation agreements to permanently protect natural areas. 3. Where would the lands be located? Land throughout the city will be eligible for consideration. 4. What can be accomplished with $2,000,000? An initial investment by Andover residents will open the door to matching funds from public agencies, nonprofit organizations and corporate sponsors. Preservation can be accomplished in a variety of ways, including the purchase of property, dedication of conservation easements, purchase or transfer of development rights and park dedication. By utilizing a combination of funding sources and methods, the amount of land that can be protected will be multiplied. 5. How long will these properties be protected? The land will be protected in perpetuity. 6. How much will property taxes increase to fund this program and for how long? A property owner will pay about $8 per year for each $100,000 of assessed property value for fifteen years. The annual tax impact is expected to decrease in future years due to growth in the city's tax base. 7. How will the city ensure the program is effective? A citizen advisory committee appointed by the City Council will review spending and expenditures will be audited annually. This information will be open to public review. . 8. Does the city have experience with similar projects? This year the city acquired more than 20 acres of natural habitat area and reached agreement to protect an additional 10 acres along the same wildlife corridor near Hanson Boulevard and 161 51 Avenue. The agreement includes a trail connection to the existing system along Hanson Boulevard. A restoration project in Kelsey Round Lake Park was also completed with funding from with the Department of Natural Resources and the Natural Resources Conservation Service. The city is currently working with the DNR, Coon Creek Watershed Management District, Tree Trust and Anoka County Parks to restore native plants in wetlands along Coon Creek. With dedicated funding a city wide effort to preserve natural areas can be implemented. 9. What will the effect be on my property? Local and national research has shown that natural areas positively affect home values and consistently rank high on lists of home buyer preferences. 10. Are there natural areas remaining in Andover that need to be protected? Yes. Approximately 40% of the city remains undeveloped. However, The Metropolitan Council forecasts the city's population will grow to 39,000 people with the addition of as many as 4,000 new homes by the year 2020. There is presently an opportunity to preserve unique natural areas from development for the enjoyment of residents now and in the years to come. 11. Will all property owners be required to pay this tax? No, state law exempts agricultural land and seasonal property from taxes used to repay all referendum debt. 12. Why would a landowner want to participate in this program? This would be an option for landowners who don't want to see their land developed but want to protect it for the enjoyment of future generations. For Additional Information Contact: at (763) 755-5100 Q) 1685 CROSSTOWN BOULEVARD N.W. . ANDOVER, MINNESOTA 55304 . (763) 755-5100 FAX (763) 755-8923 . WWW.CI.ANDOVER.MN.US TO: Mayor and Councilmembers FROM: Jim Dickinson, City Administrator SUBJECT: 2007 Proposed Budget & 2007 Tax Levy Review DATE August 29, 2006 INTRODUCTION The Council has had a number of reviews of the 2007 Proposed Budget that will be supported by the 2007 Tax Levy. At the last meeting only a few questions remained and those questions will be addressed through the discussion. The Council is requested to brim!: their 2007 Bud!!:et information that was discussed at the Au!!:ust 22. 2006 workshop meetin!!: to assist with the discussion. DISCUSSION The following items identify sections of the budget the Council wanted more information, updates are in italics: Personnel Related Implications: To date the following are issues facing personnel related expenses: 1. A total salary compensation adjustment package is proposed to provide wages that are competitive with other government entities. Human Resources indicated that 2007 wage proposals in other communities for a cost-of-living increase are ranging from 3% to over 4%. Finance/Administration is currently utilizing a 3.5% cost-of-living increase for the proposed 2007 Budget as a place holder. Council concurrence relative to this percentage will be sought at the workshop. Council desired an opportunity to review an updated survey on cost of livin'Z increases, and to include neighborin'Z communities. Human Resources has updated the survey and those results are attached. Contractual Departments: 1. The Anoka County Sheriff's contract is currently being negotiated, currently just maintaining the status quo (72 hour of law enforcement coverage, 12 hours of Community Service Officer coverage, two School Liaison Officers, additional park patrol through use of CSOs and a part-time Crime Prevention position) results in an increase of$123,512. Per Council direction, Administration has requested pricing for additional patrolling, pricing was received for an additional 8 hours of law enforcement coverage. The following identifies the additional cost based on a particular start date: January 2007 $181,758 May 2007 $126,425 June 2007 $112,550 July 2007 $ 98,738 1 The current budget is utilizing a July 2007 start date! Council provided a number of complements to the Sheriff's Office. those were past alonf!. The Council also requested that the Sheriff's Office provide Sheriff activity updates in addition to the arrest activity at Council meetinf!s. The Sheriff's Office welcomed the request!! Council Memberships and Donations/Contributions: The following memberships are included as part of the 2007 proposed budget: League of Minnesota Cities North Metro Mayor Association of Metropolitan Cities (AMM) $17,311 $15,400 $ 6,500 Repeat of2006 Budget item Repeat of2006 Budget item Not included in 2006 Budget The following donations/contributions are included as part of the 2007 proposed budget: Community Schools Mediation Services Youth First Alexandra House Senior High Parties $43,142 $ 3,075 $ 5,000 $10,000 $ 1,500 General Fund General Fund Charitable Gambling Fund Charitable Gambling Fund Charitable Gambling Fund Council requested a report on the activities of Community Schools. That has been requested. and if received by the meeting. it will be presented Council also indicated a desire to see if additional funds could be souf!ht for Youth First. I am suggestinf! that if savinf!s. from what is currently being bU(if!eted. are achieved in the employee heath insurance renewal, that be used to assist Youth First. The other attachments to this staff report (and listed below) are draft staff reports that are anticipated to be presented to the Council at the September 5, 2006 Council meeting. Attachments 1. Adopt 2007 Preliminary Tax Levy 2. 2007 Debt Service Levy Changes 3. Set Truth in Taxation Hearing Date ACTION REOUESTED The Council is requested to review the staff report, attachments and provide direction to staff as to whether the Council feels the budget and levy are proceeding in the right direction. Attachments 2 Proposed COLA 2007 Agency Pop. Non-Union Anoka 17,509 3.00% Andover 30,000 3.50% Arden Hills 9,426 3.00% Blaine 41,658 3.50% Bloomington 86,683 3.00% Columbia Heights 18,882 3.00% Coon Rapids 58,991 3.50% Cottage Grove 28,706 3.50% Crystal 23,703 3.50% Eagan 65,000 3.00% Forest Lake 3.00% Fridley 28,104 3.00% Hastings 21,600 3.50% Maplewood 36,000 4.00% New Brighton 22,328 3.00% Prior Lake 16,000 3.00% Ramsey 20,000 3.00% Roseville 33,674 3.00% St. Cloud 50,143 2.50% Spring Lake Park 6,628 3.00% Stillwater 16,500 3.50% Q) 1685 CROSSTOWN BOULEVARD N.W. . ANDOVER, MINNESOTA 55304 . (763) 755-5100 FAX (763) 755-8923. WWW.CI.ANDOVER.MN.US TO: Mayor and Councilmembers SUBJECT: Adopt 2007 Preliminary Tax Levy '~;;/'~ \ FROM: Jim Dickinson, City Administrator DATE: September 5, 2006 INTRODUCTION Each year the City Council is required by state law to approve a preliminary budget and submit a preliminary levy certification to Anoka County Property Records and Taxation Division by September 15th. ' DISCUSSION The 2007 Preliminary Levy certification is the outcome of the numerous budget workshops held with the Council over the summer. The Preliminary 2007 Budget proposes a total property tax levy of $9,316,427: $6,115,179 (65.6%) operational levy, $1,833,494 (19.7%) debt service levy, and $1,367,754 (14.7%) capital levy. The Council has the right to reduce or keep constant this levy until the final certification date of December 28,2006. BUDGET IMP ACT This is the first step in establishing an operating budget for 2007. ACTION REOUIRED The Andover City Council is requested to approve the attached resolution that indicates a tatal preliminary levy of $9,316,427 to be submitted to the Anoka County Property Records and Taxation Division by September 15th. Respectfully submitted, Jim Dickinson Attachments: Resolution Adopting the Proposed 2007 Property Tax Levy Attachment A - Proposed 2007 Property Tax Levy cs CITY OF ANDOVER COUNTY OF ANOKA STATE OF MINNESOTA RES. NO. A RESOLUTION ADOPTING THE CITY OF ANDOVER 2007 PROPOSED PROPERTY TAX LEVY TO BE CERTIFIED TO THE COUNTY AUDITOR. \)" ~~ + WHEREAS, the preparation and adoption of operating budgets is recognized as sound financial practice; and WHEREAS, the City of Andover receives significant financial support from its residents through the payment of property taxes; and WHEREAS, the City of Andover has the responsibility to appropriately and efficiently manage the public's funds; and WHEREAS, Minnesota State Law requires the City to certify to the County Auditor a proposed tax levy and budget prior to September 15,2006. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Andover hereby adopts the proposed 2007 property tax levy totaling $9,316,427 as listed on Attachment A. Adopted by the City of Andover this 5th day of September 2006. CITY OF ANDOVER ATTEST: Michael R. Gamache - Mayor Victoria Volk - City Clerk (5) ---- \),..~~ 1\ ii"(\..-..........,, t ~ City of Andover, Minnesota 612512006 Property Tax Levy Certified Certified Certified Certlfled r Reque.ted Change 2003 2004 2005 2008 2007 % of Total $ % General Fund levy $ 4,549,530 $ 4,894,048 $ 4,874,908 $ 5,640,212 6,080,179 65.26% $ 439,967.00 7.80% Debt Service Funds Levy 1999 G.O. Equipment Certificate 301.980 326,655 2001 C G.O. Equipment Certificate 274,404 276,693 283,210 283,537 2003 G.O. Equipment Certificate 200,000 212,695 2003C G.O. Equipment Certificate 168,000 132,030 132,180 2oo4A G.O. Capilallmprovement Bonds 247,766 364,788 365,051 2004 EDA Public Facility Revenue Bonds 807,000 847,350 889,718 20058 Capital Improvement Bonds 137,922 126,305 20058 G.O. Equipment Certificate 200,000 65,788 63,945 2006B G.O. Equipment Certificate 188,475 2007 G.O. Equipment Certificate 200.000 Total Debt Service* 776,384 984,043 1.670,006 1,831,565 1,833,494 19.68% 1,929.00 0.11% Other levies Capital Projects levy Capital EquipmentIProject 203,200 203,200 203,200 209,296 210,000 2.25% 704.00 0.34% Parks Projects 50,800 50,800 52,800 54,384 56,000 0.60% 1,616.00 2.97% Road & Bridge 619,611 619,611 679,899 734,686 1,052,953 11.30% 318,267.00 43.32% Pedestrtan Trail Maintenance 46,000 47,380 48,801 0.52% 1,421.00 3.00% Lower Rum River Watershed 24,000 30,000 30,000 33,396 35,000 0.38% 1,604.00 4.80% GrOSI City Levy 6,223,525 8,781,700 7,558,813 8,550,81g ',318,427 100% 765,508.00 8.95% Less Fiscal Disparities Distribution 835,118 14',133 128,888 g48,173 520,000 (26,173.00) -2.82% local Tax Rate Levy $ 5,388,327 $ 5,832,587 $ 8,625,'47 7,604,748 $ 8,386,427 791.681.00 10.41% Adjusted Tax Capacity Value" $ 18,248,780 $ 18.604,414 $ 21,251,752 $ 24,010,760 $ 26,636,841 $ 2,826,081 11.77% ~ ~ Tax Capacity Rate". 33.161% 31.350% 31.197% 31.672% 31.287% -1.216% -0.385% Tax Capacity Rate WID lRRWSO 33.037% 31.209% 31.076% 31.547% 0.000% Tax Capacity Rate With lRRWSD 33.376% 31.603% 31.414% 31.895% 0.000% .2003 Debt Servics Levy is based on City's Debt Management Study L } ** Adjusted Value determined by adjusting for Fiscal Disparities and Tax Increment estimates. ~ ... Blended rate due to the City of Andover levying for Lower Rum River Watershed District V>J'\\ \H \'-\e Jj l\!~ (1) Adjusted Tax Capacity Value is subject to change. DY\ ,':) (0' IJW'lV'\ {J'" ~~\I{~"''''1'i \1 ~', CD 5'\ND6VE~ 1685 CROSSTOWN BOULEVARD N.W. . ANDOVER, MINNESOTA 55304. (763) 755-5100 FAX (763) 755-8923 . WWW.CI.ANDOVER.MN.US FROM: Jim Dickinson, City AdministratorlFinance Director '-~\ ~ TO: Mayor and Councilmembers SUBJECT: 2007 Debt Service Levy Changes DATE: September 6, 2006 INTRODUCTION Anoka County Property Records and Taxation Division requires a City Council resolution changing bonded indebtedness levies for 2007 that would have been certified to Anoka County as part of prior years bond sales. DISCUSSION When the City issues bonds, a certification of the bonded indebtedness levy is sent to Anoka County. The County is charged with assuring on an annual basis that local government bonded indebtedness payments are made. To assist in monitoring, the County is requesting a resolution that would update all or a portion of previously certified bonded indebtedness levies. Attached is a resolution to update bonded indebtedness levies along with a brief description as to why there was a change. BUDGET IMP ACT The 2007 City of Andover Debt Service Budgets are current and up-to-date. This resolution is to inform the County of any changes that have taken place in the past year as well as any new issuances proposed to be levied for 2007. ACTION REOUlRED The Andover City Council is requested to approve the attached resolution that would update certified bonded indebtedness levies for 2007. Respectfully submitted, Jim Dickinson Attachment: Resolution Updating Certified Bonded Indebtedness for 2007 Attachment A - 2006 Proposed Levy Certification Debt Changes 6) CITY OF ANDOVER COUNTY OF ANOKA STATE OF MINNESOTA RES. NO. A RESOLUTION UPDATING CERTIFIED BONDED INDEBTEDNESS FOR 2007. "0'~\ WHEREAS, the preparation and adoption of budgets is recognized as sound financial practice; and WHEREAS, the City of Andover has the responsibility to appropriately and efficiently manage the public's funds; and WHEREAS, the City of Andover has determined that it is prudent to update certified bonded indebtedness levies for 2006; and WHEREAS, the Anoka County Property Records and Taxation Division is requiring a City Council resolution updating bonded indebtedness levies that would have been certified Anoka County as part of prior year bond sales. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Andover hereby updates all or a portion of previously certified bonded indebtedness levies for 2007 as listed on Attachment A. Adopted by the City of Andover this 5th day of September 2006. CITY OF ANDOVER ATTEST: Michael R. Gamache - Mayor Victoria Volk - City Clerk ~ CITY OF ANDOVER 2007 Proposed Levy Certification Debt Changes "\)<- ~'\ Attachment A County Levy City Levy Levy GENERAL OBLIGATION DEBT Scheduled Scheduled Changes Variance Explanation 56 2004A GO Capital Improvement Bonds 365,051 365,051 Ok 58 2005A GO Improvement Bonds 571,500 571,500 Paid for by assessments 59 2005B GO Equipment Certificate 64,900 63,945 955 City has interest earnings in Debt Service Fund 60 2005B GO Capital Improvement Bonds 128,200 126,305 1,895 City has interest earnings in Debt Service Fund 61 2006A GO PIR Bonds 133,624 133,624 Paid for by assessments 62 2006B GO Equipment Certificate 169,763 188,475 (18,712) City levying for two interest payments 2007 GO Equipment Certificate 200,000 (200,000) Bonds not yet issued 2004 EDA Public Facility Lease Rev 889,718 (889,718) Lease revenue payment per pledge agreement Total $ 1,433,037 $ 1,833,494 $ (400,457) @) CITY OF NDOVE 1685 CROSSTOWN BOULEVARD N.W. . ANDOVER, MINNESOTA 55304 . (763) 755-5100 FAX (763) 755-8923 . WWW.CI.ANDOVER.MN.US TO: Mayor and Councilmembers '\),~~\ FROM: Jim Dickinson, City AdministratorlFinance Director SUBJECT: Set Truth in Taxation Hearing Date DATE: September 5, 2006 INTRODUCTION This year the Andover City Council is required to hold Truth in Taxation meetings. These meetings give the public the opportunity to comment on the proposed 2007 budget and tax levy. DISCUSSION: The first hearing date selected by the City will be for the initial hearing to present the proposed levy and budget to the public. If the initial hearing is not sufficient for all public comment and further discussion is required, a continuation hearing will be necessary, The date and time of continuation hearing must be announced before the close of the initial hearing. The continuation hearing must occur at least 5 but no more than 14 business days after the initial hearing. If a continuation hearing is not necessary, the City must announce the date and time of a subsequent hearing for the official adoption of the final levy and budget. The announcement must be made prior to the end of the initial hearing. The Andover City Council is requested to set an initial Truth in Taxation Public Hearing date from the suggested dates as follows: Initial hearing date: -Monday December 4,2006 at 7:00 PM -Tuesday December 5, 2006 at 7:00 PM (Done as part of a regularly scheduled meeting) -Monday December 11, 2006 at 7:00 PM Continuation hearing date: -Tuesday, December 19, 2006 a regular City Council meeting. Official adoption date: -Tuesday, December 19, 2006 a regular City Council meeting. ACTION REOUIRED The Andover City Council is requested to select a Truth-in-Taxation hearing date. Respectfully submitted, Jim Dickinson @ COUNTY OF ANOKA PROPERTY RECORDS AND TAXATION DIVISION GOVERNMENT CENTER. 2100 3RD AVENUE. ANOKA, MN 55303 FAX (763) 323-5421 . Property Assessment . Property Records and Public Service . Property Tax Accounting and Research August 17, 2006 Mr. Jim Dickinson Finance Director City of Andover 1685 Crosstown Blvd. NW Andover, MN 55304 Dear Mr. Dickinson: The Truth in Taxation law, M.S. 275.065 requires cities to hold a public budget hearing for property taxes payable in the year 2007. The dates for this hearing cannot conflict with the initial hearing set by the county, metropolitan agencies or the school districts located in your city. However, your continuation hearing may conflict with the continuation hearing of another taxing district. These hearings must be held between November 29 and December 20, 2006. The continuation hearing must be at least 5 but no more than 14 business days after your initial hearing. Additionally, Chapter 389, Laws of 1998, requires that the first and second Mondays of December are reserved for use by the cities until September 15. The following taxing districts within your city have set the following hearing dates: TAXING HEARING DISTRICT DATE Anoka County................... December 7 .......... Metropolitan Agencies......._..December 6 .......... SD #11........................ . November 30 ......... SD #15......................... December 2 .......... RECONVENING DATE December 19 December 13 December 8 December 9 With this information you can now set the initial date for your public hearing and a date for reconvening the meeting, if necessary. In addition, the time and location of the initial meeting, the phone number an interested taxpayer may call and your payable 2007 certified proposed property tax levy is due on or before September 15, 2006. A proposed levy and hearing date certification form is enclosed. Also, a copy of the bond levy schedule for your taxing jurisdiction is enclosed. If you aren't levying the scheduled amount, a board resolution to cancel the bonded indebtedness levy is required. According to M.S. 475.61, the county is required to levy the amount originally certified unless the taxing authority passes a resolution canceling the levy. If you have any questions concerning the Truth in Taxation process, please call at (763) 323-5435. Sincerely, CZ (jjJ. --(Lv\.- ~ Jo n Flavin Property Tax Accounting Encl. Affirmative Action I Equal Opportunity Employer @ CITY OF NDOVE (j) 1685 CROSSTOWN BOULEVARD N.W. . ANDOVER, MINNESOTA 55304 . (763) 755-5100 FAX (763) 755-8923 . WWW.CI.ANDOVER.MN.US TO: Mayor and Councilmembers FROM: Jim Dickinson, City Administrator SUBJECT: 2007-2011 Capital Improvement Plan (CIP) Review DATE August 22, 2006 INTRODUCTION City Departments have prepared a proposed 2007-2011 CIP (attached) for the Council's review. Also attached are various rate analysis and cash flow projections used during the process. The proposed projects will be review with the Council at the meeting. Underlined items in the Staff report will be discussed in further detail at the meeting. DISCUSSION Bude:et Guidelines: The following are City Council's 2007 Budget Development guidelines (established by the City Council on May 2,2006) used by City Staff to prepare the proposed 2007-2011 CIP: 1) A commitment to maintain or reduce the City Tax Capacity Rate, utilizing recent market value growth to meet the needs of the organization and positioning the City for long-term competitiveness, staffing and capital requirements through sustainable revenue sources and operational efficiencies. 2) A commitment to review various revenue streams. including but not limited to tax levy. state aid. grants and special assessments. to adequately fund necessary City roadway improvements. 3) A fiscal goal that works toward establishing the General Fund balance for working capital at no less than 35% of planned 2007 General Fund expenditures. 4) A commitment to limit the 2007 debt levy to no more than 25% of the gross tax levy and a commitment to a detailed city debt analysis to take advantage of alternative financing consistent with the City's adopted Debt Policy. 5) A comprehensive review of the condition of capital equipment to ensure that the most cost- effective replacement schedule is followed. Equipment will be replaced on the basis of a cost benefit analvsis rather than a vear based replacement schedule. 1 6) A team approach that encourages strategic planning to meet immediate and long-term operational. staffing, infrastructure and facility needs. 7) A management philosophy that actively supports the implementation of Council policies and goals. and recognizes the need to be responsive to changing community conditions, concerns and demands in a cost effective manner. Current City of Andover Capital Improvement Policy: The following is the City of Andover adopted Capital Improvement Policy, which is part of the City of Andover Financial Policies: CITYOFANDOVERFmANC~Poucrns C. Capital Improvement Policy 1. A Capital Improvements Program (CIP) will be developed for a period of five years. As resources are available, the most current year of the CIP will be incorporated into the current year operating budget as the Capital Improvements Budget (Cm). The CIP will be reviewed and updated annually. Years two through five are for planning purposes only. 2. The City will maintain its physical assets in a manner, adequate to protect the City's capital investment and to minimize future maintenance and replacement costs. The City will provide for maintenance and replacement from current revenues where possible. 3. To be considered in the Capital Improvements Program a project must have an estimated cost of at least $5,000 in one of the calendar years of the project. Projects may not be combined to meet the minimum standard unless they are dependent upon each other. Items that are operating expense (such as maintenance agreements, personal computer software upgrades, etc.) will not be considered within the CIP. 5. Capital projects, which duplicate other public and/or private service, will not be considered. 6. The City will identitY the estimated costs and potential funding sources for each capital project prior to inclusion in the CIP. The operating costs to maintain capital projects shall be considered prior to the decision to undertake the capital projects. 7. Capital projects and/or capital asset purchases will receive a higher priority if they meet a majority of the following criteria: A. Mandatory project B. Maintenance project (approved replacement schedules) C. Improve efficiency D. Provide a new service E. Policy area project 2 F. Broad extent of usage G. Length of expected useful life H. Positive effect on operation and maintenance costs I. Availability of county/state/federal grants J. Elimination of hazards (improves public safety) K. Prior commitments L. Replacement due to disaster or loss 9. The CIP is to be presented by the Finance Director annually to the City Council for approval. Any substantive change to the CIP after approval must be approved by the City Council. Proposed 2007 Capital Proiects Levy: Capital Proiects Levy - The 2007 Budget number for the Capital Projects Levy is part of the 2007-2011 Capital Improvement Plan (CIP) review process. . Road and Bridge - This levy is proposed for transportation programming related to maintaining City streets, roadways and pedestrian trails. This would be the fourth year that a portion of the Road & Bridge Fund is dedicated to pedestrian trail maintenance. This levy is also used for the City's seal coating and crack sealing programs and to street overlays and reconstructs. The 2007 Road and Bridge levv was calculated using an additional 1 % of captured net tax capacity based on Council direction. And while the policv for road assessments is not fully complete, the budget is designed to achieve the Council's goal of adequately funding necessary City roadway improvements. . Park Improvements - This levy is proposed as an annual appropriation to be used to underwrite a wide range of park improvement projects as recommended by the Park and Recreation Commission and approved by the City Council. This funding is intended to be a long-term supplemental source of capital funding for park projects that would be separately identified in the City's Five-Year Capital Improvement Plan. A 3% levv increase is proposed. . Capital EauipmentIProiects - Under the Capital Projects Levy, the levy proposed is designated to capital improvement/equipment project expenditures. Through this designation, the City, over time, will be able to build a fund reserve to avoid cash flow "spikes" and address a wide range of capital improvement needs such as facility maintenance projects under a more controlled spending environment. No increase will be proposed for this levy. which is currently approximately $210,000. Debt Service Levy: Annually the Finance Department conducts a detailed debt service analysis to monitor outstanding debt and to look for early debt retirement or refinancing opportunities that will yield interest expense saving to the City, that process is currently underway. The Debt Service levy will need to provide for (at a minimum) the following debt service payments: 3 . 2004A G.O. Capital Imp. Bonds . 2004 EDA Public Facility Bonds . 2005 G.O. Capital Imp. Bonds . 2005B G.O. Equipment Certificate . 2006B G.O. Equipment Certificate $365,051 $889,718 $126,305 $ 63,945 $188,475 There will also be an additional $200.000 added to the levY to accommodate a 2007 G.O. Equipment Certificate to purchase equipment that will be outlined in the 2007-2011 CIP. ACTION REOUESTED The Council is requested to review the 2007-2011 CIP and provide direction to staff. Attachments -Water System Financial Projections -Sewer System Financial Projections -Park Improvement Fund Projected Fund Balance -Trail Fund Projected Fund Balance -Road and Bridge Funds - Rollup Projected Fund Balance -MSA Funded Projects Projected Fund Balance -Tax Levy Funded - Roadway Proj ects -Tax Levy Funded - Pedestrian Trail Maintenance -2007-2011 Proposed Capital Improvement Plan 4 Yea Inf\ationFactor A....rag. Use (gallons per user pe A"",, Added New ComecOOnI New Customers Total Customers ~I.' Base Rate Use Rata Connedlon Charge Area Charge ConneclO<VAnoa ......... Use Rate IOperaUona Revem.... Use+Base M...... PermilFees Penalties ,- Xferln 01"'" TolaI Expens.. O,*"""" DebI Service CapltalOt<lay Replacemert Reserve TolaI Balance. Un,..lrlcted Annual Surplu&lDelldl: Cumulative baIaoce Ilnfrastructu,.fTrunk ~venue. Comection Charges Area Charges ''''''"'" Special Assessrnert Replacement Reserve """" ToIaI expeRt.. Debt SeMce CapilaIOutIay XferOt.C T"'" Balance Annual SurpluslDeficit B-.ce 2001 1,041,001 38.356 13,900 16,806 114,336 ". 1,224,125 872.653 815,673 1,688,326 2002 ,..... 40,983 65 200 300 4,742 7.30 1.14 1,840 1.686 1,058,666 40,343 '4,000 18,977 411,352 196 1,539.534 90<1.962 253.557 363,000 1.526.519 2003 ,..... 37,163 65 200 200 '.900 7.67 1.20 1,987 1,821 ... 5" 5" 1,337,130 28.392 8,350 25.9215 (93,195) 5OS,170 1,811,773 974,455 458.030 350,000 1.782.485 CfTY OF ANDOVER Wate' System FilYnc:YI Pro}Ktlona 2004 ,..... 39,871 65 200 200 5,100 ..05 1.26 2,146 1,967 ... 5" 5" 1,329,831 48,818 13,350 1.,606 2,186 739.438 127.986 2.276,813 993,752 749,487 434.000 2,171,219 AduaI 2005 ,..... 36.215 65 200 200 5,410 ,..... 34,704 50 150 150 5.620 ....mat. .... ,..... 34.704 50 150 150 5,770 8.87 1.39 2.503 2.294 ... 5" 5" 1,"09,672 "6,316 11,350 21,638 12,"86 168,221 5,892 1,675,355 ','....,736 7"8,720 105,000 1,996,"56 2007 9."9 1.49 2,704 2,..n ... '" '" 1,547,561 "8,316 11,350 21,638 12,"66 92,645 5,692 1,737,668 1,179,078 7"5,663 65.000 1,979.7'" 2'" ,..... 34,704 50 150 150 5.920 ,..... 34,704 35 100 100 6,020 2000 10.67 1.70 3,153 2,890 ." 7" 7" 1,831,661 "6,316 11,350 21,638 12,"66 72,883 5.692 2,002,006 1,250,884 7"9,"39 50.000 2,050,323 Fe<caot 2010 2011 ,..... 34,704 35 100 100 6,120 ,.... 34,704 35 100 100 6,220 12.21 1.91 3,678 3.370 ... 5" 5" 2,085,"00 "6,316 11,350 21,638 12,"66 85,011 5,692 2,267,873 1,327,063 757,507 65.000 2,139,570 2012 ,..... 34,704 '5 100 100 6,320 12.82 2.01 3.972 3,640 ... 5" 5" 2,22",316 "6,316 11,350 21,638 12,"66 91,812 5,692 2,"13,590 1,366,875 759,<<0 65.000 2,181,315 2013 201" ("63,601) 1,990,721 1,527,120 "57,348 737,1"9 (124,893) 612,256 I c;"pltal Projects W... Rehab W'" ~ofWell" T..... New DeYeIopmert Projects 1 Z' water lint down South PIanl Pain: waler tower 2 miIIon galon storage tank Surface Seal Brick Strudlns Oemo .,... WTP reclaim tank addition EQ_ WflAer Securty Syslem lmprovemeru EIeclricScissorUft GPS VanRepIacemer1 T"'" Funded by 0petati0nI Funded by Infrastruc:tl.q'ruok Funded bydebl Total IDebt Rat. Teon MOS CumulaliveDS Cunonl OS WTP 8."5 1,32 2,318 2,12" '" 5" 5" 1,"25,123 "6.316 11.350 21,638 12,"66 5,692 1,522,585 1.098,87" 754.392 68,196 1,919,"62 10.16 1.59 2,920 2,675 ." 7" 7" 1,683,861 "6,318 11,350 21,638 12,"66 100,056 5,692 1,881,379 1.21.....50 7"8,228 63.000 2,025,678 11.63 1.62 3."06 3,121 '" 7" 7" 1,954,669 "6.316 11.350 21,638 12,"68 78,71" 5,692 2,130,845 1,288,"10 754,221 50,000 2,092,631 ,..... 34,704 35 100 100 6,"20 ,..... 34,704 '5 100 100 6,520 ,..... 34.704 35 100 100 6,820 13.46 2.11 .,290 3,931 ... 5" 5" 1".1" 2.21 ",633 ",2"6 ." 5" 5" 1".84 2.32 5.'" '.565 '" 5" 5" 2,371,911 "6,316 11,350 21,838 12,"68 99,157 5,692 2,568,530 2,528,705 "6,316 11,350 21,638 12,"66 107,090 5,692 2,733,257 1,407,881 759,964 00.000 1,"50,117 759,034 00.000 2.227,845 2,269,151 13,015 29,288 99,594 (396,877) (321.101) (2"2,073) (1....,299) ("8,317) 36.21" 128,303 232,276 340,685 "64,105 1.540,135 1,569,"23 1,689,017 1.272,1"0 951,039 708,966 564.667 516,349 554,563 682.866 915,1"2 1,255,827 1.719,932 931,718 5.962 90.212 88,219 73,"50 383.000 797,979 "5,328 768,758 350,000 1,960,065 1,335,347 50,119 "5,656 "34,000 12,385 1,877,507 961,261 79.891 130,910 2.210 1,17",272 "05,535 123,864 25.000 50.000 604,399 "37,977 133,77" 25,000 50.000 315,3<< 101.133 25,000 50.000 646,751 "91,"76 340,571 109,223 25.000 50.000 52",795 387,817 117,961 25,000 510,778 397,2"2 127,398 25.000 549,840 "29,022 137.590 25,000 "63,343 1"8,597 25,000 500,"'1 160,485 25,000 228,000 781,540 1,"56,387 591,812 685,896 836,941 12,108 "~63 546.630 213,978 888,235 56.... 505,170 1,"50,"03 "63,254 399.166 739,"38 1 ,601,858 978,847 976,&47 170.250 168,221 338,"71 175,500 92,645 268,1"5 978,500 100,056 1.078,556 284.210 299,000 72,683 656.093 284.210 650.000 78,71" 1,012,92" 284.210 150,000 85,011 519,221 284.210 150,000 91,812 526,022 284,210 150,000 99.157 533,367 284,210 150,000 107,090 541,300 .....391 760,808 695.779 1,308,035 509.662 1.617,697 2,093,346 275,649 197,"25 265,928 2,556.699 2.935,305 378,606 (587.080) (131.298) 2,218,927 (502,1"6) 1,71",781 1,7"5,201 30,"20 1,810,791 65,590 103,57" 1<<,596 1,91",365 2,058,961 2,290,771 170,250 15,000 5.000 5.000 "0,000 275.250 40.000 2,348,225 .5,000 "5.000 10,000 175,500 120,500 750,000 108,000 2,950,000 18,000 230,500 3,991,500 50.000 12",000 150.000 50.000 65.000 150,000 205,000 65.000 00.000 175,000 500.000 349,000 700,000 00.000 150,000 150,000 150,000 205,000 210,000 210,000 275,250 105,000 170,250 55,000 63,000 175,500 978,500 2,950,000 230,500 3,991,500 50.000 299,000 50.000 650.000 700,000 65.000 150,000 205,000 65.000 150,000 00.000 150,000 00.000 150,000 205,000 210,000 210,000 349,000 5..... 10 o 5..... 10 5..... 10 739,"38 5..... 10 7"',393 7"6,720 5.... 10 5..... 10 5..... 15 284,210 17,5% of Comectlon I Area Charges is U$ed to suppolt 1he WTP 7"5.683 7"8,228 5..... 15 284,210 284,210 74g,"39 5..... 15 754,221 5..... 15 284,210 757,507 5.()(:l% 5,00% 15 15 5..... 15 284,210 284.210 284.210 75g,....O 759.034 759,964 @ Year InftatiOn Factor. ell:penses -..... New Come<tiono New c.-~ Total Customers ..... .... ROO U.._ Connection Charge Anoo Chaove ConnectionIAr.. .... Rale UseRate IOoer'llons R_ .... Uoe Penalties ....... Othe, ToIaI Ex...... Operations Oeta _ CapllalOt<lay Replacement Re....... TOIaI 8&"nce. Urvestrictlld ........S~ FB 1213112000 BaIanal 2001 ,..... 65 200 300 5,578 1,153.225 17,378 95,422 1266023 738,810 825,622 1364232 (98,209) 1783625 '002 7.30 '22 1,180 1,229,730 20,018 46,959 164 1296891 9n,659 ".000 228062 1234 721 ,..... 65 200 200 5,895 200. ,..... 65 200 200 6,017 2004 ,..... 65 200 200 '.21>1 46.00 '" 1,252 ,,, '" "" 1,338.825 18,914 4.016 7527 1369282 988,704 7.000 000 000 1 395 704 (26,422) ...... 200' em Of AHOO'VER s..... S,.... FNnc:". projKtions 47.84 351 1,302 '" '" "" 1,523,475 19,646 33,601 7624 1584346 1,139,365 7.000 61,173 1207538 ......... .... ,..... 50 150 150 8,435 49.75 361 1,340 '" ." '" 1,362.832 19,646 33,601 1416079 1,256.859 5.000 '00 000 1561859 378.808 (145,780) ,.... 50 150 150 '.565 2007 ,..... 50 150 150 ..m 2001 ,..... 35 100 100 6,635 53.81 387 1,434 ." ." ,,, 1,529.946 19,646 33.601 1583193 1,333.402 300,000 '00 000 1933402 (91,6n) (350,209) 2001 ,..... 35 100 100 '.935 55.96 ." 1,491 '" '" '" 1,814,468 19,846 33,601 1667715 1,373,404 '00 000 1 673 404 ........ 2010 2011 5820 .,. 1.551 '" '" ,,, 1,703,31" 19,646 33,601 1 756561 1,"14,606 300 000 1714606 ('5,689) ,..... 35 100 100 7.035 60.'53 435 1,813 '" '" '" 1,796,593 19,646 33,601 1849840 1,"57,044 350000 1807044 41,955 2012 ,..... 35 100 100 7,135 62.95 .52 1,678 '" '" '" 1,894,702 19,8411 33,601 1947949 1 ,500,755 350000 1850755 42,796 2013 2014 ,..... 35 100 100 7,435 46.00 331 1,215 ." 5" "" 1,287,168 22,"18 (1,416) 1308168 988,413 410,873 '90 000 1 787286 &2,170 (479,118) 51.7" ,n 1.379 '" '" '" 1,....9,841 19,648 33,601 1 502888 1,294,565 '00 000 1594 565 ,..... '5 100 100 7235 ,..... 35 100 100 7,335 65.47 58.09 70.81 ." 1,745 '" '" '" ,.. 1,815 ." '" '" 509 1.... '" ." '" 1,997,761 19,646 33,601 2 051 008 2,105,889 19,648 33,601 2159136 1,545,178 1,592,151 350000 1895778 '00 000 1992151 97,194 166.985 155,230 1.362,674 1529,659 11nfr'lJtructur~runk R_ Connedlon Cha<ge. Atea Charges ..."'.. ReplacemeliReserw SpedaI Auessments ~ TOIaI ""- OebtService CapIIaIOt<Iay ToIaI "Ia~ ........S<.<pluaIOef<ll F81213112000 ....... 1,685,416 223,910 44,178 289845 282,024 135584 417606 (127,783) "0064 1741586 349,952 21,759 228,062 39,~7 25530 643481 (200,633) 1.268,468 248,n3 34,135 390,000 331,~7 1002<115 552,268 291846 84411.. 1242048 385,173 39.185 "00,000 18,959 72228 913545 127,951 ,..43n 272334 463,254 207904 671158 1618.854 1,473.074 350,155 37,532 94,484 48122 530303 55.600 68.950 37.532 300,000 "0,000 502262 1361391 58,050 71,700 37,532 300.000 "0,000 507262 660 500 680 500 (21,818) (153,218) 1,031,189 40,200 52,185 37.532 300.000 "0.000 469917 1025500 41.800 sa265 37.532 300.000 "0,000 473617 120 SOO 120500 124000 124000 1.067.455 "3,500 58.465 37,532 300,000 437467 84,178 150000 234178 203,309 1110.251 "5,200 58,730 37,532 350,000 491462 84,178 150 000 234178 257,284 1.207444 "'.000 61,075 37,532 350.000 495607 84,178 150 000 234178 261,429 48,900 63,525 37.532 350.000 50,900 68.000 37,532 400,000 730,081 2"2,387 455011 455017 523900 523900 349,417 349,617 499957 554512 75,286 84,178 150000 23-4178 84,178 150000 23-4178 265,779 320,334 2571.411 2,891745 IC'DiblIProlects ""- New Developmenl Projects Croaeown Blvd Trunk YelklwPineU'l$tation U'l Station'1 Upgrage Equlprnenl GPS JelVacTI\ldl. MiscEqulprneri TOIaI 212291 11658 741739 984126 1059412 1,031794 170,250 353,650 5.000 528,900 884 576 1.233.993 1.583,610 120.500 12",000 650.000 1786,919 150,000 150000 2044,203 150,000 150 000 2305 632 150,000 150 000 150,000 150,000 175,500 400,000 65.000 660 500 300.000 420.500 174.000 150,000 1;0,000 Funded by Operations Funded by lnIraslruCluf8lTrunk Funcledbydebt 150,000 150000 1000bI -- T.... 05-'- Total Annual Debt Service 5..... 10 ,..... I. 5..... 10 5..... 10 5.000 523,900 528900 5..... 10 680.500 660 500 5..... 10 300.000 120,500 420,500 12",000 650 000 mooo 5..... 10 150,000 150 000 5..... 10 &4,1711 150,000 150,000 5..... 10 &4,178 150,000 1;0.000 5..... 10 84,178 150,000 150.000 5..... I. 5..... 10 5..... 