HomeMy WebLinkAboutWK August 22, 2006
~NDbVE~
1685 CROSSTOWN BOULEVARD N"W, . ANDOVER, MINNESOTA 55304 . (763) 755-5100
FAX (763) 755-8923 . WWW.CI.ANDOVER.MN.US
City Council Workshop
Tuesday, August 22, 2006
Conference Rooms A & B
I. Call to Order - 6:00 p.m.
2. Special Assessment Policy (continued) - Engineering
3. Railroad Quiet Zones/06- I 0 (continued) - Engineering
4. Update on NPDES & New Requirements/06- I - Engineering
5. Review of Buffer Requirements and Potential Changes - Planning & Engineering
6. Options for Bunker Lake Boulevard Median Maintenance (continued) - Planning
7. Changes in Deer Hunting Regulations - Planning
8. 2007 Budget Update - Administration
9. Other Business
10. Adjournment
5'\ND6VE~
@
1685 CROSSTOWN BOULEVARD N. W. . ANDOVER. MINNESOTA 55304 . (763) 755-5100
FAX (763) 755-8923 . WWW.CI.ANDOVER.MN.US
TO: Mayor and Council Members
CC: Jim Dickinson, City Administrator lV"d..--
FROM: David D. Berkowitz, City Engineer
Jason J. Law, Civil Engineer III
SUBJECT: Continued Discussion - Special Assessment Policy - Engineering
DATE: August 22, 2006
INTRODUCTION
This item is a continuation of previous discussions regarding funding options to maintain the City's
road infrastructure.
DISCUSSION
Based upon Council's direction, staff has prepared a revised analysis of the needs to maintain our
road infrastructure through the Mill and Overlay program. The order of the reconstruction projects
was reevaluated based upon average OCI ratings for each development, field reviews and
geographic considerations trying to group projects together in the same portion of the City.
Concrete curb and gutter will be constructed where there is existing bituminous curb, in areas
without curb or ditches or in areas deemed necessary for drainage by the City Engineer. The
Council may want to consider separating quantities and developments within a given year to
differentiate project costs and assessments between areas with and without concrete curb and gutter
and varying lot sizes. Costs would be broken out per development or addition and would be
identified in a feasibility report.
The attached spreadsheet identifies the developments in most need of repair, the estimated costs
associated with the reconstruction and the years they are identified for improvement. Staff would
like to maintain flexibility in scheduling of projects that are more than two years out as conditions
can and do change. The attached cost estimates include an assumed 5.5% increase in construction
costs per year (versus a 4% assumption in previous analyses). Per Engineering News Record, the
Construction Cost Index (CCI) from December 2000 - December 2005 was 5.2%.
The average funding needs identified on the spreadsheet to reconstruct all developments with OCI's
less than 54 (between the years of 2007-2013) is $1,020,740 per year. This schedule assumes that
the Lund's Evergreen Estates 2nd - 5th Additions will all be reconstructed in 2013, therefore they are
not being included in the current 2007-201 I CIP. Depicted on the attached spreadsheet are the
differences between assessing 25% or 30% of the total project costs to the benefiting properties. If
the 25% assessment rate is chosen, an additional $51,000 I year will need to come from the Road
and Bridge Fund to finance the improvements. If 25% assessment rate is chosen, the mill and
overlay program may see a shortfall approximately once every six years.
Mayor and Council Members
August 22, 2006
Page 2 of2
Also attached is a draft roadway reconstruction policy for your review. Two main items that staff
would like direction on are the percentage that the Council would like to assess and how
assessments would be handled for properties that are adjacent to a Municipal State Aid road.
ACTION REQUIRED
The City Council is requested to review the information provided and determine an acceptable
assessment rate as a percentage ofthe total project costs to assess properties benefiting from the mill
and overlay program and direct staff on the assessment policy for roadway reconstruction projects.
Once details are worked out, the policy will be brought forward for official approval of the Council
at a future date.
Respectfully submitted,
David D. Berkowitz
~::
Q~Q.
Attachments: Potential Mill and Overlay Projects spreadsheet ..,./
Annual Mill & Overlay Cost Estimate spreadsheet
Draft Roadway Reconstruction Policy ./
CIl~
ClO
..",
.. ,
CIl...
>0
<(0
'"
"''''
... ...
NN
., ""0
(1)'1""'....-
ni ~ .nit)-
O"=':!;!
I- g ....:,..:
'" ......
00
<0 '"
NN
'" '"
~16-~
0"'''
N .q_~
... ...
... ...
<DU>
<D,,!
... ...
<D U>
~I~-~
~~~
... ...
... ...
"''''
<<icO
<D U>
::I~~~
O~~~
... ...
D:
<(
z
W
o
m
I-
Z
W
:E
m
m
W
m
m
<(
<DU>
"'or:
00
......
~I ~ CD..
~~~
'" '"
... ...
<DU>
LO'"
?!- cid
o <D U>
., g:1 ~ ~
~cr;m
... ...
W
I-
<(
:E
i=
m
W
I-
m
o
o
>-
S
0::
W
>
o
oil
...J
...J
:i!
I-
W
W
0::
I-
m
...J
<(
:>
z
z
<(
"''''
00
cO<D
<0 '"
"'I"'-"!.
0"'''
0......
",<0'"
... ...
"''''
'" .,
NN
........
<DU>
:;100
0......
("11'1""'_"':
... ...
... ...
'"
CIl c:
5 0
-u
=gE
a> (/) C;
c.c:_
.. 00
WlJl-
00
"'.,
00
........
r-...
0-0
N'"
O~Q_
... ...
... ...
"''''0
ON.,
MNcrio
'l""'N_.
ONI.O.....
~c.O~o
OO......N
OMJ'-..O
NtA-tR-...:
...
...."''''
u>",...
M~~~
oll)(DT""
C\I M'I""'-u)'
":"""'ltO'"
o",:q~
ONU)r--
N ... ... ..,.
....<DO
<0"''''
I'--~N
<DN'"
N<D'"
~IO'>-~ci
oNOM
N~~~
... ...
O<DU>
'" ... U>
cOM"":
"'au>
... r- '"
::Ir--: to M
~~;g~
... ... ...
"'<D...
"'''''''
cir'O:;
N....U>
"'LOO
::1 r-: ......- vi"
~~;b~
... ... ...
",...u>
~"""'I"'"
.....mo
O<D...
~1......._m_U!.
~~~~
N<D'"
... ... ...
r- '" U>
...",,,,
cONo
.......U>
"''''0
g:1 v- 0- 'Ii'
~~;b;;;
... ... ...
N<D'"
<ONO
Lriciui
"'''''''
...r-",
~lv-mM
~~~:;
... ... ...
a",'"
r-<D.,
NO>N
"'....",
.......U>
:;I-.:--mc:i
01.0...........
(\1("')(0'1"'"
tR-fh...:
...
en?f!.
CIlO
~e~
::I UJ III
0--
0aiCi>
ClE>
C:UJO
.- en I
'g~CDJ!l
::::JrJ)c6o
11..<(0::1-
CIl~
Clo
..",
.. ,
CIl...
>0
<(0
'"
"''''
... ...
NN
.,,,,,,,
.!!o'l""'....
J!l"',n-,n-
o"=':!;!
I- g .....-,..:
'" ......
00
<0'"
NN
"''''
"''''
~lciO
0"'''
N v_"It..
... ...
... ...
<DU>
CD,,!
... ...
<D U>
~I~-~
~~~
... ...
... ...
"''''
cOcO
<D U>
00
::1.0 ,n-
O~~~
... ...
D:
<(
z
W
o
m
I-
Z
W
:E
m
(I'J
W
m
m
<(
<DU>
"'or:
00
r-...
~Ico_ct!.,
~~~
'" '"
... ...
<DU>
"''''
(/e. 00
'" CDU>
'" g:1~~
~a;m
... ...
'" '"
00
crieD
<0'"
"'10."!.
0"'''
0......
",<0'"
... ...
"''''
"'.,
NN
....",
...,"'-"!.
000
or-...
N ~"':
... ...
... ...
'"
e c:
::I 0
:::u
't:J ::I
c:.=
~~J!l
.. 00
WlJl-
00
'" .,
cid
....",
r- ...
0-0"
N'"
O_ct
... ...
... ...
<0"'0
ON.,
MI.O..oO
""'COl.O""'lt
0......1.0......
~lliarici
OLOWN
ONt-O
NWEA-...:
...
.,"''''
"''''...
"'<ON
McnCOC:O
'l""'NCO_
~u5o:iv)
":'COLD""'lt
Or--M.....
o _-It)'''':
N .......,......
000
N<D'"
MoiC'i
N<D'"
r-...",
~1""'-riO
~:gt;~
tf)o......-...=
... ...
N"'U>
~Nu)
LO<.O"":
<D '" U>
"'''''''
~IO-NM
~~ffi~
... ... ...
'" "''''
...",,,,
r---:......:o:i
<D 0 U>
N <0 0
::I......-ri..,;
~~ffi~
... ... ...
....NU>
"'CD...
r-..:NO
... '" ...
~I V_ N_ (D..
c.....VIl)
NVNCD
Nr-",
... ... ...
....NU>
.......'"
uiuic::i
<D"'u>
r-NO
g:1 CO- cD r.D
ONoo..-
NNtOcn
... ... ...
N<D'"
~~~
'" <0 '"
",....'"
~I ri ci M
~~ID:;
... ... ...
"'CD'"
~~::l
<D"''''
<D"'U>
:;1"'-1'---0
~~~~
WEA-...:
...
U)~
CIl'"
~t:!.~
::I UJ III
~g~
ClE>
c:UJO
"- (/J I
'g~CDJ!l
::::JCf)c60
11..<(0::1-
'"
0
CIl" ...:
CIa .,
[!~ "!.
...
CIl... '"
>0 ...
<(0
'"
...
...
., en
'"
!E ... '"
0 ...:
J!l '"
,.:, '"
0 .,
I- 0 ...
0
'"
....
<D
.f
....
"1""
......
or-
- ",'"
c
J!l
'"
c
0
U <0
't:J 0
CIl C"'i
E '"
::I "'I~
'" ...<D
UJ ~~
..
'"
-
UJ
0
U
c;; '"
-
0 ....
~ C"'i
'" '"
0 "'IN,
.;: ...<D
.. ~~
c:
CIl
u
'"
-
c:
CIl
E LO
'"
UJ C"'i
CIl '"
UJ ~IN_
'"
.. 0'"
'<f. "'....
...
0
.,
~ '"
~ 0
. C"'i
'"
'" '"
.. "" r-_
0 0'"
... ~~
~
c;;
::I
c:
c:
..
CD 0
'"
oil cri
0:: '"
E "'1"'-
0 00
.. 0....
... ",'"
~
CIl
't:J
CIl
CIl
c:
'" N
't:J ...
c: N
::I '"
II.. "'1"'_
c;; 0<0
0'"
c: ",'"
0
;:
:a
't:J
<(
'5
0";
o Q)
_ '0
Q) c:
::J
> ...
'" '"
.<: c:
'0 ";;
:; .0
0 UJ
;: ro
Q) Q)
;: ,.,
2-w
c: <:-
Q) Q)
E >
UJ CIl
UJ C .c
Q) U)
UJ Q) .,
UJ E ... "0
III C. 0
~ 0 '" c;
N
0 Qj UJ
0
'" > "0
~ Q) c:
't:J ::I
Q) -'
> ro
0 c:
c: 0
Q) +'
UJ U
0 '0 1n
.<: '" '"
0 ... CIl E
"!!! Q) 0 (; UI
C '" II.. c; e
~ 0 Ol CIl 1n
0 .8 CIl -'"
'" ~ "E 0
N UJ '0 0 ':;
:::: Q) c:: z 0
1U
0 ::J
0 0-
0 Q) Q)
.0 ro c
N ~ Q)
'" Q) ... .c Ol
... ,., ... >;- ro
0 :s
"!!! 0 '" .c
a; >
_0 UI '
00 C) .~
Q) - c; c;
'oU; ro Q)
a.... -'><
....
Q) ...; UI Q)
'" III ;: >
~ Q) 0 "C; UI
,., "0 0
Q) 0 ro Q)
> '" ... Q) "0 13
III c: 0 ~ Q) ..:
c: '~ '" E c
III .~ ro
.c U
<n= "iij <> .!!1
"'.8 a: c:
~Q) UJ ;;:
o :5 E
0 ~ ::J
'" 0
ui .8 E UI
-'" Q)
> -c. '" co 10
~ ::I 0 0 1n
0 :!'1 0 <n UJ
'" '" 1n
N "- ':; c "0
~::I 0 0
~.o 0- UI 0
'" ' c c J:
Q) ~ Q) .c
,.,0 en 0
- UJ ....,
0'0 1n
o c:
0_.2 UJ
... ~ ;:
'" ::J '" Q)
... 0 0 :>
,.,.c 0 c: -'"
..o~ '" co
UJ ;: ~o
ti -c. .c ;:
0 ::J "C 0
0 0 c'5
13 .<: z
0 't:J
Q)-
'0' ~ M
~ , UI Q)
c..8 ;: UJ OlUJ
CIl 0 Q) 't:J"O
~ ... "- c:
0 "0 10 0:: 0
::I .. 0 ..
't:J Q) 0 CIl 1n "0 0-
2! ,., '" ~ UJ c; c:
Q) ",.!!1 0
- c: c: Q)"O .c
UJ 0 co UI 0 E
::J U - 0
'-'" ~3:: Q)
0 ro E ~
-.c
"" c:
::J ,_
0 E
it:
"- '"
'0 ~
<:-8'
Q) ~
> c.
UJ Q)
.- :5
""
<ti
"0
z
CITY OF ANDOVER
ROADWAY RECONSTRUCTION ASSESSMENT POLICY
Adopted:
,
t.
(Sept. ??, 2006)
ROADWAY RECONSTRUCTION ASSESSMENT POLICY
Section I.
Section II.
Table of Contents
General Policy Statement
Roadway Reconstruction Assessment Requirements
Page
1
2
CITY OF ANDOVER
ROADWAY RECONSTRUCTION ASSESSMENT POLICY
SECTION I - General Policy Statement
I. GENERAL
The purpose of this document is to establish a standard assessment policy for roadway
reconstruction projects within the City of Andover.
Roadway reconstruction projects are defined as local and/or Municipal State Aid City
streets that have an existing bituminous surface and have reached a level of distress in
which the City Engineer determines that the roadway is in poor condition such that full
replacement is warranted. Improvements consists of a new bituminous surface, concrete
curb and gutter (if required by the City's Concrete Curb and Gutter Policy), additional
storm sewer as needed, storm sewer replacement and street widening if a substandard
section exists.
Street and storm sewer/drainage costs are apportioned to the properties benefiting from
the project. Apportioning the costs of the street and storm sewer construction may be
done by dividing the cost of the street improvements by the assessable front footage of
the benefiting properties to determine a cost for linear front foot or by dividing the costs
of the street improvements by the number of benefiting lots. This is explained under the
Methods of Assessment.
The nature of the street improvements dictate whether or not concrete curb and gutter is
required (Per the City's concrete curb and gutter policy). The following is a list of
reconstruction projects where concrete curb and gutter is required:
I. Existing Municipal State Aid Routes (If MSA funding is used)
2. Reconstruction Projects
· Rural w.l Existing Bituminous curb
· Rural w.l no curb or drainage ditches
. All Urban
3. Existing Business Areas (Commercial, Retail, Industrial) with no curb, no
drainage ditches or existing bituminous curb is in place
Roadway reconstruction areas shall be identified in the City's Capital Improvement Plan
(CIP) at least two years prior to construction. The CIP is a fluid document in which
roadways will be identified in the plan, but may be moved to a later date if those areas are
not within two years of reconstruction and other areas have been found to be in greater
need of repair.
Assessments for other improvements (sanitary sewer, water main, etc.) included in a road
reconstruction project shall follow the City's standard assessment policy.
I
SECTION II - Roadway Reconstruction Assessment Requirements
1. GENERAL
Minnesota State Law, Chapter 429 provides that a Municipality has the power to make
public improvements such as, street and storm sewer improvements including grading,
curb and gutter, and surfacing, and assess the improvements to the benefiting properties.
This section of the policy describes how roadway reconstruction project shall be
assessed.
All properties benefiting from the roadway reconstruction (fronting along the new
roadway) shall pay a proportionate share of the cost of local improvements per this
policy. The City Council has approved the roadway reconstruction assessment such that
30% of the project cost (construction costs and indirect cost such as engineering, design
and other administrative costs as identified on the City's assessment worksheet) to be
assessed as identified under the Methods of Assessments. The remainder of the costs
shall be funded by the City's Road & Bridge Fund.
Any roadway reconstruction project (including Municipal State Aid streets) that is part of
a neighborhood or subdivision will be assessed. If a Municipal State Aid street is
included in the reconstruction project, the City can submit for reimbursement from the
State for a portion of the project, but this would not reduce the assessable amount (based
upon 30% of the total project costs) to the benefiting properties. Any State Aid funds
collected for these projects would go toward funding the City's share of the total project
costs.
II. POLICIES RELATING TO SPECIAL ASSESSMENTS
Assessment
The total assessment costs must be apportioned equally amongst properties having the
same general land use (residential, institutional, multiple family, commercial or
industrial), based on benefit. Total assessment against any particular parcel shall not
exceed benefit to that parcel.
Assessment Period
Reconstruction improvements shall be assessed for a period of up to five (5) years. A
Senior Citizen deferral is permitted (refer to State Law).
Interest Rate
The rate of interest on assessments shall be determined by the City Finance Director with
concurrence of the City Council at the time the project is initiated.
?
Methods of Assessment
The City Council has approved two (2) methods (Unit & Front Footage) of assessing
roadway reconstruction projects. It should be emphasized that the special assessment
method and policies summarized herein cannot be considered as all-inclusive and that
unusual circumstances may at times justify special considerations.
Unit (Lot)
Unit is a parcel or lot in an area that cannot be further subdivided, i.e., in a single family
R-4 Zone the standard minimum lot is 80' x 130'. If a parcel can be subdivided one
assessment per potential parcel will be assessed for as many units as can be subdivided in
that particular zoning district. In a unit assessment, 30% of the total project costs would
be divided equally amongst all units in a development, resulting in a uniform assessment
per lot.
Front Footage
Frontage footage assessment may be utilized in areas in which large parcels exist that can
subdivide or in which there are different types of land uses (residential, commercial,
industrial). In a front footage assessment, 30% ofthe total project costs would be divided
by the total front footage for all lots within the project limits. Front footage for comer
lots would be determined by adding the length of the short side and half of the long side.
The cost per front foot would then be multiplied by each unit's calculated front footage to
determine their assessment. It is likely that this method would result in different
assessments per parcel. If a large parcel has the potential to fully develop (40 Acre
subdivision) the City Council has the discretion to assess more than just the front footage.
This would be identified and approved in the feasibility report.
,
?'~~~
I\) W I\) (11-> I\) 0>
oogo~oooi\)
?fl. '?fl.o> 0"""0 CD 0
:>"'lJOJ)>OOO
o.CDIllOOOOO
-'0 (f) en en en en
afCD(1)c................
0:J'<3.....................
--CD CD 'UlUl
00 III 0.'TI-<-<
0......-, 0__
!a.dQ~;;'5S
VJii)ooO--
-o.....:J:J:J
(") (J) _. Q Q. Q.
ou;~~c:c
!!l. iilCD!:!'o.
en ~O:J:r
"- OCICIC
tn :>-'00
00 ~o-S1OS1O
CD ~~GlGl
~ 2"0.--
~ ~r.c cO'
OC-'-'
o = III III
:J~CDCD
en_cuOl
~:rcnVJ
CQ.=;:=;:
ac;:::;:;:::;.:
o' 0. ::T ::T
:>CDoO
OOOOs.
o 3 :> ,..,
00 IllQ "
......==mg
:Jgtio
o.Xoro
~l)lS1Oro
o"oGlo
o iil 5' S10
-oo0Gl
- UJ __
=:'01'=::;-
0- 0.0
30CD-
o 00 C
03 III 0.
CD 3 o.l)l
o 0.
- -- III
I\Jgga.
oCD:>o.
oxQ)2;
7'~~g
c-?fl.a!.
(t) 0'1\)
fl ..., 0
I\J en'#.
o -_
o Qo
~ 3;;;
en (J) 0'
(11 CD-.
i\) =;: 3
~ ~cn
o -.co
'0 :E
CD CD
~ ~
CD
III
~
.
'TI
C
-
c
ill
"Cl
..
o
(g'
n
-
00
Q"
C1l
'<
o
::l
0.
N
o
->
Co)
-t
o
~
r- ~
en ....
f-""
f-:;E
o
o
0.
iil
:>
0.
s:
CD
III
0.
o
=;:
00
(It
Co)
N
....
N
N
Co)
""
:....
Cl'I
(It
-.j
~
CD
Cl'I
N
....
""
:...
....
(It
....
o
-:....
o
-.j
~
....
CD
:..
Cl'I
(It
....
N
Co
""
co
Co
Co)
co
CD
co
.
.....................
NNNNNNNNNNNNNNNN
0000000000000000
-~~~------------
""""""""""""""""""""""""""""""""
1\)1\)1\)1\) 1\)1\)1\) 1\)1\)1\)1\)
0000 000 0000
~~................ ........................ ........0.....0
00->0 000 OtO->tO
~~:;E0~~~~~~~oo~~9~CDQ~
:>~ =;:;:+;:+;:+3' 0.1lli-!!! "'"00 !:!:
0. ~ 8. III ::T::T ::Tii_ -> - 0 0.1~ III CD CD
ro iii' iil al<e.l<e. :e. 00- ~ ~ C5 ~ 3 ::T :> 0
:> =;: is. -t gJ gJ gJ)> 0 ~ 0 ~_ ~ !?r :>0.1\)
o -tCD -t CD3 .... I\) (11 8: "'" 0 -. 00 CD 0.
", CD r+ :J -- -. --.J C CD ..... CD ........ ........
~~...,~~a.~~ ro:J(1)cn-~5
::>_Illiilro)>)>)>g -'0."'"- c.!:!,
0. ~ 0 )> 8: 0. 8: iilo l!!l m I ;::;: ~
CD CD 0. 0. -. CD I"" 00 0> 0- 0
)>a.~;::::;':!::!: nW:T:J:J
)> -.;::;: 0 0" 0 0 -CD "-
0. CD -- :> :> :> 3 00 i5:
0. Illg 0.
- 3 ;::;:
0' 00' 0'
:> 00 :>
0' 00
:>
"'lJ
er
->
I
->
to
CXl
0>
................................................................................
to to to to to to to to to to to to to to to to
CXlCXlCXlCXlCXlCXlCXlCXl~~CXl~CXl~tOCXl
o OI\)(11WO(11 OO>O>->CXl->tO->....
0>
....
o
0>0>0>0>(11(11(11(11(11(11(11(11(11(11(11(11
1\)->->9tO~~~~CXl~~~0>0>""
~~wo~W->OOOCXlOOOOO
OJ
;::;:
OJOOOOO
z;::;:ooooo
- :J::J::J::J::J
g:JQQQQQ
CDQCDCDCDCDCD
CD-.................--
CD CD CD CD CD
o
o
OJ OJ:>
;::;:;::;:Q
CD
-
CD
00000
zOoooo
o:::J:J::J::J:J
:>00000
mmmmmm
-----
CD CD CD CD CD
{R
(11
""
I\)
(11
....
o
(11
....