10 &4,178 84,178 &4.118 (D \,;11 T UI'" ANUUVt:K Park Improvement Fund Projected Fund Balance 2006 2007 2008 2009 2010 2011 TOTALS Projected Sources of Revenue Park Dedication Fee $2,425 per unit platted units 100 50 50 50 50 50 Anticipated Park Dedication Fee $ 242,500 $ 121,250 $ 121,250 $ 121,250 $ 121,250 $ 121,250 $ 646.750 Commercial I Residential - Andover Station N 176,420 60,390 76,733 78,733 100,000 514,276 DNR Grant 62,500 62,500 Capital Projects Levy a Park Improvements 52,600 52,600 52,800 52,600 52,600 52,600 316,600 Total Revenues Available 471,720 316,940 252,783 252,783 274,050 174,050 1,742,326 Projected Commitments Annual Miscellaneous Projects 25,000 25,000 25,000 25,000 25,000 25,000 150,000 Debt Service Payment 52,600 52,600 52,600 52,800 52,800 52,600 316,600 Andover Conununity Center Contribution 50,000 50,000 Andover Station North Ballfields 70,000 385,000 35,000 490,000 Country Oaks West Park 42,166 42,166 Prairie Knoll Park 35,000 150,000 165,000 Woodland Estates 4th 15,000 15,000 Fox Meadows Park 10,000 10,000 Oakview Park 50,000 50,000 Strootman Pari< 40,000 '0,000 Terrace Park 55,000 55,000 Crooked Lake Boat Landing 125,000 125,000 Woodland Crossing Park 57,000 57,000 Sophies South Park 75,000 75,000 Forest Meadows Park 25,000 25,000 Andover Lions Park 65,000 65,000 Hawkridge Park 500,000 500,000 Total Commitments 349,966 882,800 269,800 162,600 727,600 77,800 2,270,988 Revenues Over (Under) Expenditures 121,732 (365,860) (17,017) 89,983 (453,750) 96,250 Fund Balance as of December 31, 2005 248,757 Fund Balance Brought Forward 370,469 4,629 (12,368) 77,595 (376,155) Ending Fund Balance. $ 370,489 $ 4,629 $ (12,388) $ 77,595 $ (376,155) $ (279,905) *Target .10% of current years commitments to create a contingency for any project overages. 6) CITY OF ANDOVER Trail Fund Projected Fund Balilnc:e 2006 2007 200B 2009 2010 2011 TOTALS Projected Sources of Revenue Trail fee $590 per unit platted units 150 150 100 100 100 100 Trail Fee 88,500 $ 88,500 $ 59,000 $ 59,000 $ 59,000 $ 59,000 $ 413,000 Total Revenue. Available 88,500 88,500 59,000 59,000 59,000 59,000 413,000 Projected Commitments East side ofCrosslown Blvd. 139th Aile to t41sllane 30,000 30,000 North side of Bunker lake Blvd. Hanson Blvd to Crane 5t 30,000 30,000 Station Parkway - Thrush 51 10 Jay 5t 60,000 60,000 North Side of Crosstown Blvd. Nightingale 51 to Hanson Blvd 100,000 100,000 157th Ave. Prairie Rd to Kumquat St 230,000 230,000 West side of Crosstown Blvd. South Coon Creek to Andover Blvd 75,000 75,000 Total Commitments 60,000 60,000 100,000 230,000 75,000 $ 525,000 Revenu.. Over (Under) Expenditures 28,500 28,500 (41,000) (171,000) (16,000) 59,000 Fund Balance as of December 31. 2005 107,455 Fund Balance Brought Forward 135,955 164,455 164,455 (6,545) (22,545) Ending Fund Balance. S 135,955 $ 164,455 123,455 S (6,545) $ (22,545) $ 36,455 -Target .10% of current years commitments to create a contingency for any project overagel. - It La anticipated that all projects will not be fully expended by the end of the year, and future projects will be contingent on additional revenue.. @ CITY OF ANDOVER Road & Bridge Funds a Rollup Projected Fund Balance 2006 2007 2006 2009 2010 2011 TOTALS Projected Sources of Revenue Est. Annual MSA Construction Allocation $ 716,152 $ 718,152 $ 718,152 $ 718,152 $ 718,152 $ 718,152 $ 4,308,912 2001 State Aid Road Bond pymt. Principal (140,000) (150,000) (155,000) (160,000) (170,000) (175,000) (950,000) Available MSA Construction for Other Commibnents 578,152 568,152 563,152 558,152 548,152 543,152 3,358,912 Est. Annual Maintenance Allocation 307,779 307,779 307,779 307,779 307,779 307,779 1,846,674 2001 State Aid Road Bond Pymt -Interest (96,958) (91,298) (85,120) (78,583) (71,568) (84,063) (487,590) General Fund Commitment (169,744) (174,836) (180,081) (185,484) (191,048) (196,780) (1,097,974) Available MSA Maintenance for Other Commitments 41,077 41,845 42,578 43,712 45,163 46,936 261,110 Total MSA Available for other Commitments 619,229 609,797 605,730 601,864 593,315 590,088 1,229,026 Federal Funds 270,000 270,000 Assessments- 190,000 389,898 365,701 305,788 473,493 355,518 2,080,396 Tax levy 782,036 1,101,754 1,136,700 1,188.089 1,242,659 1,300.614 6,751,852 Total Revenues Available 1,861,265 2,101,449 2,108,131 2,095,741 2,309,467 2,246,218 10,331,274 Projected Commitments MSA - New & Reconstruct Routes 1,554,400 383,000 898,800 767,000 714,000 4,317,200 MSA - County Intersection Upgrade. 600,000 175,000 175,000 275,000 1,225.000 MSA. Rail Road Quiet Zones 90,000 400,000 60,000 550,000 MSA - Signal Upgrades 20,000 20,000 Pedesbian Trail Maintenance 47,000 48,000 49,000 50,000 51,000 52,000 297,000 R & B . Pavement Markings 14,000 15,000 16,000 17,000 18,000 19,000 99,000 R & B . Curb Replacement 40,000 41,000 42,000 43,000 44,000 210,000 R & B . Rail Road Qulet Zones 400,000 400,000 R & B - Seal Coating 233,889 245,667 240,236 304,244 594,980 501,614 2,120,630 R & B - Crack Sealing 91,008 80,726 74"70 174,295 151.472 152,187 724,158 R & B - Overlays 1,022,994 791,004 1,019,292 911,645 948,387 4,693,322 Total Convnltments 2,560,297 2,100,387 2,685,510 2,281,831 2,597,097 2,431,188 14,656,310 Revenues Over (Under) Expenditures (699,032) 1,062 (577,379) (186,090) (287,630) (184,970) $ (4,325,036) Fund Balance as of December 31. 2005 2,798,112 Fund Balance Brought Forward 2,099,080 2.100,142 1,522.762 1,336,672 1,049,042 Ending Fund Balance $ 2,099,080 $ 2,100,142 $ 1,522,762 $ 1,336,672 $ 1,049,042 $ 884,072 . Assuming collected In lame year @ CITY OF ANOOVER MSA Funded Projects Projected Fund Balance 2006 2007 2008 2009 2010 2011 TOTALS Projected Sources of Revenue Est. Annual MSA Construction Allocation $ 718,152 $ 718,152 $ 718,152 $ 718,152 $ 718,152 $ 718,152 4,308,912 2001 State Aid Road Bond Pymt - Principal (140,000) (150,000) (155,000) (160,000) (170,000) (175,000) (950,000) Available MSA Construction for Other Commitments 578,152 568,152 563.152 558,152 548,152 543,152 3,358,912 Est. Annual Maintenance Allocation 307,779 307,779 307,779 307,779 307,779 307,779 1,846,674 2001 State Aid Road Bond Pymt . Interest (96,958) (91,298) (85,120) (78,683) (71,568) (84,063) (487,590) General Fund Commitment (169,744) (174,836) (180.081 ) (185,484) (191,048) (196,780) (1,097,974) Available MSA Maintenance for Other Commitments 41,077 41,645 42,578 43.712 45,163 46,936 261.110 Total MSA Available for other Commitments 619.229 609,797 605,730 601,864 593,315 590,088 1,229,026 Federal Funds 270,000 270,000 Assessments- 190,000 83,000 128,400 200,000 71,000 672.400 Total Revenues Available 1,079,229 692,797 734,130 601,864 793,315 661,088 2,171.426 Projected Commitments MSA - New & Reconstruct Routes 1,554.400 383,000 898,800 767,000 714,000 4,317,200 MSA - County Intersection Upgrades 600,000 175,000 175,000 275,000 1,225,000 MSA . Rail Road Quiet Zones 90,000 400,000 60,000 650,000 MSA . Signal Upgrades 20,000 20,000 Total Commitments 2,174,400 648,000 1,473,800 275,000 827,000 714,000 6,112,200 Revenues Over (Under) Expenditures (1,095,171) 44,797 (739.670) 326,864 (33.685) (52,912) (3,940,774) Fund Balance as of December 31. 2005 1,500,000 Fund Balance Brought Forward 404,829 449,626 (290,045) 36,819 3,134 Ending Fund Balance $ 404,829 $ 449,626 $ (290,045) $ 36,819 $ 3,134 (49.778) @ CITY OF ANOQVER Tax Levy Funded - Roadway Projects Projected Fund Balance 2006 2007 2008 2009 2010 2011 TOTALS Projected Sources of Revenue Tax Levy 734,656 1,052,953 1,086,435 1,136,316 1,189,332 1,245,688 6,445,380 Assessments 306,898 237,301 305,788 273,493 284,516 1,407,996 Total Revenues Available 734,656 1,359,851 1.323,736 1,442,104 1,462,825 1,530,204 7,853,376 Projected Commitments R & B - Pavement Mar1dngs 14,000 15,000 16,000 17,000 18,000 19,000 99,000 R & B - Curb Replacement 40,000 41,000 42.000 43,000 44,000 210,000 R & B - Rail Road Quiet Zones 400,000 400,000 R & B - Seal Coating 233,889 245,667 240,236 304,244 594,980 501,614 2,120,630 R & B . Crack Sealing 91,008 80,726 74,470 174,295 151.472 152,187 724,158 R & B . Overlays 1,022,994 791,004 1,019,292 911,645 948,387 4,693,322 Total Commitments 338,897 1,404,387 1,162,710 1,956,831 1,719,097 1,665,188 8,247,110 Revenues Over (Under) Expenditures 395,759 (44,536) 161,026 (514,727) (258,272) (134,984) (393,734) Fund Balance as of December 31,2005 1,267,096 Fund Balance Brought FOlWard 1,662,855 1,618.319 1,779,345 1,264,618 1,008,346 Ending Fund Balance S 1,662,855 1,818,319 $ 1,779,345 $ 1,264,618 $ 1,008,346 873,362 CITY OF ANDOVER Tax Levy Funded. Pedestrian Trail Maintenance Projected Fund Balance 2006 2007 2008 2009 2010 2011 TOTALS Projected Sources of Revenue Tax Levy 47,380 48,801 50,265 51,773 53,327 54,926 306.472 Projected Commitments R & B - Pedestrian Trail Maintenance 47,000 48,000 49,000 50,000 51,000 52,000 297,000 Revenues Over (Under) Expenditures 380 801 1,265 1,773 2,327 2,928 9,472 Fund Balance as of December 31, 2005 31,016 Fund Balance Brought FOlWard 31,396 32,197 33,462 35,235 37,562 Ending Fund Balance $ 31,398 $ 32,197 $ 33,462 $ 35,235 $ 37,562 $ 40,488 @ 1685 CROSSTOWN BOULEVARD N,W, . ANDOVER, MINNESOTA 55304 . (763) 755-5100 FAX (763) 755-8923 . WWW,CI.ANDOVER,MN,US 2007 - 2011 , Proposed Capital Improvement Plan Projects By Department ....................................................................... Pg 1 Projects By Funding Source................................................................. Pg 5 Departments Central Equipment ...................................................................... Pg 11 Community Center................ ............... ........ ..... ...... ............... ..... Pg 15 Elections...................................................................................... Pg 20 Engineering ......... ........... .......... ...... ............... ........ ..... ..... ........ .... Pg 21 Facility Management ..... ......... ................. ........... ............... ......... Pg 25 Fire ... ......... ........... ..... ...... .......... ................ .......... ........................ Pg 37 Park & Rec - Operations ............................................................ Pg 48 Park & Rec - Projects ................................................................. Pg 59 Planning & Zoning...... ............. ........ ...... ....... ........ ..... ..... ..... ....... Pg 70 Sanitary Sewer.. .......... ...... .......... ........... ..... ..... ........................... Pg 71 Storm Sewer. ........... ..... ........... ..... ..... ...... ....... ........ ..... ..... ..... ...... Pg 75 Street Signs........ ..... ........... .......... ........ ........ ..... .......... ..... ........... Pg 79 Streets / Highways ...................................................................... Pg 81 Water ..... .............. .......... ...... .......... ..... ................ .......... ..... .......... Pg 97 City of Andover, MN Capital Plan 2007 thru 2011 PROJECTS BY DEPARTMENT Department Project# Priority 2007 2008 2009 2010 2011 Total ICentral Equipment I Canopy for Fuel Island 09-4880~1 3 250,000 250,000 Replacement - Hotsy Pressure Washer 09-4880~2 3 7,000 7,000 Replacement - Floor Sweeper 10-4880~1 1 35,000 35,000 Replacement - Service Truck 10-4880~2 2 28,000 28,000 Central Equipment Total 257,000 35,000 28,000 320,000 ICommunity Center I Walk Behind Roor Scrubber 07 -4400~1 1 7,500 7,500 Carpet - West Side Entrance 07 -4400~2 2 8,000 8,000 Kitchen Equipment - Fryer/Grill . 08-4400~1 2 7,000 7,000 BatteI)' Pack Replacement - Zamboni 09-44000-Cl 2 7,000 7,000 Storage Buiiding 10-44000-01 2 15,000 15,000 Community Center Total 15,500 7,000 7,000 15,000 44,500 IElections I Voting Equipment 08-41310-01 100,000 100,000 Elections Total 100,000 100,000 IEngineering ~ New Development Projects 07-4160~1 1 351,000 241,000 248,000 300,000 300,000 1,440,000 Pedestrian Trail Maintenance 07-4160~2 1 48,000 49,000 50,000 51,000 52,000 250,000 Replacement- Blazer #11 09-4160~1 2 30,000 30,000 Replacement - Total Station 09-4160~2 1 21,000 21,000 Engineering Total 399,000 290,000 349,000 351,000 352,000 1,741,000 IFacility Management I Carpet Replacement 07-41900-01 2 10,000 10,000 10,000 10,000 10,000 50,000 Annual ParKing Lot Maintenance 07-4190~2 1 20,000 21,000 22,000 23,000 24,000 110,000 Communication Radios 07-4190~3 1 10,000 10,000 Surface Seal all Brick Structures OB-4190~1 1 40,000 40,000 Land Purchase OB-41900-02 1 515,217 515,217 Buildin9 A - Seal Floor 08-41900-03 1 7,000 8,000 15,000 Satt Storage Building OB-4190~4 1 350,000 350,000 Recyclin9 Buildin9 & Fence OB-41900-05 1 250,000 250,000 Attached Storage Buildin9 08-4190~6 1 200,000 200,000 Fire St #2 Addition and ParKin9 Lot Improve, 08-4190~7 2 450,000 450,000 Addition to Storage Building & Vehicle Maint Shop 09-41900-01 1 1,850,000 1,850,000 Pedestrian Tunnel Under Crosstown Blvd, 10-4190~1 1 300,000 300,000 Wednesday, August J 6, 2006 1 Departmen Project# Priority 2007 2008 2009 2010 2011 Total Facility Management Total 40,000 1,843,217 1,882,000 341,000 34,000 4,140,217 Fire Rescue Truck 07112200-01 1 40,000 40,000 New Mobile Data Terminals in Fire Trucks 0742200-02 2 30,000 30,000 Thermal Imaging Camera 07- 42200-03 1 14,000 14,000 Replacement - Hydraulic Rescue Equipment 07 -42200-04 2 30,000 30,000 Hose Washedfester 0742200-05 2 8,000 8,000 Replacement -Fire Marshall Vehicle 0842200-01 2 30,000 30,000 Replacement - Fire Tanker #31 08- 42200-02 1 295,000 295,000 i Waterllce rescue boat 08- 42200-03 1 20,000 20,000 Replacement - Fire Engine #11 09-42200-01 1 400,000 400,000 Replacement - Ladder Truck #11 10 -42200-01 1 850,000 850,000 Replacement - Fire Chiefs Vehicle 10 42200-02 2 40,000 40,000 Fire Total 122,000 345,000 400,000 890,000 1,757,000 Park & Rec - O perations Replace /Repair Play Structures - VariousParks 0745000-01 2 40,000 40,000 40,000 40,000 40,000 200,000 Replacement - Self - Propelled 48' Sweeper 07 -45000-02 2 20,000 20,000 Zero Turn Mower 0745000 -03 1 7,500 7,500 Replacement - Toro Groundsmaster328 07- 45000-04 1 32,000 32,000 Truck - 314 Ton Crew Cab 08115000 -01 1 35,000 35,000 Replacement - Mower Trailer 08 -05000-02 1 8,500 8,500 Replacement -Toro Groundmaster 08 -45000-03 1 22,000 22,000 Replacement - Large Cape* lawnmower 09 45000-01 1 112,000 112,000 Replacement - ToroGroundsmaster 0945000-02 1 23,000 23,000 Replacement - Trailer 11- 45000-01 2 9,000 9,000 Replacement - One Ton Pick U wlPlow 11- 45000-02 2 65,000 65,000 P P Park & Rec - Operations Total 99,500 105,500 175,000 40,000 114,000 534,000 Park &Rec - Proj Andover Station North Complex 07- 45001 -01 1 385,000 35,000 420,000 Terrace Park 07- 45001 -02 1 55,000 55,000 Crooked Lake Boat Landing 0745001 -03 1 125,000 125,000 Stmotman Park 0745001 -04 1 40,000 40,000 Annual Miscellaneous Projects 0745001 -99 1 25,000 25,000 25,000 25,000 25,000 125,000 Forest Meadows Park 08- 45001 -01 1 25,000 25,000 Sophies South Park 0845001 -02 1 75,000 75,000 Woodland Crossing Park 0845001 -03 1 57,000 57,000 Andover Lions Park 09 -45001 -01 1 85,000 85,000 Hawkridge Park Improvements 10 -45001 -01 1 500,000 500,000 Prairie Knoll Park - Phase III 1045001 -02 1 150,000 150,000 Park & Rec - Projects Total 630,000 217,000 110,000 675,000 25,000 1,657,000 Planning & Zo ning Replacement - Ford Taurus #15 08- 41500-01 2 20,000 20,000 Planning & Zoning Total 20,000 20,000 Sanitary Sewer Wednesday, August 16, 2006 2 Department Project# Priority 2007 2008 2009 20]0 2011 Total Lift Staion #1 Upgrade 07-48200-01 85,000 85,000 Crosstown Blvd Trunk Sewer Une 07-48200-02 400,000 400,000 New JeWac Truck 08-48200-01 300,000 300,000 Yellow Pine Lift Station 09-48200-01 650,000 650,000 Sanitary Sewer Total 485,000 300,000 650,000 1,435,000 iStorm Sewer , Storm Sewer Improvemenls 07-48300-01 1 50,000 51,000 52,000 53,000 54,000 260,000 F,E,S, Repair/Meadowood Addition/148th & Makah Sl 07-48300-02 1 60,000 60,000 New Track Backhoe 08-48300-01 2 80,000 80,000 Replacement- Elgin Street Sweeper 10-43100-01 1 150,000 150,000 Storm Sewer Total 110,000 131,000 52,000 203,000 54,000 550,000 :Street Signs I Replacement- Sign Truck #410 07 -43300-{)1 2 75,000 75,000 Radius Master Machine 07-43300-02 1 8,400 8,400 Street Signs Total 83,400 83,400 iStreets / Highways I Annual Street Seal Coal Project 07-43100-01 1 287,632 271,328 480,438 660,377 515,760 2,215,535 Annual Street Crack Seal Project 07-43100-02 1 89,840 98,968 183,390 153,439 152,187 677,824 Annual Street Mill and Overlay 07-43100-03 1 1,022,994 791,004 1,019,292 911,645 948,387 4,693,322 Annual Pavement MarKings 07-43100-04 1 15,000 16,000 17,000 18,000 19,000 85,000 Annual Cult Replacement 07-43100-05 1 40,000 41,000 42,000 43,000 44,000 210,000 Mounted Pothoie Spray Palcher 07-43100-06 1 150,000 150,000 Replacement- Dump Truck wi Snow Removal #195 07-43100-07 1 200,000 200,000 Rail Road Quiet Zones 07-43100-08 1 90,000 400,000 400,000 60,000 950,000 Municipal Stale Aid Routes I New & Reconstruct 07-43100-09 1 383,000 898,800 767,000 714,000 2,762,800 Inlersection Upgrades 07-43100-10 1 175,000 175,000 275,000 625,000 Construct Bikewayl Walkway Corridors 07- TRAIL-{)1 1 60,000 100,000 230,000 75,000 465,000 Replacement- Hot Asphall Box 08-43100-02 1 40,000 40,000 Dump Truck wlSnow Equipment 08-43100-04 2 155,000 155,000 Replacement- Dump Truck wi Snow Removal #197 08-43100-05 1 200,000 200,000 Replacement- Water Tanker 09-43100-01 2 100,000 100,000 Asphall Paving Machine 09-43100-02 1 90,000 90,000 Streets / Highways Total 2,513,466 3,187,100 2,837,120 2,688,461 2,393,334 13,619,481 IWater I Rehabilitation of Wells 07-48100-01 1 45,000 45,000 50,000 50,000 55,000 245,000 Seafing of Well #1 07-48100-02 2 10,000 10,000 Water Main along South Coon Creek Drive 08-48100-01 1 750,000 750,000 Waler Tower Painting 08-48100-02 1 350,000 350,000 Demolish 500,000 Gallon WalerTower 09-48100-01 1 175,000 175,000 Construct Waler Tower 09-48100-02 1 2,950,000 2,950,000 WTP Reclaim Tank Addition 10-48100-01 1 500,000 500,000 Water Total 55,000 1,145,000 3,175,000 550,000 55,000 4,980,000 GRAND TOTAL 4,552,866 7,690,817 9,894,120 5,788,461 3,055,334 30,981,598 Wednesday, August 16, 2006 3 City of Andover, MN Capital Plan 2007 thru 2011 PROJECTS BY FUNDING SOURCE Source Project# Priority 2007 2008 2009 2010 2011 Total IAssessmeuts ~ Annual Street Mill and Overlay 07-43100-03 306,898 237,301 305,788 273,493 284,516 1,407,996 Municipal State Aid Routes / New & Reconstruct 08-43100-01 83,000 128,400 200,000 71,000 482,400 Assessments Total 389,898 365,701 305,788 473,493 355,516 1,890,396 iBuilding Fund I Land Purdlase 08-41900-02 515,217 515,217 Building Fund Total 515,217 515,217 ICapital Equipment Reserve I Water Tower Painting 08-48100-02 242,000 242,000 Capital Equipment Reserve Total 242,000 242,000 ICapital Projects Levy . Annual Parkin9 Lot Maintenance 07-41900-02 1 20,000 21,000 22,000 23,000 24,000 110,000 Communication Radios 07-41900-03 1 10,000 10,000 Radius Master Machine 07-43300-02 1 8,400 8,400 ReplacelRepair Play Structures - Various Parl<s 07-45000-01 2 40,000 40,000 Voting Equipment 08-41310-01 1 100,000 100,000 Surface Seal all Brick Structures 08-41900-01 1 22,000 22,000 Capital Projects Levy Total 78,400 143,000 22,000 23,000 24,000 290,400 iCentral Equipment Fund I Replacement - Holsy Pressure Washer 09-48800-02 3 7,000 7,000 Replacement - Floor Sweeper 10-48800-01 1 35,000 35,000 Replacement - Service Truck 10-48800-02 2 28,000 28,000 Central Equipment Fund Total 7,000 35,000 28,000 70,000 , ICommunity Center Operations I Walk Behind Floor Scrubber 07-44000-01 1 7,500 7,500 Carpet - West Side EntJance 07-44000-02 2 8,000 8,000 Kitchen Equipment- Fryer/Grill 08-44000-01 2 7,000 7,000 Battery Pack Replacement - Zamboni 09-44000-01 2 7,000 7,000 Storage Building 1 0-44000-01 2 15,000 15,000 Community Center Operations Total 15,500 7,000 7,000 15,000 44,500 Wednesday, August 16, 2006 5 Source Project# Priority 2007 2008 2009 2010 2011 Total IConstruction Seal Coat Fund ~ Annual Street Seal Coat Project 07-43100-01 41,965 31,092 176,194 65,397 14,146 328,794 Annual Street Crack Seal Project 07-43100-02 9,114 24,498 9,095 1,967 0 44,674 Construction Seal Coat Fund Total 51,079 55,590 185,289 67,364 14,146 373,468 IDNR Grant ~ Crooked Lake Boat Landing 07-45001-03 62,500 62,500 DNR Grant Total 62,500 62,500 IEquipment Bond I Rescue Truck 07-42200-01 1 40,000 40,000 New Mobile Data Tenninals in Fire Trucks 07-42200-02 2 30,000 30,000 Thermal Imaging Camera 07-42200-03 1 14,000 14,000 Replacement- Hydraulic Rescue Equipment 07-42200-04 2 30,000 30,000 Hose Washerrr ester 07-42200-05 2 8,000 8,000 Mounted Pothole Spray Patcher 07-43100-06 1 150,000 150,000 Replacement - Dump Truck wi Snow Removal #195 07-43100-07 1 200,000 200,000 Replacement- Sign Truck #410 07-43300-01 2 75,000 75,000 Replacement- Seff-Propelled 48' Sweeper 07-45000-02 2 20,000 20,000 Zero Tum Mower 07-45000-03 1 7,500 7,500 Replacement - Taro Groundsmaster 328 07-45000-04 1 32,000 32,000 Replacement - Ford Taurus #15 08-41500-01 2 20,000 20,000 Replacement - Fire Marshall Vehicle 08-42200-01 2 30,000 30,000 Replacement- Fire Tanker #31 08-42200-02 1 295,000 295,000 Walernce rescue boat 08-42200-03 1 20,000 20,000 Replacement - Hot Asphall Box 08-43100-02 1 40,000 40,000 Dump Truck wlSnow Equipment 08-43100-04 2 155,000 155,000 Replacement - Dump Truck wi Snow Removal #197 08-43100-05 1 200,000 200,000 Truck - 3/4 Ton Crew Cab 08-45000-01 1 35,000 35,000 Replacement - Mower Trailer 08-45000-02 1 8,500 8,500 Replacement - Taro Groundmasler 08-45000-03 1 22,000 22,000 Replacement - Blazer #1 1 09-41600-01 2 30,000 30,000 Replacement - Total Station 09-41600-02 1 21,000 21,000 Replacement - Fire Engine #11 09-42200-01 1 400,000 400,000 Replacement- WalerTanl<er 09-43100-01 2 100,000 100,000 Asphall Paving Machine 09-43100-02 1 90,000 90,000 Replacement- Large Capacily Lawnmower 09-45000-01 1 112,000 112,000 Replacement - T oro Groundsmaster 09-45000-02 1 23,000 23,000 Replacement - Ladder Truck #1 1 10-42200-01 1 850,000 850,000 Replacement - Fire Chiefs Vehicle 10-42200-02 2 40,000 40,000 Replacement - Trailer 11-45000-01 2 9,000 9,000 Replacement - One Ton Pick Up wlPlow 11-45000-02 2 65,000 65,000 Equipment Bond Total 606,500 825,500 776,000 890,000 74,000 3,172,000 IG.O. Bond I Sail Storage Building 08-41900-04 1 350,000 350,000 Recycling Building & Fence 08-41900-05 1 250,000 250,000 Attached Storage Building 08-41900-06 1 200,000 200,000 Fire St #2 Addition and ParKing Lot Improve, 08-41900-07 2 450,000 450,000 Addition to Storage Building & Vehicie Maint Shop 09-41900-01 1 1,850,000 1,850,000 Wednesday, August J 6, 2006 6 Source Project# Priority 2007 2008 2009 2010 2011 Total Canopy for Fuel Island 09-48800-01 3 250,000 250,000 Pedestrian Tunnel Under Crosstown Blvd, 10-41900-01 1 300,000 300,000 G.O, Bond Total 1,250,000 2,100,000 300,000 3,650,000 iGeneral Fund I Carpet Replacement 07-41900-01 2 10,000 10,000 10,000 10,000 10,000 50,000 ReplacelRepair Play Structures. Various Paries 07-45000-01 2 40,000 40,000 40,000 40,000 160,000 Building A . Seal Floor 08-41900-03 1 7,000 8,000 15,000 General Fund Total 10,000 57,000 SO,OOO 58,000 SO,OOO 225,000 IMunicipal State Aid Funds I Rail Road Quiet Zones 07-43100-08 90,000 400,000 60,000 550,000 Municipal State Aid Routes I New & Reconstruct 08-43100-01 300,000 770,400 567,000 643,000 2,280,400 intersection Upgrades 08-43100-03 175,000 175,000 275,000 625,000 Municipal State Aid Funds Total 565,000 1,345,400 275,000 627,000 643,000 3,455,400 IPark Improvement Funds I Andover Station North Complex 07-45001-01 385,000 35,000 420,000 Terrace Park 07-45001-02 55,000 55,000 Crooked Lake Boat Landing 07-45001-03 62,500 62,500 Strootman Park 07-45001-04 40,000 40,000 Annual Miscellaneous Projecls 07-45001-99 25,000 25,000 25,000 25,000 25,000 125,000 Forest Meadows Park 08-45001-01 25,000 25,000 Sophies South Park 08-45001-02 75,000 75,000 Woodland Crossing Park 08-45001-03 57 ,000 57,000 Andover Lions Park 09-45001-01 85,000 85,000 Hawkridge Park Improvements 10-45001-01 500,000 500,000 Prairie KnoB Park. Phase III 10-45001-02 150,000 150,000 Park Improvement Funds Total 567,SOO 217,000 110,000 675,0ll0 25,000 1,594,500 !R & B - Crack Seal & Seal Coat I Annual Street Seal Coat Project 07-43100-01 245,667 240,236 304,244 594,980 501,614 1,886,741 Annual Street Crack Seal Project 07-43100-02 BO,726 74,470 174,295 151,472 152,187 633,150 R & B - Crack Seal & Seal Coat Total 326,393 314,706 478,539 746,452 653,801 2,519,891 IR & B - Overlays I Annual Street Mill and Overlay 07-43100-03 716,096 553,703 713,504 638,152 663,871 3,285,326 R & B - Overlays Total 716,096 553,703 713,504 638,152 663,871 3,285,326 IR & B - Pedestrian Trail ~ Pedestrian Trail Maintenance 07-41600-02 48,000 49,000 50,000 51,000 52,000 250,000 R & B - Pedestrian Trail Total 48,000 49,000 SO,OOO 51,000 52,000 250,000 IR & B - Reserve I Wednesday, August 16, 2006 7 Source Project# Priority 2007 2008 2009 2010 2011 Total Annual Pavement Mar1<ings 07-43100-04 15,000 16,000 17,000 18,000 19,000 85,000 Annual Curb Replacement 07-43100-05 40,000 41,000 42,000 43,000 44,000 210,000 Rail Road Quiet Zones 07-43100-08 400,000 400,000 R & B - Reserve Total 55,000 57,000 459,000 61,000 63,000 695,000 iSanitary Sewer Fund I New JeWac Truck 08-48200-01 300,000 300,000 Sanitary Sewer Fund Total 300,000 300,000 ISewer Revenue Bonds I Yellow Pine Lift Station 09-48200-01 650,000 650,000 Sewer Revenue Bonds Total 650,000 650,000 iSewer Trunk Fund I New Development Projects 07-41600-01 175,500 120,500 124,000 150,000 150,000 720,000 Lift Staion #1 Upgrade 07-48200-01 85,000 85,000 Crosstown Blvd Trunk Sewer Line 07-48200-02 400,000 400,000 Sewer Trunk Fund Total 660,500 120,500 124,000 150,000 150,000 1,205,000 IStorm Sewer Fund ~ Stonn Sewer Improvements 07-48300-01 1 SO,OOO 51,000 52,000 53,000 54,000 260,000 F,E,S, RepairlMeadowood Addilion/148lh & Makah Sl 07-48300-02 1 60,000 60,000 New Track Backhoe 08-48300-01 2 80,000 80,000 Replacement - Elgin Street Sweeper 10-43100-01 1 1SO,000 150,000 Storm Sewer Fund Total 110,000 131,000 52,000 203,000 54,000 550,000 ITrail Funds I Construct Bikeway! Walkway Corridors 07-TRAIL-01 60,000 100,000 230,000 75,000 465,000 Trail Funds Total 60,000 100,000 230,000 75,000 465,000 IWater Fund I Rehabmtation of Wells 07-48100-01 1 45,000 45,000 50,000 50,000 55,000 245,000 Seaflng of Well #1 07-48100-02 2 10,000 10,000 Surtace Seal all Brick Structures 08-41900-01 1 18,000 18,000 Water Fund Total 55,000 63,000 50,000 50,000 55,000 273,000 IWater Revenue Bonds Construct Water Tower 09-48100-02 2,950,000 2,950,000 Water Revenue Bonds Total 2,950,000 2,950,000 IWater Trunk Fund I New Development Projects 07-41600-01 175,500 120,500 124,000 150,000 150,000 720,000 Water Main along South Coon Creek Drive 08-48100-01 750,000 750,000 Wednesday, August 16, 2006 8 Source Project# Priority , 2007 2008 2009 2010 2011 Total Water Tower Painting 08-48100-02 108,000 108,000 Demolish 500,000 Gallon Water Tower 09-48100-01 175,000 175,000 WTP Reclaim Tank Addition 10-48100-01 500,000 500,000 Water Trunk Fund Total 175,500 978,500 299,000 650,000 150,000 2,253,000 GRAND TOTAL 4,552,866 7,690,817 9,894,120 5.788,461 3,055,334 30,981,598 Wednesday, August 16, 2006 9 Capital Plan City of Andover, MN 2007 thru 2011 Type Improvement Useful Life 20 Years Category Equipment Priority 3 - Low Contact PW Superintendent Department Central Equipment Project # 09-48800-01 Project Name Canopy for Fuel Island Description Relocate the fueling station and install two (2) new 10,000 gallon fuel tanks and possibility keep the 2,000 gallon diesel fuel tank for an alternative fuel like E85. Also, install a canopy to cover the fuel pumps and Gasboy fuel monitoring equipment Justification The canopy would keep the fuel pumps, gasboy equipment, operators dry and help keep sun, rain and snow damage to a minimum. It would also keep the fuel in the tanks from getting contaminated. The larger tanks will allow us to have tanker drops of? ,500 gallons of fuel, saving us money and the frequency of the drops that we now have, The tanks are approximately 18 years old and are warranted for 30 years. The pumps were installed in 1999 and are in good shape, Expenditures Improvement 2007 2008 2009 250,000 250,000 2010 2011 Total 250,000 250,000 Total Funding Sources G,Q, Bond 2007 2008 2009 250,000 250,000 2010 2011 Total 250,000 250,000 Total Operational Impact/Other I The larger tanks will allow us to have a tanker drops of 7,500 gallons of fuel, saving us money and the frequency of the drops that we now have, Wednesday, August J 6. 2006 1 1 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment Useful Life 10 Years Category Equipment Priority 3 - Low Contaet PW Superintendent Department Central Equipment Projeet # 09-48800-02 Project Name Replacement - Hotsy Pressure Washer Description I The existing Hotsy pressure washer is well used and becoming a high maintenance item. It has been working here for almost 15 years. Justification I A new one would operate more efficiently, saving time and money by having less break downs, The new one should run on natural gas rather than on kerosene, wouldn't have to run out and buy fuel for it all the time, Expenditures Equipment 2007 2008 2009 7,000 7,000 2010 2011 Total 7,000 7,000 Total Funding Sources Central Equipment Fund 2007 2008 2009 7,000 7,000 2010 2011 Total 7,000 7,000 Total Operntional Impact/Other I Less break downs, saving time and money, Not having to send people out to buy fuel for it would also save money. Harder to get parts for. Wednesday, August J 6, 2006 12 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment Useful Life IS Years Category Equipment Priority I - High Contact PW Superintendent Department Central Equipment Project # 10-48800-01 Project Name Replacement - Floor Sweeper Description Replace Unit #324, a 1991 Floor Sweeper/Scrubber, With the addition of new buildings, it will be more economical to purchase a new unit that is faster and more efficient 1 don't believe that a bigger machine is what we need but one that is just more efficient Justification The floors are not cleaned as often as they should be because the current sweeper's washing and vacuum portion is worn out and parts are getting harder to find. The sweeper works well outside because we only use the broom portion of the machine, The present machine works well for the area that we now have but ifwe double the area, we will need to be able to clean the area faster and do it more efficiently, Expenditures Equipment, 2007 2008 2009 2010 35,000 35,000 2011 Total 35,000 35,000 Total Funding Sources Central Equipment Fund 2007 2008 2009 2010 35,000 35,000 2011 Total 35,000 35,000 Total Operational Impact/Other I A new machine would have less maintenance issues even with using it more often. Wednesday, August J 6, 2006 13 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment Useful Life 10 Years Category Equipment Priority 2 - Medium Contact PW Superintendent Department Central Equipment Project # 10-48800-02 Project Name Replacement - Senice Truck Description Replace Unit #371, a 2001 510 Ex! Cab 4x4 truck with 34,000 miles, This truck averages about 7,000 miles a year and by 2010 it will have approximately 62,000 miles, The new truck should be able to carry 3 or 4 people and also have a tailgate lift. A crew cab truck set up with some of the same options that are on the #371 would be good. Justification I To assist mechanics with jobs outside the shop such as parts runs, schooling, vehicle repair and moving equipment around. Many times this vehicle is not big enough to handle the job, A newer truck would be more efficient and help us work more efficiently. The current vehicle would make a good intern or spare vehicle or kept as a runner/drop truck. Expenditures Vehicles 2007 2008 2009 2010 2011 28,000 28,000 Total 28,000 28,000 Total Funding Sources Central Equipment Fund 2007 2008 2009 2010 2011 28,000 28,000 Total 28,000 28,000 Total Operntional Impact/Other I A bigger vehicle would increase operating costs - fuel and maintenance. Wednesday. August 16, 2006 14 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment Useful Life 5 years Category Equipment Priority 1 - High Contaet Comm Ctr Manager Department Community Center Project # 07-44000-01 Project Name Walk Behind Floor Scrubber Description I A new walk behirid floor scrubber for operations at the Conununity Center. Justification I The floor scrubber would be used throughout the Conununity Center. The field house alone needs to be scrubbed every week, and at 16,000 + square feet a new floor scrubber would help, In addition to the field house, we would use the scrubber in the ice arena locker rooms and hallway, main street, and concessions lobby area. Expenditures Equipment 2007 7,500 7,500 2008 2009 2010 2011 Total 7,500 7,500 Total Funding Sources Community Center Operations 2007 7,500 7,500 2008 2009 2010 2011 Total 7,500 7,500 Total Operntional Impact/Other I The floor scrubber would allow us to continue to maintain the facility at a high level. Wednesday, August 16, 2006 15 Capital Plan City of Andover, MN 2007 thru 2011 Type Improvement Useful Life 10 Years Category Improvements Priority 2 - Medium Contaet Comm Ctr Manager Department Community Center Prnject # 07-44000-02 PrnjectName Carpet - West Side Entrance Description Install carpet tiles inside the west end doors. Justification I The carpet tiles would give the entrance a more finished look. In addition to keeping snow / salt / sand from making it's way down the hall during the winter months, the tiles can be replaced as they go bad without having to change the entire carpet area. Expenditures Improvement 2007 8,000 8,000 2008 2009 2010 2011 Total 8,000 8,000 Total Funding Sources Community Center Operations 2007 8,000 8,000 2008 2009 2010 2011 Total 8,000 8,000 Total Operational Impact/Other I It would save staff from having to mop or scrub the entrance area as much. It also would be safer in the winter months due to the concrete floor getting slippery. We currently have a contract to rent carpet runners in the winter and spring that would no longer be needed, Wednesday, Augusl16, 2006 16 Capital Plan City of Andover, MN 2007 thru 2011 Project # 08-44000-01 Project Name Kitchen Equipment - Fryer/Grill Type Equipment Useful Life 15-20 Years Category Equipment Priority 2 - Medium Contact Comm Ctr Manager Department Community Center Description I A grill and flyer for expanding the menu at the Community Center concessions, Justification I When the concessions was built, the hood and steel wall guards were installed. This would be the next step in finishing off that area The YMCA would in the end share in the cost to purchase. Expenditures Equipment 2007 2008 7,000 7,000 2009 2010 2011 Total 7,000 7,000 Total Funding Sources Community Center Operations Total 2007 2008 7,000 7,000 2009 2010 2011 Total 7,000 7,000 Operational Impact/Other I The additional revenues from the sales of "hot" food items would help pay the equipment off over the years. There would be some additional costs when it comes to hiring a cook to prepare the food. According to the Anoka County Health Department we are already licensed to operate a grill and fryer. Wednesday, August 16, 2006 17 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment Useful Life 7 Years Category Unassigned Priority 2 - Medium Contact Department Community Center Project # 09-44000-01 Project Name Battery Pack Replacement - Zamboni Description I Battery Pack for the Electric Zamboni. Justification l The battery pack that drives the Zamboni has to be replaced every 5-7 years, Over time, the batteries will hold less and less of a charge and eventually have to be replaced, Expenditures Vehicles 2007 2008 2009 7,000 7,000 2010 2011 Total 7,000 7,000 Total Funding Sources Community Center Operations 2007 2008 2009 7,000 7,000 2010 2011 Total 7,000 7,000 Total Operational Impact/Other l The Zamboni is a necessary part of the operation of the ice arena, and without it we would not be able to keep the facility open. The hope is that with the preventative maintenance program that is in place, we can achieve the maximum amount of time available on the battery pack before it has to be renlaced, Wednesday, August 16, 2006 18 Capital Plan City of Andover, MN 2007 thru 2011 Type Improvement Useful Life 25 Years Category Building Construction Priority 2 - Medium Contact Comm Ctr Manager Department Community Center Project # 10-44000-01 Project Name Storage Building Description I Storage Building / Garage for future equipment purchases, The building would be added to the north end of the field house using the existing wall as part of the new structure. Justification I As the Community Center continues to grow and acquire more recreational equipment, tables, chairs etc., there will be a lack of storage space, We would only buy equipment if there was a need for it in the field house and if it would help increase rental hours, Some of the equipment would be rented out to users and create additional revenues. Expenditures Construction 2007 2008 2009 2010 15,000 15,000 2011 Total 15,000 15,000 Total Funding Sources Community Center Operations 2007 2008 2009 2010 15,000 15,000 2011 Total 15,000 15,000 Total Operational Impact/Other I The additional space would provide storage for equipment and would need to have electricity and heat. This space would free up some space in what has already become a crowded field house storage room. Wednesday, August J 6, 2006 19 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment Useful Life 15 Years Category Equipment Priority I - High Contaet City Clerk Department Elections Project # 08-41310-01 Project Name Voting Equipment Description I New electronic voting equipment for 10 precincts, Justification I A Federal mandate to comply with HA VA - Help America Vote Act The current equipment is non-compliant. Total 2008 100,000 100,000 2009 2010 2011 Total 100,000 100,000 . Expenditures 2007 Equipment Total 2008 100,000 100,000 2009 2010 2011 Total 100,000 100,000 Funding Sources 2007 Capital Projects Levy Operational Impact/Other I Continued storage and maintenance of all the equipment. Wednesday, August J 6, 2006 20 Capital Plan City of Andover, MN 2007 thru 2011 Type Improvement Useful Life 50 YeaIS Category New Development Projects Priority I - High Contact City Engineer Department Engineering Project # 07-41600-01 Project Name New Development Projects Description New developments include the construction of sanitary sewer, water main, storm sewers and streets, Since the majority of the improvement projects are being privately installed by the developer, the following expenditures are the city's share for trunk water and sewer improvements, Note: All private development construction is dependent upon market conditions, plat approval and normal City development procedures. Justification The develoment phasing is identified in the City's Comprehensive Plan. Expenditures Construction 2007 351,000 351,000 2008 241,000 241,000 2009 248,000 248,000 2010 300,000 JOO,Ooo 2011 300,000 JOO,OOO Total 1,440,000 1,440,000 Total Funding Sources 2007 2008 2009 2010 2011 Total Sewer Trunk Fund 175,500 120,500 124,000 150,000 150,000 720,000 Water Trunk Fund 175,500 120,500 124,000 150,000 150,000 720,000 Total 351,000 241,000 248,000 300,000 JOO,Ooo 1,440,000 Operational Impact/Other I Additional maintenance of streets, storm sewer, water main and sanitary sewer will result Additional streets will be added for snowplowing. Wednesday, August 16, 2006 21 Capital Plan City of Andover, MN Project # 07-41600-02 Project Name Pedestrian Trail Maintenance 2007 thru 2011 Type Improvement Useful Life 20 years Category Improvements Priority 1 - High Cootact City Eogineer Department Engineering Description This project provides maintenance such as patching, crack filling and restoration for the city's pedestrian and park trail system. Justification -I City trails are in need of general maintenance including bituminous patching, crack filling and restoration to maintain the high level of service to pedestrian walkers, bikers and roller bladers. A 5-year capital improvement plan was prepared for the City to identifY and prioritize the necessary repairs, Expenditures Improvement 2007 48,000 48,000 2008 49,000 49,000 2009 50,000 SO,OOO 2010 51,000 51,000 2011 52,000 52,000 Total 250,000 250,000 Total Funding Sources R & B - Pedestrian Trail 2007 48,000 48,000 2008 49,000 49,000 2009 50,000 SO,OOO 2010 51,000 51,000 2011 52,000 52,000 Total 250,000 250,000 Total Operational Impact/Other I As the city trail system begins to age, general maintenance such as bituminous patching, crack filling and restoration becomes a necessity. The maintenance will allow for a longer service life for the trail system throughout the city. Wednesday, August J 6, 2006 22 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment Useful Life 10 Years Category Equipment Priority 2 - Medium Contact City Eogineer Department Engineering Project # 09-41600-01 Project Name Replacement - Blazer #11 Description I Replace Unit #11, a 1995 SIO Blazer with 57,700 miles. The Engineering Department puts about 5,000 miles per year on this vehicle. After 14 years, it will have approximately 77,000 miles on it This unit could make a good intern vehicle or spare vehicle if needed. Justification I This vehicle is an Engineering Tech inspection vehicle and needs to be available for inspections and surveying, Expenditures Equipment 2007 2008 2009 30,000 30,000 2010 2011 Total 30,000 30,000 Total Funding Sources Equipment Bond 2007 2008 2009 30,000 30,000 2010 2011 Total 30,000 30,000 Total Operational Impact/Other I Lower maintenance costs and downtime, . Wednesday, August 16, 2006 23 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment Useful Life 10 years Category Equipment Priority I - High Contact City Engineer Department Engineering Project # 09-41600-02 Project Name Replacement - Total Station Description Replace the existing Total Station, which is approximately 8 years old and utilizes outdated software, The Engineering Department utilizes the Total Station to stake construction projects (curb and gutter, sewer, water main, etc) and to complete topographic surveys for design purposes, The Total Station is used almost on a daily basis during the construction season by the Engineering Department Replacement of the Total Station would be approximately every 10 years upon purchase of a new unit Justification The hardware and software associated with the Total Station becomes more obsolete every year. It would be beneficial to replace this unit while it still has some trade value towards purchase of a new unit Expenditures Equipment 2007 2008 2009 21,000 21,000 2010 2011 Total 21,000 21,000 Total Funding Sources Equipment Bond 2007 2008 2009 21,000 21,000 2010 2011 Total 21,000 21,000 Total OperationallmpactJOther l Upgrading the unit will allow for increased efficiency by the Engineering Department as new hardware and software technologies are incorporated into the surveying discipline, Wednesday, August J 6, 2006 24 Capital Plan City of Andover, MN 2007 thru 2011 Type Improvement Useful Life 10 Vears Category Equipment Priority 2 - Medium Contact PW Superintendent Department Facility Management Project # 07-41900-01 Project Name Carpet Replacement Description The replacement of carpet in appropriate areas of all City buildings where deemed necessary. An annual review of all carpeted areas will be done to determine the order of replacement Justification The buildings get a lot of use and, despite the appropriate cleaning and maintenance, the carpeted areas will need to be replaced. Expenditures Facility Maintenance 2007 10,000 10,000 2008 10,000 10,000 2009 10,000 10,000 2010 10,000 10,000 2011 10,000 10,000 Total 50,000 SO,OOO Total Funding Sources General Fund 2007 10,000 10,000 2008 10,000 10,000 2009 10,000 10,000 2010 10,000 10,000 2011 10,000 10,000 Total 50,000 SO,OOO Total OperntionaI Impact/Other I The carpet replacement will be needed in order to keep the buildings in good repair, Due to heavy use, it is anticipated that all carpeted areas will need to be replaced. Wednesday, August 16, 2006 25 Capital Plan City of Andover, MN 2007 thru 2011 Type Improvement Useful Life 10 Years Categury Improvemeuts Priority 1 - High Contact City Engineer Department Facility Management Project # 07-41900-02 Project Name Annual Parking Lot Maintenance Description Yearly maintenance of the City parking lots is n=ssary to extend their useful lives. Parking lots that need maintaining include those at the City Hall complex, Public Works, Community Center, at City parks, and at the Fire Stations. Yearly maintenance may include crack sealing, seal coating, and mill and overlays. Maintenance will generally be completed with the street zones, or on an as needed basis. Justification Completing periodic maintenance on the City parking lots, similar to City streets, will extend the overall design life of the pavement and reduce and/or prolong costly repairs. Expenditures Improvement 2007 20,000 20,000 2008 21,000 21,000 2009 22,000 22,000 2010 23,000 23,000 2011 24,000 24,000 Total 110,000 110,000 Total Funding Sources Capital Projects Levy 2007 20,000 20,000 2008 21,000 21,000 2009 22,000 22,000 2010 23,000 23,000 2011 24,000 24,000 Total 110,000 110,000 Total Operational Impact/Other I Maintaining the parking lots will result in less annual maintenance for public works and prolong the life of the pavements, Wednesday, August 16, 2006 26 Capital Plan City of Andover, MN 2007 thru 2011 Projeet # 07-41900-03 ProjeetName Communication Radios Type Equipment Useful Life ] 0 Years Category Equipment Priority ] - High Contaet PW Superintendent Department Facility Management Description l The city has a need for three 800 mhz communication radios to be used in emergency situations between the Civil Defense person, Public W orles Superintendent, Fire Chief and the Sherifl's Department Justification I Central Communications changed to the new frequency a few years back and the old system will be discontinued.. Expenditures Equipment 2007 10,000 10,000 2008 2009 2010 2011 Total 10,000 10,000 Total Funding Sources Capital Projects Levy 2007 10,000 10,000 2008 2009 2010 2011 Total 10,000 10,000 Total Operational Impact/Other I Without the ability to communicate between departments, we slow down the response time that is so critical when dealing with emergencies. Wednesday, August J 6, 2006 27 Capital Plan City of Andover, MN 2007 thru 2011 Type Improvement Useful Life 5 years Category Facility Management Priority 1 - High Contact PW Superintendent Department Facility Management Project # 08-41900-01 Project Name Surface Seal all Brick Structures Description A surface sealing application would be initiated for all brick and/or block municipal buildings. The buildings include: City Hall, Public Works, Fire Station #1 & #2, Sunshine Park Building, Prairie Knoll Park Building, and all utility department buildings such as the pump houses and treatment facility. Justification This is a necessary maintenance item to ensure the long term integrity of the municipal buildings, Expenditures Facility Maintenance 2007 2008 40,000 40,000 2009 2010 2011 Total 40,000 40,000 Total Funding Sources Capital Projects Levy Water Fund 2007 2008 22,000 18,000 40,000 2009 2010 2011 Total 22,000 18,000 40,000 Total Operational Impact/Other] This will reduce the amount of long term maintenance and repair to the municipal buildings, Wednesday, August 16, 2006 28 Capital Plan City of Andover, MN 2007 thru 2011 Type Improvement Useful Life Unassigned Category Improvements Priority 1 - High Contact PW Superintendent Department Facility Management Project # 08-41900-02 Project Name Land Purchase Description Purchase land west of the Public Works building to be used for a salt storage building, material storage, recycling center and future facility expansion. The City's is currently under contract to purchase this property, The City management team will be evaluating and assisting with the planning and future expansion for the Public Works Facility. Adequate property is necessary to insure that future needs of the community can be met. Justification This is the last opportunity to purchase this property and keep city facilities together in one complex. Future site expansion opportunities are limited without additional property. Expenditures Land Acquisition 2007 2008 515,217 515.217 2009 2010 2011 Total 515,217 515.217 Total Funding Sources Building Fund 2007 2008 515.217 515.217 2009 2010 2011 Total 515,217 515.217 Total Operational Impact/Other Large cost savings in keeping facilities together. Another large savings is having a salt storage area on the property, The recycling center would be moved away from the parks and this would help maintain cleaner parks on the complex. It would also provide a large storage area for the seal coat rock, swe in etc. en land areas in Andover will soon be a thin of the ast Wednesday, August J 6, 2006 29 Capital Plan City of Andover, MN 2007 thru 2011 Type Improvement Useful Life 2 Years Category Facility Management Priority I - High Contact PW Superintendent Department Facility Management Project # 08-41900-03 Project Name Building A - Seal Floor Description Apply a sealant to the cement floor in Building A (large garage), Justification The cement floor in Building A spalds due to salt and traffic from daily vehicles use, Sealing of the floors should be repeated every 2 years to retain the integrity of the floor surface. Without this process, the cement floor would deteriorate and would have to be replaced. It is much more cost effective to perform the maintenance than to replace the entire floor. Expenditures Facility Maintenance 2007 2008 7,000 7,000 2009 2010 8.000 8,000 2011 Total 15,000 15,000 Total Funding Sources General Fund 2007 2008 7,000 7,000 2009 2010 8,000 8,000 2011 Total 15,000 15,000 Total Operational Impact/OtlJer I Gives use a much longer life of the cement floor, than having to replace it before its life expectancy is up, Wednesday, August 16, 2006 30 Capital Plan City of Andover, MN Project # 08-41900-04 Project Name Salt Storage Building 2007 thru 2011 Type Improvement Useful Life 30 Years + Category Facility Management Priority 1 - High Contact PW Superintendent Department Facility Management Description I Ibis salt storage building would be 40' x 50' x 25' high. The City would be able to purchase a season's worth of salt and keep it stored inside this structure out of the elements, We would meet all environmental specifications needed for this type of storage, with no damage to the product being stored. This facility would be built to blend in with the rest of the City complex and not a sight distraction within the campus. Justification I At the present time the City purchases salt from Anoka County, which has been done since the City was first adopted. This puts us at the mercy of the county operations, causing situations such as what time someone will be there to load our trucks, do they have an adequate supply of salt needed at all times, We have had good working relations with the county, but they also would like to see us be able to store our own winter supply so they would be able to keep a larger supply of salt for county use, Cost savings is also a large part of having our own storage, We can purchase product at $10.00 to 15.00 per ton less, plus we wouldn't be paying a 15% administration fee for county personnel services. This building will pay for itself over a short oeriod of time. Expenditures Construction 2007 2008 350,000 350,000 2009 2010 2011 Total 350,000 350,000 Total Funding Sources G,O, Bond 2007 2008 350,000 350,000 2009 2010 2011 Total 350,000 350,000 Total Operational Impact/Other I Having this building right here on campus will save a great deal of personnel time, )nicking, and fuel costs, The salt not used could be returned to the storage building and not dumped outside where it gets wet and damaged, or becomes an environmental problem. Wednesday, August J 6, 2006 31 Capital Plan City of Andover, MN Project # 08-41900-05 Project Name Recycling Building & Fence 2007 thru 2011 Type Improvement, Useful Life 15-20 Years Category Facility Management Priority 1 - High Contact PW Superintendent Department Facility Management Description I Move Recycling Center from location on Tower Drive to new location located north of the water treatment facility, A new building that will be constructed of materials that will best blend in with the rest of the public works campus, This structure will have to be larger than the present one so more recycled materials can be stored inside and with less chance of the lighter materials blowing out Also need more room for outside storage, a paved drive surface, completely fenced, better security lighting, and updated security camera's. Justification I At the present location we have just plain run out of room! And the recycling center will have to be moved do to it now sits in the foot print of the new addition of the vehicle storage building. Also as clean as we try to keep this area, it is probably not the best neighbor to the Community Center and YMCA do to items that blowout of the recycling storage yard Also it would be best to keep the large trucks off of Tower Drive for safety reason, due to narrow streets and a lot of pedestrian traffic, Expenditures Construction 2007 2008 250,000 250,000 2009 2010 2011 Total 250,000 250,000 Total Funding Sources G,Q, Bond 2007 2008 250,000 250,000 2009 2010 2011 Total 250,000 . 250,000 Total Operational Impact/Other I In the new location we will most likely be able to keep a closer watch on the area. It will still be within the area of the public works so there would be no extra cost in maintenance of the grounds and with a larger area it will be more customer friendly. Wednesday, August 16, 2006 32 Capital Plan City of Andover, MN 2007 thru 2011 Project # 08-41900-06 Project Name Attacbed Storage Building Type Improvement Useful Life 25 Years Category Facility Management Priority 1 - High Contact PW Superintendent Department Facility Management Description I Three sided attachment building 25' x 50'. This building will be used for small equipment that can be stored in all types of temperature but under a roofto protect it from the elements. It will also work as screening the facility. Justification Expenditures Construction 2007 2008 200,000 200,000 2009 2010 2011 Total 200,000 200,000 Total Funding Sources G,Q, Bond 2007 2008 200,000 200,000 2009 2010 2011 Total 200,000 200,000 Total I ""........ 1m..."",." Wednesday, August 16, 2006 33 Capital Plan City of Andover, MN Project # 08-41900-07 Project Name Fire St. #2 Addition and Parking Lot Improve. 2007 thru 2011 Type bnprovement Useful Life 30 Years Category bnprovements Priority 2 - Medium Contact Fire Chief Department Facility Management Description The addition of one bay to the apparatus area, the purchase and storage of an auxiliary power generator, and expanding the existing parking lot to allow for more room and parking space, The project also includes a mill and overlay of the existing parking lots at Station #1 and #2. Justification The additional space to the building will allow for all vehicles to be parked in front of an exit door. The firefighters will not have to move a vehicle in order to get another one out of the building. The additional bay will also make clean up operations after an event much easier, The frrefighters will not have to 1I!0ve vehicles out of the building in order to clean hose and equipment The additional parking space will provide for much needed hard surface training area and more vehicle parking, Replacement of the existing parking lots is necessary due to the heavy frre vehicle traffic, Expenditures 2007 2008 2009 2010 2011 Total Equipment 35,000 35,000 Improvement 415,000 415,000 Total 450,000 450,000 Funding Sources G,Q, Bond 2007 2008 450,000 450,000 2009 2010 '2011 Total 450,000 450,000 Total Opemtional Impact/Other I The additional space will make all fire operations more efficient at this building, Vehicles will not have to be moved in order to get others out and clean-up will be much easier and faster, Wednesday, August J 6, 2006 34 Capital Plan City of Andover, MN 2007 thru 2011 Project # 09-41900-01 Project Name Addition to Storage Building & Vehicle Maint. Shop Type Improvement Useful Life 30 Yean; + Category Facility Management Priority 1 - High Contact PW Superintendent Department Facility Management Description I This is an addition to the present vehicle storage building. It will be added to the north end of the present building and be the same in size, 100' x 250' with a 75' x 140' addition to the northwest side of the new vehicle storage garage for the vehicle maintenance shop. This building will be built with cement panels to match the present vehicle garage and would screen Public Works operations from the Community Center/YMCA as proposed in ajoint meeting with the Mayor and City Council. Justification 1 Due to the increase of vehicles, equipment and supplies now used by the City of Andover, this vehicle storage building and vehicle maintenance repair shop is badly needed. It is not cost effective to have vehicles or other equipment stored outside. Minnesota's four seasons are way too hard on them and it makes for a much cleaner operation. The vehicle maintenance repair shop has been needed for a long time. The area now used has doors that are not wide enough and work areas for the hydraulic hoist are way too small. Also with the amount of equipment now maintained by our staff in the area is much too small to run a completely safe operation. Expenditures Improvement 2007 2008 2009 1,850,000 1,850,000 2010 2011 Total 1,850,000 1,850,000 Total Funding Sources G,Q, Bond 2007 2008 2009 1,850,000 1,850,000 2010 2011 Total 1,850,000 1,850,000 Total Operational Impact/Other This will impact the life of the vehicles and other equipment by being stored inside and to house our vehicle maintenance mechanics. Over the years, the cost savings have been shown when the proper maintenance of our equipment can be implemented. This building will provide a safe, roductive, and health 0 erational area for Ci em 10 ees that will benefit the Ci of Andover for man ears, Wednesday, August J 6, 2006 35 Capital Plan City of Andover, MN 2007 thru 2011 Project # 10-41900-01 Project Name Pedestrian Tunnel Under Crosstown Blvd. Type Improvement Useful Life 30 Years + Category Facility Management Priority 1 - High Contact PW Superintendent Department Facility Management Description I This would be a pedestrian underpass walkway under Crosstown to accommodate pedestrian traffic from a possible development of a parking lot or other sports fields on the north side of Crosstown Boulevard that could crossunder Crosstown Boulevard to Sunshine Park Facilities or just connect to the cities trail system. Justification 1 This item was discussed at a Council Workshop with the Public Works Department Managers February 16th 2006, For safety and for easy access for crossing Crosstown Boulevard from a future park and/or future parking lot on the north side of Crosstown Boulevard to Sunshine Park on the South side, or just getting to the city trail system the quickest and safest way will be a pedestrian underpass under Crosstown Boulevard. . Expenditures Improvement 2007 2008 2009 2010 300,000 300,000 2011 Total 300,000 300,000 Tolal Funding Sources G,Q, Bond 2007 2008 2009 2010 300,000 300,000 2011 Total 300,000 300,000 Tolal Operational Impact/Other 1 Connecting of these area's though a trail system, or underpass will only benefit our operational impact This underpass will also add to the safety of our personnel and equipment. That is the smaller equipment that now has to cross a very busy street, could also use the underpass. Keeping the campuses formate works well in holdinQ down operational cost. Wednesday, August 16, 2006 36 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment Useful Life 10 Years Category Equipment Priority I . High Contact Fire Chief Department Fire Project # 07-42200-01 Project Name Rescue Truck Description Purchase a rescue truck for responding to emergency medical calls. These would be an addition to the fleet Justification Currently the grass truck at St #2 is responding to all medical calls but is not equipped to handle all emergencies. Another smaller truck designated and equipped strictly for medical calls would be more efficient and economical, thus preserving the bigger grass rig and extending its useful life, Of the fire department responses, approximately 60% of the calls are now medical related, With the medical gear currently stored on the grass truck, the equipment is always getting wet or damaged by fire type responses, The goal of having one specific vehicle at each station designed for medical responses will help to keep the appropriate equipment in the right locations always available for medical calls, The proposed truck will have a fiberglass body with plenty of storage space so that we will also be able to store and transport hydraulic rescue equipment on the vehicle as needed. The grass trucks will last us longer as they will be used strictly for wildfires and transportation of hose and equipment from fire scenes. The medical gear and equipment will also be less likely to become contaminated by fire and have to be thrown away or cleaned before we have a chance to use it All three stations have a higher percentage of medical responses and it is important that we have the appropriate vehicles to erform the 'ob, Expenditures Vehicles 2007 40,000 40,000 2008 2009 2010 2011 Total 40,000 40,000 Total Funding Sources Equipment Bond 2007 40,000 40,000 2008 2009 2010 2011 Total 40,000 40,000 Total Operational Impact/Other I A smaller truck would be more efficient and economical and would also extend the useful life of the grass rig, By having a designated vehicle for medical responses, the fire department will be able to cany more of the appropriate medical equipment and not have to be concerned about contamination from grass fires or other types offrre incidents that we may respond to, The "medical" vehicles will also be kept in town and not in other cities as they may be now when called for mutual aid assistance for wildfires. Wednesday, August J 6, 2006 37 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment Useful Life 5 years Category Equipment Priority 2 - Medium Contact Fire Chief Department Fire Project # 07-42200-02 Project Name New Mobile Data Terminals in Fire Trucks Description Installation of mobile data terminals (MDT's) in fire trucks, Justification By including MDTs in fIre vehicles, firefIghters will be able to access important data and information from the Anoka County Communications Center and fire stations, As an example, known bazardous conditions will be identified while responding to the incident Expenditures Equipment 2007 30,000 30,000 2008 2009 2010 2011 Total 30,000 30,000 Total Funding Sources Equipment Bond 2007 30,000 30,000 2008 2009 2010 2011 Total 30,000 30,000 Total OperntionailmpactlOther I The installation ofMDTs will improve communications and data capabilities. The opportunity to view important information prior to arriving at the scene will make the firefIghters jobs much safer. Wednesday, August J 6, 2006 38 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment Useful Life 5 years Category Equipment Priority 1 - High Contact Fire Chief Department Fire Project # 07-42200-03 Project Name Thermal Imaging Camera Description I The thermal imaging camera is new technology that will greatly increase firefighters ability to locate beat sources in a structure. The camera is designed to be used to find human bodies in fire situations where it is near impossible to see because of the smoke and fire encountered during a structure fire, The camera will also be used to fmd hot spots in walls and lor floors during the extinguishment process. Justification I Firefighters will be much more effective in performing search and rescue of victims who could not get out of the structure for some reason. The camera will also be very helpful in identifYing internal hot spots that may not be visible. Expenditures Equipment 2007 14,000 14,000 2008 2009 2010 2011 Total 14,000 14,000 Total Funding Sources Equipment Bond 2007 14,000 14,000 2008 2009 2010 2011 Total 14,000 14,000 Total Operational Impact/Other I The camera will potentially save lives of victims who may not be visible by conventional methods or means, Firefighters can scan a room from one location looking for a victim and move to the next room much faster. Wednesday, August} 6. 2006 39 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment Useful Life 10 yean; Category Equipment Priority 2 - Medium Contact Fire Chief Department Fire Project # 07-42200-04 Project Name Replacement - Hydraulic Rescue Equipment Description Replace one (and possibly two) hydraulic rescue tools used for extrication and heavy rescue work. Justification The current equipment is approximately 13 years old and is somewhat heavier than the new types of equipment. The new hydraulic tools also have more capacity for pushing, pulling, and cutting activities, Expenditures Equipment 2007 30,000 30,000 2008 2009 2010 2011 Total 30,000 30.000 Total Funding Sources Equipment Bond 2007 30,000 30,000 2008 2009 2010 2011 Total 30,000 30,000 Total Operntional Impact/Other I The hydraulic rescue equipment is necessary to provide the fastest and most efficient means to extricate trapped parties, The lighter weight and stronger tools will make the rescue work much less stressful for the firefighters to perform. Wednesday, August J 6, 2006 40 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment Useful Life 20 Years Category Equipment Priority 2 - Medium Contact Fire Chief Department Fire Project # 07-42200-05 Project Name Hose Washerffester Description The hose washer !tester can be used to wash hose as necessary and also to conduct the annual required hose tests. Justification The hose washer will save time after the incident has ended in that the firefighters will be able to wash hose much faster after each incident The tester will be use to conduct the annual hose testing where each section of hose is required to be tested to a certain pressure for a certain period of time. The tester will allow the fire department to keep the pumpers in service instead of committing them for the testing process, Expenditures Equipment 2007 8,000 8,000 2008 2009 2010 2011 Total 8,000 8,000 Total Fnnding Sources Equipment Bond 2007 8,000 8,000 2008 2009 2010 2011 Total 8,000 8,000 Total Operational ImpactJOtlJer I The new washer /tester will aid in making our jobs of getting the trucks back into service much easier after the fire events. The washer can clean hose much faster than firefighters scrubbing hose with a brush or broom, The hose is required to be tested annually, and with the proposed tester at least five sections can be tested at a time instead of doing each section individuallv, Wednesday, August 16, 2006 41 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment Useful Life 1 0 Years Category Equipment Priority 2 - Medium Contact Fire Chief Department Fire Project # 08-42200-01 Project Name Replacement - Fire Marshall Vehicle Description Replace Unit # 4801 _ 1997 SlO Blazer with 53,000 miles. We may want to evaluate what type of vehicle we will need for this position at the time of replacement Justification The Fire Marshal's vehicle is anticipated to have approximately 65,000 miles on it by the year 2008, and the ability to respond to an emergency with a dependable vehicle needs to be considered. There have been more maintenance issues with this vehicle, and although most have been minor, the occurrences are increasing and the costs will also start to increase as the vehicle gets older. Expenditures Vehicles 2007 2008 30,000 30,000 2009 2010 2011 Total 30,000 30,000 Total Funding Sources Equipment Bond 2007 2008 30,000 30,000 2009 2010 2011 Total 30,000 30,000 Total Operational Impact/Other I The new vehicle will be used for day to day inspections and also emergency responses when the Fire Marshal is available to assist at the incident including medical calls, It is crucial that the Fire Marshals vehicle be in good operating order to perform all of the functions needed. This vehicle is also used to help conduct all of the fire investigations and the appropriate equipment needs to be stored in the vehicle. The fire department needs to have a verY denendable vehicle to perform all of the functions listed, Wednesday, August 16, 2006 42 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment UseCul LiCe 20 Years Category Equipment Priority 1 - High Contact Fire ChieC Department Fire Project # 08-42200-02 Project Name Replacement - Fire Tanker #31 Description Replace fire tanker #31, a 19911ntemational! Alexis tanker with 7,700 miles, Justification l lbis vehicle will be seventeen years old in 2008 and will most certainly need a major refurbishment or replacement It would be recommended to replace and sell the existing vehicle as is so that our fire department will benefit from new vehicle technology that should last us for the next twenty years. The maintenance costs are starting to increase and the body work needed should be evaluated. The new tanker will have high technology flow meters, automated pump controls, a more efficient engine that creates less pollution in the station and on the road. Expenditures Equipment 2007 2008 295,000 295,000 2009 2010 2011 Total 295,000 295,000 Total Funding Sources Equipment Bond 2007 2008 295,000 295,000 2009 2010 2011 Total 295,000 295,000 Total Operational Impact/Other The new technology will allow firefighters to perform their jobs in a more efficient and safe manner. The newer technology will allow for just one operator to staff the vehicle for water shuttles to and from the fire scenes, Currently, we need at least two firefighters to operate the tanker properly, The newer controls and gauges will also help to make the vehicle much easier to pump and dump water as needed. Other items that will be improved include; electronic dump chutes for water control, inside cab controls for operator ease, larger pump that can he 1.5.0, certified, better emergency lighting for responding to the scene, more storage room, roll up doors for safer access on the scene, pre plumbed suppressant foam su I, electroniclh draulic dum tank lowerin device, and the room needed for a second ortable tank. Wednesday, August J 6, 2006 43 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment Useful Life 15 Years Category Equipment Priority I - High Cootact Fife Chief Department Fire Project # 08-42200-03 Project Name WaterlIce rescue boat Description A small boat designed and built to perform water and ice rescues, Justification Andover does not currently have a rescue boat. The boat would be used to perform ice and water rescues, The boat will make these specific types of rescues safer for all responders, The boat will allow firefighters to perform rescue work rather than waiting for a boat to arrive and perform recovery work. Expenditures Equipment 2007 2008 20,000 20,000 2009 2010 2011 Total 20,000 20,000 Total Funding Sources Equipment Bond 2007 2008 20,000 20,000 2009 2010 2011 Total 20,000 20,000 Total Operational Impact/Other I Boat will make an easier and safer rescue for all responders and parties being rescued, The boat will save lives and make it safer for firefighters who have to enter the water or crawl on the ice, The current method of having firefighters wear wet suits and try to swim or crawl on the ice to the victim is not Very safe or recommended if we can avoid it The boat will helD !tet the rescuer and victim out of the situation faster and safer, Wednesday, August 16, 2006 44 Capital Plan City of Andover, MN Project # 09-42200-01 Project Name Replacement - Fire Engine #11 2007 thru 2011 Type Equipment Useful Life 20 Years Category Equipment Priority 1 - High Contact Fire Chief Department Fire Description Replace fire engine #11, a 1991 Pierce Lance pumper truck with 23,100 miles, Justification Engine # II and three other major pieces of equipment are scheduled to be replaced in the next few years. The current engine is working fme but is starting to have more day to day repairs. As with any vehicle that is 16 years old, some parts can be harder to fmd and take longer to receive for needed repairs. The fire department can not afford to have vehicles down for extended periods of time. Expenditures Vehicles 2007, 2008 2009 400,000 400,000 2010 2011 Total 400,000 400,000 Total Funding Sources Equipment Bond 2007 2008 2009 400,000 400,000 2010 2011 Total 400,000 400,000 Total Operational Impact/Other I The new technology will allow firefighters to respond and conduct fire suppression activities, rescue operations, and other required activities in a safer and more efficient manner, The maintenance costs can be lowered as well, Some of the new technology items include increasing the capability to transport more firefighters to the scene, internal plumbed foam suppressant system, climate control1ed cab can be used for firefighter rehabilitation, much better visibility when driving to emergencies, better maneuverability, and new designs make it much easier to enter and exit the cab area In addition the new emergency lighting standards will make it easier to see the truck while responding and also while parked at the scene, Wednesday, Augusl16, 2006 45 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment Useful Life 20 Years Category Equipment Priority I - High Contact Fire Chief Department Fire Prnject# 10-42200-01 Project Name Replacement - Ladder Truck #11 Description Replace ladder truck #11, a 1991 Pierce 75' ladder truck with 15,800 miles. The new ladder truck would be a 100 foot aerial platform, which includes a bucket at the end of the ladder for firefighter safety. The 100 foot reach will allow for the fire departrnentto perform rescue and suppression activities in buildings that we can not currently reach, Justification I The city is required by the 1.8,0, to have this type of vehicle available for use because of the building heights allowed in Andover, The new platform style truck versus the current straight ladder will be much safer for firefighter activities and fire suppression activities. It should be noted that the newest aerial truck equipment and technologies are better than what we are now using, The new vehicles have safety sensors and weight distribution gauges that will keep the operators from making mistakes while operating the truck that could be very costly or dangerous, The newer buildings in Andover are getting taller with more green space between the building and a hard surface making it much more difficult to reach some of them because of the height restrictions of the current ladder truck. Expenditures Equipment 2007 2008 2009 2010 850,000 850,000 2011 Total 850,000 850,000 Total Funding Sources Equipment Bond 2007 2008 2009 2010 850,000 850,000 2011 Total 850,000 850,000 Total Operational Impact/Other I The use of an aerial device can be very dangerous if not performed properly, A new platform truck will allow firefighters to perform the most dangerous of activities as required from time to time, and know that they have the right piece of equipment to do the job, The larger and taller buildings now being built in Andover will require this type of equipment The current ladder truck has been fairly dependable with not many major repairs needed. The maintenance costs are going up for this vehicle and the trade in value may be going down as the truck gets older, The new bucket style of truck will also much safer conditions for firefighters performing suppression activities. The new ladder truck can be equipped to have pre-plumbed breathing air in the bucket for extended use and also high intensity lighting mounted on the bucket wiIl greatly increase site visibility, Firefighters will no longer have to cany heavy equipment up the ladder but rather can swing the bucket down to the ground to pick it up, The larger cab design wiIl allow for transporting more firefighters and also can be used for rehabilitation of staff when needed, The bucket design will also allow for two master stream devices mounted near the top of the bucket to be used for extinguishment for very large types of fires, The over head visibilitv at the scene will also heln the incident commander make vital decisions regarding the tactics and strategies to be used, Wednesday, August 16, 2006 46 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment Useful Life ) 0 Vears Category Equipment Priority 2 - Medium Contact Fire Chief Department Fire Project # 10-42200-02 Project Name Replacement - Fire Chiefs Vehicle Description Replacement of Fire Chiefs vehicle, a 2002 Tahoe with approximately 34,000, Justification In order to keep the first line emergency responding vehicles in the proper operating conditions, it is important to replace equipment when needed. The current vehicle has worked vel)' well and should be evaluated for repair histol)' and maintenance costs as the replacement date gets closer. Expenditures Equipment 2007 2008 2009 2010 40,000 40,000 2011 Total 40,000 40,000 Total Funding Sources Equipment Bond 2007 2008 2009 2010 40,000 40,000 2011 Total 40,000 40,000 Total Operational Impact/Other I The Chiefs vehicle is used by the Chief to respond to emergency incidents. The vehicle has to be in good shape and able to provide safe and protective transportation when responding to all types of incidents. The vehicle also carries all of the Chiefs protective gear and equipment needed to help conduct fire investigations. The Chief regularly uses the vehicle to conduct interviews while on the scene with property owners and also uses the truck to provide a place for fire victims to sit out of the elements while they are waiting for relatives or the Red Cross to respond to the scene, Wednesday, August 16, 2006 47 Capital Plan City of Andover, MN 2007 thru 2011 Project # 07-45000-01 Project Name ReplacelRepair Play Structures - Various Parks Type Improvement Useful Life 10 Years Category Park Improvements Priority 2 - Medium Contact PW Superintendent Department Park & Rec - Operations Description I Repair to fall zones and achieve ADA accessibility. Replacement of playgrmmd equipment and other major replacements, such as short fences on ball fields, soccer goals, or any area of play that does not meet safety specifications. Justification I Old equipment no longer meets ADA requirements, such as entrapments, fall zones or handicap accessibility, Working to bring the parks up to meet all safety requirements, Expenditures Equipment 2007 40,000 40,000 2008 40,000 40,000 2009 40,000 40,000 2010 40,000 40,000 2011 40,000 40,000 Total 200,000 200,000 Total Funding Sources 2007 2008 2009 2010 2011 Total Capttal Projects Levy 40,000 40,000 General Fund 40,000 40,000 40,000 40,000 160,000 Total 40,000 40,000 40,000 40,000 40,000 200,000 Operational Impact/Other I Less maintenance and will meet all safety requirements, Wednesday, August 16, 2006 48 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment Useful Life 15 Years Category Equipment Priority 2 - Medium Contact PW Superintendeot Department Park & Rec - Operations Project # 07-45000-02 Project Name Replacement - Self-Propelled 48" Sweeper Description Replace Unit #542, a 1988 Olathe sweeper, This machine is smaller than the pull type and can get into tighter places, Justification The current machine has a lot of hours on it and is costing us more each year to repair and maintain as a front line unit Expenditures Equipment 2007 20,000 20,000 2008 2009 2010 2011 Total 20,000 20,000 Total Funding Sources Equipment Bond 2007 20,000 Total 20,000 2008 2009 2010 2011 Total 20,000 20,000 Operntional Impact/Other I A more cost efficient machine with less breakdowns. . Wednesday, August 16, 2006 49 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment Useful Life 10 Years Category Equipment Priority I - High Contact PW Superintendent Department Park & Rec - Operations Project # 07-45000-03 Project Name Zero Turn Mower Description A zero turn mower to be used by the Parks Department for mowing operations at the Community Center, City Hall and Public Works facilities. Justification I This mower is smaller than the normal six foot mowers and has a zero turn operation allowing it to trim and turn in smaller areas. Expenditures Equipment 2007 7,500 7,500 2008 2009 2010 2011 Total 7,500 7,500 Tola) Funding Sources Equipment Bond 2007 7,500 7,500 2008 2009 2010 2011 Total 7,500 7,500 Tola) Operational Impact/Other 1 This machine can be used in more isolated areas and eliminate trimming with a hand mower and less clean up. Saving time, personnel and money. Wednesday. AuguS116. 