{R {R {R {R {R
~~..... ~.....~~~~~...............~~
CD010~W01~""'~""'CDOW""''''''1\J
I\) CXl 0> CXl 0>->-> to 00 (11 O->CXl to""
~~o~OO~~COCXlW->->(11~~
""to->->CXltO(11O>~tO(11~~....O>O>
CXltOCXlOCXl~CXlI\)CXl->I\)(11I\)I\)(11O>
WtOi\)~m~~~ow~i\)~IDow
~....I\)~~I\)CXlO->O>CXlCXl....W....->
{R
->
~
0>
_(11
to
I\)
~
to
I\)
{R{R{R {R {R{R{R{R
->->I\){R{RW{R{R{R{R->I\)WI\){R{R
tOw""->CXl(11tO....tOl\)tOwO~....(11
->O>~tO....I\)O>O>(11(11tOwO>O>O>~
~~w~N01~.....m~~~om~~
.....W~010CJ)W...............01~CJ)O.....CD
I\) W(11 CXlO>->O>I\)(11WO>l\)tOOCXlCXl
~~OOOCDW~~W~~wo~~o
O>tO""OtO(11O>O>~CXlCXl->W~W~
{R
->
{R{R{R {R{R{R {R (R{R{R{R
N.....(.oJ~........01.....tfl......EflI\JW~W{;R~
~tO(11I\)I\)OWO>WWCXlWWtOO>CXl
""(11W~OWCXl(11O>O>""W~(11(111\)
..... W eN W N a, ...... Cx'C.,.'C.1ol 01 Co "'i\J ..... CD 01
O>WtOO>tO(11tO~tOOO->""~CXl(11
~W~CD01~~01W~~~~WW~
i\)~O(11~OIDmw~i\)~~->~w
WW(11CXlO>~""(11CXl""(11tO~OCXlCXl
CXl
o
CXl
-....
0>
CXl
~
(11
{R
N
{R{R{R {R{R{R {R (R{R{R{R
W~~~~~~~~~W~01~~~
I\)WI\)W~OO>~O>""""OI\)~~tO
CXl........I\)....~(11tOww->o........tOtO
CoWOCXlWWCXlOtO(11~~m->oo
tOtO~~(11tOW(11->O>->OCXl~O>O>
w~~~~owo~~~~~~o~
~~oo~moow~o~~~~~~~
CXlO>~tO~tOWCXlO>(110->~1\)~0>
->
~
_0
->
0>
I\)
->
~
-t
~. ~
o 00'
"""f'\ !:!:
0:>
clC
-.
0-
O-t
00
:>-
!!l.!!!.
{R(It(lt~ (R{R ~O)>
~~-~~~!~~tQ~~~~~~~~Ooo
(11o....~wwl~O> N~~(11O>O>->~OOoooo
~~~0~~~9 0~~~~~~9~ooCD
W....O~WN~....I\)~(11->O>~wO>~ ~~
~~~w~~i~-~o~~~mmCD~~ wm
I\)tOO(11I\)OO>O~(11->~""O>(11tO~ 00-
->mo~mmm~mo~~w~~o-> ~ro
tOO>O>OI\)->OI\)""I\)~I\)(11CXl->""-> ~
N
o
....
o
NNN8N....NNN~NNNNNNNNN
00 0000_000000000
~~ ~~~cc~c~ccocc
NOCD....NN--.j~-CDO-.j-.jco-.jco
I\)
o
o
~
~
iii"
0.
:i'
6'
ro
00
1\)1\) 1\)1\)1\)1\)1\)1\)1\)1\)1\)1\)1\)1\)
00 000000000000
00 ->000000->0000
~O> ->~~CXl~CXlCXl->~CXl~~
omUlxz::O~^i~~o"'lJGl:>Z:;EGl
c:>roCDOO-CD - -'CDo.OO-'
~o::l~a~~~ ~g~a~;:+o~
","i~IllCDa~~8~OO~::T:>~!:!:<
!!l.:>C-CD~ml- mo 0'~1ll0
-'-~<:>'TIgmo.g~S::>~CD:>1ll
OCD__.)>O. oom. OOCD"'lJCD:>c.","
30.>i:>o.ro~Woo-tOIll0~ ~<
"-o~ o.oo::T-W::T c.:> ~_
"'--'0. _._~CD_::lIllOo.~ 0. CD
o.--m- WOOCD-~< < =<
o.CD<C!: 0":> 00:>3<0000 ""'CD<
;::;: 0 :> m m 00 m
~)>::l > 1\)0 ~ 00
jm ~ ~S ~ ~
III 9: 0.- )> ro
C!: )> CD-I 0. 00
o 0. 0.
::l 9:@ a:
~ ~o 0
~ om :>
~ ::l
a ~
l>> (j
::l a
~ l>>
::l
.!!.
->
to
~
to
~~_.Jo~....a. ~_ _~~~~~
tOtO~~tOtO~tOtO~~tOtOtO~tO~
~~~~~~~~~~~~~~~~~
(11
I\)
CXl
""""........""""WWWWWWI\)
~~I\)->->o~!D~~~O>o
wi\)OWOO~I\)~W~~~
o
go
::TO
Ul5
~ ro
-10
0'
:>
(11(11
00
tO~~~
tD
~
(11 (11
-> ....
OJ
?=
g
~S!!5S!!~~~~~~
--~;~............~--~
ro
OJ
;::;:
o
OJ::l~OJ
O;::;:(j)j;::;:
g 0 CD
~ r-
::l
{R
""
_(11
CXl
~
o
o
0>
~
QIll
"'lJ-'
"'lJ-<
III CD
!!l.1ll
-.
Q:;
"'lJ
o
CD
<
CD
~
3
CD
:>
-
-
::0
o
III
0.
00
"'lJ
III
<
,~' :>
r-u;::;:
o~
III
ro
~
OCD
aQl
-10
CD
-t
o
Ow
o
{R(It(lt(lt{R {R{R ~~{R{R{R{R :>z
~~~t~~f~~o~~~~~~~~~~g
~~~(11~~r.~~9~~~~~~~9~~0~
(11WOI\)OI\) to....~O>tOl\)l\)l\)""(11 0"'-
CXl->I\)~O>~ (11""~I\)O>->(11W""tO 0000
->!"~!,,I\)"", ~""~9:1"'!Jl?'!":I"'!" oo~
~(11""~~~120>~WOtOcoCXlO>""(11 00
~""m""~O>I~""I\)~~I\)->I\)WWCXl 00
{R
->
o
-~
o
W
9
->
""
{R
->
(11
I\)
Co
o
o
i\)
o
{R~(It(lt{R{R {R(It (It{R{R{R{R{R{R g
~WWQ~~[~~-Q~W~~~W~ ~~
~t~~t~I~~~m~~~~t~~~~~
Co~o-w~~W~~->OCXlI\)O>O~~a!!!.
~ww""~w~O>~~~tOCXlI\)->O>O 0
WI\)Wco(11(11~CXl~W->I\)->I\)CXlWW 00
IDi\)~wwwl~o~~~~->mo~m -
(1101\)~tOCXl~0>~00""0>0(11~tO
(R
->
CXl
W
~
CXl
9
I\)
""
-t
{R{Ri~{R{R {R~ ~{R{R{R{R{R{R ~
N.... ~(11-> 1\)-(ltI\)WI\)I\)O>....~ III
w.... O>w(11I~""~~~O>->O>(11""O>~O~
~w wWWco->O>I\)""CXl""~WO>O -0 u
~mow~o~m~Co~~m~~~~~!!l.a
0>~""""(11""1~""""00->(110>""~"" -
~~9!"9!"~~:I"'9?'~~~~O>:I'" ~
~0>1\)0""""""0>(110~I\)W->0>->"" -
""WI\)I\)~(11I\)~""~OtOtOI\)O>~1\)
C
'0
0.
III
-
CD
:> 0.
~
-
->
~
-
o
0>
"'C
o
-
CD
::s
-
iii'
s:
III
::s
Co
o
<
CD
...
iii'
'<
"'C
...
.2,
CD
n
fil'
~
C1l
Dl
cc
C1l
(")
~
::E
a:
C1l
o
n
II
co
....
:....
~NDbVE*
(J)
1685 CROSSTOWN BOULEVARD N.W, . ANDOVER, MINNESOTA 55304 . (763) 755-5100
FAX (763) 755-8923 . WWW.C1.ANDOVER.MN.US
TO: Mayor and Council Members
CC: Jim Dickinson, City AdministratorWL--
FROM: David D. Berkowitz, City Engineer
SUBJECT: Continued Discussion - Railroad Quiet Zones/06-10 - Engineering
DATE: August 22, 2006
INTRODUCTION
SEH has revised the Draft Railroad Quiet Zone Report to address additional information requested
by the City Council at the workshop held in July 2006. The revised draft is attached for your review.
DISCUSSION
Information that was added to the draft Railroad Quiet Zone report include additional information on
wayside horns, the possible phasing in of improvements and Met Council as a possible funding
source. After further review and comparisons to current railroad quiet zone improvements in Coon
Rapids that have recently been bid the estimated costs have increased from the first draft report.
Please review the updated draft report for discussion.
The developer of Sophie's South (Marty Harstad) has proposed to offer the City $100,000 toward the
Railroad Quiet Zone on Crosstown Boulevard NW if the City would commit to complete the
improvements by June I, 2007. Refer to the attached letter from Harstad Hills, Inc. Mr. Harstad
feels the train whistles are affecting the sale of lots in the development and if the Quiet Zone was
implemented, sales would improve. The June 1,2007 deadline may not be possible due to the time it
takes for the Federal Railroad Administration to approve the City's report, design of improvements,
Anoka County Highway review and completion of construction. Also Crosstown Boulevard NW is
not a County or Municipal State Aid road so State Aid funding would not be available to fund the
remaining $326,000 to complete the project.
BUDGET IMP ACT
Engineering, Finance and Administration have reviewed the possible funding sources and Municipal
State Aid (MSA) and/or the City's Road and Bridge Fund would seem to be the most reasonable
sources to fund the improvements. Crosstown Boulevard NW east of Hanson Boulevard NW is not
a County or Municipal State Aid road. If the City was to accept the road as a turnback, the City
could then designate this segment as a MSA designation making the road eligible for MSA funding.
Mayor and Council Members
August 22, 2006
Page 2 of2
ACTION REQUIRED
The City Council is requested to review the Draft Railroad Quiet Zone Report and direct staff and
SEH on how to proceed. If the report is acceptable, the report will be brought to a regular scheduled
City Council meeting for formal approval and the improvements would be included in the 2007-201 I
Capital Improvement Plan.
Respectfully submitted,
David D. Berkowitz
Attachment: Draft (#2) Railroad Quiet Zone Report,/'
Letter from Harstad HilI~, Inc. ,/
~Q,I.
August 15. 2006August 15. 2006July 21, 2006
RE: Railroad Quiet Zone Study
Andover, Minnesota
SEH No, A-ANDOV0605.00
Mr. David Berkowitz, P.E.
City Engineer
City of Andover
1685 Crosstown Blvd, N.W.
Andover MN 55304
Dear Mr. Berkowitz:
Enclosed are eight copies of a draft report analyzing the City's options to create a railroad quiet zone at
six at grade railroad crossing within the City of Andover. After your review, we will forward it onto the
BNSF and Anoka County for their comments,
If you have any questions, do not hesitate to call.
~hort Elliott Hendrickson Inc. (SEH@) I
Sincerely,
David McKenzie, PE
Project Manager
do
s:\ae\a\andover\060500\reports&specs\r\rr quiet zone study.doc
Railroad Quiet Zone Study
Andover, Minnesota
SEH No. A-ANDOV0605.00
August 2006
I hereby certify that this report was prepared by me or under my direct
supervision, and that I am a duly Licensed Professional Engineer under the laws
of the State of Minnesota.
David McKenzie, PE
Date:
Lic. No.: 23106
Reviewed by:
Date
Short Elliott Hendrickson Inc.
3535 Vadnais Center Drive
S1. Paul, MN 55110-5196
651.490.2000
Table of Contents
Letter of Transmittal
Certification Page
~itle Pag~
Table of Contents
Page
1.0 Introduction ........... .......... ........... ....................... .................... ..... .... ...... ........ ..............1
1.1 Background on FRA Rules ................................,.....,..............,........................,..2
1.2 Risk Analysis...,....,...".........,......,....,..............,...............,............."...,...".,...,......5
1.3 Proposed Alternatives.. ...... ................. .............. ......, ............................, .....,.... ....9
1.3.1 Center Medians ....................,...........,......,..................................,............9
1.3.2 Four Quadrant Gates ....,..................,.................................,...........,......10
1.3,3 Wayside Horns ......,..................................................................,...........,10
1.3.4 Quiet Zone Implementation ..................................................................11
1.3,5 Funding ,.......................,....................................., ,........,........,...... ,...... ..12
2.0 Conclusion .................... ...... ...................................... .............. .................................15
Chart 1
Chart 2
Chart 3
Chart 4
Chart 5
Appendix A
Appendix B
Appendix C
lUst of ICharts
Crossing Data Summary ." ,....................,..... "........., ,.......,........., ..........,........3
Risk level Analysis"............,.....,...,............,.,.....,.."..,...,.......,.....",....".......... 7
Creating a New Quiet Zone or New Partial Quiet Zone Using SSMs.............8
Summary of Proposed Improvements ..........................................................13
Summary of Cost".....,.., ,...............................,.... ........., ,......... ........, ,..........., 14
lUst of Appendice~
Concept layout of Center Medians
FRA Quiet Zone Calculator
Automated Train Horn
SEH is a registered trademark of Short Elliott Hendrickson Inc.
Railroad Quiet Zone Study
Andover, Minnesota
A-ANDOV0605.00
Paoei
I July 12, 2006 Rev 8/14/2006
Railroad Quiet Zone Study
Prepared for Andover, Minnesota
1.0 Introduction
The City has been concerned about the impact of the railroad noise to the
development of the City, Over the past several years, there has been increase
in residential development near the BNSF Railroad mainline track. The train
noise is generated by the train horns blowing at the six mainline grade
crossmgs.
In the 1996 legislation, the federal government preempted local and state
governments from regulating train horn noise. In 2005, after many years of
investigation and rule making, final rules regulating train horn noise was
adopted. There are six public grade crossings that the City would like to
establish a federally approved railroad quiet zone.
The new Federal Railroad Administration (FRA) rules provide a mechanism
to evaluate how the City may minimize the noise caused by the trains. The
rules provide for communities to create quiet zones where trains are exempt
from horn regulations.
There are three basic options for the City to reduce noise.
1. Permanently close or grade separate (bridge) the roadways from the
tracks
2. Install wayside or stationary horns at a crossing.
3. Comply with the FRA rules for a full-time or a nighttime quiet zone,
Permanent closures have limited support from the local community and a
grade separation is a long-term project.
Wayside or stationary horns are a relatively new technology that has recently
been approved for general installation, The wayside horn replaces the train
mounted horn with a horn mounted at the crossing. The wayside horn is
activated by the crossing signal system. The Road Authority is generally
responsible for installation and maintenance of the system. The noise level
is comparable to a train horn, but it decreases the noise impact area. The
stationary horn works well in non residential areas, because the
immediate area near the crossing is subjected to the full noise of the horn
for 25 seconds, rather than a gradual increase as the train approaches, The
A-ANDOV0605.00
Page 1
wayside horn was authorized in the quiet zone rule packet, it is technically
not in a quiet zone. It is considered the same risk level as a train mounted
horn.
The FRA quiet zone rules allow a community to establish a quiet zone
provided a series of conditions are met. The community has the option of a
24-hour per day zone or a nighttime (10:00 p.m. to 7:00 a,m.) zone. The
process of obtaining either one is the same.
Chart 1 provides a summary of crossing characteristics for the six grade
crossings within the City of Andover,
1.1 Background on FRA Rules
The FRA was directed in the early 1990s to establish national standards for
locomotive horns at public grade crossings. After careful research, the FRA
released draft rules in 2000. In December of2003, Interim Final rules were
issued, and on April 27, 2005, the Final Rules were adopted. These rules
preempt any state or local laws related to locomotive train horns.
The Final Rules have four distinct parts:
1. Railroads must sound the horn 15 to 20 seconds prior to a train's arrival
at a grade crossing, but not more than Y4-mile in advance of the crossing.
2. The rules describe a minimum and maximum volume level for a train
horn. (96 dB (A) and 11OdB(A)).
3, The rules outline a new test procedure to determine horn compliance.
4. The rules have provisions for local communities to establish quiet zones,
where railroads are exempt for blowing the locomotive horns.
There are six types of quiet zones. Four of these quiet zone types provide for
a transitional process for preexisting train horn bans. The City does not meet
these requirements, The two types of zones that the City meets are a 24-hour
quiet zone or a partial nighttime quiet zone. The partial quiet zone would run
from 10:00 p.m, to 7:00 a.m. The requirements for either a full-time or partial
nighttime quiet zones are the same, The City can choose which type to
establish. Communities that have chosen the part-time zone reasoned that
risk associated with no train horns were greatly reduced at night because of
the decreased traffic volumes.
Quiet zone issues dominate the rules and are of most interest to local
communities, even though the three other parts will help to reduce noise
impacts. The FRA has incorporated flexibility in the process to create quiet
zones, but has also made the process complex. The concept utilizes a risk
index approach that estimates expected safety outcomes. Risk is averaged
over the railroad crossings in the proposed zone and compared to a national
risk level (NSRT), This risk analysis computes a Risk Index with Horns
(RIWH) and a Quiet Zone Risk Index (QZRI). This analysis determines what
crossing improvements are needed for a community to establish a quiet zone.
At a minimum, all new quiet zones must have railroad signals with gates.
The FRA has provided an Internet site (www.fra.dot.gov) to allow for the
calculation ofthe QZRI and RIWH and NSRT, and is commonly called the
Quiet Zone Calculator.
Railroad Quiet Zone Study
Andover, Minnesota
A-ANDOV0605.00
Page 2
~
III
E
E
:::l
....en
t:1ll
Ill'lii
.co
Om
r::
'jjj
en
o
..
o
.. 0 J!l "
:> 5 ..c '" N
C p., ~ .~Q) * (:!
.. 00 0 00 0 ] ....l.. '"
~ 00 u V) '" V) '" '<t 0 ;!~ 01)0 E- '" 00 "
'" Id N 0 ~ " ~
~ ~ P<: "i. '" ~ ~ '" .S ..c >- C\ "
U N ~ U ~ l:l
. '0 ~ ...t:.~
... 0 '" ~ 5
co c oj
... -< Ei: u
~ .... ~ J!l
" "
'i: > f<) Q) ..c '"
C a:I 0 0 > .~~ N
'1:l t- * (:!
.. '0 ~ ~ '<t .~ ....l oj E- '" N
... 00 <Il ,...: 0 '" '<t 0 '<t 01)0 " 0 ~
'" '" -< '<t f<) N ...:; ~ '" 0 ~ ~ ~ >- 0
..J ~ <0-. N N ] "S ..c U N "E
'0 0 <Il ~ ..s:: .~
'E 0 0 ~ ~ ~ E=
'" U P<: Ei:
3: I
.. 0 J!l "
:> 5 ..c '" 00
c ., 0 .~1IJ ~
.. N 0 N t- o ] ....l.. * '<t
> 00 u ::r: Ol 0 V) '<t 0 '<t 01)0 E- '" 00 2
~<- V) 00 ~ N 0 ~ ~ "
~ oj -< '" ~ '" ~ "S ..c >- C\ "
'0 "'" <Il N vi P<: U ~ l:l
~ ..c.-::::
... 0 0 u ~ ~ 5
CD c
... -< Ei: u
..; 0 J!l I"
>
in 5 ..c '" 0
~ .~Q) I:!
c 0 0 00 '" 0 ~ ....l.. * 00
;c 00 u ~ '0 0 0 '<t 0 '<t 01)0 E- '" 00 2
'" N 0 ~ ~ "
0 V) oj P<: "1. '" ~ '" "S ..c >- C\ b
... ~ "'" U N '" U ~
I/) '0 ~ ..s:::.~
I/) 0 0 ~ ~ 5
c
e -< Ei: u
u
..; 0 J!l "
> 5 ..c '" 0
in ., '0 .~Q) :::!:
00 0 ~ C\ 0 "a ....l.. * 00
... t- U ::r: C\ 0 V) '<t 0 '<t 01)0 E- '" 00 "
.. V) 0 N 5 0 N ~ " ~
-< V) '" ~ V) ~ >- C\ "
> ~ oj f<) N P<: .S ..c ~ l:l
0 '0 -a <Il ~ ~.~ U
'lJ 0 U c
c ~ 0
<- Ei: u
..; "
> 0 J!l
in 5 '0 ..c '" C\
.. U ~ f<) 0 .~llJ C :::!:
... t- o ~ Ol 0 ~ ....l.. 0 '" '<t
'" t- U ::r: V) '" N '<t 0 0 '<t ~ 01)0 "-" " 00 2
..J '" oj ~ N '" ~ '" ~ .S ~ 0 >- C\ "
~ -< f<) ~ ~ l:l
... '0 "'" ~ ~
.. 0 <Il ..c ,_ 5
... 0 c U ~ ~
c -< Ei: u
:>
al
u I~ ~ ~
\>=: Cl ....
<0-. e I ~ 0
.. c ~ Cl ~ ..
E 0 I~ '" 01) u "
0 c '" c u
'" "-" .?;> I.~ '@ c "~ ] '6 ~
oj '1:l
Z 'I: 6h ~ '" .... ~ '" .s
0 0 '" '@ ~ '" '1:l I~ "'" " ;:>
'lJ Z -B 0 Cl '5 " I~ c " ~ ~ c ~ ] <Il
'" '0; Po 8 "@ -~ 0 ;:> I~
0 E- ;:> " 2 " :::1 ~ c I~ <0-. U 0 '"
Q: -< Cl gj'f:; ....l oj <Il :E c
0 ~ ~ o " ~
'1:l <0-. <0-. C B ;:> <0-. ",~ "a ~ "0;
Cl '1:l ~ ~Cl " 0 ~ 0 e 0 ,~ 2 '"
oj ~ I~ ~ '~ ~" ~ 8
<Il 0 0 ~::': 0 0 0 IS 0 oj
::J P<: P<: <Il Z P<: Z <Il Z E-Cl <Il p., Cl
"
S
~
01)
c
.~
~
~
...
'"
c
o
U
*
Railroad Quiet Zone Study
Andover, Minnesota
A-ANDOV0605.00
Page 3
There are five predetermined engineering improvements called
supplementary safety measures (SSM) that can be used to lower the QZRI
and brings a crossing(s) into automatic conformance with the rules. The five
SSMs include the following:
1. One-Wav Streets with Full Gate Coverage - One-way streets allow for
the gate( s) to be placed on the approach lanes of traffic, and vehicles
cannot go around the gates. Vehicles also cannot get trapped between the
gates.
2. Nighttime Closure of a Crossing - The roadway would be closed by the
use of some type of barricade( s) that can completely close off the
crossing. This would be used if only a part-time quiet zone is requested.
The closure must include a process that will verify that a crossing has
been closed for the night. Other cities have used an automatic barricade
that is locked into place and provides a warning light to the train that the
crossing is closed.
3. Permanent Closure of the Crossing - This means that the roadway would
be closed and barricaded permanently. The railroad signals and surface
would be removed. Under the FRA risk computations, the closure allows
a credit in the risk assessment that may allow other options at the
remaining crossings in the zone.
4. Raised Center Medians - Raised center medians a minimum of 60 feet
long (100 feet long preferred) are installed to prevent vehicles from
driving around the gates. If the median is less than 6 inches tall, traffic
delineators are required. If a roadway is of sufficient width, medians are
relatively inexpensive to install. The disadvantage of medians is the
disruption to local access.
5. Four Ouadrant Gates - Four quadrant gates are regular railroad gates
with two additional gates being added to the exit traffic lanes. This will
completely close off the crossing, The exit gates are on a delay that will
allow a vehicle to clear the crossing before descending. Traffic loop
detectors may be required to detect if a vehicle is stopped on the tracks.
The advantage of this SSM is that no additional roadway work is usually
needed for the gates to be installed. The disadvantage is that there is a
potential to trap a vehicle, they are expensive to install, the City may
assume maintenance ofthe loop detectors and the City may be
responsible for the extra maintenance for the extra gates. .
If SSM are not practical, Alternate Safety Measures (ASM) can be proposed
to the FRA for individual crossings. These ASM can be non-engineering
solutions, such as traffic enforcement, photo enforcement, or education
programs. Other engineering solutions can be proposed if shown effective in
improving safety. These may include different styles of medians or a new
type of warning device. A community is required to provide documentation
that an ASM is effective. This documentation may require video camera
installation, review of police efforts to enforce crossing violations, or a
record of public service announcements. The level of documentation is not
well defined in the rules. The two most popular ASM are:
Railroad Quiet Zone Study
Andover, Minnesota
A-ANDOV0605.00
Page 4
1. Photo Enforcement of Traffic Violations - This is a system of cameras
that monitor the railroad crossings and will issue traffic tickets to
violators. In Minnesota, this is against state law.
2. Increased Traffic Enforcement - This is a program that targets traffic
violations near railroad crossings, The Quiet Zone submittal would
outline and document what the City has done to enforce traffic
violations,
The FRA rules require communities to notify the FRA, the state Department
of Transportation, and the railroad that they are interested in creating a quiet
zone and provide a process for these interested parties to comment. The
process has some built in time periods and that take 4 to 6 months to
implement. If SSMs are installed according to the rules at all crossings, the
community will receive an automatic approval for a quiet zone. If ASMs or
other exceptions are needed, the FRA review and approval will be needed,
The rules are silent on the liability to either the railroad or communities who
enact quiet zones. In the record of decision, the FRA discusses railroad and
community liability. The record of decision (page 66), the FRA says "As for
the public authority that creates a quiet zone in accordance with this part,
FRA expects that courts will apply the standard of care set by this rule,
inasmuch as any quiet zone established in accordance with this part will have
been established in accordance with federal law and FRA's intention to
preempt State laws expressly stated." This rule, in effect, establishes the
standard of care for the creating of quiet zones and the sounding of train
horns, providing reassurance both to railroads and communities that no
plaintiff will prevail on the basis that an audible warning has been withheld.
Further, this rule making does nothing to undermine the sovereign immunity
of State and local governments, where they have asserted it. .
The rules encourage joint establishment of quiet zones where there are
multiple roadway jurisdictions. Generally, one government agency will take
the lead and coordinate the process.
1.2 Risk Analysis
The FRA has developed a risk analysis to evaluate proposed quiet zones, The
analysis is based on their national crossing inventory and accident databases,
The basis in an accident prediction model that uses 12 criteria to determine
the probability and severity of a vehicle-train crash at each crossing. Using
these calculations, a National Significant Risk Index (NSRI) and an
individual Risk Index With Horns (RIWH) can be developed. They have also
compare crossings that have had quiet zones in-place with non quiet zone
crossings and have developed a QZRI and an effectiveness rating for each
type of SSM.
Using their Quiet Zone Calculator, these various numbers are computed and
provided the basis for what needs to be done at each crossing in order for a
community to obtain a Quiet Zone. Chart 2 summaries the calculations for
the City of Andover.
The preliminary analysis of the six grade crossings in Andover shows that all
have the minimum railroad signals with gates, but the combination of high
Railroad Quiet Zone Study
Andover, Minnesota
A-ANDOV0605.00
Page 5
traffic volumes and high train volumes, the Risk Index with Horns (RIWH)
requires additional improvements, Chart 2 summarizes the risk calculations,
Chart 3 is a process flow chart outline the steps needed to obtain a quiet
zone.
Railroad Quiet Zone Study
Andover, Minnesota
A-ANDOV0605.00
Page 6
.!!!
CII
>-
iij
('ole
1::<(
C1I-
.cCII
o~
..J
..ll::
CII
ii2
-
e
CI)
E
E
0
(,)
I- 0 0 0
It: <'l <'l <'l
0 0 0
III r-=- r-=- r-=-
z ~ ~ ~
~ ~ I'- V)
III 0 I'- '"
... a- a- '"
CI) 00 r-=- r-=-
> '" 'I"
<I:
CI) p., ~ V)
10 ::l 00 0 I'-
e 00 V) a- 00 'I"
... 0 a- '1"_
00 ~ V) "'- ..f: '"
... ~ ~ .a
\0 '" 'I"
0
CI)
... ell
III CIl \0 V) a- ~
....I> 00 0 0 <'l V)
'C"C V) 'I" 0 00 \0 '1"_
~ '" v) '"
;UC \0 ~
:: 0
CIl >- 00 00
10 ::l '" 0 '" I'- I'-
e 00 0 0
... V) ~ 0 '" 'I" 00
... CI) v) 00
... ~ \0 v) <'l V) 00-
0
e ~
~ . 0 0 00 'I" 'I"
_'C 00 0 V) '" \0
01 > V) V) 0 00 V) a-
01- ~ v) v) '" 00
olll \0 <'l V)
... 0
(,)
... ....,
CI) <'l 0 'I" ~ ~
> . 00 00 V)
o'C 0 I'-
'C~ V) V) 0 '" a- 0
elll \0 '" 00 .a r-=-
<I: 0 '" 'I"
... U 0 <'l <'l 0
CI) CI) . I'-
......'C I'- 0 'I" 00 ~
cca.2; V) ""l. 0 "'- I'-_ 00
.ij....llll ~ '" <'l ~ 0'
\0 ~ 'I" I'- ~
0
-
0 E
Z .5 -5
E-< ~ ~ "~
0 ~ 1:2 1:2::E
CI E-< .<: '"
'" CI ~ ~ 1:2 ~ N",
::J ...: UV) v 0'",
Railroad Quiet Zone Study
Andover, Minnesota
A-ANDOV0605.00
PaQe 7
Chart 3 - Creating a New Quiet Zone or New Partial Quiet Zone
using SSMs
Ciscl" mer. Th '5 S..Mrnary of the rule is for in'orma~ion.J~ pJPOSlS only. E/"!ti~ies
,..bjlct tOm. N'.shoo'd refer to tn. r..llt'xt" publ s"'ed n the Feder": Reg l~ron
A;.tI127, 2~:J5. S~..ld "ny ~ortO" oft"'iJ IIJIT'M"ry conflict wit., the rule. th.l.1~gu"Gt
of'lhl rule shal~ gcvem.
UbM 1 notif<:a'tion. sil.~
homs. .,d ,"sta 1 signa..,
at.a: CrtlU ngs
Subrn t Notificaton.
lIenee homs, and .",t,all
sigl"age at ,,'I crossings
$'
,~
,~
~
&
CZs .sbbliSlootd on tlo, bas' 0
cC"1'"mon with NSRT are
11Jbjeot to ~"ual review
Railroad Quiet Zone Study
Andover, Minnesota
A-ANDOV0605.00
Page 8
1.3 Proposed Alternatives
The following is a discussion regarding the feasibility of installing SSMs at
each of the six crossings. It appears that one-way streets, crossing closures,
or nighttime closures are impractical for the City of Andover. This study
concentrates on adding center medians, adding four quadrant gates to each of
the crossings, or adding wayside horns.
1.3.1 Center Medians
Center medians have become a popular SSM alternative for local
communities because they can be inexpensive compare to other SSM options
and are easy to install.
The rules require that the medians be raised and be a minimum of 100 feet
long. In certain exceptions, medians can be shortened to 60 feet. If a median
is less than 6 inched high, delineator signs must be installed on the median.
Appendix A provides preliminary layouts for each of the crossings.
Bunker Lake Boulevard
Bunker Lake Boulevard currently is a two lane rural section roadway with
shoulders. The railroad signals with gates are spaced far enough apart that
the introduction of center medians would not require signal relocation.
Outside curb and gutters would be added and lanes shifted to allow for the
new medians.
The railroad circuitry will need to be upgrade to a Constant Warning Time
(CWT) to meet the rule requirements. The City has already requested
MnDOT and the BNSF upgrade this circuitry because of the railroad siding
to the north causes inappropriate timing at the signal.
Andover Boulevard
Andover Boulevard is a rural two lane roadway with two tracks. The railroad
signals with gates are only 38 feet apart and do not provide sufficient space
to add a median. The signal will need to be relocated or replaced.
The signals were install in the 1980s and major relocation work may
necessitate a complete replacement of the system. The BNSF has identified
that the relocation and lor replacement would be at the City's expense. The
concrete surface will also need to extended or replaced. The existing surface
is in far to good condition,
Crosstown Boulevard
Crosstown Boulevard is a two lane rural roadway. The railroad signals with
gates are spaced only 35 feet apart and do not provide sufficient space to add
a median. The signal will need to be relocated or replaced,
The signals were install in the 1980s and major relocation work may
necessitate a complete replacement of the system. The BNSF has identified
that the relocation and lor replacement would be at the City's expense. The
concrete surface will also need to extended or replaced. The existing surface
is in far to good condition.
Railroad Quiet Zone Study
Andover, Minnesota
A-ANDOV0605.00
Page 9
161 sl Avenue
161 sl Avenue is a two lane rural roadway. The roadway signals are space far
enough apart the no work would be require on the signal system. The
medians could be added and the lanes shifted. The existing shoulder width
would be reduced from 8 feet to 4 feet. There will need to be some minor
work on the right turn lane just east of the crossing.
Ward Lake Drive
Ward Lake Drive is a rural gravel roadway. The railroad signals were
installed in 2002 and are 32' apart. The railroad signals will need to be
relocated to allow for a median. The BNSF has identified that the relocation
and lor replacement would be at the City's expense. The existing timber
crossing will need to be lengthened and replaced.
181" Avenue
181" Avenue is rural two lane on the northern boundary of the City. The
signals were install in the 1980s and major relocation work may necessitate a
complete replacement of the system. The signals with gates will need to be
relocated to allow for the installation of the medians. The BNSF has
identified that the relocation and lor replacement would be at the City's
expense. There will be additional road work and possible wetland impacts
when the roadway is widened.
1.3.2 Four Quadrant Gates
Four quadrant gates systems have two additional exit gates installed
compared to a traditional signal system. These exit gates operate on a delay
to the normal gates to allow vehicles to clear the crossing, The addition of
the two exit gates requires a complete rewiring of the crossing circuitry and
generally will require the installation ofloop detectors in the pavement. Loop
detectors would detect if a vehicle is stopped on the track and would keep the
exist gate in the up position, so the vehicle is not trapped between two gates.
The rewiring of the signal system is needed because of the exit gate circuitry
is complex and needs a new controller and additional battery backup
capacity. The BNSF's policy is that the Road Authority will be responsible
for the installation and maintenance of the loop detectors and the two
additional gates,
1.3.3
Detailed cost estimates to upgrade are not available at this stage of a project
but the cost will be around $150,000 plus the maintenance costs of $2,000 to
$3,000 per year per crossing. With the age of 5 of the signal systems
around 20 years old, complete new systems may be required.
Wayside Horns
Wayside or stationary horns are a relatively new technology that has recently
been approved for general installation. The wayside horn replaces the train
mounted horn with a horn mounted at the crossing, The wayside horn is
activated by the crossing signal system. The sound of the horn is directed
Railroad Quiet Zone Study
Andover, Minnesota
A-ANDOV0605"OO
Page 10
toward the approaching vehicles so the noise impact area is significantly
reduced. The sound level is the same as a train mounted horn. The horn
system provides feedback to the train engineer that the system is working
properly.
The stationary horn works well in non-residential areas, because the
immediate area near the crossing is subjected to the full noise of the horn for
25 seconds, rather than a gradual increase as the train approaches. The
wayside horn was authorized in the quiet zone rule packet, although it
technically is not in a quiet zone. It is considered the same risk level as a
train mounted horn,
The Road Authority is generally responsible for installation and maintenance
of the system. The installation of wayside horns would cost about $50,000 to
$75,000 per crossing plus the cost to upgrade the signal circuitry. The
circuitry upgrades would be in the range of $25,000 to $50,000 per crossing,
There would also be ongoing inspection and maintenance costs of the system
in the range of $1~,000 to $J~,OOO per year.
Railroad Controls Ltd in Texas is the patent holder for this svstem.
Appendix C provides additional detail about the svtem, Their web site
(www.Railroadcontrols.com ) contains complete information.
1.3.4 Quiet Zone Implementation
A community has flexibility in establishing a quiet zone, All crossing within
a City do not have the included in a quiet zone, A plan to phase in a quiet
zone can be devised.
There are three considerations that need to be accounted for:
I. The minimum length of a quiet zone is one half mile. (one quarter
mile in each direction of the crossing) All crossings within a quiet
zone must be included. In Andover, the crossing spacing allows for
each crossing to be treated individual.
2. The risk analysis allows that crossing risk can be average over the
number of crossings in a quiet zone. There may be advantage to
grouping crossings into a quiet zone.
3, Consideration of railroad operations should be accounted for.
Multiple quiet zones in an area create confusion for the train
engineers. A logical plan to implement from the south to the north
should be considered.
Ouiet zone implementation can be phased in. The minimum Federal
requirement is that each Quiet zone is one half mile long and contain a
minimum of one crossing. The spacing of the crossings in Andover allows
each crossing to be considered a separate quiet zone, so the Citv could
implement up to six separate Quiet zones.
Railroad Quiet Zone StUdy
Andover, Minnesota
A-ANDOV0605.00
Page 11
1.3.5 Funding
Quiet Zone improvements can be funded by Municipal State Aid (MSA) funds if
the improvements are on a Local Municipal State Aid Route or a County State
Aid Highway (CSAH). Other local funds shall be utilized if the roads are not
designated MSA or CSAH. In Andover, Crosstown Boulevard is the only non-
State Aid Street.
Railroad signals and signal upgrades are normally funded by Federal or Railroad
funds. The Federal funds are part of the Federal Transportation safety
improvement program which are distributed through the Met Council and
MnDOT. MnDOT policy on quiet zones is that Federal funds will not be used
for quiet zone improvements, but would be eligible if the signal system is
antiquated or already scheduled for upgrade. The Met Council solicits potential
proiects every two years and the next solicitation in scheduled for the Spring of
2007. The waiting list for these funds is about 5 years,
The Railroad has participated in signal upgrades if the signals are antiquated or
they have changed their operations that affect signal operations. They do not
participate in quiet zone funding.
Railroad Quiet Zone Study
Andover, Minnesota
A-ANDOV0605"OO
Page 12
en
-
r::
Gl
E
Gl
>
o
L-
a.
E
..,-0
t::Gl
III en
.cO
Oa.
2
a.
....
o
~
III
E
E
:J
In
Oll ~. <n
.5 ~ ~ N
... 0.. '" U a
o uf .0.. g 0 vr 5
~ [;j ~ ~ ~ ;, [;j 0;.R ,.
"- ~ E .~ "- 6b 0;, '"
-g ] ::l 1;> ::l 'S ].<;; ijj 1:l
lIlaOll~""a ~~
~ ~ o<J "g '5'5 ~ ~] a
ec-eeOll)cElUb.Q
Q. QJ ;::S +-> .~"'9 QJi ro u ~
u u Vl "'0 j (,) U cd'-
'"d "'0 .;:j ro "'t:l 0""'- ~
"'0"'0.-&.... "'0'0 fro
<<<<B~<p<:p<:b
Oll
<=
"<;;
'"
o
b
"
~
"
b
5
"
" ..
~.Oll
l:l >> "
0ll~6
<= ...
je~
"
.B
.l!l"'"
" ..
Q) .~
~ [;j
00.
u
""
o
"
Oil:;:!
<= '"
.U} ,..c:
"''5
b ~ ~
"
"515 ~
1.5 ~ a
.s~ $!
'" 0.. "
~.", .. g
ro cd ::>-. 0
j:;.E ~ ."
011)"'00
~>.."'"
~OeN
>>
+-' ~ 0lJ ~
'" .. <=
a ~.- ."
0.."'>
0.." 'C
"'~ ""r; <=.",
<= .. Oll" ~
OJ <= <= '" ~
'6 Oll'- >>E "'::l
0,) 'r;) ~ ro .a '!::"l
ap<:e~_"g
~ p<: " OJ ijj ....
..... Q) i==: 0 (,) 0 tI)
c..... Q) J-o ro tI) ~
"..t-.~tI) 0
o u Vl "'0 ::S.....
"'d 0 :::s Clj u ti
"'0 "ii 5 ~ J-o.~ 0
< P<:....l<<BClS!
<n
<= ~ -
o .~ <= ~
" 0 .. a
~ "'O~'"B -
~ ~ [;j w <= ~ OJ"
'6E~",6b.::l.", '6;':;6b~
g B e [;j'<;; 8' g ~ g ~ '<;; g
~ ....... .j..l ..... ~ 0 J-o !: ~..f5 ~ 0
tl~~] c~gfUcd~o
-'C " E g"- ::l .. ~ 0 " <= ~~
ijj .", .",,,..,, ijj .... - " '"
o t;.V) fU cd 8 c.8 6 (,) 5 ~ oS .5
"'0 .::s ....... ...., u "'O..c !::: "'0 '"0 0 00 ~
.",-6' ~ ijjS! ".;:: s.",:;:o; ijj e
< < " U ~.D ~._ < ;:> P<:....l "
~ '- ....... ui
'~ .8 ~ ~ .~
'.,z::: ~ '"0 ..... '"0
o '"0'- C Q)
~ '@ tI) 0 e
c ~ ~ ~-5
d) ~ 0 Q) cd._ U
~ 0 '" ~~~g
" <= ....>-<p
a .0 .e ;::S :.ei'~ 3
U ~ 5 2Q)~B
] ..>> ~. 13 ~ ~ "
~.. .. Oll <='C '" g
€ .. ~ ,. 0ll.5 8 0.. a 0
::l .D~ "'g ~.5 ~ 0 Q) U
Uo .9o:;:!eo~:;:!oo
~NCI)o-.::t...tn-.::t
N
o
o
N
.5
.. '"
Ollo;
.."5 6b
>. ~ ......
~e.;
.", " OJ
.. .... 0
o " ....
5-0..0:-=
o;.~ l:l
[;. ~
o~z
~'-
.. ~ 0
~""O~
...... cd.....
'" 0 '"
"'....-
0<=",
G 0 a1
" '" <=
Q) fU 0
b"" '" ..
s"3""O ~
U 0 [;j"-
.<::~'"
'" - '"
. "0
N 0 ~ ....
M c;;;> u
GI"1Il
UGI_
<= GI cu v-. 00 v-. 00 00
cu .! " ~
ti GI,g "'" '" '" "'" '" "'"
ClOen
..... ti u t'"')
Oo~[:::Ol
~Z.s! ~~
::J :i ~......
iU
" "
ClO
Ci)"
cu
'CE
cu ...
00
......
=c
cu-
D:
'"
B 6
b\o
.<:: "
.~ ;g
'" <=
0; 0
6b'~
Ui::8
"''' <=0 '"
B c OJ
cd;=: ~ ~
Oll <= _ Oll
..c'(; ~ .s
.~ e Q) .....
~ <= .", ~ ~
tI) 0 C cd tI)
0; f-< .. 0 j:; 0; f-<
6b:::~'~" 6b:::
Uiu~::8~Uiu
o
3
o
U
OJ
.:<
o
<=
<
....
00 '"
.-'"
"'0
~'"
~~
.,;
>
~,....,
a:l""
~~
>:r:
0<
""en
<=u
<~
o
3
o
U
OJ
.:<
o
<=
<
~'"
0""
00 .
'" '"
~N
"" ~
o
.,;
>
05
~,....,
Boo
"'~
~P<:
....U
U~
'" '"
" "
1;i 1;i
Oll Oll
-5 -5
'~ '~
'" '"
o;f-< o;f-<
.~::: .~:::
enU enU
0 ~
>
3 0
.",
0 <=
U <
.. ""
~ 0
<= 0
< u
>-.- a:l.-
N", ~~
00 .
'" 00 '" .-
~N ~N
"" ~ "" ~
0 0
~ "
>
" 8
::l~ "'"
ijjO ~~
>N
<:r: ....len
'" < "2<
~en ..en
""u :::::8
~~
'"
"
1;i
Oll
-5
"~
'"
O;f-<
.~:::
enU
o
3
o
U
..
~
<=
<
~
00 ~
00'"
"'''''
~N
"" ~
o
"
::l~
ijjN
>N
<:r:
'" <
~en
oou
~~
" 0
o 3
+:; 0
.!:! U
'C
,~ ~
-'l~
.,;
>
~05
;~G'
'C oj ~
cu....l~
o ~:r:
D:.:<<
3en
a:l8
Railroad Quiet Zone Study
Andover, Minnesota
A-ANDOV0605.00
Pace 13
-
UI
o
o
10 ...
1::0
C'lI~
,cC'll
oE
E
:J
U)
.. ~i
:> 0
<: 0
~ 0 0
0 0
; 6 v>
~ V) r-
~ '"
co '"
...
'"
.. ~
>
'C
C 0 0
.. 0 0
... o. 0
.. i 0 v>
.... V) r-
'\:I ~ '"
... '"
..
== '"
.. ~i
:> 0
<: 0
.. 0 0
~ i o. 0
0 v>
~ V) r-
~ '"
CD '"
... '"
,j ~i
>
iii 0 0
<: 0 0
0
~ I 6 q
0 V) V)
- ~ r-
ell '"
ell '"
0
...
l.) '"
,j ~1
> 0
iii 0
0 0
... I 0 0
.. 6 v>
> V)
0 ~ r-
'\:I '" '"
<:
<C '"
.. I
... 0
.. 0
..... 0 0
...'\:1 0 q
...2: ~ 6 V)
~aI V) r-
~ '"
:> '"
aI
'"
*
'"
~ * I
oj *
0 '"
'" g
!a g
'6 .e ::c:
" ~
::E oj
16
~ 0
.... ",p
Ii ;:l
0 .":l
u ~ lZl
'"
....
'"
o
...
..
...
c
OIl
c
..
....
c
.;
e
-;
=
c
c
<
<:>
<:>
<:>
<'11
lit>
EA
o
~
<:>
<:>
<:>
.....1
<il
....
.....
o
tl
Vl
o
u
.,
u
&i
<:
.,
.S
S
Ol
~
..,
"CI
"CI
OIl
o
....
....
'"
o
...
-;
....
c
..
e
..
..
...
.5
..
.c
....
.~
Vl
;:l
~
oJ<
'"
:a
....
..
Railroad Quiet Zone Study
Andover, Minnesota
A-ANDOV0605.00
Page 14
2.0 Conclusion
The next steps for this project would be:
· The City needs to decide which crossings will be included in the Quiet
Zone. How to phase the improvement will be a important decision.
· The City needs to decide if it is 24-hour or partial night time zone.
· The City needs to decide on what options will be done,
· Reach agreement with Anoka County on quiet zone improvements.
· Prepare final plans and cost estimates.
· Notify the Railroad, County, and Mn/DOT about the City's intention to
establish a quiet zone.
· Negotiate an agreement with the Railroad for the signal work.
· Construct the proposed improvements,
· Notify the FRA, Railroad, and Mn/DOT that a quiet zone has been
established.
s:\ae\a\andover\060500\reports&specs\r\rr quiet zone studyreviseddoc
Railroad Quiet Zone Study
Andover, Minnesota
A-ANDOV0605.00
Page 15
51 ~ ~~ ~~~ i ~~ i~ ~i ~ ; i~ ~~ ;
{:.