2006 50 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment Useful Life I 0 Years Category Equipment Priority I - High Contact PW Superintendent Department Park & Roc - Operations Project # 07-45000-04 Project Name Replacement - Toro Groundsmaster 328 Description Replace Unit #560, a 1992 Toro Groundmaster 328 with cab, a 72" discharge deck and snow blower and has approximately 1,600 hours, The Parks Department would like to replace it with a 4-wheel drive model, which is helpful in moving snow and mowing on hilly and wet terrain, The current machine would replace one of the older units in another department Justification This unit is used year round and maintenance costs are rising, The cost to operate this unit increased $,58 per hour this last year, This unit used around the Community Center, City Hall and Public Works facilities. Expenditures Equipment 2007 32,000 32,000 2008 2009 2010 2011 Total 32,000 32,000 Total Funding Sources Equipment Bond 2007 32,000 32,000 2008 2009 2010 2011 Total 32,000 32,000 Total Operational Impact/Other I An additional unit with a cab will help during winter operations. The 4-wheel drive unit will be more efficient with its time ra!her than spinning its tires and getting stuck. Wednesday, August J 6, 2006 51 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment Useful Life 10 Years Category Equipment Priority I - High Conlaet PW Superintendent Department Park & Rec - Operations Projeet # 08-45000-01 Project Name Truck - 3/4 Ton Crew Cab Description Large pick up truck to haul mowers, equipment and personnel to job sites around the city, It would be similar to Unit 502 which has worked great. This would be an addition to the fleet Justification I To haul more equipment and personnel to various job sites saving time, Expenditures Vehicles 2007 2008 35,000 35,000 2009 2010 2011 Total 35,000 35,000 Total Funding Sources Equipment Bond 2007 2008 35,000 35,000 2009 2010 2011 Total 35,000 35,000 Total Operationallmpact/Other I Save time and money by hauling a number of people out to the job site in one vehicle rather than two or more, A second rig would be extremly helpful during the spring, summer and fall months when all of the part-time help is here. Wednesday, August 16, 2006 52 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment Useful Life 10 Years Category Equipment Priority I - High Contact PW Superintendent Department Park & Rec - Operations Project # 08-45000-02 Project Name Replacement - Mower Trailer Description Replace Unit# T-555, a tandem axle trailer with GVW rating of 10,000 to 12,000 lbs with a trailer similar to Unit #T-554., Justification This trailer has already been sandblasted and painted once before because of rust and is now starting to sbow its age, In addition, this trailer bas higher siderails making it diffucult to load and unload equipment Expenditures Equipment 2007 2008 8,500 8,500 2009 2010 2011 Total 8,500 8,500 Total Funding Sources Equipment Bond 2007 2008 8,500 8,500 2009 2010 2011 ' Total 8,500 8,500 Total Operntional Impact/Other I Save time and money in bauling equipment around the city on a proven multi use trailer, Wednesday, August J 6, 2006 53 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment Useful Life 10 Years Category Equipment Priority 1 - High Contact PW Superintendent Department Park & Rec - Operntions Project # 08-45000-03 Project Name Replacement - Toro Groundmaster Description Replace Unit #550, a 1998 Taro Groundmaster mower with 2,700 hours, Justification The maintenance cost are substantially higher than any of the other mowers. This machine is spending more and more time in the shop being repaired rather than mowing and being productive, Expenditures Equipment 2007 2008 22,000 22,000 2009 2010 2011 Total 22,000 22,000 Total Funding Sources Equipment Bond 2007 2008 22,000 22,000 2009 2010 2011 Total 22,000 22,000 Total OpemtionaI Impact/Other] More time being productive, saving time and money, . Wednesday, August 16, 2006 54 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment Useful Life 10 Years Category Equipment Priority 1 - High Contact PW Superintendent Department Park & Rec - Operations Projeet # 09-45000-01 Project Name Replacement - Large Capacity Lawnmower Description Replace Unit #580, a 1999 Toro 580 large capacity mower with 2,000 hours. This machine is averaging 200 - 300 hours per year and by 2009 it will have approximately 2,500 hours, Justification Maintenance costs are starting to accumulate and it should be traded in while it still has some value. Maintenance costs rose $1.37 per hour over the previous year. Expenditures Equipment 2007 2008 2009 112,000 112,000 2010 2011 Total 112,000 112,000 Total Funding Sources Equipment Bond 2007 2008 2009 112,000 112,000 2010 2011 Total 112,000 112,000 Total Operational Impact/Other I Higher maintenance cost, possibly more break downs and lower trade-in value, Wednesday, August J 6, 2006 55 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment Useful Life 10 Years Category Equipment Priority 1 - High Coo tact PW Superintendent Department Park & Rec - Operations Project # 09-45000-02 Project Name Replacement - Toro Groundsmaster Description Replace Unit #559, a 1999 Toro Groundsmaster 328 with 1,600 hours, Justification These units are run year round and average about 300 hours a year!! With the additional parks that are added each year, the average hour that each machine puts on will increase, Expenditures Equipment 2007 2008 2009 23,000 23,000 2010 2011 Total 23,000 23,000 Total Funding Sources Equipment Bond 2007 2008 2009 23,000 23,000 2010 2011 Total 23,000 23,000 Total Operational Impact/Other I Possibility of more costly breakdowns in the future along with higher everyday maintenance issues, Wednesday, Augus116, 2006 56 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment Useful Life 10 Years Category Equipment Priority 2 - Medium Contact PW Superintendent Department Park & Rec - Operations Project # 11-45000-01 Project Name Replacement - Trailer Description Replace Unit #T-554, a tandem axle trailer with GVW rating of 10,000 - 12,000 lbs. We just had it sand blasted and repainted top to bottom extending it useful life a few more years, Justification This is the main trailer for the Parks Department. It was the first and only trailer that was designed for hauling mowers and it has worked out great. We would like to purchase another one just like it. Expenditures Equipment 2007 2008 2009 2010 2011 9,000 9,000 Total 9,000 9,000 Total Funding Sources Equipment Bond 2007 2008 2009 2010 2011 9,000 9,000 Total 9,000 9,000 Total Operntional Impact/Other 1 More parks can only mean moving more equipment to them. Wednesday, August 16, 2006 57 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment Useful Life ] 0 Years Category Equipment Priority 2 - Medium Contact PW Superintendent Department Park & Rec - Operations Project # 11-45000-02 Project Name Replacement - One Ton Pick Up wlPlow Description Replace Unit # 599, a 2000 F450 I-ton with 37,000 miles, These trucks are on the move all year and average about 6,000 miles per year, Justification This truck is used everyday; hauling material, equipment, people and also plowing snow in the winter, The plowing of snow puts a lot of wear and tear on the engine, transmission and other drive line components, Expenditures Vehicles 2007 2008 2009 2010 2011 65,000 65,000 Total 65,000 65,000 Total Funding Sources Equipment Bond 2007 2008 2009 2010 2011 65,000 65,000 Total 65,000 65,000 Total Operationallmpact/Otber I Being that this is a front line unit, we need to know that we can count on it everyday. Cost to operate it have only gone up $.22 per mile last year put those costs will continue to rise in the coming years, With preventative maintenance, we might be able to extend its useful life, Wednesday, Augusl16, 2006 58 Capital Plan City of Andover, MN 2007 thru 2011 Type Improvement Useful Life 30 Years + Category Park Improvements Priority I - High Contact City Engineer Department Park & Rec - Projects Project # 07-45001-01 Project Name Andover Station North Complex Description Continued development and construction of an AthleticlPark Complex south of the WDE site. With the fields due to be completed in the fall of 2006; bleachers and playground equipment will be necessary. In order to maximize the usage of the fields, lighting of the two larger fields is necessary with the possibility of lighting the third and smaller field. 2007 - $20,000 for 3 sets of bleachers, $65,000 for playground equipment and $300,000 to light the 2 larger fields and possibly the smaller field. 2008 - $35,000 for playground equipment Note: Parkin would be shared with the businesses. Justification The bleachers are necessary to allow the spectators to enjoy watching the games without having to stand for long periods of time; The playground equipment will allow families with children not playing baseball the opportunity to enjoy another activity. The lighting of the fields allows additional games and practices to be played during the evenings. Expenditures Improvement 2007 385,000 385,000 2008 35,000 35,000 2009 2010 2011 Total 420,000 420,000 Total Funding Sources Park Improvement Funds 2007 385,000 385,000 2008 35,000 35,000 2009 2010 2011 Total 420,000 420,000 Total Operational Impact/Other I Routine maintenance will be required to upkeep the field and park. Wednesday, August J 6, 2006 59 Capital Plan City of Andover, MN 2007 thru 2011 Type bnprovement Useful Lire 25 Years Category Park bnprovements Priority 1 - High Cootact City Engineer Department Park & Rec - Projects Project # 07-45001-02 Project Name Terrace Park Description Install new basketball court and parking lot with concrete curb and gutter along with completing a small section of trail to provide access to the playground equipment and the other portions of the park. Justification I The existing parking lot is currently gravel. Since this is located in an urban area, the parking lot should be paved and the neighborhood residents have requested a baskethall court. Also, the trail to the playground area needs to be paved. This project has been recommended by the Park & Recreation Commission. Expenditures Improvement 2007 55,000 55,000 2008 2009 2010 2011 Total 55,000 55,000 Total Funding Sources Pari< Improvement Funds 2007 55,000 55,000 2008 2009 2010 2011 Total 55,000 55,000 Total Operational Impact/Other I Additional long-term maintenance and ultimately replacement will be necessary, Wednesday, Augusr 16, 2006 60 Capital Plan City of Andover, MN 2007 thru 2011 Type Improvement Useful Life 25 Y <:an; Category Park Improvements Priority 1 - High Cootaet City Engineer Departmeot Park & Rec - Projects Project # 07-45001-03 Project Name Crooked Lake Boat Landing Description I Construct new parking lot, install new dock and dredge boat landing area. This project will go forward with the assistance of a MN DNR Matching Grant Justification I The existing parking lot is beyond its normal maintenance requirements. Surface has deteriorated and a number of pot holes have been filled up to this point A boat dock is necessary for individuals launching their boat, Also, the boat landing has silted in and needs to be removed to allow boats to maneuver. This project has been recommended by the Park & Recreation Commission. Expenditures Improvement 2007 125,000 125,000 2008 2009 2010 2011 Total 125,000 125,000 Total Funding Sources DNR Grant Parle Improvement Funds 2007 62,SOO 62,500 125,000 2008 2009 2010 2011 Total 62,500 62,500 125,000 Total Operational Impact/Other 'I Normal maintenance (sealcoating. sniping. etc.) will be necessary. Wednesday, August J 6, 2006 61 Capital Plan City of Andover, MN 2007 thru 2011 Project # 07-45001-04 Type Improvement Useful Life 25 Years Category Park Improvements Priority 1 - High Contact City Engineer Department Park & Rec - Projects Project Name Strootman Park Description I Reconstruct existing ballfield and replace fencing, The ballfield will be reduced in size for players generally under the age of 12. In addition, there will not be an outfield fence so the field can be used for other sports as welL Justification I Current ballfield fencing does not meet League ofMN Cities guidelines and needs to be replaced. This project has been recommended by the Park & Recreation Commission, Expenditures Improvement 2007 40,000 40,000 2008 2009 2010 2011 Total 40,000 40,000 Total Funding Sources Park Improvement Funds 2007 40,000 40,000 2008 2009 2010 2011 Total 40,000 40,000 Total Operational Impact/Other I Normal maintenance will be necessary, Wednesday, August} 6, 2006 62 Capital Plan City of Andover, MN 2007 thru 2011 Project # 07-45001-99 Project Name Annual Miscellaneous Projects Type Improvement Useful Life Unassigoed Category Park Improvements Priority I - High Contact City Engineer Department Park & Rec - Projects Description I This is for unforeseen or requested miscellaneous projects that may arise during the year, requested by the public, staff, City Council or the Parks and Recreation Commission for each year. Justification I This gives flexibility to the City to do certain small-sized projects that may be warranted; for example, purchase of soccer goals. This funding has been recommended by the Park & Recreation Commission. Expenditures Improvement 2007 25,000 25,000 2008 25,000 25,000 2009 25,000 25,000 2010 25,000 25,000 2011 25,000 25,000 Total 125,000 125,000 Total Funding Sources Park Improvement Funds 2007 25,000 25,000 2008 25,000 25,000 2009 25,000 25,000 2010 25,000 25,000 2011 25,000 25,000 Total 125,000 125,000 Total OperntionaI Impact/Other I Allows the Park and Recreation Commission to address a variety of different needs throughout the year, Wednesday, August 16, 2006 63 Capital Plan City of Andover, MN 2007 thru 2011 Project # 08-45001-01 Project Name Forest Meadows Park Type Improvement Useful Life 15 Years Category Park Improvements Priority 1 - High Contact City Engin= Department Park & Ree - Projects Description Install additional playground equipment for 2-5 year old users. Justification I This funding has been recommended by the Park & Recreation Commission. Total 2008 25,000 25,000 2009 2010 2011 Total 25,000 25,000 Expenditures 2007 Improvement Total 2008 25,000 25,000 2009 2010 2011 Total 25,000 25,000 Funding Sources 2007 Pari< Improvement Funds Operational Impact/Other I Additional long-term maintenance and ultimately replacement will be necessary. Wednesday, August 16, 2006 64 Capital Plan City of Andover, MN 2007 thru 2011 Type Improvement Useful Life 15 Years Category Park Improvements Priority 1 - High Contact City Engineer Department Park & Rec - Projects Project # 08-45001-02 Project Name Sophies South Park Description Install new playground equipment and basketball court. The park was dedicated as part of the development of Sophies South. Since no park exists within the general area, it was recommended to begin developing the park. Justification This funding has been recommended by the Park & Recreation Commission. Expenditures Improvement 2007 2008 75,000 75,000 2009 2010 2011 Total 75,000 75,000 Total Funding Sources Park Improvement Funds 2007 2008 75,000 15,000 2009 2010 2011 Total 15,000 15,000 Total OpemtionaI Impact/Other I Additional long-term maintenance and ultimately replacement will be necessary, Wednesday, August 16, 2006 65 Capital Plan City of Andover, MN 2007 thru 2011 Type hnprovement Useful Life 15 Years Category Park hnproyements Priority 1 - High Contact City Engineer Department Park & Roc - Projects Project # 08-45001-03 Project Name Woodland Crossing Park Description Install new playground equipment Justification The park will have a new basketball court and shelter built in 2006. To complete the park, new playground equipment is necessary for all ages from 2 - 12 years old. Expenditures Improvement 2007 2008 57,000 57,000 2009 2010 2011 Total 57,000 57,000 Total Funding Sources Parlt Improvement Funds 2007 2008 57,000 57,000 2009 2010 2011 Total 57,000 57,000 Total Operational Impact/Other I Additional long-term maintenance and ultimately replacement will be necessary. Wednesday, August 16, 2006 66 Capital Plan City of Andover, MN 2007 thru 2011 Project # 09-45001-01 Project Name Andover Lions Park Type Improvement Useful Life 25 Years Category Park Improvements Priority 1 - High Contact City Engineer Department Park & Rec - Projects Description l Install outfield fencing with mow strips for ballfield and install new irrigation system. 8 foot high fencing with mow strips - $35,000 and irrigate existing ballfield - $50,000. Justification I The installation of an outfield fence will allow the ball to stay in play and also give the awesome feeling when a ball is hit for a home run, Also give the players a safer playing surface by installing a irrigation system. This project has been recommended by the Park & Recreation Commission. Expenditures Improvement 2007 2008 2009 85,000 85,000 2010 2011 Total 85,000 85,000 Total Funding Sources Park. Improvement Funds 2007 2008 2009 85,000 85,000 2010 2011 Total 85,000 85,000 Total OperationallmpactlOther I Additionallong-tenn maintenance and ultimately replacement will be necessary, Wednesday, August 16, 2006 67 Capital Plan City of Andover, MN 2007 thru 2011 Type Improvement Useful Life 30 Years Category Park Improvements Priority 1 - High Contact City Engineer Department Park & Rec - Projects Project # 10-45001-01 Project Name Hawkridge Park Improvements Description The project includes the construction of a warming house, construction of a well w/pump and controls, installation of irrigation for the soccer and ball fields, playground equipment for children 2-5 years of age and bleachers for sporting spectators. Storage building/bathroomslconcessions - $209,000; drill well with pump & controls - $100,000; septic system - $7,500; pave existing parking lot - $90,000; irrigation for 2 fields - $50,000; playground Equipment (2-5 year olds) - $25,000; bleachers with concrete pads(soccer & ballfield - $15,000; securi light - $2,500; ark si e and landsca in - $1,000. Justification By continuing to improve the park system in Andover, the City provides a high quality parks and recreation complex to meet the growing needs of an active community. These improvements will provide high quality athletic and recreational opportunities to the residents, A warming house provides shelter and a restroom facility that can be used year around. The well and irrigation provide for a high quality athletic surface for soccer, baseball/softball activities and water for the restroom. Playground equipment provides activities for younger children and bleachers provide a safe and comfortable place for spectators. This roO ect has been recommended b the Park & Recreation Commission. Expenditures Improvement 2007 2008 2009 2010 500,000 500,000 2011 Total 500,000 500,000 Total Funding Sources Park Improvement Funds 2007 2008 2009 2010 500,000 500,000 2011 Total 500,000 500,000 Total Operational Impact/Other The construction of a warming house and restroom facility will increase the use and enjoyment of the park. Also, the construction of the storage/warming house/restroom facility will eliminate the need to rent a portable warming house and portable bathroom, The well construction will give the ability to ice the rinks from the on-site well and will eliminate the need to "tanker" water to the site from the Public Works facility on Crosstown Blvd. The la ound e ui ment will re uire additionallong-tenn maintenance and ultimate re lacement will be necess Wednesday, Augusrl6, 2006 68 Capital Plan City of Andover, MN 2007 thru 2011 Project # 10-45001-02 Projcct N'ame Prairie Knoll Park - Phase ill Type Improvement Useful Life 25 Years Category Park Improvements Priority 1 . High Contact City Engineer Department Park & Rec - Projects Description 2010 - The parking lot would be paved including concrete curb and gutter ($150,000). Justification I Prairie Knoll Park is considered a regional city park and completion would bring it into compliance with City standards due to the increased use by the associations for both soccer and football. This project has been recommended by the Park & Recreation Commission. Expenditures Improvement 2007 2008 2009 2011 Total 150,000 150,000 Total 2010 .150,000 150,000 Funding Sources Park Improvement Funds 2007 2008 2010 150,000 150,000 2009 Total 2011 Total 150,000 150,000 Operational ImpactlOfuer I Additionallong-tenn maintenance and ultimately replacement will be necessary, . 69 Wednesday, August J 6, 2006 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment UseCul LiCe I 0 Years Category Equipment Priority 2 - Medium Contact Comrn, Dev, Director Department Planning & Zoning Project # 08-41500-01 Project Name Replacement - Ford Taurus #15 Description Replace Unit #15, a 1995 Taurus with 64,000 miles. 1bis unit averages 4,000 to 6,000 miles a year, Justification By year 2008, this vehicle will have 75,000 miles on it This vehicle could be used as an intern vehicle or for city employees attending seminars/training, Expenditures Equipment 2007 2008 20,000 20,000 2009 2010 2011 Total 20,000 20,000 Total Funding Sources Equipment Bond 2007 2008 20,000 20,000 2009 2010 2011 Total 20,000 20,000 Total Operationallmpact/Other I Will decrease maintenance costs and improve productivity. 1bis car could be kept and used for interns and possibly replace an older unit Wednesday, August J 6, 2006 70 Capital Plan City of Andover, MN 2007 thru 2011 Type Improvement Useful Life 15-20 Years Category Improvements Priority 1 - High Contact PW Superintendent Department Sanitary Sewer Project # 07-48200-01 Project Name Lift Staion #1 Upgrade Description Replacement of the control cabinet at this lift station along with replacement of the pumps. Adding a permanent natural gas generator to this site is also included, Justification This lift station was originally set up as a temporary lift station. When future development to the west was to take place and a new trunk line was installed from the Anoka area, this station was then to be eliminated and the flows would be to a gravity system. We have been told this probably will not happen any time soon and we should consider the lift station as a permanent structure, This is the oldest lift station of the 9 currently in use, The controls and components to operate this unit are out dated and in need of replacement The controls would be upgraded to the same controls used at all the other stations. This particular station has the highest usage on a day to day basis along with the longest force main to reach the gravity system. There have been numerous power outages at this location and it is recommended to install a p=anent generator on this site as well. Expenditures Improvement 2007 85,000 85,000 2008 2009 2010 2011 Total 85,000 85,000 Total Funding Sources Sewer Trunk Fund 2007 85,000 85,000 2008 2009 2010 2011 Total 85,000 85,000 Total Operational Impact/Other I By upgrading this site, the number and types of problems would be significantly reduced. This lift station would be patterned after lift station #4, which was upgraded in 2006, It has seen a dramatic decrease in the number of alarms and call outs, which is saving many hours of overtime to respond to anv calls, Wednesday, August 16, 2006 71 Capital Plan City of Andover, MN 2007 thru 2011 Type bnprovement Useful Life 50 Vears Category Improvements Priority I - High Contact City Engineer Department Sanitary Sewer Project # 07-48200-02 Project Name Crosstown Blvd Trunk Sewer Line Description Extend sanitary sewer trunk along Crosstown Boulevard from the railroad tracks east to Prairie Road. It will be necessary to jack the sanitary sewer underneath the railroad, Justification I The trunk sanitary sewer will be extended to serve properties adjacent to Crosstown Boulevard and east of Prairie Road. The extension has been recommended through the sanitary sewer report (2004 Sanitary Sewer Report). Expenditures Improvement 2007 400,000 400,000 2008 2009 2010 2011 Total 400,000 400,000 Total Funding Sources Sewer Trunk Fund 2007 400,000 400,000 2008 2009 2010 2011 Total 400,000 400,000 Total Operational Impact/Other I Additional routine maintenance including televising and cleaning will be required. Wednesday, August J 6, 2006 72 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment Useful Life 15-20 Years Category Equipment Priority 1 - High Contaet PW Superintendent Department Sanitary Sewer Project # 08-48200-01 PrnjectName New JetIVac Truck Description This is a combinationjet/vac unit, Model 2115 Positive Displacement Unit (PD Unit) used for cleaning sanitary and storm sewers, This unit will carry up to 2000 gallons of water and 600 feet of jetting hose, Justification I Approximately 13 miles or 15% of the sanitary sewer system is trunk mains with diameters of 12" - 36". These trunk mains are flowing near capacity in some areas at the present time. By removing the sedimentation in these pipes the flow line will drop giving more room for additional flows, In turn this could put on hold the addition of the designated lift station to by pass certain areas for a year or more. Without the addition of this new PD Unit, the trunk lines could still be cleaned by blocking the flow in the main which will cause a backup in the system until the pipes are cleaned. This would be done in sections at a time to try and avoid a major backup into basements, This is not the best way to do the maintenance but would work with some risk. This type of unit can also clean flared end sections in back yards and sedimentation ponds within a reasonable distance, This would allow some areas to be cleaned without having to enter properties with equipment that will do some type of damage to yards saving money in yard restoration, Expenditures Equipment 2007 2008 300,000 300,000 2009 2010 2011 Total 300,000 300,000 Total Funding Sources Sanitary Sewer Fund 2007 2008 300,000 300,000 2009 2010 2011 Total 300,000 300,000 Total Operational Impact/Other I This truck will help save time with cleaning of the system. It will also allow the system to be cleaned under heavy flows which cannot be done with the machine currently being used. This type of V AC truck will allow the operators to clean more of the system without having to stop because the truck cannot handle the flows, It would save time by not having to plug mains and risk backups into basements because of some unforeseen difficulty, The older machine would be used in the storm sewer department which would enable the maintenance department to clean both sanitary and storm sewers at the same time which will help satisfy some of the rQuirements for the NPDES, Wednesday, August J 6, 2006 73 Capital Plan City of Andover, MN 2007 thru 2011 Type Improvement Useful Life 50 Years Category Improvements Priority I - High Contact PW Superintendent Department Sanitary Sewer Project # 09-48200-01 Project Name YeHow Pine Lift Station Description Install a lift station at Yellow Pine Street to divert flow from the Bluebird Street trunk line to the Pinewood trunk line, The wet well for this lift station was constructed in 2005 as a part of the Crosstown Boulevard Improvements Project. Justification This lift station will allow additional capacity in the Bluebird Street trunk line to serve adjacent properties until the year 2020, Expenditures Improvement 2007 2008 2009 650,000 650,000 2010 2011 Total 650,000 650,000 Total Funding Sources Sewer Revenue Bonds 2007 2008 2009 650,000 650,000 2010 2011 Total 650,000 650,000 Total Operational ImpactJOlher I Routine monitoring and maintenance of the lift station will be required. Wednesday, August J 6, 2006 74 Capital Plan City of Andover, MN 2007 thru 2011 Type Improvement Useful Life 30 Years + Category Utilities Priority 1 - High Contact City Engineer Department Storm Sewer Project # 07-48300-01 Project Name Stonn Sewer Improvements Description Each year, areas of the City are identified where improvements are required to maintain our storm sewer system. Maintenance items include replacement of failing culverts, catch basins, and storm sewer pipes, erosion issues at storm sewer outfalls, and dredging of ponds and ditches, 2007 - Repair failing culvert and patch street on 141 st Ave in Smith's Green Acres Justification I Maintaining the City's storm sewer system improves water quality, improves public safety, and reduces the need for costly repairs in the future. Repairing and maintaining these systems also allows public works to focus on and comply with requirements of the NPDES program, such as pipe cleaning, inspections, and sweeping. Expenditures Construction 2007 50,000 SO,OOO 2008 51,000 51,000 2009 52,000 52,000 2010 53,000 53,000 2011 54,000 54,000 Total 260,000 260,000 Total Funding Sources Storm Sewer Fund 2007 50,000 SO,OOO 2008 51,000 51,000 2009 52,000 52,000 2010 53,000 53,000 2011 54,000 54,000 Total 260,000 260,000 Total OperntionaI Impact/Other I Repairing problem areas in the storm sewer system will reduce the yearly maintenance needs placed on the public works personneL Wednesday, August 16, 2006 75 Capital Plan City of Andover, MN 2007 thru 2011 Project # 07-48300-02 Project Name F.E.S. RepairlMeadowood Addition/148th & Makah St. Type Improvement Useful Life 20 years Category Improvements Priority 1 - High Contact PW Superintendent Department Storm Sewer Description I The flared end section of the storm system located in the park west ofMakah St. is deteriorating and in need of repair. This was built over 20 years ago out of railroad ties and should be replaced with our standard rip-rap (rock). . Justification I The outflow of the system after the flared end section is made up of railroad tie and is rotting away, It is located on an embankment that will start to wash away ifnot corrected, This is in the area of the back waters of the Rum River and could be a serious repair ifnot taken care of in the near future, This could potentially washout the bank creating a bigger problem by having to retrieve the dirt from the bottom of the slope thus adding costs to the project. Expenditures Improvement 2007 60,000 60,000 2008 2009 2010 2011 Total 60,000 60,000 Total Funding Sources Storm Sewer Fund 2007 60,000 60,000 2008 2009 2010 2011 Total 60,000 60,000 Total OperationallmpactJOtber I lfthis repair is done soon it will save more expense if done later after a more serious problem is created. If the repair is done in the near future it could save close to $20,000.00 by not having such an extensive repair. Wednesday, August 16, 2006 76 Capital Plan City of Andover, MN 2007 thru 2011 Project # 08-48300-01 Type Equipment Useful Life 15-20 Years Category Equipment Priority 2 - Medium Contact PW Superintendent Department Stonn Sewer Project Name New Track Backhoe Description New larger backhoe to be used to clean out ditches and storm ponds, Justification Present equipment is not large enough and cannot reach far enough for cleaning out storm water ponds and ditches, Expenditures Equipment 2007 2008 80,000 80,000 2009 2010 2011 Total 80,000 80,000 Total Funding Sources Storm Sewer Fund 2007 2008 80,000 80,000 2009 2010 2011 Total 80,000 80,000 Total OperntionaI Impact/Other This new machine will allow the department to clean areas that require a larger unit The machine presently being used is to small and cannot get to some areas of the system, More of the system could be cleaned without hiring a contractor, This could also be used in other departments sucb as for water main airs, ark eo' ects, etc, Wednesday, Augusr 16, 2006 77 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment Useful Life 15 Years Category Equipment Priority 1 - High Contact PW Superintendent Department Storm Sewer Project # 10-43100-01 Project Name Replacement - Elgin Street Sweeper Description Replace Unit #169, a 2000 Elgin sweeper. Justification The maintenance cost of this machine has risen $.58 per hour in the last year alone. The Spring of2006, we have put a lot ofmoncy into it Expenditures Vehicles 2007 2008 2009 2010 150,000 150,000 2011 Total 150,000 150,000 Total Funding Sources Storm Sewer Fund 2007 2008 2009 2010 150,000 150,000 2011 Total 150,000 150,000 Total Operational Impact/Other I We will need to monitor the costs closely over the next few years and make a decision at that time, This machine only runs about a month and a halfa year, Wednesday, August 16, 2006 78 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment Useful Life 10 Years Category Equipmeot Priority 2 - Medium Cootact PW Superintendent Department Street Signs Project # 07-43300-01 Project Name Replacement - Sign Truck #410 Description Replace Unit #410, a 1995 F350 sign truck chassis with an enclosed box and 71,000 miles, This unit spends a fair amount of time idling at the job site while the hydraulics are being used to install or remove sign posts. This truck was set up and is not very user friendly, We are looking to at some new designed sign trucks that are out there. Justification A beller designed vehicle would provide safer and improved production while transporting and installing/removing equipment (signs), Expenditures Equipment 2007 75,000 75,000 2008 2009 2010 2011 Total 75,000 75,000 Total Funding Sources Equipment Bond 2007 75,000 75,000 2008 2009 2010 2011 Total 75,000 75,000 Total OperntionaI Impact/Other I Better use of equipment, saving time and money, Wednesday, August J 6, 2006 79 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment Useful Life Category Equipment Priority I - High Contact PW Superintendent Department Street Signs Project # 07-43300-02 Project Name Radius Master Machine Description I The Roper Whitney Radius Master is a metal fabrication notcher used to cut the precise comer radius specified by MUTCD for sheet sign fabrication, It is a hydraulically operated, self-contained unit designed to cut comer radii on sign blanks and other sheet material without having to make blade adjustments. It requires no set-up, The Radius Master comes with the 4 radii used by Minnesota Department of Transportation, Justification I When using our metal shear to cut sign blanks to size and reuse old blanks, the sharp comers must be cut to a specific radius, Currently, the comers are marked with the proper radius, put in a vise in the maintenance shop and grind the comers down with a hand held 4- I12n grinder. 1his process is time consuming, extremely' noisy and very hot particles are exposed to the skin, A full face shield is required, as well as ear protection. To special order sign blanks costs the city 2-3 times as much as our annual bid order that takes 6-10 weeks to receive. The cost of aluminum sign blanks has increased 100% in the last II months. The Radius Master is safe, clean, quiet and easy to use. There is no setup and clean up is minimal. The machine uses 8 sq it of floor space & operates on standard 110 electricity. The entire process to cut a comer to the exact radius reouires iust seconds from'start to finish, Expenditures Equipment 2007 8,400 8,400 2008 2009 2010 2011 Total 8,400 8,400 Total Funding Sources Capital Projects Levy 2007 8,400 8,400 2008 2009 2010 2011 Total 8,400 8,400 Total Operational Impact/Other I It is quiet, inexpensive to operate, easy to use, safe and requires very little room. Maintenance is minimal due to the simplicity and few moving parts, Wednesday, August 16, 2006 80 Capital Plan City of Andover, MN 2007 thru 2011 Type Improvement Useful Life 7 Yeais Category StreetslHighways Priority I - High Cootact City Engin= Departmeot Str= I Highways Project # 07-43100-01 Project Name Annual Street Seal Coat Project Description This project provides for a seal coat of the streets in the following maintenance zones: 2007 - Zone 5 2008 - Zone 6 2009 - Zone 7 2010 - Zone 8 and 9 2011-Zone 1 uired. Justification Seal coating will extend the useful life of roads by protecting the bituminous from oxidation due to adverse weather conditions (sun, rain, wind, snow, etc,), The prevention of oxidation will prolong the useful life of the pavement and defer the need for a costly reconstruction, Seal coating also improves the skid resistance of the roadway surface by increasing the friction between vehicle tires and the roadway. New developments requiring seal coating are not shown on the attached maps. Expenditures Construction 2007 287,632 287,632 2008 271,328 271,328 2009 480,438 480,438 2010 660,377 660,317 2011 515,760 515,760 Total 2,215,535 2,215,535 Total Funding Sources 2007 2008 2009 2010 2011 Total Construction Seal Coat Fund 41,965 31,092 176,194 65,397 14,146 328,794 R & B - Crack Seal & Seal Coa 245,667 240,236 304,244 594,980 501,614 1,886.741 Total 287,632 271,328 480,438 660,317 515,760 2,215,535 Operational Impact/Other I Extending the life of the street will reduce routine maintenance (Crack sealing, pot hole patching, overlays, etc,) and extend the overall design life of the pavement. Wednesday, August 16, 2006 81 Capital Plan City of Andover, MN 2007 thru 2011 Type Improvement Useful Life 7 Years Category StreetsIHighways Priority I - High Contact City Engineer Department Streets I Highways Project # 07-43100-02 Project Name Annual Street Crack Seal Project Description The project provides for sealing of the street cracks in the following maintenance zones: 2007 - Zone 6 2008 - Zone 7 2009 - Zone 8 and 9 2010 - Zone I 2011 - Zone 2 Justification The sealing of street cracks will significantly extend the useful life of the streets. This will extend the time frame when a costly street reconstruction project will be necessary. The sealing of cracks in the street surface reduces/eliminates water from entering the road base and subgrade, This process reduces the freeze/thaw cycles of the subgrade, maintaining the integrity of the road, Crack sealing is completed in a particular zone one year prior to seal coating, This allows the crack sealing material to cure and minimize bleed through once seal coated. Expenditures Construction 2007 89,840 89,840 2008 98,968 98,968 2009 183,390 183,390 2010 153,439 153,439 2011 152,187 152,187 Total 677,824 677,824 Total Funding Sources 2007 2008 2009 2010 2011 Total Construction Seal Coat Fund 9,114 24,498 9,095 1,967 0 44,674 R & B - Crack Seal & Seal Coa 80,726 74,470 174,295 151,472 152,187 633,150 Total 89,840 98,968 183,390 153,439 152,187 677,824 Operational Impact/Other I Sealing the street cracks will reduce routine maintenance by eliminating the source of degradation resulting from moisture in the road subgrade, Wednesday, August 16, 2006 82 Capital Plan City of Andover, MN 2007 thru 2011 Type Improvement Useful Life 20 Years Category StreetslHighways Priority I - High Contact City Engineer Department Streets I Highways Project # 07-43100-03 Project Name Annual Street Mill and Overlay Description The Street Mill and Overlay projects will consist of milling the existing street surface and constructing a new asphalt surface. Minor shouldering and restoration work will be included with the project In developments that have existing bituminous curb or no curb or ditch, concrete curb and gutter will be constructed. 30% of the total project costs are assessed to the benefiting properties in each development This program helps to maintain the integrity and value of the communities street infrastructure. Areas to be reconstructed are shown on the attached maps and are listed below: 2007 - Lund's Evergreen Estates 2nd, 3rd, 4th & 5th Additions 2008 - Northglen, Grow Oakview Estates 2009 - Woodland Ridge, Indian Meadows 3rd Addition, Kelsey Estates 2010 - Stenquist Addition, Johnson's Oakmount Terrace, Ivywood Estates 20 II - Prairie Meadows, Enchanted Drive Area, A1ladin Acres Justification The streets in these neighborhoods are in excess of20 years old and are in need of rehabilitation, The intent of this Street Mill and Overlay is to provide the community with a high quality transportation system and maintain a constant upkeep of the City's street infrastructure. Expenditures Construction 2007 1,022,994 1,022,994 2008 791,004 791,004 2009 1,019,292 1,019,292 2010 911,645 911,645 2011 948,387 948,387 Total 4,693,322 4,693,322 Total Funding Sources 2007 2008 2009 2010 2011 Total Assessments 306,898 237,301 305,788 273,493 284,516 1,407,996 R & B - Overlays 716,096 553,703 713,504 638,152 663,871 3,285,326 Total 1,022,994 791,004 1,019,292 911,645 948,387 4,693,322 Operational Impact/Other I The rehabilitation of the streets will reduce the routine maintenance (Crack sealing, pot hole patching, etc..) in the area. Long term, this reconditioning will prolong the structural stability of the roadway making for a longer serviceable life. Wednesday, August 16, 2006 83 Capital Plan City of Andover, .MN 2007 thru 2011 Type Improvement Useful Life 1-2 Years Category Improvements Priority I - High Cootaet City Engineer Department Streets I Highways Project # 07-43100-04 ProjcctName Annual Pavement Markings Description The pavement striping for City streets is conducted one time per year. This includes centerline striping and sboulder striping. Striping enhances the safety of the roadway by directing traffic to the correct lane movement Justification Striping is required through the local and state agencies. A reflective standard is required. Restriping annually maintains the pavement markings to the required standards. Expenditures Improvement 2007 15,000 15,000 2008 16,000 16,000 2009 17,000 17,000 2010 18,000 18,000 2011 19,000 19,000 Total 85,000 85,000 Total Funding Sources R & B - Reserve 2007 . 15,000 15,000 2008 16,000 16,000 2009 17 ,000 17,000 2010 18,000 18,000 2011 19,000 19,000 Total 85,000 85,000 Total OperntionaI Impact/Other I The pavement markings are contracted out each year adding virtually no operational impact Wednesday, August 16, 2006 84 Capital Plan City of Andover, MN 2007 thru 2011 Type Improvement Useful Life 30 Years Category StreetslHighways Priority I - High Contact City Engineer Department Streets I Highways Project # 07-43100-05 ProjcctNamc Annual Curb Replacement Description Damaged and failing concrete curb and gutter throughout the City needs to be repaired or replaced to help maintain the integrity of the roadway system. Replacing damaged or failing sections of curb and gutter helps with drainage of the roadway and prolongs the life of the street system. Justification The majority of the concrete curb and gutter throughout the City is in relatively good condition. However, there are isolated areas that need rehabilititation every year. Failing or damaged sections of concrete curb and gutter are removed and replaced. Replacing damaged sections of concrete curb and gutter maintains the integrity of and prolongs the life of the City's street infrastructure. Expenditures Construction 2007 40,000 40,000 2008 41,000 41,000 2009 42,000 42,000 2010 43,000 43,000 2011 44,000 44,000 Total 210,000 210,000 Total Funding Sources R & B - Reserve 2007 40,000 40,000 2008 41,000 41,000 2009 42,000 42,000 2010 43,000 43,000 2011 44,000 44,000 Total 210,000 210,000 Total Operational Impact/Other 1 Repairing failing or damaged sections of curb and gutter reduces the routine maintenance required by the public works department Wednesday, August 16, 2006 85 Capital Plan City of Andover, MN 2007 thru 2011 Project # 07-43100-06 Project Name Mounted Pothole Spray Patcher Type Equipment Useful Life 10 Years Category Equipment Priority I - High Contact PW Superintendent Department Streets I Highways Description I This unit is a truck mounted spay patcher, used for street repairs such as Potholes, Alligator Cracks, Utility Cuts, Shoulder Work, Depressions, Edge Raveling, and Tire Depressions, This unit carries its own emulsion and aggregate. Spray injector patching is easy and effective, Spray injection patching is most economical and longest lasting method of pothole repair. The pothole is cleaned with a high-volume blower, a tack coat of emulsion is applied to the area, a mixture of aggregate and hot emulsion fill the pothole, and a fmish coat of dJy aggregate is sprayed over the top and again the street is ready for traffic. All of this in just a matter of minutes and the patch will usually out last the rest ofthe road surface. Justification I The current trailer has reached its life expectancy and with the increase in city streets does not have the capacity to keep up with needs of the city. This unit also needs a three person crew with two of the three standing out in traffic. There have had some very close calls with traffic that don't follow work crew warning signs, With the new truck mounted unit, only one person is needed to control all the patching functions from the safety and comfort of the cab. The driver operates ajoystick from the driver's seat and performs the four-step process, typically in less than a minute and can be used nine months of the year, Expenditures Equipment 2007 150,000 150,000 2008 2009 2010 2011 Total 150,000 150,000 Total Funding Sources Equipment Bond 2007 150,000 150,000 2008 2009 2010 2011 Total 150,000 150,000 Total Operational Impact/Other I The spray patcher once filled with product can operate two to three days without having to be refilled, With the present machine, it becomes a daily procedure to have to leave town to refill with emulsion, The aggregate we will keep in stock so that is Dot a problem. So we will be able to reduce cost, increase production, and limit our liability! Wednesday, August 16, 2006 86 Capital Plan City of Andover, M.N 2007 thru 2011 Type Equipment Useful Life laY ears Category Equipment Priority I - High Contact PW Superintendent Department Streets I Highways Project # 07-43100-07 Project Name Replacement - Dump Truck wI Snow Removal #195 Description Replace Unit # 195, a 1995 L 1'9000 tandem axle dump truck with snow removal equipment and approximately 60,000 miles, This truck is used for plowing snow and for hauling materials like sand, asphalt, gravel and debris, Justification This vehicle has been used by the city since 1994 and has performed very well. Ibis is one of the remaining few units with a manual transmission in it It's difficult and tiring to operate the snow removal equipment and change gears at the same time, Less operations in the cab will keep the driver alert for longer periods of time during those long snow removal days and nights. Expenditures Equipment 2007 200,000 200,000 2008 2009 2010 2011 Total 200,000 200,000 Total Funding Sources Equipment Bond 2007 200,000 200,000 2008 2009 2010 2011 Total 200,000 200,000 Total Operntional Impact/Other I Decreased maintenance cost and down time, Wednesday, August J 6, 2006 87 Capital Plan City of Andover, MN 2007 thru 2011 Type Improvement Useful Life 50 Years Category Improvements Priority 1 - High Contact City Engineer Department Streets I Highways Project # 07-43100-08 Project Name Rail Road Quiet Zones Description Improvements at rail road crossings are necessary to comply with rail road requirements to allow for "quiet zones," or crossings wbere the trains do not need to blow their borns. Necessary improvements include construction of divided roadway sections with concrete medians, sign installation, and installation of new rail road crossing signals. Justification Improvements are planned at the following crossings: 2007 - Bunker Lake Blvd ($90,000) 2008 - Andover Blvd ($400,000) 2009 - Crosstown Blvd ($400,000) 2010 - l6lst Avenue ($60,000 Expenditures Construction 2007 90,000 90,000 2008 400,000 400,000 2009 400,000 400,000 2010 60,000 60,000 2011 Total 950,000 950,000 Total Funding Sources 2007 2008 2009 2010 2011 Total Municipal State Aid Funds 90,000 400,000 60,000 550,000 R & B - Reserve 400,000 400,000 Total 90,000 400,000 400,000 60,000 950,000 Operational Impact/Other 'J Improvements will enhance the quality oflife for residents living adjacent to the crossings, resulting in less disruptions from the trains while providing safe crossings for vebicular and pedestrian traffic. fVednesday,August16,2006 88 Capital Plan City of Andover, MN 2007 thru 2011 Type Improvement Useful Life 20 Years Category Streets/Highways Priority 1 - High COD tact City Engineer Department Streets I Highways Project # 07-43100-09 Project Name Municipal State Aid Routes / New & Reconstruct Description The following projects are proposed to be constructed and/or rehabilitated to meet State Aid Standards, The rehabilitation projects will consist of milling the existing street surface, constructing concrete curb and gutter where it does not exist, and improving stonn drainage, 2007: I 68th Lane (Verdin St - Crocus St) $383,000 2008: South Coon Creek Drive (Round Lake Blvd - Crosstown) $844,200 2010: Nightingale Street (Crosstown Blvd - 161st Ave) $767,000 20 II: Prairie Road (Andover Blvd - Crosstown Blvd) $714,000 Justification 2007: I 68th Lane NW (Verdin St - Crocus St) - Upgrade needed to maintain roadway and meet State Aid Standards, Part of 2007 Overlay Project 2008: South Coon Creek Drive (Round Lake Blvd - Crosstown) - Upgrade needed to maintain roadway and meet State Aid Standards. Constructed concurrently with trunk water main extension, 2010: Nightingale Street (Crosstown Blvd - 161st Ave) - Upgrade needed to maintain integrity of State Aid roadway infrastructure, 20 II: Prairie Road (Andover Blvd - Crosstown Blvd) - Upgrade needed to maintain integrity of State Aid roadway infrastructure. Expenditures Construction 2007 383,000 383,000 2008 898,800 898,800 2009 2010 767,000 767,000 2011 714,000 714,000 Total 2,762,800 2,762,800 Total Funding Sources 2007 2008 2009 2010 2011 Total Assessments 83,000 t28,400 200,000 71,000 482,400 Municipal State Aid Funds 300,000 770,400 567,000 643,000 2,280,400 Total 383,000 898,800 767,000 714,000 2,762,800 OperationallmpactlOtber I Rehabilitating the roads will reduce the amount of routine maintenance along these sections of roadway and provide a safer and higher quality transportation system. Wednesday, August 16, 2006 89 Capital Plan City of Andover, MN 2007 thru 2011 Type Improvement Useful Life 25 Years Category Improvements Priority 1 - High Contact City Engineer Department Streets I Highways Project # 07-43100-10 Project Name Intersection Upgrades Description 2007 - Construction of turn lanes at the intersection of Crosstown Blvd and Nightingale Street ($175,000) 2008 - Intersection upgrades, including construction of a traffic signal, at Hanson Blvd and 133rd Ave. This signal will include a cost share with the City of Coon Rapids. ($175,000) 2009 - Construction of a traffic signal at the intersection of South Coon Creek Dr and Round Lake Blvd. Minor lane widening may be needed but turn lane construction would not be included in this project ($275,000) Justification I Intersection upgrades are necessary due to the increased development and demands On the transportation system, the need for safety improvements, and to comply with Anoka County Highway Department requirements. Expenditures Construction 2007 175,000 175,000 2008 175,000 175,000 2009 275,000 275,000 2010 2011 Total 625,000 625,000 Total Funding Sources Municipal State Aid Funds 2007 175,000 175,000 2008 175,000 175,000 2009 275,000 275,000 2010 2011 Total 625,000 625,000 Total Operational Impact/Other I Improvements will improve the flow of traffic and will improve the safety of vehicles, pedestrians and bicyclists, Wednesday, August J 6, 2006 90 Capital Plan City of Andover, MN 2007 thru 2011 Type Improvement UseCul LiCe 25 Years Category Trail Construction Priority 1 - High Contact City Engineer Department Streets I Highways Project # 07-TRAIL-Ol Project Name Construct Bikeway/Walkway Corridors Description 2007 - Station Parkway from Thrush St to Jay St ($60,000). 2008 - North side of Crosstown Blvd from Nightingale St to Hanson Blvd ($100,000). 2009 - Construct a trail along 157th Avenue from Prairie Road to Kumquat St ($230,000), 2010 - West side of Crosstown Blvd from South Coon Creek to Andover Blvd ($75,000). Justification Improve pedestrian and multi-modal access to various destinations within and externally to the city. The trails have reviewed by the Park and Recreation Commission. These trails that are proposed are a combination of interest by the Park Commission and City Council. Expenditures Construction 2007 60,000 60,000 2008 100,000 100,000 2009 230,000 230,000 2010 75,000 75,000 2011 Total 465,000 465,000 Total Funding Sources Trail Funds 2007 60,000 60,000 2008 100,000 100,000 2009 230,000 230,000 2010 75,000 75,000 2011 Total 465,000 465,000 Total Operntional Impact/Other I Additional long-term maintenance and snowplowing will be necessary. Wednesday, August J 6, 2006 91 Capital Plan City of Andover, :M.N 2007 thru 2011 Type Equipment Useful Life 10 Years Category Equipment Priority I - High Contaet PW Superintendent Department Streets I Highways Project # 08-43100-02 Project Name Replacement - Hot Asphalt Box Description Replace a 1998 hot asphalt box donated by the Andover Lions Club, The new unit will be mounted to a flat bed roll off attachment for the new hook truck that arrives in the fall of 2006, Justification The current hot asphalt box is starting to experience maintenance issues and is wasting a lot of asphalt material by not keeping it WanD. Expenditures Equipment 2007 2008 40,000 40,000 2009 2010 2011 Total 40,000 40,000 Total Funding Sources Equipment Bond 2007 2008 40,000 40,000 2009 2010 2011 Total 40,000 40,000 Total Operational Impact/Other 1 By attaching it to a flat bed roll of!; it can be loaded and unloaded in a matter of minutes and be used year round. Wednesday, August 16, 2006 92 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment Useful Life Category Equipment Priority 2 - Medium Contaet PW Superintendent Department Streets / Highways Project # 08-43100-04 Project Name Dump Truck w/Snow Equipment Description Purchase a dump truck with snow removal equipment that would remove Unit # 196 from the snow removal cycle. This would be an addition to the fleet Unit # 196 is a 1996 with 40,000 miles, it would be kept for a backup snow plow truck and used for moving trailers and equipment year round. Justification Unit 196 has a 9 foot long box which is on the short side for carrying material, It is also very difficult to load because the loader bucket is almost 9 1/2 feet wide. Performing snow plowing and salting operation makes this truck less desirable then any others in the fleet We wouldn't have to remove plow equipment ifwe had to haul out material or equipment because of an emergency. Expenditures Vehicles 2007 2008 155,000 155,000 2009 2010 2011 Total 155,000 155,000 Total Funding Sources Equipment Bond 2007 2008 155,000 155,000 2009 2010 2011 Total 155,000 155,000 Total Operational Impact/Other I Unit # 196 would be used as a backup snowplow truck and for moving equipment and materials year round. Wednesday, AuguS116, 2006 93 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment Useful Life 10 Years Category Equipment Priority I. High Contact PW Superintendent Department Streets / Highways Project # 08-43100-05 Project Name Replacement - Dump Truck wI Snow Removal #197 Description I Unit #197, a 1996 LT9000 tandem axle dump truck and snow removal equipment with 55,000 miles on it Justification I This is one of the remaining few units with a manual transmission in it It's difficult and tiring to operate the snow removal equipment and change gears at the same time. Less operations in the cab will keep the driver alert for longer periods oftime during those long snow removal days and nights. Expenditures Equipment 2007 2008 200,000 200,000 2009 2010 2011 Total 200,000 200,000 Total Funding Sources Equipment Bond 2007 2008 200,000 200,000 2009 2010 2011 Total 200,000 200,000 Total Operntionallmpact/Otber I Changing to an automatic transmission and newer snowplow controls will give us more attentive drivers and less fatigued driver after many hours of service. Wednesday, August 16, 2006 94 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment Useful Life 15 Years Category Equipment Priority 2 - Medium Contact PW Superintendent Department Streets / Highways Project # 09-43100-01 Project Name Replacement - Water Tanker Description Replace Unit #163, a 1986 water tanker with 63,000 miles. Justification.. I The old tanker was partially refurbished a few years ago because the floor and tank had rusted out. A new water truck would handle the job tasks better and more efficiently. The Parks Dept water tanker with its cab over design and short turning radius has been a great asset to the public works staff. Expenditures Vehicles 2007 2008 2009 100,000 100,000 2010 2011 Total 100,000 100,000 Total Funding Sources Equipment Bond 2007 2008 2009 100,000 100,000 2010 2011 Total 100,000 100,000 Total OperntionaI Impact/Other I The design of the new water tanker make it very efficient to operate and pleasure to use. The front adjustable nozzle is particularly liked by the public works staff. Wednesday, August 16, 2006 95 Capital Plan City of Andover, MN 2007 thru 2011 Type Equipment Useful Life 20 Years Category Equipment Priority I - High Contact PW Superintendent Department Streets / Highways Project # 09-43100-02 Project Name Asphalt Paving Machine Description Asphalt paving machine used for overlay and trails. The City currently does not own a paver which we have an increasing need for due to the deterioration of city streets. Justification I Due to increasing repairs to city streets, the city has a need to own a paver. It could also be used for trails. Expenditures Equipment 2007 2008 2009 90,000 90,000 2010 2011 Total 90,000 90,000 Total Funding Sources Equipment Bond 2007 2008 2009 90,000 90,000 2010 2011 Total 90,000 90,000 Total OperntionaI Impact/Other I Not having to rent one, being able to use it when it fits in to our time scbedule rather than having to see when one is available to rent Share cost with another city is an option. Wednesday, August 16, 2006 96 Capital Plan City of Andover, MN 2007 thru 2011 Type Improvement Useful Life 7 Years Category Improvements Priority I . High Contact PW Superintendent Department Water Project # 07-48100-01 Projcct Name Rehabilitation of Wells Description The motor, pump and column pipe are taken out for inspection and worn parts are replaced. The well is televised to determine the depth and condition, lfthe well is at or close to the original drill depth everything is put back in place. The well may need to be cleaned out to the original depth if there is a substantial decrease in the depth. Justification To make sure the well is operational to what it is designed for and to correct any problems that may affect our ability to produce the amount of water needed to meet the demand. A complete inspection and maintenance overhall is performed on each well a minimum of once every seven (7) years. Expenditures Improvement 2007 45,000 45,000 2008 45,000 45,000 2009 50,000 50,000 2010 50,000 50,000 2011 55,000 55,000 Total 245,000 245,000 Total Funding Sources Water Fund 2007 45,000 45,000 2008 45,000 45,000 2009 50,000 50,000 2010 50,000 50,000 2011 55,000 55,000 Total 245,000 245,000 Total OperntionaI Impact/Other I This would be done at such a time that it would not affect the demand needs of the system. Typically done late fall. Wednesday, August 16, 2006 97 Capital Plan City of Andover, MN 2007 thru 2011 Type Improvement Useful Life Unassigned Category Improvements Priority 2. Medium Contact PW Superintendent Department Water Project # 07-48100-02 Project Name Sealing of Well #1 Description Well #1 would be sealed off from use by a licensed well contractor. Justification This well has not been used for sometime now. This particular well is 600 feet deep and is pumping a high volumne of sand when it was in operation, The well was designated as an emergency well about four years ago and was not used in this time frame. The formation of this well is very soft and would take a considerable amount of money to try and make it produce the water needed. There is no other aquifer in this area above the existing aquifer. It is also a well that is high in radium which is another reason not to use it It would be in the best interest of the city to seal it and use the water from the treatment facility to feed this area. Money would be best spent on making the water system one system rather than the two we are current! usin . Expenditures Improvement 2007 10,000 10,000 2008 2009 2010 2011 Total 10,000 10,000 Total Funding Sources Water Fund 2007 10,000 10,000 2008 2009 2010 2011 Total 10,000 10,000 Total OperntionaI Impact/Other I Money usually used to treat the water at the well head is no longer needed. There would be a power savings also as the well would be pulled and all the controlls would be eliminated from the well house. Wednesday, August 16, 2006 98 Capital Plan City of Andover, MN 2007 thru 2011 Type Improvement Useful Life 50 Years Category Improvements Priority 1 - High Contact City Engineer Dcpartment Water Project # 08-48100-01 Project Name Water Main along South Coon Creek Drive Description Install a 12" water main along South Coon Creek Drive from 1 45th Avenue to Jonquil Street. Justification I Construction of a water main along South Coon Creek Drive will allow the existing water distribution system between the east and west sides of town to be looped. The only existing connection between the two parts of town is along Bunker Lake Boulevard. Looping of the system will allow treated water to be continuously supplied to all residents in town on the water system. It will also help alleviate the pressure variance that is experienced between the east and west sides of town. Coon Creek Boulevard is scheduled for reconstruction in 2008. It would be advantageous to construct the water main concurrently with the roadway reconstruction. Expenditures Improvement 2007 2008 750,000 750,000 2009 2010 2011 Total 750,000 750,000 Total Funding Sources Water Trunk Fund 2007 2008 750,000 750,000 2009 2010 2011 Total 750,000 750,000 Total OperntionaI Impact/Other I Additional maintenance and flushing requirements for the water main system will result Wednesday, August 16, 2006 99 Capital Plan City of Andover, MN 2007 thru 2011 Type Improvement Useful Life 15-20 Years Category Utilities Priority I - High Contact PW Superintendent Department Water Project # 08-48100-02 Project Name Water Tower Painting Description Painting of the water tower closest to City Hall, including the new City logo. Justification I The tower is going to be in need of painting to maintain its appearance and to protect it from wear and tear. A new City logo should also be put on the tower that show's what the City of Andover is about Expenditures Improvement 2007 2008 350,000 350,000 2009 2010 2011 Total 350,000 350,000 Total Funding Sources 2007 2008 2009 2010 2011 Total Capital Equipment Reserve 242,000 242,000 Water Trunk Fund 108,000 108,000 Total 350,000 350,000 OperntionaI Impact/Other I This is a scheduled maintenance that should be budgeted for. Wednesday, August 16, 2006 100 Capital Plan City of Andover, MN 2007 thru 2011 Type Improvement Useful Life Unassigned Category Improvements Priority I - High Contact City Engineer Department Water Project # 09-48100-01 Project Name Demolish 500,000 Gallon Water Tower Description Demolish the existing 500,000 gallon water tower located on the west side oftown. Justification I The existing 500,000 gallon water tower will be demolished and replaced by a new two million gallon water tower so the City's water distribution system can be managed under one pressure zone, providing treated water to all residents on the system. Expenditures Improvement 2007 2008 2009 175,000 175,000 2010 2011 Total 175,000 175,000 Total Funding Sources Water Trunk Fund 2007 2008 2009 175,000 175,000 2010 2011 Total 175,000 175,000 Total OperntionaI Impact/Other I Maintenance of the existing water tower will no longer be required. Wednesday, August 16, 2006 101 Capital Plan City of Andover, MN Project # 09-48100-02 Project Name Construct Water Tower 2007 thru 2011 Type Improvement Useful Life 50 Years Category Improvements Priority 1 - High Contact City Engineer Department Water Description Construct a 2 million gallon elevated storage tank adjacent to the water treatment plant Justification In order to adequately supply treated water at an acceptable pressure to the entire distribution system in Andover, a two million gallon water tower must be constructed near the water treatment plant The existing 500,000 water tower in the southwest part of town would be demolished as part of this process. Construction of this tower and demolition of the existing 500,000 gallon tower would eliminate the low pressure zone currently in the southwest part of town. Expenditures Construction 2007 2008 2009 2,950,000 2,950,000 2010 2011 Total 2,950,000 2,950,000 Total Funding Sources Water Revenue Bonds 2007 2008 2009 2,950,000 2,950,000 2010 2011 Total 2,950,000 2,950,000 Total OperntionaI Impact/Other I Additional maintenance and monitoring would be required of the Sewer and Water department Wednesday, August 16, 2006 102 Capital Plan City of Andover, MN 2007 thru 2011 Project # 10-48100-01 Projcct Name WTP Reclaim Tank Addition Type Improvement Useful Life 30 Years Category Improvements Priority I - High Contact PW Superintendent Department Water Description I Add an additional 200,000 gallon reclaim tank and process piping to the water plant Justification I In order to maintain a certain level of operations and meet the demands of the water population, this tank would help in meeting this objective. Staffhas noticed that during the high peaking months of May through September the water plant needs to backwash the filters on a daily basis. With the single reclaim tank now in operation the daily operations will run into a difficulty with backwashing filters as there is not enough room to handle the flows required to meet the needs. As the population continues to increase more of a demand is put on the system to function at a high rate of production. With an increase in tank size the operations can continue without much interuption when more room is required for backwashing of the filters. Expenditures Improvement 2007 2008 2009 2010 500,000 500,000 2011 Total 500,000 500,000 Total Funding Sources Water Trunk Fund 2007 2008 2009 2010 500,000 500,000 2011 Total 500,000 500,000 Total OperntionaI Impact/Other With additional storage for backwashing the filtering process would not need to be interupted by shutting down certain wells in order to keep the filters from over loading. With an increase in capacity the water plant filters would be able to operate fully keeping the amount of water filtered at it's hi est ca aci . Wednesday, August 16, 2006 103 t-;< C/-ot w.~ CITY G.O. OPEN SPACE BONDS (Ch 475) Election Amount Financed $2,000,000 Number of Years 15 Structure Equal P & I Interest Rate 4.50% Referendum Mid. Val. . Pavable 2006 2,522,273,800 Debt Levy ReQuired l1il105% 195,539 Tax Rate 0.0078% Taxable Tax Increase Tvne of Propertv Market Value Debt Service Only' $200,000 $16 250,000 19 300,000 23 350,000 27 Residential 400,000 31 Homestead 450,000 35 500,000 39 550,000 43 600,000 47 650,000 50 700,000 54 750,000 58 $500,000 $39 CommerciaV 750,000 58 Industrial 1,000,000 78 1,500,000 116 2,000,000 155 $300,000 $23 Agricultural 325,000 25 Homestead ** 350,000 27 400,000 31 500,000 39 600,000 47 Agricultural $5,000 $0.00 Non-Homestead 6,000 0.00 (dollars per acre) 7,000 0.00 8,000 0.00 $100,000 $0.00 SeasonaVRecreation 200,000 0.00 300,000 0.00 400,000 0.00 500,000 0.00 City of Andover, Minnesota e Estimated Tax Impact August 29, 2006 EHLERS . .....e'.'" "<0 *The figures in the table are based on county taxes for new bonded debt only, and do not include tax levies for other purposes. Tax increases shown above are gross increases, not including the impact of the state Property Tax Refund ("Circuit Breaker") program. Many owners of homestead property will qualify for a refund, based on their income and total property taxes. This will decrease the net tax effect of the bond issue for many property owners. "For agricultural homestead property, land and buildings beyond the house, garage, and one acre are exempt from referendum market value tax. Prepared by Ehlers & Associates, Inc. Preliminary: For Discussion Purposes ONLY 8/29/2006 ~NDbVE~ \ 1685 CROSSTOWN BOULEVARD N,W. . ANDOVER, MINNESOTA 55304 . (763) 755-5100 FAX (763) 755-8923 . WWW,CI.ANDOVER.MN.US TO: Mayor and Councilmembers FROM: Jim Dickinson, City Administrator SUBJECT: Additional Information - Open Space Referendwn Discussion DATE: August 29, 2006 The attached docwnents are provided by the City's bond counsel and updated with information by the City's fiscal advisor. The docwnents are what will need to be approved at future meetings to comply with State of Minnesota statute requirements for a referendwn ballot question. The attachments are as listed: Pgs 1 - 7 Pgs 8 - 9 Pg 10 Pgs 11 - 12 Pgs 13 - 15 Resolution Calling For An Election On $2,000,000 General Obligation Bonds Anoka County Auditor Notification Letter Affidavit Of Posting Notice Of Election And Of Posting Sample Ballot Official Returns of Judges Of City Election Resolution Canvassing Returns of Election I will review each of the docwnents briefly with the Council at the meeting. Attachments , EXTRACT OF MINUTES OF MEETING OF THE CITY COUNCIL OF THE CITY OF ANDOVER, MINNESOTA HELD: September 5, 2006 Pursuant to due call and notice thereof, a regular or special meeting of the City Council :>fthe City of Andover, Minnesota, was duly called and held at the City Hall on September 5, 2006, at _ o'clock p.m. The following members were present: md the following were absent: Member introduced the following resolution and moved its adoption: RESOLUTION CALLING FOR AN ELECTION ON $2,000,000 GENERAL OBLIGATION BONDS BE IT RESOLVED by the City Council (the "Council") of the City of Andover, Minnesota (the "City"), as follows: 1_ Project. This Council has investigated the facts and does hereby fmd, determine md declare that it is necessary and expedient to issue general obligation bonds to finance the acquisition of land from willing sellers for the preservation of natural areas, water and air quality, wildlife habitat and to enhance the trail system, for which spending would be subject to an annual audit. 