Ol
"
<:
Ol
> I -I ~I ~~ gl ~I ~I ~I ~I ~I ~~ ~I ~U~ ~~ ~1 ~I
<C
;;;
0;
-
~I ~ ~~ ~ ~~ ~ ~~ ~~ ~i ~ ~ ~~ m~ ~
Ol
>
.<:
0
Ol
-'"
'" I -I 0101 01 g! el ~I ~I ~I ~~ ~I ~~ ~~ ~~ ~j 3\1
...J
'E
~
51 ~ ~ ~ ~~~ ~ ~~ i~ ~i ~ ~ ~~ ~~ ~
Ol
" {:.
<:
Ol
>
<C
;;; I -I ~I ~~ ~1:iS1 ~I ~I ~I ~I ~I ~I ~~ ~~ ~~ 0101
co
-
-g 51 ~ ~ ~ ~~~ ~ ~~ I~ ~i ~ I i~~ ml ~
a; {:.
<:
'" ~
<:
"!!1 B
'0 co '" I -I ~I ~~ ~~ ~I ~I ~I ~I ~I ~p~1 ~~ ~j ~j ~1 3\1 ~j
$ Ol '"
::;: 0 Ie
'" 0
"~ ~ C:' u
Ol ...
;;; c
Ol z -
w U ::;: co
- '0 ~ ~ @ ~m~ ~ ~~ ~I ~i ~ i i~ ~~ ~
'" ~
0 Ol
Ol Ol '" 51
u <: > '5 '0
0 0 Ol > {:.
N '0 0:: a;
'" <:
<: 1;) <C co ~
:~ ':'j 0 Ol
0 >
~ C:' 0 I -I ~I ~~ ~I ~I ~I ~I ~I ~I ~~ ~I ~j ~j ~~ ~1 ~I
'0
11. '0 - <:
'" j::: <C
,g
"iij
0::
-g ~I ~ ~~ ~~~ ~ ~~~~~ ii ~ i ~~ ~~ ~
a;
Ol
-'"
'"
...J
~ I ~I ~I gl ~I ~I el ~I ~j ~I ~I ~I ~I ~~ ~~ ~~ ~j 01
Ol
-'"
<:
"
'"
15 ! ~~ ~;; ; ~~;;~ ....1....' -I ....1 ~I""I ~I ~I
"<:
11.
-
"i':
~
~I ~ ~I ~I ~I ~I tl ~ ~ 01 01 ~I ~I ~I
~I ~11Il III G G ~I ~I ~I ~~
15 -'"
'" "'~ ~ ~ "
" " " Ol o 3:
~I 0 gill S "" 3: Ol
<:
'E "E ~ Cl '" Ol e - u
3: E g j '" '"
<: ,,e .ao O/l " E E <: 't: I
"- <: 2 u: Ol "
,Qm '" ,- e <: <: 0 en CI) 11
roOl E _E " l!? Ol E 0 0 U
Ol " " u u ~ -'" ~ U <: )1 '0 '0
N > E (J ..t::: <: <: '" '"
=0 0 '" > u 0 ,g ~
DE Ol ~~ ~ ... u .c lS Ie "in .~ ~ ~
OOl > N U <: E l!! Ie "iij
'" <'tI== ... . 0 )( '" <:
::;:0:: 11. Ill::;: '" '" U w W I- W 0:: 0:: W
l ~! I il~1 J J III I III i~
If ~'!luu.. !I H!I I~
IS ~ u au~ n ~ H i I II H
if ~ooo~~~ ~~ !!!! ~~
)l ~!Iia~a JJ } ~I ~ ~ aa Ii
Jf ~~!8~~~ ~~ ~!!! 00
Jl ~! I alaa a I I AI I IIII al
" f ~ ~ ! J~~~ ~ ~ ! ~!! I ~I
Ii IS P p~u n ~ II i I II ~i
" . Jf ~ ~ ! ~~~~ ~ ~ ! ~!! I ~
t l ~!! I ~ ~ al J ! I II I I I a ~ a
)f ~ ~ 8 ~~~~ ! ~ ~~ !!! ~ 0
~ iia~llllal~""" ..~.. i~
~ ~~~~tt~~ ~ ~ ~ ~~tt~~ ~ ~ ~ ~ ~~tt ~ ~ ~
J" Hi Ii J J I II
~~ ~ ~~~ ~~ ~ ~~ ~ .~.
f ~ 00 0 ~~~ ~~! !!! ~~
j] ~ !I I ~~m }~} II I a aa
jf ~ ~! 8 a~~ ~8 ~ !!! 00
] ~ !I ill! !I I II I i III
f ~ IJ ! Ig~ !~! !!! I~I
I ~] ~ !I I III }~ I II I . I II
. JI jf ~ ~! ~ ~~~ ~~! !! i I~
J l IJ ! all I~II JJ I I ja
f ~ Ig ~ ~~~ !g~~ !!! JO
I I ~~ l iil I~I~ ~~ ~ ~I~
~ I !i ! ~~a ~~!a ~~ ~ Iii
J
j'.j n II
------- -- - -- - --- ---- -- - - ---
...;; a
11 !
UI
!lj
~l I
~~
~~
ill
Appendix C
Automated Horn System
Automated Horn System
.!I!
ImDrOye the Quality of Life in Your Community
with the Automated Horn System (AHSTM)
AHSTM is an Innovative railroad slanallna device that slanlficantly
Improves safetv for motorists and pedestrians and dramatically
reduces the amount of noise pollution created by train horns along
rail corridors in populated areas.
How It Works
AHSâ„¢ is a stationary horn system actiyated by the rallroad-hiahway
Grade crossinG warninG system,
AHS Research & Study
AHS and Train Horn Comoarison
AHS Installations
AHS in Action
The AHSTM is mounted at the crossinG, rather than on the
locomotive. to deliyer a lonGer. louder. more consistent audible
warninG to motorists and pedestrians while eliminatina noise
Reduces Noise by 98%
&ouncl Lw.1 Tl1ln Horn AHa 110m PrtctI1l
(dBA) Ana (wn) Am (ac,..) Redllcllon
>70 265 31 86%
..eo 171 I> 1I7%
>90 31 <1 980/.
...........
..I........
"'_"_NIo
Tr<Cllill HUrl I ~uumJ CUlIluur
.............~.....
.
...........u \
.'
, i
l l
",
, "
'".. ,~
'., '\
,
. <
\ .... ,r j~
"..". ~:tl,"::-.,"/
~!
.-.... --I
Automated Horn System Sound Contour
Dollution In nelahborhoods for more than 1/2 mile alona the rail corridor,
AHSTM sounds like a train horn because the tone modules In the AHSTM horns were dialtally
recorded from an actual locomotlye horn. After recelYlna the slanal from the railroad's track
circuit warnlna system. AHSTM mimics the train horn warnlna by cvc1ina throuah the standard
railroad whistle oattern until the train reaches the crosslna.
Once the train has entered the crosslna AHSTM stoos soundlna Its horn. A confirmation slanal
notifies the locomotive enalneer that the AHSTM Is functlonlna
orooerly.
When the locomotive enalneer sees that the confirmation
slanalls flashina. he will not be reaulred to sound his horn
unless he detects an unsafe condition at the arade crosslna.
Coordination with the railroad ooeratlna comoany Is essential
since the AHSTM Is directly connected to the railroad's crosslna
slanal-warnlna system, The railroad ooeratlna comoany must
Issue Instructions to their train crews reaardlna the soundlna
or non-soundlna of the train's horn,
.
"
What residents 8< officials say
about AHS in Ames, Iowa
AUG-14-2006 02:16 PM HARSTAD MANAGEMENT
6516363422
P. 02/02
~
Harstad Hills, Inc.
2195 Silver I.ake Road
New Brightor,. MN 55112
Office (651) 636-9991
Fax (651) 636-3422
August 14. 2006
Dave Berkowitz
City of Andover
1685 Crosstown Blvd. NW
Andover. MN 55304
Subject: Railroad quiet zone donatio'l
Dear Mr. Berkowitz:
Thank you for taking the time ta mee' with me last week to discuss the
railroad quiet zone study. It is my understanding that due to a lack of
funding. the Crosstown Boulevard railroad intersection will not be
considered at the present time.
As you are well aware. we have an 87-lot development at the intersection
of Crosstown Boulevard and the railrclod crossing. Needless to say. the train
whistle has an adverse effect on lot s<lIes in our development. For this
reason. I would propose the followin~ general outline.
I would make a $100.000 cash donation to the city for the purpose of
creating a quiet zone at the intersec1ion of Crosstown Boulevard and the
railroad crossing. The monies would be payable to the city upon the award
for construction by the city council. 11e construction must be completed by
6/1/07.
Should the city decide to do an areo..assessment for completion of this
project. this offer would be withdraw!" .
If you have any questions or concern::. please feel free to call,
Sincerely,
d/-
Mnrtin N I-Inrdnrl
@
5'\", ,. ". .~,
\. ~;. \,~.
NDOVE 1\
1685 CROSSTOWN BOULEVARD N.W. . ANDOVER, MINNESOTA 55304 . (763) 755-5100
FAX (763) 755-8923 . WWW.CLANDOVER.MN.US
To:
Mayor and Council Members
CC:
Jim Dickinson, City Administrator
From:
David D. Berkowitz, City Engineer
Kameron Kytonen, Natural Resources Technician
Subject:
Update on NPDES & New Requirements/06-01 ~ Engineering
Date:
August 22, 2006
INTRODUCTION
The City of Andover is required to comply with the latest NPDES regulations set forth by the
Minnesota Pollution Control Agency (MPCA). Just recently, the City was chosen as one of 30
cities required to formulate a Non-Degradation Report. A select group of cities was chosen
primarily because of factors including current population and growth rate.
DISCUSSION
This new requirement stems from a May 2003 Minnesota Court of Appeals decision to mandate
the MPCA to address non-degradation, which is generally defined as the decline in water quality
since 1988 because of the effects of storm water. This implies that the selected group of cities are
required to perform a study to determine if they are new or expanded significant dischargers and to
develop best management practices (BMP's) or infrastructure improvements to keep pollutant
loading of receiving waters at levels consistently attained in 1988.
The City will be required to assess the change in storm water discharge loading using a model to
address at least three criteria including volume, total suspended solids (TSS) and phosphorus and
create a report to mediate significant new and expanded discharges if found to exceed the levels in
1988.
To adequately follow through with these requirements, staff has sent out and received proposals
from three different engineering firms. The quotes received are as follows:
Contractor
WSB and Associates, Inc,
Wenck Associates, Inc.
Houston Engineering, Inc.
Quote Amount
$32,000.00
$32,016.00
$46,500.00
Wenck Associates, Inc. is the c<;msulting engineering firm for the Coon Creek Watershed District
and is very knowledgeable with the City of Andover. Staff recommends that Wenck Associates,
Inc. be selected to perform the study for the City.
Mayor and Council Members
August 22, 2006
Page 2 of2
BUDGET IMP ACT
The study would be funded by the City's Storm Water Utility Fund.
ACTION REOUESTED
It is requested that the City Council award the study to Wenck Associates, Inc. in an amount not to
exceed $32,016.00
Respectfully submitted,
David D. Berkowitz
City Engineer
~nJjL
Natural Resources Technician
CJ~CJ.
~NDbVE~
@
1685 CROSSTOWN BOULEVARD N"W. . ANDOVER, MINNESOTA 55304 . (763) 755-5100
FAX (763) 755-8923 . WWW"CI.ANDOVER"MN"US
TO:
Mayor and Council members
CC:
Jim Dickinson, City Administrator wd-
Will Neumeister, Community Development Directorfl.l:ir-
Chris Vrchota, Associate Planner ~
FROM:
SUBJECT:
Review of Buffer Requirements and Potential Changes - Planning &
Engineering
DATE:
August 22, 2006
INTRODUCTION
There continues to be a number of problems arising on properties where houses are built
close to the back of the required 1 DO-foot buildable area, Especially problematic are
properties that abut wetlands or storm water ponds, There have also been some questions
raised about where the required 16,5 buffer area around wetlands and ponds is to be
measured from. Changes to three code sections are being suggested to address these
problems,
DISCUSSION
The first proposed change is to section 11-3-6-B-I, which lays out the design standards
for lots served by municipal sanitary sewer. This section would be changed as follows:
I. Lots Served By Municipal Sanitary Sewer: Lots served by municipal sanitary
sewer shall remove all organic material and replace with granular material with no
more than five percent (5%) organic material by volume for the front one hundred
sixteen and one-half feet (116.5) fl-OO!1 of depth of the lot at a minimum width of the
lot as required for that zoning district by the zoning ordinance,
This change would create an extra 16.5 feet of buildable space on all urban lots. This
space would allow for the easier placement of decks, patios, sheds, and additions on the
rear of the house, as well as creating more useabIe rear yard space.
The second change would be required if the first change were to be adopted. It would
change the buiIdabiIity requirement mentioned in the definition for a "Buffer Strip" to
match the new I I6.5-foot requirement, as shown below:
BUFFER STRIP: A one rod (16.5 feet or 5 meters) wide area abutting a wetland
and/or storm water pond that shall be left undisturbed or in its natural condition
during the development, building and landscaping phases, The buffer strip shall not
be included within the one hundred sixteen and one-halffoot (116.5) fl-OO!1
buiIdability requirement of Section I I - I -4 of this code. definition of "hnilchhl" lot,,"
The final proposed change is to section 13-6-5. This section establishes the requirement
for buffer strips and describes where they are to be located. There has been some
confusion about where the buffer strip should be measured from around storm water
ponds. The proposed change shown below is meant to remove any confusion:
Requirements: Buffer strips shall be established and maintained in accordance with
the following requirements:
I. Buffer strips shall be identified within each lot by active protective fencing
approved by the city. The developer shall be responsible for the placement of the
fencing. A one rod (16.5 feet or 5 meters, measured linear) wide undisturbed buffer
strip shall be maintained abutting all wetlands and/or storm water ponds during the
development and building phases. (Ord. I 14 A, 7-17-200 I )
2. Buffer strips shall apply to all wetlands and/or storm water ponds. Buffer strips
shall be measured from the delineated wetland boundarv around wetlands and
from the designated normal water level elevation surrounding storm water,
sedimentation and/or rate control ponds as identified on the grading, drainage,
and erosion control plan for all new developments.
3, Buffer strips abutting storm water ponds shall be measured from the 100 year flood
elevation surrounding the storm water pond.
ACTION REOUESTED
The Council is asked to direct staff as to whether or not the proposed ordinance
amendments should move forward.
~)'Ubmittod'
Chris V rchota
@
1685 CROSSTOWN BOULEVARD N,W" . ANDOVER, MINNESOTA 55304. (763) 755-5100
FAX (763) 755-8923 . WWW"CI.ANDOVER.MN"US
TO:
Mayor and Council Members
CC:
Jim Dickinson, City Administrator t.KI.-
Will Neumeister, Community Development Directo~
FROM:
SUBJECT: Options for Bunker Lake Boulevard Median Maintenance (continued) - Planning
DATE:
August 22, 2006
INTRODUCTION
At the July 25th Council Workshop the discussion item was first introduced. Since that time, staff has
thought about other options available and want to get more input from the Council on what direction to
pursue. Attached is the discussion item as it was presented last month.
DISCUSSION
These are six options that could be considered as to what can be done with the median on Bunker:
I. Do nothing, ($10,000 annual cost to maintain)
2. Remove all the plant materials and place concrete in the median. (one-time cost of$120,000)
3. Remove all the plant materials and place colored concrete in the median (one-time cost of$240,000)
4. Remove all the plant materials and place paver bricks in the median leaving spaces for a limited
number of decorative trees and shrubs. (initial cost could be well over $300,000, with some annual
costs for limited landscape areas)
5. Remove all the plant material and place crushed granite in the median leaving spaces for a limited
number of decorative trees and shrubs. (initial cost of $45,000 with some annual costs for limited
landscaped areas)
6. Remove all the plant materials and start over with a native planting plan. (we are still trying to get a
cost estimate from Prairie Restorations and it will be provided at the meeting)
Staff feels that option #5 is the best one to pursue at this time. Whichever option is picked, the EDA and
City Council will need to be discuss who would pay the costs to do the work. At the meeting, staff will
provide some digital photos of examples of what some other cities have done in their medians.
ACTION REQUESTED
The staff is looking for direction on whether there is anyone option that has more appeal than any of the
others on the list. The Andover Station Owners Associations are still interested in moving towards
lowering their annual operating costs.
Attachment: Previous Staff Report
CITY OF
NDOVE
@,
1685 CROSSTOWN BOULEVARD N.W. . ANDOVER, MINNESOTA 55304. (763) 755-5100
FAX (763) 755-8923 . WWW"CI.ANDOVER"MN,US
TO: Mayor and Council Members
cc: run Dickinson, City Administrator
FROM: Will Neumeister, Co=unity Development Director (.(/1-
SUBJECT: Options for Bunker Lake Boulevard Median Maintenance
DATE: July 25,2006
As you can see from the attached sheet from Finance, the Bunker Lake Boulevard median is again going to cost both
property owners associanons at Andover Station a significant amount of money. TIlls memo is written because the
Associations have asked for us to look at new ways to get these costs under control.
A month ago the staff suggested to put concrete in the entire median. but that was met with objection. Stair has
consulted with Mickman Brothers and together we believe we have an idea of what to do to gain control of the weeds
and still have landscaping in the median. We feel that we need to limit the amount of organic area to only about 10%
of the area and selectively place salt tolerant, very hardy plants in a proper fashion in smaller spaces (see attached
drawing). The situation we have right now is out of control and will not ever be completely under control unless we
do a major change.
We would suggest a material in the median that looks nice, and is able to keep weeds from growing up and is more
cost effective to install. Th~ material would be a grey colored crushed (unwashed sand) granite quarry rock that is
placed and compacted very well, then a material called "poly pavement" would be sprayed on it to hold it in place
and bind the material together. The finished product would look like exposed aggregate (stronger than bituminous).
The idea would be to reduce the amount of organic growing media to a much smaller area, and then plant very close
together to have the plants out compete the weeds. The cost breakdown below is what could be expected include:
Item No. Description Units Est. Quantity Unit Price Total
I Mobilization Each I $3,500 $3,500
2 Traffic Control Each 1 $3,500 $3,500
3 Common CY 600 $15 $9,000
Excavation
4 Granular CY 300 $12 $3,600
Borrow
5 Crushed Granite Tons 750tons $16 $12,000
6 LaborlEqup. To CY 300 $8 $2,400
Compact Granite
7 Irrigation System Lump Sum 1 $3,000 $3,000
Modifications
8 Salvage Plants! Lump Sum I $5,000 $5,000
New Plants
9 Poly Pavement Lump Sum 1 $2,400 $2,400
Total $44,400
Attachments: Current Maintenance Cost Breakdown / Concept Drawing
~..- , ,
,
~ CITY OF ANDOVER '.- ~
~ Andover Station Maintenance Cost Sharing - 2005
Area A Area B Area C
Andover Station II Andover Station Andover Economic
Owners Association Properties Association Development Authority
% $ % $ % $
Mickman Brothers
Spring Cleanup $ 1,985.00 20,00% $ 397.00 80.00% $ 1,588,00 0.00% $
Start up Irrigation System 1,145.38 3920% 448.99 45,10% 516.57 15,70% 179.82
Repair Irrigation 491.49 3920% 192.66 45.10% 221.66 15.70% 77.17
Mid-Season Cleanup 2,997,00 20.00% 599.40 80.00% 2,397.60 0,00%
Fall Cleanup 1,635.00 20.00% 327,00 80.00% 1,308,00 0,00%
WlIllerization of Irrigation 160,00 3920% 62.72 45.10% 72.16 15.70% 25.12
8,413.87 2,OZT.77 6,103.99 282. 11
Anolta County Highway Dept
Pennil 110.00 20.00% 22.00 80,00% 88.00 0,00%
Water 2,465.25 3920% 966.38 45.10% 1,111.83 15.70% 387.04
United Rentals
Lane Closures on Bunker 1,045.50 20,00% 209.10 80.00% 836.40 0.00%
Street Lights
Bulbs 868.08 50.00% 434,04 24.00% 208.34 26.00% 225.70
Aircon Bec:lric 3,921.71 50.00% 1,960,86 24.00% 94121 26.00% 1,019.64
Connexus Energy 6,289.37 50.00% 3,144.69 24.00% 1,509.45 26.00% 1,63523
11.079.16 5,539.59 2,659.00 2,880.57
Invoice Totals 23,113.78 8,764.84 10,799.22 3,549,72
37,92% 46.72% 15,36%
City Expenses 248.25 94. 14 115.99 38.13
Grand Total $ 23,362.03 $ 8,858.98 $ 10,915.21 $ 3,587.85
Py"
gJdatalstaffllbrezinkalAndover Station Cost Sharing 2005.xls
11612006
0",,' 't':,,' ',,' ',':" "'::'),1. '1"
. '... "",~
. ", ::~'~. '\~
a.., . - : I' ~,':
, , '1&'j'I'1.11'
."...'."r.",.'i.
. . .' .~, . '.~
. . ~ "'.! ."~. -
1.~;i:4! I rf~ ~ ,U
J.,. ~ ." -. ~H
"Ii " ',.; I CYf/sU
!! " "fi GY~(GYi)
I r ." : . "! I
I! ,."" " .'j t
'J. '<I
I, "1
Is" "'."}' I
if'" ,.,', f,;,} I
11:,' ~\:!.,'
J:'~?'>I Cr~ ffazS
' . . ,
I' ,(.11
"'~ " "I
I I .\" .... I
111,('~""
11"*" I
J ~.\LA .!
! ~;.~.~t.V d,..
! iTW.\; .V:,
I Of! ~.;;,:":
( li~4,.'. . /"
\
\
..
'"
CITY OF
NDOVE
0J
1685 CROSSTOWN BOULEVARD N,W, . ANDOVER, MINNESOTA 55304
MAIN (763) 755-5100 FAX (763) 755-8923 . WWW"CI.ANDOVER"MN"US
TO:
Mayor and Councilmembers
CC:
Jim Dickinson, City Administrator wJ.,.. ,
Will Neumeister, Community Development Director lllcY-
Andy Cross, Associate Planner ~
FROM:
SUBJECT:
Changes in Deer Hunting Regulations - Planning
DATE:
August 22, 2006
INTRODUCTION
Council requested information on changing the border of the bow hunting area on the map to allow
hunting in an area where it is currently prohibited,
DISCUSSION
Chapter 5-4 ofthe City Code regulates where firearms may be discharged in the City. It is referred to
as our "Discharge Ordinance." The ordinance references a map that illustrates three discharge zones in
Andover:
1) Prohibited Zone: The discharge of firearms and bows is completely prohibited.
2) Restricted Zone 1: 10 acres required to shoot a gun, 2,5 acres required to shoot a bow &
arrow,
3) Restricted Zone 2: 10 acres required to shoot a gun at geese, 40 acres required to shoot a gun
at deer. 2.5 acres required to shoot a bow & arrow,
Several property owners in the Prohibited Zone have requested that their land be placed in Restricted
Zone 2, which would allow them to hunt deer with bow & arrow on their property. Their properties are
in the R-I zoning district, which means they are at least 2.5 acres and have private wells and septic
systems. The area to be added would be north of Andover Boulevard between Prairie Road and
University Avenue (see attachment).
To accommodate this request, the Council will need to change the "Firearm!Bow Discharge Map." If
the Council approves this map amendment, then final changes will be made to the official map on file
at the City. As with all changes to the City Code, a public hearing will be required.
Respectfully submitted,
t;i~
Attachments
City Code 5-4 "Discharge Ordinance"
Discharge Map with Proposed Change
CHAPTER 4
WEAPONS
SECTION:
5-4-1: Discharge Of Weapons
5-4-1: DISCHARGE OF WEAPONS:
A. Definitions: The following definitions shall apply in the interpretation and
enforcement of this section:
BOW: All long bows used for target and hunting purposes as
regulated and defined by Minnesota Statutes Chapter
97B.