2. Election. The proposition of authorizing the issuance of not to exceed $2,000,000 general obligation bonds for said purpose shall be submitted to the qualified electors of the City at the general election to be held on November 7, 2006. The election shall be held between the hours of7:00 a.m. and 8:00 p.m. The polling places for the election shall be: Precinct Polling Place 1 Hope Lutheran Church 16180 Round Lake Boulevard NW 2 Grace Lutheran Church 13655 Round Lake Boulevard NW 3 Riverdale Assembly of God Church 3210 Bunker Lake Boulevard NW 4 Crooked Lake Elementary School 2939 Bunker Lake Boulevard NW I 93&S24vl 5 Meadow Creek Church 3037 Bunker Lake Boulevard NW 6 Bunker Hills Activity Center 550 Bunker Lake Boulevard NW 7 Constance Evangelical Free Church 16150 Crosstown Boulevard NW 8 Andover Christian Church 16045 Nightingale Street NW 9 Prairie Oak Community Church 1657 l6lst Avenue NW 10 Andover Elementary School 14950 Hanson Boulevard NW 3. Notice and Ballot. The Clerk is hereby authorized and directed to post and publish according to law a Notice of Election and Ballot, and to prepare ballots for the question for use at the election, which notice and ballot shall be in substantially the following forms: 193&&24vl 2 NOTICE OF ELECTION NOTICE IS HEREBY GIVEN that an election on a question will be held in and for the City of Andover, Anoka County, Minnesota, on November 7, 2006, between the hours of7:00 a.m. and 8:00 p.m., at which time the following question will be submitted: "Shall the City of Andover, Minnesota, be authorized to issue its general obligation bonds in an amount not to exceed $2,000,000 to fmance the acquisition ofland from willing sellers for the preservation of: natural areas, water and air quality, wildlife habitat and to enhance the trail system? Spending would be subject to an annual audit." The polling places for the election shall be Precinct Polling Place 1 Hope Lutheran Church 16180 Round Lake Boulevard NW 2 Grace Lutheran Church 13655 Round Lake Boulevard NW 3 Riverdale Assembly of God Church 3210 Bunker Lake Boulevard NW 4 Crooked Lake Elementary School 2939 Bunker Lake Boulevard NW 5 Meadow Creek Church 3037 Bunker Lake Boulevard NW 6 Bunker Hills Activity Center 550 Bunker Lake Boulevard NW 7 Constance Evangelical Free Church 16150 Crosstown Boulevard NW 8 Andover Christian Church 16045 Nightingale Street NW 9 Prairie Oak Community Church 1657 161st Avenue NW 10 Andover Elementary School 14950 Hanson Boulevard NW 10"UHZ"4vl 3 in the City, at which places all of the qualified electors of the City residing within the precinc1 with respect to which the polling place has been established may cast their ballots. Dated: ,2006. BY ORDER OF THE CITY COUNCIL Isl City Clerk 193&&24vl 4 CITY QUESTION BALLOT CITY OF ANDOVER November 7, 2006 INSTRUCTION TO VOTERS: To vote for a question, put an (X) in the square next to the word "YES" for that question. To vote against a question, put an (X) in the square next to the word "NO" for that question. CITY QUESTION NO.1 PRESERVATION OF WATER, WILDLIFE AND NATURAL HABITAT AREAS o YES "Shall the City of Andover, Minnesota, be authorized to issue its general obligation bonds in an amount not to exceed $2,000,000 to fmance the acquisition ofland from willing sellers for the preservation of: natural areas, water and air quality, wildlife habitat and to enhance the trail system? Spending would be subject to an annual audit." o NO BY VOTING "YES" ON TIllS BALLOT QUESTION, YOU ARE VOTING FOR A PROPERTY TAX INCREASE. The maximum amount of increased levy as a percentage of market value is .0078%. The maximum amount that would be raised by the new referendum tax rate in the fIrst year if it were to be levied is $195,539. 1938824vl 5 4. Election Judges. Election judges will be appointed at least twenty five days prior to the election. 5. Manner: Canvass. The election shall be held and conducted in accordance with the statutes of the State of Minnesota applicable, and the Council shall meet as required by law for the purpose of canvassing the election and declaring the results thereof. The motion for the adoption of the foregoing resolution was duly seconded by member and, after full discus!lion thereof and upon a vote being taken thereon, the following voted in favor thereof: and the following voted against the same: Whereupon the resolution was declared duly passed and adopted. 193&&24vl 6 STATE OF MINNESOTA COUNTY OF ANOKA CITY OF ANDOVER I, the undersigned, being the duly qualified and acting Clerk of the City of Andover, Minnesota., DO HEREBY CERTIFY that I have carefully compared the attached and foregoing extract of minutes with the original minutes of a meeting of the City Council duly called and held on the date therein indicated, which are on fIle and of record in my office, and the same is a full, true and correct transcript therefrom insofar as the same relate to an election on the proposed issuance of general obligation bonds to finance the acquisition ofland from willing sellers for the preservation of natural areas, water and air quality, wildlife habitat and to enhance the trail system, for which spending would be subject to an annual audit. WITNESS my hand as such Clerk on September 5, 2006. City Clerk lQ,RR?4vl 7 1685 CROSSTOWN BOULEVARD N.W. . ANDOVER, MINNESOTA 55304. (763) 755-5100 FAX (763) 755-8923 . WWW,CI.ANDOVER.MN.US ,2006 Anoka County Auditor 2100 Third Avenue Anoka., Minnesota 55303-2265 Dear County Auditor: Pursuant to Minnesota Statutes, Section 205.16, Subdivision 4, this letter is to formally advise you that the City of Andover, Minnesota, will be holding an election on a question on the date of the general election, November 7, 2006, between the hours of7:00 a.m. and 8:00 p.m. at the following polling places in the City: Precinct Polling Place 1 Hope Lutheran Church 16180 Round Lake Boulevard NW 2 Grace Lutheran Church 13655 Round Lake Boulevard NW 3 Riverdale Assembly of God Church 3210 Bunker Lake Boulevard NW 4 Crooked Lake Elementary School 2939 Bunker Lake Boulevard NW 5 Meadow Creek Church 3037 Bunker Lake Boulevard NW 6 Bunker Hills Activity Center 550 Bunker Lake Boulevard NW 7 Constance Evangelical Free Church 16150 Crosstown Boulevard NW 8 Andover Christian Church 16045 Nightingale Street NW 9 Prairie Oak Community Church 1657 161st Avenue NW 10 Andover Elementary School 14950 Hanson Boulevard NW 1938824vl cv The following question will be submitted to the voters at that election: "Shall the City of Andover, Minnesota, be authorized to issue its general obligation bonds in an amount not to exceed $2,000,0000 to finance the acquisition of land from willing sellers for the preservation of: natural areas, water and air quality, wildlife habitat and to enhance the trail system? Spending would be subject to an annual audit." Very truly yours, CITY OF ANDOVER, MINNESOTA By Its City Clerk 1938824vl 2 6) STATE OF MINNESOTA COUNTYOFANOKA CITY OF ANDOVER AFFIDAVIT OF POSTING NOTICE OF ELECTION AND OF POSTING SAMPLE BALLOT The undersigned, City Clerk for the City of Andover, Minnesota, being first duly sworn on oath, deposes and says that on ,2006 (at least ten days before the election) she posted the Notice of Election, a true and correct copy of which is hereto attached, at the office of the City Clerk in said City, and at each of the following public and conspicuous places within said City: One at One at One at She further says that on , 2006, at least four days before the election, she posted a sample ballot, a true and correct copy of which is attached hereto, at the office of the City Clerk. On the election day, she posted a sample ballot at each polling place for the election. She further certifies that two weeks published notice of the election appeared in a newspaper published in the City, as evidenced by the affidavit of publication attached hereto, and that one week published notice of said sample ballot appeared in the official newspaper of the City as evidenced by the affidavit of publication attached hereto. City Clerk Subscribed and sworn to before me on , 2006. Notary Public (Attach Notice of Election, Sample Ballot and Publisher's Affidavits) c@ 10'lS!:S!:,).d,,1 STATE OF MINNESOTA COUNTY OF ANOKA CITY OF ANDOVER OFFICIAL RETURNS OF JUDGES OF CITY ELECTION VVe, , Judges of the election held in the City of Andover, Anoka County, Minnesota, on November 7, 2006, DO HEREBY CERTIFY as follows: 1. On the date of the election we attended at the polling place for the election, to-wit: 2. The polls for the election were duly opened at 7:00 a.m. and remained open continuously thereafter until 8:00 p.m. on said day, and no longer. 3. The election was in all respects conducted according to law, and all qualified voters resident in the City who desired to vote thereat were permitted to do so. 4. Each person who voted thereat was furnished by us with an official ballot in form identical with the one hereto attached. 5. Forthwith upon the closing of the polls for the election, we proceeded to count and canvass the votes cast at the election upon the question set forth below, and thereupon found and determined and do hereby certify and declare, that the vote was as follows: "Shall the City of Andover, Minnesota, be authorized to issue its general obligation bonds in an amount not to exceed $2,000,000 to finance the acquisition of land from willing sellers for the preservation of: natural areas, water and air quality, wildlife habitat and to enhance the trail system? Spending would be subject to an annual audit." Votes YES Votes NO Spoiled or Blank Ballots Total Ballots VVITNESS our hands officially as such election officers on November _, 2006. (Attach Ballot) @ 101.R:SZ?4vl STATE OF MINNESOTA COUNTY OF ANOKA CITY OF ANDOVER I, the undersigned, being the duly qualified and acting City Clerk of the City of Andover, Minnesota, DO HEREBY CERTIFY that attached hereto is a full, true and correct copy of the official returns of the judges of the election held in said City on November 7, 2006, as shown in the files and records in my office. WI1NESS my hand on ,2006. City Clerk 1938824vl 2 @ EX1RACT OF MINUTES OF A MEETING OF THE CITY COUNCIL OF THE CITY OF ANDOVER. MINNESOTA HELD: November _, 2006 Pursuant to due call and notice thereof, a special or regular meeting of the City Council of the City of Andover, Minnesota, was called and held at the City Hall on November 2006, at o'clock .M. The following members were present: and the following were absent: The City Clerk presented affidavits of posting and publication of a Notice of Election held in accordance with the resolution adopted on September 5, 2006, authorizing the election to vote on the question of the City of Andover issuing bonds in an amount not to exceed $2,000,000, to finance the acquisition of land from willing sellers for the preservation of natural areas, water and air quality, wildlife habitat and to enhance the trail system, for which spending would be subject to an annual audit, and also presented the official returns of the judges of election. Said affidavits and returns were duly examined, approved and ordered placed on file in the office of the City Clerk. Member adoption: introduced the following resolution and moved its RESOLUTION CANVASSING RETURNS OF ELECTION BE IT RESOLVED by the City Council of the City of Andover, Anoka County, Minnesota (the "City"), that it is hereby found, determined and declared that the election held in and for the City on November 7, 2006, was in all respects duly and legally called and held and the returns thereof have been duly canvassed, and the votes cast at the election for and against the following question were as follows: "Shall the City of Andover, Minnesota, be authorized to issue its general obligation bonds in an amount not to exceed $2,000,000 to finance the acquisition of land from willing sellers for the preservation of: natural areas, water and air quality, wildlife habitat and to enhance the trail system? Spending would be subject to an annual audit." Votes YES Votes NO Spoiled or Blank Ballots Total Votes 1938824vl @ and said proposition, having received the approval of a majority of the votes cast thereon, is hereby declared to have carried. The motion for the adoption of the foregoing resolution was duly seconded by member and, after full discussion thereof and upon a vote being taken thereon, the following voted in favor thereof: and the following voted against the same: Whereupon the resolution was declared duly passed and adopted. 1938824vl 2 @ STATE OF MINNESOTA COUNTY OF ANOKA CITY OF ANDOVER I, the undersigned, being the duly qualified and acting City Clerk of the City of Andover, Minnesota, DO HEREBY CERTIFY that I have compared the attached and foregoing extract of minutes with the original minutes on file and of record in my office and that the same is a full, true and correct transcript of minutes of a meeting of the City Council duly held on the date therein indicated, insofar as the same relates to canvassing the results of an election held in and for the City. WITNESS my hand as such City Clerk on November _, 2006. City Clerk lO1.RR?4vl 3 @) 2006 FTE's by Population Minneapolis 382,295 4500 25 225 11.77 Wayzata 4,122 41 45 3 9.95 Sl Paul 287,604 2850 400 800 9.91 Hennepin County 1,144,037 11000 476 9.62 Carver* 1,801 13 0 2 7.22 New Prague 5,016 35 45 6.98 Sl Anthony Village 8,012 54 45 12 6.74 Carver County 81,618 540 74 25 6.62 Anoka 18,275 116 94 115 6.35 Minnetrista 4,890 31 0 0 6.34 Ramsey County 515,411 3200 786 230 6.21 Bloomington 85,301 529 140 300 6.20 Richfield 34,502 209 29 100 6.06 Hopkins 17,643 106 6 65 6.01 Newport 3,694 22 1 5 5.96 Golden Valley 20,736 122 7 202 5.88 Columbia Heights 18,698 110 42 56 5.88 Orono 7,687 45 4 12 5.85 Chaska 20,260 115 235 100 5.68 Jordan 4,413 25 4 6 5.67 Farmington 15,549 88 18 44 5.66 Edina 48,156 265 70 300 5.50 St. Louis Park 44,896 242 8 90 5.39 Robbinsdale 14,068 74 27 8 5.26 Hastings 19,782 103 8 5.21 Anoka County 316,830 1609 110 472 5.08 Fridley 27,480 139 65 185 5.06 Scott County 112,623 552 128 53 4.90 Maplewood 35,763 174 35 376 4.87 Spring Lake Park 6,833 33 16 4.83 Osseo 2,485 12 9 3 4.83 Rosemount 16,794 81 14 26 4.82 Oak Park Heights 4,379 21 0 10 4.80 Mound 9,630 46 7 4 4.78 Shako pee 24,967 118 122 33 4.73 North St. Paul 12,273 58 19 4.73 Savage 23,570 111 65 12 4.71 Medina 4,276 20 2 1 4.68 Burnsville 61,355 286 13 128 4.66 Rogers 5,580 26 21 4 4.66 Marine On Saint Croix 644 3 1 4.66 Deephaven 3,885 18 1 10 4.63 *Contracts with another aaencv for police protection Paae 1 of 3 2006 FTE's by Population South St. Paul 20,304 94 18 50 4.63 Roseville 34,080 154 14 200 4.52 Crystal 23,012 101 10 0 4.39 Washington County 217,435 947 171 110 4.36 Maple Grove 55,278 240 12 591 4.34 Minnetonka 51,658 224 17 196 4.34 West St. Paul 19,655 84 5 20 4.27 Dakota County 383,076 1598 231 159 4.17 Excelsior 2,400 10 3 4.17 Brooklyn Park 68,715 285 47 330 4.15 Waconia* 8,018 33 75 6 4.12 Lexington 2,220 9 12 5 4.05 Lakeville 47,523 191 38 163 4.02 Ramsey 19,208 77 5 20 4.01 Prior Lake 19,662 78 7 94 3.97 New Brighton 22,332 88 12 200 3.94 Cottage Grove 31,437 122 8 100 3.88 New Hope 20,908 81 16 150 3.87 Watertown* 3,620 14 6 3.87 Woodbury 49,329 190 7 200 3.85 Victoria 5,198 20 20 20 3.85 Coon Rapids 62,295 238 96 100 3.82 St. Paul Park 5,052 19 29 4 3.76 Lino Lakes 18,368 69 5 54 3.76 Apple Valley 48,418 180 57 112 3.72 Plymouth 70,238 260 8 500 3.70 Hamburg 545 2 1 0 3.67 Norwood Young America* 3,272 12 0 25 3.67, White Bear Lake 24,909 91 11 3.65 Eden Prairie 59,325 215 7 300 3.62 Mendota Heights 11,635 42 14 5 3.61 Mounds View 12,865 46 3 10 3.58 Forest Lake 15,692 56 14 19 3.57 Blaine 49,962 173 17 69 3.46 Champlin 22,925 79 13 25 3.45 Circle Pines 4,742 16 0 10 3.37 Foley* 2,154 7 0 12 3.25 Chanhassen* 21,600 65 4 50 3.01 Shoreview* 26,475 77 10 10 2.91 New Germany 346 1 4 2.89 Shorewood* 7,595 21 10 10 2.76 Andover added 20 for Police 28,939 79 2 25 2.73 *Contracts with another agency for police protection -' Page 2 of 3 2006 FTE's by Population Greenfield* 2,744 7 5 0 2.55 Arden Hills* 9,457 24 0 50 2.54 Centerville 3,557 9 2 3 2.53 Hugo 8,375 21 1 4 2.51 Hanover* 2,048 5 1 0 2.44 Rockford 3,738 9 1 2 2.41 Spring Park* 1,720 4 0 0 2.33 Corcoran 5,850 13 7 4 2.22 Lauderdale 2,364 5 0 4 2.12 Andover* 28,939 59 2 25 2.04 Independence* 3,529 7 0 0 1.98 Falcon Heights* 5,579 11 1 25 1.97 Vadnais Heights* 13,270 26 1 14 1.96 Maple Plain 2,096 4 0 0 1.91 Lake Elmo* 7,666 14 28 3 1.83 Mahtomedi* 8,050 14 2 4 1.74 East Bethel* 11,230 19 0 2 1.69 Oak Grove* 7,290 11 2 5 1.51 Ham Lake* 14,034 20 2 5 1.43 Dept 12,000 16 2 5 1.33 Little Canada 9,890 13 8 18 1.31 New Market 1,028 1 4 0.97 Dellwood 1,070 1 0.93 Brooklyn Center 29,174 0.00 Gem Lake* 442 0 2 0 0.00 Hampton 598 0 6 1 0.00 Inver Grove Heights 31,053 0.00 Pine Springs 421 0 0 0 0.00 St Francis 6,177 0.00 *Contracts with another agency for police protection Page 3 of 3 .A.noka-Hennepin School District COMMUNITY EDUCATION Memo Date: To: From: Re: June 6, 2006 Jim Dickinson, City Administrator Reid Mortensen, Community Education Supervisor ~ Community School Budget 2007 ~ I am requesting the support of the City of Andover for the Community School program during the 2007 budget year. The proposal is based on the maintenance of existing levels of service. Anoka-Hennepin School District provides the supervisory position, most of the clerical support and ten hours of staff time at each building. The joint funding provided by the City of Andover and Community Education provides the necessary staff time to create the services listed below. Services Provided With Joint School District/City Funding 1. Youth Programs and Activities- Andover: 30-36 per quarter Crooked Lake: 20-24 per quarter Rum River 20-24 per quarter 2. School Buildings Open to Community Groups-4 nights a week 3. Summer Program Cost of Services-City of Andover Share 1. Youth Program 2. Summer Program 3. Total $35,542 $7,600 $43,142 City of Andover-Allocation by Building Andover $17,770 Crooked Lake $8,886 Rum River $8,886 Summer $7,600 T ota! $43,142 If you have additional questions please give me a call at 506-1263. discover 'VI ig~W ", Anoka-Hennepin School District ,;> 2727 Ferry Street North. Anoka, MN 55303 . Tel: 763.506.1260 . Fax: 763.506.1299 . TIY: 763.506.1292 unu''U' t:lTln'lcs:> \:-1 ?_Tnn_llc:,/~e 66 Memo Date: To: From: Re: August 29, 2006 Lee Brezinka, Assistant Finance Director City of Andover Reid Mortensen, Community Education Program Supervisor City of Andover/Community Education Program The purpose of this memo is to clarify the services that the funding from the City of Andover and Anoka Hennepin Community Education provide for Andover residents. At Andover Elementary, Crooked Lake Elementary and Rum River Elementary we have the following staff and school year positions: Andover: Community School Programmer; 175 days at 30 hours per week; Andover funds 20 hours/week and Community Education funds 10 hours/week Crooked Lake: Community School Programmer; 175 days at 20 hours per week; Andover funds 10 hours/week and Community Education funds 10 hours/week Rum River: Community School Programmer; 175 days at 20 hours per week; Andover funds 10 hours/week and Community Education funds 10 hours/week Summer: Community School Programmer for 6 week summer program These staff provide a variety of programs that include arts, skills, enrichment, recreational and general interest classes and activities for preschoolers through teens with some special events and activities. Included with this memo are brochures that are representative of the type of programming that is offered after school and some evenings. In addition these staff coordinate facility use at the schools for community groups after school, evenings and weekends. Besides community groups, facility use includes tournaments, community athletic practices, civic groups, trainings and special school and community events. Data is not complete for the 05/06 school year, but over 5800 youth participated in programming for the 04/05 school year. If you need additional information or have questions, please do not hesitate to contact me at 763-506-1263 or email me at Reid.Mortensen@anoka.k12.mn.us. Community School Youth Programmer Carolynn Meints 506-1712 Community School Secretary Carolyn Ballstaat 506-5642 Community School Programs are brought to you by the City of Anaover ana Anoka-Hennepin School District 11 Andover Community School FALL 2005 Back To School Scrapbook Start saving your school memories now! Come and assemble a 3-ring photo album. Personalize your pages and add your favorite photos. Bring "Back to School" pictures to start with. Extra inserts will be pro- vided so you can continue to add throughout the year! Course# Location Gr. Date/Day Time Wks Fee 1273CF1-00 Andover K-5 Oct 12 W 3:50-6:00 1 $18,00 Fall Canvas Bag You'll design and decorate your own special canvas bag with puff paints, fabric and buttons. When completed, you'll be able to use your bag for school or anything you may want to put in it. Course# Location Gr. Date/Day Time Wks Fee 1273CF3-00 Andover K-5 Oct 26 W 6:30-7:30 1 $8,00 Fancy Notebook You'll embellish a spiral notebook using different fabrics, buttons and sequins. Course# Location Gr. Date/Day Time Wks Fee 1273CF2-00 Andover K-5 Oct 5 W 6:30-7:30 $12.00 Tie Dye T-Shirt Be the talk of the class as your wear your tie dyed t-shirt that you made! (Size 18-20 T-shirt supplied. If a larger size is needed, please note on the registration,) Course# Location Gr. Date/Day Time Wks Fee 1273CF4-00 Andover K-5 Nov 16 W 3:50-5:00 1 $12.00 Treasure Box Store all your treasures in this wooden box that you decoupage. The box will already be base coated so you get to do the fun part! Course# Location Gr. Date/Day Time Wks Fee 1273CF5-00 Andover K-5 Oct 26 W 3:50-6:00 1 $12.00 Archery (Tuesday/Thursday Class) This popular two-session class will introduce you to the basic skills used in archery: safety rules, stance, aiming and correct shooting tech- niques. We will provide the targets, bows, arrows, equipment and pro- fessional instructor. Register early as class size is limited! Course# Location Gr. Date/Day Time Wks Fee 1273HF1-00 Andover 2-5 Nov 1 & 3 3:50-4:50 1 $14,00 Archery Partners (Tuesday/Thursday Class) This class is designed to give instruction in pairs with one adult for each student. Basic archery skills will be stressed: safety rules, stance, aim- ing and correct shooting techniques. We provide the targets, bows, arrows, equipment and professional instruction. Register early as class size is limited.. Course# Location Gr. Date/Day Time Wks Fee 1272BF1-00 Andover K-5 Nov 1 & 3 4:55-5:55 $16.00 Basketball Warm Up Students who enjoy the game of basketball and would like to sharpen up their skills are invited to join this fun group. We'll practice the basic skills including dribbling, ball control, lay-ups, shooting, and defense. Inter-squad games will be played each week. Great tune-up for the Andover Athletic leagues. Boys and girls welcome. Course# Location Gr. Date/Day Time Wks Fee 1273HF4-00 Andover 3-5 Nov 30 W 3:50-4:50 4 $12.00 New this year...Register on line at www.discovercommunityed.com Flag Football Have fun playing the popular game of flag football, Students will learn and practice catching, passing, kicking, and running with the ball as well as offense and defense formations, play calling, rules, and sports- manship. Inter-squad games will be played each week, Join the team and make new friends!! Dress for the outdoors. Course# Location Gr. Date/Day Time Wks Fee 1273HF4-00 Andoverr 3-5 Oct 6 Th 3:50-4:50 4 $12.00 Little Ninjas Our specialized Little Ninja's program is an age-specific curriculum that is professionally designed to teach children important life skills in a fun, exciting and enriching manner. In this program your child will learn more than just how to kick and punch, They will learn valuable life skills such as focus, memory, teamwork, discipline, self-control, fitness, balance and coordination. Many of the same concepts you are teachi- ing your child at home will be consistently reinforced through classroom discussions in your child's program. Course# Location Gr. Date/Day Time Wks Fee 1273FF2-01 Andover K-2 Sep 27 T 3:50-4:20 6 $39.00 1273FF2-02 Andover K-2 Nov 8 T 3:50-4:20 6 $39.00 Soccer Fun Students will receive instruction on the basic rules and skills of soccer, including teamwork and good sportsmanship. Join the team and have fun playing this great game!! Course# Location Gr. Date/Day Time Wks Fee 1273HF5-00 Andover K-2 Oct 4 T 3:50-4:50 4 $12.00 Sports of All Sorts In this class students will be playing a variety of fun sports and exciting gym games including floor hockey, T-ball, kickball and much more! A different activity each week. This class is designed to give the younger students a "taste" of many fun activities. Girls and Boys are welcome. Meet new friends and have some fun!! Course# Location Gr. Date/Day Time Wks Fee 1273HF6-00 Andover K-2 Nov 8 T 3:50-4:50 4 $12.00 Volleyball Warm Up Join us after school for an afternoon of Volleyball. You'll have fun learn- ing skills and playing inter-squad matches, Great warm up to join the Winter Volleyball team! Course# Location Gr. Date/Day Time Wks Fee 1273HF7-00 Andover 3-5 Oct 6 Th 3:50-5:20 5 $20,00 YMCA Danceline This energetic class will teach basic dance team techniques! Get in line and join the fun! Please wear comfortable clothing and tennis shoes.. This class is cooperative with the YMCA, Course# Location Gr. Date/Day Time Wks Fee 1273HF8-00 Andover K-5 Nov14 M 3:50-4:50 6 $36,00 YMCA Youth Fitness Fitness is fun! Join others to learn how you can be fit and healthy in spirit, mind and body, We'll excercise your muscles, play some fun games and meet new friends, We'd love to have you join us, This class is cooperative with the YMCA. Course# Location Gr. Date/Day Time Wks Fee 12731F1-D0 Andover K-5 Oct 4 T 3:50-4:50 6 $36,00 YMCA Youth Yoga A wonderful way to introduce the benefits of fitness yoga (strength, stretching, breathing & relaxation) to children through games and activi- ties in a safe, enjoyable, inclusive format. This class is cooperative with the YMCA. Course# Location Gr. Date/Day Time Wks Fee 12731F2-00 Andover K-5 Oct 5 W 3:50-4:50 6 $36.00 ~ y ~ Emma B Howe Northtown Family YMCA 8950 Springbrook Drive Coon Rapids, MN 55433 763-785-7882 Andover Dragons Choir Be a part of our Andover Dragons Choir! You will be performing for our school. Look for an announcement for the upcoming date. The choir will be directed by our music teacher, Yvonne Ostien. Class size is lim- ited. Course# Location Gr. DatelDay Time Wks Fee 1273DF1-00 Andover 4-5 Oct 11 T 3:50-5:00 10 $38,00 Babysitting Preparation (Man, Tues, Wed Class) Students will/earn about common babysitting situations, safety proce- dures, first aid, and child development stages. This is a must for all beginning sitters. Snack Included. (Certification cards will be awarded upon completion.) Course# Location Gr. DatelDay Time Wks Fee 1273FF1-00 Andover 4-5 Nov 14-16 3:50-6:00 $30,00 r r ~ New this year...Register on line at www.discovercommunityed.com ~~ .Ai ~ Girls Club Girls, you wanna have some fun? We are calling all girls! Come and learn some fun things, play some fun games and do some fun crafts (including lip gloss and body glitter!) and make a cool journal to keep. Course# Location Gr. DatelDay Time Wks Fee 1273CF6-01 Andover K-2 Oct 12 W 3:50-4:50 5 $20.00 1273CF6-02 Andover 3-5 Oct 13 Th 3:50-4:50 5 $20.00 A Study Club Learn good study habits! Receive extra help with homework, reading and special projects. Course# Location 1273FF4-01 Andover 1273FF4-02 Andover Gr. 4-5 4-5 Date/Day Time Wks Fee Oct 4 T 3:50-5:00 6 $25.00 Nov 15 T 3:50-5:00 5 $21.00 Back to School Bash Join Andover, Crooked Lake, McKinley and Rum River Elementary Schools for a night of excitement! Meet new friends, participate in open gym activities, win prizes, do a fun craft, enjoy a slice of pizza and a beverage, sing karaoke, listen to music and more! "Back To School Bash' will be held at Andover Elementary School. Course# Location Gr. DatelDay Time Wks Fee 1273HF2-01 Andover 1-3 Sep 28 W 6:30-8:00 1 $9.00 1273HF2-02 Andover 4-5 Sep 20 T 6:30-8:00 1 $9.00 Family Rollerskating Night Mark your calendars for a fun family night at Cheap Skate in Coon Rapids, Watch for flyers or pick one up in the Community School office. You must provide your own transportation. Pay at the door Course# Location Gr. DatelDay Time Wks Fee 1273HF3-01Cheapskate K-5 Oct 25 T 6:00-9:00 1 $4.00 1273HF3-02Cheapskate K-5 Nov 15 T 6:00-9:00 1 $4.00 Community Education funds, including participant fees and municipal funding paid for the printing and distribution of this publication. Regular K-12 instruction funding was not used. r-----------------------------___.___._____.___., All classes require pre-registration and are filled on a first-come, first- emergency causes cancellation of classes. served basis, We reserve the right to cancel classes due to insufficient regis- Cancellation will be announced on the school intercom. Parents should be tration. No refunds will be made after the first class. sure children have instruction of where to go if class is canceled and both 1. Please complete one registration form for each class, parents ~re working, ~Ie~se include this inf?rmation on the regist~ation form. 2, All fees must accompany registration. Make checks payable to Fee ASSistance applications are available In your local Community Education "Anoka-Hennepin District #11." Offices, F~r further Information please ca!1 !i06-1260. . ". . . 3. There is no confirmation on registrations, Assume you are enrolled CO":lmu~lty Education Welcomes Participants of All Abilities. All actlv/- . , . ties In thiS flyer are open to persons With disabilities. We encourage people to If you are not not,lfied otherwise, " actively engage and participate in age-appropriate community education inte- 4. Enclose registration form, al?ng v.:lth p~yment, In a seal:d envelop.e. grate activities, The Community Education Department will provide accessibil- Students may drop off registrations In the Community Education ity assistance if needed, to make physical and social integration successful. If Office. Registrations MUST be received two business days prior to you need assistance to participate, inform the Community Education office at start of class. least two weeks prior to class. This document will be provided in alternate for- PARENTS PLEASE NOTE: Due to unpredictable weather or other emergen- mats upon a 72 hour request to accommodate people with disabilities. Please cies, please plan with your child where they should go after school if an contact Carolynn Meints at 506-1712 to make a request. TIIIE COURSE # lAST NAME ADDRESS PARENTNAME SCHOOL YOUmEND ClASS DJilll Accornnxxlatioo<i A=ibility Needs Office Use: Date I TIIIE COURSE # lAST NAME ADDRESS PARENTNAME SCHOOL YOU mEND ClASS DJilll AccomrrxxIatioo<i A=ibility Needs Office Use: Date Rum River Community School WINTER 2005 Community School Youth Programmer Kim Munson 506-8212 ~-,' y ~ " -.. Community School Secretary .' Carolyn Bal/staat 506-5642 Community School Programs are brought to you by the City of Antlover anti Anoka-Hennepin School DIstrict 11 ~'. ,';: ;:' Arts & Crafts (Paint Shirts Recommended For All Arts and Craft Classes) Candy Cane Holder You'll start by painting a 4' ceramic candy holder. You'll complete your candy cane holder by adding candy canes. Great as an ornament or for gift giving. Course# Location Gr. Date/Day Time Wks Fee 1323CW4-QORum River K-5 Dee 19 M 4:15-5:15 1 $8.00 Christmas Tree Pillow Deeorate your home and get into the spirn of the holidays by making this adorable no sew pillow. Christmas colors and a gold jingle bell, will remind everyone of the holiday season. Course# Location Gr. Date/Day Time Wks Fee 1323CW5-ooRum River 3-5 Dee 12 M 4:15-5:45 1 $16.00 Enchanted Forest Come paint these two 3' and one 4' ceramic trees nestled on a mirror base glistening wnh snow. Makes a great winter scene! Course# Location Gr. Date/Day Time Wks Fee 1323CW6-o0Rum River K-5 Jan 9 M 4:15-5:30 1 $15.00 Frosty Fun Come join us for this hour while we watch "Frosty The Snowman', paint a 3' ceramic snowman and have chocolate "Frosty's' from Wendy's. Course# Location Gr. Date/Day Time Wks Fee 1323CW7-OORum River K-2 Jan 23 M 4:15-5:15 1 $11.00 Gingerbread Boy Door Stop Come and turn this outside edging stone into the most adorable ginger- bread boy everl He can be used as a doorstop or as a decorative piece for your front step, porch or deck. Course# Location Gr. Date/Day Time Wks Fee 1323CW8-ooRum River K-5 Dee 5 M 4:15-5:30 1 $9.00 "Let It Snow" Lighted Snowman Bring this snowman to life by painting him and his "Let It Snow' sign then adding a light to make him bright! Course# Location Gr. Date/Day Time Wks Fee 1323CW1-OORum River K-5 Jan 18 M 4:15-5:15 1 $13,00 "No Sew" Heart Pillow Need something to cuddle this Valentine's Day? Come and make your own heart shaped, "no sew', fleece pillow. Looks great and is very "huggable' I Course# Location Gr. Date/Day Time Wks Fee 1323CW2-00Rum River 3-5 Feb 13 M 4:15-5:45 1 $16,00 "No Sew" Poncho & Hat Make your own poncho and hat out of fleece material, No sewing required. A supply list will be sent to you after you register. Course# Location Gr. Date/Day Time Wks Fee 1323CW3-ooRum River 4-5 Jan 19 Th 4:15-6:15 1 $12.00 Valentine Votive Candle Holder Just in time for Valentines Dayl Come paint enher a ceramic heart bear or ceramic heart bunny sitting next to the votive holder. A great gift idea for that someone special! Course# Location Gr. Date/Day Time Wks Fee 1323CW9-OORum River K-2 Jan 30 M 4:15-5:15 1 $10.00 v Broadway On Site Presents ~ "The Hobbit" at Rum River &". Watch for flyers coming home soon! A Recreation/Sports Archery (Tuesday/Thursday Class) This popular two session class will introduce you to the basic skills used in archery: safety rules, stance, aiming and correct shooting tech- niques, We will provide the targets, bows, arrows, equipment and pro- fessional instructor. Register early, class size is limned! Course# Location Gr. Date/Day Time Wks Fee 1323HW5-ooRum River 2-5 Dee 13 &15 4:15-5:15 1 $14,00 Archery Partners (Tuesday/Thursday Class) This class is designed to give instruction in pairs with one adull for each student. Basic archery skills will be stressed: safety rules, stance, aim- ing and correct shooting techniques. We provide the targets, bows, arrows, equipment and professional instruction. Register early as class size is limned. Course# Location Gr. Date/Day Time Wks Fee 1322BW1-o0Rum River K-5 Dee 13 & 15 5:30-6:30 1 $16,00 Floor Hockey Tournament Join us in playing floor hockey. On March 18th, we will be in a tourna- ment held in Blaine at Roosevell Middle School. T.Shirt included! Course# Location . Gr. Date/Day Time Wks Fee 1323GW1-OORum River 3-5 Feb 7 T 4:15-5:15 5 $33.00 Sports For Fun In this class, students will be playing a variety of fun sports and excning gym games including floor hockey, T-Ball, kickball and much more! A different activity each week. This class is designed to give the younger students a "taste' of many fun activnies. Girls and boys are welcome. Meet new friends and have some funl Course# Location Gr. Date/Day Time Wks Fee 1323HW3-o1Rum River K-2 Jan 3 T 4:15-5:15 5 $21.00 I 1323HW3-02Rum River 3-5 Jan 5 Th 4:15-5:15 3 $13.00 YMCA Youth Fitness Fitness is fun! Join others to learn how you can be frt and heallhy in spirn, mind and body. We'll excercise your muscles, play some fun games and meet new friends. We'd love to have you join us. This class is cooperative wnh the YMCA. Course# Location Gr. Date/Day Time Wks Fee 1323IW1-o0Rum River 4-5 Dee 1 Th 4:15-5:15 4 $24.00 Volleyball Tournament Join the Volleyball team as we practice up for the annual tournament to be held on Saturday, March 4th at Northdale Middle School. Open to all 3rd, 4th and 5th graders who enjoy playing this great game, We'll have fun practicing our skills and playing inter-squad matches in prepa- ration for the big tourney! Bump, Set, Spike! Tournament T-Shirt is included in fee. Course# Location Gr. Date/Day Time Wks Fee 1323GW2-OORum River 3-5 Feb 2 Th 4:15-5:15 5 $33,00 r -, y Andover YMCA 15200 Hanson Boulevard Andover, MN 55304 (763) 230-9622 ~ A; Special Events After School Rollerskating Party Join us for a fun afternoon of skating at Cheapskate! We'll leave by bus right after school and return to the school at approximately 7:00pm. Fee includes skate rental, hot dog, chips and pop, Watch for an addi- lionalflyer wfth more information I Course# Location Gr. Date/Day TIme Wks Fee 1323EW1-00cheapskate 1-5 Jan 17 T 4:15-7:00 1 $12.00 Family Rollerskating Mark your calendars for a fun family night at Cheapskate in Coon Rapids. Pick up a flyer in the Community School office. You must pro- vide your own transportation, Pay at the door, Course# Location Gr. Date/Day TIme Wks Fee 1323HW1-D1Cheapskate K-5 Dec 13 T 6:00-9:00 1 $4.00 1323HW1-02Cheapskate K-5 Jan 24 T 6:00-9:00 1 $4.00 1323HW1-03Cheapskate K-5 Feb 21 T 6:00-9:00 1 $4.00 Family Swim Night Please join us at the Roosevelt Middle School Pool for an evening of fun in the water for the entire familyl An adutt must accompany children under 7. For more information, pick up a flyer in the Community School office. You must provide your own transportation. Pay at the door, $2.00 per person or $8.00 per family. Course# Location Gr. Date/Day TIme Wks Fee 1323HW2-01 RMS K-5 Jan 13 F 6:30-8:30 1 $21$8 1323HW2-02 RMS K-5 Feb 10 F 6:30-8:30 1 $21$8 Sweetheart Dance Celebrate the holiday with your sweetheart! Students (Grades K-3) and a special adutt in their lives are invfted to this holiday special event. You will be able to dance to music, make a special craft, enjoy refresh- ments and have your picture taken (fee includes one photo). $7.00 per person or $20.00 per family. Held at Rum River Elementary. Course# Location Gr. Date/Day TIme Wks Fee 1323HW4-DORum River K-3 Feb 10 F 6:30-8:30 1 $7/$20 Community EdMcationfunds. including participtmtfees andnumicipalfunding paidfo,. the printing and distribution of this publication. Regular K-12 instruction funding was not used. rAil;~:;-ec;u;;p;~isi;;;n-;d~;ruI;d-;a'fl;-~;ii~st-:-' -e~;e~;;~;-dn;jjatjo~~la-;s~ -. -. -. -. -., served basis, A $5.00 processing lee will be charged lor all refunds. Cancellation will be announced on the school Intercom, Parents should be We reserve the right to cancel dasses due to insufficient registration, sure children ha~e instructio~ of wher~ t~ go if c1~ss is cancela? an~ both 1. Please complete one registration form for each dass, parents ~re working, ~e~se Indude t~IS Inf?rmation on the registration fom:' 2 All fees must accompany registration, Make checks payable to Fee ASSistance applical10ns are available In your local Community Education , 'Anoka-Hennepin District #11.' Offices, F~r further i~formation please ca!1 ?O6-1260, .... ' , 3 There Is no confirmation on registrations Assume you are enrolled Coll)mumty Education Welcomes PartiCipants 01 All Abilities. All acllVl- , , , , " ties In thiS flyer are open to persons with disabilities. We encourage people to If you are n~t not,llled Otherwise, " actively engage and participate in age-appropriate community education inte- 4. Enclose registration lorm, al?ng WIth p~yment, In a sealed enveioP:e' grate activities, The Community Education Department will provide accessibil- Students may drop 011 registrations In the Community EducatIon ity assistance il needed, to make physical and social integration successful, If Ollice. Registrations MUST be received two business days prior to you need assistance to participate, inform the Community Education office at start 01 class. least two weeks prior to class. This document will be provided in alternate for- PARENTS PLEASE NOTE: Due to unpredictable weather or other emergen- mats upo~ a 72 hour request to accommodate people with disabilities. Please cies, please plan with your child where they should go after school if an contact Kim Munson at 506-8212 to make a request. ~._._._._._._._._._._._._._._._._._._._._._._._.~ 11' ~ New this year...Register on line at www.discovercommunityed.com &... A CDURSE# 1ITlE LCX:1ffiON OF C1.ASS LAST NAME FIRST NAME ADDRE::S 01Y ZlP ffiRENT NAME PffiNE (H) WKiSmER SCHXlL YOUATIEND GRADE C1.ASSR:'OM1EAQffiR C1.ASS DATE DNY TIME C1.ASS FEE Aaxxrrmdalim;/1\o::e<Nlility Needs Offire Use: Date Ca<;h Cln:k # FA COURSE # 1ITlE LCX:ATION OFC1.ASS LAST NAME FlRSTNAME ADDRE::S 01Y ZlP ffiRENTNAME PffiNE (H) WKiSmER SCHX)L YOUATIEND GRADE C1.ASSK:OM1FACHER CLASS DATE DNY TIME CLASS FEE Aaxxrrmdaliorl'f1\o::e<Nlili1y Needs Offire Use: Thte Ca<;h Cln:k # FA CDURSE # 1ITlE LCX:ATION OF C1.ASS LAST NAME FIRST NAME ADDRE::S 01Y ZlP ffiRENT NAME PHJNE (H) WKiSmER SCHX)L YOUATIEND GRADE C1.ASSR:'OM1FACHER CLASS DATE DNY TIME C1.ASS FEE Au.uIlIlulalim;/A~lilily Needs Offire Use: Dale Ca<;h Cln:k # FA Crooked Lake Community School SPRING 2006 Community School Youth Programmer Kim Munson 506-2112 Community School Secretary Carolyn Ballstactt 506-56LJ2 Community ScllOol Programs are brOught to you by the City of Anaover ana Anoka-Hennepin School District 11- . . -- I Sports For Fun ! In this class students will be playing a variety of fun sports and exciting r gym games including floor hockey, T-ball, kickball and much more! A ! different activity each week. This class is designed to give the younger Bunny Candy Dish I students a 'taste" of many fun activities, Girls and Boys are welcome. Paint an adorable ceramic Bunny Candy Dish. The bunny stands 9" tall -f Meet new friends and have some fun!! (No class 4/10) and is holding a candy dish with a lid. Take him home andfiil the dish ! Course# Location Gr. Date/Day Time Wks Fee with your favorite sweet treats. Very cute project! : 1213HS4-00 Crkd Lk 3-5 Mar 20 M 4:05-5:05 4, $17.00 . Course# . Location Gr. DatelDay Time - Wks Fee ! 1213CS1,00 Crkd Lk K-5 Mar 29 W 4:05-5:20 _ 1 . $14.00 j Spring Softball - . . I Softball fever is in the air! Grab your glove and join the team! We'll : work on the skills of the game: throwing, catching, fielding, hitting and ! base running, Good sportsmanship and teamwork will be stressed. All : boys and girls are welcome! I Course# Location Gr.. Date/Day Time Wks Fee 1213HS5-00CrkdLk 3-5 May 1 M 4:05-5:05 4 $17.00 Clean The Cupboard _ Mother Hubbard's cupboard is full! We have lots of leftover kits for boys and girls to choose from, maybe even two! You may choose from wood, ceramics, magnets and more! Course# Location Gr. - DatelDay Time Wks Fee 1213CS5-00 Crkd Lk K-5 Apr 19 W 4:05-5:0~ 1 $12.00 Father's Day Surprise! Students will be making a surprise gift for Dad or that someone special in their life. This is a great project that he will cherish forever. Students may peek in the Community School office to see the sample, but remember ~it's a secretl Course# Location Gr. _ DatelDay Time Wks Fee . 1213CS2-00 Crkd Lk K-5 May 17 W 4:05-5:20 1 $12.00 Mother's Day Surprise!- Mom listen, but don't peek - a special gift just for you! Your child will paint a very special project to make this gift one you will always treas- ure. Stop and see the sample in the Community School office...but keep it a secret! . Course# Location Gr. Date/Day Time . Wks Fee 1213CS3-00 Crkd Lk K-5 May 8 M 4:05-5:20. 1 $12.00 Welcome Frog Garden Ornament This ceramic garden ornament will brighten any garden. This cute frog is perched on top of a rock that says "Welcome". You will paint with special outdoor paints so your piece will weather any kind of weather. Course# Location Gr. Date/Day Time Wks Fee 1213CS4-00 Crkd Lk K-5 May 15 M 4:05-5:05 1 $11.00 Soccer Fun Students will receive instruction on the basic rules and skills of soccer, including teamwork and good sportsmanship. Join the team and have fun playing this great game!! Course# Location Gr, DateIDay Time Wks Fee 1213HS3-00 Crkd Lk K-2 Mar 8 W 4:05-5:05 4 $17.00 Spring T-Ball . This fun introduction to baseball gives students the chance to learn the game at their own pace. Using 'soft" baseballs, students will work on catching and throwing the ball, fielding ground balls and pop-ups, run- ning the bases and hitting. We will start off using the T-ball stands, then progress into hitting slow pitches. This is a non-competitive class that will stress saf(jty, teamwork and good sportsmanship. All boys and I girls are welcome! . I Course# Location Gr. Date/Day Time Wks Fee ! 1213HS6-00 Crkd Lk .K-2 May 3 W 4:05,5:05 4$17.00 I I I - : Horseback Riding Lessons-Beginner : Enjoy a 3 week horseback riding course that will teach you the funda- l mentals of riding as well as basic horse care. Lessons will create a I sense of "belonging' and self confidence. Each lesson is 1 1/2 hours in length, with one half of the time in class and the other hal! of the time riding, Students must provide their own transportation. Parents are invited to stay and watch. Classes are held rain or shine, Students should wear long pants and boots (if they have them). Helmets are provided. Located at Roselawn Stabies, 24069 Rum River Blvd., SI. Francis (753-5517) 10 minutes north of Anoka, Please do not mail reg- istration directly to Roselawn Stables, Course# Location Gr. Date/Day' Time Wks Fee 1213FS3-01 Roselawn 4-5 Apr 3 M 7:00-8:30 3 $75.00 1213FS3-02 Roselawn 4-5 Apr 5 W 7:00-8:30 3 $75.00 1213FS3-03 Roselawn 4-5 May 8 M 7:00-8:30 3 $75.00- 1213FS3-04 Roselawn 4.5 May 10 W 7:00-8:30 3 $75.00 I- I- I I I I ' i~ New this year...Register on line at www.discovercommunityed.com Babysitting Preparation (Tues, Wed, Thurs Class) Students willleam about common babysitting situations, safety proce- dures, first aid and child development stages. This is a must for ail beginning sitters, Snack Included. (Certification cards will be awarded upon completion.) Course# Location. Gr. Date/Day Time Wks Fee 12131S1-00 Crkd Lk 4-5 May 2-4 '4:05-6:05 1 $30,00 Computer Lab This class is for all you computer wizards who want to experiment'with a new program or just have fun playing your favorite games, You can play, practice and explore the world of computers. . This is your chance to use a variety of your favorite software in the computer lab. Come and have fun! Course# Location Gr. 1213FS1-00 Crkd Lk K-5 , Date/Day Time Wks Fee Apr 17 M 4:05-5:05 4 $21.00 Family Rollerskating Mark your caiendars for a fun family night at Cheapskate in Coon I Rapids. Pick up a flyer in the Community School office, You must pro- vide your own transportation. Pay at the door. Course# Location Gr. Date/Day Time Wks Fee 1213HS1-01 Cheapskate K-5 Mar 21 T 6:00-8:00.1 $4,00 1213HS1-02 Cheapskate K-5 Apr 18 T 6:00-8:00. 1 $4.00 1213HS1-03 Cheapskate K-5 May 16 T 6:0Q-8:00 1 $4.00 Family Swim Night Please join us at the Roosevelt Middle School Pool for an evening of I fun in the water for the entire family! An adult must accompany children under 7. For more information, pick up a flyer in the Community School office. You must provide your own transportation. Pay at the door, $2;00 per person or $8.00 per family. .. Course# Location Gr. Date/Day Time Wks Fee 1213HS2-00 RMS K-5 Mar 24 F 6:30-8:30 1 $21$8 I , Community Education funds, including participant fees and municipal funding paid for the printing and distribution of this publication. . Regular K-12 ins,tructionfunding was not used. . r._._._._._.~._._._._.~._._._._._~_._._._._._._.' . All classes require pre'reglstralion and are filled on a first-come, first1 emergency causes cancellation of classes.. . . 1 seNed basis. A $5.00 processing fee will be charged for all refunds~ . Cancell~tion will be, annou~ced on the school. interco~. Parents should be 1 . We reseNe the 6ght to cancel classes due to insufficient registration. ~ sure children ha~e Instructlo~ of wher~ t~ go If class IS cancele? an~ both . 11. Please complete one registration form for each class. parents ~re working, ~Ie~se mclude ~IS mf?rmatlon on the reglS.l~alion for"!. 1 . 2. All fees must accompany registration, Make checks payable to Fee ASSistance applications are available In your local Community Education . .1 'Anoka-Hennepin District #11.' Offices. F?r further i~formatlon please call 506-1260. . . ..:, 1 ,3, There is no confirmation on registrations. Assume you are enrolled ! l?o":lmu~lty Education Welcomes P~rtlclpan~~ of All Abilities: All actlV!- I if you are not notified othe . ' tle~ In thiS fiyer are open. t~ per~ons With dlsab!htles. We en~ourage ~eoRle to . . ,. rwlse, , . actively engage and partiCipate In age-appropnate community education Inte. 1 . 4. Enclose registration form, ,alon~ With payment, In a .sealed en.velope. grate activities. The Community Education Department will provide accessibil- . 1 St~dents may drop off registrations In the Community Education, ity assistance If needed, 10 make physical and social integration successful. If 1 Office. REGISTRATIONS MUST BE RECEIVED TWO BUSINESS you need assistance to participate, inform the Community Education office at I. DAYS PRIOR TO START OF CLASS. i least two weeks prior to class. This document will be provided In alternate for- . PARENTS PLEASE NOTE: Due to unpredictable weather or other emergen- mats upon a 72 hour request 10 accommodate people with disabilities. Please 1 . cies, please pian with your child where they should go after school if an contact Kim Munson at 506.2112 to make a request. . , . TIIlE LOCiIDON OF CLASS . PARENTNAME SOIOOL YOUtUIEND CLASS DAlE Accomm:datioosl AcceSsibility Needs Office Use: Date PHONE (H) GRADE DAY Cash FlRSfNAME CITY . . ZIP . . WKiSII1ER C1ASSROOMlEACBER CLASS FEE TIME Check # FA COURSE # lASf NAME ADDRESS PARENTNAME SOIOOL YOU mEND CLASS DAlE AccommOOationslAc:c:esSJbility Needs Office Use: Date TIIlE PHONE(H) . , GRADE , DAY Olsh LOCiIDON OF CLASS FlRSf NAME CITY ZIP WI</SITIER, CLASSROOM1EAOffiR CLASS FEE TIME Check # FA \ ~ ..)>- N ~ 3 ~ 25 !!!. g ~ .~ ffi a g ~ en en Ql :::I cnoa. 'S ~ ~ c' -<" 0 0 cn 9- ""C C - ro CD iil 3 :::I ~ [a - OleO' >< en Ql CD -. (f) cn~CD _. a. ~ :5" 0 co::J g- 3 3' ~~-g ~ o' Q. ~::.; ~ a ~. ~ 3 CD Ol-a. ::::!. ~ m .:<o~ a. - _. CD 0 en'C~ -Ol..... ~;:1Q c: 3 C/I g. ~ ?I :l-CD m9.20 ~;Ui5 O'CD(') c:C%~ ~::J(Q o c: 0 CD ~ ct; en ~ :l :l o 3 - CD ~. .; c c: ~ n :r Ol en CD en ~ CD < CD :l e CD =l' o 3 (') Ol 'C 2' ~ CD a. iii >< :l (') ~ CD 3 CD ::l. iii >< (') Ol 'C Ol (') ~ I CO o :::R o I --J o :::R o I .t>- O :::R o I ...... o :::R o o :::R o ...... o "*" N o :::R o I W o :::R o I N o :::R o I (j) o :::R o I (J1 o :::R o "'U w '< '" o o '" ~) / / / r/ . - II . I _I * + + .1. t . . J I (/)(')(')-1(') m~;::::;.:a;::;.: -'<'< ll)'< CO "'U:::o-"'U :1 ~ )>-. CO (')-. -. 0 < -. 0 g.::, CO -< ::' Qoo;l~a~ (')x -OX (ilOg'COO . c.. :J Ul ;:!. :J ;:+: CD CO '< I Ulc: -10 ~. ~ 3 :J CO CO II CO Ul Ul ~ ~ ~ Ul - Ul CO CO ll) Ul c.. * Ul "'U w '< '" o o w "'U w '< '" o o ~ "'U w '< '" o o CJ'1 "'U W '< '" o o 0'> w o "*" - )>CDm _.~ tn !!!. ~ + ~ ~QoSUSU (') -. ..... CD (") 0. CD "'C.,tnQ. SU ~~"'C '< -. (") CD .... -. .., Ntn~(') o -. CD O~:I:~ N:;oO..... ~CD3(") ., SU CD ::r -tnSU ~-=:~~ -. ,... (Q Z~SUCD 3: S' ~ :i' 3::::!:lOJ"'C )>~s:::a (") -. tn "C -. 0 -. CD ~=t~~ CDSUCDL.ooo" tn Q.tn~ CD '-. tn -I >< s::: "'C SU (') tn ., >< -~OCD s:::w"Ctn 0.0._," -.......... ,., ~C:l:;O o '< CD 3:=-Ic; _. SU SU ~ ~ ., >< s::: ~ tn CD CD"'CtnCD SU CD '" OJ ., SU SU ~ tn 0. CD 2,(") -. SU tn"C -. ..... SU en-=: ..... . SU CD ..... . CD '" ~ .)>5" - OJ 3 :!l ...a. c: 0 OJ 0: en c: :::!': .~ :;":30 < CD_:3 Q) UI CIJ OJ ::J cnoQ. ""C Q) "",-, s ..., 0" 5i -<" 0 c .- ~ -g or ~ ::J :1 cD ::J '<0._ S'cC" ~ ~. ~ .. " (I) _. (C C. ~ :5" 0 -0':] a. 3 3' (I)",." ::h_= (() o' Q, bl"- - =r~ a. 0 -. (jj' 3 ~ ." - a. '" ::r (I) ::!. CD ~ .;;:o~ ~mQ !eo -g _ 5=;:1Q c: 3 .. g:~i " - (I) oraQO .:i:;o 0' C"~g c: (I) - -"<0 o.C:o 0(1)< (I). (I) .. ~ " " o 3 - (I) " - j ~ ~ i . .- " !2. c: a. (I) iil (ii " c: (I) =l' o 3 bl "E. c: ~ (I) a. W x :i' (') ~ (I) 3 (I) a - '" x bl ." '" (') -? ." c: o ::r '" .. (I) .. I N .j:>. I I I N 0 0 I -" I 0) .j:>. 0 :oR -" ()) 0 :oR 0 0 0 :oR *- 0 N 0 :oR 0 0 0 :oR :oR 0 0 :oR :oR 0 0 0 0 lJ Q) '< N o o N lJ Q) '< N o o v.> lJ Q) '< N o ~ * + + .:l + ~Q2dg w -< '< or '< ro-o:::o(")~ )> "'0 (1) _. 0 -. < ,<-"0 c.. "C (1) . CII' :J-o-l Qo-ie..,W W (1) 0 x (') X "C .., 0 OJ (1) 0 (1):JQ)::4.:J c.. CII '< -. OJ (1) I ene -io CII W 3 -. x (1) :J (1) CII (1) CII_ CII (1) CII W (1) c.. ClIo. CII lJ Q) '< N o o (J'1 lJ Q) '< N o o ()') I "'C"'I'Im .., f'V en o CD ..... "C < -. CD CD 3 :1.~1>> '<:cS- I>>-ICDo. o.I>>OJ"'C _. >< I>> CD C CD en .., en en CD (') .....'" CD CDI>>-=:~ B~CI>"'" co..: 0 o(f)Ci)~ -.....<1>> ~~'<cE Ul CD + CD "'C ~ I>> -. CD 0. -. ~ "'en~O o Qo ~ -. I>> O~ "C 0 _. 0 s:~~; en::;::I:~ :;. en 0 0. (') -. 3 0 CD ~ CD < "'C:::a~~ I>> CD CD "'C '< I>> I>> .., N= 0. 0 o :-. Qo"C o CD CD N.: OJ:1. :;. c '<: """ ~. -I -~I>> ~CD>< -. en CD o en en ~ '" I Community Resource Partnerships, Inc. 1000 Westgate Drive, Suite 252 St. Paul, MN 55114 DATE: August 29,2006 TO: NMMA BOARD MEMBERS FROM: Bob Benke RE: REVENUE TRENDS Attached for your information and use are copies of graphs depicting changes in revenue streams using Pay 2002 as the base. The base was chosen to coincide with Legislative action to change property class rates at the same time that there were major cuts in LGA. The first chart shows the composite trend data for all NMMA cities without the City of Minneapolis included due to the significant difference in budget levels. When Minneapolis is included, the pattern is very similar but the degree of change is different. We will package this chart for discussions with legislative candidates and other appropriate outlets. The second chart is for your select city. Board Members are the only ones to get copies of this information and we will not share it with others without your consent. Use of this information is your choice. We recognize that each city has its own tax base make up, local culture and political discussion to deal with. We felt that there are so many possible ways to interpret the data that it should be done by those responsible for the decisions being reflected. In general, the charts show that LGA has been reduced significantly, property tax levies and homestead tax levies have risen noticeably and local business taxes have declined. We did not separate out the multi-family property tax data The composite data show that when adjusted for inflated costs of public services, as opposed to the Cost of Living Index, city revenue base is about 10% below the Pay 2002 level. The homestead tax trend is fueled both by the class rate changes as well as escalating home values. The business class tax drop reflects the rate change but does not include the statewide business tax currently levied by the State. For your information, we also generated a data base based on State Auditor's data that covers the 2000 -2004 budget years. CY 2005 data won't be available until later this year. In reviewing the results, it is clear that there are too many discrepancies and unexplainable changes to draw detailed conclusions. Examples include how capital expenditures are recorded, how debt service is set up (GO Levy vs. EDA Revenue Bonds), etc. Consequently, we will not be releasing that information to anyone. Please review the two charts and let me know if you have any questions. We'll get the best answers possible. If you share this information during your budget process or other public forums we would welcome your assessment as to the value added to your city. CC: Joseph Strauss Bill Barnhart Becca Pryse U:\NMMA\2007 Session\Finance Docs\City Revenue Charts\Dist.Cover Memo.doc 't CITY OF NDOVE 1685 CROSSTOWN BOULEVARD N.W. . ANDOVER, MINNESOTA 55304 . (763) 755.5100 FAX (763) 755-8923 . WWW.CI.ANDOVER.MN.US TO: Mayor and Councilmembers FROM: Jim Dickinson, City Administrator SUBJECT: Follow Up Information DATE: August 29,2006 At the August 22nd Council workshop, there was a request by the Council to have more information distributed on the Motor Vehicle Sales Tax (MVST) Constitutional Amendment that will be on the November 7th ballot. I have attached a North Metro Mayors Association document that should assist each Councilmember. If you would like additional information, do not hesitate in contacting me. NMMA Transportation Policy Position: TRANSPORTATION BACKGROUND; The 2005 Legislature adopted a transportation funding bill that would have provided significant increases in funding for roads, highways and transit services in Minnesota. The 2006 Legislature again considered funding increases but failed to reach consensus in the Conference Committee. Consequently, the only immediate opportunity to increase funds for roads, highways and transit services is support for the adoption of the Motor Vehicle Sales Tax (MVST) Constitutional Amendment that will be on the November 7 ballot. The NMMA Board Members are hopeful that candidates for Governor and the Legislature will address the escalating transportation funding gap during the General Election campaign process and then follow through during the 2007 Session. The gas tax, or, "fuel user fee", has not changed from the current rate of 20 cents per gallon since fall of 1988 when gas sold at an average of about $1.00 per gallon. If the same rate of tax as a percent of purchase price. 20.0%, prevailed at today's price of about $3.00 per gallon, the fuel user fee would be 60 cents, or a 200% increase that would generate an additional $1.3 Billion per year to repair and improve Minnesota's deteriorating transportation infrastructure and level of service. CURRENT POLICY POSITION: The NMMA Board of Directors recommends that the Governor and Legislature collaborate in the development and passage of a transportation funding package early in the 2007 Session so as to avoid late session failure to reach agreement. Agreement is urgently needed to address needs of city and county roads as well as the state roads that they supplement. Further, a long term financing strategy for transit infrastructure and services is needed to meet mobility needs of our work force, handicapped travelers and increasing numbers of senior citizens. Towards this end, the NMMA offers the following documents as resources and a framework for debate: · "Transportation Principles" that should guide decision making, including, o Reliance on increased user fees o Provide certainty of funding o Prudent Fiscal Management · "Principles Commentary" that provides additional ideas for consideration and rationale for recommended actions, · "Transportation Fact Sheet" documenting the severity of the trunk highway system funding gap based on 2005 estimates that predate recent annual increases in highway construction costs due to inflation, · A "Conceptual Funding Plan" offering a mix of fund sources for consideration that can serve as a menu of choices and framework for analysis and debate on the options available. U:\NMMA\2007 Session\Transportation Docs\NMMA Transportation Policy Position 8.10.06.doc &. NORTH METRO MAYORS ASSOCIATION TRANSPORTATION PRINCIPLES FOR CONSIDERATION BY CANDIDATES FOR GOVERNOR AND LEGISLATURE--2006 ELECTION CAMPAIGNS OVERVIEW The North Metro Mayors Association members believe that significant new revenues are needed for Minnesota's transportation system. We have fallen behind prudent investment schedules and are suffering safety, congestion, economic and quality of life impacts as a result. Our future well being demands that we invest now to enhance our future ability to sustain our growing population and our economic base that provides jobs and wealth to us all. The problems created by chronic underinvestment in transportation are well known and have been well documented in reports and media coverage. There were serious proposals under consideration in the 2005 Legislature from the Governor, the Association of Minnesota Counties, the Minnesota Chamber of Commerce, the Minnesota Transportation Alliance and individual Legislators. These organizations and leaders should be congratulated for their efforts that raised awareness of the need for significant new funding and for providing specific solutions to the funding dilemma. Unfortunately, the funding bill agreed to by the Legislature did not meet with the Governor's approval. . In the end, the 2006 Legislature failed to. reach agreement on transportation funding. Our challenge now is to craft a plan that can receive bipartisan support in the Legislature as well as the concurrence of the Governor in the 2007 Session. Toward that end, the NMMA puts forth for consideration the attached PRINCIPLES that should guide the crafting of the increased transportation funding legislation. NMMA MEMBER CITIES Andover Anoka Blaine Brooklyn Center Brooklyn Park O1amplin Circle Pines Coon Rapids Crystal Dayton Lexington Maple Grove MinneapolIs Mounds View I New Brighton New Hope Oak Grove Osseo Ramsey Spring Lake Park CONTACTS: 651-203-7259 Steve Larson, Mayor, City of New Brighton, NMMA President Mark Steffenson, Mayor, City of Maple Grove, NMMA Vice President Joseph Strauss, NMMA Executive Vice President Bob Benke, Director, Research and Advocacy Services NMMA KEY PRINCIPLES · RELIANCE ON INCREASED USER FEES TO FUND HIGHWAY IMPROVEMENTS o USER CONTRIBUTION PROPORTIONAL TO BURDEN IMPOSED o TRANSPARENCY OF RELATIONSHIP o GENERATIONAL EQUITY · CERTAINTY OF FUNDING FOR TRANSIT & HIGHWAYS o LEGISLATIVE ACTION FOR IMMEDIATE IMPACT WITHOUT REFERENDA REQUIREMENTS o 100% MVST TRANSFER o MINIMAL RELIANCE ON UNCERTAIN SOURCES: · FEDERAL FUNDING INCREASES · TOLL FACILITIES · EFFICIENCIES · PRUDENT FISCAL MANAGEMENT o PHASE IN OF REVENUE INCREASES: · AVOID HIGHWAY PROGRAM SURGE/DELIVERY PROBLEMS · LEAD TIME NEEDED FOR MAJOR TRANSIT CORRIDOR PROJECTS o PROVIDE RESOURCES TO ADVANCE HIGH PRIORITY CRITICAL BRIDGE, INTER REGIONAL CORRIDOR AND BEL lWA Y BOTTLENECK PROJECTS · BONDING PAID FROM NEW REVENUE SOURCE · ESTABLISH DEBT BURDEN LIMITS FOR HUTDF o PROVIDE EARLY NEW FUNDING FOR SYSTEM PARTNERS THAT ALSO NEED HELP: · CITY AND COUNTY STATE AID ACCOUNTS NOT BENEFITED FROM USER FEE INCREASES SINCE 1988 · TRANSIT SERVICE CUTS MUST BE REVERSED U:INMMA\2007 SessionlTransportation DocsINMMA Principles 2007.doc A NMMA TRANSPORTATION PRINCIPLES COMMENTARY AUGUST 2006 We concur with the findings of the Minnesota Chamber of Commerce, the Minnesota Transportation Alliance, the Association of Minnesota Counties and other transportation advocates that significant new, additional funding is needed for transportation. We believe that the best source of that new revenue should be the users of the system. Resolving all of the policy issues that complicate this debate at one time is a daunting task. Purity in purpose may not be achievable in the immediate future, but we should debate the options with fundamental Principles as a basis for conversation. We suggest that three Principles should fonn the basis of beginning that conversation: 1. RELIANCE ON INCREASED USER FEES 2. CERTAINTY OF FUNDING 3. PRUDENT FISCAL MANAGEMENT I RELIANCE ON INCREASED USER FEES TO FUND HIGHWAY IMPROVEMENTS: I . CONTRIBUTION PROPORTIONAL TO BURDEN IMPOSED We believe that it is fair and appropriate that users of the transportation system pay for the burdens that they impose on society and other users. To suggest otherwise is to argue for cross subsidization of one user to another. It is not always clear what constitutes a 'fair' fee contribution, and society as a whole benefits from an efficient transportation system. For example, each citizen benefits from lower priced, higher quality foods derived from use of an efficient road system whether they use the road personally or not. Likewise, there is societal value in providing effective transit services for people without auto availability. In considering how to balance costs and burdens imposed, it is convenient to think in tenns of other 'utility' systems. In public water supply utility tenns, there are two basic cost factors: 1) Water Opportunity Costs, and, 2) Water Use Costs The Opportunity Cost is a fixed cost that ensures that the pumps and pipes are in place and water is available when a user needs it. The Use Cost is a variable cost that is detennined by how much water is used. One option to consider for highway user fees would suggest that vehicle registration and MVST revenues should cover the availability cost while fuel user fees should cover the variable operating costs. Given the difficulty in calculating costs and burdens, immediate action is recommended to gradually increase vehicle registration fees, fuel user fees as well as 100% dedication of MVST revenues. Further, the Legislature should review the costs of transportation system construction and operation to detennine if a different mix of revenue sources is appropriate. · TRANSPARENCY OF RELATIONSHIP We believe that the majority of consumers are willing to pay a fair fee for their use of a service as long as there is a clear relationship between use cost paid. The use of "Opt-In Tolling" on 1-394 is a clear example of direct linkage of payment to user choices made. However, for most motorists, use of credit cards for payments for fuel at the pump insulates the user from direct cost impact of driving both by delaying the cash transfer and by mixing the fuel cost with other card based purchases. Most road users understand that fuel use is a measure actual miles driven. Perhaps not surprisingly, many do not know that fuel user fee revenues are constitutionally dedicated to "highway purposes". Further, there is some qualification as to what is deemed a highway purpose. The Govemor and MnlDOT should lead efforts to clarify fund source and use information. Future transportation user fee increases should be accompanied by a clear statement of what the funds will be used for and how and why the choice of rates and sources was made. · GENERATIONAL EQUITY We believe that the transportation system should be funded on a "Pay as You Go" basis with restrained use of borrowing. An entire generation of new drivers in Minnesota has not experienced a user fee rate increase. In real dollar terms they are paying only about 60% of the fuel user fee set in 1988. Real reductions were made in vehicle registration fees in 2000. In other words, current users are not paying at a rate that should have been adjusted incrementally over the past 18 years just to keep the buying power constant. To a degree, borrowing funds via bonding to pay for current investments is a wise choice if the benefits gained and costs avoided by advancing projects out weigh the costs of the loan. To the extent that bonding is used to catch up to deferred costs, future users are being asked to pay for costs that were passed on from one generation of users to another. We also need to consider policy options such as: 'What is an appropriate level of debt service that we can justify for bonding without losing future generations' choice flexibility"? Given the amount of past use of bonding for highway improvements, we suggest that future borrowing costs should be paid by directly increasing current user fees to cover the debt payment Further, the Legislature should establish a highway bonding limit policy, comparable to limits on General Fund bonding, so that future bonding program decisions can be made more rationally and without the political rancor that has been evident in recent debates. CERTAINTY OF FUNDING FOR TRANSIT & HIGHWAYS: The current shortage of funds for highways and transit investments has created an unsustainable program delivery challenge. Use of available funds to preserve what has been built is a necessary choice but it leaves little hope for those looking at unmet needs to improve the system. Consequently, there are increasing efforts to go "around the system" to influence priorities and schedules. Expanding project scope and cost inflation is a frequent issue but should be anticipated. Frequently problems are not identified until more intensive design 2 work or site exploration has occurred just due to the nature of the planning and design process. Delays and changed conditions mean that anticipated improvements may not arrive when planned. As our funding gap. has deepened, costs of steel and concrete have escalated, further exacerbating the problem. Communities and businesses follow a tortured path without certainty that funds will be available for implementation, further complicating the best public involvement process and creating lack of trust needed to succeed. A more dependable funding stream must be assured to provide credibility in the project development process. In order for streamlining efforts to effectively reduce the overburden of unnecessary tasks and processes, more work is needed eartier in the project definition stage. In order for that eartier work to occur, adequate resources and staff expertise must be maintained to drive the process. The result will be fewer, surprises found later in the process. In short, our programming process should maximize the match of expectations for improvements with the certainty of delivery. . LEGISLATIVE ACTION YS. REFERENDA REQUIREMENTS In our representative form of government we elect office holders to make decisions on our behalf. We elect people that we trust will make good decisions. We are obligated to share opinions and information on choices to be made with those representatives, recognizing the complexity of the decision. If trust is not sustained, we have opportunities in future elections to change our choice of representative. In addition to this consideration, submitting needed funding increases to a referendum adds uncertainty and delay to the delivery of improvements. Deferring increases in funding until after a November ballot risks: a. Rejection of needed revenue increases and lost investment opportunities ' b. More years of inflation costs added to projects ready to go. c. More years delay in the receipt of benefits in safety, congestion and environmental impact gained from improvements. . TRANSFER OF MOTOR VEHICLE SALES TAX REVENUE FROM THE GENERAL FUND Legislative action to transfer 100% of the share of MVST funds currently retained in the General Fund is recommended for approval on November 7,2006. This transfer is appropriate in that: , . a. The action would provide some certain funds immediately on a secure schedule. b. The MVST revenues can be considered transportation user fees that most payers assume are for that purpose c. If the Legislature and Governor believe that a Constitutional Amendment is needed to avoid 'raiding' by a future Legislature, the issue can be left on the 2006 ballot for ratification of the 2006 Session decision. I It is appropriate to note that if the MVST transfer is approved, the transportation funding problem will not be solved. The new revenue available to MnlDOT will 3 only fill about 5% of the funding gap in the Metro area trunk highway system. More steps must follow in the 2007 Session. · RELIANCE ON UNCERTAIN FEDERAL FUNDING Congress was many months late in passing SAFETEA-LU, the latest federal funding reauthorization bill for transportation. Minnesota lost over $150 Million in federal revenues due to the lateness of the new bill. Appropriations will apparently be only 85% of the authorized funding levels and earmarking has complicated the matching with state funds. It is apparent that there will not be significant increases in future federal user fees to help fill our funding gap. Consequently, future programming should be supported by a strong state fund commitment sufficient to meet basic operating and construction program needs. Federal funds should be used to accelerate critical projects in the base program. · MINIMAL RELIANCE ON UNCERTAIN PRIVATE FUNDING Mn!DOTs MnPASS Study results indicate that there are no potential tolling projects in the Twin Cities area that will generate sufficient revenues to justify 100% private sector financing. Indications are that the most encouraging project would generate only 25% of the revenues needed to cash flow. The remaining funds would have to come from the public sector. How those funds would be sourced is uncertain. How many and when funds would be needed is unknown at this time. We suggest that we not rely on those funds to influence our choices today. Rather, we should continue to seek opportunities in the future and consider those projects when they are found viable. · ANALYSIS TO DETERMINE 'EFFICIENCIES' THAT CAN YIELD FUNDS FOR NEW PROJECTS The Pawlenty Administration has made significant reductions in the Mn!DOT administrative and management ranks over the past biennium. Additional cuts are anticipated in the 2007-2008 Budget to be submitted to the Legislature in January. Streamlining actions have been taken along with design! build and other management strategies to reduce overhead costs. The results of these actions are positive. These savings are not reflected in national statistics that were used in 2005 to suggest greater efficiencies can result in transfer of revenues to construction projects. However, we need to be certain that we maintain the level of professional expertise needed to develop and deliver the program that we ask for. We must maintain the infrastructure already in place. We suggest that the Legislature ask that a "Peer Review" of Mn/DOT operations, budgets and policies by respected transportation professionals be conducted to ensure that organizational capacity is maintained at the appropriate level for future program delivery. It might also be of value to review the structural organization of highway and transit service planning and delivery in the Twin Cities metropolitan area. Do we need seven Regional Rail Authorities in addition to the Metropolitan Council? Should the 'Twin Cities' transportation planning area be extended beyond the 8 County Mn/DOT Metro District boundaries? Are the highest priority projects being scheduled for funding on a statewide basis? 