FIREARM: Shotguns and pellet weapons, whether C02 or pneumatic
powered.
HANDGUN: A hand held weapon with a rifled barrel and discharging a
single shot or pellet at a time.
IMMEDIATE
FAMILY: All persons related to the landowner that shall include the
children, grandchildren and their spouses.
RIFLE: A shoulder weapon with a long bored barrel or barrels and
discharging a single shot or pellet at a time,
SHOTGUN: A shoulder weapon with a smooth bored barrel or barrels
and normally discharging more than one pellet at a time,
except when using a single slug. (Amended Ord. 240, 10-6-
1998, eff. 1-1-1999; amd, 2003 Code)
B. Compliance With Provisions: No person shall discharge at any time a
firearm or bow upon or onto any land or property within the city except
as provided by this section,
C, Prohibited Discharges:
1, No person shall discharge a firearm within five hundred feet (500') of
any residence or a bow within one hundred fifty feet (150') of anv
residence.
2, No person shall discharge a firearm or bow on public property owned or
operated by the city, county, state or school district.
3. The discharge of a rifle or handgun utilizing a solid projectile shall not
be allowed within the city.
D, Permitted Discharges; Restrictions:
1. Written permission by the property owner shall be given to any
person prior to the discharge of a firearm or bow on his/her property.
2. When recreational target shooting is conducted, the projectile shall
be directed at a target with a backstop of sufficient strength and
density to stop and control the projectile.
3. When discharging a firearm or bow, the projectile shall not carry
beyond the property line. (Amended Ord. 240, 10-6-1998, eft. 1-1-
1999)
E. Permit To Hunt Deer:
1, Permit Required: An individual annual or seasonal permit is required by
the city for the discharge of firearms for the purpose of hunting deer with a
shotgun (slug only) in designated areas of the city as shown on the map
attached to Ordinance 240 which ordinance is on file in the office of the
City Clerk for public use and inspection. Said map and the language
contained and stated on the map shall become part of this section.
Discharge of firearms in these areas requires a city permit and shall occur
no closer than one-quarter (1/4) mile from any urban development, park or
institutional use. (Amended Ord. 240,10-6-1998, eft. 1-1-1999; amd. 2003
Code)
-*
2. Consent Of Property Owners: A request for such permit shall be
accompanied by written permission from fifty percent (50%) or more of the
adjacent landowners.
3. Time Limit On Acquiring Permit: Permits shall be obtained from the city
thirty (30) days prior to the opening day of firearm deer season as
established by the Minnesota Department of Natural Resources.
4. Conditions Of Issuance: Such permit shall only be issued under the
terms consistent with this section and all applicable state and federal laws
and regulations concerning the hunting of deer via firearm.
F, Exemptions From Provisions:
1. The provisions of this section shall not apply to the discharge of
firearms, rifles or handguns when done in the lawful defense of persons or
property. No part of this section is intended to abridge the constitutional
right to keep and bear arms,
2, The City Council may approve an exemption to this section to allow the
discharge of firearms and bows for the sole purpose of managing and
controlling wildlife populations, provided the hunt has received the support
from the Minnesota Department of Natural Resources.
G. Violation; Penalty: Any person who violates any provision of this section
shall be guilty of a misdemeanor and, upon conviction thereof, shall be
punished according to state law. (Amended Ord. 240,10-6-1998, eft, 1-
1-1999)
'.
C I T Y 0 F
NDOVE
{JJ
1685 CROSSTOWN BOULEVARD N.W. . ANDOVER, MINNESOTA 55304 . (763) 755-5100
FAX (763) 755-8923 . WWW.CI.ANDOVER.MN.US
TO: Mayor and Councilmembers
FROM: Jim Dickinson, City Administrator
SUBJECT: 2007 Budget Update
DA IE August 22, 2006
INTRODUCTION
City Departments have prepared requested 2007 Annual Operating Budgets; the deadline for
each department's submission to Finance/Administration was July 5, 2006; Finance compiled all
of the department's requests and Finance/Administration conducted individual department
meetings to review requests and ultimately prepared the proposed 2007 Annual Operating Budget
for City Council review. Items underlined identifY areas that staff is seeking Council input.
DISCUSSION
Budget Guidelines:
The following are City Council's 2007 Budget Development guidelines (established by the City
Council on May 2,2006) used by City Staff to prepare the proposed 2007 operating budget:
1) A commitment to maintain or reduce the City Tax Capacity Rate, utilizing recent market
value growth to meet the needs of the organization and positioning the City for long-term
competitiveness, staffing and capital requirements through sustainable revenue sources and
operational efficiencies.
2) A commitment to review various revenue streams, including but not limited to tax levy, state
aid, grants and special assessments, to adequately fund necessary City roadway
improvements.
3) A fiscal goal that works toward establishing the General Fund balance for working capital at
no less than 35% of planned 2007 General Fund expenditures.
4) A commitment to limit the 2007 debt levy to no more than 25% of the gross tax levy and a
commitment to a detailed city debt analysis to take advantage of alternative financing
consistent with the City's adopted Debt Policy.
5) A comprehensive review of the condition of capital equipment to ensure that the most cost-
effective replacement schedule is followed. Equipment will be replaced on the basis of a cost
benefit analysis rather than a year based replacement schedule.
6) A team approach that encourages strategic planning to meet immediate and long-term
operational, staffing, infrastructure and facility needs.
1
7) A management philosophy that actively supports the implementation of Council policies and
goals, and recognizes the need to be responsive to changing community conditions, concerns
and demands in a cost effective manner.
Fund Balance Update:
Work still continues by staff relative to 2006 Budget revenue and expenditure estimates. Any
additional revenues and expense savings will assist in achieving the Council guideline that works
toward establishing the General Fund fund balance for working capital at no less than 35% of
planned 2007 General Fund expenditures. AdministrationlFinance would also like to preserve
the emergency reserve fund balances for core services (snow emergency, facility management,
public safety, and information technology) and economic development that were created through
the 2006 Budget process. To date the following emergency fund balance designations in addition
to a 35% working capital designation ($2,986,366) are identified as part of the proposed 2007
Budget:
1. Snow Emergency
2. Facility Management
3. Information Technology
4. Public Safety
4. Economic Development
$50,000
$50,000
$50,000
$50,000
$50,000
Salt, sand & overtime
Emergency building repairs
Emergency technology repair or replacement
Emergency calls by the Fire Department
Phasing out tax increment budget support
The $250,000 of emergency fund balances does comply with the City's Financial Policies that
states:
"The City will budget to maintain an unreserved fund balance available for contingencies of
between 1 percent and 3 percent of budgeted expenditures for each operating fund in order to
finance unforeseen items and events that occur during the course of the year. It is not necessary
for each fund to hold its own contingency, The General Fund may hold contingencies for other
funds when appropriate."
New Staffing Requests:
The deadline for new staffing requests was due July 5th. Requests were received the Fire
Department, Public Works and the Community Center. Administration is not recommending any
new staffing for the Fire Department and Public Works request will be dealt with through
creative staff scheduling and equipment purchases that will achieve efficiencies.
The Community Center staffing request will flow through the Community Center Advisory
Commission and be dependent on available revenue sources.
Personnel Related Implications:
To date the following are issues facing personnel related expenses:
I. A total salary compensation adjustment package is proposed to provide wages that are
competitive with other government entities. Human Resources indicated that 2007 wage
proposals in other communities for a cost-of-living increase are ranging from 3% to over
4%. Finance/Administration is currently utilizing a 3.5% cost-of-living increase for the
2
proposed 2007 Budget as a place holder. Council concurrence relative to this percentage
will be sought at the workshop.
2. It is anticipated that as in past budgets, there is a need to request additional budget dollars
to bring into market positions that are not competitive with comparable communities.
The past few years that number was $25,000 to $30,000, the proposed 2007 Budget
proposes a lesser number ($15,000) since the past few years adiustments have made
significant strides in achieving competitive pay, Also in 2007 the City will need to
prepare for Pay Equity Compliance. The City's Human Resources Manager, in
consultation with the City Council and City Administrator, will conduct the market
analysis.
3. The proposed budget is currently carrying a 15% health insurance increase (the
guaranteed maximum increase under our contract with Preferred One). The mid year
review of the health plan that was recently done is predicting a 10% increase, Once the
actual renewal is negotiated, the budget will be adiusted accordingly. You may recall that
the City switched to a high deductible plan with a health spending account (HSA). I am
remaining optimistic that the switch will lower future health insurance increases.
4. Various departments will have changes in the personal services line items do to the
reallocation of staffing in the respective departments. The most significant allocation
changes will be in Protective Inspection, Public Works, Planning, Administration, and
Finance departments. The Public Works allocations are to be reflective of actual;
Protective Inspection Department reflecting staffing shifts; the Administration and
Planning allocation reflecting a reduction in the amount of time charged to the EDA
budget; and the Finance Department will reflect a reduction in the total staffing
complement.
5. The Finance Director and Administration Secretarv positions are still in the budget. but
reflect mid-2007 hiring. These positions will be reviewed in early 2007 after recent
staffing changes and staffing complements have had an opportunity to be adequately
assessed for meeting service demands.
Contractual Departments:
1. The City Attorney has submitted a 3% contract increase. The increase ($5,630 annually)
is substantiated by an increase in the number of criminal prosecutions and a slight
modification to accommodate legal expenses that are not covered under the retainer
agreement.
2. The Anoka County Sheriffs contract is currently being negotiated, currently just
maintaining the status quo (72 hour of law enforcement coverage, 12 hours of
Community Service Officer coverage, two School Liaison Officers, additional park patrol
through use of CSOs and a part-time Crime Prevention position) results in an increase of
$123,512.
Per Council direction. Administration has requested pricing for additional patrolling,
pricing was received for an additional 8 hours of law enforcement coverage. The
following identifies the additional cost based on a particular start date:
3
January
May
June
July
2007
2007
2007
2007
$181,758
$126,425
$112,550
$ 98,738
The current budget is utilizing a July 2007 start date! Council direction is sought on
whether or not this is the direction yOU want to go?
Council Memberships and Donations/Contributions:
The following memberships are included as part of the 2007 proposed budget:
League of Minnesota Cities
North Metro Mayor
Association of Metropolitan Cities (AMM)
$17,311
$15,400
$ 6,500
Repeat of2006 Budget item
Repeat of2006 Budget item
Not included in 2006 Budget
The following donations/contributions are included as part of the 2007 proposed budget:
Community Schools
Mediation Services
Youth First
Alexandra House
Senior High Parties
$43,142
$ 3,075
$ 5,000
$10,000
$ 1,500
General Fund
General Fund
Charitable Gambling Fund
Charitable Gambling Fund
Charitable Gambling Fund
Council concurrence is sought on the various memberships and donations/contributions.
Capital Projects Levy:
Capital Proiects Levv - The 2007 Budget number for the Capital Projects Levy is part of the
2007-2011 Capital Improvement Plan (CIP) review process, The full CIP will be presented at the
August 29th workshop.
· Road and Bridge - This levy is proposed for transportation programming related to
maintaining City streets, roadways and pedestrian trails, This would be the fourth year
that a portion of the Road & Bridge Fund is dedicated to pedestrian trail maintenance.
This levy is also used for the City's seal coating and crack sealing programs and to street
overlays and reconstructs. The 2007 Road and Bridge levy was calculated using an
additional 1 % of captured net tax capacity based on Council direction, And while the
policy for road assessments is not fully complete. the budget is designed to achieve the
Council's goal of adequately funding necessarv City roadway improvements,
· Park Improvements - This levy is proposed as an annual appropriation to be used to
underwrite a wide range of park improvement projects as recommended by the Park and
Recreation Commission and approved by the City Council. This funding is intended to be
a long-term supplemental source of capital funding for park projects that would be
separately identified in the City's Five-Year Capital Improvement Plan, A 3% levy
increase is proposed.
4
· Capital EquipmentIProiects - Under the Capital Projects Levy, the levy proposed is
designated to capital improvement/equipment project expenditures. Through this
designation, the City, over time, will be able to build a fund reserve to avoid cash flow
"spikes" and address a wide range of capital improvement needs such as facility
maintenance projects under a more controlled spending environment. No increase will be
proposed for this levy, which is currently approximately $210.000,
Debt Service Levy:
Annually the Finance Department conducts a detailed debt service analysis to monitor
outstanding debt and to look for early debt retirement or refinancing opportunities that will yield
interest expense saving to the City, that process is currently underway.
The Debt Service levy will need to provide for (at a minimum) the following debt service
payments:
· 2004A G.O. Capital Imp. Bonds
· 2004 EDA Public Facility Bonds
· 2005 G.O. Capital Imp. Bonds
· 2005B G.O. Equipment Certificate
· 2006B G.O. Equipment Certificate
$365,051
$889,718
$126,305
$ 63,945
$188,475
There will also be an additional $200.000 added to the levy to accommodate a 2007 G,O.
Equipment Certificate to purchase equipment that will be outlined in the 2007-2011 CIP.
The levy for the 2004 EDA Public Facility Bonds represents the levy designated in the pro-forma
financial statements for the community center.
ACTION REOUESTED
The Council is requested to review the 2007 Budget progress and provide direction to staff,
---
5
CITY OF
NDOVE
1685 CROSSTOWN BOULEVARD N.W, . ANDOVER, MINNESOTA 55304. (763) 755-5100
FAX (763) 755-8923 . WWW.CI.ANDOVER,MN"US
2007
Proposed
Tax Levy
&
Proposed
General Fund
Operating Budget
Pay 2007 Valuation Estimates
Property Tax Levies - Certified 2003-2006 & Proposed 2007
General Fund
Revenue & Expense Summary
Expenditure Budget Summary By Department
Expenditure Rollup
Functions
General Government Rollup
Public Safety Rollup
Public Works Rollup
Other Rollup
Pg 1
Pg2
Pg3
Pg4
Pg5
Pg 7
Pg23
Pg29
Pg39
(Note: Individual Departments are following each function)
..
..
iii
a: E
w"
> co
OW
c g
z.,
<( co
ll--i
0>
~...
58
N
,.,
co
c..
~..
.. U ::l
~ ! 7a
co>
o
.....
iUg
~N
tXllf
~ ; m
=-;~
~:l5>
~..
= ~ .2
.- g.~
o
CD
C>
C>
N
co
c..
..-
:c Gl' Q)
co '" ::l
~:1~
co
c..
..-
:E CI m
co '" ::l
a~~
~..
= ~ .2
I- ~ ~
o
...
C>
C>
N
co
c..
..-
:c~~
:: i ca
~:l5>
~..
U ::l
co-
c,co
co>
o
ex:>
...
N
.:;
'"
...
oi
N
...
o
o
'"
N
...
...
o
N
ex:>
N
...
'"
'"
'"
ri
....
'"
tD
N
...
o
o
"!.
C;;
'"
ri
;:l;
N
...
'"
....
q
'"
...
ri
N
...
o
o
ex:>
tD
ex:>
N
..
....
N
N
...
....
o
~
tD
'"
'"
o
N
...
o
o
"l.
C;;
o
,.:
'"
"'-
...
'"
'iii
'0
l-
e::
,2
iii
::>
'iii
>
Ii;
>
o
."
e::
<(
s
o
t
o
~
G'
'"
'"
.:;
'"
ex:>_
::.
ex:>
N
..
~
~
~
M
'"
....
..
ex:>
"'.
::.
'E
Q)
E
Q)
tJ
.s
..
'"
I-
."
Q)
:;
a.
'"
(J
~
N
....
..
:!!.
s
'"
N
,.:
...
t::-
N
~
o
'"
'"
@.
~
....
~
,.:
co
e
e::
"2
:;
@
'E
o
(J
~
10
C,
'"
i5
~
'"
u:
~
....
ex:>
tD
'"
ex:>
tD
N
o
ex:>
...
o
o
..
N
N
'"
....
'"
N_
~
N
....
'"
....
..
o
'"
o;j
~
Q)
::>
'iii
>
Q)
iii
e::
x
'"
I-
'iii
"
o
...J
...
...
...
N
o
o
ri
co'#.
f8~
mo
'" ~
ex:>
oi
N
...
ex:>
...
o
ri
'"
o
ri
co?ft
'" ~
ex:>...
M"';
....~
o
,.:
N
...
'"
o
...
tD
'"
'"
N
~?f!!.
"'...
.......
cON
o~
N
..
N
...
....
'"
'"
N
'"
ex:>
N
ex:>
N
ex:>
tD
'"
"':.
N
...
e::
.2
:;
@
U;
i5
~
10
Co
'"
i5
'iii
"
'"
u:
'"
Q)
::>
'iii
>
"0
Q)
U;
::>
~
'iii
'0
I-
Q)
'"
e::
'"
Q).c::
::>(J
~?f!!.
~
"u
'"
Co
'"
(J
x
'"
I-
?f!!.?f!!."#.
"'... ex:>
;~~
~ ~ ~
"'ltLOLOlX)
OvM,...
"I"'"" o. co N
gco~:2
LOvCOr--
c5ric6m
NNNN
..,. tilt b't M-
"'ltLnCO"'"
0000
0000
NNNN
>->->->-
co m to Rl
c..c..c..c..
Q)
'"
e::
'"
Q).c::
::>(J
~?f!!.
Q;
-'"
10
:;:
Q)
:c
'"
x
'"
I-
~~~
0"''''
-.i-r'io
~ ~ ~
0000
0000
~~~~
cncoe>,...
ONLO,....
r--:.rici
covvN
cnhC'\lLt)CO
N N~ N
b'tMtR-f;R-
...."''''...
0000
0000
NNNN
>- >- >- >-
co co m n::I
c..c..c..c..
1
..
III
:l
ii
>
~
'u
..
Co
..
U
><
..
I-
1(0
!D
o
~
(0
....
-
<Xl
...
o
o
N
,.,
'"
c..
'"
o
o
N
,.,
'"
c..
'"
o
o
N
,.,
'"
c..
....
o
o
N
,.,
'"
c..
o
o
o
o
o
o
o
'"
...
o
o
o
o
o
o
.:;
N
...
o
o
o
o
o
o
o
N
...
o
o
o
o
o
o
.:;
;;;
o
o
o
o
o
o
o
;;;
o
o
o
o
o
o
.:;
...
oJ.
..
Q)
::>
..
>
..
Ql
...
..
..
==
Ql
:is
..
..
..
I-
....
o
o
N
,.,
'"
c..
...
o
o
N
,.,
'"
c..
'"
o
o
N
,.,
'"
c..
'"
o
o
N
,.,
'"
c..
o
o
o
0'
o
o
o
o
o
ri
...
o
o
o
o
o
o
o
o
'"
N
...
o
o
o
o
o
o
o
o
o
N'
...
o
o
o
o
o
o
o
o
"l.
~
...
o
o
o
o
o
o
o
o
0_
;;;
o
o
o
o
o
o
o
o
'"
...
oJ.
City of Andover, Minnesota 8/1612006
Property Tax Levy
Certified Certified Certified Certified Requested Change
2003 2004 2005 2006 2007 $ %
General Fund Levy $ 4,549"530 $ 4,894.046 $ 4.874.908 $ 5"640"212 $ 6"080"179 $ 439.967"00 7.80%
Debt Service Funds levy
1999 G.O. Equipment Certificate 301.980 326,655
2001C G.O. Equipment Certificate 274.404 276,693 283,210 283.537
2003 G.O. Equipment Certificate 200.000 212"695
2003C G"D" Equipment Certificate 168,000 132"030 132,180
2004A G.O. Capitallmprnvement Bonds 247,766 364,788 365.051
2004 EDA Pubfic FaCIlity Revenue Bonds 807.000 847,350 869,718
20058 Capital Improvement Bonds 137,922 126.305
20056 G.O. Equipment Certificate 200.000 65"788 63.945
20068 G"D, Equipment Certificate 188.475
2007 G.O. Equipment Certificate 200.000
Total Debt Service* 776.384 984,043 1,670.006 1.831.565 1.833,494 1,929"00 0,11%
Other Levies
Capital Projects Levy
Cap~a1 EquipmentlProject 203.200 203.200 203,200 209,296 210"000 704.00 0"34%
Parks Projects 50.800 50,800 52,800 54,364 56,000 1.616"00 2"97%
Road & Bridge 619,611 619,611 679.899 734,686 1,052,953 318,267"00 43.32%
Pedestrian TraD Maintenance 46,000 47,380 48.801 1.421"00 3"00%
Lower Rum River Watershed 24.000 30"000 30,000 33.396 35"000 1.604"00 4.80%
Gross City Levy 6,223,525 6,781.700 7,556.813 8,550,919 9,316,427 765,508.00 8.95%
Less Fiscal Disparities Distribution 835,198 949,133 926,866 946,173 920,000 (26.173"00) -2,82%
Local Tax Rate Levy $ 5,388,327 $ 5,832,567 $ 6,629,947 $ 7,604,746 $ 8,396,427 791.681.00 10,41%
Adjusted Tax Capacity Value- $ 16,248,790 $ 18,604,494 $ 21,251,752 $ 24,010,780 $ 26,836,841 $ 2"826.061 11.77%
% Chanae Chanae
Tax Capacity Rate- 33"161% 31.350% 31.197% 31.672% 31.287% -1"216% ,{l"385%
Tax Capacity Rate WID LRRWSD 33"037% 31.209% 31.076% 31.547% 0.000%
Tax Capacity Rate With LRRWSD 33"376% 31.603% 31"414% 31"895% 0.000%
.2003 Debt SeMce Levy is based on City's Debt Management Study
- Adjusted Value determined by adjusting for Fiscal Disparities and Tax Increment estimates.
- Blended rate due to the City of Andover levying far Lower Rum River Wate~ed District
(1) Adjusted Tax: Capacity Value is subjed to change.
?
8/1612006
CITY OF ANDOVER
General Fund
Revenue & Expense Summary
Actual Actual Actual Budget Estimate Requested Budget Change 06 - 07
2003 2004 2005 2006 2006 2007 S %
REVENUES
Property Taxes S 4,286"838 S 4.541,227 S 4.550.918 S 5,281,248 S 5.281,248 S 6,114,479 S 833.231 15.78%
Ucense and Permits 551,122 675.869 724.438 563"950 642"675 572,350 8.400 1.49%
Intergovernmental Revenues 508.318 585,290 653.455 585,723 580,723 592,840 7,117 1,22%
Charges for Current Services 647,816 798,794 933,365 832.650 802,250 799,150 (33,500) -4.02%
Fines and Forfens 68"686 79,450 90,530 87,500 89,500 91.500 4.000 4"57%
Interest Income (6,407) 58.309 81.565 75"000 90,000 90,000 15,000 20,00%
Miscellaneous Revenue 241.147 259,038 104.824 82.100 83.000 86,530 4,430 5.40%
Transfers 165"000 299"000 175,000 180.000 180"000 185"625 5"625 3.13%
L~IQI~B~ES.l:s.l;:~6.462'520 ..J./1"".'O""7,296;s71U:"i'''"7'314,095 7:'688.171 ~_"'.c;C 7.749,396 '.'= 8,532,474 844,303 . :.~.n 10.90%"
EXPENDITURES
General Government 2,105.626 1,996.175 2,070.872 2,376.511 2,289.935 2.489,830 113.319 4"77%
pubnc Safety 2.631.988 2,730.046 3,071,503 3.286,149 3,289,899 3,630,396 344,247 10.48%
Pubfic Works 1.920.989 1"838,768 2,262"007 2,221,252 2.203,802 2,392.248 170.996 7.70%
Other 25"865 21"992 9"798 23"000 20"000 20.000 (3,000) -13,04%
r':.JQf~:~~QiNBEI~;6:684:468~6:S86.98~.-m:180 "~ ""'~i:sOO,m-;7,803.636"::""-8.53Z::it74~~~25:562-:::::--;-~8.02%'
r-U:~j~Rj~~$"""12Z1,948~f~09~;$"'(1liO,OB5) ,_. Tlm)411 ,i $ . T54,246)'~""'"'.lr~-218-:741.__=:_'i.~:'''';
3
GENERAL GOVERNMENT
Mayor and Council $
Administration
Newsletter
Human ResoW"CeS
Attorney
City Oed<
Elections
Finance
Assessing
Information Services
Planning & Zoning
Engineering
~. ._F~,~an.~~C2It
iJ.!!~~!~.c~L.:2Ji
PUBUC SAFEIT
Police Protection
Fire Protection
Protective Inspection
Civil Defense
AnimaJ Control
['i;;!;N~:~~~,t2 '^
PUBUC WORKS
StreetS and Highways
Snow and Ice Removal
Street Signs
Traffic Signals
Street lighting
Street lights - Billed
Park & Recreation
_~lin~"", .