4 We suggest that these questions deserve consideration. In the mean time, we should not bank our future on additional savings until we conduct an audit of costs and benefits that could be achieved and the legislative and administrative actions that must be made to enable those changes to occur. PRUDENT FISCAL MANAGEMENT: "PAY AS YOU GO" MnlDOT has estimated that the i gap in funding needed to meet established performance standards through the year 2030 is $24 Billion statewide, with a shortage of $21 Billion in the Metro Area. We should not respond to this challenge simply and by only raising new revenues immediately. We need to take a more thoughtful view of how much of the gap needs to be filled and how quickly to generate the most effective retum on our increased investment , . PHASE IN REVENUE INCREASES The delivery of highway and transitway projects is a long and complicated process. Public involvement and environmental analyses are crucial parts of the process. Greatly accelerating implementation of critical projects must not come at the full cost of abandoning these commitments. While there are several MnlDOT projects in "Advanced Design" stages almost ready to go, is it is possible to ramp up to a full flow of recommended new funding immediately? Is our construction industry able to gear up quickly after recent hard times? How soon can priority projects be brought on line and what investments in planning and project development are needed to get there. We also are concemed that key transit system additions to the Hiawatha Line are controversial and not fully designed. These concems suggest we need to more accurately determine how much new funding is needed in the next few years while accounting for likely cost inflation and scope adjustment that are inevitable to accommodate community needs and to avoid unwise 'comer cutting'. . PROVIDE RESOURCES FOR HIGH PRIORITY MEGA PROJECTS The lack of adequate funds for highways and capital investments in transit has not been fully met by recent bonding and advanced federal fund use. There are several critical bottleneck, beltway and Inter Regional Corridor projects remaining in the near term 'mega project' category. These projects require large amounts of money over short periods of time. Funding these projects from the regular program would leave very few smaller projects funded for the foreseeable future. Judicious use of bonding, as suggested above, removes these projects from the programming process and removes major headaches from the system operation. , . PROVIDE EARLY NEW FUNDING FOR TRANSIT, CITIES AND COUNTIES The Metro Council has identified a system of transit ways that should be built by 2030 to meet future mobility needs. MnlDOT has assumed that these transit services would be available when making their need forecasts. Reliance on bonding for the state program has not providing increased funding for city and county roads needed to supplement the state arterials. In fact, funding problems at Mn/DOT have led to increased demands for city and county contributions to project costs. As new funding is brought online, emphasis should be placed on addressing the funding needs of transit providers, cities and counties. U:\NMMA\2006 Session\Transportation\NMMA PRINCIPLES Commentary 2007.doc 5 NMMA TRANSPORTATION FACT SHEET UNMET NEEDS - 2008-2030 MnlDOT developed performance standards for the Minnesota Trunk Highway System and analyzed the current status of each route. Based on their review, the current funding stream was found to be significantly deficient in meeting needs for improvements. Moreover, a significant portion of the anticipated unmet funding needs, based on current fund distribution policies, was derived from Metropolitan Area roadways. The following table summarizes MnlDOT's findings. The 'Funding Gap' equals $1.048 per year on average ($23.9B I 23 years). This estimate does not include funding shortfalls for transit or for City, Township and County roads needed to complement M' ta' h' h t mneso s Ig way sys em. STATEWIDE METRO METRO SHARE FUND NEEDS 2008-2030 $38.1 B $27B 70.9% CURRENT REVENUE STREAM $14.5 B $6.5B 44.8% FUNDING GAP $23.9 B $20.6 B 86.2% MVST CONSTITUTIONAL AMENDMENT The Constitutional Amendment on the November 2006 General Election ballot proposes to dedicate 100% of the Motor Vehicle Sales Tax revenues to transportation purposes compared to the current 54% dedication in state law. If approved in November, the transfer will be phased in over a five year period, giving the Legislature time to adjust the General Fund Budget. MnlDOT estimates that the new revenue to the Highway User Tax Distribution Fund (HUTDF) would grow from $37.5 M in 2008 to $187.3 M in 2012 and each year there after. The portion going to the state trunk highway system would increase from $22.1 M to $110.3 M in 2012. This represents 10.6% of the estimated annual statewide funding gap for trunk highways and 5.5% of the Metro gap at current distribution rates. The Amendment provides that at least 40% of the transferred funds would be dedicated to public transit uses, mostly in the Metropolitan Area. At this rate transit funding would increase from $22.5 M in 2008 to $122.1 M in 2012 and each year beyond. For comparison, the Metropolitan Council has estimated that the capital costs to add transit ways and increase bus use for just the Tier I routes in their 2030 Transportation Policy Plan by 2020 are $665M - $1.2458 plus an additional $22 M for operating costs each year. In summary, the MVST transfer would provide approximately $1.33 8 in new transit revenues through 2020, about enough to implement the proposed Tier I transit services. MnlDOT assumed that the Tier I and Tier II services will be in place when they prepared their 2030 forecasts noted above. OTHER MVST FACTOIDS · Minnesota cities would share $3.2 M in additional MVST funds in 2008 for MSA streets · Minnesota cities would share $16.1 M in additional MVST funds in 2012 and beyond. · NMMA area cities would share about $4.5 M in MVST funds in 2012 for MSA streets · Minneapolis would receive about $1.9 M in additional MVST funds in 2012. · Minnesota cities are responsible for more lane miles of city streets (31.608 miles) not eligible for MSA funding than MnlDOT has on the state freeway and highway system (29,024 miles). NMMA CONTACTS Bob Benke, Director Research & Advocacy Services Office: 651-203-7259 Cell: 612-669-0274 bob@straussmomt.com Becca Pryse Ewald Consulting Office: 651-265-7858 Cell: 612-490-2651 beccap@ewald.com Bill Barnhart Barnhart & Associates Cell: 612-702-4931 bbarnha@cpintemet.com U:\NMMA\2007 Session\Transportation DocsWMMA 2007 TRANSPORTATION FACT SHEET-doc ~z z<t o~ ZC> O~ -0 ~z ~~ I-z 00 :J- ...J!;( ...J.... -tt: 1-0 D.a.. Wen OZ z~ 0.... o jijM :>.... CO cN oct^ 0::'" oct'" ws: >-w CDZ 0:: oct W >- -l oct u m u: W ~ 1Il om 1-0 ZZ 0:;) _u. I- is o oct ZI- Sz Q.W C)Z zO -Q. O:E ZO :;)u u. M .... o N N .... o N .... .... o N o .... o N a> o o N CD o o N W m :;) o Z :;) u. W Z ::::i It> N N It> 0> ~ ~ CXl .... o .... N ..q l") ~ ~ It> 0> .... <0 ... ~ ~ ... <0 ... It> 0> ~ ~ <0 t'- o CXl ... ~ ~ t'- <0 ... t'- It> ~ ~ 0> ... It> o N ~ ..q ..q ... ~ ~ ~ u. o l- => :c a:i o o N ~ It> 0 0'" ~~ ~O/l octo> Olo lDo :gN g~ U. .5 E ....J-- Ol 0:: CI o I- ~ - C Ol E >- III a.. .... N ~ o CXl ~ ~ ~ ~ N l") ~ N l") ~ <0 ... ~ CXlO> 00 00 NN ~~ JIlJll c <= Ol Ol UU It> l") >- u. .!: It> o o Eli .f: 0 Ol... Olo CDN m "1ii W W ::l W W U. u.u. ~ 0:: 0:: W We> Z ~ ~~ ...J ...J >< W WW => =>0 u. u.Z M o CXl ~ o <0 ... ~ ..q <0 ~ CXl ..q ~ N l") ~ <0 ..- ~ ~ ~ u. o l- => :c 19m o Ol 1-- .0 l;; ::l lD en=> ..q o o ..q ~ o o <0_ ... ~ o N l") ~ ..q o l") ~ CXl CXl N ~ N t'- N ~ <0 It> N ~ o <0 ... ~ o ~o OlO C.N :Eo g~ ~~:!! .!: I ,g 3l@g ~m-g a.. ~o:: m W W u. CD ~ W en Z W o :J It) 10 o N ~ o It> t'- ,~ :8 N ~ It> t'- ... ~ o I ~ , I~ o o ... ~ It> 't'- !~ o It> ~ U. 10 l- => :c c5:c Q;I- .2:-"0 'C c o III 'C a..~ .r::"O .~~ :c_ _lll 00 c;g ,g0 III - G>~ ~~o OOl... oct CD <0 ~:!;! III III Ol Ol C. Ol ~~u. -'~ CD Ol Ol lD l;lD=> c:03: o Ol Ol =o<=Ol iii.r::E> _~o.8 ~~-=CG CD ~ o o 0_ ... ~ ~ ~ o o N ~ o o l") ~ o o l") ~ o o N ~ :c 1-", ~ g: en Z ~ o S ij; zoo:: o 1-"0 CD .oc :c .::l ::l I- en u. t'- co o o <0 ~ o It> l") l")- ~ o N It> ~ 0> t'- ..q ~ CXl l") <0 ~ N t'- <0 ~ ... l") <0 ~ o ... ..q ~ ..q o ... ~ It> l") t'- ~ t'- CXl ... ~ t'- CXl ... ~ t'- ..q ... ~ CXl o ... ~ ... t'- ~ It> l") ~ u. o l- => :c '<;e o <0 ~ o o o ... .!: Ol lD III .r:: a.. 0:: W u. en Z oct 0:: l- I- en > :E a> ..q o t'- ~ It> CXl o ~ ~ t'- o t'- ~ <0 <0 <0 ~ It> CXl t'- ~ o CXl t'- ~ N o t'- ~ It> ..q ..q ~ :c I- 3: '" Ol Ol ZE m Q) - iil ~o:: o .... o It> ... ~ N 0> ..q ~ It> l") ... ~ It> ... ... ~ CXl 0> ~ N t'- ~ CXl ..q ~ ..q N ~ :? e> '<;e N ':f '<;e CXl !:1 I- Cii Z oct 0:: I- '<;e o ..q - o C Q) E Ol o III a. Q) 0:: O/l '" ~ Q) III O.r:: 'i:: en Oll- en en ~> :!!:E !!!:c 1-1- '<;e o o ... .!: Ol lD III .r:: a.. ~ .!: It> o o Eli .50> 010 Olo CDN 0:: W U. en Z oct 0:: l- I- m > :E 1;j I- ~ lD o Ol =am <=m III III Ol Q) "O~ .~ oct Ol 0 aii 1i)~ .... .... ..q It> CXl 8 N a iii ~ '--- t'- t'- It> ~ ~ I-- N ..q CXl lD <= o 'i': o ~ ... CXl t'- o - ~ III .r:: ~ o "0 l") Ol CXl .r:: CXl o III ~~ Ol N Ol It> en CXl ~ o It> t'- ~ I-- 0> <0 ..q ~ ~ ~ ~ W Z ...J ~ o I- '" .., 0:: >- .c ." " to c. ! a. N .... l") .... :E 10 '<t 0 0 0 10 <(-, '<t 10 ...... '<t r- CO 0::<( 0 C') '<t_ O C') ...... (')1- N ...... C') C\r ...... N 00 0::1- Ell Ell Ell Ell Ell Ell c.. 0 0 0 0 0 V N CO 0 10 V CO C') ~ C') ~ CO N. C') CO C') ...... 0 0 0 ll') ...... ll') N ...... ...... C') N N ^ 0 0 Ell Ell Ell Ell Ell Ell -' 10 V 0 0 0 N <( N CO ...... CO C") 0 ZI- t- V N_ 10 ll') CO <(0 ...... -'I- c..m ~ (/) Ell Ell Ell Ell Ell Ell ll') 0 ll') 0 ll') C') 10 ...... t- t- O t- C') eje ...... ~ ...... N ...... ...... ...... 0 ...... ll') ll') 0 N N N 0 0 Ell Ell Ell Ell Ell Ell ll') 0 ll') 0 ll') C') 10 ...... t- t- O t- ...... ...... N ...... ...... ...... N eje ~ 0 ...... ll') ll') 0 N N N 0 0 Ell Ell Ell Ell Ell Ell N N V 0 V CO C') C') 10 ...... ll') (J) ...... ...... N ...... ...... ...... ...... ~ eje 0 ...... 0 0 0 N C') (/) N 0 0 0:: <( W Ell Ell Ell Ell Ell Ell >- -' N N V 0 V CO <( C') C') 10 ...... ll') (J) () ...... ...... N ...... ...... ...... (/) 0 eje ~ u:: 0 ...... 0 0 0 N C') N 0 0 Ell Ell Ell Ell Ell Ell <D <D 0 <D 0 <D <D <D C') , (J) eje 0 0 0 0 ...... N 0 Ell Ell Ell Ell Ell Ell <D <D 0 10 0 <D <D <D C') , CO ~ 0 0 0 0 0 ...... N 0 Ell Ell Ell Ell Ell Ell W W 0 W~W WwfiJ <( <( 0 ~O W O::O~ () ~~ W~W WWW Zw () :i:ffi <(Vz 0:: 9~1- O::~I- WI- :s J: @w ~ O::I-(/) -I- :i:z<( <( <( <(z<( ><( W~ (/) > 0 :i:(/) c.. Wwo:: o(/)W OW 0:: Wo:: W ZZ I-I-w (/) Ww O::w I-W ~-' I->W o::wo:: o::>W 0:: -(/)0:: 0 <(wz I-..J() I-WZ -'z w> ~>z Z 1-<( 1-000W w<(z WO::W ;5w I- ZW <(:Ez ~ (/)(/) (/) (') (/)- :E (') (/) 0:: u.. :E 0(') > o::u..+ I- :E 1-0 CITY OF NDOVE 1685 CROSSTOWN BOULEVARD N.W. . ANDOVER, MINNESOTA 55304 . (763) 755-5100 FAX (763) 755-8923 . WWW.CI.ANDOVER.MN.US TO: Mayor and Councilmembers FROM: Jim Dickinson, City Administrator SUBJECT: Follow Up Information DATE: August 29, 2006 At the August 22nd Council workshop, there was a request by the Council to have more information distributed on the Motor Vehicle Sales Tax (MVST) Constitutional Amendment that will be on the November ih ballot. I have attached a North Metro Mayors Association document that should assist each Councilmember. If you would like additional information, do not hesitate in contacting me. NMMA Transportation Policy Position: TRANSPORTATION BACKGROUND: The 2005 Legislature adopted a transportation funding bill that would have provided significant increases in funding for roads, highways and transit services in Minnesota. The 2006 Legislature again considered funding increases but failed to reach consensus in the Conference Committee. Consequently, the only immediate opportunity to increase funds for roads, highways and transit services is support for the adoption of the Motor Vehicle Sales Tax (MVST) Constitutional Amendment that will be on the November 7 ballot. The NMMA Board Members are hopeful that candidates for Governor and the Legislature will address the escalating transportation funding gap during the General Election campaign process and then follow through during the 2007 Session. The gas tax, or, "fuel user fee", has not changed from the current rate of 20 cents per gallon since fall of 1988 when gas sold at an average of about $1.00 per gallon. If the same rate of tax as a percent of purchase price, 20.0%, prevailed at today's price of about $3.00 per gallon, the fuel user fee would be 60 cents, or a 200% increase that would generate an additional $1.3 Billion per year to repair and improve Minnesota's deteriorating transportation infrastructure and level of service. CURRENT POLICY POSITION: The NMMA Board of Directors recommends that the Governor and Legislature collaborate in the development and passage of a transportation funding package early in the 2007 Session so as to avoid late session failure to reach agreement. Agreement is urgently needed to address needs of city and county roads as well as the state roads that they supplement. Further, a long term financing strategy for transit infrastructure and services is needed to meet mobility needs of our work force, handicapped travelers and increasing numbers of senior citizens. Towards this end, the NMMA offers the fOllowing documents as resources and a framework for debate: · "Transportation Principles" that should guide decision making, including, o Reliance on increased user fees o Provide certainty of funding o Prudent Fiscal Management · "Principles Commentary" that provides additional ideas for consideration and rationale for recommended actions, · "Transportation Fact Sheet" documenting the severity of the trunk highway system funding gap based on 2005 estimates that predate recent annual increases in highway construction costs due to inflation, · A "Conceptual Funding Plan" offering a mix of fund sources for consideration that can serve as a menu of choices and framework for analysis and debate on the options available. U:\NMMA\2007 Session\Transportation Docs\NMMA Transportation Policy Position 8.10.06.doc ... NORTH METRO MAYORS ASSOCIATION TRANSPORTATION PRINCIPLES FOR CONSIDERATION BY CANDIDATES FOR GOVERNOR AND LEGISLATURE-2006 ELECTION CAMPAIGNS OVERVIEW The North Metro Mayors Association members believe that significant new revenues are needed for Minnesota's transportation system. We have fallen behind prudent investment schedules and are suffering safety, congestion, economic and quality of life impacts as a result. Our future well being demands that we invest now to enhance our future ability to sustain our growing population and our economic base that provides jobs and wealth to us all. The problems created by chronic underinvestment in transportation are well known and have been well documented in reports and media coverage. There were serious proposals under consideration in the 2005 Legislature from the Governor, the Association of Minnesota Counties, the Minnesota Chamber of Commerce, the Minnesota Transportation Alliance and individual Legislators. These organizations and leaders should be congratulated for their efforts that raised awareness of the need for significant new funding and for providing specific solutions to the funding dilemma. Unfortunately, the funding bill agreed to by the Legislature did not meet with the Governor's approval. In the end, the 2006 Legislature failed to. reach agreement on transportation funding. Our challenge now is to craft a plan that can receive bipartisan support in the Legislature as well as the concurrence of the Governor in the 2007 Session. Toward that end, the NMMA puts forth for consideration the attached PRINCIPLES that should guide the crafting of the increased transportation funding legislation. NMMA MEMBER CITIES Andover Anoka Blaine Brooklyn Center Brooklyn Park Champlin Circle Pines Coon Rapids Crystal Dayton Lexington Maple Grove Minneapolis Mounds View New Brighton New Hope Oak Grove Osseo Ramsey Spring Lake Park CONTACTS: 651-203-7259 Steve Larson, Mayor, City of New Brighton, NMMA President Mark Steffenson, Mayor, City of Maple Grove, NMMA Vice President Joseph Strauss, NMMA Executive Vice President Bob Benke, Director, Research and Advocacy Services NMMA KEY PRINCIPLES · RELIANCE ON INCREASED USER FEES TO FUND HIGHWAY IMPROVEMENTS o USER CONTRIBUTION PROPORTIONAL TO BURDEN IMPOSED o TRANSPARENCY OF RELATIONSHIP o GENERATIONAL EQUITY · CERTAINTY OF FUNDING FOR TRANSIT & HIGHWAYS o LEGISLATIVE ACTION FOR IMMEDIATE IMPACT WITHOUT REFERENDA REQUIREMENTS o 100% MVST TRANSFER o MINIMAL RELIANCE ON UNCERTAIN SOURCES: · FEDERAL FUNDING INCREASES · TOLL FACILITIES · EFFICIENCIES · PRUDENTF~CAlMANAGEMENT o PHASE IN OF REVENUE INCREASES: · AVOID HIGHWAY PROGRAM SURGE/DELIVERY PROBLEMS · LEAD TIME NEEDED FOR MAJOR TRANSIT CORRIDOR PROJECTS o PROVIDE RESOURCES TO ADVANCE HIGH PRIORITY CRITICAL BRIDGE, INTER REGIONAL CORRIDOR AND BELTWAY BOTTLENECK PROJECTS · BONDING PAID FROM NEW REVENUE SOURCE · ESTABLISH DEBT BURDEN LIMITS FOR HUTDF o PROVIDE EARLY NEW FUNDING FOR SYSTEM PARTNERS THAT ALSO NEED HELP: · CITY AND COUNTY STATE AID ACCOUNTS NOT BENEFITED FROM USER FEE INCREASES SINCE 1988 · TRANSIT SERVICE CUTS MUST BE REVERSED U:INMMA\2007 Sesslon\Transportatlon DocsINMMA Principles 2007.doc ~ NMMA TRANSPORTATION PRINCIPLES COMMENTARY AUGUST 2006 We concur with the findings of the Minnesota Chamber of Commerce, the Minnesota Transportation Alliance, the Association of Minnesota Counties and other transportation advocates that significant new, additional funding is needed for transportation. We believe that the best source of that new revenue should be the users of the system. Resolving all of the policy issues that complicate this debate at one time is a daunting task. Purity in purpose may not be achievable in the immediate future, but we should debate the options with fundamental Principles as a basis for conversation. We suggest that three Principles should form the basis of beginning that conversation: 1. RELIANCE ON INCREASED USER FEES 2. CERTAINTY OF FUNDING 3. PRUDENT FISCAL MANAGEMENT RELIANCE ON INCREASED USER FEES TO FUND HIGHWAY IMPROVEMENTS: · CONTRIBUTION PROPORTIONAL TO BURDEN IMPOSED We believe that it is fair and appropriate that users of the transportation system pay for the burdens that they impose on society and other users. To suggest otherwise is to argue for cross subsidization of one user to another. It is not always clear what constitutes a 'fair' fee contribution, and society as a whole benefits from an efficient transportation system. For example, each citizen benefits from lower priced, higher quality foods derived from use of an efficient road system whether they use the road personally or not. Likewise, there is societal value in providing effective transit services for people without auto availability . In considering how to balance costs and burdens imposed, it is convenient to think in terms of other 'utility' systems. In public water supply utility terms, there are two basic cost factors: 1) Water Opportunity Costs, and, 2) Water Use Costs The Opportunity Cost is a fixed cost that ensures that the pumps and pipes are in place and water is available when a user needs it. The Use Cost is a variable cost that is determined by how much water is used. One option to consider for highway user fees would suggest that vehicle registration and MVST revenues should cover the availability cost while fuel user fees should cover the variable operating costs. Given the difficulty in calculating costs and burdens, immediate action is recommended to gradually increase vehicle registration fees, fuel user fees as well as 100% dedication of MVST revenues. Further, the Legislature should review the costs of transportation system construction and operation to determine if a different mix of revenue sources is appropriate. · TRANSPARENCY OF RELATIONSHIP We believe that the majority of consumers are willing to pay a fair fee for their use of a service as long as there is a clear relationship between use cost paid. The use of "Opt-In Tolling" on 1-394 is a clear example of direct linkage of payment to user choices made. However, for most motorists, use of credit cards for payments for fuel at the pump insulates the user from direct cost impact of driving both by delaying the cash transfer and by mixing the fuel cost with other card based purchases. Most road users understand that fuel use is a measure actual miles driven. Perhaps not surprisingly, many do not know that fuel user fee revenues are constitutionally dedicated to "highway purposes". Further, there is some qualification as to what is deemed a highway purpose. The Governor and MnlDOT should lead efforts to clarify fund source and use information. Future transportation user fee increases should be accompanied by a clear statement of what the funds will be used for and how and why the choice of rates and sources was made. · GENERATIONAL EQUITY We believe that the transportation system should be funded on a "Pay as You Go" basis with restrained use of borrowing. An entire generation of new drivers in Minnesota has not experienced a user fee rate increase. In real dollar terms they are paying only about 60% of the fuel user fee set in 1988. Real reductions were made in vehicle registration fees in 2000. In other words, current users are not paying at a rate that should have been adjusted incrementally over the past 18 years just to keep the buying power constant. To a degree, borrowing funds via bonding to pay for current investments is a wise choice if the benefits gained and costs avoided by advancing projects out weigh the costs of the loan. To the extent that bonding is used to catch up to deferred costs, future users are being asked to pay for costs that were passed on from one generation of users to another. We also need to consider policy options such as: 'What is an appropriate level of debt service that we can justify for bonding without losing future generations' choice flexibility"? Given the amount of past use of bonding for highway improvements, we suggest that future borrowing costs should be paid by directly increasing current user fees to cover the debt payment. Further, the Legislature should establish a highway bonding limit policy, comparable to limits on General Fund bonding, so that future bonding program decisions can be made more rationally and without the political rancor that has been evident in recent debates. CERTAINTY OF FUNDING FOR TRANSIT & HIGHWAYS: The current shortage of funds for highways and transit investments has created an unsustainable program delivery challenge. Use of available funds to preserve what has been built is a necessary choice but it leaves little hope for those looking at unmet needs to improve the system. Consequently, there are increasing efforts to go "around the system" to influence priorities and schedules. Expanding project scope and cost inflation is a frequent issue but should be anticipated. Frequently problems are not identified until more intensive design 2 work or site exploration has occurred just due to the nature of the planning and design process. Delays and changed conditions mean that anticipated improvements may not arrive when planned. As our funding gap has deepened, costs of steel and concrete have escalated, further exacerbating the problem. Communities and businesses follow a tortured path without certainty that funds will be available for implementation, further complicating the best public involvement process and creating lack of trust needed to succeed. A more dependable funding stream must be assured to provide credibility in the project development process. In order for streamlining efforts to effectively reduce the overburden of unnecessary tasks and processes, more work is needed earlier in the project definition stage. In order for that earlier work to occur, adequate resources and staff expertise must be maintained to drive the process. The result will be fewer. surprises found later in the process. In short, our programming process should maximize the match of expectations for improvements with the certainty of delivery. · LEGISLATIVE ACTION V5. REFERENDA REQUIREMENTS In our representative form of government we elect office holders to make decisions on our behalf. We elect people that we trust will make good decisions. We are obligated to share opinions and information on choices to be made with those representatives, recognizing the complexity of the decision. If trust is not sustained, we have opportunities in future elections to change our choice of representative. In addition to this consideration, submitting needed funding increases to a referendum adds uncertainty and delay to the delivery of improvements. Deferring increases in funding until after a November ballot risks: a. Rejection of needed revenue increases and lost investment opportunities b. More years of inflation costs added to projects ready to go. c. More years delay in the receipt of benefits in safety, congestion and environmental impact gained from improvements. · TRANSFER OF MOTOR VEHICLE SALES TAX REVENUE FROM THE GENERAL FUND Legislative action to transfer 100% of the share of MVST funds currently retained in the General Fund is recommended for approval on November 7,2006. This transfer is appropriate in that: a. The action would provide some certain funds immediately on a secure schedule. b. The MVST revenues can be considered transportation user fees that most payers assume are for that purpose c. If the Legislature and Governor believe that a Constitutional Amendment is needed to avoid 'raiding' by a future Legislature, the issue can be left on the 2006 ballot for ratification of the 2006 Session decision. It is appropriate to note that if the MVST transfer is approved, the transportation funding problem will not be solved. The new revenue available to Mn/DOT will 3 only fill about 5% of the funding gap in the Metro area trunk highway system. More steps must follow in the 2007 Session. · RELIANCE ON UNCERTAIN FEDERAL FUNDING Congress was many months late in passing SAFETEA-LU, the latest federal funding reauthorization bill for transportation. Minnesota lost over $150 Million in federal revenues due to the lateness of the new bill. Appropriations will apparently be only 85% of the authorized funding levels and earmarking has complicated the matching with state funds. It is apparent that there will not be significant increases in future federal user fees to help fill our funding gap. Consequently, future programming should be supported by a strong state fund commitment sufficient to meet basic operating and construction program needs. Federal funds should be used to accelerate critical projects in the base program. · MINIMAL RELIANCE ON UNCERTAIN PRIVATE FUNDING Mn!DOT's MnPASS Study results indicate that there are no potential tolling projects in the Twin Cities area that will generate sufficient revenues to justify 100% private sector financing. Indications are that the most encouraging project would generate only 25% of the revenues needed to cash flow. The remaining funds would have to come from the public sector. How those funds would be sourced is uncertain. How many and when funds would be needed is unknown at this time. We suggest that we not rely on those funds to influence our choices today. Rather, we should continue to seek opportunities in the future and consider those projects when they are found viable. · ANALYSIS TO DETERMINE 'EFFICIENCIES' THAT CAN YIELD FUNDS FOR NEW PROJECTS The Pawlenty Administration has made significant reductions in the Mn/DOT administrative and management ranks over the past biennium. Additional cuts are anticipated in the 2007-2008 Budget to be submitted to the Legislature in January. Streamlining actions have been taken along with design! build and other management strategies to reduce overhead costs. The results of these actions are positive. These savings are not reflected in national statistics that were used in 2005 to suggest greater efficiencies can result in transfer of revenues to construction projects. However, we need to be certain that we maintain the level of professional expertise needed to develop and deliver the program that we ask for. We must maintain the infrastructure already in place. We suggest that the Legislature ask that a 'Peer Review" of Mn!DOT operations, budgets and policies by respected transportation professionals be conducted to ensure that organizational capacity is maintained at the appropriate level for future program delivery. It might also be of value to review the structural organization of highway and transit service planning and delivery in the Twin Cities metropolitan area. Do we need seven Regional Rail Authorities in addition to the Metropolitan Council? Should the 'Twin Cities' transportation planning area be extended beyond the 8 County Mn/DOT Metro District boundaries? Are the highest priority projects being scheduled for funding on a statewide basis? 4 We suggest that these questions. deserve consideration. In the mean time, we should not bank our future on additional savings until we conduct an audit of costs and benefits that could be achieved and the legislative and administrative actions that must be made to enable those changes to occur. PRUDENT FISCAL MANAGEMENT: "PAY AS YOU GO" Mn/DOT has estimated that the gap in funding needed to meet established performance standards through the year 2030 is $24 Billion statewide, with a shortage of $21 Billion in the Metro Area. We should not respond to this challenge simply and by only raising new revenues immediately. We need to take a more thoughtful view of how much of the gap needs to be filled and how quickly to generate the most effective return on our increased investment · PHASE IN REVENUE INCREASES The delivery of highway and transitway projects is a long and complicated process. Public involvement and environmental analyses are crucial parts of the process. Greatly accelerating implementation of critical projects must not come at the full cost of abandoning these commitments. While there are several Mn/DOT projects in "Advanced Design" stages almost ready to go, is it is possible to ramp up to a full flow of recommended new funding immediately? Is our construction industry able to gear up quickly after recent hard times? How soon can priority projects be brought on line and what investments in planning and project development are needed to get there. We also are concerned that key transit system additions to the Hiawatha Line are controversial and not fully designed. These concerns suggest we need to more accurately determine how much new funding is needed in the next few years while accounting for likely cost inflation and scope adjustment that are inevitable to accommodate community needs and to avoid unwise 'corner cutting'. . PROVIDE RESOURCES FOR HIGH PRIORITY MEGA PROJECTS The lack. of adequate funds for highways and capital investments in transit has not been fully met by recent bonding and advanced federal fund use. There are several critical bottleneck, beltway and Inter Regional Corridor projects remaining in the near term 'mega project' category. These projects require large amounts of money over short periods of time. Funding these projects from the regular program would leave very few smaller projects funded for the foreseeable future. Judicious use of bonding, as suggested above, removes these projects from the programming process and removes major headaches from the system operation. . PROVIDE EARLY NEW FUNDING FOR TRANSIT, CITIES AND COUNTIES The Metro Council has identified a system of transit ways that should be built by 2030 to meet future mobility needs. Mn/DOT has assumed that these transit services would be available when making their need forecasts. Reliance on bonding for the state program has not providing increased funding for city and county roads needed to supplement the state arterials. In fact, funding problems at Mn/DOT have led to increased demands for city and county contributions to project costs. As new funding is brought online, emphasis should be placed on addressing the funding needs of transit providers, cities and counties. U:INMMA\2006 Session\TransportationlNMMA PRINCIPLES Commentary 2007.doc 5 NMMA TRANSPORTATION FACT SHEET UNMET NEEDS - 2008-2030 MnlDOT developed performance standards for the Minnesota Trunk Highway System and analyzed the current status of each route. Based on their review, the current funding stream was found to be significantly deficient in meeting needs for improvements. Moreover, a significant portion' of the anticipated unmet funding needs, based on current fund distribution policies, was derived from Metropolitan Area roadways. The following table summarizes Mn/DOT's findings. The 'Funding Gap' equals $1.048 per year on average ($23.9B 123 years). This estimate does not include funding shortfalls for transit or for City, Township and County roads needed to complement Mi t I h. h t nneso a s Ilgl way sys em. STATEWIDE METRO METRO SHARE FUND NEEDS 2008-2030 $38.1 B $27 B 70.9% CURRENT REVENUE STREAM $14.5 B $6.5 B 44.8% FUNDING GAP $23.9 B $20.6 B 86.2% MVST CONSTITUTIONAL AMENDMENT The Constitutional Amendment on the November 2006 General Election ballot proposes to dedicate 100% of the Motor Vehicle Sales Tax revenues to transportation purposes compared to the current 54% dedication in state law. If approved in November, the transfer will be phased in over a five year period, giving the Legislature time to adjust the General Fund Budget. Mn/DOT estimates that the new revenue to the Highway User Tax Distribution Fund (HUTDF) would grow from $37.5 M in 2008 to $187.3 M in 2012 and each year there after. The portion going to the state trunk highway system would increase from $22.1 M to $110.3 M in 2012. This represents 10.6% of the estimated annual statewide funding gap for trunk highways and 5.5% of the Metro gap at current distribution rates. The Amendment provides that at least 40% of the transferred funds would be dedicated to public transit uses, mostly in the Metropolitan Area. At this rate transit funding would increase from $22.5 M in 2008 to $122.1 M in 2012 and each year beyond. For comparison, the Metropolitan Council has estimated that the capital costs to add transit ways and increase bus use for just the Tier I routes in their 2030 Transportation Policy Plan by 2020 are $665M - $1.2458 plus an additional $22 M for operating costs each year. In summary, the MVST transfer would provide approximately $1.33 8 in new transit revenues through 2020, about enough to implement the proposed Tier I transit services. Mn/DOT assumed that the Tier I and Tier II services will be in place when they prepared their 2030 forecasts noted above. OTHER MVST FACTOIDS · Minnesota cities would share $3.2 M in additional MVST funds in 2008 for MSA streets · Minnesota cities would share $16.1 M in additional MVST funds in 2012 and beyond. · NMMA area cities would share about $4.5 M in MVST funds in 2012 for MSA streets · Minneapolis would receive about $1.9 M in additional MVST funds in 2012. · Minnesota cities are responsible for more lane miles of city streets (31.608 miles) not eligible for MSA funding than MnlDOT has on the state freeway and highway system (29,024 miles). NMMA CONTACTS Bob Benke, Director Research & Advocacy Services Office: 651-203-7259 Cell: 612-669-0274 bob@straussmomt.com Becca pryse Ewald Consulting Office: 651-265-7858 Cell: 612-490-2651 beccap@ewald.com Bill Bamhart Bamhart & Associates Cell: 612-702-4931 bbarnha@cpintemet.com U:\NMMA\2007 Session\Transportation Docs\NMMA 2007 TRANSPORTATION FACT SHEET. doc >- ...JZ z<l: O~ zc) 02!: -0 ....Z ~~ ....z 00 :J- ...JI- ...J~ -0:: ....0 a.a.. Wen UZ z~ 01- U OiM :I'" cO cN oct^ 0:: tit oct tit w:: >-w coz 0:: oct W >- -I oct u en ii: W ~ al oen 1-0 ZZ 0::J _u. l- e o oct ZI- 5z Q.W C)Z zO -Q. 0:::;: zo ~u M ... o N N ... o N ... ... o N o ... o N Cl> o o N co o o N W en ::J o Z ::J u. W Z :J LO N N ~ <Xl ... o ~ ... (0 ... ~ ... (0 ... ~ o <Xl ... ~ r-- (0 ... ~ LO o N ~ "It "It ... .... u. o l- => ::c ... LO Cl> ~ N "It <') ~ LO 0) ~ LO 0) <I) (0 r-- ~ r-- LO ~ 0) ... <I) ~ - c '" E ~ Q. :E '" o cO o o N (;: LOO 0'" 00 .N ~O/l octo) "'0 "'0 "'N ~>- gu. C u. ,- -' ... 0::0 I-~ N ~ o <Xl <I) ~ <I) ~ N <') ~ N <') ~ (0 ... .... <Xl 0) 00 00 NN (;:(;: 2l2l c c '" '" 00 LO <') >- u. .!; LO o o ~ .f; 0 01... "'0 lllN en c;; W W :I W W u.. ~ ~ ~ W We> Z ~ ~~ -' -' >< W WW => =>0 u.. u. Z M o <Xl ~ o (0 ... ~ "It (0 <I) <Xl "It <I) N <') <I) (0 ... ~ <I) <I) u.. o l- => ::c m '" 15 m 1-:: .a", :I '" en=> "It o o "It ~ o o (0_ ... ~ o N <') ~ "It o <') <I) <Xl <Xl N <I) N r-- N <I) (0 LO N ~ o (0 ... .... o ~o "'0 a.N :::;:'0 g~ NLO", <l)r--c c 1 0 'CD @U 0.....-6 ~(OQ) 0.. ~o:: en W W u.. III ~ W en Z W o :J It) o o N ~ o LO r-- ~ o o N <I) LO r-- ... ~ o LO ... <I) o o ... <I) LO r-- , ~ o LO .... u.. o l- => ::c co 6::c !fl- ~-g 0'" .'" 0..8, .r:.'O O)"i:: I~ -'" o 0 c'E ~t) ~ > '" '" ~~O 0"'... <(Ill (0 I!!~ '" '" '" '" a. '" >-",u.. "I:t.2..... ~ ~ '" '" '" '" 1>"'=> c:Eo;: o '" '" gOc", Ill.r:.E1> ......:t!o..a 69$~m ~ o o o ~ ~ ~ o o N .... o o <') ~ o o <') ~ o o N <I) (/) o Z o III ::c I- ::c I- '" 0;: '" '" :I Z lii 10 ij; 00:: 1-'0 .a '" :I :I (/)u.. .... o o (0 <I) o LO <') M ~ o N LO <I) 0) r-- "It <I) <Xl <') (0 ~ N r-- (0 ~ ... <') (0 ~ o ... "It .... co "It o ... ~ LO <') r-- ~ r-- <Xl ... <I) r-- <Xl ... ~ r-- "It ... <I) <Xl o ... ~ ... r-- <I) LO <') .... u.. o l- => ::c '0'< o (0 ~ o o o ... ,!; '" '" '" .r:. 0.. 0:: W u.. (/) Z <( 0:: l- I- (/) > :::;: ::c I- ~ [{l Z ~ m '" - ij; ~o:: 01 "It o r-- ~ LO <Xl o "It ~ r-- o r-- <I) (0 (0 (0 ~ LO <Xl r-- <I) o <Xl r-- ~ N o r-- ~ LO "It "It ~ o ... o LO ... ~ N 0) "It <I) LO <') ... ~ LO ... ... ~ <Xl 0) ~ N r-- <I) <Xl "It ~ "It N ~ :::;: e> '0'< N :::;: '0'< <Xl ~ I- 1ii Z <( 0:: I- '0'< o "It ~ o o o ... .!; II> '" to .r:. 0.. 0:: W u. (/) Z <( 0:: l- I- (/) > :::;: ... ... "It LO <Xl ~ N (5 ;a <I) f--- r-- r-- LO ..,f <I) f--- N "It <Xl '" '" o "" <I) gf--- ... <Xl r-- (; - ~ '" .r:. ~ 0- '0 <') II> <Xl .r:. <Xl o '" ~~ II> N '" LO (/) <Xl <I) - o LO r-- ~ - 0) (0 "It .... - o 'E II> E '" o '" C. '" 0:: O/l", '" ~ II> '" O.r:. .~ (/) "'I- (/)(/) ~> ~:::;: ~::c 1-1- (;: .!; LO o o ~ .~ en 010 11>0 lllN 1;j I- ~ '" o II> =Om ",(/) '" to II> Q) '0 ~ .~ <( .! ~ .l9iii (/):::;: <I) ~ ::: W Z -' ~ o I- m .., '" ~ "0 Gl l;; a. Gl It N ... M ... .' :E <D '<t a a a <D <(-I '<t <D .... '<t ..... 00 0::<( a M '<t a M .... "l- N .... M N .... N 00 0::1- ~ ~ ~ ~ ~ ~ a.. a a a a a '<t N 00 a <D '<t 00 M ~ M ~ 00 N M 00 M .... 0 .... 0 N .... .... a It) It) M N N ^ ci ci ~ ~ ~ ~ ~ ~ -I <D '<t a a a N <( N 00 .... 00 M a zl- ..... '<t N <D It) 00 <(0 .... -II- a.. CD ::l (/) ~ ~ ~ ~ ~ ~ It) a It) a It) M <D .... ..... ..... a ..... M ~ .... ~ .... N .... .... .... 0 0 .... It) It) a N N N ci ci ~ ~ ~ ~ ~ ~ It) a It) a It) M <D .... ..... ..... a ..... ~ .... ~ .... N .... .... .... N 0 0 .... It) It) a N N N ci ci ~ ~ ~ ~ ~ ~ N N '<t a '<t 00 M M <D .... It) Ol .... .... N .... .... .... .... ~ ~ 0 0 .... a a a N M (/) N ci ci 0:: <( W ~ ~ ~ ~ ~ ~ >- -I N N '<t a '<t 00 <( M M <D .... It) Ol 0 .... .... N .... .... .... (/) a ~ ~ u:: 0 0 .... a 0 a N M N ci ci ~ ~ ~ ~ ~ ~ <D <D a <D a <D , <D <D M Ol ~ a a a a .... N ci ~ ~ ~ ~ ~ ~ <D <D a <D a <D , <D <D M 00 ~ a a a a .... N ci ~ ~ ~ ~ ~ ~ W W 0 w~w ~wfil <( <( 0 ::l0 W O::a::l 0 ~~ 0 3:[fl a:: w~w www Zw ::s <('<tZ ::l ~~~ O::I-(/) O::::ll- wI- I@w -I- <( <( <(z<( ><( W::l 0 3:(/) a.. zz (/) > wwa:: O(/)W owo:: wa:: w I-I-w (/) Ww a::w I-w ~-I I->W a::wa:: a::>w 0:: -(/)a:: 0 <(wz 1--10 I-WZ -IZ w> ~>z Z 1-<( I-a::w w<(Z wo::w ~w I- ZW <(:EZ ::l (/)(/) (/) " :E(/)- :E " (/) 0:: u.. 0" > o::u..+ I- :E 1-0