L!!!l'!~.!!IicJYorI<J ....; ".
OTHER
'1(""""
;:r~1!'L~~__~ ~~
Actual
2003
91,791
127,726
21,673
49,491
146,365
129,195
1,431
246,524
106,933
131,098
262,461
323,478
453,370
,2,091,536
1,421,312
769,142
426,216
6,656
8,662
2,631,985' "
331,406
483,288
115,208
21,690
35,584
139,122
603,004
114,785
1;844,087
25,865
25,865
rL._,9..~roTAL~. $ (;.593.476
CITY OF ANDOVER
Expenditure Budget Summary Totals - By Department
Budget Year 2007
Actual
2004
$ 90,320
125,537
16,484
52,623
147,907
124,781
35,031
250,249
11 0,890
128,191
268,909
343,698
298,218
. 1,992;838.5
1,500,424
821,823
389,772
10,159
7,869
2,730,ll47 ~~.
406,286
372,296
113,841
19,881
28,769
144,767
615,966
114,054
'l,ll15,861l
21.991
'21.991
S (;.560,736
Actual
2005
$ 94,645
148,690
16,265
49,265
155,429
132,121
6,032
200,845
114,105
135,269
304,730
378,264
335,213
2,670,872
1,664,086
973,791
415,454
9,708
8.464
. . 3,ll7l,5l13.__
661,464
449,125
157,801
14,264
35,773
152,358
674,716
116,506
"2,262,01)7
9,798
9,798
$ 7,414,180
Budget.
2006
$ 116,008
157,275
24,000
91,387
159,370
137,113
53,061
286,493
118,500
135,826
349,615
392,845
355,018
, 2,376,511
1,861,610
940,391
459,230
15,453
9,465
'. '3,286;149.
553,860
450,433
143,651
23,000
30.900
155,000
759,578
104,830
2,221.252 .
23,000
23,000
$ .7,906;912
4
Estimate
2006
$
116,008
143,325
26,000
71,387
159,370
137,113
53,061
237,443
118,500
127,476
347,615
391,245
361,392
2,289;935
1,861,610
945,341
459,230
15,453
8,265
3,289,899
541,410
448,433
154,651
20,000
30,900
155,000
754,078
99,330
. :2,203,802
20,000
20,IlOO
S 7,803,636
Requested.
2007
$
103.126
179,346
26,000
83,025
165,000
152,706
7,264
279,690
124,000
138,477
368,026
440,663
422,507
:2,489.830
2,085,122
1,025,085
489,633
20,876
9,680
3,630,396
585,869
497,358
174,038
20,500
31,900
157,000
825,313
]00,270
,2,392,248
20,000
20,000
Change (0)
$ %
(12,882)
22,07]
2,000
(8,362)
5,630
15,593
(45,797)
(6,803)
5.500
2,651
18,411
47,818
67,489
113,319
223,512
84,694
30,403
5,423
215
344;241
32,009
46,925
30,387
(2,500)
1,000
2,000
65,735
(4,560)
,1711,99fi
(3,000)
" {3,OOO) ,.
$ 'B,532,474 ~: " 625,'562 ,.
~11.10%
14.03%
8.33%
-9.15%
3.53%
1137%
-86.31%
.2.37%
4.64%
1.95%
5.27%
12_17%
19.01%
4;7T".4<
12.01%
9.01%
6.62%
35.091'/0
227%
., 10"48"4'
5.78%
10.42%
21.15%
-10.81%
3.24%
1.29"10
8.65%
-4.35%
7,700J.l
-13.04%
~13:04~
:t'91%
CITY OF ANDOVER
Budget Worksheet - 2007
General Fund General Fund Rollup
Accouot Actual Actual Actual Bud::et Estimate Requested
Number Descriptioo 2003 2004 2005 2006 2006 2007
Salaries & Benefits
60110 Salaries - Regular 2,140,391 2,168,675 2,364,688 2,828,549 2,772,549 2,958,070
60120 Salaries - Volunteer Fire Fighters 172,068 171,850 194,877 200,000 210,000 225,000
60130 Salaries - Election Judges 25,541
60140 Salaries - Council / Commission 44,579 41,888 44,010 46,940 46,940 46,940
60210 FlCA 131,690 134,412 139,821 188,321 188,321 200,263
60220 Medicare 32,593 33,438 34,549 44,051 44,051 46,833
60310 Health Insurance 211,156 233,993 241.436 308,603 308,603 334,995
60320 Dental Insurance 12,765 13,324 15,182 18,424 18,424 20,544
60330 Life Insurance 2.066 1,967 1,809 800 800 784
60340 Long-Term Disability 5,078 5,500 5,663 7,067 7,067 7,504
60410 PERA 117,696 115,942 123,620 174,707 174,707 194,284
60420 Nationwide Retirement 2,000 2,000 2,000 2,000 2,000
60520 Workers Comp 38,478 43,864 43,092 49,880 49,880 60,955
60530 1CMA 5,250 2.750
60540 Relief Association 165,367 205,651 206,263 235,000 235.000 250,000
60990 Inter-City Labor Allocation (5,050) (34,889) (300.846) (300,846) (309,710)
Salaries & Benefits 3,074,127 3,165,906 3,417.009 3,803,496 3,757,496 4,038,462
Departmental
61005 Supplies - General 23,635 25,785 23,936 29,800 28,200 28,600
61010 Supplies - Printed Forms 2,036 2,611 1,951 1,550 1,550 2,050
61015 Supplies - Training 1,992 571 3,979 3,250 2,750 2,750
61020 Supplies - Operating 66,679 105,189 194,158 115,165 101,965 128,575
61025 Supplies - Cleaning 5,118 5,478 4,997 5,450 5,850 6,650
61030 Supplies - Signs 21,757 14,150 49,073 12,500 35,000 22,500
61045 Supplies - Gas 150 150 200
61105 R & M Supplies - General 21,979 20,301 24,613 39,500 39,100 40,800
61120 R & M Supplies - Building 12,584 12,532 13,626 10,500 10,000 10,000
61125 R & M Supplies - Streets 99,998 93,272 132,599 116,000 116,000 131,000
61130 R & M Supplies - Landscape 17,341 21,377 37.502 21,500 21,500 23,000
61205 Small & Expend - Small Tools 6,687 5,305 12,643 4,050 7.750 9,800
61210 Small & Expend - Office Equipm 15,116 13,000 11,500 13,000
61220 Software 3,250 3,286 3,195 4,500 4.000 3,200
61225 T ecbnology Upgrades 15,301 11,625 8,121 6,500 6,500 10,000
61240 Maps for Resale 542 27 300 300 300
61305 Uniforms 1,019 1,292 662 1,750 1,750 1,750
61310 Meals / Lodging 8,547 6,705 6,716 9,890 9,440 10,850
61315 Continuing Education 4,968 9,614 29,357 26,925 26,375 32,775
61320 Annual Dues / Licenses 79,173 66,944 50,396 69,710 59,560 68,121
61325 Subscriptions / Publications 1,243 1,598 1,270 1,450 1,450 1,450
61405 Postage 19,890 17,155 15,921 24,545 24,945 25,285
61410 Transportation / Mileage 7.037 5.218 6.417 8,900 8,900 9,325
Departmental 420.776 430,035 636,250 526,885 524,535 581,981
5
CITY OF ANDOVER
Budget Worksheet - 2007
General Fund General Fund Rollup
Account Actual Actual Actual Bud::et Estimate Requested
Number Description 2003 2004 2005 2006 2006 2007
Operating
62005 Electric 237.404 240,629 252,147 266,250 263,250 279,250
62010 Water & Sewer Service 18,386 18.425 15,009 20,616 21,000 64,616
62015 Natural Gas 45,774 52,962 73,407 70,700 77,900 91,000
62020 Refuse Collection 10,816 12,293 12,814 14,900 14,450 16,350
62025 Storm Water Utility Charge 952 1,909 1,903 2,050 2,150 2,250
62030 Telephone 40,132 49,054 49,317 59,525 53,225 56,925
62100 Insurance 104,031 104,292 106,728 110,929 11 0,929 116,475
62200 Rentals 24,896 27,035 32,051 32,250 29,100 29,250
62205 Central Equipment Services 317,970 302,784 314,671 334,112 334,112 367,479
62300 Equipment Maintenance Contract 11,114 15,760 29,435 16,360 17,900 19,892
62305 Software Maintenance Contracts 4,783 7,327 8,878 38,400 35,400 43.600
Operating 816,258 832,470 896,360 966,092 959,416 1,087.087
Professional Services
63005 Professional Services 206,868 221,950 237,958 247,524 236,024 242,742
63010 Contractual Services 1,546,546 1,651,047 1,962,189 2,035,710 2,025,510 2,263,022
63015 Attorney 146,365 147,907 155,429 159,370 159,370 165,000
63020 Gopher Feet 129 18 150 150 150
63025 Publishing 7,167 7,705 4,324 27,150 26,900 7,050
63030 Printing 11,190 8,442 7,515 12,135 12,735 12,530
63100 R & M Labor - General 29,975 26,065 33,277 32,200 28,950 35,150
63105 R & M Labor - Building 26,755 30,449 44,110 29,700 31,050 47,800
63110 R & M Labor - Streets 3,500 3,500 3,500
63200 Inspections 1,418 1,935 2,000 2,000 2,000
63215 Recording Fee 350 259 591 500 500 500
63300 Improvements - Streets 12,059 10,000 8,000 8,000
63900 Miscellaneous 3,934 6,878 8,503 32,500 12,500 22,500
63905 Contingency 22,424 15,447 4,415 18,000 15,000 15.000
Professional Services 2,002,992 2.128,337 2,460,263 2,610.439 2,562.189 2,824,944
Capital Outlay
65300 Improvements 43,167 1,763
65500 Office Equipment 11,759
65600 Equipment 25,589 4,298
Capital Outlay 80,515 1,763 4,298
nebt Service
66201 Assessment - Principal 8,498 2,225
nebt Service 8,498 2,225
Other Uses
67101 Transfer To Other Funds 190.310
Other Uses 190,310
Total 6,593,476 6,560,736 7,414,180 7,906,912 7,803,636 8.532,474
6
CITY OF ANDOVER
Budget Worksheet - 2007
Function: General Government General Government Rollup
Account Actual Actual Actual Budget Estimate Requested
Number Description 2003 2004 2005 2006 2006 2007
Salaries & Benefits
60110 Salaries - Regular 833,491 870,566 896,993 1,463,572 1,407,572 1,506.972
60130 Salaries - Election Judges 25,541
60140 Salaries - Council f Commission 42,179 40,318 41,920 43,340 43,340 43,340
60210 FICA 51,650 53,286 54,509 91,072 91,072 96,120
60220 Medicare 12,141 12,708 12,745 21,303 21,303 22,480
60310 Health Insurance 74,963 83,267 84,783 135,997 135,997 160,770
60320 Dental Insurance 4,764 4,971 5,531 8,232 8,232 9,844
60330 Life Insurance 575 584 344 400 400 384
60340 Long-Term Disability 1,970 2,192 2,255 3,704 3.704 3,918
60410 PERA 44,984 45,470 47,243 86,554 86,554 95,251
60420 Nationwide Retirement 2,000 2,000 2,000 2,000 2,000
60520 Workers Comp 13,048 14,483 15,134 17,818 17,818 " 22,607
60530 lCMA 5,250 2,750
60990 Inter-City Labor Allocation (5.050) (11.168) (536,322) (536,322) (565,808)
Salaries & Benefits 1,079,965 1,146,968 1,163,456 1,337,670 1,281,670 1,397,878
Departmental
61005 Supplies - General 15,086 17,432 14.844 20,700 19,100 19,700
61015 Supplies - Training 1,373 1,250 1,250 1,250
61020 Supplies - Operating 6,124 9,543 5,255 16,050 15,850 8,900
61025 Supplies - Cleaning 5,118 5,228 4,809 5,200 5,600 5,800
61105 R & M Supplies - General 5,047 6,930 4,169 8,100 7,700 7,900
61120 R & M Supplies - Building 12,334 10,032 13,589 10,250 9,750 9,750
61205 Small & Expend - Small Tools 819 1.686 2,857 1,200 4,900 4,900
61210 Small & Expend - Office Equipn 15,116 13,000 11,500 13 ,000
61220 Software 3,250 3,286 2,335 3,000 2,500 3,200
61225 Technology Upgrades 15,301 11,625 8,121 6,500 6,500 10,000
61240 Maps for Resale 542 27 300 300 300
61310 Meals f Lodging 3,036 3,739 2,898 4,490 3,790 4,700
61315 Continuing Education 3,523 5,817 7,171 9,925 9,375 11,775
61320 Annual Dues f Licenses 43,489 48,219 43,731 50,910 48,060 55,321
61325 Subscriptions f Publications 40 108 201 250 250 250
61405 Postage 16,222 13,874 12,983 20,170 20,570 20,860
61410 Transportation f Mileage 4,337 3.688 3.199 4,925 4,925 4,750
Departmental 135,641 ]41.234 ]41.278 ] 76,220 ] 71,920 182,356
Operating
62005 Electric 48,062 47,098 53,458 56,500 56,500 69,500
620]0 Water & Sewer Service 18,386 ]8,425 15,009 20,616 21,000 24,616
620]5 Natural Gas 45,728 5].577 72.748 70,700 77,900 91,000
62020 Refuse Collection 5,783 6.384 6,804 8,650 8,200 9.100
62025 Storm Water Utility Charge 669 1,343 1,359 1,550 ],650 1,750
62030 Telephone 30,546 39,20] 39,325 47,300 42,100 45,700
62100 Insurance 56,065 56,206 57,403 60,125 60.125 63,131
62200 Rentals ]4,783 12,913 13,373 15,300 15,150 15,300
62205 Central Equipment Services ]0,285 10,285 10,598 10,916 10,916 12.007
62300 Equipment Maintenance Contra< 10,704 13,193 26,313 6,760 " 7,500 9,500
62305 Software Maintenance Contracts 2,999 4,039 6,103 34,900 31,900 40,100
Operating 244,010 260,664 302,492 333,317 332,941 381,704
7
CITY OF ANDOVER
Budget Worksheet - 2007
Function: General Government General Government Rollup
Account Actual Actual Actual Budget Estimate Requested
Number Description 2003 2004 2005 2006 2006 2007
Professional Services
63005 Professional Services 196,076 196,162 205,832 216,124 208,774 214,842
63010 Contractual Services 41,579 53,438 41.987 57,400 57,400 63,200
63015 Attorney 146,365 147,907 155,429 159,370 159,370 165,000
63025 Publishing 6,077 6,696 3,705 25,550 25,300 5,450
63030 Printing 11,190 8,285 7,350 11,510 12,110 12,000
63100 R & M Labor - General 966 442 1,523 1,650 1,400 1,600
63105 R & M Labor - Building 26,755 30,449 44,110 29,700 31,050 47,800
63215 Recording Fee 350 259 591 500 500 500
63900 Miscellaneous 493 334 3,120 27,500 7,500 17,500
Professional Services 429,851 443,972 463,646 529,304 503,404 527,892
Capital Outlay
65500 Office Equipment 11,759
Capital Outlay 11,759
Other Uses
67101 Transfer To Other Funds 190,310
Other Uses 190,310
Total 2,091,536 1,992,838 2,070.872 2,376,511 2,289,935 2.489,830
8
CITY OF ANDOVER
Budget Worksheet - 2007
Function: General Government C~ Council-41100
Account Actual Actual Actual Budget Estimate Requested
Number Description 2003 2004 2005 2006 2006 2007
Salaries & Benefits
60140 Salaries - Council / Commission 39,579 37,598 39,500 39,500 39,500 39,500
60210 FICA 2,376 2,376 2,403 2,449 2,449 2,449
60220 Medicare 574 556 562 574 574 574
60410 PERA 942 912 923 1,020 1,020 1,063
Salaries & Benefits 43,471 41,442 43,387 43,543 43,543 43,586
Departmental
61005 Supplies - General 181 385 713 500 500 500
61310 Meals / Lodging 421 373 407 600 600 600
61315 Continuing Education 15 165 425 425 425
61320 Annual Dues / Licenses 36,563 37,563 39,031 37,410 37,410 44,416
61325 Subscriptions / Publications 16 150 150 150
61410 Transportation / Mileage 101 116 227 500 500 500
Departmental 37,282 38,452 40,542 39,585 39,585 46,591
Operating
62100 Insurance 1,309 1,312 1,340 1,380 1,380 1.449
Operating 1,309 1,312 1,340 1,380 1,380 1,449
Professional Services
63005 Professional Services 9.729 9,114 9,375 11,500 11 ,500 11,500
63025 Publishing 20,000 20,000
Professional Services 9,729 9,114 9,375 31,500 31,500 11,500
Total 91,791 90,320 94,645 116,008 116,008 103,126
9
8/1612006
CITY OF ANDOVER
Budget Worksheet - 2007
Function: General Government Administration - 41200
Account Actual Actual Actual Budget Estimate Requested
Number Description 2003 2004 2005 2006 2006 2007
Salaries & Benefits
60110 Salaries - Regular 87,371 88,871 97,020 148,628 136,628 155,842
60210 FICA 5.075 4,834 5.617 9,215 9,215 9,662
60220 Medicare 1,232 1,254 1,325 2,155 2,155 2,260
60310 Health Insurance 6,913 7,049 8,155 12,956 12,956 13,455
60320 Dental Insurance 482 467 498 784 784 856
60330 Life Insurance 267 275 31 32 32 32
60340 Long-Term Disability 219 214 234 387 387 405
60410 PERA 4,808 3,654 4,971 8,918 8,918 9,740
60420 Nationwide Retirement 2,000 2,000 2,000 2,000 2,000
60520 Workers Comp 1,389 1,551 1,518 1,858 1,858 2,338
60530 1CMA 5,250 2,750
60990 Inter-City Labor Allocation (5.050) (8,168) (53,797) (53,797) (43,042)
Salaries & Benefits 107,956 104.751 121,368 133,136 121,136 153,548
Departmental
61005 Supplies - General 1,325 1,302 1,768 2,400 1,800 2,200
61310 Meals I Lodging 960 1,169 731 700 1,000 1,000
61315 Continuing Education 15 650 953 750 750 2,900
61320 Annual Dues I Licenses 1,606 2,173 485 3,450 2,500 2,500
61325 Subscriptions I Publications 20
61405 Postage 1,269 979 981 1,300 1,000 1,100
61410 Trnnsportation I Mileage 1,972 1,196 1,308 1,600 1,600 1.600
Departmental 7,147 7.469 6,246 10,200 8,650 11,300
Operating
62030 Telephone 836 629 1,018 1,000 1,100 1,100
62100 Insunmce 11,558 11.587 11,834 12,189 12,189 12,798
Operating 12,394 12.216 12.852 13,189 13,289 13,898
Professional Services
63005 Professional Services 8,074
63025 ,Publishing 32 1,057 149 500 250 400
63100 R & M Labor - General 197 44 250 200
Professional Services 229 1.101 8,223 750 250 600
Total 127,726 125,537 148,690 157,275 143,325 179,346
8116/2006
10
CITY OF ANDOVER
Budget Worksheet - 2007
Function: General Government Newsletter- 41210
Account Actual Actual Actual Budget Estimate Requested
Number Description 2003 2004 2005 2006 2006 2007
Departmental
61005 Supplies - General 16 20
61405 Postage 10,467 8.623 8,914 12,600 14,000 14,000
Departmental 10,483 8,643 8,914 12,600 14.000 14,000
Professional Services
63030 Printing 11,190 7.841 7,350 11.400 12,000 12,000
Professional Services 11,190 7.841 7,350 11,400 12,000 12.000
Total 21,673 16,484 16,265 24,000 26,000 26,000
1 1
811612006
CITY OF ANDOVER
Budget Worksheet - 2007
Function: General Government Human Resources - 41230
Account Actual Actual Actual Budget Estimate Requested
Number Description 2003 2004 200S 2006 2006 2007
Salaries & Benefits
60110 Salaries - Regular 4,878 6,168 934 67,888 67,888 77,672
60210 FICA 284 307 57 4,209 4,209 4,816
60220 Medicare 66 85 12 984 984 1,126
60310 Health Insurance 375 458 143 8,609 8,609 8,855
60320 Dental Insurance 22 24 7 392 392 428
60330 Life Insurance 1 1 0 16 16 16
60340 Long-Term Disability 12 14 3 177 177 202
60410 PERA 270 297 51 4,073 4,073 4,855
60520 Workers Comp 584 673 725 849 849 1,165
60990 Inter-City Labor Allocation (1.000) (79,634) (79,634) (91,257)
Salaries & Benefits 6,492 7,027 1,931 7,563 7,563 7,878
Departmental
61005 Supplies - General 199 69 876 1,200 1,200 1,200
61020 Supplies - Opernting 400 400 400
61310 Meals I Lodging 298 443 200 200 200 200
61315 Continuing Education 90 624 491 1,000 1,000 1,000
61320 Annual Dues I Licenses 1,551 1,654 1,177 2,000 2,000 2,005
61405 Postage 253 128 700 700 700
61410 Transportation I Mileage 279 301 321 250 250 250
Departmental 2,417 3,344 3,193 5,750 5,750 5,755
Operating
62305 Software Maintenance Contract 3,000 3,000 3,000
Opernting 3,000 3,000 3,000
Professional Services
63005 Professional Services 38,181 40,089 40,528 46,074 46,074 47,392
63025 Publishing 1,908 1,829 493 1,500 1,500 1,500
63900 Miscellaneous 493 334 3.120 27,500 7,500 17,500
Professional Services 40,582 42,252 44,141 75,074 55,074 66,392
Total 49,491 52,623 49,265 9J,387 71,387 83,025
12
8/1612006
CITY OF ANDOVER
Budget Worksheet - 2007
Function: General Government Attorney - 41240
Account Actual Actual Actual Budget Estimate Requested
Number Description 2003 2004 2005 2006 2006 2007
Professional Services
63015 Attorney 146,365 147,907 155,429 159,370 159,370 165,000
Professional Services 146,365 147,907 155,429 159,370 159,370 165,000
Total 146,365 147,907 155.429 159,370 159,370 165,000
13
8!l612006
CITY OF ANDOVER
Budget Worksheet - 2007
Function: General Government City Clerk - 41300
Account Actual Actual Actual Budget Estimate Requested
Number Description 2003 2004 2005 2006 2006 2007
Salaries & Benefits
60110 Salaries - Regular 83,604 85,048 90,598 157,723 157,723 127,915
60210 FICA 5,179 5,267 5,462 7,423 7,423 7,930
60220 Medicare 1,211 1,232 1,278 1,735 1,735 1,854
60310 Health Insurance 5,027 5,616 5,404 8,694 8,694 13,455
60320 Dental Insurance 328 453 496 784 784 856
60330 Life Insurance 32 31 31 48 48 48
60340 Long-Term Disability 212" 227 234 311 311 333
60410 PERA 4,623 4,703 4,885 7,183 7,183 7,995
60520 Workers Comp 1,031 1,330 1,235 1,497 1,497 1,920
60990 Inter-City Labor Allocation 500 (2.000) (71,486) (71,486) (34,217)
Salaries & Benefits 101.747 101,907 109,622 113,912 113,912 128,089
Departmental
61005 Supplies - General 602 1,039 454 500 500 600
61020 Supplies - Operating 73
61310 Meals / Lodging 322 321 719 540 540 700
61315 Continuing Education 745
61320 Annual Dues / Licenses 600 924 514 1,600 1,600 1,650
61405 Postage 316 130 150 150 160
61410 Transportation / Mileage 367 429 221 500 500 600
Departmental 1,891 3,029 2,855 3,290 3,290 3,710
Operating
62100 Insurance 18,880 18,927 19,331 19,911 19.911 20,907
Operating 18.880 18,927 19,331 19,911 19,911 20,907
Professional Services
63010 Contractual Services 6,500 500 223
63025 Publishing 45 43 91
63030 Printing 347
63100 R & M Labor - General 132 28
Professional Services 6,677 918 314
Total 129,195 124.781 132,121 137,113 137,113 152,706
8/1612006
14
CITY OF ANDOVER
Budget Worksheet - 2007
Function: General Government Elections - 41310
Account Actual Actual Actual Budget Estimate Requested
Number Description 2003 2004 2005 2006 2006 2007
Salaries & Benefits
60110 Salaries - Regular 1,614 5,252 4,951
60130 Salaries - Election Judges 25,541
60210 FICA 100 331 299
60220 Medicare 23 78 70
60310 Health Insurance 92 472 393
60320 Dental Insurance 8 40 37
60330 Life Insurance 1 3 2
60340 Long-Term Disability 4 14 13
60410 PERA 89 299 267
60990 Inter-City Labor Allocation (500) 44.406 44,406 7,264
Salaries & Benefits 1.431 32,030 6,032 44.406 44.406 7,264
Departmental
61005 Supplies - General 185 200 200
61020 Supplies - Operating 2,048 7,150 7,150
61405 Postage 520 520
61410 Transportation I Mileage 204 275 275
Departmental 2,437 8,145 8,145
Professional Services
63005 Professional Services 267 400 400
63010 Contractual Services 200
63030 Printing 97 110 110
Professional Services 564 510 510
Total 1,431 35.031 6,032 53,061 53.061 7,264
15
811612006
CITY OF ANDOVER
Budget Worksheet - 2007
Function: General Government Finance - 41400
Account Actual Actual Actual Budget Estimate Requested
Number Description 2003 2004 2005 2006 2006 2007
Salaries & Benefits
60110 Salaries - Regular 172,831 180,298 143,964 307,723 263,723 314,690
60210 FICA 10,004 10,019 7,892 19,078 19,078 19,511
60220 Medicare 2,339 2,452 1,833 4,463 4,463 4,564
60310 Health Insurance 13,368 15,835 13,370 28,001 28,001 44,275
60320 Dental Insurance 945 959 804 1,568 1,568 2,140
60330 Life Insurance 66 64 50 96 96 80
60340 Long-Term Disability 391 457 351 800 800 818
60410 PERA 8,261 8,715 6,350 18,464 18,464 19,668
60520 Workers Comp 3,156 3,276 3,526 3,846 3,846 4,721
60990 Inter-City Labor Allocation (150,297) (150,297) (183,686)
Salaries & Benefits 211,361 222.075 178,141 233,742 189,742 226,781
Departmental
61005 Supplies - General 3,625 3,791 2,438 4,000 3,000 3,500
61310 Meals I Lodging 531 266 750 250 500
61315 Continuing Education 835 1,120 529 2,350 1,800 2,350
61320 Annual Dues I Licenses 634 582 80 900 900 900
61325 Subscriptions I Publications 68
61405 Postage 1,209 754 883 1,500 1,500 1,500
61410 Transportation I Mileage 1,177 932 458 1,000 1,000 1.000
Departmental 8.011 7.445 4,456 10,500 8,450 9,750
Operating
62030 Telephone 751 829 213 600 600 600
62100 Insurance 144 144 147 151 151 159
62305 Software Maintenance Contract 18,000 15,000 18.000
Operating 895 973 360 18.751 15,751 18,759
Professional Services
63005 Professional Services 25,373 18,860 16,949 21,650 21,650 22,550
63025 Publishing 705 856 939 1,550 1,550 1,550
63100 R & M Labor - General 179 40 300 300 300
Professional Services 26,257 19,756 17,889 23.500 23,500 24,400
Total 246,524 250,249 200,845 286,493 237,443 279,690
16
8/1 612006
CITY OF ANDOVER
Budget Worksheet - 2007
Function: General Government Assessing - 41410
Account Actual Actual Actual Budget Estimate Requested
Number Description 2003 2004 2005 2006 2006 2007
Professional Services
63005 Professional Services 106,933 110,890 114,105 118,500 118,500 124,000
Professional Services 106,933 110,890 114.105 118,500 118,500 124,000
Total 106,933 110,890 114.105 118,500 118,500 124,000
17
8!l612006
CITY OF ANDOVER
Budget Worksheet - 2007
Function: General Government Information Services - 41420
Account Actual Actual Actual Budget Estimate Requested
Number Description 2003 2004 2005 2006 2006 2007
Salaries & Benefits
60110 Salaries - Regular 56,633 59,493 56,305 64,593 64,593 66,855
60210 FICA 3,155 3,490 3,586 4,005 4,005 4,145
60220 Medicare 738 816 839 937 937 969
60310 Health Insurance 6,958 8,210 7,734 8,609 8,609 8,855
60320 Dental Insurance 330 343 376 392 392 428
60330 Life Insurance 23 23 23 16 16 16
60340 Long-Term Disability 143 159 162 168 168 174
60410 PERA 3,132 3,290 3,374 3,876 3,876 4,178
60520 Workers Comp 557 641 670 807 807 1,003
60990 Inter-City Labor Allocation (7,227) (7,227) (7,396)
Salaries & Benefits 71.669 76,465 73,067 76,176 76,176 79,227
Departmental
61005 Supplies - General 4,743 5,508 4,070 6,000 6,000 6,000
61015 Supplies - Training 1,373 1,250 1,250 1,250
61105 R & M Supplies - General 228 155
61210 Small & Expend - Office Equip 9,976 13,000 11 ,500 13,000
61225 Technology Upgrades 15,301 11,625 8,121 6,500 6,500 10,000
61315 Continuing Education 100
61320 Annual Dues I Licenses 35 35 10 250 250 250
61405 Postage 43 6 132 100 100 100
61410 Transportation I Mileage 24 30 78 100 100 100
Departmental 21,747 17,359 22,486 27,200 25.700 30,700
Operating
62030 Telepbone 590 1,068 983 800 800 800
62200 Rentals 7,150 7,150 7,206 7,800 7,800 7,800
62300 Equipment Maintenance Contra 10,704 12,733 15,829
62305 Software Maintenance Contract 3,823 10,500 10,500 15,200
Operating 18,444 20,951 27,841 19,100 19,100 23.800
Professional Services
63005 Professional Services 11,159 13,166 11,323 12,850 6,000 4,250
63 100 R & M Labor - General 100 250 552 500 500 500
Professional Services 11,259 13,416 11,875 13,350 6,500 4.750
Capital Outlay
65500 Office Equipment 7,979
Capital Outlay 7,979
Total 131,098 128,191 135,269 135.826 127.476 138,477
18
8/1612006
CITY OF ANDOVER
Budget Worksheet - 2007
Function: General Government Planning & Zoning - 41500
Account Actual Actual Actual Budget Estimate Requested
Number Description 2003 2004 2005 2006 2006 2007
Salaries & Benefits
60110 Salaries - Regular 190,860 199,056 226,766 279,254 279,254 294,345
60140 Salaries - Council f CommissiOl 2,600 2,720 2,420 3,840 3,840 3,840
60210 FICA 11,636 12,203 13,533 17,551 17,551 18,488
60220 Medicare 2,721 2,854 3.165 4,106 4,106 4,324
60310 Health Insurance 19,922 20,769 23,634 30,259 30,259 31,510
60320 Dentallnsurance 1,153 1,199 1,668 1,960 1,960 2,140
60330 Life Insurance 81 82 102 80 80 80
60340 Long-Term Disability 423 469 580 725 725 765
60410 PERA 10,380 10,338 12,213 16,755 16,755 18,397
60520 Workers Comp 2,310 2,634 2,835 3,490 3,490 4,415
60990 Inter-City Labor Allocation (27,942) (27,942) (28,591)
Salaries it Benefits 242,086 252,324 286,917 330,078 330,078 349,713
Departmental
61005 Supplies - General 2,139 1,948 2,371 2,700 2,700 2,700
61020 Supplies - Operating 441 59 213 100 300 100
61310 Meals f Lodging 116 562 266 700 400 700
61315 Continuing Education 538 125 1,836 2,400 2,400 2,100
61320 Annual Dues f Licenses 1,019 2,559 739 1,800 600 600
61325 Subscriptions f Publications 65
61405 Postage 1,669 1,535 911 1,700 1,000 1,700
61410 Trnnsportation f Mileage 50 159 234 200 200 200
Departmental 5,972 6,947 6,635 9,600 7,600 8,100
Operating
62030 Telephone 477 373 623 800 800 800
62100 Insurance 231 232 237 244 244 256
62205 Central Equipment Services 2,489 2,490 2,566 2,643 2,643 2,907
Operating 3,197 3,095 3,426 3.687 3,687 3,963
Professional Services
63005 Professional Services 3,510 3,333 5,129 3,450 3,450 3,450
63025 Publishing 3,387 2,911 2,032 2,000 2,000 2,000
63100 R & M Labor - General 179 40 300 300 300
63215 Recording Fee 350 259 591 500 500 500
Professional Services 7,426 6,543 7,752 6,250 6;250 6,250
Capital Outlay
65500 Office Equipment 3,780
Capital Outlay 3,780
Total 262,461 268,909 304,730 349,615 347,615 368,026
19
811612006
CITY OF ANDOVER
Budget Worksheet - 2007
Function: General Government Engineering - 41600
Account Actual Actual Actual Budget Estimate Requested
Number Description 2003 2004 2005 2006 2006 2007
Salaries & Benefits
60110 Salaries - Regular 235,700 246,380 276,454 437,763 437,763 469,653
60210 FICA 13,841 14,459 15,660 27,142 27,142 29,119
60220 Medicare 3,237 3,381 3,662 6,349 6,349 6,809
60310 Health Insurance 22,308 24,858 25,950 38,869 38,869 40,365
60320 Dental Insurance 1,496 1,486 1,645 2,352 2,352 2,996
60330 Life Insurance 104 105 106 112 112 112
60340 Long-Term Disability 566 638 679 1,136 1,136 1,221
60410 PERA 12,479 13,262 14,210 26,265 26,265 29,355
60520 Workers Comp 4,021 4,378 4,625 5,471 5,471 7,045
60990 Inter-City Labor Allocation (190,345) (190,345) (184,883)
Salaries & Benefits 293,752 308,947 342,991 355,114 355,114 401,792
Departmental
61005 Supplies - General 2,256 3,185 2,153 3,200 3,200 3,000
61020 Supplies - Operating 2,371 2,163 2,751 2,800 2,800 2,800
61205 Small & Expend - Small Tools 180 1,261 1,269 1,200 1,200 1,200
61210 Small & Expend - Office Eq 5,140
61220 Software 3,250 3,286 2,335 3,000 2,500 3,200
61240 Maps for Resale 542 27 300 300 300
61310 Meals I Lodging 388 605 576 1,000 800 1,000
61315 Continuing Education 2,045 3,283 2,352 3,000 3,000 3,000
61320 Annual Dues I Licenses 1,481 2,729 1,696 3,500 2,800 3,000
61325 Subscriptions I Publications 24 108 48 100 100 100
61405 Postage 1,565 1,408 904 1,600 1,600 1,600
61410 Transportation I Mileage 367 321 354 500 500 500
Departmental 14.469 18,376 19,578 20,200 18,800 19,700
Operating
62030 Telephone 2,848 3,813 3,814 3,600 3,900 3,900
62100 Insurance 244 245 250 258 258 271
62205 Central Equipment Services 7,796 7,795 8,032 8,273 8,273 9,100
62305 Software Maintenance Contract 2,999 4,039 2,280 3,400 3,400 3,900
Operating 13,887 15,892 14,376 15,531 15,831 17,171
Professional Services
63005 Professional Services 1,191 443 348 1,700 1,200 1,700
63100 R & M Labor - General 179 40 971 300 300 300
Professional Services 1,370 483 1,319 2,000 1,500 2,000
Total 323,478 343.698 378,264 392,845 391,245 440,663
?n
811612006
CITY OF ANDOVER
Budget Worksheet - 2007
Function: General Government FaciItiy Mgmt Rollup - 41900
Account Actual Actual Actual Budget Estimate Requested
Number Description 2003 2004 2005 2006 2006 2007
Departmental
61020 Supplies - Operating 3,312 5,273 2,219 5,600 5,200 5,600
61025 Supplies - Cleaning 5,118 5,228 4,809 5,200 5,600 5,800
61105 R & M Supplies - General 4,819 6,775 4,169 8,100 7,700 7,900
61120 R & M Supplies - Building 12,334 10,032 13,589 10,250 9,750 9.750
61205 Small & Expend - Small Tools 639 425 1,588 3,700 3,700
Departmental 26,222 27,733 26,373 29,150 31,950 32.750
Operating
62005 Electric 48,062 47,098 53,458 56,500 56,500 69,500
62010 Water & Sewer Service 18,386 18,425 15,009 20,616 21,000 24,616
62015 Natural Gas 45,728 51,577 72,748 70,700 77,900 91,000
62020 Refuse Collection 5,783 6,384 6,804 8,650 8,200 9,100
62025 Storm Water Utility Charge 669 1,343 1,359 1,550 1,650 1,750
62030 Telephone 25,044 32,489 32,674 40,500 34,900 38,500
62100 Insurnnce 23,699 23,759 24,264 25,992 25,992 27,291
62200 Rentals 7,633 5,763 6,166 7,500 7,350 7,500
62300 Equipment Maintenance Contra 460 10,484 6,760 7,500 9,500
Operating 175,004 187,298 222,966 238,768 240,992 278,757
Professional Services
63010 Contractual Services 35,079 52.738 41,764 57,400 57,400 63,200
63105 R & M Labor - Building 26,755 30,449 44,110 29,700 31,050 47,800
Professional Services 61,834 83,187 85,874 87,100 88,450 111.000
Other Uses
67101 Transfer To Other Funds 190,310
Other Uses 190,310
Total 453,370 298,21 8 335,213 355,018 361,392 422,507
453,370 298,21 8 335,213 355,018 361,392 422,507
21
8/16/2006
CIlY OF ANDOVER
Budget Worksheet - 2007
Function: Public Safety Public Safety Rollup
Account Actual Actual Actual Bndget Estimate Requested
Number Description 2003 2004 2005 2006 2006 2007
Salaries & Benefits
60110 Salaries - Regular 490,467 443,897 475,171 456,745 456,745 489,418
60120 Salaries - V oluuteer Fire Figble1 172,068 171,850 194,877 200,000 210,000 225,000
60210 FICA 31,127 29,840 32,177 40,715 40,715 44,297
60220 Medicare 9,012 8,736 9,377 9,523 9,523 10,358
60310 Health Insurance 49,531 50,635 49,010 49,651 49,651 51,520
60320 Dental Insurance 2,686 2,750 3,304 3,136 3,136 3,424
60330 Life Insurance 1,110 996 1,071 128 128 128
60340 Long-Term Disability 1,177 1,186 1,230 1,188 1,188 1,273
60410 PERA 29,953 29,290 30,615 33,660 33,660 38,923
60520 Workers Comp 17,173 18,059 18,489 20,710 20,710 23,922
60540 Relief Association 165,367 205,651 206,263 235,000 235,000 250,000
60990 Inter-City Labor Allocation 65,830 65,830 76,325
Salaries & Benefits 969,671 962,890 1,021,584 1.116,286 1,126,286 1,214,588
Departmental
61005 Supplies - General 4,781 5,357 4,892 6,100 6,100 5,800
61010 Supplies-PrinredFonns 2,036 2,611 1,951 1,550 1,550 2,050
61015 Supplies - Training 619 571 3,979 2,000 1,500 1,500
61020 Supplies - Operating 22,835 41,869 144,499 36,115 36,115 42,175
61045 Supplies - Gas 150 150 200
61105 R & M Supplies. General 537 1,009 1,750 1,750 1,750
61205 Small & Expend . Small Tools 1,395 339 850 850 900
61220 Software 860 1,500 1,500
61305 Unifonns 1,019 1,292 662 1,750 1.750 1,750
61310 Meals I Lodging 4,557 2,827 2,927 4,550 4,800 5,300
61315 Continuing Education 1,445 3,797 17,629 17,000 17,000 21,000
61320 Annual Dues I Licenses 31,640 14,579 4,775 13,000 8,000 8,500
61325 Subscriptions / Publications 1,203 1,490 1,069 1,200 1,200 1,200
61405 Postage 1,999 1,674 1,588 2,500 ,2,500 2,550
61410 Transportation I Mileage 2,355 1,285 2,373 3,200 3,200 3,700
Departmental 76.421 78,361 187,544 93,215 87,965 98,375
Operating
62005 Electric 703 703 642 750 750 750
62030 Telephone 2,367 2,339 1,781 3,225 3,125 3,225
62100 Insurance 19,210 19,258 19,669 20,259 20,259 21,272
62200 Rentals 3,338 3,443 3,491 3,450 3,450 3,450
62205 Central Equipment Services 116,951 116,953 120,513 124,129 124,129 136,542
62300 Equipment Maintenance Contra 410 2,567 3,122 9,600 10,400 10,392
62305 Software Mainrenance Contract 984 2,488 1,935 2,500 2,500 2,500
Operating 143,963 147,751 151,153 163,913 164,613 178,131
Professional Services
63005 Professional Services 5,331 23,339 29,508 23,950 23,950 24,100
63010 Contractual Services 1,430,679 1,512,329 1,674,421 1,882,310 1,881,11 0 2,105,822
63020 Gopher Feet 129 18 150 150 150
63025 Publishing 177 178 400 400 400
63030 Printing 157 165 625 625 530
63100 R & M Labor - General 1.566 5,091 2.634 5.300 4.800 8.300
Professional Services 1,437,753 1.541,045 1,706,924 1,912,735 1.911.035 2,139.302
Capital Outlay
65600 Equipment 4,180 4,298
Capital Outlay 4,180 4.298
Total 2,631.988 2,730.047 3,071,503 3.286.149 3.289,899 3,630.396
23
CITY OF ANDOVER
Budget Worksheet - 2007
Function: Public Safety Police Protection - 42100
Account Actual Actual Actual Budget Estimate Requested
Number Description 2003 2004 2005 2006 2006 2007
Professional Services
63010 Contractual Services 1,421,312 1,500,424 1,664.086 1,861,610 1,861,610 2,085.122
Professional Services 1,421,312 1,500,424 1.664.086 1,861,610 1,861,610 2.085,122
Total 1,421,312 1,500,424 1,664.086 1,861,610 1,861,610 2,085.122
24
811612006
CITY OF ANDOVER
Budget Worksheet - 2007
Function: Public Safety Fire Protection - 42200
Account Actual Actual Actual Budget Estimate Requested
Number Description 2003 2004 2005 2006 2006 2007
Salaries & Benefits
60110 Salaries - Rcgular 169,821 175,009 185,899 183,374 183,374 199,096
60120 Salaries - Volunteer Fire Fighte 172,068 171,850 194,877 200,000 210,000 225,000
60210 FICA 13,551 13,631 15,170 23,767 23,767 26,297
60220 Medicare 4.901 4,945 5,399 5,559 5,559 6,150
60310 Health Insurance 14,582 17,128 16,653 17,303 17,303 18,055
60320 Dental Insurance 1,030 1,074 1.177 1,176 1,176 1,284
60330 Life Insurance 964 868 941 48 48 48
60340 Long-Term Disability 434 472 484 476 476 518
60410 PERA 13,931 14,425 15,023 17,257 17,257 20,777
60520 Workers Comp 14,265 15,170 15,601 17,293 17,293 19,567
60540 Relief Association 165,367 205,651 206,263 235,000 235,000 250,000
60990 Inter-City Labor Allocation 8.720 8,720 9,914
Salaries & Benefits 570,914 620.223 657,486 709,973 719,973 776,706
Departmental
61005 Supplies - General 1,754 2,216 1,382 2,300 2,300 2,500
61015 Supplies - Training 619 571 3,979 2,000 1,500 1,500
61020 Supplies - Operating 20,921 40,873 144,062 35,000 35,000 40,000
61045 Supplies - Gas 150 150 200
61105 R & M Supplies - General 462 1,009 750 750 750
61205 Small & Expend - Small Tools 1,395 339 850 850 900
61305 Uniforms 1,019 1,292 662 1,750 1,750 1,750
61310 Meals / Lodging 4,017 2,804 2,775 3,750 4.000 4,500
61315 Continuing Education 1,120 15,513 15,000 15,000 19,000
61320 Annual Dues / Licenses 30.799 14,254 4,715 11,000 6,000 6.500
61325 Subscriptions / Publications 1,203 1,490 1,069 1,200 1,200 1,200
61405 Postage 423 56 413 500 500 550
61410 Transportation / Mileage 1,913 1.092 2,055 2,500 2,500 3,000
Departmental 64,525 66,777 176,965 76,750 71,500 82,350
Operating
62030 Telephone 235 426 464 700 600 700
62100 Insurance 17,369 17,412 17,783 18,316 18,316 19,232
62205 Central Equipment Services 108,777 108.778 112,089 115,452 115,452 126,997
62300 Equipment Maintenance Contra 410 231 746 4,000 4,800 4,000
Operating 126,791 126,847 131,082 13 8,468 139,168 150,929
Professional Services
63005 Professional Services 123 2,797 293 500 500 500
63010 Contractual Services 1,7II 4,794 2,871 12,000 12,000 12,000
63025 Publishing 61 100 100 100
63030 Printing 157 165 600 600 500
63100 R & M Labor - General 898 228 570 2.000 1,500 2,000
Professional Services 2,732 7,976 3,960 15,200 14,700 15,100
Capital Outlay
65600 Equipment 4,180 4,298
Capital Outlay 4,180 4,298
Total 769,142 821.823 973,791 940.391 945,341 1,025,085
25
811612006
CITY OF ANDOVER
Budget Worksheet - 2007
Function: Public Safety Protective Inspection - 42300
Account Actual Actual Actual Budget Estimate Requested
Number Description 2003 2004 2005 2006 2006 2007
Salaries & Benefits
60110 Salaries - Regular 316,548 265,900 286,111 273,371 273,371 290,322
60210 FICA 17,414 16,033 16,827 16,948 16,948 18,000
60220 Medicare 4,073 3,750 3,936 3,964 3,964 4,208
60310 Health Insurance 34,655 33,107 31,977 32,348 32,348 33,465
60320 Dental Insurance 1,643 1,660 2,109 1,960 1,960 2,140
60330 Life Insurance 145 127 129 80 80 80
60340 Long- T= Disability 736 706 738 712 712 755
60410 PERA 15,877 14,700 15,422 16,403 16,403 18,146
60520 Workers Comp 2,908 2,889 2,888 3,417 3,417 4,355
60990 Inter-City Labor Allocation 600 52,792 52,792 61,496
Salaries & Benefits 393,999 339.472 360,137 401,995 401,995 432.967
Departmental
61005 Supplies - General 3,027 3,141 3,511 3,750 3,750 3,250
61010 Supplies - Printed Forms 1,936 2,611 1,601 1,500 1,500 2,000
61020 Supplies - Operating 1,671 866 351 1,000 1,000 1,000
61220 Software 860 1,500 1,500
61310 Meals / Lodging 540 23 152 800 800 800
61315 Continuing Education 1,445 2,677 2,117 2,000 2,000 2,000
61320 Annual Dues / Licenses 841 325 60 2,000 2,000 2,000
61405 Postage 1,576 1,618 1.174 2,000 2,000 2,000
61410 Transportation / Mileage 442 193 318 700 700 700
Departmental 11,478 11,454 10,143 15,250 15,250 13,750
Operating
62030 Telephone 2,132 1,913 1,316 2,500 2,500 2,500
62100 Insurance 1,192 1,195 1,221 1,258 1,258 1,321
62200 Rentals 3,338 3,443 3,491 3,450 3,450 3,450
62205 Central Equipment Services 8,174 8,175 8,424 8,677 8,677 9,545
" 62305 Software Maintenance Contract 984 2,488 1,935 2,500 2,500 2,500
Operating 15.820 17,214 16,388 18,385 18,385 19,316
Professional Services
63005 Professional Services 4,545 20,043 28,669 23,000 23,000 23,000
63025 Publishing 177 117 300 300 300
63100 R & M Labor - General 197 1,589 300 300 300
Professional Services 4,919 21,632 28,786 23,600 23,600 23,600
Total 426,216 389,772 415,454 459,230 459,230 489,633
211
811612006
CITY OF ANDOVER
Budget Worksheet - 2007
Function: Public Safety Civil Defense - 42400
Account Actual Actual Actual Budget Estimate Requested
Number Description 2003 2004 2005 2006 2006 2007
Salaries & Benefits
60110 Salaries - Regular 4,098 2,988 3,161
60210 FICA 162 176 181
60220 Medicare 38 41 42
60310 Health Insurance 294 400 380
60320 Dental Insurance 13 16 18
60330 Life Insurance I I I
60340 Long-Term Disability 7 8 8
60410 PERA 145 165 169
60990 Inter-City Labor Allocation (600) 4,318 4,318 4,915
Salaries & Benefits 4.758 3,195 3,961 4,318 4,318 4,915
Departmental
61005 Supplies - General 50 50 50
61020 Supplies - Operating 25 25 1,025
61105 R & M Supplies - General 75 1,000 1,000 1,000
Departmental 75 1,075 1,075 2,075
Operating
62005 Electric 703 703 642 750 750 750
62030 Telephone 25 25 25
62100 Insurance 649 651 665 685 685 719
62300 Equipment Maintenance Contra 2,336 2,376 5,600 5,600 6,392
Operating 1,352 3,690 3,683 7,060 7,060 7,886
Professional Services
63100 R & M Labor - General 471 3,274 2,064 3,000 3.000 6,000
Professional Services 471 3,274 ' 2,064 3.000 3.000 6,000
Capital Outlay
65600 Equipment
Capital Outlay
Total 6,656 10,159 9,708 15,453 15,453 20,876
27
8/1 6/2006
CITY OF ANDOVER
Budget Worksheet - 2007
Function: Public Safety Animal Control- 41500
Account Actual Actual Actual Budget Estimate Requested
Number Description 2003 2004 2005 2006 2006 2007
Departmental
61010 Supplies - Printed Forms 100 351 50 50 50
61020 Supplies - Operating 243 130 86 90 90 150
Departmental 343 130 437 140 140 200
Professional Services
63005 Professional Services 663 499 546 450 450 600
63010 Contractual Services 7,656 7,111 7,464 8,700 7,500 8,700
63020 Gopher Feel 129 18 150 150 150
63030 Printing 25 25 30
Professional Services 8,319 7,739 8,028 9,325 8,125 9,480
Total 8,662 7,869 8,464 9,465 8,265 9,680
28
811612006
CITY OF ANDOVER
Budget Worksheet - 2007
Function: Public Works Public Works Rollup
Account Actual Actual Actual Budget Estimate Requested
Number Description 2003 2004 2005 2006 2006 2007
Salaries & Benefits
60110 Salaries - Regular 816,433 854,212 992,523 908,232 908,232 961,680
60140 Salaries - Council / COmmiSSiOI 2,400 1,570 2,090 3,600 3,600 3,600
60210 FICA 48,913 51,286 53,135 56,534 56,534 59,846
60220 Medicare 11,440 11,994 12,427 13,225 13,225 13 ,995
60310 Health Insurance 86,662 100,091 107,644 122,955 122,955 122,705
60320 Dental Insurance 5,315 5,603 6,346 7,056 7,056 7,276
60330 Life Insurance 381 387 393 272 272 272
60340 Long-Term Disability 1,931 2,122 2.178 2,175 2,175 2,313
60410 PERA 42,759 41,182 45,762 54,493 54,493 60,110
60520 Workers Comp 8,257 11,322 9,469 11,352 11,352 14,426
60990 Inter-City Labor Allocation" (23,721) 169,646 169,646 179,773
Salaries & Benefits 1,024,491 1,056,048 1,231,969 1,349,540 1,349,540 1,425,996
Departmental
61005 Supplies - General 3,768 2,996 4,200 3,000 3,000 3,100
61020 Supplies - Operating 37,720 53,777 44,404 63,000 50,000 77,500
61025 Supplies - Cleaning 250 189 250 250 850
61030 Supplies - Signs 21,757 14,150 49,073 12,500 35,000 22,500
61105 R & M Supplies - General 16,395 12,362 20,445 29,650 29,650 31,150
61120 R & M Supplies - Building 250 2,500 37 250 250 250
61125 R & M Supplies - Streets 99,998 93,272 132,599 116,000 116,000 131,000
61130 R & M Supplies - Landscape 17,341 21,377 37,502 21,500 21,500 23,000
61205 Small & Expend - Small Tools 4,473 3,619 9,447 2,000 2,000 4,000
61310 Meals / Lodging 954 139 891 850 850 850
61315 Continuing Education 4,556
61320 Annual Dues / Licenses 4,044 4,146 1,890 5,800 3,500 4,300
61405 Postage 1,669 1,607 1,350 1,875 1,875 1,875
61410 Transportation / Mileage 345 245 845 775 775 875
Departmental 208,714 210,440 307,428 257,450 264,650 301,250
Operating
62005 Electric 188,639 192,828 198,047 209,000 206,000 209,000
62015 Natura1 Gas 46 1,385 659
62010 Water & Sewer Service 40,000
62020 Refuse Collection 5,033 5,909 6,010 6,250 6,250 7.250
62025 Stonn Water Utility Charge 283 566 544 500 500 500
62030 Te1epbone 7,219 7,514 8,212 9,000 8,000 8,000
62100 Insurance 28,756 28,828 29,656 30,545 30,545 32,072
62200 Rentals 6,775 10,679 15,187 13,500 10,500 10,500
62205 Central Equipment Services 190,734 175,546 183,560 199,067 199,067 218,930
62305 Software Maintenance Contract 800 800 840 1,000 1,000 1,000
Operating 428,285 424,055 442,715 468,862 461,862 527,252
Professional Services
63005 Professional Services 5,461 2,449 2,618 7,450 3,300 3,800
63010 Contractual Services 74,288 85,280 245,780 96,000 87,000 94,000
63025 Publishing 913 1,009 441 1,200 1,200 1,200
63100 R & M Labor - General 27,443 20,532 29,120 25,250 22,750 25,250
63110 R & M Labor - Streets 3,500 3,500 3,500
63200 Inspections 1,418 1,935 2,000 2,000 2,000
63300 Improvements - Streets 12,059 10,000 8,000 8.000
Professional Services 109,523 121,329 279,895 145,400 127,750 137,750
29
CITY OF ANDOVER
BudgetVVorksheet-2007
Function: Public Works Public Works Rollup
Account Actual Actual Actual Budget Estimate Requested
Number Description 2003 2004 2005 2006 2006 2007
Capital Outlay
65300 Improvements 43,167 1,763
65600 Equipment 21,409
Capital Outlay 64,576 1,763
Debt Service
66201 Assessment - Principal 8,498 2,225
Debt Service 8,498 2,225
Total 1,844.087 1,815.860 2.262,007 2,221,252 2,203.802 2,392,248
30
CITY OF ANDOVER
Budget Worksheet - 2007
Function: Public Works Streets & Highways - 43100
Account Actual Actual Actual Budget Estimate Requested
Number Description 2003 2004 2005 2006 2006 2007
Salaries & Benefits
60110 Salaries - Regular 212,928 243,244 298,214 477,389 477,389 506,443
60210 FICA 12,696 14,610 14,552 29,598 29,598 31,399
60220 Medicare 2,970 3,417 3,403 6,924 6,924 7,342
60310 Health Insurance 24,323 31,489 34,850 68,957 68,957 71,185
60320 Dental Insurance 1,515 1,746 1,933 3,528 3,528 3,852
60330 Life Insurance 107 119 119 144 144 144
60340 Long-Term Disability 531 628 640 1,201 1,201 1,275
60410 PERA 11,775 13,221 13,445 28,642 28,642 31,656
60520 Workers Comp 3,920 4,345 4,923 5,967 5,967 7,597
60990 Inter-City Labor Allocation (60,000) (17,721) (216,994) (216,994) (225,165)
Salaries & Benefits 210.765 295,098 372,078 405,356 405,356 435.728
Departmental
61005 Supplies - General 735 649 2,241 600 600 700
61020 Supplies - Operating 13,903 12,078 19,330 17,500 17,500 18,000
61105 R & M Supplies - General 3,485 1,034 5,220 7,000 7,000 7,000
61125 R & M Supplies - Streets 7,667 15,513 11,809 11,000 11,000 16,000
61205 Small & Expend - Small Tools 3,442 1,577 7,514 1,000 1,000 2,000
61310 Meals / Lodging 545 139 621 500 500 500
61315 Continuing Education 2,560
61320 Annual Dues / Licenses 2,186 2,563 1,137 3,000 1,200 2,000
61405 Postage 417 430 369 500 500 500
61410 Transportation / Mileage 23 216 210 200 200 200
Departmental 32,403 34,199 51,010 41,300 39,500 46,900
Opera1ing
62030 Telephone 3,854 3,850 4,098 4.000 4,000 4,000
62100 Insurance 15,901 15,940 16,280 16,768 16,768 17,606
62200 Rentals 229 1,896 6,840 5,000 2,000 2,000
62205 Central Equipment Services 42,025 26.839 27,656 38,486 38.486 42,335
Operating 62,009 48,525 54,874 64,254 61,254 65,941
Professional Services
63005 Professional Services 83 750 100 100
63010 Contractual Services 4,426 16,309 180,421 28,000 23,000 25,000
63025 Publishing 17 80 200 200 200
63100 R & M Labor - General 4,072 16 1,063 500 500 500
63110 R & M Labor - Streets 3,500 3,500 3,500
63200 Inspections 1,935
63300 Improvements - Streets 12,059 10,000 8,000 8,000
Professional Services 8,515 28,464 183,503 42,950 35,300 37,300
Capital Outlay
65600 Equipment 17,714
Capital Outlay 17,714
Total 331.406 406.286 661,464 553,860 541,410 585.869
~1
8/16/2006
CITY OF ANDOVER
Budget Worksheet - 2007
Function: Public Works Snow &: Ice - 43200
Account Actual Actual Actual Budget Estimate Requested
Number Description 2003 2004 2005 2006 2006 2007
Salaries & Benefits
60110 Salaries - Regular 166,428 148,077 179,064
60210 FICA 10,000 8,898 9,786
60220 Medicare 2,339 2,081 2,289
60310 Health Insurance 17,538 17,841 19,826
60320 Dental Insurance 1,023 945 1,139
60330 Life Insurance 78 68 73
60340 Long-Term Disability 410 403 431
60410 PERA 9,203 8,187 9,066
60990 Inter-City Labor Allocation 80,000 230,380 230,380 257,744
Salaries & Benefits 287,019 186,500 221.674 230,380 230,380 257,744
Departmental
61005 Supplies - General 476 855 310 500 500 500
61020 Supplies - Operating 3,100 5,661 2,139 4,000 4,000 4,000
6II05 R & M Supplies - General 3,239 4,872 5,034 6,000 6,000 7,500
61125 R & M Supplies - Streets 92,331 77,759 120,790 105,000 105,000 II 5,000
61320 Annual Dues / Licenses 255 375 300 300 300
Departmental 99.401 89,522 128,273 115,800 115,800 127,300
Operating
62030 Telephone 1,000
62100 Insurance 2,936 2,943 3,006 3,096 3,096 3,251
62205 Central Equipment Services 93,332 93,331 96,172 99,057 99,057 108,963
Operating 96,268 96,274 99,178 103, I 53 102,153 112,214
Professional Services
63005 Professional Services 600 1,000
63 100 R & M Labor - General 100 100 100
Professional Services 600 1,100 100 100
Total 483,288 372,296 449,125 450.433 448,433 497,358
32
8/1612006
CITY OF ANDOVER
Budget Worksheet - 2007
Function: Public Works Street Signs - 43300
Account Actual Actual Actual Budget Estimate Requested
Number Description 2003 2004 2005 2006 2006 2007
Salaries & Benefits
601I0 Salaries - Regular 63,260 66,094 76,916 46,126 46,126 48,859
60210 FICA 3,734 3,963 4,170 2,860 2,860 3,029
60220 Medicare 873 927 975 669 669 708
60310 Health Insurance 7,954 7,786 8,910 8,609 8,609 4,600
60320 Dental Insurance 410 428 469 392 392 428
60330 . Life Insurance 29 29 28 16 16 16
60340 Long-Term Disability 148 162 164 120 120 127
60410 PERA 3,256 460 3,453 2,768 2,768 3,054
60520 Workers Comp 412 3,379 481 577 577 733
60990 Inter-City Labor Allocation (6,000) 40,217 40,217 47,410
Salaries & Benefits 80,076 77,228 95,566 102,354 102,354 108,964
Departmental
61005 Supplies - General 310 100 100 100
61020 Supplies - Operating 1,586 12,760 3,442 16,500 5,000 28,500
61030 Supplies - Signs 21,757 14,150 49,073 12,500 35,000 22,500
61105 R & M Supplies - General 272 663 334 1,000 1,000 1,000
61205 Small & Expend - Small Tools 508 (244)
61310 Meals / Lodging 386
61315 Continuing Education 130
61320 Annual Dues / Licenses 645 112 98 1,000 1,000 1,000
61410 Transportation / Mileage 172 47 100 100 100
Departmental 24,818 28,193 53,190 31,200 42,200 53,200
Operating
62030 Telephone 122 225 568
62100 Insurance 135 136 139 143 143 150
62200 Rentals 500 500 500
62205 Central Equipment Services 7,259 7,259 7,480 7,704 7,704 8,474
62305 Software Maintenance Contract 800 800 840 1,000 1,000 1,000
Operating 8,316 8,420 9,027 9,347 9,347 10,124
Professional Services
63100 R & M Labor - General 1,998 18 250 250 1,250
63200 Inspections 500 500 500
Professional Services 1,998 18 750 750 1,750
Total 115,208 113,841 157,801 143,651 154,651 174,038
33
8116/2006
CITY OF ANDOVER
Budget Worksheet - 2007
Function: Public Works TraffIC Signals - 43400
Account Actual Actual Actual Budget Estimate Requested
Number Description 2003 2004 2005 2006 2006 2007
Operating
62005 Electric 18,305 13,101 8,154 17,000 14,000 14,000
Operating 18.305 13,101 8.154 17.000 14,000 14,000
Professional Services
63100 R & M Labor - General 3,385 6,780 6,110 6,000 6,000 6,500
Professional Services 3,385 6,780 6,1l0 6.000 6,000 6,500
Total 21.690 19,881 14,264 23,000 20,000 20,500
34
811612006
CITY OF ANDOVER
Budget Worksheet - 2007
Function: Public Works Street Lighting - 43500
Account Actual Actual Actual Budget Estimate Requested
Number Description 2003 2004 2005 2006 2006 2007
Operating
62005 Electric 26,115 28,694 27,954 29,000 29,000 30,000
Operating 26,115 28,694 27,954 29,000 29,000 30,000
Professional Services
63 100 R & M Labor - General 430 75 7,819 400 400 400
63200 Inspections 1,418 1,500 1,500 1,500
Professional Services 1,848 75 7,819 1,900 1,900 1,900
Capital Outlay
65300 Improvements 7,621
Capital Outlay 7,621
Total 35,584 28,769 35,773 30,900 30,900 31,900
35
8/1612006
CITY OF ANDOVER
Budget Worksheet - 2007
Function: Public Works Street Lights Billed - 43600
Account Actual Actual Actual Budget Estimate Requested
Number Description 2003 2004 2005 2006 2006 2007
Operating
62005 Electric 132,298 13 8,944 141,150 147,000 147,000 149,000
Operating 132,298 138,944 141,150 147,000 147,000 149,000
Professional Services
63010 Contractual Services 6,824 5,823 11,208 8,000 8,000 8,000
Professional Services 6,824 5,823 11,208 8,000 8,000 8,000
Total 139,122 144,767 152,358 155,000 155,000 157,000
36
811612006
CITY OF ANDOVER
Budget Worksheet - 2007
Function: Public Works Parks & Recreation - 45000
Account Actual Actual Actual Budget Estimate Requested
Number Description 2003 2004 2005 2006 2006 2007
Salaries & Benefits
60110 Salaries - Regular 319,614 341,342 380,719 343,478 343,478 363,694
60140 Salaries - Council I Commissior 2,400 1,570 2,090 3,600 3,600 3,600
60210 FICA 19,235 20,458 21,266 21,519 21,519 22,772
60220 Medicare 4,498 4,784 4,974 5,034 5,034 5,326
60310 Health Insurance 31,745 37,289 38,217 41,042 41,042 42,320
60320 Dental Insurance 1,937 2,043 2,326 2,744 2,744 2,568
60330 Life Insurance 137 141 144 96 96 96
60340 Long-Term Disability 705 782 796 747 747 800
60410 PERA 15,527 16,247 16,698 20,609 20,609 22,732
60520 Workers Comp 3,143 3,179 3,625 4,293 4,293 5,456
60990 Inter-City Labor Allocation (20,000) 114,997 114,997 10 1,965
Salaries & Benefits 378,941 427,835 470,853 558,159 558,159 571,329
Departmental
61005 Supplies - General 2,194 1,337 1,022 1,500 1,500 1,500
61020 Supplies - Operating 16,986 19,759 16,394 20,000 20,000 23,500
61025 Supplies - Cleaning 250 189 250 250 850
61105 R & M Supplies - General 9,399 5,793 9,857 15,000 15,000 15,000
61130 R & M Supplies - Landscape 17,341 21,377 37,502 21,500 21,500 23,000
61205 Small & Expend - Small Tools 1,031 1,534 2,178 1,000 1,000 2,000
61310 Meals I Lodging 175
61315 Continuing Education 1,379
61320 Annual Dues I Licenses 553 572 515 1,500 1,000 1,000
61405 Postage 626 614 491 700 700 700
61410 Transportation I Mileage 10 50 50 150
Departmental 48,130 51,236 69,710 61,500 61,000 67,700
Operating
62005 Electric 11,921 12,089 20,790 16,000 16,000 16,000
62010 Water & Sewer Service 40,000
62015 Natural Gas 46 1,385 659
62020 Refuse Collection 3,562 4,182 4,243 4,500 4,500 5,500
62025 Storm Water Utility Charge 283 566 544 500 500 500
62030 Telephone 3,243 3,439 3,546 4,000 4,000 4,000
62100 Insurance 9,784 9,809 10,231 10,538 10,538 11,065
62200 Rentals 6,546 8,783 8,347 8,000 8,000 8;000
62205 Central Equipment Services 47,703 47,703 51,826 53,381 53,381 58,719
Operating 83,088 87,956 100,186 96,919 96,919 . 143,784
Professional Services
63005 Professional Services 4,091 2,449 2,535 5,500 3,000 3,500
63010 Contractual Services 24,011 28,841 19,683 20,000 20,000 23,000
63100 R & M Labor - General 17,004 13,661 11,749 17,500 15,000 16,000
Professional Services 45,106 44,951 33,966 43,000 38.000 42,500
Capital Outlay
65300 Improvements 35,546 1,763
65600 Equipment 3.695
Capital Outlay 39,241 1,763
Debt Service
66201 Assessment - Principal 8,498 2.225
Debt Service 8,498 2,225
Total 603,004 615,966 674,716 759,578 754.078 825 313
liH:l006
37
CITY OF ANDOVER
Budget Worksheet - 2007
Function: Public Works Recycling - 46000
Account Actual Actual Actual Budget Estimate Requested
Number Description 2003 2004 2005 2006 2006 2007
Salaries & Benefits
60110 Salaries - Regular 54,203 55,455 57,611 41,239 41,239 42,684
60210 FICA 3,248 3,357 3,362 2,557 2,557 2,646
60220 Medicare 760 785 787 598 598 619
60310 Health Insurance 5,102 5,686 5,841 4,347 4,347 4,600
60320 Dental Insurance 430 441 479 392 392 428
60330 Life Insurance 30 30 29 16 16 16
60340 Long-Term Disability 137 147 148 107 107 111
60410 PERA 2,998 3,067 3,100 2,474 2,474 2,668
60520 Workers Comp 782 419 440 515 515 640
60990 Inter-City Labor Allocation 1,046 1,046 (2,181)
Salaries & Benefits 67,690 69,387 71,798 53,291 53,291 52,231
Departmental
61005 Supplies - General 363 155 317 300 300 300
61020 Supplies - Operating 2,145 3,519 3,100 5,000 3,500 3,500
61105 R & M Supplies - General 650 650 650
61120 R & M Supplies - Building 250 2,500 37 250 250 250
61310 Meals! Lodging 23 95 350 350 350
61315 Continuing Education 488
61320 Annual Dues! Licenses 405 524 140
61405 Postage 626 563 490 675 675 675
61410 Transportation! Mileage 150 29 578 425 425 425
Departmental 3,962 7,290 5,244 7,650 6,150 6,150
Operating
62020 Refuse Collection 1,471 1,727 1,767 1,750 1,750 1,750
62205 Central Equipment Services 415 414 426 439 439 439
Operating 1,886 2,141 2,193 2,189 2,189 2,189
Professional Services
63005 Professioual Services 770 200 200 200
63010 Contractual Services 39,027 34,307 34,469 40,000 36,000 38,000
63025 Publishing 896 929 441 1,000 1,000 1,000
63100 R & M Labor - General 554 2,362 500 500 500
Professional Services 41,247 35,236 37,272 41,700 37,700 39,700
Total 114,785 114,054 116,506 104,830 99,330 100,270
38
811612006
CITY OF ANDOVER
Budget Worksheet - 2007
Function: Other Other Rollup
Account Actual Actual Actual Budget Estimate Requested
Number Description 2003 2004 2005 2006 2006 2007
Professional Services
63900 Miscellaneous 3,441 6,544 5,383 5,000 5,000 5,000
63905 Contingency 22,424 15,447 4,415 18,000 15,000 15,000
Professional Services 25,865 21,991 9,798 23,000 20,000 20,000
Total 25,865 21,991 9,798 23,000 20,000 20,000
39
CITY OF ANDOVER
Budget Worksheet - 2007
Function: Other Unallocated - 49100
Account Actual Actual Actual Budget Estimate Requested
Number Description 2003 2004 2005 2006 2006 2007
Professional Services
63900 Miscellaneous 3,441 6,544 5,383 5,000 5,000 5,000
63905 Contingency 22,424 15,447 4,415 18,000 15,000 15,000
Professional Services 25.865 21,991 9,798 23,000 20,000 20,000
Total 25,865 21,991 9,798 23,000 20,000 20,000
40
8/1612006